RESOLUTION NO. 2024-249
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, CERTIFYING ADDENDUM NO. 1 TO THE HOUSING ELEMENT
IMPLEMENTATION AND PUBLIC SAFETY ELEMENT UPDATE SUPPLEMENTAL
ENVIRONMENTAL IMPACT REPORT FOR THE CLIMATE ACTION PLAN UPDATE
WHEREAS, on Sept. 22, 2015, the City Council adopted a Climate Action Plan, or CAP, along with the General Plan Update with Resolution No. 2015-244; and WHEREAS, on Sept. 22, 2015, the City Council certified the Final Program Environmental Impact Report for the General Plan Update and CAP, State Clearinghouse Number 2011011004 (EIR 13-02), with Resolution No. 2015-242; and
WHEREAS, EIR 13-02 evaluated the potential environmental effect s of implementing the greenhouse gas, or GHG, reduction measures contained in the 2015 CAP; and WHEREAS, on Jan. 30, 2024, the City Council certified Supplemental Environmental Impact Report for the 2023 Housing Element Implementation and Public Safety Element Update, State Clearinghou se Number 2022090339 (EIR 2022-0007) through adoption of Resolution No. 2024-0014; and
WHEREAS, EIR 2022-0007 evaluated the potential environmental effect s of implementing the GHG reduction measures contained in the CAP Update, or "project "; and WHEREAS, the city has determined that EIR 13-02 and EIR 2022-0007 are of continuing informational value and that the potential environmental impacts of the CAP Update are within the scope of these previously certified document s; and
WHEREAS, the city has determined that none of the conditions requiring subsequent or supplemental environmental review under the California Environmental Quality Act, or CEQA, Guideline s section 15162 exist for the CAP Update; and WHEREAS, an addendum to EIR 2022-0007 was prepared and indicated no significant environmental impacts would occur as a result of implementing the CAP Update; and WHEREAS, all material s with regard to the project were made available to the Planning Commission of the City of Carlsbad ("Planning Commission") for its review, consideration, and recomm endation to the City Council of the project , including but not limited to: Addendum No. 1 to the Housing Element Implementation and Public Safety Element Update Supplemental Environmental Impact Report for the Climate Action Plan Update (Addendum No. 1); and WHEREAS, the city duly noticed a public hearing of the Planning Commission on Oct. 2, 2024, to consider the project and adopted Planning Commission Resolution No. 7520 recommending certification of Addendum No. 1; and
WHEREAS, pursuant to the provisions of the Carlsbad Municipal Code, the City Council did, on Nov. 12, 2024, hold a duly noticed public hearing as prescribed by law to consider the Planning Commission recommendation to certify Addendum No. 1; and WHEREAS, at said public hearing, the City Council heard and considered all testimony and arguments, of all persons desiring to be heard, and examined Addendum No. 1, analyzed the information submitted by staff and considered any written and oral comments received; and WHEREAS, the Record of Proceedings upon which the City Council bases its decision includes, but is not limited to: (1) Addendum No. 1 and the appendices and technical reports cited in and/or relied upon in preparing Addendum No. 1; (2) the staff reports , city files and records and other document s prepared for and/or submitted to the city relating to Addendum No. 1; (3) the evidence, facts, findings, and other determinations set forth in herein; (4) the General Plan and Carlsbad Municipal Code; (S) all plans, studies, data and correspondence submitted to the city in connection with Addendum No. 1; (6) all documentary and oral evidence received at public workshops, meetings, or hearings or submitted to the city relating to Addendum No. 1, and/or elsewhere during the course of the review of the project itself .
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows :
1. 2.
That the above recitations are true and correct .
That the City Council has considered the full record before it, which includes the Record of Proceedings. Furthermore, the recitals set forth above are found to be true and correct and material to this resolution ; and are incorporated herein by reference .
3. That the addendum to EIR 2022-0007 is adequate and provides good-faith disclosure of available information on the project and all reasonable and feasible alternatives thereto .
The addendum to EIR 2022-0007 found no significant environmental impact s would occur as a result of the Climate Action Plan Update.
4. The findings of the Planning Commission contained in Planning Commission Resolution No. 7520, on file with the City Clerk and incorporated herein by reference, are the findings of the City Council.
5. Addendum No. 1 (Attachment A), on file with the City Clerk and incorporated by this reference, evaluated as stated above, is certified based on the following findings:
FINDINGS:
a. The City Council has reviewed, analyzed, and considered Addendum No. 1 to Final EIR 2022-0007 prior to certifying this project.
b. Based upon the evidence submitted and as demonstrated by the analysis included in the Addendum No. 1 to Final EIR 2022-0007, none of the conditions described in CEQA Guidelines Sections 15162 or 15163 calling for the preparation of a subsequent or supplemental EIR or negative declaration have occurred; specifically:
I. The proposed modifications to the project do not create substantial changes that would require major revisions to the EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; and
II. The proposed modifications to the project do not create substantial changes with respect to the circumstances under which the project is undertaken that will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; and
Ill. There is no new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the EIR was certified as complete and adopted, that shows any of the following:
i. The modifications will have one or more significant effects not discussed in the certified EIR;
ii. Significant effects previously examined will be substantially more severe than shown in the certified EIR;
iii. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the Applicant declines to adopt the mitigation measure or alternative; or
iv. Mitigation measures or alternatives that are considerably different from those analyzed in the certified EIR would substantially reduce one or more significant effects on the environment, but the Applicant declines to adopt the mitigation measure or alterative; and
v. The evaluation of the proposed modification s to the project, certified EIR, and Addendum reflects the City Council's independent judgment and analysis based on review of the entirety of the administrative record, which record provides the information upon which this resolution is based.
IV. Pursuant to the above findings, the City Council determines that the EIR (EIR 13-02) and SEIR (EIR 2022-0007), together with the Addendum, satisfy all the requirements of CEOA and is adequate to serve as the required environmental documentation for the project .
c. The City Council finds that the Addendum No. 1 to Final EIR 2022-0007 reflects the City of Carlsbad's independent judgment and analysis, has been prepared in accordance with requirements of the CEOA, the State CEOA Guidelines, and the Environmental Review Procedures of the City of Carlsbad.
d. Pursuant to Public Resources Code Section 21081.6(a)(2) and CEOA Guidelines Section 15091(e), the documents and other materials which constitute the record of proceeding s on which this resolution is based are in the City of Carlsbad, at 1200 Carlsbad Village Drive in the custody of the City Clerk, and at 1635 Faraday Avenue in the custody of the City Planner .
6. This action is final on the date this resolution is adopted by the City Council. The Provisions of Chapter 1.16 of the Carlsbad Municipal Code, "Time Limits for Judicial Review", shall apply:
"NOTICE"
The time within which judicial review of thi s decision must be sought is governed by Code of Civil Procedure, Section 1094.6, which has been made applicable in the City of Carlsbad by Carlsbad Municipal Code Chapter 1.16. Any petition or other paper seeking review must be filed in the appropriate court not later than the ninetieth day following the date on which this decision becomes final; however, if within ten days after the decision becomes final a request for the record is filed with a deposit in an amount sufficient to cover the estimated cost or preparation of such a record, the time within which such petition may be filed in court is extended to not later than the thirtieth day following the date on which the record is either personally delivered or mailed to the party, or his attorney of record, if he has one. A written request for the preparation of the record of the proceeding s shall be filed with the City Clerk, City of Carlsbad, 1200 Carlsbad Village Drive, Carlsbad, CA, 92008.
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 12th day of November , 2024, by the following vote, to wit :
AYES:
NAYS:
ABSTAIN:
ABSENT:
BLACKBURN, BHAT-PATEL, ACOSTA, BURKHOLDER, LUNA.
NONE.
NONE.
NONE. ~ ?
KEITH ~f:! BURN, Mayor
SHERRY FREISINGER, City Clerk
(SEAL)
City of Carlsbad
Addendum No. 1 to the Housing Element
Implementation and Public Safety
Element Update Supplemental
Environmental Impact Report for the
Climate Action Plan Update
prepared for
City of Carlsbad
1635 Faraday Avenue
Carlsbad, California 92008
prepared by
Ascent, Inc.
1230 Columbia Street, Suite 440
San Diego, CA 92101
Public Review Draft
ƚƚĂĐŚŵĞŶƚ
Nov. 12, 2024 Item #8 Page 501 of 637
i)
.
.
Nov. 12, 2024 Item #8 Page 502 of 637
Table of Contents
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR i Table of Contents
Executive Summary ......................................................................................................................................... iii 1 Introduction and Project Summary ........................................................................................................... 1 2 Project Context ...................................................................................................................................... 13 3 Overview of the CEQA Guidelines .......................................................................................................... 15 4 Environmental Effects and Determinations ........................................................................................... 17 5 Addendum Methodology ....................................................................................................................... 18 6 Addendum Evaluation ........................................................................................................................... 19 7 References ............................................................................................................................................. 87
Tables
Table 1 Summary of CAP Update Measures and Actions ................................................................ 4
Figures
Figure 1 Regional Location and Project Vicinity ............................................................................... 2
Nov. 12, 2024 Item #8 Page 503 of 637
City of Carlsbad
Climate Action Plan Update
ii
This page intentionally left blank.
Nov. 12, 2024 Item #8 Page 504 of 637
Executive Summary
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR iii Executive Summary
The Project consists of an update to the City of Carlsbad’s Climate Action Plan (CAP Update). The city’s CAP Update outlines goals, strategies, and acti ons for reducing emissions and combating climate change. The current CAP, approved as part of the 2015 General Plan and amended in July 2020, ensures that Carlsbad does its part to contribute to the goals of AB 32 and its successor legislation, SB 32, to reduce its GHG emissions to 1990 levels by 2020, and to 40 percent below 1990 by 2030. The horizon year for the current CAP is 2035, corresponding with the buildout year of the 2015 General Plan.
The CAP Update contains strategies to reduce local greenhouse gas (GHG) emissions and streamline environmental review of future development projects in the city in accordance with the California Environmental Quality Act (CEQA) such that new development is designed and built following sustainable practices. This is the city’s second comprehensive update to the CAP, following the CAP Amendment No. 1 in July 2020 and the original CAP which was adopted in September 2015. CAP strategies reflect the goals and policies of the city’s General Plan, addressing topics such as increasing energy efficiency, expanding bicycle and pedestrian infrastructure, and achieving solid waste reduction.
The CAP Update establishes measures and actions to assist the City of Carlsbad in achieving its GHG emission reduction targets. The CAP Update includes measures organized into six sectors: water and wastewater, energy, waste diversion, transportation, off-road equipment, and carbon sequestration.
These sectors serve as a way to organize GHG reduction measures and indicate the focus areas of the associated measures. Within each measure there are one or more actions that define activities, programs, policies, or projects that the city government will implement or support to achieve CAP Update goals.
In considering the potential environmental impacts of the CAP Update, the city has determined that the EIR certified for the 2015 General Plan update (Gen eral Plan & Climate Action Plan Environmental Impact Report, State Clearinghouse Number 2011011004, dated June 2015) and SEIR certified for the 2023 Housing Element Implementation and Public Safety Element Update (Housing Element Implementation and Public Safety Element Update Supplemental Environmental Impact Report, State Clearinghouse Number 2022090339, dated July 2023) are of continuing informational value. Further, the city has determined that the potential environmental impacts (both direct and indirect impacts) of the CAP Update are within the scope of the previously certified CEQA documents, and that none of the conditions requiring subsequent or supplement al environmental review under CEQA Guidelines section 15162 exists. Based on the information and an alysis provided below, the city has determined that only minor or technical changes to the previously certified EIRs are necessary and that preparation of an Addendum pursuant to CEQA Guidelines section 15164 is appropriate. This Addendum was prepared as a first-tier CEQA document to “ade quately address” the dire ct and indirect physical environmental effects of CAP Update implementation, including implementation ordinances, so the city can focus analysis in second-tier documents and implementation actions on issues specific to later projects. Agencies can adopt General Plan or zoni ng policies, and apply those policies to specific projects that are consistent with the General Plan or zoning ordinance (Public Resources Code section 21083.3). Under such circumstances, if an impact is not peculiar to the project, then issues addressed by those policies are statutorily exempt from further CEQA review. Based on the general nature of its measures and actions, the CAP Update is analyzed herein to determine whether it could cause a direct or reasonably foreseeable indirect change in the environment.
Nov. 12, 2024 Item #8 Page 505 of 637
City of Carlsbad
Climate Action Plan Update
iv
This page intentionally left blank.
Nov. 12, 2024 Item #8 Page 506 of 637
Introduction and Project Summary
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 1 1 Introduction and Project Summary
Project Title
Addendum No. 1 to the Housing Element Implemen tation and Public Safety Element Update Supplemental Environmental Impact Report (SEIR) for the Climate Action Plan Update (the “Project” which is also referred to herein as the “CAP Update”)
Lead Agency Name and Address
City of Carlsbad
1635 Faraday Avenue
Carlsbad, California 92008
Contact Person and Phone Number
Katie Hentrich, Senior Program Manager, (442) 339-2623
Project Location
The City of Carlsbad encompasse s approximately 39 square miles of land in northwest San Diego County and is surrounded by Oceanside to the north, Vista, San Marcos, and unincorporated areas of San Diego County to the east, Encinitas to the south, and the Pacific Ocean to the west. Along Carlsbad’s northern edge, urban development abuts Highway 78, with the roadway and Buena Vista Lagoon acting as a boundary between Carlsbad and Oceanside. Similarly, Bat Iquitos Lagoon, along the city’s southern edge, acts as a boundary between Carlsbad and Encinitas. To the east, boundaries are less distinct, as a mix of hillsides and urban deve lopment are adjacent to Vista, San Marcos, and unincorporated County lands. The CAP Update planning boundary is the Carlsbad city limits, which is depicted on Figure 1.
Project Sponsor’s Name and Address
City of Carlsbad
1635 Faraday Avenue
Carlsbad, California 92008
Nov. 12, 2024 Item #8 Page 507 of 637
City of Carlsbad
Climate Action Plan Update
2 Figure 1 Regional Location and Project Vicinity
Nov. 12, 2024 Item #8 Page 508 of 637
SAN DIEGO
COUNTY
r ·,
/ L-·7
/ ,·
/ L_;J
// ~-7
/ i
'\
/'\
/
/
/
/
/
/
/
/
/
/ t / ·-"
/ San Luis Rey
/ Oceanside
·\.
\
'\
''\
\ ~
\ . •,r
\
\
\
\
r.: ·; City of Carlsbad
[=-=-.i City Limit s
3 ~~iiiiiiiiiiil"'!~~""""'I Miles
1 in= 2.9mi
0 1.5
Esri Ocean Base
20210138 GIS 001
\
\
\
\,
\
\
\ \
f,.J
/' ...... _ ✓-
.r---./
.}
J
r-'
)
(
.,...i
)
'--,
CC\
Turner
,-- ---!
i....~
i.l
·7
Introduction and Project Summary
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 3 Project Description
The City of Carlsbad (City) strives to reduce its contribution to climate change through policy frameworks that pursue the community’s goal of promoting a sustainable environment. The Climate Action Plan Update (CAP Update) serves to contin ue and elevate this policy framework by realigning its climate action policies with the most recent technological advancements, best practices, and State legislation. The CAP Update is organized into the following chapters:
x Chapter 1, Introduction. The introduction provides an overview of the effects of global climate change, describes the extensive and targeted outreach to engage community members to ensure that the planning process is inclusive and representative of various needs and viewpoints, and provides background for the city’s climate action planning process. x Chapter 2, Greenhouse Gas Emissions Inventory, Forecasts, and Targets. This chapter inventories the city’s GHG emissions to demonstrate the city’s overall contribution to climate change and the contribution of individual GHG emissions sources and forecasts how emissions are expected to change with future growth. This chapter presents the technical basis for the CAP Update, and sets Carlsbad-specific GHG reduction targets for 2035 and 2045 that align with State legislation.
x Chapter 3, Greenhouse Gas Reduction Strategies and Measures. This chapter presents six strategies and 25 measures that will reduce GHG emissions and build resilience to climate impacts in the community (i.e., GHG reduction strategies). The strategies are organized into six sectors: water and wastewater, energy, waste diversion, transportation, off-road equipment, and carbon sequestration.
x Chapter 4, Implementation and Monitoring. Building off the information in Chapter 3, this chapter outlines the process by which the city will implement CAP Update strategies and measures, and how progress will be monitored over time to ensure the CAP Update is effective in reducing emissions.
The CAP Update contains strategies to reduce local greenhouse gas (GHG) emissions and streamline environmental review of future development projects in the city in accordance with the California Environmental Quality Act (CEQA) such that ne w development is designed and built following sustainable practices. The CAP Update is the city’s second comprehensive update to the CAP, following the CAP Amendment No. 1 in July 2020 and the original CAP adopted in September 2015 as part of the 2015 General Plan. CAP strategies reflect the goals and policies of the city’s General Plan, addressing topics such as increasing energy efficiency, expanding bicycle and pedestrian infrastructure, and achieving solid waste reduction.
The CAP Update establishes measures and actions that would reduce GHG emissions in Carlsbad to levels that achieve its GHG reduction targets, which are aligned with the State’s GHG reduction goals.
The city’s 2035 target requires GHG emissions to be reduced 50 percent below 2016 levels (aligned with and extrapolated from SB 32) and reduced to 85 percent below 2016 levels by 2045 (aligned with AB 1279). The CAP Update measures and actions are identified in Table 1. The measures and actions meet the city’s GHG reduction targets.
The CAP Update meets the requirements for a qualified plan for the reduction of greenhouse gas emissions under State CEQA Guidelines Section 15183. for use in cumulative impact analysis pertaining to development projects. This Addendum No. 1 is intended to be used for future project-specific GHG emissions analyses by providing the appropriate level of environmental review to allow for future projects to tier from and streamline their analys is of GHG emissions pursuant to CEQA Guidelines Nov. 12, 2024 Item #8 Page 509 of 637
City of Carlsbad
Climate Action Plan Update
4 Section 15183.5(b)(2), unless otherwise determined to be cumulatively considerable. CEQA provides a variety of devices available to streamline the environmental review process and avoid redundancy.
This Addendum No. 1 was also prepared to function as a first-tier CEQA document that would “adequately address” the direct and indirect physical environmental effects of GHG reduction measures including implementation ordinances so th at city can focus the anal ysis in its second-tier documents and implementation actions solely on the issues specific to the later project. Pursuant to Public Resources Code section 21083.3, agencies can adopt General Plan or zoning policies, and apply those policies to specific projects that are consistent with the General Plan or zoning ordinance. Under such circumstances, if the impact at issue is not peculiar to the parcel or project, then the particular issues addressed by those policies are statutorily exempt from further CEQA review. Based on the “general nature” of the proposed measures and actions, the CAP Update is analyzed herein as to determine whether the activity could cause a direct or reasonably foreseeable indirect change in the environment.
Table 1. Summary of CAP Update Measures and Actions
Transportation
Measure T-1: Traffic Calming & Optimization
Primary Actions
Action T-1.a: Continue optimizing traffic signals within the city, adjusting as needed as traffic volumes and conditions change, and coordinating along major corridors.
Action T-1.b: Install roundabouts or traffic circles when feasible, utilizing the city’s engineering standard for intersection control.
Supportive Actions
Action T-1.c: Leverage the Sustainable Mobility Plan and Intersection Control Evaluation engineering standards to determine the location of new roundabouts and traffic circles.
Measure T-2: Transportation Demand Management Program
Primary Actions
Action T-2.a: Continue implementing and enforcing existing TDM program and enforcing existing TDM ordinance (adopted 2019), mandating TDM improvements and strategies for non-residential development.
Action T-2.b: Update TDM ordinance to modify existing threshold for compliance (e.g., reducing average daily trips threshold) as well as streamlining of other reporting requirements, as appropriate, by 2045.
Supportive Actions
Action T-2.c: Continue surveying businesses, pursuant to the TDM ordinance, to monitor implementation and track compliance.
Action T-2.d: Update TDM strategies in the TDM program as new technology emerges.
Action T-2.e: Leverage Carlsbad Commuter and other city channels to educate commuters on alternative commute choices and resources available.
Measure T-3: Safe Routes to School
Primary Actions
Action T-3.a: Continue implementing a Safe Routes to School program to encourage walking and biking to school.
Supportive Actions
Action T-3.b: Leverage the city’s Sustainable Mobility Plan to determine location-specific improvements.
Action T-3.c: Seek funding to launch Safe Routes to Schools programs at additional school sites.
Nov. 12, 2024 Item #8 Page 510 of 637
Introduction and Project Summary
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 5 Table 1. Summary of CAP Update Measures and Actions
Action T-3.d: Leverage the Sustainable Mobility Plan to conduct Safe Routes to School-related education and outreach activities at schools throughout the city.
Measure T-4: Bikeway System Improvements
Primary Actions
Action T-4.a: Construct 7.9 added miles of Class I multi-use bike paths.
Action T-4.b: Improve 61.2 miles of Class II bike lanes to Class II buffered bike lanes.
Action T-4.c: Continue other bikeway system improvements, as available.
Supportive Actions
Action T-4.d: Leverage the city’s Sustainable Mobility Plan to determine location of bikeway system improvements and secure bike parking and/or storage.
Action T-4.e: Explore launch of a local on-demand microstransit program, such as the City of Oceanside’s program.
Action T-4.f: Evaluate the city’s Supportive Bicycle Infrastructure, such as adding new bicycle parking at highly used coastal destinations, bike repair stations, and additional bike-related amenities.
Measure T-5: Pedestrian System Improvements
Primary Actions
Action T-5.a: Add 6.19 miles of sidewalk.
Supportive Actions
Action T-5.b: Utilize the city’s Sustainable Mobility Plan to identify suitable locations for pedestrian system improvements, focusing on creating safer and more user-friendly infrastructure to facilitate ease of use for pedestrians.
Measure T-6: Local Transportation Improvements
Primary Actions
Action T-6.a: Explore local transportation improvements to provide sustainable on-demand, flexible fleet transit and first-mile last-mile solutions.
Action T-6.b: Leverage the Multimodal Transportation Impact Fee for implementation of local transportation improvements.
Supportive Actions
Action T-6.c: Leverage existing regional transportation plans (e.g., North County Comprehensive Multimodal Corridor Plan, SANDAG Regional Transportation Plan) to add or update improvements to the transportation system within Carlsbad
Action T-6.d: Coordinate with regional and local agencies and partners on influencing transportation improvements throughout the region and within Carlsbad.
Measure T-7: Municipal Transportation Demand Management Primary Actions
Action T-7.a: Continue implementing existing Transportation Demand Management programs for eligible city staff.
Supportive Actions
Action T-7.b: Explore establishing new Transportation Demand Management programs for city staff, resulting in Transportation Demand Management plans for city facilities.
Nov. 12, 2024 Item #8 Page 511 of 637
City of Carlsbad
Climate Action Plan Update
6 Table 1. Summary of CAP Update Measures and Actions
Measure T-8: Increase Public Zero Emission Infrastructure Primary Actions
Action T-8.a: Increase the number of zero emission miles traveled within the city by installing and incentivizing public zero emission vehicle and bicycle infrastructure.
Supportive Actions
Action T-8.b: Seek external funding and/or partnerships for installation of zero emission vehicle and bicycle infrastructure (e.g., Clean Energy Alliance customer programs).
Action T-8.c: Explore creation of incentive programs for new construction and existing buildings to install zero emission vehicle and bicycle infrastructure beyond building code requirements.
Action T-8.d: Continue education and outreach on zero emission vehicle options and rebates.
Action T-8.e: Update existing Electric Vehicle Siting Plan to incorporate additional sites for zero emission vehicle and bicycle infrastructure, as well as new technologies, expanded zero emission vehicle types, and best practices.
Action T-8.f: Explore employee purchase programs to encourage workplace charging for city staff.
Measure T-9: Zero Emission City Fleet
Primary Actions
Action T-9.a: Continue transition and expansion of the city’s zero emission fleet.
Action T-9.b: Install zero emission charging infrastructure to support fleet conversion and deployment needs.
Supportive Actions
Action T-9.c: Establish city fleet regulations for idling.
Action T-9.d: Plan for fleet conversion and deployment, including updates to technology, legislation, and other best practices.
Action T-9.e: Research technology options and purchase technology to sustain city fleet operations during emergencies.
Action T-9.f: Transition all passenger fleet vehicle purchases after FY 2022-23 to be electric vehicles, with the exception of public safety vehicle purchases, which will be electric where feasible.
Action T-9.g: Update city policies to encourage use of zero emission vehicles wherever feasible.
Measure T-10: Parking Management Strategies
Primary Actions
Action T-10.a: Reduce vehicle miles traveled per capita citywide through parking management strategies.
Supportive Actions
Action T-10.b: Implement and update city’s parking management strategies (e.g., Carlsbad Village, Barrio, and Beach Areas Parking Management Plan, Village and Barrio Master Plan) to encourage alternative modes of transportation throughout the city.
Energy
Measure E-1: Renewable Electricity at Municipal Facilities Primary Actions
Action E-1.a: Increase percentage of renewable electricity purchased for existing city facilities and street and safety lighting to 100%.
Nov. 12, 2024 Item #8 Page 512 of 637
Introduction and Project Summary
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 7 Table 1. Summary of CAP Update Measures and Actions
Action E-1.b: Have 100% renewable electricity be the default for new city facilities and street and safety lighting.
Action E-1.c: Eliminate natural gas use at city facilities, where feasible.
Supportive Actions
Action E-1.d: Coordinate with the city’s energy suppliers on the purchase of 100% renewable electricity (e.g., “Green Impact” level from Clean Energy Alliance).
Action E-1.e: Continue certifying city facilities in the Carlsbad Green Business Program.
Action E-1.f: Conduct analysis to determine best practices and technologies for eliminating natural gas use at city facilities.
Action E-1.g: Leverage local and regional partnerships and seek funding to support identified renewable electricity upgrades and elimination of natural gas use at city facilities.
Action E-1.h: Upgrade all street and safety lighting to more energy efficient options.
Measure E-2: Community Choice Energy
Primary Actions
Action E-2.a: Continue the participation in the Clean Energy Alliance (CEA) Community Choice Energy program.
Action E-2.b: Set 100% renewable electricity (e.g., CEA’s “Green Impact”) as the default option for CEA customers within the city.
Supportive Actions
Action E-2.c: Explore the purchase of renewable energy credits if CEA is not reaching its 2035 goal.
Action E-2.d: Support promotion of CEA’s customer programs and encourage CEA customers to participate.
Measure E-3: Nonresidential Building Energy
Measure E-3.1: Nonresidential Building Energy Existing Reach Code Primary Actions
Action E-3.1.a: Continue implementing existing building energy efficiency and water heater ordinances (adopted in 2019).
Supportive Actions
Action E-3.1.b: Analyze feasibility of eligible sites for renewable energy infrastructure across all city facilities, leveraging any pre-existing analyses that are applicable.
Action E-3.1.c: Seek grant funding for installation of renewable energy infrastructure at existing and new city facilities (e.g., solar, battery storage, microgrids).
Measure E-3.2: Nonresidential Building Energy – Updated Reach Code Primary Actions
Action E-3.2.a: Update city’s building code, or “reach code,” to include updated energy performance-based requirements for new nonresidential buildings.
Supportive Actions
Action E-3.2.b: Leverage CEA and SDG&E customer programs, or other similar programs.
Action E-3.2.c: Explore pilot programs and incentives to educate businesses on energy efficiency and renewable energy options for new and existing buildings.
Measure E-3.3: Nonresidential Building Energy – Solar Carports Nov. 12, 2024 Item #8 Page 513 of 637
City of Carlsbad
Climate Action Plan Update
8 Table 1. Summary of CAP Update Measures and Actions
Primary Actions
Action E-3.3.a: Construct “solar carports” (also known as installing solar panels over outdoor parking spaces) at eligible city-owned parking lots.
Supportive Actions
Action E-3.3.b: Conduct feasibility study for solar carport installation at city facilities to determine which are eligible and for what size of system.
Action E-3.3.c: Seek grant funding and leverage partnerships to install solar carports.
Measure E-4: Residential Building Energy
Measure E-4.1: Residential Building Energy – Existing Reach Code Primary Actions
Action E-4.1.a: Continue implementing existing building energy efficiency and water heater ordinances (adopted in 2019).
Supportive Actions
Action E-4.1.b: Explore updating the Home Energy Score Assessment Pilot Program.
Action E-4.1.c: Leverage CEA and SDG&E customer programs, or other similar programs Action E-4.1.d: Explore pilot programs and incentives to educate residents on energy efficiency and renewable energy options for new and existing buildings.
Measure E-4.2: Residential Building Energy – Updated Reach Code Primary Actions
Action E-4.2.a: Update city’s building code, or “reach code,” to include updated energy performance-based requirements for new residential buildings.
Supportive Actions
Action E-4.2.b: Leverage CEA and SDG&E customer programs, or other similar programs.
Action E-4.2.c: Explore pilot programs and incentives to educate residents on energy efficiency and renewable energy options for new and existing buildings Measure E-5: Building Energy Benchmarking
Primary Actions
Action E-5.a: Develop, adopt, and implement a building energy benchmarking ordinance.
Supportive Actions
Action E-5.b: Prepare a building stock analysis.
Action E-5.c: Explore options and best practices for requiring existing commercial and residential buildings of a certain size to submit energy data annually.
Action E-5.d: Conduct education and outreach to building owners and the public regarding new requirements.
Measure E-6: Decarbonize Existing Buildings
Primary Actions
Action E-6.a: Reduce energy usage and decarbonize existing residential buildings, particularly existing residential buildings not covered by any reach code requirements.
Supportive Actions
Action E-6.b: Explore updating the Home Energy Score Assessment Pilot Program.
Nov. 12, 2024 Item #8 Page 514 of 637
Introduction and Project Summary
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 9 Table 1. Summary of CAP Update Measures and Actions
Action E-6.c: Leverage CEA and SDG&E customer programs, or other similar programs.
Action E-6.d: Seek external funding to launch and/or leverage existing pilot programs and incentives to support existing building decarbonization (e.g., appliance exchange, weatherization, solar PV installation, battery storage)
Action E-6.e: Leverage building stock analysis (prepared for E-5) to target existing residential buildings.
Water and Wastewater
Measure W-1: Wastewater System Improvements
Primary Actions
Action W-1.a: Continue making improvements to the City of Carlsbad’s collection system, including but not limited to upgrading lift stations.
Supportive Actions
Action W-1.b: Explore system improvements based on SCADA Master Plan.
Measure W-2: Water System Improvements
Primary Actions
Action W-2.a: Continue making improvements to CMWD’s potable and recycled water systems, including but not limited to expanding water reuse, and using renewable energy to power facilities.
Supportive Actions
Action W-2.b: Continue to explore local water supply options and assess feasibility and cost to benefit ratio.
Action W-2.c: Assess feasibility and seek funding for renewable energy and/or storage at CMWD facilities.
Waste Diversion
Measure WD-1: Solid and Organic Waste Diversion
Primary Actions
Action WD-1.a: Reduce waste disposal to 4.2 pounds per person per day (or the equivalent of a 75% diversion rate) by 2035 and to 1.7per person per day (or the equivalent of a 90% diversion rate) by 2045.
Action WD-1.b: Divert 75% organic waste by 2035 and 90% by 2045.
Supportive Actions
Action WD-1.c: Research ordinance for requirement of a percentage of disposal for organic waste.
Action WD-1.d: Encourage maximum organics diversion from local businesses.
Action WD-1.e: Establish a Construction & Demolition diversion program.
Action WD-1.f: Maximize edible food recovery.
Action WD-1.g: Establish a program for permitted haulers for proper diversion of all waste streams.
Action WD-1.h: Continue implementing existing Sustainable Materials Management systems and ordinances citywide, including at city facilities and events.
Action WD-1.i: Continue implementing existing compost and mulch giveaway programs; explore launching new giveaway programs that target specific users.
Action WD-1.j: Update the city’s sustainable purchasing policy to include regulatory requirements for sustainable procurement.
Action WD-1.k: Pursue vendor contracts to help implement diversion goals and monitor compliance.
Nov. 12, 2024 Item #8 Page 515 of 637
City of Carlsbad
Climate Action Plan Update
10 Table 1. Summary of CAP Update Measures and Actions
Off-Road Equipment
Measure OR-1: Convert Gas-Powered Leaf Blowers
Primary Actions
Action OR-1.a: Develop, adopt, and implement an ordinance prohibiting the use of gas-powered leaf blowers.
Supportive Actions
Action OR-1.b: Leverage existing State and regional resources to promote trade-in of existing gas-powered leaf blowers or other similar incentives.
Action OR-1.c: Conduct outreach regarding the new requirements.
Measure OR-2: Increase Renewable or Alternative Fuel Construction Equipment Primary Actions
Action OR-2.a: Develop, adopt, and implement an ordinance requiring new developments and significant land-moving and construction projects to use electric-powered or alternatively-fueled construction equipment that reduces 50% of emissions from project construction activities.
Supportive Actions
Action OR-2.b: Exempt small residential and non-residential projects from this requirement.
Action OR-2.c: Conduct outreach regarding new requirements.
Action OR-2.d: Seek external funding and leverage existing resources to support conversion of medium and heavy duty vehicles.
Carbon Sequestration
Measure CS-1: Community Forest Management
Primary Actions
Action CS-1.a: Increase city’s tree inventory by continuing to implement the Community Forest Management Plan.
Action CS-1.b: To help sustain the city’s tree inventory, continue replacing trees at a 2:1 ratio.
Action CS-1.c: Conduct an inventory to assess urban canopy cover every five years.
Supportive Actions
Action CS-1.d: Explore additional locations for tree planting beyond what is included in the Community Forest Management Plan, with “right tree right space,” ongoing budget, and maintenance costs taken into consideration.
Action CS-1.e: Encourage eligible residents to take part in a free street tree planting assessment.
Source: City of Carlsbad 2024.
Note: The implementation actions under each GHG reduction measure have been categorized as “Primary” or “Supportive” to signify the degree in which an action a ffects the quantifiable GHG reductions that are expected to be achieved with implementation. Primary actions ar e implementation actions that drive quantifiable GHG reductions. Supportive actions provide additional support to the successful implementation of the measure and may also have associated GHG reductions that have not been quantified as part of the CAP Update.
The city has developed an update to its Climate Action Plan Consistency Review Checklist (CAP Nov. 12, 2024 Item #8 Page 516 of 637
Introduction and Project Summary
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 11 Consistency Checklist), in conjunction with the CA P Update, to provide a streamlined review process for proposed new development projects that are subject to discretionary review and trigger environmental review pursuant to CEQA. New developments that are consistent with growth projections and applicable GHG reduction measures of the CAP Update are eligible for streamlining under State CEQA Guidelines Section 15183.5. The proposed CAP Consistency Checklist is discussed in more detail in Chapter 4 of the CAP update.
The CAP Update includes strategies, measures, and actions intended to reduce GHG emissions from six emissions sectors. To achieve reductions in GHG emissions, measures and actions within each sector are proposed to be implemented within specific timeframes. The strategies, measures, and actions are listed in full in Table 1. The strategies, measures, and actions describe the overall approach and detail the specific programs and actions that the city will carry out. This Addendum has been prepared to address the implementation of the CAP Update measures and actions that could result in reasonably foreseeable physical impacts to the en vironment. More focused CEQA analysis (focusing on specifics of individual implementing actions) may be required in the future.
Discretionary Actions
The CAP Update would require the following discretionary actions by the City Council:
x Approval of Addendum No. 1 to the Housing Element Implementation and Public Safety Element Update Supplemental Environmental Impact Report x Adoption of the CAP Update
Location of Prior Environmental Document(s)
The location and custodian of the General Plan update EIR, and Housing Element Implementation and Public Safety Element Update SEIR are the City Cler k, City of Carlsbad, 1200 Carlsbad Village Drive, Carlsbad, CA. A copy of the previous environmental documents is also available online at the City of Carlsbad, Planning Department website:
https://www.carlsbadca.gov/home/showpublisheddocument/14316/638248571137030000 Nov. 12, 2024 Item #8 Page 517 of 637
City of Carlsbad
Climate Action Plan Update
12 This page intentionally left blank.
Nov. 12, 2024 Item #8 Page 518 of 637
Project Context
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 13 2 Project Context
The following provides a history and timeline of the environmental documentation that has been prepared for the City of Carlsbad’s CAP and Housing Element Implementation and Public Safety Element Update.
On September 22, 2015, the City of Carlsbad certified a final environmental impact report (EIR) for a comprehensive update to the General Plan and a Climate Action Plan (General Plan & Climate Action Plan Environmental Impact Report, State Clearinghouse Number 2011011004, dated June 2015) (City of Carlsbad 2015). The city’s 2015 CAP was developed in response to AB 32, and the increasing severity of climate events. The 2015 CAP includes goals, po licies, and actions for Carlsbad to reduce GHG emissions and address climate change through 20 35. The certified EIR discussed the potential environmental impacts (both direct and indirect impacts) associated with future development allowed under the General Plan update and included a thorough analysis of the estimated build out of the city through the horizon year 2035. The EIR found that, with implementation of the policies and programs contained in the General Plan and recommended mitigation measures, all impacts (direct and indirect) associated with future development under the General Plan update would be less than significant, except impacts on Air Quality and Transportation which would be significant and unavoidable.
As statewide targets adjusted to limit global warming below 2 degrees Celsius, the city has adapted its CAP and GHG reduction targets ac cordingly. On July 14, 2020, the City Council approved CAP Amendment No. 1 to revise the GHG inventory and reduction targets and forecast, update reductions from existing measures and incorporate community choice energy as a new reduction measure. This was partially influenced by the publication of the 2017 California Air Resources Board (CARB) Climate Change Scoping Plan (Scoping Plan) and the 2018 San Diego Association of Governments (SANDAG) Regional Climate Action Planning Framework (ReC AP). Both documents included new guidance on calculating GHG reduction targets. The amended CAP contained a 2012 GHG inventory, requiring the recalculation of 2020 and 2035 emissions reduction targets and recalculation of the business-as-usual (BAU) forecast, State and federal emissions reductions, and local reductions needed to reach a 2017 Scoping Plan aligned target. The BAU forecast assumes no additional actions to reduce GHG emissions occur after 2012 (the updated baseline inventory year), providing an assessment of how Carlsbad’s GHG emissions would change with future growth.
Addendum No. 1 to the 2015 General Plan Update and CAP EIR was prepared in May 2020 for updates to the certified CAP (“CAP Amendment No. 1”) (City of Carlsbad 2020). CAP Amendment No. 1 included use of the 2012 GHG inventory, calculation of 2020 and 2035 targets using the 2012 GHG inventory and guidance from CARB’s 2017 Climate Change Scoping Plan, the addition of Community Choice Energy (CCE) as a GHG reduction measure and recalculation of the CAP measures to reflect changes in State and federal policies and the changed electrical generation emissions factor associated with CCE. The Addendum concluded that CAP Amendment No. 1 did not constitute a substantial change in the project or circumstances involving significant environmental effects or a substantial increase in the severity of previously identified effects. The mitigation measures previously included and remaining in the CAP, and the CCE implementation measure remained fe asible. Therefore, CAP Amendment No. 1 did not necessitate a subsequent EIR because it did not create any of the situations contained in State CEQA Guidelines Section 15162.
Nov. 12, 2024 Item #8 Page 519 of 637
City of Carlsbad
Climate Action Plan Update
14 Addendum
The Housing Element Update for the General Plan was prepared in late 2020 and provided to the California Department of Housing and Community Development (HCD) for preliminary review. The Housing Element was analyzed under its own respective CEQA document, Addendum No. 2 to the 2015 General Plan EIR, which was approved by the City Council on April 6, 2021 (SCH#2011011004) (City of Carlsbad 2021). This Addendum found that, with implementation of mitigation measures, all impacts (direct and indirect) associated with the Housing Element did not identify any changes in the Project (2015 General Plan), chan ges in circumstance, and/or any new information of substantial importance that would cause significant effects to environmental resources. Addendum No. 2 determined that the 2015 General Plan EIR was of continuing informational value, the changes in the 2021 Housing Element Update were within the scope of that previously certified EIR, and none of the conditions requiring the preparation of subsequent or supplemental environmental review under CEQA Guidelines section 15162 existed.
On February 2, 2024, the City of Carlsbad certified a supplemental environmental impact report (SEIR) which consists of amendments to the Carlsbad General Plan, including the Land Use and Community Design Element and Public Safety Element, and amendments to Carlsbad Municipal Code Title 21, the Zoning Ordinance (Housing Element Implementation and Public Safety Element Update Supplemental Environmental Impact Report, State Clearinghouse Number 2022090339, dated July 2023) (City of Carlsbad 2024). The certified SEIR discussed the potential environmental impacts (both direct and indirect impacts) associated with the development of housing on 18 sites as part of the Housing Element implementation. The SEIR identified updates to the Carlsbad General Plan, specifically the Land Use and Community Design Element, to allow for this development. The Public Safety Element would also be updated to ensure consistency with State regulations. Updates to the Land Use and Community Design Element included the addition of two new residential land use designations (R-35 and R-40) for the accommodation of higher density residential development, establishment of revised minimum densities for some residential designations, miscellaneous, related changes to tables, text and policies, and changes to land use designations on multiple sites to accommodate the city’s Regional Housing Needs Allocation (RHNA) share. Updates to the Public Safety Element included the addition of the requirements of new State legislation and the incorporation of new policies based on local and regional data. The SEIR found that, with implementation of mitigation measures, all impacts (direct and indirect) associated with the Housing Element Implementation and Public Safety Element Update would be less than significant, except impacts on Air Quality, GHG, Noise, and Transportation which would be significant and unavoidable.
In considering the potential environmental impacts of the CAP Update, the city has determined that the EIR certified for the 2015 General Plan update and SEIR certified for the 2024 Housing Element Implementation and Public Safety Element Update are of continuing informational value. The city also has determined that the potential environmental impacts (both direct and indirect impacts) of the CAP Update are within the scope of the previously certified EIR and SEIR and that none of the conditions requiring subsequent or supplemental environmental review under CEQA Guidelines section 15162 exists. Based on the information and analysis provided below, the city has determined that only minor or technical changes to the previously certified EI R are necessary and that that preparation of an Addendum pursuant to CEQA Guidelines section 15164 is appropriate.
Nov. 12, 2024 Item #8 Page 520 of 637
Overview of the CEQA Guidelines
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 15 3 Overview of the CEQA Guidelines
Section 15160 of the CEQA Guidelines explains that there are several mechanisms, and variations in environmental documents, that can be tailored to different situations and intended uses of environmental review. Specifically, Section 15160 states that the “…variations listed [including Subsequent EIRs, Supplemental EIRs, and Addendums] are not exclusive. Lead agencies may use other variations consistent with the Guidelines to meet the needs of other circumstances.” This provision allows Lead agencies to tailor the use of CEQA mechanisms (such as this Addendum) to fit the circumstances presented to the Lead agency by a project. Here, the city has opted to prepare an Addendum to assess the minor modifications of the Project that have transpired since preparation of the EIR.
Public Resources Code Section 21166 and Californi a Environmental Quality Act (CEQA) Guidelines Sections 15162 and 15164 set forth the criteria for determining the appropriate additional environmental documentation, if any, to be completed when changes are proposed to a project that has a previously certified Environmental Impact Report (EIR). When considering the need for additional environmental review, the fundamental determination a lead agency must make is whether the previously certified EIR retains some informat ional value or whether changes in the project or circumstances have rendered it wholly irrelevant. If the previously certified EIR has continuing informational value, the lead agency then must determine whether the proposed changes in the Project require additional environmental review under Public Resources Code Section 21166 and CEQA Guidelines Section 15162.
CEQA Guidelines Section 15164 states that a lead agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary, but none of the conditions described in Section 15162 calling for preparation of a subseque nt EIR have occurred. CEQA Guidelines section 15162(a) states that no Subsequent or Supplemental EIR shall be prepared for a project with a certified EIR unless the lead agency determines, based on substantial evidence in the light of the whole record, one or more of the following:
1. Substantial changes are proposed in the project that will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.
2. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.
3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of the following:
A. The project will have one or more significant effects not discussed in the previous EIR.
B. Significant effects previously examined will be substantially more severe than shown in the previous EIR.
C. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative.
Nov. 12, 2024 Item #8 Page 521 of 637
City of Carlsbad
Climate Action Plan Update
16 Addendum
D. Mitigation measures or alternatives that are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents de cline to adopt the mitigation measure or alternative.
The analysis pursuant to Section 15162 demonstrates whether the lead agency can approve the activity as being within the scope of the existing certified EIR, that an addendum to the existing EIR would be appropriate, and no new environmental document, such as a new EIR, would be required. The addendum need not be circulated for public review but can be included in or attached to the final EIR, and the decision-making body shall consider the addendum with the final EIR prior to deciding on the project.
The City of Carlsbad has prepared this Addendum, pursuant to CEQA Guidelines Sections 15162 and 15164, to evaluate whether the Project’s environmental impacts are covered by and within the scope of the Housing Element Implementation and Public Safety Element Update Supplemental Environmental Impact Report (State Clearinghouse Number 2022090339, dated July 2023). The following Addendum details any changes in the Pr oject, changes in circumstances under which the Project is undertaken, and/or “new information of substantial importance” that may cause one or more significant effects to environmental resources.
The responses herein substantiate and support the City of Carlsbad’s determination that the potential environmental impacts of the CAP Update measures and actions are within the scope of the Housing Element Implementation and Public Safety Element Update SEIR, do not require subsequent or supplemental environmental review under CEQA Guidelines Section 15162 and, in conjunction with the SEIR, preparation of an Addendum pursuant to CEQA Guidelines Section 15164 is appropriate.
Nov. 12, 2024 Item #8 Page 522 of 637
Environmental Effects and Determinations
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 17 4 Environmental Effects and Determinations
The subject areas checked below were determined to be new significant environmental effects or to be previously identified effects that have a substantial increase in severity either due to a change in Project, change in circumstances, or new information of substantial importance, as indicated by the checklist and discussion on the following pages.
ŶNONE
පAestheticsපAir QualityපBiological Resources
පEnergy, Greenhouse Gas Emissions,
and Climate Change
පGeology, Soils,
and Seismicity
පHazards and Hazardous
Materials, Airport Safety, and
Wildfires
පHistorical, Archaeological, and
Paleontological Resources (includes
Tribal Cultural Resources)
පHydrology and
Flooding
/Water Quality
පLand Use Planning, Housing,
and Population
පNoiseපPublic Facilities
and Services
පUtilities and Service Systems
පTransportationපAgriculture &
Forestry
Resources
පImpacts Not Potentially
Significant: Mineral
Resources
Determination
Based on this analysis, the 2024 Housing Element Implementation and Public Safety Element Update SEIR has continuing informational value and:
ƑSubstantial changes are proposed in the project or there are substantial changes in the circumstances under which the project will be undertaken that will require major revisions to the previous EIR due to the involvement of significant new environmental effects or a substantial increase in the severity of previously identified significant effects. Or, there is “new information of substantial importance,” as that t e r m i s u s e d i n C E Q A G u i d e l i n e s S e c t i o n 15162(a)(3). Therefore, a SUBSEQUENT or SUPPLEMENTAL EIR is required.
ŶNo substantial changes are proposed in the project and there are no substantial changes in the circumstances under which the project will be undertaken that will require major revisions to the previous EIR due to the involvement of significant new environmental effects or a substantial increase in the severity of previously identified significant effects. Also, there is no “new information of substantial importance” as that term is used in CEQA Guidelines Section 15162(a)(3). Therefore, the preparation of an Addendum to the previously certified SEIR (City of Carlsbad, Housing Element Implementation and Public Safety Element Update Supplemental Environmental Impact Report (SEIR) (State Clearinghouse Number 2022090339, dated July 2023) is adequate and appropriate.
Signature: _________________________________ Date: __________________________ Printed Name: ______________________________ Title: __________________________ Eric Lardy
May 2, 2024
City Planner
Nov. 12, 2024Item #8 Page 523 of 637
t -g
~
City of Carlsbad
Climate Action Plan Update
18 Addendum
5 Addendum Methodology
The city has previously prepared and certified an EIR for the 2015 General Plan, an Addendum for the CAP Amendment (2020), an Addendum for the Housing Element (2021), and a SEIR for the Housing Element Implementation and Public Safety Element Update (2024). Collectively, these CEQA reviews are known as the “Previous CEQA Documents.” No le gal actions were filed challenging the Previous CEQA Documents and thus are presumed valid.
Since the adoption of the Previous CEQA Documents, there have been no substantial changes in the city’s policies that relate to actions in the CAP Update; neither has there been new information, or a change of circumstances which would invalidate the Previous CEQA Documents. In addition, the city adopted ordinances in 2019 that amended the Carlsbad Municipal Code related to energy efficiency, renewable energy, alternative water heating, el ectric vehicle charging infrastructure and transportation demand management, which further mitigate environmental impacts.
The CAP Update is a programmatic planning document which catalogues the priorities of the city for reducing energy use and greenhouse gas emissions to meet State reduction targets. The CAP Update does not approve or authorize a project that could potentially alter the environment. Rather, it outlines the need for future work to advance each of the separate measures and actions.
Nov. 12, 2024 Item #8 Page 524 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 19 6 Addendum Evaluation
Aesthetics
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Have a substantial adverse effect
on a scenic vista?
Less than
Significant None No No No Yes Yes
b. Substantially damage scenic
resources, including, but not
limited to, trees, rock
outcroppings, and historic
buildings within a State scenic
highway?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 525 of 637
City of Carlsbad
Climate Action Plan Update
20 Addendum CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the
Proposed
Changes
Involve a New
or Substantial
Increase in
the Severity
of Previously
Identified
Impacts?
Are There New
Circumstances Involving a
New or Substantial Increase
in the Severity of Previously
Identified Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical
Changes or
Additions
Necessary or
Did None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of the
SEIR?
c. In non-urbanized areas, substantially
degrade the exiting visual character or
quality of public views of the site and its
surroundings (Public views are those
that are experienced from publicly
accessible vantage point). If the project
is in an urbanized area, would the
project conflict with applicable zoning
and other regulations governing scenic
quality?
Less than
Significant None No No No Yes Yes
d. Create a new source of substantial light or
glare that would adversely affect day- or
nighttime views in the area?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 526 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 21 Previous CEQA Analysis Aesthetics Findings
The 2024 SEIR identified less than significant impacts for scenic vistas (AES-1), scenic resources within scenic highways (AES-2), visual quality (AES-3), and light and glare (AES-4) (Section 4.1, Aesthetics).
Addendum Analysis
The implementation of the CAP Update measures and actions would result in short-term and long- term changes related to aesthetics as described below.
Construction activities associated with the implementation of the CAP Update, such as equipment use and staging of materials, would result in short-term, temporary changes to aesthetic conditions in the city. The types of construction activities associated with the CAP Update would vary depending on the type of CAP Update measure. For example, Measures T-1, T-4, T-5, T-8, and T-9 would involve removing existing pavement; repaving roadway surfaces; painting or restriping pavement; modifying curbs; laying concrete, and installing traffic signals, lighting, landscaping, street furniture, and other amenities. Some of these improvements, such as Measure E-3.3, W-1, and W-2, would require limited ground disturbance. Construction activities would be short-term and temporary, and would not involve equipment of substantial height, bulk, or massing that would have substantial adverse effects on existing scenic vistas, scenic resources, or visual quality. Because duration of these activities would be limited to relatively short periods, their temporary effects on aesthetic resources would not be substantial.
Construction activities would also incrementally in crease sources of light and glare in the city, for example from outdoor lighting sources associated with construction of transportation improvements and glare from construction vehicl es and equipment. Construction activities would generally occur during daytime hours and would comply with applicable lighting requirements including the City’s Zoning Ordinance and Title 24 of the California Building Code that reduce light spillover. Furthermore, construction activities would be located in developed areas with existing sources of outdoor lighting and glare, characteristic of developed urban and suburban environments. Thus, the CAP Update would not create temporary new sources of substantial light or glare that would adversely affect day or nighttime views in the city.
Long-term changes resulting from implementation of CAP Update measures would include improvements at or near grade level of existing roadways, as well as minor changes to traffic intersections and walkways (through implementation of Measures T-1, T-4, T-5, T-8, and T-9), improvements to water and wastewater systems (Measures W-1 and W-2), and planting of trees (through implementation of Measure CS-1). Energy-r elated measures such as Measure E.3-3, which includes the construction of solar carports, would also result in changes to the aesthetic environment.
Implementation of Measures T-1, T-4, T-5, T-8, and T-9 would also result in the installation of new sidewalks, new and upgraded bikeways and walkways along existing developed roadways and rights- of-way in the city, and the installation of roundabouts or control traffic within the intersections of existing developed roadways. The CAP Update would not result in new features of substantial height, bulk, or massing that would result in substantial long-term damage to scenic vistas, scenic resources, or visual quality. Additionally, the increase in planted trees and the development of new landscaping (Measure CS-1) would offer long-term visual improvement to the local surrounding area and would not result in a substantial effect to scenic vistas, scenic resources, or visual quality.
Transportation measures and actions included in the CAP Update would include improvements to the city’s existing pedestrian, bicycle, and transit network that may introduce new short term light sources. In addition, installation of solar carports (Measure E-3.3) would introduce new sources of glare from sunlight reflecting off of solar photovoltaic panels.
Nov. 12, 2024 Item #8 Page 527 of 637
City of Carlsbad
Climate Action Plan Update
22 Addendum
These types of improvements would comply with applicable lighting requirements including the city’s Zoning Ordinance and Title 24 of the California Building Code that reduce light spillover. Improvements resulting from implementation of the CAP Update would be located in developed areas with existing sources of outdoor lighting and glare, characteristic of developed urban and suburban environments.
Thus, the CAP Update would not create new long-term sources of substantial light or glare that would adversely affect day or nighttime views in the city.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to aesthetics. The 2024 SEIR did not identify significant aesthetic impacts and did not identify mitigation measures. The CAP Update would not result in any new or substantially more severe significant impacts related to aesthetics.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to aesthetics.
Nov. 12, 2024 Item #8 Page 528 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 23 Agriculture and Forestry Resources
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information of
Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Convert Prime Farmland, Unique
Farmland, or Farmland of
statewide Importance, as shown
on maps prepared pursuant to
the Farmland Mapping and
Monitoring Program of the
California Resources Agency, to
nonagricultural use?
No Impact
None No No No Yes Yes
b. Conflict with existing zoning for
agricultural use, or a Williamson
Act contract?
No Impact
None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 529 of 637
City of Carlsbad
Climate Action Plan Update
24 Addendum
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the
Proposed
Changes
Involve a New
or Substantial
Increase in
the Severity
of Previously
Identified
Impacts?
Are There New Circumstances
Involving a New or
Substantial Increase in the
Severity of Previously
Identified Impacts?
Is There New
Information of
Substantial
Importance
Requiring New
Analysis or
Verification?
Are Only Minor
Technical
Changes or
Additions
Necessary or
Did None of
the Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
c. Conflict with existing zoning for, or
cause rezoning of, forest land, as
defined in Public Resources Code
Section 12220 (g)), timberland (as
defined by Public Resources Code
Section 4526), or timberland zoned
Timberland Production (as defined by
Government Code Section 51104(g))?
No Impact
None No No No Yes Yes
d. Result in the loss of forest land or
conversion of forest land to non-forest
use?
No Impact
None No No No Yes Yes
e. Involve other changes in the exiting
environment which, due to their
location or nature, could result in the
conversion of Farmland, to non-
agricultural use or conversion of forest
land to non-forest use?
No Impact
None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 530 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 25 Previous CEQA Analysis Agriculture and Forestry Resources Findings The 2024 SEIR identified no impacts for converting Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland); for conflicting with existing zoning for agricultural use or a Williamson Act contract or with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)); timberland (as defined by Public Resources Code Section 4526); or timberland zoned Timberland Production (as defined by Government Code Section 51104(g)); and for resulting in the loss of forest land or conversion of forest land to non-forest use; or involving other changes in the existing environment which, due to their location or nature, could result i n c o n v e r s i o n o f F a r m l a n d t o n o n - a g r i c u l t u r a l u s e o r c o n v e r s i o n o f f o r e s t l a n d t o n o n - f o r e s t u s e (Section 4.16.1, Agriculture and Forestry Resources).
Addendum Analysis
Implementation of the CAP Update would not result in the conversion of Important Farmland or forest land to urban or other uses. Measures and actions included in the CAP Update may include construction activities, such as equipment use an d staging of materials; however, construction activities would occur in previously disturbed, developed areas not currently used for agricultural uses or under a Williamson Act contract. There are currently no Williamson Act contracts in the city and the CAP Update does not propose land use changes that would affect the status of any Williamson Act contracts (DOC 2024). Additionally, there are no areas in the city zoned as forest or timberland, therefore, implementation of the CAP Update would not conflict with existing zoning or cause rezoning any forest land, timberland, or timber land zone d for timberland production. Therefore, the CAP Update would not involve other changes in the exiting environment which, due to their location or nature, could result in the conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to agriculture and forestry resources. The 2024 SEIR did not identify significant agriculture and forestry resources impacts and did not identify mitigation measures. The CAP Update would not re sult in any new or substantially more severe significant impacts related to agriculture and forestry resources.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to agriculture and forestry resources.
Nov. 12, 2024 Item #8 Page 531 of 637
City of Carlsbad
Climate Action Plan Update
26 Addendum Air Quality
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Conflict with or obstruct
implementation of the applicable
air quality plan?
Less than
Significant with
Mitigation
MM AQ-1 No No No Yes Yes
b. Result in a cumulatively
considerable net increase of any
criteria pollutant for which the
project region is non-attainment
under an applicable federal or
State ambient air quality
standard?
Significant and
Unavoidable MM AQ-2 No No No Yes Yes
c. Expose sensitive receptors to
substantial pollutant
concentrations?
Less than
Significant with
Mitigation
MM AQ-3
MM AQ-4 No No No Yes Yes
d. Result in other emissions (such as
those leading to odors) adversely
affecting a substantial number of
people?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 532 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 27 Previous CEQA Analysis Air Quality Findings
The 2024 SEIR identified a less than significant impa ct related to a conflict with or obstruction of the San Diego Regional Air Quality Strategy or State Implementation Plan (AQ-1) with implementation of mitigation measure AQ-1. The 2024 SEIR identified that although mitigation measure AQ-2 would reduce operational emissions from future development, it would be speculative to quantify such emissions until details of the individual projects are known and concluded impacts to be significant and unavoidable (AQ-2). The 2024 SEIR identified a less than significant impact related to exposing offsite sensitive receptors to substantial pollution concentrations (AQ-3) with implementation of mitigation measure AQ-3 and mitigation measure AQ -4. The 2024 SEIR also identified a less than significant impact related to creating objectional odors (AQ-4) (Section 4.2, Air Quality).
Addendum Analysis
The implementation of the CAP Update measures and actions would result in short-term and long- term changes related to air quality as described below.
Construction activities associated with the implementation of the CAP Update, such as equipment use, construction of new facilities or retrofitting of exis ting facilities, would result in construction-related air quality emissions. The types of construction activities associated with the CAP Update would vary depending on the type of CAP Update measure. Examples of activities that would result from implementation of the CAP Update measures include construction of new EV charging stations, public zero emission vehicle and bicycle charging infrastructure, building efficiency retrofits, roundabouts or traffic circles, new and improved bicycle infrastructure, new solar carports, and water and wastewater system improvements (e.g., Measures T-1, T-2, T-3, T-4, T-5, T-8, T-9, E-3.3, W-1, and W-2). These construction activities would involve using construc tion equipment and vehicles to remove existing pavement; repave roadway surfaces; paint or rest ripe pavement; modify curbs; lay concrete, and install traffic signals, lighting, landscaping, street furniture, and other amenities. These construction activities would be completed by workers located in the city and surrounding areas in the San Diego region.
Construction activities resulting from implementation of the CAP Update would generate emissions of
ROG, NO
X, PM10, and PM 2.5 associated with off-road equipment use (i.e. excavators, front loaders, pavers, dump trucks, cranes, and backhoes), material and equipment delivery trips, worker commute trips, and other miscellaneous activities. Construction activities would be relatively small in scale, occur intermittently in different locations throughout the city, last for only short periods of time, and would not require substantial relocation of construction workers from areas outside of the city and the San Diego region. The CAP Update includes measures that would reduce air pollutant emissions during construction activities. For example, measure OR-2 would increase the use of renewable and alternative fuel construction equipment, while Measure T-9 would establish city fleet regulations for idling, thus reducing construction vehicle idling ti me and further reducing construction related air pollutant emissions. Due to the non-intensive, sporadic, and dispersed nature of these construction activities, emissions of criteria air pollutants would not occur in concentrations which would exceed SDAPCD thresholds and would therefore be consistent with the goals of the San Diego Regional Air Quality Strategy or State Implementation Plan. Ther efore, mitigation measure AQ-1 identified in the SEIR would not apply to the construction related air pollutant emissions of the CAP Update. Mitigation measure AQ-1 identified in the SEIR applies specifically to the construction impacts associated with housing development projects permitted under implementation of the Housing Element Update, and would therefore not apply to the CAP Update.
Nov. 12, 2024 Item #8 Page 533 of 637
City of Carlsbad
Climate Action Plan Update
28 Addendum The CAP Update includes several measures (T-4, T-5) that would reduce GHG and vehicle miles traveled (VMT) through the expansion of bicycle infrastructure, and increased connectivity of sidewalk networks. Although there would be a temporary, nominal amount of vehicle trips related to construction worker commute and equipment delivery associated with bike and sidewalk improvements and other construction activities resulting from CAP Update implementation, the CAP Update would not result in result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or State ambient air quality standard. Therefore, mitigation measure AQ-2 identified in the SEIR would not apply to the CAP Update.
Measures that would result in new zero emission vehicle and bicycle charging stations (T-8), roundabouts (T-1), improved bicycle infrastructure (T-4), solar carports (E-3.3) would result in minor criteria air pollutant and TAC emissions during construction. It is unlikely that these types of activities would be of the size, intensity, or duration to exceed SDAPCD thresholds of significance or to emit substantial TAC concentrations. Measure WD-1 woul d increase the diversion of solid and organic waste from landfills which could lead to increase d haul truck trips to and from composting and recycling facilities; however, it is anticipated that these trips would displace the haul truck trips that would be diverted from the landfill. A substantial ne t increase in the number of haul truck trips and associated criteria air pollutant emissions within the city would not be anticipated. Furthermore, these haul truck trips would likely be infrequent and would not involve the trucks idling for extended periods of time near sensitive receptors. As such, implementation of the CAP Update would not expose off- site sensitive receptors to substantial pollution concentrations. Therefore, mitigation measures AQ-3 and AQ-4 identified in the SEIR would not apply to the CAP Update.
Construction activities that would occur under CAP Update implementation would result in temporary generation of odorous emissions. However, cons istent with the less than significant impact determination of the 2024 SEIR, given the temporary and intermittent nature of the impacts, and dissipation of odor, construction-related odor impacts would be minor. Furthermore, construction activities would be required to comply with SDAPCD Rule 51 (Nuisance), which regulates nuisance odors (SDAPCD 1976).
Long-term changes resulting from implementation of the CAP Update would reduce GHG emissions generated within the city by implementing numero us transportation-, water-, waste-, and energy- related measures. For example, the implementation of the CAP Update would encourage the use of alternatively fueled vehicles through measures such as Measure T-8 which would involve installing and incentivizing public zero emission vehicle and bicycle infrastructure. This would reduce overall gasoline and fuel consumption, therefore reducing air pollutant emissions related to fossil fuel combustion.
Other transportation-related measures such as Measures T-5, T-7, and T-10 would reduce VMT in the city by improving street connectivity, provide resources and incentives for alternative commutes, such as a carpool matching, and implement parking ma nagement strategies. Reducing VMT would reduce the emission of air pollutants by decreasing the consumption of fossil fuel in vehicles and reducing emissions related to tire and brake wear.
Actions aimed at diverting and eliminating solid wa ste from disposal in landfills would generate compostable materials and demand for compost products (e.g., Measure WD-1), which would lead to a need for haul trucks to transport these materials. Truck trips for hauling of organic waste to processing facilities would be offset by reductions in truck trips to landfills. Organic waste collected in the city is recycled at a Republic Services composting facility in Otay (City of Carlsbad 2024).
Nov. 12, 2024 Item #8 Page 534 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 29 Energy-related measures such as Measure E-3.1 would continue to implement and enforce the city’s reach code which is focused on requiring solar photovoltaic (PV) and other energy efficiency measures for new and existing nonresidential buildings, while Measure E-3.3 focuses on the installation of solar carports at city-owned parking lots. While these reduction measures were formulated to reduce GHGs, they would also improve overall air quality by reducing the emission of criteria air pollutants. A higher proportion of buildings powered by more efficient and/or renewable electric systems due to implementation of Measure E-3.1 would reduce natural gas combustion at nonresidential land uses within the city, which would also reduce local crit eria air pollution. The effe cts associated with the reduction of air pollutant emissions in the city and SDAPCD would be largely beneficial and would, by nature, reduce the concentration of air pollutants. Therefore, operational activities under implementation of the CAP Update would not result in the exceedance of SDAPCD thresholds and would be considered consistent with the goals of the San Diego Regional Air Quality Strategy or State Implementation Plan. Operational activities would also not violate air quality standards or contribute to an existing air quality violation because pr oject-related emissions would not exceed SDAPCD thresholds or result in a cumulatively considerable net increase of criteria pollutants for which the region is nonattainment under applicable federal or State ambient air quality standards.
The operation of the measures and actions in the CAP Update would not expose off-site sensitive receptors to substantial pollution concentrations. Measure WD-1 would result in increased odors from the anaerobic decomposition of composted waste and haul truck trips to composting facilities. These impacts would be avoided through implementation of an Odor Impact Minimization Plan (OIMP) as required by State regulation. Therefore, the CAP Update would not result in new emissions (such as those leading to odors) adversely affecting a substantial number of people.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects rela ted to air quality. Implem entation of mitigation measures AQ-1 through AQ-4 from the SEIR are not applicable to the air quality impacts of the CAP Update. The CAP Update would not result in any new or substantially more severe significant impacts related to air quality.
Applicable Mitigation Measures from the SEIR
The SEIR identified mitigation measures AQ-1 through AQ-4 for air quality impacts. None of these mitigation measures are applicable to the CAP Update.
Nov. 12, 2024 Item #8 Page 535 of 637
City of Carlsbad
Climate Action Plan Update
30 Biological Resources
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Have a substantial adverse effect,
either directly or through habitat
modifications, on any species
identified as a candidate,
sensitive, or special status species
in local or regional plans, policies,
or regulations, or by the California
Department of Fish and Wildlife or
US Fish and Wildlife Service?
Less than
Significant
with
Mitigation
MM BIO-1
MM BIO-2 No No No Yes Yes
b. Have a substantial adverse effect
on any riparian habitat or other
sensitive natural community
identified in local or regional
plans, policies, or regulations, or
by the California Department of
Fish and Wildlife or US Fish and
Wildlife Service?
Less than
Significant
with
Mitigation
MM BIO-1
MM BIO-3
MM BIO-4
No No No Yes Yes
Nov. 12, 2024 Item #8 Page 536 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 31 CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
c. Have a substantial adverse effect
on State or federally protected
wetlands (including, but not limited
to, marsh, vernal pool, coastal,
etc.) through direct removal, filling,
hydrological interruption, or other
means?
Less than
Significant
with
Mitigation
MM BIO-1
MM BIO-3
MM BIO-4
MM BIO-5
No No No Yes Yes
d. Interfere substantially with the
movement of any native resident
or migratory fish or wildlife
species or with established native
resident or migratory wildlife
corridors, or impede the use of
native wildlife nursery sites?
Less than
Significant
with
Mitigation
MM BIO-1
MM BIO-3
MM BIO-4
No No No Yes Yes
e. Conflict with any local policies or
ordinances protecting biological
resources, such as a tree
preservation policy or ordinance?
Less than
Significant
with
Mitigation
MM BIO-6 No No No Yes Yes
f. Conflict with the provisions of an
adopted Habitat Conservation
Plan, Natural Community
Conservation Plan, or other
approved local, regional, or State
habitat conservation plan?
Less than
Significant
with
Mitigation
MM BIO-1
MM BIO-2
MM BIO-3
MM BIO-4
MM BIO-7
MM BIO-8
No No No Yes Yes
Nov. 12, 2024 Item #8 Page 537 of 637
City of Carlsbad
Climate Action Plan Update
32 Previous CEQA Analysis Biological Resources Findings The 2024 SEIR identified a less than significant impact related to a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or US Fish and Wildlife Service (BIO-1) with implementation of mitigation measures BIO- 1 and BIO-2. The 2024 SEIR identified a less than significant impact to any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or US Fish and Wildlife Service (BIO-2) with implementation of mitigation measures BIO-1, BIO-3, and BIO-4. The 2024 SEIR identified a less than significant impact to State or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) (BIO-3) with implementation of mitigation measures BIO-1, BIO-3, BIO-4, and BIO-5. The 2024 SEIR identified a less than si gnificant impact to interfering substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impeding the use of native wildlif e nursery sites (BIO-4) with implementation of mitigation measures BIO-1, BIO-3, and BIO-4. The 2024 SEIR identifi ed a less than significant impact related to conflicts with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance (BIO-5) with implementation of mitigation measure BIO-6. The 2024 SEIR identified a less than signif icant impact related to conflicts with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or State habitat conservation plan (BIO-6) with implementation of mitigation measures BIO-1, BIO-2, BIO-3, BIO-4, BIO-7 and BIO-8 (Section 4.3, Biological Resources).
Addendum Analysis
Implementation of the CAP Update would include measures and actions that involve construction and ground disturbing activities, including minor grading and excavation. For example, Measures T-1, T-4, T- 5, T-8, and T-9 would involve removing existing pavement; repaving roadway surfaces; painting or restriping pavement; modifying curbs; laying concrete, and installing traffic signals, lighting, landscaping, and trees. Some of these improvements, such as Measures E-3.3, W-1, and W-2, would require limited ground disturbance from construction activities. The CAP Update consists of minor improvements and building retrofits within the city and construction activities would occur in previously disturbed, developed areas such as roadways and parking lots that lack natural habitat and where candidate, sensitive, or special-status species or their habitats are not present. Therefore, implementation of the CAP Update would not cause a substantial adverse direct or indirect effect to special-status species.
Because implementation of the CAP Update would occur in previously disturbed, developed areas, implementation of the CAP Update would not occur in areas where riparian habitat or other sensitive natural communities, protected wetlands, wildlife co rridors, and protected biological resources are present. Furthermore, implementation of mitigation measure BIO-2 would reduce any impacts to candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or US Fish and Wildlife Service because the pre-construction bird surveys would ensure that active nests are identified and as necessary avoided. Implementation of mitigation measure BIO-2 would also reduce conflicts with the city’s Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or State habitat conservation plans because it would assure compliance with the Migratory Bird Treaty Act (MBTA) and California Fish and Game Code (CFGC) Section 3503. Implementation of mitigation measure BIO-6 would reduce any conflicts with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance because it would require a project-specific tree survey to determine measures to address impacts such as avoidance, minimization, restoration, or compensation.
Nov. 12, 2024 Item #8 Page 538 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 33 Because duration of construction activities woul d be limited to relatively short periods, their temporary effects on biological resources would not be substantial.
Long-term changes resulting from implementation of CAP Update measures would include improvements at or near grade level of existing roadways, as well as minor changes to traffic intersections and walkways (through implementation of Measures T-1, T-4, T-5, T-8, and T-9), improvements to water and wastewater systems (Measures W-1 and W-2), planting of trees (through implementation of Measure CS-1). Implementation of Measures T-1, T-4, T-5, T-8, and T-9 would also result in the installation of new sidewalks, new and upgraded bikeways and walkways along existing developed roadways and rights-of-way in the city, and the installation of roundabouts or control traffic within the intersections of existing developed roadways. The CAP Update would not result in physical improvements or effects that would result in substantial long-term damage to biological resources.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects rela ted to biological resources. Implementation of mitigation measures BIO-1, BIO-3, BIO-4, BIO-5, BIO-7, and BIO-8 from the SEIR are not applicable to the CAP Update. Implementation of mitigation me asure BIO-2 would ensure a less-than-significant impact to special-status biological resources. Implementation of mitigation measure BIO-6 would ensure a less-than-significant impact for conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance. The CAP Update would not result in any new or substantially more severe significant impacts related to biological resources.
Applicable Mitigation Measures from the SEIR
The CAP Update would not result in more significant impacts related to biological resources. Mitigation Measures BIO-2 and BIO-6 from the 2024 SEIR would apply to the CAP Update and ensure CAP Update impacts related to biological resources are less than significant.
BIO-2 Pre-Construction Bird Surveys, Avoidance, and Notification If construction activities are initiated during the bird nesting season (February 1 – August 31) involving removal of vegetation or other nesting bird habitat, including abandoned structures and other man- made features, a pre-construction nesting bird survey shall be conducted no more than three days prior to initiation of ground disturbance and ve getation removal activities. The nesting bird pre- construction survey shall be conducted on foot and shall include a 300-foot survey buffer around the construction site. The survey shall be conducted by a biologist familiar with the identification of avian species known to occur in southern California coastal communities (i.e., qualified biologist). If active nests are found, an avoidance buffer shall be determined by a qualified biologist in coordination with the city. The avoidance buffer width will depend up on the species, the proposed work activity, and existing disturbances associated with land uses outside of the site, which shall be demarcated by the biologist with bright orange construction fencing, flagging, construction lathe, or other means to demarcate the boundary. All construction personnel shall be notified as to the existence of the buffer zone and to avoid entering the buffer zone during the nesting season. No ground disturbing activities shall occur within the buffer until the biologist has confirmed that breeding/nesting is completed, and the young have fledged the nest. Encroachment into the buffer shall occur only at the discretion of the qualified biologist on the basis that the encroachment will not be detrimental to an active nest. A report summarizing the pre-construction survey(s) shall be prepared by a qualified biologist and shall be submitted to the city prior to the commencement of construction activities.
Nov. 12, 2024 Item #8 Page 539 of 637
City of Carlsbad
Climate Action Plan Update
34 BIO-6 Protected Tree and Tree Canopy Survey
Prior to the issuance of a grading permit, a tree survey shall be conducted by a certified arborist prior to project construction to tag and assess all trees subject to the city’s Trees and Shrubs Ordinance (Municipal Code Title 11.12) and/or CFMP. A city arborist will inspect the property and recommend approving or denying the application in a written report submitted to the City Manager. The city shall post a letter of notification and a non-removable marking upon the subject tree a minimum of 30 days prior to its removal. The letter will be posted in a prominent location, visible from a public street and will include, the location of the tree, the reason for the trees remo val, the date of the scheduled removal, the species of tree to be replanted, the size of the tree to be replanted, the date by which an appeal must be made to the parks and recreation commission, and a description of the appeal process.
The following measures shall be implemented in addition to those required under the city’s permits required for tree removal and maintenance ordinance Guidelines (Municipal Code Title 11.12.090) to avoid and/or compensate for potential indirect im pacts to preserved sensitive natural communities and protected trees within Carlsbad before, during, and following construction activities.
PRE-CONSTRUCTION
x Fencing. Protective fencing at least three feet high with signs and flagging shall be erected around all preserved sensitive natural communities where adjacent to proposed vegetation clearing and grubbing, grading, or other construction activities. The protective fence shall be installed at a minimum of five feet beyond the tree canopy dripline. The intent of protection fencing is to prevent inadvertent limb/vegetation damage, root damage and/or compaction by construction equipment. The protective fencing shall be depicted on all construction plans and maps provided to contractors and labeled clearly to prohibit entry, and the placement of the fence in the field shall be approved by a qualified biologist prior to initiation of construction activities. The contractor shall maintain the fence to keep it upright, taut and aligned at all times. Fencing shall be removed only after all construction activities are completed.
x Pre-Construction Meeting. A pre-construction meeting shall be held between all site contractors and a registered consulting arborist and/or a qualified biologist. All site contractors and their employees shall provide written acknowledgement of their receiving sensitive natural community protection training. This training shall include, but shall not be limited to, the following information: (1) the location and marking of protected sensitive natural communities; (2) the necessity of preventing damage to these sensitive natural communities; and (3) a discussion of work practices that shall accomplish such.
DURING CONSTRUCTION
x Fence Monitoring. The protective fence shall be monitored regularly (at least weekly) during construction activities to ensure that the fencing remains intact and functional, and that no encroachment has occurred into the protected natural community; any repairs to the fence or encroachment correction shall be conducted immediately. x Equipment Operation and Storage. Contractors shall avoid using heavy equipment around the sensitive natural communities. Operating heavy machinery around the root zones of trees would increase soil compaction, which decreases soil aeration and, subsequently, reduces water penetration into the soil. All heavy equipment and vehicles shall, at minimum, stay out of the fenced protected zones, unless where specifically approved in writing and under the supervision of a registered consulting arborist and/or a qualified biologist.
Nov. 12, 2024 Item #8 Page 540 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 35 x Materials Storage and Disposal. Contractors shall not store or discard any construction materials within the fenced protected zones and shall remove all foreign debris within these areas. The contractors shall leave the duff, mulch, chips, and leaves around the retained trees for water retention and nutrient supply. Contractors shall avoid draining or leakage of equipment fluids near retained trees. Fluids such as gasoline, diesel, oils, hydraulics, brake and transmission fluids, paint, paint thinners, and glycol (anti-freeze) shall be disposed of properly. The contractors shall ensure that equipment be parked at least 50 feet, and that equipment/vehicle refueling occur at least 100 feet, from fenced protected zones to avoid the possibility of leakage of equipment fluids into the soil. x Grade Changes. Contractors shall ensure that grade changes, including adding fill, shall not be permitted within the fenced protected zone without special written authorization and under supervision by a registered consulting arborist and/or a qualified biologist. Lowering the grade within the fenced protected zones could necessitate cutting main support and feeder roots, thus jeopardizing the health and structural integrity of the tree(s). Adding soil, even temporarily, on top of the existing grade could compact the soil further, and decrease both water and air availability to the tree roots. Contractors shall ensure that grade changes made outside of the fenced protected zone shall not create conditions that allow water to pond.
x Trenching. Except where specifically approved in writing beforehand, all trenching shall be outside of the fenced protected zone. Roots primarily extend in a horizontal direction forming a support base to the tree similar to the base of a wineglass. Where trenching is necessary in areas that contain roots from retained trees, contractors shall use trenching techniques that include the use of either a root pruner (Dosko root pruner or equivalent) or an Air-Spade to limit root impacts. An International Society of Arboriculture (ISA) certified arborist or American Society of Consulting Arborists (ASCA) registered consulting arborist shall ensure that all pruning cuts shall be clean and sharp, to minimize ripping, tearing, and fracturing of the root system. Root damage caused by backhoes, earthmovers, dozers, or graders is severe and may ultimately result in tree mortality. Use of both root pruning and Air-Spade equipment shall be accompanied only by hand tools to remove soil from trench locations. The trench shall be made no deeper than necessary. x Erosion Control. Appropriate erosion control best management practices (BMPs) shall be implemented to protect preserved sensitive natural communities during and following project construction. Erosion control materials shall be certified as weed free. x Inspection. An ISA certified arborist or ASCA registered consulting arborist shall inspect the preserved trees adjacent to grading and construction activity on a monthly basis for the duration of the grading and construction activities. A report summarizing site conditions, observations, tree health, and recommendations for minimizing tree damage shall be submitted by the registered consulting arborist following each inspection.
POST-CONSTRUCTION
x Mulch. The contractors shall ensure that the natural duff layer under all trees adjacent to construction activities shall be maintained. This would stabilize soil temperatures in root zones, conserve soil moisture, and reduce erosion. The contractors shall ensure that the mulch be kept clear of the trunk base to avoid creating conditions favorable to the establishment and growth of decay causing fungal pathogens. Should it be necessary to add organic mulch beneath retained oak trees, packaged or commercial oak leaf mulch shall not be used as it may Nov. 12, 2024 Item #8 Page 541 of 637
City of Carlsbad
Climate Action Plan Update
36 contain root fungus. Also, the use of redwood chips shall be avoided as certain inhibitive chemicals may be present in the wood. Other wood chips and crushed walnut shells can be used, but the best mulch that provides a source of nutrients for the tree is its own leaf litter.
Any added organic mulch added by the contractors shall be applied to a maximum depth of 4 inches where possible.
x Watering Adjacent Plant Material. All installed landscaping plants near the preserved sensitive natural communities shall require moderate to low levels of water. The surrounding plants shall be watered infrequently with deep soaks and allowed to dry out in-between, rather than frequent light irrigation. The soil shall not be allowed to become saturated or stay continually wet, nor should drainage allow ponding of water. Irrigation spray shall not hit the trunk of any tree. The contractors shall maintain a 30-inch dry-zone around all tree trunks. An above ground micro-spray irrigation system shall be used in lieu of typical underground pop- up sprays.
x Monitoring. An ISA certified arborist or ASCA registered consulting arborist shall inspect the trees preserved on the site adjacent to construction activities for a period of two years following the completion of construction. Monitoring visits shall be completed quarterly, totaling eight visits. Following each monitoring visit, a report summarizing site conditions, observations, tree health, and recommendations for promoting tree health shall be submitted to the city.
Additionally, any tree mortality shall be noted and any tree dying during the two-year monitoring period shall be replaced at a minimum 3:1 ratio on-site in coordination with the city.
Nov. 12, 2024 Item #8 Page 542 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 37 Cultural Resources
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Cause a substantial adverse
change in the significance of a
historical resource pursuant to
§15064.5?
Significant and
Unavoidable None No No No Yes Yes
b. Cause a substantial adverse
change in the significance of an
archaeological resource pursuant
to §15064.5?
Less than
Significant None No No No Yes Yes
c. Disturb any human remains,
including those interred outside
of formal cemeteries?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 543 of 637
City of Carlsbad
Climate Action Plan Update
38 Previous CEQA Analysis Cultural Resources Findings
The 2024 SEIR identified a significant and unavoidable impact related to a substantial adverse change in the significance of a historical resource pursuant to §15064.5 and identified no feasible mitigation measures (CUL-1). The 2024 SEIR identified a less than significant impact related to a substantial adverse change in the significance of an archaeological resource pursuant to §15064.5 (CUL-2). The 2024 SEIR also identified a less than significant impact for disturbing any human remains, including those interred outside of formal cemeteries (CUL-3) (Section 4.4, Cultural and Tribal Cultural Resources).
Addendum Analysis
Implementation of the CAP Update would result in physical changes to the environment that could occur in proximity to or involve encountering historical resources. For example, some improvements that result from the CAP Update, such as Measures T-1, T-4, T-5, T-8, T-9, CS-1, E-3.3, W-1, and W-2, would require limited ground disturbance. Energy efficiency improvements and building retrofits (Measure E-6) would involve minor changes to the exterior (e.g., rooftop solar panels) or interior (e.g., water heating and space heating and cooling systems) of existing buildings, and would not otherwise involve features with substantial height, bulk, or massing that would cause a substantial adverse change to a historic resource. Adherence to the relevant General Plan policies, the Historic Preservation Ordinance, and the relevant elements of the Carlsbad Cultural Resource Guidelines would protect historical resources from substantial adverse changes during CAP Update implementation.
Because ground disturbance associated with the implementation of CAP Update Measures T-1, T-4, T- 5, T-8, T-9, CS-1, E-3.3, W-1, and W-2 would be limited to shallow depths, comprised of artificial fill or previously disturbed soils, archaeological resources are unlikely to be encountered. In addition, construction activities associated with CAP Update implementation would occur in already disturbed developed areas such as roadways and parking lots. Zero emission vehicle charging stations (Measure T-8) would be installed in new and existing developments, and roadway improvements such as roundabouts, traffic circles, walkways, and bicycle infrastructure would occur along existing developed roadways. In addition, tree planting associated with Measure CS-1 would likely occur within city parks and public rights-of-way. Furthermore, the Carlsbad Cultural Resource Guidelines addresses treatment of cultural resources to avoid substantial adverse effects should they be encountered during ground disturbance activities associated with the CAP Up date. Therefore, with adherence to the Carlsbad Cultural Resource Guidelines, implementation of the CAP Update would not cause a substantial adverse change in the significance of an archaeological resource pursuant to §15064.5.
The Carlsbad Cultural Resource Guidelines Standard Treatment 11: Post-Review Discoveries section addresses treatment of human remains should they be disturbed as a result of ground disturbing activities. Moreover, human burials, in addition to being potential archaeol ogical resources, have specific provisions for treatment in Public Resources Code (PRC) Section 5097. The California Health and Safety Code (Section 7050.5, 7051, and 7054) has specific provisions for the protection of human burial remains. Existing regulations address the illegality of interfering with human burial remains, and protect them from disturbance, vandalism, or dest ruction. They also include established procedures to be implemented if Native American skeletal remains are discovered. PRC Section 5097.98 also addresses the disposition of Native American burial s, protects such remains, and provides for the establishment of the NAHC to resolve any related disputes. All development projects are also subject to State of California Health and Safety Code Sect ion 7050.5 which states that, if human remains are unearthed, no further disturbance can occur until the county coroner has made the necessary findings as to the origin and disposition of the remains pursuant to the PRC Section 5097.98.
Nov. 12, 2024 Item #8 Page 544 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 39 If the remains are determined to be of Native American descent, the coroner has 24 hours to notify the Native American Heritage Commission which w ill determine and notify a most likely descendant (MLD). The MLD shall complete the inspection of the site and make recommendations to the landowner within 48 hours of being granted access. With adherence to these existing regulations as well as the Carlsbad Cultural Resource Guidelin es, implementation of the CAP Update would not disturb any human remains, including those interred outside of formal cemeteries.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to cultural resources. The 2024 SEIR identified a significant and unavoidable impact for cultural resources (CUL-1) and did not identify feasible mitigation measures. The CAP Update would not re sult in any new or substantially more severe significant impacts related to cultural resources.
Applicable Mitigation Measures from the SEIR
There are no feasible mitigation measures from the 2024 SEIR to reduce impacts related to cultural resources.
Nov. 12, 2024 Item #8 Page 545 of 637
City of Carlsbad
Climate Action Plan Update
40 Energy
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Result in potentially significant
environmental impact due to
wasteful, inefficient, or
unnecessary consumption of
energy resources, during project
construction and operation?
No Impact
None No No No Yes Yes
b. Conflict with or obstruct a State or
local plan for renewable energy or
energy efficiency?
No Impact
None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 546 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 41 Previous CEQA Analysis Energy Findings
The 2024 SEIR identified no impact for the wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation or for conflicts with or obstruction of a State or local plan for renewable energy or energy efficiency (Section 4.16.2, Energy).
Addendum Analysis
Construction activities associated with implemen tation of the CAP Update measures and actions would result in short-term consumption of energy resulting from the use of construction equipment.
The types of construction activities associated with the CAP Update would vary depending on the type of CAP Update measure. Examples of activities that would result from implementation of CAP Update measures include construction of new public zero emission vehicle and bicycle charging infrastructure, building efficiency retrofits, roundabouts or traffic circles, bicycle infrastructure, new solar carports, and water and wastewater system improvements (e.g., Measures T-1, T-2, T-3, T-4, T-5, T-8, T-9, E-3.3, W-1, and W-2). These activities would consume energy resources such as electricity, fuels, and non- renewable resources during construction. In addition , construction materials require energy to be produced, and would likely be used in projects that involve new construction or replacement of older materials. The California Green Building Standards Code (CALGreen) includes specific requirements related to recycling, construction materials, and energy efficiency standards, which would apply to construction projects envisioned by the CAP Up date and help to minimize waste and energy consumption. Although implementation of the CAP Update would result in short-term construction activities that would consume energy resources, standard best management practices would discourage unnecessary idling and the operation of poorly maintained equipment during construction. In addition, the CAP Update includes measures that would reduce nonrenewable energy consumption during construction activities. For example, Measure OR-2 would increase the use of renewable and alternative fuel construction equipment, while Measure T-9 would establish city fleet regulations for idling, thus reducing construction vehicle idling time and further reducing construction related energy consumption.
Implementation of the CAP Update would improve operational energy efficiency and reduce the use of fossil fuels, for example through measures which reduce VMT (Measure T-2) and encourage zero emission vehicle use (Measure T-8), as well as measures which facilitate the increased generation and utilization of renewable energy Measures E-1 through E-6). The measures and actions in the CAP Update reduce GHG emissions, primarily by improving energy efficiency and decreasing consumption of fossil fuels and nonrenewable energy consumption. Thus, implementation of the CAP Update would not result in wasteful, inefficient, or unnecessary consumption of energy, consistent with the SEIR findings.
Where applicable, measures and actions associated with the CAP Update would be required to comply with CALGreen, the latest California Building Code (CBC) requirements, including CBC Energy Efficiency Standards, as well as all federal, State, and lo cal rules and regulations pertaining to energy consumption and conservation. Through implementation of city policies as delineated in the city’s General Plan, and concurrent implementation of the CAP Update, measures and actions would support the San Diego Regional Energy Strategy renewable energy goals and would not conflict with any applicable plan, policy, or regulation adopted regarding renewable energy or energy efficiency.
Nov. 12, 2024 Item #8 Page 547 of 637
City of Carlsbad
Climate Action Plan Update
42 Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to energy. The 2024 SEIR did not identify significant energy impacts and did not identify mitigation measures. The CAP Update would not result in any new or substantially more severe significant impacts related to energy.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to energy.
Nov. 12, 2024 Item #8 Page 548 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 43 Geology and Soils
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within
the Scope
of the
SEIR?
Would implementation of the CAP Update:
a. Directly or indirectly cause
potential substantial adverse
effects, including the risk of loss,
injury, or death involving:
i. Rupture of a known earthquake
fault, as delineated on the most
recent Alquist-Priolo Earthquake
Fault Zoning Map issued by the
State Geologist for the area or
based on other substantial
evidence of a known fault? Refer
to Division of Mines and Geology
Special Publication 42.
Less than
Significant None No No No Yes Yes
ii. Strong seismic ground shaking? Less than
Significant None No No No Yes Yes
iii. Seismic-related ground failure,
including liquefaction?
Less than
Significant None No No No Yes Yes
iv. Landslides? Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 549 of 637
City of Carlsbad
Climate Action Plan Update
44 CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
b. Result in substantial soil erosion or the
loss of topsoil?
Less than
Significant None No No No Yes Yes
c. Be located on a geologic unit or soil
that is unstable, or that would become
unstable as a result of the project, and
potentially result in on- or off-site
landslide, lateral spreading,
subsidence, liquefaction, or collapse?
Less than
Significant None No No No Yes Yes
d. Be located on expansive soil, as
defined in Table 1-B of the Uniform
Building Code (1994), creating
substantial direct or indirect risks to
life or property?
Less than
Significant None No No No Yes Yes
e. Have soils incapable of adequately
supporting the use of septic tanks or
alternative wastewater disposal
systems where sewers are not
available for the disposal of
wastewater?
Less than
Significant None No No No Yes Yes
f. Directly or indirectly destroy a unique
paleontological resource or site or
unique geologic feature?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 550 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 45 Previous CEQA Analysis Geology and Soils Findings
The 2024 SEIR identified less than significant impacts for the risk of loss, injury, or death involving rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault (GEO-1); and for the risk of loss, injury, or death involving strong seismic ground shaking, seismic-related ground failure, including liquefact ion or landslides (GEO-2). The 2024 SEIR also identified less than significant impacts for substantial soil erosion or the loss of topsoil (GEO-3) and for on or off-site landslide, lateral spreading, subs idence, liquefaction or collapse, and location on expansive soils creating substantial direct or indirect risks to life or property (GEO-4). The 2024 SEIR identified less than signif icant impacts for soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater (GEO-5) and for the project to directly or indirectly destroy a unique paleontological resource or site or unique geologic feature (GEO-6) (Section 4.5, Geology and Soils).
Addendum Analysis
Measures and actions associated with the CAP Update include improvements to energy infrastructure (Measures E-1 through E-6), development of roundabouts (Measure T-1), bicycle infrastructure (Measure T-4), pedestrian infrastructure (Measure T-5), and improvements to water and wastewater infrastructure (Measures W-1, W-2). The measures identified in the CAP Update do not propose new housing nor do they propose changes to policies or regulations related to land use or residential zoning.
Therefore, the CAP Update would not result in the risk of loss, injury, or death involving rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault or result in the risk of loss, injury, or death involving strong seismic ground shaking, seismic-related ground failure, including liquefaction or landslides. The CAP Update would not result in substantial soil erosion or the loss of topsoil or result in on or off-site landslide, lateral spreading, subsidence, liquefaction or collapse, and location on expansive soils creating substantial direct or indirect risks to life or property.
The measures and actions in the CAP Update would not require use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater.
Implementation of the CAP Update would include measures and actions (Measures T-1, T-4, T-5, T-8, T- 9, CS-1, E-3.3, W-1, and W-2) that involve ground disturbing activities which could encounter paleontological resources in areas with moderate to high sensitivity. While encountering paleontological resources is possible during CAP Update implementation, it is unlikely because of the shallow depth of below ground disturbance associated with activities such as trenching to install zero emission vehicle and bicycle charging infrastructure and making im provements to public ro adway rights-of-way to support walking and biking. For measures and actions requiring ground disturbance in areas underlain by sensitive geologic units, the Carlsbad Cultural Resource Guidelines require a review of primary literature and online databases, a paleontological assessment of the project area (plus a one-mile radius) by the San Diego Museum of Natural History, and a field survey to determine if paleontological resources or potentially fossiliferous sediments are present (if the sensitive sediments are exposed at the surface).
The results of these analyses are used to create a Paleontological Assessment Report which will provide recommendations to mitigate impacts to paleontological resources, if necessary. The Carlsbad Cultural Resource Guidelines set forth mitigation measures.
Additionally, General Plan policies 7-P.7 through 7- P.11 of the Arts, History, Culture, and Education Element would reduce impacts to paleontological re sources by implementing the Carlsbad Cultural Resource Guidelines; requiring monitoring of ground-disturbing activities in areas known to contain Nov. 12, 2024 Item #8 Page 551 of 637
City of Carlsbad
Climate Action Plan Update
46 paleontological resources; and ensuring proper treatment and consultation of paleontological resources discovered during ground-disturbing activities. With compliance with these guidelines and General Plan policies, implementation of the CAP Update would not directly or indirectly destroy a unique paleontological resource or site or unique geologic feature.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to geology and soils. The 2024 SEIR did not identify significant geology and soils impacts and did not identify mitigation measures. The CAP Update would not result in any new or substantially more severe significant impacts related to geology and soils.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to geology and soils.
Nov. 12, 2024 Item #8 Page 552 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 47 Greenhouse Gas Emissions
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information of
Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Generate greenhouse gas
emissions, either directly or
indirectly, that may have a
significant impact on the
environment?
Significant
and
Unavoidable
GHG-1 No No No Yes Yes
b. Conflict with an applicable plan,
policy, or regulation adopted for
the purpose of reducing the
emissions of greenhouse gases?
Significant
and
Unavoidable
GHG-1 No No No Yes Yes
Nov. 12, 2024 Item #8 Page 553 of 637
City of Carlsbad
Climate Action Plan Update
48 Previous CEQA Analysis Greenhouse Gas Emissions Findings The 2024 SEIR identified a significant and un avoidable impact for generating greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment and for conflicting with an applicable plan, policy, or re gulation adopted for the purpose of reducing the emissions of greenhouse gases (GHG-1). It identifi es Mitigation Measure GHG-1, which requires the preparation of this CAP Update to reduce the GH G emissions impacts identified in the 2024 SEIR (Section 4.6, Greenhouse Gas Emissions).
Addendum Analysis
The CAP Update establishes measures and actions that would reduce GHG emissions in Carlsbad to levels that achieve its GHG reduction targets, which are aligned with the State’s GHG reduction goals.
The city’s 2035 target requires GHG emissions to be reduced 50 percent below 2016 levels (aligned with and extrapolated from SB 32) and reduced to 85 percent below 2016 levels by 2045 (aligned with AB 1279). The CAP Update measures and actions would meet the city’s GHG reduction targets.
In addition, implementation of the CAP Update would result in physical changes to the environment that would involve short-term physical changes that could result in GHG emissions. Several of the measures and actions identified in the CAP Update promote construction of new facilities or retrofitting of existing facilities that would generate construction-related GHG emissions. Some examples of activities that would generate construction-related GHG emissions include retrofitting of existing buildings and developments to transition to renewable energy generation (Measures E-1, E-6, W-1, and W-2), constructing roundabouts or traffic circles (Measure T-1), installation of solar carports (Measure E-3.3), installation of zero emission vehicle ch arging stations (Measure T-8), improvements to pedestrian and bicycling infrastructure (Measures T-5 and T-4), and implementation of activities related to urban tree planting (Measure CS-1).
Implementation of the CAP Update would reduce overall GHG emissions generated within the city, for example by encouraging the use of alternative fuels in vehicles and equipment (Measures T-8, OR-1, and OR-2), reducing VMT (Measures T-5, T-7, and T-10), improving energy efficiency (Measures E-1 through E-6), reducing waste generation (Measure WD-1), and increasing carbon sequestration (Measure CS-1).
In addition, measures that support energy efficiency and renewable energy generation would reduce GHG emissions at power plants generating electricity that serve the city. Thus, any temporary GHG emissions would be offset by the overall net benefit of GHG emissions reduction after implementation of the CAP Update. Therefore, implementation of the CAP Update would not generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment, nor would implementation of the CAP Update conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of GHGs.
Conclusion
There are no changes in circumstances or new information of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to GHG emissions. Implementation of Mitigation Measure GHG-1, which requires preparation of the CAP Update evaluated in this Addendum No. 1, would be satisfied by preparation of the CAP Update, and therefore is not applicable to actions implementing the CAP Update.
The CAP Update would not result in any new or substantially more severe significant impacts related to GHG emissions.
Nov. 12, 2024 Item #8 Page 554 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 49 Applicable Mitigation Measures from the SEIR
The CAP Update satisfies the requirements of 2024 SEIR mitigation measure GHG-1; no other mitigation measures related to GHG emissions impacts are identified in the 2024 SEIR.
Nov. 12, 2024 Item #8 Page 555 of 637
City of Carlsbad
Climate Action Plan Update
50 Hazards and Hazardous Materials
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Create a significant hazard to the
public or the environment through
the routine transport, use, or
disposal of hazardous materials?
Less than
Significant None No No No Yes Yes
b. Create a significant hazard to the
public or the environment through
reasonably foreseeable upset and
accident conditions involving the
release of hazardous materials
into the environment?
Less than
Significant None No No No Yes Yes
c. Emit hazardous emissions or
handle hazardous or acutely
hazardous materials, substances,
or waste within one-quarter mile
of an existing or proposed school?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 556 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 51 CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
d. Be located on a site which is
included on a list of hazardous
material sites compiled pursuant
to Government Code Section
65962.5 and, as a result, would it
create a significant hazard to the
public or the environment?
Less than
Significant None No No No Yes Yes
e. For a project located within an
airport land use plan area, or
where such a plan has not been
adopted, within two miles of a
public airport or public use airport,
would the project result in a safety
hazard or excessive noise for
people residing or working in the
project area?
Less than
Significant None No No No Yes Yes
f. Impair implementation of or
physically interfere with an
adopted emergency response plan
or emergency evacuation plan?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 557 of 637
City of Carlsbad
Climate Action Plan Update
52 Previous CEQA Analysis Hazards and Hazardous Materials Findings The 2024 SEIR identified less than significant impacts for the routine transport, use, or disposal of hazardous materials and reasonably foreseeable upse t and accident conditions involving the release of hazardous materials (HAZ-1); emitting or handling hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school (HAZ-2); being located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and creating a significant hazard to the public or the environment (HAZ-3); being located within an airport land use plan or within two miles of a public airport or public use airport and resulting in a safety hazard or excessive noise for people residing or working in the project area (HAZ- 4); and for impairing implementation of or physically interfering with an adopted emergency response plan or emergency evacuation plan (HAZ-5) (Section 4.7, Hazards and Hazardous Materials).
Addendum Analysis
The implementation of the CAP Update measures and actions would result in short-term and long- term changes related to hazards and hazardous materials as described below.
Construction activities and routine maintenance as sociated with implementation of the CAP Update would result in short-term, temporary changes to hazards and hazardous materials conditions in the city. Although the types of construction activities associated with the CAP Update would vary depending on the type of CAP Update measure, they could result in an increase in the overall routine, transport, use and disposal of hazardous materials in the city for construction activities. For example, Measures T-1, T-4, T-5, T-8, and T-9 would involve removing existing pavement; repaving roadway surfaces; painting or restriping pavement; modify ing curbs; laying concrete, and installing traffic signals, lighting, landscaping, street furniture, an d other amenities. Construction activities would be short-term and temporary and would be required to comply with relevant federal, State, and local regulations that require strict adherence to guide lines regarding the safe use, transportation, and disposal of hazardous materials as well as ensuring the reduction of the potential for humans or the environment to be affected by an accidental release of hazardous materials. Enforcement of these regulatory standards would ensure that the measures and actions facilitated by implementation of the CAP Update would not create a significant hazard through reasonably foreseeable upset and/or accident conditions involving the release of haza rdous materials into the environment. Compliance with applicable regulations would ensure that any hazardous materials used during the implementation of the CAP Update would not result in hazardous emissions within one-quarter mile of an existing or proposed school.
Some improvements as a result of the CAP Update, such as Measures E-3.3, W-1, and W-2, would require limited ground disturbance which could result in the release of contaminants into the environment, if they are present in the underlying soils and/or groundwater. In the event that CAP Update implementation results in ground disturbance, any residual contamination that is encountered would be remediated to allowable regulatory levels in accordance with applicable county and State regulations before any ground-disturbing activities are permitted to occur. Therefore, implementation of the CAP Update would not result in a significant hazard to the public or the environment due to being located on a hazardous materials site.
The McClellan–Palomar Airport is located near the center of the city and has a Land Use Compatibility Plan (ALUCP) developed and adopted by the San Diego County Airport Land Use Commission in 2010 and last amended in 2011 (San Diego County Re gional Airport Authority 2011). The CAP Update measures and actions would not result in new or relocated residential land uses, other types of noise- Nov. 12, 2024 Item #8 Page 558 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 53 sensitive receptors, or new places of permanent employment where residents or workers could be exposed to a safety hazard or excessive noise. Therefore, implementation of the CAP Update would not expose residents or workers to a safety hazard or excessive noise levels.
Long-term changes resulting from implementation of CAP Update measures and actions would include improvements at or near grade level of existing roadways, new and upgraded bikeways and sidewalks along existing developed roadways and rights-of-way in the city, the installation of roundabouts or traffic circles to control traffic within the intersections of existing developed roadways, and the installation of zero emission charging infrastructure (through implementation of Measures T-1, T-4, T- 5, T-8, and T-9). However, these improvements would not adversely affect the capacity of roadways during an emergency or evacuation. CAP Update Me asure T-1, which encourages the installation of roundabouts, would reduce congestion, thus increasing traffic flow and the ability to evacuate during an emergency. Furthermore, the CAP Update measures and actions would comply with the San Diego County Emergency Operations Plan (EOP) and the California Fire Code. Therefore, implementation of the CAP Update would not impair or interfere with adopted emergency response or evacuation plans.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to hazards and hazardous materials. The 2024 SEIR did not identify significant hazards and hazardous material impacts and did not identify mitigation measures. The CAP Update would not result in any new or substantially more severe significant impacts related to hazards and hazardous material.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to hazards and hazardous materials.
Nov. 12, 2024 Item #8 Page 559 of 637
City of Carlsbad
Climate Action Plan Update
54 Hydrology and Water Quality
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Violate any water quality
standards or waste discharge
requirements or otherwise
substantially degrade surface or
ground water quality?
Less than
Significant None No No No Yes Yes
b. Substantially decrease
groundwater supplies or interfere
substantially with groundwater
recharge, such that the project
may impede sustainable
groundwater management of the
basin?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 560 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 55 CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a
New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical
Changes or
Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
c. Substantially alter the existing
drainage pattern of the site or area,
including through the alteration of
the course of a stream or river or
through the addition of impervious
surfaces in a manner which would:
i. result in substantial erosion or
siltation, on- or off-site;
ii. substantially increase the rate or
amount of surface runoff in a
manner which would result in
flooding on- or offsite;
iii. create or contribute runoff water
which would exceed the capacity
of existing or planned
stormwater drainage systems or
provide substantial sources of
polluted runoff; or
iv. impede or redirect flood flows?
Less than
Significant None No No No Yes Yes
d. In flood hazard, tsunami, or seiche
zones, risk release of pollutants due
to project inundation?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 561 of 637
City of Carlsbad
Climate Action Plan Update
56 CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There
New
Circumstances
Involving a
New or
Substantial
Increase in
the Severity
of Previously
Identified
Impacts?
Is There New
Information of
Substantial
Importance
Requiring New
Analysis or
Verification?
Are Only Minor
Technical
Changes or
Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
e. Conflict with or obstruct
implementation of a water quality
control plan or sustainable
groundwater management plan?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 562 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 57 Previous CEQA Analysis Hydrology and Water Quality Findings The 2024 SEIR identified less th an significant impacts related to the violation of water quality standards, waste discharge requirements (WDR’s), or otherwise degradation of surface or ground water quality (HYD-1); decreasing groundwater supplies or interfering with groundwater recharge (HYD-2); altering the existing drainage patterns thro ugh the alteration of the course of a stream or river or through the addition of impervious surfaces resulting in substantial erosion or siltation on- or off-site, increasing the rate or amount of surface runoff in a manner which would result in flooding on- or off-site, or creating or contributing runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff (HYD-3); impede or redirect flood flows or in floo d hazard, tsunami, or seiche zones risk release of pollutants due to project inundation (HYD-4); conflicts with or obstruction of implementation of a water quality control plan or sustainable groundwater management plan (HYD-5) (Section 4.8, Hydrology and Water Quality).
Addendum Analysis
The implementation of the CAP Update measures and actions would result in short-term and long- term changes related to hydrology and water quality as described below.
The CAP Update measures involving construction activity would require minor grading, excavation, and other ground disturbance associated with removing existing pavement; repaving roadway surfaces; painting or restriping pavement; modifying curbs; laying concrete, and installing traffic signals, lighting, landscaping, street furniture, and other amenities (through implementation of Measures T-1, T-4, T-5, T-8, and T-9). Measures E-3.3, W-1, W-2, and CS-1 would also involve ground- disturbing activities, which could, depending on their location, potentially cause soil erosion which in turn can contaminate nearby surface water. However, implementation of the measures and actions in the CAP Update would be required to comply with State and local water quality regulations designed to control erosion and protect water quality during construction. This includes compliance with the requirements of the State Water Resources Control Board (SWRCB) Construction General Permit, which requires preparation and implementation of a Stormwater Pollution Prevention Plan (SWPPP) for projects that disturb one acre or more of land. Erosion and sediment controls identified in the SWPPP would substantially reduce the amount of soil disturbance, erosion, and sediment transport into receiving waters, and pollutants in site runoff during construction. The CMC also sets forth requirements and BMPs pertaining to the mitigation of erosion, sediment control and runoff as outlined in CMC Chapter 15.12 and Chapter 15.16. Through compliance with all applicable regulations and permits, implementation of the CAP Update would not violate any water quality standards or WDRs or otherwise substantially degrade water quality; su bstantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would result in substantial erosion or siltation on- or off-site, increase the rate or amount of surfac e runoff in a manner which would result in flooding on- or off-site, or create or contribute runoff wate r which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff.
The CAP Update measures and actions involving ground disturbing activities (Measures T-1, T-4, T-5, T-8, T-9, E-3.3, W-1, W-2, CS-1) could require th e use of water for dust abatement as needed via a water truck. However, the ground disturbing acti vities would be temporary and intermittent and would not involve the substantial use of groundwater or otherwise affect recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level.
Nov. 12, 2024 Item #8 Page 563 of 637
City of Carlsbad
Climate Action Plan Update
58 Furthermore, implementation of the CAP Update would not involve development of residential land uses or other types of land development or induce population growth in an area that would increase water demand. In addition, the city requires new construction and redevelopment to use low impact development (LID) techniques. These techniques would ensure that pervious surfaces are incorporated into development that would be facilitated by the project. Therefore, implementation of the CAP Update would not decrease groundwater supplies or interfere with groundwater recharge.
Long-term changes resulting from implementation of the CAP Update measures would include improvements at or near grade level of existing roadways, as well as minor changes to traffic intersections and walkways (through implementation of Measures T-1, T-4, T-5, T-8, and T-9), improvements to water and wastewater systems (Measures W-1 and W-2), and the planting of trees (through implementation of Measure CS-1). The CMC requires BMPs to control the volume, rate, and potential pollutant load of stormwater runoff from new development and redevelopment projects as a requirement of the Municipal Stormwater Permit. Furthermore, the city’s LID ordinance in Chapter 15.12.080 aims to specifically reduce the amount of surface runoff and aid in groundwater recharge through techniques such as infiltration, evapotranspiration, bioretenti on and/or rainfall harvest and additional uses in accordance with the requirements set forth in the MS4 permit and the LID standards manual. Given compliance with the above regulations and requirements, implementation of the CAP Update would not alter the existing drainage patterns or contribute runoff water in a manner which would result in substantial erosion, siltation, or flooding, nor would it exceed the capacity of existing or planned stormwater drainage systems.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to hydrology and water quality. The 2024 SEIR did not identify significant hydrology and water quality impacts and did not identify mitigation measures.
The CAP Update would not result in any new or subs tantially more severe significant impacts related to hydrology and water quality.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to hydrology and water quality.
Nov. 12, 2024 Item #8 Page 564 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 59 Land Use and Planning
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Physically divide an established
community? No Impact None No No No Yes Yes
b. Cause a significant environmental
impact due to a conflict with any
land use plan, policy, or regulation
adopted for the purpose of
avoiding or mitigating an
environmental effect?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 565 of 637
City of Carlsbad
Climate Action Plan Update
60 Previous CEQA Analysis Land Use and Planning Findings The 2024 SEIR identified no impact for physically dividing an established community (LU-1) and a less than significant impact for conflicts with any land us e plan, policy, or regulation (LU-2) (Section 4.9, Land Use and Planning).
Addendum Analysis
Implementation of the CAP Update would not result in physical improvements that could physically divide a community. For example, measures resulting in construction of roundabouts or traffic circles (T-1) and bikeways (T-4) would reduce vehicle congestion and encourage bicycle trips, which would increase community connectivity and access. Implementation of Measure T-5 would also increase community connectivity and access by adding 6.1 miles of sidewalk to existing infrastructure and increasing the connectivity of sidewalk networks. As such, the CAP Update measures and actions are intended to improve, rather than impair, community connectivity and access throughout the city.
Therefore, implementation of the CAP Update would not result in construction of physical barriers that would physically divide an established community.
The CAP Update measures and actions would include improvements to the city’s existing pedestrian, bicycle, and transit network within developed areas (Measures T-1, T-3, T-4, and T-5). Implementation of the CAP Update would not change existing land uses and would comply with all applicable land use plans, policies, and regulations, including SANDAG’s 2021 Regional Plan and the city’s 2015 General Plan. Therefore, implementation of the CAP Upda te would not cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect.
Conclusion
There are no changes in circumstances or new information of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to land use and planning. The 2024 SEIR did not identify significant land use and planning impacts and did not identify mitigation measures. The CAP Update would not result in any new or substantially more severe significant impacts related to land use and planning.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to land use and planning.
Nov. 12, 2024 Item #8 Page 566 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 61 Mineral Resources
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Result in the loss of availability
of a known mineral resource
that would be of value to the
region and the residents of the
State?
No Impact None No No No Yes Yes
b. Result in the loss of availability
of a locally important mineral
resource recovery site
delineated on a local general
plan, specific plan, or other land
use plan?
No Impact None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 567 of 637
City of Carlsbad
Climate Action Plan Update
62 Previous CEQA Analysis Mineral Resources Findings
The 2024 SEIR identified no impacts to the loss of availability of a known mineral resource that would be of value to the region and the residents of the State, or the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan (Section 4.16.3, Mineral Resources).
Addendum Analysis
Carlsbad does not have mineral resources of economic value or active mining sites (City of Carlsbad 2015), therefore the 2024 SEIR identified no impa cts to the loss of availability of a known mineral resource that would be of value to the region and the residents of the State, or the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan. Similarly, implementation of the CAP Update would not result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the State, or result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to mineral resources. The 2024 SEIR did not identify significant mineral resources impacts and did not identify mitigation measures. The CAP Update would not result in any new or substantially more severe significant impacts related to mineral resources.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to mineral resources.
Nov. 12, 2024 Item #8 Page 568 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 63 Noise
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve a
New or Substantial
Increase in the
Severity of
Previously
Identified Impacts?
Are There New
Circumstances
Involving a
New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information of
Substantial
Importance
Requiring New
Analysis or
Verification?
Are Only Minor
Technical
Changes or
Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP
Update:
a. Generation of a substantial
temporary or permanent
increase in ambient noise levels
in the vicinity of the project in
excess of standards established
in the local general plan or noise
ordinance, or applicable
standards of other agencies?
Significant and
Unavoidable
(construction)
Less than
Significant
(operation)
MM NOI-1 No No No Yes Yes
b. Generation of excessive
groundborne vibration or
groundborne noise levels?
Less than
Significant
with
Mitigation
MM NOI-2 No No No Yes Yes
Nov. 12, 2024 Item #8 Page 569 of 637
City of Carlsbad
Climate Action Plan Update
64 c. For a project located within the
vicinity of a private airstrip or an
airport land use plan or, where
such a plan has not been adopted,
within two miles of a public
airport or public use airport,
would the project expose people
residing or working in the project
area to excessive noise levels?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 570 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 65 Previous CEQA Analysis Noise Findings
The 2024 SEIR identified that although mitigati on measure NOI-1 would reduce construction noise impacts for projects located within 500 feet of noise-sensitive land uses, it conservatively concluded impacts to be significant and unavoidable related to construction activities generating a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies (NOI-1). The 2024 SEIR identified a less than significant impact related to operational activities generating a substantial temporary or pe rmanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies (NOI-2). The 2024 SEIR identified a less than significant impact related to the generation of excessive groundborne vibration or groundborne noise levels (NOI- 3) with implementation of mitigation measure NO I-2. The 2024 SEIR also identified a less than significant impact related to excessive noise levels within the vicinity of a private airstrip or an airport land use plan or (NOI-4) (Section 4.10, Noise).
Addendum Analysis
The implementation of the CAP Update measures and actions would result in short-term changes related to noise as described below.
Construction activities associated with the implementation of the CAP Update, such as equipment use, construction of new facilities or retrofitting of existing facilities, would result in construction-related noise in the city. The types of construction activi ties associated with the CAP Update would vary depending on the type of CAP Update measure. CAP Update measures that may result in the generation of noise associated with construction activities include construction of new public zero emission vehicle and bicycle charging infrastructu re, building efficiency retrofits, roundabouts or traffic circles, bicycle infrastructure, new so lar carports, and water and wastewater system improvements (e.g., Measures T-1, T-2, T-3, T-4, T-5, T-8, T-9, E-3.3, W-1, and W-2). Construction activities associated with CAP Update measures and actions may involve using construction equipment and vehicles to remove existing pavement; repave roadway surfaces; paint or restripe pavement; modify curbs; lay concrete, and install traffic signals, lighting, landscaping, street furniture, and other amenities. Construction equipment that could be used includes concrete saws for hardscape removal, backhoes or mini excavators, skip loaders, smooth drum rollers, dump trucks, and striping and paving machines, depending on the CAP Update measure. Co nstruction activities associated with the CAP Update would be short-term and would not involve equipment or activities, such as blasting or pile driving that would result in the generation of a substantial temporary or permanent increase in ambient noise levels or the generation of excessive groundborne vibration or groundborne noise levels.
Construction activities associated with the implementation of the CAP Update would not include two subterranean levels or more (generally more than 20,000 cubic yards of excavated soil material), and would be short term, thus avoiding a construction duration of 18 months. Construction activities associated with the implementation of the CAP Up date would not require use of large, heavy-duty equipment types used in housing development projects or require pile driving, therefore, mitigation measures NOI-1 andNOI-2 identified in the SEIR that were specific to impacts associated with housing development permitted under implementation of the Housing Element Update would not apply to the CAP Update.
Implementation of the CAP Update would be subject to existing city noise policies and regulations and General Plan policies and programs, specifically those found in the Noise Element, and other local agency polices and regulations pertaining to noise at any development site. Compliance with Nov. 12, 2024 Item #8 Page 571 of 637
City of Carlsbad
Climate Action Plan Update
66 Occupational Safety and Health Administration (OSHA) standards for worker safety would minimize exposure of workers to excessive noise levels. Therefore, implementation of measures and actions included in the CAP Update would not create a permanent increase in ambient noise levels or produce a new permanent source of noise, and construction-related noise impacts would be reduced through enforcement of applicable city or other local agency noise policies.
Long-term changes resulting from operation of the measures and actions in the CAP Update would not permanently introduce any new stationary sources of noise (e.g., machinery, pumps, fans, compressors, or other equipment) and would not generate new vehicle trips that would result in transportation- related noise. The transportation-related measures such as Measures T-5, T-7, and T-10 would reduce VMT in the city by improving street connectivity , provide resources and incentives for alternative commutes, such as a carpool matching, and implement parking management strategies. Reducing VMT would reduce transportation-related noise. Th erefore, the CAP Update would not result in a substantial temporary or permanent increase in ambient noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies or in the generation of excessive groundborne vibration or groundborne noise levels.
The CAP Update does not propose any new sensitive receptors (e.g., residences, schools) that could be adversely impacted from noise associated with aircraft flyovers. Temporary construction workers would not be adversely affected by aircraft flyover as noise generated from construction equipment would be the dominant noise exposure to them, which is generally dealt with by wearing ear plugs to prevent hearing damage. Furthermore, long-term maintenance workers would not sleep on-site; thus, they would not be exposed to potential sleep disturbance from aircraft flyovers. Thus, implementation of the CAP Update would not expose people residing or working near an airport to excessive airport/aircraft noise.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects relate d to noise. Implementation of mitigation measures NOI-1 and NOI-2 from the 2024 SEIR are not applicable to the CAP Update. The CAP Update would not result in any new or substantially more severe significant impacts related to noise.
Applicable Mitigation Measures from the SEIR
The SEIR identified Mitigation Measures NOI-1 and NOI-2 for noise impacts. Neither of these mitigation measures are applicable to the CAP Update.
Nov. 12, 2024 Item #8 Page 572 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 67 Population and Housing
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Induce substantial unplanned
population growth in an area,
either directly (for example, by
proposing new homes and
businesses) or indirectly (for
example, through extension of
roads and other infrastructure)?
Less than
Significant None No No No Yes Yes
b. Displace substantial numbers of
existing housing or people,
necessitating the construction of
replacement housing
elsewhere?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 573 of 637
City of Carlsbad
Climate Action Plan Update
68 Previous CEQA Analysis Population and Housing Findings The 2024 SEIR identified less than significant im pacts for unplanned population growth (PH-1) and substantial displacement of existing people or housing, necessitating the construction of replacement housing elsewhere (PH-2) (Section 4.11, Population and Housing).
Addendum Analysis
Construction activities associated with the im plementation of the CAP Update could require a temporary increase in the number of construction workers traveling into the city to perform construction work. These types of projects would be small, short-term, and temporary construction projects, which would not require a large construction crew. Furthermore, construction workers would likely be from Carlsbad or the greater San Diego region and permanent, substantial relocation of workers would not be required. Therefore, implementation of the CAP Update would not result in substantial population growth or employment growth in the city.
Implementation of the CAP Update would not displace people or housing because the measures and actions in the CAP Update would not require the removal of existing housing and would not propose changes to policies or regulations related to land use or residential zoning or otherwise increase population growth in the city or surrounding area s. Therefore, implementation of the CAP Update would not displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to population and housing. The 2024 SEIR did not identify significant population and housing impacts and did not identify mitigation measures. The CAP Update would not result in any new or substantially more severe significant impacts related to population and housing.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to population and housing.
Nov. 12, 2024 Item #8 Page 574 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 69 Public Services
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Result in substantial adverse
physical impacts associated with
the provision of new or physically
altered government facilities, the
construction of which could cause
significant environmental impacts,
in order to maintain acceptable
service ratios, response times, or
other performance objectives for
any of the public services:
x Fire?
x Police protection?
x Schools?
x Parks?
x Other public facilities?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 575 of 637
City of Carlsbad
Climate Action Plan Update
70 Previous CEQA Analysis Public Services Findings
The 2024 SEIR identified less than significant impacts associated with the provision of new or physically altered government facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable servic e ratios, response times, or other performance objectives for any of the public services, including fire protection services (PS-1), police protection services (PS-2), and schools (PS-3) (Section 4.12, Public Services and Recreation).
Addendum Analysis
The CAP Update would not generate new or increased demand for fire protection services or interfere with or modify the ability of police and fire protection services to meet performance objectives or response times outlined in the 2024 SEIR. The CAP Update does not include development of new residences or the creation of substantial numbers of permanent jobs requiring increased fire or police services. The CAP Update would not induce population growth in the community that would require school services, new or expanded park facilities, other public facilities. The measures and actions from the CAP Update would not generate increased demand for public services such that construction of new or expanded facilities would be required to maintain adequate serv ice ratios. Therefore, implementation of the CAP Update would not result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to public services. The 2024 SEIR did not identify significant public services impacts and did not id entify mitigation measures. The CAP Update would not result in any new or substantially more severe significant impacts related to public services.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to public services.
Nov. 12, 2024 Item #8 Page 576 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 71 Recreation
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information of
Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Would the project increase the
use of existing neighborhood and
regional parks, or other
recreational facilities such that
substantial physical deterioration
of the facility would occur or be
accelerated?
Less than
Significant None No No No Yes Yes
b. Does the project include
recreational facilities or require
the construction or expansion of
recreational facilities which might
have an adverse physical effect on
the environment?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 577 of 637
City of Carlsbad
Climate Action Plan Update
72 Previous CEQA Analysis Recreation Findings
The 2024 SEIR identified less than significant impacts associated with the provision of new or physically altered parks, or the need for new or physically al tered parks, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios or other performance objectives (PS-4). The 2024 SEIR identified less than significant impacts related to the increase in use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated and for including recreational facilities or requiring the construction or expansio n of recreational facilities which might have an adverse physical effect on the environment (PS-4) (Section 4.12, Public Services and Recreation).
Addendum Analysis
The CAP Update would not generate new or increa sed demand for parks and recreation facilities.
Typically, this impact occurs when a project induces population growth, such as new development or a business that would necessitate a large number of new employees. The CAP Update does not include development of new residences or the creation of substantial numbers of permanent jobs. Therefore, implementation of the CAP Update would not result in substantial adverse physical impacts associated with the provision of new or physically altered park facilities. Implementation of the CAP Update would also not increase the use of recreational facilities to the extent that substantial deterioration would occur or require the construction or expansion of recreational facilities.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects rela ted to recreation. The 2024 SEIR did not identify significant recreation impacts and did not identify mitigation measures. The CAP Update would not result in any new or substantially more severe significant impacts related to recreation.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to recreation.
Nov. 12, 2024 Item #8 Page 578 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 73 Transportation
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information of
Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Conflict with a program, plan,
ordinance or policy addressing
the circulation system, including
transit, roadway, bicycle and
pedestrian facilities?
Less than
Significant None No No No Yes Yes
b. Conflict or be inconsistent with
CEQA Guidelines § 15064.3,
subdivision (b)?
Significant
and
Unavoidable
MM T-1 No No No Yes Yes
c. Substantially increase hazards
due to a geometric design
feature ((e.g., sharp curves or
dangerous intersections) or
incompatible uses (e.g., farm
equipment)
Less than
Significant None No No No Yes Yes
d. Result in inadequate emergency
access?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 579 of 637
City of Carlsbad
Climate Action Plan Update
74 Previous CEQA Analysis Transportation Findings
The 2024 SEIR identified a less than significant impact for conflicts with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities ( T - 1 ) . T h e 2 0 2 4 S E I R i d e n t i f i e d t h a t a l t h o u g h mitigation measure T-1 would aim to achieve VMT reductions for development projects, it concluded impacts to be significant and unavoidable related to CEQA Guidelines Section 15064.3, subdivision (b) (T-2). The 2024 SEIR identified a less than significant impact related to substantially increasi ng hazards due to a geometric design feature (T-3) and for inadequate emergency access (T-4) (Section 4.13, Transportation).
Addendum Analysis
Overall, implementation of the CAP Update (e.g., Measures T-1 through T-7 and T-10) would result in lower total annual VMT levels in the city. However, short-term construction activities associated with the CAP Update would lead to minor, temporary disruptions to traffic circulation patterns during the period of construction. Projects that would require construction include retrofitting of existing buildings and developments to transition to higher energy efficiency and renewable energy generation (Measures E-1, E-6, W-1, and W-2), constructing roundabouts or traffic circles (Measure T-1), installation of solar carports (Mea sure E-3.3), installation of zero emission vehicle charging stations (Measure T-8), improvements to pedestrian and bicycling infrastructure (Measures T-5 and T-4), and implementation of activities related to urban tree planting (Measure CS-1).
Long-term transportation changes could result from actions aimed at diverting and eliminating solid waste; for example, generation of more compostable materials and demand for compost products (Measure WD-1) would lead to a need for haul trucks to transport these materials. Truck trips for hauling of organic waste to processing facilities would be offset by reductions in truck trips to landfills. Organic waste collected in the city is recycled at a Republic Services composting facility in Otay (City of Carlsbad 2024). Other long-term transportation changes associated with the CAP Update could result from actions that increase transit use and reduce commuting and traffic congestion. Actions such as increasing the number of roundabouts or traffic circles (Measure T-1), and incentivizing people to use alternative modes of travel (Measures T-2 and T-8) would lead to reduced traffic congestion. Changes to circulation patterns for pedestrian and cycling mobility modes would result from implementation of new pedestrian and bicycling routes, as well as enhancement of existing infrastructure (e.g., adding lanes, buffers, and sidewalks). Implementation of the CAP Update would improve the operation of the circulation system in several ways, including fewer vehicle trips on roadways and highways and higher numbers of transit riders. Therefore, implementation of the CAP Update would not adversely affect the performance of the circulation system and would not conflict with any applicable transportation plans, ordinances, or policies.
Implementation of the CAP Update would not induce substantial population or employment growth in the city that would in turn generate increased VMT. Construction activities associated with the CAP Update measures and actions would not require a large construction crew. Any temporary VMT increases associated with construction activities would be more than offset by the CAP Update’s overall effect of reducing the long-term rate of VMT in the city. Therefore, CAP Update implementation would not conflict or be inconsistent with CEQA Guidelines section 15064.3(b). SEIR mitigation measure T-1, which would reduce VMT levels of housing development identified in the SEIR, is not applicable to the CAP Update because the CAP Update would result in decreased levels of VMT in the city.
The city maintains improvement standards that guide the construction of new transportation facilities to minimize design hazards for all users of the system. Furthermore, General Plan policies 3-P.10, 3- P.12, 3-P.13, and 3-P.16 would reduce impacts rela ted to safety. Therefore, implementation of the CAP Update would not substantially increase hazards due to a geometric design feature.
Nov. 12, 2024 Item #8 Page 580 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 75 In the short-term, implementation of the CAP Update would have the potential to affect emergency access during construction of individual projec ts facilitated by the CAP Update. For example, construction pertaining to improving pedestrian and bicycle infrastructure and safety (Measures T-4 and T-5) could temporarily alter existing roadways that serve as emergency access routes. In the long-term, the CAP Update would not result in new development or land uses that would require installation of emergency access routes. Activities implementing the CAP Update would not be permitted to conflict with regulatory requirements to provide adequate accommodation of fire access to structure frontages, multiple access points to development, as well as adequate width, height, and turning radius of roadways and access points, pursuant to California Building Code and California Fire Code requirements. Activities implementing the CAP Update would be required to comply with city and San Diego County standards and requirements and would undergo review by public safety officials as part of the approval process.
Additionally, General Plan policies 3-P.12, 3-P.29, 3-P.30, and 3-P.33 would prevent CAP update implementation from resulting in physical effects that impede or obstruct emergency access. Therefore, implementation of the CAP Update would not result in inadequate emergency access.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects relate d to transportation. Implem entation of Mitigation Measure T-1 from the 2024 SEIR is not applicable to the CAP Update. The CAP Update would not result in any new or substantially more severe significant impacts related to transportation.
Applicable Mitigation Measures from the SEIR
The 2024 SEIR identified Mitigation Measure T-1 fo r transportation impact T-2. This mitigation measure is not applicable to the CAP Update.
Nov. 12, 2024 Item #8 Page 581 of 637
City of Carlsbad
Climate Action Plan Update
76 Tribal Cultural Resources
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information of
Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Would the project cause a
substantial adverse change in the
significance of a tribal cultural
resource, defined in Public
Resources Code §21074 as either
a site, feature, place cultural
landscape that is geographically
defined in terms of the size and
scope of the landscape, sacred
place, or object with cultural
value to a California Native
American tribe, and that is:
i. Listed or eligible for listing in
the California Register of
Historical Resources, or in a
local register of historical
resources as defined in
Public Resources Code
section 5020.1(k), or
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 582 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 77 CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information of
Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
ii. A resource determined by
the lead agency, in its
discretion and supported by
substantial evidence, to be
significant pursuant to
criteria set forth in
subdivision c of Public
Resources Code §5024.1, the
lead agency shall consider
the significance of the
resource to a California
Native American tribe.
Nov. 12, 2024 Item #8 Page 583 of 637
City of Carlsbad
Climate Action Plan Update
78 Previous CEQA Analysis Tribal Cultural Resources Findings The 2024 SEIR identified less than significant impacts related to causing a substantial adverse change in the significance of a Tribal cultural resource as defined in Public Resources Code Section 21074 that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code Section 5020.1(k) or pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1 (CUL-4) (Section 4.4, Cultural and Tribal Cultural Resources).
Addendum Analysis
Implementation of the CAP Update would result in physical changes to the environment that could occur in proximity to or involve encountering tribal cultural resources. For example, some improvements that result from the CAP Update, such as Measures T-1, T-4, T-5, T-8, T-9, CS-1, E-3.3, W- 1, and W-2, would require ground disturbing activities, including minor grading and excavation, during which, depending on their location, a tribal cultural resource could be encountered. The Carlsbad Cultural Resource Guidelines addresses identification and treatment of tribal cultural resources that may be impacted as a result of the CAP Update. Therefore, implementation of the CAP Update would not cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k). Since the CAP Update would adhere to the Carlsbad Cultural Resource Guidelines, it would not cause a substantial adverse change in the significance of a tribal cultural resource, pursuant to criteria set forth in subdivision (c) of Public Resources Code §5024.1.
Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to tribal cultural resources. The 2024 SEIR did not identify significant tribal cultural resources impacts and did not identify mitigation measures. The CAP Update would not result in any new or substantially more severe significant impacts related to tribal cultural resources.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to tribal cultural resources.
Nov. 12, 2024 Item #8 Page 584 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 79 Utilities and Service Systems
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Require or result in the
relocation or construction of new
or expanded water, wastewater
treatment or storm water
drainage, electric power, natural
gas, or telecommunications
facilities, the construction or
relocation of which could cause
significant environmental
effects?
Less than
Significant None No No No Yes Yes
b. Have sufficient water supplies
available to serve the project and
reasonably foreseeable future
development during normal, dry
and multiple dry years?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 585 of 637
City of Carlsbad
Climate Action Plan Update
80 CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
c. Result in a determination by the
wastewater treatment provider,
which serves or may serve the
project that it has adequate
capacity to serve the project’s
projected demand in addition to
the provider’s existing
commitments?
Less than
Significant None No No No Yes Yes
d. Generate solid waste in excess
of State or local standards, or
in excess of the capacity of
local infrastructure, or
otherwise impair the
attainment of solid waste
reduction goals?
Less than
Significant None No No No Yes Yes
e. Comply with federal, State,
and local management and
reduction statutes and
regulations related to solid
waste?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 586 of 637
Addendum Evaluation
Addendum No. 1
Housing Element Implementation and Public Safety Element Update SEIR 81 Previous CEQA Analysis Utilities and Service Systems Findings The 2024 SEIR identified less than significant impacts related to the relocation or construction of new or expanded water, wastewater treatment or stormw ater drainage, electric power, natural gas, or telecommunication facilities (UTIL-1); sufficient wa ter supplies during normal, dry and multiple dry years (UTIL-2); adequate wastewater treatment capa city (UTIL-3); the generation of solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goal s and compliance with federal, State, and local management and reduction statutes and regulations related to solid waste (UTIL-4) (Section 4.14, Utilities and Service Systems).
Addendum Analysis
Implementation of the CAP Update would not increase development or induce population growth directly or indirectly, because measures and actions do not propose new housing nor do they propose changes to policies or regulations related to land use or residential or nonresidential zoning. Although tree planting (Measure CS-1) would potentially increase demand for water used for irrigation, the CAP Update would be required to comply with General Plan policies 9-P.3 through 9-P.6, which would reduce impacts to water services and facilities by promoting water saving measures such as water sub- metering, using recycled water for landscape irrigation, and using on-site gray water and rainwater collection systems. Therefore, the CAP Update would not result in demand for new or expanded infrastructure, including water, wastewater treatment, stormwater drainage, natural gas or telecommunication facilities would not increase to serve new population or development.
The implementation of the CAP Update would incrementally increase electricity consumption, for example through measures that increase the installa tion zero emission infrastructure (Measure T-8), consume energy more efficiently within buildings and water systems (Measures E-3.1, E-3.2, E-4.2 E- 6, and W-2), and install solar carports (Measure E-3.3). However, as discussed in the San Diego Gas and Electric Company (SDG&E)’s Integrated Resource Plan, SDG&E has existing plans in place to solicit additional long-term renewable contracts, including conventional and long-duration storage technologies (SDG&E 2022). The CAP Update’s support for using more renewable energy and more efficient natural gas consumption would decrease demand for natural gas infrastructure .
The implementation of the CAP Update would not involve development of residential communities or other non-residential development or induce population growth in an area that would increase demand for wastewater treatment. Further, it would not involve the construction of restroom facilities. Implementation of the CAP Update woul d not result in new habitable structures (e.g., housing, nonresidential development) that would generate wastewater, therefore, implementation of the CAP Update would not exceed the capacity of any wastewater treatment provider.
Implementation of the CAP Update would not induce increased residential or non-residential development, or population growth directly or in directly, and there would be no increase in solid waste production as a result of the CAP Update. Although some solid waste could be generated during construction activities or throug h retrofitting buildings (Measure E-6), the solid waste generated would be minimal due to the nature of constructi on activities and associated improvements, and therefore would not exceed the capacity of local facilities. Measure WD-1 includes strategies to continue to increase the diversion of waste from landfills, which is consistent with and would further State solid waste statutes and goals Therefore, solid waste generated as a result of the CAP Update would not be generated in excess of local standards or capacity of local infrastructure.
Nov. 12, 2024 Item #8 Page 587 of 637
City of Carlsbad
Climate Action Plan Update
82 Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to utilities and service systems. The 2024 SEIR did not identify significant utilities and service systems impacts and did not identify mitigation measures.
The CAP Update would not result in any new or subs tantially more severe significant impacts related to utilities and service systems.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to utilities and service systems.
Nov. 12, 2024 Item #8 Page 588 of 637
Addendum Evaluation
Addendum 83
Wildfire
CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the Proposed
Changes Involve
a New or
Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances
Involving a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical Changes
or Additions
Necessary or Did
None of the
Conditions
Described in
§15162 Occur?
(§15164(a))
Project is
within the
Scope of
the SEIR?
Would implementation of the CAP Update:
a. Substantially impair an adopted
emergency response plan or
emergency evacuation plan?
Less than
Significant None No No No Yes Yes
b. Due to slope, prevailing winds, and
other factors, exacerbate wildfire
risks, and thereby expose project
occupants to pollutant
concentrations from a wildfire or the
uncontrolled spread of a wildfire?
Less than
Significant None No No No Yes Yes
c. Require the installation or
maintenance of associated
infrastructure (such as roads, fuel
brakes, emergency water sources,
power lines or other utilities) that
may result in temporary or ongoing
impacts to the environment?
Less than
Significant None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 589 of 637
City of Carlsbad
Climate Action Plan Update
84 CEQA Guidelines Section 15162
Is a Subsequent SEIR Needed?
SEIR Evaluation Criteria
SEIR
Significance
Conclusion
SEIR
Mitigation
Measures
Do the
Proposed
Changes
Involve a New
or Substantial
Increase in the
Severity of
Previously
Identified
Impacts?
Are There New
Circumstances Involving a
New or Substantial Increase
in the Severity of Previously
Identified Impacts?
Is There New
Information
of Substantial
Importance
Requiring
New Analysis
or
Verification?
Are Only Minor
Technical
Changes or
Additions
Necessary or
Did None of
the Conditions
Described in
§15162 Occur?
(§15164(a))
Project
is within
the
Scope of
the
SEIR?
d. Expose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff, post-fire slope
instability, or drainage changes?
Less than
Significant
None No No No Yes Yes
Nov. 12, 2024 Item #8 Page 590 of 637
Addendum Evaluation
Addendum 85
Previous CEQA Analysis Wildfire Findings
The 2024 SEIR identified less than significant impacts for wildfire emergency response, access, and evacuation (WF-1); and related to slope, prevailing winds, and other factors that could exacerbate wildfire risks, installation or maintenance of associated infrastructure that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment, exposing people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post- fire slope instability, or drainage changes; and exposing people or structures, either directly or indirectly, to a significant risk of loss, injury, or death involving wildland fires (WF-2) (Section 4.15, Wildfire).
Addendum Analysis
The implementation of the CAP Update would result in short-term and long-term changes related to wildfire as described below.
Implementation of the CAP Update would result in alterations of public roadways. The CAP Update measures and actions would include improvements at or near grade level of existing roadways, new and upgraded bikeways and walkways along existing developed roadways and rights-of-way in the city, and the installation of roundabouts or traffic ci rcles to control traffic within the intersections of existing developed roadways (through implementation of Measures T-1, T-4, T-5, and T-8). However, these improvements would not adversely affect the capacity of roadways during an emergency or evacuation. New Class II bike lanes and Class II buffered bike plans implemented per Measure T-4 would be separately from vehicle lanes using paint and therefore would not impede the movement of emergency vehicles or vehicles during an evac uation event. CAP Update Measure T-1, which encourages the installation of roundabouts, would reduce congestion, thus increasing traffic flow and the ability to evacuate during an emergency. Therefore, implementation of the CAP Update would not impair or interfere with adopted emergency response or evacuation plans.
Although the city is located within a Local Responsibly Area Very High Fire Hazard Severity Zone and adjacent to a State Responsibility Area Very High Fire Hazard Severity Zone, the CAP Update measures and actions would not include the construction of new housing and do not propose changes to policies or regulations related to land use or residential zoning. The CAP Update would not introduce new occupants that could be exposed to pollutant concentrations from a wildfire or the uncontrolled spread of as wildfire or require the installation or maintenance of associated infrastructure (such as roads, fuel brakes, emergency water sources, power lines or other utilities). Action CS-1.a would continue implementation of the existing Community Forest Management Plan and therefore the CAP Update would not result in changes to the types of trees planted within fire hazard severity zones.
Furthermore, activities associated with implementation of the CAP Update measures would comply with the San Diego County Emergency Operations Plan (EOP) and be subject to the California Fire Code (CFC), which includes safety measures to minimize the threat of fire. Implementation of the CAP Update would also be required, where applicable, to meet CBC requirements, including CCR Title 24, Part 2, which includes specific requirements related to exterior wildfire exposure. Impacts related to downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes would be reduced by compliance with the CBC and CMC, as well as applicable policies from the Public Safety Element Update (p olicies 6-P.20 through 6-P.31). Compliance with applicable policies, codes and regulations would reduce the risk of loss, injury, or death from wildfire and the CAP Update would not exacerbate wildfire risks.
Nov. 12, 2024 Item #8 Page 591 of 637
City of Carlsbad
Climate Action Plan Update
86 Conclusion
There are no changes in circumstances or new in formation of substantial importance that would require major revisions to the 2024 SEIR or result in new significant effects or a substantial increase in the severity of previously identified effects related to wildfire. The 2024 SEIR did not identify significant wildfire impacts and did not identify mitigation measures. The CAP Update would not result in any new or substantially more severe significant impacts related to wildfire.
Applicable Mitigation Measures from the SEIR
There are no mitigation measures from the 2024 SEIR identified to reduce impacts related to wildfire.
Nov. 12, 2024 Item #8 Page 592 of 637
Addendum Evaluation
Addendum 87
7 References
California Department of Conservation. 2024. California Williamson Act Enrollment Finder. Available:
https://gis.conservation.ca.gov/portal/home/webmap/viewer.html?webmap=18f7488c0a9d4d299f5e9c33 b312f312. Retrieved March 28, 2024.
City of Carlsbad. 2015. City of Carlsbad General Plan Draft Environmental Impact Report. Available:
https://www.carlsbadca.gov/departments/community-development/planning/general-plan/related- documents/-folder-773. Accessed March 20, 2024.
_________. 2020. An Addendum to the Previously Certified Program Environmental Impact Report for the 2015 General Plan Update and Climate Action Plan (PEIR 13-02). Available:
https://records.carlsbadca.gov/WebLink/DocView.aspx?id=5154824&dbid=0&repo=CityofCarlsbad.
Accessed April 15, 2024.
_________. 2021. 2021 Housing Element Update Addendum. Available:
https://records.carlsbadca.gov/WebLink/DocView.aspx?id=5312802&dbid=0&repo=CityofCarlsbad&cr=
1. Accessed April 15, 2024.
_________. 2023. City of Carlsbad Housing Element Implementation and Public Safety Element Update Draft Supplemental Environmental Impact Report. Available: https://files.ceqanet.opr.ca.gov/281700- 3/attachment/_PFNFkSV8FCkmdU1hXlW25tF98n-
BZ_pdzLkWZUQ3Kc2CA6Q1LZ_Xp9kUhHB0NSwdr7p4ccqp_dRZJ4S0. Accessed March 20, 2024.
_________. 2024. Organic Waste Composting. Available: https://www.carlsbadca.gov/departments/environmental- sustainability/reduce-reuse-recycle/organic-waste-recycling. Accessed April 15, 2024.
DOC. See California Department of Conservation.
San Diego Gas and Electric Company. 2022. Individual Integrated Resource Plan of San Diego Gas & Electric Company. Available:
https://www.sdge.com/sites/default/files/regulatory/SDG%26E%202022%20Individual%20Integrated%20 Resource%20Plan%20%28PUBLIC%29_0.pdf. Accessed March 28, 2024.
SDG&E. See San Diego Gas and Electric Company.
Nov. 12, 2024 Item #8 Page 593 of 637