Many of the materials generated from your project can be recycled. You are required to list materials that will be reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing this form, please contact Waste Management at (760) 929 -9400, a certified C&D recycler, or the Carlsbad Building Division at (760) 602 -2700. Please note: Unless you are self -hauling, Waste Management or approved haulers must be used for all construction projects within the City of Carlsbad.
Applicant Information
Permit No. Project Title
Project Address APN
Owner Contractor Architect Other
Applicant Name
Last First
Applicant Address
Phone ( ) E-mail Address
Applicant Mailing Address
(if different than project address)
Project Type
(check all that apply):
Residential Commercial Public Building Industrial
Brief Description
Project Size Estimated Cost of Project $
(square footage)
Please check the appropriate box:
I plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction.
I plan on self-hauling to a certified recycling facility and will provide all receipts after construction.
This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE MANAGEMENT .
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief.
Print Name ___Signature _____Date
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Attachment "C" (cont'd)
Development Services
DEBRIS RECYCLING ESTIMATE:
SECTION A Permit No. Project Title
Project Address APN
Applicant Name Phone ( )
Last First
SECTION B Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
Material Type Estimated
Waste Quantity
(tons)
A
Place a (ü) check
next to items to be
reused or salvaged
B
Place a (ü) check next
to items to be
recycled
C
Place a (ü) check next
to items to be
disposed at landfill
Complete this line of the table only if
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Asphalt & Concrete
Brick / Masonry / Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Carpet
Carpet Padding / Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Roofing Materials
Scrap Metal
Stucco
Other:
TOTAL =
SECTION C
To meet 65% Diversion Requirement (estimate) x 0.65 = tons Total Estimated Waste from above Minimum Required Diversion Contractor/Owner Signature Date
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will (cont’d) not be issued without a completed Construction Waste Management Plan.
Rev. 11/12/18
Attachment "C" (cont'd)
Rev. 2.10.21
Category Material
Mixed Debris Construction
Demolition
Asphalt/Concrete Asphalt (broken)
Concrete (broken)
Concrete (solid slab)
Brick/Masonry/Tile Brick (broken)
Brick (whole, palletized)
Masonry brick (broken)
Tile
Building Materials (cabinets, doors, windows, etc.)
Cardboard (flat)
Carpet By square foot
By cubic yard
Carpet Padding/Foam
Ceiling Tiles Whole (palletized)
Loose
Drywall (new or used) 1/2” (by square foot)
5/8” (by square foot)
Demo/used (by cu. yd.)
Landscape Debris (brush, trees, etc.)
Asphalt Composition
Shingles, asphalt Shingle
Unpainted Wood/Pallets By board foot
By cubic yard
Trash/Garbage
Other (estimated weight)
Column A
Volume
cy
cy
cy
cy
cy
cy
cy
cy
sq ft
cy
cy
sq ft
cy
sq ft
cy
cy
sq ft
sq ft
cy
cy
cy
bd ft
cy
cy
cy
cy
cy
cy
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Column B
Tons/Unit
0.18 1.19
0.70 1.20
1.30 0.70
1.51 0.60
0.00175
0.15 0.05
0.0005
0.30 0.000125
0.0003
0.09 0.0008
0.00105
0.25 0.15
0.22 0.001375
0.15 0.18
estimate
estimate
estimate
estimate
Total all
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Column C
Tons
Conversion Table for Common Construction Waste
This document is informational only. It is here to help you convert truckload quantities to tons, if necessary.
Attachment "C" (cont'd)
BLDG. 3
SITE PLAN
PROJECT INFORMATION
SHEET INDEX
SHT NO. TITLE
ARCHITECTURAL
A0.1 SITE PLAN / PROJECT INFORMATION
A0.2 GENERAL NOTES / STORM WATER BMPS
A0.3 ACCESSIBILITY AND FINISH NOTES
A1.1 BUILDING 3 - ORIENTATION AND EXISTING WALL TYPE PLAN A2.1 BUILDING 3 - FAMILY RESTROOM DEMO PLAN
A2.2 BUILDING 3 - FAMILY RESTROOM REPAIR PLAN
A2.3 BUILDING 3 - MEN'S / WOMEN'S SHOWER ROOM DEMO PLAN A2.4 BUILDING 3 - MEN'S / WOMEN'S SHOWER ROOM REPAIR PLAN A2.5 BUILDING 3 - MEN'S / WOMEN'S LOCKER ROOM DEMO PLAN A2.6 BUILDING 3 - MEN'S / WOMEN'S LOCKER ROOM REPAIR PLAN A2.7 BUILDING 3 - FLOOR FINISH REPAIR PLAN
A3.1 WALL TYPE DETAILS
A3.2 WALL TYPE DETAILS
A3.3 WALL TYPE DETAILS
A3.4 WALL DETAILS
A3.5 DETAILS
STRUCTURAL
S1 BUILDING 3 - STRUCTURAL NOTES AND DETAILS
SITE PLAN
SCALE: N.T.S
VICINITY MAP
NOT TO SCALEN
N
PROJECT SUMMARY
BUILDING #3 - MEN'S AND WOMEN'S LOCKER ROOM AND SHOWER AREAS,
INCLUDING FAMILY RESTROOM SHOWERS, TO BE REPAIRED AND RENOVATED,
INCLUDING FLOOR AND WALL TILE ASSEMBLIES, DUE TO FAILING WATERPROOFING. NEW WORK SHALL COMPLY WITH CURRENT ACCESSIBILITY REQUIREMENTS.
FLOOR AREA OF WORK: 2,730 S.F.
PROJECT NAME: ALGA NORTE PARK AQUATIC CENTER
BUILDING 3 SHOWER REPAIRS
PROJECT ADDRESS: 6565 ALICANTE ROAD, CARLSBAD, CA 92008 JURISDICTION:
CITY OF CARLSBAD
GOVERNING CODE: CALIFORNIA BUILDING CODES - 2022 EDITIONS
CALIFORNIA BUILDING CODE (CBC)
CALIFORNIA FIRE CODE (CFC)
CALIFORNIA MECHANICAL CODE (CMC)
CALIFORNIA PLUMBING CODE (CPC)
CALIFORNIA ELECTRICAL CODE (CEC)
CALIFORNIA GREEN BUILDING CODE (CGBC)
CALIFORNIA ENERGY CODE (CECC)
CONSTRUCTION TYPE:
TYPE V-B
OCCUPANCY CLASS: A-3, B, S-1
SPRINKLERED: YES
NUMBER OF STORIES: 1 STORY
HEIGHT OF BUILDING:
24'-11" PER RECORD DRAWINGS
LOT NUMBER: 5
ZONE: P-C (PLANNED COMMUNITY)
ACCESSOR'S PARCEL NO: 215-021-07
LEGAL DESCRIPTION: LOT 5 OF CARLSBAD TRACT NO. 99-03-LA COSTA GREENS, ACCORDING TO MAP NO. 14543, FILED IN
THE OFFICE OF THE COUNTY RECORDER OF THE
COUNTY OF SAN DIEGO ON FEBRUARY 12, 2003 IN
THE CITY OF CARLSBAD, COUNTY SAN DIEGO,
STATE OF CALIFORNIA.
ALGA NORTE PARK
BUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #:
DATE:
DRAWN BY:
CHECKED BY:
SCALE:
SHEET NUMBER:
18D020.00
26 AUG 2020
LB
DW/GM
AS NOTED
CITY PROJECT #: #4756
ALGA NORTE PARK AQUATIC CENTER
BUILDING 3 SHOWER REPAIRS
PACIFIC
OCEAN
PALOMAR AIRPORT RD.
POINSETTIA LANE
EL CAMINO
REAL
ALICANTE
ALGA
NORTE
PARK
MCCLELLAN
PALOMAR
AIRPORT
AVIARA
PARKWAY
ALGA ROAD
LA COSTA AVE
LA
COSTA
GOLF
COURSE
A0.1
1 03 DEC 2021 P.C. REVISION
2 12 SEP 2023 P.C. REVISION
2012 ALGA NORTE PARK ORIGINAL
CONSTRUCTION DRAWINGS
(AVAILABLE THROUGH CITY ENGINEER)
SITE:
· CIVIL (GRADING & DRANAIGE)
· AQUATIC ELEMENTS (POOLS)
· LANDSCAPE & IRRIGATION
· SKATE PARKS
BUILDINGS:
· ARCHITECTURE
· STRUCTURAL
· MECHANICAL
· PLUMBING
· ELECTRICAL
· FOOD SERVICE
ADDITIONAL DRAWINGS FOR REFERENCE ONLY
2 2
2 2
3 26 SEP 2023 CLIENT REVISION
PROJECT DATA
OWNER:
CITY OF CARLSBAD PARKS AND RECREATION
DEPARTMENT
799 PINE AVENUE
CARLSBAD, CA 92008
CONTACT:
MOLLY AMENDT, PE
CITY OF CARLSBAD PUBLIC WORKS
1635 FARADAY AVENUE
CARLSBAD, CA 92008
(760) 573-3368
ARCHITECT
DOUGLAS A. WHITMORE, AIA
KERSTEN GEMBALLA
WHITMORE ARCHITECTS
5675 RUFFIN ROAD, SUITE 350
SAN DIEGO, CALIFORNIA 92123
(619) 232-4575
CONSULTING STRUCTURAL ENGINEER
STEPHEN KERR, S.E.
JOSEPHSON-WERDOWATZ & ASSOCIATES, INC.
6370 LUSK BOULEVARD, SUITE F200
SAN DIEGO, CALIFORNIA 92121
(858) 558-2181
PROJECT DIRECTORY
4 26 OCT 2023 P.C. REVISION
5 14 NOV 2023 P.C. REVISION
CBC2023-0083
1.THE CONTRACT DOCUMENTS REPRESENT THE ENTIRE AGREEMENTBETWEEN THE OWNER AND THE CONTRACTOR FOR COMPLETECONSTRUCTION OF THIS PROJECT.2.THE CONTRACT DOCUMENTS INCLUDE THE DRAWINGS, CONSTRUCTIONAGREEMENT, INCLUDING GENERAL CONDITIONS AND SPECIALCONDITIONS OF THE CONTRACT, ADDENDA, SCHEDULES, CHANGEORDERS, AND ALL FEDERAL, STATE AND LOCAL CODES ANDREGULATIONS PERTAINING TO THE PRACTICE OF CONSTRUCTION.3.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL MEANS,METHODS, SCHEDULES, SEQUENCING, EXECUTION AND COORDINATIONOF WORK INDICATED IN THE CONTRACT DOCUMENTS.4.THE DRAWINGS ARE BASED ON AVAILABLE RECORD DRAWINGS ANDINFORMATION PROVIDED BY THE OWNER.5.THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT INWRITING OF ANY DISCREPANCIES, ERRORS OR OMISSIONS IN THECONSTRUCTION DOCUMENTS PRIOR TO SUBMISSION OF COSTPROPOSALS OR CONSTRUCTION SO THAT INSTRUCTIONS CAN BEISSUED TO THE CONTRACTOR PRIOR TO PROCEEDING.6.THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT INWRITING, IN THE EVENT UNUSUAL, LATENT OR UNKNOWN CONDITIONSOR UTILITIES ARE ENCOUNTERED WHICH MIGHT AFFECT THE WORK TOFOLLOW, OR WHERE EXISTING CONDITIONS DIFFER FROM THOSEINDICATED, SO THAT INSTRUCTIONS CAN BE ISSUED TO THECONTRACTOR PRIOR TO PROCEEDING.7.THE CONTRACTOR SHALL PROVIDE CURRENT COPIES OF THEFOLLOWING DOCUMENTS TO THE OWNER PRIOR TO THECOMMENCEMENT OF WORK:A. STATE OF CALIFORNIA CONTRACTOR'S LICENSE, INDICATING TYPE, NUMBER AND EXPIRATION DATE.B. BUSINESS LICENSE IN THE CURRENT JURISDICTION.C. WORKER'S COMPENSATION INSURANCE CERTIFICATE.D. GENERAL LIABILITY INSURANCE CERTIFICATE BROAD-FORM) NAMING THE CITY OF CARLSBAD AND ARCHITECT AS ADDITIONAL INSUREDS.8.THE CONTRACTOR'S WORK AND WORKMANSHIP SHALL BE OF THE BESTQUALITY THROUGHOUT FOR EACH CRAFT OR TRADE INVOLVED.9.THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING OF ANYWORK THAT CANNOT BE GUARANTEED AS SPECIFIED.10.DRAWINGS ARE SCHEMATIC IN NATURE AND MAY SHOW ADJOININGMATERIAL WITH EXAGGERATED SEPARATIONS TO DEPICT LAPS,OFFSETS AND SEALS. DO NOT SCALE DRAWINGS.11.VERIFY ALL DIMENSIONS, CONDITIONS, QUANTITIES, ETC. - OBTAINARCHITECT'S DIRECTION AS TO DESIGN INTENT IN THE EVENT OFCONFLICT OR INTERFERENCE.12.VERIFY ALL MATERIAL PATTERNS, FIXTURE AND JOINT LOCATIONS,OBJECT PLACEMENT, ETC. WITH ARCHITECT BEFORE FABRICATION ORINSTALLATION TO ENSURE PROPER ALIGNMENT AND SYMMETRY AREPROVIDED TO ARCHITECT'S SATISFACTION.13.DRAWING DETAILS AND KEYNOTES ARE TYPICAL FOR SIMILARCONDITIONS. WHERE DETAILS ARE NOT SHOWN FOR ANY PART OF THEWORK, CONSTRUCTION SHALL BE SIMILAR TO OTHER WORK, AND INACCORDANCE WITH MANUFACTURER AND INDUSTRY STANDARDS.14.THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER ANDARCHITECT, BOTH ORALLY AND IN WRITING, UPON DISCOVERY OF ANYUNANTICIPATED CONDITION DURING CONSTRUCTION, SUCH AS THEPRESENCE OF DECAY, MOLD, FUNGUS, ASBESTOS OR OTHERPOTENTIALLY HAZARDOUS CONDITION. THE CONTRACTOR SHALLSUSPEND FURTHER WORK AT THE AFFECTED AREA(S) UNTIL THEOWNER AND ARCHITECT PROVIDE A WRITTEN DIRECTIVE REGARDINGTHE AFFECTED WORK. THE SUSPENSION OF WORK SHALL NOTCONSTITUTE A BASIS FOR A CONTRACT TIME EXTENSION NOR FORADDITIONAL COMPENSATION, UNLESS THE DELAY IN THE DIRECTIVECONCERNING THE METHOD OF PROCEEDING IS NOT RECEIVED BY THECONTRACTOR FROM THE OWNER AND ARCHITECT OF THE DISCOVERYOF THE UNANTICIPATED CONDITION.15.THE CONTRACTOR SHALL NOTIFY AN APPROVED "DIG ALERT/UTILITYMARK-OUT SERVICE", PRIOR TO EXCAVATION OR INTRUSIVE WORKWHERE WORK MAY AFFECT EXISTING UTILITIES.16.THE CONTRACTOR SHALL COORDINATE UTILITY OUTAGES WITH THEOWNER TO COMPLETE WORK AS SPECIFIED.17.THE PROJECT PREMISES SHALL REMAIN ACCESSIBLE AND HABITABLEDURING CONSTRUCTION AS SPECIFIED. THE CONTRACTOR SHALL:A.SCHEDULE WORK ACCESS, SEQUENCE AND TIME PERIODSAFFECTING OCCUPANTS, PURSUANT TO OWNER'S REVIEWAND APPROVAL.B.MOVE, PROTECT AND REPOSITION FURNISHINGS TO COMPLETE WORK.C.MAINTAIN DUST CONTROL AND CONTAINMENTS TO COMPLETEWORK.D.PROVIDE CONTINUOUS PROTECTION FOR CONSTRUCTIONPATH-OF-TRAVEL.18.THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, PRODUCTS,SERVICES, ETC. REQUIRED FOR COMPLETE AND PROPER WORK,UNLESS NOTED OTHERWISE (UNO). THE OWNER WILL FURNISH, ANDTHE CONTRACTOR SHALL INSTALL, CERTAIN FIXTURES, MATERIALS ANDPRODUCTS WHERE INDICATED ON DRAWINGS .19.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINETHE CONTRACT DOCUMENTS AND SITE TO DETERMINE THE NATUREAND EXTENT OF THE WORK TO BE PERFORMED AND OPERATIONSREQUIRED TO EXECUTE THE WORK.20.THE FAILURE OR OMISSION OF THE CONTRACTOR TO VISIT THE SITE,AND BECOME FAMILIAR WITH THE EXISTING CONDITIONS SHALL IN NOWAY RELIEVE THE CONTRACTOR FROM OBLIGATIONS WITH RESPECTTO THE CONTRACT.21.THE INFORMATION INDICATED ON THE DRAWINGS REPRESENTS THECURRENT INFORMATION AVAILABLE REGARDING THE CHARACTER ANDLOCATION OF EXISTING CONDITIONS, CONSTRUCTION, DETAILS,FINISHES AND MATERIALS WHICH MAY BE ENCOUNTERED.22.IT IS EXPRESSLY UNDERSTOOD AND AGREED THAT THE OWNERASSUMES NO RESPONSIBILITY WHATSOEVER REGARDING THEACCURACY OR SUFFICIENCY OF THE DRAWINGS OR THEINTERPRETATION THEREOF.23.THERE IS NO GUARANTEE OR WARRANTY, EITHER EXPRESSED ORIMPLIED, THAT CONDITIONS AND LOCATIONS INDICATED AREREPRESENTATIVE OF ALL SIMILAR CONDITIONS AND LOCATIONSPRESENT ON THE SITE, OR THAT UNKNOWN, UNFORESEEN, ORCONFLICTING CONDITIONS, WHICH AFFECT THE WORK, ARE NOTPRESENT ON THE SITE.24.CONDUITS, ELECTRICAL BOXES, LIGHTING, FIRE ALARM SYSTEM, ETC.MAY BE DETACHED TO FACILITATE REPAIRS. THE FUNCTIONS OF THECONDUITS, BOXES, FIRE ALARM SPRINKLER SYSTEMS ARE TO BEMAINTAINED DURING CONSTRUCTION, EXCEPT AS OTHERWISE NOTEDHEREIN.25.THE EGRESS PATH SHALL REMAIN FREE AND CLEAR OF ALLOBSTRUCTIONS AT ALL TIMES. NO STORAGE IS PERMITTED IN ANYEGRESS PATHS.26.PAINTING OF SURFACES AND MATERIALS ARE TO MATCH THE EXISTINGCONDITIONS IN COLOR AND SHEEN. THE GENERAL CONTRACTOR SHALLSUBMIT COLOR SAMPLES, FOR REVIEW AND APPROVAL, TO THEARCHITECT.27.THIS BUILDING, AND ITS APPURTENANCES, MAY CONTAIN CONDITIONSWITH GUARDRAILS THAT DO NOT COMPLY WITH CODE, OR CONDITIONSTHAT DO NOT HAVE CODE-REQUIRED GUARDRAILS. CONTRACTORSHALL ADDRESS SAFETY ISSUES ARISING FROM THESE CONDITIONSTHROUGHOUT THE DURATION OF THE PROJECT.28.THE CONTRACTOR SHALL BE RESPONSIBLE FOR JOB SITE SAFETY,INCLUDING BUT NOT LIMITED TO ERECTION AND MAINTENANCE OFSAFETY BARRICADES. THE CONTRACTOR SHALL BE RESPONSIBLE FORCOMPLYING WITH APPLICABLE HEALTH AND SAFETY STANDARDS, LAWS,CODES AND REGULATIONS.29.ALL PROJECT WORK SHALL BE FURNISHED PER SPECIFICATIONS.30.ALL PROJECT WORK SHALL BE IN COMPLIANCE WITH CFC CHAPTER 33,FIRE SAFETY DURING CONSTRUCTION.31.CONTRACTOR TO CONFIRM ALL MOLD REMEDIATION IS COMPLETEPRIOR TO START OF REPAIRS.32.CONTRACTOR TO TEMPORARILY SHUT OFF & CAP ALL UTILITY LINES INAREAS OF REPAIRS33.CONTRACTOR TO PROVIDE TEMPORARY SHORING AT WALLSREQUIRING REPAIRS.34.CONTRACTOR TO PROVIDE COMPREHENSIVE 'BUMPER-TO-BUMPER'WARRANTY FOR A PERIOD OF TWO YEARS FROM FINAL ACCEPTANCEOF THIS WORK. THIS INCLUDES WORKMANSHIP WARRANTY FOR ALLLABOR AND MATERIAL TO REPLACE OR REPAIR DEFECTIVE WORK, INADDITION TO ALL MANUFACTURER'S PRODUCT WARRANTIES PROVIDED THIS PROJECT SHALL COMPLY WITH ALL CURRENT REQUIREMENTS OF THE STATEPERMIT; CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD (SDRWQCB), SANDIEGO MUNICIPAL STORM WATER PERMIT, THE CITY OF SAN DIEGO LAND DEVELOPMENTCODE, AND THE STORM WATER STANDARDS MANUALPRIOR TO ANY DISTURBANCE, TEMPORARY SEDIMENT CONTROLS SHALL BE INSTALLEDBY THE CONTRACTOR OR QUALIFIED PERSON(S) AS INDICATED BELOW:1.ALL REQUIREMENTS OF THE CITY OF SAN DIEGO "STORM WATER STANDARDSMANUAL" MUST BE INCORPORATED INTO THE DESIGN AND CONSTRUCTION OF THEPROPOSED GRADING/IMPROVEMENTS CONSISTENT WITH THE APPROVED STORMWATER POLLUTION PREVENTION PLAN (SWPPP) AND/OR WATER POLLUTIONCONTROL PLAN (WPCP) FOR CONSTRUCTION LEVEL BMPS AND, IF APPLICABLE, THESTORM WATER QUALITY MANAGEMENT PLAN (SWQMP) FOR POST-CONSTRUCTIONBMPS.2.THE CONTRACTOR SHALL INSTALL AND MAINTAIN ALL STORM DRAIN INLETPROTECTION. INLET PROTECTION IN THE PUBLIC RIGHT-OF-WAY MUST BETEMPORARILY REMOVED PRIOR TO A RAIN EVENT TO ENSURE NO FLOODING OCCURSAND REINSTALLED AFTER RAIN IS OVER.3.ALL CONSTRUCTION BMPS SHALL BE INSTALLED AND PROPERLY MAINTAINEDTHROUGHOUT THE DURATION OF CONSTRUCTION.4.THE CONTRACTOR SHALL ONLY GRADE, INCLUDING CLEARING AND GRUBBING,AREAS FOR WHICH THE CONTRACTOR OR QUALIFIED CONTACT PERSON CANPROVIDE EROSION AND SEDIMENT CONTROL MEASURES.5.THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SUB-CONTRACTORSAND SUPPLIERS ARE AWARE OF ALL STORM WATER BMPS AND IMPLEMENT SUCHMEASURES. FAILURE TO COMPLY WITH THE APPROVED SWPPP/WPCP WILL RESULT INTHE ISSUANCE OF CORRECTION NOTICES, CITATIONS, CIVIL PENALTIES, AND/ORSTOP WORK NOTICES.6.THE CONTRACTOR OR QUALIFIED CONTACT PERSON SHALL BE RESPONSIBLE FORCLEANUP OF ALL SILT, DEBRIS, AND MUD ON AFFECTED AND ADJACENT STREET(S)AND WITHIN STORM DRAIN SYSTEM DUE TO CONSTRUCTION VEHICLES/EQUIPMENTAND CONSTRUCTION ACTIVITY AT THE END OF EACH WORK DAY.7.THE CONTRACTOR SHALL PROTECT NEW AND EXISTING STORM WATER CONVEYANCESYSTEMS FROM SEDIMENTATION, CONCRETE RINSE, OR OTHERCONSTRUCTION-RELATED DEBRIS AND DISCHARGES WITH THE APPROPRIATE BMPSTHAT ARE ACCEPTABLE TO THE CITY RESIDENT ENGINEER AND AS INDICATED IN THESWPPP/WPCP.8.THE CONTRACTOR OR QUALIFIED CONTACT PERSON SHALL CLEAR DEBRIS, SILT, ANDMUD FROM ALL DITCHES AND SWALES PRIOR TO AND WITHIN 3 BUSINESS DAYSAFTER EACH RAIN EVENT OR PRIOR TO THE NEXT RAIN EVENT, WHICHEVER ISSOONER.9.IF NON-STORM WATER DISCHARGE LEAVES THE SITE, THE CONTRACTOR SHALLIMMEDIATELY STOP THE ACTIVITY AND REPAIR THE DAMAGES. THE CONTRACTORSHALL NOTIFY THE CITY RESIDENT ENGINEER OF THE DISCHARGE, PRIOR TORESUMING CONSTRUCTION ACTIVITY. ANY AND ALL WASTE MATERIAL, SEDIMENT,AND DEBRIS FROM EACH NON-STORM WATER DISCHARGE SHALL BE REMOVED FROMTHE STORM DRAIN CONVEYANCE SYSTEM AND PROPERLY DISPOSED OF BY THECONTRACTOR.
10.EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE ATALL TIMES. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ONSITE ATCONVENIENT LOCATIONS TO FACILITATE RAPID DEPLOYMENT OF CONSTRUCTIONBMPS WHEN RAIN IS IMMINENT.11.THE CONTRACTOR SHALL RESTORE AND MAINTAIN ALL EROSION AND SEDIMENTCONTROL BMPS TO WORKING ORDER YEAR-ROUND.12.THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION AND SEDIMENT CONTROLMEASURES DUE TO UNFORESEEN CIRCUMSTANCES TO PREVENT NON-STORMWATER AND SEDIMENT-LADEN DISCHARGES.13.THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARYPRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDEDWATERS CREATE A HAZARDOUS CONDITION.14.ALL EROSION AND SEDIMENT CONTROL MEASURES PROVIDED PER THE APPROVEDSWPPP/WPCP SHALL BE INSTALLED AND MAINTAINED. ALL EROSION AND SEDIMENTCONTROLS FOR INTERIM CONDITIONS SHALL BE PROPERLY DOCUMENTED ANDINSTALLED TO THE SATISFACTION OF THE CITY RESIDENT ENGINEER.15.AS NECESSARY, THE CITY RESIDENT ENGINEER SHALL SCHEDULE MEETINGS FORTHE PROJECT TEAM (GENERAL CONTRACTOR, QUALIFIED CONTACT PERSON,EROSION CONTROL SUBCONTRACTOR IF ANY, ENGINEER OF WORK,OWNER/DEVELOPER, AND THE CITY RESIDENT ENGINEER) TO EVALUATE THEADEQUACY OF THE EROSION AND SEDIMENT CONTROL MEASURES AND OTHER BMPSRELATIVE TO ANTICIPATED CONSTRUCTION ACTIVITIES.16.THE CONTRACTOR OR QUALIFIED CONTACT PERSON SHALL CONDUCT VISUALINSPECTIONS AND MAINTAIN ALL BMPS DAILY AND AS NEEDED. VISUAL INSPECTIONSAND MAINTENANCE OF ALL BMPS SHALL BE CONDUCTED BEFORE, DURING ANDAFTER EVERY RAIN EVENT AND EVERY 24 HOURS DURING ANY PROLONGED RAINEVENT. THE CONTRACTOR SHALL MAINTAIN AND REPAIR ALL BMPS AS SOON ASPOSSIBLE AS SAFETY ALLOWS.17.CONSTRUCTION ENTRANCE AND EXIT AREA. TEMPORARY CONSTRUCTION ENTRANCEAND EXITS SHALL BE CONSTRUCTED IN ACCORDANCE WITH CASQA FACT SHEET TC-1OR CALTRANS FACT SHEET TC-01 TO PREVENT TRACKING OF SEDIMENT AND OTHERPOTENTIAL POLLUTANTS ONTO PAVED SURFACES AND TRAVELED WAYS. WIDTHSHALL BE 10' OR THE MINIMUM NECESSARY TO ACCOMMODATE VEHICLES ANDEFFECTIVELY MANAGED PER THE SAN DIEGO MUNICIPAL CODE CHAPTER 4, ARTICLE3, DIVISION 3 "STORM WATER MANAGEMENT AND DISCHARGE CONTROL". Updated 10/1/2018 STORM WATER QUALITY NOTES - CONSTRUCTION BMPs
ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:18D020.0026 AUG 2020LBDW/GMAS NOTED CITY PROJECT #: #4756GENERAL NOTESA0.2
GENERAL NOTES
1. SHOWER COMPARTMENTS:a)SHOWER COMPARTMENTS TO BE FINISHED WITH A SMOOTH,NONABSORBENT SURFACE TO HEIGHT NOT LESS THAT 72INCHES ABOVE THE DRAIN INLET. CBC 1210.3b)FLOOR OR GROUND SURFACE OF THE SHOWERS TO COMPLY WITHTHE FOLLOWING PER CBC 11B-608.9i)FLOOR AND GROUND SURFACE SHALL BE STABLE, FIRM, AND SLIP RESISTANT PER CBC 11B-302.1ii) FLOOR AND GROUND SURFACE SHALL BE SLOPED 1:48 MAXIMUM IN ANY DIRECTIONiii) WHERE THE DRAINS ARE PROVIDED, THE GRATE OPENINGS SHALLBE 1/4" MAXIMUM AND FLUSH WITH THE FLOOR SURFACE.c)THRESHOLD OF THE ROLL-IN TYPE SHOWER COMPARTMENT TOHAVE A MAXIMUM 1/2" HIGH ENTRY THRESHOLD PER CBC11B-608.7.d)WATER CONTROLS OF A SINGLE LEVER DESIGN SHALL COMPLY WITHTHE FOLLOWING PER CBC 11B-608.5: I) OPERABLE WITH A MAXIMUM FORCE OF 5 POUNDS,II) MOUNTED AT 40 INCHES ABOVE THE SHOWER FLOOR, WITH THE CENTERLINE OF THE CONTROLS TO BE WITHIN A REACH OF 19 INCHES TO 27 INCHES FROM THE REAR EDGE OF THE SEAT.iii) THE HOSE OF THE SPRAY UNIT SHALL BE AT LEAST 59 INCHES LONG THAT ALLOWS IT BE USED AS BOTH A FIXED SHOWER HEAD AND AS A HAND-HELD SHOWER HEAD.iv) THE SHOWER SPRAY UNIT SHALL HAVE AN ON/OFF CONTROL WITH A NON-POSITIVE SHUT-OFF.v) IF AN ADJUSTABLE-HEIGHT SHOWER HEAD ON A VERTICAL BAR IS PROVIDED, THE BAR SHALL BE INSTALLED SO AS NOT TO OBSTRUCT THE USE OF THE GRAB BARS.vi) THE SHOWER SPRAY UNIT SHALL DELIVER WATER THAT IS 120 DEGREE FAHRENHEIT, MAXIMUM.vii) TOP OF THE MOUNTING BRACKET SHALL BE A MAXIMUM OF 48 I INCHES ABOVE THE SHOWER FLOOR PER CBC 11B-608.5e)SHOWER HAS A SEAT MOUNTED AND LOCATED PER ONE OFSECTION IN CBC 11B-608.3f)MOUNTING HEIGHT OF THE GRAB BAR TO BE 33 INCHES TO 36INCHES ABOVE THE SHOWER FLOOR, MEASURED FROM THEFINISHED FLOOR TO THE TOP OF THE GRIPPING SURFACE PERCBC 11B-608.4g)SOAP DISH TO BE MOUNTED A MAXIMUM OF 40 INCHES ABOVE THEFLOOR PER CBC 11B-608.102. URINALS:a.AT URINAL AND WATER CLOSET LOCATIONS, PROVIDE WALL ANDPARTITIONS WITHIN 2 FEET OF FIXTURES TO BE SMOOTH, HARD,NONABSORBENT TO A HEIGHT OF 4 FEET ABOVE FLOOR. CBC 1209.2b.URINALS SHALL BE THE STALL-TYPE OR WALL-HUNG TYPE WITH THERIM AT 17 INCHES MAXIMUM ABOVE THE FINISH FLOOR OR GROUND.CBC 11B-605.2c.URINAL SHALL BE 13.5-INCHES DEEP MINIMUM, MEASURED FROM THEOUTER FACE OF THE URINAL RIM TO THE BACK OF THE FIXTURE. CBC11B-605.2d.A CLEAR SPACE OF 30 INCHES WIDE AND 48 INCHES DEPTH SHALL BEPROVIDED FOR FORWARD APPROACH. CBC 11B-605.3 AND -305.3. WATER CLOSETS:a)WATER CLOSET SEAT SHALL BE LOCATED TO 17" TO 19" ABOVETHE FINISH FLOOR. CBC 11B-604.44. LAVATORY:i) PROVIDE KNEE AND TOE CLEARANCE IN ACCORDANCE WITH CBC 11B-306. CBC 11B-606.3.ii) PROVIDE EXPOSED PIPING UNDERNEATH THE LAVATORY TO BE INSULATED. CBC 11B-606.5.iii) PROVIDE 18" MINIMUM IS FROM CENTERLINE OF LAVATORY TO ADJACENT WALL. CBC 11B-606.6.
5. TOILET STALLS:a)AMBULATORY STALLS:i) A COMPARTMENT WITH A MINIMUM DEPTH OF 60 INCHES AND A WIDTH OF 35 TO 37 INCHES PER CBC 11B-604.8.2.1.ii) DOOR SHALL BE SELF-CLOSING CBC 11B-604.8.2.2,iii) WATER CLOSET COMPARTMENT PARTITIONS SHALL PROVIDE A TOE CLEARANCE OF 9 INCHES ABOVE THE FINISH FLOOR AND 6 INCHES DEEP MINIMUM BEYOND THE COMPARTMENT-SIDE FACE OF THE PARTITION, EXCLUSIVE OF PARTITION SUPPORT MEMBERS CBC 11B-604.8.1.4 iv) OPERABLE PARTS THAT ARE OPERABLE WITH ONE HAND DOES NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST PER CBC 11B-309.4. v) THE FORCE REQUIRED TO ACTIVATE OPERABLE PARTS SHALL BE 5-POUNDS MAXIMUM PER CBC 11B-309.3.1. vi) FOR ACCESSIBLE WATER CLOSETS - A MINIMUM CLEAR FLOOR SPACE OF 60" WIDE AND 48" DEEP MANEUVERING CLEARANCE IN FRONT OF THE WATER CLOSET. CBC 11B-604.3.16. GRAB BARS:a)PROVIDE GRAB BARS 42 INCHES LONG AT THE SIDE AND 36 INCHESLONG AT THE REAR OF THE WATER CLOSET, BETWEEN 33 AND 36INCHES ABOVE THE FLOOR. CBC 11B-609.4.7. RESTROOM ACCESSORIES:a)SPECIFY RESTROOM ACCESSORY, SUCH AS TOILET SEAT COVERDISPENSER, MIRROR, ETC., OPERABLE PARTS TO BE NO MORETHAN 40" ABOVE THE FINISH FLOOR PER CBC 11B-603.5.8. GYM LOCKERS:a.PROVIDE 5% BUT NOT LESS THAN ONE OF THE LOCKERS TO BEACCESSIBLE PER CBC 11B-222.1b.PROVIDE CLEAR FLOOR SPACE PER CBC 11B-811.2c.HEIGHT OF THE STORAGE ELEMENT SHALL COMPLY WITH ONE OF THEREACH RANGES PRESCRIBED IN CBC 11B-308 PER CBC 11B-811.3.d.OPERABLE PARTS THAT ARE OPERABLE WITH ONE HAND AND DOESNOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THEWRIST PER CBC 11B-309.4.e.THE FORCE REQUIRED TO ACTIVATE OPERABLE PARTS SHALL BE5-POUNDS MAXIMUM PER CBC 11B-309.4.9. SHOWER BENCH:BENCH TO HAVE A BACK SUPPORT OF 48" LONG MINIMUM AND MUST EXTENDFROM A POINT 2" MAXIMUM ABOVE THE SEAT SURFACE TO A POINT 18"MINIMUM ABOVE THE SEAT SURFACE. BACK SUPPORT SHALL BE 2-1/2"MAXIMUM FORM THE REAR EDGE OF THE SEAT MEASURED HORIZONTALLY.
ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:18D020.0026 AUG 2020LBDW/GMAS NOTED CITY PROJECT #: #4756ACCESSIBILITY ANDFINISH NOTESA0.32iLAVATORY KNEE CLEARANCE 212 SEP 2023 P.C. REVISION326 SEP 2023 CLIENT REVISION
NEW SHEET
ACCESSIBILITY AND FINISH NOTES
B
B
B.2
B2
C
C
D
D
D.8
D.8
E
E
3 33.2 3.2
5 55.2 5.2
ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:18D020.0026 AUG 2020LBDW/GMAS NOTED CITY PROJECT #: #4756BUILDING 3EXISTING ORIENTATION ANDEXISTING WALL TYPE PLANA1.1 NSCALE: 1/4" = 1'-0"ORIENTATION AND EXISTING WALL TYPE PLAN EXISTING WALL TYPESGENERAL NOTES:
326 SEP 2023 CLIENT REVISION3 3
;
;
;
FAMILY RESTROOM DEMOLITION KEYNOTES
ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:
18D020.0026 AUG 2020LBDW/GMAS NOTED
CITY PROJECT #: #4756
BUILDING 3FAMILY RESTROOMDEMO FLOOR PLAN
A2.1
S&ALE
FAMILY RESTROOM DEMO 3LAN
N
S&ALE
FAMILY RESTROOM DEMO INTERIOR ELE9ATIONSA%&D A
1 03 DEC 2021 P.C. REVISION
3326 SEP 2023 CLIENT REVISION
3 3
3 3
··
FAMILY RESTROOM REPAIR KEYNOTES
GENERAL NOTE:
ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:
18D020.0026 AUG 2020LBDW/GMAS NOTED
CITY PROJECT #: #4756
BUILDING 3FAMILY RESTROOMREPAIR FLOOR PLAN
A2.2 S&ALE:
FAMILY RESTROOM REPAIR INTERIOR ELE9ATIONS
S&ALE:
FAMILY RESTROOM REPAIR FLOOR PLAN
N
A%&' A
1 03 DEC 2021 P.C. REVISION
2 212 SEP 2023 P.C. REVISION
3 3
3 3
3 3
326 SEP 2023 CLIENT REVISION2
2 3
3 2
2 2
2 4
4 4 4
426 OCT 2023 P.C. REVISION
LEGEN'
234
5 5
5 5
55 5
55 514 NOV 2023 P.C. REVISION 5
5 ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:
18D020.0026 AUG 2020LBDW/GMAS NOTED
CITY PROJECT #: #4756
BUILDING 3MEN'S / WOMEN'S SHOWERROOM DEMO PLAN
A2.3
SCALE: 3/8" = 1'-0"SHOWER ROOMS - DEMO PLAN1
SCALE: 3/8" = 1'-0"WOMEN'S SHOWER ROOM - DEMO INTERIOR ELEVATIONS (MEN'S SIM.)2ABC N
SHOWER ROOM DEMOLITION KEYNOTES
3 326 SEP 2023 CLIENT REVISION
3 3
D
ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:
18D020.0026 AUG 2020LBDW/GMAS NOTED
CITY PROJECT #: #4756
BUILDING 3MEN'S / WOMEN'S SHOWERROOM REPAIR PLAN
A2.4
SCALE: 3/8" = 1'-0"SHOWER ROOMS - REPAIR PLAN1
SCALE: 3/8" = 1'-0"WOMEN'S SHOWER ROOM - REPAIR INTERIOR ELEVATIONS (MEN'S SIM.)2ABCD N
LEGEND
SHOWER ROOM REPAIR KEYNOTES
GENERAL NOTE:
3 3
3 326 SEP 2023 CLIENT REVISION
2 212 SEP 2023 P.C. REVISION
ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:18D020.0026 AUG 2020LBDW/GMAS NOTED CITY PROJECT #: #4756BUILDING 3MEN / WOMEN'S LOCKER ROOMDEMO PLANA2.5SCALE: 3/8" = 1'-0"LOCKER ROOM - DEMO PLAN1N
SHOWER ROOMDEMOLITION KEYNOTES
326 SEP 2023 CLIENT REVISION212 SEP 2023 P.C. REVISION
2 26 OCT 2023 P.C. REVISION4
43 ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:18D020.0026 AUG 2020LBDW/GMAS NOTED CITY PROJECT #: #4756BUILDING 3MEN'S / WOMEN'S RESTROOM &LOCKER ROOMREPAIR PLANA2.6LEGEND SHOWER ROOM REPAIR KEYNOTESGENERAL NOTES:
32 2
326 SEP 2023 CLIENT REVISION212 SEP 2023 P.C. REVISION
SCALE: 3/8" = 1'-0"LOCKER ROOM - REPAIR PLANN 1
33 3
3 3 3
2 44426 OCT 2023 P.C. REVISION2
2345
5 55514 NOV 2023 P.C. REVISION
5 555
01 enlarged floor tile layout plan1/4" = 1'-0"
ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:
18D020.0026 AUG 2020LBDW/GMAS NOTED
CITY PROJECT #: #4756
BUILDING 3FLOOR FINISHREPAIR PLAN
A2.7
LEGEND
FLOOR FINISH REPAIR LAYOUT
326 SEP 2023 CLIENT REVISION
33 ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:
18D020.0026 AUG 2020LBDW/GMAS NOTED
CITY PROJECT #: #4756
SCALE: 1-1/2"=1'-0"1WALL TYPE A DEMOLITION KEYNOTES REPAIR KEYNOTES SCALE: 1-1/2"=1'-0"2WALL TYPE B DEMOLITION KEYNOTES REPAIR KEYNOTES SCALE: 1-1/2"=1'-0"3WALL TYPE C DEMOLITION KEYNOTES REPAIR KEYNOTES SCALE: 1-1/2"=1'-0"4WALL TYPE D DEMOLITION KEYNOTES REPAIR KEYNOTES A3.1WALL TYPE DETAILS
ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:
18D020.0026 AUG 2020LBDW/GMAS NOTED
CITY PROJECT #: #4756
SCALE: 1"=1'-0"1WALL TYPE E DEMOLITION KEYNOTES REPAIR KEYNOTES SCALE: 1"=1'-0"3WALL TYPE G DEMOLITION KEYNOTES REPAIR KEYNOTES SCALE: 1"=1'-0"2WALL TYPE F DEMOLITION KEYNOTES REPAIR KEYNOTES A3.2WALL TYPE DETAILS
ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:
18D020.0026 AUG 2020LBDW/GMAS NOTED
CITY PROJECT #: #4756
SCALE: 1"=1'-0"1WALL TYPE GI DEMOLITION KEYNOTES REPAIR KEYNOTES SCALE: 1"=1'-0"2WALL TYPE H DEMOLITION KEYNOTES REPAIR KEYNOTES A3.3WALL TYPE DETAILS
ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:
18D020.0026 AUG 2020LBDW/GMAS NOTED
CITY PROJECT #: #4756
SCALE: 3"=1'-0"1BASE DETAIL @ WALL TYPE ASCALE: 3"=1'-0"4 SCALE: 3"=1'-0"2BASE DETAIL @ WALL TYPE BSCALE: 3"=1'-0"8 SCALE: 3"=1'-0"5 SCALE: 3"=1'-0"3BASE DETAIL @ WALL TYPE CSCALE: 3"=1'-0"6 SCALE: 3"=1'-0"7BASE DETAIL @ WALL TYPES G/G1
SCALE: 6"=1'-0"9WAINSCOT TOP A3.4WALL DETAILS
REFER TO TCNA B414-23
REFER TO TCNA B414-23
REFER TO TCNA B414-23 AND W221-23
REFER TO TCNA B414-23 AND W221-23REFER TO TCNA B414-23
REFER TO TCNA B414-23 AND W248-23REFER TO TCNA B414-23
REFER TO TCNA W248-23
BASE DETAIL @ WALL TYPE D
BASE DETAIL @ WALL TYPE E
BASE DETAIL @ WALL TYPE F
BASE DETAIL @ WALL TYPE H
ALGA NORTE PARKBUILDING 3 - SHOWER REPAIRS
REVISIONS:
PROJECT #: DATE:DRAWN BY:CHECKED BY:SCALE:SHEET NUMBER:
18D020.0026 AUG 2020LBDW/GMAS NOTED
CITY PROJECT #: #4756
SCALE: 6"=1'-0"1SHOWER DRAINSCALE: 3"=1'-0"4SOFFIT DETAIL (@ FAMILY RESTROOM) SCALE: 6"=1'-0"2SHOWER WALL TOP
SCALE: 6"=1'-0"3STEEL POST BASEA3.5 DETAILS
REFER TO TCNA B414-23
REFER TO TCNA B414-23
SCALE: 6"=1'-0"5TRENCH DRAIN
2023-09-21
Appendix A
FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:
□ The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto. □ The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto. □ Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).
□ The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4). □ The Fleet does not fall under the Regulation or is otherwise exempted, and a detailed reasoning is attached hereto.
Name of Bidder:
Signature:
Name:
Title:
Date:
PWS24-2254FAC
Exhibit 5
P
lans, specifications and contract documents
(on file in the Office of the City Clerk)
July 23, 2024
Item #11 Page 12 of 12
00 01 01 TITLE PAGE Date Printed: July 3, 2024
D
ocument Version: 1.0 Current Update: December 2023
CITY OF CARLSBAD
CONTRACT DOCUMENTS
FOR:
Alga Norte Park Pool Replaster
Project No. 4733
PWS24-3464FAC
1635 Faraday Ave, Carlsbad, CA 92008
Email: [email protected]
Exhibit 5
00 11 10 NOTICE INVITING BIDS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
Table of Contents
SECTION 1 .................................................................................................................................. 6 00 11 10 NOTICE INVITING BIDS ................................................................................................. 6
1. RECEIPT OF BIDS. ............................................................................................................... 6
2. DESCRIPTION OF WORK. .................................................................................................... 6
3. COMPLETION OF WORK. .................................................................................................... 6
4. OPENING AND AWARD OF BIDS. ........................................................................................ 6
5. PERIOD FOR AWARD. ......................................................................................................... 6
6. BIDDER QUALIFICATIONS. .................................................................................................. 6
7. PRE-BID CONFERENCE. ....................................................................................................... 7
8. OBTAINING CONTRACT DOCUMENTS. ............................................................................... 7
9. BID GUARANTEE AND BONDS. ........................................................................................... 7
10. PREVAILING WAGE RATES AND LABOR COMPLIANCE. ..................................................... 8
11. PROJECT ADMINISTRATION/QUESTIONS. ........................................................................ 8 00 21 10 INSTRUCTIONS TO BIDDERS ......................................................................................... 9
1. SECURING CONTRACT DOCUMENTS. ................................................................................. 9
2. EXAMINATION OF SITE AND CONTRACT DOCUMENTS. ..................................................... 9
3. INTERPRETATION OF DRAWINGS AND DOCUMENTS. ........................................................ 9
4. QUESTIONS. ..................................................................................................................... 10
5. PRE-BID CONFERENCE. ..................................................................................................... 10
6. ADDENDA. ........................................................................................................................ 11
7. ALTERNATE BIDS. ............................................................................................................. 11
8. COMPLETION OF BID FORMS. .......................................................................................... 11
00 11 10 NOTICE INVITING BIDS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
9. GOVERNING GENERAL PROVISIONS. ................................................................................ 12
10. MODIFICATIONS OF BIDS. .............................................................................................. 12
11. BID GUARANTEE. ............................................................................................................ 12
12. LABOR & MATERIAL BOND AND PERFORMANCE & WARRANTY BOND REQUIREMENTS. 13 13. SUBSTITUTION OF SECURITY. ......................................................................................... 13
14. OPTIONAL ESCROW FOR SECURITY DEPOSIT. ................................................................ 14
15. INSURANCE REQUIREMENTS. ......................................................................................... 14
16. LICENSING REQUIREMENTS. .......................................................................................... 15
17. SUBCONTRACTORS. ....................................................................................................... 15
18. BIDDER INFORMATION AND EXPERIENCE FORM. .......................................................... 16
19. NON-COLLUSION AFFIDAVIT. ......................................................................................... 16
20. IRAN CONTRACTING ACT OF 2010. ................................................................................ 17
21. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION. ..................................... 17
22. PREVAILING WAGES. ...................................................................................................... 18
23. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS. ............................................ 18
24. SIGNING OF BIDS. ........................................................................................................... 18
25. SUBMISSION OF SEALED BIDS. ....................................................................................... 18
26. OPENING OF BIDS. ......................................................................................................... 19
27. WITHDRAWAL OF BID. ................................................................................................... 19
28. BIDDERS INTERESTED IN MORE THAN ONE BID. ............................................................ 20
29. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES, AND FEES. ........................ 20
30. PERMIT AND INSPECTION FEE ALLOWANCE. ................................................................. 20
00 11 10 NOTICE INVITING BIDS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
31. BASIS OF AWARD; BALANCED BID. ................................................................................. 20
32. AWARD PROCESS. .......................................................................................................... 21
33. EXECUTION OF CONTRACT. ............................................................................................ 21
34. BUSINESS LICENSE .......................................................................................................... 21
35. PARTICIPATION OF MINORITY AND WOMEN-OWNED BUSINESSES. .............................. 21
36. USE OF RECYCLED MATERIALS ....................................................................................... 21
37. STATUTORY REFERENCES ............................................................................................... 21 00 41 00 BID FORM .................................................................................................................. 22
1. BID SCHEDULE .............................................................................................................. 23 Schedule B ........................................................................................................................... 23
2. TOTAL BID PRICE .......................................................................................................... 24
3. RECITALS ....................................................................................................................... 24 00 43 10 BID BOND FORM ........................................................................................................ 30 00 43 20 BID SECURITY ............................................................................................................. 32 00 43 30 PROPOSED SUBCONTRACTORS FORM ....................................................................... 33 00 43 40 BIDDER INFORMATION AND EXPERIENCE FORM ....................................................... 35
1. INFORMATION ABOUT BIDDER .................................................................................... 35
2. LIST OF CURRENT PROJECTS (BACKLOG) ...................................................................... 38
3. VERIFICATION AND EXECUTION ................................................................................... 42 00 45 10 NON-COLLUSION AFFIDAVIT ...................................................................................... 43 00 45 15 IRAN CONTRACTING ACT CERTIFICATION .................................................................. 44 00 45 20 PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION ................................. 45
00 11 10 NOTICE INVITING BIDS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
00 45 25 CERTIFICATE OF INSURANCE ..................................................................................... 46 00 45 30 STATEMENT REGARDING DEBARMENT ..................................................................... 47 00 45 35 DISCLOSURE OF DISCIPLINE RECORD ......................................................................... 48 00 52 00 CONTRACT ................................................................................................................. 50 00 61 10 LABOR AND MATERIALS BOND .................................................................................. 54 00 61 20 FAITHFUL PERFORMANCE AND WARRANTY BOND ................................................... 57 00 61 30 OPTIONAL ESCROW AGREEMENT .............................................................................. 61 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS ...................................................... 65 INTRODUCTION .................................................................................................................... 65 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS (This section not used) ............. 143 SECTION 2 .............................................................................................................................. 143 01 11 00 SUMMARY OF WORK ............................................................................................... 143 PART 1 GENERAL ................................................................................................................ 143 PART 3 EXECUTION (NOT USED) ........................................................................................ 143 01 11 20 MEASUREMENT AND PAYMENT .............................................................................. 144 PART 1 GENERAL .......................................................................................................... 144 PART 2 PRODUCTS (NOT USED) ......................................................................................... 148 PART 3 EXECUTION (NOT USED) ........................................................................................ 148 01 31 00 PROJECT MANAGEMENT AND COORDINATION ...................................................... 149 PART 1 CONSTRUCTION MANAGEMENT SOFTWARE ......................................................... 149 01 32 00 SUBMITTALS ............................................................................................................ 150 PART 1 GENERAL ................................................................................................................ 150
00 11 10 NOTICE INVITING BIDS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
PART 2 PRODUCTS (NOT USED) ......................................................................................... 155 PART 3 EXECUTION (NOT USED) ........................................................................................ 155 01 33 00 CONSTRUCTION PROGRESS SCHEDULE ................................................................... 156 PART 1 GENERAL ................................................................................................................ 156 PART 2 EXECUTION ............................................................................................................ 164 01 41 26 PERMIT REQUIREMENTS.......................................................................................... 170 PART 1 GENERAL ................................................................................................................ 170 PART 2 PRODUCTS (NOT USED) ......................................................................................... 172 PART 3 EXECUTION (NOT USED) ........................................................................................ 172 01 50 00 TEMPORARY FACILITIES AND CONTROLS ................................................................. 173 PART 1 GENERAL ................................................................................................................ 173 PART 2 PRODUCTS (NOT USED) ......................................................................................... 178 PART 3 EXECUTION (NOT USED) ........................................................................................ 178
Technical Specifications & Contract Plans……………………………………………………………………………179
Attachments
Attachment A– Exhibit showing concrete deck work areas- Plan note 23 & 24 Appendices
Appendix A – Fleet Compliance Certification
00 11 10 NOTICE INVITING BIDS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
SECTION 1
00 11 10 NOTICE INVITING BIDS
1. RECEIPT OF BIDS.
The City of Carlsbad (“Agency”) will accept B ids via electronic format via the City of Carlsbad Electronic Bidding Site up to and no later than August 21, 2024 at 11 a.m. through the online bidding portal (Contracting & Purchasing | Carlsbad, CA (carlsbadca.gov) for the construction of the Work entitled:
Alga Norte Park Pool Replaster
PWS24-3464FAC
Project No. 4733
2. DESCRIPTION OF WORK.
The Work includes the provision of all equipment, labor, materials, tools, services, transportation, permits, utilities, and all other items necessary to complete the construction of the following, as specified and shown in the Construction Documents: Replaster pools and replace appurtenances all as shown on, and included in, the plans and contract documents The Work Site is located in the City of Carlsbad, in the County of San Diego, California.
3. COMPLETION OF WORK.
The Contract Time is established as seventy-five ( 75) Calendar Days. The Contract Time shall begin twenty (20) Days from the date of receipt of the Notice to Proceed.
The Engineers’ estimate for this Project is $1,400,000.
4. OPENING AND AWARD OF BIDS.
Agency shall consider awarding the Contract for the Project to the lowest, responsive, responsible Bidder as determined by the Agency from the base Bid alone. The Agency has the right to reject any or all Bids or to waive any irregularities or informalities in any Bids or in the Bidding process.
5. PERIOD FOR AWARD.
A period of ninety (90) Calendar Days from the time of Bid opening may be required to award the Contract. No Bidder may withdraw its Bid or Bid G uarantee during this period. Bidders shall assume full responsibility for their Bid Price during this period and shall make certain that such delay does not restrict the Bid Guarantee.
6. BIDDER QUALIFICATIONS.
Bidders shall be licensed contractors pursuant to Business and Professions Code Sections 7000 et seq. under the classification of C- 53 (Swimming Pool Contractor) as of the date of submittal of the Bid Documents and shall maintain such license until final acceptance of the Work. Additional qualifications are included in the Contract Documents.
00 11 10 NOTICE INVITING BIDS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
All of the work in sections 13 11 00 - 13 11 07 is to be the responsibility of one experienced swimming pool contractor primarily engaged in the construction of commercial public-use swimming pools. The contractor must have also, in the last five years constructed at least five (5) commercially designed municipal and public-use swimming pools, each of which shall have incorporated a minimum size of 6,000 square feet of water surface area with a concrete and ceramic tile perimeter overflow gutter and self-modulating balance tank.
7. PRE-BID CONFERENCE.
The Agency will conduct a mandatory Pre-Bid Conference at the Agency’s office (address listed below) on August 12, 2024, at 8:00 a.m.
Address: The swimming pool entrance located at 6565 Alicante Rd, Carlsbad, CA 92009.
Representatives of the Agency and consulting engineers, if any, will be present. Questions asked by Bidders at the Pre -Bid Conference not specifically addressed within the Contract Documents shall be answered in writing, and shall be sent to all Bidders present at the Pre -Bid Conference and be posted on the online bidding portal . Bids will not be accepted from any bidder who did not attend a mandatory Pre-Bid Conference.
8. OBTAINING CONTRACT DOCUMENTS.
Bidders may obtain a copy of the Contract Documents from Agency’s website ( Contracting & Purchasing | Carlsbad, CA (carlsbadca.gov) ). T o the extent required by Public Contract Code Section 20103.7, upon request from a contractor plan room service, the Agency shall provide an electronic copy of the Contract Documents at no charge to the contractor plan room. It is the responsibility of each prospective Bidder to download and print all Bid Documents for review and to verify the completeness of Bid Documents before submitting a Bid. All Addenda will be posted on the online bidding portal. It is the responsibility of each prospective Bidder to check the online bidding portal on a daily basis through the close of the bidding period for any applicable Addenda.
The Agency does not assume any liability or responsibility for any defective or incomplete copying, excerpting, scanning, faxing, downloading or printing of the Bid Documents. Information on the online bidding portal may change without notice to prospective Bidders. The Contract Documents shall supersede any information posted or transmitted by the online bidding portal.
No time extensions or other consideration will be given for non- receipt or other circumstance associated with the review or acquisition of Contract Documents. Bids must be submitted on the Agency’s Bid Forms in the Contract Documents.
9. BID GUARANTEE AND BONDS.
Each Bid shall be accompanied by cash, a certified or cashier’s check or Bid Bond secured from a surety company satisfactory to the Agency, the amount of which shall not be less than 10% of the submitted Total Bid Price, made payable to the Agency as bid security. The bid security shall be provided as a guarantee that within 10 Working Days after the Agency provides the successful bidder the Notice of Award, the successful Bidder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the
00 11 10 NOTICE INVITING BIDS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
successful Bidder fails to comply within these 10 Working Days. No interest will be paid on funds deposited with the Agency.
All Bidders must upload Bidder’s Bond to the online bidding portal. The original Bid Bond for the 3 apparent low Bidders must be submitted to the city within 2 Business Days of Bid opening.
The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Bond each in an amount equal to 100% of the Contract Price. Each bond shall be in the forms set forth in the Contract Documents, shall be secured from a surety company that meets all State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. Pursuant to Public Contract Code Section 22300, the successful Bidder may substitute certain securities for funds withheld by Agency to ensure its performance under the Contract.
10. PREVAILING WAGE RATES AND LABOR COMPLIANCE.
This Project is subject to prevailing wages and labor compliance per the Labor Code. To this end, Bidder shall sign and submit with its Bid the California Department of Industrial Relations (DIR) Public Works Contractor Registration Certification on the form 00 45 00 provided. Failure to submit this form may render the bid non- responsive. In addition, each Bidder shall provide the registration number for each listed S ubcontractor in the space provided in the Proposed Subcontractors form. In bidding this Project, it shall be the Bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this Contract and applicable law in its Bid. A copy of the prevailing wage rates may be obtained via the internet at: www.dir.ca.gov/dlsr/.
11. PROJECT ADMINISTRATION/QUESTIONS.
Requests for Information (RFI) or interpretations of Bid Documents during the bid period shall be submitted via Online Q&A in the online bidding portal.
The cutoff date and time to submit questions or substitution request regarding this Project via Online Q&A in the online bidding portal is August 13 , 2024 at 5 p.m. No questions will be entertained after that date.
The answers to questions submitted during the bidding period will be published in an addendum and provide to those bidding on the Project.
For further information, see the online bidding portal.
END OF SECTION
00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
00 21 10 INSTRUCTIONS TO BIDDERS
1. SECURING CONTRACT DOCUMENTS.
Bids must be submitted to the Agency on the Bid Forms which are a part of the Contract Documents for the Project. The Contract Documents may be obtained from the Agency’s online bidding portal (Contracting & Purchasing | Carlsbad, CA (carlsbadca.gov) ). Prospective bidders are encouraged to communicate with the Agency well in advance of the date and time bids are due to the Agency (“Bid Submission Deadline”) to determine the availability of Contract Documents.
The Agency may also make the Contract Documents available for review at one or more plan rooms. Prospective Bidders who choose to review the Contract Documents at a plan room must contact the Agency to obtain the required Contract Documents if they decide to submit a Bid for the Project.
Addenda will be posted on the online bidding portal . Failure to acknowledge all A ddenda may make a Bid nonresponsive and ineligible for award of the Contract. Bidders are advised to verify the issuance of all A ddenda and receipt of them 1 Working Day prior to bidding. Failure to acknowledge all Addenda may make a Bid nonresponsive and ineligible for award of the Contract.
2. EXAMINATION OF SITE AND CONTRACT DOCUMENTS.
At its own expense and before submitting its Bid, each Bidder shall visit the Site of the proposed Work and fully acquaint itself with the conditions relating to the construction and labor required so that the Bidder may fully understand the Work, including but not limited to, difficulties and restrictions attending the execution of the Work under the Contract. Each Bidder shall carefully examine the Drawings, and shall read the Specifications, Contract Documents , and all other referenced documents. Each Bidder shall also determine the local conditions which may in any way affect the performance of the Work, including local tax structure, contractors’ licensing requirements, availability of required insurance, the prevailing wages and other relevant cost factors. Each Bidder shall also familiarize itself with all federal, state and local laws, ordinances, rules, regulations and codes affecting the performance of the Work, including the cost of permits and licenses required for the Work, and shall make such surveys and investigations, including investigations of subsurface or latent physical conditions at the S ite or where Work is to be performed as may be required. Bidders are responsible for consulting the standards referenced in the Contract. The failure or omission of any Bidder to receive or examine any contract documents, forms, instruments, addenda, or other documents, or to visit the S ite and acquaint itself with conditions there existing shall in no way relieve any Bidder from any obligation with respect to its Bid or to the Contract and no relief for error or omission will be given except as required under California law. The submission of a Bid shall be taken as conclusive evidence of compliance with this Section.
3. INTERPRETATION OF DRAWINGS AND DOCUMENTS.
Prospective Bidders unclear as to the true meaning of any part of the Drawings, Specifications or other parts of the Contract Documents, or discrepancies in or omissions from the Drawings and Specifications, may promptly submit a written request for inform ation, interpretation,
00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
clarification, or correction (“RFI”) to the Bid Administrator, the Agencies designated representative for soliciting and conducting bids on the Agencies online ebidding portal. (defined below). The Agency may not respond to RFIs submitted past the Q&A Submission Deadline. The Bidder submitting the RFI is responsible for prompt delivery to the Bid Administrator.
Responses to RFIs will be made only by duly issued written Addenda. The Agency shall not provide verbal responses to RFIs. Copies of written Addenda will be posted on the online bidding portal for each prospective Bidder who has downloaded a set of Contract Documents. The Agency will not be responsible for any other explanation or interpretations of the Drawings, Specifications or other parts of the Contract Documents. If any Prospective Bidder becomes aware of any errors or omissions in any part of the Contract Documents, the Prospective Bidder must promptly notify the Agency of such error or omission.
Before award of the Contract, no addition to, modification of, or interpretation of any provision in the Contract Documents will be given by any agent, employee or contractor of the Agency except as otherwise specified in these Instructions to Bidders. No bidder may rely on verbal directions given by any agent, employee or contractor of the Agency except as specified in these Instructions to Bidders.
4. QUESTIONS.
Questions regarding this Project m ust be submitted through the online ebidding portal .
Questions shall be definite and certain, and shall reference applicable drawing sheets, notes, details or specification sections. The deadline to submit questions is identified in the Notice Inviting Bids. Questions received after the deadline may not be answered. Responses to questions submitted during the bidding period will be published in an A ddendum and provided to those bidding on the Project no later than the date specified in the Notice Inviting Bids.
Except for the Agency’s Bid Administrator, no other members of the Agency’s staff or Board should be contacted about this procurement during the bidding process. All inquiries and comments from Prospective Bidders regarding a proposed Bid must be communicated in writing, unless otherwise instructed by the Agency. The Agency may, in its sole discretion, disqualify any Prospective Bidder who engages in any prohibited communications.
5. PRE-BID CONFERENCE.
The Notice Inviting Bids shall state whether a Pre-Bid Conference will be held and, if so, whether attendance is mandatory . Bids will not be accepted from any bidder who did not attend a Mandatory Pre-Bid Conference. The C onference will commence at the specified start time and the Site visit will begin at the conclusion of the Conference. Prospective Bidders who arrive late and who do not sign the “Sign- In” or attendance sheet, may be disqualified from the bidding process.
Representatives of the Agency and its consultants, if any, will be present to the extent possible.
Questions asked by Bidders at the Pre -Bid Conference not specifically addressed within the Contract Documents shall be answered in writing and shall be sent to all Bidders present at the Pre-Bid Conference.
00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
A Pre -Bid Conference may include a Project S ite visit. Personal Protective Equipment (PPE) is required of all Job Walk attendees. Attendees are required to wear closed toe shoes, long pants, no sleeveless shirts, safety glasses (may be prescription with side shields if in process areas), safety vests and hard hats. Only those possessing such attire will be allowed on the Job Site. The Agency will not provide personal protective equipment to Job Walk attendees.
6. ADDENDA.
The Agency may revise the Contract Documents before the Bid Submission Deadline. Revisions, if any, shall be made by written Addenda. All Addenda will be posted on the online bidding portal.
All Addenda issued by the Agency shall be acknowledged by the Bidder on the online bidding portal and made part of the Contract Documents. The Bidder shall acknowledge the Addenda before submitting its Bid. Bidders are responsible for the receipt of all Addenda. The Agency may reject a Bid if the Bidder fails to acknowledge all Addenda.
Pursuant to Public Contract Code Section 4104.5, if the Agency issues an Addendum which includes material changes to the Project less than 72 hours before the Bid Submission Deadline, the Agency will extend the Bid Submission Deadline by no less than 72 ho urs. The Agency may determine, in its sole discretion, whether an Addendum warrants postponement of the Bid Submission Deadline.
7. ALTERNATE BIDS.
If alternate Bid items are called for in the Notice Inviting Bids and the Contract Documents, the time required for completion of the Work for the alternate Bid items is factored into the Contract duration and no additional Contract time will be awarded. The Agency may elect to include one or more of the alternate Bid items, or to otherwise remove certain work from the Project scope of work. Accordingly, each Bidder must ensure that each Bid item contains a proportionate share of profit, overhead, and other costs or expenses which will be incurred by the Bidder.
If the Agency utilizes alternate Bid items as described above, the Notice Inviting Bids will prescribe predetermined criteria for the B id package selection or a selection process in which price information and B idder identities are not revealed to the Agency before the Bid Submission Deadline.
8. COMPLETION OF BID FORMS.
Bids shall only be prepared using the Bid Forms which are included in the Contract Documents.
The use of substitute Bid Forms other than legible and correct photocopies of those provided by the Agency are prohibited. Bids shall be executed by an authorized signatory as described in these Instructions to Bidders. In addition, Bidders shall fill in all blank spaces (including inserting “N/A” where applicable), and initial all interlineations, alterations, or erasures to the Bid Forms. Bidders shall neither delete, modify, nor supplement the printed matter on the Bid Forms nor make substitutions thereon. Use of black or blue ink, indelible pencil, or a typewriter is required.
Deviations from these instructions may result in the Bid being deemed non-responsive.
The following documents must be completed and properly executed including notarization, where indicated, and submitted as a part of the complete Bid Package:
00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
1. Bid Form (00 41 00)
2. Bid Bond (00 43 10) or Bid Security (00 43 20) with check/cash
3. Proposed Subcontractors Form (00 43 30)
4. Bidder Information and Experience Form (00 43 40)
5. Non-Collusion Affidavit (00 45 10)
6. Iran Contracting Act Certification (00 45 15)
7. Public Works Contractor Registration Certification (00 45 20)
8. Certificate of Insurance (00 45 25)
9. Statement Regarding Debarment (00 45 30)
10. Disclosure of Discipline Record (00 45 35)
11. Acknowledgement of ALL Addenda on the online bidding portal.
12. Optional Escrow Agreement, as applicable (00 61 30)
All Bids shall be computed on the basis of the given estimated quantities of work, as indicated in the Bid, multiplied by the unit price as submitted by the Bidder.
When paper copies are submitted, all prices must be written in ink or typewritten. Changes or corrections may be crossed out and typed or written in with ink and must be initialed in ink by a person authorized to sign for the Contractor.
9. GOVERNING GENERAL PROVISIONS.
The S pecifications contained in the Agency Supplemental General Provisions (00 73 00) take precedence over the specification language contained in the Standard Specifications for Public Works Construction, “the Greenbook” latest edition and all errata. The Supplemental General Provisions address th e unique conditions in the City of Carlsbad that are not addressed in the Greenbook. Therefore, if there is a conflict between the two, the Supplemental Provisions shall control over the Greenbook.
The Greenbook may be purchased at Bidder’s/Contractor’s local technical bookstore, online or directly from the publisher. The Supplemental Provisions are available only for download from the online bidding portal with Contract Documents. The Agency does not provide hard copies.
10. MODIFICATIONS OF BIDS.
Each Bidder shall submit its Bid in strict conformity with the requirements of the Contract Documents. Unauthorized additions, modifications, revisions, conditions, limitations, exclusions, or provisions attached to a Bid may render it non-responsive and may cause its rejection. Bidders shall not delete, modify, or supplement the printed matter on the Bid Forms, or make substitutions thereon. Oral, telephonic, and electronic modifications will not be considered.
11. BID GUARANTEE.
Each Bid shall be accompanied by: (a) a cashier’s check; or, (b) a certified check made payable to Agency; or, (c) a Bid Bond secured from a surety company satisfactory to the Board, the amount of which shall not be less than 10% of the total bid price, made payable to Agency as bid security.
Personal sureties and unregistered surety companies are unacceptable. The surety insurer shall be a California admitted surety insurer, as defined in Code of Civil Procedure Section 995.120.
00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
The bid security shall be provided as a guarantee that within 10 Working Days after the Agency provides the successful B idder the Notice of Award, the successful B idder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security may be declared forfeited if the successful Bidder fails to enter into a contract and provide the necessary bonds and certificates of insurance. Any B id received that does not comply with these Bid Guarantee instructions may be rejected as non-responsive, and Agency may enter into a contract with the next lowest, responsive, responsible B idder, or may call for new B ids. No interest shall be paid on funds deposited with the Agency. Copies of Bid B onds submitted to the Agency shall have the same force and effect as the original.
The Bidder’s security of the second and third next lowest responsive B idders may be withheld until the Contract has been fully executed. The security submitted by all other unsuccessful Bidders shall be returned to them, or deemed void, within 10 Working Days after the Contract is awarded
The proceeds of the B idder’s security may also become property of the Agency if the Bidder withdraws its Bid within 15 Calendar Days after the Bid opening date, unless otherwise required by law, including Public Contract Code S ection 5100 et. seq., and notwithstanding the award of the Contract to another Bidder.
The Bidder shall submit Bid Bond (00 43 10) or Bid Security (00 43 20) with properly certified check with the Bid Package.
12. LABOR & MATERIAL BOND AND PERFORMANCE & WARRANTY BOND REQUIREMENTS.
The successful B idder shall furnish Agency with a Labor and Material Payment Bond and a Performance and Warranty Bond, each in an amount equal to 100% of the Contract price. Each bond shall be secured from a surety company that meets all State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120 and is admitted by the State of California, and whose assets exceed their liabilities in an amount equal to or in excess of the amount of the bond. The Agency shall not accept personal sureties and unregistered surety companies. Each bond shall be accompanied, upon the request of Agency, with all documents required by Code of Civil Procedure Section 995.660 to the extent required by law. All bonding and insurance requirements shall be completed and submitted to Agency within 10 Working Days from the date the Agency provides the successful Bidder with the Notice of Award.
These bonds shall be kept in full force and effect during the course of this Project, and shall extend in full force and effect and be retained by the Agency until they are released as stated in the Contract. The B onds are to be accompanied by an original, or a certified copy, of the unrevoked appointment, power of attorney, by laws, or other instrument entitling or authorizing the person who executed the bond to do so.
13. SUBSTITUTION OF SECURITY.
The Contract Documents call for monthly progress payments based upon the percentage of the Work completed. The Agency will retain a percentage of each progress payment as provided by
00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
the Contract Documents. At the request and expense of the successful Bidder, the Agency will substitute securities for the amount so retained in accordance with Public Contract Code Section 22300.
14. OPTIONAL ESCROW FOR SECURITY DEPOSIT.
Pursuant to applicable provisions of law (i.e. , Public Contract Code S ection 10263), appropriate securities may be substituted for any obligation required by these instructions or for any monies withheld by the Agency to ensure performance under the Contract. Public Contract Code Section 10263 requires monies or securities to be deposited with the Agency or a state or federally chartered bank in California as the escrow agent. The escrow agent shall maintain insurance to cover negligent acts and omissions of the agent in connection with the handling of retentions under this section in an amount not less than $100,000 per contract.
15. INSURANCE REQUIREMENTS.
Before commencing the Work, the successful Bidder shall purchase and maintain insurance as set forth in the Agency General Conditions. If the Bid is accepted, and if requested by the Agency, Contractor shall provide Agency or preferred vendor copies of the insurer’s most recent annual statement and quarterly statement filed with the Department of Insurance pursuant to Insurance Code Section 900 et seq. within 10 Calendar Days of the insurer’s receipt of a request to submit the statements.
In accordance with the provisions of Labor Code Section 3700, Contractor shall secure the payment of compensation to its employees. Contractor shall sign and file with the Agency the following certificate before performing the Work under the Contract:
I am aware of the provisions of Labor Code Section 3700, which require every employer to be insured against liability for workers’ compensation or to undertake self -insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of the Contract.
The form of such, Certificate of Insurance (00 45 25), shall be submitted as a part of the Bid Package.
Insurance must be placed with insurers that:
1) Have a rating in the most recent Best’s Key Rating Guide of at least A-:VII, or 2) Appear on the List of Approved Surplus Line Insurers, (“LASLI”) with a Best’s Key Rating Guide of at least A: X.
3) Are admitted to conduct the business of insurance in the State of California by the Insurance Commissioner.
4) Otherwise comply with all other aspects of City Council Policy No. 70.
Auto policies offered to meet the specification of this Contract must:
1) Meet the conditions stated above for all insurance companies.
00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
2) Cover any vehicle used in the performance of the Contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-scheduled.
Workers’ compensation insurance required under this Contract must be offered by a company meeting the above standards with the exception that the Best’s rating condition may be waived.
The Agency does accept policies issued by the State Compensation Fund meeting the requirement for workers’ compensation insurance.
The Contractor shall be required to maintain insurance as specified in the Contract. Any additional cost of the insurance shall be included in the Bid price.
The award of the Contract by the Board is contingent upon the Contractor submitting the required bonds and insurance, as described in the Contract Documents, within 10 Working Days of bid opening. If the Contractor fails to comply with these requirements, the Agency may award the Contract to the second or third lowest B idder and the bid security of the lowest B idder may be forfeited.
16. LICENSING REQUIREMENTS.
Pursuant to Business and Professions Code Section 7028.15 and Public Contract Code Section 3300, all Bidders must possess proper licenses for performance of the Contract. Subcontractors must possess the appropriate licenses for each specialty subcontracted. Pursuant to Business and Professions Code Section 7028.5, the Agency shall consider any B id submitted by a contractor not currently licensed in accordance with California law and pursuant to the requirements found in the Contract Documents to be nonresponsive, and the Agency shall reject the Bid. The Agency shall have the right to request, and Bidders shall provide within 10 Calendar Days, evidence satisfactory to the Agency of all valid license(s) currently held by that Bidder and each of the Bidder’s Subcontractors, before awarding the Contract.
Notwithstanding anything contained in this Contract, if the Work involves federal funds, the Contractor shall be properly licensed by the time the Contract is awarded, pursuant to the provisions of Public Contract Code Section 20103.5.
17. SUBCONTRACTORS.
Bidder shall set forth the name, address of the place of business, and contractor license number of each Subcontractor who will perform work, labor, furnish materials or render services to the bidder on the C ontract. This requirement includes each S ubcontractor licensed by the State of California who, under subcontract to B idder, specially fabricates and installs a portion of the Work described in the Drawings and Specifications in an amount in excess of one -half of one percent (0.5%) of the total B id price. Additionally, the Bidder shall indicate the portion of the Work to be done by each Subcontractor in accordance with Public Contract Code Section 4104.
Bidder shall submit Proposed Subcontractors Form (00 43 30) with the Bid Package.
This form will be used by the Agency to determine the percentage of work that the Bidder proposes to perform. Bidders are cautioned that failure to provide complete and correct
00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
information may result in rejection of the B id as non- responsive. Any Bid that proposes performance of more than 50 percent of the Work by S ubcontractors or performance by forces other than the Bidder’s own organization will be rejected as non- responsive. Specialty items of work that may be so designated on the Proposed Subcontractors Form (00 43 30) “Contractor’s Bid” will not be included in computing the percentage of work proposed to be performed by the Bidder.
Suppliers of materials from sources outside the limits of Work are not Subcontractors. The value of materials and transport of materials from sources outside the limits of Work, as shown on the plans, shall be assigned to the Contractor or the Subcontractor, as the case may be, that the Bidder proposes as installer of the materials. The value of material incorporated in any Subcontractor-installed Bid item that is supplied by the Bidder shall be included as a part of the Work that the Bidder proposes to be performed by the Subcontractor installing the item.
When the Bidder proposes to use a Subcontractor to construct or install less than 100 percent of a Bid item, the Bidder shall attach an explanation sheet to the Proposed Subcontractor Form (00 43 30). The explanation sheet shall clearly apprise the Agency of the specific facts that show the Bidder proposes to perform no less than fifty percent (50%) of the Work with its own forces.
Determination of the subcontract amounts for purposes of award of the Contract shall be determined by the Board in conformance with the provisions of the Contract Documents. The decision of the Board shall be final.
Contractor is prohibited from performing any Work on this Project with a S ubcontractor who is ineligible to perform work on a public works project pursuant to Labor Code Section 1771.1 or 1777.7.
Bidders shall make copies of the disclosure forms as may be necessary to provide the required information to Subcontractors. The page number and total number of additional form pages shall be entered in the location provided on each type of form so duplicated.
18. BIDDER INFORMATION AND EXPERIENCE FORM.
Each Bidder shall complete the provided questionnaire and shall submit the questionnaire along with its Bid. Failure to provide all information requested within the questionnaire along with the Bid may cause the B id to be rejected as non- responsive. The Agency may reject any Bid if an investigation of the information submitted does not satisfy the Agency that the Bidder is qualified to properly carry out the terms of the Contract.
The Bidder shall submit Bidder Information and Experience Form (00 43 40) with the Bid Package.
19. NON-COLLUSION AFFIDAVIT.
Bidders on all public works contracts are required to submit an affidavit of non- collusion with their Bid. This form (00 45 10 Non-Collusion Affidavit) is included with the Bid Package and must be signed and dated under penalty of perjury.
00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
20. IRAN CONTRACTING ACT OF 2010.
In accordance with Public Contract Code Section 2200 et seq ., the Agency requires that any person that submits a bid or proposal or otherwise proposes to enter into or renew a contract with the Agency with respect to goods or services of $1,000,000 or more, certify at the time the bid is submitted or the contract is renewed, that the person is not identified on a list created pursuant to subdivision (b) of Public Contract Code Section 2203 as a person engaging in investment activities in Iran described in subdivision (a) of Public Contract Code Section 2202.5, or as a person described in subdivision (b) of Public Contract Code Section 2202.5, as applicable.
The form of such Iran Contracting Certificate is included with the Bid Package and must be signed and dated under penalty of perjury.
21. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION.
Pursuant to Labor Code Section 1773, the Agency has obtained the prevailing rate of per diem wages and the prevailing wage rate for holiday and overtime work applicable in San Diego County from the Director of the Department of Industrial Relations for eac h craft, classification, or type of worker needed to execute this Contract. A copy of these prevailing wage rates may be obtained via the internet at www.dir.ca.gov/dlsr/.
In addition, a copy of the prevailing rate of per diem wages is available at the Agency and shall be made available to interested parties upon request. The successful Bidder shall post a copy of the prevailing wage rates at each job site. It shall be mandatory upon the Bidder to whom the Contract is awarded, and upon any S ubcontractors, to comply with all Labor Code provisions, which include but are not limited to the payment of not less than the specified prevailing wage rates to all workers employed by them in the execution of the Contract, employment of apprentices, hours of labor and debarment of contractors and subcontractors.
Pursuant to Labor Code Sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded the Contract, the Bidder and its S ubcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project.
This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. In bidding on this Project, it shall be the Bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirem ents under the Contract and applicable law in its Bid.
To this end, Bidder shall sign and submit with its Bid the Public Works Contractor Registration Certification on the form provided, attesting to the facts contained in the registration certificate.
Failure to submit this certificate may render the Bid non-responsive. In addition, each Bidder shall provide the registration number for each listed S ubcontractor in the space provided in the Proposed Subcontractors Form (00 43 30).
00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
22. PREVAILING WAGES.
Pursuant to Labor Code Sections 1720, et. seq. and 1770, et. seq., Contractor shall pay prevailing wages for all Work performed under the Contract. The Agency has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages in the locality in which the Work will be performed for each craft or type of worker needed to execute the Contract. These rates are available at the Agency or may be obtained online at http://www.dir.ca.gov. Bidders are advised that a copy of these rates must be posted by the successful Bidder at the job site(s).
23. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS.
In accordance with the provisions of the Labor Code, contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code Section 1777.1 or 1777.7. Any contract on a public works project executed between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid to a debarred subcontractor by the Contractor for the Project shall be returned to the Agency. The Contractor shall be responsible for the payment of wages to workers of a debarred S ubcontractor who has been allowed to work on the Project.
The Agency may disqualify a Contractor or S ubcontractor from participating in bidding when a Contractor or Subcontractor has been debarred by the Agency or another jurisdiction in the State of California as an irresponsible bidder.
24. SIGNING OF BIDS.
All Bids submitted shall be executed by the Bidder or its authorized representative. Bidders may be asked to provide evidence in the form of an authenticated resolution of its Board of Directors or a Power of Attorney evidencing the capacity of the person signing the Bid to bind the Bidder to each Bid and to any Contract arising therefrom.
If a Bidder is a joint venture or partnership, it may be asked to submit an authenticated Power of Attorney executed by each joint venturer or partner appointing and designating one of the joint venturers or partners as a management sponsor to execute the Bid on behalf of Bidder. Only that joint venturer or partner shall execute the Bid. The Power of Attorney shall also: (1) authorize that particular joint venturer or partner to act for and bind Bidder in all matters relating to the Bid; and (2) provide that each venturer or partner shall be jointly and severally liable for any and all of the duties and obligations that the Bidder assumes under the Bid and under any Contract arising therefrom. The Bid shall be executed by the designated joint venturer or partner on behalf of the joint venture or partnership in its legal name.
25. SUBMISSION OF SEALED BIDS.
Once the Bid and supporting documents have been completed and signed as set forth in these Instructions to Bidders, they shall be uploaded, along with other required materials, to the online bidding portal before the deadline for submitting bids.
00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
At the time of Bid submission, whether in the form of a cashier’s check, a properly certified check or an approved corporate surety bond payable to the Agency, Bidders must upload an electronic Portable Document Format (PDF) copy of the Bid Guarantee to the online bidding portal. The first 3 apparent low B idders must provide the Agency with the original Bid Guarantee within 2 Business Days after the Bid opening date.
Failure to submit the electronic version of the Bid Guarantee at time of bid submission shall cause the bid to be rejected and deemed non- responsive. Failure to provide the original within 2 business days may deem the bidder non-responsive.
Original Bid Bond shall be submitted to:
Public Works Contract Administration
Attention: Janean Hawney, Contract Administrator
1635 Faraday Avenue
Carlsbad, California, 92008
No oral or telephonic B ids will be considered. Pursuant to Public Contract Code S ections 1600 and 1601, only where expressly permitted in these Instructions to Bidders and the Notice Inviting Bids may B idders submit their B ids via electronic transmission ( the online bidding portal ). Bids received after the Bid Submission Deadline will not be accepted. Agency may reject any B id not strictly complying with Agency’s designated methods for delivery.
26. OPENING OF BIDS.
Bids submitted on the online bidding portal will be reviewed by the Agency. Once the Bid Submission Deadline has passed, B idders, proposers, the general public, and Agency staff are able to immediately see the results online. Agency shall consider award of the Contract to the lowest, responsive, responsible Bidder as determined by the Agency consistent with Section 32 below. In case of a discrepancy between the line item entries submitted in the online bidding portal and the Bid Form, the online bidding portal shall prevail. In the event of any discrepancies, written numbers (e.g., fifty, hundred) will govern over numerical numbers (e.g., 50, 100) on the Bid Form.
In the event of any discrepancies, written numbers (e.g., fifty, hundred) will govern over numerical numbers (e.g., 50, 100) on the Price Proposal Form. Also, the sum of all lump sum line items will govern over the “Total Proposed Lump Sum Price” line item. The Agency may reject any or all Bids or waive any irregularities or informalities in any Bids or in the Bidding process.
The Bid and the terms of the Contract Documents constitute an irrevocable offer that shall remain valid and in full force for a period of 90 Calendar Days from the Bid Submission Deadline and such additional time as may be mutually agreed upon by the Agency and the Bidder.
27. WITHDRAWAL OF BID.
Any B id may be withdrawn via written letter, incurring no penalty, at any time before the scheduled closing time for receipt of B ids. Requests to withdraw B ids shall be worded to not
00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
reveal the amount of the original Bid. Withdrawn B ids may be resubmitted until the Bid Submission Deadline, provided that resubmitted Bids are in conformance with these Instructions to Bidders.
Bids may be withdrawn after bid opening only by providing written notice to Agency within five (5) Working Days of the bid opening and in compliance with Public Contract Code Section 5100 et seq., or as otherwise may be allowed with the consent of the Agency.
28. BIDDERS INTERESTED IN MORE THAN ONE BID.
No Bidder shall be allowed to make, file or be interested in more than 1 B id for the same work unless alternate Bids are specifically called for. If the Notice Inviting Bids provides for alternate Bids, a person, firm or corporation that has submitted a sub- proposal to a Bidder, or that has quoted prices of materials to a Bidder, is not disqualified from submitting a sub- proposal or quoting prices to other Bidders. No person, firm, corporation, or other entity may submit a sub - proposal to a Bidder, or quote prices of materials to a Bidder, when also submitting a prime Bid on the same Project.
29. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES, AND FEES.
Contractor and its S ubcontractors performing work under the Contract will be required to pay California sales tax and other applicable taxes, and to pay for permits, licenses and fees required by the agencies with authority in the jurisdiction in which the Work will be located, unless otherwise expressly provided by the Contract Documents.
30. PERMIT AND INSPECTION FEE ALLOWANCE.
Notwithstanding anything contained in these Instructions to Bidders, the Bid Form contains an allowance for the Contractor’s cost of acquiring traffic control permits and for construction inspection fees that may be charged to the Contractor by the Agency. The allowance is included within the Bid Form to eliminate the need by Bidders to research or estimate the costs of traffic control permits and construction inspection fees before submitting a B id. The allowance is specifically intended to account for the costs of traffic control permits and construction inspection fees charged by the Agency. No other costs payable by Contractor to the Agency are included within the allowance.
If such cost is not contained or specified in the Bid Form, the Contractor shall include the costs in the other Bid items on the Bid Form.
31. BASIS OF AWARD; BALANCED BID.
The Agency shall award the Contract to the lowest responsible Bidder submitting a responsive Bid. The lowest Bid will be determined on the basis of the total B id price. In the event of any discrepancies, written numbers (e.g., fifty, hundred) will govern over numerical numbers (e.g., 50, 100) on the Price Proposal Form. Also, the sum of all lump sum line items will govern over the “Total Proposed Lump Sum Price” line item.
The Agency may reject any Bid which, in its opinion when compared to other Bids received or to the Agency’s internal estimates, does not accurately reflect the cost to perform the Work. The Agency may reject as non-responsive any Bid which unevenly weights or allocates costs, including
00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: July 3, 2024 Document Version: 1.0 Current Update: December 2023
but not limited to overhead and profit to 1 or more particular Bid items or otherwise violates Public Contract Code Section 9203.
32. AWARD PROCESS.
Once all Bids are opened and reviewed to determine the lowest responsive and responsible Bidder, the Board may award the Contract. Once notified by Agency staff, the apparent successful Bidder should begin to prepare the following documents: (1) the Labor and Materials Bond; (2) the Performance and Warranty Bond; and (3) the required insurance certificates and endorsements. Once the Agency notifies the Bidder of the award, the Bidder will have 10 Working Days from the date of this notification to execute the Contract and supply the Agency with all of the required documents and certifications or the Bidder may forfeit the Bid security and the Agency may pursue award of the Contract to the next lowest, responsive, responsible Bidder.
Once the Agency receives all properly drafted and executed documents and certifications from the Bidder, the Agency shall issue a Notice to Proceed to that Bidder.
33. EXECUTION OF CONTRACT.
As required in these Instructions to Bidders, the Bidder to whom an award is made shall execute the Contract in the amount determined by the Contract Documents. The Agency may require appropriate evidence that the persons executing the Contract are duly empowered to do so. The Contract and bond forms to be executed by the successful Bidder are included within these Specifications and shall not be detached.
34. BUSINESS LICENSE
The prime C ontractor and all S ubcontractors are required to have and maintain a valid City of Carlsbad Business License for the duration of the Contract.
35. PARTICIPATION OF MINORITY AND WOMEN-OWNED BUSINESSES.
The Agency encourages the participation of minority and women-owned businesses.
36. USE OF RECYCLED MATERIALS
The Agency encourages Bidders, suppliers, manufacturers, fabricators and contractors to utilize recycled and recyclable materials when available, appropriate and approved by the Agency’s Engineer.
37. STATUTORY REFERENCES
All references in these Instructions to Bidders (00 21 10) to any statute, rule or regulation are to the statute, rule or regulation as amended, modified, supplemented or replaced from time to time by the corresponding legislative or regulatory body.
END OF SECTION
00 41 10 BID FORM Date Printed: July 3, 2024
Document Version: 1.0 Current Update: December 2023
00 41 00 BID FORM
NAME OF PROJECT: Alga Norte Park Pool Replaster
CONTRACT NO.: PWS24-3464FAC
NAME OF BIDDER:
AGENCY: City of Carlsbad
1635 Faraday Ave
Carlsbad, CA 92008
The undersigned declares that we have carefully examined the location of the proposed Work, and have read and examined the Contract Documents, including all Plans, Specifications, and Addenda, if any, for the above -mentioned Project. The undersigned has acknowledged receipt, understanding, and full consideration of ANY and ALL Addenda to the Contract Documents via the online bidding portal.
We propose to furnish all labor, materials, equipment, tools, transportation, and services, and to discharge all duties and obligations necessary and required to perform and complete the Project, as described and in strict conformity with the Drawings, and these Specifications for TOTAL BID PRICE.