RESOLUTION NO. 1800 .

A R

ESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD

MUNICIPAL WATER DISTRICT OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING AMENDMENT NO. 3 TO THE PROFESSIONAL SERVICES
AGREEMENT WITH PARTNERS IN CONTROL INC., DBA ENTERPRISE AUTOMATION, FOR SYSTEM INTEGRATOR SERVICES FOR PHASE 1 OF THE

PROJECT TO REPLACE THE WATER AND WASTEWATER SUPERVISORY

CONTROL AND DATA ACQUISITION SYSTEMS
WH
EREAS, on Jan. 9, 2024, the Carlsbad Municipal Water District Board adopted Resolution No. 1726, authorizing a professional services agreement with Partners i n Control, Inc., dba Enterprise Automation, or Enterprise Automation, for system integrator services for Phase 1 of the project to replace the water and wastewater supervisory control and data acquisition, or SCADA, systems at 54 water and wastewater facilities, in an amount not to exceed $2,221,288; and WHEREAS, in March 2024, staff began working with Enterprise Automation on the project and work has been proceeding according to schedule; and
WHEREAS, on July 16, 2024, the CMWD Board approved Amendment No. 1 in an amount not to exceed $745,439, authorizing Enterprise Automation to perform electrical panel design services that were originally planned as part of the construction scope, to improve coordination and reduce potential project delays; and
WHEREAS, on Dec. 11, 2024, the CMWD Executive Manager approved Amendment No. 2 in an amount not to exceed $17,955, authorizing Enterprise Automation to prepare an e ngineer’s estimate for the construction phase of the project; and
WHEREAS, other C apital Improvement Program, or CIP, projects have been completed at various water and wastewater facilities throughout the city that need to be integrated into the SCADA systems; and
WHEREAS, six newly constructed or upgraded facilities were designed and built to align with the city’s standardized SCADA architecture and were intended for future inclusion in the citywide SCADA system; and
WHEREAS, separate modifications to existing facilities changed operational requirements, resulting in the need for additional SCADA programming and integration beyond the original project scope; and
March 24, 2026
Item #1 5 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 W HEREAS, staff recommend amending the professional services agreement with Partners in Control, Inc., dba Enterprise Automation, to include the six new facilities and modified existing facilities and associated SCADA integration updates; and
WHEREAS, sufficient funding is available in the CIP Project Nos. 5542-1, 5542-2 and 5542-3.

NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of the City of Carlsbad, California, as follows:

1. That the above recitations are true and correct.

2. That the CMWD Board has determined that the proposed action is not a “project” as defined by California Environmental Quality Act, or CEQA , Section 21065 and CEQA Guidelines Section 15378(a) and does not require environmental review under CEQA Guidelines Section 15060(c)(2) because the action is limited to the amendment of a professional services agreement to provide system integration servic es for the water/wastewater SCADA systems. The action has no potential to cause either a direct physical change in the environment or a reasonably foreseeable indirect physical change in the environment.

3. That the President is authorized and directed to execute Amendment No. 3 to the agreement with Partners in Control, Inc. , dba Enterprise Automation , to provide additional system integrator services for the water and wastewater SCADA replacement project in an amount not to exceed $ 432,846, which is attached hereto as Attachment A.

March 24, 2026
Item #1 6 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the City Council of the City of Carlsbad and the Board of Directors of the Carlsbad Municipal Water District on the 24th day of March, 2026, by the following vote, to wit:

AYES: Blackburn, Bhat-Patel, Acosta, Burkholder, Shin.

NAYS: None.

ABSTAIN: None.

ABSENT: None.
_____________
_________________________
KEITH BLACKBURN, President
_____________
_________________________
SHERRY FREISINGER, Secretary
(SEAL)
March 24, 2026
Item #1 7 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2

Docusign Envelope ID: D49041 D3-DFF5-4C0C-B052-119837848307 Attachment A
PSA24-2318UTIL
AMENDMENT NO. 3 TO THE AGREEMENT FOR SYSTEM INTEGRATOR SERVICES FOR THE WATER AND

WASTEWATER SCADA SYSTEM REPLACEMENT
PARTNERS IN CONTROL INC. D.B.A. ENTERPRISE AUTOMATION
This Amendment No. 3 is entered into and effective as of the ___ day of -----------� 2026, amending the agreement dated January 10, 2024 ("Agreement") by and between the Carlsbad Municipal Water District, a Public Agency organized under the Municipal Water Act of 1911, and a Subsidiary District of the City of Carlsbad, California {11CMWD11 ) , and Partners in
Control Inc. d.b.a. Enterprise Automation, a California corporation {"Contractor11 ) (collectively, the
"Parties") for SCADA Integration services.

RECITALS
A. On July 17, 2024, the Parties executed Amendment No. 1 to the Agreement for system integrator services for the development, programming, documenting and training for the new SCADA replacement project; and
B. On December 11, 2024, the Parties executed Amendment No. 2 to alter the Agreement's scope of work, schedule, and fee.; and
C. The Parties desire to amend the Agreement's scope of work, schedule, and fee.

D. The Parties have negotiated and agreed to a supplemental scope of work and fee schedule, which is attached to and incorporated by this reference as Exhibit 11A11 , Scope of Services and
Fee.

NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, CMWD and Contractor agree as follows:

1. In addition to those Services contained in the Agreement, as may have been amended from time to
time, Contractor will provide those services described in Exhibit 11A11 •

2. CMWD will pay Contractor for all work associated with those services described in Exhibit ''/!\' on a time and materials basis not-to-exceed four hundred and thirty thousand eight hundred and forty­ six dollars {$432,846) Contractor will provide CMWD, on a monthly basis, copies of invoices sufficiently detailed to include hours performed, hourly rates, and related activities and costs for approval by CMWD.

3. With this Amendment, the total Agreement amount shall not exceed three million four hundred and seventeen thousand five hundred twenty-eight dollars {$3,417,528).

4. Contractor will complete all work described in Exhibit''/!\' by January 8, 2027.

5. All other provisions of the Agreement, as may have been amended from time to time, will remain in full force and effect.

6. All requisite insurance policies to be maintained by Contractor pursuant to the Agreement, as may have been amended from time to time, will include coverage for this Amendment.

General Counsel Approved Version 5/30/2025
3 March 24, 2026
Item #1 8 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 March
25th
Docusign Envelope ID: D49041 D3-DFF5-4C0C-B052-119837848307 PSA24-2318UTIL

7. The individuals executing this Amendment and the instruments referenced in it on behalf of Contractor each represent and warrant that they have the legal power, right and actual authority to bind Contractor to the terms and conditions of this Amendment. [signatures on following page]
General Counsel Approved Version 5/30/2025
March 24, 2026
Item #1 9 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041 D3-DFF5-4C0C-B052-119837B4B307

CONTRACTOR
Partners in Control Inc. d.b.a. Enterprise
Automation, a California corporation
By:
(sign here)
Luke Stephenson, President
(print name/title)
By:
(sign here)
Preston Hopson, Secretary
(print name/title)
PSA24-2318UTIL
CARLSBAD MUNICIPAL WATER DISTRICT, a
Public Agency organized under the Municipal
Water Act of 1911, and a Subsidiary District of
the City of Carlsbad
By:

KEITH BLACKBURN, President
ATTEST:

SHERRY FREISINGER, Secretary
By:

Deputy/Assistant Secretary
If required by CMWD, proper notarial acknowledgment of execution by Contractor must be attached . .!f.g corporation, Agreement must be signed by one corporate officer from each of the following two groups:

Group A
Chairman,
President, or
Vice-President
Group B
Secretary,
Assistant Secretary,
CFO or Assistant Treasurer
Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation.

APPROVED AS TO FORM:

CINDIE K. McMAHON, General Counsel
BY: ___ t1_i��V1--b1A,_S _____ _
Assistant General Counsel
General Counsel Approved Version 5/30/2025
5 March 24, 2026
Item #1 10 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2

Docusign Envelope ID: D49041 D3-DFF5-4C0C-B052-119837848307 EXHIBIT"A" SCOPE OF

SERVICES AND FEE
PSA24-2318UTIL
March 24, 2026
Item #1 11 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041 D3-DFF5-4C0C-B052-119837B4B307 SCADA Replacement Project. Contract Amendment 3
EA Project Number: EA23CWD037, v3.0.0
Purchase Order: P143416
Contract Amendment 3
EA23CWD037 SCADA Replacement Project
Carlsbad MWD
1/8/2026
Kyle James,
SCADA Supervisor
PSA24-2318UTIL Amend No. 3
Exhibit "A"

ENTERPRISE

AUTOMATION
This letter represents Enterprise Automation's (EA) formal request to amend or alter the scope, schedule, fee, or other pertinent project documents. A description of the project modifications is contained hereafter.

Justification for Contract Amendment
This amendment captures multiple unique new scope items, described in the sections below.

New Sites
Carlsbad Municipal Water District (the District) has recently finalized the construction of 6 new remote sites, listed below:

1. Villas Lift Station

2. Chinquapin Lift Station

3. El Fuerte and Rancho Pancho Motorized Valve Vault (Pressure Reducing Station)

4. Melrose Pressure Reducing Station

5. El Fuerte/Corintia Pressure Reducing Station

6. Lower El Fuerte Pressure Reducing Station
With the completion of construction of these sites, the District has asked that EA implement PLC & SCADA programming at these facilities using the templates developed as part of the District's SCADA Replacement project.

However, these sites are not in complete alignment with the template PLC & HMI programs developed as part of the SCADA Replacement project, and as a result, the templates need to be slightly modified to be flexible for the 1/0 and control present at the facilities. El Fuerte and the Rancho Pancho Motorized Valve Vault do not conform to any of the existing template PLC & HMI programs, so these sites require a new custom PLC program & HMI screen, similar to the custom screens of CWRF Pump Station and D Site.

The full scope of services captured in this amendment include updating the specifications developed as part of the SCADA Replacement project, modifying the existing Lift Stations & Pressure Reducing Stations template, developing a new El Fuerte and Rancho Pancho program, instancing the PLC program for each site from the template programs, including the new sites in the Ignition SCADA system, testing of the PLC & SCADA programs, and the execution of on-site commissioning tasks to start up the new sites.

March 24, 2026
Item #1 12 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041 D3-DFF5-4C0C-B052-119837B4B307 SCADA Replacement Project. Contract Amendment 3
EA Project Number: EA23CWD037, v3.0.0
Calavera Potable Pump Station (PS) Modifications
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)

ENTERPRISE

AUTOMATION
The District has recently proposed significant mechanical & electrical modifications to the existing Calavera Potable Pump Station facility. EA needs to design both SCADA and PLC programs for this facility to ensure all future modifications are considered and included.

The Calavera Potable Pump Station is currently included with the Pump Station "template" PLC program and SCADA screen, which represents a total of 4 Pump Stations that are similar in 1/0 and functionality across the District. However, as a result of the proposed mechanical & electrical modifications, this template is no longer useful and should be broken down into 4 unique site programs & screens to improve future maintainability.

The full scope of services captured in this contract amendment includes updating the specifications developed as part of the SCADA Replacement project, developing a new functional specification for the Calavera Potable Pump Station, breaking out the existing Pump Station functional specification into unique specifications for each site included in the Pump Stations Template, developing the PLC, adding the updated configuration to the SCADA system, and testing of the PLC & SCADA programs.

Commissioning of this facility is already included in EA's current scope and as such was not included in this amendment.

Additional programming and Changes
During the recent Factory Acceptance Test (FAT) with the District, EA was asked to add multiple features and functionalities to the programs that were not initially scoped. Implementing some of the changes and programming updates require significant rework or hardwired 1/0 changes, additional programming time, and coordination with the future Citywide Electrical Control Panel Replacement contractor, testing and factory acceptance test.

Description of Contract Amendment
Initiation/Meetings
EA will require additional time for project setup, execution planning, kickoff meetings, and team check-in meetings. These tasks are crucial to the organized execution of this additional scope.

Specifications
EA has allocated budget for updating existing documentation related to the six new sites and the Calavera Pump Station Modifications project. Documentation that needs to be updated may include the master site list, PLC and SCADA tagging standards, 1/0 lists, network diagrams, and alarm specifications.

PLC/HMI Development
Additional time is required to develop and verify program instances for the six new sites in addition to updating the functional specifications to reflect process modifications at the Calavera Pump Station. The template pump station specifications will be divided into four separate documents to accommodate the differences between the Calavera Potable and Reclaim Pump Stations and the Bressie Potable and Reclaim Pump Stations.

March 24, 2026
Item #1 13 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041 D3-DFF5-4C0C-B052-119837B4B307 SCADA Replacement Project. Contract Amendment 3
EA Project Number: EA23CWD037, v3.0.0
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)

ENTERPRISE

AUTOMATION
EA has budgeted to have additional workshop time to discuss and review control strategy with the District.

Due to the updates to the control strategies and design documents for Calavera Pump Station, additional budget is required to conduct programming/configuration tasks. Specifically, EA will need additional time for PLC programming and Ignition global setup configuration and screen development.

Testing
After completing the new PLC programs and screens for the new sites, as well as the updated PLC program and screens for the Calavera Pump Stations, EA will conduct internal integrated testing and Witnessed Factory Acceptance Testing (FAT). Any identified non-conformances will be addressed to ensure the system is fully prepared for implementation.

New Sites Commissioning
Once panels are ready to be commissioned, EA will execute panel-specific deployments and start up tasks alongside the current site commissioning plans for the main project. EA has included budget to complete on-site panel hardware checkouts, verify completed loop checks, and execute panel SAT procedures.

In addition to deployment tasks, EA has budgeted coordination time to join the construction meeting and provide support for the District or District's chosen Construction Manager, for this new scope. Here, EA will answer RFls and provide general support throughout the commissioning process as needed.

Closeout
Following the completion of commissioning of the new sites, EA will update automation design and construction standards to as built, reflecting any documentation changes made during commissioning. Panel drawing as-builts will be done by others.

March 24, 2026
Item #1 14 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041 D3-DFF5-4C0C-B052-119837B4B307 SCADA Replacement Project. Contract Amendment 3
EA Project Number: EA23CWD037, v3.0.0
Schedule Effect
□ Delay □ Advance □ None
Cost Estimate
� Unknown
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)

ENTERPRISE

AUTOMATION
See the attached cost estimate for a detailed breakdown of costs associated with this amendment.

Conclusion
I welcome any further discussion that may facilitate the refinement of this scope of work. Please contact me on our main office number (949) 769-6000 x 106 or alternatively on my cell phone at (949) 273-9853 with any questions.

Thank you,
Paul Rahmanian
Area Manager (Carlsbad Account Manager)
March 24, 2026
Item #1 15 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041 D3-DFF5-4C0C-B052-119837B4B307 SCADA Replacement Project. Contract Amendment 3
EA Project Number: EA23CWD037, v3.0.0
Assumptions & Clarifications
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)

ENTERPRISE

AUTOMATION

1. EA has listed specific line items and sites that are being included in the scope of this amendment. The scope of this amendment will not be expanded any further than the sites and line items explicitly described herein.

2. EA will not be responsible for the testing of any control panels. This will be the responsibility of the contracted fabricator or electrician.

3. EA will not be responsible for the resolution of any issues found on-site including electrical, mechanical, instrumentation, networking, and similar issues unless the source of the issue stems from the PLC or SCADA programming.

4. EA expects to execute all tasks within the original schedule bounds for this project if authorized on or before March 30th 2026; however, procurement and fabrication delays by others may impact the overall project schedule.

5. EA expects all panel installation, site construction, electrical wiring and related tasks to be completed (by others) prior to arriving at each site for deployment.

6. Written approval (email or letter) from Carlsbad MWD is required for all submittals within 10 business days of release by EA.

7. Delays due to mechanical, electrical, or IT related issues, production scheduling constraints, or lack of system availability out of EA's control, which result in additional site time, will be charged at EA's standard hourly rates.

8. Terms and conditions are per the original Purchase Order.

March 24, 2026
Item #1 16 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041D3-DFF5-4COC-B052-119837848307 Client: Carlsbad MWD
Project: SCADA Replacement Project - Contract Amendment 3 Number: EA23CWD037 Date: 1/5/2026 Revision: 3.0.0 Author: NT Reviewed By: PR/AC/SP Summary
# Engineering Labor In Office
Proj. Eng. Lead Eng. PM CAD
Initiation 0 0 4 0
Specifications 92 25 18 0
PLC Development 169 62 35 0
HMI Development 238 80 48 0
Testing 246 132 57 0
Commissioning 72 24 52 0
Closeout 16 4 3 0
Engineering Labor Totals 833 327 217 0
Expenses (excl. taxes)
EXP Travel
I
Total Expenses
(Grand Total
EA23CWD037 CA3 ESTIMATE SCADA Replacement Project 3.0.0.xlsm Summary Out of Office
Proj. Eng. Lead Eng. PM
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
184 68 0
0 0 0
184 68 0
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)
+ ENTERPRISE
AUTC?!�t�I!2.�
Totals
CAD Hours Price
0 6 $22,216
0 135 $33,594
0 266 $66,600
0 366 $91,458
0 435 $109,917
0 400 $100,092
0 23 $5,713
0 1631 $429,590
Price
$3,256
$3 256
$432,846!
1 of 11
March 24, 2026
Item #1 17 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041D3-DFF5-4C0C-8052-119837B4B307 Client: Carlsbad MWD
Project: SCADA Replacement Project - Contract Amendment 3 Number: EA23CWD037 Date: 1/5/2026 Revision: 3.0.0 Author: NT Reviewed By: PR/ AC/SP Initiation
Engineering Labor In Office
WBS Description Proj. Eng. Lead Eng. PM CAD
Project initiation
010 Project setup 4
accounting setup
develop project schedule, resource loading
050 Execution planning 8
develop initial detailed project task execution plans
EA Internal team check-in meetings
995 Team check-in meetings 36 36
review project progress, ETCs, schedule, risks, etc.

Out of Office
Architect Proj. Eng. Lead Eng. PM CAD
2 PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)
♦ ENTERPRISEAUTqtt�I!2.r::!
Totals
Architect Hours Price
14 $3,820
72 $18,396
!Hours I I I I 41 O I 21 I OI OI OI OI OI j 86j
!Price 11 $01 $ 01 $ 1,0681 $ 01 $5761 I $01 $ 01 $ 01 $ 01 $ 01 EA23CWD037 CA3 ESTIMATE SCADA Replacement Project 3.0.0.xlsm ENG Initiation $22,216j
2 of 11
March 24, 2026
Item #1 18 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041D3-DFF5-4C0C-8052-119837B4B307 Client: Carlsbad MWD
Project: SCADA Replacement Project - Contract Amendment 3 Number: EA23CWD037 Date: 1/5/2026 Revision: 3.0.0 Author: NT Reviewed By: PR/ AC/SP Specifications
Engineering Labor In Office
WBS Description Proj. Eng. Lead Eng. PM CAD
Documentation updates for New Sites
Update existing documentation
105 master site list 1 1
165 PLC & SCADA tagging standards 2 1
105 1/0 lists 12 2
170 Functional specifications 8 2
130 network 4 1
160 alarming 2 1
170 Develop new documentation
El Fuerte/Rancho Pancho functional specification 24 4
Submittal
prepare and submit to client
post submittal changes 8 2
Documentation updates for Calavera PS Modifications
Update existing documentation
105 master site list 1 1
105 1/0 lists & Modbus mapping 24 8
160 alarming 2 1
Submittal
prepare and submit to client
post submittal changes 4 1
990 Project management
Coordination, project management, overhead, meetings 18 Out of Office
Architect Proj. Eng. Lead Eng. PM CAD
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)
♦ ENTERPRISEAUTqtt�I!2.r::!
Totals
Architect Hours Price
75 $18,387
42 $10,401
18 $4,806
!Hours 11 92! 25! 18! 0! 0! I 0! 0! 0! 0! 0! I 135i
!Price 11 $21,988! $ 6,800! $ 4,806! $ 0! $ 0! I $ 0! $ 0! $ 0! $ 0! $ 0! EA23CWD037 CA3 ESTIMATE SCADA Replacement Project 3.0.0.xlsm ENG Specifications $33,5941
3 of 11
March 24, 2026
Item #1 19 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041D3-DFF5-4C0C-8052-119837B4B307 Client: Carlsbad MWD
Project: SCADA Replacement Project - Contract Amendment 3 Number: EA23CWD037 Date: 1/5/2026 Revision: 3.0.0 Author: NT Reviewed By_: PR/ AC/SP PLC Development
Engineering Labor In Office
WBS Description Proj. Eng. Lead Eng. PM CAD Architect
330 PLC Program Modification for New Sites
Add new template options to existing programs
Lift Stations 10 2
Pressure Reducing Stations 2 1
Develop new programs
El Fuerte/Rancho Pancho 32 12
330 PLC Program Instantiation for New Sites
Create Program Instances from Templates 10 3
duplicate template
update communications
update tag names
remove optional features as necessary
Verify Created Instances 6 2
test documentation
internal testing
non-conformances correction and retest
EA23CWD037 CA3 ESTIMATE SCADA Replacement Project 3.0.0.xlsm ENG PLC Development Out of Office
Proj. Eng. Lead Eng. PM CAD
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)
♦ ENTERPRISEAUTqtt�I!2.r::!
Totals
Architect Hours Price
59 $14,596
21 $5,184
4 of 11
March 24, 2026
Item #1 20 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041D3-DFF5-4C0C-8052-119837B4B307 Client: Carlsbad MWD
Project: SCADA Replacement Project - Contract Amendment 3 Number: EA23CWD037 Date: 1/5/2026 Revision: 3.0.0 Author: NT Reviewed By_: PR/ AC/SP PLC Development
Engineering Labor In Office
WBS Description Proj. Eng. Lead Eng. PM CAD
170 Calavera PS Functional Specifications Modifications Split template pump station spec into 4 individual specs 10 4 Calavera Potable Pump Station
Calavera Reclaim Pump Station
Bressi Potable Pump Station
Bressi Reclaim Pump Station
As-needed updates 16 4
Modify Calavera Potable Pump Station logic 16 8
control & monitoring of pre-packaged skid
1/0 list with rack layout, tags, and descriptions
Communication with prei)ackaged skid
Summary of operation
Operator setpoints and commands
Detailed logic descriptions
Sequences and state transitions
Interlocks and permissives
Alarms, limits, and deadbands
Totalizers and reporting data
control strategy workshop 3 2
330 Calavera PS PLC Programming Modifications
Split template pump station program into 4 programs 16 4 Calavera Potable Pump Station
Calavera Reclaim Pump Station
Bressi Potable Pump Station
Bressi Reclaim Pump Station
As-needed updates 24 8
Reprogram Calavera Potable Pump Station per updated spec 24 12 Program setup and hardware configuration
1/0 mapping and processing
Communication with pre-packaged skid
Equipment instance setup
Process logic
Alarms and totalizers
Simulation code
990 Project management
Coordination, project management, overhead, meetings 35 Out of Office
Architect Proj. Eng. Lead Eng. PM CAD
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)
♦ ENTERPRISEAUTqtt�I!2.r::!
Totals
Architect Hours Price
63 $15,651
88 $21,824
35 $9,345
!Hours 11 169! 62! 3 5! O! O! I O! O! O! O! O! I 266i
!Price II $40,391 I $16,864! $9,345! $0! $OU $0! $0! $0! $0! $0! EA23CWD037 CA3 ESTIMATE SCADA Replacement Project 3.0.0.xlsm ENG PLC Development $66,600i
5 of 11
March 24, 2026
Item #1 21 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041D3-DFF5-4C0C-8052-119837B4B307 Client: Carlsbad MWD
Project: SCADA Replacement Project - Contract Amendment 3 Number: EA23CWD037 Date: 1/5/2026 Revision: 3.0.0 Author: NT Reviewed By_: PR/ AC/SP HMI Development
Engineering Labor In Office
WBS Description Proj. Eng. Lead Eng. PM CAD Architect
410 Ignition Global Setup for New Sites
Update Metadata 24 4
include new sites
verify navigation functionality
update tag generator for new sites
430 Ignition Screen Development for New Sites
Develop Level 1 Screens 24 4
Overviews
Trends
Alarms
Management/ Administration
Develop Level 2 Screens
New template options 14 4
New El Fuerte/Rancho Pancho screen 16 4
Progress Review Workshops 6 6
Develop Edge-Specific Configuration 14 4
410 Ignition Global Setup for Calavera PS modifications Update Metadata 16 4
include new sites
verify navigation functionality
update tag generator for pump stations
430 Ignition Screen Development for Calavera PS modifications Develop Level 1 Screens 16 4
Overviews
As-needed tag linking updates
Develop Level 2 Screens 60 32
Split template pump station screen into 4 individual screens Calavera Potable Pump Station
Calavera Reclaim Pump Station
Bressi Potable Pump Station
Bressi Reclaim Pump Station
Update Calavera Potable screen 28 6
Progress Review Workshops 4 4
Develop Edge-Specific Configuration 16 4
EA23CWD037 CA3 ESTIMATE SCADA Replacement Project 3.0.0.xlsm ENG HMI Development Out of Office
Proj. Eng. Lead Eng. PM CAD
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)
♦ ENTERPRISEAUTqtt�I!2.r::!
Totals
Architect Hours Price
28 $6,824
96 $23,670
20 $4,912
174 $43,236
6 of 11
March 24, 2026
Item #1 22 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041D3-DFF5-4C0C-8052-119837B4B307 Client: Carlsbad MWD
Project: SCADA Replacement Project - Contract Amendment 3 Number: EA23CWD037 Date: 1/5/2026 Revision: 3.0.0 Author: NT Reviewed By_: PR/ AC/SP HMI Development
Engineering Labor In Office
WBS Description Proj. Eng. Lead Eng. PM CAD
990 Project management
Coordination, project management, overhead, meetings 48 Out of Office
Architect Proj. Eng. Lead Eng. PM CAD
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)
♦ ENTERPRISE AUTqtt�I!2.r::!
Totals
Architect Hours Price
48 $12,816
!Hours 11 238! BO! 48! O! O! I O! O! O! O! O! j 366j
!Price !! $56,882! $21,760! $12,816! $0! son $0! $0! $0! $0! $0! EA23CWD037 CA3 ESTIMATE SCADA Replacement Project 3.0.0.xlsm ENG HMI Development $91,458j
7 of 11
March 24, 2026
Item #1 23 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041D3-DFF5-4C0C-8052-119837B4B307 Client: Carlsbad MWD
Project: SCADA Replacement Project - Contract Amendment 3 Number: EA23CWD037 Date: 1/5/2026 Revision: 3.0.0 Author: NT Reviewed By_: PR/ AC/SP Testing
Engineering Labor In Office
WBS Description Proj. Eng. Lead Eng. PM CAD Architect
721 Factory Acceptance Test - Additional Features
Resolution of additional scope identified during FAT
Add alarm client filtering (NC4) 36 14
Add compressor running input at all Lift Stations (NC 8) 8 4 Add meta data database for pump information (NC 10) 20 4 Add ability to swap current pump serial number (NC 26) 16 2 Add pressure Al for each PSV at Maerkle (NC 31) 6 2
Add valve vault 1/0 at Maerkle (NC 47) 8 2
Add intrusion alarm at D4 tank (NC 61) 2 1
Modify page navigation (NC72) 24 4
Modify button graphic (NC 85) 8 4
Add Hi Position alarm to ClaVals (NC 91) 12 4
Remove pressure relief valve 1/0 from some PRS sites (NC 98) 4 2 Integrated Testing and FAT for New Sites
720 Integrated Testing of Site PLC Programs and Screens test documentation 8 2
internal testing 24 24
non conformances correction and retesting 16 16
790 Factory Acceptance Test
test documentation 2
witnessed acceptance testing 8 8
non-conformances 4 4
Integrated Testing and FAT for Calavera PS Modifications 720 Integrated Testing of Site PLC Programs and Screens test documentation 4 1
internal testing 16 16
non conformances correction and retesting 10 10
790 Factory Acceptance Test
test documentation 2
witnessed acceptance testing 4 4
non-conformances 4 4
990 Project management
Coordination, project management, overhead, meetings 57 Out of Office
Proj. Eng. Lead Eng. PM CAD
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)
♦ ENTERPRISE AUTqtt�I!2.r::!
Totals
Architect Hours Price
187 $46,112
116 $29,506
75 $19,080
57 $15,219
!Hours II 2461 1321 5 71 ol ol I ol ol ol ol ol I 4351
!Price II $58,7941 $35,9041 $15,2191 S ol Sol I S ol Sol Sol Sol Sol EA23CWD037 CA3 ESTIMATE SCADA Replacement Project 3.0.0.xlsm ENG Testing $109,9171
8 of 11
March 24, 2026
Item #1 24 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041D3-DFF5-4C0C-8052-119837B4B307 Client: Carlsbad MWD
Project: SCADA Replacement Project - Contract Amendment 3 Number: EA23CWD037 Date: 1/5/2026 Revision: 3.0.0 Author: NT Reviewed By_: PR/ AC/SP Commissioning
Engineering Labor In Office
WBS Description Proj. Eng. Lead Eng. PM CAD
New Sites Commissioning
840 Startup activities for site 1 10 2
PLC 1/0 checkout
equipment testing
functional testing
890 SAT
documentation deliverables
840 Startup activities for remaining 5 sites 50 10
810 Coordination meetings for site 1 2 2
construction meeting attendance
810 Coordination meetings for remaining 5 sites 10 10
990 Project management
Coordination, project management, overhead, meetings 52 Out of Office
Architect Proj. Eng. Lead Eng. PM CAD
28 10
156 58
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)
♦ ENTERPRISE AUTqtt�I!2.r::!
Totals
Architect Hours Price
348 $86,208
52 $13,884
!Hours 11 121 241 521 ol O! I 1841 68! ol O! oj I 400j
!Price 11 $17,2081 $6,528! $13,8841 $0! $0! ! $43,9761 $18,496! $01 $0! $0! EA23CWD037 CA3 ESTIMATE SCADA Replacement Project 3.0.0.xlsm ENG Commissioning $100,092j
9 of 11
March 24, 2026
Item #1 25 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041D3-DFF5-4C0C-8052-119837B4B307 Client: Carlsbad MWD
Project: SCADA Replacement Project - Contract Amendment 3 Number: EA23CWD037 Date: 1/5/2026 Revision: 3.0.0 Author: NT Reviewed By: PR/ AC/SP Closeout
Engineering Labor In Office
WBS Description Proj. Eng. Lead Eng. PM CAD
770 As-buih documentation
Prepare as-builts for all documentation 16 4
engineering workflow
platform architecture
PLC standards
SCADA standards
site functional specifications
alarm notification
990 Project management
Coordination, project management, overhead, meetings 3
Out of Office
Architect Proj. Eng. Lead Eng. PM CAD
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)
♦ ENTERPRISEAUTqtt�I!2.r::!
Totals
Architect Hours Price
20 $4,912
3 $801
!Hours 11 16! 4! 3! 0! O! I 0! O! O! 0! 0! j 23j
!Price 11 $3,824! $1,088! $801 ! $0! $0! I $0! $0! $0! $0! $0! EA23CWD037 CA3 ESTIMATE SCADA Replacement Project 3.0.0.xlsm ENG Closeout $5,713j
10 of 11
March 24, 2026
Item #1 26 of 31
Docusign Envelope ID: 0A93B2C0-9E3E-4B47-8F87-4EC899D00EA2 Docusign Envelope ID: D49041D3-DFF5-4C0C-B052-119837848307 Client: Carlsbad MWD
Project: SCADA Replacement Project - Contract Amendment 3 Number: EA23CWD037 Date: 1/5/2026 Revision: 3.0.0 Author: NT Reviewed By_: PR/ AC/SP Travel
No. Description Rate Details
Site Commissioning Travel mileage, meals, accommodations, expenses

1. mileage to CMWD round trip, 101 mi., $0.67 /mi.

2. mileage hotel to site daily round trip, 10 mi., $0.67/mi.

3. hotel per night, per GSA rate

4. per diem per GSA rate
Price
EA23CWD037 CA3 ESTIMATE SCADA Replacement Project 3.0.0.xlsm EXP Travel Qty.
5 10
10 10
PSA24-2318UTIL Amend No. 3
Exhibit "A" (Cont.)
A.. ENTERPRISE
y AUT(?tt�I!9..�
Unit Cost Ext. Cost Price
$3,256
$68 $338
$7 $67
$199 $1,990
$86 $860
$3,2561
11 of 11
March 24, 2026