2025-01-14; City Council; 06; Revised plans, specifications and contract documents, acceptance of bids, relief of a bid, award of contract to Filanc and transferring funds for construction of the Cann

Carlsbad City Council
January 14, 2025

Document
2025-01-14; City Council; 06; Revised plans, specifications and contract documents, acceptance of bids, relief of a bid, award of contract to Filanc and transferring funds for construction of the Cann
Meeting
January 14, 2025
Body
Carlsbad City Council
Pages
43
Original file
1.1 MB
Text extracted from the city's file for reading and search. Open the original on records.carlsbadca.gov. That file is the official record.

CA Review GH
Meeting Date: Jan. 14, 2025
To: Mayor and City Council
From: Geoff Patnoe, City Manager
Staff Contacts: Dave Padilla, Utilities Assistant Director [email protected], 442-339-2356
Daniel Zimny, Utilities Senior Engineer
[email protected], 442-339-2551
Subject: Revised plans, specifications and contract documents, acceptance of bids, relief of a bid, award of contract to Filanc and transferring funds for construction of the Cannon Lift Station Improvements Project District: 2
Rec
ommended Action
Adopt a resolution approving the revised plans, specifications and contract documents, accepting bids, authorizing relief of the apparent low bid, awarding a construction contract to Filanc, and transferring funds within the sewer replacement fund for construction of the Cannon Lift Station Improvements Project, Capital Improvement Program Project No. 5552.

Executive Summary
The city operates 11 sewer lift stations that pump sewage uphill to higher elevations in the sewer collection system. These stations use meters to measure the sewage flow and to monitor lift station operations. The flow meter at the Cannon Lift Station, at 2197 Cannon Road as shown in Exhibit 3, is at the end of its service life and requires replacement. The project will replace the flow meter, the vault that houses it and check valves, and install new power and signal cabling. This work will improve the lift station’s operation and reliability.

The low bidder on the project, HPS Mechanical, Inc. has withdrawn its bid. Staff recommend that the City Council accept HPS Mechanical Inc.’s request to withdraw its bid and instead award a contract to the second lowest bidder, Filanc, in an amount not to exceed $960,182.00.

The Carlsbad Municipal Code Sections 3.28.080(C), 3.28.080(E) and 3.28.080(I)(6) require the City Council to adopt the plans, specifications and contract documents and approve all formally bid contracts when the value exceeds $200,000. The City Council previously approved plans, specifications and contract documents for the project, Capital Improvement Program, or CIP, Project No. 5552, Cannon Lift Station Improvements Project, but design changes made during Jan. 14, 2025
Item #6 Page 1 of 8

the bidding phase resulted in revised plans, specifications and contract documents that need to be approved by the City Council.

Staff are also requesting a transfer of $350,000.00 from CIP Project No. 5503, Sewer Line Rehabilitation and Replacement Program to CIP Project No. 5552, Cannon Lift Station Improvements Project, to award the construction contract and complete the project.

Explanation & Analysis
The City Council approved the project’s plans, specifications and contract documents on Sept. 10, 2024, authorizing the City Clerk to advertise for bids, Resolution No. 2024-210. The project is estimated to cost $690,000.00.1
Since the City Council approved the contract documents on Sept. 10, 2024, two design addenda were made during the bidding phase to incorporate changes to pavement restoration and the access hatch product specified for the proposed meter vault. The changes are reflected in the revised set of contract documents in Exhibit 2.

Five bids were received on Nov. 5, 2024. The apparent low bidder, HPS Mechanical, Inc., submitted a bid in the amount of $795,683.00 but requested withdrawal of its bid due to a clerical error in the bid amount.

HPS Mechanical obtained what is known as a bid bond to provide the city with assurance that if accepted, the contractor will honor its bid. The City Council is being asked to relieve HPS Mechanical of its low bid due to a clerical error, which releases the contractor from its bid bond, and instead award the construction contract to the next lowest responsive and responsible bidder, Filanc, in an amount not to exceed $960,182.00. Staff have determined that Filanc’s bid was responsive to the city’s bid request and that Filanc is a responsible bidder because it has completed similar projects.

Staff recommend that the City Council approve the revised plans, specifications and contract documents for the project in Exhibit 2 and award the construction contract to Filanc.

Fiscal An alysis
The total construction cost for the project is estimated to be $1,402,182.00. This project is funded by the sewer replacement fund and currently has $1,057,154.00 in available project funds. An additional $350,000.00 is needed to award the contract and complete the project.

Capital Improvement Program Project No. 5503, Sewer Line Rehabilitation and Replacement Program, is also funded by the sewer replacement fund and has sufficient funds to provide additional budget for Project No. 5552.

1 This cost is based on an engineer’s estimate, an opinion of a project’s probable construction cost given by an experienced and qualified professional engineer generally familiar with the construction industry. Staff use them to obtain an estimate that will be as close to the actual costs as possible Jan. 14, 2025
Item #6 Page 2 of 8

A summary of the estimated costs, available funds and additional appropriation needed are shown in the table below:

Cannon Lift Station Improvements Project
Capital Improvement Program Project No. 5552
Total appropriation to date $1,107,253.00
Total expenditures and encumbrances to date -$50,099.00 Total available funding $1,057,154.00
Construction contract – Filanc -$960,182.00
Construction contingency (20%) -$192,000.00
Construction management, inspection and testing, public outreach, engineering and administration (estimated) -$250,000.00 Total estimated construction costs -$1,402,182.00
Remaining balance -$345,028.00
Additional appropriation needed (rounded) $350,000.00
Carlsbad Municipal Code Sections 3.28.040(C)(5) and 3.28.090(B) authorize the City Manager or designee to approve change orders in an amount equal to the contingency set at the time of contract award, which for this project is $192,000.00.

Next Steps
Once the City Council accepts the bids and awards the construction contract to Filanc, staff will issue a purchase order, schedule a pre-construction meeting with the contractor and issue a notice to proceed to construct the project.

The duration of the construction contract is nine months, not including rain days and delays from change orders that may extend the contract duration. The project is expected to be completed by late 2025 or early 2026, and a notice of completion to release bonds issued for the project will be recorded at that time.

Environmental E
valuation
The City Planner, through the process outlined in Carlsbad Municipal Code Section 19.04.060, has determined that this project is exempt pursuant to California Code of Regulations Section 15302(c), Replacement or Reconstruction, which applies to the replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity. No exceptions to the exemption as set forth in CEQA Guidelines Section 15300.2 or Carlsbad Municipal Code Section 19.04.070(B) apply.

Exhibits

1. City Council resolution

2. Revised plans, specifications and contract documents ( on file in the Office of the City Clerk)

3. Location map

Jan. 14, 2025
Item #6 Page 3 of 8
RESOLUTION NO. 2025-005

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,

CALIFORNIA, APPROVING THE REVISED PLANS, SPECIFICATIONS, AND

CONTRACT DOCUMENTS, ACCEPTING BIDS, AUTHORIZING RELIEF OF THE

APPARENT LOW BID, AWARDING A CONSTRUCTION CONTRACT TO FILANC,

AND TRANSFERRING FUNDS WITHIN THE SEWER REPLACEMENT FUND FOR

CONSTRUCTION OF THE CANNON LIFT STATION IMPROVEMENTS PROJECT, CAPITAL IMPROVEMENT PROGRAM PROJECT NO. 5552
WHEREAS, the City Council of the City of Carlsbad, California has determined it necessary, desirable and in the public interest to complete the Cannon Lift Station Improvements Project, Capital Improvement Program, or CIP, Project No. 5552, or Project; and WHEREAS, on Sept. 10, 2024, the City Council adopted Resolution No. 2024-210, approving plans, specifications, and contract documents and authorizing the City Clerk to advertise for bids to construct the Project; and
WHEREAS, two addenda to the contract documents were released during the bidding phase to reflect changes in the plans and specifications; and
WHEREAS, on Nov. 5, 2024, staff received five bids in response to the bid advertisement; and WHEREAS, HPS Mechanical, Inc. submitted the lowest bid but later requested to withdraw its bid due to a clerical error in its bid; and
WHEREAS, Filanc submitted the second lowest bid in an amount not to exceed $960,182.00, and staff determined Filanc to be a responsible bidder and its bid to be responsive; and WHEREAS, Carlsbad Municipal Code, or CMC, Section 3.28.080(E) requires the City Council to approve plans and specifications for all construction projects that are to be formally bid upon when the value exceeds $200,000 and such plans, specifications and contract documents are on file at the City Clerk's office and are incorporated herein by reference; and WHEREAS, CMC Sections 3.28.040(C)(5) and 3.28.090(B) authorize the City Manager or designee to approve change orders in an amount equal to the contingency set at the time of contract award, which is $192,000.00; and
WHEREAS, staff request a budget transfer in the amount of $350,000.00 from CIP Project No. 5503 Sewer Line Rehabilitation and Replacement Program to CIP Project No. 5552, Cannon Lift Station Improvements Project, to complete the Project; and
WHEREAS, the City Planner has determined that the Project is exempt from the California Environmental Quality Act, or CEQA, per CEQA Guidelines Section 15302(c) - replacement or reconstruction of existing structures and/or facilities involving negligible or no expansion of capacity• No exceptions to the exemption as set forth in CEQA Guidelines section 15300.2 or the CMC Section

19.04.070 (B) apply.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows:

1. 2.

3. That the above recitations are true and correct .

That the City Council approves the revised plans, specifications and contract documents for the Cannon Lift Station Improvements Project, CIP Project No. 5552.

That the City Council authorizes relief of the bid submitted by HPS Mechanical, Inc., and the City Clerk is directed to release the accompanying bid bond submitted as part of its bid.

4. That the second lowest bid submitted by Filanc in an amount of $960,182.00 for construction of the Cannon Lift Station Improvements Project, CIP Project No. 5552, is accepted, and the Mayor is hereby authorized to execute a contract with Filanc.

5. That the City Manager or designee is hereby authorized to approve construction change orders up to $192,000.00.

6. That the City Manager or designee is authorized to transfer $350,000.00 from the CIP Project No. 5503 Sewer Line Rehabilitation and Replacement Program to CIP Project No. 5552, Cannon Lift Station Improvements Project, within the sewer replacement fund.

7. That the City Manager or designee is authorized to sign all other documents necessary for regulatory compliance, to extend funding opportunities, or to otherwise implement and finalize the project, all of which are subject to review and approval as to form by the City Attorney's office.

8. That the award of this contract is contingent upon Filanc executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within 20 calendar days after adoption of this Resolution. The City Manager may grant reasonable extensions of time to execute the contract and assemble the required bonds and insurance policies.

PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 14th day of January 2025, by the following vote, to wit:

AYES:

NAYS:

ABSTAIN:

ABSENT:

BLACKBURN, BHAT-PATEL, ACOSTA, BURKHOLDER, SHIN.

NONE.

NONE.

NONE.

KEITH BLACKBURN, Mayor
Exhibit 2

Plans, specifications and contract documents
(on file in the Office of the City Clerk)

Jan. 14, 2025
Item #6 Page 7 of 8
Public Works
Contract Administration 1635 Faraday Avenue  Carlsbad, CA 92008  760-602-4677 t October 21, 2024
ADDENDUM NO. 2
RE: CANNON LIFT STATION IMPROVEMENTS
BID NO. PWS25-3495UTIL
Please include the attached addendum in the Notice to Bidder/Request for Bids you have for the above project.

Please note change in date for the above-mentioned bid.

New date for bid opening is:

November 5, 2024
Time remains the same: 11 a.m.

This addendum--receipt acknowledged--must be attached to your Request for Bid when your bid is submitted.

GRAHAM JORDAN
Contract Administrator
I ACKNOWLEDGE RECEIPT OF ADDENDUM NO. 2
__________________________________
Bidder's Signature
EXHIBIT 2
Contract No. 5552 – PWS25-3495UTIL 1
Addendum No. 2

CITY OF CARLSBAD

CANNON LIFT STATION IMPROVEMENTS

Contract No. 5552
Bid No. PWS25-3495UTIL

Addendum No. 2

From: Graham Jordan, Contract Administrator
Phone: 442-339-2462
[email protected]

No. of Pages: 1 page

Date: October 21, 2024

Bid Opening Date: November 5, 2024 - 11 a.m.

NOTICE:

This Addendum forms a part of the Contract Documents for the above identified project and modifies portions of the original Contract Specifications and/or Plans. Documents not specifically mentioned in this Addendum remain in full force.

Acknowledge receipt of this Addendum on the Bid Form. Failure to do so may subject bidder to disqualification.

Please note change in bid opening date for the above-mentioned bid.

New date and time for bid opening is:

Tuesday, November 5, 2024, 11 a.m.

MODIFICATIONS, DELETIONS, AND ADDITIONS TO THE NOTICE INVITING BIDS

ITEM NO. 1: DUE DATE

Change the due date wherever it is referenced in the Request for Bids to November 5, 2024, at 11 a.m.

Public Works
Contract Administration 1635 Faraday Avenue  Carlsbad, CA 92008  760-602-4677 t

October 16, 2024

ADDENDUM NO. 1

RE: Cannon Lift Station Improvements Project
Bid No. PWS24-2335UTIL

Please include the attached addendum in the Notice to Bidder/Request for Bids you have for the above project.

This addendum--receipt acknowledged--must be included to your bid when your bid is submitted.

GRAHAM JORDAN
Contract Administrator

I ACKNOWLEDGE RECEIPT OF ADDENDUM NO. 1

__________________________________________________________ Bidder’s Signature

Contract No. 5552 – PWS25-3495UTIL 1
Addendum No. 1

CITY OF CARLSBAD

CANNON LIFT STATION IMPROVEMENTS

Contract No. 5552
Bid No. PWS25-3495UTIL

Addendum No. 1

From: Graham Jordan, Contract Administrator
Phone: 760-602-2462
[email protected]

No. of Pages: 87 pages

Date: October 16, 2024

Bid Opening Date: October 22, 2024 - 11:00 a.m. (unchanged)

NOTICE:

This Addendum forms a part of the Contract Documents for the above identified project and modifies portions of the original Contract Specifications and/or Plans. Documents not specifically mentioned in this Addendum remain in full force.

Acknowledge receipt of this Addendum on the Bid Form. Failure to do so may subject bidder to disqualification.

MODIFICATIONS, DELETIONS, AND/OR ADDITIONS TO THE CONTRACTOR’S PROPOSAL

ITEM NO. 1: CONTRACTOR’S PROPOSAL
Replace the Contractor’s Proposal in its entirety with the revised Contractor’s Proposal included as Attachment A.

MODIFICATIONS, DELETIONS, AND/OR ADDITIONS TO THE PLANS

ITEM NO. 2: DRAWING 544-7
Replace the improvement plan with the revised plan set included as Attachment B.

MODIFICATIONS, DELETIONS, AND/OR ADDITIONS TO THE GENERAL PROVISIONS

ITEM NO. 3: 6-1.1.1 BASELINE CONSTRUCTION SCHEDULE
Modify the following contract section per the revised language below:

Contract No. 5552 – PWS25-3495UTIL 2
Addendum No. 1
6-1.1.1 Baseline Construction Schedule . The Contractor shall prepare the Baseline Construction Schedule as a Critical Path Method (CPM) Schedule in the precedence diagram method (activity-on-node) format and submit the schedule in accordance with 2-5.3. The schedule shall:

A. Be prepared using a commercially available, Windows compatible software program, “Suretrak” by Primavera or “Project” by Microsoft Corporation or approved equal.

B. Be prepared in hard copy (paper) and electronic (Adobe PDF) format and free of file locking, encryption or any other protocol that would impede full access to the data and labeled with the project name and number, the Contractor’s name and the date of preparation.

C. Begin with the date projected for the Notice to Proceed and conclude with the date of final completion conforming with the Contract time.

D. Depict a time-scaled network diagram of all activities, logic relationships of interdependent activities, and milestones comprising the complete period of Work with tasks on the vertical axis and their durations on the horizontal axis. Use distinctive texture patterns or line types to show the critical path within the Contract time. Include a tabular listing of each activity and its identification number, description, duration, early start, early finish, late start, late finish, total float, and all predecessor and successor activities. The number of activities will communicate the Contractor’s plan for project execution, accurately describe the project work and allow monitoring and evaluation of progress and time impacts. Activity descriptions shall accurately define the work planned for the activity. Activity durations shall not be shorter than 1 working day or longer than 15 working days unless approved by the Engineer.

E. Include detail of all project phasing, staging and sequencing including all milestones necessary to define beginning and ending of each phase or stage and constraints which may impact any activity. Include time allowances for coordination with utility comp anies and other agencies, equipment and material deliveries, submittal reviews and approvals, traffic control setup and phasing, Work performed by others, inspections, testing and commissioning, corrective work, and any non-work periods.

Float or slack time within the schedule is available without charge or compensation to the party or contingency that first exhausts it. A schedule which shows a project duration longer than the Contract time will not be accepted by the Engineer.

If the Baseline Construction Schedule does not meet the requirements of these specifications, the Contractor shall revise the schedule and resubmit it to the Engineer. Failure to obtain the Engineer’s approval of the schedule within fifteen (15) Working Days after the date of the Preconstruction Meeting shall be grounds to consider the Contractor in default of the Contract per 6-4. The time required by the Engineer to review the initial Baseline Construction Schedule submittal will not be included in the 15 Working Days. The Engineer shall complete subsequent reviews of the revised schedule and progress updates within 5 working days of receipt.

The Contractor shall not be permitted to commence any excavation or demolition activities until the Engineer accepts the Baseline Construction Schedule. For each day of delay beyond the 15 Working Days after the Preconstruction Meeting that the Baseline Construction Schedule is not Contract No. 5552 – PWS25-3495UTIL 3
Addendum No. 1
accepted by the Engineer, the Contractor shall be charged $100 through a deductive Change Order.

The Engineer’s response to each review will consist of one of the following:

“Accepted.” The Contractor may proceed with the Work.

“Accepted with Comments.” The Contractor may proceed with the Work, but must revise and resubmit the schedule prior to submittal of the first progress payment application. The Engineer’s acceptance of the schedule is a condition precedent to payment of any progress payment.

“Not Accepted.” The Contractor may not proceed with the Work and must revise and resubmit the schedule.

ITEM NO. 4: 9-4 BID ITEM DESCRIPTIONS
Add the following bid item per the description below:

Seal Coat Existing Driveway
The contract price paid for this bid item shall constitute full compensation to furnish all labor, materials and equipment to place an asphalt-based seal coat to the extents shown on the plan and in accordance with the contract, specifications and Greenbook Section 302 -8. The area specified in the contract quantity shall receive two applications of seal coat.

MODIFICATIONS, DELETIONS, AND /OR ADDITIONS TO THE TECHNICAL

SPECIFICATIONS

ITEM NO. 5: TECHNICAL SPECIFICAITONS
Replace Section 05500 Miscellaneous Metals of the technical spec ifications with the revised section attached herein as Attachment C. The following provision within the section has been revised:

Section 05500 – MISCELLANEOUS METALS

2.02 Access Hatches
I. Access hatches shall be manufactured by Bilco, type JD-AL H20 THD Series 48x48 Aluminum H-20 off street Trough/Channel frame, H -20, Double leaf , (USF Fabrication In c. part# 1000244419), or approved equal.

MODIFICATIONS, DELETIONS, AND/OR ADDITIONS TO THE APENDICES

ITEM NO. 6: APPENDIX B – GEOTECHNICAL INVESTIGATION REPORTS Add the geotechnical report attached herein as Attachment D to Appendix B of the Contract.

Contract No. 5552 – PWS25-3495UTIL 4
Addendum No. 1

ATTACHMENT A

CONTRACTOR’S PROPOSAL

Contract No. 5552 – PWS25-3495UTIL 5
Addendum No. 1

CITY OF CARLSBAD

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

CONTRACTOR'S PROPOSAL

City Council
City of Carlsbad
1200 Carlsbad Village Drive
Carlsbad, California 92008

The undersigned declares he/she has carefully examined the location of the work, read the Notice Inviting Bids, examined the Plans, Specifications, General Provisions, Contract Documents, and addenda thereto, and hereby proposes to furnish all labor, materials, equipment, and incidental services required to do all the work to complete Contract No. 5552 in accordance with the Plans, Specifications, General Provisions, Contract Documents, and addenda thereto and that he/she will take in full payment therefore the following unit prices for each item complete, to wit (refer to Section 9-4 for bid item descriptions):

SCHEDULE “A”

Item
No. Description
Approximat
e Quantity
And Unit
Unit Price
(Figures)

Total Amount
(Figures)

1 Mobilization and Preparatory
Work (not to exceed 5% of
Total Bid)
LS $___________

2 Temporary Traffic Control LS $___________

3 Preconstruction Survey LS $___________

4 Storm Water Pollution Control
(SWPPP)
LS $___________

5 Utility Locating and Potholing LS $___________

6 Excavation Support System LS $___________

7 Dewatering LS $___________

8 Force Main Dewatering LS $___________

9 Demolition LS $___________

10 Temporary Sewer Bypass LS $___________

Contract No. 5552 – PWS25-3495UTIL 6
Addendum No. 1
Item
No. Description
Approximat
e Quantity
And Unit
Unit Price
(Figures)

Total Amount
(Figures)
11 Construct 8’ Diameter Manhole LS $___________

12 Over-excavation and Backfill 20 CY $___________ $___________

13 Furnish and Install HDPE Pipe
and Fittings
LS $___________

14 Furnish and Install Flow Meter 1 EA $___________ $___________

15 Furnish and Install 14” Plug
Valve
1 EA $___________ $___________

16 Furnish and Install 10” Plug
Valve
3 EA $___________ $___________

17 Furnish and Install 10” Check
Valve
3 EA $___________ $___________

18 Furnish and Install Electrical
and Instrumentation
Improvements
1 LS $___________

19 Furnish and Install Aggregate
Base
1 LS $___________

20 Furnish and Install Asphalt
Concrete
1 LS $___________

21 Seal Coat Existing Driveway 5,400 SF $___________ $___________

Total amount of bid (in figures) for Schedule “A”: $

Total amount of bid (in words) for Schedule “A”:

The City shall determine the low bid based on the sum of Schedule “A”.

Price(s) given above are firm for 90 days after the date of bid opening.

Addendum(a) No(s). ___________________ has/have been received and is/are included in this proposal.

Contract No. 5552 – PWS25-3495UTIL 7
Addendum No. 1

The Undersigned has carefully checked all of the above figures and understands that the City will not be responsible for any error or omission on the part of the Undersigned in preparing this bid.

The Undersigned agrees that in case of default in executing the required Contract with necessary bonds and insurance policies within twenty (20) days from the date of award of Contract by the City Council of the City of Carlsbad, the City may administratively authorize award of the contract to the second or third lowest bidder and the bid security of the lowest bidder may be forfeited.

The Undersigned bidder declares, under penalty of perjury, that the undersigned is licensed to do business or act in the capacity of a contractor within the State of California, validly licensed under license number _________________________, classification ________________ which expires on _____________________, and Department of Industrial Relations PWC registration number ___________________________________ which expires on ____________________, and that this statement is true and correct and has the legal effect of an affidavit.

A bid submitted to the City by a Contractor who is not licensed as a contractor pursuant to the Business and Professions Code shall be considered nonresponsive and shall be rejected by the City § 7028.15(e). In all contracts where federal funds are involve d, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with California law. However, at the time the contract is awarded, the contractor shall be properly licensed.

The Undersigned bidder hereby represents as follows:

1. That no Council member, officer agent, or employee of the City of Carlsbad is personally interested, directly or indirectly, in this Contract, or the compensation to be paid hereunder; that no representation, oral or in writing, of the City Council, its officers, agents, or employees has inducted him/her to enter into this Contract, excepting only those contained in this form of Contract and the papers made a part hereof by its terms; and

2. That this bid is made without connection with any person, firm, or corporation making a bid for the same work, and is in all respects fair and without collusion or fraud.

Accompanying this proposal is _____________________________ _ (Cash, Certified Check, Bond or Cashier's Check) for ten percent (10%) of the amount bid.

The Undersigned is aware of the provisions of section 3700 of the Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code and agrees to comply with such provisions before commencing the performance of the work of this Contract and continue to comply until the contract is complete.

The Undersigned is aware of the provisions of the Labor Code, Part 7, Chapter 1, Article 2, relative to the general prevailing rate of wages for each craft or type of worker needed to execute the Contract and agrees to comply with its provisions.

Contract No. 5552 – PWS25-3495UTIL 8
Addendum No. 1
IF A SOLE OWNER OR SOLE CONTRACTOR SIGN HERE:

(1) Name under which business is conducted _______________________________________

(2) Signature (given and surname) of proprietor ______________________________________

(3) Place of Business __________________________________________________________ (Street and Number)
City and State _____________________________________________________________

(4) Zip Code ___________________ Telephone No. _________________________________

(5) E-Mail ___________________________________________________________________

IF A PARTNERSHIP, SIGN HERE:

(1) Name under which business is conducted _______________________________________

(2) Signature (given and surname and character of partner) (Note: Signature must be made by a general partner)

_________________________________________________________________________

_________________________________________________________________________

(3) Place of Business __________________________________________________________ (Street and Number)
City and State _____________________________________________________________

(4) Zip Code ___________________ Telephone No. _________________________________

(5) E-Mail ___________________________________________________________________

Contract No. 5552 – PWS25-3495UTIL 9
Addendum No. 1
IF A CORPORATION, SIGN HERE:

(1) Name under which business is conducted _______________________________________

__________________________________________________________________________

(2) _________________________________________________________________________ (Signature)

____________________________________________________________________________ (Title)

Impress Corporate Seal here

(3) Incorporated under the laws of the State of _______________________________________

(4) Place of Business __________________________________________________________ (Street and Number)
City and State _____________________________________________________________

(5) Zip Code _____________________ Telephone No. _______________________________

(6) E-Mail ___________________________________________________________________

NOTARIAL ACKNOWLEDGMENT OF EXECUTION BY ALL SIGNATORIES MUST BE

ATTACHED

List below names of president, vice president, secretary and assistant secretary, if a corporation; if a partnership, list names of all general partners, and managing partners:

____________________________________ ___________________________________

____________________________________ ___________________________________

____________________________________ ___________________________________

____________________________________ ___________________________________

____________________________________ ___________________________________

____________________________________ ___________________________________

____________________________________ ___________________________________

____________________________________ ___________________________________

Contract No. 5552 – PWS25-3495UTIL 10
Addendum No. 1

ATTACHMENT B

REVISED PLANSET

1/2" 01 "

BID SET - NOT FOR CONSTRUCTION

CANNON LIFT STATION IMPROVEMENTS
CIP 5552

CONSTRUCTION PLANS

FOR THE

CARLSBAD, CALIFORNIA

CITY OF CARLSBAD, UTILITIES DEPARTMENT

KEITH BLACKBURN - MAYOR

CITY COUNCIL MEMBERS

GEOFF PATNOE

PAZ GOMEZ

BID SET

CITY MANAGER

DEPUTY CITY MANAGER, PUBLIC WORKS
TERESA ACOSTA - DISTRICT 4
PRIYA BHAT-PATEL - DISTRICT 3
MELANIE BURKHOLDER - DISTRICT 1
KEVIN SHIN - DISTRICT 2
AUGUST 2024

FILL EXTERIOR WITH SEALANT

EPOXY LINED VAULT PENETRATION

MODULAR LINK SEAL
(P) DI FORCEMAIN

PRECAST VAULT

INTERIOR

POLYETHYLENE FOAM FILLER
MIN 20", PER

LINK SEAL

MANUFACTURERSUMP
PUMP
1-1/2" SCH. 80 PVC DISCHARGE WITH CHECK VALVE
AND COMPRESSION COUPLING. 1-1/2" GALVANIZED
SUPPORT BRACKET.

FRP GRATE
APPROX. 14'
SEE SHEET 3 AND 5 FOR SUMP PUMP DISCHARGE

ALIGNMENT

CANNON LIFT STATION IMPROVEMENTS
IMPROVEMENT PLAN FOR:
1/2" 0 1" 5552 544-7

BID SET - NOT FOR CONSTRUCTION
2 6

NOTES, LEGEND, ABBREVIATIONS
AND MISC. DETAILS
NI
SD
DP
LEGEND

DESCRIPTION SYMBOL

ABBREVIATIONS

DESCRIPTION ABBREVIATION

SUMP PUMP DISCHARGE
STA: N/A SCALE: N.T.S.1 PROPOSED MANHOLE PENETRATION DETAIL STA: N/A SCALE: N/A2
1 1 ADDENDUM 11 10/2024 DP10/2024

(E) CANNON ROAD LIFT STATION

CANNON ROAD
SEE DWG 409-8, SHEET 5 FOR (E)

ON-SITE STORM DRAIN IMPROVEMENTS, NOT SHOWN ON

THESE PLANS
20'
20'
24 MEDIAN
(E) AC DRIVEWAY
SEE DETAIL G, SHEET C-10, DWG 409-8
PIP (E) 12" DRAIN LINE
PIP (E) 6" VENT PIPE
SEE SHEET 5 FOR

PROPOSED FLOW

METER VAULT
PIP (E) 24" RCP SD
PER DWG 409-8
PIP (E) 14" HDPE

SEWER BYPASS
PER DWG 409-8

PIP (E) ROLLED

CURB AND GUTTER
1 3
2 6
4 5

PIP (E) EMERGENCY

BYPASS CONCRETE VAULT
PER DWG 409-8
(E) 18' DIAMETER

VALVE VAULT
PER SHEET C-5
DWG 409-8
(E) 18' DIAMETER WET WELL
PER SHEET C-5 DWG 409-8
TOP SLAB EL. 27.0'
FLOOR EL. -0.6'
PIP (E) 20" PVC
SEWER

PIP (E) FENCE AND
GATE
PIP (E) 5' DIAMETER

SEWER MANHOLE
RIM: 27.0'
IE: 6.5'

PIP (E) SIDEWALK AND

PEDESTRIAN RAMPS

PIP (E) FENCE AND
GATE
(E) DRAIN PER
SHEET C-8 DWG
409-8
3 22
PIP (E) 2" SUMP PUMP

DISCHARGE PER DWG
409-8
PIP (E) 16" OD (IPS) DR 17

HDPE FORCEMAIN PER
DWG 396-2

PIP (E) SEWER

LATERAL PER DWG
409-8
22 SDGE OVERHEAD

ELECTRICAL

EASEMENT PER DWG
409-8
26 26

CANNON LIFT STATION IMPROVEMENTS
IMPROVEMENT PLAN FOR:
1/2" 0 1" 5552 544-7

BID SET - NOT FOR CONSTRUCTION
3 6

OVERALL SITE PLAN
NI
SD
DP
CONSTRUCTION NOTES:

1. DEMO (E) CHEMICAL INJECTION MANHOLE AND REPLACE W/ NEW FLOW METERING VAULT. SEE SHEET 4 FOR MANHOLE DEMOLITION

2. CONTRACTOR TO LOCATE AND PIP (E) 1" CONDUIT 112A PER DWG 409-8.

REUSE CONDUIT FOR (P) FLOW METER SIGNAL CABLE

3. REMOVE (E) 2" CHEMICAL INJECTION FEED PER DWG 409-8 SHEET C-8.

REPLACE WITH (P) 2" ELECTRICAL CONDUIT FOR FLOW METER AND SUMP PUMP POWER PER SDGE STANDARD 3370

4. RR (E) 10" PLUG VALVE (TYP OF 3)

5. RR (E) 10" CHECK VALVE W/ VAL-MATIC SURGEBUSTER W/ MECHANICAL DISC INDICATOR AND BACKFLOW ACTUATOR (TYP OF 3)

6. PIP (E) 16" OD (IPS) DR 17 HDPE FORCEMAIN

7. (P) 16" IPS ELECTROFUSION COUPLER. MIN. 230 PSI RATING

8. (P) 14" DIOD DR 13.5 HDPE, FLG ADAPTER X PE

9. (P) 14" ID FULL PORT PLUG VALVE

10. (P) 14" ID ELECTROMAGNETIC FLOW METER, ENDRESS+HAUSER 24 V DC PROLINE PROMAG W 400

11. (P) 14" DISMANTLING JOINT, ROMAC DJ400 OR APPROVED EQUAL

12. (P)16" IPS X 14" DIOD HDPE REDUCER, MIN DR 17

13. 1.5 'X 1.5 'X 1.5' SUMP

14. PRECAST STRUCTURAL RISER SECTION (TYP)

15. PRECAST STRUCTURAL MONOLITHIC BASE SECTION

16. GALVANIZED STEEL LADDER W/ LADDER-UP

17. PRECAST HS-20 HEAVY DUTY TRAFFIC RATED FLAT-TOP PER MANHOLE

MANUFACTURER

18. 48" X 48" HS-20 HEAVY DUTY TRAFFIC RATED VAULT ACCESS COVER PER SPEC. 05500

19. FRP GRATE

20. HOT DIP GALVANIZED ADJUSTABLE PIPE SUPPORT

21. SUMP PUMP - LITTLE GIANT #506251 OR APPROVED EQUAL

22. 1-1/2" SCH. 80 PVC DISCHARGE (APPROX. 110 LF, MIN 2.5' DEPTH).

CONNECT TO EXISTING MANHOLE WITH NEW CORED CONNECTION PER DETAIL 2 SHEET 2. BACKFILL PER CMWD STD. DWG. W-2.

23. WATERPROOF EXTERIOR STRUCTURE

24. RR (E) 10" DI SPOOL AND VICTAULIC COUPLING (TYP OF 3)

25. MANHOLE PENETRATION DETAIL, SHEET 2

26. SEAL COAT ASPHALT DRIVEWAY UPON COMPLETING LIFT STATION IMPROVEMENTS (2-COAT)
X
1 1
1 1 ADDENDUM 11 10/2024 DP10/2024

NOTES:

1. CONTRACTOR TO LOCATE EXISTING ELECTRICAL

CONDUITS TO FLOW METER AND PROTECT IN
PLACE

2. CONTRACTOR TO REMOVE AND REPLACE

EXISTING JUNCTION BOX FOR FLOW METER AND

SUMP PUMP POWER (NOT SHOWN)

PIP (E) FORCEMAIN
DEMOLISH (E) MANHOLE. SEE

SECTION VIEW, THIS SHEET

REMOVE AND DISPOSE OF
(E) PIPE SUPPORT
2' X 2' SUMP
EL 27.0
EL 10.5
4'
(TYP)
6'
NOTES:

1. CONTRACTOR TO LOCATE EXISTING ELECTRICAL

CONDUITS TO FLOW METER AND PROTECT IN
PLACE

2. CONTRACTOR TO REMOVE AND REPLACE

EXISTING JUNCTION BOX FOR FLOW METER

POWER (NOT SHOWN)
3'2'

REMOVE AND DISPOSE OF
(E) FRAME, COVER AND CONCRETE COLLAR

DEMOLISH (E) PRECAST

CONCRETE

MANHOLE

DEMOLISH (E) REINFORCED CONCRETE

BASE AND SUMP
PIP (E) 16" OD DR17 HDPE FORECEMAIN

REMOVE AND DISPOSE OF
(E) PIPE SUPPORT
3 EL 10.5 ±
EL 27 ±
1' - 7/16"
18'
4'
(E) 10" DI SPOOL
(E) 14" X 10" DI REDUCER
(E) 14" X 10" WYE
(E) 14" DI PIPE
4 5
6 (E) PIPE SUPPORT (TYP).
24 PIP (E) PIPE SUPPORT PER
DETAIL 1, SHEET S-10, DWG
409-8 (TYP OF 3). REPAIR
DAMAGED COATINGS.

CANNON LIFT STATION IMPROVEMENTS
IMPROVEMENT PLAN FOR:
1/2" 0 1" 5552 544-7

BID SET - NOT FOR CONSTRUCTION

MANHOLE DEMOLITION - PLAN
STA: SCALE: N.T.S.1

MANHOLE DEMOLITION - SECTION
STA: SCALE: N.T.S.A

EXISTING VALVE VAULT - SECTION
STA: SCALE: N.T.S.2

ACCESS ROAD RESTORATION
STA: SCALE: N.T.S.3
3" AC SURFACE COURSE
6" AC BASE COURSE
9" SUB-BASE
NOTE:

REFER TO CSD GS-28 FOR ASPHALT CONCRETE RESURFACING

REQUIREMENTS
4 6

DEMOLITION AND RESTORATION

DETAILS
NI
SD
DP
CONSTRUCTION NOTES:

1. DEMO (E) CHEMICAL INJECTION MANHOLE AND REPLACE W/ NEW FLOW METERING VAULT. SEE SHEET 4 FOR MANHOLE

DEMOLITION

2. CONTRACTOR TO LOCATE AND PIP (E) 1" CONDUIT 112A PER DWG 409-8. REUSE CONDUIT FOR (P) FLOW METER SIGNAL CABLE

3. REMOVE (E) 2" CHEMICAL INJECTION FEED PER DWG 409-8 SHEET C-8. REPLACE WITH (P) 2" ELECTRICAL CONDUIT FOR FLOW
METER AND SUMP PUMP POWER PER SDGE STANDARD 3370

4. RR (E) 10" PLUG VALVE (TYP OF 3)

5. RR (E) 10" CHECK VALVE W/ VAL-MATIC SURGEBUSTER W/

MECHANICAL DISC INDICATOR AND BACKFLOW ACTUATOR (TYP
OF 3)

6. PIP (E) 16" OD (IPS) DR 17 HDPE FORCEMAIN

7. (P) 16" IPS ELECTROFUSION COUPLER. MIN. 230 PSI RATING

8. (P) 14" DIOD DR 13.5 HDPE, FLG ADAPTER X PE

9. (P) 14" ID FULL PORT PLUG VALVE

10. (P) 14" ID ELECTROMAGNETIC FLOW METER, ENDRESS+HAUSER 24V DC PROLINE PROMAG W 400

11. (P) 14" DISMANTLING JOINT, ROMAC DJ400 OR APPROVED EQUAL

12. (P)16" IPS X 14" DIOD HDPE REDUCER, MIN DR 17

13. 1.5 'X 1.5 'X 1.5' SUMP

14. PRECAST STRUCTURAL RISER SECTION (TYP)

15. PRECAST STRUCTURAL MONOLITHIC BASE SECTION

16. GALVANIZED STEEL LADDER W/ LADDER-UP

17. PRECAST HS-20 HEAVY DUTY TRAFFIC RATED FLAT-TOP PER

MANHOLE MANUFACTURER

18. 48" X 48" HS-20 HEAVY DUTY TRAFFIC RATED VAULT ACCESS COVER PER SPEC. 05500

19. FRP GRATE

20. HOT DIP GALVANIZED ADJUSTABLE PIPE SUPPORT

21. SUMP PUMP - LITTLE GIANT #506251 OR APPROVED EQUAL

22. 1-1/2" SCH. 80 PVC DISCHARGE (APPROX. 110 LF, MIN 2.5' DEPTH).

CONNECT TO EXISTING MANHOLE WITH NEW CORED
CONNECTION PER DETAIL 2 SHEET 2. BACKFILL PER CMWD STD.

DWG. W-2.

23. WATERPROOF EXTERIOR STRUCTURE

24. RR (E) 10" DI SPOOL AND VICTAULIC COUPLING (TYP OF 3)

25. MANHOLE PENETRATION DETAIL, SHEET 2
X
NOTE:

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE ORDERING

REPLACEMENT VALVES, SPOOLS AND FITTINGS

(E) CANNON

ROAD LIFT

STATION

32.4'
SEE GENERAL NOTE 1
RR (E) 12"

DRAIN AS
NEEDED

PROPOSED CENTER
N:1998026.8464
E:6239002.6533
SEE DETAIL 2, THIS SHEET

FOR FLOW METER VAULT PLAN
2 PIP (E) BUILDING WALL
PIP (E) 14" PLUG VALVE

PIP (E) EMERGENCY

BYPASS VAULT WITH
14" DI BLIND FLANGE
6 6
6 22
3 SECTION A AND B NOTES:

1. ALL PRECAST STRUCTURAL SECTIONS PER VAULT MANUFACTURER.

2. STRUCTURAL REINFORCEMENT PER PRECAST VAULT MANUFACTURER, PRECAST BASE REINFORCEMENT SHOWN FOR REFERENCE ONLY.

3. WATERPROOFING OF EXTERIOR AND PRECAST JOINTS PER SPECIFICATION 07110

4. CONTRACTOR TO VERIFY ALL EXISTING CHEMICAL INJECTION METERING

MANHOLE DIMENSIONS BEFORE ORDERING PROPOSED FLOW METER VAULT

5. SUMP IS OUTSIDE OF SECTION VIEW, SHOWN FOR REFERENCE ONLY

6. VAULT SHALL BE CAST WITH A SLOPE TOWARDS THE SUMP AS SHOWN

8.0'

2.0'

4.5'

3.17'
18 17
16 14
15 19

SEE PAVEMENT RESTORATION
DETAIL, SHEET 4
ASSUMED GW DEPTH.

REFER TO GEOTECHNICAL

REPORT PROVIDED IN
ADDENDUM 1 FOR GROUND
WATER PARAMETERS.
23 MIN 3"

0.5% (TYP)
8 9 10
11 25
8 18
13 21 22
6 7
7 6
12 12 2.2' 1.5' 2.2'4.6'

1.6'
6 7
8 9
10 11
25 8
7 6

1.9'
17 18
23 8.0'
(E) 12" PVC C900
DRAIN
20 9" TYP
12 12

CANNON LIFT STATION IMPROVEMENTS
IMPROVEMENT PLAN FOR:
1/2" 0 1" 5552 544-7

BID SET - NOT FOR CONSTRUCTION

PROPOSED FLOW METER VAULT SITE PLAN
STA: N/A SCALE: 1" = 4'1

PROPOSED FLOW METER VAULT SECTION-A
STA: N/A SCALE: 1" = 2'A

PROPOSED FLOW METER VAULT PLAN
STA: N/A SCALE: 1" = 2'2

PROPOSED FLOW METER VAULT SECTION-B
STA: N/A SCALE: 1" = 2'B
5 6

FLOW METER VAULT

SITE PLAN AND SECTION VIEWS
NI
SD
DP
CONSTRUCTION NOTES:

1. DEMO (E) CHEMICAL INJECTION MANHOLE AND REPLACE W/ NEW FLOW METERING VAULT. SEE SHEET 4 FOR MANHOLE DEMOLITION

2. CONTRACTOR TO LOCATE AND PIP (E) 1" CONDUIT 112A PER DWG 409-8. REUSE

CONDUIT FOR (P) FLOW METER SIGNAL CABLE

3. REMOVE (E) 2" CHEMICAL INJECTION FEED PER DWG 409-8 SHEET C-8. REPLACE WITH (P) 2" ELECTRICAL CONDUIT FOR FLOW METER AND SUMP PUMP POWER PER SDGE STANDARD 3370

4. RR (E) 10" PLUG VALVE (TYP OF 3)

5. RR (E) 10" CHECK VALVE W/ VAL-MATIC SURGEBUSTER W/ MECHANICAL DISC INDICATOR AND BACKFLOW ACTUATOR (TYP OF 3)

6. PIP (E) 16" OD (IPS) DR 17 HDPE FORCEMAIN

7. (P) 16" IPS ELECTROFUSION COUPLER. MIN. 230 PSI RATING

8. (P) 14" DIOD DR 13.5 HDPE, FLG ADAPTER X PE

9. (P) 14" ID FULL PORT PLUG VALVE

10. (P) 14" ID ELECTROMAGNETIC FLOW METER, ENDRESS+HAUSER 24V DC PROLINE PROMAG W 400

11. (P) 14" DISMANTLING JOINT, ROMAC DJ400 OR APPROVED EQUAL

12. (P)16" IPS X 14" DIOD HDPE REDUCER, MIN DR 17

13. 1.5 'X 1.5 'X 1.5' SUMP

14. PRECAST STRUCTURAL RISER SECTION (TYP)

15. PRECAST STRUCTURAL MONOLITHIC BASE SECTION

16. GALVANIZED STEEL LADDER W/ LADDER-UP

17. PRECAST HS-20 HEAVY DUTY TRAFFIC RATED FLAT-TOP PER MANHOLE

MANUFACTURER

18. 48" X 48" HS-20 HEAVY DUTY TRAFFIC RATED VAULT ACCESS COVER PER SPEC.

19. FRP GRATE

20. HOT DIP GALVANIZED ADJUSTABLE PIPE SUPPORT

21. SUMP PUMP - LITTLE GIANT #506251 OR APPROVED EQUAL

22. 1-1/2" SCH. 80 PVC DISCHARGE (APPROX. 110 LF, MIN 2.5' DEPTH). CONNECT TO EXISTING MANHOLE WITH NEW CORED CONNECTION PER DETAIL 2 SHEET 2.

BACKFILL PER CMWD STD. DWG. W-2.

23. WATERPROOF EXTERIOR STRUCTURE

24. RR (E) 10" DI SPOOL AND VICTAULIC COUPLING (TYP OF 3)

25. MANHOLE PENETRATION DETAIL, SHEET 2
X

GENERAL NOTES

1. CONTRACTOR SHALL SET SURVEY REFERENCE POINTS TO EXISTING CENTER OF MANHOLE AND PIPE CENTERLINE PRIOR TO DEMOLITION. FIELD VERIFY ELEVATIONS AND DIMENSIONS OF ALL EXISTING

IMPROVEMENTS TO BE JOINED OR MATCHED BY NEW WORK

2. RESTORE EXISTING PAVEMENT IN ALL EXCAVATION AREAS OR WHERE DAMAGED BY CONSTRUCTION PER STANDARD DRAWINGS GS-25 AND DETAIL 3, SHEET 4.
1 ADDENDUM 11 10/2024 DP10/2024
1 REMOVE (E) 14" BLIND FLANGE, CONNECT
ABOVE GROUND 14" SEWER BYPASS
DISCHARGE TO (E) 14" DUCTILE IRON

FLANGED BYPASS CONNECTION
APPROX. LOCATION OF ABOVE

GROUND RESTRAINED SEWER

BYPASS, FOR REFERENCE ONLY
APPROX. LOCATION OF HDPE TEMP
CAP. CONTRACTOR TO DRAIN

SEWER FORECMAIN AND INSTALL

ELECTROFUSION OR BUTT FUSED

CAP PRIOR TO START OF SEWER
BYPASS OPERATIONS.

INSTALL TEMPORARY PLUG AT

MANHOLE OUTLET DURING

FORCEMAIN DEWATERING

OPERATIONS

OBSERVATION MANHOLE DURING FORCEMAIN
DRAINING OPERATIONS. PROVIDE STANDBY

VACTOR TRUCK AND MAINTAIN WATER
SURFACE ELEVATION BELOW 16'
RIM: 27.0'
IE: 6.5'
APPROX. LOCATION

SEWER BYPASS AND

STANDBY PUMP, SHOWN

FOR REFERENCE ONLY
(E) 16" OD (IPS) HDPE DR 17 FORCEMAIN.

LENGTH=6500 FT. TO DOWNSTREAM

GRAVITY/BREAK MANHOLE

CANNON RD

EL CAMINO REAL
DIVERSION STRUCTURE PER DWG 333-2GE
RIM: 44.5
INV: 19.08
TOP OF DIVERSION GATE: 20.15

CANNON RD

GRAND PACIFIC DR

FORCEMAIN DRAINAGE

DISCHARGE LOCATION
MH SWAH5402
RIM: 178.4
INV: 170.4
14" HDPE FORCE MAIN
PER DWG 396-2A
15" PVC GRAVITY MAIN
PER DWG 396-2A

CANNON LIFT STATION IMPROVEMENTS
IMPROVEMENT PLAN FOR:
1/2" 0 1" 5552 544-7

BID SET - NOT FOR CONSTRUCTION
6 6

TEMPORARY SEWER BYPASS PLAN
NI
SD
DP
SEWER BYPASS NOTES:

1. REFER TO SPECIFICATION 02960 - TEMPORARY SEWER BYPASS PUMPING. BYPASS SYSTEM SHALL BE DESIGNED FOR PEAK WET WEATHER FLOW = 2440 GPM.

2. CONTRACTOR RESPONSIBLE FOR ALL SEWER FORCEMAIN DEWATERING OPERATIONS PRIOR TO INSTALLATION, TEMP. CAP, AND THE FLOW METER VAULT INSTALLATION TIE-IN PER SHEET 5

3. APPROXIMATE VOLUME OF SEWER FORCEMAIN DEWATERING = 51,000 GAL. CONTRACTOR TO INTERCEPT AND COLLECT ALL FORCEMAIN DEWATERING DISCHARGE AND DELIVER TO MANHOLE SWAH5402 PER DETAIL 2, THIS SHEET. MAXIMUM DISCHARGE RATE = 1000 GPM

4. ESTIMATED PEAK DRY WEATHER FLOW INFLUENT TO STATION = 1000 GPM

5. ESTIMATED AVERAGE DRY WEATHER FLOW INFLUENT TO STATION BETWEEN 12 A.M. AND 6 A.M = 400 GPM

6. ESTIMATED STORAGE IN EXISTING GRAVITY MAIN/MANHOLES TRIBUTARY TO LIFT STATION: 40,000 GAL, INCLUDING EXISTING FLOW

7. CONTRACTOR TO COORDINATE WITH CITY OF CARLSBAD UTILITIES DEPARTMENT DURING SHUTDOWN OF LIFT STATION AND

INSTALLATION AND STARTUP OF SEWER BYPASS

8. SEWER FORCEMAIN DEWATERING OPERATIONS MUST OCCUR AT NIGHT BETWEEN THE HOURS OF 12 A.M. AND 6 A.M. ONLY.

9. CONTRACTOR TO REMOVE DIVERSION GATE FROM DIVERSION STRUCTURE IN DETAIL 1, THIS SHEET PRIOR TO FORCEMAIN

DRAINAGE OPERATIONS AND REPLACE AFTER COMPLETION

EXISTING SEWER DIVERSION GATE LOCATION
STA: N/A SCALE: 1" = 100'1

FORCEMAIN DRAINAGE DISCHARGE LOCATION
STA: N/A SCALE: 1" = 100'2

Contract No. 5552 – PWS25-3495UTIL 11
Addendum No. 1

ATTACHMENT C

TECHNICAL SPECIFICATION
SECTION 05500

MISCELLANEOUS METALS

SECTION 05500 – MISCELLANEOUS METALS
Miscellaneous Metals and Access Hatches
Contract No. 5552 05500 - 1
PART 1 - GENERAL

1.01 SECTION INCLUDES
A. The Contractor shall provide all labor, materials, equipment and incidentals required to furnish and install all miscellaneous metal fabrications work, including ladders and fall preventions systems and access hatches.

1.02 REFERENCES
A. Comply with the applicable provisions and recommendations of the following, except as otherwise shown or specified:

1. ASTM A36 – Structural Steel.

2. ASTM A123 – Zinc (Hot -Galvanized) Coatings on Products Fabricated from Rolled, Pressed, and Forged Steel Shapes, Plates, Bars, and Strip.

3. ASTM A153 – Zinc Coating (Hot-Dip) on Iron and Steel Hardware.

4. ASTM A240 – Heat Resisting Chromium and Chromium -Nickel Stainless Steel Plate, Sheet, and Strip for Fusion-welded Unfired Pressure Vessels.

5. ASTM A320 – Alloy Steel Bolting Material for Low Temperature Service.

6. ASTM A386 – Zinc Coating (Hot-Dip) on Assembled Steel Products.

7. ASTM B209 – Aluminum-Alloy Sheet and Plate.

8. ASTM B211 – Aluminum-Alloy Bars, Rods and Wire.

9. ASTM B221 – Aluminum -Alloy Extruded Bars, Rods, Wire, Shapes and Tubes.

10. ANSI A14.3 – Safety Requirements for Fixed Ladders.

11. AWS D1.1 – Structural Welding Code.

12. ANSI/ASSP Z359.6 – Specifications and Design Requirements for Active Fall Protection Systems.

13. AISI Standards for Stainless Steel.

14. CalOSHA – Subchapter 4. Construction Safety Orders, Article 24. Fall Protection.

15. CSA Z259.16 – Design of Active Fall-Protection Systems.

16. National Association of Architectural Metal Manufacturers (NAAMM) – Metal Finishes Manual, AMP 500-06.

1.03 SUBMITTALS
A. All submittals shall be submitted in accordance with Section 2- 5.3 “Submittals” of the General Provisions and the following requirements.

B. Shop drawings for the fabrication and erection of all assemblies of miscellaneous metal fabrications work. Include plans, elevations, and details of sections and connections.

Show anchorage and accessory items. Include setting drawing and templates for location and installation of miscellaneous metal fabrications items and anchorage devices.

SECTION 05500 – MISCELLANEOUS METALS
Miscellaneous Metals and Access Hatches
Contract No. 5552 05500 - 2
C. Copies of manufacturer’s specifications, load tables, dimension diagrams, anchor details, and installation instructions for products to be used in miscellaneous metal fabrications work.

D. An alloy certification for all stainless steel shall be provided to show alloy conformance.

Submit certificates of welding consumables used for shop and field welding.

E. Submit welding procedure specifications (WPS) and procedure qualification records (PQR) for each welding process and welder qualification records (WQR) for each welder and welding operator. Submit bend and tensile test coupons concurrently with welder qualification and procedure qualification records.

1.04 QUALITY ASSURANCE
A. Field Measurements: Take field measurements where required prior to preparation of Shop Drawings and fabrication to ensure proper fitting of the work.

B. Shop Assembly: Preassemble items in the shop to the greatest extent possible to minimize field splicing and assembly of units at the project site. Disassemble units only to the extent necessary for shipping and handling limitations. Clearly mark units for reassembly and coordinated installation.

C. Welding: All weld procedures and welder qualification shall be available for review at the request of the Agency. All welding shall be inspected by a Contractor -provided inspector qualified in accordance with AWS requirements and approved by the Engineer.

PART 2 - PRODUCTS

2.01 GENERAL
A. Materials: Unless otherwise specified or indicated on the drawings, structural and miscellaneous metals shall conform with the standards of the American Society for Testing and Materials, including the following:

Item
ASTM
Standard No.

Class, Grade Type or
Alloy No.

Cast Iron A48 Class 40B

Steel
Galvanized sheet iron or steel A446, A525, A526 Coating G90 Black steel, sheet or strip A569, A570
Coil (plate) A635
Structural plate, bars, rolled
Shapes, and miscellaneous
items

A36
Standard bolts, nuts, and
washers
A307
SECTION 05500 – MISCELLANEOUS METALS
Miscellaneous Metals and Access Hatches
Contract No. 5552 05500 - 3

Item
ASTM
Standard No.

Class, Grade Type or
Alloy No.

High strength bolts, nuts and
Hardened flat washers

A325,
Eyebolts A489 Type 1
Tubing, cold-formed A500
Tubing, hot-formed A501
Steel pipe A53 Grade B

Stainless Steel
Plate, sheet and strip UNS Designation L31653
B. Stainless steels are designed by type or the Unified Numbering System (UNS). All stainless steel shall be Type 316 L.

C. Aluminum:

1. Alloy and Temper: Provide alloy and temper as shown or specified, or as otherwise recommended by the aluminum producer or finisher.

2. Extruded Shapes and Tubes: ASTM B221.

3. Plate and Sheet: ASTM B209.

4. Bars, Rods and Wire: ASTM B211.

5. Finish: Provide Architectural Class I anodized finish AA -M32C22A41 Clear as specified in the NAAMM Manual.

D. Stainless Steel Fasteners and Fittings: ASTM A320.

E. Zinc Coated Hardware: ASTM A153.

2.02 ACCESS HATCHES
A. All hatches shall be fabricated from Aluminum 6061 T6 unless otherwise indicated. All hatch hardware shall be Type 316 stainless steel. Hatches shall be gutter -type, or as shown.

B. Hatch opening sizes, number and direction of swing of door leaves, and locations, shall be as indicated. Sizes given shall be for the clear opening. Unless indicated otherwise, hinges shall be located on the longer dimension side. Unless indicated otherwise, ladder hatches shall be a minimum of 30 inches wide by 36 inches long, with the ladder centered on the shorter dimension, and the door hinge opposite the ladder.

C. Door leaves shall be a minimum of ¼ inch checkered pattern plate. Channel frames shall be a minimum of ¼ inch material with an anchor flange around the perimeter.

Hatches shall be provided with an automatic hold- open arm with release handle.

Hatches shall be designed for easy opening from both inside and outside.

SECTION 05500 – MISCELLANEOUS METALS
Miscellaneous Metals and Access Hatches
Contract No. 5552 05500 - 4
D. Hatches shall be designed to be water-tight and shall be equipped with a joint gutter and moat-type edge drain. The Contractor shall field verify hatch installation conditions via shop drawings.

E. Hatches shall include a recessed hasp for a padlock that is covered by a hinged lid flush with the surface and shall accommodate an openable lock from the inside F. Hatch cover shall be equipped with a hold- open arm with separate grip handle, which automatically locks the cover in the open position. Hatches without separate grip handles shall not be permitted.

G. Hatches at grade level shall be designed for AASHTO HS-20 loading and be suitable for direct heavy duty traffic.

H. Installation shall be in accordance with manufacturer’s instructions.

I. Access hatches shall be manufactured by by Bilco, type JD-AL H20 THD Series 48x48
Aluminum H-20 off street Trough/Channel frame, H-20, Double Leaf, (USF Fabrication Inc. part# 1000244419), or approved equal.

2.03 LADDERS
A. Access ladders for
valve vaults shall be 24” galvanized steel. Ladder shall be Alhambra Foundry Type A-3400, or approved equal. All ladders shall meet all code and OSHA safety requirements.

2.04 FALL PREVENTION SYSTEM FOR VERTICAL LADDERS
A. E quip ladders with a ladder -centered notched safety climbing tube. Safety rails and associated accessories shall be of the same material as the ladder. All necessary components shall be provided, including 2 safety belts for each fall prevention installation to provide a complete and fully operational fall prevention system. Safety belts shall fit a waist range from 23 inches to 54 inches.

B. At all locations where fall prevention systems are installed, a safety chain with a snap hook shall be permanently attached to the top of the ladder. The chain shall be long enough to allow a person to connect the belt to the chain while standing on the landing adjacent to the ladder. The chain and snap hook shall have a minimum allowable capability of 500 pounds.

C. A removable extension kit with storage brackets and box mounted on the handrail or other Agency-directed location shall be provided for each installation.

PART 3 - EXECUTION

3.01 INSTALLATION
A. Set miscellaneous metal fabrications accurately in location, alignment and elevation, plumb, level, true and free of rack, measured from established lines and levels. Brace temporarily or anchor temporarily in formwork where fabrications are to be built into concrete, masonry or similar construction.

SECTION 05500 – MISCELLANEOUS METALS
Miscellaneous Metals and Access Hatches
Contract No. 5552 05500 - 5
B. Anchor securely as shown or as required for the intended use, using concealed anchors wherever possible.

C. L adders shall be fitted accurately and field measured where necessary.

D. Fit exposed connections accurately together to form tight hairline joints. Weld steel connections which are not to be left as exposed joints, but cannot be shop welded because of shipping size limitations. Grind steel joints smooth and touch up with a shop paint coat.

Do not weld, cut or abrade the surfaces of exterior units which have been hot -dip galvanized after fabrication, and are intended for bolted or screwed field connections.

E. Protection of Aluminum from Dissimilar Materials: Using approved washers, strips or sheets of felt, protect all surfaces of aluminum from contact with dissimilar materials such as concrete, masonry, steel, nonferrous metals, etc.

F. Galvanizing: All structural steel plates, shapes, bars, and fabricated assemblies required to be galvanized shall, after the steel has been thoroughly cleaned of rust and scale, be galvanized in accordance with the requirements of ASTM A123 Class G90. Any galvanized part that becomes warped during the galvanizing operation shall be straightened. Field repairs to galvanizing shall be made using “Galvinox,” “Galvo- Weld,” or equal.ds
G. Welding: All welding shall be by the metal -arc method or gas -shielded arc method as described in the American Welding Society’s “Welding Handbook” as supplemented by other pertinent standards of the AWS. Qualifications of welders shall be in accordance with the AWS Standards governing same. All sharp corners of material to be painted or coated shall be ground to a minimum of 1/32-inch on the flat. All exposed aluminum welds shall be ground smooth and flush and shall be polished and anodized. Discoloration of exposed aluminum surfaces, whether or not due to welding, shall constitute a basis for rejection of the entire assembly.

END OF SECTION
Contract No. 5552 – PWS25-3495UTIL 12
Addendum No. 1

ATTACHMENT D

Ground Water Monitoring, Slug Test and
Soil Analysis Report for the Cannon Lift
Station Improvements

GROUNDWATER MONITORING, SLUG TESTING, AND

ANALYSIS

CANNON ROAD LIFT STATION IMPROVEMENTS
Carlsbad, California
PREPARED FOR:

City of Carlsbad
5950 El Camino Real
Carlsbad, California 92008
PREPARED BY:

Atlas Technical Consultants LLC
9085 Aero Drive, Suite B
San Diego, California 92123 October 8, 2024
9085 Aero Drive, Suite B
San Diego, CA 92123
(877) 215-4321 | oneatlas.com
October 8, 2024
Atlas No. 18937
Report No. 1
MR. DANIEL ZIMNY,
PE QSD

SENIOR ENGINEER

PUBLIC WORKS - UTILITIES DEPARTMENT

CITY OF CARLSBAD
5950 EL CAMINO REAL
CARLSBAD, CALIFORNIA 92008
Subject: Groundwater Monito
ring, Slug Testing, and Analysis
Cannon Road Lift Station Improvement
2229 Cannon Road, Carlsbad, California
Dear Mr. Zimny:

In accordance with your request and our proposal No. 24-05861R, Atlas Technical Consultants LLC (Atlas) is pleased to present this report describing the preliminary results of the geotechnical services performed in support of the Cannon Lift Station proposed improvement project (CIP 5552). Our services consisted of a review of readily available geologic literature, site reconnaissance, drilling an exploratory boring and installation of a temporary monitoring well, geotechnical laboratory testing, groundwater monitoring and environmental sampling, slug testing to provide a preliminary assessment of groundwater hydraulic conductivity characteristics at the monitoring well, and preparation of this report.

We appreciate the opportunity to be of service on this project. Should you have any questions, please contact the undersigned at your convenience.

Respectfully submitted,
Atlas Technical Consultants LLC
Stephane Dalo, EIT Nickey Ak
bariyeh, PE 88640
Staff Engineer Project Engineer
Jonathan Goodmacher, CHG 860
Princ
ipal Geologist
NA:SD:JG:af
Distribution: [email protected]

Atlas No. 18937
Report No. 1
Page | i

CONTENTS

1. INTRODUCTION ................................................................................................................. 1

2. SCOPE OF WORK ............................................................................................................. 1

2.1 Subsurface Investigation, Monitoring Well Installation, and Groundwater Analyses .... 1

2.2 Geotechnical Laboratory Testing ................................................................................ 1

2.3 Environmental Screening ........................................................................................... 2

2.4 Slug Testing ............................................................................................................... 3

2.5 Analysis and Report Preparation ................................................................................ 3

3. SITE DESCRIPTION ........................................................................................................... 3

4. GEOLOGY AND SUBSURFACE CONDITIONS ................................................................. 3

5. SLUG TESTING RESULTS ................................................................................................ 4

6. CLOSURE .......................................................................................................................... 5

7. REFERENCES ................................................................................................................... 6 TABLES
Table 1 Groundwater Monitoring Data

FIGURES
Figure 1 Site Vicinity Map
Figure 2 Subsurface Exploration Map
Figure 3 Regional Geology Map

APPENDICES
Subsurface Exploration
Geotechnical Laboratory Testing
Environmental Laboratory Test Report

Atlas No. 18937
Report No. 1
Page | 1

1. INTRODUCTION
Based on the project drawings (City of Carlsbad, 2024), it is our understanding the project will consist of demolition of the existing chemical injection manhole and its replacement with a new flowmeter vault at the Cannon Road Lift Station site. Atlas performed a geotechnical evaluation to address the potential impacts of groundwater conditions for the proposed project. Figure 1 presents the site vicinity.

2. SCOPE OF WORK
Atlas’ scope for this project included the following:
• Reviewing pertinent documents including published geologic reports and maps, aerial photographs, and project plans
• Preparing and acquiring the required groundwater monitoring well permit from the County of San Diego Department of Environmental Health and Quality (DEHQ) • Marking out and clearing the proposed boring location by Atlas’ in-house geophysical survey team and also contacting Underground Service Alert (USA) to clear the proposed boring location
• Drilling and logging (using the Unified Soil Classification System) a soil boring to a depth of about 25 feet using a truck-mounted, hollow-stem auger equipped drill rig o Converting the boring to a groundwater monitoring well and developing it in accordance with standard industry practices
o Collecting and analyzing soil samples at our in-house geotechnical laboratory o Monitoring groundwater levels at the time of drilling and after well development • Performing a slug test to evaluate the hydraulic conductivity of groundwater at the site • Collecting and transporting ground water samples to a State of California- certified environmental testing laboratory
• Preparing this report summarizing the results of our investigations thus far

2.1 Subsurface Investigation, Monitoring Well Installation, and Groundwater Analyses
On August 27, 2024, Atlas explored subsurface conditions by drilling one boring to depth of about 25 feet below the existing ground surface (bgs) using a truck-mounted drill rig equipped with a hollow-stem auger. The boring was subsequently converted to groundwater monitoring well with flush mount, traffic -rated well completion box. Figure 2 presents the approximate location and depth of the monitoring well. The boring/monitoring well log is presented in Appendix I.

2.2 Geotechnical Laboratory Testing
Selected samples from the exploratory boring were tested to evaluate particle- size distribution, percent finer than No. 200 sieve, and Atterberg limits. The laboratory test results were used in editing the boring log and are presented in Appendix II.

Atlas No. 18937
Report No. 1
Page | 2

2.3 Environmental Screening
On September 12, 2024, Atlas collected representative groundwater samples from the monitoring well in accordance with DEHQ Site Assessment and Mitigation (SAM) Manual guidelines. Field data collected during the sampling is archived in Atlas’ file and can be provided if requested.

The groundwater samples were transported under appropriate chain- of-custody protocols to a State of California- certified environmental laboratory. The collected samples were analyzed for oil and grease, volatile and semi-volatile organic compounds, pesticides, and California Title 22 Metals (including boron and mercury ), total suspended solids, total dissolved solids, and biochemical oxygen demand. More specifically, the groundwater samples were screened for following substances:
• T otal Arsenic
• Total Boron
• Total Cadmium
• Total Chromium
• Total Copper
• Total Iron
• Total Lead
• Total Manganese
• Total Mercury
• Total Molybdenum
• Total Nickel
• Total Selenium
• Total Silver
• Total Zinc
• Oil and Grease
• Total Toxic Organics
• Total Dissolved Solids
• Benzene
• Biochemical Oxygen Demand (EPA 405.1)
• Total Suspended Solids
• pH (at time of sampling)
• Temperature (at time of sampling)
The environmental screening test results are presented in Appendix III.

Atlas No. 18937
Report No. 1
Page | 3

2.4 Slug Testing
On September 12, 2024, an engineer from Atlas performed slug testing at the Monitoring Well MW-1 location in general accordance with ASTM Test Method D4044/D4044M-15 using a “slug” constructed of a sand-filled PVC pipe. Both rising and falling head tests were conducted by either removing or dropping the slug rapidly from the boring and measuring the response of the well using a data logger connected to a portable computer. The test was considered complete when the groundwater returned to its initially evaluated level (which was measured prior to conducting the test).

Once the data was downloaded, it was analyzed to evaluate the hydraulic conductivity using the AQTESOLV, v. 4.5, computer program (Duffield, G.M., 2007). The Bouwer and Rice (1989) Method of analysis was used to model the hydraulic conductivity assuming an unconfined aquifer.

2.5 Analysis and Report Preparation
The results of the field and geotechnical and environmental laboratory testing conducted are presented herein.

3. SITE DESCRIPTION
The Cannon Lift Station is located at 2229 Cannon Road in Carlsbad, California. The project site is bounded by Cannon Road on the west and a residential community on the north sides .

Topographically, the project site is located on the south side of Agua Hedionda Creek at the base of a hillslope ascending to the south . According to the historic aerial photos (NetrOnline, 2024) the existing lift station was construct ed sometime between 2005 and 2009. Per the available project plans (City of Carlsbad, 2024) , the elevation of the site is approximately 25 feet Above Mean Sea Level (msl).

4. GEOLOGY AND SUBSURFACE CONDITIONS
According to Kennedy and Tan (2007) the site is underlain directly by Quaternary Young Alluvial flood-plain deposits (hereafter alluvium). However, based on our boring logs Artificial fills overlie the alluvium . Figure 3 presents the regional geology, and descriptions of the materials encountered are provided below.

Artificial Fill (Af): Artificial fill w as encountered in MW-1 below the existing pavement section to a depth of approximately 7.5 feet below ground surface (bgs). The fill materials encountered generally consisted of moist, medium dense, fine to coarse grained silty sand with some gravel and clay.

Quaternary Alluvium (Qa): As noted, a lluvial deposits were encountered below the fill and extended to the total depth drilled of approximately 25 feet bgs. The materials encountered generally consisted of moist to wet, medium dense, fine to medium grained clayey and silty sand

Atlas No. 18937
Report No. 1
Page | 4
to approximately 22 bgs, and wet, loose, well-graded sand with gravel from approximately 22 to 25 bgs.

Groundwater: At the time of dr illing, groundwater was initially observed at approximately 18 feet below grade in MW-1. Groundwater levels monitored thus far are shown in Table 1.

In accordance with our contract, groundwater levels wi ll continue to be periodically monitored and the data transmitted to your offices.

Table 1: Groundwater Monitoring Data
Date Measured Depth to Groundwater (feet),
bgs1
Groundwater Elevation
(feet), msl
August 27, 2024 (During Drilling) 18.0 8.0
August 30, 2024 (Well Development) 10.5 15.6
September 12, 2024 (1st Monitoring Event) 9.4 16.6

1. Below Ground Surface (bgs)

2. Ground surface elevation at MW-1 location is approximately 26 feet above Mean Sea Level (msl) based on Google Earth and project drawings.

It should be recognized that groundwater conditions may vary at a site over time. Fluctuations in the groundwater level may occur due to variations in ground surface topography, subsurface geologic conditions and structure, rainfall, irrigation, broken pipes, changes in site drainage, and other factors. These types of conditions can be most effectively assessed at the time of construction.

5. SLUG TESTING RESULTS

5.1 Hydraulic Conductivity Testing Results
The results of our groundwater hydraulic conductivity assessment using slug testing are presented in Table 2 below.

Table 2: Estimated Hydraulic Conductivity
Test
Rising Head
Hydraulic Conductivity, K
(feet/second)
Falling Head
Hydraulic Conductivity, K
(feet/second)
Test 1 3.17 x 10-5 3.84 x 10-5
Test 2 2.95 x 10-5 3.06 x 10-5
Test 3 3.45 x 10-5 3.39 x 10-5
Average of All Tests 3.31 x 10-5
The results of our groundwater hydraulic conductivity assessment using slug testing show that the average of our six tests (three rising head and three falling head) is 3.31E-05. It is probable

Atlas No. 18937
Report No. 1
Page | 5
that the test results reflect the presence of the well -graded sand with gravel encountered at a depth of about 22 bgs and may not be representative of conditions at elevations above that.

6. CLOSURE
Atlas should be advised of changes in the project scope so that the recommendations contained in this report can be evaluated with respect to the revised plans. Changes in recommendations will be verified in writing. The findings in this report are valid as of the date of this report. Changes in the condition of the site can occur with the passage of time, whether they are due to natural processes or work on this or adjacent areas. In addition, changes in the standards of practice and government regulations can occur. Thus, the findings in this report may be invalidated wholly or in part by changes beyond our control. This report should not be relied upon after a period of two years without a review by us verifying the suitability of the conclusions and recommendations to site conditions at that time.

Please note that slug testing can only provide an estimate of hydraulic conductivity within the immediate vicinity of the wells. As such, performing the slug testing at one location at the site will only serve to provide approximate hydraulic conductivity at that location, which can be used as part of the preliminary cost estimating efforts. In our experience, hydraulic conductivity values can vary by orders of magnitude across the project area. Therefore, obtaining representative hydraulic conductivity for the final design of a dewatering system will warrant additional testing prior to construction. Atlas recommends that the monitoring well should be periodically monitored, and groundwater elevation should be recorded by a qualified individual.

The findings in this report are valid as of the date of this report. Changes in the condition of the site can occur with the passage of time, whether they are due to natural processes or work on this or adjacent areas. In addition, changes in the standards of practice and government regulations can occur. Thus, the findings in this report may be invalidated wholly or in part by changes beyond our control. This report should not be relied upon after a period of two years without a review by us verifying the suitability of the conclusions and recommendations to site conditions at that time.

In the performance of our professional services, we comply with that level of care and skill ordinarily exercised by members of our profession currently practicing under similar conditions and in the same locality. The client recognizes that subsurface conditions may vary from those encountered at the exploration locations and that our data, interpretations, and recommendations are based solely on the information obtained by us. We will be responsible for those data, interpretations, and recommendations, but shall not be responsible for interpretations by others of the information developed. Our services consist of professional consultation and observation only, and no warranty of any kind whatsoever, expressed, or implied, is made or intended in connection with the work performed or to be performed by us, or by our proposal for consulting or other services, or by our furnishing of oral or written reports or findings.

Atlas No. 18937
Report No. 1
Page | 6

7. REFERENCES
American Society for Testing and Materials (ASTM) D4044/4044M-15, 2015, Standard Test Method for (Field Procedure) for Instantaneous Change in Head (Slug) Tests for Determining Hydraulic Properties of Aquifers.

Bouwer, H., and R.C. Rice, 1989, The Bouwer and Rice Slug Test – An Updates, Environmental Science Engineering, Groundwater, Vol. 27, No.3, P-304-309, dated May 1.

City of Carlsbad, 2024, Construction Plans for the Cannon Lift Station Improvements, Capital Improvement Project (CIP) No. 5552, Bid Set, dated August.

Duffield, G.M., 2007, AQTESOLV for Windows, Version 4.5, HydroSOLVE, Inc., Reston, VA.

Environmental Protection Agency (EPA), 1994, Slug Tests, SPO No. 2046, dated October 3.

Kennedy, M.P. and Tan, S.S. (2007), Geologic Map of the Oceanside 30’ x 60’ Quadrangle, California, California Geologic Survey, Scale 1:100,000.

NETROnline, (2024), Historic Aerials Website, https://historicaerials.com/viewer, accessed September 2024.

State Water Resources Control Board (SWRCB), 2024, Geotracker, accessed in September:
https://geotracker.waterboards.ca.gov/

©2024 OpenStreet Map
1 SITE VICINITY MAP
Cannon Road Lift Station Monitoring Well
Carlsbad, California
Date:

Job No.:

By:

September, 2024
18937.000
CGI
Figure:

SCALE (feet)
N
2,0004,000 0

PROJECT SITE
2 SUBSURFACE EXPLORATION MAP
Cannon Road Lift Station Monitoring Well
Carlsbad, California
Date:

Job No.:

By:

September, 2024
18937.000
CGI
Figure:

Location of Groundwater
Monitoring Well
(Depth in Feet)
©2024 Google Earth
SCALE (feet)
NOTE: All locations are approximate.

N
3060 0
LEGEND:

Reference:

Plans: City of Carlsbad, Utilities Department. (2024), Overall Site Plan, Cannon Lift Station Improvements CIP 5552
Project Limits
MW-1
(25)
MW-1
(25)

CANNON ROAD
REGIONAL GEOLOGY MAPFigure:

Cannon Road Lift Station Monitoring Well
Carlsbad, California
Date:

Job No.:

By:

September, 2024
18937.000
CGI
EXPLANATION:

N
Reference:

Kennedy, M.P. and Tan, S.S. (2007), Geologic Map of the Oceanside 30' x 60' Quadrangle, California, California Geological Survey, Scale 1:100,000 SCALE (feet)
2,0004,000 0
3 Alluvial flood-plain deposits
Young alluvial flood-plain deposits
Old paralic deposits, undivided
Old alluvial flood-plain deposits,
undivided
Very old paralic deposits, undivided
NOTE: All locations are approximate.

Qa
Qoa
Qvop
Qop

PROJECT SITE
Qya
Qya
Tsa
Kp
Mzu
Santiago Formation
Point Loma Formation
Metasedimentary and
metavolcanic rocks, undivided

SUBSURFACE EXPLORATION

Relatively undisturbed samples were obtained using a modified California (CAL) sampler, which is a ring -lined split tube sampler with a 3 -inch outer diameter and 2½ -inch inner diameter.

Standard Penetration Tests (SPT) were performed using a 2 -inch outer diameter and 1⅜ -inch inner diameter split tube sampler. The CAL and SPT samplers were driven with a 140- pound weight dropping 30 inches. The number of blows needed to drive the samplers the final 12 inches of an 18-inch drive is noted on the boring log as “Driving Resistance (blows/ft. of drive).” SPT and CAL sampler refusal was encountered when 50 blows were applied during any one of the three 6-inch intervals, a total of 100 blows was applied, or there was no discernible sampler advancement during the application of 10 successive blows. The SPT penetration resistance was normalized to a safety hammer (cathead and rope) with a 60% energy transfer ratio in accordance with ASTM D6066. The normalized SPT penetration resistance is noted on the boring logs as “N

60.” Disturbed bulk samples were obtained from the SPT sampler and the drill cuttings. The soils are classified in accordance with the Unified Soil Classification System.

A groundwater monitoring well was installed at the boring location to monitor groundwater levels over time.. A diagram presenting the well construction is presented in Appendix I SPT
CAL
SPT
CAL
SPT
PD
HYD
PD
PD
PD
AL
PD
18 13
10 12
6 24
13 8
4 inches of Asph
alt Concrete (AC) over 10 inches of
Aggregate Base (AB).

ARTIFICIAL FILL (Af): SILTY SAND (SM); medium dense,
brown, moist, fine to medium grained, few GRAVEL, trace CLAY.

SILTY SAND with GRAVEL (SM); medium dense, brown,
moist, fine to coarse grained, trace CLAY.

QUATERNARY ALLUVIUM (Qa): CLAYEY SAND (SC);
medium dense, mottled grayish brown, moist, fine to
medium grained, trace black organics.

SILTY SAND (SM); medium dense, grayish brown, wet, fine to medium grained, trace CLAY.

CLAYEY SAND (SC); medium dense, grayish brown to
black, wet, fine to medium grained.

Well-graded SAND with GRAVEL (SW); loose, grayish
brown, wet, fine to coarse grained.

BORING TERMINATED AT 25 FEET BGS.

GROUNDWATER ENCOUNTERED AT 10.45 FEET BGS.

Well Box
Watertight
Locking Cap
Cement Backfill
Bentonite Seal
2'' PVC Sch. 40
Fil
ter Pack, #2
Sand
2'' PVC Sch. 40
(slotted)
Cap

DRILLING EQUIPMEN
T
Figure

THIS SUMMARY APP

LIES ONLY AT THE LOCATION
OF THIS BORING AND AT THE TIME OF DRILLING.

SUBSURFACE CONDITIONS MAY DIFFER AT OTHER

LOCATIONS AND MAY CHANGE AT THIS LOCATION
WITH THE PASSAGE OF TIME. THE DATA

PRESENTED IS A SIMPLIFICATION OF THE ACTUAL
CONDITIONS ENCOUNTERED.
1 I-1

BULK SAMPLE

DRIVE SAMPLE
Hammer Efficiency = 79.6% N60~1.33NSPT
BORIN
G DIA. (in.)
8 START
DEPTH/ELEV. GR
OUND WATER (ft)
SITE
8/27/24
END

REVIEWED BY
140-lb Hammer, 30-in Drop
SAMP

LING METHOD
SHEET NO.

AT END OF DRILLING 18.00 ft / Elev 8.00 ft
AF
TER DRILLING 10.45 ft / Elev 15.55 ft
L

OGGED BY
Cannon Road Lift Station Monitoring Well
ATL

AS PROJECT NAME
18937
Hollow Stem Auger
8/27/24
CME-95

DRILLING COMPANY
TO
TAL DEPTH (ft) GROUND ELEV. (ft)

ATLAS PROJECT NUMBER
25 26
KBHBaja Exploration

33.145016, -117.304157 | 2229 Can
non Road, Carlsbad, California

DRILL METHOD
JG
NOTES
DEPTH
(ft)
5 10
15 20
25 ELEVATION
(ft)
25 20
15 10
5 AT TIME OF DRILLING ---
BORING RECORD MW-1
ATLAS LOG BRIGHTLINE - - 9/15/24 10:55 - C:\USERS\KHAHN\DOCUME NTS\APP I - CANNON STREET WELL.GPJ
LAB
TESTS
BLOWS

PER FOOT
N60

DESCRIPTION AND CLASSIFICATION

GRAPHIC

LOG WELL DIAGRAM
Casing Type: PV
C

GEOTECHNICAL LABORATORY TESTING

Laboratory tests were performed to provide pertinent geotechnical parameters for engineering analyses associated with the proposed improvements. The following tests were conducted:
• CLASSIFICATION: Field classifications were verified in the laboratory by visual examination. The final soil classifications are in accordance with the Unified Soil Classification System.
• PARTICLE-SIZE DISTRIBUTION: The particle- size distribution was evaluated on selected soil samples in accordance with ASTM D6913.
• PERCENT FINER THAN #200: The percent of materials finer than No. 200 sieve (75µm) was measured on selected samples in accordance with ASTM C117 and ASTM D1140.

Soil samples not tested are stored in our laboratory for future reference and analysis, if needed.

Unless notified to the contrary, all samples will be disposed of 30 days from the date of this report.

-
-
-
Date:

Job Number: Figure:

ATTERBERG LIMITS

LIQUID LIMIT

PLASTIC LIMIT

PLASTICITY INDEX
SM

SAMPLE NUMBER
93216
UNIFIED SOIL CLASSIFICATION:

SILTY SANDDESCRIPTION

SAMPLE LOCATION
MW-1 at 1½ to 5 Feet
Carlsbad, California
Cannon Road Lift Station Monitoring Well
18937
September, 2024
II-1
By: KBH
0 10
20 30
40 50
60 70
80 90
100

0.0010.010.11101001000
Grain Size in Millimeters
U.S. Standard Sieve Sizes
Sieve Analysis
Hydrometer
Percent Finer by Weight
Cobbles Gravel
Coarse Fine
Sand
Coarse Medium Fine
Silt or Clay
6" 3" 3/4" 1-½" 3/8" #4 #10 #8 #30 #16 #50 #100 #200

-
-
-
Date:

Job Number: Figure:

SAMPLE LOCATION UNIFIED SOIL CLASSIFICATION:

MW-1 at 5½ to 6½ Feet

SAMPLE NUMBER
93217
SILTY SAND with

GRAVELDESCRIPTION

ATTERBERG LIMITS

LIQUID LIMIT

PLASTIC LIMIT

PLASTICITY INDEX
Carlsbad, California
SM
Cannon Road Lift Station Monitoring Well
18937
September, 2024
II-2
By: KBH
0 10
20 30
40 50
60 70
80 90
100

0.010.11101001000
Grain Size in Millimeters
U.S. Standard Sieve Sizes
Percent Finer by Weight
Cobbles Gravel
Coarse Fine
Sand
Coarse Medium Fine
Silt or Clay
6" 3" 3/4" 1-½" 3/8" #4 #10 #8 #30 #16 #50 #40 #100 #200

-
-
-
Date:

Job Number: Figure:

SAMPLE LOCATION UNIFIED SOIL CLASSIFICATION:

MW-1 at 11 to 11½ Feet

SAMPLE NUMBER
93218

DESCRIPTION CLAYEY SAND

ATTERBERG LIMITS

LIQUID LIMIT

PLASTIC LIMIT

PLASTICITY INDEX
Carlsbad, California
SC
Cannon Road Lift Station Monitoring Well
18937
September, 2024
II-3
By: KBH
0 10
20 30
40 50
60 70
80 90
100

0.010.11101001000
Grain Size in Millimeters
U.S. Standard Sieve Sizes
Percent Finer by Weight
Cobbles Gravel
Coarse Fine
Sand
Coarse Medium Fine
Silt or Clay
6" 3" 3/4" 1-½" 3/8" #4 #10 #8 #30 #16 #50 #40 #100 #200

34 20
14 Date:

Job Number: Figure:
18937
September, 2024
II-4
By: KBH

CLAYEY SAND

ATTERBERG LIMITS

LIQUID LIMIT

PLASTIC LIMIT

PLASTICITY INDEX
SC
Carlsbad, California
Cannon Road Lift Station Monitoring Well

SAMPLE LOCATION
MW-1 at 21 to 21½ Feet

SAMPLE NUMBER
93220
UNIFIED SOIL CLASSIFICATION:

DESCRIPTION
0 10
20 30
40 50
60 70
80 90
100

0.010.11101001000
Grain Size in Millimeters
U.S. Standard Sieve Sizes
Percent Finer by Weight
Cobbles Gravel
Coarse Fine
Sand
Coarse Medium Fine
Silt or Clay
6" 3" 3/4" 1-½" 3/8" #4 #10 #8 #30 #16 #50 #40 #100 #200

-
-
-
Date:

Job Number: Figure:
18937
September, 2024
II-5
By: KBH
Carlsbad, California
Cannon Road Lift Station Monitoring Well
Well-graded SAND with
GRAVEL

ATTERBERG LIMITS

LIQUID LIMIT

PLASTIC LIMIT

PLASTICITY INDEX

SWSAMPLE LOCATION
MW-1 at 24 to 25 Feet

SAMPLE NUMBER
93221
UNIFIED SOIL CLASSIFICATION:

DESCRIPTION
0 10
20 30
40 50
60 70
80 90
100

0.010.11101001000
Grain Size in Millimeters
U.S. Standard Sieve Sizes
Percent Finer by Weight
Cobbles Gravel
Coarse Fine
Sand
Coarse Medium Fine
Silt or Clay
6" 3" 3/4" 1-½" 3/8" #4 #10 #8 #30 #16 #50 #40 #100 #200

ENVIRONMENTAL LABORATORY TEST REPORT

ANALYTICAL REPORT

PREPARED FOR
Attn: Stephane Dalo
Atlas Engineering West, Inc.
9085 Aero Drive
Suite B
San Diego, California 92123
Generated 9/19/2024 4:25:38 PM

JOB DESCRIPTION
Cannon St Lift Station, No. 24-05861

JOB NUMBER
570-198822-1
See page two for job notes and contact information.

Tustin CA 92780
2841 Dow Avenue, Suite 100
Eurofins Calscience

Page 1 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Eurofins Calscience
Eurofins Calscience is a laboratory within Eurofins Environment Testing Southwest, LLC, a company within Eurofins Environment Testing Group of Companies Job Notes
This report may not be reproduced except in full, and with written approval from the laboratory. The results relate only to the samples tested. For questions please contact the Project Manager at the e-mail address or telephone number listed on this page.

The test results in this report relate only to the samples as received by the laboratory and will meet all requirements of the methodology, with any exceptions noted. This report shall not be reproduced except in full, without the express written approval of the laboratory. All questions should be directed to the Eurofins Calscience Project Manager.

Authorization
Generated
9/19/2024 4:25:38 PM
Authorized for release by
Allyson Chapman, Project Manager I
[email protected]
(714)895-5494

Page 2 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Table of Contents
Client: Atlas Engineering West, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Laboratory Job ID: 570-198822-1

Page 3 of 43 ends

Eurofins Calscience
9/19/2024
Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Definitions/Glossary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Case Narrative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Detection Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Client Sample Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Surrogate Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 QC Sample Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 QC Association Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 Lab Chronicle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 Certification Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 Method Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40 Sample Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 Chain of Custody . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42 Receipt Checklists . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Definitions/Glossary
Job ID: 570-198822-1Client: Atlas Engineering West, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Qualifiers

GC/MS VOA
Qualifier Description
J Result is less than the RL but greater than or equal to the MDL and the concentration is an approximate value.

Qualifier
GC/MS Semi VOA
Qualifier Description
*- LCS and/or LCSD is outside acceptance limits, low biased.

Qualifier
*1 LCS/LCSD RPD exceeds control limits.

J Result is less than the RL but greater than or equal to the MDL and the concentration is an approximate value.

GC Semi VOA
Qualifier Description
*+ LCS and/or LCSD is outside acceptance limits, high biased.

Qualifier
J Result is less than the RL but greater than or equal to the MDL and the concentration is an approximate value.

Metals
Qualifier Description
J Result is less than the RL but greater than or equal to the MDL and the concentration is an approximate value.

Qualifier
Glossary
These commonly used abbreviations may or may not be present in this report. ¤ Listed under the "D" column to designate that the result is reported on a dry weight basis Abbreviation
%R Percent Recovery
CFL Contains Free Liquid
CFU Colony Forming Unit
CNF Contains No Free Liquid
DER Duplicate Error Ratio (normalized absolute difference) Dil Fac Dilution Factor
DL Detection Limit (DoD/DOE)
DL, RA, RE, IN Indicates a Dilution, Re-analysis, Re-extraction, or additional Initial metals/anion analysis of the sample DLC Decision Level Concentration (Radiochemistry)
EDL Estimated Detection Limit (Dioxin)
LOD Limit of Detection (DoD/DOE)
LOQ Limit of Quantitation (DoD/DOE)
MCL EP
A recommended "Maximum Contaminant Level"
MDA Minimum Detectable Activity (Radiochemistry)
MDC Minimum Detectable Concentration (Radiochemistry)
MDL Method Detection Limit
ML Minimum Level (Dioxin)
MPN Most Probable Number
MQL Method Quantitation Limit
NC Not Calculated
ND Not Detected at the reporting limit (or MDL or EDL if shown) NEG Negative / Absent
POS Positive / Present
PQL Practical Quantitation Limit
PRES Presumptive
QC Quality Control
RER Relative Error Ratio (Radiochemistry)
RL Reporting Limit or Requested Limit (Radiochemistry)
RPD Relative Percent Difference, a measure of the relative difference between two points TEF Toxicity Equivalent Factor (Dioxin)
TEQ Toxicity Equivalent Quotient (Dioxin)
TNTC Too Numerous To Count
Eurofins Calscience

Page 4 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Job Narrative
570-198822-1
Analytical test results meet all requirements of the associated regulatory program listed on the Accreditation/Certification Summary Page unless otherwise noted under the individual analysis. Data qualifiers and/or narrative comments are included to explain any exceptions, if applicable.
· Matrix QC may not be reported if insufficient sample is provided or site-specific QC samples were not submitted. In these situations, to demonstrate precision and accuracy at a batch level, a LCS/LCSD may be performed, unless otherwise specified in the method.
· Surrogate and/or isotope dilution analyte recoveries (if applicable) which are outside of the QC window are confirmed unless attributed to a dilution or otherwise noted in the narrative.

Regulated compliance samples (e.g. SDWA, NPDES) must comply with the associated agency requirements/permits.

Receipt
The sample was received on 9/12/2024 6:00 PM. Unless otherwise noted below, the sample arrived in good condition, and, where required, properly preserved and on ice. The temperature of the cooler at receipt time was 5.0°C.

GC/MS VOA
No additional analytical or quality issues were noted, other than those described above or in the Definitions/ Glossary page.

GC/MS Semi VOA
Method 625.1: Insufficient sample volume was available to perform a matrix spike/matrix spike duplicate (MS/MSD) associated with preparation batch 570-480372. The laboratory control sample (LCS) was performed in duplicate (LCSD) to provide precision data for this batch. Method 625.1
Method 625.1: The laboratory control sample and/or the laboratory control sample duplicate (LCS/LCSD) for preparation batch 570-480372 and analytical batch 570-481184 recovered outside control limits for the following analyte(s): Benzidine. Benzidine has been identified as a poor performing analyte when analyzed using this method; therefore, re-extraction/re-analysis was not performed.

Method 625.1: The RPD of the laboratory control sample (LCS) and laboratory control sample duplicate (LCSD) for preparation batch 570-480372 and analytical batch 570-481184 recovered outside control limits for the following analytes: Benzidine and N- Nitrosodimethylamine.

No additional analytical or quality issues were noted, other than those described above or in the Definitions/ Glossary page.

PCBs
Method 608.3_PCB: Insufficient sample volume was available to perform a matrix spike/matrix spike duplicate (MS/MSD) associated with preparation batch 570-481537. The laboratory control sample (LCS) was performed in duplicate (LCSD) to provide precision data for this batch. Method 608.3 PEST/PCB LL Method 608.3_PCB: The laboratory control sample (LCS) and laboratory control sample duplicate (LCSD) for preparation batch 570-481537 and analytical batch 570-482222 recovered outside control limits for the following analytes: Aroclor-1260. This analyte was biased high in the LCS and was not detected in the associated samples; therefore, the data have been reported.

No additional analytical or quality issues were noted, other than those described above or in the Definitions/ Glossary page.

Pesticides
Method 608.3_Pest: Insufficient sample volume was available to perform a matrix spike/matrix spike duplicate (MS/MSD) associated with preparation batch 570-481537. The laboratory control sample (LCS) was performed in duplicate (LCSD) to provide precision data for this batch. Method 608.3 PEST/PCB LL No additional analytical or quality issues were noted, other than those described above or in the Definitions/ Glossary page.

Metals
No additional analytical or quality issues were noted, other than those described above or in the Definitions/ Glossary page.

General Chemistry
Case Narrative
Client: Atlas Engineering West, Inc. Job ID: 570-198822-1 Project: Cannon St Lift Station, No. 24-05861
Eurofins Calscience
Job ID: 570-198822-1 Eurofins Calscience

Page 5 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Method 1664B: The laboratory control sample (LCS) was performed in duplicate (LCSD) to provide precision data for this batch.

Insufficient sample volume was available to perform a matrix spike/matrix spike duplicate (MS/MSD) associated with preparation batch 570-481199.

No additional analytical or quality issues were noted, other than those described above or in the Definitions/ Glossary page.

Case Narrative
Client: Atlas Engineering West, Inc. Job ID: 570-198822-1 Project: Cannon St Lift Station, No. 24-05861
Eurofins Calscience
Job ID: 570-198822-1 (Continued) Eurofins Calscience

Page 6 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Detection Summary
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Client Sample ID: MW-1 Lab Sample ID: 570-198822-1
tert-Butyl alcohol (TBA)
RL

0.010 mg/L
MDL

0.0015
Analyte Result Qualifier Unit Dil Fac D Method Prep Type Total/NA1J 0.0036 624.1
Endosulfan I 0.000019 mg/L0.000018 Total/NA100.00012 608.3 Arsenic 0.100 mg/L0.0199 Total
Recoverable

10.0499 J 6010B
Boron 0.500 mg/L0.00388 T
otal
Recoverable

10.723 6010B
Cadmium 0.0100 mg/L0.000620 Total
Recoverable

10.000700 J 6010B
Chromium 0.0500 mg/L0.00296 Total
Recoverable

10.0800 6010B
Copper 0.0500 mg/L0.00269 Total
Recoverable

10.0851 6010B
Iron 0.500 mg/L0.0131 Total
Recoverable
176.2 6010B
Lead 0.0500 mg/L0.00527 Total
Recoverable

10.0401 J 6010B
Manganese 0.0500 mg/L0.00134 Total
Recoverable

12.21 6010B
Nickel 0.0500 mg/L0.00307 Total
Recoverable

10.0671 6010B
Selenium 0.0500 mg/L0.0162 Total
Recoverable

10.0561 6010B
Zinc 0.250 mg/L0.0133 Total
Recoverable

10.183 J 6010B
Mercury 0.000200 mg/L0.000124 Total/NA10.000157 J 7470A Total Suspended Solids 100 mg/L80.0 Total/NA15060 SM 2540D Biochemical Oxygen Demand 0.533 mg/L0.267 Total/NA11.11 SM 5210B Eurofins Calscience
This Detection Summary does not include radiochemical test results.

Page 7 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Client Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: EPA 624.1 - Volatile Organic Compounds (GC/MS)
Lab Sample ID: 570-198822-1Client Sample ID: MW-1
Matrix: WaterDate Collected: 09/11/24 08:40
Date Received: 09/12/24 18:00
RL MDL
ND 0.0010 0.00023 mg/L 09/13/24 02:57 1
Analyte Dil FacAnalyzedPreparedUnit DResult
Qualifier
1,1,1,2-Tetrachloroethane

0.0010 0.00035 mg/L 09/13/24 02:57 1ND1,1,1-Trichloroethane

0.0010 0.00033 mg/L 09/13/24 02:57 1ND1,1,2,2-Tetrachloroethane

0.010 0.0038 mg/L 09/13/24 02:57 1ND1,1,2-Trichloro-1,2,2-trifluoroethane

0.0010 0.00025 mg/L 09/13/24 02:57 1ND1,1,2-Trichloroethane

0.0010 0.00029 mg/L 09/13/24 02:57 1ND1,1-Dichloroethane

0.0010 0.00038 mg/L 09/13/24 02:57 1ND1,1-Dichloroethene

0.0010 0.00035 mg/L 09/13/24 02:57 1ND1,1-Dichloropropene

0.0010 0.00054 mg/L 09/13/24 02:57 1ND1,2,3-Trichlorobenzene

0.0050 0.0012 mg/L 09/13/24 02:57 1ND1,2,3-Trichloropropane

0.0010 0.00058 mg/L 09/13/24 02:57 1ND1,2,4-Trichlorobenzene

0.0010 0.00026 mg/L 09/13/24 02:57 1ND1,2,4-Trimethylbenzene

0.0050 0.0015 mg/L 09/13/24 02:57 1ND1,2-Dibromo-3-Chloropropane

0.0010 0.00045 mg/L 09/13/24 02:57 1ND1,2-Dibromoethane

0.0010 0.00022 mg/L 09/13/24 02:57 1ND1,2-Dichlorobenzene

0.00050 0.00021 mg/L 09/13/24 02:57 1ND1,2-Dichloroethane

0.0010 0.00049 mg/L 09/13/24 02:57 1ND1,2-Dichloropropane

0.0010 0.00033 mg/L 09/13/24 02:57 1ND1,3,5-Trimethylbenzene

0.0010 0.00023 mg/L 09/13/24 02:57 1ND1,3-Dichlorobenzene

0.0010 0.00026 mg/L 09/13/24 02:57 1ND1,3-Dichloropropane

0.0010 0.00024 mg/L 09/13/24 02:57 1ND1,4-Dichlorobenzene

0.0010 0.00041 mg/L 09/13/24 02:57 1ND2,2-Dichloropropane

0.010 0.0036 mg/L 09/13/24 02:57 1ND2-Butanone

0.0020 0.00094 mg/L 09/13/24 02:57 1ND2-Chloroethyl vinyl ether

0.0010 0.00029 mg/L 09/13/24 02:57 1ND2-Chlorotoluene

0.010 0.0022 mg/L 09/13/24 02:57 1ND2-Hexanone

0.0010 0.00025 mg/L 09/13/24 02:57 1ND4-Chlorotoluene

0.010 0.0019 mg/L 09/13/24 02:57 1ND4-Methyl-2-pentanone

0.012 0.010 mg/L 09/13/24 02:57 1NDAcetone

0.0050 0.0034 mg/L 09/13/24 02:57 1NDAcrolein

0.0020 0.0014 mg/L 09/13/24 02:57 1NDAcrylonitrile

0.00050 0.00030 mg/L 09/13/24 02:57 1NDBenzene

0.0010 0.00025 mg/L 09/13/24 02:57 1NDBromobenzene

0.0010 0.00026 mg/L 09/13/24 02:57 1NDBromochloromethane

0.0010 0.00024 mg/L 09/13/24 02:57 1NDBromodichloromethane

0.0010 0.00046 mg/L 09/13/24 02:57 1NDBromoform

0.0050 0.0037 mg/L 09/13/24 02:57 1NDBromomethane

0.0010 0.00030 mg/L 09/13/24 02:57 1NDcis-1,2-Dichloroethene

0.00050 0.00021 mg/L 09/13/24 02:57 1NDcis-1,3-Dichloropropene

0.010 0.0025 mg/L 09/13/24 02:57 1NDCarbon disulfide

0.00050 0.00045 mg/L 09/13/24 02:57 1NDCarbon tetrachloride

0.0010 0.00020 mg/L 09/13/24 02:57 1NDChlorobenzene

0.0010 0.00054 mg/L 09/13/24 02:57 1NDChloroethane

0.0010 0.00026 mg/L 09/13/24 02:57 1NDChloroform

0.0010 0.00065 mg/L 09/13/24 02:57 1NDChloromethane

0.0010 0.00025 mg/L 09/13/24 02:57 1NDDibromochloromethane

0.0010 0.00025 mg/L 09/13/24 02:57 1NDDibromomethane

0.0010 0.00063 mg/L 09/13/24 02:57 1NDDichlorodifluoromethane

0.0020 0.00025 mg/L 09/13/24 02:57 1NDDi-isopropyl ether (DIPE) Eurofins Calscience

Page 8 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Client Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: EPA 624.1 - Volatile Organic Compounds (GC/MS) (Continued) Lab Sample ID: 570-198822-1Client Sample ID: MW-1
Matrix: WaterDate Collected: 09/11/24 08:40
Date Received: 09/12/24 18:00
RL MDL
ND 0.10 0.055 mg/L 09/13/24 02:57 1
Analyte Dil FacAnalyzedPreparedUnit DResult
Qualifier
Ethanol

0.0010 0.00023 mg/L 09/13/24 02:57 1NDEthylbenzene

0.0020 0.00026 mg/L 09/13/24 02:57 1NDEthyl-t-butyl ether (ETBE)

0.0010 0.00070 mg/L 09/13/24 02:57 1NDHexachloro-1,3-butadiene

0.050 0.036 mg/L 09/13/24 02:57 1NDIsopropanol

0.0010 0.00029 mg/L 09/13/24 02:57 1NDIsopropylbenzene

0.0020 0.00083 mg/L 09/13/24 02:57 1NDMethylene Chloride

0.0010 0.00024 mg/L 09/13/24 02:57 1NDMethyl-t-Butyl Ether (MTBE)

0.010 0.0038 mg/L 09/13/24 02:57 1NDNaphthalene

0.0010 0.00032 mg/L 09/13/24 02:57 1NDn-Butylbenzene

0.0010 0.00030 mg/L 09/13/24 02:57 1NDN-Propylbenzene

0.0010 0.00024 mg/L 09/13/24 02:57 1NDo-Xylene

0.0010 0.00048 mg/L 09/13/24 02:57 1NDm,p-Xylene

0.0010 0.00030 mg/L 09/13/24 02:57 1NDp-Isopropyltoluene

0.0010 0.00031 mg/L 09/13/24 02:57 1NDsec-Butylbenzene

0.0010 0.00074 mg/L 09/13/24 02:57 1NDStyrene

0.0010 0.00025 mg/L 09/13/24 02:57 1NDtrans-1,2-Dichloroethene

0.00050 0.00033 mg/L 09/13/24 02:57 1NDtrans-1,3-Dichloropropene

0.0020 0.00032 mg/L 09/13/24 02:57 1NDTert-amyl-methyl ether (TAME)

0.010 0.0015 mg/L 09/13/24 02:57 10.0036 Jtert-Butyl alcohol (TBA)

0.0010 0.00026 mg/L 09/13/24 02:57 1NDtert-Butylbenzene

0.0010 0.00039 mg/L 09/13/24 02:57 1NDTetrachloroethene

0.010 0.0030 mg/L 09/13/24 02:57 1NDTetrahydrofuran

0.0010 0.00019 mg/L 09/13/24 02:57 1NDToluene

0.0010 0.00041 mg/L 09/13/24 02:57 1NDTrichloroethene

0.0050 0.0026 mg/L 09/13/24 02:57 1NDTrichlorofluoromethane

0.010 0.0044 mg/L 09/13/24 02:57 1NDVinyl acetate

0.00050 0.00036 mg/L 09/13/24 02:57 1NDVinyl chloride
1,2-Dichloroethane-d4 (Surr) 107 60 - 140 09/13/24 02:57 1 Surrogate Dil FacAnalyzedPreparedQualifier Limits%Recovery 4-Bromofluorobenzene (Surr) 98 09/13/24 02:57 160 - 140 Dibromofluoromethane 105 09/13/24 02:57 160 - 140
Toluene-d8 (Surr) 99 09/13/24 02:57 160 - 140
Eurofins Calscience

Page 9 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Client Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: EPA 625.1 - Semivolatile Organic Compounds (GC/MS) Lab Sample ID: 570-198822-1Client Sample ID: MW-1
Matrix: WaterDate Collected: 09/11/24 08:40
Date Received: 09/12/24 18:00
RL MDL
ND 0.0096 0.00073 mg/L 09/13/24 05:17 09/16/24 19:56 1
Analyte Dil FacAnalyzedPreparedUnit DResult
Qualifier
1,2,4-Trichlorobenzene

0.0096 0.00071 mg/L 09/13/24 05:17 09/16/24 19:56 1ND1,2-Diphenylhydrazine(as Azobenzene)

0.0096 0.0011 mg/L 09/13/24 05:17 09/16/24 19:56 1ND2,4,6-Trichlorophenol

0.0096 0.0013 mg/L 09/13/24 05:17 09/16/24 19:56 1ND2,4-Dichlorophenol

0.0096 0.0011 mg/L 09/13/24 05:17 09/16/24 19:56 1ND2,4-Dimethylphenol

0.048 0.012 mg/L 09/13/24 05:17 09/16/24 19:56 1ND2,4-Dinitrophenol

0.0096 0.0011 mg/L 09/13/24 05:17 09/16/24 19:56 1ND2,4-Dinitrotoluene

0.0096 0.0011 mg/L 09/13/24 05:17 09/16/24 19:56 1ND2,6-Dinitrotoluene

0.0096 0.00066 mg/L 09/13/24 05:17 09/16/24 19:56 1ND2-Chloronaphthalene

0.0096 0.00091 mg/L 09/13/24 05:17 09/16/24 19:56 1ND2-Chlorophenol

0.0096 0.0022 mg/L 09/13/24 05:17 09/16/24 19:56 1ND2-Nitrophenol

0.0096 0.0065 mg/L 09/13/24 05:17 09/16/24 19:56 1ND3,3'-Dichlorobenzidine

0.048 0.011 mg/L 09/13/24 05:17 09/16/24 19:56 1ND4,6-Dinitro-2-methylphenol

0.0096 0.0012 mg/L 09/13/24 05:17 09/16/24 19:56 1ND4-Bromophenyl phenyl ether

0.0096 0.0013 mg/L 09/13/24 05:17 09/16/24 19:56 1ND4-Chloro-3-methylphenol

0.0096 0.00099 mg/L 09/13/24 05:17 09/16/24 19:56 1ND4-Chlorophenyl phenyl ether

0.0096 0.0035 mg/L 09/13/24 05:17 09/16/24 19:56 1ND4-Nitrophenol

0.0096 0.00087 mg/L 09/13/24 05:17 09/16/24 19:56 1NDAcenaphthene

0.0096 0.00083 mg/L 09/13/24 05:17 09/16/24 19:56 1NDAcenaphthylene

0.0096 0.00094 mg/L 09/13/24 05:17 09/16/24 19:56 1NDAnthracene

0.048 0.011 mg/L 09/13/24 05:17 09/16/24 19:56 1ND *- *1Benzidine

0.0096 0.0012 mg/L 09/13/24 05:17 09/16/24 19:56 1NDBenzo[a]anthracene

0.0096 0.0018 mg/L 09/13/24 05:17 09/16/24 19:56 1NDBenzo[a]pyrene

0.0096 0.0016 mg/L 09/13/24 05:17 09/16/24 19:56 1NDBenzo[b]fluoranthene

0.0096 0.0018 mg/L 09/13/24 05:17 09/16/24 19:56 1NDBenzo[g,h,i]perylene

0.0096 0.0012 mg/L 09/13/24 05:17 09/16/24 19:56 1NDBenzo[k]fluoranthene

0.0096 0.00097 mg/L 09/13/24 05:17 09/16/24 19:56 1NDBis (2-chloroethoxy) methane

0.024 0.0074 mg/L 09/13/24 05:17 09/16/24 19:56 1NDBis(2-chloroethyl)ether

0.0096 0.0011 mg/L 09/13/24 05:17 09/16/24 19:56 1NDbis (2-chloroisopropyl) ether

0.0096 0.0047 mg/L 09/13/24 05:17 09/16/24 19:56 1NDBis(2-ethylhexyl) phthalate

0.0096 0.0040 mg/L 09/13/24 05:17 09/16/24 19:56 1NDButyl benzyl phthalate

0.0096 0.0012 mg/L 09/13/24 05:17 09/16/24 19:56 1NDChrysene

0.0096 0.0018 mg/L 09/13/24 05:17 09/16/24 19:56 1NDDibenz(a,h)anthracene

0.0096 0.0011 mg/L 09/13/24 05:17 09/16/24 19:56 1NDDiethyl phthalate

0.0096 0.00089 mg/L 09/13/24 05:17 09/16/24 19:56 1NDDimethyl phthalate

0.0096 0.0013 mg/L 09/13/24 05:17 09/16/24 19:56 1NDDi-n-butyl phthalate

0.0096 0.0044 mg/L 09/13/24 05:17 09/16/24 19:56 1NDDi-n-octyl phthalate

0.0096 0.0011 mg/L 09/13/24 05:17 09/16/24 19:56 1NDFluoranthene

0.0096 0.00089 mg/L 09/13/24 05:17 09/16/24 19:56 1NDFluorene

0.0096 0.0011 mg/L 09/13/24 05:17 09/16/24 19:56 1NDHexachloro-1,3-butadiene

0.0096 0.00085 mg/L 09/13/24 05:17 09/16/24 19:56 1NDHexachlorobenzene

0.024 0.0029 mg/L 09/13/24 05:17 09/16/24 19:56 1NDHexachlorocyclopentadiene

0.0096 0.00085 mg/L 09/13/24 05:17 09/16/24 19:56 1NDHexachloroethane

0.0096 0.0029 mg/L 09/13/24 05:17 09/16/24 19:56 1NDIndeno[1,2,3-cd]pyrene

0.0096 0.0014 mg/L 09/13/24 05:17 09/16/24 19:56 1NDIsophorone

0.0096 0.0034 mg/L 09/13/24 05:17 09/16/24 19:56 1NDNaphthalene

0.024 0.0072 mg/L 09/13/24 05:17 09/16/24 19:56 1NDNitrobenzene

0.0096 0.00071 mg/L 09/13/24 05:17 09/16/24 19:56 1ND *1N-Nitrosodimethylamine

0.0096 0.00099 mg/L 09/13/24 05:17 09/16/24 19:56 1NDN-Nitrosodi-n-propylamine Eurofins Calscience

Page 10 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Client Sample Results
Job ID: 570-198822-1Client: Atlas Engineering West, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: EPA 625.1 - Semivolatile Organic Compounds (GC/MS) (Continued) Lab Sample ID: 570-198822-1Client Sample ID: MW-1
Matrix: WaterDate Collected: 09/11/24 08:40
Date Received: 09/12/24 18:00
RL MDL
ND 0.0096 0.0012 mg/L 09/13/24 05:17 09/16/24 19:56 1
Analyte Dil FacAnalyzedPreparedUnit DResult
Qualifier
N-Nitrosodiphenylamine

0.0096 0.0046 mg/L 09/13/24 05:17 09/16/24 19:56 1NDPentachlorophenol

0.0096 0.0011 mg/L 09/13/24 05:17 09/16/24 19:56 1NDPhenanthrene

0.0096 0.00040 mg/L 09/13/24 05:17 09/16/24 19:56 1NDPhenol

0.0096 0.0012 mg/L 09/13/24 05:17 09/16/24 19:56 1NDPyrene 2,4,6-Tribromophenol (Surr) 80 33 - 139 09/13/24 05:17 09/16/24 19:56 1 Surrogate Dil FacAnalyzedPreparedQualifier Limits%Recovery 2-Fluorobiphenyl (Surr) 58 09/13/24 05:17 09/16/24 19:56 133 - 126 2-Fluorophenol (Surr) 50 09/13/24 05:17 09/16/24 19:56 112 - 120 Nitrobenzene-d5 (Surr) 69 09/13/24 05:17 09/16/24 19:56 136 - 120 Phenol-d6 (Surr) 30 09/13/24 05:17 09/16/24 19:56 110 - 120 p-Terphenyl-d14 (Surr) 68 09/13/24 05:17 09/16/24 19:56 147 - 131 Eurofins Calscience

Page 11 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Client Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: EPA 608.3 - Organochlorine Pesticides in Water
Lab Sample ID: 570-198822-1Client Sample ID: MW-1
Matrix: WaterDate Collected: 09/11/24 08:40
Date Received: 09/12/24 18:00
RL MDL
ND 0.0000096 0.0000063 mg/L 09/17/24 05:15 09/18/24 12:53 1 Analyte Dil FacAnalyzedPreparedUnit DResult Qualifier 4,4'-DDD

0.0000048 0.0000027 mg/L 09/17/24 05:15 09/18/24 12:53 1ND4,4'-DDE

0.0000048 0.0000023 mg/L 09/17/24 05:15 09/18/24 12:53 1ND4,4'-DDT

0.0000048 0.0000044 mg/L 09/17/24 05:15 09/18/24 12:53 1NDAldrin

0.000048 0.0000012 mg/L 09/17/24 05:15 09/18/24 12:53 1NDalpha-Chlordane

0.0000019 0.0000017 mg/L 09/17/24 05:15 09/18/24 12:53 1NDalpha-BHC

0.0000072 0.0000056 mg/L 09/17/24 05:15 09/18/24 12:53 1NDbeta-BHC

0.000048 0.000037 mg/L 09/17/24 05:15 09/18/24 12:53 1NDChlordane

0.0000048 0.0000028 mg/L 09/17/24 05:15 09/18/24 12:53 1NDdelta-BHC

0.0000048 0.0000019 mg/L 09/17/24 05:15 09/18/24 12:53 1NDDieldrin

0.000019 0.000018 mg/L 09/17/24 05:15 09/18/24 14:18 100.00012Endosulfan I

0.0000096 0.0000059 mg/L 09/17/24 05:15 09/18/24 12:53 1NDEndosulfan II

0.0000048 0.0000020 mg/L 09/17/24 05:15 09/18/24 12:53 1NDEndosulfan sulfate

0.0000048 0.0000033 mg/L 09/17/24 05:15 09/18/24 12:53 1NDEndrin

0.000048 0.000035 mg/L 09/17/24 05:15 09/18/24 12:53 1NDEndrin aldehyde

0.0000048 0.0000031 mg/L 09/17/24 05:15 09/18/24 12:53 1NDEndrin ketone

0.000014 0.000013 mg/L 09/17/24 05:15 09/18/24 12:53 1NDgamma-Chlordane

0.0000019 0.0000009
5 mg/L 09/17/24 05:15 09/18/24 12:53 1NDgamma-BHC (Lindane)

0.0000019 0.0000017 mg/L 09/17/24 05:15 09/18/24 12:53 1NDHeptachlor

0.0000096 0.0000057 mg/L 09/17/24 05:15 09/18/24 12:53 1NDHeptachlor epoxide

0.0000096 0.0000054 mg/L 09/17/24 05:15 09/18/24 12:53 1NDMethoxychlor

0.000096 0.000078 mg/L 09/17/24 05:15 09/18/24 12:53 1NDToxaphene Tetrachloro-m-xylene (Surr) 74 20 - 139 09/17/24 05:15 09/18/24 12:53 1 Surrogate Dil FacAnalyzedPreparedQualifier Limits%Recovery Tetrachloro-m-xylene (Surr) 75 09/17/24 05:15 09/18/24 14:18 1020 - 139 DCB Decachlorobiphenyl (Surr) 94 09/17/24 05:15 09/18/24 12:53 120 - 154 DCB Decachlorobiphenyl (Surr) 118 09/17/24 05:15 09/18/24 14:18 1020 - 154 Eurofins Calscience

Page 12 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Client Sample Results
Job ID: 570-198822-1Client: Atlas Engineering West, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: EPA 608.3 - Polychlorinated Biphenyls (PCBs) (GC) Lab Sample ID: 570-198822-1Client Sample ID: MW-1
Matrix: WaterDate Collected: 09/11/24 08:40
Date Received: 09/12/24 18:00
RL MDL
ND 0.000096 0.000063 mg/L 09/17/24 05:15 09/18/24 16:44 1 Analyte Dil FacAnalyzedPreparedUnit DResult
Qualifier
Aroclor-1016

0.000096 0.000063 mg/L 09/17/24 05:15 09/18/24 16:44 1NDAroclor-1221

0.000096 0.000063 mg/L 09/17/24 05:15 09/18/24 16:44 1NDAroclor-1232

0.000096 0.000063 mg/L 09/17/24 05:15 09/18/24 16:44 1NDAroclor-1242

0.000096 0.000063 mg/L 09/17/24 05:15 09/18/24 16:44 1NDAroclor-1248

0.000096 0.000074 mg/L 09/17/24 05:15 09/18/24 16:44 1NDAroclor-1254

0.000096 0.000074 mg/L 09/17/24 05:15 09/18/24 16:44 1ND *+Aroclor-1260 Tetrachloro-m-xylene (Surr) 82 20 - 139 09/17/24 05:15 09/18/24 16:44 1 Surrogate Dil FacAnalyzedPreparedQualifier Limits%Recovery DCB Decachlorobiphenyl (Surr) 123 09/17/24 05:15 09/18/24 16:44 120 - 154 Eurofins Calscience

Page 13 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Client Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: SW846 6010B - Metals (ICP) - Total Recoverable
Lab Sample ID: 570-198822-1Client Sample ID: MW-1
Matrix: WaterDate Collected: 09/11/24 08:40
Date Received: 09/12/24 18:00
RL MDL

0.0499 J 0.100 0.0199 mg/L 09/16/24 09:33 09/16/24 17:20 1 Analyte Dil FacAnalyzedPreparedUnit DResult
Qualifier
Arsenic

0.500 0.00388 mg/L 09/16/24 09:33 09/16/24 17:20 10.723Boron

0.0100 0.000620 mg/L 09/16/24 09:33 09/16/24 17:20 10.000700 JCadmium

0.0500 0.00296 mg/L 09/16/24 09:33 09/16/24 17:20 10.0800Chromium

0.0500 0.00269 mg/L 09/16/24 09:33 09/16/24 17:20 10.0851Copper

0.500 0.0131 mg/L 09/16/24 09:33 09/16/24 17:20 176.2Iron

0.0500 0.00527 mg/L 09/16/24 09:33 09/16/24 17:20 10.0401 JLead

0.0500 0.00134 mg/L 09/16/24 09:33 09/16/24 17:20 12.21Manganese

0.0500 0.00391 mg/L 09/16/24 09:33 09/16/24 17:20 1NDMolybdenum

0.0500 0.00307 mg/L 09/16/24 09:33 09/16/24 17:20 10.0671Nickel

0.0500 0.0162 mg/L 09/16/24 09:33 09/16/24 17:20 10.0561Selenium

0.0100 0.00259 mg/L 09/16/24 09:33 09/16/24 17:20 1NDSilver

0.250 0.0133 mg/L 09/16/24 09:33 09/16/24 17:20 10.183 JZinc Eurofins Calscience

Page 14 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Client Sample Results
Job ID: 570-198822-1Client: Atlas Engineering West, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: SW846 7470A - Mercury (CVAA)
Lab Sample ID: 570-198822-1Client Sample ID: MW-1
Matrix: WaterDate Collected: 09/11/24 08:40
Date Received: 09/12/24 18:00
RL MDL

0.000157 J 0.000200 0.000124 mg/L 09/16/24 12:35 09/16/24 16:39 1 Analyte Dil FacAnalyzedPreparedUnit DResult Qualifier Mercury
Eurofins Calscience

Page 15 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Client Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
General Chemistry
Lab Sample ID: 570-198822-1Client Sample ID: MW-1
Matrix: WaterDate Collected: 09/11/24 08:40
Date Received: 09/12/24 18:00
RL MDL
ND 0.949 0.484 mg/L 09/16/24 10:01 09/16/24 13:41 1
Analyte Dil FacAnalyzedPreparedUnit DResult Qualifier
HEM: Oil and Grease (1664B)

0.949 0.603
mg/L 09/16/24 10:01 09/16/24 13:41 1NDHEM-SGT: Oil and Grease (1664B) 100 80.0 mg/L 09/13/24 09:55 15060Total Suspended Solids (SM 2540D)

0.533 0.267 mg/L 09/12/24 21:14 09/17/24 19:38 11.11Biochemical Oxygen Demand (SM 5210B)
Eurofins Calscience

Page 16 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Surrogate Summary
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 624.1 - Volatile Organic Compounds (GC/MS)
Prep Type: Total/NAMatrix: Water
Lab Sample ID Client Sample ID (60-140) (60-140) (60-140) (60-140)

DCA BFB DBFM
TOL
107 98 105 99570-198822-1
Percent Surrogate Recovery (Acceptance Limits)
MW-1
101 99 100 100LCS 570-480253/1002 Lab Control Sample
101 100 100 101LCSD 570-480253/3 Lab Control Sample Dup 105 98 103 99MB 570-480253/5 Method Blank
Surrogate Legend
DCA
= 1,2-Dichloroethane-d4 (Surr)
BFB = 4-Bromofluorobenzene (Surr)
DBFM = Dibromofluoromethane
TOL = Toluene-d8 (Surr)
Method: 625.1 - Semivolatile Organic Compounds (GC/MS)
Prep T
ype: Total/NAMatrix: Water
Lab Sample ID Client Sample ID (33-139) (33-126) (12-120) (36-120) (10-120) (47-131) TBP FBP 2FP
NBZ PHL6 TPHd14
80 58 50 69 30 68570-198822-1
Percent Surrogate Recovery (Acceptance Limits)
MW-1
91 64 58 3564 77LCS 570-480372/2-A Lab Control Sample
100 69 69 4372 87LCSD 570-480372/3-A Lab Control Sample Dup 90 68 58 3580 76MB 570-480372/1-A Method Blank
Surrogate Legend
TBP
= 2,4,6-Tribromophenol (Surr)
FBP = 2-Fluorobiphenyl (Surr)
2FP = 2-Fluorophenol (Surr)
NBZ = Nitrobenzene-d5 (Surr)
PHL6 = Phenol-d6 (Surr)
TPHd14 = p-Terphenyl-d14 (Surr)
Method: 608.3 - Organochlorine Pesticides in Water
Prep T
ype: Total/NAMatrix: Water
Lab Sample ID Client Sample ID (20-139) (20-154)
TCX1 DCB2
74 94570-198822-1
Percent Surrogate Recovery (Acceptance Limits)
MW-1
62 77LCS 570-481537/2-A Lab Control Sample
61 83LCSD 570-481537/3-A Lab Control Sample Dup
Surrogate Legend
TCX = T
etrachloro-m-xylene (Surr)
DCB = DCB Decachlorobiphenyl (Surr)
Method: 608.3 - Organochlorine Pesticides in Water
Prep T
ype: Total/NAMatrix: Water
Lab Sample ID Client Sample ID (20-139) (20-154)
TCX2 DCB2
75 118570-198822-1
Percent Surrogate Recovery (Acceptance Limits)
MW-1
62 84MB 570-481537/1-A Method Blank
Eurofins Calscience

Page 17 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Surrogate Summary
Job ID: 570-198822-1Client: Atlas Engineering West, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Surrogate Legend
TCX = Tetrachloro-m-xylene (Surr)
DCB = DCB Decachlorobiphenyl (Surr)
Method: 608.3 - Polychlorinated Biphenyls (PCBs) (GC)
Prep Type: Total/NAMatrix: Water
Lab Sample ID Client Sample ID (20-139) (20-154)
TCX1 DCB1
82 123570-198822-1
Percent Surrogate Recovery (Acceptance Limits)
MW-1
57 95LCS 570-481537/4-A Lab Control Sample
60 91LCSD 570-481537/5-A Lab Control Sample Dup
75 89MB 570-481537/1-A Method Blank
Surrogate Legend
TCX = Tetrachloro-m-xylene (Surr)
DCB = DCB Decachlorobiphenyl (Surr)
Eurofins Calscience

Page 18 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 624.1 - Volatile Organic Compounds (GC/MS)
Client Sample ID: Method BlankLab Sample ID: MB 570-480253/5 Matrix: Water Prep Type: Total/NA
Analysis Batch: 480253
RL MDL
1,1,1,2-Tetrachloroethane ND 0.0010 0.00023 mg/L 09/12/24 20:00 1 MB
MB
Analyte Dil FacAnalyzedPreparedDUnitResult Qualifier
ND 0.000350.0010 mg/L 09/12/24 20:00 11,1,1-Trichloroethane ND 0.000330.0010 mg/L 09/12/24 20:00 11,1,2,2-Tetrachloroethane ND 0.00380.010 mg/L 09/12/24 20:00 11,1,2-Trichloro-1,2,2-trifluoroethane ND 0.000250.0010 mg/L 09/12/24 20:00 11,1,2-Trichloroethane ND 0.000290.0010 mg/L 09/12/24 20:00 11,1-Dichloroethane ND 0.000380.0010 mg/L 09/12/24 20:00 11,1-Dichloroethene ND 0.000350.0010 mg/L 09/12/24 20:00 11,1-Dichloropropene ND 0.000540.0010 mg/L 09/12/24 20:00 11,2,3-Trichlorobenzene ND 0.00120.0050 mg/L 09/12/24 20:00 11,2,3-Trichloropropane ND 0.000580.0010 mg/L 09/12/24 20:00 11,2,4-Trichlorobenzene ND 0.000260.0010 mg/L 09/12/24 20:00 11,2,4-Trimethylbenzene ND 0.00150.0050 mg/L 09/12/24 20:00 11,2-Dibromo-3-Chloropropane ND 0.000450.0010 mg/L 09/12/24 20:00 11,2-Dibromoethane ND 0.000220.0010 mg/L 09/12/24 20:00 11,2-Dichlorobenzene ND 0.000210.00050 mg/L 09/12/24 20:00 11,2-Dichloroethane ND 0.000490.0010 mg/L 09/12/24 20:00 11,2-Dichloropropane ND 0.000330.0010 mg/L 09/12/24 20:00 11,3,5-Trimethylbenzene ND 0.000230.0010 mg/L 09/12/24 20:00 11,3-Dichlorobenzene ND 0.000260.0010 mg/L 09/12/24 20:00 11,3-Dichloropropane ND 0.000240.0010 mg/L 09/12/24 20:00 11,4-Dichlorobenzene ND 0.000410.0010 mg/L 09/12/24 20:00 12,2-Dichloropropane ND 0.00360.010 mg/L 09/12/24 20:00 12-Butanone
ND 0.000940.0020 mg/L 09/12/24 20:00 12-Chloroethyl vinyl ether ND 0.000290.0010 mg/L 09/12/24 20:00 12-Chlorotoluene
ND 0.00220.010 mg/L 09/12/24 20:00 12-Hexanone
ND 0.000250.0010 mg/L 09/12/24 20:00 14-Chlorotoluene
ND 0.00190.010 mg/L 09/12/24 20:00 14-Methyl-2-pentanone ND 0.0100.012 mg/L 09/12/24 20:00 1Acetone
ND 0.00340.0050 mg/L 09/12/24 20:00 1Acrolein
ND 0.00140.0020 mg/L 09/12/24 20:00 1Acrylonitrile
ND 0.000300.00050 mg/L 09/12/24 20:00 1Benzene
ND 0.000250.0010 mg/L 09/12/24 20:00 1Bromobenzene
ND 0.000260.0010 mg/L 09/12/24 20:00 1Bromochloromethane ND 0.000240.0010 mg/L 09/12/24 20:00 1Bromodichloromethane ND 0.000460.0010 mg/L 09/12/24 20:00 1Bromoform
ND 0.00370.0050 mg/L 09/12/24 20:00 1Bromomethane
ND 0.000300.0010 mg/L 09/12/24 20:00 1cis-1,2-Dichloroethene ND 0.000210.00050 mg/L 09/12/24 20:00 1cis-1,3-Dichloropropene ND 0.00250.010 mg/L 09/12/24 20:00 1Carbon disulfide
ND 0.000450.00050 mg/L 09/12/24 20:00 1Carbon tetrachloride ND 0.000200.0010 mg/L 09/12/24 20:00 1Chlorobenzene
ND 0.000540.0010 mg/L 09/12/24 20:00 1Chloroethane
ND 0.000260.0010 mg/L 09/12/24 20:00 1Chloroform
ND 0.000650.0010 mg/L 09/12/24 20:00 1Chloromethane
ND 0.000250.0010 mg/L 09/12/24 20:00 1Dibromochloromethane ND 0.000250.0010 mg/L 09/12/24 20:00 1Dibromomethane
ND 0.000630.0010 mg/L 09/12/24 20:00 1Dichlorodifluoromethane Eurofins Calscience

Page 19 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 624.1 - Volatile Organic Compounds (GC/MS) (Continued) Client Sample ID: Method BlankLab Sample ID: MB 570-480253/5 Matrix: Water Prep Type: Total/NA
Analysis Batch: 480253
RL MDL
Di-isopropyl ether (DIPE) ND 0.0020 0.00025 mg/L 09/12/24 20:00 1 MB MB
Analyte Dil FacAnalyzedPreparedDUnitResult
Qualifier
ND 0.0550.10 mg/L 09/12/24 20:00 1Ethanol
ND 0.000230.0010 mg/L 09/12/24 20:00 1Ethylbenzene
ND 0.000260.0020 mg/L 09/12/24 20:00 1Ethyl-t-butyl ether (ETBE) ND 0.000700.0010 mg/L 09/12/24 20:00 1Hexachloro-1,3-butadiene ND 0.0360.050 mg/L 09/12/24 20:00 1Isopropanol
ND 0.000290.0010 mg/L 09/12/24 20:00 1Isopropylbenzene
ND 0.000830.0020 mg/L 09/12/24 20:00 1Methylene Chloride ND 0.000240.0010 mg/L 09/12/24 20:00 1Methyl-t-Butyl Ether (MTBE) ND 0.00380.010 mg/L 09/12/24 20:00 1Naphthalene
ND 0.000320.0010 mg/L 09/12/24 20:00 1n-Butylbenzene
ND 0.000300.0010 mg/L 09/12/24 20:00 1N-Propylbenzene
ND 0.000240.0010 mg/L 09/12/24 20:00 1o-Xylene
ND 0.000480.0010 mg/L 09/12/24 20:00 1m,p-Xylene
ND 0.000300.0010 mg/L 09/12/24 20:00 1p-Isopropyltoluene ND 0.000310.0010 mg/L 09/12/24 20:00 1sec-Butylbenzene
ND 0.000740.0010 mg/L 09/12/24 20:00 1Styrene
ND 0.000250.0010 mg/L 09/12/24 20:00 1trans-1,2-Dichloroethene ND 0.000330.00050 mg/L 09/12/24 20:00 1trans-1,3-Dichloropropene ND 0.000320.0020 mg/L 09/12/24 20:00 1Tert-amyl-methyl ether (TAME) ND 0.00150.010 mg/L 09/12/24 20:00 1tert-Butyl alcohol (TBA) ND 0.000260.0010 mg/L 09/12/24 20:00 1tert-Butylbenzene ND 0.000390.0010 mg/L 09/12/24 20:00 1Tetrachloroethene ND 0.00300.010 mg/L 09/12/24 20:00 1Tetrahydrofuran
ND 0.000190.0010 mg/L 09/12/24 20:00 1Toluene
ND 0.000410.0010 mg/L 09/12/24 20:00 1Trichloroethene
ND 0.00260.0050 mg/L 09/12/24 20:00 1Trichlorofluoromethane ND 0.00440.010 mg/L 09/12/24 20:00 1Vinyl acetate
ND 0.000360.00050 mg/L 09/12/24 20:00 1Vinyl chloride
1,2-Dichloroethane-d4 (Surr) 105 60 - 140 09/12/24 20:00 1 MB MB
Surrogate Dil FacPrepared AnalyzedQualifier Limits%Recovery 98 09/12/24 20:00 14-Bromofluorobenzene (Surr) 60 - 140 103 09/12/24 20:00 1Dibromofluoromethane 60 - 140
99 09/12/24 20:00 1Toluene-d8 (Surr) 60 - 140
Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-480253/1002 Matrix: Water Prep Type: Total/NA
Analysis Batch: 480253
1,1,1,2-Tetrachloroethane 0.0200 0.02023 mg/L 101 60 - 140 Analyte

LCS LCS
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits
1,1,1-Trichloroethane 0.0200 0.01976 mg/L 99 70 - 130
1,1,2,2-Tetrachloroethane 0.0200 0.02060 mg/L 103 60 - 140 1,1,2-Trichloro-1,2,2-trifluoroetha
ne

0.0200 0.01973 mg/L 99 60 - 140
1,1,2-Trichloroethane 0.0200 0.02048 mg/L 102 70 - 130
1,1-Dichloroethane 0.0200 0.01979 mg/L 99 70 - 130
1,1-Dichloroethene 0.0200 0.01895 mg/L 95 50 - 150
Eurofins Calscience

Page 20 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 624.1 - Volatile Organic Compounds (GC/MS) (Continued) Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-480253/1002 Matrix: Water Prep Type: Total/NA
Analysis Batch: 480253
1,1-Dichloropropene 0.0200 0.02017 mg/L 101 60 - 140
Analyte

LCS LCS
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits
1,2,3-Trichlorobenzene 0.0200 0.02126 mg/L 106
60 - 140
1,2,3-Trichloropropane 0.0200 0.01923 mg/L 96 60 - 140
1,2,4-Trichlorobenzene 0.0200 0.02150 mg/L 107 60 - 140 1,2,4-Trimethylbenzene 0.0200 0.02039 mg/L 102 60 - 140 1,2-Dibromo-3-Chloropropane 0.0200 0.01991 mg/L 100 60 - 140 1,2-Dibromoethane 0.0200 0.02094 mg/L 105 60 - 140
1,2-Dichlorobenzene 0.0200 0.02078 mg/L 104 65 - 135
1,2-Dichloroethane 0.0200 0.02034 mg/L 102 70 - 130
1,2-Dichloropropane 0.0200 0.02012 mg/L 101 35 - 165
1,3,5-Trimethylbenzene 0.0200 0.02106 mg/L 105 60 - 140 1,3-Dichlorobenzene 0.0200 0.02013 mg/L 101 70 - 130
1,3-Dichloropropane 0.0200 0.02084 mg/L 104 60 - 140
1,4-Dichlorobenzene 0.0200 0.02022 mg/L 101 65 - 135
2,2-Dichloropropane 0.0200 0.01995 mg/L 100 60 - 140
2-Butanone 0.0200 0.02068 mg/L 103 60 - 140
2-Chloroethyl vinyl ether 0.0200 0.01830 mg/L 92 1 - 225 2-Chlorotoluene 0.0200 0.02011 mg/L 101 60 - 140
2-Hexanone 0.0200 0.01839 mg/L 92 60 - 140
4-Chlorotoluene 0.0200 0.02006 mg/L 100 60 - 140
4-Methyl-2-pentanone 0.0200 0.02020 mg/L 101 60 - 140
Acetone 0.0200 0.01971 mg/L 99 60 - 140
Acrolein 0.0400 0.04018 mg/L 100 60 - 140
Acrylonitrile 0.0200 0.02148 mg/L 107 60 - 140
Benzene 0.0200 0.02013 mg/L 101 65 - 135
Bromobenzene 0.0200 0.02059 mg/L 103 60 - 140
Bromochloromethane 0.0200 0.02102 mg/L 105 60 - 140
Bromodichloromethane 0.0200 0.02000 mg/L 100 65 - 135
Bromoform 0.0200 0.02016 mg/L 101 70 - 130
Bromomethane 0.0200 0.02317 mg/L 116 15 - 185
cis-1,2-Dichloroethene 0.0200 0.02034 mg/L 102 60 - 140 cis-1,3-Dichloropropene 0.0200 0.02133 mg/L 107 25 - 175 Carbon disulfide 0.0200 0.01829 mg/L 91 60 - 140
Carbon tetrachloride 0.0200 0.02050 mg/L 102 70 - 130
Chlorobenzene 0.0200 0.02037 mg/L 102 65 - 135
Chloroethane 0.0200 0.02077 mg/L 104 40 - 160
Chloroform 0.0200 0.02017 mg/L 101 70 - 135
Chloromethane 0.0200 0.01991 mg/L 100 1 - 205
Dibromochloromethane 0.0200 0.02052 mg/L 103 70 - 135
Dibromomethane 0.0200 0.02136 mg/L 107 60 - 140
Dichlorodifluoromethane 0.0200 0.01553 mg/L 78 60 - 140 Di-isopropyl ether (DIPE) 0.0200 0.01985 mg/L 99 60 - 140 Ethanol 0.200 0.2119 mg/L 106 60 - 140
Ethylbenzene 0.0200 0.02022 mg/L 101 60 - 140
Ethyl-t-butyl ether (ETBE) 0.0200 0.01955 mg/L 98 60 - 140 Hexachloro-1,3-butadiene 0.0200 0.02053 mg/L 103 60 - 140 Isopropanol 0.100 0.1028 mg/L 103 60 - 140
Isopropylbenzene 0.0200 0.02051 mg/L 103 60 - 140
Methylene Chloride 0.0200 0.02031 mg/L 102 60 - 140
Eurofins Calscience

Page 21 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 624.1 - Volatile Organic Compounds (GC/MS) (Continued) Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-480253/1002 Matrix: Water Prep Type: Total/NA
Analysis Batch: 480253
Methyl-t-Butyl Ether (MTBE) 0.0200 0.01999 mg/L 100 60 - 140 Analyte

LCS LCS
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits
Naphthalene 0.0200 0.02023 mg/L 101 60 - 140
n-Butylbenzene 0.0200

0.02087 mg/L 104 60 - 140
N-Propylbenzene 0.0200 0.02054 mg/L 103 60 - 140
o-Xylene 0.0200 0.02038 mg/L 102 60 - 140
m,p-Xylene 0.0400 0.04140 mg/L 104 60 - 140
p-Isopropyltoluene 0.0200 0.02026 mg/L 101 60 - 140
sec-Butylbenzene 0.0200 0.02034 mg/L 102 60 - 140
Styrene 0.0200 0.02062 mg/L 103 60 - 140
trans-1,2-Dichloroethene 0.0200 0.02070 mg/L 103 70 - 130 trans-1,3-Dichloropropene 0.0200 0.01619 mg/L 81 50 - 150 Tert-amyl-methyl ether (TAME) 0.0200 0.01958 mg/L 98 60 - 140 tert-Butyl alcohol (TBA) 0.100 0.09960 mg/L 100 60 - 140 tert-Butylbenzene 0.0200 0.02073 mg/L 104 60 - 140
Tetrachloroethene 0.0200 0.02043 mg/L 102 70 - 130
Tetrahydrofuran 0.0200 0.01924 mg/L 96 60 - 140
Toluene 0.0200 0.02021 mg/L 101 70 - 130
Trichloroethene 0.0200 0.01994 mg/L 100 65 - 135
Trichlorofluoromethane 0.0200 0.02001 mg/L 100 50 - 150 Vinyl acetate 0.0200 0.01786 mg/L 89 60 - 140
Vinyl chloride 0.0200 0.01980 mg/L 99 5 - 195
1,2-Dichloroethane-d4 (Surr) 60 - 140
Surrogate
101

LCS LCS
Qualifier Limits%Recovery
994-Bromofluorobenzene (Surr) 60 - 140
100Dibromofluoromethane 60 - 140
100Toluene-d8 (Surr) 60 - 140
Client Sample ID: Lab Control Sample DupLab Sample ID: LCSD 570-480253/3 Matrix: Water Prep Type: Total/NA
Analysis Batch: 480253
1,1,1,2-Tetrachloroethane 0.0200 0.02024 mg/L 101 60 - 140 0 30 Analyte

LCSD LCSD
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits LimitRPD
RPD
1,1,1-Trichloroethane 0.0200 0.01974 mg/L 99 70 - 130 0 36 1,1,2,2-Tetrachloroethane 0.0200 0.01999 mg/L 100 60 - 140 3 61 1,1,2-Trichloro-1,2,2-trifluoroetha
ne

0.0200 0.01945 mg/L 97 60 - 140 1 30
1,1,2-Trichloroethane 0.0200 0.02095 mg/L 105 70 - 130 2 45 1,1-Dichloroethane 0.0200 0.01817 mg/L 91 70 - 130 9 40 1,1-Dichloroethene 0.0200 0.01907 mg/L 95 50 - 150 1 32 1,1-Dichloropropene 0.0200 0.02011 mg/L 101 60 - 140 0 30 1,2,3-Trichlorobenzene 0.0200 0.02131 mg/L 107 60 - 140 0 30 1,2,3-Trichloropropane 0.0200 0.01941 mg/L 97 60 - 140 1 30 1,2,4-Trichlorobenzene 0.0200 0.02125 mg/L 106 60 - 140 1 30 1,2,4-Trimethylbenzene 0.0200 0.02011 mg/L 101 60 - 140 1 30 1,2-Dibromo-3-Chloropropane 0.0200 0.01988 mg/L 99 60 - 140 0 30 1,2-Dibromoethane 0.0200 0.02073 mg/L 104 60 - 140 1 30 1,2-Dichlorobenzene 0.0200 0.02030 mg/L 102 65 - 135 2 57 Eurofins Calscience

Page 22 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 624.1 - Volatile Organic Compounds (GC/MS) (Continued) Client Sample ID: Lab Control Sample DupLab Sample ID: LCSD 570-480253/3 Matrix: Water Prep Type: Total/NA
Analysis Batch: 480253
1,2-Dichloroethane 0.0200 0.02015 mg/L 101 70 - 130 1 49 Analyte

LCSD LCSD
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits LimitRPD
RPD
1,2-Dichloropropane 0.0200 0.02016 mg/L 101
35 - 165 0 55
1,3,5-Trimethylbenzene 0.0200 0.02089 mg/L 104 60 - 140 1 30 1,3-Dichlorobenzene 0.0200 0.01984 mg/L 99 70 - 130 1 43 1,3-Dichloropropane 0.0200 0.02058 mg/L 103 60 - 140 1 30 1,4-Dichlorobenzene 0.0200 0.01990 mg/L 100 65 - 135 2 57 2,2-Dichloropropane 0.0200 0.01952 mg/L 98 60 - 140 2 30 2-Butanone 0.0200 0.02086 mg/L 104 60 - 140 1 30
2-Chloroethyl vinyl ether 0.0200 0.01795 mg/L 90 1 - 225 2 71 2-Chlorotoluene 0.0200 0.02000 mg/L 100 60 - 140 1 30
2-Hexanone 0.0200 0.01866 mg/L 93 60 - 140 2 30
4-Chlorotoluene 0.0200 0.01986 mg/L 99 60 - 140 1 30
4-Methyl-2-pentanone 0.0200 0.02025 mg/L 101 60 - 140 0 30 Acetone 0.0200 0.02139 mg/L 107 60 - 140 8 30
Acrolein 0.0400 0.03965 mg/L 99 60 - 140 1 60
Acrylonitrile 0.0200 0.02094 mg/L 105 60 - 140 3 60
Benzene 0.0200 0.02010 mg/L 100 65 - 135 0 61
Bromobenzene 0.0200 0.02041 mg/L 102 60 - 140 1 30
Bromochloromethane 0.0200 0.02065 mg/L 103 60 - 140 2 30 Bromodichloromethane 0.0200 0.02008 mg/L 100 65 - 135 0 56 Bromoform 0.0200 0.02038 mg/L 102 70 - 130 1 42
Bromomethane 0.0200 0.02237 mg/L 112 15 - 185 4 61
cis-1,2-Dichloroethene 0.0200 0.02081 mg/L 104 60 - 140 2 30 cis-1,3-Dichloropropene 0.0200 0.02106 mg/L 105 25 - 175 1 58 Carbon disulfide 0.0200 0.01807 mg/L 90 60 - 140 1 30
Carbon tetrachloride 0.0200 0.02011 mg/L 101 70 - 130 2 41 Chlorobenzene 0.0200 0.02018 mg/L 101 65 - 135 1 53
Chloroethane 0.0200 0.02069 mg/L 103 40 - 160 0 78
Chloroform 0.0200 0.02015 mg/L 101 70 - 135 0 30
Chloromethane 0.0200 0.01962 mg/L 98 1 - 205 2 60
Dibromochloromethane 0.0200 0.02070 mg/L 104 70 - 135 1 50 Dibromomethane 0.0200 0.02083 mg/L 104 60 - 140 3 30
Dichlorodifluoromethane 0.0200 0.01532 mg/L 77 60 - 140 1 30 Di-isopropyl ether (DIPE) 0.0200 0.02014 mg/L 101 60 - 140 1 30 Ethanol 0.200 0.2000 mg/L 100 60 - 140 6 30
Ethylbenzene 0.0200 0.01999 mg/L 100 60 - 140 1 63
Ethyl-t-butyl ether (ETBE) 0.0200 0.01968 mg/L 98 60 - 140 1 30 Hexachloro-1,3-butadiene 0.0200 0.01982 mg/L 99 60 - 140 4 30 Isopropanol 0.100 0.1067 mg/L 107 60 - 140 4 30
Isopropylbenzene 0.0200 0.02045 mg/L 102 60 - 140 0 30
Methylene Chloride 0.0200 0.02052 mg/L 103 60 - 140 1 28 Methyl-t-Butyl Ether (MTBE) 0.0200 0.01980 mg/L 99 60 - 140 1 30 Naphthalene 0.0200 0.02050 mg/L 102 60 - 140 1 30
n-Butylbenzene 0.0200 0.02062 mg/L 103 60 - 140 1 30
N-Propylbenzene 0.0200 0.02009 mg/L 100 60 - 140 2 30
o-Xylene 0.0200 0.02034 mg/L 102 60 - 140 0 30
m,p-Xylene 0.0400 0.04105 mg/L 103 60 - 140 1 30
p-Isopropyltoluene 0.0200 0.02006 mg/L 100 60 - 140 1 30 sec-Butylbenzene 0.0200 0.02006 mg/L 100 60 - 140 1 30
Eurofins Calscience

Page 23 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 624.1 - Volatile Organic Compounds (GC/MS) (Continued) Client Sample ID: Lab Control Sample DupLab Sample ID: LCSD 570-480253/3 Matrix: Water Prep Type: Total/NA
Analysis Batch: 480253
Styrene 0.0200 0.02052 mg/L 103 60 - 140 1 30
Analyte

LCSD LCSD
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits LimitRPD
RPD
trans-1,2-Dichloroethene 0.0200 0.02045 mg/L 102
70 - 130 1 45
trans-1,3-Dichloropropene 0.0200 0.01641 mg/L 82 50 - 150 1 86 Tert-amyl-methyl ether (TAME) 0.0200 0.01956 mg/L 98 60 - 140 0 30 tert-Butyl alcohol (TBA) 0.100 0.09631 mg/L 96 60 - 140 3 30 tert-Butylbenzene 0.0200 0.02048 mg/L 102 60 - 140 1 30 Tetrachloroethene 0.0200 0.02002 mg/L 100 70 - 130 2 39 Tetrahydrofuran 0.0200 0.01944 mg/L 97 60 - 140 1 30
Toluene 0.0200 0.01998 mg/L 100 70 - 130 1 41
Trichloroethene 0.0200 0.01989 mg/L 99 65 - 135 0 48
Trichlorofluoromethane 0.0200 0.01964 mg/L 98 50 - 150 2 84 Vinyl acetate 0.0200 0.01772 mg/L 89 60 - 140 1 30
Vinyl chloride 0.0200 0.01930 mg/L 96 5 - 195 3 66
1,2-Dichloroethane-d4 (Surr) 60 - 140
Surrogate
101

LCSD LCSD
Qualifier Limits%Recovery
1004-Bromofluorobenzene (Surr) 60 - 140
100Dibromofluoromethane 60 - 140
101Toluene-d8 (Surr) 60 - 140
Method: 625.1 - Semivolatile Organic Compounds (GC/MS)
Client Sample ID: Method BlankLab Sample ID: MB 570-480372/1-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481184 Prep Batch: 480372
RL MDL
1,2,4-Trichlorobenzene ND 0.010 0.00077 mg/L 09/13/24 05:17 09/16/24 13:58 1 MB MB
Analyte Dil FacAnalyzedPreparedDUnitResult Qualifier
ND 0.000740.010 mg/L 09/13/24 05:17 09/16/24 13:58 11,2-Diphenylhydrazine(as Azobenzene)
ND 0.00120.010 mg/L 09/13/24 05:17 09/16/24 13:58 12,4,6-Trichlorophenol ND 0.00140.010 mg/L 09/13/24 05:17 09/16/24 13:58 12,4-Dichlorophenol ND 0.00110.010 mg/L 09/13/24 05:17 09/16/24 13:58 12,4-Dimethylphenol ND 0.0130.050 mg/L 09/13/24 05:17 09/16/24 13:58 12,4-Dinitrophenol ND 0.00110.010 mg/L 09/13/24 05:17 09/16/24 13:58 12,4-Dinitrotoluene ND 0.00110.010 mg/L 09/13/24 05:17 09/16/24 13:58 12,6-Dinitrotoluene ND 0.000690.010 mg/L 09/13/24 05:17 09/16/24 13:58 12-Chloronaphthalene ND 0.000950.010 mg/L 09/13/24 05:17 09/16/24 13:58 12-Chlorophenol ND 0.00230.010 mg/L 09/13/24 05:17 09/16/24 13:58 12-Nitrophenol ND 0.00680.010 mg/L 09/13/24 05:17 09/16/24 13:58 13,3'-Dichlorobenzidine ND 0.0110.050 mg/L 09/13/24 05:17 09/16/24 13:58 14,6-Dinitro-2-methylphenol ND 0.00120.010 mg/L 09/13/24 05:17 09/16/24 13:58 14-Bromophenyl phenyl ether ND 0.00140.010 mg/L 09/13/24 05:17 09/16/24 13:58 14-Chloro-3-methylphenol ND 0.00100.010 mg/L 09/13/24 05:17 09/16/24 13:58 14-Chlorophenyl phenyl ether ND 0.00370.010 mg/L 09/13/24 05:17 09/16/24 13:58 14-Nitrophenol ND 0.000910.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Acenaphthene ND 0.000870.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Acenaphthylene ND 0.000980.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Anthracene ND 0.0110.050 mg/L 09/13/24 05:17 09/16/24 13:58 1Benzidine Eurofins Calscience

Page 24 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 625.1 - Semivolatile Organic Compounds (GC/MS) (Continued) Client Sample ID: Method BlankLab Sample ID: MB 570-480372/1-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481184 Prep Batch: 480372
RL MDL
Benzo[a]anthracene ND 0.010 0.0013 mg/L 09/13/24 05:17 09/16/24 13:58 1 MB
MB
Analyte Dil FacAnalyzedPreparedDUnitResult Qualifier
ND 0.00190.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Benzo[a]pyrene ND 0.00170.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Benzo[b]fluoranthene ND 0.00190.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Benzo[g,h,i]perylene ND 0.00120.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Benzo[k]fluoranthene ND 0.00100.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Bis (2-chloroethoxy) methane ND 0.00770.025 mg/L 09/13/24 05:17 09/16/24 13:58 1Bis(2-chloroethyl)ether ND 0.00120.010 mg/L 09/13/24 05:17 09/16/24 13:58 1bis (2-chloroisopropyl) ether ND 0.00490.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Bis(2-ethylhexyl) phthalate ND 0.00410.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Butyl benzyl phthalate ND 0.00120.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Chrysene ND 0.00180.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Dibenz(a,h)anthracene ND 0.00120.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Diethyl phthalate ND 0.000930.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Dimethyl phthalate ND 0.00140.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Di-n-butyl phthalate ND 0.00460.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Di-n-octyl phthalate ND 0.00110.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Fluoranthene ND 0.000930.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Fluorene ND 0.00110.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Hexachloro-1,3-butadiene ND 0.000890.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Hexachlorobenzene ND 0.00300.025 mg/L 09/13/24 05:17 09/16/24 13:58 1Hexachlorocyclopentadiene ND 0.000880.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Hexachloroethane ND 0.00310.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Indeno[1,2,3-cd]pyrene ND 0.00140.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Isophorone ND 0.00360.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Naphthalene ND 0.00750.025 mg/L 09/13/24 05:17 09/16/24 13:58 1Nitrobenzene ND 0.000740.010 mg/L 09/13/24 05:17 09/16/24 13:58 1N-Nitrosodimethylamine ND 0.00100.010 mg/L 09/13/24 05:17 09/16/24 13:58 1N-Nitrosodi-n-propylamine ND 0.00120.010 mg/L 09/13/24 05:17 09/16/24 13:58 1N-Nitrosodiphenylamine ND 0.00480.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Pentachlorophenol ND 0.00110.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Phenanthrene ND 0.000420.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Phenol ND 0.00120.010 mg/L 09/13/24 05:17 09/16/24 13:58 1Pyrene 2,4,6-Tribromophenol (Surr) 90 33 - 139 09/16/24 13:58 1 MB MB
Surrogate
09/13/24 05:17
Dil FacPrepared AnalyzedQualifier Limits%Recovery
68 09/13/24 05:17 09/16/24 13:58 12-Fluorobiphenyl (Surr) 33 - 126 58 09/13/24 05:17 09/16/24 13:58 12-Fluorophenol (Surr) 12 - 120 80 09/13/24 05:17 09/16/24 13:58 1Nitrobenzene-d5 (Surr) 36 - 120 35 09/13/24 05:17 09/16/24 13:58 1Phenol-d6 (Surr) 10 - 120 76 09/13/24 05:17 09/16/24 13:58 1p-Terphenyl-d14 (Surr) 47 - 131 Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-480372/2-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481184 Prep Batch: 480372
1,2,4-Trichlorobenzene 0.100 0.07465 mg/L 75 57 - 130
Analyte

LCS LCS
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits
Eurofins Calscience

Page 25 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 625.1 - Semivolatile Organic Compounds (GC/MS) (Continued) Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-480372/2-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481184 Prep Batch: 480372
1,2-Diphenylhydrazine(as
Azobenzene)

0.100 0.08300 mg/L 83 57 - 120
Analyte

LCS LCS
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits
2,4,6-Trichlorophenol 0.100 0.08961 mg/L 90
52 - 129
2,4-Dichlorophenol 0.100 0.08155 mg/L 82 53 - 122
2,4-Dimethylphenol 0.100 0.09856 mg/L 99 42 - 120
2,4-Dinitrophenol 0.100 0.08771 mg/L 88 1 - 173
2,4-Dinitrotoluene 0.100 0.08511 mg/L 85 48 - 127
2,6-Dinitrotoluene 0.100 0.08253 mg/L 83 68 - 137
2-Chloronaphthalene 0.100 0.08039 mg/L 80 65 - 120
2-Chlorophenol 0.100 0.07555 mg/L 76 36 - 120
2-Nitrophenol 0.100 0.08066 mg/L 81 45 - 167
3,3'-Dichlorobenzidine 0.100 0.08026 mg/L 80 8 - 213
4,6-Dinitro-2-methylphenol 0.100 0.07985 mg/L 80 53 - 130 4-Bromophenyl phenyl ether 0.100 0.08112 mg/L 81 65 - 120 4-Chloro-3-methylphenol 0.100 0.07790 mg/L 78 41 - 128
4-Chlorophenyl phenyl ether 0.100 0.08028 mg/L 80 38 - 145 4-Nitrophenol 0.100 0.03895 mg/L 39 13 - 129
Acenaphthene 0.100 0.07930 mg/L 79 60 - 132
Acenaphthylene 0.100 0.08147 mg/L 81 54 - 126
Anthracene 0.100 0.08176 mg/L 82 43 - 120
Benzidine 0.100 ND *- mg/L 6 20 - 143
Benzo[a]anthracene 0.100 0.08114 mg/L 81 42 - 133
Benzo[a]pyrene 0.100 0.08468 mg/L 85 32 - 148
Benzo[b]fluoranthene 0.100 0.08215 mg/L 82 42 - 140
Benzo[g,h,i]perylene 0.100 0.08711 mg/L 87 1 - 195
Benzo[k]fluoranthene 0.100 0.08137 mg/L 81 25 - 146
Bis (2-chloroethoxy) methane 0.100 0.07851 mg/L 79 49 - 165 Bis(2-chloroethyl)ether 0.100 0.08072 mg/L 81 43 - 126
bis (2-chloroisopropyl) ether 0.100 0.08013 mg/L 80 63 - 139 Bis(2-ethylhexyl) phthalate 0.100 0.09470 mg/L 95 29 - 137 Butyl benzyl phthalate 0.100 0.08612 mg/L 86 1 - 140
Chrysene 0.100 0.07929 mg/L 79 44 - 140
Dibenz(a,h)anthracene 0.100 0.09001 mg/L 90 1 - 200
Diethyl phthalate 0.100 0.08161 mg/L 82 1 - 120
Dimethyl phthalate 0.100 0.08512 mg/L 85 1 - 120
Di-n-butyl phthalate 0.100 0.08450 mg/L 85 8 - 120
Di-n-octyl phthalate 0.100 0.08553 mg/L 86 19 - 132
Fluoranthene 0.100 0.07200 mg/L 72 43 - 121
Fluorene 0.100 0.08130 mg/L 81 70 - 120
Hexachloro-1,3-butadiene 0.100 0.07886 mg/L 79 38 - 120 Hexachlorobenzene 0.100 0.08535 mg/L 85 8 - 142
Hexachlorocyclopentadiene 0.100 0.1137 mg/L 114 46 - 135 Hexachloroethane 0.100 0.06167 mg/L 62 55 - 120
Indeno[1,2,3-cd]pyrene 0.100 0.08732 mg/L 87 1 - 151
Isophorone 0.100 0.07340 mg/L 73 47 - 180
Naphthalene 0.100 0.07366 mg/L 74 36 - 120
Nitrobenzene 0.100 0.07785 mg/L 78 54 - 158
N-Nitrosodimethylamine 0.100 0.04857 mg/L 49 38 - 120
N-Nitrosodi-n-propylamine 0.100 0.08003 mg/L 80 14 - 198 Eurofins Calscience

Page 26 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 625.1 - Semivolatile Organic Compounds (GC/MS) (Continued) Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-480372/2-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481184 Prep Batch: 480372
N-Nitrosodiphenylamine 0.100 0.1081 mg/L 108 79 - 127
Analyte

LCS LCS
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits
Pentachlorophenol 0.100 0.08815 mg/L 88 38 - 152
Phenanthrene 0.100

0.08037 mg/L 80 65 - 120
Phenol 0.100 0.03266 mg/L 33 17 - 120
Pyrene 0.100 0.09249 mg/L 92 70 - 120
2,4,6-Tribromophenol (Surr) 33 - 139
Surrogate
91 LCS LCS
Qualifier Limits%Recovery
642-Fluorobiphenyl (Surr) 33 - 126
582-Fluorophenol (Surr) 12 - 120
64Nitrobenzene-d5 (Surr) 36 - 120
35Phenol-d6 (Surr) 10 - 120
77p-Terphenyl-d14 (Surr) 47 - 131
Client Sample ID: Lab Control Sample DupLab Sample ID: LCSD 570-480372/3-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481184 Prep Batch: 480372
1,2,4-Trichlorobenzene 0.100 0.08511 mg/L 85 57 - 130 13 30 Analyte

LCSD LCSD
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits LimitRPD
RPD
1,2-Diphenylhydrazine(as
Azobenzene)

0.100 0.08982 mg/L 90 57 - 120 8 20
2,4,6-Trichlorophenol 0.100 0.09794 mg/L 98 52 - 129 9 35 2,4-Dichlorophenol 0.100 0.09236 mg/L 92 53 - 122 12 30 2,4-Dimethylphenol 0.100 0.1177 mg/L 118 42 - 120 18 35 2,4-Dinitrophenol 0.100 0.09916 mg/L 99 1 - 173 12 79
2,4-Dinitrotoluene 0.100 0.09303 mg/L 93 48 - 127 9 25
2,6-Dinitrotoluene 0.100 0.09592 mg/L 96 68 - 137 15 29 2-Chloronaphthalene 0.100 0.09037 mg/L 90 65 - 120 12 15 2-Chlorophenol 0.100 0.09440 mg/L 94 36 - 120 22 37
2-Nitrophenol 0.100 0.09308 mg/L 93 45 - 167 14 33
3,3'-Dichlorobenzidine 0.100 0.09695 mg/L 97 8 - 213 19 65 4,6-Dinitro-2-methylphenol 0.100 0.1003 mg/L 100 53 - 130 23 122 4-Bromophenyl phenyl ether 0.100 0.09441 mg/L 94 65 - 120 15 26 4-Chloro-3-methylphenol 0.100 0.09062 mg/L 91 41 - 128 15 44 4-Chlorophenyl phenyl ether 0.100 0.09211 mg/L 92 38 - 145 14 36 4-Nitrophenol 0.100 0.04512 mg/L 45 13 - 129 15 79
Acenaphthene 0.100 0.09004 mg/L 90 60 - 132 13 29
Acenaphthylene 0.100 0.09409 mg/L 94 54 - 126 14 45
Anthracene 0.100 0.09493 mg/L 95 43 - 120 15 40
Benzidine 0.100 0.01744 J *- *1 mg/L 17 20 - 143 98 30
Benzo[a]anthracene 0.100 0.09519 mg/L 95 42 - 133 16 32 Benzo[a]pyrene 0.100 0.09435 mg/L 94 32 - 148 11 43
Benzo[b]fluoranthene 0.100 0.09372 mg/L 94 42 - 140 13 43 Benzo[g,h,i]perylene 0.100 0.1040 mg/L 104 1 - 195 18 61 Benzo[k]fluoranthene 0.100 0.09290 mg/L 93 25 - 146 13 38 Bis (2-chloroethoxy) methane 0.100 0.09491 mg/L 95 49 - 165 19 32 Bis(2-chloroethyl)ether 0.100 0.09479 mg/L 95 43 - 126 16 65 bis (2-chloroisopropyl) ether 0.100 0.09060 mg/L 91 63 - 139 12 46 Eurofins Calscience

Page 27 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 625.1 - Semivolatile Organic Compounds (GC/MS) (Continued) Client Sample ID: Lab Control Sample DupLab Sample ID: LCSD 570-480372/3-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481184 Prep Batch: 480372
Bis(2-ethylhexyl) phthalate 0.100 0.1093 mg/L 109 29 - 137 14 50 Analyte

LCSD LCSD
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits LimitRPD
RPD
Butyl benzyl phthalate 0.100 0.1016 mg/L 102
1 - 140 17 36
Chrysene 0.100 0.09280 mg/L 93 44 - 140 16 53
Dibenz(a,h)anthracene 0.100 0.1003 mg/L 100 1 - 200 11 75 Diethyl phthalate 0.100 0.09323 mg/L 93 1 - 120 13 60
Dimethyl phthalate 0.100 0.09830 mg/L 98 1 - 120 14 110 Di-n-butyl phthalate 0.100 0.09646 mg/L 96 8 - 120 13 28 Di-n-octyl phthalate 0.100 0.09963 mg/L 100 19 - 132 15 42 Fluoranthene 0.100 0.08513 mg/L 85 43 - 121 17 40
Fluorene 0.100 0.09070 mg/L 91 70 - 120 11 23
Hexachloro-1,3-butadiene 0.100 0.08710 mg/L 87 38 - 120 10 38 Hexachlorobenzene 0.100 0.09891 mg/L 99 8 - 142 15 33
Hexachlorocyclopentadiene 0.100 0.1288 mg/L 129 46 - 135 13 20 Hexachloroethane 0.100 0.07058 mg/L 71 55 - 120 13 32
Indeno[1,2,3-cd]pyrene 0.100 0.1038 mg/L 104 1 - 151 17 60 Isophorone 0.100 0.08714 mg/L 87 47 - 180 17 56
Naphthalene 0.100 0.08443 mg/L 84 36 - 120 14 39
Nitrobenzene 0.100 0.08558 mg/L 86 54 - 158 9 37
N-Nitrosodimethylamine 0.100 0.05972 *1 mg/L 60 38 - 120 21 20 N-Nitrosodi-n-propylamine 0.100 0.08918 mg/L 89 14 - 198 11 52 N-Nitrosodiphenylamine 0.100 0.1133 mg/L 113 79 - 127 5 20 Pentachlorophenol 0.100 0.1049 mg/L 105 38 - 152 17 52
Phenanthrene 0.100 0.09188 mg/L 92 65 - 120 13 24
Phenol 0.100 0.04154 mg/L 42 17 - 120 24 39
Pyrene 0.100 0.1069 mg/L 107 70 - 120 14 30
2,4,6-Tribromophenol (Surr) 33 - 139
Surrogate
100

LCSD LCSD
Qualifier Limits%Recovery
692-Fluorobiphenyl (Surr) 33 - 126
692-Fluorophenol (Surr) 12 - 120
72Nitrobenzene-d5 (Surr) 36 - 120
43Phenol-d6 (Surr) 10 - 120
87p-Terphenyl-d14 (Surr) 47 - 131
Method: 608.3 - Organochlorine Pesticides in Water
Client Sample ID: Method BlankLab Sample ID: MB 570-481537/1-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481489 Prep Batch: 481537
RL MDL
4,4'-DDD ND 0.0000067 0.0000044 mg/L 09/17/24 05:15 09/17/24 22:39 1 MB MB
Analyte Dil FacAnalyzedPreparedDUnitResult Qualifier
ND 0.00000190.0000033 mg/L 09/17/24 05:15 09/17/24 22:39 14,4'-DDE ND 0.00000160.0000033 mg/L 09/17/24 05:15 09/17/24 22:39 14,4'-DDT ND 0.00000310.0000033 mg/L 09/17/24 05:15 09/17/24 22:39 1Aldrin ND 0.0000008
3 0.000033 mg/L 09/17/24 05:15 09/17/24 22:39 1alpha-Chlordane ND 0.00000120.0000013 mg/L 09/17/24 05:15 09/17/24 22:39 1alpha-BHC ND 0.00000390.0000050 mg/L 09/17/24 05:15 09/17/24 22:39 1beta-BHC Eurofins Calscience

Page 28 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering West, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 608.3 - Organochlorine Pesticides in Water (Continued) Client Sample ID: Method BlankLab Sample ID: MB 570-481537/1-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481489 Prep Batch: 481537
RL MDL
Chlordane ND 0.000033 0.000025 mg/L 09/17/24 05:15 09/17/24 22:39 1 MB
MB
Analyte Dil FacAnalyzedPreparedDUnitResult Qualifier
ND 0.00000200.0000033 mg/L 09/17/24 05:15 09/17/24 22:39 1delta-BHC ND 0.00000130.0000033 mg/L 09/17/24 05:15 09/17/24 22:39 1Dieldrin ND 0.00000130.0000013 mg/L 09/17/24 05:15 09/17/24 22:39 1Endosulfan I ND 0.00000410.0000067 mg/L 09/17/24 05:15 09/17/24 22:39 1Endosulfan II ND 0.00000140.0000033 mg/L 09/17/24 05:15 09/17/24 22:39 1Endosulfan sulfate ND 0.00000230.0000033 mg/L 09/17/24 05:15 09/17/24 22:39 1Endrin ND 0.0000240.000033 mg/L 09/17/24 05:15 09/17/24 22:39 1Endrin aldehyde ND 0.00000210.0000033 mg/L 09/17/24 05:15 09/17/24 22:39 1Endrin ketone ND 0.00000870.000010 mg/L 09/17/24 05:15 09/17/24 22:39 1gamma-Chlordane ND 0.0000006
6 0.0000013 mg/L 09/17/24 05:15 09/17/24 22:39 1gamma-BHC (Lindane) ND 0.00000120.0000013 mg/L 09/17/24 05:15 09/17/24 22:39 1Heptachlor ND 0.00000390.0000067 mg/L 09/17/24 05:15 09/17/24 22:39 1Heptachlor epoxide ND 0.00000370.0000067 mg/L 09/17/24 05:15 09/17/24 22:39 1Methoxychlor ND 0.0000540.000067 mg/L 09/17/24 05:15 09/17/24 22:39 1Toxaphene Tetrachloro-m-xylene (Surr) 62 20 - 139 09/17/24 22:39 1 MB MB
Surrogate
09/17/24 05:15
Dil FacPrepared AnalyzedQualifier Limits%Recovery
84 09/17/24 05:15 09/17/24 22:39 1DCB Decachlorobiphenyl (Surr) 20 - 154 Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-481537/2-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481489 Prep Batch: 481537
4,4'-DDD 0.0000333 0.00002508 mg/L 75 31 - 141
Analyte

LCS LCS
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits
4,4'-DDE 0.0000333 0.00002368 mg/L 71 30 - 145
4,4'-DDT 0.0000333 0.00002399 mg/L 72 25 - 160
Aldrin 0.0000333 0.00002406 mg/L 72 42 - 140
alpha-Chlordane 0.0000333 0.00002378 J mg/L 71 45 - 140 alpha-BHC 0.0000333 0.00002303 mg/L 69 37 - 140
beta-BHC 0.0000333 0.00002406 mg/L 72 17 - 147
delta-BHC 0.0000333 0.00001904 mg/L 57 19 - 140
Dieldrin 0.0000333 0.00002438 mg/L 73 36 - 146
Endosulfan I 0.0000333 0.00002387 mg/L 72 45 - 153
Endosulfan II 0.0000333 0.00002440 mg/L 73 1 - 202
Endosulfan sulfate 0.0000333 0.00002443 mg/L 73 26 - 144 Endrin 0.0000333 0.00002443 mg/L 73 30 - 147
Endrin aldehyde 0.0000333 0.00002416 J mg/L 72 50 - 135 Endrin ketone 0.0000333 0.00002438 mg/L 73 60 - 140
gamma-Chlordane 0.0000333 0.00002242 mg/L 67 45 - 140
gamma-BHC (Lindane) 0.0000333 0.00002345 mg/L 70 32 - 140 Heptachlor 0.0000333 0.00002243 mg/L 67 34 - 140
Heptachlor epoxide 0.0000333 0.00002364 mg/L 71 37 - 142 Methoxychlor 0.0000333 0.00002317 mg/L 70 50 - 135
Eurofins Calscience

Page 29 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 608.3 - Organochlorine Pesticides in Water (Continued) Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-481537/2-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481489 Prep Batch: 481537
Tetrachloro-m-xylene (Surr) 20 - 139
Surrogate
62 LCS LCS
Qualifier Limits%Recovery
77DCB Decachlorobiphenyl (Surr) 20 - 154
Client Sample ID: Lab Control Sample DupLab Sample ID: LCSD 570-481537/3-A Matrix: Water Prep Type: T
otal/NA
Analysis Batch: 481489 Prep Batch: 481537
4,4'-DDD 0.0000333 0.00002535 mg/L 76 31 - 141 1 39
Analyte

LCSD LCSD
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits LimitRPD
RPD
4,4'-DDE 0.0000333 0.00002320 mg/L 70 30 - 145 2 35
4,4'-DDT 0.0000333 0.00002413 mg/L 72 25 - 160 1 42
Aldrin 0.0000333 0.00002270 mg/L 68 42 - 140 6 35
alpha-Chlordane 0.0000333 0.00002382 J mg/L 71 45 - 140 0 35 alpha-BHC 0.0000333 0.00002324 mg/L 70 37 - 140 1 36
beta-BHC 0.0000333 0.00002439 mg/L 73 17 - 147 1 44
delta-BHC 0.0000333 0.00002254 mg/L 68 19 - 140 17 52
Dieldrin 0.0000333 0.00002450 mg/L 74 36 - 146 1 49
Endosulfan I 0.0000333 0.00002342 mg/L 70 45 - 153 2 28 Endosulfan II 0.0000333 0.00002456 mg/L 74 1 - 202 1 53 Endosulfan sulfate 0.0000333 0.00002427 mg/L 73 26 - 144 1 38 Endrin 0.0000333 0.00002410 mg/L 72 30 - 147 1 48
Endrin aldehyde 0.0000333 0.00002438 J mg/L 73 50 - 135 1 25 Endrin ketone 0.0000333 0.00002493 mg/L 75 60 - 140 2 30 gamma-Chlordane 0.0000333 0.00002188 mg/L 66 45 - 140 2 35 gamma-BHC (Lindane) 0.0000333 0.00002321 mg/L 70 32 - 140 1 39 Heptachlor 0.0000333 0.00002778 mg/L 83 34 - 140 21 43
Heptachlor epoxide 0.0000333 0.00002512 mg/L 75 37 - 142 6 26 Methoxychlor 0.0000333 0.00002326 mg/L 70 50 - 135 0 25 Tetrachloro-m-xylene (Surr) 20 - 139
Surrogate
61 LCSD LCSD
Qualifier Limits%Recovery
83DCB Decachlorobiphenyl (Surr) 20 - 154
Method: 608.3 - Polychlorinated Biphenyls (PCBs) (GC)
Client Sample ID: Method BlankLab Sample ID: MB 570-481537/1-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 482222 Prep Batch: 481537
RL MDL
Aroclor-1016 ND 0.000067 0.000043 mg/L 09/17/24 05:15 09/18/24 15:50 1 MB MB
Analyte Dil FacAnalyzedPreparedDUnitResult Qualifier
ND 0.0000430.000067 mg/L 09/17/24 05:15 09/18/24 15:50 1Aroclor-1221 ND 0.0000430.000067 mg/L 09/17/24 05:15 09/18/24 15:50 1Aroclor-1232 ND 0.0000430.000067 mg/L 09/17/24 05:15 09/18/24 15:50 1Aroclor-1242 ND 0.0000430.000067 mg/L 09/17/24 05:15 09/18/24 15:50 1Aroclor-1248 ND 0.0000520.000067 mg/L 09/17/24 05:15 09/18/24 15:50 1Aroclor-1254 ND 0.0000520.000067 mg/L 09/17/24 05:15 09/18/24 15:50 1Aroclor-1260 Eurofins Calscience

Page 30 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 608.3 - Polychlorinated Biphenyls (PCBs) (GC) (Continued) Client Sample ID: Method BlankLab Sample ID: MB 570-481537/1-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 482222 Prep Batch: 481537
Tetrachloro-m-xylene (Surr) 75 20 - 139 09/18/24 15:50 1 MB MB
Surrogate
09/17/24 05:15
Dil FacPrepared AnalyzedQualifier Limits%Recovery
89 09/17/24 05:15 09/18/24 15:50
1DCB Decachlorobiphenyl (Surr) 20 - 154
Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-481537/4-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 482222 Prep Batch: 481537
Aroclor-1016 0.000133 0.0001864 mg/L 140 50 - 140
Analyte

LCS LCS
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits
Aroclor-1260 0.000133 0.0002337 *+ mg/L 175 8 - 140
Tetrachloro-m-xylene (Surr) 20 - 139
Surrogate
57 LCS LCS
Qualifier Limits%Recovery
95DCB Decachlorobiphenyl (Surr) 20 - 154
Client Sample ID: Lab Control Sample DupLab Sample ID: LCSD 570-481537/5-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 482222 Prep Batch: 481537
Aroclor-1016 0.000133 0.0001819 mg/L 136 50 - 140 2 36
Analyte

LCSD LCSD
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits LimitRPD
RPD
Aroclor-1260 0.000133 0.0002102 *+ mg/L 158 8 - 140 11 38 Tetrachloro-m-xylene (Surr) 20 - 139
Surrogate
60 LCSD LCSD
Qualifier Limits%Recovery
91DCB Decachlorobiphenyl (Surr) 20 - 154
Method: 6010B - Metals (ICP)
Client Sample ID: Method BlankLab Sample ID: MB 570-481166/1-A Matrix: Water Prep Type: Total Recoverable
Analysis Batch: 481454 Prep Batch: 481166
RL MDL
Arsenic ND 0.100 0.0199 mg/L 09/16/24 09:33 09/16/24 15:03 1 MB MB
Analyte Dil FacAnalyzedPreparedDUnitResult Qualifier
ND 0.003880.500 mg/L 09/16/24 09:33 09/16/24 15:03 1Boron ND 0.0006200.0100 mg/L 09/16/24 09:33 09/16/24 15:03 1Cadmium ND 0.002960.0500 mg/L 09/16/24 09:33 09/16/24 15:03 1Chromium ND 0.002690.0500 mg/L 09/16/24 09:33 09/16/24 15:03 1Copper ND 0.01310.500 mg/L 09/16/24 09:33 09/16/24 15:03 1Iron ND 0.005270.0500 mg/L 09/16/24 09:33 09/16/24 15:03 1Lead ND 0.001340.0500 mg/L 09/16/24 09:33 09/16/24 15:03 1Manganese ND 0.003910.0500 mg/L 09/16/24 09:33 09/16/24 15:03 1Molybdenum ND 0.003070.0500 mg/L 09/16/24 09:33 09/16/24 15:03 1Nickel ND 0.01620.0500 mg/L 09/16/24 09:33 09/16/24 15:03 1Selenium ND 0.002590.0100 mg/L 09/16/24 09:33 09/16/24 15:03 1Silver ND 0.01330.250 mg/L 09/16/24 09:33 09/16/24 15:03 1Zinc Eurofins Calscience

Page 31 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 6010B - Metals (ICP) (Continued)
Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-481166/2-A Matrix: Water Prep Type: Total Recoverable
Analysis Batch: 481454 Prep Batch: 481166
Arsenic 0.500 0.5005 mg/L 100 80 - 120
Analyte

LCS LCS
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits
Boron 0.500 0.5074 mg/L 101
80 - 120
Cadmium 0.500 0.5139 mg/L 103 80 - 120
Chromium 0.500 0.5161 mg/L 103 80 - 120
Copper 0.500 0.5129 mg/L 103 80 - 120
Iron 0.500 0.5200 mg/L 104 80 - 120
Lead 0.500 0.5166 mg/L 103 80 - 120
Manganese 0.500 0.5191 mg/L 104 80 - 120
Molybdenum 0.500 0.5102 mg/L 102 80 - 120
Nickel 0.500 0.5245 mg/L 105 80 - 120
Selenium 0.500 0.4820 mg/L 96 80 - 120
Silver 0.250 0.2514 mg/L 101 80 - 120
Zinc 0.500 0.5106 mg/L 102 80 - 120
Client Sample ID: Lab Control Sample DupLab Sample ID: LCSD 570-481166/3-A Matrix: Water Prep Type: Total Recoverable
Analysis Batch: 481454 Prep Batch: 481166
Arsenic 0.500 0.4694 mg/L 94 80 - 120 6 20
Analyte

LCSD LCSD
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits LimitRPD
RPD
Boron 0.500 0.4772 J mg/L 95 80 - 120 6 20
Cadmium 0.500 0.4836 mg/L 97 80 - 120 6 20
Chromium 0.500 0.4835 mg/L 97 80 - 120 7 20
Copper 0.500 0.4822 mg/L 96 80 - 120 6 20
Iron 0.500 0.4938 J mg/L 99 80 - 120 5 20
Lead 0.500 0.4848 mg/L 97 80 - 120 6 20
Manganese 0.500 0.4881 mg/L 98 80 - 120 6 20
Molybdenum 0.500 0.4826 mg/L 97 80 - 120 6 20
Nickel 0.500 0.4915 mg/L 98 80 - 120 6 20
Selenium 0.500 0.4604 mg/L 92 80 - 120 5 20
Silver 0.250 0.2366 mg/L 95 80 - 120 6 20
Zinc 0.500 0.4790 mg/L 96 80 - 120 6 20
Method: 7470A - Mercury (CVAA)
Client Sample ID: Method BlankLab Sample ID: MB 570-481286/1-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481331 Prep Batch: 481286
RL MDL
Mercury ND 0.000200 0.000124 mg/L 09/16/24 12:35 09/16/24 16:00 1 MB MB
Analyte Dil FacAnalyzedPreparedDUnitResult Qualifier
Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-481286/2-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481331 Prep Batch: 481286
Mercury 0.00800 0.007434 mg/L 93 80 - 120
Analyte

LCS LCS
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits
Eurofins Calscience

Page 32 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: 7470A - Mercury (CVAA) (Continued)
Client Sample ID: Lab Control Sample DupLab Sample ID: LCSD 570-481286/3-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481331 Prep Batch: 481286
Mercury 0.00800 0.007397 mg/L 92 80 - 120 1 10
Analyte

LCSD LCSD
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits LimitRPD
RPD
Method: 1664B - HEM and SGT-HEM
Client Sample ID: Method BlankLab Sample ID: MB 570-481 199/1-A
Matrix: Water Prep Type: Total/NA
Analysis Batch: 481335 Prep Batch: 481199
RL MDL
HEM: Oil and Grease ND 1.00 0.510 mg/L 09/16/24 10:01 09/16/24 13:41 1 MB MB
Analyte Dil FacAnalyzedPreparedDUnitResult Qualifier
ND 0.6361.00 mg/L 09/16/24 10:01 09/16/24 13:41 1HEM-SGT: Oil and Grease Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-481199/2-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481335 Prep Batch: 481199
HEM: Oil and Grease 40.0 32.20 mg/L 81 78 - 114
Analyte

LCS LCS
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits
HEM-SGT: Oil and Grease 20.0 13.40 mg/L 67 64 - 132
Client Sample ID: Lab Control Sample DupLab Sample ID: LCSD 570-481199/3-A Matrix: Water Prep Type: Total/NA
Analysis Batch: 481335 Prep Batch: 481199
HEM: Oil and Grease 40.0 36.00 mg/L 90 78 - 114 11 18
Analyte

LCSD LCSD
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits LimitRPD
RPD
HEM-SGT: Oil and Grease 20.0 13.70 mg/L 69 64 - 132 2 34 Method: SM 2540D - Solids, Total Suspended (TSS)
Client Sample ID: Method BlankLab Sample ID: MB 570-480511/1 Matrix: Water Prep Type: Total/NA
Analysis Batch: 480511
RL MDL
Total Suspended Solids ND 1.00 0.800 mg/L 09/13/24 09:55 1 MB MB
Analyte Dil FacAnalyzedPreparedDUnitResult Qualifier
Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-480511/2 Matrix: Water Prep Type: Total/NA
Analysis Batch: 480511
Total Suspended Solids 100 90.00 mg/L 90 77 - 116
Analyte

LCS LCS
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits
Client Sample ID: Lab Control Sample DupLab Sample ID: LCSD 570-480511/3 Matrix: Water Prep Type: Total/NA
Analysis Batch: 480511
Total Suspended Solids 100 98.00 mg/L 98 77 - 116 9 10
Analyte

LCSD LCSD
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits LimitRPD
RPD
Eurofins Calscience

Page 33 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Sample Results
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method: SM 2540D - Solids, Total Suspended (TSS) (Continued) Client Sample ID: MW-1Lab Sample ID: 570-198822-1 DU
Matrix: Water Prep Type: Total/NA
Analysis Batch: 480511
Total Suspended Solids 5060 4570 mg/L 10 10
Analyte
DU DU
DUnitResult Qualifier
Sample
Result
Sample
Qualifier LimitRPD
RPD
Method: SM 5210B - BOD, 5-Day
Client Sample ID: Lab Control SampleLab Sample ID: LCS 570-48031 1/3-A
Matrix: Water Prep Type: Total/NA
Analysis Batch: 482344 Prep Batch: 480311
Biochemical Oxygen Demand 199 204.7 mg/L 103 84.6 - 115. 4 Analyte

LCS LCS
DUnitResult Qualifier %Rec
Spike
Added
%Rec
Limits
Client Sample ID: Method BlankLab Sample ID: USB 570-482344/1 Matrix: Water Prep Type: Total/NA
Analysis Batch: 482344
RL MDL
Biochemical Oxygen Demand ND 2.00 1.00 mg/L 09/17/24 19:09 1

USB USB
Analyte Dil FacAnalyzedPreparedDUnitResult Qualifier
Eurofins Calscience

Page 34 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Association Summary
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861

GC/MS VOA
Analysis Batch: 480253
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water 624.1570-198822-1 MW-1 Total/NA
Water 624.1MB 570-480253/5 Method Blank Total/NA
Water 624.1LCS 570-480253/1002 Lab Control Sample Total/NA Water 624.1LCSD 570-480253/3 Lab Control Sample Dup Total/NA GC/MS Semi VOA
Prep Batch: 480372
Lab Sample ID Client Sample ID Prep T
ype Matrix Method Prep Batch
Water 625.1570-198822-1 MW-1 Total/NA
Water 625.1MB 570-480372/1-A Method Blank Total/NA
Water 625.1LCS 570-480372/2-A Lab Control Sample Total/NA Water 625.1LCSD 570-480372/3-A Lab Control Sample Dup Total/NA Analysis Batch: 481184
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water 625.1 480372570-198822-1 MW-1 Total/NA
Water 625.1 480372MB 570-480372/1-A Method Blank Total/NA Water 625.1 480372LCS 570-480372/2-A Lab Control Sample Total/NA Water 625.1 480372LCSD 570-480372/3-A Lab Control Sample Dup Total/NA GC Semi VOA
Analysis Batch: 481489
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water 608.3 481537MB 570-481537/1-A Method Blank Total/NA Water 608.3 481537LCS 570-481537/2-A Lab Control Sample Total/NA Water 608.3 481537LCSD 570-481537/3-A Lab Control Sample Dup Total/NA Prep Batch: 481537
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water 608570-198822-1 MW-1 Total/NA
Water 608MB 570-481537/1-A Method Blank Total/NA
Water 608LCS 570-481537/2-A Lab Control Sample Total/NA Water 608LCS 570-481537/4-A Lab Control Sample Total/NA Water 608LCSD 570-481537/3-A Lab Control Sample Dup Total/NA Water 608LCSD 570-481537/5-A Lab Control Sample Dup Total/NA Analysis Batch: 481970
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water 608.3 481537570-198822-1 MW-1 Total/NA
Water 608.3 481537570-198822-1 MW-1 Total/NA
Analysis Batch: 482222
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water 608.3 481537570-198822-1 MW-1 Total/NA
Water 608.3 481537MB 570-481537/1-A Method Blank Total/NA Water 608.3 481537LCS 570-481537/4-A Lab Control Sample Total/NA Water 608.3 481537LCSD 570-481537/5-A Lab Control Sample Dup Total/NA Eurofins Calscience

Page 35 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Association Summary
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Metals
Prep Batch: 481166
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water 3005A570-198822-1 MW-1 Total Recoverable
Water 3005AMB 570-481166/1-A Method Blank Total Recoverable Water 3005ALCS 570-481166/2-A Lab Control Sample T
otal Recoverable
Water 3005ALCSD 570-481166/3-A Lab Control Sample Dup Total Recoverable Prep Batch: 481286
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water 7470A570-198822-1 MW-1 Total/NA
Water 7470AMB 570-481286/1-A Method Blank Total/NA
Water 7470ALCS 570-481286/2-A Lab Control Sample Total/NA Water 7470ALCSD 570-481286/3-A Lab Control Sample Dup Total/NA Analysis Batch: 481331
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water 7470A 481286570-198822-1 MW-1 Total/NA
Water 7470A 481286MB 570-481286/1-A Method Blank Total/NA Water 7470A 481286LCS 570-481286/2-A Lab Control Sample Total/NA Water 7470A 481286LCSD 570-481286/3-A Lab Control Sample Dup Total/NA Analysis Batch: 481454
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water 6010B 481166570-198822-1 MW-1 Total Recoverable
Water 6010B 481166MB 570-481166/1-A Method Blank Total Recoverable Water 6010B 481166LCS 570-481166/2-A Lab Control Sample Total Recoverable Water 6010B 481166LCSD 570-481166/3-A Lab Control Sample Dup Total Recoverable General Chemistry
Prep Batch: 480311
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water BOD Prep570-198822-1 MW-1 Total/NA
Water BOD PrepLCS 570-480311/3-A Lab Control Sample Total/NA Analysis Batch: 480511
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water SM 2540D570-198822-1 MW-1 Total/NA
Water SM 2540DMB 570-480511/1 Method Blank Total/NA
Water SM 2540DLCS 570-480511/2 Lab Control Sample Total/NA Water SM 2540DLCSD 570-480511/3 Lab Control Sample Dup Total/NA Water SM 2540D570-198822-1 DU MW-1 Total/NA
Prep Batch: 481199
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water 1664B570-198822-1 MW-1 Total/NA
Water 1664BMB 570-481199/1-A Method Blank Total/NA
Water 1664BLCS 570-481199/2-A Lab Control Sample Total/NA Water 1664BLCSD 570-481199/3-A Lab Control Sample Dup Total/NA Analysis Batch: 481335
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water 1664B 481199570-198822-1 MW-1 Total/NA
Eurofins Calscience

Page 36 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 QC Association Summary
Job ID: 570-198822-1Client: Atlas Engineering West, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
General Chemistry (Continued)
Analysis Batch: 481335 (Continued)
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water 1664B 481199MB 570-481199/1-A Method Blank Total/NA Water 1664B 481199LCS 570-481199/2-A Lab Control Sample Total/NA W
ater 1664B 481199LCSD 570-481199/3-A Lab Control Sample Dup Total/NA Analysis Batch: 482344
Lab Sample ID Client Sample ID Prep Type Matrix Method Prep Batch Water SM 5210B 480311570-198822-1 MW-1 Total/NA
Water SM 5210BUSB 570-482344/1 Method Blank Total/NA
Water SM 5210B 480311LCS 570-480311/3-A Lab Control Sample Total/NA Eurofins Calscience

Page 37 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Lab Chronicle
Client: Atlas Engineering W
est, Inc. Job ID: 570-198822-1
Project/Site: Cannon St Lift Station, No. 24-05861
Client Sample ID: MW-1 Lab Sample ID: 570-198822-1
Matrix: WaterDate Collected: 09/11/24 08:40
Date Received: 09/12/24 18:00
Analysis 624.1 PT09/13/24 02:571 EET CAL 4480253
Type
Batch
Method
Batch
Prep Type LabAnalystRun
Prepared
or Analyzed
Initial
Amount Amount
Final
Batch
NumberFactor
Dil
Total/NA 5 mL 5 mL
Instrument ID: GCMSQQ
Prep 625.1 480372 09/13/24 05:17 H1SH EET CAL 4Total/NA 1044.7 mL 2 mL Analysis 625.1 1 481184 09/16/24 19:56 CG EET CAL 4Total/NA 1 mL 1 mL GCMSCCCInstrument ID:

Prep 608 481537 09/17/24 05:15 H1SH EET CAL 4Total/NA 1042.7 mL 1 mL Analysis 608.3 1 481970 09/18/24 12:53 N5Y3 EET CAL 4Total/NA 1 mL 1 mL GC54AInstrument ID:

Prep 608 481537 09/17/24 05:15 H1SH EET CAL 4Total/NA 1042.7 mL 1 mL Analysis 608.3 10 481970 09/18/24 14:18 N5Y3 EET CAL 4Total/NA 1 mL 1 mL GC54AInstrument ID:

Prep 608 481537 09/17/24 05:15 H1SH EET CAL 4Total/NA 1042.7 mL 1 mL Analysis 608.3 1 482222 09/18/24 16:44 P2HW EET CAL 4Total/NA 1 mL 1 mL GC64AInstrument ID:

Prep 3005A 481166 09/16/24 09:33 JP8N EET CAL 4Total Recoverable 50 mL 50 mL Analysis 6010B 1 481454 09/16/24 17:20 P1R EET CAL 4Total Recoverable 1.0 mL 1.0 mL ICP11Instrument ID:

Prep 7470A 481286 09/16/24 12:35 VCN7 EET CAL 4Total/NA 25 mL 50 mL Analysis 7470A 1 481331 09/16/24 16:39 RL6Q EET CAL 4Total/NA HG9Instrument ID:

Prep 1664B 481199 09/16/24 10:01 S7HP EET CAL 4Total/NA 1054 mL 1000 mL Analysis 1664B 1 481335 09/16/24 13:41 B8AH EET CAL 4Total/NA NO EQUIQInstrument ID:

Analysis SM 2540D 1 480511 09/13/24 09:55 DL2G EET CAL 4Total/NA 10 mL 1000 mL NOEQUIPInstrument ID:

Prep BOD Prep 480311 09/12/24 21:14 UT9T EET CAL 4Total/NA Analysis SM 5210B 1 482344 09/17/24 19:38 U7UR EET CAL 4Total/NA 300 mL 80 mL BOD3Instrument ID:

Laboratory References:

EET CAL 4 = Eurofins Calscience Tustin, 2841 Dow Avenue, Tustin, CA 92780, TEL (714)895-5494 Eurofins Calscience

Page 38 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Accreditation/Certification Summary
Client: Atlas Engineering West, Inc. Job ID: 570-198822-1 Project/Site: Cannon St Lift Station, No. 24-05861
Laboratory: Eurofins Calscience
Unless otherwise noted, all analytes for this laboratory were covered under each accreditation/certification below.

Authority Program Identification Number Expiration Date California State 3082 07-31-26
The following analytes are included in this report, but the laboratory is not certified by the governing authority. This list may include analytes for which the agency does not offer certification.

Analysis Method Prep Method Matrix Analyte
608.3 608 Water alpha-Chlordane
608.3 608 Water Endrin ketone
608.3 608 Water gamma-Chlordane
624.1 Water 1,1,1,2-Tetrachloroethane
624.1 Water 1,1,2-Trichloro-1,2,2-trifluoroethane
624.1 Water 1,1-Dichloropropene
624.1 W
ater 1,2,3-Trichlorobenzene
624.1 Water 1,2,3-Trichloropropane
624.1 Water 1,2,4-Trichlorobenzene
624.1 Water 1,2,4-Trimethylbenzene
624.1 Water 1,2-Dibromo-3-Chloropropane
624.1 Water 1,2-Dibromoethane
624.1 Water 1,3,5-Trimethylbenzene
624.1 Water 1,3-Dichloropropane
624.1 Water 2,2-Dichloropropane
624.1 Water 2-Chlorotoluene
624.1 Water 2-Hexanone
624.1 Water 4-Chlorotoluene
624.1 Water Bromobenzene
624.1 Water Bromochloromethane
624.1 Water Carbon disulfide
624.1 Water cis-1,2-Dichloroethene
624.1 Water Dibromomethane
624.1 Water Dichlorodifluoromethane
624.1 Water Di-isopropyl ether (DIPE)
624.1 Water Ethyl-t-butyl ether (ETBE)
624.1 Water Hexachloro-1,3-butadiene
624.1 Water Isopropanol
624.1 Water Isopropylbenzene
624.1 Water Methyl-t-Butyl Ether (MTBE)
624.1 Water Naphthalene
624.1 Water n-Butylbenzene
624.1 Water N-Propylbenzene
624.1 Water p-Isopropyltoluene
624.1 Water sec-Butylbenzene
624.1 Water Styrene
624.1 Water Tert-amyl-methyl ether (TAME)
624.1 Water tert-Butylbenzene
624.1 Water Vinyl acetate
Eurofins Calscience

Page 39 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Method Summary
Job ID: 570-198822-1Client: Atlas Engineering W
est, Inc.

Project/Site: Cannon St Lift Station, No. 24-05861
Method Method Description LaboratoryProtocol
EPA624.1 Volatile Organic Compounds (GC/MS) EET CAL 4
EPA625.1 Semivolatile Organic Compounds (GC/MS) EET CAL 4 EPA608.3 Organochlorine Pesticides in Water EET
CAL 4
EPA608.3 Polychlorinated Biphenyls (PCBs) (GC) EET CAL 4 SW8466010B Metals (ICP) EET CAL 4
SW8467470A Mercury (CVAA) EET CAL 4
1664B1664B HEM and SGT-HEM EET CAL 4
SMSM 2540D Solids, Total Suspended (TSS) EET CAL 4
SMSM 5210B BOD, 5-Day EET CAL 4
1664B1664B HEM and SGT-HEM (Aqueous) EET CAL 4
SW8463005A Preparation, Total Recoverable or Dissolved Metals EET CAL 4 EPA608 Liquid-Liquid Extraction (Separatory Funnel) EET CAL 4 40CFR136A625.1 Liquid-Liquid Extraction EET CAL 4
SW8467470A Preparation, Mercury EET CAL 4
SMBOD Prep Preparation, BOD EET CAL 4
Protocol References:
1664B = EP
A-821-98-002
40CFR136A = "Methods for Organic Chemical Analysis of Municipal Industrial Wastewater ", 40CFR, Part 136, Appendix A , October 26, 1984 and
subsequent revisions.

EPA = US Environmental Protection Agency
SM = "Standard Methods For The Examination Of Water And Wastewater" SW846 = "Test Methods For Evaluating Solid Waste, Physical/Chemical Methods", Third Edition, November 1986 And Its Updates.

Laboratory References:

EET
CAL 4 = Eurofins Calscience Tustin, 2841 Dow Avenue, Tustin, CA 92780, TEL (714)895-5494 Eurofins Calscience

Page 40 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Sample Summary
Client: Atlas Engineering West, Inc. Job ID: 570-198822-1 Project/Site: Cannon St Lift Station, No. 24-05861
Lab Sample ID Client Sample ID Matrix Collected Received 570-198822-1 MW-1 Water 09/11/24 08:40 09/12/24 18:00
Eurofins Calscience

Page 41 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15

Page 42 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Login Sample Receipt Checklist
Client: Atlas Engineering West, Inc. Job Number: 570-198822-1 Login Number: 198822
Question Answer Comment
Creator: Nguyen, Jenny
List Source: Eurofins Calscience
List Number: 1
N/ARadioactivity wasn't checked or is </= background as measured by a survey meter.

TrueThe cooler's custody seal, if present, is intact.

TrueSample custody seals, if present, are intact.

TrueThe cooler or samples do not appear to have been compromised or tampered with.

TrueSamples were received on ice.

TrueCooler Temperature is acceptable.

TrueCooler
Temperature is recorded.

TrueCOC is present.

TrueCOC is filled out in ink and legible.

TrueCOC is filled out with all pertinent information.

TrueIs the Field Sampler's name present on COC?
TrueThere are no discrepancies between the containers received and the COC.

TrueSamples are received within Holding Time (excluding tests with immediate HTs)
TrueSample containers have legible labels.

TrueContainers are not broken or leaking.

TrueSample collection date/times are provided.

TrueAppropriate sample containers are used.

TrueSample bottles are completely filled.

TrueSample Preservation Verified.

TrueThere is sufficient vol. for all requested analyses, incl. any requested MS/MSDs
TrueContainers requiring zero headspace have no headspace or bubble is <6mm (1/4").

TrueMultiphasic samples are not present.

TrueSamples do not require splitting or compositing.

N/AResidual Chlorine Checked.

Eurofins Calscience

Page 43 of 43 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Revised 6/12/18 Contract No. 5552 Page 1 of 138
City of Carlsbad

San Diego County

California

CONTRACT DOCUMENTS,

GENERAL PROVISIONS, SUPPLEMENTAL

PROVISIONS, AND TECHNICAL SPECIFICATIONS

FOR

CANNON LIFT STATION

IMPROVEMENTS

CONTRACT NO. 5552

BID NO. PWS25-3495UTIL

August 7, 2024

Revised 6/12/18 Contract No. 5552 Page 2 of 138

TABLE OF CONTENTS
Item Page

Notice Inviting Bids ..................................................................................................................... 7

Contractor's Proposal ................................................................................................................ 14

Listing of Manufacturers ............................................................................................................ 19

Bid Security Form ..................................................................................................................... 20

Bidder’s Bond to Accompany Proposal ..................................................................................... 21

Guide for Completing the “Designation of Subcontractors” Form .............................................. 22

Designation of Subcontractor and Amount of Subcontractor’s Bid Items .................................. 24

Bidder's Statement of Technical Ability and Experience ............................................................ 25

Bidder’s Certificate of Insurance for General Liability, Employers’ Liability, Automotive Liability and Workers’ Compensation ........................................................................................ 26

Bidder’s Statement Re Debarment ............................................................................................ 27

Bidder's Disclosure of Discipline Record …………………………………………… ...................... 28

Noncollusion Declaration to Be Executed by Bidder and Submitted with Bid ............................. 30

Contract Public Works ............................................................................................................... 31

Labor and Materials Bond ......................................................................................................... 38

Faithful Performance/Warranty Bond ........................................................................................ 40

Optional Escrow Agreement for Surety Deposits in Lieu of Retention ....................................... 42

Revised 6/12/18 Contract No. 5552 Page 3 of 138

GENERAL PROVISIONS

Section 1 Terms, Definitions Abbreviations and Symbols
1-1 Terms .......................................................... ..................................................... 45 1-2 Definitions .................................................... ..................................................... 45 1-3 Abbreviations ............................................... ..................................................... 51 1-4 Units of Measure .......................................... ..................................................... 54 1-5 Symbols ....................................................... ..................................................... 55

Section 2 Scope and Control of The Work
2-1 Award and Execution of Contract ................. ..................................................... 56 2-2 Assignment .................................................. ..................................................... 56 2-3 Subcontracts ................................................ ..................................................... 56 2-4 Contract Bonds ............................................ ..................................................... 57 2-5 Plans and Specifications .............................. ..................................................... 58 2-6 Work to be Done .......................................... ..................................................... 62 2-7 Subsurface Data .......................................... ..................................................... 63 2-8 Right-of-Way ................................................ ..................................................... 63 2-9 Surveying ..................................................... ..................................................... 63 2-10 Authority of Board and Engineer .................. ..................................................... 64 2-11 Inspection .................................................... ..................................................... 65

Section 3 Changes in Work
3-1 Changes Requested by the Contractor ........ ..................................................... 66 3-2 Changes Initiated by the Agency .................. ..................................................... 66 3-3 Extra Work ................................................... ..................................................... 67 3-4 Changed Conditions .................................... ..................................................... 70 3-5 Disputed Work ............................................. ..................................................... 71

Section 4 Control of Materials
4-1 Materials and Workmanship ......................... ..................................................... 77 4-2 Materials Transportation, Handling and Storage ................................................ 81

Section 5 Utilities
5-1 Location ....................................................... ..................................................... 82 5-2 Protection .................................................... ..................................................... 82 5-3 Removal ...................................................... ..................................................... 83 5-4 Relocation .................................................... ..................................................... 83 5-5 Delays .......................................................... ..................................................... 84 5-6 Cooperation ................................................. ..................................................... 84

Section 6 Prosecution, Progress and Acceptance of the Work 6-1 Construction Schedule and Commencement of Work ........................................ 85 6-2 Prosecution of Work ..................................... ..................................................... 87 6-3 Suspension of Work ..................................... ..................................................... 90 6-4 Default by Contractor ................................... ..................................................... 90 6-5 Termination of Contract................................ ..................................................... 91 6-6 Delays and Extensions of Time .................... ..................................................... 91 6-7 Time of Completion ...................................... ..................................................... 92 6-8 Completion, Acceptance, and Warranty ....... ..................................................... 93 6-9 Liquidated Damages .................................... ..................................................... 94 Revised 6/12/18 Contract No. 5552 Page 4 of 138
6-10 Use of Improvement During Construction .... ..................................................... 95

Section 7 Responsibilities of the Contractor
7-1 Contractor’s Equipment and Facilities .......... ..................................................... 96 7-2 Labor ........................................................... ..................................................... 96 7-3 Liability Insurance ........................................ ..................................................... 96 7-4 Workers' Compensation Insurance .............. ..................................................... 96 7-5 Permits ........................................................ ..................................................... 97 7-6 The Contractor’s Representative .................. ..................................................... 98 7-7 Cooperation and Collateral Work ................. ..................................................... 99 7-8 Project Site Maintenance ............................. ................................................... 100 7-9 Protection and Restoration of Existing Improvements ...................................... 103 7-10 Public Convenience and Safety ................... ................................................... 104 7-11 Patent Fees or Royalties .............................. ................................................... 111 7-12 Advertising ................................................... ................................................... 112 7-13 Laws to be Observed ................................... ................................................... 112 7-14 Antitrust Claims ............................................ ................................................... 112

Section 8 Facilities for Agency Personnel
8-1 General ........................................................ ................................................... 113

Section 9 Measurement and Payment
9-1 Measurement of Quantities for Unit Price Work ............................................... 114 9-2 Lump Sum Work .......................................... ................................................... 114 9-3 Payment ...................................................... ................................................... 114 9-4 Bid Items ...................................................... ................................................... 118

SUPPLEMENTAL PROVISIONS TO PARTS 2, 3, 4 AND 6 OF THE SSPWC

Part 2 Construction Materials

Section 200 Rock Materials
200-2 Untreated Base Materials ............................. ................................................... 122

Section 201 Concrete, Mortar and Related Materials
201-1 Portland Cement Concrete .......................... ................................................... 122

Section 203 Bituminous Materials
203-6 Asphalt Concrete ......................................... ................................................... 123

Section 213 Engineering Fabrics
213-5 Geotextiles and Geogrids ............................. ................................................... 124

Part 3 Construction Methods

Section 300 Earthwork
300-2 Unclassified Excavation ................................................................................... 125 300-12 Storm Water Pollution Prevention Plan ............................................................ 125

Section 301 Treated Soil, Subgrade Preparation and Placement of Base Materials 301-1 Subgrade Preparation ...................................................................................... 128

Section 302 Roadway Surfacing
302-5 Asphalt Concrete Pavement ............................................................................ 128 302-15 Public Convenience and Traffic Control ........................................................... 129 Revised 6/12/18 Contract No. 5552 Page 5 of 138

Section 303 Concrete and Masonry Construction
303-1 Concrete Structures ......................................................................................... 130 303-5 Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, And Driveways ....................................................................... 130

Section 306 Underground Conduit Construction
306-3 Open Trench Operations .................................................................................. 131 306-12 Backfill ............................................................................................................. 132 306-13 Trench Resurfacing .......................................................................................... 132

Part 4 Existing Improvements

Section 400 Protection and Restoration
400-1 General ............................................................................................................ 133 400-2 Permanent Survey Markers ............................................................................. 133 400-3 Payment .......................................................................................................... 133

Section 401 Removal
401-3 Concrete and Masonry Improvements ............................................................. 133

Part 6 Temporary Traffic Control

Section 601 Temporary Traffic Control for Construction and Maintenance Work Zones 601-1 General ............................................................................................................ 134 601-3 Temporary Traffic Control (TTC) Zone Devices ............................................... 134 601-4 Temporary Traffic Striping and Pavement Markings ......................................... 138 Revised 6/12/18 Contract No. 5552 Page 6 of 138

TECHNICAL SPECIFICATIONS

DIVISION 2 – SITE WORK
02960 Temporary Bypass Pumping

DIVISION 3 – CONCRETE
03461 Precast Concrete Manhole

DIVISION 5 – METALS
05500 Miscellaneous Metals

DIVISION 15 - MECHANICAL
15062 Pipe Sleeves and Penetrations
15610 Flow Meter

DIVISION 16 – ELECTRICAL
16000 General Electrical Requirements

APPENDICES
Appendix A SWPPP Template
Appendix B Geotechnical Investigation Report
Appendix C EWA Special Use Discharge Permit Application Documents Appendix D Cannon Lift Station As-Builts (for reference only) Appendix E CARB Fleet Compliance Certification

Revised 6/12/18 Contract No. 5552 Page 7 of 138

CITY OF CARLSBAD, CALIFORNIA

NOTICE INVITING BIDS

Until 11 a.m. on October 22 November 5, 2024, the City shall accept bids via electronic format via the City of Carlsbad Electronic Bidding Site, PlanetBids, which may be accessed at https://www.carlsbadca.gov/departments/finance/contracting-purchasing, for performing the work as follows: Demolition of existing flow meter and vault and installation of a new manhole, flow meter, plug valve, force main piping, and check valve replacements together with all surveying and construction staking, potholing, stormwater and non-stormwater pollution control, traffic control, sewer bypassing, temporary dewatering, excavation support systems, and incidental services for

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552
PWS25-3495UTIL

ELECTRONIC FORMAT RECEIPT AND OPENING OF BIDS: Bids will be received in electronic format (eBids) EXCLUSIVELY at the City of Carlsbad’s electronic bidding (eBidding) site, at: Contracting & Purchasing | Carlsbad, CA (carlsbadca.gov) and are due by the date and time shown on the cover of this solicitation.

BIDDERS MUST BE PRE-REGISTERED with the City’s bidding system and possess a system-assigned Digital ID in order to submit an electronic bid.

The City’s electronic bidding (eBidding) system will automatically track information submitted to the site including IP addresses, browsers being used and the URLs from which information was submitted. In addition, the City’s bidding system will keep a history of every login instance including the time of login, and other information about the user's computer configuration such as the operating system, browser type, version, and more. Because of these security features, Bidders who disable their browsers’ cookies will not be able to log in and use the City’s bidding system.

The City’s electronic bidding system is responsible for bid tabulations. Upon the bidder’s or proposer’s entry of their bid, t he system will ensure that all required fields are entered. The system will not accept a bid for which any required information is missing. This includes all necessary pricing, subcontractor listing(s) and any other essential documentation and supporting materials and forms requested or contained in these solicitation documents.

BIDS REMAIN SEALED UNTIL DUE DATE AND TIME
eBids are transmitted into the City’s bidding system via hypertext transfer protocol secure (https) mechanism using SSL 128-256-bit security certif icates issued from Verisign/Thawte which encrypts data being transferred from client to server. Bids submitted prior to the Due Date and Time are not available for review by anyone other than the submitter, who will have until the Due Date and Time to change, rescind or retrieve its bid should they desire to do so.

BIDS MUST BE SUBMITTED BY DUE DATE AND TIME

MUST BE SUBMITTED BY DUE DATE AND TIME
Once the deadline is reached, no further submissions are accepted into the system. Once the Due Date and Time has passed, bidders, proposers, the general public, and City staff are able Revised 6/12/18 Contract No. 5552 Page 8 of 138
to immediately see the results online. City staff may then begin reviewing the submissions for responsiveness, compliance and other issues.

RECAPITULATION OF THE WORK
Bids shall not contain any recapitulation of the Work. Conditional Bids may be rejected as being non-responsive. Alternative proposals will not be considered unless called for.

BIDS MAY BE WITHDRAWN by the Bidder prior to, but not after, the time set as Due Date and Time.

Important Note: Submission of the electronic bid into the system may not be instantaneous.

Due to the speed and capabilities of the user’s internet service provider (ISP), bandwidth, computer hardware and other variables, it may take time for the bidder’s submission to upload and be received by the City’s eBidding system. It is the bidder’s sole responsibility to ensure their bids are received on time by the City’s eBidding system. The City of Carlsbad is not responsible for bids that do not arrive by the Due Date and Time.

ELECTRONIC SUBMISSIONS CARRY FULL FORCE AND EFFECT
The Bidder, by submitting their electronic proposal, agrees to and certifies under penalty of perjury under the laws of the State of California, that the certification, forms and affidavits submitted as part of this proposal are true and correct. The bidder, by submitting its electronic bid, acknowledges that doing so carries the same force and full legal effect as a paper submission with a longhand (wet) signature. By submitting an electronic bid, the bidder certifies that the bidder has thoroughly examined and understands the entire Contract Documents (which consist of the plans and specifications, drawings, forms, affidavits and the solicitation documents), and that by submitting the eBid as its bid proposal, the bidder acknowledges, agrees to and is bound by the entire Contract Documents, including any addenda issued thereto, and incorporated by reference in the Contract Documents.

BIDS ARE PUBLIC RECORDS
Upon receipt by the City, bids shall become public records subject to public disclosure. It is the responsibility of the Bidder to clearly identify any confidential, proprietary, trade secret or otherwise legally privileged information contained within the proposal’s General references to sections of the California Public Records Act (PRA) will not suffice. If the Bidder does not provide applicable case law that clearly establishes that the requested information is exempt from the disclosure requirements of the PRA, the City shall be free to release the information when required in accordance with the PRA, pursuant to any other applicable law, or by order of any court or government agency, and the Bidder agrees to hold the City harmless for any such release of this information.

INSTRUCTIONS TO BIDDERS AND BID REQUIREMENTS
This bid and the terms of the Contract Documents and General Provisions constitute an irrevocable offer that shall remain valid and in full force for a period of 90 days and such additional time as may be mutually agreed upon by the City of Carlsbad and the Bidder.

No bid will be received unless it is made on a proposal form furnished by the Purchasing Department. Each bid must be accompanied by security in a form and amount required by law.

The bidder's security of the second and third next lowest responsive bidders may be withheld until the Contract has been fully executed. The security submitted by all other unsuccessful bidders shall be returned to them, or deemed void, within ten (10) days after the Contract is awarded. Pursuant to the provisions of law (Public C ontract Code section 10263), appropriate Revised 6/12/18 Contract No. 5552 Page 9 of 138
securities may be substituted for any obligation required by this notice or for any monies withheld by the City to ensure performance under this Contract. Section 10263 of the Public Contract Code requires monies or securities to be deposited with the City or a state or federally chartered bank in California as the escrow agent. The escrow agent shall maintain insurance to cover negligent acts and omissions of the agent in connection with the handling of retentions under this section in an amount not less than $100,000 per contract.

The City of Carlsbad may disqualify a contractor or subcontractor from participating in bidding when a contractor or subcontractor has been debarred by the City of Carlsbad or another jurisdiction in the State of California as an irresponsible bidder.

The work shall be performed in strict conformity with the plans, provisions, and specifications as approved by the City Council of the City of Carlsbad on file with the City Clerk’s Office. The specifications for the work include City of Carlsbad Technical Specifications and the 2021 Standard Specifications for Public Works Construction, Parts 2 - 8, all hereinafter designated “SSPWC”, as amended. Specification Reference is hereby made to the plans and specifications for full particulars and description of the work. The General Provisions (Part 1) to the SSPWC do not apply.

The City of Carlsbad encourages the participation of minority and women-owned businesses.

The City of Carlsbad encourages all bidders, suppliers, manufacturers, fabricators and contractors to utilize recycled and recyclable materials when available, appropriate and approved by the Engineer.

BID DOCUMENTS
The bid documents comprise the following documents which must be completed and properly executed including notarization, where indicated.

1. Contractor's Proposal

2. Bidder's Bond ( at time of Bid submit PDF copy via PlanetBids / All Bidders). Bid Bond (Original) within two (2) business days of bid Opening / three (3) Apparent Low Bidders.

3. Noncollusion Declaration

4. Designation of Subcontractor and Amount of Subcontractor’s Bid

5. Bidder's Statement of Technical Ability and Experience

6. Acknowledgement of Addendum(a)

7. Certificate of Insurance. The riders covering the City, its officials, employees and volunteers may be omitted at the time of bid submittal but shall be provided by the Bidder prior to award of this contract.

8. Bidder’s Statement Re Debarment

9. Bidder's Disclosure of Discipline Record

10. Listing of Manufacturers

11. CARB Fleet Compliance Certification (Appendix E)

12. Escrow Agreement for Security Deposits - (optional, must be completed if the Bidder wishes to use the Escrow Agreement for Security)

BIDDER’S GUARANTEE OF GOOD FAITH (BID SECURITY)
At the time of bid submission, bidders must upload and submit an electronic PDF copy of the aforementioned bid security. Whether in the form of a cashier's check, a properly certified check or an approved corporate surety bond payable to the City of Carlsbad, the bid security must be Revised 6/12/18 Contract No. 5552 Page 10 of 138
uploaded to the City’s eBidding system. Within two (2) business days after the bid opening date, the first three (3) apparent low bidders must provide the City with the original bid security.

Failure to submit the electronic version of the bid security at time of bid submission shall cause the bid to be rejected and deemed non-responsive. Only the three (3) apparent low bidders are required to submit original bid security to the City within two (2) business days after bid opening date. Failure to provide the original within two (2) business days may deem the bidder non- responsive.

ENGINEER’S ESTIMATE
All bids will be compared on the basis of the Engineer's Estimate. The estimated quantities are approximate and serve solely as a basis for the comparison of bids. The Engineer's Estimate is $690,000.

TIME OF COMPLETION
The Contractor shall complete the Work within the time set in the contract as defined in the General Provisions Section 6-7.

SPECIALTY CONTRACTORS:

ACCEPTABLE LICENSE TYPES
Except as provided herein a bid submitted to the City by a Contractor who is not licensed as a contractor pursuant to the Business and Professions Code shall be considered nonresponsive and shall be rejected by the City. In all contracts where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with California law. Where federal funds are involved the contractor shall be properly licensed at the time the contract is awarded. In all other cases the contractor shall state their license number, expiration date and classification in the proposal, under penalty of perjury. This invitation to bid does not use federal funds. The following classifications are acceptable for this contract: A - General Engineering.

ESCROW AGREEMENT
If the Contractor intends to utilize the escrow agreement included in the contract documents in lieu of the usual 5% retention from each payment, these documents must be completed and submitted with the signed contract. The escrow agreement may not be substituted at a later date.

OBTAINING PLANS AND SPECIFICATIONS
Sets of plans, various supplemental provisions, and Contract documents may be obtained from the City of Carlsbad website at https://www.carlsbadca.gov/departments/finance/contracting- purchasing Paper copies will not be sold.

INTENT OF PLANS AND SPECIFICATIONS
Any prospective bidder who is in doubt as to the intended meaning of any part of the drawings, specifications or other contract documents, or finds discrepancies in or omissions from the drawings and specifications may submit to the Engineer a written request for clarification or correction. Any response will be made only by a written addendum duly issued by the Engineer a copy of which will be mailed or delivered to each person receiving a set of the contract documents. No oral response will be made to such inquiry. Prior to the award of the contract, no addition to, modification of or interpretation of any provision in the contract documents will be given by any agent, employee or contractor of the City of Carlsbad Revised 6/12/18 Contract No. 5552 Page 11 of 138
except as hereinbefore specified. No bidder may rely on directions given by any agent, employee or contractor of the City of Carlsbad except as hereinbefore specified.

BIDDER’S INQUIRIES
Questions on the bid documents during the bid period shall be submitted in writing, via the eBidding website.

Questions shall be definite and certain and shall reference applicable drawing sheets, notes, details or specification sheets.

The cutoff date to submit questions is October 11 , 2024, at 5 p.m . No questions will be entertained after that date.

The answers to questions submitted during the bidding period will be published in an addendum and provided to those bidding on the project no later than October 17, 2024.

REJECTION OF BIDS
The City of Carlsbad reserves the right to reject any or all bids and to waive any minor irregularity or informality in such bids.

PREVAILING WAGE TO BE PAID
The general prevailing rate of wages for each craft or type of worker needed to execute the Contract shall be those as determined by the Director of Industrial Relations pursuant to the sections 1770, 1773, and 1773.1 of the Labor Code. Pursuant to section 1773.2 of the Labor Code, a current copy of applicable wage rates is on file in the Office of the City Engineer. The Contractor to whom the Contract is awarded shall not pay less than the said specified prevailing rates of wages to all workers employed by him or her in the execution of the Contract.

The Prime Contractor shall be responsible for insuring compliance with provisions of section 1777.5 of the Labor Code and section 4100 et seq. of the Public Contracts Code, "Subletting and Subcontracting Fair Practices Act." The City Engineer is the City’s "duly authorized officer" for the purposes of section 4107 and 4107.5.

The provisions of Part 7, Chapter 1, of the Labor Code commencing with section 1720 shall apply to the Contract for work.

A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

The Prime Contractor and all subcontractors shall comply with Section 1776 of the Labor Code, which generally requires keeping accurate payroll records, verifying and certifying payroll records, and making them available for inspection. Contractor shall require all subcontractors to comply with Section 1776.

CALIFORNIA AIR RESOURCES BOARD (CARB) ADVANCED CLEAN FLEETS

REGULATIONS
Contractor’s vehicles with a gross vehicle weight rating greater than 8,500 lbs. and light -duty package delivery vehicles operated in California may be subject to the California Air Resources Revised 6/12/18 Contract No. 5552 Page 12 of 138
Board (CARB) Advanced Clean Fleets regulations. Such vehicles may therefore be subject to requirements to reduce emissions of air pollutants. For more information, please see Appendix E and visit the CARB Advanced Clean Fleets webpage at https://ww2.arb.ca.gov/our- work/programs/advanced-clean-fleets.

MANDATORY PRE-BID MEETING
A mandatory pre-bid meeting will be held at the project site at 2201 Cannon Road (600 feet east of the intersection with Hemingway Drive), Carlsbad, CA on October 3, 2024, at 10 a.m.

Bidders will be provided access to the facility and representatives of the Agency will be present.

Questions asked by Bidders at the Pre -Bid Meeting not specifically addressed within the Contract Documents shall be answered in writing and shall be sent to all Bidders present at the Pre-Bid Meeting and be posted on the online bidding portal.

UNIT PRICES AND COMPUTATION OF BIDS
All bids are to be computed on the basis of the given estimated quantities of work, as indicated in this proposal, times the unit price as submitted by the bidder.

ADDENDA
Bidders are advised to verify the issuance of all addenda and receipt thereof one day prior to bidding. Submission of bids without acknowledgment of addenda may be cause of rejection of bid.

BOND AND INSURANCE REQUIREMENTS
The Contractor shall provide bonds to secure faithful performance and warranty of the work in an amount equal to one hundred percent (100%) of the Contract price on this project. The Contractor shall provide bonds to secure payment of laborers and materials suppliers, in an amount equal to one hundred percent (100%) of the total amount payable by the terms of the contract. These bonds shall be kept in full force and effect during the course of this project and shall extend in full force and effect and be retained by the City until they are released as stated in the General Provisions section of this contract. All bonds are to be placed with a surety insurance carrier admitted and authorized to transact the business of insurance in California and whose assets exceed their liabilities in an amount equal to or in excess of the amount of the bond. The bonds are to be accompanied by the following documents:

1. An original, or a certified copy, of the unrevoked appointment, power of attorney, by laws, or other instrument entitling or authorizing the person who executed the bond to do so.

2. A certified copy of the certificate of authority of the insurer issued by the insurance commissioner.

If the bid is accepted, the City may require copies of the insurer's most recent annual statement and quarterly statement filed with the Department of Insurance pursuant to Article 10 (commencing with section 900) of Chapter 1 of Part 2 of Division 1 of the Insurance Code, within 10 calendar days of the insurer's receipt of a request to submit the statements.

Insurance is to be placed with insurers that:

1. Have a rating in the most recent Best's Key Rating Guide of at least A-:VII

2. Are admitted and authorized to transact the business of insurance in the State of California by the Insurance Commissioner.

Revised 6/12/18 Contract No. 5552 Page 13 of 138
September 11, 2024
Auto policies offered to meet the specification of this contract must:

1. Meet the conditions stated above for all insurance companies.

2. Cover any vehicle used in the performance of the contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-scheduled.

Workers' compensation insurance required under this contract must be offered by a company meeting the above standards with the exception that the Best's rating condition is waived. The City does accept policies issued by the State Compensation Fund meeting the requirement for workers' compensation insurance.

The Contractor shall be required to maintain insurance as specified in the Contract. Any additional cost of said insurance shall be included in the bid price.

The award of the contract by the City is contingent upon the Contractor submitting the required bonds and insurance, as described in the contract, within twenty days of bid opening. If the Contractor fails to comply with these requirements, the City may award the contract to the second or third lowest bidder and the bid security of the lowest bidder may be forfeited.

BUSINESS LICENSE
The prime contractor and all subcontractors are required to have and maintain a valid City of Carlsbad Business License for the duration of the contract.

Approved by the City Council of the City of Carlsbad , California, by Resolution No. 2024-210, adopted on the 10th day of September 2024.

Date Graham Jordan, Deputy Clerk

Revised 6/12/18 Contract No. 5552 Page 14 of 138

CITY OF CARLSBAD

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

CONTRACTOR'S PROPOSAL

City Council
City of Carlsbad
1200 Carlsbad Village Drive
Carlsbad, California 92008

The undersigned declares he/she has carefully examined the location of the work, read the Notice Inviting Bids, examined the Plans, Specifications, General Provisions, Contract Documents, and addenda thereto, and hereby proposes to furnish all labor, materials, equipment, and incidental services required to do all the work to complete Contract No. 5552 in accordance with the Plans, Specifications, General Provisions, Contract Documents, and addenda thereto and that he/she will take in full payment therefore the following unit prices for each item complete, to wit (refer to Section 9-4 for bid item descriptions):

SCHEDULE “A”

Item
No. Description
Approximate
Quantity
And Unit
Unit Price
(Figures)

Total Amount
(Figures)

1 Mobilization and Preparatory
Work (not to exceed 5% of
Total Bid)
LS $___________

2 Temporary Traffic Control LS $___________

3 Preconstruction Survey LS $___________

4 Storm Water Pollution Control
(SWPPP)
LS $___________

5 Utility Locating and Potholing LS $___________

6 Excavation Support System LS $___________

7 Dewatering LS $___________

8 Force Main Dewatering LS $___________

9 Demolition LS $___________

10 Temporary Sewer Bypass LS $___________

Revised 6/12/18 Contract No. 5552 Page 15 of 138
Item
No. Description
Approximate
Quantity
And Unit
Unit Price
(Figures)

Total Amount
(Figures)
11 Construct 8’ Diameter Manhole LS $___ ________

12 Ove r-excavation and Backfill 20 CY $___ ________ $___ ________

13 Furnish and Install HDPE Pipe
and Fittings
LS $___________

14 Furnish and Install Flow Mete r 1 E A $___ ________ $___ ________

15 Furnish and Install 14” Plug
Valve
1 EA $___________ $___________

16 Furnish and Install 10” Plug
Valve
3 EA $___________ $___________

17 Furnish and Install 10” Check
Valve
3 EA $___________ $___________

18 Furnish and Install Electrical
and Instrumentation
Improvements
1 LS $___________

19 Furnish and Install Aggregate
Base
1 LS $___________

20 Furnish and Install Asphalt
Concrete
1 LS $___________

21 Seal Coat Existing Driveway 5,400 SF $___________ $___________

Total amount of bid (in figures) for Schedule “A”: $

Total amount of bid (in words) for Schedule “A”:

The City shall determine the low bid based on the sum of Schedule “A”.

Price(s) given above are firm for 90 days after the date of bid opening.

Addendum(a) No(s). ___________________ has/have been received and is/are included in this proposal.

The Undersigned has carefully checked all of the above figures and understands that the City will not be responsible for any error or omission on the part of the Undersigned in preparing this bid.

Revised 6/12/18 Contract No. 5552 Page 16 of 138
The Undersigned agrees that in case of default in executing the required Contract with necessary bonds and insurance policies within twenty (20) days from the date of award of Contract by the City Council of the City of Carlsbad, the City may administratively authorize award of the contract to the second or third lowest bidder and the bid security of the lowest bidder may be forfeited.

The Undersigned bidder declares, under penalty of perjury, that the undersigned is licensed to do business or act in the capacity of a contractor within the State of California, validly licensed under license number _________________________, classification ________________ which expires on _____________________, and Department of Industrial Relations PWC registration number ___________________________________ which expires on ____________________, and that this statement is true and correct and has the legal effect of an affidavit.

A bid submitted to the City by a Contractor who is not licensed as a contractor pursuant to the Business and Professions Code shall be considered nonresponsive and shall be rejected by the City § 7028.15(e). In all contracts where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with California law.

However, at the time the contract is awarded, the contractor shall be properly licensed.

The Undersigned bidder hereby represents as follows:

1. That no Council member, officer agent, or employee of the City of Carlsbad is personally interested, directly or indirectly, in this Contract, or the compensation to be paid hereunder; that no representation, oral or in writing, of the City Council, its officers, agents, or employees has inducted him/her to enter into this Contract, excepting only those contained in this form of Contract and the papers made a part hereof by its terms; and

2. That this bid is made without connection with any person, firm, or corporation making a bid for the same work, and is in all respects fair and without collusion or fraud.

Accompanying this proposal is ______________________________ (Cash, Certified Check, Bond or Cashier's Check) for ten percent (10%) of the amount bid.

The Undersigned is aware of the provisions of section 3700 of the Labor Code which requires every employer to be insured against liability fo r workers' compensation or to undertake self- insurance in accordance with the provisions of that code and agrees to comply with such provisions before commencing the performance of the work of this Contract and continue to comply until the contract is complete.

The Undersigned is aware of the provisions of the Labor Code, Part 7, Chapter 1, Article 2, relative to the general prevailing rate of wages for each craft or type of worker needed to execute the Contract and agrees to comply with its provisions.

Revised 6/12/18 Contract No. 5552 Page 17 of 138
IF A SOLE OWNER OR SOLE CONTRACTOR SIGN HERE:

(1) Name under which business is conducted _______________________________________

(2) Signature (given and surname) of proprietor ______________________________________

(3) Place of Business __________________________________________________________ (Street and Number)
City and State _____________________________________________________________

(4) Zip Code ___________________ Telephone No. _________________________________

(5) E-Mail ___________________________________________________________________

IF A PARTNERSHIP, SIGN HERE:

(1) Name under which business is conducted _______________________________________

(2) Signature (given and surname and character of partner) (Note: Signature must be made by a general partner)

_________________________________________________________________________

_________________________________________________________________________

(3) Place of Business __________________________________________________________ (Street and Number)
City and State _____________________________________________________________

(4) Zip Code ___________________ Telephone No. _________________________________

(5) E-Mail ___________________________________________________________________

Revised 6/12/18 Contract No. 5552 Page 18 of 138
IF A CORPORATION, SIGN HERE:

(1) Name under which business is conducted _______________________________________

__________________________________________________________________________

(2) _________________________________________________________________________ (Signature)

____________________________________________________________________________ (Title)

Impress Corporate Seal here

(3) Incorporated under the laws of the State of _______________________________________

(4) Place of Business __________________________________________________________ (Street and Number)
City and State _____________________________________________________________

(5) Zip Code _____________________ Telephone No. _______________________________

(6) E-Mail ___________________________________________________________________

NOTARIAL ACKNOWLEDGMENT OF EXECUTION BY ALL SIGNATORIES MUST BE

ATTACHED

List below names of president, vice president, secretary and assistant secretary, if a corporation; if a partnership, list names of all general partners, and managing partners:

____________________________________ ___________________________________

____________________________________ ___________________________________

____________________________________ ___________________________________

____________________________________ ___________________________________

____________________________________ ___________________________________

____________________________________ ___________________________________

____________________________________ ___________________________________

____________________________________ ___________________________________ Revised 6/12/18 Contract No. 5552 Page 19 of 138

LISTING OF MANUFACTURERS
(To Accompany Proposal)

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

The Contractor shall submit this completed form with the bid to identify the products, equipment, or materials and their manufacturers proposed for use in the Work. If the Contractor elects to list products, equipment, or materials not listed in the Specifications, Plans, or Carlsbad Engineering Standards, the Contractor shall provide substantiating data to demonstrate that the substitute products, equipment, or materials are of equal quality, durability, functional character, and efficiency as determined by the Engineer . Only one manufacturer shall be listed for each item.

Item or Material
Manufacturer

Substitutions for products, equipment, or materials listed above shall be allowed only if submitted for approval at least two weeks prior to the Bid Due Date or, for products, equipment, or materials not listed above, in accordance with Article 4-1.6 of the General Provisions and within 35 calendar days following Contract award.

Revised 6/12/18 Contract No. 5552 Page 20 of 138

BID SECURITY FORM
(Check to Accompany Bid)

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

(NOTE: The following form shall be used if check accompanies bid.)

Accompanying this proposal is a *Certified *Cashier’s check payable to the order of City of Carlsbad, in the sum of _______________________________________ dollars ($________________), this amount being ten percent (10%) of the total amount of the bid. The proceeds of this check shall become the property of the City provided this proposal shall be accepted by the City through action of its legally constituted contracting authorities and the undersigned shall fail to execute a contract and furnish the required Performance, Warranty and Payment Bonds and proof of insurance coverage within the stipulated time; otherwise, the check shall be returned to the undersigned. The proceeds of this check shall also become the property of the City if the undersigned shall withdraw his or her bid within the period of fifteen (15) days after the date set for the opening thereof, unless otherwise required by law, and notwithstanding the award of the contract to another bidder.

_______________________________________

_______________________________________
BIDDER

_________________
*Delete the inapplicable word.

(NOTE: If the Bidder desires to use a bond instead of check, the Bid Bond form on the following pages shall be executed--the sum of this bond shall be not less than ten percent (10%) of the total amount of the bid.)
Revised 6/12/18 Contract No. 5552 Page 21 of 138

BIDDER'S BOND TO ACCOMPANY PROPOSAL

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

KNOW ALL PERSONS BY THESE PRESENTS:

That we, _______________________________________________________, as Principal, and _____________________________________, as Surety are held and firmly bound unto the City of Carlsbad, California, in an amount as follows: (must be at least ten percent (10%) of the bid amount) __________________________ for which payment, well and truly made, we bind ourselves, our heirs, executors and administrators, successors or assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THE FOREGOING OBLIGATION IS SUCH that if the proposal of the above-bounden Principal for:

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

in the City of Carlsbad, is accepted by the City Council, and if the Principal shall duly enter into and execute a Contract including required bonds and insurance policies within twenty (20) days from the date of award of Contract by the City Council of the City of Carlsbad, being duly notified of said award, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect, and the amount specified herein shall be forfeited to the said City.

In the event Principal executed this bond as an individual, it is agreed that the death of Principal shall not exonerate the Surety from its obligations under this bond.

SIGNED AND SEALED, this ____________ day of ___________________________, 20_____

________________________________(SEAL) _____________________________(SEAL) (Principal) (Surety)

By: __________________________________ By: ________________________________ (Signature) (Signature)

__________________________________ ________________________________ (Print Name/Title) (Print Name/Title)

(SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETY – ATTACH ATTORNEY-IN-FACT

CERTIFICATE)

APPROVED AS TO FORM:

CINDIE K. McMAHON
City Attorney

By: __________________________________
Assistant City Attorney
Revised 6/12/18 Contract No. 5552 Page 22 of 138

GUIDE FOR COMPLETING
THE “DESIGNATION OF SUBCONTRACTORS” FORM

REFERENCES Prior to preparation of the following “Subcontractor Disclosure Form” Bidders are urged to review the definitions in section 1-2 of the General Provisions to this Contract, especially, “Bid”, “Bidder”, “Contract”, “Contractor”, “Contract Price”, “Contract Unit Price”, “Engineer”, “Own Organization”, “Subcontractor”, and “Work”. Bidders are further urged to review sections 2-3 SUBCONTRACTS of the General Provisions.

CAUTIONS This form will be used by the Agency to determine the percentage of work that the Bidder proposes to perform. Bidders are cautioned that failure to provide complete and correct information may result in rejection of the bid as non-responsive. Any bid that proposes performance of more than 50 percent of the work by subcontractors or otherwise to be performed by forces other than the Bidder’s own organization will be rejected as non- responsive. Specialty items of work that may be so designated by the Engineer on the “Contractor’s Proposal” are not included in computing the percentage of work proposed to be performed by the Bidder.

INSTRUCTIONS The Bidder shall set forth the name and location of business of each and every subcontractor whom the Bidder proposes to perform work or labor or render service in or about the work or improvement, and every subcontractor licensed as a contractor by the State of California whom the Bidder proposes to specially fabricate and install any portion of the work or improvement according to detailed drawings contained in the plans and specifications in excess of one-half of one percent (0.5%) of the Bidder’s total bid or, in the case of bids or offers for the construction of streets and highways, including bridges, in excess of one-half of one percent (0.5%) or ten thousand dollars ($10,000) whichever is greater. Said name(s) and location(s) of business of subcontractor(s) shall be set forth and included as an integral part of the bid offer.

The Designation of Subcontractors form must be submitted as a part of the Bidder’s sealed bid.

Failure to provide complete and correct information may result in rejection of the bid as non- responsive.

Suppliers of materials from sources outside the limits of work are not subcontractors. The value of materials and transport of materials from sources outside the limits of work, as shown on the plans, shall be assigned to the Contractor or the Subcontractor as the case may be, that the Bidder proposes as installer of said materials. The value of material incorporated in any Subcontractor-installed bid item that is supplied by the Bidder shall be included as a part of the work that the Bidder proposes to be performed by the Subcontractor installing said item.

When a Subcontractor has a Carlsbad business license, the number must be entered on the proper form. If the Subcontractor does not have a valid business license, enter “NONE” in the appropriate space.

When the Bidder proposes using a Subcontractor to construct or install less than 100 percent of a bid item, the Bidder shall attach an explanation sheet to the Designation of Subcontractor form. The explanation sheet shall clearly apprise the City of the specific facts that show the Bidder proposes to perform no less than fifty percent (50%) of the work with its own forces.

Revised 6/12/18 Contract No. 5552 Page 23 of 138
Determination of the subcontract amounts for purposes of award of the contract shall be determined by the City Council in conformance with the provisions of the contract documents and the various supplemental provisions. The decision of the City Council shall be final.

Contractor is prohibited from performing any work on this project with a subcontractor who is ineligible to perform work on a public works project pursuant to Labor Code Sections 1771.1 or 1777.7.

Bidders shall make any additional copies of the disclosure forms as may be necessary to provide the required information. The page number and total number of additional form pages shall be entered in the location provided on each type of form so duplicated.

Revised 6/12/18 Contract No. 5552 Page 24 of 138

DESIGNATION OF SUBCONTRACTOR AND

AMOUNT OF SUBCONTRACTOR'S BID ITEMS
(To Accompany Proposal)

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

The Bidder certifies that it has used the sub-bid of the following listed subcontractors in preparing this bid for the Work and that the listed subcontractors will be used to perform the portions of the Work as designated in this list in accordance with applicable provisions of the specifications and section 4100 et seq. of the Public Contract Code, "Subletting and Subcontracting Fair Practices Act." The Bidder further certifies that no additional subcontractor will be allowed to perform any portion of the Work in excess of one-half of one percent (0.5%) of the Bidder’s total bid, or in the case of bids or offers for construction of streets and highways, including bridges, in excess of one-half of one percent (0.5%) or ten thousand dollars ($10,000), whichever is greater, and that no changes in the subcontractors listed work will be made except upon the prior approval of the Agency.

SUBCONTRACTOR’S BID ITEMS
Portion of
Work
Subcontractor Name and
Location of Business
Phone No.
and Email
Address
DIR
Registration
No.

Subcontractor’s
License No. and
Classification*
Amount of
Work by
Subcontractor
in Dollars*

Page _____ of _____ pages of this Subcontractor Designation form

_________________

* Pursuant to section 4104 (a)(3)(A) California Public Contract Code, receipt of the information preceded by an asterisk may be submitted by the Bidder up to 24 hours after the deadline for submitting bids contained in the “Notice Inviting Bids.” Revised 6/12/18 Contract No. 5552 Page 25 of 138

BIDDER'S STATEMENT OF

TECHNICAL ABILITY AND EXPERIENCE
(To Accompany Proposal)

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

The Bidder is required to state what work of a similar character to that included in the proposed Contract he/she has successfully performed and give references, with telephone numbers, which will enable the City to judge his/her responsibility, experience and skill. An attachment can be used.

The bidder shall demonstrate at least five years of experience successfully completing at least five projects involving sewer lift station mechanical, HDPE electrofusion, and electrical improvements with a value of $1,000,000 or greater and similar in scope to the Work of this Contract. Bidder must also submit the qualifications of its Representatives in accordance with Section 7-6. The proposal shall be deemed non-responsive if the required technical ability and experience for the Bidder or its representative is not demonstrated.

Date Contract
Completed
Name and Address
of the Employer
Name and Phone
No. of Person to
Contract
Type of Work Amount of
Contract

Revised 6/12/18 Contract No. 5552 Page 26 of 138
BIDDER’S CERTIFICATE OF INSURANCE FOR
GENERAL LIABILITY, EMPLOYERS’ LIABILITY,

AUTOMOTIVE
LIABILITY AND WORKERS’ COMPENSATION
(To Accompany Proposal)

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

As a required part of the Bidder’s proposal the Bidder must attach either of the following to this page.

1) Certificates of insurance showing conformance with the requirements herein for each of:

Comprehensive General Liability

Automobile Liability

Workers Compensation

Employer’s Liability

2) Statement with an insurance carrier’s notarized signature stating that the carrier can, and upon payment of fees and/or premiums by the Bidder, will issue to the Bidder Policies of insurance for Comprehensive General Liability, Automobile Liability, Workers Compensation and Employer’s Liability in conformance with the requirements herein and Certificates of insurance to the Agency showing conformance with the requirements herein.

All certificates of insurance and statements of willingness to issue insurance for auto policies offered to meet the specification of this contract must:

1) Meet the conditions stated in The Notice Inviting Bids and the General Provisions for this project for each insurance company that the Contractor proposes.

2) Cover any vehicle used in the performance of the contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-scheduled.

Revised 6/12/18 Contract No. 5552 Page 27 of 138

BIDDER'S STATEMENT RE DEBARMENT
(To Accompany Proposal)

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

1) Have you or any of your subcontractors ever been debarred as an irresponsible bidder by another jurisdiction in the State of California?

______ ______
yes no

2) If yes, what was/were the name(s) of the agency(ies) and what was/were the period(s) of debarment(s)? Attach additional copies of this page to accommodate more than two debarments.

party debarred

agency

period of debarment

party debarred

agency

period of debarment

BY CONTRACTOR:

(name of Contractor)

By:
(sign here)

(print name/title)

Page _____ of _____ pages of this Re Debarment form

Revised 6/12/18 Contract No. 5552 Page 28 of 138

BIDDER'S DISCLOSURE OF DISCIPLINE RECORD
(To Accompany Proposal)

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within 10 years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.

1) Have you ever had your contractor’s license suspended or revoked by the California Contractors’ State License Board two or more times within an eight year period?

______ ______
yes no

2) Has the suspension or revocation of your contractor’s license ever been stayed?

______ ______
yes no

3) Have any subcontractors that you propose to perform any portion of the Work ever had their contractor’s license suspended or revoked by the California Contractors’ State License Board two or more times within an eight year period?

______ ______
yes no

4) Has the suspension or revocation of the license of any subcontractor’s that you propose to perform any portion of the Work ever been stayed?
______ ______
yes no

5) If the answer to either of 1. or 3. above is yes fully identify, in each and every case, the party disciplined, the date of and violation that the disciplinary action pertains to, describe the nature of the violation and the disciplinary action taken therefore.

(If needed attach additional sheets to provide full disclosure.)

Page _____ of _____ pages of this Disclosure of Discipline form

Revised 6/12/18 Contract No. 5552 Page 29 of 138

BIDDER'S DISCLOSURE OF DISCIPLINE RECORD
(CONTINUED)
(To Accompany Proposal)

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

6) If the answer to either of 2. or 4. above is yes fully identify, in each and every case, the party whose discipline was stayed, the date of the violation that the disciplinary action pertains to, describe the nature of the violation and the condition (if any) upon which the disciplinary action was stayed.

(If needed attach additional sheets to provide full disclosure.)

BY CONTRACTOR:

(name of Contractor)

By:
(sign here)

(print name/title)

Page _____ of _____ pages of this Disclosure of Discipline form

Revised 6/12/18 Contract No. 5552 Page 30 of 138

NONCOLLUSION DECLARATION TO BE EXECUTED BY

BIDDER AND SUBMITTED WITH BID
PUBLIC CONTRACT CODE SECTION 7106

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

The undersigned declares:

I am the ____________ of ______________, the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ___________________________, 20____ at _________ [city], ________ [state].

________________________________________________
Signature of Bidder

Revised 6/12/18 Contract No. 5552 Page 31 of 138

CONTRACT

PUBLIC WORKS

This agreement is made this ____________ day of ____________________________, 2024, by and between the City of Carlsbad, California, a municipal corporation, (hereinafter called "City"), and __________________________________ whose principal place of business is _______________________________________________ (hereinafter called "Contractor").

City and Contractor agree as follows:

1. Description of Work. Contractor shall perform all work specified in the Contract documents for:

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

(hereinafter called "project")

2. Provisions of Labor and Materials. Contractor shall provide all labor, materials, tools, equipment, and personnel to perform the work specified by the Contract Documents.

3. Contract Documents. The Contract Documents consist of this Contract, Notice Inviting Bids, Contractor's Proposal, Bidder's Bond, Noncollusion Declaration, Designation of Subcontractors, Technical Ability and Experience, Bidder’s Statement Re Debarment, Escrow Agreement, Release Form, the Plans and Specifications, the General Provisions, addendum(s) to said Plans and Specifications and General Provisions, and all proper amendments and changes made thereto in accordance with this Contract or the Plans and Specifications, and all bonds for the project; all of which are incorporated herein by this reference.

Contractor, her/his subcontractors, and materials suppliers shall provide and install the work as indicated, specified, and implied by the Contract Documents. Any items of work not indicated or specified, but which are essential to the completion of the work, shall be provided at the Contractor's expense to fulfill the intent of said documents. In all instances through the life of the Contract, the City will be the interpreter of the intent of the Contract Documents, and the City’s decision relative to said intent will be final and binding. Failure of the Contractor to apprise subcontractors and materials suppliers of this condition of the Contract will not relieve responsibility of compliance.

4. Payment. For all compensation for Contractor's performance of work under this Contract, City shall make payment to the Contractor per section 9-3 PAYMENT of the General Provisions section of this contract. The Engineer will close the estimate of work completed for progress payments on the last working day of each month. The City shall withhold retention as required by Public Contract Code Section 9203.

5. Independent Investigation. Contractor has made an independent investigation of the jobsite, the soil conditions at the jobsite, and all other conditions that might affect the progress of the work and is aware of those conditions. The Contract price includes payment for all work that may be done by Contractor, whether anticipated or not, in order to overcome underground conditions. Any information that may have been furnished to Contractor by City about underground conditions or other job conditions is for Contractor's convenience only, and City

Revised 6/12/18 Contract No. 5552 Page 32 of 138
does not warrant that the conditions are as thus indicated. Contractor is satisfied with all job conditions, including underground conditions and has not relied on information furnished by City.

6. Hazardous Waste or Other Unusual Conditions. If the contract involves digging trenches or other excavations that extend deeper than four feet below the surface Contractor shall promptly, and before the following conditions are disturbed, notify City, in writing, of any:

A. Hazardous Waste. Material that Contractor believes may be material that is hazardous waste, as defined in section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.

B. Differing Conditions. Subsurface or latent physical conditions at the site differing from those indicated.

C. Unknown Physical Conditions. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.

City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in contractor's costs of, or the time required for, performance of any part of the work shall issue a change order under the procedures described in this contract.

In the event that a dispute arises between City and Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the contractor's cost of, or time required for, performance of any part of the work, contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the contract. Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the contracting parties.

7. Immigration Reform and Control Act. Contractor certifies it is aware of the requirements of the Immigration Reform and Control Act of 1986 (8 USC sections 1101-1525) and has complied and will comply with these requirements, including, but not limited to, verifying the eligibility for employment of all agents, employees, subcontractors, and consultants that are included in this Contract.

8. Prevailing Wage. Pursuant to the California Labor Code, the director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with California Labor Code, section 1773 and a copy of a schedule of said general prevailing wage rates is on file in the office of the City Engineer and is incorporated by reference herein. Pursuant to California Labor Code, section 1775, Contractor shall pay prevailing wages.

Contractor shall post copies of all applicable prevailing wages on the job site. Contractor shall comply with California Labor Code, section 1776, which generally requires keeping accurate payroll records, verifying and certifying payroll records, and making them available for inspection. Contractor shall require all subcontractors to comply with Section 1776.

9. Indemnification. Contractor shall assume the defense of, pay all expenses of defense, and indemnify and hold harmless the City, and its officers and employees, from all claims, loss,

Revised 6/12/18 Contract No. 5552 Page 33 of 138
damage, injury and liability of every kind, nature and description, directly or indirectly arising from or in connection with the performance of the Contract or work; or from any failure or alleged failure of Contractor to comply with any applicable law, rules or regulations including those relating to safety and health; and from any and all claims, loss, damages, injury and liability, howsoever the same may be caused, resulting directly or indirectly from the nature of the work covered by the Contract, except for loss or damage caused by the sole or active negligence or willful misconduct of the City. The expenses of defense include all costs and expenses including attorneys' fees for litigation, arbitration, or other dispute resolution method.

Contractor shall also defend and indemnify the City against any challenges to the award of the contract to Contractor, and Contractor will pay all costs, including defense costs for the City.

Defense costs include the cost of separate counsel for City, if City requests separate counsel.

Contractor shall also defend and indemnify the City against any challenges to the award of the contract to Contractor, arising in whole or in part from alleged inaccuracies or misrepresentation by the Contractor, whether intentional or otherwise, and Contractor will pay all costs, including defense costs for the City. Defense costs include the cost of separate counsel for City, if City requests separate counsel.

10. Insurance. Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his or her agents, representatives, employees or subcontractors. Said insurance shall meet the City of Carlsbad’s policy for insurance as stated in City Council Policy # 70.

(A) Coverages and Limits Contractor shall maintain the types of coverages and minimum limits indicted herein:

a. Commercial General Liability (GLC) Insurance : Insurance written on an “occurrence” basis, including products-completed operations, personal & advertising injury, with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.

b. Business Automobile Liability Insurance : $2,000,000 combined single limit per accident for bodily injury and property damage. In addition, the auto policy must cover any vehicle used in the performance of the contract, used onsite or offsite, whether owned, non- owned or hired, and whether scheduled or non-scheduled.

c. Workers' Compensation and Employers' Liability Insurance: Workers' compensation limits as required by the Labor Code of the State of California and Employers’ Liability limits of $1,000,000 per incident. Workers' compensation offered by the State Compensation Insurance Fund is acceptable to the City.

(B) Additional Provisions: Contractor shall ensure that the policies of insurance required under this agreement with the exception of Workers’ Compensation and Business Automobile Liability Insurance contain, or are endorsed to contain, the following provisions.

a. The City, its officials, employees and volunteers are to be covered as additional insured as respects: liability arising out of activities performed by or on behalf of the Contractor; products and completed operations of the contractor; premises owned, leased, hired or

Revised 6/12/18 Contract No. 5552 Page 34 of 138
borrowed by the contractor. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officials, employees or volunteers. All additional insured endorsements must be evidenced using separate documents attached to the certificate of insurance; one for each company affording general liability, and employers’ liability coverage.

b. The Contractor's insurance coverage shall be primary insurance as respects the City, its officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officials, employees or volunteers shall be in excess of the contractor's insurance and shall not contribute with it.

c. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officials, employees or volunteers.

d. Coverage shall state that the contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.

(C) Notice of Cancellation. Each insurance policy required by this agreement shall be endorsed to state that coverage shall not be nonrenewed, suspended, voided, canceled, or reduced in coverage or limits except after ten (10) days' prior written notice has been sent to the City by certified mail, return receipt requested.

(D) Deductibles and Self-Insured Retention (S.I.R.) Levels. Any deductibles or self- insured retention levels must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retention levels as respects the City, its officials and employees; or the contractor shall procure a bond guaranteeing payment of losses and related investigation, claim administration and defense expenses.

(E) Waiver of Subrogation. All policies of insurance required under this agreement shall contain a waiver of all rights of subrogation the insurer may have or may acquire against the City or any of its officials or employees.

(F) Subcontractors. Contractor shall include all subcontractors as insured under its policies or shall furnish separate certificates and endorsements for each subcontractor. Coverages for subcontractors shall be subject to all of the requirements stated herein.

(G) Acceptability of Insurers. Insurance is to be placed with insurers that have a rating in Best's Key Rating Guide of at least A-:VII. Insurers must also be authorized to transact the business of insurance by the State of California Insurance Commissioner as admitted carriers as evidenced by a listing in the official publication of the Department of Insurance of the State of California and/or under the standards specified by City Council Policy # 70.

(H) Verification of Coverage. Contractor shall furnish the City with certificates of insurance and original endorsements affecting coverage required by this clause. The certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificates and endorsements are to be in forms approved by the City and are to be received and approved by the City before the Contract is executed by the City.

Revised 6/12/18 Contract No. 5552 Page 35 of 138
(I) Cost of Insurance. The Cost of all insurance required under this agreement shall be included in the Contractor's bid.

11. Claims and Lawsuits. All claims by Contractor shall be resolved in accordance with Public Contract Code section 9204, which is incorporated by reference. A copy of Section 9204 is included in Section 3 of the General Provisions. In addition, all claims by Contractor for $375,000 or less shall be resolved in accordance with the provisions in the Public Contract Code, Division 2, Part 3, Chapter 1, Article 1.5 (commencing with section 20104) which are incorporated by reference. A copy of Article 1.5 is included in Section 3 of the General Provisions. In the event of a conflict between Section 9204 and Article 1.5, Section 9204 shall apply. Notwithstanding the provisions of this section of the contract, all claims shall comply with the Government Tort Claim Act (section 900 et seq., of the California Government Code) for any claim or cause of action for money or damages prior to filing any lawsuit for breach of this agreement.

(A) Assertion of Claims. Contractor hereby agrees that any contract claim submitted to the City must be asserted as part of the contract process as set forth in this agreement and not in anticipation of litigation or in conjunction with litigation.

(B) False Claims. Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud and the Contractor may be subject to criminal prosecution.

(C) Government Code. Contractor acknowledges that California Government Code sections 12650 et seq., the False Claims Act, provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of the information.

(D) Penalty Recovery. If the City of Carlsbad seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorney's fees.

(E) Debarment for False Claims. Contractor hereby acknowledges that the filing of a false claim may subject the Contractor to an administrative debarment proceeding wherein the Contractor may be prevented from further bidding on public contracts for a period of up to five years.

(F) Carlsbad Municipal Code. The provisions of Carlsbad Municipal Code sections

3.32.025, 3.32.026, 3.32.027 and 3.32.028 pertaining to false claims are incorporated herein by reference.

(G) Debarment from Other Jurisdictions. Contractor hereby acknowledges that debarment by another jurisdiction is grounds for the City Council of the City of Carlsbad to disqualify the Contractor or subcontractor from participating in future contract bidding.

(H) Jurisdiction. Contractor agrees and hereby stipulates that the proper venue and jurisdiction for resolution of any disputes between the parties arising out of this agreement is San Diego County, California.

I have read and understand all provisions of Section 11 above. ________ init ________ init

Revised 6/12/18 Contract No. 5552 Page 36 of 138

12. Maintenance of Records. Contractor shall maintain and make available at no cost to the City, upon request, records in accordance with sections 1776 and 1812 of Part 7, Chapter 1, Article 2, of the Labor Code. If the Contractor does not maintain the records at Contractor's principal place of business as specified above, Contractor shall so inform the City by certified letter accompanying the return of this Contract. Contractor shall notify the City by certified mail of any change of address of such records.

13. Labor Code Provisions. The provisions of Part 7, Chapter 1, commencing with section 1720 of the Labor Code are incorporated herein by reference.

14. Security. Securities in the form of cash, cashier's check, or certified check may be substituted for any monies withheld by the City to secure performance of this contract for any obligation established by this contract. Any other security that is mutually agreed to by the Contractor and the City may be substituted for monies withheld to ensure performance under this Contract.

15. Unfair Business Practices. In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the contractor or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the contractor, without further acknowledgment by the parties.

16. Provisions Required by Law Deemed Inserted. Each and every provision of law and clause required by law to be inserted in this Contract shall be deemed to be inserted herein and included herein, and if, through mistake or otherwise, any such provision is not inserted, or is not correctly inserted, then upon application of either party, the Contract shall forthwith be physically amended to make such insertion or correction.

17. Additional Provisions. Any additional provisions of this agreement are set forth in the "General Provisions" or "Supplemental Provisions" attached hereto and made a part hereof.

[signatures on the following page]

Revised 6/12/18 Contract No. 5552 Page 37 of 138

NOTARIAL ACKNOWLEDGMENT OF EXECUTION BY ALL SIGNATORIES MUST BE

ATTACHED

(CORPORATE SEAL)

CONTRACTOR:

(name of Contractor)

By:
(sign here)

(print name and title)

By:
(sign here)

(print name and title)
CITY OF CARLSBAD, a municipal
corporation of the State of California

By:

KEITH BLACKBURN, Mayor

ATTEST:

SHERRY FREISINGER, City Clerk

President or vice-president and secretary or assistant secretary must sign for corporations. If only one officer signs, the corporation must attach a resolution certified by the secretary or assistant secretary under the corporate seal empowering that officer to bind the corporation.

APPROVED AS TO FORM:

CINDIE K. McMAHON
City Attorney

By:

Assistant City Attorney

Revised 6/12/18 Contract No. 5552 Page 38 of 138

LABOR AND MATERIALS BOND

WHEREAS, the City Council of the City of Carlsbad located in the State of California has awarded to ________________________________________________________ (hereinafter designated as the "Principal"), a Contract for:

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

in the City of Carlsbad, in strict conformity with the drawings and specifications, and other Contract Documents now on file in the Office of the City Clerk of the City of Carlsbad and all of which are incorporated herein by this reference.

WHEREAS, Principal has executed or is about to execute said Contract and the terms thereof require the furnishing of a bond, providing that if Principal or any of their subcontractors shall fail to pay for any materials, provisions, provender or other supplies or teams used in, upon or about the performance of the work agreed to be done, or for any work or labor done thereon of any kind, the Surety on this bond will pay the same to the extent hereinafter set forth.

NOW, THEREFORE, WE, _____________________ as Principal, (hereinafter designated as the "Contractor"), and _______________________________________________________ as Surety, are held firmly bound unto the City of Carlsbad in the sum __________________, said sum being an amount equal to: One hundred percent (100%) of the total amount payable under the terms of the contract by the City of Carlsbad, and for which payment well and truly to be made we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if the Contractor or his/her subcontractors fail to pay for any materials, provisions, provender, supplies, or teams used in, upon, for, or about the performance of the work contracted to be done, or for any other work or labor thereon of any kind, consistent with California Civil Code section 9100, or for amounts due under the Unemployment Insurance Code with respect to the work or labor performed under this Contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the contractor and subcontractors pursuant to section 13020 of the Unemployment Insurance Code with respect to the work and labor, that the Surety will pay for the same, and, also, in case suit is brought upon the bond, reasonable attorney's fees, to be fixed by the court consistent with California Civil Code section 9554.

This bond shall inure to the benefit of any of the persons named in California Civil Code section 9100, so as to give a right of action to those persons or their assigns in any suit brought upon the bond.

Surety stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract, or to the work to be performed hereunder or the specifications accompanying the same shall affect its obligations on this bond, and it does hereby waive notice of any change, extension of time, alterations or addition to the terms of the contract or to the work or to the specifications.

Revised 6/12/18 Contract No. 5552 Page 39 of 138
In the event that Contractor is an individual, it is agreed that the death of any such Contractor shall not exonerate the Surety from its obligations under this bond.

SIGNED AND SEALED, this ______________ day of __________________________, 20____

_______________________________(SEAL) _____________________________(SEAL) (Principal) (Surety)

By: _________________________________ By: ________________________________ (Signature) (Signature)

__________________________________ ________________________________ (Print Name & Title) (Print Name & Title)

(SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETY – ATTACH ATTORNEY-IN-FACT CERTIFICATE)

APPROVED AS TO FORM:

CINDIE K. McMAHON
City Attorney

By: _________________________________
Assistant City Attorney

Revised 6/12/18 Contract No. 5552 Page 40 of 138

FAITHFUL PERFORMANCE/WARRANTY BOND

WHEREAS, the City Council of the City of Carlsbad, State of California has awarded to _____________________________________________________ (hereinafter designated as the "Principal"), a Contract for:

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

in the City of Carlsbad, in strict conformity with the contract, the drawings and specifications, and other Contract Documents now on file in the Office of the City Clerk of the City of Carlsbad, all of which are incorporated herein by this reference.

WHEREAS, Principal has executed or is about to execute said Contract and the terms thereof require the furnishing of a bond for the faithful performance and warranty of said Contract;

NOW, THEREFORE, WE, _____________________ as Principal, (hereinafter designated as the "Contractor"), and _______________________________________________________ as Surety, are held firmly bound unto the City of Carlsbad in the sum __________________, said sum being an amount equal to: One hundred percent (100%) of the total amount payable under the terms of the contract by the City of Carlsbad, and for which payment well and truly to be made we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if the above bounden Contractor, their heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions, and agreements in the Contract and any alteration thereof made as therein provided on their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the City of Carlsbad, its officers, employees and agents, as therein stipulated, then this obligation shall become null and void; otherwise it shall remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by the City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

Surety stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract, or to the work to be performed there under or the specifications accompanying the same shall affect its obligations on this bond, and it does hereby waive notice of any change, extension of time, alterations or addition to the terms of the contract or to the work or to the specifications.

Revised 6/12/18 Contract No. 5552 Page 41 of 138

In the event that Contractor is an individual, it is agreed that the death of any such Contractor shall not exonerate the Surety from its obligations under this bond.

SIGNED AND SEALED, this ______________ day of __________________________, 20____

_______________________________(SEAL) _____________________________(SEAL) (Principal) (Surety)

By: _________________________________ By: ________________________________ (Signature) (Signature)

__________________________________ ________________________________ (Print Name & Title) (Print Name & Title)

(SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETY – ATTACH ATTORNEY-IN-FACT CERTIFICATE)

APPROVED AS TO FORM:

CINDIE K. McMAHON
City Attorney

By: _________________________________
Assistant City Attorney

Revised 6/12/18 Contract No. 5552 Page 42 of 138

OPTIONAL ESCROW AGREEMENT FOR

SECURITY DEPOSITS IN LIEU OF RETENTION

This Escrow Agreement is made and entered into by and between the City of Carlsbad whose address is 1200 Carlsbad Village Drive, Carlsbad, California, 92008, hereinafter called "City" and ___________________________________________________________, whose address is _________________________________________________________________ hereinafter called "Contractor" and ___________________________________________________, whose address is __________________________________________________________ hereinafter called "Escrow Agent."

For the consideration hereinafter set forth, the City, Contractor and Escrow Agent agree as follows:

1. Pursuant to section 22300 of the Public Contract Code of the State of California, the Contractor has the option to deposit securities with the Escrow Agent as a substitute for retention earnings required to be withheld by the City pursuant to the Construction Contract entered into between the City and Contractor for

CANNON LIFT STATION IMPROVEMENTS
CONTRACT NO. 5552

in the amount of ___________________________ dated ______________ (hereinafter referred to as the "Contract"). Alternatively, on written request of the Contractor, the City shall make payments of the retention earnings directly to the Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent shall notify the City within 10 days of the deposit. The market value of the securities at the time of the substitution shall be a least equal to the cash amount then required to be withheld as retention under the terms of the contract between the City and Contractor. Securities shall be held in the name of the City and shall designate the Contractor as the beneficial owner.

2. The City shall make progress payments to the Contractor for such funds which otherwise would be withheld from progress payments pursuant to the Contract provisions, provided that the Escrow Agent holds securities in the form and amount specified above.

3. When the City makes payment of retentions earned directly to the Escrow Agent, the Escrow Agent shall hold them for the benefit of the Contractor until such time as the escrow created under this contract is terminated. The Contractor may direct the investment of the payments into securities. All terms and conditions of this agreement and the rights and responsibilities of the parties shall be equally applicable and binding when the City pays the Escrow Agent directly.

4. The Contractor shall be responsible for paying all fees for the expenses incurred by the Escrow Agent in administering the Escrow Account and all expenses of the City. These expenses and payment terms shall be determined by the City, Contractor and Escrow Agent.

5. The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to the City.

Revised 6/12/18 Contract No. 5552 Page 43 of 138

6. Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from City to the Escrow Agent that City consents to the withdrawal of the amount sought to be withdrawn by Contractor.

7. The City shall have a right to draw upon the securities in the event of default by the Contractor. Upon seven days' written notice to the Escrow Agent from the City of the default, the Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by the City.

8. Upon receipt of written notification from the City certifying that the Contract is final and complete and that the Contractor has complied with all requirements and procedures applicable to the Contract, the Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of the Escrow Account. The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges.

9. The Escrow Agent shall rely on the written notifications from the City and the Contractor pursuant to sections (1) to (8), inclusive, of this agreement and the City and Contractor shall hold Escrow Agent harmless from Escrow Agent's release, conversion and disbursement of the securities and interest as set forth above.

10. The names of the persons who are authorized to give written notices or to receive written notice on behalf of the City and on behalf of Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows:

For City:

Title FINANCE DIRECTOR

Name

Signature

Address 1635 Faraday Avenue, Carlsbad, CA 92008
For Contractor:

Title

Name

Signature

Address

For Escrow Agent:

Title

Name

Signature

Address

Revised 6/12/18 Contract No. 5552 Page 44 of 138

At the time the Escrow Account is opened, the City and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Agreement.

IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers on the date first set forth above.

For City:

Title MAYOR

Name

Signature

Address 1200 Carlsbad Village Drive, Carlsbad, CA
92008

For Contractor:

Title

Name

Signature

Address

For Escrow Agent:

Title

Name

Signature

Address

Revised 6/15/17 Contract No. 5552 Page 45 of 138

GENERAL PROVISIONS
FOR

CANNON LIFT STATION IMPROVEMENTS

CONTRACT NO. 5552

CITY OF CARLSBAD

BIDDERS ARE ADVISED THAT THIS SECTION REPLACES PART 1,

GENERAL PROVISIONS, OF THE STANDARD SPECIFICATIONS FOR

PUBLIC WORKS CONSTRUCTION

SECTION 1 -- TERMS, DEFINITIONS, ABBREVIATIONS, AND

SYMBOLS

1-1 TERMS . Unless otherwise stated, the words directed, required, permitted, ordered, instructed, designated, considered necessary, prescribed, approved, acceptable, satisfactory, or words of like meaning, refer to actions, expressions, and prerogatives of the Engineer.

1-1.1 Reference to Drawings. Where words “shown”, “indicated”, “detailed”, “noted”, “scheduled”, or words of similar import are used, it shall be understood that reference is made to the plans accompanying these provisions, unless stated otherwise.

1-1.2 Directions. Where words “directed”, “designated”, “selected”, or words of similar import are used, it shall be understood that the direction, designation or selection of the Engineer is intended, unless stated otherwise. The word “required” and words of similar import shall be understood to mean “as required to properly complete the work as required and as approved by the Engineer,” unless stated otherwise.

1-1.3 Equals and Approvals. Where the words “equal”, “approved equal”, “equivalent”, and such words of similar import are used, it shall be understood such words are followed by the expression “in the opinion of the Engineer”, unless otherwise stated. Where the words “approved”, “approval”, “acceptance”, or words of similar import are used, it shall be understood that the approval, acceptance, or similar import of the Engineer is intended.

1-1.4 Perform. The word “perform” shall be understood to mean that the Contractor, at its expense, shall perform all operations, labor, tools and equipment, and further, including the furnishing and installing of materials that are indicated, specified or required to mean that the Contractor, at its expense, shall furnish and install the work, complete and in-place and ready to use, including furnishing of necessary labor, materials, tools, equipment, and transportation.

1-2 DEFINITIONS . The following words, or groups of words, shall be exclusively defined by the definitions assigned to them herein.

Revised 6/15/17 Contract No. 5552 Page 46 of 138
Addendum – Written or graphic instrument issued prior to the opening of Bids which clarifies, corrects, or changes the bidding or Contract Documents. The term Addendum shall include bulletins and all other types of written notices issued to potential bidders prior to opening of Bids.

Agency – The City of Carlsbad, California.

Agreement – See Contract.

Assessment Act Contract – A Contract financed by special assessments authorized under a State Act or procedural ordinance of a City or County.

Average Sound Level – The level, in decibels, of the mean-square A-weighted sound pressure during a stated time period, with reference to the square of the standard reference sound pressure of 20 micropascals. The "average sound level" is equivalent to the industry standard Leq. See Equivalent Continuous Sound Level.

Base – A layer of specified material of planned thickness placed immediately below the pavement or surfacing.

Bid – The offer or proposal of the Bidder submitted on the prescribed form setting forth the prices for the Work.

Bidder – Any individual, firm, partnership, corporation, or combination thereof, submitting a Bid for the Work, acting directly or through a duly authorized representative.

Board – The officer or body constituting the awarding authority of the Agency, which is the City Council for the City of Carlsbad or the Board of Directors of Carlsbad Municipal Water District.

Bond – Bid, performance, and payment bond or other instrument of security.

Caltrans – The State of California, Department of Transportation.

Cash Contract – A Contract financed by means other than special assessments.

Certificate of Compliance – A written document signed and submitted by a supplier or manufacturer that certifies that the material or assembled material supplied to the Work site conforms to the requirements of the Contract Documents.

Change Order – A written order to the Contractor signed by the Agency directing an addition, deletion, or revision in the Work, or an adjustment in the Contract Price or the Contract time issued after the effective date of the Contract. A Change Order may or may not also be signed by the Contractor.

Code – The terms Government Code, Labor Code, etc., refer to codes of the State of California.

Construction Manager– the Project Inspector’s immediate supervisor and first level of appeal for informal dispute resolution.

Contract – The written agreement between the Agency and the Contractor covering the Work.

Revised 6/15/17 Contract No. 5552 Page 47 of 138
Contract Documents – Including but not limited to; the Contract, any Addendum (which pertain to the Contract Documents), Notice Inviting Bids, Instructions to Bidders; Bid (including documentation accompanying the Bid and any post-bid documentation submitted prior to the Notice of Award) when attached as an exhibit to the Contract, the Bonds, the General Provisions, permits, the Technical Specifications, the Supplemental Provisions, the Plans, Standard Plans, Standard Specifications, Reference Specifications, and all Modifications issued after the execution of the Contract.

Contractor – The individual, partnership, corporation, joint venture, or other legal entity having a Contract with the Agency to perform the Work. In the case of work being done under permit issued by the Agency, the permittee shall be constructed to be the Contractor. The term “prime contractor” shall mean Contractor.

Contract Time - The number of Working Days to complete the Work as specified in the Contract Documents.

Contract Price – The total amount of money for which the Contract is awarded.

Contract Unit Price – The amount stated in the Bid for a single unit of an item of work.

County Sealer – The Sealer of Weights and Measures of the county in which the Contract is let.

Critical Path – In the construction schedule, the sequence of activities that represents the longest path through the Project network of activities and the shortest possible Project duration.

Days – Days shall mean consecutive calendar’s days unless otherwise specified.

Decibel – A unit for measuring the amplitude of sound, equal to 20 times the logarithm to the base 10 of the ratio of the pressure of the sound measured to the reference pressure, which is 20 micropascals.

Defective Work - Work that does not conform to the requirements of the Contract Documents.

Deputy City Engineer – The Engineering Manager of the Construction Management & Inspection Department, the Construction Manager’s immediate supervisor and the Engineer’s designated representative. The Deputy City Engineer is the second level of appeal for informal dispute resolution.

Dispute Board – Persons designated by the City Manager of the City of Carlsbad or Executive Manager of the Carlsbad Municipal Water District, to hear and advise the City Manager on claims submitted by the Contractor. The City Manager for the City of Carlsbad or the Executive Manager for the Carlsbad Municipal Water District is the last appeal level for informal dispute resolution.

Disputed Work – Work in which the Agency and the Contractor are in disagreement.

Electrolier – Street light assembly complete, including foundation, standard, luminaire arm, luminaire, etc.

Revised 6/15/17 Contract No. 5552 Page 48 of 138
Engineer – The City Engineer of the City of Carlsbad or his/her approved representative. The Engineer is the third level of appeal for informal dispute resolution.

Engineer of Record/Design Engineer – A registered professional engineer licensed in the State of California who is qualified to act as an agent of a project owner or to prepare plans for facilities to be accepted by the City of Carlsbad. The term includes persons licensed in the State of California as Civil Engineers or Structural Engineers.

Equivalent Continuous Sound Level (Leq) – The average sound level which, over a given period of time, has the same total energy as the fluctuating noise and is also known as the time- average sound level.

Extra Work – New or unforeseen work not covered by a Contract Unit Price or Stipulated Unit Price.

Float – The number of days by which an activity in the construction schedule may be delayed from either its earliest start date or earliest completion date without extending the Contract Time (total float). Total float belongs to the Project and to any Party to accommodate changes in the Work or to mitigate the effect of events which may delay completion.

Holiday – Holidays and the days observed are listed below. If a holiday falls on a Saturday, the holiday is observed on the preceding Friday. If the holiday falls on a Sunday, it is observed the following Monday. Unless specified otherwise in the Contract Documents or authorized by the Engineer, do not work on holidays.

New Year’s Day January 1
Martin Luther King Day 3rd Monday in January
Presidents’ Day 3rd Monday in February
Memorial Day Last Monday in May
Independence Day July 4
Labor Day 1st Monday in September
Indigenous People’s Day 2nd Monday in October
Veteran’s Day November 11
Thanksgiving Day 4th Thursday in November
Thanksgiving Friday Day after Thanksgiving
Christmas Day December 25

House Connection Sewer – A sewer, within a public street or right-of-way, proposed to connect any parcel, lot, or part of a lot with a mainline sewer.

House Sewer – A sewer, wholly within private property, proposed to connect any building to a house connection sewer.

Luminaire – The lamp housing including the optical and socket assemblies (and ballast if so specified).

Luminaire Arm – The structural member, bracket, or mast arm, which, mounted on the standard, supports the luminaire.

Minor Bid Item – a single contract item constituting less than 10 percent (10%) of the original Contract Price bid.

Revised 6/15/17 Contract No. 5552 Page 49 of 138

Modification – Includes Change Orders and Supplemental Agreements. A Modification may only be used after the effective date of the Contract.

Night Work – See Working Night.

Notice of Award – The written notice by the Agency to the successful Bidder stating that upon compliance by it with the required conditions, the Agency will execute the Contract.

Notice to Proceed – A written notice given by the Agency to the Contractor fixing the date on which the Contract time will start.

Own Organization - When used in Sections 2-3.1 and 2-3.2 – Employees of the Contractor who are hired, directed, supervised and paid by the Contractor to accomplish the completion of the Work. Further, such employees have their employment taxes, State disability insurance payments, State and Federal income taxes paid and administered, as applicable, by the Contractor. Further, “own organization” means construction equipment that the Contractor owns or leases and uses to accomplish the Work. Equipment that is owner operated or leased equipment with an operator is not part of the Contractor's Own Organization and will not be included for the purpose of compliance with Sections 2-3.1 and 2-3.2.

Person – Any individual, firm, association, partnership, corporation, trust, joint venture, or other legal entity.

Plans – The drawings, profiles, cross sections, working drawings, and supplemental drawings, or reproductions thereof, approved by the Engineer, which show the location, character, dimensions, or details of the Work.

Private Contract – Work subject to Agency inspection, control, and approval, involving private funds, not administered by the Agency.

Project Inspector – the Engineer’s designated representative for inspection, contract administration and first level for informal dispute resolution.

Proposal – See Bid.

Reference Specifications – Those bulletins, standards, rules, methods of analysis or test, codes, and specifications of other agencies, engineering societies, or industrial associations referred to in the Contract Documents. These refer to the latest edition, including amendments in effect and published at the time of advertising the project or issuing the permit, unless specifically referred to by edition, volume, or date.

Roadway – The portion of a street reserved for vehicular use.

Service Connection – Service connections are all or any portion of the conduit, cable, or duct, including meter, between a utility distribution line and an individual consumer.

Sewer – Any conduit intended for the reception and transfer of sewage and fluid industrial waste.

Revised 6/15/17 Contract No. 5552 Page 50 of 138
Shop Drawings – Drawings showing the details of manufactured or assembled products proposed to be incorporated into the Work.

Sound Level – The weighted sound pressure level obtained using a sound level meter and frequency weighting network as provided in the American National Standards Institute (ANSI) specifications for sound level meters. "Sound level" means the same as "noise level."

Special Provisions – Revisions to the Standard Specifications setting forth conditions and requirements peculiar to the Work.

Specifications – General Provisions, Standard Specifications, Technical Specifications, Reference Specifications, Supplemental Provisions, and specifications in Supplemental Agreements between the Contractor and the Board.

Standard – The shaft or pole used to support street lighting luminaire, traffic signal heads, mast arms, etc.

Standard Plans – Details of standard structures, devices, or instructions referred to on the Plans or in Specifications by title or number.

Standard Specifications – The Standard Specifications for Public Works Construction (SSPWC), the “Greenbook”.

State – State of California.

Stipulated Unit Price – Unit prices established by the Agency in the Contract Documents.

Storm Drain – Any conduit and appurtenances intended for the reception and transfer of storm water.

Street – Any road, highway, parkway, freeway, alley, walk, or way.

Subbase – A layer of specified material of planned thickness between a base and the subgrade.

Subcontractor – An individual, firm, or corporation having a direct contract with the Contractor or with any other Subcontractor for the performance of a part of the Work.

Subgrade – For roadways, that portion of the roadbed on which pavement, surfacing, base, subbase, or a layer of other material is placed. For structures, the soil prepared to support a structure.

Supervision – Supervision, where used to indicate supervision by the Engineer, shall mean the performance of obligations, and the exercise of rights, specifically imposed upon and granted to the Agency in becoming a party to the Contract. Except as specifically stated herein, supervision by the Agency shall not mean active and direct superintendence of details of the Work.

Supplemental Agreement – A written amendment of the Contract Documents signed by both parties.

Revised 6/15/17 Contract No. 5552 Page 51 of 138
Supplemental Provisions – See Special Provisions.

Surety – Any individual, firm, or corporation, bound with and for the Contractor for the acceptable performance, execution, and completion of the Work, and for the satisfaction of all obligations incurred.

Tonne – Also referred to as “metric ton”. Represents a unit of measure in the International System of Units equal to 1,000 kilograms.

Utility – Tracks, overhead or underground wires, pipelines, conduits, ducts, or structures, sewers, or storm drains owned, operated, or maintained in or across a public right of way or easement.

Work – That which is proposed to be constructed or done under the Contract or permit, including the furnishing of all labor, materials, equipment, and services.

Working Drawings – Drawings showing the details not shown on the Plans which are required to be designed by the Contractor.

Working Night – A period of night-time work, allowed only on Sunday through Thursday, excluding holidays.

1-3 ABBREVIATIONS.

1-3.1 General. The abbreviation herein, together with others in general use, are applicable to these Standard Specifications and to project Plans or other Contract Documents.

All abbreviations and symbols used on Plans for structural steel construction shall conform to those given by the “Manual of Steel Construction” published by the American Institute of Steel Construction, Inc.

1-3.2 Common Usage

Abbreviation Word or Words Abbreviation Word or Words

ABAN .............................................................Abandon ABAND .......................................................Abandoned ABS ........................ Acrylonitrile – butadiene – styrene AC .................................................... Asphalt Concrete ACP ........................................... Asbestos cement pipe ACWS ..................... Asphalt concrete wearing surface ALT ................................................................Alternate APTS ................................. Apartment and Apartments AMER STD ................................... American Standard AWG ............... American Wire Gage (nonferrous wire) BC .................................................. Beginning of curve BCR ....................................... Beginning of curb return BDRY ............................................................Boundary BF ..................................................... Bottom of footing BLDG ........................................ Building and Buildings BM .............................................................. Benchmark BVC .................................... Beginning of vertical curve B/W ........................................................... Back of wall C/C ..................................................... Center to center CAB ...................................... Crushed aggregate base CAL/OSHA ............ California Occupational Safety and Health Administration
CalTrans ....... California Department of Transportation CAP .................................... Corrugated aluminum pipe CB ............................................................. Catch Basin Cb ........................................................................ Curb CBP ............................... Catch Basin Connection Pipe CBR ....................................... California Bearing Ratio CCR ............................ California Code of Regulations CCTV ............................................... Closed Circuit TV CES .......................... Carlsbad Engineering Standards CF ................................................................ Curb face CF ................................................................ Cubic foot C&G .................................................... Curb and gutter CFR ................................ Code of Federal Regulations CFS ......................................... Cubic Feet per Second CIP ......................................................... Cast iron pipe CIPP ................................................ Cast-in place pipe CL ............................................. Clearance, center line CLF .................................................... Chain link fence

Revised 6/15/17 Contract No. 5552 Page 52 of 138
CMB ............................... Crushed miscellaneous base CMC ......................................... Cement mortar-coated CML ............................................ Cement mortar-lined CMWD .................... Carlsbad Municipal Water District CO .................................................... Cleanout (Sewer) COL ..................................................................Column COMM ....................................................... Commercial CONC ........................................................... Concrete CONN ........................................................ Connection CONST .................................. Construct, Construction COORD ...................................................... Coordinate CSP ............................................ Corrugated steel pipe CSD ............................... Carlsbad Standard Drawings CTB ............................................ Cement treated base CV ............................................................ Check valve CY ............................................................... Cubic yard D .............................................................. Load of pipe dB ................................................................... Decibels DBL .................................................................. Double DF ............................................................... Douglas fir DIA ................................................................ Diameter DIP ..................................................... Ductile iron pipe DL ................................................................Dead load DR ...................................................... Dimension Ratio DT .................................................................Drain Tile DWG ............................................................... Drawing DWY .............................................................. Driveway DWY APPR ................................... Driveway approach E ....................................................................... Electric EA ........................................................................ Each EC ............................................................ End of curve ECR ................................................ End of curb return EF ................................................................ Each face EG ......................................................... Edge of gutter EGL .................................................. Energy grade line EI ................................................................... Elevation ELC ..................................... Electrolier lighting conduit ELT ........................................................ Extra long ton ENGR ....................................... Engineer, Engineering EP ................................................... Edge of pavement ESMT ........................................................... Easement ETB .......................................... Emulsion-treated base EVC ............................................... End of vertical curb EWA ............................... Encina Wastewater Authority EXC ............................................................ Excavation EXP JT ................................................. Expansion joint EXST ............................................................... Existing F .................................................................. Fahrenheit F&C ................................................... Frame and cover F&I .................................................. Furnish and install FAB ............................................................... Fabricate FAS ............................................... Flashing arrow sign FD ............................................................... Floor drain FDN ............................................................ Foundation FED SPEC ................................. Federal Specification FG ........................................................ Finished grade FH ............................................................. Fire hydrant FL ................................................................... Flow line FS ...................................................... Finished surface FT-LB .........................................................Foot-pound FTG .................................................................. Footing FW ............................................................ Face of wall G ........................................................................... Gas GA ..................................................................... Gauge GAL ............................................... Gallon and Gallons GALV ......................................................... Galvanized GAR ........................................... Garage and Garages GIP .............................................. Galvanized iron pipe GL ........................................ Ground line or grade line GM .............................................................. Gas meter GNV ............................................... Ground Not Visible GP ..................................................................Guy pole GPM ................................................ gallons per minute GR ...................................................................... Grade GRTG ............................................................... Grating GSP ........................................... Galvanized steel pipe H ............................................................ High or height HB .................................................................. Hose bib HC ................................................... House connection HDWL ........................................................... Headwall HGL .............................................. Hydraulic grade line HORIZ .......................................................... Horizontal HP ............................................................. Horsepower HPG ................................................ High pressure gas HPS ................................ High pressure sodium (Light) HYDR ............................................................ Hydraulic IE ......................................................... Invert Elevation ID ........................................................ Inside diameter INCL ...............................................................Including INSP .............................................................Inspection INV ...................................................................... Invert IP .................................................................... Iron pipe JC ..................................................... Junction chamber JCT .................................................................Junction JS ..................................................... Junction structure JT ......................................................................... Joint L ........................................................................ Length LAB ............................................................. Laboratory LAT ................................................................... Lateral LB ...................................................................... Pound LD ..................................................... Local depression LF ................................................................ Linear foot LH ............................................................... Lamp hole LL ...................................................................Live load LOL .............................................................Layout line LONG ........................................................Longitudinal LP ................................................................ Lamp post LPS ................................. Low pressure sodium (Light) LS ................................................................ Lump sum LTS .................................................... Lime treated soil LWD ............................... Leucadia Wastewater District MAINT ..................................................... Maintenance MAX ............................................................. Maximum MCR ............................................ Middle of curb return MEAS ............................................................. Measure MH ................................... Manhole, maintenance hole MIL SPEC .................................... Military specification MISC ..................................................... Miscellaneous MOD ................................................... Modified, modify MON ............................................................ Monument MS4 ............. Municipal Separate Storm Sewer System MSL .. Mean Sea Level (Reg. Standard Drawing M-12)
MTBM ......................... Microtunneling Boring Machine MULT ...............................................................Multiple MUTCD .....Manual on Uniform Traffic Control Devices
MVL ............................................... Mercury vapor light

Revised 6/15/17 Contract No. 5552 Page 53 of 138
NCTD .............................. North County Transit District NOI ....................................................... Notice of Intent NOT ........................................... Notice of Termination NRCP .............................. Nonreinforced concrete pipe OBS ...............................................................Obsolete OC ................................................................ On center OD ..................................................... Outside diameter OE .............................................................. Outer edge OHE ................................................ Overhead Electric OMWD ................. Olivenhain Municipal Water District OPP ...............................................................Opposite ORIG ................................................................Original PB ................................................................... Pull box PC .................................................... Point of curvature PCC ....................... Portland cement concrete or point of compound curvature
PCVC ....................... Point of compound vertical curve PE ........................................................... Polyethylene PI .................................................. Point of intersection PL ............................................................. Property line PMB ............................ Processed miscellaneous base POC ...................................................... Point on curve POT .................................................... Point on tangent PP .............................................................. Power pole PRC .......................................... Point of reverse curve PRVC ............................ Point of reverse vertical curve PSI ......................................... Pounds per square inch PT .................................................... Point of tangency PVC .................................................. Polyvinyl chloride PVMT ........................................................... Pavement PVT R/W ....................................... Private right-of-way Q ........................ Rate of flow in cubic feet per second QUAD ....................................... Quadrangle, Quadrant R ....................................................................... Radius R&O ......................................................... Rock and oil R/W .......................................................... Right-of-way RA ...................................................... Recycling agent RAC ................................... Recycled asphalt concrete RAP ................................ Reclaimed asphalt pavement RBAC ............................. Rubberized asphalt concrete RC ................................................ Reinforced concrete RCB ...................................... Reinforced concrete box RCE ...................................... Registered civil engineer RCP ..................................... Reinforced concrete pipe RCV ........................................... Remote control valve REF ............................................................. Reference REINF ..............................Reinforced or reinforcement RES ...............................................................Reservoir RGE ........................ Registered geotechnical engineer ROW ....................................................... Right-of-Way RR ...................................................................Railroad RSE .............................. Registered structural engineer RTE .................................... Registered traffic engineer S .................................... Sewer or Slope, as applicable SCCP ............................... Steel cylinder concrete pipe SD ............................................................. Storm drain SDNR .............................. San Diego Northern Railway SDR ....... Standard thermoplastic pipe dimension ratio (ratio of pipe O.D. to minimum wall thickness)
SDRSD ......... San Diego Regional Standard Drawings
SE ...................................................... Sand Equivalent SEC .................................................................. Section SF ............................................................. Square foot SFM ................................................ Sewer Force Main SI ....................... International System of Units (Metric) SPEC ..................................................... Specifications SPPWC .......................................... Standard Plans for Public Works Construction
SSPWC ............................. Standard Specifications for Public Works Construction
ST HWY ................................................ State highway STA ................................................................... Station STD ............................................................... Standard STR ..................................................................Straight STR GR ................................................ Straight grade STRUC .......................................... Structural/Structure SW .................................................................Sidewalk SWD ...................................................... Sidewalk drain SY ............................................................ Square yard T .................................................................. Telephone TAN ................................................................. Tangent TC .............................................................. Top of curb TEL ............................................................. Telephone TF ........................................................... Top of footing TOPO ........................................................ Topography TR ........................................................................ Tract TRANS ......................................................... Transition TS ......................... Traffic signal or transition structure TSC ............................................. Traffic signal conduit TSS ........................................... Traffic signal standard TW ..............................................................Top of wall TYP .................................................................. Typical UE .............................................. Underground Electric USA .................................... Underground Service Alert VAR ..................................................... Varies, Variable VB ................................................................ Valve box VC .......................................................... Vertical curve VCP ................................................... Vitrified clay pipe VERT ............................................................... Vertical VOL .................................................................. Volume VWD ....................................... Vallecitos Water District W ........................ Water, Wider or Width, as applicable WATCH .............. Work Area Traffic Control Handbook WI ............................................................ Wrought iron WM ........................................................... Water meter WPJ .......................................... Weakened plane joint XCONN ............................................ Cross connection XSEC ..................................................... Cross section

Revised 6/15/17 Contract No. 5552 Page 54 of 138

1-3.3 Institutions.

Abbreviation Word or Words

AASHTO ............................. American Association of State Highway and Transportation Officials ACI .................................................................................................... American Concrete Institute AISC ...............................................................................American Institute of Steel Construction ANSI ................................................................................. American National Standards Institute AREA ........................................................................ American Railway Engineering Association ASME ........................................................................ American Society of Mechanical Engineers ASQ ................................................................................................. American Society for Quality ASTM ........................................................................ American Society for Testing and Materials AWPA ............................................................................ American Wood Preservers Association AWS ................................................................................................... American Welding Society AWWA .................................................................................. American Water Works Association EEI ........................................................................................................... Edison Electric Institute EIA ...................................................................................................Electronic Industries Alliance EPA ......................................................................................... Environmental Protection Agency ETL ............................................................................................... Electrical Testing Laboratories FCC .................................................................................. Federal Communications Commission FHWA ......................................................................................... Federal Highway Administration GRI ............................................................................................ Geosynthetic Research Institute IEEE ................................................................... Institute of Electrical and Electronics Engineers IMSA ............................................................................International Municipal Signal Association ISSA ............................................................................ International Slurry Surfacing Association ITE ....................................................................................... Institute of Transportation Engineers NCHRP ........................................................... National Cooperative Highway Research Program NEMA .................................................................... National Electrical Manufacturers Association NSF .................................................................................................National Science Foundation OSHA ..................................................................Occupational Safety and Health Administration PPI .............................................................................................................. Plastics Pipe Institute RUS ............................................................................................................ Rural Utilities Service SAE ........................................................................................... Society of Automotive Engineers SSPC ........................................................................................... Society for Protective Coatings UL ................................................................................................. Underwriters' Laboratories Inc.

1-4 UNITS OF MEASURE.

1-4.1 General. U.S. Standard Measures, also called U.S. Customary System, are the principal measurement system in these specifications. However, certain material specifications and test requirements contained herein use SI units specifically and conversions to U.S. Standard Measures may or may not have been included in these circumstances. When U.S. Standard Measures are not included in parenthesis, then the SI units shall control. S.I. units and U.S.

Standard Measures in parenthesis may or may not be exactly equivalent.

Reference is also made to ASTM E 380 for definitions of various units of the SI system and a more extensive set of conversion factors.

Revised 6/15/17 Contract No. 5552 Page 55 of 138
1-4.2 Units of Measure and Their Abbreviations.

U.S. Customary Unit (Equal To) SI Unit
(Abbreviations) (Abbreviations)
1 mil (=0.001 in) ....................................................................................25.4 micrometer ( m) 1 inch (in) ..............................................................................................25.4 millimeter (mm) 1 inch (in) ..............................................................................................2.54 centimeter (cm) 1 foot (ft) ................................................................................................0.3048 meter (m) 1 yard (yd) .............................................................................................0.9144 meter (m) 1 mile (mi) .............................................................................................1.6093 kilometer (km) 1 square foot (ft 2) ..................................................................................0.0929 square meter (m 2) 1 square yard (yd 2) ................................................................................0.8361 square meter (m2) 1 cubic foot (ft 3) .....................................................................................0.0283 cubic meter (m3) 1 cubic yard (yd 3) ..................................................................................0.7646 cubic meter (m3) 1 acre ....................................................................................................0.4047 hectare (ha) 1 U.S. gallon (gal) .................................................................................3.7854 Liter (L) 1 fluid ounce (fl. oz.) ..............................................................................29.5735 millileter (mL) 1 pound mass (lb) (avoirdupois) ...........................................................0.4536 kilogram (kg) 1 ounce mass (oz) .................................................................................0.02835 kilogram (kg) 1 Ton (=2000 lb avoirdupois) ................................................................0.9072 Tonne (= 907 kg) 1 Poise ..................................................................................................0.1 pascal . second (Pa . s) 1 centistoke (cs) ....................................................................................1 square millimeters per second (mm2/s)
1 pound force (lbf) .................................................................................4.4482 Newton (N) 1 pounds per square inch (psi) .............................................................6.8948 Kilopascal (kPa) 1 pound force per foot (lbf/ft) .................................................................1.4594 Newton per meter (N/m)
1 foot-pound force (ft-lbf).......................................................................1.3558 Joules (J) 1 foot-pound force per second ([ft-lbf]/s) ...............................................1.3558 Watt (W) 1 part per million (ppm) .........................................................................1 milligram/liter (mg/L)

Temperature Units and Abbreviations
Degree Fahrenheit (°F): ........................................................................Degree Celsius (°C):
°F = (1.8 x °C) + 32 ...............................................................................°C = (°F – 32)/1.8

SI Units (abbreviation) Commonly Used in Both Systems
1 Ampere (A)
1 Volt (V)
1 Candela (cd)
1 Lumen (lm)
1 second (s)

Common Metric Prefixes
kilo (k) ....................................................................................................10 3 centi (c)..................................................................................................10 -2 milli (m) ..................................................................................................10 -3 micro ( ) ................................................................................................10-6 nano (n) .................................................................................................10 -9 pico (p) ..................................................................................................10 -12

1-5 SYMBOLS.

 Delta, the central angle or angle between tangents
 Angle
% Percent
‘ Feet or minutes
“ Inches or seconds
1 Number
/ per or (between words)
° Degree
PL Property line
CL Centerline
SL Survey line or station line

Revised 6/15/17 Contract No. 5552 Page 56 of 138
SECTION 2 – SCOPE AND CONTROL OF WORK

2-1 AWARD AND EXECUTION OF CONTRACT. Award and execution of Contract will be as provided for in the Specifications, Instruction to Bidders, or Notice Inviting Bids.

2-2 ASSIGNMENT. No Contract or portion thereof may be assigned without consent of the board, except that the contractor may assign money due or which will accrue to it under the contract. If given written notice, such assignment will be recognized by the Board to the extent permitted by law. Any assignment of money shall be subject to all proper withholdings in favor of the Agency and to all deductions provided for in the Contract. All money withheld, whether assigned or not, shall be subject to being used by the Agency for completion of the work, should the Contractor be in default.

2-3 SUBCONTRACTS .

2-3.1 General. Each Bidder shall comply with the Chapter of the Public Contract Code including Sections 4100 through 4113. The following excerpts or summaries of some of the requirements of this Chapter are included below for information:

The Bidder shall set forth in the Bid, as provided in 4104:

“(a) The name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvements, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor’s total bid, or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of 1 percent of the prime contractor’s total bid or ten thousand dollars ($10,000), whichever is greater.”

“(b) The portion of the work which will be done by each such subcontractor under this act. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in his bid.”

If the Contractor fails to specify a Subcontractor or specifies more than one Subcontractor for the same portion of the work to be performed under the Contract (in excess of one-half of 1 percent of the Contractor’s total Bid), the Contractor shall be qualified to perform that portion itself, and shall perform that portion itself, except as otherwise provided in the Code.

As provided in Section 4107, no Contractor whose Bid is accepted shall substitute any person as Subcontractor in place of the Subcontractor listed in the original Bid, except for causes and by procedures established in Section 4107.5. This section provides procedures to correct a clerical error in the listing of a Subcontractor.

Section 4110 provides that a Contractor violating any of the provisions of the Chapter violates the Contract and the Board may exercise the option either to cancel the Contract or assess the Contractor a penalty in an amount of not more than 10 percent of the subcontract involved, after a public hearing.

Revised 6/15/17 Contract No. 5552 Page 57 of 138

Should the Contractor fail to adhere to the provisions requiring the Contractor to complete 50 percent of the contract price with its own organization, the Agency may at its sole discretion elect to cancel the contract or deduct an amount equal to 10 percent of the value of the work performed in excess of 50 percent of the contract price by other than the Contractor’s own organization. The Board shall be the sole body for determination of a violation of these provisions. In any proceedings under this section, the prime contractor shall be entitled to a public hearing before the Board and shall be notified ten (10) days in advance of the time and location of said hearing. The determination of the Board shall be final.

2-3.2 Additional Responsibility. The Contractor shall give personal attention to the fulfillment of the Contract and shall keep the Work under its control.

The Contractor shall perform, with its own organization, Contract work amounting to at least 50 percent of the Contract Price except that any designated “Specialty Items” may be performed by subcontract, and the amount of any such “Specialty Items” so performed may be deducted from the Contract Price before computing the amount required to be performed by the Contractor with its own organization. “Specialty Items” will be identified by the Agency in the Bid or Proposal. Where an entire item is subcontracted, the value of work subcontracted will be based on the Contract Unit Price. When a portion of an item is subcontracted, the value of work subcontracted will be based on the estimated percentage of the Contract Unit Price. This will be determined from information submitted by the Contractor, and subject to approval by the Engineer.

Before the work of any Subcontractor is started, the Contractor shall submit to the Engineer for approval a written statement showing the work to be subcontracted giving the name and business of each Subcontractor and description and value of each portion of the work to be so subcontracted.

2-3.3 Status of Subcontractors. Subcontractors shall be considered employees of the Contractor, and the Contractor shall be responsible for their work.

2-4 CONTRACT BONDS. Before execution of the Contract, the Bidder shall file surety bonds with the Agency to be approved by the Board in the amounts and for the purposes noted below.

Bonds issued by a surety, who is authorized to issue bonds in California, and whose bonding limitation shown in said circular is sufficient to provide bonds in the amount required by the Contract shall be deemed to be approved unless specifically rejected by the Agency. Bonds from all other sureties shall be accompanied by all of the documents enumerated in Code of Civil Procedure 995.660 (a). The Bidder shall pay all bond premiums, costs, and incidentals.

Before execution of the Contract, the Bidder shall file surety bonds with the Agency to be approved by the Board in the amounts and for the purposes noted below. Bonds issued by a surety, who is authorized to issue bonds in California, and whose bonding limitation shown in said circular is sufficient to provide bonds in the amount required by the Contract shall be deemed to be approved unless specifically rejected by the Agency. Bonds from all other sureties shall be accompanied by all of the documents enumerated in Code of Civil Procedure 995.660 (a). The Bidder shall pay all bond premiums, costs, and incidentals.

Each bond shall incorporate, by reference, the Contract and be signed by both the Bidder and Surety and the signature of the authorized agent of the Surety shall be notarized.

Revised 6/15/17 Contract No. 5552 Page 58 of 138
The Contractor shall provide a faithful performance/warranty bond and payment bond (labor and materials bond) for this contract. The faithful performance/warranty bond shall be in a sum not less than one hundred percent of the total amount payable by the terms of this contract. The Contractor shall provide bonds to secure payment of laborers and materials suppliers in a sum not less than one hundred percent of the total amount payable by the terms of this contract.

Both bonds shall extend in full force and effect and be retained by the Agency during this project until they are released according to the provisions of this section.

The faithful performance/warranty bond will be reduced to 25 percent of the original amount 30 days after recordation of the Notice of Completion and will remain in full force and effect for the one-year warranty period and until all warranty repairs are completed to the satisfaction of the Engineer. The bonds to secure payment of laborers and materials suppliers shall be released six months plus 30 days after recordation of the Notice of Completion if all claims have been paid.

All bonds are to be placed with a surety insurance carrier admitted and authorized to transact the business of insurance in California and whose assets exceed their liabilities in an amount equal to or in excess of the amount of the bond. The bonds are to contain the following documents:

1. An original, or a certified copy, of the un-revoked appointment, power of attorney, by laws, or other instrument entitling or authorizing the person who executed the bond to do so.

2. A certified copy of the certificate of authority of the insurer issued by the insurance commissioner.

If the bid is accepted, the Agency may require a financial statement of the assets and liabilities of the insurer at the end of the quarter calendar year prior to 30 days next preceding the date of the execution of the bond. The financial statement shall be made by an officer's certificate as defined in Section 173 of the Corporations Code. In the case of a foreign insurer, the financial statement may be verified by the oath of the principal officer or manager residing within the United States.

Should any bond become insufficient, the Contractor shall renew the bond within 10 days after receiving notice from the Agency.

Should any Surety at any time be unsatisfactory to the Board, notice will be given the Contractor to that effect. No further payments shall be deemed due or will be made under the contract until a new Surety shall qualify and be accepted by the Board.

Changes in the Work or extensions of time, made pursuant to the Contract, shall in no way release the Contractor or Surety from its obligations. Notice of such changes or extensions shall be waived by the Surety.

2-5 PLANS AND SPECIFICATIONS .

2-5.1 General. The Contractor shall keep at the Work site a copy of the Plans and Specifications, to which the Engineer shall have access at all times.

The specifications for the work include the General Provisions, Supplemental Provisions, Project Technical Specifications, Carlsbad Engineering Standards (CES), Standard Specifications for Public Works Construction (SSPWC) and the latest supplements thereto,

Revised 6/15/17 Contract No. 5552 Page 59 of 138
2021 edition as published by the "Greenbook" Committee of Public Works Standards, Inc., hereinafter designated "SSPWC", as amended.

The Plans shall consist of the construction drawings, Drawing No. 544-7 issued under this Contract.

The Standard Drawings consist of the latest edition of the San Diego Area Regional Standard Drawings, hereinafter designated SDRSD, as issued by the San Diego County Department of Public Works, together with the most recent editions of the City of Carlsbad Engineering Standards and Carlsbad Standard Drawings, as issued by the City of Carlsbad and the Carlsbad Municipal Water District, hereinafter designated as CES and CSD, respectively.

Modified standard drawings, if applicable, are enclosed in the appendices to these General Provisions.

The Plans, Specifications, and other Contract Documents shall govern the Work. The Contract Documents are intended to be complementary and cooperative. Anything specified in the Specifications and not shown on the Plans or shown on the Plans and not specified in the Specifications, shall be as though shown on or specified in both.

The Plans shall be supplemented by such working drawings and shop drawings as are necessary to adequately control the Work.

The Contractor shall ascertain the existence of any conditions affecting the cost of the Work through a reasonable examination of the Work site prior to submitting the Bid.

Existing improvements visible at the Work site, for which no specific disposition is made on the Plans, but which interfere with the completion of the Work, shall be removed and disposed of by the Contractor.

The Contractor shall, upon discovering any error or omission in the Plans or Specifications, immediately call it to the attention of the Engineer.

2-5.2 Precedence of Contract Documents.

If there is a conflict in the Contract Documents, the document highest in precedence shall control. The precedence shall be the most recent edition of the following documents listed in order of highest to lowest precedence:

1. Permits from other agencies as may be required by law.

2. Change orders, whichever occurs last.

3. Contract addenda, whichever occurs last.

4. Contract.

5. Carlsbad General and Supplemental Provisions.

6. Carlsbad Engineering Standards.

7. Technical Specifications.

8. Plans.

9. Standards Plans.
a. City of Carlsbad Standard Drawings.
b. City of Carlsbad Standard Drawings.
c. City of Carlsbad modifications to the San Diego Area Regional Standard Drawings. d. San Diego Area Regional Standard Drawings.

Revised 6/15/17 Contract No. 5552 Page 60 of 138
e. Traffic Signal Design Guidelines and Standards.
f. State of California Department of Transportation Standard Plans. g. State of California Department of Transportation Standard Specifications. h. California Manual on Uniform Traffic Control Devices (CA MUTCD).

10. Standard Specifications for Public Works Construction, as amended.

11. Reference Specifications.

12. Manufacturer’s Installation Recommendations

Detail drawings shall take precedence over general drawings.

Detailed plans and plan views shall have precedence over general plans.

2-5.2.1 Precedence of Caltrans Specifications. Where Caltrans specifications are used to modify the SSPWC or are added to the SSPWC by the Contract Documents, the Caltrans specifications shall have precedence only in reference to the materials referred to in the Caltrans specifications. The documents listed in Section 2-5.2 above, in their order of precedence above, shall prevail over the Caltrans specifications in all other matters.

2-5.3 Submittals.

2-5.3.1 General. Submittals shall be provided, at the Contractor’s expense, as required in 2-5.3.2, 2-5.3.3 and 2-5.3.4, when required by the Plans or Special Provisions, or when requested by the Engineer.

One electronic (PDF) file shall be submitted. If revisions are required, the Engineer will return one redlined copy for resubmission. Upon acceptance, the Engineer will return one electronic copy to the Contractor.

Materials shall neither be furnished nor fabricated, nor shall any work for which submittals are required be performed, before the required submittals have been reviewed and accepted by the Engineer. Neither review nor acceptance of submittals by the Engineer shall relieve the Contractor from responsibility for errors, omissions, or deviations from the Contract Documents, unless such deviations were specifically called to the attention of the Engineer in the letter of transmittal. The Contractor shall be responsible for the correctness of the submittals.

The Contractor shall allow a minimum of 20 working days for review of submittals unless otherwise specified in the Special Provisions. Each submittal shall be accompanied by a letter of transmittal.

Each submittal shall be consecutively numbered. Resubmittals shall be labeled with the number of the original submittal followed by an ascending alphabetical designation (e.g. The label ‘4-C’ would indicate the third instance that the fourth submittal had been given to the Engineer). Each sheet of each submittal shall be consecutively numbered. Each set of shop drawings and submittals shall be accompanied by a letter of transmittal on the Contractor’s letterhead. The letter of transmittal shall contain the following:

1. Project title and Agency contract number.

2. Number of complete sets.

3. Contractor’s certification statement.

4. Specification section number(s) pertaining to material submitted for review.

Revised 6/15/17 Contract No. 5552 Page 61 of 138

5. Submittal number (Submittal numbers shall be consecutive including subsequent submittals for the same materials.)

6. Description of the contents of the submittal.

7. Identification of deviations from the Contract Documents.

8. The signature, printed name, title and company name of the Contractor’s representative.

The Contractor shall subscribe to and shall place the following certification on all submittals:

 “I hereby certify that the (equipment, material, procedure(s)) shown and marked in this submittal is that proposed to be incorporated into this Project, is in compliance with the Contract Documents, can be installed in the allocated spaces, and is submitted for approval.”

Or

 “
I hereby certify that the (equipment, material, procedure(s)) contained herein meet all requirements shown or specified in the Contract Documents, except for the following deviation(s):
.”

2-5.3.2 Working Drawings. Working drawings are drawings showing details not shown on the Plans which are required to be designed by the Contractor. Working drawings shall be of a size and scale to clearly show all necessary details.

Working drawings are required in the following sections:

TABLE 2-5.3.2
Item Section Number Title Subject
1 7-8.6.1 Dewatering Excavation Dewatering
2 7-10.4.1 Safety Orders Trench Shoring
3 7-10.4.8 Steel Plate Covers Steel Plate Bridging
4 300-3.2 Cofferdams Structure Excavation & Backfill
5 300-12.1 SWPPP SWPPP
6 303-1.6.1 General Falsework
7 303-1.7.1 General Placing Reinforcement
8 303-3.1 General Prestressed Concrete Construction
9 304-1.1.2 Falsework Plans Structural Steel
10 307-1.1 General Jacking Operations
11 307-2.1 General Tunneling Operations
12 306-8 Microtunneling Microtunneling Operations
13 601-2 Temporary Traffic Control Plan Traffic Control 14 02690 Temporary Sewer Bypass Pumping Sewer Bypassing

Working drawings listed above as Items 2, 3, 4, 7, 8, 9, 10, 11, 12, and 13 shall be prepared by a Civil or Structural Engineer registered by the State of California.

2-5.3.3 Shop Drawings. Shop drawings are drawings showing details of manufactured or assembled products proposed to be incorporated into the Work. Shop drawings are required in the following sections and as specified in the Special Provisions:

Revised 6/15/17 Contract No. 5552 Page 62 of 138
TABLE 2-5.3.3
Item Section Number Title Subject
1 207-2.5 Joints Reinforced Concrete Pipe
2 207-8.4 Joints Vitrified Clay Pipe
3 304-1.1.1 Shop Drawings Structural Steel
4 304-2.1 General Metal Hand Railings

2-5.3.4 Supporting Information. Supporting information is information required by the Specifications for the purposes of administration of the Contract, analysis for verification of conformance with the Specifications, the operation and maintenance of a manufactured product or system to be constructed as part of the Work, and other information as may be required by the Engineer. Three hard copies and one electronic (PDF) file of the supporting information shall be submitted to the Engineer prior to the start of the Work unless otherwise specified in the Special Provisions or directed by the Engineer. Supporting information for systems shall be bound together and include all manufactured items for the system. If resubmittal is not required, one red lined copy will be returned to the Contractor. Supporting information shall consist of the following and is required unless otherwise specified in the Special Provisions:

1. List of Subcontractors per 2-3.2.

2. List of Materials per 4-1.4.

3. Certifications per 4-1.5.

4. Construction Schedule per 6-1 and Work Plan per 6-2.2.

5. Confined Space Entry Program per 7-10.4.4.

6. Concrete mix designs per 201-1.1.

7. Asphalt concrete mix designs per 203-6.1.

8. Controller Cabinet Wiring Diagrams per 701-17.2.2

9. Data, including, but not limited to, catalog sheets, manufacturer’s brochures, technical bulletins, specifications, diagrams, product samples, and other information necessary to describe a system, product or item. This information is required for irrigation systems, street lighting systems, and traffic signals, and may also be required for any product, manufactured item, or system.

10. Temporary highline plan per Carlsbad Engineering Standards.

2-5.4 Record Drawings. The Contractor shall maintain a complete "as-built" record set of blue-line prints, which shall be corrected in red ink daily and show every change from the original drawings and specifications and the exact "as-built" locations, sizes and kinds of equipment, underground piping, conduits, valves, and all other work not visible at surface grade.

Prints for this purpose may be obtained from the Agency at cost. The official record drawing shall accurately reflect all changes and modifications to the original plan. The Contractor shall formally submit the final record drawing at the final walk-through meeting. At the direction of the Engineer, the Contractor shall correct and revise the Record Drawings to accurately reflect field conditions. Re-submittal of the Record Drawings shall be completed within ten (10) working days of the final walk-through meeting date and shall reflect any additional punch list items.

Payment for the upkeep, revision, and submittal of the record drawings shall be included in the lump sum price for mobilization.

2-6 WORK TO BE DONE. The Contractor shall perform all work necessary to complete the Contract in a satisfactory manner. Unless otherwise provided, the Contractor shall furnish all materials, equipment, tools, labor, and incidentals necessary to complete the Work.

Revised 6/15/17 Contract No. 5552 Page 63 of 138
2-7 SUBSURFACE DATA. All soil and test hole data, water table elevations, and soil or groundwater analyses shown on the drawings or included in the Specifications apply only at the location of the test holes and to the depths indicated. Soil test reports for test holes which have been drilled are available for inspection at the office of the Engineer.

The Contractor may make independent investigations of the project site, including evaluation of the soil or groundwater conditions and/or the presence of rock, in order to characterize the subsurface conditions that may be encountered to the Contractor’s satisfaction. The costs for such investigations shall be considered included in the bid price and no additional compensation will be made therefor.

The indicated elevation of the water table is that which existed on the date when test hole data was determined. It is the Contractor’s responsibility to determine and allow for the elevation of groundwater at the time of project construction. A difference in elevation between groundwater shown in soil boring logs and groundwater actually encountered during construction will not be considered as a basis for extra work.

2-8 RIGHT-OF-WAY. Rights-of-way, easements, or rights-of-entry for the Work, when indicated on the Plans, will be provided by the Agency. Unless otherwise provided, the Contractor shall make arrangements, pay for, and assume all responsibility for acquiring, using, and restoring additional work areas and removing and/or disposing of facilities temporarily required. The Contractor shall indemnify and hold the agency harmless from all claims for damages caused by such actions.

2-9 SURVEYING.

2-9.1 General. The Contractor will perform and be responsible for the accuracy of surveying adequate for construction. The Contractor shall set and preserve construction survey stakes and marks for the duration of their usefulness. If any construction survey stakes are lost or disturbed and need to be replaced, such replacement shall be performed at the expense of the Contractor.

The Contractor shall notify the Engineer in writing at least 2 Working Days before survey services in connection with the laying out of any portion of the Work. The Contractor shall set all stakes for line and grade. Setting tolerances for construction staking shall conform with Chapter 12, Construction Surveys of the Caltrans Surveys Manual. Surveying to determine the boundaries of the public right-of-way or easements shall conform with Chapter 10, Right-of-Way Surveys.

Unless otherwise specified in the Special Provisions, stakes will be set and stationed for alignments for pipelines (sewers, storm drains, potable water, recycled water) and their appurtenances, curbs, headers, structures, rough grade, finish grade and right-of-way or easement boundaries. A corresponding cut or fill to finished grade (or flowline) will be indicated on a grade sheet.

2-9.2 Permanent Survey Markers. The Contractor shall not cover or disturb permanent survey monuments or benchmarks without the consent of the Engineer. Where the Engineer concurs, in writing, with the Contractor that protecting an existing monument in place is impractical, the Contractor shall employ a licensed land surveyor or a registered civil engineer authorized to practice land surveying within the State of California, hereinafter Surveyor, to establish the location of the monument before it is disturbed. The Contractor shall have the

Revised 6/15/17 Contract No. 5552 Page 64 of 138
monument replaced by the Surveyor no later than thirty (30) days after construction at the site of the replacement is completed. The Surveyor shall file corner record(s) as required by §§ 8772 and 8773, et seq. of the California Business and Professions Code.

The Contractor shall have a Record of Survey prepared by the Surveyor and file it in conformance with §8700 - 8805 of the State of California Business and Professions Code when the Surveyor performs any surveying that such map is required under §8762 of the State of California Business and Professions Code and whenever the Surveyor shall establish, set or construct any permanent survey monument. SDRS Drawing No. M-10 type monuments, bolts, spikes, leaded tacks and nails (when set in concrete), iron pipes, reinforcing steel and all monuments and marks that are at, or accessory to, property corners and street centerlines are permanent survey monuments. The Record of Survey shall show all monuments set, control monuments used, the basis of bearings and all other data needed to determine the procedure of survey and the degree of accuracy attained by the field surveying including the unadjusted ratio of closure. The unadjusted ratio of closure shall not exceed 1 part in 40,000. The Record of Survey shall show the location and justification of location of all permanent monuments set and their relation to the street right-of-way. Record(s) of Survey(s) shall be submitted for the Engineer’s review and approval before submittal to the County Surveyor and before submittal to the County Recorder.

When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, the Contractor shall adjust the monument frame and cover to the new grade within 7 days of paving unless the Engineer shall approve otherwise.

Monument frames and covers shall be protected during street sealing or painting projects or be cleaned to the satisfaction of the Engineer.

2-9.3 Line and Grade. All work shall conform to the lines, elevations, and grades shown on the Plans.

Three consecutive points set on the same slope shall be used together so that any variation from a straight grade can be detected. Any such variation shall be reported to the Engineer. In the absence of such report, the Contractor shall be responsible for any error in the grade of the Work.

Grades for underground conduits will be set at the surface of the ground. The Contractor shall transfer them to the bottom of the trench.

2-9.4 Payment for Survey, Payment for survey work shall be included in the bid items requiring the survey work and no additional payment will be made. Extension of unit prices for extra work shall include full compensation for attendant survey work and no additional payment will be made. Payment for the replacement of disturbed monuments and the filing of records of survey and/or corner records, including filing fees, shall be incidental to the work necessitating the disturbance of said monuments and no additional payment will be made.

2-10 AUTHORITY OF BOARD AND ENGINEER . The Board has the final authority in all matters affecting the Work. Within the scope of the Contract, the Engineer has the authority to enforce compliance with the Plans and Specifications. The Contractor shall promptly comply with instructions from the Engineer or an authorized representative.

The decision of the Engineer is final and binding on all questions relating to: quantities; acceptability of material, equipment, or work; execution, progress or sequence of work; and

Revised 6/15/17 Contract No. 5552 Page 65 of 138
interpretation of the Plans, Specifications, or other drawings. This shall be precedent to any payment under the Contract, unless otherwise ordered by the Board.

2-10.1 Availability of Records, The Contractor shall, at no charge to the Agency, provide copies of all records in the Contractor’s or subcontractor’s possession pertaining to the work that the Engineer may request.

2-10.2 Audit and Inspection, Contractor agrees to maintain and/or make available, to the Engineer, within San Diego County, accurate books and accounting records relative to all its activities and to contractually require all subcontractors to this Contract to do the same. The Engineer shall have the right to monitor, assess, and evaluate Contractor’s and its subcontractors’ performance pursuant to this Agreement, said monitoring, assessments, and evaluations to include, but not be limited to, audits, inspection of premises, reports, contracts, subcontracts and interviews of Contractor’s staff and the staff of all subcontractors to this contract. At any time during normal business hours and as often as the Engineer may deem necessary, upon reasonable advance notice, Contractor shall make available to the Engineer for examination, all of its, and all subcontractors to this contract, records with respect to all matters covered by this Contract and will permit the Engineer to audit, examine, copy and make excerpts or transcripts from such data and records, and to make audits of all invoices, materials, payrolls, records of personnel, and other data relating to all matters covered by this Contract.

However, any such activities shall be carried out in a manner so as to not unreasonably interfere with Contractor’s ongoing business operations. Contractor and all subcontractors to this contract shall maintain such data and records for as long as may be required by applicable laws and regulations.

2-11 INSPECTION. The Work is subject to inspection and approval by the Engineer. The Contractor shall notify the Engineer before noon of the working day before inspection is required.

Work shall be done only in the presence of the Engineer, unless otherwise authorized. Any work done without proper inspection will be subject to rejection. The Engineer and any authorized representatives shall at all times have access to the Work during its construction at shops and yards as well as the project site. The Contractor shall provide every reasonable facility for ascertaining that the materials and workmanship are in accordance with these Specifications.

Inspection of the Work shall not relieve the Contractor of the obligation to fulfill all conditions of the Contract.

Revised 6/15/17 Contract No. 5552 Page 66 of 138
SECTION 3 – CHANGES IN WORK

3-1 CHANGES REQUESTED BY THE CONTRACTOR.

3-1.1 General. Changes in the Plans and Specifications, requested in writing by the Contractor, which do not materially affect the Work and which are not detrimental to the Work or to the interests of the Agency, may be granted by the Engineer. Nothing herein shall be construed as granting a right to the Contractor to demand acceptance of such changes.

3-1.2 Payment for Changes Requested by the Contractor. If such changes are granted, they shall be made at a reduction in cost or no additional cost to the Agency.

3-2 CHANGES INITIATED BY THE AGENCY.

3-2.1 General. The Agency may change the Plans, Specifications, character of the work, or quantity of work provided the total arithmetic dollar value of all such changes, both additive and deductive, does not exceed 25 percent of the Contract Price. Should it become necessary to exceed this limitation, the change shall be by written Supplemental Agreement between the Contractor and Agency, unless both parties agree to proceed with the change by Change Order.

Change Orders shall be in writing and state the dollar value of the change or established method of payment, any adjustment in contract time of completion, and when negotiated prices are involved, shall provide for the Contractor’s signature indicating acceptance.

3-2.2 Payment.

3-2.2.1 Contract Unit Prices. If a change is ordered in an item of work covered by a Contract Unit Price, and such change does not involve substantial change in character of the work from that shown on the Plans or specified in the Specifications, then an adjustment in payment will be made. This adjustment will be based upon the increase or decrease in quantity and the Contract Unit Price.

If the actual quantity of an item of work covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications varies from the Bid quantity by 50 percent or less, payment will be made at the Contract Unit Price. If the actual quantity of said item of work varies from the Bid quantity by more than 50 percent, payment will be made per Section 3-2.2.2 or 3-2.2.3 as appropriate.

If a change is ordered in an item of work covered by a Contract Unit Price, and such change does involve a substantial change in the character of the work from that shown on the Plans or specified in the Specifications, an adjustment in payment will be made per Section 3-2.4.

3-2.2.2 Increases of More Than 50 Percent. Should the actual quantity of an item of work covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications, exceed the Bid quantity by more than 50 percent, payment for the quantity in excess of 150 percent of the Bid quantity will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or at the option of the Engineer, on the basis of Extra Work per Section 3-3. The Extra Work per Section 3-3, basis of payment, shall not include fixed costs. Fixed costs shall be deemed to have been recovered by the Contractor through payment for 150 percent of the Bid quantity at the Contract Unit Price.

Revised 6/15/17 Contract No. 5552 Page 67 of 138

3-2.2.3 Decreases of More Than 50 Percent. Should the actual quantity of an item of work covered by a Contract Unit Price, and constructed in conformance with the Plans and Specifications, be less than 50 percent of the Bid quantity, an adjustment in payment will not be made unless so requested in writing by the Contractor. If the Contractor so requests, payment will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or at the option of the Engineer, on the basis of Extra Work per Section 3-3; however, in no case will payment be less than would be made for the actual quantity at the Contract Unit Price nor more than would be made for 50 percent of the Bid quantity at the Contract Unit Price.

3-2.3 Stipulated Unit Prices. Stipulated Unit Prices are unit prices established by the Agency in the Contract Documents as distinguished from Contract Unit Prices submitted by the Contractor. Stipulated Unit Prices may be used for the adjustment of Contract changes when so specified in the Special Provisions.

3-2.4 Agreed Prices. Agreed Prices are prices for new or unforeseen work, or adjustments in Contract Unit Prices per Section 3-2.2, established by mutual agreement between the Contractor and the Agency. If mutual agreement cannot be reached, the Engineer may direct the Contractor to proceed on the basis of Extra Work in accordance per Section 3-3, except as otherwise specified in Sections 3-2.2.2 and 3-2.2.3.

3.2.4.1 Schedule of Values. Prior to construction, Contractor shall provide a schedule of values for all lump sum bid items that shall be used for the purpose of progress payments. The prices shall be valid for the purpose of change orders to the project.

3.2.5 Eliminated Items. Should any Bid item be eliminated in its entirety, payment will be made to the Contractor for its actual costs incurred in connection with the eliminated item prior to notification in writing from the Engineer so stating its elimination. If material conforming to the Plans and Specifications is ordered by the Contractor for use in the eliminated item prior to the date of notification of elimination by the Engineer, and if the order for that material cannot be canceled, payment will be made to the Contractor for the actual cost of the material. In this case, the material shall become the property of the Agency. Payment will be made to the Contractor for its actual costs for any further handling. If the material is returnable, the material shall be returned and payment will be made to the Contractor for the actual cost of charges made by the supplier for returning the material and for handling by the Contractor. Actual costs, as used herein, shall be computed on the basis of Extra Work per Section 3-3.

3-3 EXTRA WORK .

3-3.1 General. New or unforeseen work will be classified as “extra work” when the Engineer determines that it is not covered by Contract Unit Prices or stipulated unit prices.

3-3.2 Payment.

3-3.2.1 General. When the price for the extra work cannot be agreed upon, the Agency will pay for the extra work based on the accumulation of costs as provided herein.

Revised 6/15/17 Contract No. 5552 Page 68 of 138
3-3.2.2 Basis for Establishing Costs.

(a) Labor. The costs of labor will be the actual cost for wages of workers performing the extra work at the time the extra work is done, plus employer payments of payroll taxes, workers compensation insurance, liability insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs, resulting from Federal, State, or local laws, as well as assessments or benefits required by lawful collective bargaining agreements.

The use of a labor classification which would increase the extra work cost will not be permitted unless the Contractor establishes the necessity for such additional costs. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental. The labor cost for foremen shall be proportioned to all of their assigned work and only that applicable to extra work will be paid.

Nondirect labor costs, including superintendence, shall be considered part of the markup of Section 3-3.2.3 (a).

(b) Materials. The cost of materials reported shall be at invoice or lowest current price at which such materials are locally available and delivered to the job site in the quantities involved, plus sales tax, freight, and delivery.

The Agency reserves the right to approve materials and sources of supply, or to supply materials to the Contractor if necessary, for the progress of the Work. No markup shall be applied to any material provided by the Agency.

(c) Tool and Equipment Rental. No payment will be made for the use of tools which have a replacement value of $200 or less.

Regardless of ownership, the rates and right-of-way delay factors to be used in determining rental and delay costs shall be the edition of the, “Labor Surcharge and Equipment Rental Rates” published by Caltrans, current at the time of the actual use of the tool or equipment. The right-of-way delay factors therein shall be used as multipliers of the rental rates for determining the value of costs for delay to the Contractor and subcontractors, if any. The labor surcharge rates published therein are not a part of this contract.

The rental rates paid shall include the cost of fuel, oil, lubrication, supplies, small tools, necessary attachments, repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals. Necessary loading and transportation costs for equipment used on the extra work shall be included.

If equipment is used intermittently and, when not in use, could be returned to its rental source at less expense to the Agency than holding it at the Work site, it shall be returned, unless the Contractor elects to keep it at the Work site, at no expense to the Agency.

All equipment shall be acceptable to the Engineer, in good working condition, and suitable for the purpose for which it is to be used. Manufacturer’s ratings and approved modifications shall be used to classify equipment and it shall be powered by a unit of at least the minimum rating recommended by the manufacturer.

Revised 6/15/17 Contract No. 5552 Page 69 of 138
The reported rental time for equipment already at the Work site shall be the duration of its use on the extra work. This time begins when equipment is first put into actual operation on the extra work, plus the time required to move it from its previous site and back, or to a closer site.

(d) Other Items. The Agency may authorize other items which may be required on the extra work, including labor, services, material, and equipment. These items must be different in their nature from those required for the Work and be of a type not ordinarily available from the Contractor or Subcontractors.

Invoices covering all such items in detail shall be submitted with the request for payment.

(e) Invoices. Vendors’ invoices for material, equipment rental and other expenditures shall be submitted with the request for payment. If the request for payment is not substantiated by invoices or other documentation, the Agency may establish the cost of the item involved at the lowest price which was current at the time of the report.

3-3.2.3 Markup.

(a) Work by Contractor. The following percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profits:

1. Labor …………………………..… 20

2. Materials .……………………….. 15

3. Equipment Rental ……………… 15

4. Other Items and Expenditures .. 15

To the sum of the costs and markups provided for in this section, 1 percent shall be added as compensation for bonding.

(b) Work by Subcontractor. When all or any part of the extra work is performed by a Subcontractor, the markup established in Section 3-3.2.3(a) shall be applied to the Subcontractor's actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.

3-3.3 Daily Reports by Contractor. When the price for the extra work cannot be agreed upon, the Contractor shall submit a daily report to the Engineer on forms approved by the Agency. Included are applicable delivery tickets, listing all labor, materials, and equipment involved for that day, and other services and expenditures when authorized. Payment for extra work will not be made until such time that the Contractor submits completed daily reports and all supporting documents to the Engineer. Failure to submit the daily report by the close of the next working day may waive any rights for that day. An attempt shall be made to reconcile the report daily, and it shall be signed by the Engineer and the Contractor. In the event of disagreement, pertinent notes shall be entered by each party to explain points which cannot be resolved immediately. Each party shall retain a signed copy of the report. Reports by Subcontractors or others shall be submitted through the Contractor.

The report shall:

1. Show names of workers, classifications, and hours worked.

2. Describe and list quantities of materials used.

Revised 6/15/17 Contract No. 5552 Page 70 of 138

3. Show type of equipment, size, identification number, and hours of operation, including loading and transportation, if applicable.

4. Describe other services and expenditures in such detail as the Agency may require.

3-4 CHANGED CONDITIONS. The Contractor shall promptly notify the Engineer of the following work site conditions (hereinafter called changed conditions), in writing, upon their discovery and before they are disturbed:

1. Subsurface or latent physical conditions differing materially from those represented in the Contract Documents;

2. Unknown physical conditions of an unusual nature differing materially from those ordinarily encountered and generally recognized as inherent in work of the character being performed; and

3. Material differing from that represented in the Contract which the Contractor believes may be hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.

The Engineer will promptly investigate conditions which appear to be changed conditions. If the Engineer determines that conditions are changed conditions and they will materially affect performance time, the Contractor, upon submitting a written request, will be granted an extension of time subject to the provisions of 6-6.

If the Engineer determines that the conditions do not justify an adjustment in compensation, the Contractor will be notified in writing. This notice will also advise the Contractor of its obligation to notify the Engineer in writing if the Contractor disagrees.

The Contractor’s failure to give notice of changed conditions promptly upon their discovery and before they are disturbed shall constitute a waiver of all claims in connection therewith.

The Contractor shall not be entitled to the payment of any additional compensation for any act, or failure to act, by the Engineer, including failure or refusal to issue a change order, or for the happening of any event, thing, occurrence, or other cause, unless the Contractor shall have first given the Engineer due written notice of potential claim as hereinafter specified. Compliance with this section shall not be required as a prerequisite to notice provisions in Section 6-7.3 Contract Time Accounting, nor to any claim that is based on differences in measurement or errors of computation as to contract quantities. The written notice of potential claim for changed conditions shall be submitted by the Contractor to the Engineer upon their discovery and prior to the time that the Contractor performs the work giving rise to the potential claim. The Contractor’s failure to give written notice of potential claim for changed conditions to the agency upon their discovery and before they are disturbed shall constitute a waiver of all claims in connection therewith.

The Contractor shall provide the City with a written document containing a description of the particular circumstances giving rise to the potential claim, the reasons for which the Contractor believes additional compensation may be due and nature of any and all costs involved within 20 working days of the date of service of the written notice of potential claim for changed conditions. Verbal notifications are disallowed.

The potential claim shall include the following certification relative to the California False Claims Act, Government Code Sections 12650-12655:

Revised 6/15/17 Contract No. 5552 Page 71 of 138

“The undersigned certifies that the above statements are made in full cognizance of the California False Claims Act, Government Code Sections 12650-12655. The undersigned further understands and agrees that this potential claim, unless resolved, must be restated as a claim in response to the City’s proposed final estimate in order for it to be further considered.”

By: ___________________________________ Title: ______________________________

Date: _________________________________

Company Name: ______________________________________________________________

The Contractor’s estimate of costs may be updated when actual costs are known. The Contractor shall submit substantiation of its actual costs to the Engineer within 20 working days after the affected work is completed. Failure to do so shall be sufficient cause for denial of any claim subsequently filed on the basis of said notice of potential claim.

It is the intention of this section that differences between the parties arising under and by virtue of the contract be brought to the attention of the Engineer at the earliest possible time in order that such matters be settled, if possible, or other appropriate action promptly taken.

3-5 DISPUTED WORK. The Contractor shall give the Agency written notice of potential claim prior to commencing any disputed work. Failure to give said notice shall constitute a waiver of all claims in connection therewith. If the Contractor and the Agency are unable to reach agreement on disputed work, the Agency may direct the Contractor to proceed with the Work.

Prior to proceeding with dispute resolution pursuant to Public Contract Code provisions specified hereinafter, the contractor shall attempt to resolve all disputes informally through the following dispute resolution chain of command:

1. Project Inspector

2. Construction Manager

3. Deputy City Engineer

4. City Engineer

5. City Manager

The Contractor shall submit a complete report within 20 working days after completion of the disputed work stating its position on the claim, the contractual basis for the claim, along with all documentation supporting the costs and all other evidentiary materials. At each level of claim or appeal of claim the City will, within 10 working days of receipt of said claim or appeal of claim, review the Contractor’s report and respond with a position, request additional information or request that the Contractor meet and present its report. When additional information or a meeting is requested, the City will provide its position within 10 working days of receipt of said additional information or Contractor’s presentation of its report. The Contractor may appeal each level’s position up to the City Manager after which the Contractor may proceed under the provisions of the Public Contract Code.

The authority within the dispute resolution chain of command is limited to recommending a resolution to a claim to the City Manager. Actual approval of the claim is subject to the change order provisions in the contract.

Revised 6/15/17 Contract No. 5552 Page 72 of 138
All claims by the -Contractor shall be resolved in accordance with Public Contract Code section 9204, which is set forth below:

9204. (a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner.

(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project.

(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department.
(ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department.
(iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is

Revised 6/15/17 Contract No. 5552 Page 73 of 138
disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.

If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.

Revised 6/15/17 Contract No. 5552 Page 74 of 138
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.

(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section.

(f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.

(g) This section applies to contracts entered into on or after January 1, 2017.

(h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.

(i) This section shall remain in effect only until January 1, 2020, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes or extends that date.

In addition, all claims by Contractor for $375,000 or less shall be resolved in accordance with the procedures in the Public Contract Code, Division 2, Part 3, Chapter 1, Article 1.5 (commencing with Section 20104) which is set forth below.

ARTICLE 1.5 RESOLUTION OF CONSTRUCTION CLAIMS

20104. (a)(1) This article applies to all public works claims of three hundred seventy-five thousand dollars ($375,000) or less which arise between a contractor and a local agency. (2) This article shall not apply to any claims resulting from a contract between a contractor and a public agency when the public agency has elected to resolve any disputes pursuant to Article

7.1 (commencing with Section 10240) of Chapter 1 of Part 2. (b)(1) "Public work" has the same meaning as in Sections 3100 and 3106 of the Civil Code, except that "public work" does not include any work or improvement contracted for by the state or the Regents of the University of California.
(2) "Claim" means a separate demand by the contractor for (A) a time extension, (B) payment of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public work and payment of which is not otherwise expressly provided for or the

Revised 6/15/17 Contract No. 5552 Page 75 of 138
claimant is not otherwise entitled to, or (C) an amount the payment of which is disputed by the local agency.
(c) The provisions of this article or a summary thereof shall be set forth in the plans or specifications for any work which may give rise to a claim under this article. (d) This article applies only to contracts entered into on or after January 1, 1991.

20104.2. For any claim subject to this article, the following requirements apply:
(a) The claim shall be in writing and include the documents necessary to substantiate the claim.

Claims must be filed on or before the date of final payment. Nothing in this subdivision is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims.
(b)(1) For claims of less than fifty thousand dollars ($50,000), the local agency shall respond in writing to any written claim within 45 days of receipt of the claim, or may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses to the claim the local agency may have against the claimant. (2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the claimant. (3) The local agency's written response to the claim, as further documented, shall be submitted to the claimant within 15 days after receipt of the further documentation or within a period of time no greater than that taken by the claimant in producing the additional information, whichever is greater.
(c)(1) For claims of over fifty thousand dollars ($50,000) and less than or equal to three hundred seventy-five thousand dollars ($375,000), the local agency shall respond in writing to all written claims within 60 days of receipt of the claim, or may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses to the claim the local agency may have against the claimant.
(2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the claimant. (3) The local agency's written response to the claim, as further documented, shall be submitted to the claimant within 30 days after receipt of the further documentation, or within a period of time no greater than that taken by the claimant in producing the additional information or requested documentation, whichever is greater.
(d) If the claimant disputes the local agency's written response, or the local agency fails to respond within the time prescribed, the claimant may so notify the local agency, in writing, either within 15 days of receipt of the local agency's response or within 15 days of the local agency's failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon a demand, the local agency shall schedule a meet and confer conference within 30 days for settlement of the dispute. (e) Following the meet and confer conference, if the claim or any portion remains in dispute, the claimant may file a claim as provided in Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code.

For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the claimant submits his or her written claim pursuant to subdivision (a) until the time that claim is denied as a result of the meet and confer process, including any period of time utilized by the meet and confer process. (f) This article does not apply to tort claims and nothing in this article is intended nor shall be construed to change the time periods for filing tort claims or actions specified by Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code.

Revised 6/15/17 Contract No. 5552 Page 76 of 138
20104.4. The following procedures are established for all civil actions filed to resolve claims subject to this article:
(a) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to non -binding mediation unless waived by mutual stipulation of both parties. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court or by stipulation of both parties. If the parties fail to select a mediator within the 15-day period, any party may petition the court to appoint the mediator.
(b)(1) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1141.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil procedure) shall apply to any proceeding brought under the subdivision consistent with the rules pertaining to judicial arbitration.
(2) Notwithstanding any other provision of law, upon stipulation of the parties, arbitrators appointed for purposes of this article shall be experienced in construction law, and, upon stipulation of the parties, mediators and arbitrators shall be paid necessary and reasonable hourly rates of pay not to exceed their customary rate, and such fees and expenses shall be paid equally by the parties, except in the case of arbitration where the arbitrator, for good cause, determines a different division. In no event shall these fees or expenses be paid by state or county funds.
(3) In addition to Chapter 2.5 (commencing with Section 1141.10) Title 3 of Part 3 of the Code of Civil Procedure, any party who after receiving an arbitration award requests a trial de novo but does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, pay the attorney's fees of the other party arising out of the trial de novo. (c) The court may, upon request by any party, order any witnesses to participate in the mediation or arbitration process.

20104.6. (a) No local agency shall fail to pay money as to any portion of a claim which is undisputed except as otherwise provided in the contract. (b) In any suit filed under Section 20104.4, the local agency shall pay interest at the legal rate on any arbitration award or judgment. The interest shall begin to accrue on the date the suit is filed in a court of law.

Although not to be construed as proceeding under extra work provisions, the Contractor shall keep and furnish records of disputed work in accordance with Section 3-3.

Revised 6/15/17 Contract No. 5552 Page 77 of 138
SECTION 4 – CONTROL OF MATERIALS

4-1 MATERIALS AND WORKMANSHIP .

4-1.1. General. All materials, parts, and equipment furnished by the Contractor in the Work shall be new, high grade, and free from defects. Quality of work shall be in accordance with the generally accepted standards. Material and work quality shall be subject to the Engineer’s approval.

Materials and work quality not conforming to the requirements of the Specifications shall be considered defective and will be subject to rejection. Defective work or material, whether in place or not, shall be removed immediately from the site by the Contractor, at its expense, when so directed by the Engineer.

If the Contractor fails to replace any defective or damaged work or material after reasonable notice, the Engineer may cause such work or materials to be replaced. The replacement expense will be deducted from the amount to be paid to the Contractor.

Used or secondhand materials, parts, and equipment may be used only if permitted by the Specifications.

4-1.2 Protection of Work and Materials. The Contractor shall provide and maintain storage facilities and employ such measures as will preserve the specified quality and fitness of materials to be used in the Work. Stored materials shall be reasonably accessible for inspection.

The Contractor shall also adequately protect new and existing work and all items of equipment for the duration of the Contract.

The Contractor shall not, without the Agency’s consent, assign, sell, mortgage, hypothecate, or remove equipment or materials which have been installed or delivered and which may be necessary for the completion of the Contract.

4-1.3 Inspection Requirements.

4-1.3.1 General. Unless otherwise specified, inspection is required at the source for such typical materials and fabricated items as bituminous paving mixtures, structural concrete, metal fabrication, metal casting, welding, concrete pipe manufacture, protective coating application, and similar shop or plant operations.

Steel pipe in sizes less than 6 inches and vitrified clay and cast-iron pipe in all sizes are acceptable upon certification as to compliance with the Specifications, subject to sampling and testing by the Agency. Standard items of equipment such as electric motors, conveyors, elevators, plumbing fixtures, etc., are subject to inspection at the job site only. Special items of equipment such as designed electrical panel boards, large pumps, sewage plant equipment, etc., are subject to inspection at the source, normally only for performance testing. The Specifications may require inspection at the source for other items not typical of those listed in this section.

The Contractor shall provide the Engineer free and safe access to any and all parts of work at any time. Such free and safe access shall include means of safe access and egress, ventilation, lighting, shoring, dewatering and all elements pertaining to the safety of persons as contained in

Revised 6/15/17 Contract No. 5552 Page 78 of 138
the State of California, California Code of Regulations, Title 8, Industrial Relations, Chapter 4, Division of Industrial Safety, Subchapter 4, Construction Safety Orders and such other safety regulations as may apply. Contractor shall furnish Engineer with such information as may be necessary to keep the Engineer fully informed regarding progress and manner of work and character of materials. Inspection or testing of the whole or any portion of the work or materials incorporated in the work shall not relieve Contractor from any obligation to fulfill this Contract.

4-1.3.2 Inspection of Materials Not Locally Produced. When the Contractor intends to purchase materials, fabricated products, or equipment from sources located more than 50 miles outside the geographical limits of the Agency, an inspector or accredited testing laboratory (approved by the Engineer), shall be engaged by the Contractor at its expense, to inspect the materials, equipment or process. This approval shall be obtained before producing any material or equipment. The inspector or representative of the testing laboratory shall judge the materials by the requirements of the Plans and Specifications. The Contractor shall forward reports required by the Engineer. No material or equipment shall be shipped nor shall any processing, fabrication or treatment of such materials be done without proper inspection by the approved agent. Approval by said agent shall not relieve the Contractor of responsibility for complying with the Contract requirements.

4-1.3.3 Inspection by the Agency. The Agency will provide all inspection and testing laboratory services within 50 miles of the geographical limits of the Agency. For private contracts, all costs of inspection at the source, including salaries and mileage costs, shall be paid by the permittee.

4-1.4 Test of Material. Before incorporation in the Work, the Contractor shall submit samples of materials, as the Engineer may require, at no cost to the Agency. The Contractor, at its expense, shall deliver the materials for testing to the place and at the time designated by the Engineer. Unless otherwise provided, all initial testing will be performed under the direction of the Engineer, and at no expense to the Contractor. If the Contractor is to provide and pay for testing, it will be stated in the Specifications. For private contracts, the testing expense shall be borne by the permittee.

The Contractor shall notify the Engineer in writing, at least 15 days in advance, of its intention to use materials for which tests are specified, to allow sufficient time to perform the tests. The notice shall name the proposed supplier and source of material.

If the notice of intent to use is sent before the materials are available for testing or inspection or is sent so far in advance that the materials on hand at the time will not last but will be replaced by a new lot prior to use on the Work, it will be the Contractor’s responsibility to renotify the Engineer when samples which are representative may be obtained.

Except as specified in these Provisions, the Agency will bear the cost of testing of locally produced materials and/or on-site workmanship where the results of such tests meet or exceed the requirements indicated in the Standard Specifications, Technical Specification, and any Supplemental Provisions. The cost of all other tests shall be borne by the Contractor.

At the option of the Engineer, the source of supply of each of the materials shall be approved by the Engineer before the delivery is started. All materials proposed for use may be inspected or tested at any time during their preparation and use. If, after incorporating such materials into the Work, it is found that sources of supply that have been approved do not furnish a uniform product, or if the product from any source proves unacceptable at any time, the Contractor shall

Revised 6/15/17 Contract No. 5552 Page 79 of 138
furnish approved material from other approved sources. If any product proves unacceptable after improper storage, handling or for any other reason it shall be rejected, not incorporated into the work and shall be removed from the project site all at the Contractor’s expense.

Compaction tests may be made by the Engineer and all costs for tests that meet or exceed the requirements of the specifications shall be borne by the Agency. Said tests may be made at any place along the work as deemed necessary by the Engineer. The costs of any retests made necessary by noncompliance with the specifications shall be borne by the Contractor.

4-1.5 Certification. The Engineer may waive materials testing requirements of the Specifications and accept the manufacturer’s written certification that the materials to be supplied meet those requirements. Material test data may be required as part of the certification.

4-1.6 Trade Names or Equals. The Contractor may supply any of the materials specified or offer an equivalent. The Engineer shall determine whether the material offered is equivalent to that specified. Adequate time shall be allowed for the Engineer to make this determination.

Whenever any particular material, process, or equipment is indicated by patent, proprietary or brand name, or by name of manufacturer, such wording is used for the purpose of facilitating its description and shall be deemed to be followed by the words “ or equal”. A listing of materials is not intended to be comprehensive, or in order of preference. The Contractor may offer any material, process, or equipment considered to be equivalent to that indicated.

The substantiation of offers shall be submitted as provided in the Contract Documents.

The Contractor shall, at its expense, furnish data concerning items offered by it as equivalent to those specified. The Contractor shall have the material tested as required by the Engineer to determine that the quality, strength, physical, chemical, or other characteristics, including durability, finish, efficiency, dimensions, service, and suitability are such that the item will fulfill its intended function.

Test methods shall be subject to the approval of the Engineer. Test results shall be reported promptly to the Engineer, who will evaluate the results and determine if the substitute item is equivalent. The Engineer’s findings shall be final. Installation and use of a substitute item shall not be made until approved by the Engineer.

If a substitute offered by the Contractor is not found to be equal to the specified material, the Contractor shall furnish and install the specified material.

The specified Contract completion time shall not be affected by any circumstance developing from the provisions of this section.

The Contractor is responsible for the satisfactory performance of substituted items. If, in the sole opinion of the Engineer, the substitution is determined to be unsatisfactory in performance, appearance, durability, compatibility with associated items, availability of repair parts and suitability of application the Contractor shall remove the substituted item and replace it with the originally specified item at no cost to the Agency.

4-1.7 Weighing and Metering Equipment. All scales and metering equipment used for proportioning materials shall be inspected for accuracy and certified within the past 12 months by the State of California Bureau of Weights and Measures, by the County Director or Sealer of Weights and Measures, or by a scale mechanic registered with or licensed by the County.

Revised 6/15/17 Contract No. 5552 Page 80 of 138
The accuracy of the work of a scale service agency, except as stated herein, shall meet the standards of the California Business and Professions Code and the California Code of Regulations pertaining to weighing devices. A certificate of compliance shall be presented, prior to operation, to the Engineer for approval and shall be renewed whenever required by the Engineer at no cost to the Agency.

All scales shall be arranged so they may be read easily from the operator’s platform or area.

They shall indicate the true net weight without the application of any factor. The figures of the scales shall be clearly legible. Scales shall be accurate to within 1 percent when tested with the plant shut down. Weighing equipment shall be so insulated against vibration or moving of other operating equipment in the plant area that the error in weighing with the entire plant running will not exceed 2 percent for any setting nor 1.5 percent for any batch.

4-1.8 Calibration of Testing Equipment. Testing equipment, such as, but not limited to pressure gages, metering devices, hydraulic systems, force (load) measuring instruments, and strain-measuring devices shall be calibrated by a testing agency acceptable to the Engineer at intervals not to exceed 12 months and following repairs, modification, or relocation of the equipment. Calibration certificates shall be provided when requested by the Engineer.

4-1.9 Construction Materials Dispute Resolution (Soils, Rock Materials, Concrete, Mortar and Related Materials, Masonry Materials, Bituminous Materials, Rock Products, and Modified Asphalts). In the interest of safety and public value, whenever credible evidence arises to contradict the test values of materials, the Agency and the Contractor will initiate an immediate and cooperative investigation. Test values of materials are results of the materials’ tests, as defined by these Specifications or by the special provisions, required to accept the Work. Credible evidence is process observations or test values gathered using industry accepted practices. A contradiction exists whenever test values or process observations of the same or similar materials are diverse enough such that the work acceptance or performance becomes suspect. The investigation shall allow access to all test results, procedures, and facilities relevant to the disputed work and consider all available information and, when necessary, gather new and additional information in an attempt to determine the validity, the cause, and if necessary, the remedy to the contradiction. If the cooperative investigation reaches any resolution mechanism acceptable to both the Agency and the Contractor, the contradiction shall be considered resolved and the cooperative investigation concluded.

Whenever the cooperative investigation is unable to reach resolution, the investigation may then either conclude without resolution or continue by written notification of one party to the other requesting the implementation of a resolution process by committee. The continuance of the investigation shall be contingent upon recipient’s agreement and acknowledged in writing within 3 calendar days after receiving a request. Without acknowledgement, the investigation shall conclude without resolution. The committee shall consist of three State of California Registered Civil Engineers. Within 7 calendar days after the written request notification, the Agency and the Contractor will each select one engineer. Within 14 calendar days of the written request notification, the two selected engineers will select a third engineer. The goal in selection of the third member is to complement the professional experience of the first two engineers. Should the two engineers fail to select the third engineer, the Agency and the Contractor shall each propose 2 engineers to be the third member within 21 calendar days after the written request notification. The first two engineers previously selected shall then select one of the four proposed engineers in a blind draw. The committee shall be a continuance of the cooperative investigation and will re-consider all available information and if necessary, gather new and additional information to determine the validity, the cause, and if necessary, the remedy to the contradiction. The committee will focus upon the performance adequacy of the material(s) using

Revised 6/15/17 Contract No. 5552 Page 81 of 138
standard engineering principles and practices and to ensure public value, the committee may provide engineering recommendations as necessary. Unless otherwise agreed, the committee will have 30 calendar days from its formation to complete their review and submit their findings.

The final resolution of the committee shall be by majority opinion, in writing, stamped and signed. Should the final resolution not be unanimous, the dissenter may attach a written, stamped, and signed minority opinion. Once started, the resolution process by committee shall continue to full conclusion unless:

1. Within 7 days of the formation of the committee, the Agency and the Contractor reach an acceptable resolution mechanism; or

2. Within 14 days of the formation of the committee, the initiating party withdraws its written notification and agrees to bear all investigative related costs thus far incurred; or

3. At any point by the mutual agreement of the Agency and the Contractor. Unless otherwise agreed, the Contractor shall bear and maintain a record for all the investigative costs until resolution. Should the investigation discover assignable causes for the contradiction, the assignable party, the Agency or the Contractor, shall bear all costs associated with the investigation. Should assignable causes for the contradiction extended to both parties, the investigation will assign costs cooperatively with each party or when necessary, equally. Should the investigation substantiate a contradiction without assignable cause, the investigation will assign costs cooperatively with each party or when necessary, equally. Should the investigation be unable to substantiate a contradiction, the initiator of the investigation shall bear all investigative costs. All claim notification requirements of the contract pertaining to the contradiction shall be suspended until the investigation is concluded.

4-2 MATERIALS TRANSPORTATION, HANDLING AND STORAGE. The Contractor shall order, purchase, transport, coordinate delivery, accept delivery, confirm the quantity and quality received, prepare storage area(s), store, handle, protect, move, relocate, remove and dispose excess of all materials used to accomplish the Work. Materials shall be delivered to the site of the work only during working hours, as defined in Section 6-7.2, and shall be accompanied by bills of lading that shall clearly state for each delivery: the name of the Contractor as consignee, the project name and number, address of delivery and name of consignor and a description of the material(s) shipped. Prior to storage of any materials which have been shipped to or by the Contractor to any location within the Agency’s boundaries the Contractor shall provide the Engineer a copy of lease agreements for each property where such materials are stored. The lease agreement shall clearly state the term of the lease, the description of materials allowed to be stored and shall provide for the removal of the materials and restoration of the storage site within the time allowed for the Work. All such storage shall conform to all laws and ordinances that may pertain to the materials stored and to preparation of the storage site and the location of the site on which the materials are stored. Loss, damage or deterioration of all stored materials shall be the Contractor’s responsibility. Conformance to the requirements of this section, both within and outside the limits of work are a part of the Work.

The Engineer shall have the right to verify the suitability of materials and their proper storage at any time during the Work.

Revised 6/15/17 Contract No. 5552 Page 82 of 138
SECTION 5 – UTILITIES

5-1 LOCATION. The Agency and affected utility companies have, by a search of known records, endeavored to locate and indicate on the Plans, all utilities which are known to exist within the limits of the work. However, the accuracy and/or completeness of the nature, size and/or location of utilities indicated on the Plans is not guaranteed.

Where underground main distribution conduits such as water, gas, sewer, electric power, telephone, or cable television are shown on the Plans, the Contractor shall assume that every property parcel will be served by a service connection for each type of utility.

As provided in Section 4216 of the California Government Code, at least 2 working days prior to commencing any excavation, the Contractor shall contact the regional notification center (Underground Service Alert of Southern California) and obtain an inquiry identification number.

The California Department of Transportation is not required by Section 4216 to become a member of the regional notification center. The Contractor shall contact it for location of its subsurface installations.

Prior to pipeline excavation, the Contractor shall determine, by potholing, the locations and depths of all utilities which are shown on the Contract Documents or have been marked by the utility owners and which may affect or be affected by its operations. The Contractor shall pothole all service connections, utilities that cross or parallel (within 5 feet) the proposed construction, and all connection points to existing utilities. The Contractor shall record the material size (outside diameter), type, and horizontal and vertical locations (bearing and slope) and submit the data and allow time for the Engineer’s review in accordance with Section 2-5.3.

If no separate pay item is provided in the Contract for potholing, full compensation for such work shall be considered included in the bid item of work requiring the potholing and no separate payment shall be made therefor.

5-2 PROTECTION. The Contractor shall not interrupt the service function or disturb the support of any utility without authority from the owner or order from the Agency. All valves, switches, vaults, and meters shall be maintained readily accessible for emergency shutoff.

Where protection is required to ensure support of utilities located as shown on the Plans or in accordance with Section 5-1, the Contractor shall, unless otherwise provided, furnish and place the necessary protection at its expense.

Upon learning of the existence and location of any utility omitted from or shown incorrectly on the Plans, the Contractor shall immediately notify the Engineer in writing. When authorized by the Engineer, support or protection of the utility will be paid for as provided in Section 3-2.2.3 or 3-3.

The Contractor shall immediately notify the Engineer and the utility owner if any utility is disturbed or damaged. The Contractor shall bear the costs of repair or replacement of any utility damaged if located as noted in Section 5-1.

When placing concrete around or contiguous to any non-metallic utility installation, the Contractor shall at its expense:

Revised 6/15/17 Contract No. 5552 Page 83 of 138

1. Furnish and install a 2-inch cushion of expansion joint material or other similar resilient material; or

2. Provide a sleeve or other opening which will result in a 2-inch minimum-clear annular space between the concrete and the utility; or

3. Provide other acceptable means to prevent embedment in or bonding to the concrete.

Where concrete is used for backfill or for structures which would result in embedment, or partial embedment, of a metallic utility installation; or where the coating, bedding or other cathodic protection system is exposed or damaged by the Contractor’s operations, the Contractor shall notify the Engineer and arrange to secure the advice of the affected utility owner regarding the procedures required to maintain or restore the integrity of the system.

5-3 REMOVAL. Unless otherwise specified, the Contractor shall remove all interfering portions of utilities shown on the Plans or indicated in the Bid documents as “abandoned” or “to be abandoned in place”. Before starting removal operations, the Contractor shall ascertain from the Agency whether the abandonment is complete, and the costs involved in the removal and disposal shall be included in the Bid for the items of work necessitating such removals.

The costs involved in the removal and disposal shall be considered incidental to the bid items of work necessitating such removals and no separate payment shall be made therefor, unless a bid item for “Removal” is specifically included in the bid proposal.

5-4 RELOCATION. When feasible, the owners responsible for utilities within the area affected by the Work will complete their necessary installations, relocations, repairs, or replacements before commencement of work by the Contractor. When the Plans or Specifications indicate that a utility installation is to be relocated, altered, or constructed by others, the Agency will conduct all negotiations with the owners and work will be done at no cost to the Contractor, except for manhole frame and cover sets to be brought to grade as directed and approved by the City. Utilities which are relocated in order to avoid interference shall be protected in their position and the cost of such protection shall be included in the Bid for the items of work necessitating such relocation.

After award of the Contract, portions of utilities which are found to interfere with the Work will be relocated, altered or reconstructed by the owners, or the Engineer may order changes in the Work to avoid interference. Such changes will be paid for in accordance with Section 3-2.

When the Plans or Specifications provide for the Contractor to alter, relocate, or reconstruct a utility, all costs for such work shall be included in the Bid for the items of work necessitating such work. Temporary or permanent relocation or alteration of utilities requested by the Contractor for its convenience shall be its responsibility and it shall make all arrangements and bear all costs.

The utility owner will relocate service connections as necessary within the limits of the Work or within temporary construction or slope easements. When directed by the Engineer, the Contractor shall arrange for the relocation of service connections as necessary between the meter and property line, or between a meter and the limits of temporary construction or slope easements. The relocation of such service connections will be paid for in accordance with provisions of Section 3-3. Payment will include the restoration of all existing improvements which may be affected thereby. The Contractor may agree with the owner of any utility to disconnect and reconnect interfering service connections. The Agency will not be involved in any such agreement.

Revised 6/15/17 Contract No. 5552 Page 84 of 138

In conformance with Section 5-6 the Contractor shall coordinate the work with utility agencies and companies. Prior to the installation of any and all utility structures within the limits of work by any utility agency or company, or its contractor, the Contractor shall place all curb or curb and gutter that is a part of the work and adjacent to the location where such utility structures are shown on the plans and are noted as being located, relocated or are otherwise shown as installed by others. In order to minimize delays to the Contractor caused by the failure of other parties to relocate utilities that interfere with the construction, the Contractor, upon the Engineer’s approval, may be permitted to temporarily omit the portion of work affected by the utility. If such temporary omission is approved by the Engineer, the Contractor shall place survey or other physical control markers sufficient to locate the curb or curb and gutter to the satisfaction of the utility agency or company. Such temporary omission shall be for the Contractor’s convenience and no additional compensation will be allowed therefore or for additional work, materials or delay associated with the temporary omission. The portion thus omitted shall be constructed by the Contractor immediately following the relocation of the utility involved unless otherwise directed by the Engineer.

5-5 DELAYS . The Contractor shall notify the Engineer of its construction schedule insofar as it affects the protection, removal, or relocation of utilities. Said notification shall be included as a part of the construction schedule required in Section 6-1. The Contractor shall notify the Engineer in writing of any subsequent changes in the construction schedule which will affect the time available for protection, removal, or relocation of utilities.

The Contractor will not be entitled to damages or additional payment for delays attributable to utility relocations or alterations if correctly located, noted, and completed in accordance with Section 5-1.

The Contractor may be given an extension of time for unforeseen delays attributable to unreasonably protracted interference by utilities in performing work correctly shown on the Plans.

The Agency will assume responsibility for the timely removal, relocation, or protection of existing main or trunkline utility facilities within the area affected by the Work if such utilities are not identified in the Contract Documents. The Contractor will not be assessed liquidated damages for any delay caused by failure of Agency to provide for the timely removal, relocation, or protection of such existing facilities.

If the Contractor sustains loss due to delays attributable to interferences, relocations, or alterations not covered by Section 5-1, which could not have been avoided by the judicious handling of forces, equipment, or plant, there shall be paid to the Contractor such amount as the Engineer may find to be fair and reasonable compensation for such part of the Contractor’s actual loss as was unavoidable and the Contractor may be granted an extension of time.

5-6 COOPERATION . When necessary, the Contractor shall so conduct its operations as to permit access to the Work site and provide time for utility work to be accomplished during the progress of the Work. Cooperation with CMWD and City staff will be required for all work affecting existing utility systems or facilities and prior to water utility shutdowns, sewer bypass operations, testing and inspections, and project completion.

Revised 6/15/17 Contract No. 5552 Page 85 of 138
SECTION 6 – PROSECUTION, PROGRESS,

AND ACCEPTANCE OF THE WORK

6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK. Except as otherwise provided herein and unless otherwise prohibited by permits from other agencies as may be required by law the Contractor shall begin work within ten (10) calendar days after receipt of the "Notice to Proceed".

6-1.1 Pre-Construction Meeting. After, or upon, notification of contract award, the Engineer will set the time and location for the Preconstruction Meeting. Attendance of the Contractor’s management personnel responsible for the management, administration, and execution of the project is mandatory for the meeting to be convened. Failure of the Contractor to have the Contractor’s responsible project personnel attend the Preconstruction Meeting will be grounds for default by Contractor per Section 6-4. No separate payment will be made for the Contractor’s attendance at the meeting. The notice to proceed will only be issued on or after the completion of the preconstruction meeting.

6-1.1.1 Baseline Construction Schedule. The Contractor shall prepare the Baseline Construction Schedule as a Critical Path Method (CPM) Schedule in the precedence diagram method (activity-on-node) format and submit the schedule in accordance with 2-5.3. The schedule shall:

A. Be prepared using a commercially available, Windows compatible software program, “Suretrak” by Primavera or “Project” by Microsoft Corporation or approved equal.

B. Be prepared in hard copy (paper) and electronic (Adobe PDF) format and free of file locking, encryption or any other protocol that would impede full access to the data and labeled with the project name and number, the Contractor’s name and the date of preparation.

C. Begin with the date projected for the Notice to Proceed and conclude with the date of final completion conforming with the Contract time.

D. Depict a time-scaled network diagram of all activities, logic relationships of interdependent activities, and milestones comprising the complete period of Work with tasks on the vertical axis and their durations on the horizontal axis. Use distinctive texture patterns or line types to show the critical path within the Contract time. Include a tabular listing of each activity and its identification number, description, duration, early start, early finish, late start, late finish, total float, and all predecessor and successor activities. The number of activities will communicate the Contractor’s plan for project execution, accurately describe the project work and allow monitoring and evaluation of progress and time impacts. Activity descriptions shall accurately define the work planned for the activity. Activity durations shall not be shorter than 1 working day or longer than 15 working days unless approved by the Engineer.

E. Include detail of all project phasing, staging and sequencing including all milestones necessary to define beginning and ending of each phase or stage and constraints which may impact any activity. Include time allowances for coordination with utility companies and other agencies, equipment and material deliveries, submittal reviews and approvals,

Revised 6/15/17 Contract No. 5552 Page 86 of 138
traffic control setup and phasing, Work performed by others, inspections, testing and commissioning, corrective work, and any non-work periods.

Float or slack time within the schedule is available without charge or compensation to the party or contingency that first exhausts it. A schedule which shows a project duration longer than the Contract time will not be accepted by the Engineer.

If the Baseline Construction Schedule does not meet the requirements of these specifications, the Contractor shall revise the schedule and resubmit it to the Engineer. Failure to obtain the Engineer’s approval of the schedule within fifteen (15) Working Days after the date of the Preconstruction Meeting shall be grounds to consider the Contractor in default of the Contract per 6-4. The time required by the Engineer to review the initial Baseline Construction Schedule submittal will not be included in the 15 Working Days. The Engineer shall complete subsequent reviews of the revised schedule and progress updates within 5 working days of receipt.

The Contractor shall not be permitted to commence any excavation or demolition activities until the Engineer accepts the Baseline Construction Schedule. For each day of delay beyond the 15 Working Days after the Preconstruction Meeting that the Baseline Construction Schedule is not accepted by the Engineer, the Contractor shall be charged $100 through a deductive Change Order.

The Engineer’s response to each review will consist of one of the following:

“Accepted.” The Contractor may proceed with the Work.

“Accepted with Comments.” The Contractor may proceed with the Work, but must revise and resubmit the schedule prior to submittal of the first progress payment application.

The Engineer’s acceptance of the schedule is a condition precedent to payment of any progress payment.

“Not Accepted.” The Contractor may not proceed with the Work and must revise and resubmit the schedule.

6-1.1.2 Schedule Updates and Revisions. The Contractor shall meet with the Engineer during the last week of each month to agree upon the completion level of each activity as a basis for progress payments. Schedule updates shall conform with the requirements for the initial submittal in 6-1.1.1 and shall:

A. Show the actual dates of each activity start and/or finish during the month. The schedule update shall include specific notation for any changes in actual dates after they are first reported.

B. Report the percent complete for each activity in progress at the end of the month as determined by the Engineer.

C. Include a list and explanation of all changes made to the activities, dates or interconnecting logic.

D. Include activity and network revisions reflecting the Change Orders approved in the previous month as agreed upon during the review and acceptance of the Change Orders.

Revised 6/15/17 Contract No. 5552 Page 87 of 138

The Engineer’s responses to the progress schedule updates shall be as described in 6-1.1.1.

The Contractor shall proceed with Work and request payment for the progress schedule updates as described therein.

Should the actual or projected progress of the Work exceed 5 percent of the Contract time, the Contractor shall prepare and submit a revised Baseline Construction Schedule independently of and prior to the next progress schedule update. The Contractor shall provide an explanation for each change made to the schedule.

If the Contractor fails to submit the progress schedule updates as required herein, the Contractor may elect to proceed with the Work at its own risk and shall forfeit payment for the progress schedule update until compliance is met. If the Contractor elects to delay or cease Work after failure to submit the progress schedule updates, any resulting delay, impact, or disruption to the Work will be the Contractor’s responsibility.

6-1.1.3 Interim Revisions. Should the actual or projected progress of the Work exceed 5 percent of the Contract Time, the Contractor shall prepare and submit a revised Baseline Construction Schedule independently of and prior to the next progress schedule update with a list and explanation of each change made to the schedule. The submittal, schedule review and acceptance requirements of 6-1.1.2 shall apply.

6-1.1.4 Late Completion or Milestone Dates. If a schedule update indicates a completion date later than the Contract time or contractually required milestone completion date, the Agency may withhold Liquidated Damages for the number of days late. Should a subsequent schedule update which removes all or a portion of the delay be “Accepted” by the Engineer, all or the allocated portion of the previously held Liquidated Damages shall be released in the monthly payment to the Contractor immediately following such acceptance.

6-1.1.5 Final Schedule Update. The Contractor shall prepare and submit a final schedule update when one hundred percent of the Work is completed. The update must accurately represent the actual dates for all activities. The final schedule update shall be prepared and reviewed in accordance with 6-1.1.2. Acceptance of the final schedule update is required for release of funds retained per 9-3.2.

6-1.1.6 Three-Week Look Ahead Schedules. The Contractor shall submit a detailed 3-week look ahead schedule prior to each progress meeting throughout project duration. The schedules shall be revised weekly to identify the construction activities and durations for each bid item of work for the current week and the succeeding two weeks. The Contractor shall revise the schedule to include additional activities or actual progress when so requested by the Engineer.

6-1.1.7 Measurement and Payment. The Contractor’s preparation, revision and maintenance of the Construction Schedule are incidental to the Work and no separate payment will be made therefor.

6-2 PROSECUTION OF WORK. To minimize public inconvenience and possible hazard and to restore street and other work areas to their original condition and state of usefulness as soon as practicable, the Contractor shall diligently prosecute the Work to completion. If the Engineer determines that the Contractor is failing to prosecute the Work to the proper extent, the Contractor shall, upon orders from the Engineer, immediately take steps to remedy the situation.

All costs of prosecuting the Work as described herein shall be included in the Contractor’s Bid.

Revised 6/15/17 Contract No. 5552 Page 88 of 138
Should the Contractor fail to take the necessary steps to fully accomplish said purposes, after orders of the Engineer, the Engineer may suspend the work in whole or part, until the Contractor takes said steps.

As soon as possible under the provisions of the Specifications, the Contractor shall backfill all excavations and restore to usefulness all improvements existing prior to the start of the Work.

If Work is suspended through no fault of the Agency, all expenses and losses incurred by the Contractor during such suspensions shall be borne by the Contractor. If the Contractor fails to properly provide for public safety, traffic, and protection of the Work during periods of suspension, the Agency may elect to do so, and deduct the cost thereof from monies due the Contractor. Such actions will not relieve the Contractor from liability.

The Contractor shall incorporate non-workdays, moratoriums or special events specified in the Contract Documents into the Construction Schedule required by Section 6.1. No additional payment, adjustment of bid prices or adjustments of contract time will be allowed as a consequence of these events.

6-2.1 Order of Work. The work to be done shall consist of furnishing all labor, equipment and materials, and performing all operations necessary to complete the Work as shown or specified on the Contract Documents. The work descriptions in this section are an overview only and shall not relieve the Contractor from its responsibilities to conduct all coordination and perform the Work in accordance with the Contract Documents. The Contractor shall conduct the following general work activities:

1. Submit construction schedule, schedule of values, working drawings, submittals, shop drawings, sewer bypass plan, groundwater dewatering plan, and force main dewatering plan. Secure necessary permits and approvals in accordance with the Contract Documents.

2. Secure laydown/staging areas including any off-site staging area(s) if necessary.

3. Conduct surveying and staking of pipeline alignments, locations of appurtenances, limits of right-of-way or easements and pre-construction video and photographs. Conduct Underground Service Alert (DigAlert) notification and utility mark-out. Mobilize labor force, materials and equipment for subsequent phases of Work and install temporary facilities and BMPs, traffic control and excavation safety measures.

4. Pothole all utilities that cross or parallel (within 5 feet of) planned excavations and immediately notify the Engineer of any potential conflicts. Submit potholing data in accordance with Section 2-5.3. Pavement saw-cutting or excavation shall not commence at any construction heading until the project alignments have been staked and existing utilities have been potholed and confirmed by the Contractor to have no conflict with the Work.

5. Permit, furnish, install and test the groundwater dewatering system.

6. Permit, furnish and operate temporary standby generator.

7. Furnish, install and test the sewer bypass system.

8. Dewater the force main. Install temporary cut and cap on HDPE force main. Begin sewer bypassing.

9. Demolish the existing flow meter and chemical injection manhole and appurtenances.

10. Install the new manhole, flow meter, valves and piping. Replace the plug valves and check valves and install the new electrical improvements as shown or specified.

Revised 6/15/17 Contract No. 5552 Page 89 of 138

11. Dewater the force main per contract document requirements. Connect the new force main piping to the existing HDPE force main. Remove sewer bypass and restore sewer force main flow.

6-2.2 Construction Phasing. The following construction phase guidelines are provided for the Contractor’s use in developing the construction schedule and a Work Plan that describes the labor, materials, equipment and procedures to conduct the Work. The phasing guidelines listed herein are not intended to be a complete list of all construction activities and shall not relieve the Contractor from its responsibilities to coordinate and perform the Work, revise the phasing descriptions, or to develop additional phases or revise the order of phasing as necessary to complete the Work in its entirety in accordance with the Contract Documents.

The Contractor shall develop a detailed Work Plan describing the materials, equipment and procedures for each phase of the Work and submit the Work Plan in accordance with Section 2-

5.3. Any modification of the phasing described below shall be approved by the Engineer.

6-2.2.1 Phasing Criteria. The Contractor shall accommodate the following criteria into the construction schedule and Work Plan:

1. All construction activities shall meet the scheduling restrictions identified in these specifications or as determined by the City during review of the Contractor’s Work Plan.

Refer to Section 6-2.

2. Contractor shall submit a Site Work Plan. The Work Plan shall identify staging areas; describe the methods for the protection of private improvements and existing utilities; and include a listing of materials and equipment and other pertinent details necessary to complete the work.

3. Contractor shall submit a sewer bypass plan and an excavation shoring and dewatering plan.

4. Contractor shall maintain two traffic lanes through the project site outside of work hours.

One lane of travel with a flagging operation may be allowed during work hours, subject to approval of the Contractor’s traffic control plan submittal.

5. Excavations must be backfilled or securely shored and plated at the end of each workday.

6. When water or fire service interruptions are necessary and approved, no customer shall be without water for longer than 8 hours. If a planned water service shutdown duration exceeds 8 hours, the Contractor shall submit a highline plan for approval and provide all highlining prior to the shutdown.

7. Excavations shall be backfilled and base paved within 3 working days of completing pipeline connections.

8. Site restoration shall be completed within ten working days of completion of construction of all improvements.

6-2.3 Project Meetings. The Engineer will establish the time and location of weekly Project Meetings. The Contractor’s Representative shall attend each Project Meeting. The Project Representative shall be the individual determined under Section 7-6, “The Contractor’s Representative”. No separate payment for attendance of the Contractor, the Contractor’s Representative or any other employee or subcontractor or subcontractor’s employee at these meetings will be made. If the Contractor’s Representative cannot attend, the Contractor shall notify the Engineer a minimum of 24 hours prior to the start of the scheduled meeting. If the Contractor does not provide the required notification, the Contractor shall pay the Agency’s

Revised 6/15/17 Contract No. 5552 Page 90 of 138
costs for staff and consultants that attended. The Contractor shall be charged a minimum of 2 hours of each attendee’s time via a deductive Change Order.

6-3 SUSPENSION OF WORK .

6-3.1 General. The Work may be suspended in whole or in part when determined by the Engineer that the suspension is necessary in the interest of the Agency. The Contractor shall comply immediately with any written order of the Engineer. Such suspension shall be without liability to the Contractor on the part of the Agency except as otherwise specified in Section 6-6.3.

6-3.2 Archaeological and Paleontological Discoveries. The Contractor shall coordinate with the Archaeological and Cultural Monitor during excavation activities.

If discovery is made of items of archaeological or paleontological interest, the Contractor shall immediately cease excavation in the area of discovery and shall not continue until ordered by the Engineer. When resumed, excavation operations within the area of discovery shall be as directed by the Engineer.

Discoveries which may be encountered may include, but not be limited to, dwelling sites, stone implements or other artifacts, animal bones, human bones, and fossils.

The Contractor shall be entitled to an extension and compensation in accordance with Section 6-6.

6-4 DEFAULT BY CONTRACTOR. If the Contractor fails to promptly begin procurement or delivery of material and equipment, to commence the Work within the time specified, to maintain the rate of delivery of material, to execute the Work in the manner and at such locations as specified, or fails to maintain the Work schedule which will insure the Agency’s interest, or, if the Contractor is not carrying out the intent of the Contract, the Agency may serve written notice upon the Contractor and the Surety on its Faithful Performance Bond demanding satisfactory compliance with the Contract.

The Contract may be canceled by the Board without liability for damage, when in the Board’s opinion the Contractor is not complying in good faith, has become insolvent, or has assigned or subcontracted any part of the Work without the Board’s consent. In the event of such cancellation, the Contractor will be paid the actual amount due based on Contract Unit Prices or lump sums bid and the quantity of the Work completed at the time of cancellation, less damages caused to the Agency by acts of the Contractor. The Contractor, in having tendered a Bid, shall be deemed to have waived any and all claims for damages because of cancellation of Contract for any such reason. If the Agency declares the Contract canceled for any of the above reasons, written notice to that effect shall be served upon the Surety. The Surety shall, within five (5) days, assume control and perform the Work as successor to the Contractor.

If the Surety assumes any part of the Work, it shall take the Contractor’s place in all respects for that part and shall be paid by the Agency for all work performed by it in accordance with the Contract. If the Surety assumes the entire Contract, all money due the Contractor at the time of its default shall be payable to the Surety as the Work progresses, subject to the terms of the Contract.

Revised 6/15/17 Contract No. 5552 Page 91 of 138
If the Surety does not assume control and perform the Work within 5 days after receiving notice of cancellation, or fails to continue to comply, the Agency may exclude the Surety from the premises. The Agency may then take possession of all material and equipment and complete the Work by Agency forces, by letting the unfinished Work to another Contractor, or by a combination of such methods. In any event, the cost of completing the Work shall be charged against the Contractor and its Surety and may be deducted from any money due or becoming due from the Agency. If the sums due under the Contract are insufficient for completion, the Contractor or Surety shall pay to the Agency within 5 days after the completion, all costs in excess of the sums due.

The provisions of this section shall be in addition to all other rights and remedies available to the Agency under law.

6-5 TERMINATION OF CONTRACT. The Board may terminate the Contract at its own discretion or when conditions encountered during the Work make it impossible or impracticable to proceed, or when the Agency is prevented from proceeding with the Contract by act of God, by law, or by official action of a public authority.

6-6 DELAYS AND EXTENSIONS OF TIME.

6-6.1 General. If delays are caused by unforeseen events beyond the control of the Contractor, such delays will entitle the Contractor to an extension of time as provided herein, but the Contractor will not be entitled to damages or additional payment due to such delays, except as provided in 6-6.3. Such unforeseen events may include war, government regulations, labor disputes, strikes, fires, floods, adverse weather or elements necessitating cessation of work, inability to obtain materials, labor or equipment, required extra work, or other specific events as may be further described in the Specifications.

No extension of time will be granted for a delay caused by the Contractor’s inability to obtain materials unless the Contractor furnishes to the Engineer documentary proof. The proof must be provided in a timely manner in accordance with the sequence of the Contractor’s operations and the approved construction schedule.

If delays beyond the Contractor’s control are caused by events other than those mentioned above, the Engineer may deem an extension of time to be in the best interest of the Agency.

The Contractor will not be entitled to damages or additional payment due to such delays, except as provided in Section 6-6.3.

If delays beyond the Contractor’s control are caused solely by action or inaction by the Agency, such delays will entitle the Contractor to an extension of time as provided in Section 6-6.2.

6-6.2 Extensions of Time. Extensions of time, when granted, will be based upon the effect of delays to the Work. They will not be granted for noncontrolling delays to minor portions of the Work unless it can be shown that such delays did or will delay the progress of the Work.

6-6.3 Payment for Delays to Contractor. The Contractor will be compensated for damages incurred due to delays for which the Agency is responsible. Such actual costs will be determined by the Engineer. The Agency will not be liable for damages which the Contractor could have avoided by any reasonable means, such as judicious handling of forces, equipment, or plant.

The determination of what damages the Contractor could have avoided will be made by the Engineer.

Revised 6/15/17 Contract No. 5552 Page 92 of 138

6-6.4 Written Notice and Report. The Contractor shall provide written notice to the Engineer within two hours of the beginning of any period that the Contractor has placed any workers or equipment on standby for any reason that the Contractor has determined to be caused by the Agency or by any organization that the Agency may otherwise be obligated by. The Contractor shall provide continuing daily written notice to the Engineer, each working day, throughout the duration of such period of delay. The initial and continuing written notices shall include the classification of each workman and supervisor and the make and model of each piece of equipment placed on standby, the cumulative duration of the standby, the Contractor’s opinion of the cause of the delay and a cogent explanation of why the Contractor could not avoid the delay by reasonable means. Should the Contractor fail to provide the notice(s) required by this section the Contractor agrees that no delay has occurred and that it will not submit any claim(s) therefore.

6-7 TIME OF COMPLETION .

6-7.1 General. The Contractor shall complete the Work within the time set forth in the Contract. The Contractor shall complete each portion of the Work within such time as set forth in the Contract for such portion. The time of completion of the Contract shall be expressed in calendar days. The Contractor shall diligently prosecute the work to completion within one hundred eighty (180) Working Days after the starting date specified in the Notice to Proceed.

6-7.2 Working Day. A working day is any day within the period between the start of the Contract time as defined in Section 6-1 and the date provided for completion, or upon field acceptance by the Engineer for all work provided for in the Contract, whichever occurs first, other than:

1. Saturday, Sunday, and any day designated as a holiday by the Agency;

2. any day identified as a construction moratorium due to special events or holiday periods; 3 any other day designated as a holiday in a Master Labor Agreement entered into by the Contractor or on behalf of the Contractor as an eligible member of a contractor association;

4. any day the Contractor is prevented from working at the beginning of the workday for cause as defined in Section 6-6.1;

5. any day the Contractor is prevented from working during the first 5 hours with at least 60 percent of the normal work force for cause as defined in Section 6-6.1.

In addition to Agency holidays, open excavations and service shutdowns will not be allowed on the day prior to Thanksgiving and between December 23 and January 1.

Main line or service shutdowns will not be allowed on Mondays and Fridays.

Unless otherwise approved in writing by the Engineer, the hours of work shall be between the hours of 7 a.m. and 4 p.m. on Mondays through Fridays, excluding Agency holidays and other restricted days or times as specified in 6-2.

The Contractor shall obtain the written approval of the Engineer if the Contractor desires to work outside said hours or at any time during weekends and/or holidays. This written permission must be obtained at least 48 hours prior to such work. The Engineer may approve work outside the hours and/or days stated herein when, in his/her sole opinion, such work conducted by the

Revised 6/15/17 Contract No. 5552 Page 93 of 138
Contractor is beneficial to the best interests of the Agency. The Contractor shall pay the inspection costs of such work.

The Contractor shall incorporate the dates, areas and types of work prohibited elsewhere in the Contract Documents into the construction schedule. No additional payment, adjustment of bid prices or adjustment of contract time of completion will be allowed as a consequence of the prohibition of work being performed within the dates, areas and/or types of work prohibited in this section.

Contractor is hereby advised that the Engineer may require after hours or weekend work if required for the protection and safety of existing facilities, workers or the public.

6-7.3 Contract Time Accounting. The Engineer will make a daily determination of each working day to be charged against the Contract time. These determinations will be discussed and the Contractor will be furnished a periodic statement showing allowable number of working days of Contract time, as adjusted, at the beginning of the reporting period. The statement will also indicate the number of working days charged during the reporting period and the number of working days of Contract time remaining. If the Contractor does not agree with the statement, it shall file a written protest within 15 days after receipt, setting forth the facts of the protest.

Otherwise, the statement will be deemed to have been accepted.

6-8 COMPLETION, ACCEPTANCE, AND WARRANTY .

6-8.1 Site Walk-Through. After the site has been fully restored, the Inspector will schedule an inspection within five days of the Contractor’s request. The Contractor and Inspector shall attend the inspection and all outstanding deficiencies shall be identified in a List of Deficiencies.

A review of the red-line record drawings and asset schedule shall also be completed at the Site Walk-Through and all red-line deficiencies will be added to the List of Deficiencies.

6-8.2 List of Deficiencies . Following the Site Walk-Through, the Inspector will generate the List of Deficiencies (also known as the punchlist) within five working days. The Contractor shall then have 10 working days to perform corrective work and provide a written response to each punchlist item.

6-8.3 Site Follow-Up Walk-Through. Upon receipt of written responses to the List of Deficiencies, the Inspector will complete a follow-up inspection. Any outstanding deficiencies will be noted and returned to the Contractor. Outstanding deficiencies will delay full payment of any relevant bid items.

6-8.4 Request for Final Walk-Through. Once the Contractor asserts they have satisfied the terms of the Contract and with the Inspector’s permission, the Contractor may submit written assertion in the form of a Request for Final Walk-Through, certifying that all deficiencies identified through the Site Walk-Through process have been addressed and request a Final Inspection to demonstrate project completion to the Agency. The Contractor shall provide an attachment to the Request for Final Inspection with the Contractor’s written response to each deficiency. The Request for Final Inspection shall not be considered complete without the Contractor’s written response to each deficiency.

6-8.5 Final Walk-Through. Upon receipt of the Request for Final Walk-Through, the Inspector shall schedule the Final Inspection. The Inspector and Contractor shall attend the final

Revised 6/15/17 Contract No. 5552 Page 94 of 138
inspection. Representatives from other Agency departments reserve the right to be present at the Final Inspection.

The red-line record drawings and asset schedules shall also be reviewed.

If any deficiencies are not satisfactorily addressed or additional deficiencies are identified, the Contractor will have 10 working days to complete the corrective work.

6-8.6 Request for Completion. The Engineer will not accept the Work or any portion of the Work before all of the Work is completed and all outstanding deficiencies are corrected by the Contractor, and the Engineer is satisfied that all of the Work meets the requirements of the Contract Documents.

Once the Final Walk-Through has been completed and all outstanding deficiencies satisfactorily completed to Agency’s approval, the Contractor shall submit a written assertion in the form of Request for Completion letter, certifying that the Work has been completed.

6-8.7 Completion. Upon receipt of the Request for Completion letter, the Agency shall review the written assertion within 2 working days. If, in the Engineer’s judgment, the Work has been completed in accordance with the Contract Documents, the Agency will issue a Completion Letter.

The completion date will be the date to which liquidated damages will be computed.

Use, temporary, interim or permanent, of all, or portions of, the Work does not constitute completion or acceptance of the Work.

6-8.8 Acceptance. Acceptance will occur after all the requirements contained in the Contract Documents have been fulfilled. If, in the Engineer’s judgment, the Contractor has fully performed the Contract, the Engineer will so certify to the Board. Upon such certification by the Engineer, the Board may accept the Work. Upon the Board’s acceptance of the Work, the Agency will cause a “Notice of Completion” to be filed in the office of the San Diego County Recorder. The date of recordation shall be the date of acceptance of the Work.

6-8.9 Warranty. All work shall be warranted for one (1) year after acceptance of the Work and any faulty work or materials discovered during the warranty period shall be repaired or replaced by the Contractor, at its expense. Twenty-five percent of the faithful performance bond shall be retained as a warranty bond for the warranty period. The Contractor shall replace or repair any such defective work in a manner satisfactory to the Engineer, after notice to do so from the Engineer, and within the time specified in the notice. If the Contractor fails to make such replacement or repairs within the time specified in the notice, the Agency may perform this work and the Contractor’s sureties shall be liable for the cost thereof.

6-9 LIQUIDATED DAMAGES. Failure of the Contractor to complete the Work within the time allowed will result in damages being sustained by the Agency. For each consecutive calendar day in excess of the time specified for completion of Work, as adjusted in accordance with Section 6-6, the Contractor shall pay the Agency, or have withheld monies due it, the sum of two thousand dollars ($2,000.00). Such sum is liquidated damages and shall not be construed as a penalty and may be deducted from payments due the Contractor if such delay occurs.

Revised 6/15/17 Contract No. 5552 Page 95 of 138
Execution of the Contract shall constitute agreement by the Agency and Contractor that the amount specified above per day is the minimum value of costs and actual damages caused by the Contractor to complete the Work within the allotted time. Any progress payments made after the specified completion date shall not constitute a waiver of this paragraph or of any damages.

6-10 USE OF IMPROVEMENT DURING CONSTRUCTION. The Agency reserves the right to take over and utilize all or part of any completed facility or appurtenance. The Contractor will be notified in writing in advance of such action. Such action by the Agency will relieve the Contractor of responsibility for injury or damage to said completed portions of the improvement resulting from use by public traffic or from the action of the elements or from any other cause, except Contractor operations or negligence. The Contractor will not be required to reclean such portions of the improvement before field acceptance, except for cleanup made necessary by its operations. Nothing in this section shall be construed as relieving the Contractor from full responsibility for correcting defective work or materials.

In the event the Agency exercises its right to place into service and utilize all or part of any completed facility or appurtenance, the Agency will assume the responsibility and liability for injury to persons or property resulting from the utilization of the facility or appurtenance so placed into service, except for any such injury to persons or property caused by any willful or negligent act or omission by the Contractor, Subcontractor, their officers, employees, or agents.

Revised 6/15/17 Contract No. 5552 Page 96 of 138
SECTION 7 – RESPONSIBILITIES OF THE CONTRACTOR

7-1 CONTRACTOR’S EQUIPMENT AND FACILITIES. The Contractor shall furnish and maintain in good condition all equipment and facilities as required for the proper execution and inspection of the Work. Such equipment and facilities shall meet all requirements of applicable ordinances and laws.

7-2 LABOR.

7-2.1 General. Only competent workers shall be employed on the Work. Any person employed who is found to be incompetent, intemperate, troublesome, disorderly, or otherwise objectionable, or who fails or refuses to perform work properly and acceptably, shall be immediately removed from the Work by the Contractor and not be reemployed on the Work.

7-2.2 Laws. The Contractor, its agents, and employees shall be bound by and comply with applicable provisions of the Labor Code and Federal, State, and local laws related to labor.

The Contractor shall strictly adhere to the provisions of the Labor Code regarding minimum wages; the 8-hour day and 40-hour week; overtime; Saturday, Sunday, and holiday work; and nondiscrimination because of race, color, national origin, sex, or religion. The Contractor shall forfeit to the Agency the penalties prescribed in the Labor Code for violations.

In accordance with the Labor Code, the Board has on file and will publish a schedule of prevailing wage rates for the types of work to be done under the Contract. The Contractor shall not pay less than these rates.

Each worker shall be paid subsistence and travel as required by the collective bargaining agreement on file with the State of California Department of Industrial Relations.

The Contractor’s attention is directed to Section 1776 of the Labor Code which imposes responsibility upon the Contractor for the maintenance, certification, and availability for inspection of such records for all persons employed by the Contractor or Subcontractor in connection with the project. The Contractor shall agree through the Contract to comply with this Section and the remaining provisions of the Labor Code.

7-3 LIABILITY INSURANCE. Insurance shall be required as specified in section 10 of the Public Works Contract.

The cost of this insurance shall be included in the Contractor’s Bid.

7-4 WORKERS’ COMPENSATION INSURANCE. Before execution of the Contract by the Board, the Contractor shall file with the Engineer the following signed certification:

“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”

Revised 6/15/17 Contract No. 5552 Page 97 of 138
The Contractor shall also comply with Section 3800 of the Labor Code by securing, paying for, and maintaining in full force and effect for the duration of the contract, complete Workers’ Compensation Insurance, and shall furnish a Certificate of Insurance to the Engineer before execution of the Contract. The Agency, its officers, or employees, will not be responsible for any claims in law or equity occasioned by failure of the Contractor to comply with this paragraph.

All compensation insurance policies shall bear an endorsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the Agency shall be notified by registered mail not less than 30 days before expiration or cancellation is effective.

All insurance is to be placed with insurers that are admitted and authorized to conduct business in the state of California and are listed in the official publication of the Department of Insurance of the State of California. Policies issued by the State Compensation Fund meet the requirement for workers' compensation insurance.

7-5 PERMITS. Except as specified herein the Contractor will obtain, at no cost to the Contractor all City of Carlsbad encroachment, right-of-way, grading and building permits necessary to perform work for this contract on Agency property, streets, or other rights-of-way.

Contractor shall not begin work until all permits incidental to the work are obtained. The Contractor shall obtain and pay for all permits for the disposal of all materials removed from the project. The cost of said permit(s) shall be included in the price bid for the appropriate bid item and no additional compensation will be allowed therefor. The Contractor shall obtain and pay for all costs incurred for permits necessitated by its operations such as, but not limited to, those permits required for night work, oversize load, blasting, and demolition. For private contracts, the Contractor shall obtain all permits incidental to the Work or made necessary by its operations, and pay all costs incurred by the permit requirements.

The Contractor shall pay all business taxes or license fees that are required for the work.

Refer to 7.8.6 and 7.8.6.1 for water pollution control and groundwater dewatering permits, respectively.

7-5.1 Resource Agency Permits. No resource agency permits are required for the Work.

7-5.2 Air Pollution Control Permits. The use of materials or activities that can generate air emissions are regulated by the California Air Resource Board (CARB) and the San Diego County Air Pollution Control District (SDAPCD) and either require permits or are subject to state or local air regulations which establish limitations on equipment or product use or VOC content and requirements for recordkeeping and reporting. These materials and activities include, but are not limited to the following:

 Abrasive blasting
 Adhesives
 Asbestos abatement, removal or disruption
 Coating or painting
 Concrete curing compounds
 Demolition of buildings, equipment or structures
 Fiberglass/polyester resin layup or machining

Revised 6/15/17 Contract No. 5552 Page 98 of 138
 Operation of non-road diesel engines greater than 49 hp (including generators, compressors, pumps, hydro blasters, etc.)
 Operation of off-road diesel engines greater than 25 hp (including forklifts, construction equipment, load handlers, etc.)
 Solvents
 Welding

Operators of portable engines and other types of equipment can register their units under the CARB Statewide Portable Equipment Registration Program (PERP) in order to operate their equipment throughout California. However, the use of portable equipment (e.g., bypass pumps) to perform the function of permitted stationary equipment is subject to SDAPCD regulation in addition to CARB requirements.

Diesel-engine driven generators or equipment shall have a valid permit or registration in accordance with the California Air Resources Board and/or the San Diego County Air Pollution Control District regulations prior to mobilization to the site. The Contractor shall submit a copy of the permit or registration documents for all equipment subject to state or local air pollution control regulations and maintain the permit or registration documents in valid standing during the performance of the Work.

Products such as paints, adhesives, resins, solvents and other products shall comply with the Volatile Organic Compound (VOC) content limits established by CARB and/or the SDAPCD.

The Contractor shall be responsible for determining that such products can be used legally in the performance of the Work. The Contractor shall maintain and submit records to the City Engineer on the quantities of paints or solvents used as may be required by applicable regulations.

Prior to starting any activity that is required to have an air pollution control permit or registration, the Contractor shall verify the applicability of the latest air pollution control regulations pertaining to the proposed materials, equipment and operations and obtain and comply with applicable requirements:

 Rule 11 – Exemptions from Rule 10 Permit Requirements Rule 12 – Registration of Specified Equipment
 Rule 12.1 – Portable Equipment Registration
 Rule 51 – Nuisance
 Rule 67.0.1 – Architectural Coatings
 Rule 67.17 – Storage of Materials Containing Volatile Organic Compounds  Rule 71 – Abrasive Blasting

San Diego Air Pollution Control District: 858-586-2600
https://www.sdapcd.org/content/sdapcd/permits.html

California Air Resource Board:
https://ww2.arb.ca.gov/our-work/programs/portable-equipment-registration-program-perp/about

7-6 THE CONTRACTOR’S REPRESENTATIVE. Before starting work, the Contractor shall designate in writing a representative who shall have complete authority to act for it. An alternative representative may be designated as well. The representative or alternate shall be present at the Work site whenever work is in progress or whenever actions of the elements

Revised 6/15/17 Contract No. 5552 Page 99 of 138
necessitate its presence to take measures necessary to protect the Work, persons, or property.

Any order or communication given to this representative shall be deemed delivered to the Contractor. A joint venture shall designate only one representative and alternate. In the absence of the Contractor or its representative, instructions or directions may be given by the Engineer to the superintendent or person in charge of the specific work to which the order applies. Such order shall be complied with promptly and referred to the Contractor or its representative.

In order to communicate with the Agency, the Contractor’s representative, superintendent, or person in charge of specific work shall be able to speak, read, and write the English language.

The qualifications for the Contractor's Representative shall include at a minimum:

1. At least three years of experience in a superintendent capacity for qualifying projects that are submitted in the Contractor’s Statement of Technical Ability and Experience form submitted with the bid, which shall meet the requirements specified therein. The Contractor shall be responsible for submitting verifiable experience records.

2. Completion of OSHA 30-hour Construction Training Course. Submit certification as proof.

The City reserves the right to disqualify bidders if the required technical ability and experience for the Contractor's Representative is not established.

In the event that the Contractor proposes to change the Contractor's Representative prior to Project completion, the Contractor shall notify the Agency and submit the qualifications of the proposed Contractor's Representative for the Engineer's review at least two weeks prior to the proposed change. The qualifications shall demonstrate that the minimum requirements of the position, as described herein, are satisfied. The Engineer will review the qualifications of proposed Contractor's Representative within 5 working days of receipt.

No change in Contractor's Representative will be allowed without the Agency's approval. In the event of a change in Contractor's Representative without prior approval, Agency reserves the right to suspend work, at the Contractor's cost, until a qualified Contractor's Representative is approved for the Project.

7-7 COOPERATION AND COLLATERAL WORK. The Contractor shall be responsible for ascertaining the nature and extent of any simultaneous, collateral, and essential work by others.

The Agency, its workers and contractors and others, shall have the right to operate within or adjacent to the Work site during the performance of such work.

The Agency, the Contractor, and each of such workers, contractors and others, shall coordinate their operations and cooperate to minimize interference.

The Contractor shall include in its Bid all costs involved as a result of coordinating its work with others. the Contractor will not be entitled to additional compensation from the Agency for damages resulting from such simultaneous, collateral, and essential work. If necessary to avoid or minimize such damage or delay, the Contractor shall redeploy its work force to other parts of the Work.

Should the Contractor be delayed by the Agency, and such delay could not have been reasonably foreseen or prevented by the Contractor, the Engineer will determine the extent of the delay, the effect on the project, and any extension of time.

Revised 6/15/17 Contract No. 5552 Page 100 of 138

7-7.1 Coordination. The Contractor shall coordinate and cooperate with all utility companies during the mark-out and locating of their lines or during their relocation or construction if necessary. The Contractor may be granted a time extension if, in the opinion of the Engineer, a delay is caused by the utility company. No additional compensation will be made to the Contractor for any such delay.

7-8 PROJECT SITE MAINTENANCE.

7-8.1 Cleanup and Dust Control. Throughout all phases of construction, including suspension of work, and until the final acceptance, the Contractor shall keep the site clean and free from rubbish and debris. The Contractor shall also abate dust nuisance by cleaning, sweeping and sprinkling with water, or other means as necessary. The use of water resulting in mud on public streets will not be permitted as a substitute for sweeping or other methods.

When required by the Plans or Specifications, the Contractor shall furnish and operate a self- loading motor sweeper with spray nozzles at least once each working day for the purpose of keeping paved areas acceptably clean wherever construction, including restoration, is incomplete.

Materials and equipment shall be removed from the site as soon as they are no longer necessary. Before the final inspection, the site shall be cleared of equipment, unused materials, and rubbish so as to present a satisfactory clean and neat appearance. All cleanup costs shall be included in the Contractor’s Bid.

Care shall be taken to prevent spillage on haul routes. Any such spillage shall be removed immediately and the area cleaned.

Excess excavation material from catch basins or similar structures shall be removed from the site immediately. Sufficient material may remain for use as backfill if permitted by the Specifications. Forms and form lumber shall be removed from the site as soon as practicable after stripping.

Failure of the Contractor to comply with the Engineer’s cleanup orders may result in an order to suspend work until the condition is corrected. No additional compensation will be allowed as a result of such suspension.

Cleanup and dust control required herein shall also be executed on weekends and other non-working days when needed to preserve the health safety or welfare of the public. The Contractor shall conduct effective cleanup and dust control throughout the duration of the Contract. The Engineer may require increased levels of cleanup and dust control that, in his/her sole discretion, are necessary to preserve the health, safety and welfare of the public. Cleanup and dust control shall be considered incidental to the items of work that they are associated with and no additional payment will be made therefore.

7-8.2 Air Pollution Control. The Contractor shall not discharge smoke, dust, or any other air contaminants into the atmosphere in such quantity as will violate the regulations of any legally constituted authority.

7-8.3 Vermin Control. At the time of acceptance, structures entirely constructed under the Contract shall be free of rodents, insects, vermin, and pests. Necessary extermination work

Revised 6/15/17 Contract No. 5552 Page 101 of 138
shall be arranged and paid for by the Contractor as part of the Work within the Contract time and shall be performed by a licensed exterminator in accordance with requirements of governing authorities. The Contractor shall be liable for injury to persons or property and responsible for the elimination of offensive odors resulting from extermination operations.

7-8.4 Sanitation. The Contractor shall provide and maintain enclosed toilets for the use of employees engaged in the Work. These accommodations shall be maintained in a neat and sanitary condition. They shall also comply with all applicable laws, ordinances, and regulations pertaining to public health and sanitation of dwellings and camps.

Wastewater shall not be interrupted. Should the Contractor disrupt existing sewer facilities, sewage shall be conveyed in closed conduits and disposed of in a sanitary sewer system.

Sewage shall not be permitted to flow in trenches or be covered by backfill.

7-8.5 Temporary Light, Power, and Water. The Contractor shall furnish, install, maintain, and remove all temporary light, power, and water at its own expense. These include piping, wiring, lamps, and other equipment necessary for the Work. The Contractor shall not draw water from any fire hydrant (except to extinguish a fire), without obtaining permission from the water agency concerned. The Contractor shall obtain a construction meter for water used for the construction, plant establishment, maintenance, cleanup, testing and all other work requiring water related to this contract. The Contractor shall contact the appropriate water agency for requirements. The Contractor shall pay all costs of temporary light, power and water including hookup, service, meter and any, and all, other charges, deposits and/or fees therefor. Said costs shall be considered incidental to the items of work that they are associated with and no additional payment will be made therefor.

7-8.6 Water Pollution Control. The Contractor shall exercise every reasonable precaution to protect channels, storm drains, and bodies of water from pollution. It shall conduct and schedule operations so as to minimize or avoid muddying and silting of said channels, drains, and waters.

Water pollution control work shall consist of constructing those facilities which may be required to provide prevention, control, and abatement of water pollution.

The Contractor shall comply with the California State Water Resources Control Board (SWRCB) Order Number R9-2013-0001, National Pollutant Discharge Elimination System (NPDES) Permit and Waste Discharge Requirements for Discharges from the Municipal Separate Storm Sewer Systems (MS4s) Draining the Watersheds within the San Diego Region, and amendments thereto, and with all requirements of the Storm Water Pollution Prevention Plan for this project in accordance with these regulations.

A Tier 2 Storm Water Pollution Prevention Plan (SWPPP) is provided to the Contractor, in Appendix “A”, for use in preparing the Project SWPPP for approval by the City. The Contractor shall be responsible for the preparation and implementation of the SWPPP and coordination with the City and the Regional Water Quality Control Board. Refer to Section 300-12.

7-8.6.1 Dewatering. Dewatering shall be performed by the Contractor when specifically required by the Plans or Specifications or specified in the bid schedule, and as necessary for construction of the Work. Dewatering shall be performed in conformance with all applicable local, state and Federal laws and permits issued by jurisdictional regulatory agencies.

Revised 6/15/17 Contract No. 5552 Page 102 of 138
Permits necessary for the discharge of groundwater to land or the sanitary sewer system shall be obtained by the Contractor unless provided by the City. Water shall be treated prior to disposal if so specified in the Special Provisions or required by any permit.

The Contractor shall submit a Dewatering Plan and related supporting information detailing its proposed plan and methodology of dewatering, treatment/pretreatment (when required for permit compliance) and disposal of accumulated water. The plan shall identify the following:

1. location, type and size of dewatering devices and related equipment,

2. size and type of materials composing the collection system,

3. size and type of equipment to be used to retain and, if required, treat accumulated water,

4. the proposed disposal locations, and

5. any other information required by the jurisdictional agency.

If the proposed disposal location is a sanitary sewer, the Contractor shall comply with the Special Use Discharge Permit from the Encina Wastewater Authority (Appendix C). If the proposed disposal location is a storm drain system or receiving body of water, the Contractor shall obtain permits from jurisdictional regulatory agencies or written evidence that such permits are not required.

Short-term construction dewatering operations not exceeding an average of 5,000 GPD for any continuous 180-day period may qualify under Order No. R9-2024-0001, Conditional Waivers of Waste Discharge Requirements for Low Threat Discharges in the San Diego Region, Waiver No. 2 – Miscellaneous “Low Threat” Discharges to Land. These discharges are prohibited from entering MS4s, and any surface waters, including, but not be limited to, ephemeral streams, or vernal pools.

For dewatering operations discharges exceeding an average of 5,000 GPD for any continuous 180-day period, the discharger must file a Notice of Intent containing information about the operator, location, planned period and rate of discharge, and measures that will be taken to minimize or eliminate the discharge of pollutants that might affect groundwater quality. Written notice of enrollment in the Waiver must be received from the San Diego Water Board prior to initiating the discharge.

The City will furnish groundwater monitoring and/or test results conducted by the City to the Contractor prior to the start of construction if such investigation has been conducted. The Contractor shall perform additional sampling and testing to demonstrate compliance with the Special Use Discharge Permit or any other permit, or to support the application for any other permit as required.

Contractor shall avoid inducing settlement or damage to existing facilities, pavement, or adjacent property. Contractor shall submit preconstruction photographs before dewatering to document existing cracks of surfaces which may subsequently be attributed to dewatering operations. Contractor shall monitor ground surface to detect excessive and unacceptable ground subsidence associated with dewatering operations. The monitoring and repair of damage caused by such subsidence shall be borne by the Contractor at no additional cost to the City.

Contractor shall provide dewatering design plans and engineering calculations demonstrating adequacy of proposed dewatering system. Contractor shall make his own judgment regarding the transmissivity of the ground to convey groundwater unto open excavations. Contractor’s bid

Revised 6/15/17 Contract No. 5552 Page 103 of 138
price shall be deemed to cover all costs associated with groundwater dewatering, including desilting and pre-treatment, regardless of the actual depth to groundwater and regardless of the actual volume of groundwater pumped and discharged or disposed of.

All costs for dewatering including sample collection, testing, permit application fees and installation, testing and operation of the dewatering system shall be made at the contract price specified in the bid schedule for Dewatering. If no such bid item is listed, payment shall be considered included in the bid item of work requiring dewatering and no separate or additional payment shall be made therefor.

7-8.7 Drainage Control. The Contractor shall maintain drainage within and through the work areas. Earth dams will not be permitted in paved areas. Temporary dams of sandbags, asphaltic concrete, or other acceptable material will be permitted when necessary. Such dams shall be removed from the site as soon as their use is no longer necessary.

7-8.8 Noise Control. All internal combustion engines used in the construction shall be equipped with mufflers in good repair when in use on the project with special attention to the City Noise Control Ordinance, Carlsbad Municipal Code Chapter 8.48.

7-9 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS. The Contractor shall be responsible for the protection of public and private property adjacent to the Work and shall exercise due caution to avoid damage to such property.

The Contractor shall repair or replace all existing improvements within the right-of-way which are not designated for removal (e.g., curbs, sidewalks, driveways, fences, walls, signs, utility installations, pavement, structures, etc.) which are damaged or removed as a result of its operations. When a portion of a sprinkler system within the right-of-way must be removed, the remaining lines shall be capped. Repairs and replacements shall be at least equal to existing improvements and shall match them in finish and dimension.

Maintenance of street and traffic signal systems that are damaged, temporarily removed or relocated shall be done in conformance with 307-1.5.

Trees, lawns, and shrubbery that are not to be removed shall be protected from damage or injury. If damaged or removed due to Contractor’s operations, they shall be restored or replaced in as nearly the original condition and location as is reasonably possible. Lawns shall be restored with sod and unpaved areas covered with suitable mulch.

The Contractor shall give reasonable notice to occupants or owners of adjacent property to permit them to salvage or relocate plants, trees, fences, sprinklers, and other improvements, within the right-of-way which are designated for removal and would be destroyed because of the Work.

All costs to the Contractor for protecting, removing, and restoring existing improvements shall be included in the Bid.

7-9.1 Preconstruction Survey. The Contractor shall perform a preconstruction survey of the project site to provide a record of preconstruction conditions. This survey shall include the following as a minimum:

Revised 6/15/17 Contract No. 5552 Page 104 of 138

1. Video of existing public right-of-way, proposed alignment, utility mark-outs, working areas, staging and storage areas. Conduct the survey after construction staking has been completed.

2. Video of construction access roads to be used by the Contractor, including all public and private streets used for access to and from the work site. Indicate areas of damaged paving.

3. Any other areas as directed by the Owner which may be disturbed or which are to be protected from the Contractor’s operations.

4. Photographs and video of potential “problem areas”.

5. Notify the Owner seven calendar days in advance and coordinate the scheduling of the video so that a representative of the Owner may accompany the Contractor during the videotaping.

6. At the completion of the survey, the Contractor shall present the Owner with a report detailing the existing conditions at each proposed pipeline site, staging, and stockpile areas. The report shall include the following as a minimum:
a. One copy of the video in color in digital format.
b. One copy of each “potential problem area” photograph (4-inch by 6-inch colored photos).
c. Written summary of “potential problem areas” and the Contractor’s recommendations to address these problem areas.

7. Documentation (including report) of existing conditions shall be completed within 15 days of the Notice to Proceed. The Contractor will not be allowed to begin excavation or dewatering activities until the final report has been submitted and accepted by the Owner.

7-10 PUBLIC CONVENIENCE AND SAFETY.

7-10.1 Traffic and Access. The Contractor’s operations shall cause no unnecessary inconvenience. The access rights of the public shall be considered at all times. Unless otherwise authorized, traffic shall be permitted to pass through the Work, or an approved detour shall be provided.

In areas where site access is restricted, the Contractor is responsible for coordinating site access. All communications shall be made through the City inspector unless otherwise approved.

No excavation or vehicle access will be allowed to occur outside of the easement, outside of the right-of-way, or in vegetated or landscaped areas unless otherwise shown on the Plans or as approved by the Engineer.

Safe and adequate pedestrian and vehicular access shall be provided and maintained to fire hydrants; commercial and industrial establishments; churches, schools and parking lots; service stations and motels; hospitals; police and fire stations; public transportation stops and establishments of similar nature. Access to these facilities shall be continuous and unobstructed unless otherwise approved by the Engineer. Pedestrian crossings of the Work at intervals not exceeding 300 feet (90 m) shall be provided and maintained unless otherwise approved by the Engineer.

The Contractor shall refer to and comply with the requirements of Section 302-15 and Part 6 of the Supplemental Provisions.

Revised 6/15/17 Contract No. 5552 Page 105 of 138
7-10.2 Storage of Equipment and Materials in Public Streets. Construction materials shall not be stored in streets, roads, or highways after unloading. Construction equipment shall not be stored at the Work site before its actual use on the Work or after it is no longer needed.

All materials or equipment not installed or used in construction on any given day shall be stored elsewhere by the Contractor at its expense unless otherwise approved by the Engineer.

Excavated material, except that which is to be used as backfill in the adjacent trench on the same day, shall not be stored in public streets. After placing backfill, all excess material shall be removed immediately from the site.

7-10.3 Street Closures, Detours, Barricades. The Contractor shall comply with all applicable State, County, and City requirements for closure of streets. The Contractor shall provide barriers, guards, lights, signs, temporary bridges, flag persons, and watchpersons. The Contractor shall be responsible for compliance with additional public safety requirements which may arise. The Contractor shall furnish and install signs and warning devices and promptly remove them upon completion of the Work.

After obtaining the Engineers approval and at least 5 working days before closing, detouring, partially closing or reopening any street, alley or other public thoroughfare the Contractor shall notify the following:

The Engineer......................................................................................... 442-339-2766 Carlsbad Fire Administration ................................................................. 442-339-2141 Carlsbad Police Department Dispatch ................................................... 442-339-2197 Carlsbad Traffic Signals Maintenance ................................................... 760-438-2980 Carlsbad Traffic Signals Operations ...................................................... 442-339-2736 North County Transit District ................................................................. 760-966-6500 Republic Services ................................................................................. 760-332-6464

The Contractor shall comply with their requirements. The Contractor shall obtain the Engineer’s written approval prior to deviating from the requirements of 2) through, and including, 7) above.

The Contractor shall obtain the written approval no less than five working days prior to placing any traffic control that affects bus stops.

The Contractor shall secure approval, in advance, from authorities concerned for the use of any bridges proposed by it for public use. Temporary bridges shall be clearly posted as to load limit, with signs and posting conforming to current requirements covering “signs” as set forth in the Traffic Manual published by the California Department of Transportation. This manual shall also apply to the street closures, barricades, detours, lights, and other safety devices required.

All costs involved shall be included in the Bid.

Temporary traffic controls shall be in accordance with the Plans, the TCP , the California Manual on Uniform Traffic Control Devices (MUTCD), current edition, and the Contract Documents.

7-10.3.1 Construction Area Signs and Control Devices. All construction traffic signs and control devices shall be maintained throughout the duration of work in good order and according to the approved traffic control plan. All temporary traffic control devices shall conform to Caltrans Standard Specification 12-3.

Revised 6/15/17 Contract No. 5552 Page 106 of 138
Warning and advisory signs, lights and devices shall be furnished, installed and maintained by the Contractor and shall be promptly removed by the Contractor when no longer required.

Warning and advisory signs that remain in place overnight shall be stationary mounted signs.

Stationary signs that warn of non-existent conditions shall be removed from the traveled way and from the view of motorists in the traveled way or shielded from the view of the traveling public during such periods that their message does not pertain to existing conditions.

All excavation required to install stationary construction area signs shall be performed by hand methods without the use of power equipment. Warning and advisory signs that are used only during working hours may be portable signs. Portable signs shall be removed from the traveled way and shielded from the view of the traveling public during non-working hours.

Personal vehicles of the Contractor's employees shall not be parked within the traveled way, including any Section closed to public traffic. Whenever the Contractor’s vehicles or equipment are parked on the shoulder within 6’ of a traffic lane, the shoulder area shall be closed with fluorescent traffic cones or portable delineators placed on a taper in advance of the parked vehicles or equipment and along the edge of the pavement at not less than 25’ intervals to a point not less than 25’ past the last vehicle or equipment. A minimum of nine (9) cones or portable delineators shall be used for the taper. A W20-1 (Road Work Ahead) or C24 (Shoulder Work Ahead) sign shall be mounted, as required herein, on a signpost or telescoping flag tree with flags. The signpost or flag tree shall be placed where directed by the Engineer.

7-10.3.2 Maintaining Traffic. The Contractor’s personnel shall not work closer than 1.8 m (6’) nor operate equipment within 0.6 m (2’) from any traffic lane occupied by traffic. For equipment, the distance shall be measured from the closest approach of any part of the equipment as it is operated and/or maneuvered in performing the work. This requirement may be waived when the Engineer has given written authorization to the reduction in clearance that is specific to the time, duration and location of such waiver, when such reduction is shown on the traffic control plans included in these Contract Documents, when such reduction is shown on the traffic control plans prepared by the Contractor and approved by the Engineer or for the work of installing, maintaining and removing traffic control devices. As a condition of such waiver the Engineer may require the Contractor to detour traffic, adjust the width of, or realign the adjacent traffic lane, close the adjacent traffic lane or provide barriers.

During the entire construction, a minimum of one, 12-foot wide paved traffic lane shall be open for use by public traffic in each direction of travel.

7-10.3.3 Traffic Control System for Lane Closure. A traffic control system consists of closing traffic lanes or pedestrian walkways in accordance with the details shown on the plans, California Manual on Uniform Traffic Control Devices (FHWA MUTCD, current edition, as amended for use in California) and provisions under "Maintaining Traffic" elsewhere in these Provisions. The provisions in this section will not relieve the Contractor from its responsibility to provide such additional devices or take such measures as may be necessary to maintain public safety.

When lanes are closed for only the duration of work periods, all components of the traffic control system, except portable delineators placed along open trenches or excavation adjacent to the traveled way, shall be removed from the traveled way and shoulder at the end work period. If the Contractor so elects, said components may be stored at selected central locations, approved by the Engineer, within the limits of the right-of-way.

Revised 6/15/17 Contract No. 5552 Page 107 of 138
7-10.3.4 Traffic Control for Permanent and Temporary Traffic Striping. During traffic striping operations, traffic shall be controlled with lane closures, as provided for under "Traffic Control System for Lane Closure" of these Supplemental Provisions or by use of an alternative traffic control plan proposed by the Contractor and approved by the Engineer. The Contractor shall not start traffic striping operations using an alternative plan until the Contractor has submitted its plan to the Engineer and has received the Engineer's written approval of said plan.

7-10.3.5 Temporary Pavement Delineation. Temporary pavement delineation shall be furnished, placed, maintained and removed in accordance with the minimum standards specified in the latest California Manual on Uniform Traffic Control Devices (CAMUTCD) published by Caltrans. Whenever the work causes obliteration of pavement delineation, temporary or permanent pavement delineation shall be in place prior to opening the traveled way to public traffic. Lane line or centerline pavement delineation shall be provided at all times for traveled ways open to public traffic. All work necessary, including any required lines or marks, to establish the alignment of temporary pavement delineation shall be performed by the Contractor. When temporary pavement delineation is removed, all lines and marks used to establish the alignment of the temporary pavement delineation shall be removed by grinding.

Surfaces to receive temporary pavement delineation shall be dry and free of dirt and loose material. Temporary pavement delineation shall not be applied over existing pavement delineation or other temporary pavement delineation. Temporary pavement delineation shall be maintained until superseded or replaced with permanent pavement delineation.

Temporary pavement delineation shall be removed when, as determined by the Engineer, the temporary pavement delineation conflicts with the permanent pavement delineation or with a new traffic pattern for the area and is no longer required for the direction of public traffic. When temporary pavement delineation is required to be removed, all lines and marks used to establish the alignment of the temporary pavement delineation shall be removed.

7-10.3.6 Preparation of Traffic Control Plans. The Contractor shall submit traffic control plans (TCPs) as a part of the Work for all construction activities that are located within the traveled way. TCPs shall be prepared by a professional engineer registered in the State of California and regularly engaged in the preparation of traffic control plans. Design of TCPs for construction shall meet the requirements of the City and the California Manual on Uniform Traffic Control Devices as published by Caltrans. Submittal and review requirements for TCPs shall conform to Section 2-5.3 Shop Drawings and Submittals.

The Contractor must obtain the Engineer’s approval prior to implementing TCPs. The minimum 20-day review period specified in Section 2-5.3.1 for shop drawings and submittals shall pertain to each submittal of TCPs. New or revised TCP submittals shall include all TCPs needed for the entire duration of the Work. Each TCP phase shall be prepared in sufficient scale and detail to show the lane widths, transition lengths, curve radii, stationing of features affecting the traffic control plan and the methodology proposed to transition to the subsequent TCP phase. When the vertical alignment of the traveled surface differs from the finished pavement elevation, vertical curves must also be shown. The Engineer shall be the sole judge of the suitability and quality of any such TCPs.

7-10.3.7 Payment. The contract price paid for Traffic Control shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for performing all work involved to implement the traffic control system, complete in-place, including, but not limited to, preparing and revising TCPs, flag persons, installing temporary or permanent traffic control

Revised 6/15/17 Contract No. 5552 Page 108 of 138
devices such as barriers, delineators, lighting, signage, portable changeable message signs, striping, pavement markers and markings in accordance with the Contract Documents and as directed by the Engineer. Progress payments for Traffic Control will be based on the percentage of the improvement work necessitating traffic control and completed.

7-10.4 Safety.

7-10.4.1 Safety Orders. The Contractor shall have at the Work site, copies or suitable extracts of: Construction Safety Orders, Tunnel Safety Orders and General Industry Safety Orders issued by the State Division of Industrial Safety. The Contractor shall comply with provisions of these and all other applicable laws, ordinances, and regulations.

Before excavating any trench 5 feet or more in depth, the Contractor shall submit a detailed plan to the Agency showing the design of shoring, bracing, sloping, or other provisions to be made for the workers’ protection from the hazard of caving ground during the excavation of such trench. If the plan varies from the shoring system standards, the plan shall be prepared by a registered Civil or Structural Engineer registered in the state of California and regularly engaged in the design of excavation support systems. No excavation shall start until the Engineer has accepted the plan and the Contractor has obtained a permit from the State Division of Industrial Safety. A copy of the permit shall be submitted to the Engineer.

Sloped excavations, trench boxes, or unbraced temporary excavations will not be allowed.

Temporary excavations shall be fully sheeted and tightly braced such that the surrounding ground is in intimate contact with the shoring and bracing system at all times during construction. The temporary excavation support system design must adhere to the minimum requirements of the geotechnical report (see Appendix B).

Payment for performing all work necessary to provide safety measures shall be included in the prices bid for other items of work except where separate bid items for excavation safety are provided or required by law.

7-10.4.2 Use of Explosives. Explosives may be used only when authorized in writing by the Engineer, or as otherwise stated in the Specifications. Explosives shall be handled, used, and stored in accordance with all applicable regulations.

The Engineer’s approval of the use of explosives shall not relieve the Contractor from liability for claims caused by blasting operations.

7-10.4.3 Special Hazardous Substances and Processes. Materials that contain hazardous substances or mixtures may be required on the Work. A Material Safety Data Sheet as described in Section 5194 of the California Code of Regulations shall be requested by the Contractor from the manufacturer of any hazardous products used.

Material usage shall be accomplished with strict adherence to California Division of Industrial Safety requirements and all manufacturer warnings and application instructions listed on the Material Safety Data Sheet and on the product container label.

The Contractor shall notify the Engineer if a specified product cannot be used under safe conditions.

Revised 6/15/17 Contract No. 5552 Page 109 of 138
7-10.4.4 Confined Spaces.
(a) Confined Space Entry Program. The Contractor shall be responsible for implementing, administering and maintaining a confined space entry program (CSEP) in accordance with Sections 5156, 5157 and 5158, Title 8, CCR.

Prior to starting the Work, the Contractor shall prepare and submit its comprehensive CSEP to the Engineer. The CSEP shall address all potential physical and environmental hazards and contain procedures for safe entry into confined spaces, including, but not limited to the following:

1. Training of personnel

2. Purging and cleaning the space of materials and residue

3. Potential isolation and control of energy and material inflow

4. Controlled access to the space

5. Atmospheric testing of the space

6. Ventilation of the space

7. Special hazards consideration

8. Personal protective equipment

9. Rescue plan provisions

The Contractor’s submittal shall include the names of its personnel, including subcontractor personnel, assigned to the project who will have CSEP responsibilities, their CSEP training, and their specific assignment and responsibility in carrying out the CSEP.

(b) Permit-Required Confined Spaces. Entry into permit-required confined spaces as defined in Section 5157, Title 8, CCR may be required as a part of the Work. All manholes, tanks, vaults, pipelines, excavations, or other enclosed or partially enclosed spaces shall be considered permit-required confined spaces until the pre-entry procedures demonstrate otherwise. The Contractor shall implement a permit space program prior to performing any work in a permit- required confined space. A copy of the permit shall be available at all times for review by Contractor and Agency personnel at the Work site.

(c) Payment. Payment for implementing, administering, and providing all equipment and personnel to perform the CSEP shall be included in the bid items for which the CSEP is required.

7-10.4.5 Safety and Protection of Workers and Public. The Contractor shall take all necessary precautions for the safety of employees on the work and shall comply with all applicable provisions of Federal, State and Municipal safety laws and building codes to prevent accidents or injury to persons on, about, or adjacent to the premises where the work is being performed. The Contractor shall erect and properly maintain at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and public and shall use danger signs warning against hazards created by such features of construction as protruding nails, hoists, well holes, and falling materials.

7-10.4.6 Flood Lighting.

7-10.4.6.1 General. When work is being performed during hours of darkness, as defined in Division 1, Section 280, of the California Vehicle Code, flood lighting shall be used to illuminate the Work site, flagger stations, equipment crossings and other hazardous areas. Flood lighting shall provide visibility for a distance of 1/2 mile (800 m). Flood lights shall not shine directly into the view of oncoming traffic.

Revised 6/15/17 Contract No. 5552 Page 110 of 138

7-10.4.6.2 Payment. No separate or additional payment will be made for flood lighting. Payment shall be included in the Contract Unit Price or lump sum price in the Bid for the various Bid items.

7-10.4.7 Security and Protective Devices.

7-10.4.7.1 General. Security and protective devices shall consist of fencing, steel plates, or other devices as specified in the Special Provisions to protect open excavations.

7-10.4.7.2 Security Fencing. The Contractor shall completely fence open excavations. Security fencing shall conform to 304-5. Security fencing shall remain in place unless workers are present and construction operations are in progress during which time the Contractor shall provide equivalent security.

7-10.4.7.3 Payment. No separate or additional payment will be made for security fencing or protective devices. Payment shall be included in the Contract Unit Price or lump sum price in the Bid for the various Bid items.

7-10.4.8 Steel Plate Covers.

7-10.4.8.1 General. The Contractor shall provide, install, and maintain steel plate covers as necessary to protect from accidental entry into openings, trenches, and excavations. Plates shall provide complete coverage to prevent any person, bicycle, motorcycle, or motor vehicle from being endangered due to plate movement causing separations or gaps. The Contractor shall submit the design in accordance with Section 2-5.3 which shall include the following criteria:

1. The approval of steel plate bridging shall be at the sole discretion of the Engineer.

2. Steel plate bridging shall be designed to support HS20-44 truck loading per Caltrans Bridge Design Specifications Manual.

3. Surfaces exposed to pedestrian or vehicular traffic shall be non-skid. The Contractor shall maintain a non-skid surface on the steel plate having a minimum coefficient of friction equivalent to 0.35 as determined by California Test Method 342. If a different test method is used, the Contractor may utilize standard test plates with known coefficients of friction available from each Caltrans District Materials Engineer to correlate skid resistance results to California Test Method 342.

4. The Contractor shall install signage with a 2-inch (51 mm) minimum letter height indicating the steel plate cover load limit, the Company’s name, and a 24-hour emergency contact phone number. The

5. Contractor shall install Rough Road (W33) sign with black lettering on an orange background in advance of steel plate bridging.

6. The Contractor is responsible for the maintenance of the plates and asphalt concrete ramps or other devices used to secure the plates and shoring of the trench to support all loads.

7. Contractor shall immediately mobilize necessary personnel and equipment to repair plate movements, separation, noise, anchors, asphalt ramps or any other deficiency.

Failure to respond within 2 hours after being notified by the Engineer shall be grounds for the City to perform necessary repairs at the expense of the Contractor.

8. When plates are removed, the pavement surface shall be repaired to the satisfaction of the Engineer.

Revised 6/15/17 Contract No. 5552 Page 111 of 138

9. For trench widths exceeding those in Table 7-10.4.8.2, a structural design shall be prepared by a California registered civil or structural engineer regularly engaged in the design of shoring systems.

7-10.4.8.2 Thickness. Steel plate covers shall conform to Table 7-10.4.8.2.

TABLE 7-10.4.8.2
Trench Width Steel Plate Cover Thickness
Less than 10" 1/2" (12.5 mm)
10" (250 mm) to 1'-11" (580 mm) 3/4" (19 mm)
2' (600 mm) to 2'-7" (790 mm) 7/8" (22 mm)
2'-8" (820 mm) to 3'-5" (1040 mm) 1" (25 mm)
3'-6" (1070 mm) to 5'-3" (1600 mm) 1-1/4" (32 mm)
More than 5'-3" (1600 mm) See Note 1
Notes:

The Contractor shall submit a Working Drawing and calculations based on AASHTO H20-44 bridge loading.

7-10.4.8.3 Installation. Steel plate covers shall extend a minimum of 2 feet (600 mm) beyond trench edges. Unless otherwise specified in the Special Provisions or approved by the Engineer for the site conditions prior to use, steel plate covers shall be installed using Method 1. Method 2 shall not be used in a traveled lane.

Method 1. The pavement shall be cold milled to a depth equal to the thickness of the plate and to a width and length equal to the dimensions of the plate. The cold milling shall produce a flat surface to support the plate with no horizontal or vertical movement.

Horizontal gaps between the unmilled pavement and the plate shall not exceed 1 inch (25 mm) and shall be filled with elastomeric sealant material which may, at the Contractor’s option, be mixed with no more that 50%, by volume, of Type I aggregate conforming to the requirements of Tables 203-5.2(B) and 203-5.3(A).

Method 2. The approach plate and ending plate (in longitudinal placement) shall be attached to the surface by a minimum of 2 dowels, ¾” diameter (19 mm), drilled at the corners of the plate and drilled 6 inches (150 mm) into the pavement. Subsequent plates may be butted next to each other. Temporary asphalt concrete (D2-SC 800) shall be used to construct tapers from the steel plate surface to the existing surface at a 12-inch (300 mm) run for each 1 inch (25 mm) thickness of steel plate. When steel plates are removed, the dowel holes in the pavement section shall be completely filled with elastomeric sealant material.

Advance traffic warning signs shall be installed as specified in the Special Provisions or shown on the TCP.

7-10.4.8.4 Payment. Steel plate bridging materials including, but not limited to steel plates, anchoring devices, cold milling, elastomeric sealant material, asphalt ramping and padding, signage, placing, installation, removal, relocation, preparation and processing of shop drawings and submittals to support the use of steel plate bridging and all other materials, labor, supervision, overhead of any type or description will be considered as incidental to the work. No separate or additional payment for steel plate bridging will be made. No extension to contract time will be allowed for, or because of, the use of steel plate bridging.

7-11 PATENT FEES OR ROYALTIES. The Contractor shall absorb in its Bid the patent fees or royalties on any patented article or process furnished or used in the Work. The Contractor

Revised 6/15/17 Contract No. 5552 Page 112 of 138
shall indemnify and hold the Agency harmless from any legal action that may be brought for infringement of patents.

7-12 ADVERTISING. The names, addresses and specialties of Contractors, Subcontractors, architects, or engineers may be displayed on removable signs. The size and location shall be subject to the Engineer’s approval.

Commercial advertising matter shall not be attached to or painted on the surfaces of buildings, fences, canopies, or barricades.

7-13 LAWS TO BE OBSERVED. The Contractor shall keep fully informed of State and National laws and County and Municipal ordinances and regulations which in any manner affect those employed in the Work or the materials used in the Work or in any way affect the conduct of the Work. The Contractor shall at all times observe and comply with such laws, ordinances, and regulations. Municipal ordinances that affect this work include Chapter 11.06. Excavation and Grading. If this notice specifies locations or possible materials, such as borrow pits or gravel beds, for use in the proposed construction project which would be subject to Section 1601 or Section 1603 of the Fish and Game Code, the conditions established pursuant to Section 1601 et seq. of the Fish and Game Code shall become conditions of the contract.

7-14 ANTITRUST CLAIMS. Section 7103.5 of the Public Contract Code provides:

“In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the contractor or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec 15) or Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or subcontract. The assignment shall be made and become effective at the time the awarding body tenders final payment to the contractor, without further acknowledgment of the parties.”

Revised 6/15/17 Contract No. 5552 Page 113 of 138
SECTION 8 – FACILITIES FOR AGENCY PERSONNEL

8-1 GENERAL. Field Facilities for Agency personnel are not required.

Revised 6/15/17 Contract No. 5552 Page 114 of 138
SECTION 9 – MEASUREMENT AND PAYMENT

9-1 MEASUREMENT OF QUANTITIES FOR UNIT PRICE WORK.

9-1.1 General. Unless otherwise specified, quantities of work shall be determined from measurements or dimensions in horizontal planes. However, linear quantities of pipe, piling, fencing and timber shall be considered as being the true length measured along longitudinal axis.

Unless otherwise provided in Specifications, volumetric quantities shall be the product of the mean area of vertical or horizontal sections and the intervening horizontal or vertical dimension.

The planimeter shall be considered an instrument of precision adapted to measurement of all areas.

9-1.2 Methods of Measurement. Materials and items of work which are to be paid for on basis of measurement shall be measured in accordance with methods stipulated in the particular sections involved.

9-1.3 Certified Weights. When payment is to be made on the basis of weight, the weighing shall be done on certified platform scales or, when approved by the Engineer, on a completely automated weighing and recording system. The Contractor shall furnish the Engineer with duplicate licensed weighmaster’s certificates showing actual net weights. The Agency will accept the certificates as evidence of weights delivered.

9-1.4 Units of Measurement. The system of measure for this contract shall be the U.S.

Standard Measures.

9-2 LUMP SUM WORK. Items for which quantities are indicated “Lump Sum”, “L.S.”, or “Job”, shall be paid for at the price indicated in the Bid. Such payment shall be full compensation for the items of work and all work appurtenant thereto.

The Contractor shall submit to the Engineer within 15 days after award of Contract, a detailed schedule in triplicate, to be used as a basis for determining progress payments on a lump sum contract or designated lump sum bid item. This schedule shall equal the lump sum bid and shall be in such form and sufficiently detailed as to satisfy the Engineer that it correctly represents a reasonable apportionment of the lump sum.

9-3 PAYMENT.

9-3.1 General. The quantities listed in the Bid schedule will not govern final payment.

Payment to the Contractor will be made only for actual quantities of Contract items constructed in accordance with the Plans and Specifications. Upon completion of construction, if the actual quantities show either an increase or decrease from the quantities given in the Bid schedule, the Contract Unit Prices will prevail subject to the provisions of Section 3-2.2.1.

The unit and lump sum prices to be paid shall be full compensation for the items of work and all appurtenant work, including furnishing all materials, labor, equipment, tools, and incidentals.

Payment will not be made for materials wasted or disposed of in a manner not called for under the Contract. This includes rejected material not unloaded from vehicles, material rejected after

Revised 6/15/17 Contract No. 5552 Page 115 of 138
it has been placed, and material placed outside of the Plan lines. No compensation will be allowed for disposing of rejected or excess material.

Payment for work performed or materials furnished under an Assessment Act Contract will be made as provided in particular proceedings or legislative act under which such contract was awarded.

Whenever any portion of the Work is performed by the Agency at the Contractor’s request, the cost thereof shall be charged against the Contractor, and may be deducted from any amount due or becoming due from the Agency.

Whenever immediate action is required to prevent violation of any law, injury, death, or property damage, and precautions which are the Contractor’s responsibility have not been taken and are not reasonably expected to be taken, the Agency may, after reasonable attempt to notify the Contractor, cause such precautions to be taken and shall charge the cost thereof against the Contractor, or may deduct such cost from any amount due or becoming due from the Agency.

Agency action or inaction under such circumstances shall not be construed as relieving the Contractor or its Surety from liability.

Payment shall not relieve the Contractor from its obligations under the Contract; nor shall such payment be construed to be acceptance of any of the Work. Payment shall not be construed as the transfer of ownership of any equipment or materials to the Agency. Responsibility of ownership shall remain with the Contractor who shall be obligated to store any fully or partially completed work or structure for which payment has been made; or replace any materials or equipment required to be provided under the Contract which may be damaged, lost, stolen or otherwise degraded in any way prior to acceptance of the Work, except as provided in Section 6-10.

Guarantee periods shall not be affected by any payment but shall commence on the date of recordation of the “Notice of Completion.”

If, within the time fixed by law, a properly executed notice to stop payment is filed with the Agency, due to the Contractor’s failure to pay for labor or materials used in the Work, all money due for such labor or materials will be withheld from payment to the Contractor in accordance with applicable laws.

At the expiration of 35 days from the date of acceptance of the Work by the Board, or as prescribed by law, the amount deducted from the final estimate and retained by the Agency will be paid to the Contractor except such amounts as are required by law to be withheld by properly executed and filed notices to stop payment, or as may be authorized by the Contract to be further retained.

9-3.2 Partial and Final Payment. The Engineer will, after award of Contract, establish a closure date for the purpose of making monthly progress payments. The Contractor may request in writing that such monthly closure date be changed. The Engineer may approve such request when it is compatible with the Agency’s payment procedure.

Each month, the Engineer will make an approximate measurement of the work performed to the closure date as basis for making monthly progress payments. The estimated value will be based on contract unit prices, completed change order work and as provided for in Section 9-2 of these General Provisions. Progress payments shall be made no later than thirty (30) calendar

Revised 6/15/17 Contract No. 5552 Page 116 of 138
days after the closure date. Five (5) working days following the closure date, the Engineer shall complete the detailed progress pay estimate and submit it to the Contractor for the Contractor’s information. Should the Contractor assert that additional payment is due, the Contractor shall within ten (10) days of receipt of the progress estimate, submit a supplemental payment request to the Engineer with adequate justification supporting the amount of supplemental payment request. Upon receipt of the supplemental payment request, the Engineer shall, as soon as practicable after receipt, determine whether the supplemental payment request is a proper payment request. If the Engineer determines that the supplemental payment request is not proper, then the request shall be returned to the Contractor as soon as practicable, but not later than seven (7) days after receipt. The returned request shall be accompanied by a document setting forth in writing the reasons why the supplemental payment request was not proper. In conformance with Public Contract Code Section 20104.50, the City shall make payments within thirty (30) days after receipt of an undisputed and properly submitted supplemental payment request from the Contractor. If payment of the undisputed supplemental payment request is not made within thirty (30) days after receipt by the Engineer, then the City shall pay interest to the Contractor equivalent to the legal rate set forth in subdivision (a) of Section 685.010 of the Code of Civil Procedure.

From each progress estimate, 10 percent will be deducted and retained by the Agency, and the remainder less the amount of all previous payments will be paid. After 50 percent of the Work has been completed and if progress on the Work is satisfactory, the deduction to be made from remaining progress estimates and from the final estimate may be limited to $500 or 10 percent of the first half of total Contract amount, whichever is greater.

No progress payment made to the Contractor or its sureties will constitute a waiver of the liquidated damages under 6-9.

As provided in Section 22300 of the California Public Contract Code, the Contractor may substitute securities for any monies withheld by the Agency to ensure performance under the Contract.

After final inspection, the Engineer will make a Final Payment Estimate and process a corresponding payment. This estimate will be in writing and shall be for the total amount owed the Contractor as determined by the Engineer and shall be itemized by the contract bid item and change order item with quantities and payment amounts and shall show all deductions made or to be made for prior payments and amounts to be deducted under provisions of the contract.

All prior estimates and progress payments shall be subject to correction in the Final Payment Estimate.

The Contractor shall have 30 calendar days from receipt of the Final Payment Estimate to make written statement disputing any bid item or change order item quantity or payment amount. The Contractor shall provide all documentation at the time of submitting the statement supporting its position. Should the Contractor fail to submit the statement and supporting documentation within the time specified, the Contractor acknowledges that full and final payment has been made for all contract bid items and change order items.

If the Contractor submits a written statement with documentation in the aforementioned time, the Engineer will review the disputed item within 30 calendar days and make any appropriate adjustments on the Final Payment. Remaining disputed quantities or amounts not approved by the Engineer will be subject to resolution as specified in Section 3-5, Disputed Work.

Revised 6/15/17 Contract No. 5552 Page 117 of 138
The written statement filed by the Contractor shall be in sufficient detail to enable the Engineer to ascertain the basis and amount of said disputed items. The Engineer will consider the merits of the Contractor’s claims. It will be the responsibility of the Contractor to furnish within a reasonable time such further information and details as may be required by the Engineer to determine the facts or contentions involved in its claims. Failure to submit such information and details will be sufficient cause for denying payment for the disputed items.

9-3.2.1 Payment for Claims. Except for those final payment items disputed in the written statement required in Section 9-3.2 all claims of any dollar amount shall be submitted in a written statement by the Contractor no later than the date of receipt of the final payment estimate. Those final payment items disputed in the written statement required in Section 9-3.2 shall be submitted no later than 30 days after receipt of the Final Payment estimate. No claim will be considered that was not included in this written statement, nor will any claim be allowed for which written notice or protest is required under any provision of this contract including Sections 3-4 Changed Conditions, 3-5 Disputed Work, 6-6.3 Payment for Delays to Contractor, 6-6.4 Written Notice and Report, or 6-7.3 Contract Time Accounting, unless the Contractor has complied with notice or protest requirements.

The claims filed by the Contractor shall be in sufficient detail to enable the Engineer to ascertain the basis and amount of said claims. The Engineer will consider and determine the Contractor’s claims and it will be the responsibility of the Contractor to furnish within a reasonable time such further information and details as may be required by the Engineer to determine the facts or contentions involved in its claims. Failure to submit such information and details will be sufficient cause for denying the claims.

Payment for claims shall be processed within 30 calendar days of their resolution for those claims approved by the Engineer. The Contractor shall proceed with informal dispute resolution under Section 3-5, Disputed Work, for those claims remaining in dispute.

9-3.3 Delivered Materials. The cost of materials and equipment delivered but not incorporated into the work will not be included in the progress estimate.

9-3.4 Mobilization. When a bid item is included in the Proposal form for Mobilization and subject to the conditions and limitations in the Specifications, the costs of work in advance of construction operations and not directly attributable to any specific bid item will be included in the progress estimate. When no such bid item is provided, payment for such costs will be considered to be included in the other items of work.

9-3.4.1 Mobilization and Preparatory Work. Payment for Mobilization and Preparatory Work will be made at the Contract price and includes full compensation for furnishing all insurance, bonds, licenses, labor, materials, utilities, tools, equipment and incidentals, and for doing all the work involved in mobilization and preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidental to preparing to conduct work on and off the project site and other offsite facilities necessary for work on the project; for all other facilities, sureties, work and operations which must be performed or costs incurred prior to beginning work on various contract items on or off the project site, excepting those specifically paid for under separate bid items. Such activities shall include, but are not limited to, coordination with Agency forces, securing permits, surveying and staking, preconstruction surveys, securing construction water supply, providing power necessary for construction, providing all temporary construction fencing; installing, maintaining and removing project signs; providing on-site sanitary facilities; posting OSHA requirements and

Revised 6/15/17 Contract No. 5552 Page 118 of 138
establishing safety programs, demobilization and any other work or services not included in any other bid item. This work also includes the cost for maintaining and submitting the project record drawings at the end of the project. These record drawings must be reviewed monthly with the Agency to receive progress or final payments for any work. The Contractor hereby agrees that the price paid is sufficient for Mobilization and Preparatory Work, as described in this section, and that the Contractor shall have no right to additional compensation for Mobilization and Preparatory Work.

Progress payments for Mobilization and Preparatory Work will be made as follows:

For the first progress payment (after the issuance of the Notice to Proceed), payment will be made at thirty percent (30%) of the amount bid for Mobilization and Preparatory Work. For the second progress payment, payment will be made at fifty percent (50%) of the amount bid for Mobilization and Preparatory Work. The remaining twenty percent (20%) of the amount bid for Mobilization and Preparatory Work will be made when all punch list items are signed-off and completed to the satisfaction of the City Inspector, and the Contractor has completely demobilized from the project site(s).

9-4 BID ITEMS. Payment for each Bid Item shall be made at the quantity and type as listed in the Contractor's Proposal. All work shown or mentioned on the plans, in the Contract Documents, General Provisions, or Technical Provisions/Specifications shall be considered as included in the Bid Items. Contractor must protect existing utilities, improvements, landscaping, irrigation systems, and vegetation in place. If damaged during the work, Contractor is responsible to repair or replace any utilities, improvements, landscaping, irrigation systems, and vegetation at his expense.

Mobilization.

The contract price paid for this bid item shall constitute payment for all mobilization work in accordance with Section 9-3.4 of these General Conditions.

A field office or field laboratory or bathhouse facilities will not be required.

Temporary Traffic Control.

The contract price paid for this bid item shall constitute full compensation to furnish all labor, materials, equipment and incidentals, prepare traffic control plans and implement temporary traffic control systems, complete in-place and in accordance with the Contract Documents, including Sections 7-10.1 through 7-10.3 and 601 and its subsections, and all work required to be obtain a no-fee Right-of-Way permit(s) and Haul Route permit.

Preconstruction Survey.

The contract price for work under this item shall include, but not be limited to, furnishing all labor, material, tools and equipment, and performing all work required for preconstruction survey in accordance with 7-9.1 and all other work necessary to complete this item of work as described in the Contract Documents.

Storm Water Pollution Control (SWPPP).

The contract price paid for this bid item shall constitute full compensation for furnishing all labor, materials, tools, equipment and incidentals for preparing, amending and implementing the SWPPP in accordance with Section 7-8.6 and 300-12.

Revised 6/15/17 Contract No. 5552 Page 119 of 138
Utility Locating and Potholing.

The contract price paid for this bid item shall constitute full compensation to furnish all labor, materials, tools and equipment to determine, by potholing or other approved methods, the location and depth of all existing utilities in accordance with the Contract Documents. This bid item shall include notification to Underground Service Alert and utility mark-out, coordination and standby inspection of potholing excavations, backfilling of excavations, patching of pothole excavations with temporary AC paving, and submitting results to the Engineer in advance of pavement saw-cutting or excavations.

Excavation Support System.

The contract price paid for this bid item shall constitute full compensation to furnish and install sheeting, shoring, bracing, or equivalent method of support for excavations for the protection of life or limb which shall conform to applicable safety orders and the requirements of 7-10.4.1.

This includes, but is not limited to, the preparation and submittal of a detailed plan showing the design of shoring, bracing, or other provisions to be made for worker protection from the hazard of caving ground in or adjacent to trenches or open excavations, and acceptance of said plan by the Engineer, in accordance with California Labor Codes 6705 and 6707. This bid item shall also include obtaining any required permit from the State Division of Industrial Safety.

Dewatering.

The contract price paid for this bid item shall constitute full compensation to furnish all labor, materials and equipment to design, install and maintain a temporary groundwater dewatering system during construction in accordance with the Contract Documents. The price paid shall include, but is not limited to, applying for and obtaining a Special Use Discharge permit (Appendix C) with Encina Wastewater Authority (EWA) for groundwater discharge to the sanitary sewer; groundwater sampling and analysis to comply with EWA local discharge limits; submittal of a dewatering plan; temporary asphalt (cold mix); protective barriers, ramps or plating; system testing and maintenance for the duration of the work; redundant pumping unit; security; disposal of all dewatering discharge; removal of the system upon completion of work and site restoration.

Force Main Dewatering.

The contract price paid for this item shall constitute full compensation for all sewer force main dewatering operations, cut and cap of the HDPE force main, and for final connection of new piping to the force main in accordance with the Contract Documents. This item shall include, but is not limited to, preparation and submittal of a force main dewatering plan; Contractor supplied tanker truck(s) for force main dewatering and discharge at City designated manholes near the Cannon Lift Station; full time supervision of sewer flows to prevent a sewer system overflow; night work; and all incidental work or services.

This bid item shall not include excavation or pavement structural section restoration which are measured and paid for under separate bid items.

Demolition.

The contract price paid for this item constitutes payment for all demolition, removals and disposals of the existing chemical injection manhole, existing HDPE force main and pipe supports, existing flow meter, existing 2” chemical injection feed, existing 12” drain, and existing plug valves and check valves to be replaced as shown or specified in the Contract Documents.

Revised 6/15/17 Contract No. 5552 Page 120 of 138
Temporary Sewer Bypass.

The contract price paid for this bid item shall constitute full compensation to furnish all labor, materials and equipment to design, install and maintain temporary sewer bypass system during construction in accordance with the Contract Documents. The price paid shall include, but is not limited to, submittal of a sewer bypass plan; all connections, piping, redundant pumping units; security; temporary asphalt (cold mix); protective barriers, ramps or plating; testing and maintenance of the system for the duration of the work; applying for and obtaining all required SDAPCD permits for sewer bypass temporary generators as required in Specification 02960 – Temporary Bypass Pumping; removal of the system upon completion of work; and site restoration. Sewer bypass plan shall be designed to provide full system redundancy for required bypass flows.

Construct 8’ Diameter Manhole.

The contract price paid for this bid item shall constitute full compensation for all labor, materials and equipment required to construct a new reinforced concrete precast manhole and appurtenances in accordance with the Contract Documents. This item shall include, but is not limited to, preparation and submittal of shop drawings by a California registered civil or structural engineer; protection of existing utilities; removal and replacement of existing utilities and conduits impacted by manhole construction; excavation; subgrade preparation; crushed rock; concrete manhole and riser; concrete top slab; access hatch; ladders and ladder-up safety devices; joint sealants; manhole exterior waterproofing systems; mechanical link seals; import, placement and compaction of backfill; site restoration; disposal of waste or surplus materials; and all incidental work or services.

Over-excavation and Backfill.

The contract price per for this bid item shall constitute full compensation to furnish all labor, materials and equipment and remove unsuitable materials encountered in the excavation subgrade to a depth of 24 inches, disposal in accordance with applicable regulations, and placement of crushed rock and/or imported pipe zone backfill to the design trench subgrade elevation. The removal limits shall be as ordered by the Engineer.

Furnish and Install HDPE and Fittings.

The contract price paid for this bid item shall constitute full compensation to furnish all labor, materials, tools and equipment and install HDPE force main piping and fittings of the size and to the limits specified in accordance with the Contract Documents. This bid item shall include, but is not limited to, pavement saw-cutting; demolition of pavements; excavation; removal of existing or to be abandoned HDPE force main, conduits or structures; placement and compaction of imported pipe zone bedding and backfill and trench zone backfill; pipe; gaskets; hardware; fittings (including couplings, electrofusion fittings, reducers and dismantling joints); HDPE field butt fusion as required, pipe supports; corrosion protection of fittings and hardware; thrust blocks and thrust restraint devices; installation of utility warning tape; hydrostatic pressure testing; disposal of surplus materials and all incidental work.

This bid item shall not include pavement structural section restoration which is measured and paid for under a separate bid item.

Furnish and Install Flow Meter.

The contract price paid for this bid item shall constitute full compensation to furnish all labor, materials and equipment and install a new electromagnetic flow meter in accordance with the Contract Documents. This item includes all incidental work or services.

Revised 6/15/17 Contract No. 5552 Page 121 of 138
This bid item shall not include electrical or communication improvements which are measured and paid for under a separate bid item.

Furnish and Install Plug Valve.

The contract price paid for this bid item shall constitute full compensation to furnish all labor, materials and equipment and install new plug valves of the size specified and in accordance with the Contract Documents. This item includes all incidental work or services.

Furnish and Install Check Valve.

The contract price paid for this bid item shall constitute full compensation to furnish all labor, materials and equipment and install new check valves of the type and size specified and in accordance with the Contract Documents. This item includes all incidental work or services.

Furnish and Install Electrical and Instrumentation Improvements.

The contract price paid for this bid item shall constitute full compensation for all labor, materials and equipment required to furnish and install electrical improvements in accordance with the Contract Documents. This item shall include, but is not limited to, excavation; protecting existing utilities; electrical conduit and conductors; imported bedding and backfill material; concrete encasements; junction and pull boxes; conduit straps and anchorages; conduit seals and pipe penetration sealing through structures; sump pump and discharge piping; electrical panels and enclosures; start-up and testing of electrical, instrumentation and communications systems for the flow meter; disposal of waste or surplus materials and all incidental work or services.

Furnish and Install Aggregate Base.

The contract price paid for this bid item shall constitute full compensation to furnish all labor, materials and equipment and place untreated aggregate base (Caltrans Class II, Section 26-

1.02B), complete in-place in accordance with City of Carlsbad Standard Drawings (GS-17 and GS-25 or GS-26) and other requirements of the Contract Documents. The price paid shall include, but not be limited to preparing and compacting the subgrade; importing, placing and compacting aggregate base above the trench zone, beneath asphalt concrete, beneath Portland cement concrete pavement, flatwork or curb and gutter; and all incidental work or services.

Furnish and Install Asphalt Concrete.

The contract price paid for this bid item shall constitute full compensation to furnish all labor, materials and equipment to place asphalt concrete pavement, complete in-place in accordance with City of Carlsbad Standard Drawings (GS-17 and GS-25 or GS-26, as modified) and other requirements of the Contract Documents. The price paid shall include, but not be limited to, saw-cutting and cold milling not included in any other bid item; applying tackifiers; placing and compacting asphalt concrete along trench or site excavations, areas damaged by construction, or grind and overlay areas; applying seal coat; disposal of waste or surplus materials and all incidental work or services. Pavement that is damaged during construction, when such damage could have been prevented using rubber-tired equipmen t, steel plating or similar protective measures, will not be measured for payment and shall be replaced at the Contractor’s expense.

Seal Coat Existing Driveway
The contract price paid for this bid item shall constitute full compensation to furnish all labor, materials and equipment to place an asphalt-based seal coat to the extents shown on the plan and in accordance with the contract, specifications and Greenbook Section 302-8. The area specified in the contract quantity shall receive two applications of seal coat.

Revised 6/15/17 Contract No. 5552 Page 122 of 138

SUPPLEMENTAL PROVISIONS
TO

STANDARD SPECIFICATIONS FOR PUBLIC WORKS

CONSTRUCTION
PART 2, CONSTRUCTION MATERIALS

SECTION 200 - ROCK MATERIALS

200-2 UNTREATED BASE MATERIALS.

200-2.2 Crushed Aggregate Base.

200-2.2.1 General.

Add the following:

1. Samples for testing shall represent every 500 cubic yards or one day's production, whichever is less. If the results of the aggregate grading tests do not meet the grading requirements in Table 200-2.2.2 but meet the Quality Requirements specified in Table 200-2.2.3, placement of the aggregate base may be continued for the remainder of that day. However, another day's Work may not be started until test results indicate that the next material to be used in the Work will comply with the specified gradation and quality requirements.

2. If the results of both the aggregate grading and Sand Equivalent tests do not meet the requirements of Section 200-2.2, the aggregate base which is represented by these tests shall be removed. However, if requested by the Contractor, and approved at the sole discretion of the Engineer, the aggregate base may remain in place and the Contractor shall pay to the Agency $50 per cubic yard for such aggregate base left in place. The Agency may deduct this amount from any moneys due, or that may be come due, to the Contractor under the Contract.

SECTION 201 - CONCRETE, MORTAR, AND RELATED MATERIALS

201-1 PORTLAND CEMENT CONCRETE

TABLE 201-1.1.2(A) Modify as follows:

TABLE 201-1.1.2(A) (3)

PORTLAND CEMENT CONCRETE
Type of Construction Concrete Maximum
Class Slump Inches
All Concrete Used Within the Right-of-Way 560-C-3250 (1) (2) Trench Backfill Slurry 190-E-400 8”
Street Light Foundations and Survey Monuments 560-C-3250 4” Traffic Signal Foundations 590-C-3750 4”
Concreted-Rock Erosion Protection 520-C-2500P
310-C-17
per Table 300-11.3.1

Revised 6/15/17 Contract No. 5552 Page 123 of 138
(1) Except that concrete required to be of higher strength by Table 201-1.1.2(A) SSPWC shall be as per Table 201-1.1.2(A) SSPWC.
(2) As per Table 201-1.1.2(A) SSPWC.
(3) Portions of Table 201-1.1.2(A) of the Standard Specifications for Public Works Construction not shown herein as changed are not affected by this table.

201-1.2.4 Chemical Admixtures.

Substitute the following:

(d) Air-Entraining Admixtures. The air content shall not deviate from the percentage specified or permitted by more than 1-1/2 percentage points. The air content of freshly mixed concrete will be determined by California Test 504.

SECTION 203 - BITUMINOUS MATERIALS

203-6 ASPHALT CONCRETE.
203-6.2.1. Asphalt Binder.

Add the following:

Wet Mix or Core sampled asphalt concrete will be considered in conformance with the mix design when the Asphalt Binder content is within +/-0.5% of the design mix and the gradation conforms to the grading as shown in Table 203-6.4.4. Deviations in gradation may be considered in conformance with the mix design provided the stability of the completed mix complies with the requirements for Hveem Stability per Table 203-6.4.4.

203-6.4 Asphalt Concrete Mixtures.

Add the following:

Conventional Asphalt concrete shall be class C2-PG64-10 for a surface course 2 inches in depth and B-PG64-10 for all base courses. Asphalt concrete shall be class D2-PG70-10 for dikes and class E-PG70-10 ditches.

203-6.4.4 Composition and Grading.

Add the following:

Evaluation of asphalt concrete shall be determined from samples of asphalt concrete taken after completion of all processing (Wet Mix) or by core sample analysis of the in-place asphalt concrete or by direct central plant inspection that confirms the production of a particular mix design and verifies using samples of aggregate taken before the addition of asphalt and mineral filler (Bin). All samples shall be taken in accordance with Calif. Test 125.

When Wet Mix or Core samples of asphalt concrete are to be used for evaluation, sufficient size samples shall be taken to ensure representative and adequate quantity of material for:

1. Asphalt Content and Gradation of Extraction using Calif. Test 382 or ASTM 2172, and Calif. Test 202.

2. Stability using:
a. Hveem stability Value using Calif. Tests 304 and 366 shall be the average of three individual Values
and/or
b. Marshall Stability 1 in accordance with the Asphalt Institute's MS-2 fabricated and tested for traffic volume and shall be the average of three specimens.

Revised 6/15/17 Contract No. 5552 Page 124 of 138
1Only use Marshall Stability when the deviation between individual Hveem Stabilometer Values are greater than +/-5.

When using core sample analysis, the samples must be properly prepared to safeguard against influx of outside contaminates and so that the cut surfaces do not influence the test results.

The amount of asphalt binder used in asphalt concrete placed in dikes, gutters, gutter flares, overside drains and aprons at the ends of drainage structures shall be increased one percent by mass of the aggregate over the amount of asphalt binder determined for use in asphalt concrete placed on the traveled way.

Wet Mix or Core sampled asphalt concrete will be considered in conformance with the mix design when the asphalt content is within +/- .40 of the design mix and the gradation conforms to the grading as shown in Table 203-6.4.4. Deviations in gradation may be considered in conformance with the mix design provided the stability of the completed mix complies with the requirements for Hveem Stability per Table 203-6.4.4.

SECTION 213 - ENGINEERING GEOSYNTHETICS

213-5 GEOTEXTILES AND GEOGRIDS.

Add the following section:
213-5.1 General. Geotextile types shall be used for the applications listed in Table 213-5.1.

Table 213-5.1

GEOTEXTILE APPLICATIONS
Application of Geotextile Type Designation
Separation of Soil and Street Structural Section 90WS
Separation of Soil and Subsurface Aggregate Drain 180N
Reinforcement of Street Structural Section 200WS
Remediation and Separation of Soil 270WS
Reinforcement of Soil 270WS
Drainage at the Interface of Soil Structures N/A
Drainage at the Interface of Soil and Structures N/A
Rock Slope Protection Fabric for Rock Sizes Below 225 kg (¼ Ton) 180N Rock Slope Protection Fabric for Rock Sizes Including and Above 225 kg (¼ Ton) 250N Plant Protection Covering 90N
Erosion Control Fence with 14 AWG - 150 mm x 150 mm (6”x6”) Wire and 3 m (10’) Post Spacing
90WS
Erosion Control Fence with 1.8 m (6’) Post Spacing and No Wire Fencing 200WS

Add the following section:
213-5.2 Erosion Control Specialties . Storm water erosion control plans shall be prepared, implemented, and maintained by individuals with the respective qualifications and certification as specified in the City of Carlsbad Engineering Standards Volume 4.

Revised 6/15/17 Contract No. 5552 Page 125 of 138
Add the following section:
213-5.3 Gravel bags. Gravel bags for the use of temporary erosion control shall be burlap type, filled with no less than 23kg (50lbs) of 19 mm ( 3/4“) crushed rock and securely tied closed.

Plastic bags are not acceptable.

SECTION 300 – EARTHWORK

Add the following section:
300-2.10 Grading Tolerance. The Contractor shall finish excavated areas other than slopes and subgrade below structures, within the roadway and sidewalk areas within 30 mm (0.1’) of the grades shown on the plans. Subgrade tolerances shall conform to the requirements of section 301-1.4.

Add the following section:
300-12 STORM WATER POLLUTION PREVENTION PLAN.

300-12.1 Storm Water Pollution Prevention Plan. As part of the storm water pollution prevention work, the Contractor shall prepare and submit Storm Water Pollution Prevention Plan, hereafter referred to as the "SWPPP,". The SWPPP shall conform to the requirements of the City of Carlsbad Engineering Standards Volume 4 “SWPPP Manual”, “Greenbook” Standard Specifications for Public Works Construction, the requirements in the California Storm Water Quality Association, Stormwater Best Management Practice Handbook, Construction (“Handbook”), the requirements of the Permit, the requirements in the plans and these supplemental provisions.

300-12.2 SWPPP Document. Within 15 calendar days after the execution of the contract, the Contractor shall submit 3 copies of the SWPPP to the Engineer, in accordance with Section 2-

5.3. If revisions are required, the Contractor shall revise and resubmit the SWPPP within 15 days of receipt of the Engineer’s comments and shall allow 5 days for the Engineer to review the revisions. Upon the Engineer’s acceptance of the SWPPP, 3 additional copies of the SWPPP, incorporating the required changes, shall be submitted to the Engineer.

The objectives of the SWPPP shall be to identify pollution sources that may adversely affect the quality of storm water discharges associated with the project and to identify, construct, implement and maintain storm water pollution prevention measures, hereafter referred to as control measures, to reduce to the extent feasible pollutants in storm water discharges from the construction site both during and after construction is completed under this contract.

The SWPPP shall incorporate control measures in the following categories:

1. Soil stabilization practices;

2. Sediment control practices;

3. Wind erosion control practices;

4. Non-storm water management and waste management and disposal control practices; and

5. Daily street sweeping

Specific objectives and minimum requirements for each category of control measures are contained in the Handbook.

Revised 6/15/17 Contract No. 5552 Page 126 of 138

The Contractor shall designate a Water Pollution Control Manager who will have the responsibilities outlined in the SWPPP.

The SWPPP shall include, but not be limited to, the following items as described in the SWPPP:

1. Source Identification;

2. Erosion and Sediment Controls;

3. Non-Storm Water Management;

4. Waste Management and Disposal;

5. Maintenance, Inspection and Repair;

6. Training;

7. List of Contractors and Subcontractors;

8. Post-Construction Storm Water Management;

9. Preparer;

10. Copy of the local permit;

11. BMP Consideration Checklist;

12. SWPPP Checklist;

13. Schedule of Values; and

14. Storm Water Pollution Prevention Drawings.

The Contractor shall amend the SWPPP, graphically and in narrative form, whenever there is a change in construction activities or operations which may affect the discharge of significant quantities of pollutants to surface waters, ground waters, municipal storm drain systems, or when deemed necessary by the Engineer. The SWPPP shall also be amended if it is in violation of any condition of the Permit or has not effectively achieved the objective of reducing pollutants in storm water discharges. Amendments shall show additional control measures or revised operations, including those in areas not shown in the initially accepted SWPPP, which are required on the project to control water pollution effectively. Amendments to the SWPPP shall be submitted for review and acceptance by the Engineer in the same manner specified for the initially accepted SWPPP. Accepted amendments shall be dated and logged in the SWPPP.

Upon acceptance of the amendment, the Contractor shall implement the additional control measures or revised operations.

The Contractor shall keep a copy of the accepted SWPPP and accepted amendments at the project site. The SWPPP shall be made available upon request of a representative of the Regional Water Quality Control Board, State Water Resources Control Board, U.S.

Environmental Protection Agency or local storm water management agency. Requests by the public shall be directed to the Engineer.

300-12.3 SWPPP Implementation. Upon acceptance of the SWPPP, the Contractor shall be responsible throughout the duration of the project for installing, constructing, inspecting and maintaining the control measures included in the SWPPP and any amendments thereto and for removing and disposing of temporary control measures. Unless otherwise directed by the Engineer or specified in these supplemental provisions, the Contractor's responsibility for SWPPP implementation shall continue throughout any temporary suspension of work ordered in accordance with Section 6-3, "Suspension of Work". Requirements for installation, construction, inspection, maintenance, removal and disposal of control measures are specified in the “Handbook” and these supplemental provisions.

Revised 6/15/17 Contract No. 5552 Page 127 of 138
Soil stabilization practices and sediment control measures, including minimum requirements, shall be provided throughout the rainy season, defined as between October 1 and April 30.

Implementation of soil stabilization practices and sediment control measures for soil-disturbed areas of the project site shall be completed, except as provided for below, no later than 20 days prior to the beginning of the rainy season or upon start of applicable construction activities for projects which begin either during or within 20 days of the rainy season.

The Contractor shall implement, year-round and throughout the duration of the project, control measures included in the SWPPP for sediment tracking, wind erosion, non-storm water management and waste management and disposal.

The Engineer may order the suspension of construction operations, at the Contractor’s cost, which create water pollution if the Contractor fails to conform to the requirements of this section as determined by the Engineer.

300-12.4 Maintenance. To ensure the proper implementation and functioning of control measures, the Contractor shall regularly inspect and maintain the construction site for the control measures identified in the SWPPP, as described in Section 7-8. The Contractor shall identify corrective actions and time frames to address any damaged measures or reinitiate any measures that have been discontinued.

The construction site inspection checklist provided in the “Handbook” shall be used to ensure that the necessary measures are being properly implemented, and to ensure that the control measures are functioning adequately. The Contractor shall submit one copy of each site inspection record to the Engineer, within two days of the inspection.

During the rainy season, inspections of the construction site shall be conducted by the Contractor to identify deficient measures, as follows:

1. When the five-day rain probability forecast exceeds forty percent (40%).

2. After any precipitation which causes runoff capable of carrying sediment from the construction site;

3. At 24-hour intervals during extended precipitation events; and

4. Routinely, at a minimum of once every week.

If the Contractor or the Engineer identifies a deficiency in the deployment or functioning of an identified control measure, the deficiency shall be corrected by the Contractor immediately, or by a later date and time if requested by the Contractor and accepted by the Engineer in writing, but not later than the onset of subsequent precipitation events. The correction of deficiencies shall be at no additional cost to the City.

300-12.5 Payment. The contract lump sum price paid for the SWPPP work shall include full compensation for the design, submittal, obtaining approval, and amending the Tier 2 SWPPP and for furnishing all labor, materials, tools, equipment, and incidentals to install, implement, maintain and remove construction BMPs per the approved SWPPP. The most recent Tier 2 construction SWPPP Template is available on the City Website and an example is included in Appendix “A”.

Partial payment shall be based on the percentage of the total value of work completed.

Revised 6/15/17 Contract No. 5552 Page 128 of 138

SECTION 301 - SUBGRADE PREPARATION, TREATED MATERIALS

AND PLACEMENT OF BASE MATERIALS

301-1 SUBGRADE PREPARATION.

301-1.2 Preparation of Subgrade.

Modify the second and third paragraphs as follows:

Change each instance reading “6 inches” to “12 inches”.

301-1.3 Relative Compaction.

Delete the first paragraph and substitute the following:

The Contractor shall compact the upper 300 mm (12”) of subgrade beneath areas to be paved, have base or subbase material placed on them (including pipelines), or curb, gutter, curb and gutter, alley pavement, driveway, sidewalk constructed over them, to no less than 95 percent maximum dry density as determined by ASTM D1557.

301-1.7 Payment.

Modify the first paragraph as follows:

Payment for subgrade preparation shall be incidental to the contract bid price for which the subgrade is prepared and shall include all labor, materials; including water, operations and equipment to scarify, adjust moisture, compact or recompact the subgrade, both in cut areas and in fill areas, and no further compensation will be allowed.

SECTION 302 - ROADWAY SURFACING

302-5 ASPHALT CONCRETE PAVEMENT.

Add the following section:
302-5.2 Pavement Transitions. The Contractor shall ramp the approaches and termini to all structures and vertical joints in the cold-milled area which are transverse to through traffic with temporary asphalt concrete pavement as specified in Section 306-13.1. Ramps shall be constructed the same day as cold milling and removed the same day as permanent paving.

Ramp dimensions and compaction shall be as approved by the Engineer.

302-5.4 Tack Coat. Add the following: If the asphalt concrete pavement is being constructed directly upon an existing hard-surfaced pavement, a tack coat of PG 64-10 paving asphalt at a rate of 0.05 gallon per square yard or SS-1h emulsion at a rate between 0.05 and 0.10 gal/SY shall be uniformly applied upon the existing pavement preceding the placement of the asphalt concrete.

The contact surfaces of all cold pavement joints, curbs, gutters, manholes, and the like shall be painted with PG 64-10 paving asphalt, or SS-1h emulsion, immediately before the adjoining asphalt concrete is placed.

The Contractor shall place a tack coat between the successive interfaces of existing pavement and new asphalt concrete.

Revised 6/15/17 Contract No. 5552 Page 129 of 138
302-5.5 Distribution and Spreading.

Add after the second sentence of sixth paragraph:

The Contractor shall provide the self-propelled spreading and finishing machine used to construct the asphalt concrete surface course with an automatic screed control. The automatic screed control shall be 5.5 m (18’) minimum length. The paving machine shall be operated by an operator and two full-time screed men during all paving. The Contractor shall provide an on- site backup paving during all paving operations. No conveyor belt systems will be allowed for moving the AC. No AC windrows will be allowed. Only a surge volume/remix material transfer vehicle (MTV) is allowed to receive the AC from the haul trucks and then place it in the self- propelled spreading and finishing machine. If the Engineer determines the use of the MTV is not practical for a portion of the project, the Engineer may waive its requirement for that portion.

302-5.6.1 General.

Add to the second paragraph, Part (2):

Pinched joint rolling procedures shall be required, and vibratory rollers shall be limited to breakdown, unless otherwise directed by the Engineer.

Add after the last paragraph:

Unless directed otherwise by the Engineer, the initial breakdown rolling shall be followed by a pneumatic-tired roller as described in this section.

302-5.9 Measurement and Payment. Replace the first sentence with the following: Payment for pavement resurfacing shall be made at the unit bid price for the item requiring such work.

Add the following section:
302-15 PUBLIC CONVENIENCE AND TRAFFIC CONTROL.

The Contractor shall schedule the work so as to prevent damage by all traffic. The Contractor shall not schedule work so as to conflict with trash pickup. The trash hauling schedule can be obtained by calling the city’s contracted waste company. The Contractor shall accommodate mail delivery to residences and businesses during the work.

At least two weeks prior to work, Contractor shall send, by first class mail, notification letters to all property addresses on which resurfacing shall occur. Obtaining the appropriate addresses shall be the Contractor’s responsibility. A sample letter shall be provided by the city and the Contractor shall use the city’s sample letter and modify it with the appropriate street names, dates, times, and phone numbers specific to the work.

The limits and sequencing of the Contractor’s resurfacing operations shall impact no more than 900 lineal feet of street or curb-side parking for residents and business on any given day.

Seventy-two hours prior to the start of any construction in the public right-of-way that affects vehicular traffic and/or parking or pedestrian routes, the Contract shall give written notification of the impending disruption via door hangers. For a full street closure, all residences and/or businesses on the affected street or alley shall be notified. For partial street closures, or curb, sidewalk and driveway repairs, the residences and/or businesses directly affected by the work shall be notified.

The Contractor shall deliver the advance notification door hanger which shall state the date and time the work will begin and its anticipated duration. The notification shall list two telephone numbers that may be called to obtain additional information. One number shall be the

Revised 6/15/17 Contract No. 5552 Page 130 of 138
Contractor’s permanent office or field office and the other number shall be a 24-hour number answered by a representative of the Contractor who is knowledgeable about the project. At least one of the phone numbers shall be in the 760 area code. An answering machine shall not be connected to either number. The notification shall also give a brief description of the work and simple instructions to the home or business owner on what they need to do to facilitate the construction. The Contractor shall use the sample door hanger provided by the city and submit door hangars to the Inspector for approval. Notices shall not be distributed until approved by the Inspector.

The notification shall be pre-cut in a manner that enables it to be affixed to a doorknob without adhesives. It shall be a minimum size of 4 inches by 8-1/2 inches and shall be brightly colored with contrasting printing. The material shall be equivalent in strength and durability to 65-lb card stock. The printing on the notice shall be no smaller than 12-point. The door hanger shall list the street name, date, time, phone numbers, and appropriate information specific to the work.

The preparation, materials, printing and distribution of the notifications shall be included in the contract price for the Work requiring such notifications and no separate or additional payment shall be made.

SECTION 303 CONCRETE AND MASONRY CONSTRUCTION.

303-1 CONCRETE STRUCTURES.

303-1.2 Subgrade for Concrete Structures.

Add the following:

If groundwater is encountered, Contractor shall work a minimum 2’ deep of ¾” gravel into soil to provide an adequate base for construction of concrete structure.

303-1.11 Measurement.

Delete the subsection in its entirety and replace with the following:

Concrete structures will be measured for payment by each structure installed as specified in the bid schedule and in accordance to the plan and any referenced standard drawings.

303-1.12 Payment.

Delete the subsection in its entirety and replace with the following:

Payment for concrete structures will be made as set forth in the Bid Schedule. Payment shall include compensation for furnishing all labor, materials, tools, and equipment necessary to construct the concrete structures complete in place. Items shall include submittal of PCC mix design for approval, structure excavation, subgrade and base preparation, furnishing PCC and casting-in-place, steel reinforcement, forms, covers, rims, grates, frames, collars, cone and draft sections, bases, steps, clean up; and for all other work necessary to install the concrete structure, complete in place, and no additional compensation will be allowed therefor.

303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS.

303-5.1.1 General.

Revised 6/15/17 Contract No. 5552 Page 131 of 138
Add the following:

Portland Cement Concrete construction shall include, but not limited to, curbs, walkways, cross gutters, access ramps, driveways, concrete curb outlet, terrace ditches, and all other miscellaneous PCC construction items as indicated on the plans and per these Specifications.

Removal of adjacent asphalt concrete and aggregate base removal associated with concrete curb construction shall be replaced with full depth asphalt concrete with a minimum width of one foot perpendicular to the face of concrete edge. The replaced section shall conform to the requirements of Sections 203-6, 302-5, 401-3 and match the depth of the adjacent concrete gutter.

The Contractor shall verify with a “smart level”, string line and/or water testing that positive drainage is maintained upon completion of finishing, and any irregularities causing water ponding shall be corrected and refinished. The CITY shall be present to verify the concrete forms, prior to pouring any PCC construction improvements.

303-5.5.2 Curb.

Add the following:

The Contractor shall stamp the curb face with 75 mm (3”) high block letters directly above the point that it is crossed by underground facilities with the marking specified in Table 303-5.5.2(A)

TABLE 303-5.5.2(A)
Curb Face Markings
Type of underground facilities Marking
Water Service Lateral W
Sewer Service Lateral S
Irrigation Water Lateral or Sleeve RW

303-5.9 Measurement and Payment.

Add the following:

Curb and gutter, and curb, shall be considered as continuing across driveways, access ramps and drainage inlets when constructed adjacent thereto. Neither curb and gutter nor curb will be paid for across the length of local depressions, except that which occurs in gutter transitions at each side of an inlet.

SECTION 306 – OPEN TRENCH CONDUIT CONSTRUCTION

306-3 TRENCH EXCAVATION.

Add the following:
306-3.1 General. When the actual elevation or position of any existing pipe, conduit, or other underground appurtenances cannot be determined without excavation, the Contractor shall excavate and expose the existing improvement at the location shown on the Plans and any other locations deemed necessary by the Engineer. Such excavation shall be considered as part of the excavation necessary for the work. The Engineer shall be given the opportunity to inspect the existing improvements when it is exposed. Any adjustments in line or grade which may be necessary to accomplish the intent of the plans shall be made at no additional costs.

Revised 6/15/17 Contract No. 5552 Page 132 of 138
Add the following:
306-3.2 Removal of Surface Improvements.

Add the following:

Bituminous pavement, concrete pavement, curbs, sidewalks, or driveways removed in connection with construction shall be removed in accordance with Subsection 401 of the Standard Specifications and these Special Provisions and reconstructed in-kind.

306-3.5 Maximum Length of Open Trench.

Delete the first sentence for the first paragraph and replace with the following:

Except by permission of the Engineer, the maximum length of open trench where prefabricated pipe is used shall be the distance necessary to accommodate the amount of pipe installed in a single day.

306-12 BACKFILL.

306-12.1 General.

Add the following:

The Contractor shall install detectable underground utility marking tape above each or, in the case of bundled underground conduit of the same type, the upper underground conduit being installed by the open trench method.

Delete the following section in its entirety and replace with the following:
306-12.3.2 Compaction Requirements . The Contractor shall densify trench backfill to a minimum of 90 percent relative compaction except that in the top 915 mm (36”) of the street right-of-way, compaction shall be 95 percent.

306-13 TRENCH RESURFACING.

306-13.1 Temporary Resurfacing.

Add the following:

Temporary bituminous resurfacing materials which are placed by the Contractor are for its convenience and shall be at no cost to the Agency. Temporary bituminous resurfacing materials shall be used in lieu of permanent resurfacing only when approved by the Engineer. When temporary bituminous resurfacing materials are used in lieu of permanent resurfacing it shall be removed and replaced with permanent resurfacing within 7 days of placement. No additional payment will be made for temporary bituminous resurfacing materials. The price bid for the associated conduit or structure shall include full compensation for furnishing, placing, maintaining, removing, and disposing of such temporary resurfacing materials.

306-13.2 Permanent Resurfacing.

Add the following:

Except as provided in section 306-13.1, “Temporary Resurfacing,” the Contractor shall perform permanent trench resurfacing within 24 hours after the completion of backfill and compaction of backfill and aggregate base materials.

Revised 6/15/17 Contract No. 5552 Page 133 of 138
SECTION 400 – PROTECTION AND RESTORATION

400-1 GENERAL.

Add the following:

The Contractor shall replace all pavement striping, markings and markers which are not designated for removal and are damaged as a result of its operations.

400-2 PERMANENT SURVEY MARKERS.

Delete the second paragraph and subparagraphs a), b) and c).

400-3 PAYMENT.

Delete in its entirety and replace with the following:

No separate or additional payment will be made for 1) protection of existing improvements, and 2) restoration of existing improvements.

No separate or additional payment will be made to restore permanent survey makers.

SECTION 401 – REMOVAL

401-3 CONCRETE AND MASONRY IMPROVEMENTS.

401-3.2 Concrete Curb, Walk, Gutters, Cross Gutters, Curb Ramps, Driveway and Alley Intersections.

Delete the third and fourth sentence and add the following:

All existing concrete shall be removed to the nearest joint. Concrete shall be removed to neatly sawed edges with saw cuts made to a depth deep enough to produce a clean straight break without loosening, cracking or damaging adjoining improvements. PCC and all other material unsuitable for use as fill, as determined by the Engineer, shall be removed from the right-of-way and disposed of by the Contractor at a site of his own choice and shall pay all costs incidental to the disposal.

Add the following section:
401-3.2.1 Adjacent Asphalt Concrete Removal. Removal of asphalt concrete and aggerate base associated with concrete driveway, ramp and curb and gutter construction shall be replaced with full depth asphalt concrete to a minimum width of one foot perpendicular from face of nearest concrete edge. Removal of adjoining asphalt section and the full depth replacement is incidental to the concrete curb and gutter work as described in section 303-5.

Revised 6/15/17 Contract No. 5552 Page 134 of 138

SUPPLEMENTAL PROVISIONS
TO

STANDARD SPECIFICATIONS FOR PUBLIC WORKS

CONSTRUCTION

PART 6 TEMPORARY TRAFFIC CONTROL

SECTION 601 – TEMPORARY TRAFFIC CONTROL FOR

CONSTRUCTION AND MAINTENANCE WORK ZONES

Add the following section:
601-1.2 Payment.

The Contract price paid for Temporary Traffic Control shall include full compensation for, but not limited to, design, submittal and approval of the temporary traffic control plan (TCP) and furnishing all labor, materials, tools, equipment, and incidentals for storing, placing, maintaining, moving to new locations, replacing and removing all traffic control zone devices including flaggers, construction area signs and signage, channelizing devices including traffic barriers and end treatments, traffic sign enhancement devices including portable changeable message signs and flashing arrow signs, temporary traffic striping and pavement markings and as shown on the Plans or approved TCP and in accordance with the Contract Documents.

Full compensation for removing and salvaging the traffic control equipment and materials that are to be reused or reset in the Work shall be considered included in the Contract price paid for Temporary Traffic Control and no additional compensation will be allowed therefor.

Progress payments for Temporary Traffic Control shall be based on the percentage of the total value of work completed.

601-3 TEMPORARY TRAFFIC CONTROL (TTC) ZONE DEVICES.

601-3.1 General.

Add the following:

The Contractor shall furnish and install temporary traffic pavement markers, channelizers, signage, railing (type K), barriers, crash cushions and end treatments for railings and barriers at the locations shown on the Plans or the approved TCP and as required by the Contract Documents.

Add the following section:
601-3.4.1 General.

Add the following:

If temporary traffic signs are displaced or overturned by any cause during the progress of the Work, the Contractor shall immediately replace the signs in their approved locations. The Contractor shall maintain all temporary traffic signs used in the Work in a clean, reflective and readable condition. The Contractor shall replace or restore graffiti marked temporary traffic signs and posts used in the Work within 8 hours of such discovery.

Revised 6/15/17 Contract No. 5552 Page 135 of 138
In the event that the Contractor fails to install and/or maintain barricades or such other traffic signs, markings, delineation or devices, the Engineer may, at his/her sole option, may correct the deficiency and charge the Contractor fifty dollars ($50.00) per day per traffic sign or device, or the actual cost of providing such traffic control facility, whichever is greater.

601-3.5 Signs and Signage.

601-3.5.1 General.

Delete in its entirety and replace with the following:

Unless otherwise specified, signs shall conform to the California MUTCD. Portable signs shall consist of a base, standard or framework, and a sign panel and conform with applicable provisions for portable signs in Caltrans Standard Specification 12-3.11. Sign units shall be capable of being delivered to the Work site and placed into immediate operation. The Contractor shall provide and install all temporary traffic control signs, markers, markings, and delineators at locations shown on plans and specified herein.

Signage shall include all temporary signs required for the direction of traffic through or around the Work site. Sign placement shall conform to the California MUTCD and the TCP.

Temporary “No Parking” and “No Stopping” signs shall be installed at least 24 hours before enforcement. Public notification of temporary “No Parking” restriction shall be posted at least 72 hours before enforcement of the “No Parking” zone. The notification shall state the date and time of parking restriction for a duration not to exceed the time necessary to complete the Work at that location. Failure to meet the date so indicated will require re-posting the notification in advance of the rescheduled Work.

601-3.5.2 Payment.

Modify this section as follows:

Payment for signs and signage shall be included in the contract price for Temporary Traffic Control as specified in Section 601-2.2.

601-3.6 Channelizing Devices.

601-3.6.1 General.

Replace this section with the following:

Channelizers shall be new surface-mounted type and shall be furnished, placed, and maintained at the locations shown on the plans. Channelizer posts shall be orange in color.

Channelizers shall have affixed white reflective sheeting as specified in the special provisions.

The reflective sheeting shall be 75 mm x 300 mm (3” x 12”) in size. The reflective sheeting shall be visible at 300 m (1000’) at night under illumination of legal high beam headlights, by persons with vision of or corrected to 20/20. The channelizer bases shall be cemented to the pavement in the same manner as provided for cementing pavement markers to pavement in Section 312- 1, “Placement.” Channelizers shall be applied only on a clean, dry surface. Channelizers shall be placed on the alignment and location shown on the plans and as directed by the Engineer.

The channelizers shall be placed uniformly, straight on tangent alignment and on a true arc on curved alignment. All layout work necessary to place the channelizers to the proper alignment shall be performed by the Contractor. If the channelizers are displaced or fail to remain in an upright position, from any cause, the channelizers shall immediately be replaced or restored to their original location, by the Contractor. The Contractor shall provide the Engineer with a Certificate of Compliance in accordance with the provisions of Section 4-1.5, "Certification”. Said certificate shall certify that the channelizers comply with the plans and specifications and

Revised 6/15/17 Contract No. 5552 Page 136 of 138
conform to the prequalified design and material requirements approved by the Engineer and were manufactured in accordance with a quality control program approved by the Engineer.

Add the following subsection:
601-3.6.5.1 Temporary Railing and Crash Cushions. Temporary railing (Type K) shall consist of interconnected new or undamaged used precast concrete barrier units as shown on the plans. Temporary sand-filled crash cushions shall consist of new or undamaged used temporary sand-filled crash cushions units as shown on the plans.

Add the following subsection:
601-3.6.5.2 Appearance. Exposed surfaces of new and used units of temporary railing (Type K) shall be freshly coated with a white color paint prior to their first use on the project. The paint shall conform to the provisions in sections 210-1.5 “Paint Systems” and 310 “Painting”.

Contractor shall be responsible for the removal and cleanup or painting over the graffiti from the K-Rails within 48 hours. The Contractor shall replace or repaint units of temporary railing (Type K) or shall remove graffiti, tire or vehicle marks, dirt or other materials that mar the appearance when ordered by the Engineer.

Add the following subsection:

601-3.6.5.3 Manufacture of Temporary Railing. In addition to the requirements herein, the temporary railing (Type K) shall be manufactured per Caltrans Standard Drawing T3. Concrete used to manufacture Temporary railing (Type K) shall conform to the provisions in sections 201- 1, “Portland Cement Concrete” and 303-1 “Concrete Structures”. Load tickets and a Certificate of Compliance will not be required. Reinforcing steel shall conform to Section 201-1, “Portland Cement Concrete” and Section 303-1 “Concrete Structures”. Steel bars to receive bolts at ends of concrete panels shall conform to ASTM A36/A36M. The bolts shall conform to ASTM A307. A round bar of the same diameter may be substituted for the end-connecting bolt shown on the plans. The bar shall conform to ASTM A36/A36M, shall have a minimum length of 660 mm and shall have a 75 mm (3”) diameter by 9 mm (3/8”) thick plate welded on the upper end with a 5 mm (3/16”) fillet weld. The final surface finish of temporary railings (Type K) shall conform to the provisions in Section 303-1.9.2 “Ordinary Surface Finish.” Exposed surfaces of concrete elements shall be cured by the water method, the forms-in-place method, or the pigmented curing compound method. The pigmented curing compound shall be type 2 curing compound.

Temporary railing (Type K) may have the Contractor’s name or logo on each panel. The name or logo shall not be more than 100 mm in height and shall be located not more than 300 mm above the bottom of the rail panel.

Add the following subsections:
601-3.6.5.4 Installation of Temporary Railing. In addition to the requirements herein, the temporary railing (Type K) shall be installed per Caltrans Standard Drawing T3. Temporary railing (Type K) shall be set on firm, stable foundation. The foundation shall be graded to provide a uniform bearing throughout the entire length of the railing. Abutting ends of precast concrete units shall be placed and maintained in alignment without substantial offset to each other. The precast concrete units shall be positioned straight on tangent alignment and on a true arc on curved alignment. Each rail unit placed within 3 m (10’) of a traffic lane shall have a reflector installed on top of the rail as directed by the Engineer. Reflectors and adhesive will be furnished by the Contractor. A Type P marker panel conforming to the requirements of the Federal Highway Administration (FHWA) Manual on Uniform Traffic Control Devices (MUTCD) 2009 Edition as amended by the MUTCD 2009 California Supplement shall also be installed at each end of railing installed adjacent to a two-lane, two-way highway and at the end facing traffic of railing installed adjacent to a one-way roadbed. If the railing is placed on a skew, the

Revised 6/15/17 Contract No. 5552 Page 137 of 138
marker shall be installed at the end of the skew nearest the traveled way. Type P marker panels shall conform to the provisions of Section 206-7.2, “Temporary Traffic Signs”. Where shown on the plans, threaded rods or dowels shall be bonded in holes drilled in existing concrete. When temporary railings (Type K) are removed, any area where temporary excavation or embankment was used to accommodate the temporary railing shall be restored to its previous condition or constructed to its planned condition.

601-3.6.5.5 Temporary Sand-Filled Crash Cushions. Temporary sand-filled crash cushion units shall be selected from the latest Caltrans Authorized Material List for highway safety features and shall meet NCHRP 350 standards. Other features will be suitability to application, operational characteristics, durability and other such characteristics that the Engineer shall determine. Temporary sand-filled crash cushions (TSFCC) shall be of the type and array configurations shown on plans, and installed at every end of, or gap in, the temporary railing (Type K) whenever the closest point of approach of traffic, regardless of direction, is 4.6 m (15’) or less to the end of the temporary railing (Type K) being considered. The TSFCC shall be installed per Caltrans Standard Drawings T1 and T2 for approach speeds no less than the posted speed of the street prior to construction or 55 kilometers per hour (35 mph), whichever is the greater. The TSFCC array shall be appropriate to the application as shown on said standard drawings. A Type J and/or P marker panel conforming to the requirements of the Federal Highway Administration (FHWA) Manual on Uniform Traffic Control Devices (MUTCD) 2009 Edition as amended by the MUTCD 2009 California Supplement shall also be installed at each TSFCC array as shown in Caltrans Standard Drawings T1 and T2. Particular care shall be taken to assure that crash cushions are installed with the soil supporting them and the adjacent soil leveled to match the elevation of the bottom of the temporary railing immediately adjacent to the crash cushion. All routes of approach to the TSCFF array shall be graded such that any vehicle diverging from the travelled way to strike the TSCFF will travel on a vertical alignment parallel to the segment of the travel lane that it departed from.

601-3.7.5 Portable Changeable Message Signs (PCMS).

Add the following:
601-3.7.5.1 General. Each portable changeable message sign (PCMS) unit shall consist of a controller unit, a power supply, and a structural support system all mounted on a trailer. The PCMS unit shall be assembled to form a complete self-contained portable changeable message sign, which can be delivered to the site of the work and placed in immediate operation. The complete PCMS unit shall be capable of operating in an ambient air temperature range of -20ºC (-4ºF) to +70ºC (158ºF) and shall not be affected by unauthorized mobile radio transmissions.

The trailer shall be equipped so that it can be leveled and plumbed. Full operation height shall be with the bottom of the sign at least 2.1 m (7') above the ground and the top no more than 4.4 m (14.5') above the ground. After initial placement, PCMS shall be moved from location to location as directed by the Engineer.

601-3.7.5.2 Message Board. The message displayed on the PCMS shall be visible from a distance of 460 m (1500') and shall be legible from a distance of 230 m (750'), at noon on a cloudless day, by persons with vision corrected to 20/20. The sign panel shall be 3-line matrix and shall display not less than 7 characters per line. Sign messages to be displayed shall be as approved by the Engineer. The sign face shall be flat black and shall be protected from glare of the sun by a method which does not interfere with the clarity of the sign message. The sign shall be raised and lowered by means of a power driven lifting mechanism. The matrix sign shall be capable of complete alphanumeric selection.

Revised 6/15/17 Contract No. 5552 Page 138 of 138

Lamp matrix type signs shall be equipped with an automatic dimming operational mode that automatically compensates for the influence of a temporary light source or other abnormal lighting conditions. The sign shall have manual dimming operation modes of 3 or more different lamp intensities.

Matrix signs not utilizing lamps shall be either internally or externally illuminated at night.

The controller shall be an all solid-state unit containing all the necessary circuitry for the storage of at least 5 pre-programmed messages. The controller shall be installed in a location allowing the operator to perform all functions from one position. A keyboard entry system shall be provided to allow an operator to generate an infinite number of additional messages over the pre-programmed stored messages. The keyboard shall be equipped with a security lockout feature to prevent unauthorized use of the controller. The controller shall contain a nonvolatile memory to hold the keyboard created messages in memory during periods when the power is not activated. The controller shall provide for a variable message display rate which allows the operator to match the information display to the speed of the approaching traffic. The flashing off time shall be operator adjustable within the control cabinet.

← All documents from this meeting