Cities Index.
Agenda packet

Carmel-by-the-Sea City Council
July 9, 2024

Document
Agenda packet
Meeting
July 9, 2024
Body
Carmel-by-the-Sea City Council
Pages
12
Original file
41.1 MB
Text extracted from the city's file for reading and search. Open the original on carmelbytheseaca.api.civicclerk.com. That file is the official record.

WHEREAS, on December 13, 2023, a conceptual design of the project was presented to the Planning Commission, and feedback was received from the public and the Commission some of which was incorporated into the project; and
WHEREAS, on December 18, 2023, the Historic Resources Board issued a Determination of Ineligibility for the Hofsas House Hotel, finding it did not meet the criteria for listing as a historic resource; and
WHEREAS, also on December 18, 2023, the Historic Resources Board issued a Determination of Eligibility for the Donna Hofsas House, finding it met the criteria for listing as a historically significant building; and
WHEREAS, on March 29, 2024, a notice of the public hearing scheduled for April 10, 2024, was published in the Carmel Pine Cone in compliance with State law (California Government Code 65091) and mailed to owners of real property within a 300-foot radius of the project indicating the date and time of the public hearing; and WHEREAS, on or before March 31, 2024, the Applicant posted the public notice on the project site and hand-delivered a copy of the public notice to each property within a 100-foot radius of the project site indicating the date and time of the public hearing; and WHEREAS, on or before April 5, 2024, the meeting agenda was posted in three locations in compliance with State law indicating the date and time of the public hearing; and WHEREAS, on April 10, 2024, the Planning Commission held a duly noticed public hearing and adopted Resolution 2024-026-PC approving a Design Review, Lot Line Adjustment, and associated Coastal Development Permit for the Carmel Legacy Hotel and Resolution 2024- 027-PC approving a Use Permit for the Carmel Legacy Hotel, the historic Donna Hofsas House and associated accessory uses; and
WHEREAS, on April 24, 2024, Neal Kruse, on behalf of the Carmel Preservation Association, filed an appeal of the Planning Commission’s approval, citing a failure to adequately assess the environmental impacts of the project’s demolition and construction phase under the California Environmental Quality Act (CEQA); and
WHEREAS, on June 21, 2024, a notice of the public hearing scheduled for July 9, 2024, was published in the Carmel Pine Cone in compliance with State law (California Government Code 65091) and mailed to owners of real property within a 300-foot radius of the project indicating the date and time of the public hearing; and WHEREAS, on public notice was duly posted on the project site and a hand-delivered copy of the public notice given to each property within a 100-foot radius of the project site indicating the date and time of the public hearing; and WHEREAS, on or before July 5, 2024, the meeting agenda was posted in three locations in compliance with State law indicating the date and time of the public hearing; and WHEREAS, on July 9, 2024, the City Council did hear and consider all said reports, attachments, recommendations, and testimony herein above set forth and used their independent judgment to evaluate the project; and
Attachment 1
Resolution 2024-061

Page 3 of 4 ends

WHEREAS, this Resolution and its findings are made based upon the analysis and evidence presented to the City Council, including, without limitation, the staff report and attachments submitted by the Community Planning and Building Department; and WHEREAS, the California Environmental Quality Act (California Public Resources Code §§ 21000, et seq., “CEQA”), together with State Guidelines (14 California Code Regulations §§ 15000, et seq., the “CEQA Guidelines”) and City Environmental Regulations (CMC 17.60) require that certain projects be reviewed for environmental impacts and that environmental documents be prepared; and
WHEREAS, The City Council has analyzed the proposed Carmel Legacy Hotel Project and has determined, based on its independent judgment and review of the record, including but not limited to the staff report and attachments thereto, that: (1) the Project is categorically exempt from CEQA pursuant to Sections 15302 (Class 2 Replacement or Reconstruction), 15303 (Class 3 New Construction or Conversion of Small Structures), 15331 (Class 31 Historical Resource Preservation) and 15332 (Class 32 Infill Development) of the CEQA Guidelines; and (2) that the project does not entail any unusual circumstances and that none of the exceptions in CEQA Guidelines Section 15300.2 apply to negate the applicability of any of the above-referenced categorical exemptions; and
WHEREAS, the facts set forth in the recitals are true and correct and are incorporated herein by reference.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Carmel-ByThe-Sea does hereby deny the appeal by Neal Kruse, dated April 24, 2024 (APP 24118), determine that the project is categorically exempt from the California Environmental Quality Act, and uphold the Planning Commission’s April 10, 2024 approval of a Design Review (DR 24059) and associated Coastal Development Permit and Use Permit (UP 24060) for the Carmel Legacy Hotel project which entails the demolition of the 38-room Hofsas House Hotel and construction of the 38-room Carmel Legacy Hotel located San Carlos Street 2 northwest of 4th Avenue (APN:
010-124-001-000 and 010-124-014-000).

PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF CARMEL-BYTHE-SEA this 9th day of July 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

APPROVED: ATTEST:

Attachment 1
Resolution 2024-061

Page 4 of 4 ends

_________________________ _________________________
Dave Potter Nova Romero, MMC
Mayor City Clerk
Attachment 1
CITYOFCARMELͲBYͲTHEͲSEA
PLANNINGCOMMISSION

PLANNINGCOMMISSIONRESOLUTIONNO.2024Ͳ026ͲPC

ARESOLUTIONOFTHEPLANNINGCOMMISSIONOFTHECITYOFCARMELͲBYͲTHEͲSEA APPROVINGADESIGNREVIEWANDASSOCIATEDCOASTALDEVELOPMENTPERMITFORTHE CARMELLEGACYHOTELLOCATEDONSANCARLOSSTREET2NORTHWESTOF4THAVENUE APN:010Ͳ124Ͳ001Ͳ000and010Ͳ124Ͳ014Ͳ000

WHEREAS, on March 12, 2024, Eric Miller Architects, Inc. (“Applicant”) submitted a Design Review application DR 24Ͳ059 (Hofsas House, Inc.) described herein as (“Application”) on behalf of Hofsas House, Inc. (“Owner”) for the Carmel Legacy Hotel, conversion of the historic Donna Hofsas House from a manager’s unit to two apartments, and the addition of accessory uses both within the hotel and the historic house; and
WHEREAS, the Application has been submitted for two legal lots of record totaling 36,200 square feet located on San Carlos Street 2 northwest of 4th Avenue in the Residential and Limited Commercial (RC) District (Block 34, Lots 1, 3, 5, por. of 7, por. of 8, 9, 10, por. of 11, 12, 14); and WHEREAS, the Applicant is requesting to demolish the Hofsas House Hotel, an approximately 15,762ͲsquareͲfoot 38Ͳroom hotel, and construct the Carmel Legacy Hotel, a 32,466ͲsquareͲfoot 38Ͳroom hotel, convert the historic Donna Hofsas House from a managers unit to two apartments, and establish hotelͲrelated accessory uses; and WHEREAS, in accordance with Carmel Municipal Code (CMC) Section 17.58.030 (Commercial Design Review), new construction, alterations, rebuilds, additions, and demolitions require approval of a Residential Track Two Design Study by the Planning Commission; and WHEREAS, a Coastal Development Permit is also required in accordance with CMC

17.52.090 (Coastal Development Permit Required); and
WHEREAS, on January 26th and October 18th, 2023, the applicant and the hotel owner/operator hosted two meetings with the community, and on May 17th and May 25th, 2023, hostedtwo meetings with the Carmel Chamber of Commerce to present the project to the community and solicit feedback; and
WHEREAS, on February 2, 2023, the applicant submitted Conceptual Review application CR 23Ͳ097 (Hofsas House, Inc.) for the demolition of the Hofsas House Hotel and construction of a new hotel known as the Carmel Legacy Hotel; and
WHEREAS, on December 13, 2023, a conceptual design of the project was presented to the Planning Commission, and feedback received from the public and the Commission was incorporated into the project; and






 






Attachment 2
Resolution No. 2024Ͳ026ͲPC

Page 2 of 12 ends

WHEREAS, on December 18, 2023, the Historic Resources Board issued a Determination of Ineligibility for the Hofsas House Hotel, finding it did not meet the criteria for listing as a historic resource; and
WHEREAS, also on December 18, 2023, the Historic Resources Board issued a Determination of Eligibility for the Donna Hofsas House, finding it met the criteria for listing as a historically significant building; and
WHEREAS, on March 29, 2024, a notice of the public hearing scheduled for April 10, 2024, was published in the Carmel Pine Cone in compliance with State law (California Government Code 65091) and mailed to owners of real property within a 300Ͳfoot radius of the project indicating the date and time of the public hearing; and
WHEREAS, on or before March 31, 2024, the Applicant posted the public notice on the project site and handͲdelivered a copy of the public notice to each property within a 100Ͳfoot radius of the project site indicating the date and time of the public hearing; and WHEREAS, on or before April 5, 2024, the meeting agenda was posted in three locations in compliance with State law indicating the date and time of the public hearing; and WHEREAS, on April 10, 2024, the Planning Commission held a duly noticed public hearing to receive public testimony regarding the commercial design review, including, without limitation, the information provided to the Planning Commission by City staff and through public testimony on the final design of the project; and
WHEREAS, the California Environmental Quality Act (California Public Resources Code §§ 21000, et seq., “CEQA”), together with State Guidelines (14 California Code Regulations §§ 15000, et seq., the “CEQA Guidelines”) and City Environmental Regulations (CMC 17.60) require that certain projects be reviewed for environmental impacts and that environmental documents be prepared; and
WHEREAS, the Planning Commission found that pursuant to CEQA regulations, the Application is categorically exempt under Section 15332 (Class 32) – Infill Development Projects, and no exceptions to the exemption exist pursuant to section 15300.2 of the CEQA Guidelines; and
WHEREAS, this Resolution and its findings are made based upon the evidence presented to the Commission at the hearing date, including, without limitation, the staff report and attachments submitted by the Community Planning and Building Department; and 





 






Attachment 2
Resolution No. 2024Ͳ026ͲPC

Page 3 of 12 ends

WHEREAS, the Planning Commission did hear and consider all said reports, attachments, recommendations, and testimony herein above set forth and used their independent judgment to evaluate the project; and
WHEREAS, the facts set forth in the recitals are true and correct and are incorporated herein by reference.
NOW,THEREFORE,BEITRESOLVED that the Planning Commission of the City of CarmelͲ ByͲTheͲSea does hereby make the following findings and determinations regarding the CommercialDesignReview:
FINDINGSREQUIREDFORDESIGNSTUDYAPPROVAL
For each of the required findings listed below, the staff has indicated whether the application supports adopting the findings, either as proposed or with conditions. For all findings checked "no," the staff report discusses the issues to facilitate the Planning Commission’s decisionͲ making. Findings checked "yes" may or may not be discussed in the report, depending on the issues.

CMC17.58.060DesignReviewApprovalFindings YES NO
Conforms to the applicable policies of the General Plan and the Local Coastal Program.
ط
Complies with all applicable provisions of Carmel Municipal Code. ط Is consistent with applicable adopted design review guidelines. ط NOW,THEREFORE,BEITRESOLVED that the Planning Commission of the City of CarmelͲ ByͲTheͲSea does hereby make the following findings and determinations regarding the Coastal DevelopmentPermit:
FINDINGSREQUIREDFORCOASTALDEVELOPMENTPERMITS
For each of the required findings listed below, the staff has indicated whether the application supports adopting the findings, either as proposed or with conditions. For all findings checked "no," the staff report discusses the issues to facilitate the Planning Commission’s decisionͲ making. Findings checked "yes" may or may not be discussed in the report, depending on the issues.

CMC17.64.010.B,CoastalDevelopmentPermits YES NO

1. The project, as described in the application and accompanying materials, as modified by any conditions of approval, conforms with the certified City of CarmelͲ byͲtheͲSea Local Coastal Program.
 ط

2. If the project is located between the first public road and the sea, the project conforms with the public access and recreation policies of Chapter 3 of the Coastal Act of 1976 (commencing with Sections 30200 of the Public Resources Code).   ط

BEITFURTHERRESOLVED that the Planning Commission of the City of CarmelͲbyͲtheͲSea does hereby APPROVE the Commercial Design Review application DR 24Ͳ059 (Hofsas House, Inc.) 





 






Attachment 2
Resolution No. 2024Ͳ026ͲPC

Page 4 of 12 ends

to demolish the Hofsas House Hotel, an approximately 15,762ͲsquareͲfoot 38Ͳroom hotel, and construct the Carmel Legacy Hotel, a 32,466ͲsquareͲfoot 38Ͳroom hotel, convert the historic Donna Hofsas House from a managers unit to two apartments, and establish hotelͲrelated accessory uses located on San Carlos Street 2 northwest of 4th Avenue (Block 34, Lots 1, 3, 5, por. of 7, por. of 8, 9, 10, por. of 11, 12, 14, APN 010Ͳ124Ͳ001 and 010Ͳ124Ͳ014), subject to the following Conditions of Approval:

CONDITIONSOFAPPROVAL
No. StandardConditions

1. Authorization. This approval of Design Review application DR 24Ͳ059 (Hofsas House, Inc.) authorizes the demolition of the 38Ͳroom Hofsas House Hotel, construction of the 38Ͳ room Carmel Legacy Hotel, and conversion of the historic Donna Hofsas House from a manager’s unit to two apartments. The project site is located on San Carlos Street 2, southwest of 4th Avenue in the Residential and Limited Commercial (RC) District as depicted in the plans prepared by Eric Miller Architects approved by the Planning Commission on April 10, 2024, and stamped approved and on file in the Community Planning & Building Department unless modified by the conditions of approval contained herein.

This Design Review approval does not include any exterior modifications to the historic Donna Hofsas House. Any exterior change to the historic Donna Hofsas House shall be submitted under a separate Design Review application to the Community Planning and Building Department and shall comply with Carmel Municipal Code Chapter 17.32 (Historic Preservation).

2. Codes and Ordinances. The project shall be constructed in conformance with all requirements of the Residential & Limited Commercial (RC) District and Archaeological Significance (AS) Overlay District. All adopted building and fire codes shall be adhered to when preparing the working drawings. If any codes or ordinancesrequire design elements to be changed, or if any other changes are requested when such plans are submitted,such changes may require additional environmental review and subsequent approval by the Planning Commission.

3. PermitValidity. In accordance with CMC Section 17.52.170 (Time Limits on Approvals and Denials), a commercial design review approval remains valid for 18 months from the date of action. The project must be implemented during this time, or the approval becomes void. Implementation is effected by erecting, installing, or beginning the installation of the improvement authorized by the permit, as determined by the Director. Extensions to this approval may be granted consistent with CMC 17.52.170.C.

4. WaterUse. Approval of this application does not permit an increase in water use on the projectsitewithout adequate supply. Should the Monterey Peninsula Water Management District determine that adequate water is unavailable for this site, this permit will be scheduled for reconsideration, and appropriate findings will be prepared for review and adoption by the Planning Commission.






 






Attachment 2
Resolution No. 2024Ͳ026ͲPC

Page 5 of 12 ends

5. SetbackandHeightCertifications.A State licensed surveyor shall survey and certify the following in writing:
x The footing locations are in conformance with the approved plans prior to footing/foundation inspection;
x The roof heights and plate heights of each building are in conformance with the approved plans prior to the roof sheathing inspection. Roofs and plates shall not exceed the elevation points as identified in the approved project plans, and the roofs include an appropriate allowance for roofing material thickness. Written certifications prepared,sealed, and signed by the surveyor shall be provided prior to footing/foundation inspection and roof sheathing inspection. In the event that multiple footing/foundation pours are required, a survey letter shall be submitted for each separate section.

6. ServiceLaterals.Prior to final inspection, all electrical service laterals to any new building or structure, or to any building or structure being remodeled when such remodeling requires the relocation or replacement of the main service equipment, shall be placed underground on the premises upon which the building or structure is located.

Undergrounding will not be required when the project valuation is less than $200,000, or the City Forester determines that undergrounding will damage or destroy significant trees(s) (CMC 15.36.020).

7. UtilityMeterLocations. The placement of all utility meters shall be screened from public view to the satisfaction of the Community Planning & Building Director. Before changing the location of any utility meter, the Community Planning and Building Director or designee must give written approval.

8. Modifications. The Applicant shall submit in writing, with revised plans, to the Community Planning and Building staff any proposed changes to the approved project plans prior to incorporating those changes. If the Applicant changes the project without first obtaining City approval, the Applicant will be required to submit the change in writing, with revised plans, within two weeks of the City being notified. A cease work order may be issued at any time at the discretion of the Director of Community Planning and Building until a) either the Planning Commission or Staff has approved the change, or b) the property owner has eliminated the change and submitted the proposed change in writing, with revised plans, for review. The project will be reviewed for its compliance with the approved plans prior to the final inspection.

9. ExteriorRevisionstoPlanningApprovalForm.All proposed modifications that affect the exterior appearance of the building or site elements shall be submitted on the “Revisions to Planning Approval” form on file in the Community Planning and Building Department.

Any modification incorporated into the construction drawings not listed on this form shall not be deemed approved upon issuance of a building permit.

10. ConflictsBetweenPlanningApprovalsandConstructionPlans.Itshall be the responsibility of the Owner, Applicant, and Contractor(s) to ensure consistency between the project plans approved by the Planning Staff, the Planning Commission, or the City Council on appeal and the construction planssubmitted to the Building Division as part of the Building Permit review. Where inconsistencies between the Planning approval and the 





 






Attachment 2
Resolution No. 2024Ͳ026ͲPC

Page 6 of 12 ends

construction plans exist, the Planning approval shall govern unless otherwise approved in writing by the Community Planning & Building Director or their designee.

When changes or modificationsto the project are proposed, the Applicantshall clearly list and highlight each proposed change and bring each change to the City’s attention.

Changes to the project incorporated into the construction drawings that were not clearly listed or identified as a proposed change shall not be considered an approved change.

Should conflicts exist between the originally approved project plans and the issued construction drawings that were not explicitly identified as a proposed change, the plans approved as part of the Planning Department Review, including any Conditions of Approval, shall prevail.

11. ExteriorLighting. Prior to the issuance of a building permit, the Applicant shall include in the construction drawings a comprehensive lighting plan including all exterior light fixtures and the manufacturer’s specifications, including illumination information. All fixtures shall be shielded and downͲfacing.

ExteriorwallͲmounted lighting shall be limited to 25watts or less(incandescent equivalent or 375 lumens) per fixture and shall be installed no higher than 10 feet above the ground or walking surface.
Landscape lighting shall not exceed 18 inches above the ground nor more than 15 watts (incandescent equivalent or 225 lumens) per fixture and shall be spaced no closer than 10 feet apart. Landscape lighting shall not be used as accent lighting, nor shall it be used to illuminate trees, walls, or fences. The purpose of landscape lighting is to safely illuminate walkways and entrances to the subject property and outdoor living spaces.

12. Stone Facades (including chimneys). Prior to the issuance of a building permit, the Applicant shall identify the masonry pattern for all stonework in the construction drawings. Stone facades shall be installed in a broken course/random or similar masonry pattern. Setting the stones vertically on their face in a cobweb pattern shall not be permitted. All stonework shall be wrapped around building corners and terminated at an inside corner or a logical stopping point that provides a finished appearance. Termination of stonework shall be subject to review and approval by the Community Planning & Building Director or their designee.

13. Wood FrameWindows. Prior to the issuance of a building permit, the Applicant shall include the manufacturer’s specifications for the approved wood frame windows in the construction drawings. Window material shall be consistent throughout the project.

Windows approved with divided lights shall appear to be true divided lights, including internal and external mullions and muntins on insulated windows. Any window pane dividers that are snapͲin or otherwise superficially applied are not permitted. The painted finish shall be matte or low gloss.

14. Indemnification. The Applicant agrees, at his or her sole expense, to defend, indemnify, and hold harmless the City, its public officials, officers, employees, and assigns from any liability; and shall reimburse the City for any expense incurred, resulting from, or in 





 






Attachment 2
Resolution No. 2024Ͳ026ͲPC

Page 7 of 12 ends

connection with any project approvals. This includes any appeal, claim, suit, or other legal proceedings to attack, set aside, void, or annul any project approval. The City shall promptly notify the Applicant of any legal proceeding and cooperate fully in the defense.

The City may, at its sole discretion, participate in any such legal action, but participation shall not relieve the Applicant of any obligation under this condition. Should any party bring any legal action in connection with this project, the Superior Court of the County of Monterey, California, shall be the situs and have jurisdiction for resolving all such actions by the parties hereto.

15. Hazardous Materials Waste Survey. Prior to the issuance of a demolition permit, the Applicant shall submit a hazardous materials waste survey to the Building Division in conformance with the Monterey Bay Unified Air Pollution Control District.

16. Archaeological Report. Prior to the issuance of a building permit, the Applicant shall submit an archaeological reconnaissance report prepared by a qualified archaeologist or another person(s) meeting the standards of the State Office of Historic Preservation. The Applicant shall adhere to any recommendations set forth in the archaeological report. All new construction involving excavation shall immediately cease if materials of archaeological significance are discovered on the site and shall not be permitted to recommence until a mitigation and monitoring plan is approved by the Planning Commission.

17. CulturalResources. Throughout construction, all excavation activities shall immediately cease if cultural resources are discovered on the site, and the Applicant or his/her agent on the site shall immediately notify the City of Carmel Community Planning & Building Department within 24 hours. Work shall not recommence until such resources are properly evaluated for significance by a qualified archaeologist. If the resources are determined to be significant, prior to the resumption of work, a mitigation and monitoring plan shall be prepared by a qualified archaeologist and reviewed and approved by the City of Carmel Community Planning and Building Director.
If any human remains are found at any time during construction, work shall stop, and the applicant or his/her agent on the site shall immediately notify the Monterey County Coroner in compliance with applicable State requirements (California Public Resources Code (PRC) Section 5097.98).

18. TruckHaulRoute. Prior to the issuance of a building permit, the Applicant shall submit for review and approval by the Community Planning & Building Director, in consultation with the Public Works and Public Safety Departments, a truckͲhaul route and any necessary traffic control measures for the grading activities. The Applicant shall be responsible for ensuring adherence to the truckͲhaul route and implementation of any required traffic control measures.

19. USA North 811. Prior to any excavation or digging, the Applicant shall contact the appropriate regional notification center (USA North 811) at least two working days, but not more than 14 calendar days, prior to commencing that excavation or digging. No digging or excavation is authorized to occur onͲsite until the Applicant has obtained a 





 






Attachment 2
Resolution No. 2024Ͳ026ͲPC

Page 8 of 12 ends

Ticket Number and all utility members have positively responded to the dig request. (Visit USANorth811.org for more information)

20. ConditionsofApproval. Prior to the issuance of a building permit, the Applicant shall print a copy of the Resolution adopted by the Planning Commission and signed by the property owner(s) on a fullͲsize sheet within the construction plan set submitted to the Building Safety Division.
LandscapeConditions

21. LandscapePlanRequired. Prior to the issuance of a building permit, the Applicant shall submit a landscape plan for review and approval by the Community Planning & Building Department and the City Forester. The landscape plan shall be included in the construction drawings and will be reviewed for compliance with the landscaping standards contained in the Zoning Code, including, but not limited to, the following: 1) All new landscaping shall be 75% droughtͲtolerant; 2) Landscaped areas shall be irrigated by a drip/sprinkler system set on a timer; and 3) The projectshall meet the City’srecommended tree density standards unless otherwise approved by the City based on onͲsite conditions.
The landscape plan shall identify the location where new trees will be planted when new trees are required to be planted by the City code, the Forest and Beach Commission, or the Planning Commission.

22. TreePlantingRequirements.Prior to issuance of a building permit, the Applicant shall identify on the landscape plan the location, size, and species of required tree plantings.

All new trees shall be installed prior to the final inspection. Trees shall be recorded and monitored for at least five years to ensure their establishment and growth to maturity.

Trees that do not survive or are removed shall be replaced with new trees that are equivalent in size to the measured or projected growth of the original trees and shall be planted in the same location unless otherwise directed by the City Forester or Forest & Beach Commission.

23. TreeRemovalProhibited. Throughout construction, the Applicant shall protect all trees identified for preservation by methods approved by the City Forester. Trees on or adjacent to the site shall only be removed upon the approval of the City Forester or Forest and Beach Commission.

24. TreeProtectionMeasures. Requirements for tree preservation shall adhere to the following tree protection measures on the construction site. x Prior to grading, excavation, or construction, the developer shall clearly tag or mark all trees to be preserved.
x Excavation within 6 feet of a tree trunk is not permitted. x No attachments or wires of any kind, other than those of a protective nature, shall be attached to any tree.
x Per Municipal Code Chapter 17.48.110, no material may be stored within the dripline of a protected tree, including the drip lines of trees on neighboring parcels.






 






Attachment 2
Resolution No. 2024Ͳ026ͲPC

Page 9 of 12 ends

x Tree Protection Zone. The Tree Protection Zone shall be equal to dripline or 18 inches radially from the tree for every one inch of trunk diameter at 4.5 feet above the soil line, whichever is greater. A minimum of 4ͲfootͲhigh transparent fencing is required unless otherwise approved by the City Forester. Tree protection shall not be resized, modified, removed, or altered in any manner without written approval. The fencing must be maintained upright and taught for the duration of the project. No more than 4 inches of wood mulch shall be installed within the Tree Protection Zone. When the Tree Protection Zone is at or within the drip line, no less than 6 inches of wood mulch shall be installed 18 inches radially from the tree for every one inch of trunk diameter at 4.5 feet above the soil line outside of the fencing.
x Structural Root Zone. The Structural Root Zone shall be 6 feet from the trunk or 6 inches radially from the tree for every one inch of trunk diameter at 4.5’ above the soil line, whichever is greater. Any excavation or changes to the grade shall be approved by the City Forester prior to work. Excavation within the Structural Root Zone shall be performed with a pneumatic excavator, hydroͲvac at low pressure, or another method that does not sever roots.
x If roots greater than 2 inches in diameter or larger are encountered within the approved Structural Root Zone, the City Forester shall be contacted for approval to make any root cuts or alterations to structures to prevent roots from being damaged.
x If roots larger than 2 inches in diameter are cut without prior City Forester approval or any significant tree is endangered as a result of construction activity, the building permit will be suspended, and all work stopped until an investigation by the City Forester has been completed, and mitigation measures have been put in place.

25. FoundationWorkNearSignificantTrees. All foundations within 15 feet of significant trees shall be excavated by hand. If any tree roots larger than two inches (2”) are encountered during construction, the City Forester shall be contacted before cutting the roots. The City Forester may require the roots to be bridged or may authorize the roots to be cut. If roots larger than two inches (2”) in diameter are cut without prior City Forester approval or any significant tree is endangered as a result of construction activity, the building permit will be suspended and all work stopped until an investigation by the City Forester has been completed. Six inches (6”) of mulch shall be evenly spread across the inside the dripline of all trees prior to the issuance of a building permit.
EnvironmentalComplianceConditions

26. DrainagePlan.Prior to the issuance of a building permit, the Applicant shall submit for review and approval by the Community Planning & Building and Public Works Departments a drainage plan that meetsthe requirements of the City's drainage guidance, SOG 17Ͳ07. At a minimum, new and replaced impervious area drainage must be dispersed around the site rather than focused on one corner of the property; infiltration features must be sized appropriately and located at least 6 feet from neighboring properties. The drainage plan shall include information on drainage from new impervious areas and semiͲ 





 






Attachment 2
Resolution No. 2024Ͳ026ͲPC

Page 10 of 12 ends

pervious areas.

27. BMPTrackingForm.Prior to issuance of a building permit, the Applicant shall submit for review and approval by the Community Planning & Building and Public Works Departments a completed BMP Tracking form.

28. SemiͲPermeableSurfaces.Prior to issuance of a building permit, the Applicantshallsubmit for review and approval by the Community Planning & Building and Public Works Departments crossͲsection details for all semiͲpermeable surfaces.

29. ErosionandSedimentControlPlan.Prior to issuance of a building permit, the Applicant shall submit for review and approval by the Community Planning & Building and Public Works Departments an erosion and sediment control plan that includes locations and installation details for erosion and sediment control BMPs, material staging areas, and stabilized access.

30. ErosionControlintheRightͲofͲWay. Prior to issuance of a building permit, the Applicant shall identify on the landscape plan any natural slope within the rightͲofͲway immediately adjacent to the property where parking is not practical. Jute netting and a droughtͲ tolerant ground cover to manage postͲconstruction erosion control shall be installed.

Plants installed within the drip line of trees shall be selected from the City’s “List of Compatible Plants Under and Around Native Trees” in the Forest Management Plan. The Public Works Director, or their designee, may waive this requirement. SpecialConditions

31. PreͲConstruction Meeting. Prior to the issuance of a building permit, the contractor overseeing the project shallschedule a preͲconstruction meeting with the Project Planner to review the approval conditions and expectations during construction.

32. Conditions of Approval Acknowledgement. Prior to the issuance of a building permit revision, a completed ConditionsofApprovalAcknowledgmentform shall be included in the construction drawings. The form shall be signed by the Property Owner, Applicant, and Contractor prior to the issuance of a building permit.

33. CopperGutters&DownspoutsNotPermitted. Prior to the issuance of a building permit, the applicant shall identify the material for gutters and downspouts in the construction drawings. The use of copper for gutters and downspouts is prohibited.

34. ConstructionManagementPlan. Prior to the issuance of a building permit, the Applicant shall submit a Construction Management Plan for review and approval by the Community Planning & Building Director.

35. Public Way Improvements. Development projects involving substantial new or replacement construction shall include improvements in the public rightͲofͲway adjacent to the building site to coordinate the design of the development with the design of City streets, sidewalks, walkways and infrastructure improvements and to enhance the overall appearance of the community. Prior to the issuance of a building permit, the applicant shall submit for review and approval by the Community Planning & Building Department and Public Works Department a design for public way improvements on San Carlos Street.

36. Landscapingwithin Required Setbacks. Prior to the issuance of a building permit, the applicant shall submit for review and approval by the Community Planning & Building 





 






Attachment 2
Resolution No. 2024Ͳ026ͲPC

Page 11 of 12 ends

Department a final landscape and irrigation plan that includeslandscaping within required setbacks.

37. GarageVentilation.Garages shall be ventilated to avoid the buildͲup of exhaust gases.

When mechanical ventilation is used, noise mitigation measures shall be incorporated such as lowͲnoise fans, insulated ductwork and vibration absorbing mounting systems.

Ducts shall not exhaust toward any building openings or open space on any adjoining property nor toward any onͲsite or offͲsite open space, pathway, street, place or park accessible to the public. Venting to the roof is generally preferred. Plans for underground garagesshall be reviewed to ensure accessibility for Police and Fire Department personnel during emergencies. To the extent possible, utility meters, vaults and connections should be located within garages or driveways and away from pedestrian walking surfaces.

38. KitchensorSimilarFacilitiesforCooking. No hotel units shall contain kitchens or similar facilities for cooking. A kitchen is defined as, Any room or any part of a room designed, built, equipped, used, or intended to be used for the preparation of food and dishwashing, whether or not said room contains a cookstove or any other cooking appliance. A dining room, alcove, or similar room adjacent to or connected with a kitchen in which toasters, grills, percolators, and similar appliances are used shall not be deemed a kitchen. (CMC

17.70)

39. LotLineAdjustment. Prior to the issuance of a building permit, the applicant shall prepare a final record of survey map and submit it to the Community Planning and Building Department for review and recordation with the Office of Monterey County.

40. BuildingCoverageAnalysis. Prior to the issuance of a building permit, the applicant shall prepare a comprehensive building coverage analysis including diagrams and submit it to the Community Planning and Building Department for review and approval.

41. FloorAreaReduction. Prior to the issuance of a building permit, the applicant shall submit revised plans for review and approval by the Community Planning and Building Department that demonstrate a reduction in the building square footage on Lot 1 to comply with maximum floor area standards or submit revised plans with an alternative lot configuration that complies with maximum floor area standards.

Acknowledgment and acceptance of conditions of approval:
______________________________ ___________________________ __________ Property Owner Signature  Printed Name   Date
______________________________ ___________________________ __________ Applicant    Printed Name   Date

PASSED, APPROVED, AND ADOPTED BY THE PLANNING COMMISSION OF THE CITY OF CARMELͲBYͲTHEͲSEA this 10th day of April 2024, by the following vote: 





 









 


 
Attachment 2
Resolution No. 2024Ͳ026ͲPC

Page 12 of 12 ends

AYES: ALLEN, DELVES, KARAPETKOV, LEPAGE
NOES:
ABSENT: 
ABSTAIN: LOCKE
APPROVED:    ATTEST:
_________________________ _________________________
Michael LePage   Leah Young
Chair     Planning Commission Secretary







 






Attachment 2
CITYOFCARMELͲBYͲTHEͲSEA
PLANNINGCOMMISSION

PLANNINGCOMMISSIONRESOLUTIONNO.2024Ͳ027ͲPC

ARESOLUTIONOFTHEPLANNINGCOMMISSIONOFTHECITYOFCARMELͲBYͲTHEͲSEA APPROVINGAUSEPERMITFORTHECARMELLEGACYHOTEL,THEHISTORICDONNAHOFSAS HOUSE,ANDASSOCIATEDACCESSORYUSESLOCATEDONSANCARLOSSTREET2NORTHWEST OF4THAVENUEAPN:010Ͳ124Ͳ001Ͳ000and010Ͳ124Ͳ014Ͳ000 
WHEREAS, on March 22, 2024, Eric Miller Architects, Inc. (“Applicant”) submitted Use Permit application UP 24Ͳ060 (Hofsas House, Inc.) described herein as (“Application”) on behalf of Hofsas House, Inc. (“Owner”) for the Carmel Legacy Hotel, conversion of the historic Donna Hofsas House from a manager’s unit to two apartments, and the addition of accessory uses both within the hotel and the historic house; and
WHEREAS, the Application has been submitted for two legal lots of record totaling 36,200 square feet located on San Carlos Street 2 northwest of 4th Avenue in the Residential and Limited Commercial (RC) District (Block 34, Lots 1, 3, 5, por. of 7, por. of 8, 9, 10, por. of 11, 12, 14); and WHEREAS, the Applicant is requesting to demolish the Hofsas House Hotel, an approximately 15,762ͲsquareͲfoot 38Ͳroom hotel, and construct the Carmel Legacy Hotel, a 32,466ͲsquareͲfoot 38Ͳroom hotel, convert the historic Donna Hofsas House from a managers unit to two apartments, and establish hotelͲrelated accessory uses; and WHEREAS, in accordance with Carmel Municipal Code (CMC) Section 17.14.030 (Land Use Regulations), Hotels and Motels in the RC District require a conditional use permit; and WHEREAS, on March 29, 2024, a notice of the public hearing scheduled for April 10, 2024, was published in the Carmel Pine Cone in compliance with State law (California Government Code 65091) and mailed to owners of real property within a 300Ͳfoot radius of the project indicating the date and time of the public hearing; and
WHEREAS, on or before March 31, 2024, the Applicant posted the public notice on the project site and handͲdelivered a copy of the public notice to each property within a 100Ͳfoot radius of the project site indicating the date and time of the public hearing; and WHEREAS, on or before April 5, 2024, the meeting agenda was posted in three locations in compliance with State law indicating the date and time of the public hearing; and WHEREAS, on April 10, 2024, the Planning Commission held a duly noticed public hearing to receive public testimony regarding the Use Permit, including, without limitation, the information provided to the Planning Commission by City staff and through public testimony on the project; and






 






Attachment 3
Resolution No. 2024Ͳ027ͲPC

Page 2 of 6 ends

WHEREAS, the California Environmental Quality Act (California Public Resources Code §§ 21000, et seq., “CEQA”), together with State Guidelines (14 California Code Regulations §§ 15000, et seq., the “CEQA Guidelines”) and City Environmental Regulations (CMC 17.60) require that certain projects be reviewed for environmental impacts and that environmental documents be prepared; and
WHEREAS, the Planning Commission found that pursuant to CEQA regulations, the Application is categorically exempt under Section 15332 (Class 32) – Infill Development Projects, and no exceptions to the exemption exist pursuant to section 15300.2 of the CEQA Guidelines; and
WHEREAS, this Resolution and its findings are made based upon the evidence presented to the Commission at the hearing date, including, without limitation, the staff report and attachments submitted by the Community Planning and Building Department; and WHEREAS, the Planning Commission did hear and consider all said reports, attachments, recommendations, and testimony herein above set forth and used their independent judgment to evaluate the project; and
WHEREAS, the facts set forth in the recitals are true and correct and are incorporated herein by reference.

NOW THEREFORE, BE IT RESOLVED that the Planning Commission of the City of CarmelͲByͲ TheͲSea does hereby make the following findings and determinations regarding the Use Permit:

FINDINGS REQUIRED FOR USE PERMIT APPROVAL (CMC 17.64.010 & 17.64.020) For each of the required findings listed below, the staff has indicated whether the application, either as proposed or with conditions, supports adopting the findings. For all findings checked "no," the staff report discusses the issues to facilitate the Planning Commission's decisionͲ making. Findings checked "yes," depending on the issues, may or may not be discussed in the report.

MunicipalCodeFindings:CMC17.64.010 YES NO

1. That the proposed use will not be in conflict with the City’s General Plan. ᤯ 

2. That the proposed use will comply with all zoning standards applicable to the use and zoning district.
᤯ 

3. That granting the use permit will not set a precedent for the approval of similar uses whose incremental effect will be detrimental to the City, or will be in conflict with the General Plan.
᤯ 

4. That the proposed use will not make excessive demands on the provision of public services, including water supply, sewer capacity, energy supply, communication facilities, police protection, and fire protection.
᤯ 

5. That the proposed use will not be injurious to public health, safety or welfare. ᤯ 

6. That the proposed use will be compatible with surrounding land uses and will not conflict with the purpose established for the district within which it will be located. ᤯ 






 






Attachment 3
Resolution No. 2024Ͳ027ͲPC

Page 3 of 6 ends

7. That the proposed use will not generate adverse impacts affecting health, safety, or welfare of neighboring properties or uses.
᤯ 
MunicipalCodeFindings:CMC17.64.020 YES NO
A. That allowing the proposed use will not conflict with the City’s goal of achieving and maintaining a balanced mix of uses that serve the needs of both local and nonlocal populations.
᤯ 
B. That proposed use will provide adequate ingress and egress to and from the proposed location.
᤯ 
C. That the capacity of surrounding streets is adequate to serve the automobile and delivery truck traffic generated by the proposed use.
᤯ 
MunicipalCodeFindings:CMC17.64.120 YES NO
A. That the motel or hotel was in existence and lawfully established prior to April 1988 and has remained in operation since that time. That the proposed use will not increase the number of lodging units in existence as of that date. ᤯
B. That the proposed use will be operated as a commercial business offering transient lodging for guests and visitors. That the use will maintain living quarters occupied by a fullͲtime manager onͲsite, if such occupancy was previously established as part of the use.
᤯
C. That the minimum number of units on the site is five. That, except for the manager’s unit, no units shall contain kitchens or similar facilities for cooking food. ᤯
D. That, when reconstruction is involved, a site plan has been approved through the design review process that maximizes usable open space, minimizes unrelieved expanses of pavement devoted to parking and conforms in all respects to the commercial design requirements in Chapter 17.14 CMC, Commercial Zoning Districts.
᤯
E. That the use meets all parking requirements for all uses on the site established by Chapter 17.38 CMC, OffͲStreet Parking Requirements.
᤯
F. That incidentalservice uses provided by the motel, that are not otherwise allowed within the land use district, will be limited to use by motel occupants only and will not be made available to the general public.
᤯
BE IT FURTHER RESOLVED that the Planning Commission of the City of CarmelͲbyͲtheͲSea does hereby approve the Use Permit application UP 24Ͳ060 (Hofsas House, Inc) for the demolition of the 38Ͳroom Hofsas House Hotel and construction of the 38Ͳroom Carmel Legacy Hotel, conversion of the historic Donna Hofsas House from a manager’s unit to hotel rooms, and the addition of accessory uses both within the hotel and the historic house located on San Carlos Street 2 northwest of 4th Avenue (Block 34, Lots 1, 3, 5, por. of 7, por. of 8, 9, 10, por. of 11, 12, 14, APN 010Ͳ124Ͳ001 and 010Ͳ124Ͳ014) subject to the Conditions of Approval below:

CONDITIONSOFAPPROVAL
No. StandardConditions

1. Authorization. Approval of Use Permit application UP 24Ͳ060 (Hofsas House, Inc) authorizes a 38Ͳroom hotel, two apartments, and associated hotel accessory uses ᤯






 






Attachment 3
Resolution No. 2024Ͳ027ͲPC

Page 4 of 6 ends

located on San Carlos Street 2 northwest of 4th Avenue, in the Residential & Limited Commercial (RC) District as depicted in the application, plans and associated documents prepared by Eric Miller Architects approved by the Planning Commission on April 10, 2024, stamped approved and on file in the Community Planning & Building Department, unless modified by the conditions of approval contained herein.

2. Codes and Ordinances. The project shall conform to all Residential & Limited Commercial (RC) District requirements. All adopted building and fire codes shall be adhered to when preparing the working drawings. If any codes or ordinancesrequire design elements to be changed, or if any other changes are requested when such plans are submitted,such changes may require additional environmental review and subsequent approval by the Planning Commission.
᤯

3. WaterUse. Approval of this application does not permit an increase in water use on the project site without adequate supply. Should the Monterey Peninsula Water Management District determine that adequate water is not available for this site, this permit will be scheduled for reconsideration, and appropriate findings prepared for review and adoption by the Planning Commission.
᤯

4. Modifications. The applicant shall submit in writing, with revised plans, to the Community Planning and Building staff any proposed changes to the approved project plans prior to incorporating those changes. If the applicant changes the project without first obtaining City approval, the applicant will be required to submit the change in writing, with revised plans, within 2 weeks of the City being notified.

A cease work order may be issued any time at the discretion of the Director of Community Planning and Building until: a) either the Planning Commission or Staff has approved the change, or b) the property owner has eliminated the change and submitted the proposed change inwriting,with revised plans, forreview. The project will be reviewed for its compliance to the approved plans prior to final inspection. ᤯

5. Indemnification. The applicant agrees, at his or her sole expense, to defend, indemnify, and hold harmless the City, its public officials, officers, employees, and assigns, from any liability; and shall reimburse the City for any expense incurred, resulting from, or in connection with any project approvals. Thisincludes any appeal, claim, suit, or other legal proceeding, to attack, set aside, void, or annul any project approval. The City shall promptly notify the applicant of any legal proceeding, and shall cooperate fully in the defense. The City may, at its sole discretion, participate in any such legal action, but participation shall not relieve the applicant of any obligation under this condition. Should any party bring any legal action in connection with this project, the Superior Court of the County of Monterey, California, shall be the situs and have jurisdiction for the resolution of all such actions by the parties hereto.
᤯

6. ConditionsofApproval. All conditions of approval for the Planning permit(s) shall be printed on a fullͲsize sheet and included with the construction plan set submitted to the Building Safety Division.
᤯
SPECIALCONDITIONS






 






Attachment 3
Resolution No. 2024Ͳ027ͲPC

Page 5 of 6 ends

7. PermitValidity. In accordance with CMC Section 17.52.170.B (General Limits), the Planning Commission extends the time limit on the commercial use permit from 6 months to 18 months to run concurrently with the associated commercial Design Review application. In accordance with CMC 17.52.170.C (Time Extensions), the Planning Commission may grant one 18Ͳmonth extension of the commercial use permit if the conditionssurrounding the original approval have not changed, and the General Plan, Municipal Code, or Local Coastal Program has not been amended in a manner which causes the approval to be inconsistent with these plans or codes. ᤯

8. HotelOperations. In accordance with CMC 17.14.040.M (Hotels and Motels), hotels and motels may include minor accessory uses such as light meals and refreshments for guests only, with or without separate remuneration. If such accessory uses are available to the general public, they must be allowed uses within the underlying land use district and must meet all design, parking, and land use regulations established for the use.
᤯

9. HotelAccessoryUses. The following hotel accessory uses are approved for use by hotel guests only as part of this commercial business use permit:

Restaurant/Dining Room:
x Up to 50 seats for guests and their family/friends
x Hours of Operation: 7 am to 10 pm daily
Café/Bakery:
x 300 square feet (approximately)
x Hours of Operation: 7 am to 5 pm daily
Gym/Fitness Center:
x 500 square feet (approximately)
x Hours of Operation: 6 am to 9 pm daily
Business Center:
x 350 square feet (approximately)
Spa & Salon:
x 700 square feet (approximately)
x Hours of Operation: By appointment
Amendments: The Community Planning and Building Director shall have the authority to approve minor modifications to the accessory uses. Any modification that, in the opinion of the Director, has the potential to negatively impact surrounding uses shall be referred to the Planning Commission for review. ᤯

10. Apartments. Two apartments are permitted and shall contain complete living, sleeping, and bathing facilities.






 






Attachment 3
Resolution No. 2024Ͳ027ͲPC

Page 6 of 6 ends

11. HotelRoomKitchens. In accordance with the findingsfor approval (CMC 17.64.120), except forthe manager’s unit, no hotel unitsshall contain kitchens orsimilarfacilities for cooking food. CMC 17.70 defines a kitchen as, Any room or any part of a room designed, built, equipped, used, or intended to be used for the preparation of food and dishwashing, whether or not said room contains a cookstove or any other cooking appliance. A dining room, alcove, or similar room adjacent to or connected with a kitchen in which toasters, grills, percolators, and similar appliances are used shall not be deemed a kitchen.
᤯

12. Parking. The hotel shall provide onͲsite parking equal to 1 parking space per rental unit, including any manager's unit, plus 1.5 spaces per permanent residential use (apartment) for a total of 41 onͲsite parking spaces. No additional parking shall be required for accessory hotel uses that are limited to hotel guests. ᤯
Acknowledgment and acceptance of conditions of approval. ______________________________ ___________________________ __________ Property Owner Signature  Printed Name   Date
______________________________ ___________________________ __________ Applicant Signature   Printed Name   Date

PASSED, APPROVED, AND ADOPTED BY THE PLANNING COMMISSION OF THE CITY OF CARMELͲBYͲTHEͲSEA this 10th day of April 2024, by the following vote: 
AYES: ALLEN, DELVES, KARAPETKOV, LEPAGE
NOES:
ABSENT: 
ABSTAIN: LOCKE
APPROVED:    ATTEST:

_________________________ _________________________ Michael LePage   Leah Young
Chair     Planning Commission Secretary






 









 


 
Attachment 3
Attachment 4
Attachment 4
Attachment 4
Attachment 4
Attachment 4
Carmel Legacy Hotel 1 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024 Carmel Legacy Hotel Response to Appeal to the City
Council and Recommended Evidence for a Class 32
Categorical Exemption
On behalf of the applicant, EMC Planning Group staff conducted a review and evaluation of the project, the appeal to the City Council, conducted research regarding the applicability of the Class 32 categorical exemption, and presents the following:

Project Description
The project site is currently occupied by the Hofsas House Hotel, a 36,200 square foot building site comprised of two legal lots of record, an 8,000 square foot lot (Block 34, Lots 1 & 3, APN 010-124- 001) and a 28,200 square foot lot (Block 34, Lots 5, por. of 7, por. of 8, 9, 10, por. of 11, 12, 14, APN 010-124-014). The project site totals 36,200 square feet or 0.83 acres. The hotel, as it is known today, was constructed in 1957 and expanded in 1968. The Donna Hofsas House is located on the larger of the two parcels, fronting Dolores Street, and was constructed in 1960.

The project includes demolishing the 38-room Hofsas House Hotel and building a new hotel, Carmel Legacy Hotel. There would be no increase in the number of hotel rooms.

Response to the Appeal
Introduction
The appeal was filed on April 24, 2024, and includes Attachment A and Attachment B, with the appellant’s arguments that the project should not be categorically exempt under Class 32 of the CEQA Guidelines.

Section 21084 of the Public Resources Code requires the CEQA Guidelines to include a list of classes of projects which have been determined not to have a significant effect on the environment and which shall, therefore, be exempt from the provisions of CEQA. In response to that mandate, the California Secretary for Resources has found that 33 classes of projects, which are listed in the CEQA Guidelines, do not have a significant effect on the environment, and they are declared to be categorically exempt from the requirement for the preparation of environmental documents.

Therefore, the Secretary for Resources has found that the environmental impacts associated with projects that fall into these classes are not significant.

Attachment 5
Carmel Legacy Hotel 2 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024 The city has used the following categorical exemption associated with approval of the project:
15332. In-fill Development Projects
Class 32 consists of projects characterized as in-fill development meeting the conditions described in this section.
(a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations.
(b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. (c) The project site has no value as habitat for endangered, rare or threatened species.
(d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality.
(e) The site can be adequately served by all required utilities and public services.

Response to Appeal’s Claim that Class 32 Exemption Does Not Apply The following are responses to the claims in Attachments A and B of the appeal. In summary, the appellant does not provide any support to the claim that the Class 32 exemption does not apply because there are unusual circumstances that qualify for an exception to the exemption.

Attachment A
Attachment addresses A what the appellant refers to as “unusual circumstances making the categorical exemption inappropriate, particularly in regard to the demolition and construction phase.” The appellant presents the following circumstances:

1. The proposed project is surrounded by residential dwellings which will be subjected to significant construction noise, and traffic, particularly during excavation for the parking structure, and air quality impacts from dust, diesel exhaust and potentially, asbestos.

2. Given the quantity of dirt to be removed for the parking structure, and the amount of cement needed to build the project, the truck traffic with attendant noise, traffic impacts, and air quality impacts, will be significant along the entire truck route through the town from the construction site to the highway. This could also adversely impact emergency vehicle traffic.

Response to 1 and 2. For clarification, the project site is surrounded by a residential neighborhood to the north; Svendsgaard’s Inn and 4th Avenue to the south; San Carlos Street, Pine Terrace Condominiums and Hotel Carmel to the east; and Carmel County Inn, Dolores Street, and a residential neighborhood to the west. There is nothing unusual regarding air pollutants, asbestos, other toxins, diesel exhaust, truck traffic and noise associated with demolition and construction activities associated with the project. Typical demolition activities Attachment 5
Carmel Legacy Hotel 3 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024 include all necessary actions to remove existing structures including parking lots from the site.

Typical construction activities include grading and the import or export of soil, and the use of cement in the construction of parking structures (above ground or below ground), and the construction of new buildings and associated infrastructure. Soil removal and the use of cement are typical activities that occur during demolition and construction activities.

Regarding hazards, the city’s standard condition of approval, which was applied to the project states, “Hazardous Materials Waste Survey. Prior to the issuance of a demolition permit, the Applicant shall submit a hazardous materials waste survey to the Building Division in conformance with the Monterey Bay Unified Air Pollution Control District.” This addresses the issues of asbestos and other toxins associated with demolition of the existing structures.

Regarding construction traffic, the city’s standard condition of approval, which was applied to the project states, “Truck Haul Route. Prior to the issuance of a building permit, the Applicant shall submit for review and approval by the Community Planning & Building Director, in consultation with the Public Works and Public Safety Departments, a truck-haul route and any necessary traffic control measures for the grading activities. The Applicant shall be responsible for ensuring adherence to the truck-haul route and implementation of any required traffic control measures.” Regarding construction noise, the city’s General Plan/Local Coastal Plan includes policy P9-4 “Ensure that construction activities are managed to minimize overall noise impacts on surrounding land uses.” Additionally, Municipal Code section 15.08.180, limits the hours of construction to between 8:00 a.m. and 6:30 p.m.

Therefore, there would be no significant impacts associated with air pollutants, asbestos, other toxins, diesel exhaust, truck traffic and noise and there are no unusual circumstances associated with the project’s demolition and construction activities.

3. The historic façade of the building will be lost unnecessarily. One more piece of Carmel’s history obliterated.

Response to 3. A review of the property was conducted by five separate qualified professionals:

Chattel Inc., Historic Preservation Consultants (October 16, 2023), Heritage Services Consulting (October 23, 2023), Modern Resources (October 16, 2023), Kent Seavey (November 12, 2023), and Dr. Anthony Kirk (September 11, 2023 and September 2022). All reports concluded the existing hotel is not a significant historic resource and is not eligible for listing in the City Inventory or the California Register. The City contracted with Ms. Margaret Clovis, a qualified professional to perform an intensive survey of the Hofsas House Hotel. The DPR report submitted by Ms. Clovis concluded that the Hofsas House Hotel does not meet any of the California Register criteria and is not eligible for listing in the Carmel Inventory of Historic Resources in a DPR report. Subsequently, on December 18, 2023, the City of Carmel-by-the-Sea Historic Resources Board determined that the Hofsas House Hotel does not constitute a historic resource. No appeal of that determination was filed within the time allowed by law.

Attachment 5
Carmel Legacy Hotel 4 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024

4. The plan views are incomplete and fail to accurately portray the building as proposed. In this regard the height limit needs to be accurately assessed on this sloping site.

Response to 4. The height of the new building was determined to be consistent with the city’s zoning regulations. Therefore, there are no unusual circumstances associated with the height of the new building. The proposed height of the building projections was simulated with flagging.

Height measurements of (6) six points were measured and verified to accurately reflect the height proposed on the planset, by an affidavit signed by a licensed land surveyor, per the City’s Story Pole Certification Policy.

5. The west side proposes an increase in glass compared to that existing with consequences for the neighbors from increased reflective glare.

Response to 5. The use of glass in commercial structures such as a hotel is not an unusual circumstance.

6. The impact on parking opportunities during demolition and construction.

7. This project is located between two major streets which serve as ingress and egress to the Village. Where will the construction workers and construction vehicles park and how will they navigate through this very congested part of town. [sic] The traffic and circulation of these major demolition and construction vehicles, dump trucks, cement mixers, etc. has not been addressed. We have two inns sharing same the [sic] city block with Hofsas and two more on Fourth Avenue, one at [sic] intersection with San Carlos and the other at the intersection with Dolores. This area contains multiple inns and is also a residential neighborhood that will be heavily impacted by the project traffic.

Response to 6 and 7. It is not unusual for demolition and construction traffic to have a temporary effect on the availability of on-street parking. Additionally, the city’s Municipal Code section 15.08.190 Parking During Construction states, “The parking of construction vehicles in any posted time-limited zone is prohibited unless a construction parking permit has been issued by the City.” Municipal Code section 15.08.210, Use of Public Right-of-Way states, “When at any time any construction interferes with the use of any portion of the public right-of-way, a temporary encroachment permit therefor shall first be obtained and all necessary protection devices shall be installed. Such devices shall include, but may not be limited to: barricades, pedestrian walkways, guardrails, signs, lighting, etc. Said permit shall be obtained from the Department of Community Planning and Building and shall be approved by the Community Planning and Building Department in conjunction with the Director of Public Works. The fee for said permit shall be as established from time to time by resolution of the City Council.

Temporary encroachment permits shall be limited in duration to 48 hours unless a longer time period is specifically approved by the Directors of Planning and Building and Public Works.

Temporary encroachment permits shall not be issued to allow storage of construction materials Attachment 5
Carmel Legacy Hotel 5 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024 and/or equipment in the public right-of-way unless it can be demonstrated that a significant hardship exists that prevents material storage elsewhere on the site.” Additionally, the city has included the following condition of approval associated with construction: “Construction Management Plan. Prior to the issuance of a building permit, the Applicant shall submit a Construction Management Plan for review and approval by the Community Planning & Building Director.”
Therefore, temporary impacts on the availability of parking opportunities does not constitute an unusual circumstance.

Attachment B

1. Regarding inconsistency with the way similar past projects were analyzed in EIRs. The appellant argues that the city prepared EIRs for three projects that included demolition of existing and old commercial structures followed by construction of new commercial structures in their places. However, they don’t provide any evidence that those three projects were categorically exempt. Even if one or more of those projects were categorically exempt, preparing an EIR for those project(s) would not require the city to prepare EIRs on other projects that are categorically exempt. In summary, preparing EIRs on past projects does not affect the exempt status of other projects, include the Carmel Legacy Hotel project.

2. Regarding the definition of “infill development.” The appellant argues that the Office of Planning and Research defines infill development as follows: “The term ‘infill development’ refers to building within unused and underutilized lands within existing development patterns, typically but not exclusively in urban areas. Infill development is critical to accommodating growth and redesigning our cities to be environmentally- and sociallysustainable.” CEQA Guidelines section 15332 defines In-Fill Development Projects for purposes of this exemption, namely, that the project be substantially surrounded by urban uses. This project meets section 15332.

3. Regarding surrounding land uses. The appellant argues that an EIR should be prepared because the project site is surrounded by residential neighborhoods, including numerous residents that live in homes directly across the street.

They, as well as residents living along the truck routes will be subject to demolition and construction-related impacts. For clarification, the project site is surrounded by a residential neighborhood to the north; Svendsgaard’s Inn and 4th Avenue to the south; San Carlos Street, Pine Terrace Condominiums and Hotel Carmel to the east; and Carmel County Inn, Dolores Street, and a residential neighborhood to the west. By its very characterization of in-fill developments projects, CEQA Guidelines section 15332 states that the proposed development must occur within city limits on a project site of no more than five acres substantially surrounded by urban uses. The are no unusual circumstances associated with the project being surrounded by existing commercial and residential uses.

Attachment 5
Carmel Legacy Hotel 6 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024

4. Regarding public health and safety impacts. The appellant implies that residents in the vicinity could be exposed to air pollutants, asbestos, other toxins, diesel exhaust, truck traffic and noise. There is nothing unusual regarding air pollutants, asbestos, other toxins, diesel exhaust, truck traffic and noise associated with demolition and construction activities associated with the project. Typical demolition activities include all necessary actions to remove existing structures including parking lots from the site. Typical construction activities include grading and the import or export of soil, construction of parking structures (above ground or below ground), and construction of new buildings and associated infrastructure. These are typical activities that occur during demolition and construction activities.

Regarding hazards, the city’s standard condition of approval, which was applied to the project states, Hazardous Materials Waste Survey. Prior to the issuance of a demolition permit, the Applicant shall submit a hazardous materials waste survey to the Building Division in conformance with the Monterey Bay Unified Air Pollution Control District.” This addresses the issues of asbestos and other toxins associated with demolition of the existing structures.

Regarding construction traffic, the city’s standard condition of approval, which was applied to the project states, “Truck Haul Route. Prior to the issuance of a building permit, the Applicant shall submit for review and approval by the Community Planning & Building Director, in consultation with the Public Works and Public Safety Departments, a truck-haul route and any necessary traffic control measures for the grading activities. The Applicant shall be responsible for ensuring adherence to the truck-haul route and implementation of any required traffic control measures.” Regarding construction noise, the city’s General Plan/Local Coastal Plan includes policy P9-4 “Ensure that construction activities are managed to minimize overall noise impacts on surrounding land uses.” Therefore, there would be no significant impacts associated with air pollutants, asbestos, other toxins, diesel exhaust, truck traffic and noise and there is nothing unusual about the demolition and construction activities associated with the project.

The replacement of the hotel will address structural and engineering issues with the existing hotel, as described in the attached report from KPFF Consulting Engineers.

Categorical Exemption and Recommended Evidence
The project appears to qualify under the following four exemption categories:
§ Class 32, In-fill Development
§ Class 2, Replacement or Reconstruction
§ Class 3, New Construction or Conversion of Small Structures § Class 31, Historical Resource Restoration/Rehabilitation The applicability of each class to the project is discussed below.

Attachment 5
Carmel Legacy Hotel 7 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024 Class 32, In-fill Development Categorical Exemption
The project qualifies for a categorical exemption under Article 19, Section 15332 of the California Environmental Quality Act (CEQA).
(a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations.

Evidence. The April 10, 2024 staff report to the Planning Commission provides the evidence that the project is consistent with the applicable general plan designation and with applicable zoning designation and regulations. The project is consistent with the following General Plan Polices noted in the City’s Land Use Element:

G1-2 Preserve the residential village character and perpetuate a balance of land uses compatible with local resources and the environment.

P1-5 Preserve the development pattern established in the commercial area with a central core area of ground floor retail and service activities surrounded by a less intensive buffer area of residential, motels, offices and other uses.

The project is sited adjacent to the Commercial District in (RC) Residential and Limited Commercial Zoning.

O1-6 Recognize the natural resources and scenic quality of Carmel as a coastal community and allow uses in the community that are consistent with local needs, the Carmel Local Coastal Plan, and the California Coastal Act
P1-27 Continue to ensure that development, whether commercial or residential, does not diminish the village character by excessively blocking important public or private views and disturbing natural topography, mature trees, or native growth.

The project is lower in height, and expands surrounding viewsheds.

G1-3 Recognize the qualities and attributes that make up the unique architectural character of Carmel, retain these qualities in existing buildings, and encourage the use of them in new structures.

O1-10 Apply design regulations for the commercial district that will protect its established character while supporting the land uses contained therein.

The project’s design was evaluated and unanimously approved, by the Planning Commission who confirming the design is in alignment with the City of Carmel’s Commercial Design Guidelines Attachment 5
Carmel Legacy Hotel 8 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024 (b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses.

Evidence. The project site is 0.83 acres, located within the city limits of Carmel-by-the-Sea, and is completely surrounded by urban uses. The project site is surrounded by a residential neighborhood to the north; Svendsgaard’s Inn and 4th Avenue to the south; San Carlos Street, Pine Terrace Condominiums and Hotel Carmel to the east; and Carmel County Inn, Dolores Street, and a residential neighborhood to the west.
(c) The project site has no value as habitat for endangered, rare or threatened species.

Evidence. The project site is completely developed with structures and parking lots and within the developed city of Carmel-by-the-Sea. Janet Walther, MS, EMC Planning Group principal biologist reviewed the project site and the California Natural Diversity Database and concluded that the project site has no value as habitat for endangered, rare or threatened species. (d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality Construction Traffic), or water quality.

Evidence - Traffic. A vehicle miles traveled (VMT) study was conducted by Hexagon Transportation Consultants in November 2023 to determine if the project would result in significant traffic effects as defined by CEQA. In summary, the study concluded that the project would replace an existing hotel facility consisting of 38 rooms and on-site amenities with a proposed hotel facility consisting of 38 rooms and on-site amenities. The proposed hotel would presumably accommodate the same number of guests as the existing hotel. Therefore, it is anticipated that the proposed hotel project would generate no more than the number of vehicle trips currently generated by the existing Hofsas House Hotel. As a result of the project generating or attracting fewer than 110 net new trips per day, it can be presumed that the proposed project would have a less-than-significant impact on VMT based on OPR’s VMT screening criteria. Therefore, approval of the project would not result in any significant effects relating to traffic. Prior to construction, a Construction Mobilization plan will be prepared and submitted with construction plans. The plan will detail the following: shuttle schedule and off-site parking plans for construction worker transportation to and from the job site.

Noise mitigation measures, material delivery and removal, and hazardous waste removal will also be addressed.

Evidence – Noise. The project would be developed within the existing commercial and residential neighborhoods and would be required to comply with city noise regulations, which includes the city’s General Plan/Local Coastal Plan policy P9-4 “Ensure that construction activities are managed to minimize overall noise impacts on surrounding land uses” and the Municipal Code 15.08.180, which limits the hours of construction to between 8:00 a.m. and 6:30 p.m. Therefore, construction of the project would not result in any significant effects relating to noise.

Attachment 5
Carmel Legacy Hotel 9 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024 Evidence – Air Quality. Construction-related air quality impacts are short-term in nature and therefore are not considered significant. Additionally, the project is required to comply with all applicable local, regional, state, and federal regulations associated with demolition and construction of buildings. Regarding long-term air quality impacts associated with vehicle use, the new Carmel Legacy Hotel project will have the same number of hotel rooms as the existing Hofsas House hotel and, as documented in the traffic report prepared by Hexagon Transportation Consultants (and discussed above). Therefore, there would be no increase in existing long-term air quality impacts.

Evidence – Water Quality. Development of the project will be required to comply with the city’s grading ordinance, which requires drainage and erosion controls be in place prior to, and during, all work (Municipal Code 15.08.200 Grading). The project will also comply with the State Water Resources Control Board’s applicable construction stormwater general permit. Therefore, demolition of the existing hotel and construction of the new hotel would not result in significant water quality impacts.

Therefore, the project would not result in any significant effects relating to traffic, noise, air quality, or water quality.
(e) The site can be adequately served by all required utilities and public services.

Evidence. The existing on-site hotel is adequately served by required utilities and public services, including but not limited to water, wastewater, gas and electricity, and fire and police protection.

Therefore, the Carmel Legacy hotel with the same number of guest rooms would also be adequately served by required utilities and public services.

Class 2, Replacement or Reconstruction Categorical Exemption The project also appears to be exempt under 15302, Replacement or Reconstruction, which states:

Class 2 consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced, including but not limited to:
(a) Replacement or reconstruction of existing schools and hospitals to provide earthquake resistant structures which do not increase capacity more than 50 percent.
(b) Replacement of a commercial structure with a new structure of substantially the same size, purpose, and capacity.
(c) Replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity.
(d) Conversion of overhead electric utility distribution system facilities to underground including connection to existing overhead electric utility Attachment 5
Carmel Legacy Hotel 10 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024 distribution lines where the surface is restored to the condition existing prior to the undergrounding.

Evidence. The project is the replacement of an existing hotel (Hofsas House Hotel) with 38 guest rooms, with a new hotel (Carmel Legacy Hotel) with 38 guest rooms. The replacement hotel will be located on the same site as the hotel replaced and will have substantially the same purpose and capacity as the structure replaced; i.e. a 38-room hotel. Additionally, the new hotel is substantially the same size (square footage and height) as documented in the supplemental FAR and Square Footage calculations document provided by Eric Miller Architect’s office. The purpose of the project remains consistent (hotel to hotel), and there is no change to room capacity (38 rooms to 38 rooms).

Class 3, New Construction or Conversion of Small Structures Categorical Exemption The Donna Hofsas House component of the project is also exempt under 15303, New Construction or Conversion of Small Structures which states:

Class 3 consists of construction and location of limited numbers of new, small facilities or structures; installation of small new equipment and facilities in small structures; and the conversion of existing small structures from one use to another where only minor modifications are made in the exterior of the structure. The numbers of structures described in this section are the maximum allowable on any legal parcel. Examples of this exemption include, but are not limited to:
(a) One single-family residence, or a second dwelling unit in a residential zone. In urbanized areas, up to three single-family residences may be constructed or converted under this exemption.
(b) A duplex or similar multi-family residential structure, totaling no more than four dwelling units. In urbanized areas, this exemption applies to apartments, duplexes and similar structures designed for not more than six dwelling units. (c) A store, motel, office, restaurant or similar structure not involving the use of significant amounts of hazardous substances, and not exceeding 2500 square feet in floor area. In urbanized areas, the exemption also applies to up to four such commercial buildings not exceeding 10,000 square feet in floor area on sites zoned for such use if not involving the use of significant amounts of hazardous substances where all necessary public services and facilities are available and the surrounding area is not environmentally sensitive. (d) Water main, sewage, electrical, gas, and other utility extensions, including street improvements, of reasonable length to serve such construction. (e) Accessory (appurtenant) structures including garages, carports, patios, swimming pools, and fences.

Attachment 5
Carmel Legacy Hotel 11 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024 (f) An accessory steam sterilization unit for the treatment of medical waste at a facility occupied by a medical waste generator, provided that the unit is installed and operated in accordance with the Medical Waste Management Act (Section 117600, et seq., of the Health and Safety Code) and accepts no offsite waste.

Evidence: A portion of the project proposes to renovate the Donna Hofsas House by adding conference and exercise facilities to its interior. The project proposes minor modifications to the exterior, with the potential for no exterior changes at all. The conversion of the existing small house from residential use to multiple uses qualifies the project for this exemption.

Class 31, Historical Resource Restoration/Rehabilitation Categorical Exemption The Donna Hofsas House component of the project is also exempt under 15331, Historical resource Restoration/Rehabilitation which states:

Class 31 consists of projects limited to maintenance, repair, stabilization, rehabilitation, restoration, preservation, conservation or reconstruction of historical resources in a manner consistent with the Secretary of the Interior’s Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings (1995), Weeks and Grimmer.

Evidence: The restoration and conservation of the Donna Hofsas House will be completed in a manner consistent with the Secretary of the Interior’s Standards, and therefore qualifies for this exemption.

Exceptions to Categorical Exemptions
Section 15300.2 of the CEQA Guidelines lists exceptions that would prohibit a project from qualifying for a Categorical Exemption, even if the project satisfies the requirements for one or more of the exemption classes. On behalf of the applicant, EMC Planning Group, conducted a review and evaluation of the project and conducted research. Based on its review, EMC Planning Group concluded that none of the exceptions listed in CEQA Guidelines section 15300.2 (a-f) apply to the project (discussed below). Therefore, a Categorical Exemption is appropriate pursuant to CEQA Guidelines Section 15302.
a) Location. Classes 3, 4, 5, 6, and 11 are qualified by consideration of where the project is to be located – a project that is ordinarily insignificant in its impact on the environment may in a particularly sensitive environment be significant. Therefore, these classes are considered to apply all instances, except where the project may impact on an environmental resource of hazardous or critical concern where designated, precisely mapped, and officially adopted pursuant to law by federal, state, or local agencies.

Discussion. The project qualifies for a Class 32 exemption and therefore, the location exception does not apply to the project. The project also qualifies for a Class 3 exemption, and the Donna Hofsas House renovation will not impact an environmental resource of hazardous or critical Attachment 5
Carmel Legacy Hotel 12 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024 concern where designated, precisely mapped, and officially adopted pursuant to law by federal, state, or local agencies.
b) Cumulative Impact. All exemptions for these classes are inapplicable when the cumulative impact of successive projects of the same type in the same place, over time is significant.

Discussion. There are no successive projects of the same type in the same place planned.

Therefore, there is no cumulative impact that would be significant. In addition, because the impacts of replacing the Hotel with a similarly sized hotel are less than significant with this project, it is not expected that any future project to replace the new Hotel with another Hotel of similar size would be cumulatively significant.
c) Significant Effect. A categorical exemption shall not be used for an activity where there is a reasonable possibility that the activity will have a significant effect on the environment due to unusual circumstances.

Discussion. There is no reasonable possibility that the project would have a significant effect on the environmental due to unusual circumstances, based upon the following substantial evidence:
§ The project site is surrounded by a residential neighborhood to the north; Svendsgaard’s Inn and 4th Avenue to the south; San Carlos Street, Pine Terrace Condominiums and Hotel Carmel to the east; and Carmel County Inn, Dolores Street, and a residential neighborhood to the west. By its very characterization of in-fill developments projects, CEQA Guidelines section 15332 states that the proposed development must occur within city limits on a project site of no more than five acres substantially surrounded by urban uses. The are no unusual circumstances associated with the project being surrounded by existing commercial and residential uses.
§ There is nothing unusual regarding air pollutants, asbestos, other toxins, diesel exhaust, truck traffic and noise associated with demolition and construction activities associated with the project. Typical demolition activities include all necessary actions to remove existing structures including parking lots from the site. Typical construction activities include grading and the import or export of soil, and the use of cement in the construction of parking structures (above ground or below ground), and the construction of new buildings and associated infrastructure. Soil removal and the use of cement are typical activities that occur during demolition and construction activities.

Regarding hazards, the city’s standard condition of approval, which was applied to the project states, “Hazardous Materials Waste Survey. Prior to the issuance of a demolition permit, the Applicant shall submit a hazardous materials waste survey to the Building Division in conformance with the Monterey Bay Unified Air Pollution Control District.” This addresses the issues of asbestos and other toxins associated with demolition of the existing structures. Regarding construction traffic, the city’s standard condition of approval, Attachment 5
Carmel Legacy Hotel 13 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024 which was applied to the project states, “Truck Haul Route. Prior to the issuance of a building permit, the Applicant shall submit for review and approval by the Community Planning & Building Director, in consultation with the Public Works and Public Safety Departments, a truck-haul route and any necessary traffic control measures for the grading activities. The Applicant shall be responsible for ensuring adherence to the truck-haul route and implementation of any required traffic control measures.” Regarding construction noise, the city’s General Plan/Local Coastal Plan includes policy P9-4 “Ensure that construction activities are managed to minimize overall noise impacts on surrounding land uses.” Additionally, Municipal Code section 15.08.180, limits the hours of construction to between 8:00 a.m. and 6:30 p.m.

Therefore, there would be no significant impacts associated with air pollutants, asbestos, other toxins, diesel exhaust, truck traffic and noise and there are no unusual circumstances associated with the project’s demolition and construction activities. § The height of the new building was determined to be consistent with the city’s zoning regulations. Therefore, there are no unusual circumstances associated with the height of the new building.
§ The use of glass in commercial structures such as a hotel is not an unusual circumstance. § It is not unusual for demolition and construction traffic to have a temporary effect on the availability of on-street parking. Additionally, the city’s Municipal Code section 15.08.190 Parking During Construction states, “The parking of construction vehicles in any posted time-limited zone is prohibited unless a construction parking permit has been issued by the City.” Municipal Code section 15.08.210, Use of Public Right-of-Way states, “When at any time any construction interferes with the use of any portion of the public right-of-way, a temporary encroachment permit therefor shall first be obtained and all necessary protection devices shall be installed. Such devices shall include, but may not be limited to:
barricades, pedestrian walkways, guardrails, signs, lighting, etc. Said permit shall be obtained from the Department of Community Planning and Building and shall be approved by the Community Planning and Building Department in conjunction with the Director of Public Works. The fee for said permit shall be as established from time to time by resolution of the City Council. Temporary encroachment permits shall be limited in duration to 48 hours unless a longer time period is specifically approved by the Directors of Planning and Building and Public Works. Temporary encroachment permits shall not be issued to allow storage of construction materials and/or equipment in the public right-ofway unless it can be demonstrated that a significant hardship exists that prevents material storage elsewhere on the site.”
Attachment 5
Carmel Legacy Hotel 14 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024 § Additionally, the city has included the following condition of approval associated with construction: “Construction Management Plan. Prior to the issuance of a building permit, the Applicant shall submit a Construction Management Plan for review and approval by the Community Planning & Building Director.”
§ Therefore, temporary impacts on the availability of parking opportunities does not constitute an unusual circumstance.
d) Scenic Highways. A categorical exemption shall not be used for a project which may result in damage to scenic resources, including but not limited to, trees, historic buildings, rock outcroppings, or similar resources, within a highway officially designated as a state scenic highway. This does not apply to improvements which are required as mitigation by an adopted negative declaration or certified EIR.

Discussion. According to the Caltrans Scenic Highway System Map website, the nearest scenic highway is State Route 1, which is located approximately ½ mile east of the project site. The project site is not visible from the highway. Therefore, no officially designated scenic highways, or scenic resources, would be affected as a result of the project. e) Hazardous Waste Sites. A categorical exemption shall not be used for a project located on a site which is included on any list compiled pursuant to Section 65962.5 of the Government Code.

Discussion. The project is not located on a site that is included on any list compiled pursuant to Section 65962.5 of the Government Code. Each were checked and are discussed herein. The site is not listed on the California Environmental Protection Agency’s Cortese List (Health and Safety Code Section 25187.5). The State Water Resources Control Board’s GeoTracker (Health and Safety Code Section 25295 and Water Code Sections 13273 and 13301) does not indicate any hazardous sites within the project site. The project site is also not listed on the California Environmental Protection Agency’s list of solid waste sites identified by the Water Board with waste constituents above hazardous waste levels outside the waste management unit (Health and Safety Code Section 116395).
f) Historical Resources. A categorical exemption shall not be used for a project which may cause a substantial adverse change in the significance of a historical resource.

Discussion. A review of the property was conducted by Chattel Inc., Historic Preservation Consultants (October 16, 2023), and concluded the existing hotel is not a significant historic resource and is not eligible for listing in the City Inventory or the California Register. Subsequently, on December 18, 2023, the City of Carmel-by-the-Sea Historic Resources Board determined that the Hofsas House hotel does not constitute a historic resource. The Historic Resources Board’s determination was not appealed within 10 days of the Board’s decision and so that decision is now final and conclusive. (Carmel-by-the-Sea Municipal Code § 17.54.010(B).) Attachment 5
Carmel Legacy Hotel 15 EMC Planning Group
Response to Appeal to the City Council and Recommended Evidence for a Class 32 Categorical Exemption May 3, 2024 With respect to the House, the renovation project will not cause a substantial adverse change in the significance of this historical resource because it will not significantly affect the exterior of the House and the interior renovations will be conducted consistently with the Secretary of the Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings (1995), Weeks and Grimmer.

Attachment 5
7+)/225/27 
7+)/225/27
 

7$//$77,&63$&(%(7:((1/(9(/ 
5')/225/27 
5')/225/27
 
5')/225/27  5')/225/27 
$3$570(17
1')/225/27
 
1')/225/27
 
1')/225/27  1')/225/27  1')/225/27  %8,/',1*
/27
&29(5$*(287/,1(
1')/225/27

35(9,286/<81&2817('

)/2253/$7(287/,1(%8,/',1*
/27&29(5$*(

$77,&6725$*(
29(5

 6)
727$/(;75$)/225$5($ 
6)
&5$:/63$&(6725$*(
29(5

 6)
(;,67,1*)/225$5($ 6)
$'',7,21$/)/225$5($
6)
727$/(;,67,1*)/225$5($6)727$/352326(')/225$5($6) ',))(5(1&(
 
6)25
1')/225/27
 
6)
67)/225/27

67)/225/27 
67)/225
0((7,1*5220
/27
67)/225/27 
*$5$*(6
6)

&5$:/63$&(6725$*(
$77,&63$&(
$77,&63$&(
(438:19&39
/4'34)&9*8(&1*)7&<3
8-**94+
7*;.8.43 3T
$5&+,7(&7

(5,&0,//(5$5&+,7(&76,1&
+2))0$1$9(18( 0217(5(<&$


3+21(

)$;

:(%
HULFPLOOHUDUFKLWHFWVFRP
6*'«75'«1(«6*'5'«&4#9+0)5«#0&«52'%+(+%#6+105«+5«51.'.;«4'564+%6'&«61«6*'«14+)+0#.«5+6'«(14«9*+%*«6*';«9'4'«24'2#4'&«27$.+%#6+10«+5«':24'55.;«.+/+6'&«61«57%*«75'«4'241&7%6+10«14«27$.+%#6+10«$;«#0;«/'#05«+0«9*1.'«14«+0«2#46«+5«564+%6.;«241*+$+6'&«§«6+6.'«61«6*'5'«&4#9+0)5«#0&«52'%+(+%#6+105«4'/#+05«9+6*«6*'«#4%*+6'%6«9+6*176«24',7&+%'«8+57#.«%106#%6«9+6*«6*'5'«&4#9+0)5« «52'%+(+%#6+105«5*#..«%1056+676'«24+/#«(#5%+'«'8+&'0%'«1(«#%%'26#0%'«1(«6*'5'«4'564+%6+105 -RE1DPH

$VLQGLFDWHG
,
>«,QDU>«**.>4GPFGTKPI>4GXKV>CU§DWKNV«HKNG>*QHCUCU«*QWUG«&+#)4#/5«4'5+<'&«TXV « 
«2/ $
+2)6$6+286(/(*$&<
1:RIWK$YHRQ6DQ&DUORV6W
&$50(/%<7+(6($

(;,67,1*+27(/3/$16
$31
 
&6

 
  (;,67,1*+27(/)2857+)/2253/$1 
  (;,67,1*+27(/7+,5')/2253/$1
 
  (;,67,1*+27(/6(&21')/2253/$1
7+)/2253/$1
1')/2253/$1
 

/HJHQG
 
  (;,67,1*+27(/),567)/2253/$1
67)/2253/$1
 
  (;,67,1*+27(/522)3/$1
522)3/$1
0 0 5')/2253/$100 0

(
)$56FKHGXOH
7\SH $UHD 6LWH$UHD )$5
VW)ORRU/RW  6) 6) VW)ORRU/RW  6) 6) VW)ORRU/RW 6) 6) VW)ORRU0HHWLQJ5RRP/RW

6) 6) QG)ORRU/RW  
6) 6) QG)ORRU/RW 
6) 6) QG)ORRU/RW  6) 6) QG)ORRU/RW   6) 6) UG)ORRU/RW  
6) 6) UG)ORRU/RW  6) 6) UG)ORRU/RW  6) 6) UG)ORRU/RW   6) 6) WK)ORRU/RW  6) 6) WK)ORRU/RW   6) 6) $SDUWPHQW 6) 6) 5HVLGHQFH/RZHU)ORRU 6) 6) 5HVLGHQFH8SSHU)ORRU  6) 6) 727$/
 6) 

(
/27&29(5$*(

+2)6$6+27(/+2)6$6+286(727$/&29(5$*(


6)

6)
6)



(
$'',7,21$/)/225$5($
Visual Assessment and Evaluation
Hofsas House Hotel
Carmel, CA
Prepared by:

KPFF Consulting Engineers
San Francisco, CA
May 21, 2024
Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 2
Table of Contents

1. Scope of Report ..................................................................................................................................3

2. Limitations ..........................................................................................................................................3

3. Building & Site Descriptions ...............................................................................................................3

4. Results of Structural Evaluation .........................................................................................................5

5. Results of Civil Engineering Evaluation ............................................................................................17

6. Appendix A – Materials Testing
Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 3

1. Scope of Report
This report presents the findings of the visual assessment and evaluation of the Hofsas House Hotel, located in Carmel, California. The objective of this study was to perform a visual conditions assessment, noting deficiencies encountered, and a qualitative structural review of the buildings along with a civil assessment of the site.

The following tasks outline the scope of work that was performed for the structural evaluation of the building:

1. Review of available original structural and architectural drawings provided by the Client.

2. Walkthrough visual survey of the building exteriors to further understand and verify existing conditions, construction, systems, and finishes.

3. Walkthrough visual civil site survey of the exterior site including parking facilities, pedestrian access facilities, site amenities, and visible surface indications of utilities.

4. Prepare a letter report summarizing the results of the structural and civil evaluations.

2. Limitations
This report has been prepared for the sole and exclusive use of Eric Miller Architects (EMA) and shall not be relied upon by or transferred to any other party, or used for any other purpose, without the express written authorization of KPFF Consulting Engineers (KPFF).

In preparation of our evaluation and report, limited original structural drawings were made available to KPFF for review and use. A site investigation was performed to verify that visible existing conditions generally matched the limited available drawings; however, no finishes were removed and materials testing was limited to three concrete compression tests of one wall. The conclusions in this report were based on a review of the existing drawings, our experience with similar structures and sites. Evaluation of potential soils-related hazards have not been evaluated by KPFF.

3. Building & Site Descriptions
The Hofsas House is a hotel on the west side of San Carlos Street near 4th Avenue in Carmel, California, on a site that has approximately 20 feet of grade change. Originally a collection of smaller buildings built prior to 1957, the site is a collection of interconnecting buildings built of wood, concrete masonry (CMU) and concrete. Figure 1 is an aerial view of the site with the different colors representing construction timeframes, as best as they could be determined using the available drawings. Buildings highlighted in green represent the single-story concrete and CMU structures with timber roofs built prior to 1957. Highlighted in yellow, the wood-framed construction from 1957 enveloped some of the original structures and contains the lobby and 25 guest rooms. Orange highlights in Figure 1 represent the 3-story wood-framed L-shaped building and single-story poolside building of an unknown vintage because drawings were not available for review. Online research hints that the structures were built circa 1957, and the visible framing of the 2-story building is similar though not identical to the yellow highlighted structure.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 4
Including the three structures, the site accessible to Hofsas House guests measures approximately 0.8-acres. The lobby and guest check-in is located along San Carlos Street. A pedestrian loading zone is located along San Carlos Street. Guest parking is available at the rear of the site, accessible through one-way drive-throughs under the building. Guest parking elevations vary, but are approximately 1- to 2-stories lower than the entrance along San Carlos Street. Guest amenities including a heated swimming pool and dry saunas are located adjacent to the lower parking lot.

Figure 1- Aerial View
Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 5
Figure 2- West Elevation
Our office visited the site for visual assessment in July of 2022 and again in May of 2024. A partial set of drawings for the yellow highlighted building was available for review. Prepared by Robert R. Jones, AIA and Carter and Slattery Structural Engineers, the available drawings detail a 4-story, wood framed structure with lightly reinforced concrete grade beams. The gabled roofs consist of 5/8” thick plywood sheathing over 2x6 joists spaced at 16” on center in the southmost roof and 32” on center elsewhere. At the floor levels, 1” thick diagonal sheathing spans between 2x12’s spaced at 16” on center. At the units with the exposed exterior walkways, every other joist spans past the westmost perimeter wall to support 2x6 flat decking which carries the corridor loads.

When subjected to lateral loads, the plywood roof sheathing distributes inertial forces to diagonal sheathed shear walls. Similarly, the 1x diagonal floor sheathing distributes inertial forces to the same diagonal sheathed shear walls. The sheathed walls carry the inertial loads to the concrete strip footings.

4. Results of Structural Evaluation
Our limited field observations, the concrete core compressive tests, and our review of the partial drawings set highlighted a number of structural issues.

4.1 Inadequate Lateral System: The floor diaphragm and shear walls are sheathed with diagonal sheathing rather than plywood, and the current walls and floors very likely do not have the minimum capacity required by the current building code. The walls also likely do not have the adequate hardware (holdowns or tiedowns) required to resist overturning when subjected to large seismic loads. After a thorough quantitative seismic analysis, retrofit will likely involve removing floor and wall finishes and installing the requisite hardware and plywood sheathing.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 6

4.2 Floors at different elevations and no seismic separations between Buildings The 1957 framing included no consideration for seismic separation of the various uniquely-framed segments of the building. For example, if built today, there would be a seismic separation between the portion of the building containing the lobby and the portion that contains guest rooms directly north of the lobby. The floors in these areas do not align, as seen in Figure 2. In the event of a major earthquake, it is likely that the building will be damaged at the locations where floors do not align.

4.3 Interface with pre-1957 building: The 1957 structure was built over one of the original structures located on the site. The drawing sheet with the east wall section was not available for review; however, Figure 3 below shows the interface between the original structure with the flared foundation and the 1957 structure. The 1957 structure was excavated below the original foundation, so underpinning was shown in the section. No positive attachment between the structures is shown, and without is the 1957 structure is likely to shift on the original structure in the event of a major earthquake. Such a shift will cause substantial damage and may be irreparable.

Figure 3- Interface Between 1957 Structure and Pre-1957 Structure

4.4 Condition of the pre 1957 retaining wall: The pre-1957 structure that was incorporated into the 1957 structure has an 8’ tall concrete retaining wall within 8’ of San Carlos Street. The wall is in poor condition and has a large void vein running through it (See Figure 4). Beach sand and Carmel stone appear to have been used as aggregate in the wall concrete. Because of this, and because water Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 7
appears to have been leaking through the wall for some time, the average concrete core compressive strength was tested to be 1290 psi, with a low value of 790 psi tested where shown in Figure 4. Two other samples were taken away from the void vein, and the compressive strengths were 1050 psi and 2020 psi, as seen in the materials testing report in Appendix A. The tested concrete is quite weak, and the weakened wall is critical for the support of both the 1957 structure above and the adjacent San Carlos Street. Replacement is recommended, though it may prove cost prohibitive as it will require shoring both the roadway and the entire building, plus reattachment. The work will also likely trigger a full seismic retrofit. Due to the potential impact on the adjacent street, further detailed study is warranted, including a geotechnical investigation. Traffic, including truck traffic, is potentially surcharging a weak and decaying retaining wall in its current configuration.

Figure 4- Void Vein in East Wall of Pre-1957 Structure
Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 8

4.5 Attachment to Pre-1957 Structure At East Wall: Although the structural drawing showing the attachment between the 1957 structure and the east wall of the original structure was not available, the connection appears tenuous in the field and appears to have been repaired at one location in the past. The repair also does not appear to be rugged. Failure of this connection will lead to substantial damage.

Figure 5- Resupport of 1957 Structure at East Wall of Original Structure Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 9

4.6 Efflorescence and Weak Concrete in South Wall of Pre-1957 Structure: As shown in Figures 6 and 7, there is visible efflorescence on the surface of the south wall of the pre-1957 structure, indicating that water has been migrating through the wall. Additionally, the surface concrete at the efflorescence crumbled easily by hand. The concrete condition is likely similar to the tested concrete of the east wall.

Figure 6- Efflorescence and Weak Concrete in South Wall of Pre-1957 Structure Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 10
Figure 7- Additional Efflorescence and Weak Concrete in South Wall of Pre-1957 Structure

4.7 Exposed Deck Joists: Figure 8 shows a typical condition of cantilevered 2x12 joists on the west and south sides of the hotel buildings. The 2x12 joists at 32” on center specified on the historic structural drawings do not have the capacity to carry 100 psf corridor loading required by the building code.

Although they don’t extend to the ground, the intermittent posts will help share load between floors; however, corridor framing is typically designed to carry load at the level it is applied. In addition, the cantilevered joists are prone to dry rot, and we noted locations in the exposed walkway framing where the original members have been replaced with pressure treated lumber, presumably because the original elements rotted. We also noted signs of weathering on some exposed timber elements, plus some rot in in the exposed framing in the northmost building.. All rotted elements should be removed and replace Additionally, the joists are a conduit for moisture to enter the building if not flashed properly. No finishes were removed to examine the supporting west wall framing, but there may be rot in some locations due to water intrusion. The cantilevered joist condition has been singled out as the cause of the infamous balcony collapse in Berkeley.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 11
Figure 8- Typical Exposed Framing at Walkway
Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 12
Figure 9- Example of Weathering in Exposed Framing
Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 13
Figure 10- Dry Rot in Exposed Framing at Northmost Building Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 14
Figure 11- Dry Rot in Exposed Landing Framing at Northmost Building

4.8 Corroded Base Plate and Anchors: At the Southwest corner of the northmost building, there is a column to support the two stories of hotel space above. Although painted, the paint is blistered on the base plate and the anchor bolts are corroded. The finish should be removed for further investigation, and the base plate and anchor bolts may require replacing. Figure 12 shows the condition.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 15
Figure 12- Corroded Base Plate and Anchors

4.9 Fractured CMU at Cantilevered Beam: There is a 6x12 beam than cantilevers off the CMU wall at the north end of the building highlighted yellow in Figure 1. This beam supports the elevated walkway framing and the stair landings. The CMU support wall has cracked underneath beam and should be repaired.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 16
Figure 13- Fractured CMU Support Wall at Cantilevered 6x12 Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 17

5. Results of Civil Engineering Evaluation
The following sections note a variety of field observations made upon our May 2024 site visit. The comments listed below are primarily focused on site accessibility, but also cover other site features including site structures, drainage, and utilities. The key map below, Figure 14, provides the general location of the following listed items.

Figure 14 – Civil Site Observations Key Map
Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 18

5.1 Pedestrian Loading Zone: An approximate 30-foot length of San Carlos Street is marked white for “Hotel Loading Zone Only”. Immediately adjacent to the loading zone is a shallow curb, painted white, limited landscaping/bushes, and a brick/wood decorative wall. No direct access is available to the adjacent pedestrian walkway. While the location is generally appropriate, the loading zone is missing several features to provide pedestrian accessibility. A 5-foot wide, striped and hatched area is required adjacent to the loading zone. A direct connection to the walkway is also required, with a detectable warning surface located between where the loading zone interfaces with the walkway. While removing the existing curb, landscaping and wall appear feasible, it does not appear that sufficient space is available to provide the required accessible elements. In order to provide an accessible pedestrian loading zone, the area may need to be relocated and/or other significant improvements made to create a new location to serve the function.

Figure 15 – Existing Pedestrian Loading Zone

5.2 Lobby Entrance: The lobby entrance is located near the pedestrian loading zone, adjacent to the south driveway. The entrance is located near, and directly visible from, the public right-of-way along San Carlos Street. To enter the lobby, a pedestrian is required to take two steps up to the level of the lobby. No handrail is provided along the steps in the direct from the right-of-way. At the top of the steps, an in-swinging door provides access to the lobby. The threshold is in excess of ½”, and an adequately sized landing space is not provided at the door. Access from the rightof-way to entry also requires a pedestrian to traverse the primary driveway entrance to the onsite parking; no separate, protected walkway is provided.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 19
Figure 16 – Lobby Entrance

5.3 No Accessible Parking Stalls: Heading west from the lobby entrance brings users down a steep driveway into the on-site parking area. Approximately 30 parking spaces are provided on-site, but there are no accessible parking stalls identified. For the quantity of on-site parking provided, two accessible parking stalls are required: 1 van accessible stall and 1 standard accessible stall.

The stalls would require appropriate signage and striping, grading improvements to provide a level area, and adjacent accessible improvements to connect the parking with the site (See Items

5.4 and 5.5 below).

5.4 Pool Accessibility: A heated swimming pool amenity is located adjacent to the lowest parking area. An accessible lift is provided in order to enter the pool itself. To enter the pool area, a gate is located at the southeast corner. The gate latch is located at the top of fence and the area immediately outside of the gate lacks the required landing space. A gate is also located at the northwest corner of the pool area; the gate is located on a run of stairs, without adequate clearances around the gate or at either the top or bottom of the stair run. In addition, the deck area around the pool has areas which exceed 2%. To provide accessibility to the pool area, the southeast gate would need to be replaced, the landing area would need to be expanded, detectable warning would need to be added to separate the pedestrian zone from the parking lot, and the pool deck would need to be re-graded to provide level access.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 20
Figure 17 – Southeast Pool Entrance
Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 21
Figure 18 – Northwest Pool Entrance

5.5 Non-Accessible Pedestrian Ramps: Pedestrian ramps are located in the lowest parking area, connecting parking and the pool area with the lowest level of rooms in the main building. The ramps lack detectable warning at the interface with the parking lot. The ramps lack appropriate handrails. The ramp slopes exceed 8.33%, and no intermediate landings are provided where the elevation change exceeds 30”. All of these deficiencies would need to be corrected in order to provide accessibility. Given the total elevation change between the parking lot/pool and the building level, the ramp lengths would need to be extended. It is unclear if space is available for the extended length to be accommodated.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 22
Figure 19 – Pedestrian Ramp

5.6 Site Stairs: Given the elevation change across the site, the multiple stories of guestrooms, and the lack of interior corridors, site stairs are provided throughout the site. With the exception of stairs constructed as a part of the 1957 building, numerous issues were identifiable across the approximately dozen stairs observed on-site. In general, all stairs lacked handrails with appropriate gripping areas; handrails were frequently only provided on one side of the sitars; handrails did not extend sufficiently beyond the length of the stair run. In addition, a stair located at the north end of the main building, extending down from San Carlos St, has a handrail obstructed by an emergency fire access ladder from a higher level.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 23
Figure 20 – Stairs
Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 24
Figure 21- Stairs
Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 25
Figure 21 – Stairs
Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 26
Figure 22 – Stairs

5.7 No Pedestrian Egress to Public Right-of-Way: Site users in the off-site parking lot and at the pool amenity have no egress path to the public right-of-way. In order to reach San Carlos St, a user would need to either walk up a steep driveway on either side of the site, or use various runs of stairs. An accessible path, separated from the driveway is needed from these lower site areas.

The accessible path would need to be separated from the vehicular areas with a curbed walkway, likely with handrails. The walkway would likely require significant grading improvements and potential retaining walls; it may also severely impact vehicular access around the site.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 27
Figure 23 – Ramp at Primary Entrance Driveway

5.8 CMU Retaining Wall, Potential Movement: A CMU retaining is located at the southwest area of the site, supporting a parking lot for hotel users. The primary CMU retaining wall, located in the north-south orientation appears to be in good condition. The shorter CMU retaining wall, returning east-west and varying in height from approximately 4-feet high to flush appears to be out of plumb. The foundation of the wall is not observable, but it appears that the wall may be sliding and needs to be replaced/improved.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 28
Figure 24 – CMU Retaining Wall

5.9 Wood Retaining Wall, Structural Failure: Wood retaining walls are located around the parking at the southwest corner of the site. The parking lot is located lower than the adjacent site improvements. The wood retaining walls generally support landscape areas, with some concrete improvements. The wall is constructed of 2x12 planks with 6x6 posts spaced at 8’ on center.

Where the wall is the highest, approximately 4-feet, the wall is beginning to fail with plans being bowed out and posts beginning to rotate. Wall replacement is likely needed.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 29
Figure 25 – Wood Retaining Help

5.10 Sanitary Sewer Lateral: Relatively new sanitary sewer cleanout boxes were located throughout the parking lot at the rear of the site. Based on the cleanout box layout, it appears that sanitary sewer flows via gravity to Dolores Street. Given the appearance of the cleanout boxes and frequency of placement, we would expect that the sewer system may have been upgraded and is in relatively good condition. Further assessment could be done.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 30
Figure 26 – Sanitary Sewer Cleanout

5.11 Domestic Water Service: Several water meters were identified along the frontage on San Carlos St, located inline with both the main building and the 1957 building. Backflow preventers were located on the domestic service lines. The backflow preventers appeared to be in good condition.

No other observable notes on the water distribution.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 31
Figure 27 – Water Backflow Preventer

5.12 Gas Service Location, Limited Access & Ventilation: A gas meter was located on-site, in between the main building and the 1957 building. The gas meter is at a level that is approximately 2-stories beneath San Carlos St. The gas meter is located under site stairs, with limited access to the gas meter set. In addition, there are operable doors and windows located above the gas meter set.

This location would not currently be acceptable by gas utility agencies and may pose a potential fire hazard if a gas leak leads to trapped gas.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 32
Figure 28 – Gas Meter Under Stairs

5.13 Disconnected Drainage System: As noted previously, the site experiences significant elevation change. The site is also generally paved. During our site visit, the site was wet but did not display any clear indication of drainage issues. With that said, the majority of roof downspouts are “disconnected” from the storm drain system – they are not directly piped but rather discharge onto pavement areas. Concentrated flow from downspouts are a hazard to pedestrians and cannot be done across pedestrian paths of travel. In the current site configuration, with limited pedestrian paths of travel, this is not a concern; however, it may be more of a concern requiring storm drain additions where pedestrian accessible improvements are added to correct previously noted issues.

Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 33
Figure 29 – Downspout onto Driveway
Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 34
Appendix A
Concrete Compression Tests
Attachment 5
Attachment 5
Attachment 5
Hofsas House Hotel Visual Assessment and Evaluation
KPFF Job No. 2400074
SITE & STRUCTURAL SCREENING and EVALUATION
May 21, 2024 35
Appendix B
Hazardous Materials Report
Attachment 5
S
TECH

CONSULTING
484-b washington street monterey, ca 93940 #401 / p 831 883 8415 / f 877 984 5495 / [email protected] / stechconsulting.com Limited Asbestos & Lead-Based Paint Survey Report
Commercial Property
Site: Hofsas House, San Carlos 2NW of 4th, Carmel, California

S Tech Project: 23116-2
Prepared for: Hofsas Legacy LLC
July 27, 2023
S Tech Consulting was retained by Hofsas Legacy LLC to conduct a limited assessment for asbestos containing materials and lead-based paint at the the Hofsas House, on San Carlos, 2NW of 4th Avenue, in Carmel, California. A retaining wall, connected to the hotel requires structural inspection. To create observation panels, the existing wallboard and siding must be disturbed in six rooms on the first and second floors.

Prior to disturbing building materials, the EPA and Cal-OSHA require sampling to determine whether asbestos is present.

When asbestos is identified, it must be handled and disposed of by trained and licensed personnel, to ensure an airborne asbestos hazard is not created. Lead paint is regulated by EPA and OSHA to prevent creating a lead exposure hazard for workers and especially children.

The site visit took place on July 25, 2023 by Sean Tillema, a DOSH Certified Asbestos Consultant (CAC 07-4257) and California Department of Public Heath Certified Lead Related Construction Inspector / Risk Assessor (LRC-2901).

Scope of Work & Property Description
The scope of work was to conduct a limited asbestos and lead-based paint survey in the locations where access panels will be cut to facilitate the structural inspection. The asbestos survey was in compliance with the Monterey Bay Air Resources
District’s (MBARD) requirements. Lead testing was for
compliance for the Cal-OSHA Lead in Construction Standard.

The facility is a multi-building hotel constructed between the 1940s through 1960s. The subject building where access panels will be created was constructed in the 1950s.

The rooms selected for access panels are rooms and 1, 3, and 5 on the first floor and rooms 22, 24, and 26 on the second floor.

The panels will all be cut in the guest room closets.

The exterior of the building is clad in stucco siding. Interior walls are drywall with a skim coat.

Hotel Room #1 (Similar To Other Rooms In Scope)
Attachment 5
Limited Asbestos & Lead-Based Paint Assessment - Hofsas House, San Carlos 2NW of 4th, Carmel, California Asbestos Containing Materials
Asbestos-containing material (ACM) is defined by the United States Environmental Protection Agency (EPA) as material containing more than one percent asbestos as determined by Polarized Light Microscopy (PLM). In California, for contractor licensing and employee protection, the California Department of Occupational Safety and Health (Cal-OSHA) classifies any material as having greater than one-tenth of one percent (>0.1%) asbestos as Asbestos-Containing Construction Material (ACCM). Asbestos containing material are divided into friable and non-friable classifications. Friability refers to the likelihood of the material readily releasing airborne fibers when disturbed. Materials which are non-friable in-situ have the potential to become friable when deteriorated or when renovation or demolition occurs.

The following conclusions were arrived at from the field inspection and the analytical results:
✴ The joint compound associated with the drywall system in the four-story hotel building contains less than (<) 1% Chrysotile asbestos. Joint compound cannot be separated from the non-asbestos drywall. The removal of the drywall must be handled as friable, Regulated Asbestos Containing Material (RACM).

Analysis was performed by Patriot Environmental Laboratories, a NVLAP accredited laboratory, on a twenty-four hour laboratory turnaround time. Seventeen samples were collected and submitted to the laboratory. Once at the lab, the submitted samples were further separated into thirty-two individual materials for analysis. The table below is a summary of materials identified to contain asbestos. Following the summary table, is a listing of all materials collected from the site, with samples in red containing asbestos. The laboratory report is provided in appendix ‘A’ of this document. See the summary for additional information.
484-b washington street monterey, ca 93940 #401 / p 831 883 8415 / f 877 984 5495 / [email protected] / stechconsulting.com Asbestos Summary Table
Asbestos Material Locations Analytical Results Classification Approximate
Quantity to be
Removed
Drywall Joint
Compound
4-Story Hotel Building
Throughout
Drywall: NAD
JC: Up To <1% Chrysotile Friable, RACM
To Be Determined
By The Scope Of
The Renovations
Attachment 5
Limited Asbestos & Lead-Based Paint Assessment - Hofsas House, San Carlos 2NW of 4th, Carmel, California Asbestos Containing Materials - continued
484-b washington street monterey, ca 93940 #401 / p 831 883 8415 / f 877 984 5495 / [email protected] / stechconsulting.com Asbestos Bulk Sample Table
Sample
Number Material Sampled Sample Location
Analytical Results
NAD = No Asbestos
Detected
116-2 - 1 Drywall / Joint Compound Guest Room #1 - Bathroom Drywall: NAD JC: <1% Chrysotile
116-2 - 2 Drywall / Skim Coat Guest Room #1 - Bathroom NAD 116-2 - 3 Drywall / Joint Compound Guest Room #3 - Bathroom NAD 116-2 - 4 Drywall / Skim Coat Guest Room #3 - Bathroom NAD 116-2 - 5 Drywall / Joint Compound Guest Room #5 - Bathroom Drywall: NAD JC: <1% Chrysotile
116-2 - 6 Drywall / Skim Coat Guest Room #5 - Bathroom NAD 116-2 - 7 Drywall / Joint Compound Guest Room #26 - Bathroom Drywall: NAD JC: <1% Chrysotile
116-2 - 8 Drywall / Skim Coat Guest Room #26 - Bathroom NAD 116-2 - 9 Linoleum Guest Room #25 - Bathroom, Top Layer NAD 116-2 - 10 VFT - 9’’x9’’ w/ Black Mastic Guest Room #25 - Bathroom, Bottom Layer NAD Attachment 5
Limited Asbestos & Lead-Based Paint Assessment - Hofsas House, San Carlos 2NW of 4th, Carmel, California Asbestos Containing Materials - continued
484-b washington street monterey, ca 93940 #401 / p 831 883 8415 / f 877 984 5495 / [email protected] / stechconsulting.com Asbestos Bulk Sample Table
Sample
Number Material Sampled Sample Location
Analytical Results
NAD = No Asbestos
Detected
116-2 - 11 Linoleum Guest Room #24 - Bathroom NAD
116-2 - 12 Drywall / Joint Compound Guest Room #24 - Bathroom Drywall: NAD JC: <1% Chrysotile
116-2 - 13 Drywall / Skim Coat Guest Room #24 - Bathroom NAD 116-2 - 14 Drywall / Joint Compound Guest Room #22 - Bathroom Drywall: NAD JC: <1% Chrysotile
116-2 - 15 Drywall / Skim Coat Guest Room #22 - Bathroom NAD 116-2 - 16 Stucco Four Story Building - Exterior NAD
116-2 - 17 Stucco Four Story Building - Exterior NAD
Attachment 5
Limited Asbestos & Lead-Based Paint Assessment - Hofsas House, San Carlos 2NW of 4th, Carmel, California 484-b washington street monterey, ca 93940 #401 / p 831 883 8415 / f 877 984 5495 / [email protected] / stechconsulting.com Lead-Based Paint & Glazings
Lead-Based Paint (LBP), as defined by EPA, is of concern both as a source of direct exposure through ingestion of paint chips, and as a contributor to lead interior dust and exterior soil. Lead was widely used as a major ingredient in most interior and exterior oil-based paints prior to 1950. Lead compounds continued to be used as corrosion inhibitors, pigments and drying agents from the early 1950's. In 1972, the Consumer Products Safety Commission limited lead content in new paint to 0.5% (5000 ppm) and, in 1978, to 0.06% (600 ppm). Today, for purposes of lead-based paint inspection, for childhood lead poisoning prevention, EPA defines LBP as paint containing greater than 0.5% (5000 ppm) lead by weight or greater than 1.0 mg/cm2 by surface area. This report applies the 1.0 mg/cm2 reference standard, which applies to X-ray Fluorescence (XRF) testing.

The State of California has enacted a number of regulations to minimize lead exposure in children and adults. Specifically, Title 17, California Code Of Regulations, Division 1, Chapter 8 Accreditation, Certification, and Work Practices For Lead-Based Paint and Lead Hazards and a number of California Civil and Health and Safety Codes, provide requirements for lead-safe housing and the prevention of lead hazards from developing in housing. A complete list of all State of California LBP regulations is available at the CDPH Childhood Lead-Poisoning Prevention Branch website. The California Department of Public Health (CDPH) is the agency responsible for enforcing compliance with existing state LBP regulations.

For occupational lead exposure in the construction and building maintenance industries, lead is regulated below the threshold set by the EPA for lead-based paint. Additionally, OSHA does not limit lead health and safety requirements to paint. Many other building materials and manufactured items are known to contain lead. Adult occupational tasks may result in exposure to lead even when working with low lead concentrations. Tasks such as abrasive blasting, flame torch usage, and mechanical grinding are especially prone to occupational lead exposure. When lead is present in any concentration, Cal-OSHA, under Title 8 CCR Section 1532.1, requires employers to evaluate the task performed and conduct an exposure assessment. Based on the results of the exposure assessment, engineering controls and personal protective equipment may be necessary to reduce occupational lead exposure. Additional information is available from this Cal-OSHA fact sheet: http://www.dir.ca.gov/dosh/ dosh_publications/lead-fct-sheet-rev.pdf
Paint testing at this property was conducted by X-ray Fluorescence (XRF), which provides instant onsite analysis, penetrating all paint layers.

The following conclusions were arrived at from the testing:
✴ Exterior and interior, EPA defined Lead-Based Paint (>1.0 mg/cm2 by XRF) is NOT present in coatings anticipated to be impacted by the scope of the paint disturbance for the retaining wall inspection. ✴ For the purposes of compliance with the Cal-OSHA 8 CCR 1532.1 ‘Lead in Construction Standard’, when disturbing any amount of lead, in any material, the employer must ensure their employees are not exposed to lead in excess of the Action Level (AL) or Permissible Exposure Limit (PEL). Contractors must have historical exposure data on file for the task performed or they must conduct an exposure assessment on representative workers. Engineering controls and personal protective equipment (PPE) must be utilized where exposure data dictates. Tasks that are likely to create high lead exposure are abrasive blasting, flame torching, and mechanical grinding.

A table listing the results of all the components tested is provided in Appendix ‘B’. See summary for additional information.

Attachment 5
Limited Asbestos & Lead-Based Paint Assessment - Hofsas House, San Carlos 2NW of 4th, Carmel, California Summary of Findings
Asbestos
When conducting renovation or demolition, A State of California C-22 Licensed Asbestos Abatement Contractor who is Division of Occupational Safety & Health (DOSH) registered, must be retained when disturbing materials containing greater than 0.1% asbestos (Asbestos Containing Construction Material). All work must be conducted in strict accordance with CalOSHA’s asbestos standard, 8 CCR 1529 and the requirements of the Monterey Bay Air Resources District’s (MBARD) Rule 424. Waste must be disposed of in the correct landfill for the classification of asbestos being removed.

The following recommendations apply specifically to this project:
✴ Regulated Asbestos Containing Material (RACM) exceeding 160 square feet will not be impacted by the scope of the current renovations. A notification to the Monterey Bay Air Resources District (MBARD) is not necessary for the cutting of the observation panels in the specific rooms chosen for this project. If the scope of the removal expands to exceed 160 square feet, then air district notification will be necessary. ✴ Contractors should be aware that concealed spaces may harbor additional suspect material. Asbestos insulated pipes and asbestos cement pipes may be concealed within ceilings and wall cavities. Should any additional suspect materials be identified during the course of the renovation work, stop work and contact us to assess and sample if necessary.

Lead
Lead-Based Paint was not identified in any of the coatings expected to be impacted by the scope of the renovations. No further action is required with regards to LBP.

The following recommendations apply specifically to this project:
✴ Contractors shall ensure compliance with Cal-OSHA’s Lead in Construction Standard. All paints tested have a quantifiable lead content. Cal-OSHA has not set a lower ‘safe’ threshold for lead content in regards to occupational exposure for workers involved in the construction industry. Contractors who task employees with activities that could result in occupational exposure to lead must follow the requirements of the Lead in Construction Standard to ensure their employees are protected. Contractors should collect exposure data on their employees or have historical data from similar tasks or projects.

If you have any questions please feel free to call us at 831.883.8415 S Tech Consulting

Sean P. Tillema
Certified Asbestos Consultant (CAC) #07-4257
Certified Lead Inspector / Risk Assessor #LRC-2901
484-b washington street monterey, ca 93940 #401 / p 831 883 8415 / f 877 984 5495 / [email protected] / stechconsulting.com Attachment 5
Limited Asbestos & Lead-Based Paint Assessment - Hofsas House, San Carlos 2NW of 4th, Carmel, California Limitations
This report is not intended to identify all hazards or unsafe conditions or to imply that others do not exist. This survey was planned and implemented on the basis of a mutually agreed scope of work and S Tech’s experience in performing this type of assessment.

Areas outside our scope or inaccessible areas are excluded from this report.

S Tech Consulting has performed this survey in a professional manner using the degree of skill and care exercised for similar projects under similar conditions, by reputable and competent environmental consultants. S Tech Consulting shall not be responsible for conditions or consequences arising from relevant facts that were concealed, withheld, or not fully disclosed at the time that this survey was conducted.

S Tech Consulting further states that no warranties, expressed or implied, are made regarding the quality, fitness, or results to be achieved as a consequence of this report or impacted by information not properly disclosed to S Tech at the time of this report. It further states that no responsibility is assumed for the control or correction of conditions or practices existing at the premises of the client.
484-b washington street monterey, ca 93940 #401 / p 831 883 8415 / f 877 984 5495 / [email protected] / stechconsulting.com Attachment 5
Limited Asbestos & Lead-Based Paint Assessment - Hofsas House, San Carlos 2NW of 4th, Carmel, California 484-b washington street monterey, ca 93940 #401 / p 831 883 8415 / f 877 984 5495 / [email protected] / stechconsulting.com Site Plan and Asbestos Sample Locations
Attachment 5
Limited Asbestos & Lead-Based Paint Assessment - Hofsas House, San Carlos 2NW of 4th, Carmel, California 484-b washington street monterey, ca 93940 #401 / p 831 883 8415 / f 877 984 5495 / [email protected] / stechconsulting.com DATE PREPARED: SOURCE:

REVISION: REVISION DATE:

PROJECT NAME: CLIENT:

DRAWING TITLE:

FIGURE NO.

A
PROJECT NO: SCALE:
7/26/23
23116-2 NTS
Hofsas Hotel
San Carlos, 2NW of 4th, Carmel, California Hofsas Legacy LLC Aerial View of Subject Site
Google Earth

SUBJECT SITE
4-STORY HOTEL BUILDING
(Assessment Area)
NORTH
Attachment 5
Limited Asbestos & Lead-Based Paint Assessment - Hofsas House, San Carlos 2NW of 4th, Carmel, California 484-b washington street monterey, ca 93940 #401 / p 831 883 8415 / f 877 984 5495 / [email protected] / stechconsulting.com DATE PREPARED: SOURCE:

REVISION: REVISION DATE:

PROJECT NAME: CLIENT:

DRAWING TITLE:

FIGURE NO.
1 PROJECT NO: SCALE:
7/26/23
23116-2 NTS
Hofsas Hotel
San Carlos, 2NW of 4th, Carmel, California Hofsas Legacy LLC Indicates Interior Sample
Location
Indicates Exterior Sample
Location
Asbestos Site Sample Location Plan
Hofsas Hotel

ASSESSMENT AREAS
116-2-1
116-2-2
116-2-3
116-2-4
116-2-5
116-2-6
116-2-9
116-2-10
116-2-11
116-2-12
116-2-13
116-2-14 116-2-15
* Samples 16 & 17 Not Shown
116-2-7
116-2-8
Attachment 5
Limited Asbestos & Lead-Based Paint Assessment - Hofsas House, San Carlos 2NW of 4th, Carmel, California 484-b washington street monterey, ca 93940 #401 / p 831 883 8415 / f 877 984 5495 / [email protected] / stechconsulting.com Appendix A - Asbestos Analytical Data
Attachment 5
PLM Asbestos Identification
Certificate of Analysis
S Tech Consulting
484-B Washington Street #401
Monterey, CA 93940
Date Received: 7/26/2023
Number of Samples: 32
Lab/Client ID/Layer Location Material Description Color Composition (%) Report Number: 983996
Project Name: Hofsas Hotel
Date Reported: 7/26/2023
Claim Number:

Project Number: 23116-2
Project Location: San Carlos 2NW of 4th
Carmel, California
Date Analyzed: 7/26/2023 PO Number:

Date Collected: 7/25/2023 Collected By: Sean Tillema
983996-001 4-Story Guest Room 1
116-2-1
93% NonFibrous Material
7% Cellulose
Drywall White
Total Asbestos None Detected
983996-001A 4-Story Guest Room 1
116-2-1
100% NonFibrous MaterialJoint Compound White
Chrysotile % <1
Total Asbestos < 1%
983996-002 4-Story Guest Room 1
116-2-2
93% NonFibrous Material
7% Cellulose
Drywall White
Total Asbestos None Detected
983996-002A 4-Story Guest Room 1
116-2-2
100% NonFibrous MaterialSkim Coat White
Total Asbestos None Detected
983996-003 4-Story Guest Room 3
116-2-3
93% NonFibrous Material
7% Cellulose
Drywall White
Total Asbestos None Detected

Page 1 of 7 ends

Attachment 5
PLM Asbestos Identification
Certificate of Analysis
S Tech Consulting
484-B Washington Street #401
Monterey, CA 93940
Date Received: 7/26/2023
Number of Samples: 32
Lab/Client ID/Layer Location Material Description Color Composition (%) Report Number: 983996
Project Name: Hofsas Hotel
Date Reported: 7/26/2023
Claim Number:

Project Number: 23116-2
Project Location: San Carlos 2NW of 4th
Carmel, California
Date Analyzed: 7/26/2023 PO Number:

Date Collected: 7/25/2023 Collected By: Sean Tillema
983996-003A 4-Story Guest Room 3
116-2-3
98% NonFibrous Material
2% Glass Fibers
Joint Compound White
Total Asbestos None Detected
983996-004 4-Story Guest Room 3
116-2-4
93% NonFibrous Material
7% Cellulose
Drywall White
Total Asbestos None Detected
983996-004A 4-Story Guest Room 3
116-2-4
100% NonFibrous MaterialSkim Coat White
Total Asbestos None Detected
983996-005 4-Story Guest Room 5
116-2-5
93% NonFibrous Material
7% Cellulose
Drywall White
Total Asbestos None Detected
983996-005A 4-Story Guest Room 5
116-2-5
98% NonFibrous Material
2% Glass Fibers
Joint Compound White
Chrysotile % <1
Total Asbestos < 1%

Page 2 of 7 ends

Attachment 5
PLM Asbestos Identification
Certificate of Analysis
S Tech Consulting
484-B Washington Street #401
Monterey, CA 93940
Date Received: 7/26/2023
Number of Samples: 32
Lab/Client ID/Layer Location Material Description Color Composition (%) Report Number: 983996
Project Name: Hofsas Hotel
Date Reported: 7/26/2023
Claim Number:

Project Number: 23116-2
Project Location: San Carlos 2NW of 4th
Carmel, California
Date Analyzed: 7/26/2023 PO Number:

Date Collected: 7/25/2023 Collected By: Sean Tillema
983996-006 4-Story Guest Room 5
116-2-6
93% NonFibrous Material
7% Cellulose
Drywall White
Total Asbestos None Detected
983996-006A 4-Story Guest Room 5
116-2-6
100% NonFibrous MaterialSkim Coat White
Total Asbestos None Detected
983996-007 4-Story Guest Room 26
116-2-7
93% NonFibrous Material
7% Cellulose
Drywall White
Total Asbestos None Detected
983996-007A 4-Story Guest Room 26
116-2-7
100% NonFibrous MaterialJoint Compound White
Chrysotile % <1
Total Asbestos < 1%
983996-008 4-Story Guest Room 26
116-2-8
93% NonFibrous Material
7% Cellulose
Drywall White
Total Asbestos None Detected
983996-008A 4-Story Guest Room 26
116-2-8
100% NonFibrous MaterialSkim Coat White
Total Asbestos None Detected

Page 3 of 7 ends

Attachment 5
PLM Asbestos Identification
Certificate of Analysis
S Tech Consulting
484-B Washington Street #401
Monterey, CA 93940
Date Received: 7/26/2023
Number of Samples: 32
Lab/Client ID/Layer Location Material Description Color Composition (%) Report Number: 983996
Project Name: Hofsas Hotel
Date Reported: 7/26/2023
Claim Number:

Project Number: 23116-2
Project Location: San Carlos 2NW of 4th
Carmel, California
Date Analyzed: 7/26/2023 PO Number:

Date Collected: 7/25/2023 Collected By: Sean Tillema
983996-009 4-Story Guest Room 25
116-2-9
70% NonFibrous Material
25% Cellulose
5% Glass Fibers
Linoleum Off White
Total Asbestos None Detected
983996-009M 4-Story Guest Room 25
116-2-9
100% NonFibrous MaterialFlooring Material White
Total Asbestos None Detected
983996-010 4-Story Guest Room 25
116-2-10
100% NonFibrous MaterialVFT - 9 Inches x 9 Tan Brown
Inches
Total Asbestos None Detected
983996-010M 4-Story Guest Room 25
116-2-10
100% NonFibrous MaterialMastic Brown Black
Total Asbestos None Detected
983996-011 4-Story Guest Room 24
116-2-11
70% NonFibrous Material
25% Cellulose
5% Glass Fibers
Linoleum Off White
Total Asbestos None Detected
983996-011M 4-Story Guest Room 24
116-2-11
100% NonFibrous MaterialFlooring Material White
Total Asbestos None Detected

Page 4 of 7 ends

Attachment 5
PLM Asbestos Identification
Certificate of Analysis
S Tech Consulting
484-B Washington Street #401
Monterey, CA 93940
Date Received: 7/26/2023
Number of Samples: 32
Lab/Client ID/Layer Location Material Description Color Composition (%) Report Number: 983996
Project Name: Hofsas Hotel
Date Reported: 7/26/2023
Claim Number:

Project Number: 23116-2
Project Location: San Carlos 2NW of 4th
Carmel, California
Date Analyzed: 7/26/2023 PO Number:

Date Collected: 7/25/2023 Collected By: Sean Tillema
983996-012 4-Story Guest Room 24
116-2-12
93% NonFibrous Material
7% Cellulose
Drywall White
Total Asbestos None Detected
983996-012A 4-Story Guest Room 24
116-2-12
100% NonFibrous MaterialJoint Compound White
Chrysotile % <1
Total Asbestos < 1%
983996-013 4-Story Guest Room 24
116-2-13
93% NonFibrous Material
7% Cellulose
Drywall White
Total Asbestos None Detected
983996-013A 4-Story Guest Room 24
116-2-13
100% NonFibrous MaterialSkim Coat White
Total Asbestos None Detected
983996-014 4-Story Guest Room 22
116-2-14
93% NonFibrous Material
7% Cellulose
Drywall White
Total Asbestos None Detected

Page 5 of 7 ends

Attachment 5
PLM Asbestos Identification
Certificate of Analysis
S Tech Consulting
484-B Washington Street #401
Monterey, CA 93940
Date Received: 7/26/2023
Number of Samples: 32
Lab/Client ID/Layer Location Material Description Color Composition (%) Report Number: 983996
Project Name: Hofsas Hotel
Date Reported: 7/26/2023
Claim Number:

Project Number: 23116-2
Project Location: San Carlos 2NW of 4th
Carmel, California
Date Analyzed: 7/26/2023 PO Number:

Date Collected: 7/25/2023 Collected By: Sean Tillema
983996-014A 4-Story Guest Room 22
116-2-14
100% NonFibrous MaterialJoint Compound White
Chrysotile % <1
Total Asbestos < 1%
983996-015 4-Story Guest Room 22
116-2-15
93% NonFibrous Material
7% Cellulose
Drywall White
Total Asbestos None Detected
983996-015A 4-Story Guest Room 22
116-2-15
100% NonFibrous MaterialSkim Coat White
Total Asbestos None Detected
983996-016 4-Story Exterior
116-2-16
100% NonFibrous MaterialStucco Pink Grey
Total Asbestos None Detected
983996-017 4-Story Exterior
116-2-17
100% NonFibrous MaterialStucco Pink Grey
Total Asbestos None Detected

Page 6 of 7 ends

Attachment 5
PLM Asbestos Identification
Certificate of Analysis
S Tech Consulting
484-B Washington Street #401
Monterey, CA 93940
Date Received: 7/26/2023
Number of Samples: 32
Lab/Client ID/Layer Location Material Description Color Composition (%) Report Number: 983996
Project Name: Hofsas Hotel
Date Reported: 7/26/2023
Claim Number:

Project Number: 23116-2
Project Location: San Carlos 2NW of 4th
Carmel, California
Date Analyzed: 7/26/2023 PO Number:

Date Collected: 7/25/2023 Collected By: Sean Tillema
Denis Hau - Analyst Esmeralda Jimenez - Approved By
Note: Additional materials observed and analyzed.

Bulk sample(s) submitted was (were) analyzed in accordance with the procedure outlined in the US Federal Register 40 CFR 763, Subpart F, Appendix A; EPA-600/R-93/116 (Method for Determination of Asbestos in Building Materials), and EPA-600/M4-82-020 (US EPA Interim Method for the Determination of Asbestos in Bulk Insulation Samples). Samples were analyzed using Calibrated Visual Estimations (CVES); therefore, results may not be reliable for samples of low asbestos concentration levels. Samples of wall systems containing discrete and separable layers are analyzed separately and reported as composite unless specifically requested by the customer to report analytical results for individual layers. This report applies only to the items tested. Results are representative of the samples submitted and may not represent the entire material from which the samples were collected. “None Detected” means that no asbestos was observed in the sample. “<1%” (less than one percent) or Trace means that asbestos was observed in the sample but the concentration is below the quantifiable level of 1%. This report was issued by a NIST/NVLAP (Lab Code 201022-0) and CA Water Board ELAP (Cert. No. 2900) accredited laboratory and may not be reproduced, except in full without the expressed written consent of Patriot Environmental Laboratory Services, Inc. This report may not be used to claim product certification, approval or endorsement by NIST, NVLAP, CA-ELAP or any government agency.

ASB_Rep_2.23

Page 7 of 7 ends

Attachment 5

Limited Asbestos & Lead-Based Paint Assessment - Hofsas House, San Carlos 2NW of 4th, Carmel, California 484-b washington street monterey, ca 93940 #401 / p 831 883 8415 / f 877 984 5495 / [email protected] / stechconsulting.com Appendix B - Individual Lead XRF Data Table
Attachment 5
Limited Asbestos & Lead-Based Paint Assessment - Hofsas Hotel, San Carlos 2NW of 4th, Carmel, California 484-b washington street monterey, ca 93940 #401 / p 831 883 8415 / f 877 984 5495 / [email protected] / stechconsulting.com XRF Calibration
Assay Assay Description Purpose Standard Pass Fail Note C1 Cal-Check System Start-Up Stainless Steel 316 Device Unlocked C2 NIST Calibration #1
Lead-Based Paint XRF Calibration NIST SRM 2573 Lead Calibration Check Passed C3 NIST Calibration #2 C4 NIST Calibration #3
Project Information
Project # 23116-2
Date Tuesday, July 25, 2023
Client Hofsas Legacy LLC
Site Hofsas Hotel, San Carlos 2NW of 4th,, Carmel, California Tech Sean Tillema - CDPH #2901
Analysis X-ray Fluorescence (XRF)
484-B Washington Street, #401, Monterey, California 93940 T 831.883.8415.

XRF Data Log
Assay Area Location Component Substrate Pb (mg/cm2)
<0.01 (BDL) Pb (mg/cm2) Pb (mg/cm2)
>1.0 LBP Note
1 4-Story Building, 1st Floor Guest Room #1 Wall Drywall 0.38 2 4-Story Building, 1st Floor Guest Room #3 Wall Drywall 0.65 3 4-Story Building, 1st Floor Guest Room #5 Wall Drywall 0.53 4 4-Story Building, 2nd Floor Guest Room #26 Wall Drywall 0.31 5 4-Story Building, 2nd Floor Guest Room #24 Wall Drywall 0.09 6 4-Story Building, 2nd Floor Guest Room #22 Wall Drywall 0.12 7 4-Story Building Exterior Siding Stucco 0.19
Attachment 5
Attachment 6
Attachment 6
Attachment 6











 




!
"

 
#  









"

$
#


  





 %
$
#




















 
!








!




"&
#
$  !
'()" !
*
+,,-,./01#



 

"




 #$%&'())!
*+ 



+ #$%,%()
)!
*






-!






 "


 







./0))!)






!





)

./0










!"

1 

))!1






!









#



$

"
!





2


(* 

 34%5%05#$0%%50%%%


%5%05#$0%5$0%%%

/.# #$%&'2+ #$%,%()
)!
* #%5%05#$0%%50%%%%5%05#$0%5$0%%%

/2#.$
#6!

/.#





#



$
"
!

/.#7



 34.#))!


5/-6-773#
8))!)

./0



9





5'&%:8

-





;








!











!

!







9!



<







8

9!





"
!


#%#.







 95/#%#.
)
!




 






9




8









!









"


"









-!





/77.8.#



!

(



5*"

+ 

./0

)




 

))!



!









#




$
"
!





2


(* 

 3%5%05#$0%%50%%%

%5%05#$0
Attachment 7
%5$0%%%




!

(



#*"

 

"







-!






 "


 






./0))!)






!





)



./0










!"

1 

)
)!1





!









#



$
"
!





2


(* 

 3%5%05#$0%%50%%%

%5%05#$0%5$0%%%
/29-.8.8:/$,/.#
8))!)

!.,#%%=!
9!















/%%%=!


(
>.$
52. 3%5%05#$0%%5*

#/#%%=!


(
>.$

&?/'5%555#5$ 3%5%05#$0%5$*8 

>








!


5'&?

;



5',/8
 

))!















 








!


5',%
@!




!




?'55

5#










@!

"
!9


5'#.

5'..
5'$.


0





'













@
)!



5'$'




))!
;









5'&,








(

?

5#*


>





A
!5'&? 



@
9!

"
0 
!0
#&0!













9

9
A
8

05'&?

















:




(

&

?*8



!






;


9!



"


99
A
B



-
(

'*8
!







!



 
0(



55*

0




9




!

"
 
0 


!

!


"



"

"9


>

!








"
0
9



0 9


"




0






9



9

0








!
9;

9

5',% 

))!

0









9
09
(>


!

0 

*


!










(

/

5%*



 





"





B!8
"
!








#%%#




#%#.











)

"



5',/ 

)




0!




3





5

.(







*









9!






8





;

"


!



"



"


9

>
!

"
0
9



9




9

0





8

9!




"
!


#%#.







 95/#%#.

)
!



 






9




3







9


A
!5%#%#$
8







./0))!)



9!










)

8
!

9




!9








  

8





!





A
!#,#%#.

C
95/#%#.



Attachment 7






-


!






9>8








-



9!

9

5?#%#.





9




#&#%#.8















9>"













 

 



C
@9!5,#%#.

B "


"





!

-



"



9>




8



!


!






2!



 



 !9
> 




@ 







!





 







 



 



!





5?5$55%(




"


 

D!


*


 



 



  
 



 

  






 







 



 

 



 



  

 












  !




 


 


 









C
 95.#%#.








!9



"

-
:

!



8




!E






B

<


4 "




!







9!






8
!

9"

99




!





99


=!





!(











*




;

;!9!






8


"





-
!


>

<

!




!!

9




!







9>




!9






"







4 8



999!





!
9.

>

<

!

!9



8"
;

8
"
!










!







.
3,,#





C"
 

4






!















"
"

;"

!


!9





!




!





(*8F


!




(*4








@
G(


D!



9


C)
 "

*

9
!

!






8








 



!








!





!
D!



"



!
















! -






"
9






D!






9"

Attachment 7









(* 

48!
 


"



















!"

!







!





"








9
8








"







9!9







"

















"


05

0$


)










!

 





!

" #$% &%

!
'

() 


) (  
 #

8))!)









!9!


9







!






=!!


8







!





=!


-



!









!








!
9








8





!




=!



!



<








(5?,$5#%7;




+




!



!








0$ 

*
8







;





!


9



5'//











8


!







!9




!


;









4
5'&?!0
#&0!












!





-



0







"




8;





-









!





5',/






!





!




-

/%%%0=!0







9




"!





















./!


5',/8



)



!
./8-







8


!


9


9!












!



"
8

!






"

=!
!
9!

0 


0
!
!

"!

9



!


48

)







!



"














!




.%
8
 

))!
"









B!




9














!"



"

=!


0 


8-







8


!
!9!




"8
;



B!


!






>




>





48-




./

!







"

./







!






>




>

>




"
    


#


 

 

   





  

 


!
   
!

"

 
 
 


  


!

 




 







 

!
(5??%*8










 

))!




"

0


B!


=!

">








!









-

Attachment 7







8




!


"
"



9
"

!




"



;E!9


E!

"
;
"


"


>














=!



5?5$

H


 




48


!9








"




!





;


;
"


"


>




!
!
>







"


"

!

"!











"9


!




!


-







=!












-







78

!


>

=!



!



9

9
5?./
C0


 >

=!




48-
=!

"


0
>



!



5&







!


$58





,/


!


!

>


!
!8





"
0

>





:

"

>

!
!!



























"

0

"


!





8-








@8





"!"

9



















!






9



!9

!










9
"
9





!9



48-


!

!

I<9>















!9

;
99

9!
8






!






!


8-








) 

) #

 

*



)







!

!!








!







!

!


!!"
9





!9

!

9






!



!







!




!






>






!

!



9


!(5?5$%$%)





*









5?5$%$%(


+*


$#

 

   


  

  
 


     %&
 

  

  



  
  






'
%(
)*
&)&"
 "



+


8










<


!4
$
8-


!
&%0

!

8>


!

9




"


9




99







"
!9"

99

,-.!8
I<9>
!

9;

.%%=!

E


!

9





"
#
-




999!




Attachment 7
/-0


8-


!

;

&%%0=!0




!



8D
!

9







 

))!

!

9
,

'


.



8
9!


;

.&%=!









 

))!

!

9
#$!
"


>
1231 8




;

?%%=!







"
#
!



&
"
!

9"
9
9






'

()

) #

8









=!
"



!(5?,$%,%*4
8






!
9



!J


48



!
9








!








"

!



8





!





"





!
!


9









!




;9

!


!




"

9




9!
J


4




"

!

"



!



"




9!

!





!




"


9

!






8

!




9!












"




;
!
=!



"


48






9

!
"
 
) +


#

&
)


!





5?&#5?%(8

"


 

*
;0







9!
!
8"
;
9!



9









5?&#5?%










"




"



9







"









"

?
(



5*
;








9!
!




"


;


5/


!

!








"


%,%"
&
%
! $!
$
-
8.9#8;!9!






 

.#%%%=!
8-











/%%%0=!0













#/#%%0
=!0







.%

89



E.,#%%=!
8










-!






=!

E



;

5/...=!



5?/,?=!

"
8-









.8:-,7.#







-!







=!"


"
9






(5?$$%$%"



*8


=!

Attachment 7







9




.

&

>.$

!
9



!



#

$

998
-!






!

!







9

=!

E

;


5/...=!


5?/,?=!

"


!
"






-!









"

.'=!







!"

!9



!








!



 


"








C


!


-
8.969#!



"








!


!
9

9!




!
!!

!


!!



;





!


9
!



"


!
;

!
!!



9





!
!





!


9!



!"



9









"



!

0 "



"

(5?5$5.%!



"
*
7;
!

9!



"
";







.%



9!







"















;



!












0














!


9!



"


9



(5?5$5.%!



"
*C



!
!

"!

9
!9




>
(5?5$5?%*
8;!


9
9!



"









;
?%











$%%%=!







$%%%=!





9
9!



"


9
!
9







#%%%=!


(@;




9
9!



"

,%%%0=!0

=!
,'







*
8


E;

5/...=!


5?/,?=!
8;!



9
9!



"
,#/$K55&#%=!


,.%?K55#,/=!


"






"

$%9



=!


"9!



"




!






!
9!







-




;!9!



"






 #@







9



!





!!



;








"
@


!



!


!
!











!


!

!


!
9EE






>



9"
!






9




;




>

7;
!








4!


!





9




!


!







!

!
;
!

4!


!







>








9!







"


!









=!



!E=!
9
9!





8

#0
9!





 

/%

3


!
!







5%%%%=!








9



0
9!




=!
9
!!
5&







!
'&





9
!!
5%

9



-




!
!



<

09
>


>

8


E;

5/...=!


5?/,?=!
8;!



9

5$,,,

5$#'.
"
8









9
>


>

0 


>


#



0!


>


5
Attachment 7
8
9
9

"
9>










9
>

>
9
!
89
5/%K@


!5%K

9
>
>

!

; <
=


=
.-,




48
,8 $0

5 5/... 5$,,, 5/.. 5,$'' 5/,// L#5/'

# 5?/,? 5$#'. 5?/, 5,%?' 5.??/ 0#.%5
8

.,#%% #/'&' .,5' .#&?/ .#$,, 055#


-





;

9







!

=!




5;











"

$5=!






!
=!



!
9!















-







-
8.99>#8;!


9
9!







 

#,
;


9!






9!

-




05




9





#$
8
-

05



9










J

;!9!





#$

3
4




;


5%



9!



"


!
9




!!










;



"
9








8

9!



!


!9"





;







(
"

"*







(5?%,%#%!

)

*
7;








"






!

!

















-
7;





9



!


@








"







!

!





!
9
9!



!
-




C



!9
"!



;"


"

;

;







9!






"
;




!





-












!"

!

;



=!

!















!



-





=!


H


C


"


;
!


!


!










05


9-
"(5?%,%#%@*
!
"0;"








=!

!"



!






!
!"





" 4   

  

 


 

   


"






 




 95.#%#.











;
!
!

"



!9!






8-
9








#$0




!
"






;


-


"







&

05'




-





05


9-
"8-







?/2,#8-

9!



 



!











05 









8


 


Attachment 7
8
9>



9




-


9>

9!







!



50$4
@



9>(7






 

*4&



9>(
*43

9

3




9>(+
"
8



*43

9


!




9>( 
999!



 

*4&
&%

994
@



9>(7






 

*4&



9>(
*43

9

3




9>(



9!



 

*4&
&%

!




9>(



9!



 

*4&
&%

!



&4
@



9>(
 



05*


9>(7
*43

9

3




9>(



9!



 

*4&
&%

!




9>(



9!



 

*4&
&%

)
 

))!43


2.9 9-
.,#@



-
:




0
>

=!




!
9"!






+ 
@






!

)

+

!9

7


 95.#%#.

!
"

















>

>





!

"
!



 











<;










9


9



"

!











;


8
"
!
9
!



!9"




 





8





);

8




!





6

8"

(68*

 >




-
(



,*
6

8"

(68*


"

"(C
*





!





7
"



M!


(7M*8
!
9

./0






0










!





!




!

9




"




!
















"



9!

!
"


!

!


!












!










8"

!






"






"










!


!9

"


9;


9


8);





E
;


>












!






>>






!
;

'

>


'


!

>

!
!"


!



#'#%#.(

!
*

##%#.(8!
*




;


>








8!"
"
"
!





!9"

>

0

!


>
C#/
0
>




5&
!

8!


#%



!
8


!


;



0
>


!





8







!9




"











9




!















>












Attachment 7
-
,/
0
>


;

!


!9
0
(#/*

!

=!
>

($5*
".89-.82.9#8










!


!

>

4 58;!






"
9"
!


!

>






!9





>



9


"
9"
;











"!

!











48




"



>


!
!



 



,,$5B8



"
!



&,'B8-







#+


!

>



9

!




=!

9>









9
"

-!




9>



9
"




+


!








"
!

!






;











=!


-




48
>


!
!
!








9>




!







7;




"



!!


9
"










9







"

.,=!








=!

9>
9















.8


"
"



!


!







;
"





5%


"








>





;
5%





5%




"




8

"








;
#&

 "






"
!






"
"
!
9






9





!




48
5%


"

 





"&



8
;
#$

!

9


#.

8
"

!

9




6

!

;


8
"
!






8-







$D


9"





"

9!

0!;!




"




!






!

9


!

0 

!



!

>

"9


99

!




 !




;!




9!











-









0
0






>9



!9
6












!


!





9"




!9

 


@ 






!



8
;


9

!



"!







!

9








"









>

!



4





"

.?=!




















!
9!





%$

%,
%-

 

"
48


!
=!=!













;





!9-








!
"
9



5?&/ 

"
89



"









-




!

"

";






N




-
-!


!




(5?5$5%% 

"


"





*
Attachment 7
"




"




-


=!













-



"

";








-
"







!E







9

98

5?H


)
"





!









!
!

9-
"
 -



9
"
!










!






!9-




"




=!!9


!


-

"
"


!
!





=!!
"
!9
"





-!



9



"



( *



!


=!






"













>

-


9!9-


 =!







( *


>




"
"





!



"





-


) 


 







5





9
















9!













!

9














9!







9!









;!


#











9

9!
9

0

!







9


=!

!!













!




9
"
9
!



C







9









7=!


5 

"



=!

!9!














"





=!



9


!9
"

"9



!



!=!

!9-




"
7;





=!



9






!
"


"





!9

(*($*







=!

!






;




=!!
9!





#




"



=!



9





"


!9


00



-



!
!9







4











"9


!9

9

9






9





!




!
!
C

2



4 




!


9!



"


9



(5?5$5.%!



"
*C



!
!

"!

9
!9




>
(5?5$5?%*



5?5$5/%(



*=!











9"








5?.$



8




=!



"





4
Attachment 7
5
!&%


=!





9









!



"



!


9



!





"










9




!






"

!


#&



=!















"





!
!


0



<




>






"9

#!







!!

05




"
!










9


"!












-







4



"

559


!

=!


!9



"







!
9!





!9
"

4 "


-

"
"

!9










!





!
"



!9


00

-



9!















"














>

>




!
!"








"



!

(5?5$5'% !9
"

*






"

.&=!
!9



"!9
"






!
9!







) &).
 

/




-
9!





;



7
"



M!



(7M*


7M
!







"




!


!!





5&..#(

.#*N


 "


 -
8-


!





./0







!



./0




=!

.#;

8

-






!
!!
!




!

!












"







;



;

;
!!




5&.%%#
7M
D!





#







50
!

+
7 78




#0
!

 7
D3767




.0@

 






9

0)C87O>





$0 

+ 
6$




&0 

3
"




,0 -


%.%&#%#$O"%5




?08

!


)

68

 >



550#?0#.

Attachment 7

CITY OF CARMEL-BY-THE-SEA

PLANNING COMMISSION

PLANNING COMMISSION RESOLUTION NO. 2024-XXX-PC

A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARMEL-BY-THE-SEA

APPROVING A USE PERMIT FOR THE CARMEL LEGACY HOTEL, THE HISTORIC DONNA HOFSAS HOUSE, AND ASSOCIATED ACCESSORY USES LOCATED ON SAN CARLOS STREET 2 NORTHWEST OF 4TH AVENUE APN: 010-124-001-000 and 010-124-014-000

WHEREAS, on March 22, 2024, Eric Miller Architects, Inc. (“Applicant”) submitted Use Permit application UP 24-060 (Hofsas House, Inc.) described herein as (“Application”) on behalf of Hofsas House, Inc. (“Owner”) for the Carmel Legacy Hotel, conversion of the historic Donna Hofsas House from a manager’s unit to two apartments, and the addition of accessory uses both within the hotel and the historic house; and
WHEREAS, the Application has been submitted for two legal lots of record totaling 36,200 square feet located on San Carlos Street 2 northwest of 4th Avenue in the Residential and Limited Commercial (RC) District (Block 34, Lots 1, 3, 5, por. of 7, por. of 8, 9, 10, por. of 11, 12, 14); and WHEREAS, the Applicant is requesting to demolish the Hofsas House Hotel, an approximately 15,762-square-foot 38-room hotel, and construct the Carmel Legacy Hotel, a 32,466-square-foot 38-room hotel, convert the historic Donna Hofsas House from a managers unit to two apartments, and establish hotel-related accessory uses; and WHEREAS, in accordance with Carmel Municipal Code (CMC) Section 17.14.030 (Land Use Regulations), Hotels and Motels in the RC District require a conditional use permit; and WHEREAS, on March 29, 2024, a notice of the public hearing scheduled for April 10, 2024, was published in the Carmel Pine Cone in compliance with State law (California Government Code 65091) and mailed to owners of real property within a 300-foot radius of the project indicating the date and time of the public hearing; and
WHEREAS, on or before March 31, 2024, the Applicant posted the public notice on the project site and hand-delivered a copy of the public notice to each property within a 100-foot radius of the project site indicating the date and time of the public hearing; and WHEREAS, on or before April 5, 2024, the meeting agenda was posted in three locations in compliance with State law indicating the date and time of the public hearing; and WHEREAS, on April 10, 2024, the Planning Commission held a duly noticed public hearing to receive public testimony regarding the Use Permit, including, without limitation, the information provided to the Planning Commission by City staff and through public testimony on the project; and
Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 2 of 6 ends

WHEREAS, the California Environmental Quality Act (California Public Resources Code §§ 21000, et seq., “CEQA”), together with State Guidelines (14 California Code Regulations §§ 15000, et seq., the “CEQA Guidelines”) and City Environmental Regulations (CMC 17.60) require that certain projects be reviewed for environmental impacts and that environmental documents be prepared; and
WHEREAS, the Planning Commission found that pursuant to CEQA regulations, the Application is categorically exempt under Section 15332 (Class 32) – Infill Development Projects, and no exceptions to the exemption exist pursuant to section 15300.2 of the CEQA Guidelines; and
WHEREAS, this Resolution and its findings are made based upon the evidence presented to the Commission at the hearing date, including, without limitation, the staff report and attachments submitted by the Community Planning and Building Department; and WHEREAS, the Planning Commission did hear and consider all said reports, attachments, recommendations, and testimony herein above set forth and used their independent judgment to evaluate the project; and
WHEREAS, the facts set forth in the recitals are true and correct and are incorporated herein by reference.

NOW THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Carmel-ByThe-Sea does hereby make the following findings and determinations regarding the Use Permit:

FINDINGS REQUIRED FOR USE PERMIT APPROVAL (CMC 17.64.010 & 17.64.020) For each of the required findings listed below, the staff has indicated whether the application, either as proposed or with conditions, supports adopting the findings. For all findings checked "no," the staff report discusses the issues to facilitate the Planning Commission's decisionmaking. Findings checked "yes," depending on the issues, may or may not be discussed in the report.

Municipal Code Findings: CMC 17.64.010 YES NO

1. That the proposed use will not be in conflict with the City’s General Plan. ᤯

2. That the proposed use will comply with all zoning standards applicable to the use and zoning district.
᤯

3. That granting the use permit will not set a precedent for the approval of similar uses whose incremental effect will be detrimental to the City, or will be in conflict with the General Plan.
᤯

4. That the proposed use will not make excessive demands on the provision of public services, including water supply, sewer capacity, energy supply, communication facilities, police protection, and fire protection.
᤯

5. That the proposed use will not be injurious to public health, safety or welfare. ᤯

6. That the proposed use will be compatible with surrounding land uses and will not conflict with the purpose established for the district within which it will be located. ᤯
Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 3 of 6 ends

7. That the proposed use will not generate adverse impacts affecting health, safety, or welfare of neighboring properties or uses.
᤯
Municipal Code Findings: CMC 17.64.020 YES NO
A. That allowing the proposed use will not conflict with the City’s goal of achieving and maintaining a balanced mix of uses that serve the needs of both local and nonlocal populations.
᤯
B. That proposed use will provide adequate ingress and egress to and from the proposed location.
᤯
C. That the capacity of surrounding streets is adequate to serve the automobile and delivery truck traffic generated by the proposed use.
᤯
Municipal Code Findings: CMC 17.64.120 YES NO
A. That the motel or hotel was in existence and lawfully established prior to April 1988 and has remained in operation since that time. That the proposed use will not increase the number of lodging units in existence as of that date. ᤯
B. That the proposed use will be operated as a commercial business offering transient lodging for guests and visitors. That the use will maintain living quarters occupied by a full-time manager on-site, if such occupancy was previously established as part of the use.
᤯
C. That the minimum number of units on the site is five. That, except for the manager’s unit, no units shall contain kitchens or similar facilities for cooking food. ᤯
D. That, when reconstruction is involved, a site plan has been approved through the design review process that maximizes usable open space, minimizes unrelieved expanses of pavement devoted to parking and conforms in all respects to the commercial design requirements in Chapter 17.14 CMC, Commercial Zoning Districts.
᤯
E. That the use meets all parking requirements for all uses on the site established by Chapter 17.38 CMC, Off-Street Parking Requirements.
᤯
F. That incidental service uses provided by the motel, that are not otherwise allowed within the land use district, will be limited to use by motel occupants only and will not be made available to the general public.
᤯
BE IT FURTHER RESOLVED that the Planning Commission of the City of Carmel-by-the-Sea does hereby approve the Use Permit application UP 24-060 (Hofsas House, Inc) for the demolition of the 38-room Hofsas House Hotel and construction of the 38-room Carmel Legacy Hotel, conversion of the historic Donna Hofsas House from a manager’s unit to hotel rooms, and the addition of accessory uses both within the hotel and the historic house located on San Carlos Street 2 northwest of 4th Avenue (Block 34, Lots 1, 3, 5, por. of 7, por. of 8, 9, 10, por. of 11, 12, 14, APN 010-124-001 and 010-124-014) subject to the Conditions of Approval below:

CONDITIONS OF APPROVAL
No. Standard Conditions

1. Authorization. Approval of Use Permit application UP 24-060 (Hofsas House, Inc) authorizes a 38-room hotel, two apartments, and associated hotel accessory uses ᤯
Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 4 of 6 ends

located on San Carlos Street 2 northwest of 4th Avenue, in the Residential & Limited Commercial (RC) District as depicted in the application, plans and associated documents prepared by Eric Miller Architects approved by the Planning Commission on April 10, 2024, stamped approved and on file in the Community Planning & Building Department, unless modified by the conditions of approval contained herein.

2. Codes and Ordinances. The project shall conform to all Residential & Limited Commercial (RC) District requirements. All adopted building and fire codes shall be adhered to when preparing the working drawings. If any codes or ordinances require design elements to be changed, or if any other changes are requested when such plans are submitted, such changes may require additional environmental review and subsequent approval by the Planning Commission.
᤯

3. Water Use. Approval of this application does not permit an increase in water use on the project site without adequate supply. Should the Monterey Peninsula Water Management District determine that adequate water is not available for this site, this permit will be scheduled for reconsideration, and appropriate findings prepared for review and adoption by the Planning Commission.
᤯

4. Modifications. The applicant shall submit in writing, with revised plans, to the Community Planning and Building staff any proposed changes to the approved project plans prior to incorporating those changes. If the applicant changes the project without first obtaining City approval, the applicant will be required to submit the change in writing, with revised plans, within 2 weeks of the City being notified.

A cease work order may be issued any time at the discretion of the Director of Community Planning and Building until: a) either the Planning Commission or Staff has approved the change, or b) the property owner has eliminated the change and submitted the proposed change in writing, with revised plans, for review. The project will be reviewed for its compliance to the approved plans prior to final inspection. ᤯

5. Indemnification. The applicant agrees, at his or her sole expense, to defend, indemnify, and hold harmless the City, its public officials, officers, employees, and assigns, from any liability; and shall reimburse the City for any expense incurred, resulting from, or in connection with any project approvals. This includes any appeal, claim, suit, or other legal proceeding, to attack, set aside, void, or annul any project approval. The City shall promptly notify the applicant of any legal proceeding, and shall cooperate fully in the defense. The City may, at its sole discretion, participate in any such legal action, but participation shall not relieve the applicant of any obligation under this condition. Should any party bring any legal action in connection with this project, the Superior Court of the County of Monterey, California, shall be the situs and have jurisdiction for the resolution of all such actions by the parties hereto.
᤯

6. Conditions of Approval. All conditions of approval for the Planning permit(s) shall be printed on a full-size sheet and included with the construction plan set submitted to the Building Safety Division.
᤯

SPECIAL CONDITIONS
Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 5 of 6 ends

7. Permit Validity. In accordance with CMC Section 17.52.170.B (General Limits), the Planning Commission extends the time limit on the commercial use permit from 6 months to 18 months to run concurrently with the associated commercial Design Review application. In accordance with CMC 17.52.170.C (Time Extensions), the Planning Commission may grant one 18-month extension of the commercial use permit if the conditions surrounding the original approval have not changed, and the General Plan, Municipal Code, or Local Coastal Program has not been amended in a manner which causes the approval to be inconsistent with these plans or codes. ᤯

8. Hotel Operations. In accordance with CMC 17.14.040.M (Hotels and Motels), hotels and motels may include minor accessory uses such as light meals and refreshments for guests only, with or without separate remuneration. If such accessory uses are available to the general public, they must be allowed uses within the underlying land use district and must meet all design, parking, and land use regulations established for the use.
᤯

9. Hotel Accessory Uses. The following hotel accessory uses are approved as part of this commercial business use permit:

Restaurant/Dining Room:
x Up to 50 seats for guests and their family/friends
x Hours of Operation: 7 am to 10 pm daily
Café/Bakery:
x 300 square feet (approximately)
x Hours of Operation: 7 am to 5 pm daily
Gym/Fitness Center:
x 500 square feet (approximately)
x Hours of Operation: 6 am to 9 pm daily
Business Center:
x 350 square feet (approximately)
Spa & Salon:
x 700 square feet (approximately)
x Hours of Operation: By appointment
Amendments: The Community Planning and Building Director shall have the authority to approve minor modifications to the accessory uses. Any modification that, in the opinion of the Director, has the potential to negatively impact surrounding uses shall be referred to the Planning Commission for review. ᤯

10. Apartments. Two apartments are permitted and shall contain complete living, sleeping, and bathing facilities.

Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 6 of 6 ends

11. Hotel Room Kitchens. In accordance with the findings for approval (CMC 17.64.120), except for the manager’s unit, no hotel units shall contain kitchens or similar facilities for cooking food. CMC 17.70 defines a kitchen as, Any room or any part of a room designed, built, equipped, used, or intended to be used for the preparation of food and dishwashing, whether or not said room contains a cookstove or any other cooking appliance. A dining room, alcove, or similar room adjacent to or connected with a kitchen in which toasters, grills, percolators, and similar appliances are used shall not be deemed a kitchen.
᤯

12. Parking. The hotel shall provide on-site parking equal to 1 parking space per rental unit, including any manager's unit, plus 1.5 spaces per permanent residential use (apartment) for a total of 41 on-site parking spaces. No additional parking shall be required for accessory hotel uses that are limited to hotel guests. ᤯
Acknowledgment and acceptance of conditions of approval. ______________________________ ___________________________ __________ Property Owner Signature Printed Name Date
______________________________ ___________________________ __________ Applicant Signature Printed Name Date

PASSED, APPROVED, AND ADOPTED BY THE PLANNING COMMISSION OF THE CITY OF CARMEL-BY-THE-SEA this 10th day of April 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

APPROVED: ATTEST:

_________________________ _________________________
Michael LePage Leah Young
Chair Planning Commission Secretary
Attachment 7 $WWDFKPHQW

CITY OF CARMEL-BY-THE-SEA

PLANNING COMMISSION

PLANNING COMMISSION RESOLUTION NO. 2024-XXX-PC

A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARMEL-BY-THE-SEA

APPROVING A DESIGN REVIEW AND ASSOCIATED COASTAL DEVELOPMENT PERMIT FOR THE CARMEL LEGACY HOTEL LOCATED ON SAN CARLOS STREET 2 NORTHWEST OF 4TH AVENUE APN: 010-124-001-000 and 010-124-014-000

WHEREAS, on March 12, 2024, Eric Miller Architects, Inc. (“Applicant”) submitted a Design Review application DR 24-059 (Hofsas House, Inc.) described herein as (“Application”) on behalf of Hofsas House, Inc. (“Owner”) for the Carmel Legacy Hotel, conversion of the historic Donna Hofsas House from a manager’s unit to two apartments, and the addition of accessory uses both within the hotel and the historic house; and
WHEREAS, the Application has been submitted for two legal lots of record totaling 36,200 square feet located on San Carlos Street 2 northwest of 4th Avenue in the Residential and Limited Commercial (RC) District (Block 34, Lots 1, 3, 5, por. of 7, por. of 8, 9, 10, por. of 11, 12, 14); and WHEREAS, the Applicant is requesting to demolish the Hofsas House Hotel, an approximately 15,762-square-foot 38-room hotel, and construct the Carmel Legacy Hotel, a 32,466-square-foot 38-room hotel, convert the historic Donna Hofsas House from a managers unit to two apartments, and establish hotel-related accessory uses; and WHEREAS, in accordance with Carmel Municipal Code (CMC) Section 17.58.030 (Commercial Design Review), new construction, alterations, rebuilds, additions, and demolitions require approval of a Residential Track Two Design Study by the Planning Commission; and WHEREAS, a Coastal Development Permit is also required in accordance with CMC

17.52.090 (Coastal Development Permit Required); and
WHEREAS, on January 26th and October 18th, 2023, the applicant and the hotel owner/operator hosted two meetings with the community, and on May 17th and May 25th, 2023, hosted two meetings with the Carmel Chamber of Commerce to present the project to the community and solicit feedback; and
WHEREAS, on February 2, 2023, the applicant submitted Conceptual Review application CR 23-097 (Hofsas House, Inc.) for the demolition of the Hofsas House Hotel and construction of a new hotel known as the Carmel Legacy Hotel; and
WHEREAS, on December 13, 2023, a conceptual design of the project was presented to the Planning Commission, and feedback received from the public and the Commission was incorporated into the project; and
Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 2 of 12 ends

WHEREAS, on December 18, 2023, the Historic Resources Board issued a Determination of Ineligibility for the Hofsas House Hotel, finding it did not meet the criteria for listing as a historic resource; and
WHEREAS, also on December 18, 2023, the Historic Resources Board issued a Determination of Eligibility for the Donna Hofsas House, finding it met the criteria for listing as a historically significant building; and
WHEREAS, on March 29, 2024, a notice of the public hearing scheduled for April 10, 2024, was published in the Carmel Pine Cone in compliance with State law (California Government Code 65091) and mailed to owners of real property within a 300-foot radius of the project indicating the date and time of the public hearing; and
WHEREAS, on or before March 31, 2024, the Applicant posted the public notice on the project site and hand-delivered a copy of the public notice to each property within a 100-foot radius of the project site indicating the date and time of the public hearing; and WHEREAS, on or before April 5, 2024, the meeting agenda was posted in three locations in compliance with State law indicating the date and time of the public hearing; and WHEREAS, on April 10, 2024, the Planning Commission held a duly noticed public hearing to receive public testimony regarding the commercial design review, including, without limitation, the information provided to the Planning Commission by City staff and through public testimony on the final design of the project; and
WHEREAS, the California Environmental Quality Act (California Public Resources Code §§ 21000, et seq., “CEQA”), together with State Guidelines (14 California Code Regulations §§ 15000, et seq., the “CEQA Guidelines”) and City Environmental Regulations (CMC 17.60) require that certain projects be reviewed for environmental impacts and that environmental documents be prepared; and
WHEREAS, the Planning Commission found that pursuant to CEQA regulations, the Application is categorically exempt under Section 15332 (Class 32) – Infill Development Projects, and no exceptions to the exemption exist pursuant to section 15300.2 of the CEQA Guidelines; and
WHEREAS, this Resolution and its findings are made based upon the evidence presented to the Commission at the hearing date, including, without limitation, the staff report and attachments submitted by the Community Planning and Building Department; and Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 3 of 12 ends

WHEREAS, the Planning Commission did hear and consider all said reports, attachments, recommendations, and testimony herein above set forth and used their independent judgment to evaluate the project; and
WHEREAS, the facts set forth in the recitals are true and correct and are incorporated herein by reference.

NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of CarmelBy-The-Sea does hereby make the following findings and determinations regarding the Commercial Design Review:

FINDINGS REQUIRED FOR DESIGN STUDY APPROVAL
For each of the required findings listed below, the staff has indicated whether the application supports adopting the findings, either as proposed or with conditions. For all findings checked "no," the staff report discusses the issues to facilitate the Planning Commission’s decisionmaking. Findings checked "yes" may or may not be discussed in the report, depending on the issues.

CMC 17.58.060 Design Review Approval Findings YES NO
Conforms to the applicable policies of the General Plan and the Local Coastal Program.
ط
Complies with all applicable provisions of Carmel Municipal Code. ط Is consistent with applicable adopted design review guidelines. ط NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of CarmelBy-The-Sea does hereby make the following findings and determinations regarding the Coastal Development Permit:

FINDINGS REQUIRED FOR COASTAL DEVELOPMENT PERMITS
For each of the required findings listed below, the staff has indicated whether the application supports adopting the findings, either as proposed or with conditions. For all findings checked "no," the staff report discusses the issues to facilitate the Planning Commission’s decisionmaking. Findings checked "yes" may or may not be discussed in the report, depending on the issues.

CMC 17.64.010.B, Coastal Development Permits YES NO

1. The project, as described in the application and accompanying materials, as modified by any conditions of approval, conforms with the certified City of Carmelby-the-Sea Local Coastal Program. ط

2. If the project is located between the first public road and the sea, the project conforms with the public access and recreation policies of Chapter 3 of the Coastal Act of 1976 (commencing with Sections 30200 of the Public Resources Code). ط

BE IT FURTHER RESOLVED that the Planning Commission of the City of Carmel-by-the-Sea does hereby APPROVE the Commercial Design Review application DR 24-059 (Hofsas House, Inc.) Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 4 of 12 ends

to demolish the Hofsas House Hotel, an approximately 15,762-square-foot 38-room hotel, and construct the Carmel Legacy Hotel, a 32,466-square-foot 38-room hotel, convert the historic Donna Hofsas House from a managers unit to two apartments, and establish hotel-related accessory uses located on San Carlos Street 2 northwest of 4th Avenue (Block 34, Lots 1, 3, 5, por. of 7, por. of 8, 9, 10, por. of 11, 12, 14, APN 010-124-001 and 010-124-014), subject to the following Conditions of Approval:

CONDITIONS OF APPROVAL
No. Standard Conditions

1. Authorization. This approval of Design Review application DR 24-059 (Hofsas House, Inc.) authorizes the demolition of the 38-room Hofsas House Hotel, construction of the 38- room Carmel Legacy Hotel, and conversion of the historic Donna Hofsas House from a manager’s unit to two apartments. The project site is located on San Carlos Street 2, southwest of 4th Avenue in the Residential and Limited Commercial (RC) District as depicted in the plans prepared by Eric Miller Architects approved by the Planning Commission on April 10, 2024, and stamped approved and on file in the Community Planning & Building Department unless modified by the conditions of approval contained herein.

This Design Review approval does not include any exterior modifications to the historic Donna Hofsas House. Any exterior change to the historic Donna Hofsas House shall be submitted under a separate Design Review application to the Community Planning and Building Department and shall comply with Carmel Municipal Code Chapter 17.32 (Historic Preservation).

2. Codes and Ordinances. The project shall be constructed in conformance with all requirements of the Residential & Limited Commercial (RC) District and Archaeological Significance (AS) Overlay District. All adopted building and fire codes shall be adhered to when preparing the working drawings. If any codes or ordinances require design elements to be changed, or if any other changes are requested when such plans are submitted, such changes may require additional environmental review and subsequent approval by the Planning Commission.

3. Permit Validity. In accordance with CMC Section 17.52.170 (Time Limits on Approvals and Denials), a commercial design review approval remains valid for 18 months from the date of action. The project must be implemented during this time, or the approval becomes void. Implementation is effected by erecting, installing, or beginning the installation of the improvement authorized by the permit, as determined by the Director. Extensions to this approval may be granted consistent with CMC 17.52.170.C.

4. Water Use. Approval of this application does not permit an increase in water use on the project site without adequate supply. Should the Monterey Peninsula Water Management District determine that adequate water is unavailable for this site, this permit will be scheduled for reconsideration, and appropriate findings will be prepared for review and adoption by the Planning Commission.

Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 5 of 12 ends

5. Setback and Height Certifications. A State licensed surveyor shall survey and certify the following in writing:
x The footing locations are in conformance with the approved plans prior to footing/foundation inspection;
x The roof heights and plate heights of each building are in conformance with the approved plans prior to the roof sheathing inspection. Roofs and plates shall not exceed the elevation points as identified in the approved project plans, and the roofs include an appropriate allowance for roofing material thickness.

Written certifications prepared, sealed, and signed by the surveyor shall be provided prior to footing/foundation inspection and roof sheathing inspection. In the event that multiple footing/foundation pours are required, a survey letter shall be submitted for each separate section.

6. Service Laterals. Prior to final inspection, all electrical service laterals to any new building or structure, or to any building or structure being remodeled when such remodeling requires the relocation or replacement of the main service equipment, shall be placed underground on the premises upon which the building or structure is located.

Undergrounding will not be required when the project valuation is less than $200,000, or the City Forester determines that undergrounding will damage or destroy significant trees(s) (CMC 15.36.020).

7. Utility Meter Locations. The placement of all utility meters shall be screened from public view to the satisfaction of the Community Planning & Building Director. Before changing the location of any utility meter, the Community Planning and Building Director or designee must give written approval.

8. Modifications. The Applicant shall submit in writing, with revised plans, to the Community Planning and Building staff any proposed changes to the approved project plans prior to incorporating those changes. If the Applicant changes the project without first obtaining City approval, the Applicant will be required to submit the change in writing, with revised plans, within two weeks of the City being notified. A cease work order may be issued at any time at the discretion of the Director of Community Planning and Building until a) either the Planning Commission or Staff has approved the change, or b) the property owner has eliminated the change and submitted the proposed change in writing, with revised plans, for review. The project will be reviewed for its compliance with the approved plans prior to the final inspection.

9. Exterior Revisions to Planning Approval Form. All proposed modifications that affect the exterior appearance of the building or site elements shall be submitted on the “Revisions to Planning Approval” form on file in the Community Planning and Building Department.

Any modification incorporated into the construction drawings not listed on this form shall not be deemed approved upon issuance of a building permit.

10. Conflicts Between Planning Approvals and Construction Plans. It shall be the responsibility of the Owner, Applicant, and Contractor(s) to ensure consistency between the project plans approved by the Planning Staff, the Planning Commission, or the City Council on appeal and the construction plans submitted to the Building Division as part of the Building Permit review. Where inconsistencies between the Planning approval and the Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 6 of 12 ends

construction plans exist, the Planning approval shall govern unless otherwise approved in writing by the Community Planning & Building Director or their designee.

When changes or modifications to the project are proposed, the Applicant shall clearly list and highlight each proposed change and bring each change to the City’s attention.

Changes to the project incorporated into the construction drawings that were not clearly listed or identified as a proposed change shall not be considered an approved change.

Should conflicts exist between the originally approved project plans and the issued construction drawings that were not explicitly identified as a proposed change, the plans approved as part of the Planning Department Review, including any Conditions of Approval, shall prevail.

11. Exterior Lighting. Prior to the issuance of a building permit, the Applicant shall include in the construction drawings a comprehensive lighting plan including all exterior light fixtures and the manufacturer’s specifications, including illumination information. All fixtures shall be shielded and down-facing.

Exterior wall-mounted lighting shall be limited to 25 watts or less (incandescent equivalent or 375 lumens) per fixture and shall be installed no higher than 10 feet above the ground or walking surface.

Landscape lighting shall not exceed 18 inches above the ground nor more than 15 watts (incandescent equivalent or 225 lumens) per fixture and shall be spaced no closer than 10 feet apart. Landscape lighting shall not be used as accent lighting, nor shall it be used to illuminate trees, walls, or fences. The purpose of landscape lighting is to safely illuminate walkways and entrances to the subject property and outdoor living spaces.

12. Stone Facades (including chimneys). Prior to the issuance of a building permit, the Applicant shall identify the masonry pattern for all stonework in the construction drawings. Stone facades shall be installed in a broken course/random or similar masonry pattern. Setting the stones vertically on their face in a cobweb pattern shall not be permitted. All stonework shall be wrapped around building corners and terminated at an inside corner or a logical stopping point that provides a finished appearance. Termination of stonework shall be subject to review and approval by the Community Planning & Building Director or their designee.

13. Wood Frame Windows. Prior to the issuance of a building permit, the Applicant shall include the manufacturer’s specifications for the approved wood frame windows in the construction drawings. Window material shall be consistent throughout the project.

Windows approved with divided lights shall appear to be true divided lights, including internal and external mullions and muntins on insulated windows. Any window pane dividers that are snap-in or otherwise superficially applied are not permitted. The painted finish shall be matte or low gloss.

14. Indemnification. The Applicant agrees, at his or her sole expense, to defend, indemnify, and hold harmless the City, its public officials, officers, employees, and assigns from any liability; and shall reimburse the City for any expense incurred, resulting from, or in Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 7 of 12 ends

connection with any project approvals. This includes any appeal, claim, suit, or other legal proceedings to attack, set aside, void, or annul any project approval. The City shall promptly notify the Applicant of any legal proceeding and cooperate fully in the defense.

The City may, at its sole discretion, participate in any such legal action, but participation shall not relieve the Applicant of any obligation under this condition. Should any party bring any legal action in connection with this project, the Superior Court of the County of Monterey, California, shall be the situs and have jurisdiction for resolving all such actions by the parties hereto.

15. Hazardous Materials Waste Survey. Prior to the issuance of a demolition permit, the Applicant shall submit a hazardous materials waste survey to the Building Division in conformance with the Monterey Bay Unified Air Pollution Control District.

16. Archaeological Report. Prior to the issuance of a building permit, the Applicant shall submit an archaeological reconnaissance report prepared by a qualified archaeologist or another person(s) meeting the standards of the State Office of Historic Preservation. The Applicant shall adhere to any recommendations set forth in the archaeological report. All new construction involving excavation shall immediately cease if materials of archaeological significance are discovered on the site and shall not be permitted to recommence until a mitigation and monitoring plan is approved by the Planning Commission.

17. Cultural Resources. Throughout construction, all excavation activities shall immediately cease if cultural resources are discovered on the site, and the Applicant or his/her agent on the site shall immediately notify the City of Carmel Community Planning & Building Department within 24 hours. Work shall not recommence until such resources are properly evaluated for significance by a qualified archaeologist. If the resources are determined to be significant, prior to the resumption of work, a mitigation and monitoring plan shall be prepared by a qualified archaeologist and reviewed and approved by the City of Carmel Community Planning and Building Director.

If any human remains are found at any time during construction, work shall stop, and the applicant or his/her agent on the site shall immediately notify the Monterey County Coroner in compliance with applicable State requirements (California Public Resources Code (PRC) Section 5097.98).

18. Truck Haul Route. Prior to the issuance of a building permit, the Applicant shall submit for review and approval by the Community Planning & Building Director, in consultation with the Public Works and Public Safety Departments, a truck-haul route and any necessary traffic control measures for the grading activities. The Applicant shall be responsible for ensuring adherence to the truck-haul route and implementation of any required traffic control measures.

19. USA North 811. Prior to any excavation or digging, the Applicant shall contact the appropriate regional notification center (USA North 811) at least two working days, but not more than 14 calendar days, prior to commencing that excavation or digging. No digging or excavation is authorized to occur on-site until the Applicant has obtained a Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 8 of 12 ends

Ticket Number and all utility members have positively responded to the dig request. (Visit USANorth811.org for more information)

20. Conditions of Approval. Prior to the issuance of a building permit, the Applicant shall print a copy of the Resolution adopted by the Planning Commission and signed by the property owner(s) on a full-size sheet within the construction plan set submitted to the Building Safety Division.

Landscape Conditions

21. Landscape Plan Required. Prior to the issuance of a building permit, the Applicant shall submit a landscape plan for review and approval by the Community Planning & Building Department and the City Forester. The landscape plan shall be included in the construction drawings and will be reviewed for compliance with the landscaping standards contained in the Zoning Code, including, but not limited to, the following:
1) All new landscaping shall be 75% drought-tolerant;
2) Landscaped areas shall be irrigated by a drip/sprinkler system set on a timer; and 3) The project shall meet the City’s recommended tree density standards unless otherwise approved by the City based on on-site conditions.

The landscape plan shall identify the location where new trees will be planted when new trees are required to be planted by the City code, the Forest and Beach Commission, or the Planning Commission.

22. Tree Planting Requirements. Prior to issuance of a building permit, the Applicant shall identify on the landscape plan the location, size, and species of required tree plantings.

All new trees shall be installed prior to the final inspection. Trees shall be recorded and monitored for at least five years to ensure their establishment and growth to maturity.

Trees that do not survive or are removed shall be replaced with new trees that are equivalent in size to the measured or projected growth of the original trees and shall be planted in the same location unless otherwise directed by the City Forester or Forest & Beach Commission.

23. Tree Removal Prohibited. Throughout construction, the Applicant shall protect all trees identified for preservation by methods approved by the City Forester. Trees on or adjacent to the site shall only be removed upon the approval of the City Forester or Forest and Beach Commission.

24. Tree Protection Measures. Requirements for tree preservation shall adhere to the following tree protection measures on the construction site. x Prior to grading, excavation, or construction, the developer shall clearly tag or mark all trees to be preserved.
x Excavation within 6 feet of a tree trunk is not permitted. x No attachments or wires of any kind, other than those of a protective nature, shall be attached to any tree.
x Per Municipal Code Chapter 17.48.110, no material may be stored within the dripline of a protected tree, including the drip lines of trees on neighboring parcels.

Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 9 of 12 ends

x Tree Protection Zone. The Tree Protection Zone shall be equal to dripline or 18 inches radially from the tree for every one inch of trunk diameter at 4.5 feet above the soil line, whichever is greater. A minimum of 4-foot-high transparent fencing is required unless otherwise approved by the City Forester. Tree protection shall not be resized, modified, removed, or altered in any manner without written approval. The fencing must be maintained upright and taught for the duration of the project. No more than 4 inches of wood mulch shall be installed within the Tree Protection Zone. When the Tree Protection Zone is at or within the drip line, no less than 6 inches of wood mulch shall be installed 18 inches radially from the tree for every one inch of trunk diameter at 4.5 feet above the soil line outside of the fencing.
x Structural Root Zone. The Structural Root Zone shall be 6 feet from the trunk or 6 inches radially from the tree for every one inch of trunk diameter at 4.5’ above the soil line, whichever is greater. Any excavation or changes to the grade shall be approved by the City Forester prior to work. Excavation within the Structural Root Zone shall be performed with a pneumatic excavator, hydro-vac at low pressure, or another method that does not sever roots.
x If roots greater than 2 inches in diameter or larger are encountered within the approved Structural Root Zone, the City Forester shall be contacted for approval to make any root cuts or alterations to structures to prevent roots from being damaged.
x If roots larger than 2 inches in diameter are cut without prior City Forester approval or any significant tree is endangered as a result of construction activity, the building permit will be suspended, and all work stopped until an investigation by the City Forester has been completed, and mitigation measures have been put in place.

25. Foundation Work Near Significant Trees. All foundations within 15 feet of significant trees shall be excavated by hand. If any tree roots larger than two inches (2”) are encountered during construction, the City Forester shall be contacted before cutting the roots. The City Forester may require the roots to be bridged or may authorize the roots to be cut. If roots larger than two inches (2”) in diameter are cut without prior City Forester approval or any significant tree is endangered as a result of construction activity, the building permit will be suspended and all work stopped until an investigation by the City Forester has been completed. Six inches (6”) of mulch shall be evenly spread across the inside the dripline of all trees prior to the issuance of a building permit.

Environmental Compliance Conditions

26. Drainage Plan. Prior to the issuance of a building permit, the Applicant shall submit for review and approval by the Community Planning & Building and Public Works Departments a drainage plan that meets the requirements of the City's drainage guidance, SOG 17-07. At a minimum, new and replaced impervious area drainage must be dispersed around the site rather than focused on one corner of the property; infiltration features must be sized appropriately and located at least 6 feet from neighboring properties. The drainage plan shall include information on drainage from new impervious areas and semiAttachment 7 $WWDFKPHQW Resolution No. 2024-XXX-PC

Page 10 of 12 ends

pervious areas.

27. BMP Tracking Form. Prior to issuance of a building permit, the Applicant shall submit for review and approval by the Community Planning & Building and Public Works Departments a completed BMP Tracking form.

28. Semi-Permeable Surfaces. Prior to issuance of a building permit, the Applicant shall submit for review and approval by the Community Planning & Building and Public Works Departments cross-section details for all semi-permeable surfaces.

29. Erosion and Sediment Control Plan. Prior to issuance of a building permit, the Applicant shall submit for review and approval by the Community Planning & Building and Public Works Departments an erosion and sediment control plan that includes locations and installation details for erosion and sediment control BMPs, material staging areas, and stabilized access.

30. Erosion Control in the Right-of-Way. Prior to issuance of a building permit, the Applicant shall identify on the landscape plan any natural slope within the right-of-way immediately adjacent to the property where parking is not practical. Jute netting and a droughttolerant ground cover to manage post-construction erosion control shall be installed.

Plants installed within the drip line of trees shall be selected from the City’s “List of Compatible Plants Under and Around Native Trees” in the Forest Management Plan. The Public Works Director, or their designee, may waive this requirement.

Special Conditions

31. Pre-Construction Meeting. Prior to the issuance of a building permit, the contractor overseeing the project shall schedule a pre-construction meeting with the Project Planner to review the approval conditions and expectations during construction.

32. Conditions of Approval Acknowledgement. Prior to the issuance of a building permit revision, a completed Conditions of Approval Acknowledgment form shall be included in the construction drawings. The form shall be signed by the Property Owner, Applicant, and Contractor prior to the issuance of a building permit.

33. Copper Gutters & Downspouts Not Permitted. Prior to the issuance of a building permit, the applicant shall identify the material for gutters and downspouts in the construction drawings. The use of copper for gutters and downspouts is prohibited.

34. Construction Management Plan. Prior to the issuance of a building permit, the Applicant shall submit a Construction Management Plan for review and approval by the Community Planning & Building Director.

35. Public Way Improvements. Development projects involving substantial new or replacement construction shall include improvements in the public right-of-way adjacent to the building site to coordinate the design of the development with the design of City streets, sidewalks, walkways and infrastructure improvements and to enhance the overall appearance of the community. Prior to the issuance of a building permit, the applicant shall submit for review and approval by the Community Planning & Building Department and Public Works Department a design for public way improvements on San Carlos Street.

36. Landscaping within Required Setbacks. Prior to the issuance of a building permit, the applicant shall submit for review and approval by the Community Planning & Building Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 11 of 12 ends

Department a final landscape and irrigation plan that includes landscaping within required setbacks.

37. Garage Ventilation. Garages shall be ventilated to avoid the build-up of exhaust gases.

When mechanical ventilation is used, noise mitigation measures shall be incorporated such as low-noise fans, insulated ductwork and vibration absorbing mounting systems.

Ducts shall not exhaust toward any building openings or open space on any adjoining property nor toward any on-site or off-site open space, pathway, street, place or park accessible to the public. Venting to the roof is generally preferred. Plans for underground garages shall be reviewed to ensure accessibility for Police and Fire Department personnel during emergencies. To the extent possible, utility meters, vaults and connections should be located within garages or driveways and away from pedestrian walking surfaces.

38. Kitchens or Similar Facilities for Cooking. No hotel units shall contain kitchens or similar facilities for cooking. A kitchen is defined as, Any room or any part of a room designed, built, equipped, used, or intended to be used for the preparation of food and dishwashing, whether or not said room contains a cookstove or any other cooking appliance. A dining room, alcove, or similar room adjacent to or connected with a kitchen in which toasters, grills, percolators, and similar appliances are used shall not be deemed a kitchen. (CMC

17.70)

39. Lot Line Adjustment. Prior to the issuance of a building permit, the applicant shall prepare a final record of survey map and submit it to the Community Planning and Building Department for review and recordation with the Office of Monterey County.

40. Building Coverage Analysis. Prior to the issuance of a building permit, the applicant shall prepare a comprehensive building coverage analysis including diagrams and submit it to the Community Planning and Building Department for review and approval.

41. Floor Area Reduction. Prior to the issuance of a building permit, the applicant shall submit revised plans for review and approval by the Community Planning and Building Department that demonstrate a reduction in the building square footage on Lot 1 to comply with maximum floor area standards.

Acknowledgment and acceptance of conditions of approval:
______________________________ ___________________________ __________ Property Owner Signature Printed Name Date
______________________________ ___________________________ __________ Applicant Printed Name Date

PASSED, APPROVED, AND ADOPTED BY THE PLANNING COMMISSION OF THE CITY OF CARMEL-BY-THE-SEA this 10th day of April 2024, by the following vote:

Attachment 7 $WWDFKPHQW
Resolution No. 2024-XXX-PC

Page 12 of 12 ends

AYES:

NOES:

ABSENT:

ABSTAIN:

APPROVED: ATTEST:
_________________________ _________________________
Michael LePage Leah Young
Chair Planning Commission Secretary

Attachment 7 $WWDFKPHQW

CARMEL-BY-THE-SEA

NOTICE OF INELIGIBILITY
For the Carmel Historic Resources Inventory
On December 18, 2023, the Historic Resources Board determined that the property identified below does not constitute a historic resource.

Assessor’s Parcel Number: 010-124-014 (por.) & 010-124-001 Current Owner: Hofsas House Inc
Block/Lot: 34 /5, 7, 8 (por.), 9, 11, 14, Various & 34/1 & 3 Street Location: San Carlos Street 2 NW of 4th Avenue
Lot size: 28,200 square feet (excludes Lots 10 & 12-Donna Hofsas House) Date of Construction: 1957, 1968
; The Hofsas House Hotel is not eligible under Criterion One (Event/Association) because it does not retain a high degree of integrity and is not associated with a prominent member of the business community.
; The Hofsas House Hotel is not eligible under Criterion Two (Important Person) because the property is not associated with a person who is considered significant within Carmel’s historic context. There is no indication that the hotel operator, Donna Hofsas, played an outstanding role within the tourism community when compared to her peers. Additionally, muralist Maxine Albro’s life achievements would be better represented by her own home. ; The Hofsas House Hotel is not eligible under Criterion Three (Design/Construction) because none of the architects or builders associated with the Hofsas House Hotel could claim the design or construction was a defining moment in their careers; the Bavarian-themed vernacular buildings are not recognized as significant in the city’s Historic Context Statement; and the hotel does not display a rare style of architecture. ; The Hofsas House Hotel is not eligible under Criterion Four (Information Potential), which is generally reserved for archeological sites. There is no evidence in the historical record that the Hofsas House Hotel meets the eligibility requirements for Criterion Four.

This Determination is based on the intensive survey prepared by qualified professional Margaret Clovis dated 08/2023 (11 pages) and the peer review documentation prepared by EMC Planning Group dated October 26, 2023 (attached). This Determination was subject to a ten (10) working day appeal period, which ended at 5:00 P.M. on Wednesday, January 10, 2024. No appeals were filed during the appeal period. This Determination is final and shall remain valid for a period of 5 years. ________________________________
Marnie R. Waffle, AICP
Principal Planner
Attachment 7 $WWDFKPHQW
DPR 523A (1/95) *Required Information
State of California -- The Resources Agency

DEPARTMENT OF PARKS AND RECREATION

PRIMARY RECORD
Primary # ___________________________________________
HRI # ______________________________________________
Trinomial ___________________________________________
NRHP Status Code 
Other Listings 
Review Code ______ Reviewer ______________________ Date _______________________

Page 1 of 11 ends

P1. Other Identifier: Hofsas House Hotel
*P2. Location: Not for Publication Unrestricted *a. County Monterey and (P2b and P2c or P2d. Attach a Location Map as necessary) *b. USGS 7.5’ Quad Monterey Date  T  ; R  ;  ¼ of  ¼ of Sec ; Mount Diablo B.M. c. Address San Carlos 2 NW of 4th City Carmel by the Sea Zip 93921 d. UTM: (Give more than one for large and/or linear resources) Zone  ;  mE/  mN e. Other Locational Data: (e.g., parcel #, directions to resource, elevation, etc., as appropriate)  APN 010-124-014; Blk. 34, lots 5,7,9,11 & 14; APN 010-124-001, Blk. 34, lots 1 & 3 *P3a. Description: (Describe resource and its major elements. Include design, materials, condition, alterations, size, setting and boundaries) Between 1923 and 1933, four buildings were constructed on lots 7, 9, 11, and 12 on San Carlos Street, 2 NW of Fourth Avenue. In 1943 the two-story residence on lot 9 was remodeled into apartments. In May 1948 Harry Hofsas purchased the property and then granted the cottages to his brother, Fred, and his wife Donna in July. Donna and Fred started to remodel the cottages into a complex of rental rooms and apartments. In 1956 they demolished two of the residences on lots 7 and 12 to create a parking lot. In January 1957 they built a four-story, 25-unit motel and swimming pool. In 1967 Donna built the eightunit detached North Wing on lots 1 and 3, after demolishing two apartment buildings on those parcels.

Donna Hofsas used Bavarian themed details for the 1957 hotel and remodeled the two pre-1957 cottages to match. The front elevation of the Hofsas House Hotel extends along San Carlos Street. The reception area of the southern two-story section was one of the existing buildings, as evidenced by Robert Jones’ site plan for the project. This area was enlarged to the south (continued p. 3) P5b. Description of Photo: (View,
date, accession #) Front Elevation
05/2023
*P6. Date Constructed/Age and
Sources: 1957, 1968 Historic
Prehistoric Both
Building Permits
*P7. Owner and Address:

Hofsas House Hotel
POB 1195
Carmel, CA. 93921
*P8. Recorded by: (Name,
affiliation, and address)
Meg Clovis
14024 Reservation Rd.

Salinas, CA 93908
*P9. Date Recorded: 08/2023 
*P10. Survey Type: (Describe)
Intensive
*P3b. Resource Attributes: (List attributes and codes) HP5Hotel/Motel *P4. Resources Present: Building Structure Object Site District Element of District Other (Isolates, etc.) *P11. Report Citation: (cite survey report and other sources, or enter “none.”) 2001 Carmel City-Wide Survey, DPR by Kent Seavey.

No paper records. Verbal reference and reference in the building file. *Attachments: NONE Location Map Sketch Map Continuation Sheet Building, Structure and Object Record Archaeological Record District Record Linear Feature Record Milling Station Record Rock Art Record Artifact Record Photograph Record Other (List) 
Attachment 7 $WWDFKPHQW
DPR 523B (1/95) *Required Information
State of California -- The Resources Agency

DEPARTMENT OF PARKS AND RECREATION
Primary # __________________________________________
HRI # _____________________________________________

BUILDING, STRUCTURE, AND OBJECT RECORD

Page 2 of 11 ends

*Resource Name or # (Assigned by recorder) Hofsas House Hotel B1. Historic Name: Hofsas House Hotel
B2. Common Name: Hofsas House Hotel
B3. Original Use: Hotel B4. Present Use: Hotel
*B5. Architectural Style: Bavarian-Themed Vernacular
*B6. Construction History: (Construction date, alteration, and date of alterations) BP#445: Addition to cottage (1938); BP#1016: 2- story building remodeled into apartments (1943); BP#2986: Demolish 2 residences for parking lot (1956); BP# 2996 Build 4- story hotel (1957); BP# 3058 Build swimming pool (1957); BP# 4748 Build 8-unit North Wing (1968). See p. 4 for additional permits.
*B7. Moved? x No Yes Unknown Date:  Original Location:  *B8. Related Features: Parking lot, pool
B9a. Architect: Robert R. Jones, Cleve Dayton, George Willox b. Builder: Ralph Stean, Helm & Savoldi *B10. Significance: Theme: N/A Area Carmel by the Sea
Period of Significance: N/A Property Type Building Applicable Criteria: N/A (Discuss importance in terms of historical or architectural context as defined by theme, period, and geographic scope. Address integrity.)
In 1949 Donna J. Hofsas (1902-1981) and Frederick L. Hofsas (1897-1989) moved to Carmel from Los Angeles. Donna was a film actress with Fox Studios and Fred was an accountant. Fred’s brother, Harry, granted four cottages he had purchased on San Carlos Street to the couple. Donna and Fred started remodeling the cottages into apartments. By 1951 they were renting rooms and apartments in their advertised Hofsas House Hotel. Donna managed the rentals while Frederick continued his work as an accountant. In 1957 they built a Robert Jones designed four story Bavarian-themed motel and incorporated two of the old buildings into the new complex. Fred, who was an amateur artist, designed a mosaic coat of arms for the hotel, with the creed “Otium Cum Dignitate” (Leisure with Dignity). Donna asked her friend, renowned artist Maxine Albro, to paint murals on the inside wall of the porte cochere. Donna and Fred divorced in 1960 and Donna continued to operate the Hofsas House Hotel until her death. The hotel is still owned and operated by her descendants.

Architect Robert R. Jones (1911-1989) designed the four-story motel. Born in Berkeley, Jones was educated at the University of California, Berkeley before (continued p. 6) (This space reserved for official comments.) (Sketch Map with north arrow required.)
B11. Additional Resource Attributes (List attributes and codes):
*B12. References:

Carmel Context Statement & Historic Preservation Ordinance Sacramento Bee, 9/3/2012, p. 10
Building File, Carmel Planning Dept.

National Register Bulletin 15
Polk’s City Directories, Harrison Memorial Library
U.S. Census & Voter Registration Records
TGIF Guide.com
Donna Hofsas Obit., Carmel Pine Cone, 7/16/1981, p. 26
B13. Remarks
*B14. Evaluator: Meg Clovis
*Date of Evaluation: 08/2023
Attachment 7 $WWDFKPHQW
State of California -- The Resources Agency

DEPARTMENT OF PARKS AND RECREATION

CONTINUATION SHEET
Primary #
HRI#
Trinomial
PageRI *Resource Name or # Hofsas House Hotel
*Recorded by Meg Clovis *Date 08/2023 _ Continuation † Update DPR 523L (1/95) *Required Information
P3a. Description (continued):
to create the porte cochere. A front-facing, clipped gable roof sweeps to the south to cover the porte cochere. The roof has wide, overhanging eaves and visible rafters. Pink stucco covers the exterior walls and provides contrast for the decorative half-timbering used on both floors (the buildings were originally painted beige, per the Planning Commission’s request, so they would not look as large). A plant-covered balcony extends from the second floor. Vertical diamond paned windows are used on both floors. Floral murals surround the second-floor windows. Maxine Albro’s mural of Bavarian peasants is located on the interior wall of the porte cochere.

Three, front gable dormers
are located on the 1957
portion of the San Carlos
Street elevation. Each
dormer has two small
diamond pane casement
windows that flank inset
floral murals. A chimney is
located at the intersection of
the cross gable. Pink stucco
and half-timbering covers
the exterior walls and the
Hofsas House coat of arms,
created by Fred Hofsas, is
located at intervals along
the first-floor wall.

Figure 1: Front elevation of
Hofsas House, looking
northwest from San Carlos
Street.

A steep driveway leads down from San Carlos Street to the rear and lower level of the property. The main hotel is centered between the remodeled older residences within the complex and the 1968 North Wing. Rising four stories from the parking lot, each level of the 1957 hotel has a balcony which extends across the entire floor. The balcony has a Bavarian-style, band sawn wood railing and the balcony is divided into separate porches for each room. Each room has a door onto the porch and a window.

Flights of exterior stairs connect each level.

The two-story, 1968 building to the north of the 1957 building has an L-shaped plan and cross gable roof with wide, overhanging eaves and clipped gables. Hotel rooms are located on the upper floor while a meeting room and a covered parking area are located on the ground level. The same pink stucco and half timbering is used on the exterior. Other details from the 1957 building are incorporated into the North Wing such as the gabled dormers1
, and the band sawn railings used for the exterior
 The 1968 building’s gabled dormers have murals painted between each casement window. The murals are similar to Maxine Albro’s original murals however they were not painted by her since she died in 1966. There is no record of who painted the murals for the 1968 North Wing.

Attachment 7 $WWDFKPHQW
State of California -- The Resources Agency

DEPARTMENT OF PARKS AND RECREATION

CONTINUATION SHEET
Primary #
HRI#
Trinomial
PageRI *Resource Name or # Hofsas House Hotel
*Recorded by Meg Clovis *Date 08/2023 _ Continuation † Update DPR 523L (1/95) *Required Information
walkways and balconies. To the south of the rear parking lot is a cluster of buildings that were part of the original, pre-1957 hotel complex. Pink stucco covers the exterior walls, but half timbering is not used.

A pool and large parking area (with another automobile entrance off of Dolores Street) are located on the lower level of the property. Landscaping throughout the complex is minimal except along the driveway which leads from San Carlos Street to the covered parking under the North Wing.

The Hofsas House Hotel was established when Carmel’s reputation as a tourist attraction was on the rise. Many hotels, inns, and motels were built between 1947 and 1963 and these establishments reflect a wide range of architectural styles and themes. The 1957 section of the hotel was designed by Robert Jones, who is best known for his contemporary designs. The project contractor was Ralph Stean, who specialized in post-adobe style homes. The north wing was designed by San Jose architect Cleve Dayton, the same architect who designed Donna Hofsas’ house with the parabolic roof, located off of Dolores Street. By May 1968 George Willcox had taken over the project, working with contractors Helm and Savoldi.

The Hofsas House is a conglomeration of buildings cobbled together over four decades. Following is a timeline of alterations and additions:
x May 1948: Harry Hofsas purchases cottages (currently rooms 6, 7, 8, 9, and 10) x May 1948: New basement added to two-story building on lot 9 (BP# 1604) x June 1948: Bathroom and living room addition to two-story building on lot 9 (BP# 1625) x August 1948: Two-story building’s basement remodeled into bedroom and bath on lot 9 (BP# 1660)
x 1952: Building additions (currently rooms 20, 21, 30 and 31) x March 1952: New apartments added to existing building on lot 9 (BP#2283) x May 1952: Apartment addition to lot 13 (BP# 2315)
x June 1952: Porch roof addition to Lot 11 (BP# 2337)
x December 1956: Demolition permit for two old residences to create a parking lot for hotel (BP# 2986)
x January 1957: Construction of 4-story main hotel building with 21 units, night manager’s apartment and laundry room
x May 1957: Addition of 5 units to existing 25 units (BP# 3044) x June 1957: Build swimming pool (BP# 3058)
x November 1959: Remodel bath and hallway in duplex on lot 8 (BP# 3458) x November 1967: North wing constructed with 8 units, banquet room, kitchen, and two dry saunas (BP# 4748)
x January 1968: Tar and gravel roof replaced with shakes and roof structure changed to provide 4” minimum pitch on lot 11 (BP# 4744)
x 1974: New office added over back office of the lobby and stairs redesigned from the 4th floor to the parking lot (BP# 74-101)
x June 1977: Stairs replaced on the north side of the main building (BP# 77-132) x November 1978: Repair of failed retaining wall (BP# 78-192) Attachment 7 $WWDFKPHQW
State of California -- The Resources Agency

DEPARTMENT OF PARKS AND RECREATION

CONTINUATION SHEET
Primary #
HRI#
Trinomial
PageRI *Resource Name or # Hofsas House Hotel
*Recorded by Meg Clovis *Date 08/2023 _ Continuation † Update DPR 523L (1/95) *Required Information
Figure 2: North wing looking southwest from San Carlos Street.

Figure 3: View of hotel’s porte cochere with mural and family shield, looking southwest from San Carlos Street.

Attachment 7 $WWDFKPHQW
State of California -- The Resources Agency

DEPARTMENT OF PARKS AND RECREATION

CONTINUATION SHEET
Primary #
HRI#
Trinomial
PageRI *Resource Name or # Hofsas House Hotel
*Recorded by Meg Clovis *Date 08/2023 _ Continuation † Update DPR 523L (1/95) *Required Information
B10. Significance (continued):
relocating to the Monterey Peninsula to work for architect Robert Stanton. Jones opened his own architectural firm in 1939 designing house plans for war housing and FHA apartments. By the war’s end, Jones had opened additional offices in Merced and Oxnard. On the Peninsula, his firm designed 27 canneries and reduction plants, as well as public buildings for the Monterey Peninsula Airport. His Modernist design for the Monterey Airport Administration Building won a major design award from the Smithsonian Institute. He also designed the Elks Lodge in Monterey. In Carmel he designed All Saints Episcopal Church and the Carmel Youth Center. He designed numerous residences in the area and was known for his flat-roofed, Modern style. Robert R. Jones is included in Carmel’s Historic Context Statement.

Ralph Leo Stean (1918-2004) was the contractor for the 1957 Hofsas House Hotel project. Stean was a Carmel Valley developer and contractor who worked on the Monterey Peninsula from the mid-1940s to the 1970s. Early on he specialized in building Post-Adobe residences. Ralph Stean is listed in Carmel’s Historic Context Statement.

Cleveland Dayton (1919 - 2012) prepared the preliminary plans for the North Wing, which was built in 1968. Dayton was an architect with the Creative Design Company, a San Jose firm. The North Wing’s plans were revised by George Legge Willox (1903 – 1968), a Carmel architect who is best known for his design of the Church of the Wayfarer. Born in Scotland,2 and raised in Canada, Willox graduated with a
degree in architecture from the University of Michigan. He moved to Carmel from Los Angeles and joined Robert Stanton’s firm as head designer. He eventually opened his own architectural practice.

Willox served on Carmel’s Planning Commission for fourteen years and was appointed to the California State Planning Commission by Governor “Pat” Brown. Willox is included in Carmel’s Historic Context Statement.

The contracting firm of Helm and Savoldi constructed the North Wing. Walter Helm (1914-1998) graduated in 1938 with an engineering degree from the University of Arizona. He settled in Carmel in 1945, working as a carpenter. Helm became a licensed contractor and partnered with Michigan-native and former pro-wrestler Clem Savoldi (1909 – 1999) to form the Helm-Savoldi contracting firm. Helm and Savoldi built hundreds of custom homes on the Monterey Peninsula, working with such notable architects as Henry Hill, Jon Konigshofer, and Walter Burde. Helm and Savoldi are not included in Carmel’s Historic Context Statement.
 George Willox Obituary, Carmel Pine Cone, August 20, 1968.

Attachment 7 $WWDFKPHQW
State of California -- The Resources Agency

DEPARTMENT OF PARKS AND RECREATION

CONTINUATION SHEET
Primary #
HRI#
Trinomial
PageRI *Resource Name or # Hofsas House Hotel
*Recorded by Meg Clovis *Date 08/2023 _ Continuation † Update DPR 523L (1/95) *Required Information
Donna Hofsas asked her friend Maxine Albro (1903-1966)
to paint murals on the inside wall of the porte-cochere.

She also did three paintings for the reception area.

Maxine Albro was a nationally known muralist, mosaic
artist and sculptor. She was one of America’s leading
female artists, and one of the few women commissioned
under the New Deal’s Federal Art Project. During that
time, she executed the California agricultural workers
mural in Coit Tower. She became a leader in the
California muralist movement and her work can be found
in the collections of the Smithsonian American Art
Museum, MoMA, and the National Gallery of Art, among
others. She and her husband moved to Carmel in 1938
and she lived in Carmel until her death. She was named
an honorary life member of the Carmel Art Association
and served on Carmel’s first Art Commission. Besides the Hofsas House Hotel, her work can be seen locally at Santa Catalina School.3
Figure 4: Photo of Maxine Albro courtesy of the Carmel Art Association.

In 1961 a glowing review of the Hofsas House Hotel stated:4 “Hofsas House is something new under Carmel’s sun. It’s on a curve of the road leading into the village at San Carlos and Fourth. It’s right out of a picture book with gay murals of peasants dancing under a smiling sun and diamond paned windows, touched by the flicker of patio torches. A page out of Bavaria with king sized beds, jeweled and gold telephones, a delightful, heated swimming pool sheltered from the ocean breezes, yet a view of ocean on each of its four levels.” Evaluation for Significance
Historians use National Register Bulletin 155
as a guide when evaluating a property’s significance
whether on a local, state, or national level. As a first step, to determine whether or not a property is significant, it must be evaluated within its historic context and the City of Carmel’s Historic Context Statement6
provides this context. The City of Carmel’s Historic Preservation Ordinance (Section

17.32.040) reiterates the role of National Register Bulletin 15 in the evaluation of historic resources.  Maxine Albro Obituary. Carmel Pine Cone. 7/28/1966, p. 19.  Biggs News, 11/3/1961, p. 4. 5 National Register Bulletin 15. How to Apply the National Register Criteria for Evaluation. National Park Service. 1998 6 Historic Context Statement: Carmel-by-the-Sea (Draft). Approved by the City Council December 6, 2022.

Attachment 7 $WWDFKPHQW
State of California -- The Resources Agency

DEPARTMENT OF PARKS AND RECREATION

CONTINUATION SHEET
Primary #
HRI#
Trinomial
PageRI *Resource Name or # Hofsas House Hotel
*Recorded by Meg Clovis *Date 08/2023 _ Continuation † Update DPR 523L (1/95) *Required Information
Adopted eligibility criteria are modeled on the California Register’s four criteria with the addition of specific qualifications for Criterion Three (Section 17.32.040.D).

The Hofsas House Hotel is not eligible under Criterion One (Event/Association) despite its association with the development of business and tourism in Carmel. The Hosfas House Hotel is one of dozens of tourist-serving accommodations built in Carmel during the 1950s and 1960s. Per Carmel’s Historic Context Statement, “Properties associated with business and tourism exist in abundance throughout Carmel. Significant examples should retain a high degree of integrity. Significance would be enhanced by association with prominent members of the business community and with specific businesses or business types that were pivotal in the town’s economic development” (p. 31). The Hofsas House Hotel’s significance is not enhanced by its association with Donna Hofsas, who did not distinguish herself from others in the same business (see Criterion Two).

For a property to be listed under Criterion Two (Important Person) it must be associated with a person who is considered significant within Carmel’s historic context. An individual must have made contributions or played a role that can be justified as significant and the contributions of the individual must be compared to others who were active, prosperous, or influential in the same sphere of interest.

Carmel had over fifty hotels, inns, and motels that were in operation at the same time Donna Hofsas was managing the Hofsas House Hotel. There is no indication in the historical record that Mrs. Hofsas played an outstanding role within the tourism community when compared to her peers. Maxine Albro painted the murals on the exterior walls of the Hofsas House Hotel, but her life achievements would be better represented by her own home which was located on Santa Rita between Fourth and Fifth Avenues. The Hofsas House Hotel is not eligible for listing in the Carmel Inventory of Historic Resources under Criterion Two.

Figure 5: Rear elevation of
1957 hotel looking northeast.

Attachment 7 $WWDFKPHQW
State of California -- The Resources Agency

DEPARTMENT OF PARKS AND RECREATION

CONTINUATION SHEET
Primary #
HRI#
Trinomial
Page
RI *Resource Name or # Hofsas House Hotel
*Recorded by Meg Clovis *Date 08/2023 _ Continuation † Update DPR 523L (1/95) *Required Information
A property is eligible under Criterion Three (Design/Construction) if it, “embodies the distinctive characteristics of a type, period, region or method of construction or represents the work of a master or possesses high artistic values.” Carmel’s Historic Preservation Ordinance includes additional qualifications for eligibility under Criterion Three. An historic resource eligible under California Register Criterion Three (per Carmel’s Ordinance) should meet at least one of the following four criteria:

1. Have been designed and/or constructed by an architect, designer/builder, or contractor whose work has contributed to the unique sense of time and place recognized as significant in the Historic Context Statement.

The 1958 hotel building was designed by Robert R. Jones and constructed by Ralph Stean, who are both listed in Carmel’s Historic Context Statement. Jones is best known for his contemporary designs and Stean is best known for his post-adobe residences. The 1968 North Wing was initially designed by Clevland Dayton, re-designed by George Willox, and built by Helm and Savoldi. George Willox is the only creative individual out of the three who is listed in Carmel’s Historic Context Statement. Per Bulletin 15, a property is not eligible as the work of a master simply because it was designed by a prominent architect. “The property must express a particular phase in the development in the master’s career, an aspect of his or her work, or a particular idea or theme in his or her craft.” None of the architects or builders associated with the Hofsas House Hotel could claim that the design and/or construction of this hotel was a defining moment in their careers, so this criterion is not applicable.

2. Have been designed and or constructed by a previously unrecognized architect, designer/builder, or contractor if there is substantial, factual evidence that the architect, designer/builder, or contractor contributed to one or more of the historic contexts of the City to an extent consistent with other architects, designer/builders or contractors identified within the Historic Context Statement.

This criterion is not applicable.

3. Be a good example of an architectural style or type of construction recognized as significant in the Historic Context Statement.

Bavarian-themed vernacular commercial buildings are not recognized as significant in Carmel’s Historic Context Statement.

4. Display a rare style or type for which special consideration should be given. Properties that display particularly rare architectural styles and vernacular/utilitarian types shall be given special consideration due to their particularly unusual qualities. Such rare examples, which contribute to diversity in the community, need not have been designed by known architects, designer/builders, or contractors. Rather, rare styles and types that contribute to Carmel’s unique sense of time and place shall be deemed significant.

There are several examples of vernacular style buildings with various thematic attributes in Carmel. The Hofsas House Hotel does not display a rare style of architecture and cannot be considered eligible under this criterion.

California Register Criterion Three (Design/Construction) has three parts as follows:

A property is eligible if it 1) embodies the distinctive characteristics of a type, period, region, or method of construction, 2) represents the work of a master, or 3) possesses high artistic values.

Attachment 7 $WWDFKPHQW
State of California -- The Resources Agency

DEPARTMENT OF PARKS AND RECREATION

CONTINUATION SHEET
Primary #
HRI#
Trinomial
PageRI *Resource Name or # Hofsas House Hotel
*Recorded by Meg Clovis *Date 08/2023 _ Continuation † Update DPR 523L (1/95) *Required Information
The Hofsas House Hotel does not meet the first part of California Register Criterion Three because it does not embody the distinctive characteristics of a particular style of architecture. As evidenced by the lengthy list of building permits over a four decades, the hotel complex is an assemblage of disparate components, rather than a cohesive stylistic vision.

Although designed and constructed by architects and contractors recognized as significant in Carmel’s Historic Context Statement, the Hofsas House Hotel is not representative of their best work. The hotel does not meet the second part of Criterion Three.

The Hofsas House Hotel does not meet the third part of Criterion Three because it does not possess high artistic values and it does not express aesthetic ideals or design concepts.

The California Register’s Fourth Criterion (Information Potential) is generally reserved for archeological sites. There is no evidence in the historical record that the Hofsas House Hotel meets the eligibility requirements for Criterion Four.

Integrity
Integrity is defined as the ability of a property
to convey its significance. There are seven
aspects of integrity including location, design,
setting, materials, workmanship, feeling, and
association. To retain integrity a property must
retain several if not most aspects. If a property
does not meet any of the eligibility criteria, then
integrity is not a consideration as part of the
evaluation for historical significance.

Figure 6: North wing looking northeast.

Attachment 7 $WWDFKPHQW
State of California -- The Resources Agency

DEPARTMENT OF PARKS AND RECREATION

CONTINUATION SHEET
Primary #
HRI#
Trinomial
PageRI *Resource Name or # Hofsas House Hotel
*Recorded by Meg Clovis *Date 08/2023 _ Continuation † Update DPR 523L (1/95) *Required Information
Summary
To be eligible for the Carmel Inventory a resource must represent a theme in the Context Statement, retain substantial integrity, be at least 50 years old, and meet at least one of the four criteria for listing in the California Register. The Hofsas House Hotel does not represent a theme in the Context Statement. The Hofsas House Hotel does not retain substantial integrity. The Hofsas House Hotel is over 50 years old. The Hofsas House Hotel does not meet any of the California Register criteria. In summary, Bulletin 15, the Carmel Historic Context Statement, the Carmel Historic Preservation Ordinance, and the historical record support the conclusion that the Hofsas House Hotel is not eligible for listing in the Carmel Inventory of Historic Resources.

Figure 7: Mosaic shield created by Frederick Hofsas.

Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
$WWDFKPHQW
Attachment 7
$WWDFKPHQW
Attachment 7
hƐĞWĞƌŵŝƚĞƐĐƌŝƉƟŽŶĨŽƌĂƌŵĞů>ĞŐĂĐLJ,ŽƚĞů
WƌŽũĞĐƚKǀĞƌǀŝĞǁ͗
dŚĞ,ŽĨƐĂƐ,ŽƵƐĞ,ŽƚĞůŝƐƐĞƚĨŽƌĂŶĞdžĐŝƟŶŐƚƌĂŶƐĨŽƌŵĂƟŽŶƚŚƌŽƵŐŚƵƉŐƌĂĚŝŶŐĂŶĚŵĂŝŶƚĂŝŶŝŶŐ ŝƚƐĞdžŝƐƟŶŐϯϴŚŽƚĞůƵŶŝƚƐĂŶĚƚǁŽŽŶͲƐŝƚĞƌĞƐŝĚĞŶƟĂůƵŶŝƚƐ͘ĚĚŝƟŽŶĂůůLJ͕ƚŚĞ,ŽƵƐĞŽŶŽůŽƌĞƐ ^ƚƌĞĞƚǁŝůůƵŶĚĞƌŐŽĞdžƚĞŶƐŝǀĞƌĞŵŽĚĞůŝŶŐƚŽĂůŝŐŶǁŝƚŚƚŚĞŶĞǁǀŝƐŝŽŶŽĨƚŚĞĂƌŵĞů>ĞŐĂĐLJ ,ŽƚĞů͘
sŝƐŝŽŶ^ƚĂƚĞŵĞŶƚ͗
dŚĞĂƌŵĞů>ĞŐĂĐLJ,ŽƚĞůĂƐƉŝƌĞƐƚŽďĞĐŽŵĞĂĚŝƐƟŶŐƵŝƐŚĞĚůƵdžƵƌLJĞƐƚĂďůŝƐŚŵĞŶƚĞdžĐůƵƐŝǀĞůLJ ĐĂƚĞƌŝŶŐƚŽŝƚƐĞƐƚĞĞŵĞĚŐƵĞƐƚƐ͘

,ŽƚĞůŵĞŶŝƟĞƐ͗
dŚĞŚŽƚĞůǁŝůůďŽĂƐƚĂƌĂŶŐĞŽĨƵƉƐĐĂůĞĂŵĞŶŝƟĞƐ͕ŝŶĐůƵĚŝŶŐĂϱϬͲƐĞĂƚƌĞƐƚĂƵƌĂŶƚĞdžĐůƵƐŝǀĞƚŽ ŐƵĞƐƚƐĂŶĚƚŚĞŝƌĨĂŵŝůLJͬĨƌŝĞŶĚƐ͕ďĂƌďĞǀĞƌĂŐĞƐĂŶĚŵĞĂůƐďĞŝŶŐƐĞƌǀĞĚŝŶƚŚĞůŽďďLJĂŶĚƉĂƟŽ ĂƌĞĂƐ͕ĐŽīĞĞďĂƌǁŝƚŚďĂŬĞƌLJͬŐƌĂďΘŐŽŝƚĞŵƐ͕ƌŽŽŵƐĞƌǀŝĐĞ͕ĂďƵƐŝŶĞƐƐĐĞŶƚĞƌ͕ŚĂŝƌĂŶĚďĞĂƵƚLJ ƐĂůŽŶ͕ƐƉĂ͕ĮƚŶĞƐƐƌŽŽŵ͕ĂŶĚĂƉŽŽů͘>ĂƵŶĚƌLJƌŽŽŵĨŽƌŝŶŚŽƵƐĞůĂƵŶĚƌLJƐĞƌǀŝĐĞǁŝůůĂůƐŽďĞĂ ƉĂƌƚŽĨƚŚĞŚŽƚĞů͘
WĂƌŬŝŶŐ&ĂĐŝůŝƟĞƐ͗
dŚĞŚŽƚĞůǁŝůůƉƌŽǀŝĚĞƵŶĚĞƌŐƌŽƵŶĚƉĂƌŬŝŶŐĨŽƌĂŶĞƐƟŵĂƚĞĚϲϴĐĂƌƐ͕ǁŝƚŚǀĂůĞƚͲŽŶůLJƐĞƌǀŝĐĞƐ ĂǀĂŝůĂďůĞ͘'ƵĞƐƚƐǁŝůůĂƌƌŝǀĞŝŶƚŚĞƉŽƌƚĞĐŽĐŚĞƌĞĂŶĚůŽĂĚŝŶŐĂƌĞĂŽŶ^ĂŶĂƌůŽƐ^ƚƌĞĞƚ͘sĂůĞƚ ƐĞƌǀŝĐĞƐǁŝůůŶĂǀŝŐĂƚĞĐĂƌƐĂƌŽƵŶĚƚŚĞďůŽĐŬƚŽƚŚĞŽůŽƌĞƐ^ƚƌĞĞƚŐĂƌĂŐĞĞŶƚƌĂŶĐĞ͘sĂůĞƚǁŝůů ƌĞƚƌŝĞǀĞĐĂƌƐƵƉŽŶƌĞƋƵĞƐƚĂŶĚƚŚĞĐĂƌǁŝůůďĞĚƌŝǀĞŶƚŚƌŽƵŐŚƚŚĞƵŶĚĞƌŐƌŽƵŶĚƉĂƌŬŝŶŐƚŽƚŚĞ ĚƌŝǀĞǁĂLJŶŽƌƚŚŽĨƚŚĞŚŽƚĞůĂŶĚĞdžŝƚŽŶƚŽ^ĂŶĂƌůŽƐ^ƚƌĞĞƚŝŶƚŚĞůŽĂĚŝŶŐŽƌƉŽƌƚĞĐŽĐŚĞƌĞ ĂƌĞĂƐ͘

dƌĂŶƐƉŽƌƚĂƟŽŶ^ĞƌǀŝĐĞƐ͗
dŽĞŶŚĂŶĐĞŐƵĞƐƚĐŽŶǀĞŶŝĞŶĐĞ͕ĂǀĂŶͬůŝŵŽƐĞƌǀŝĐĞǁŝůůďĞĂǀĂŝůĂďůĞƚŽƌĞĚƵĐĞƚŚĞĨƌĞƋƵĞŶĐLJŽĨ ƚƌŝƉƐƉĞƌĚĂLJĂŶĚůŝŵŝƚƚŚĞŶĞĞĚĨŽƌĐĂƌƌĞƚƌŝĞǀĂůƐĨƌŽŵƚŚĞŐĂƌĂŐĞ͘ 
,ŽƵƌƐŽĨKƉĞƌĂƟŽŶ͗
&ƌŽŶƚĞƐŬĂŶĚsĂůĞƚ͗ϮϰŚŽƵƌƐĂĚĂLJ
Attachment 7 $WWDFKPHQW
ŽŶĐŝĞƌŐĞ^ĞƌǀŝĐĞ͗ϮϰŚŽƵƌƐĂĚĂLJ
ZĞƐƚĂƵƌĂŶƚ͗ϳĂŵƚŽϭϬƉŵ
ŽīĞĞĂƌͬĂŬĞƌLJ͗ϳĂŵʹϱƉŵ
ZŽŽŵ^ĞƌǀŝĐĞ͗ϮϰŚŽƵƌƐ
^ƉĂ͗hƉŽŶƌĞƋƵĞƐƚ͘>ŽĐĂůŵĂƐƐĂŐĞĂŶĚŽƚŚĞƌǁĞůůŶĞƐƐƚŚĞƌĂƉŝƐƚƐǁŝůůďĞƵƐĞĚƚŽĐŽŵĞŝŶĂŶĚ ƵƐĞƚŚĞĨĂĐŝůŝƚLJƚŽƉƌŽǀŝĚĞƐƉĂƐĞƌǀŝĐĞƐƚŽŐƵĞƐƚƐ͘
,Ăŝƌ^ĂůŽŶ͗^ĞƌǀŝĐĞƐĂǀĂŝůĂďůĞƵƉŽŶƌĞƋƵĞƐƚǁŝƚŚůŽĐĂůƐƚLJůŝƐƚƐĂŶĚďĂƌďĞƌƐĐŽŵŝŶŐƚŽƚŚĞŚŽƚĞů ĂŶĚƵƐŝŶŐƚŚĞŚĂŝƌƐĂůŽŶĂƌĞĂƚŽƉƌŽǀŝĚĞƚŚĞƐĞƐĞƌǀŝĐĞƐ͘ &ŝƚŶĞƐƐZŽŽŵ͗ϲĂŵƚŽϵƉŵ͕ϳĚĂLJƐĂǁĞĞŬ


ŵƉůŽLJĞĞ^ƚƌƵĐƚƵƌĞ͗
dŚĞĂƌŵĞů>ĞŐĂĐLJ,ŽƚĞůĂŶƟĐŝƉĂƚĞƐĞŵƉůŽLJŝŶŐĂƚŽƚĂůŽĨϮϬͲϯϬƐƚĂīŵĞŵďĞƌƐ͕ĚŝƐƚƌŝďƵƚĞĚ ĂĐƌŽƐƐǀĂƌŝŽƵƐƌŽůĞƐ͗
'ĞŶĞƌĂůDĂŶĂŐĞƌ
ƐƐŝƐƚĂŶƚ'ĞŶĞƌĂůDĂŶĂŐĞƌ
&ƌŽŶƚĞƐŬ
ŽŶĐŝĞƌŐĞ
ĞůůWĞƌƐŽŶ
,ŽƵƐĞŬĞĞƉŝŶŐ
DĂŝŶƚĞŶĂŶĐĞ
sĂůĞƚĂŶĚdƌĂŶƐƉŽƌƚĂƟŽŶ
ZĞƐƚĂƵƌĂŶƚ͗DĂŶĂŐĞƌ͕ŚĞĨ͕^ŽƵƐŚĞĨ͕tĂŝƚ^ƚĂī͕ZŽŽŵ^ĞƌǀŝĐĞ^ƚĂī ĂƌŝƐƚĂ
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
Attachment 7 $WWDFKPHQW
LOBBY
.16Ä 5(
.
.1$$;57$616#.
$Ä
5(5(
. 5(
5(
HOUSE
5(
BLDG 1$Ä 5(
$Ä
BLDG 2$Ä$Ä 5(BLDG 3$Ä 5($Ä 5(BLDG 4$Ä 5($Ä 5(BLDG 5$Ä 5( TOTAL F.A.R.TOTAL ALLOWED F.A.R. 5(

JUNIOR SUITES- 23 UNITS
567&+1
5(
70+6#Ä70+6#Ä
70+65
70+65
5(
UNIT B- 5 UNITS
$'&$#6* 5(
UNIT C- 2 UNITS
$'&$#6* 5(
TOTAL- 38 HOTEL UNITS
APT. 1-

RESIDENTIAL CATALOGUE
567&+1 5(
APT. 2- 567&+1 5(
TOTAL- 2 RESIDENTIAL UNITS
70+6#Ä 70+65 5(
70+6#Ä 70+6570+6#Ä 70+65
5(5(
567&+1567&+1567&+1567&+1
5(5(
57$616#. 5(
57$616#. 5(57$616#. 5(57$616#. 5(57$616#. 5( ZONE- RCEXISTING LOT SIZES #20
ÄÄ
.16Ä 5( #20
ÄÄ57/ 5(
ADJUSTED LOT SIZES .16Ä 5(
.16Ä 5(57/ 5(
#..19'&.165+<' 5(
#..19'&

BUILDING (LOT) COVERAGE
 (145(2#4%'. &'&7%6+101((14'#%*#&&+6+10#.5( .16Ä Ä    
Ä  
:   5(/#:#..19'&
.16Ä Ä    
Ä  
:   5(/#:#..19'&
%/%%1/$+0'&/#:#..19'& 5( 
241215'& %5( 
.16Ä :  5(
 5(
57/ 5(
FLOOR AREA RATIO #..19'&(145614;$7+.&+0)FAR $1075#..19'&(145(%174614ž 9+&'+064#$.1%-#%%'5570&'4)4170&)#4#)' 16*'4$#5'/'06#4'#5#4'':%.7&'& :
.16Ä :  5(
 5(
57/ 5(
:
%1/$+0'&/#:#..19'& 5( 
241215'& 5( 
MAX BUILDING SIZE ALLOWED - 10,000 SF
EXISTING 105+6'
105#0%#4.15616#.

NEW 105+6'
8#.'6

616#.
(#4 .16%18'4#)' 
5''2#)'#Ä(14%#.%7.#6+105 &+#)4#/5
. 5(
5(


%$%#..19'&(144Ä8Ä#5(2'46#$.'
6#$.'$Ä2#4-+0)52#%'52418+&'&Ä *%52#%'54'37+4'&6#$.'$Ä)7'56411/59+6*/1$+.+6;('#674'5Ä

REQUIRED
1 WITH ROLL IN SHOWER2 W/OUT ROLL-IN SHOWER3 TOTAL
6#$.'$ÄÄ )7'56411/59+6*%1//70+%#6+10('#674'5Ä 4 REQUIRED
&+0+0)411/ 5(-+6%*'0 5(%#('$#-'4; 5((+4'5+&'.170)' 5();/ 5($75+0'55%'06'4 5(52# 5( 616#.#%%'5514;75'5 5(
616#.*16'.(.114#4'# 5(
#%%'5514;75'52'4%'06#)' 
616#.(.114#4'# 5(
#26#26 5(
*175'57$616#. 5(

LOT COVERAGE

BUILDINGSLOBBY

TOTAL LOT COVERAGES
5,175 S.F.
22,001 S.F. (60.77 %)
TOTAL LOT SIZES 36,200 S.F.

BUILDING 1BUILDING 2BUILDING 3BUILDING 4BUILDING 5
SUBTOTAL3,170 S.F.3,170 S.F.2,389 S.F.2,389 S.F.3,937 S.F. 21,756 S.F.

HOUSE 1,526 S.F.

ALLOWED LOT COVERAGES 22,788 S.F. (62.95 %)EAVES
245 S.F.

UNIT D- 8 UNITS
$'&$#6* 5(
);/ 5($75+0'55%064 5(
70+6#Ä 70+65 567&+1 1 5(
1 1
1 1
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
1/16" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/12/2024 4:49:03 PM A-1

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

PROJECT INFORMATION
A.P.N: 010-124-010 & 014
C.S.

22.14 SHEET INDEX
SHEET

NUMBER SHEET NAME
A-1 PROJECT INFORMATIONA-1.1 RENDERED ELEVATIONA-1.2 RENDERINGSA-1T TOPOGRAPHIC MAPA-2 EXISTING SITE PLANA-3 EXISTING HOTEL PLANSA-4 EXISTING HOTEL ELEVATIONSA-5 EXISTING RESIDENCE PLANSA-6 EXISTING RES. ELEVATIONSA-7 SITE PLANA-7FD FIRE DEPARTMENT PLANA-8 BASEMENT GARAGE PLANA-8.2 PARKING LEVEL 2A-9 LEVEL 1 FLOOR PLANSA-10 LEVEL 2 FLOOR PLANSA-11 LEVEL 3 FLOOR PLANSA-12 LEVEL 4 FLOOR PLANSA-13 ROOF PLANA-14 EAST & NORTH ELEVATIONSA-15 WEST & SOUTH ELEVATIONSA-16 SECTIONS BLDG 1 & 3A-17 SECTIONS BLDG 2 & 4A-18 SECTIONS LOBBY & BLDG 5A-19 ADJACENT PREEXISTING GRADEA-19B PREEXISTING GRADE W/ BLDGSA-19C R-1 OBJECTIVESA-20 PREEXISTING GRADE HEIGHTSA-21 PREEXISTING GRADE HEIGHTSA-22 TEN PERCENT SPECIAL FEATURESA-23 EXISTING HOTEL MASS OVERLAYA-24 ENLARGED BLDG 1 & 2 LOWERA-25 ENLARGED BLDG 1 & 2 UPPERA-26 ENLARGED BLDG 3 & 4 LOWERA-27 ENLARGED BLDG 3 & 4 UPPERA-28 MATERIAL BOARD

PROJECT TEAM

PROJECT DESCRIPTION LOCATION MAP
OWNER:

ARCHITECT:SURVEYOR:CIVIL:LANDSCAPE:ARBORIST:

TYPE OF CONSTRUCTIONSETBACKFRONTREARSIDEBUILDING HEIGHT ERIC MILLER ARCHITECTS, INC.211 HOFFMAN AVE.MONTEREY, CA 93940 PH: 831-372-0410CONTACT: CRISTO STAEDLER & LUYEN VU 09QHVJ#XGQP5CP%CTNQU5V
%CTOGN
ÄD[
ÄVJG
Ä5GC%#
Legacy Hotel Carmel Legacy Hotel Carmel

PROJECT DATA
LANDSET ENG. INC.520-B CRAZY HORSE CANYON ROADSALINAS, CA 93907 PH: 831-443-6970CONTACT: GUY GIRARDOHOFSAS HOUSE INC.REPRESENTED BY CARRIE THEISPO BOX 1195 CARMEL, CA 93921PH: 831-624-2745

HOTEL UNIT CATALOGUE
TYPE I - GARAGETYPE VA- BUILDING5' RC & 7.5' R10' RC & 10' R15' FOR 50% @ RC & 5' FOR 100% AT R126' @ RC24' @ R1

ZONING REQUIREMENTS FOR HOFSAS HOUSE HOTEL PARCELS

FLOOR AREA RATIOBUILDING (LOT) COVERAGE

PARKING

THE PROJECT INCLUDES DEMOLITION OF THE EXISTING HOFSAS HOTEL AND RENOVATION/ PRESERVATION OF THE EXISTING HOFSAS HOUSE. THE EXISTING HOTEL STRUCTURES ARE 1 TO 4 STORIES IN HEIGHT IN MULTIPLE BUILDINGS. THESE STRUCTURES INCLUDE 38 HOTEL UNITS, MANAGER'S APARTMENT, BANQUET ROOM, POOL, SERVICE AREAS AND PARKING FOR 26 CARS ON SITE AND 2 ON SAN CARLOS STREET.

THE PROPOSED HOTEL, CARMEL LEGACY HOTEL, SHALL CONSIST OF 6 SEPERATE BUILDINGS (AND AN EXISTING HOUSE) CONNECTED WITH ONGRADE OR ELEVATED WALKWAYS. THEY SHALL ALL BE TWO STORIES IN HEIGHT AND CASCADING DOWN THE STEEP SLOPE.

THE HOTEL SHALL INCLUDE 38 HOTEL UNITS, 2 RESIDENTIAL
APARTMENTS, HOTEL SERVICE AREAS SUCH AS A 50 SEAT RESTAURANT, KITCHEN, CAFE, BUSINESS CENTER, HAIR AND BEAUTY SALON, SPA, FITNESS ROOM, POOL, HOTEL STORAGE, MECHANICAL AREAS AND UNDERGROUND GARAGES FOR 68 CARS. ACCESSORY USES SUCH AS RESTAURANT, BUSINESS CENTER, SPA, FITNESS ROOM, POOL, ETC., SHALL BE ONLY FOR THE USE OF THE HOTEL GUESTS. THE GARAGES SHALL BE VALET PARKING ONLY AND ALSO SERVE DELIVERIES AND WASTE PICK-UP.

THE HOFSAS HOUSE SHALL BE REPURPOSED AS TWO RESIDENCES, A BUSINESS CENTER AND A GYM FOR HOTEL GUESTS.

N

TREE REMOVAL
1- 3" OAK1- 4" OAK2 OAKS TO BE REMOVED4 5GAL. OAKS SHALL BE PLANTED EXISTING F.A.R. & LOT COVERAGE

ACCESSORY USES CBC HANDICAP REQUIREMENTS -
NO. REVISION
1 Planning
$WWDFKPHQW
$WWDFKPHQW
$WWDFKPHQW
DOC. NO. 2016010040
0( 8. 312 AC.)
APN 010-124-009
APN 010-124-008
DO (
C. NO. 2003118883) APN 010-124-010
APN 010-124-014
APN 010-124-013
B( LOCK 34)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
N 00°00'00" E 50.00
N 90°00'00" E 100.00
N 90°00'00" W 100.00
S 00°00'00" E 120.00
N 90°00'00" E 30.00
S 00°00'00" E 40.00
N 90°00'00" W 70.00
N 00°00'00" E
230.00
3RD AVENUE
(A 50' WIDE CITY STREET

UNIMPROVED BETWEEN DOLORES & SAN CARLOS)

PROJECT BENCHMARK
H&V CONT. PT. #141
MAGNAIL ELEV.: 96 3. 7

20.3'

22.3'

58.0'

22.2'

20.3'

21.2'

21.2'

19.0'

22.2' 19.0' 25.2'

28.1'

19.2'

46.1'
' 2. 02

46.1'

20.2'
22 2. '

27.5' 3.3'

7.7' 3.3'33.6' 3.3' 4.3'

3.5'

4.2'

15.6'3.5'

5.6'

63.8'

10.4'

6.1' 6 3. '

25.7'

41.8'

38.4' 5.2'

3.3'

1.0'

19.7' 4.14.9' '

14.6'

14.0' 2.0'

14.0'

22.3'

14.0'

22.3' 16.4'

22.4'

11.0'

7.4'

25.1' 8.1'
3 9. ' 11.3'
6 2. '

1.8'
5 0. '

1.8'
17 5. '

7.8' 7 9. '

7.0'

14.1'

12.8'
21 7. '

4.0'

10.0' 4.7'

26.9'

14.5'

22.5'

10.0'

20.4' 10.0'

20.4'

17.2'

25.8' 8.1' 4.4'

2. ' 3 6.9'
79 4. '

5.9'
10 4. '

0.6'

28.7'

0.6'
20 2. '
1 3. ' 2 6. ' 0.4'

22.0' 27.9' 30.6'

3.7'

WOODEN STA RI CASE
3-6' RW
CONC. TYP.

EDGE OF

PAVEMENT

EDGE OF

PAVEMENT
STEPS
1' RW
WOOD TYP.
4' RW
CONC. TYP.

RAISED SURFACES
ELEV:84 3. 3
ELEV:93 6. 7

RAISED SURFACES
ELEV:83 9. 4
ELEV:93 3.

C
6 OLUMN
BLDG. OVERHANG
BUILDING 1
BUILDING 2 BUILDING 3
BUILDING 4
BUILDING 6 BUILDING 7
BUILDING 5
BUILDING 4
BUILDING 4

RESIDENCE

STA RI CASE

W/ LANDING

BOLLARD
TURRET

WATER TANK
3 5. ' RW
WOOD TYP.

RAISED SURFACE
ELEV:98.10

RAISED SURFACES
ELEV:88 7. 8
ELEV:98.10
ELEV:107.53

STA RI CASE

W/ LANDING
6' WOOD
FENCE

WALKWAY
3' RW W/
3' FENCE
STEPS
GATE
RAMP
RAMP
STEPS

PATIO PATIO

RAISED SURFACE
ELEV:98 3. 3
STEPS
0 5. -1 5. ' RW
CONC. TYP.

EDGE OF

PAVEMENT
L PI
6 5. -9 5. ' RW
CONC. TYP.

STEPS

RAISED SURFACE
ELEV:107.15
STEPS
STEPS
STEPS
STEPS

STORAGE

STORAGE

PLANTER
3-6' RW
CONC. TYP.
3' WALL
CONC. TYP.

PLANTER
5' RW CONC. TYP.
7' RW
CONC. TYP.

STRUC. WALL
CONC. TYP.

BLDG OVERHANG

STAIRCASE

W/ LANDING

OVERHANG
5' WALL
CONC. TYP.
4 5. ' RW
WOOD TYP.
6' WOOD FENCE

LAND NG I LAND NG I STEPS STEPSSTEPS
5' RW
CONC. TYP.
8' RW
CONC. TYP.
0 5. -4 5. ' RW
CONC. TYP.
2 5. ' RW
CONC. TYP.
3' RW
CONC. TYP.
8' RW
CONC. TYP.
3' RW
CONC. TYP.
3' RW
WOOD TYP.

EDGE OF

PAVEMENT

EDGE OF

PAVEMENT
STEPS
STEPS

CRAWL SPACE
STEPS
STEPS
4' RW
CONC. TYP.
2' RW
WOOD TYP.
5' WALL
CONC. TYP.
0 5. -1 5. ' RW
CONC. TYP.
3' WOOD FENCE
L PI
L PI

EDGE OF

PAVEMENT
POOL

PARKING AREA

PARKING STAGES

SIDEWALK

ENTRACE
60 65
70 75
08 58
90 95
95 09
58 08
85 80
75 75
70 65
60 55
55 60
56 70
70 07
70 57.51

57.86 58.44

65.26 66.74

70.24 72.60

71.16 73.60

73.46 68.73

68.89 73.50

69.20 73.94

74.13 74.21

72.50 73.23

76.49 82.55

82.67 87.11

76.14 87.27

87.49 91.68

93.26 98.30

97.99 97.86

97.89 98.12

97.02 97.65

97.57 96.53

96.77 93.11

85.79 86.73

82.33 78.52

71.10 71.43

78.96 81.64

86.79 86.22

86.53 78.06 72.28

79.26 74.18

73.92 79.19

79.34 74.09

76.28 76.16

76.26 76.57

77.69 74.67

74.65 63.36

66.48 66.41

67.64 70.24

71.81 72.26

71.20 70.34
12 PARKING AREA

PARKING AREA

PARKING AREA

PARKING AREA

PARKING AREA
DOLORES ST.

A 50' WIDE CITY STREET
SAN CARLOS ST.

A 50' WIDE CITY STREET
4"O.
3",O.
6",O.
6",O.

MP O TR2-3"2-4"
29",O.

LOT 2
LOT 1

PROPERTY LINE
PROPERTY LINE TYP.

HOFSAS HOUSE

HOFSAS HOTEL
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
REVISION No.

ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\.me\.rvt\Hofasas House Hotel Mass.rvt 2/8/2023 3:04:22 PM A-2

HOFSAS HOUSE LEGACY
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
2/8/2023

EXISTING SITE PLAN
A.P.N: 010-124-010 & 014
KJL
2214
3/32" = 1'-0" 1 Site
EXISTING SITE PLAN 0
$WWDFKPHQW
4TH FLOOR LOT 5 & 7
4TH FLOOR LOT 9 & 11
3RD FLOOR LOT 5 & 7
3RD FLOOR LOT 9 & 11
2ND FLOOR LOT 1 & 3 2ND FLOOR LOT 1 & 3

APARTMENT
2ND FLOOR LOT 9 & 11
2ND FLOOR LOT 9 & 11
1ST FLOOR LOT 1 & 3 2ND FLOOR LOT 5 & 7 1ST FLOOR LOT 1 & 3

BUILDING (LOT) COVERAGE OUTLINE

FLOOR PLATE OUTLINEBUILDING (LOT COVERAGE)
1ST FLOOR LOT 9
1ST FLOOR LOT 9
1ST FLOOR LOT 9
1ST FLOOR LOT 5 & 7
1ST MEETING ROOM LOT 3
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
REVISION No.

ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:

As indicated
C:\.me\.rvt\Hofasas House Hotel Mass.rvt 2/8/2023 3:04:29 PM A-3

HOFSAS HOUSE LEGACY
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
2/8/2023

EXISTING HOTEL PLANS
A.P.N: 010-124-010 & 014
KJL
2214
1/16" = 1'-0" 1 EXISTING HOTEL FOURTH FLOOR PLAN1/16" = 1'-0" 4 EXISTING HOTEL THIRD FLOOR PLAN 1/16" = 1'-0" 2 EXISTING HOTEL SECOND FLOOR PLAN
4TH FLOOR PLAN
2ND FLOOR PLAN
1/16" = 1'-0" 3 EXISTING HOTEL GROUND FLOOR PLAN
1ST FLOOR PLAN
1/16" = 1'-0" 5 EXISTING HOTEL ROOF PLAN

ROOF PLAN
0 0 3RD FLOOR PLAN00 0
(E) FAR Schedule
Type Area Site Area FAR
1st Floor Lot 1 & 3 1987 SF 36200 SF 0.051st Floor Lot 1 & 3 903 SF 36200 SF 0.022nd Floor Lot 1 & 3 1987 SF 36200 SF 0.052nd Floor Lot 1 & 3 884 SF 36200 SF 0.022nd Floor Lot 5 & 7 1443 SF 36200 SF 0.042nd Floor Lot 9 & 11 1691 SF 36200 SF 0.053rd Floor Lot 5 & 7 1444 SF 36200 SF 0.043rd Floor Lot 9 & 11 2031 SF 36200 SF 0.064th Floor Lot 5 & 7 1461 SF 36200 SF 0.044th Floor Lot 9 & 11 1931 SF 36200 SF 0.05Apartment 311 SF 36200 SF 0.01Residence Lower Floor 1501 SF 36200 SF 0.04Residence Upper Floor 1482 SF 36200 SF 0.04TOTAL: 13 19056 SF 0.53 (E) LOT COVERAGE)

HOFSAS HOTELHOFSAS HOUSETOTAL COVERAGE
11,959 S.F.
1,809 S.F.
13,768 S.F.
53 %
38%
$WWDFKPHQW

MAX HEIGHT ALLOWED
26' - 0"
(E) BUILDING HEIGHT
29' - 8"

MAX BUILDING HEIGHT
26' - 0"
(E) BUILDING HEIGHT
43' - 5"

MAX HEIGHT ALLOWED
26' - 0"
(E) ROOF HEIGHT
43' - 5"

MAX HEIGHT ALLOWED
26' - 0"
(E) ROOF HEIGHT
29' - 8"
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
REVISION No.

ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\.me\.rvt\Hofasas House Hotel Mass.rvt 2/8/2023 3:04:38 PM A-4

HOFSAS HOUSE LEGACY
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
2/8/2023

EXISTING HOTEL ELEVATIONS
A.P.N: 010-124-010 & 014
KJL
2214
3/32" = 1'-0" 1 EXISTING HOTEL EAST ELEVATION
3/32" = 1'-0" 2 EXISTING HOTEL NORTH ELEVATION
3/32" = 1'-0" 3 EXISTING HOTEL WEST ELEVATION
3/32" = 1'-0" 4 EXISTING HOTEL SOUTH ELEVATION
$WWDFKPHQW
(E) RESIDENCE
1,494 S.F.
(E) RESIDENCE
1,501 S.F.
4 A-6
A-6
2 A-6 1
A-6
PARPET WALL 3

S YLIGHT

S YLIGHT

CHIMNEY
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
REVISION No.

ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/16" = 1'-0"
C:\.me\.rvt\Hofasas House Hotel Mass.rvt 2/8/2023 3:04:44 PM A-5

HOFSAS HOUSE LEGACY
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
2/8/2023

EXISTING RESIDENCE PLANS
A.P.N: 010-124-010 & 014
KJL
2214
3/16" = 1'-0" 1 EXISTING RESIDENCE SECOND FLOOR PLAN 3/16" = 1'-0" 2 EXISTING RESIDENCE GROUND FLOOR PLAN 2ND FLOOR PLAN 1ST FLOOR PLAN 0 0
3/16" = 1'-0" 3 EXISTING RESIDENCE ROOF PLAN
ROOF FLOOR PLAN 0
$WWDFKPHQW
(E) ROOF HEIGHT
33' - 4"
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
REVISION No.

ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/16" = 1'-0"
C:\.me\.rvt\Hofasas House Hotel Mass.rvt 2/8/2023 3:17:04 PM AHOFSAS HOUSE LEGACY 2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
2/8/2023
EXISTING RES. ELEVATIONS
A.P.N: 010-124-010 & 014
KJL
2214
3/1 " = 1'-0" 1 EXISTIN RESI ENCE EAST ELEVATION 3/1 " = 1'-0" 2 EXISTIN RESI ENCE SOUTH ELEVATION3/1 " = 1'-0" 3 EXISTIN RESI ENCE NORTH ELEVATION 3/1 " = 1'-0" 4 EXISTIN RESI ENCE WEST ELEVATION $WWDFKPHQW
$WWDFKPHQW
28"
O
UP
UP DN
DN
UP UP
DN DN
UP
UP
DN
DN
UP
UP
UP
UP
UP
2 A-15
A-15
A-14 1
1 4
A-17
3 A-17
1 A-16
6 A-18
A-14
2 2
A-16
5 A-18
-

SAN CARLOS STREET

DOLORES STREET

SITE PLAN
SCALE: 3/32" = 1'-0"
0 BRIDGE
ABOVE

LIGHT WELL

LIGHT WELL
ELEV. 76.00'
ELEV. 71.00'
ELEV. 71.00' ELEV. 76.00'
ELEV. 69.00'
LOBBY
5,863 S.F.

RE UIRED SETBAC
5' - 0"

ACTUAL SETBAC
5' - 0"

RE UIRED SETBAC
7' - 6"

ACTUAL SETBAC
7' - 6"

RE UIRED SETBAC
5' - 0"

ACTUAL SETBAC
5' - 0"

RE UIRED SETBAC
10' - 0"

RE UIRED SETBAC
5' - 0"

RE UIRED SETBAC
0' - 0"

RE UIRED SETBAC
5' - 0"

RE UIRED SETBAC
5' - 0"

ACTUAL SETBAC
5' - 0"

RE UIRED SETBAC
5' - 0"

ACTUAL SETBAC
4' - 3"
120' - 0"
30' - 0"
40' - 0"
120' - 0"
100' - 0"
50' - 0"
100' - 0"
100' - 0"
230' - 0"
78' - 4" 7' - 0" 78' - 4"

PERMANENT STREET CLOSURE
50' - 0"

LEVEL ABOVE OUTLINE

LEVEL ABOVE OUTLINE
1 2
1 1 1
8 3
3 3
3 3
4 4

PORTE COCHERE
PROPERTY LINE TYP.

PATIO PATIO

COMMUNITY TERRACE
PATIO
5 8
8 8
34' - 6" 20' - 9" 17' - 3"
9 8
9 123456789
010Ä%10&+6+10'&#4'#12'061':6'4+149#.-9#;+064#$.1%-9#.-9#;*+)*)7#4&4#+.&4+8'9#;/#:5.12'2'&'564+#0*%4#/24'6#+0+0)9#..4'#45'6$#%-4'37+4'/'06žÄ SETBAC
5' - 0"
(E) 28" OAK
25' - 6"

RC ZONE
LOT 2
APN: 010-124-010
LOT 1
APN: 010-124-014

RC ZONE
R1 ZONE

RC ZONE

ADJUSTED PROPERTY LINE
LOT 2 LOT 1
-';016'5

A-20 1
2 A-20
A-20 3
4 A-20
A-21 1
2 A-21
3' - 0"
5' - 2"
2'&'564+#0*%.+(6
6 (E) BLDGS
ELEV. 97.00'
ELEV. 80.00'UPPER FLOORELEV. 69.00'GROUND FLOOR
ELEV. 69.00'

PAVEMENT EDGE
ELEV. 66.70'
ELEV. 57.33'
ELEV. 51.00'
ELEV. 68.00'
ELEV. 57.00'
PROPERTY LINE TYP.

ELEV. 70.00'
ELEV. 97.00'ENTRY LEVEL
ELEV. 91.00'

SPLIT ENTRY LEVEL
ELEV. 107.00'UPPER LEVELELEV. 80.00'LOWER LEVEL
ELEV. 76.00'BASEMENT
ELEV. 76.00'BASEMENT
ELEV. 71.00'BASEMENT
ELEV. 71.00'BASEMENT
ELEV. 76.00'
ELEV. 76.00'UPPER LEVELELEV. 65.50'LOWER LEVEL
ELEV. 76.00'
ELEV. 76.00'UPPER LEVELELEV. 65.50'LOWER LEVEL
ELEV. 83.50' ELEV. 86.50'
ELEV. 80.00'
ELEV. 86.50'LEVEL ABOVEELEV. 97.00'UPPER LEVEL
ELEV. 80.50'LEVEL ABOVEELEV. 91.00'UPPER LEVEL
ELEV. 90.00'
ELEV. 98.00'
PROPERTY LINE TYP.
8 0' 4' 2' 8' 12' 16' 20'
8' - 2" 53' - 8" 4' - 6"
ELEV. 61.50' ELEV. 65.50'
3RD AVENUE
-
3 3
BUILDING 1
4,672 S.F. (4 UNITS)
BUILDING 2
4,672 S.F. (4 UNITS)
BUILDING 3
4,672 S.F. (9 UNITS)
BUILDING 4
4,672 S.F. (9 UNITS)
BUILDING 5
5,606 S.F. (12 UNITS)
SLOPE 23%

74.5 70.5

69.5 68.5
R1 ZONE
8 STOP

62.5 61.5

60.5 59.5

58.5 57.5

63. 6
5 4.5

65.5 66.5

67.5 68.5

69.570.571.5

72.573.574.5

75.576.577.5

78.5 79.5

80.5 81

86.5 (E) HOUSE
2,398 S.F. (2 APTS.)
7 3
4' - 6"

EXIT DRIVE

GARAGE ENTRY

COVERED TUNNEL

COVERED TUNNEL
1 1 ELEV. 89.25'
1 1
ELEV. 80.00'
1 CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:56:13 PM A-7

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

SITE PLAN
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
1 Plannin
$WWDFKPHQW
28"
O
UP
UP
DN
DN
DN

SAN CARLOS STREET

DOLORES STREET

FIRE DEPARTMENT PULL DIMENSIONS
SCALE: 3/32" = 1'-0"
0 BRIDGE

LIGHT WELL

LIGHT WELL
ELEV. 79.00'

RE UIRED SETBAC
5' - 0"

RE UIRED SETBAC
5' - 0"

ACTUAL SETBAC
5' - 0"

RE UIRED SETBAC
5' - 0"

ACTUAL SETBAC
4' - 3"
120' - 0"

LEVEL ABOVE OUTLINE

LEVEL ABOVE OUTLINE

LEVEL ABOVE OUTLINE
1 1
83 3

PORTE COCHERE
PROPERTY LINE TYP.

PATIO PATIO

COMMUNITY TERRACE
PATIO
F
F (+4'&'2#46/'06ž/#:27..&+/'05+10
(E) 28" OAK
LOT 2
APN: 010-124-010
LOT 1
APN: 010-124-014
LOT 2 LOT 1
-';016'5

WHEELCHAIR
LIFT

STREET PAVEMENT EDGE
105' - 0"
42' - 6" 44' - 0"
105' - 0"
42' - 6" 42' - 6"
105' - 0"

BUILDING OUTLINE
40' - 0"
F

F F F F
NOTE:

SEE PAGE A7-SITE PLAN FOR ADDITIONALINFORMATION NOT NOTED. 0' 4' 2' 8' 12' 16' 20'
ELEV. 97.00'
96' - 0"
54' - 0"
94' - 0"
56' - 0"
105' - 0" ELEV. 76.00' ELEV. 71.00'
ELEV. 97.00'
ELEV. 69.00'
ELEV. 70.00'
ELEV. 83.50' ELEV. 86.50'
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:57:52 PM A-7FD

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

FIRE DEPARTMENT PLAN
A.P.N: 010-124-010 & 014
C.S.

22.14 PROPOSED FIRE PLAN
-
NO. REVISION
$WWDFKPHQW
UP

SAN CARLOS STREET

DOLORES STREET
4 A-17
3 A-17
1 A-16
6 A-18

GARAGE BASEMENT PLAN
0 SCALE: 3/32" = 1'-0"
2 A-16
5 A-18
230' - 0"
100' - 0"
5' - 0"
7' - 6"

RETAINING WALL
10 SF AIR SUPPLY FROM ABOVE
5' - 0"

PROPERTY LINE
0' 4' 2' 8' 12' 16' 20'

PROPERTY LINE
ELEV. 47.50'
2 3 3 3 1
GARAGE B1
CAR
ELEV.
24%
10%
4 6
24' - 0"
23' - 11 1/4"

STORAGE
HC
3 1
GARAGE A1
11 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 24' - 0"
1 HC

PASSENGER ELEVATOR

SERVICE ELEVATOR
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:56:32 PM A-8

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

BASEMENT GARAGE PLAN
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
1 Plannin
$WWDFKPHQW
UP
UP
UP
4 A-17
3 A-17
1 A-1
A-18
2 A-1
5 A-18
10 23 TRASH FLAT SURFACE'
R
C
S
T
RR
ELEV. 49.50'
461 S.F.

GARAGE B2

DELIVERY DROP-OFF
GARAGE A2
10 SF AIR SUPPLY FROM ABOVE
EV 220
EV 220

HANDICAP ACCESS AISLE
ELEV. 56.50'

GREASE INTERCEPTOR
EXIT
ELEV. 57.33'
ELEV. 57.33'
ELEV. 56.50'
ELEV. 56.50'
ELEV. 56.50'
CAR
ELEV.
11 VALET

OPERATIONS

PROPOSED PARKING PLAN UPPER LEVEL
0 SCALE: 3/32" = 1'-0"
0' 4' 2' 8' 12' 16' 20'
23333 1

PARKING SUMMARY
TOTAL 68
TRASH COMPACTOR2 CUBIC YARD DUMPSTER-CARDBOARD2 CUBIC YARD DUMPSTER-SPARE2 CUBIC YARD DUMPSTER95 GAL ROLLING CART -RECYCLING55 GAL. DRUM - TALLOWGREASE INTERCEPTOR LEGEND
REQUIRED 41
R
S
T
C GARAGE B2
STANDARD - 26 GARAGE C (LEVEL ABOVE)STANDARD - 2COMPACT - 2 (38 FOR HOTEL + 3 FOR APARTMENTS)
GARAGE A2
HANDICAP - 1GARAGE B1STANDARD - 29HANDICAP- 1
8 10%
5 24
BATH
SHOWER
CLOSET
APT. 2
GARAGE A1STANDARD - 6HANDICAP- 1
HC 1
24' - 1 1/2"
2 ' - 8"
22' - 9 1/4"
8 SLOPE 23%
R1 ZONE
STOP

62.5 61.5

60.5 59.5

58.5 57.5

63. 6
5 4.5

65.5 66.5

67.5 68.5

69.570.571.5

72.573.574.5

75.576.577.5

78.5 79.5

80.5 81

86.5 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 10X20 24' - 0"

BUSINESS CENTER

GARAGE DOOR

EXIT DRIVEWAY

GARAGE ENTRY
5 1
1 1
1 CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:56:41 PM A-8.2

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024
PARKING LEVEL 2
A.P.N: 010-124-010 & 014
C.S.

22.14 3/32" = 1'-0" 1 PAR IN L2 F.F.
-
NO. REVISION
1 Pla i
$WWDFKPHQW
28"
O
DN
UP UP 1:48SCALE UP
DN
UP 1:48SCALE 1:48SCALE 1:48SCALE
2 A-15
A-15
A-14 1
1 SAN CARLOS STREET

DOLORES STREET
SUITE A1
SHOWER W.C.

BAR
4 A-17
3 A-17
1 A-16
6 A-18
PROPOSED LEVEL 1 PLAN
0 SUITE A1
W.C. SHOWERBAR
SCALE: 3/32" = 1'-0"
SUITE A1
SHOWER W.C.

BAR
SUITE A1
W.C. SHOWERBAR

BRIDGE ABOVE
ELEV. 65.50'
ELEV. 69.00'
ELEV. 66.70'
2 A-16
DESK
W.C.

ROMAN BATH
SUITE A2
BAR

ENTERTAINMENT

CENTER DESK
DESK
W.C.

ROMAN BATH
SUITE A2
BAR

ENTERTAINMENT

CENTER DESK
DESK
W.C.

ROMAN BATH
SUITE A2
BAR

ENTERTAINMENT

CENTER DESK
DESK
W.C.

ROMAN BATH
SUITE A2
BAR

ENTERTAINMENT

CENTER DESK

ENTERTAINMENT
CENTER

ENTERTAINMENT
CENTER

ENTERTAINMENT
CENTER

ENTERTAINMENT
CENTER
5 A-18
ELEV. 69.00'
BENCH

WET BAR
CLOSET

ELEVATOR
BATH
SUITE A5
CLOSET

WET BAR
BATH
SUITE A4
-
78' - 4"
APT. 1
ELEV. 69.00'

SUPPLIES / ROUTER

AIR INTAKE FOR GARAGE
(E) BATH
STAIR #1
ELEV. 65.50'

PASSENGER ELEVATOR

SERVICE ELEVATOR
HC CF
HCCF
NOTES:
= HANDICAP WITH MOBILITY FEATURES= HANDICAP WITH COMMUNICATION FEATURES

PROPERTY LINE

PROPERTY LINE
BENCH

WET BAR
CLOSET

ELEVATOR
BATH
SUITE A5
CLOSET

WET BAR
BATH
SUITE A4
HC
0' 4' 2' 8' 12' 16' 20'
O.T.B.

CAR

ELEVATOR

GARAGE C
2 2
CC

REVERSE FOLD

OVERHEAD DOOR

PRECAST GLASS BLOCK FLOOR PANELS

AIR EXHAUST LOUVER W/ FAN BELOW CEILING

AIR SUPPLY LOUVER
-
33' - 0"
LOBBY
5,863 S.F.

O.T.B. O.T.B. O.T.B. O.T.B.

O.T.B.

SUITE A3
DESK
W.C.

ROMAN BATH
SUITE A3
BAR

ENTERTAINMENT

CENTER DESK

ENTERTAINMENT
CENTER
W.C.

ROMAN BATH
BAR
CF
GYM
(E) KITCHEN
(N) SHO.
(N) CLO.
(N) PANTRY
(E) CLO.

ENTRY TO BUSINESS
CENTER
ENTRY
SUITE A3
DESK
W.C.

ROMAN BATH
SUITE A3
BAR

ENTERTAINMENT

CENTER DESK

ENTERTAINMENT
CENTER
W.C.

ROMAN BATH
BAR
5% 23%
BENCH

WET BAR
CLOSET

ELEVATOR
BATH
SUITE A5
CLOSET

WET BARBATH
SUITE A4
SUITE A6

FLOOR ABOVE

VEHICLE DISPLAY
BUILDING 1
4,672 S.F. (4 UNITS)
BUILDING 2
4,672 S.F. (4 UNITS)
BUILDING 3
4,672 S.F. (9 UNITS)
BUILDING 4
4,672 S.F. (9 UNITS)
BUILDING 5
5,606 S.F. (12 UNITS)
(E) HOUSE
2,398 S.F. (2 APTS.)

ZEN GARDEN

FLOOR ABOVE
1 1
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:56:50 PM A-9

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024
LEVEL 1 FLOOR PLANS
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
1 Plannin
$WWDFKPHQW
UP
UP
DN
UP
UP
DN DN
UP UP
DN
UP
UP
DN
DN
DN
UP
DN
UP
UP
UP
2 A-15
A-15
A-14 1
1 SAN CARLOS STREET

DOLORES STREET
4 A-17
3 A-17
1 A-16
6 A-18
PROPOSED LEVEL 2 PLAN
SCALE: 3/32" = 1'-0"
0 A-14
2 FIREPLACE / T.V.

W.C.

ROLL-IN SHOWER
BATH
BRIDGE

KITCHEN
SERVER

STATION

COLD STATION

DISHWASHER
$#5'/'06%.#55+(+%#6+10

LIGHT WELL

LIGHT WELL

ORDER UP

CIGAR PATIO
ELEV. 76.00'
ELEV. 80.00'
ELEV. 71.00'
ELEV. 76.00'
ELEV. 76.00'
ELEV. 71.00'
2 A-16

RESTROOM RESTROOM
PATIO
LOUNGE

FIRESIDE

LOUNGE FIREPLACE
5 A-18

SERVICE

ELEVATOR
GUEST

ELEVATOR

HOT STATION

CAFE/ BAKERY
-

STORAGE

MECHANICAL

EMPLOYEE

RESTROOM

EMPLOYEE

LOCKERS

WHEELCHAIR
LIFT

MECHANICAL STORAGE
CF HC
ELEV. 80.00'
CF
HCCF
NOTES:
= HANDICAP WITH MOBILITY FEATURES= HANDICAP WITH COMMUNICATION FEATURES

PROPERTY LINE

PROPERTY LINE

COVERED TUNNEL
0' 4' 2' 8' 12' 16' 20'

STORAGE

MECHANICAL

REVERSE FOLD OVERHEAD DOOR REVERSE FOLD OVERHEAD DOOR
ELEV. 76.00'

PRECAST GLASS BLOCK

FLOOR PANELS
AIR INTAKE GRILLE FOR LEVEL 1 GARAGE
-
EXIT
WINDOW
LULA

ELEVATOR
LULA

ELEVATOR
LULA

ELEVATOR
LULA

ELEVATOR
EXIT

EXIT WINDOW
WINDOW
LOBBY
5,863 S.F.

FIREPLACE / T.V.

PWDR.

SHOWER

WET BAR
CLOSET
LIVING
BATH

BEDROOM
FIREPLACE / T.V.

CLOSET WET BAR
DINING
W.C.

PWDR.

VANITY

SAUNA/ TUB
SHOWER
BATH

BEDROOM
LIVING
RISING T.V.

UNIT B
UNIT C
FIREPLACE / T.V.

PWDR.

SHOWER

WET BAR
CLOSET
LIVING
BATH

BEDROOM
RISING T.V.

UNIT C
FIREPLACE / T.V.

CLOSET WET BAR
DINING
W.C.

PWDR.

VANITY

SAUNA/ TUB
SHOWER
BATH

BEDROOM

LIVINGUNIT B
FIREPLACE / T.V.

WET BAR CLOSET
W.C.

PWDR.

VANITY
BATH

BEDROOM
LIVING
UNIT B
LULA

ELEVATOR

DESK DINING DESK DESK
FIREPLACE / T.V.

WET BAR CLOSET
W.C.

PWDR.

VANITY
BATH

BEDROOM
LIVING
UNIT B
RISING T.V.

DINING DESK
BENCH

BENCH TUB SAUNA/ SHOWER BENCH
ELEV. 80.00'

SHAMPOOPEDICURE

MANICURE

BARBER / STYLIST

MASSAGE

MIRROR / COUNTER

MASSAGE

HEALTH SPA

SKYLIGHT ABOVE SKYLIGHT ABOVE

MECHANICAL
(5) EXISTING LAUNDROMAT WASHERS TO REMAIN
8 SLOPE 23%
R1 ZONE
STOP

62.5 61.5

60.5 59.5

58.5 57.5

63. 6
5 4.5

65.5 66.5

67.5 68.5

69.570.571.5

72.573.574.5

75.576.577.5

78.5 79.5

80.5 81

86.5 BENCH

WET BAR
CLOSET

ELEVATOR
BATH
SUITE A5
CLOSET

WET BAR
BATH
SUITE A4
FIREPLACE / T.V.

WET BAR CLOSET
W.C.

PWDR.

VANITY
BATH

BEDROOM
LIVING
UNIT B

DINING DESK

TUB SAUNA/

BENCH SHOWER
SUITE A3
DESK
W.C.

ROMAN BATH
SUITE A3
BAR

ENTERTAINMENT

CENTER DESK

ENTERTAINMENT
CENTER
W.C.

ROMAN BATH
BAR
BUILDING 1
4,672 S.F. (4 UNITS)
BUILDING 2
4,672 S.F. (4 UNITS)
BUILDING 3
4,672 S.F. (9 UNITS)
BUILDING 4
4,672 S.F. (9 UNITS)
BUILDING 5
5,606 S.F. (12 UNITS)
(E) HOUSE
2,398 S.F. (2 APTS.)

COVERED TUNNEL
30' - 0"

INTRA-BLOCK
1 1
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:49:58 PM A-10

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024
LEVEL 2 FLOOR PLANS
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
1 Pla i
$WWDFKPHQW
DN
DN UP
DN
DN
DN
UP
DN DN
DN
DN
UP
UP
DN
UP
DN
DN UP
DN
DN
DN
2 A-15
A-15
A-14 1
1 SAN CARLOS STREET

DOLORES STREET
4 A-17
3 1 A-17
A-16
6 A-18
PROPOSED LEVEL 3 PLAN
0' 4' 8' 0
A-14
2 SCALE: 3/32" = 1'-0"

TERRACE

HOTEL LOUNGE

CONCIERGE

RECEPTION
ENTRY
BRIDGE
VALET

OCULUS ABOVE

INFINITY CATCH POOL

REFLECTING POOL
ELEV. 97.00'
ELEV. 86.50'
ELEV. 86.50'
ELEV. 82.50'

LIGHT WELL
2 A-16

SERVICE

ELEVATOR
GUEST

ELEVATOR

LIGHT WELL
ELEV. 97.00'
5 A-18
ELEV. 91.00'
POOL

WATER WALL

ROOF DECK

TERRACE

REFLECTING POOL

LOUNGE LOUNGE
-
ELEV. 82.50'
ELEV. 80.50'

PROPERTY LINE
ELEV. 80.50' ELEV. 86.50'
ELEV. 91.00'
ELEV. 86.50'

TERRACE
ELEV. 86.50' ELEV. 86.50'

TERRACE
ELEV. 86.50'
2' 12' 16' 20'

SCULPTURE SCULPTURE
1 KEY NOTES:

GARAGE AIR EXHAUST LOUVER
-
LOBBY
5,863 S.F.

POOL DECK

HOT TUB
ELEV. 95.00'
ELEV. 86.50' ELEV. 86.50'
ELEV. 86.50'
ELEV. 86.50'
LIVING
BATH

WET BAR BATH
PWDR.

W.C.

PRIMARY

BEDROOM

FIREPLACE
CLOSET
SHOWER

BEDROOM

SHELVES
W/D
DINING
SHOWER
LIVING
BATH

WET BAR BATH
PWDR.

W.C.

PRIMARY

BEDROOM

FIREPLACE
CLOSET
SHOWER

BEDROOM

SHELVES
W/D
DINING
SHOWER
LIVING
BATH

WET BAR BATH
PWDR.

W.C.

PRIMARY

BEDROOM

FIREPLACE
CLOSET
SHOWER

BEDROOM

SHELVES
W/D
DINING
SHOWER
LIVING
BATH

WET BAR BATH
PWDR.

W.C.

PRIMARY

BEDROOM

FIREPLACE
CLOSET
SHOWER

BEDROOM

SHELVES
W/D
DINING
SHOWER

UNIT D UNIT D UNIT D UNIT D
BUILDING 1
4,672 S.F. (4 UNITS)
BUILDING 2
4,672 S.F. (4 UNITS)
BUILDING 3
4,672 S.F. (9 UNITS)
BUILDING 4
4,672 S.F. (9 UNITS)
BUILDING 5
5,606 S.F. (12 UNITS)
(E) HOUSE
2,398 S.F. (2 APTS.)
1 ELEV. 80.50'
ELEV. 86.50'
ELEV. 80.50'
1 CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:50:18 PM A-11

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024
LEVEL 3 FLOOR PLANS
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
1 Plannin
$WWDFKPHQW
DN
DN DN
DN
DN
DN DN
UP
DN
UP
2 A-15
A-15
A-14 1
1 LEVEL 3 POOL DECK BELOW

SAN CARLOS STREET

DOLORES STREET
4 A-17
3 A-17
1 A-16
6 A-18
PROPOSED LEVEL 4 PLAN
0 ROOF DECK
GLASS
OCULUS
POOL
A-14
2 SCALE: 3/32" = 1'-0"
ELEV. 97.00'
2 A-16
ELEV. 107.00'
ELEV. 108.50'
GUEST

ELEVATOR

PERCHED OUTDOOR

SEATING
ELEV. 105.00'
5 A-18

SERVICE

ELEVATOR
ENTRY

DISPLAY

KITCHEN

DINING ROOM
ELEV. 107.00'
-
LOBBY
5,863 S.F.

ELEV. 91.00'
ELEV. 107.00'
ELEV. 105.00'
0' 4' 2' 8' 12' 16' 20'
-
+ 42" GUARDRAIL
UNIT D
LIVING
BATH

KITCHEN BATH
PWDR.

W.C.

PRIMARY

BEDROOM

FIREPLACE
CLOSET
SHOWER

BEDROOM

SHELVES
W/D
DINING
SHOWER
LIVING
BATH

KITCHEN BATH
PWDR.

W.C.

PRIMARY

BEDROOM

FIREPLACE
CLOSET
SHOWER

BEDROOM

SHELVES
W/D
DINING
SHOWER

UNIT D UNIT D UNIT D
BUILDING 1
4,672 S.F. (4 UNITS)
BUILDING 2
4,672 S.F. (4 UNITS)
BUILDING 3
4,672 S.F. (9 UNITS)
BUILDING 4
4,672 S.F. (9 UNITS)
BUILDING 5
5,606 S.F. (12 UNITS)
(E) HOUSE
2,398 S.F. (2 APTS.)
LIVING
BATH

WET BAR BATH
PWDR.

W.C.

PRIMARY

BEDROOM

FIREPLACE
CLOSET
SHOWER

BEDROOM

SHELVES
W/D
DINING
SHOWER
LIVING
BATH

WET BAR BATH
PWDR.

W.C.

PRIMARY

BEDROOM

FIREPLACE
CLOSET
SHOWER

BEDROOM

SHELVES
W/D
DINING
SHOWER
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/12/2024 4:49:11 PM A-12

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024
LEVEL 4 FLOOR PLANS
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
$WWDFKPHQW
DN DN
DN DN
DN DN
DN DN
DN
DN
DN
4 A-17
3 A-17
1 A-16
6 A-18
2 A-16
5 A-18

TYPICAL
2' - 0"

TYPICAL
2' - 0"
3' - 0"
2' - 0"
PROPOSED ROOF PLAN 0
SCALE: 3/32" = 1'-0"
ELEV. 101.00'
ELEV. 107.00'
ELEV. 105.00' ELEV. 105.00'
ELEV. 108.00' ELEV. 108.00'
ELEV. 108.00'
ELEV. 91.00' ELEV. 91.00'
ELEV. 91.00'
ELEV. 82.50' ELEV. 82.50' ELEV. 86.50' ELEV. 86.50'
ELEV. 95.00'

SOLAR PANEL AREA SOLAR PANEL AREA SOLAR PANEL AREA SOLAR PANEL AREA 0' 4' 2' 8' 12' 16' 20'

FLAT TILED ROOF

TYPICAL

FLAT TILED ROOF

TYPICAL

FLAT TILED ROOF

TYPICAL

FLAT TILED ROOF

TYPICAL

FLAT TILED ROOF

FLAT TILED ROOF

FLAT TILED ROOF

FLAT TILED ROOF FLAT TILED ROOF

FLAT TILED ROOF

BERMUDA STYLE BRONZE

ROOF TYPICAL

FLAT TILED ROOF TYPICAL
O.T.B. O.T.B.

FLAT TILED ROOF
ELEV. 86.50' ELEV. 86.50'

FLAT TILED ROOF

TYPICAL

FLAT TILED ROOF

TYPICAL
1 CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:50:52 PM A-13

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

ROOF PLAN
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
1 Plannin
$WWDFKPHQW
LEVEL 3 LOBBY
97' - 0"
LEVEL 4 LOBBY
107' - 0"
LEVEL 4 LOBBY
T.O.P.
115' - "
LEVEL 4 BL 2
97' - 0"
LEVEL 4 BL 2
T.O.P.
10 ' - 0"
LEVEL 3 BL 2
8 ' - "
LEVEL 4 BL 1
T.O.P.
100' - 0"
4 A-17
3 A-17
1 A-1
(E) GRADEPROPOSED GRADE
2 A-1
LEVEL 3 SPLIT
91' - 0"
5 A-18
LEVEL 3 BL 1
80' - "
LEVEL 4 BL 1
91' - 0"

OAK WOOD POSTS & BEAMS

METAL FRAME WINDOWS (BRONZE)

BRONZE ACCENT

PAINTED STEEL BEAM

CARMEL STONE

METAL BERMUDA ROOF (BRONZE)
120' - 7"

BRONZE GUTTER

AUTOMATIC GLASS DOOR

WOOD POST

OAK WOOD PANEL

PROPERTY LINE

PROPERTY LINE
LOBBY BLDG.

BLDG. 2 BLDG. 1

WOOD FRAME WINDOWSCARMEL STONEBRONZE GUTTERMETAL BERMUDA ROOF (BRONZE)

OAK WOOD POSTS & BEAMSSTEEL FASCIA
2 PROPOSED EAST ELEVATION (SAN CARLOS ST.)
SCALE: 3/32" = 1'-0"

ADJUSTED PROPERTY LINE
(E) HOTEL OUTLINE
(E) HOTEL OUTLINE
(E) HOTEL OUTLINE
' - 0" 8' - " 5' - 1"
10' - " 9' - 0"
10' - " 9' - 0"
(E) GRADE +26'
(E) GRADE +24'
10' - 0"
1 1
12 ' - 7 1/2"
LEVEL 3 LOBBY
97' - 0"
LEVEL 2 LOBBY
80' - 0"
LEVEL 4 LOBBY
107' - 0"
LEVEL 4 LOBBY
T.O.P.
115' - "
LEVEL 1 LOBBY
9' - 0"
PAR IN F.F.
47' - "
LEVEL 4 BL 2
97' - 0"
LEVEL 4 BL 2
T.O.P.
10 ' - 0"
LEVEL 3 BL 2
8 ' - "
LEVEL 2 BL 4
7 ' - 0"
LEVEL 1 BL 4
5' - "
LEVEL 4 BL 1
T.O.P.
100' - 0"
LEVEL 3 BL 3
ROOF
8 ' - "
LEVEL 2 BL 3
7 ' - 0"
LEVEL 1 BL 3
5' - " HOUSE FLOOR
' - 8 1/2"
LEVEL 3 FRONT
97' - 0"
LEVEL 3 SPLIT
91' - 0"
LEVEL 4 SPLIT
105' - 0"
LEVEL 3 BL 1
80' - "
LEVEL 4 BL 1
91' - 0"
PREEXISTING GRADE +24'(SEE SHEET A-19)

PROPERTY LINE PROPERTY LINE
BLDG. 5 BEHIND
BLDG. 1
BLDG. 3

HOFSAS HOUSE BEHIND

HOUSE ARA E
57' - 4"

METAL FRAME WINDOWS (BRONZE)

CARMEL STONE

METAL BERMUDA ROOF (BRONZE)

BRONZE GUTTER

CARMEL STONE COLUMN

OFF-WHITE STUCCO

METAL FRAME WINDOW (BRONZE)

BRONZE METAL PLANTER

BRONZE METAL SLAB EDGE (EAVE)

WOOD RAFTER TAIL
LEVEL 4 RAISE
108' - "

SMOOTH STONE TILES
1 PROPOSED NORTH ELEVATION (3RD AVE.)
SCALE: 3/32" = 1'-0"
(E) HOUSE BEHIND

LOBBY BLDG BEHIND
SAN CARLOS ST.

DOLORES ST.
(E) TOPOGRAPHY
(E) TOPOGRAPHY

NEIGHBORING BUILDINGS
(E) HOTEL OUTLINE
(E) HOTEL OUTLINE
PREEXISTING GRADE (SEE SHEET A-19)
10' - " 10' - " 10' - " 9' - 0"
18' - 0" 10' - " 4' - " 10' - " 9' - 0"

LOBBY BLDG BEHIND
BRONZE PIPE GUARDRAIL TYP.

PAR IN L2 F.F.
5 ' - "
FINISH GRADE +24'(SEE SHEET A-19)
80' - 0"
73' - 0"
70' - 0" 5' - 0"
5' - 0"
120' - 7"
1 12 ' - 7 1/2"
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:51:09 PM A-14

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

EAST & NORTH ELEVATIONS
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
1 Pla i
$WWDFKPHQW
LEVEL 2 LOBBY
80' - 0"
LEVEL 1 LOBBY
69' - 0"
PAR ING F.F.
47' - 6"
LEVEL 4 BLDG 2
97' - 0"
LEVEL 4 BLDG 2
T.O.P.
106' - 0"
LEVEL 3 BLDG 2
86' - 6"
LEVEL 2 BLDG 4
76' - 0"
LEVEL 1 BLDG 4
65' - 6"
LEVEL 4 BLDG 1
T.O.P.
100' - 0"
LEVEL 3 BLDG 3
ROOF
86' - 6"
LEVEL 2 BLDG 3
76' - 0"
LEVEL 1 BLDG 3
65' - 6"
4 A-17
1 A-16

HOUSE FLOOR
66' - 8 1/2"
2 A-16
LEVEL 3 SPLIT
91' - 0"
5 A-18
LEVEL 3 BLDG 1
80' - 6"
LEVEL 4 BLDG 1
91' - 0"

METAL FRAME WINDOWS (BRONZE)

CARMEL STONE COLUMNOFF-WHITE STUCCO

WOOD RAFTER TAIL

BRONZE METAL SLAB EDGE (EAVE)
(E) BLOCK WALL PAINTED GREY(E) SLAB EDGE (BLACK)(E) GREY WOOD SIDING

OFF-WHITE STUCCO
(E) GREY PARABOLIC ROOF

METAL FRAMED GLASS GARAGE DOOR
(E) GLASS WALL

GLASS GUARDRAIL

PROPERTY LINE
LOBBY BLDG. BEHIND PROPERTY LINE
BLDG. 4
BLDG. 5
BLDG. 3
BLDG. 1 BEHIND
BLDG. 2 BEHIND

METAL RAILING (BRONZE)

BRONZE METAL PLANTER

BLDG OUTLINE BEHIND

BLDG OUTLINE BEHIND
1 PROPOSED WEST ELEVATION (DOLORES ST.)
SCALE: 3/32" = 1'-0"

ADJUSTED PROPERTY LINE

ADJUSTED PROPERTY LINE

NEIGHBORING BUILDINGS NEIGHBORING BUILDINGS NEIGHBORING BUILDINGS (E) HOTEL OUTLINE
(E) HOTEL OUTLINE
10' - 6" 4' - 6" 10' - 6" 9' - 0"
21' - 6" 11' - 0"
11' - 0"

SVENDSGAARD OUTLINE BEHIND

SVENDSGAARD INN
105' - 0"
100' - 0"
PAR ING L2 F.F.
56' - 6"
120' - 7"
(E) HOTEL OUTLINE
126' - 7 1/2"
LEVEL 3 LOBBY
97' - 0"
LEVEL 2 LOBBY
80' - 0"
LEVEL 4 LOBBY
107' - 0"
LEVEL 4 LOBBY
T.O.P.
115' - 6"
LEVEL 1 LOBBY
69' - 0"
PAR ING F.F.
47' - 6"
6 A-18

HOUSE FLOOR
66' - 8 1/2"
LEVEL 3 SPLIT
91' - 0"
LEVEL 4 SPLIT
105' - 0"

METAL BERMUDA ROOF (BRONZE)

GLASS GUARDRAIL

PROPERTY LINE

PROPERTY LINE
PREEXISTING GRADE +24'
(SEE SHEET A-19)

OFF-WHITE STUCCOBRONZE METAL SLAB EDGE (EAVE)CONCRETE RETAINING WALL

STEEL FASCIACARMEL STONEMETAL FRAME WINDOWSSTEEL RAILING (BRONZE)

BRONZE GUTTEROAK WOOD POSTS & BEAMSOAK WOOD PANELBRONZE ACCENT FRAMESTEEL BEAM

OFF-WHITE PLASTERMETAL FRAME WINDOWCARMEL STONE COLUMN

WOOD RAFTER TAILBRONZE PLANTERS

STEEL STAIR WITH WOOD TREADS
LOBBY BLDG.

BLDG. 5
LEVEL 4 RAISED
108' - 6"
2 PROPOSED SOUTH ELEVATION
SCALE: 3/32" = 1'-0"
SAN CARLOS ST.

DOLORES ST.

PREEXISTING GRADE
(SEE SHEET A-19)
(E) HOTEL OUTLINE
(E) HOTEL OUTLINE
21' - 6" 11' - 0" 11' - 0" 6' - 0" 8' - 0"
2' - 0" 1' - 6"
7' - 0"
BRONZE PIPE GUARDRAIL TYP.

PREEXISTING GRADE +26'
(SEE SHEET A-19)
1 120' - 7"
126' - 7 1/2"
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:51:47 PM A-15

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

WEST & SOUTH ELEVATIONS
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
1 Plannin
$WWDFKPHQW
PAR ING F.F.
47' - 6"
LEVEL 4 BLDG 1
T.O.P.
100' - 0"
LEVEL 3 BLDG 3
ROOF
86' - 6"
LEVEL 2 BLDG 3
76' - 0"
LEVEL 1 BLDG 3
65' - 6"
UNIT B

UNIT DUNIT D
UNIT A2

MECHANICAL
TUNNE;L
LEVEL 3 BLDG 1
80' - 6"
LEVEL 4 BLDG 1
91' - 0"
LEVEL 2 BLDG 1
71' - 0"
SECTION 2 (BLDG. 1 &3)
SCALE: 1/8" = 1'-0"
22' - 0"
BLDG. RETAINING WALL OUTLINE BEHIND

BASEMENT GARAGE

PROPERTY LINE PROPERTY LINE
18' - 0"
23' - 6" 9' - 6" 10' - 6" 9' - 0" 2' - 0"
18' - 0" 10' - 6" 10' - 6"
97' - 0"

BASEMENT
10' - 6" 10' - 6"
PAR ING L2 F.F.
56' - 6"
GARAGE LEVEL 2
9' - 0" 9' - 0" BELOW-GRADE CIRCULATION TUNNEL
20' - 6"
1 PAR ING F.F.
47' - 6"
LEVEL 4 BLDG 1
T.O.P.
100' - 0"
LEVEL 3 BLDG 3
ROOF
86' - 6"
LEVEL 2 BLDG 3
76' - 0"
LEVEL 1 BLDG 3
65' - 6"
UNIT B

UNIT DUNIT D
UNIT A2

MECHANICAL
SECTION 1 (BLDG. 1 &3)
SCALE: 1/8" = 1'-0"
LEVEL 3 BLDG 1
80' - 6"
LEVEL 4 BLDG 1
91' - 0"
LEVEL 2 BLDG 1
71' - 0"
89' - 0"
22' - 0" BASEMENT
82' - 6"
102' - 0"
18' - 0" 5' - 6" 9' - 6" 10' - 6" 9' - 0" 2' - 0"
10' - 6" 10' - 6" 18' - 0"

PROPERTY LINE PROPERTY LINE

BASEMENT GARAGE
PAR ING L2 F.F.
56' - 6"
GARAGE LEVEL 2
20' - 6"
TUNNEL
1 CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
1/8" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:51:54 PM A-16

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024
SECTIONS BLDG 1 & 3
A.P.N: 010-124-010 & 014
C.S.

22.14 17.14.150 Building Height.A. No building shall have more than two stories above grade. Additional underground floors, not defined as a story, may be authorized by a use permit approved by the Planning Commission when the use of these floors is expressly limited to the parking of vehicles, noncommercial storage and mechanical equipment serving the building
-
NO. REVISION
1 Plannin
$WWDFKPHQW
PAR ING F.F.
47' - "
LEVEL 4 BL 2
97' - 0"
LEVEL 4 BL 2
T.O.P.
10 ' - 0"
LEVEL 3 BL 2
8 ' - "
LEVEL 2 BL 4
7 ' - 0"
LEVEL 1 BL 4
5' - "
UNIT A2UNIT B

UNIT DUNIT D

MECHANICAL

BASEMENT GARAGE
TUNNEL
SECTION 3 (BLDG. 2 & 4)
SCALE: 1/8" = 1'-0"
17' - 0"

BASEMENT

PROPERTY LINE PROPERTY LINE
10' - " 10' - " 10' - " 9' - 0"
18' - 0" 10' - " 10' - " PAR IN L2 F.F. 5 ' - " GARAGE LEVEL 2 20' - "

MECHANICAL
9' - 0" 9' - 0"
1 PAR IN F.F.
47' - "
LEVEL 4 BL 2
97' - 0"
LEVEL 4 BL 2
T.O.P.
10 ' - 0"
LEVEL 3 BL 2
8 ' - "
LEVEL 2 BL 4
7 ' - 0"
LEVEL 1 BL 4
5' - "
UNIT A2UNIT B
UNIT D
UNIT D

BASEMENT GARAGE
SECTION 4 (BLDG. 2 & 4)SCALE: 1/8" = 1'-0"

MECHANICAL
TUNNEL
17' - 0"
27' - 0"
BLDG. RETAINING WALL OUTLINE BEHIND

BASEMENT

PROPERTY LINE

PROPERTY LINE
18' - 0" 10' - " 10' - " 10' - " 9' - 0"
2' - 0"
18' - 0" 10' - " 10' - " PAR IN L2 F.F. 5 ' - " GARAGE LEVEL 2 20' - "
23' - "
1 CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
1/8" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:52:01 PM A-17

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024
SECTIONS BLDG 2 & 4
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
1 Pla i
$WWDFKPHQW
LEVEL 3 LOBBY
97' - 0"
LEVEL 2 LOBBY
80' - 0"
LEVEL 4 LOBBY
107' - 0"
LEVEL 4 LOBBY
T.O.P.
115' - 6"
LEVEL 1 LOBBY
69' - 0"
PAR ING F.F.
47' - 6"
6 A-18

HOUSE FLOOR
66' - 8 1/2"
LEVEL 3 SPLIT
91' - 0"
LEVEL 4 SPLIT
105' - 0"
LOUNGE

RECEPTION

KITCHEN

HOTEL DINING
BAKERY

PROPERTY LINE
97' - 3"
SECTION 5 (LOBBY & BLDG 5) SCALE: 1/8" = 1'-0"
31' - 0"
108' - 6"

BASEMENT

GARAGE C

HOUSE GARAGE
57' - 4"
APARTMENT 1
SUITE A3SUITE A3

STORAGE
PARKING GARAGE LEVEL 2

ROOF DECK
LEVEL 4 RAISED
108' - 6"
118' - 3"
9' - 10" 9' - 4 1/2" 2' - 3 1/2"
11' - 0" 11' - 0" 6' - 0" 8' - 0" 2' - 0"
1' - 6"
7' - 0"

CAR ELEVATOR BEHIND
APARTMENT 2
PAR ING L2 F.F.
56' - 6"
106' - 0"
(VEHICLE DISPLAY)

BASEMENT PARKING GARAGE
1 1
1 LEVEL 3 LOBBY
97' - 0"
LEVEL 2 LOBBY
80' - 0"
LEVEL 4 LOBBY
107' - 0"
LEVEL 4 LOBBY
T.O.P.
115' - 6"
LEVEL 1 LOBBY
69' - 0"
PAR ING F.F.
47' - 6"
4 A-17

PROPERTY LINE

PROPERTY LINE
SECTION 6 (BLDG. 5)SCALE: 1/8" = 1'-0"
SPA
UNIT B
LEVEL 3 SPLIT
91' - 0"
LEVEL 4 SPLIT
105' - 0"
5 A-18
A3
LEVEL 4 RAISED
108' - 6"
21' - 6" 11' - 0"
11' - 0" 6' - 0" 8' - 0" 2' - 0"
1' - 6"
7' - 0"

BASEMENT
PAR ING L2 F.F.
56' - 6"
A3
A3 A3
GARAGE
(E) HOUSE
RAMP
A6
A5 A4A5 A4
A3 A3
120' - 7" 1
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
1/8" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:52:30 PM A-18

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024
SECTIONS LOBBY & BLDG 5
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
1 Plannin
$WWDFKPHQW
APN 010-124-009
APN 010-124-008
APN 010-124-013
2 4
6 8
11 41.8'

14.0' 2.0'

22.4'

28.7'

0.6'3.7'

EDGE OF

PAVEMENT
1' RW
WOOD TYP.

BLDG. OVERHANG

RAISED SURFACE
ELEV:98.10
0 5. -1 5.

CONC.

EDGE O
PAVEM
L PI
STRUC. WALL
CONC. TYP.

BLDG OVERHANG
6' WOOD FENCE

LAND NI G LAND NG I STEPS STEPS STEPS
8' RW
CONC. TYP.
3' RW
CONC. TYP.
3' RW
WOOD TYP.

STEPS
4' RW
CONC. TYP.
2' RW
WOOD TYP.
5' WALL
CONC. TYP.

L PI
L PI

EDGE OF

PAVEMENT

EDGE OF PAVEMENT

PARKING STAGES

SIDEWALK
N 00°00'00" E
230.00
60 65
70 75
08 58
90 95
95 80
70 65
60 55

57.86 73.23

76.49 82.55

82.67 87.11

76.14 87.27
87 91.6
9 93.26

98.30 97.99

97.86 97.89

98.12 97.02

97.65 9

97. 96.53

93.11 68.33

63.36 66.48

66.41 N 90°00'00" E
100.00
N 90°00'00" W
100.00
S 00°00'00" E
120.00
N 90°00'00" E

30.00 S 00°00'00" E

40.00 N 90°00'00" W

70.00 10
86 MN
104

99.43 LSMG
105

98.10 MN
106

97.92 INK X
111

68.05 MNS
117

47.40 MBE
8 0
N
119

49.26 CTL
120

59.31 121
MM

52.52 122
MN

50.53 MN
138

72.93 MN
141

96.37 FND 205
FND 5/8"RB LS8368
FND 206
FND 5/8"RB LS8368
FND 3066
4"IP
WS
WS
WM
88 9. 8 RL
29" O
88 9. 5 RL
DS
CODSCO
HB
101.48

72.03 RL

72.85 RL

72.21 RL

74.83 RL

72.79 RL

73.70 RL 73 7. 1 RL

75.03 RL

75.02 RL

75.02 RL

75.04 RL

72.27 RL
WM
15" O
GM
HB
6" P
U
U
U
HB
WM
AD

97.80 AD

97.80 AD

97.76 AD

97.55 DS
101 2. 4 RL
116 2. 3 RL
10104
CHK
FND 20020
FND 5/8"RB LS8368
FND 20019
FND 5/8"RB LS8368
143

56.50 CTL
13" TR

71.15 RL
8" P
15 TR
101.17
101.61 RL
101.66 RL
101.68 R 102 3. 7 RL
102.28 RL
104.99 RL 105.01 RL 105.10 RL

75.00 RL

75.09 RL

74.83 RL
75 0. 1 RL
75 0. 3 RL
89 0. 7 RL
99 9. 6 RL

MP O TR
2 - 3"
2 - 4"
4" O

SAN CARLOS STREET
N
APPROXIMATION OF PREEXISTING CONDITIONS0' 8' 16' 32'
SCALE: 1/16" = 1'-0"
SETBAC
7' - 6"
SETBAC
5' - 0"
0' - 0"
5' - 0"
5' - 0"
5' - 0"
95 9085
70 97
70 CARMEL CODE 17.06.020-RULES OF MEASUREMENTF. "On sites disturbed from previous grading or excavation activities, an approximation of preexisting conditions may be used as a reference for determining average or existing grade using grades on adjacent sites, retaining walls and prior survey maps. All such grade approximations shall require the concurrence of the Department and a determination that the resulting project complies with all requirements of the Zoning Ordinance, avoids large exposed cuts and unnatural topography and is consistent with R-1 design objectives." 73 80
73 80
*SEE ATTACHED RESPONSE DOCUMENT ON R-1 DESIGN OBJECTIVES CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:52:43 PM A-19

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

ADJACENT PREEXISTING GRADE
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
$WWDFKPHQW
DOC. NO. 2016010040
0( 83 . 12 AC.)
APN 010-124-009
APN 010-124-008
DO (
C. NO. 2003118883) APN 010-124-010
APN 010-124-014
APN 010-124-013
B( LOCK 34)
1 2
3 4
5 6
7 8
9 10
11 12
14 20.3'

22.3'

58.0'

22.2'

20.3'

21.2'

21.2'

19.0'

22.2' 19.0' 25.2'

28.1'

19.2'

46.1'
' 2. 02

46.1'

20.2'
22 2. '

27.5' 3.3'

7.7' 3.3'33.6' 3.3' 4.3'

3.5'

4.2'

15.6'3.5'

5.6'

63.8'

10.4'

6.1' 6 3. '

25.7'

41.8'

38.4' 5.2'

3.3'

1.0'

19.7' 4.14.9' '

14.6'

14.0' 2.0'

14.0'

22.3'

14.0'

22.3' 16.4'

22.4'

11.0'

7.4'

25.1' 8.1'
3 9. ' 11.3'
6 2. '

1.8'
5 0. '

1.8'
17 5. '

7.8' 7 9. '

7.0'

14.1'

12.8'
21 7. '

4.0'

10.0' 4.7'

26.9'

14.5'

22.5'

10.0'

20.4' 10.0'

20.4'

17.2'

25.8' 8.1' 4.4'

2. ' 3 6.9'
79 4. '

5.9'
10 4. '

0.6'

28.7'

0.6'
20 2. '
1 3. ' 2 6. ' 0.4'

22.0' 27.9' 30.6'

3.7'
3-6' RW
CONC. TYP.

EDGE OF

PAVEMENT
STEPS
1' RW
WOOD TYP.
4' RW
CONC. TYP.

RAISED SURFACES
ELEV:84 3. 3
ELEV:93 6. 7

RAISED SURFACES
ELEV:83 9. 4
ELEV:93 3.

C
6 OLUMN
BLDG. OVERHANG
BUILDING 1
BUILDING 2 BUILDING 3
BUILDING 4
BUILDING 6 BUILDING 7
BUILDING 5
BUILDING 4
BUILDING 4

RESIDENCE

STA RI CASE

W/ LANDING

BOLLARD
TURRET

WATER TANK
3 5. ' RW
WOOD TYP.

RAISED SURFACE
ELEV:98.10

RAISED SURFACES
ELEV:88 7. 8
ELEV:98.10
ELEV:107.53

STA RI CASE

W/ LANDING
6' WOOD
FENCE

WALKWAY
3' RW W/
3' FENCE
STEPS
GATE
RAMP
RAMP
STEPS

PATIO PATIO

RAISED SURFACE
ELEV:98 3. 3
STEPS
0 5. -1 5.

CONC.

EDGE O
PAVEM
L PI
6 5. -9 5. ' RW
CONC. TYP.

STEPS

RAISED SURFACE
ELEV:107.15
STEPS
STEPS
STEPS
STEPS

STORAGE

STORAGE

PLANTER
3-6' RW
CONC. TYP.
3' WALL
CONC. TYP.

PLANTER
5' RW CONC. TYP.
7' RW
CONC. TYP.

STRUC. WALL
CONC. TYP.

BLDG OVERHANG

STA RI CASE

W/ LANDING

OVERHANG
5' WALL
CONC. TYP.
4 5. ' RW
WOOD TYP.
6' WOOD FENCE

LAND NI G LAND NG I STEPS STEPS STEPS
5' RW
CONC. TYP.
8' RW
CONC. TYP.
0 5. -4 5. ' RW
CONC. TYP.
2 5. ' RW
CONC. TYP.
3' RW
CONC. TYP.
8' RW
CONC. TYP.
3' RW
CONC. TYP.
3' RW
WOOD TYP.

EDGE OF

PAVEMENT

EDGE OF

PAVEMENT
STEPS
STEPS

CRAWL SPACE
STEPS
STEPS
4' RW
CONC. TYP.
2' RW
WOOD TYP.
5' WALL
CONC. TYP.
0 5. -1 5. ' RW
CONC. TYP.
3' WOOD FENCE
L PI
L PI

EDGE OF

PAVEMENT

EDGE OF PAVEMENT
POOL

PARKING AREA

PARKING AREA

PARKING AREA

PARKING STAGES

SIDEWALK
ENTRACEN 00°00'00" E
230.00
60 65
70 75
08 58
90 95
95 09
58 08
85 80
75 75
70 70
65 60
55 55
60 56
70 70
07 70

57.51 57.86

58.44 65.26

66.74 70.24

72.60 71.16

73.60 73.46

68.73 68.89

73.50 69.20

73.94 74.13

74.21 72.50

73.23 76.49

82.55 82.67

87.11 76.14 87.27
87 91.6
9 93.26

98.30 97.99

97.86 97.89

98.12 97.02

97.65 9

97. 96.53

96.77 93.11

85.79 86.73

82.33 78.52

71.10 71.43

78.96 81.64

86.79 86.22

86.53 78.06 72.28

79.26 74.18

73.92 79.19

79.34 74.09

76.28 76.16

76.26 76.57

77.69 74.67

74.65 68.33

63.36 66.48

66.41 67.64

70.24 71.81

72.26 71.20

70.34 N 90°00'00" E
100.00
N 90°00'00" W
100.00
S 00°00'00" E
120.00
N 90°00'00" E

30.00 S 00°00'00" E

40.00 N 90°00'00" W

70.00 10
86 MN
104

99.43 LSMG
105

98.10 MN
106

97.92 INK X
111

68.05 MNS
114

70.91 MN DW
115

69.38 MN DW
117

47.40 MBE
8 0
N
119

49.26 CTL
120

59.31 121
MM

52.52 122
MN

50.53 MN
123

58.51 INK X
124

74.66 MN
125

74.55 MM
126

87.61 MN 127

87.96 MM
128

71.10 MN
129

86.39 INK X
131

84.33 INK X
130

84.27 INK X
132

84.29 INK X
133

84.30 INK X
134

69.29 1
/2" RB
135

79.27 INK X
136

74.02 MN
137

73.58 INK X
138

72.93 MN
141

96.37 FND 205
FND 5/8"RB LS8368
FND 206
FND 5/8"RB LS8368
FND 3066
4"IP
WS
126.64 RL
121.09 RL
121.11 RL
WS
WM
88 9. 8 RL

78.18 RL
78 9. 6 RL

67.90 HT
29" O
88 9. 5 RL
DS
57 9. 5 FF

57.87 FF
57 9. 1 FF

58.60 TH

58.56 TH

HB GM EM
3PR TR 6",6",6"
CODSCO
HB

89.33 RL

90.92 RL

84.96 94.03

98.63 101.48
107.70 TH 107.60 FF
107.56 TH
107.60 TH
107.59 TH
107.57 TH
C
C
C
C
C
107.67 TH
107.67 TH
AD
107.08
107.60 TH
AD
107.07
107.17
HB
98 2. 0 TH

90.62 RL

90.99 RL
CO
HB
CB

69.17 CO
HB
88 0. 3 FF

87.98 FF

87.26 TH

88.35 TH
CO

86.83 TH
HB
86 5. 4 TH

79.49 TH

79.58 TH
DS DS
DS

88.80 TH

88.81 TH

88.81 TH

88.81 TH

88.81 TH
88 8. 4 TH 89.90 RL 89.74 RL

91.00 RL 89.51 RL

91.01 RL
AD

84.26 86 2. 7 RL

86.33 RL

84.41 TH

84.40 TH 84.40 TH
84 3. 5 TH
CO

93.75 TH

84.38 TH

93.74 TH

93.66 TH

72.03 RL

72.85 RL

72.21 RL

74.83 RL

72.79 RL

73.70 RL 73 7. 1 RL

75.03 RL

75.02 RL

75.02 RL

75.04 RL
CO
AD

73.36 HB
HB

74.09 FF

74.16 TH
74 1. 0 TH

74.14 TH CB

68.19 79 4. 3 TH

79.43 TH

79.40 FF

85.48 FF

79.37 TH
HB

80.31 TH

80.31 TH

80.26 TH

80.27 TH

72.27 RL
HB

74.11 TH

74.32 FF
74 2. 0 TH
DS
DS
HB
HB
GL
112.08 RL
116.62 RL
120.95 RL
121.16 RL
121.18 RL
WM
15" O
GM
HB
6" P
U
U
U

93.71 TH

98.48 TH
HB
WM

98.20 TH AD

97.80 AD

97.80 AD

97.76 AD

97.55 DS

98.15 TH
101 2. 4 RL
116 2. 3 RL
116.17 RL
126.65 RL
121.03 RL
120.96 RL
120.94 RL
10104
CHK
10115
CHK
FND 20020
FND 5/8"RB LS8368
FND 20019
FND 5/8"RB LS8368

81.52 RL 81 6. 1 RL
81 6. 1 RL
142

77.24 CTL 79.20
143

56.50 CTL
144

64.38 CTL
FND
215 3
/4 IP
LS8368
12" TR
11" TR
13" TR

71.15 RL
8" P
15 TR
101.17
101.61 RL
101.66 RL
101.68 R 102 3. 7 RL
102.28 RL
104.99 RL 105.01 RL 105.10 RL

75.00 RL

75.09 RL

74.83 RL
75 0. 1 RL
75 0. 3 RL
89 0. 7 RL
99 9. 6 RL

MP O TR
2 - 3"
2 - 4"
6" O
6" O
4" O
3" O
DN
2 A-15
A-15
1 A-14
2 A-20 1
2 A-20
A-20 3
4 A-20
A-21 1
2 A-21

SAN CARLOS STREET
N
PREEXISTING CONDITIONS WITH BUILDINGS0' 8' 16' 32'
SCALE: 1/16" = 1'-0"
SETBAC
5' - 0"
SETBAC
10' - 0"
SETBAC
7' - 6"
SETBAC
5' - 0"
SETBAC
10' - 0"
5' - 0"
0' - 0"
5' - 0"
5' - 0"
5' - 0"

ADJUSTED LOT LINE
95 9085
807370
97 85
80 70
-
CARMEL CODE 17.06.020-RULES OF MEASUREMENTF. "On sites disturbed from previous grading or excavation activities, an approximation of preexisting conditions may be used as a reference for determining average or existing grade using grades on adjacent sites, retaining walls and prior survey maps. All such grade approximations shall require the concurrence of the Department and a determination that the resulting project complies with all requirements of the Zoning Ordinance, avoids large exposed cuts and unnatural topography and is consistent with R-1 design objectives." 73 *SEE ATTACHED RESPONSE DOCUMENT ON R-1 DESIGN OBJECTIVES CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:52:52 PM A-19B

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

PREEXISTING GRADE W/ BLDGS
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
$WWDFKPHQW
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
1/4" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:52:57 PM A-19C

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024
R-1 OBJECTIVES
A.P.N: 010-124-010 & 014
C.S.

22.14 A. The Urban Forest. Site improvements and the public right-of-way should be designed to preserve significant trees and to perpetuate the established urban forest in each neighborhood where it exists. Each site should contribute to the urban forest or other vegetation characteristic of the neighborhood, by harboring an appropriate number and mix of trees and/or shrubs consistent with the neighborhood context and the neighborhood streetscape.The Legacy HotelR-1 Design ObjectivesB. Neighborhood Design. Each site shall contribute to neighborhood character including the type of forest resources present, the character of the street, the response to local topography and the treatment of open space resources such as setbacks and landscaping. It is intended by this objective that diversity in architecture be encouraged while preserving the broader elements of community design that characterize the streetscape within each neighborhood.C. Site Design. Good site design is essential to good building design. Site improvements shall be compatible with, and sensitive to, the natural features and built environment of the site and of the surrounding area. Design solutions should relate to and take advantage of site topography, vegetation and slope. Designs shall recognize the limitations of the land and work with these limitations, rather than ignoring them or trying to override them.

D. Mass and Bulk. Residential designs shall maintain Carmel’s enduring principles of modesty and simplicity and preserve the City’s tradition of simple homes set amidst a forest landscape. Buildings shall not present excess visual mass or bulk to public view or to adjoining properties. Large box-like buildings and buildings with large, continuous, unrelieved surfaces can appear massive. Designing building and roof planes with just a few, simple forms and keeping floor levels and plate heights close to grade help reduce mass and bulk. The use of natural materials such as wood or stone and the creative use of landscaping can also help to avoid excess mass by introducing texture, variety and screening.E. Scale. Buildings shall relate to a human scale in their forms, elements and in the detailing of doors, windows, roofs and walkways. Oversized design elements make structures appear dominating and monumental. This out-of-scale character represents a poor fit to the human form, vitiates the more intimate, rural charm and village character of Carmel-by-the-Sea and shall be avoided.F. Boxed-in Neighbors. Designs should preserve reasonable access to light, air and open space for surrounding properties when considered cumulatively with other buildings in the neighborhood. Designs incorporating tall or bulky building elements located near an adjoining site that is already partially boxed-in by previous development should be avoided.G. Privacy. Designs should respect the privacy of neighbors. The placement of windows, doors, balconies and decks should be sensitive to similar improvements on neighboring properties.

H. Open Space. The design of structures shall be coordinated with open space to enhance the park-like environment of the City. Open space should be distributed around buildings to provide visual relief from structural bulk and a distinct separation from buildings on adjacent sites. Open space is a shared community resource and some front yard open space on each site should remain visible from the street when this is consistent with the context established by neighboring sites.I. Landscaping. Designs should coordinate structural elements with landscaping to achieve a pleasing overall site design. Landscaped open space on-site can help enhance the urban forest, or other vegetation characteristic of the neighborhood, by coordinating with open space on neighboring sites and roadside vegetation. Landscaping also can aid in achieving other design objectives such as breaking up mass and bulk and protecting privacy, but such use of landscaping should not substitute for good building design.J. Public Views. Buildings shall be located and designed to preserve significant coastal views from the public right-of-way in conformance with Section 30251 of the California Coastal Act. The protection of public views should not prevent reasonable development of the site, yet development shall not preclude reasonable protection of any significant coastal view.The proposed hotel does not increase obstruction of any current views. The proposed hotel is positioned lower than the current hotel in relation to all surrounding properties with views. K. Private Views. Designs should respect views enjoyed by neighboring parcels. This objective is intended to balance the private rights to views from all parcels that will be affected by a proposed building or addition. No single parcel should enjoy a greater right than other parcels except the natural advantages of each site’s topography. Buildings which substantially eliminate an existing significant view enjoyed on another parcel should be avoided.L. Solar Access. Designs should preserve the rights to reasonable solar access on neighboring parcels. Excessively tall buildings, particularly those near a north property line, which would block the free passage of the sun onto neighboring solar collectors or south-facing windows on neighboring sites, should be avoided.M. Equity. Design controls and conditions of approval should be reasonable and fair. (Ord. 2004-02 § 1, 2004; Ord. 2004-01 § 1, 2004).

The Legacy Hotel not only meets the description and perpetuation of the “Urban Forest”, but re-imagines how the vegetation and architecture can be integrated into one; occupying and interacting within the built environment of the hotel.

Each building provides a vegetative Roof Deck that houses a variety of trees and shrubs. Essentially, redefining the ground plane and perpetuating the “Urban Forest” tree canopy above each building. Plantings and greenery can be found within the interblock walkways and circulation corridors between the buildings. Low-profile ground-cover or grasses are even planned to be integrated into the floor slab of the public space closest to Dolores Street.

In addition, forestry recommended trees and plantings will be added along San Carlos Street for improvement to the current streetscape. This will act to give a sense of natural proportion, balance and scale to the San Carlos facade; while providing an environmental, visual boundary to visitors entering the city from Camino Del Monte.

The current site is barren, so every effort has been made to preserve any existing trees and surrounding shrubs.

The design and aesthetic of the Legacy Hotel is a composition of many celebrated local architectural expressions. Most notably, the hotel, inadvertently, shares many of the characteristics seen in Carmel’s most iconic architectural attraction; the Clinton Walker house by Frank Lloyd Wright. The same use of Carmel Stone to clad heavy elements that visually anchor the structure to the landscape. Accompanied by low- sloping, bermudastyle metal hip roofs and windows that are delineated with unique wood-lined borders.

Using timber and locally sourced stone with Craftsman articulation and detail, the architecture builds off of the shoulders of celebrated Carmel, Coastal, and Californian design styles. The massing is broken up into a collection of smaller buildings, with a clear emphasis on holding the street line while cascading down in accordance with the local topography.

In fact, the current site is completely excavated into a 4 story pit. So the Legacy acts to redefine the lost pre-existing natural grade, by stepping down in multiple directions and providing a gradual interpretation of what the hillside once was. Allowing visitors and pedestrians to safely traverse and navigate between blocks; restitching the natural urban fabric.

The neighboring property (The Svendgaard) is pulled away from San Carlos, welcoming visitors to Carmel with a view of a parking lot and motel style swimming pool. We find it important to follow Carmel and European planning strategies, by holding the street edge and essentially funneling the pedestrians towards downtown. Yet, in the same breath, the San Carlos Street buildings maintain a low profile (sometimes with only 1 story visible) and adhere to the height objectives and massing objectives of the village character. See response to Objective B for site design in relation to topography.

The Legacy Hotel takes a unique approach to site and circulation design, which should improve the neighborhood character and move away from the outdated “Motel model”that is hurting the City’s character.

Carmel’s charm is negatively impacted by hotels/ motels with exposed exterior walkways featuring a wall of hotel room doors visible from the street. The Legacy Hotel site design features a central, outdoor corridor that leads guests to all buildings from the center of the property. This allows the San Carlos Facade to conceal circulation corridors/ hotel room doors/ and stairwells from the eye of the public.

This central artery is essential to the handicap accessibility of all buildings, while allowing the buildings to cascade down in accordance with the topography.

The Legacy weaves a simple composition between Carmel Stone to denote the heavy/ anchoring elements, with a neutral stucco for most walls, and timber framed window sequences, paneling and rafter tails found throughout. The simple massing includes one low horizontal element intersecting with one or two tower-like, vertical elements.

These towers are found in strategic locations throughout the project, with the main tower signaling the entrance to the Lobby. Due to the restricting height limitations, these “special features” allow the buildings to maintain a proper scale and street presence, without exceeding a height protrusion percentage of 10%. Without these towers, the buildings would have a disconnected relationship with the human scale on San Carlos Street. This is due to having to sink the building so far down below the street, that pedestrians are sometimes met with a view of the roof. The towers help to regain an ordinary street height, scale and proportion.

There are no long stretches of simultaneous surface. The building surface jogs and bumps to a minimum degree, often accompanied by a material change from stone to stucco. The natural and neutral color palette of browns, beiges and wood grain work to blend architecture into the Urban Forest and surrounding context.

As stated in the previous objective, our building has adapted and responded to the unnatural topographic challenges and pre-existing excavated pit. The buildings cascades down the hill, re-establishing the pre-existing slope of the hillside.

The proposed buildings decrease the scale and dominating behavior of the previous hotel. The existing hotel towers above the neighborhood as a 4 story wall of hotel units. The Legacy structures, in contrast, are broken up and dropped down into the hillside to meet Carmel’s objective on scale.

The Lobby Building, purposely, represents the uppermost point of the aggregation of buildings throughout the site. This allows the architecture to delineate its function as the gateway and central node of the aggregation of buildings. Yet, even this building retains a 26 foot height from the finish grade of San Carlos Street. The Lobby also steps down to split levels in accordance with the sloping topography; only allowing special features (towers) to extend up vertically as architectural statements. These provide a vertical rhythm, and break up the horizontal attributes of the structure.

The Legacy Hotel preserves reasonable access to light, air and open space for surrounding properties. Even allowing the public to pass through the outdoor open spaces and intra-block walkways that connect the surrounding streets. The hotel steps down in terraced increments, which allow sunlight from the East to reach the properties below on Dolores. Southern sunlight exposure is unobstructed to all neighboring properties.

The design respects the privacy of neighbors. The hotel rooms orient main openings/ sliding glass doors to the West, overlooking the privately owned Legacy Hotel property towards the sea. There are no privacy conflicts with any neighboring properties along Dolores, as they exist on a lower grade level than the hotel. This is illustrated on the North Elevation (Sheet A-14).

Interconnected pathways, intra-block walkways, and the arterial central corridor all act to provide visual separation and circulation connections between all the buildings.

Building 5, closest to Dolores, features a landscaped community terrace. This allows the building to be set back from the neighborhood, with the outdoor terrace leading to the street edge. Therefore, the Hofsas House Residence is the only building with a direct contextual relationship to the Dolores Street neighborhood. Each building features an open Roof Deck, which allows each building footprint usage to be enhanced with both interior and outdoor space. Please refer to the answer to Objective A.

The proposed hotel does not increase obstruction of any current views. The proposed hotel is positioned lower than the current hotel in relation to all surrounding properties with views.

The proposed hotel does not increase obstruction of any current views. The proposed hotel is positioned lower than the current hotel in relation to all surrounding properties with views. Please refer to the answer to Objective F.

The design aims to adhere to all reasonable and rational interpretations of the code and approval processes.
-
NO. REVISION
$WWDFKPHQW
PAR ING F.F.
47' - 6"
LEVEL 4 BLDG 1
T.O.P.
100' - 0"
LEVEL 3 BLDG 3
ROOF
86' - 6"
LEVEL 2 BLDG 3
76' - 0"
LEVEL 1 BLDG 3
65' - 6"
LEVEL 3 BLDG 1
80' - 6"
LEVEL 4 BLDG 1
91' - 0"
LEVEL 2 BLDG 1
71' - 0"
89' - 0"
85' - 0"
70' - 0"
65' - 0"
PREEXISTING GRADE + 24'

PREEXISTING GRADE
PAR ING L2 F.F.
56' - 6"
73' - 0"
FINISH GRADE + 24'
PAR ING F.F.
47' - 6"
LEVEL 4 BLDG 1
T.O.P.
100' - 0"
LEVEL 3 BLDG 3
ROOF
86' - 6"
LEVEL 2 BLDG 3
76' - 0"
LEVEL 1 BLDG 3
65' - 6"
LEVEL 3 BLDG 1
80' - 6"
LEVEL 4 BLDG 1
91' - 0"
LEVEL 2 BLDG 1
71' - 0"
PREEXISTING GRADE + 24'
95' - 0"
90' - 0"
85' - 0"
70' - 0"

PREEXISTING GRADE
BUILDING 1 & 3 HEIGHT ANALYSIS
PAR ING L2 F.F.
56' - 6"
73' - 0"
21' - 3"
23' - 6"
FINISH GRADE + 24'
80' - 0"
PAR ING F.F.
47' - 6"
LEVEL 4 BLDG 2
97' - 0"
LEVEL 4 BLDG 2
T.O.P.
106' - 0"
LEVEL 3 BLDG 2
86' - 6"
LEVEL 2 BLDG 4
76' - 0"
LEVEL 1 BLDG 4
65' - 6"
95' - 0"
90' - 0"
85' - 0"
9' - 0" 10' - 6" 10' - 6" 10' - 6"
PREEXISTING GRADE + 26'

PREEXISTING GRADE
PAR ING L2 F.F.
56' - 6"
73' - 0"
19' - 1 1/2"
23' - 6"
FINISH GRADE + 26'
LEVEL 2 LOBBY
80' - 0"
PAR ING F.F.
47' - 6"
LEVEL 4 BLDG 2
97' - 0"
LEVEL 4 BLDG 2
T.O.P.
106' - 0"
LEVEL 3 BLDG 2
86' - 6"
LEVEL 2 BLDG 4
76' - 0"
LEVEL 1 BLDG 4
65' - 6"
97' - 0"
95' - 0"
90' - 0"
85' - 0"

PREEXISTING GRADE
BUILDING 2 & 4 HEIGHT ANALYSIS
NOTES: SEE PAGE A-7 FOR VIEW MARK LOCATIONS
SEE PAGE A-19B FOR COORDINATED PERIMETER GRADE POINTS
PAR ING L2 F.F.
56' - 6"
80' - 0"
PREEXISTING GRADE + 26'
20' - 0"
FINISH GRADE + 26'
89' - 2 3/4"
107' - 0"
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:53:26 PM A-20

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

PREEXISTING GRADE HEIGHTS
A.P.N: 010-124-010 & 014
C.S.

22.14 3/32" = 1'-0" 1 BL 1 3 NORTH3/32" = 1'-0" 2 BL 1 3 SOUTH 3/32" = 1'-0" 3 BL 2 4 NORTH3/32" = 1'-0" 4 BL 2 4 SOUTH -
NO. REVISION
$WWDFKPHQW
LEVEL 3 LOBBY
97' - 0"
LEVEL 2 LOBBY
80' - 0"
LEVEL 4 LOBBY
107' - 0"
LEVEL 4 LOBBY
T.O.P.
115' - 6"
LEVEL 1 LOBBY
69' - 0"
LEVEL 4 FRONT
T.O.P.
117' - 0"
LEVEL 3 SPLIT
91' - 0"
LEVEL 4 SPLIT
105' - 0"
90' - 0"
85' - 0"
75' - 0"
95' - 0"
97' - 0"

HOUSE GARAGE
57' - 4"
LEVEL 4 RAISED
108' - 6"
PREEXISTING GRADE @ LOBBY PERIMETER
PREEXISTING GRADE + 26'

ELEVATOR TOWER (EXEMPT SPECIAL FEATURE)
23' - 3 1/2"
FINISH GRADE + 26'
FINISH GRADE + 26'
80' - 0"
1 LEVEL 3 LOBBY
97' - 0"
LEVEL 2 LOBBY
80' - 0"
LEVEL 4 LOBBY
107' - 0"
LEVEL 4 LOBBY
T.O.P.
115' - 6"
LEVEL 1 LOBBY
69' - 0"
LEVEL 3 SPLIT
91' - 0"
85' - 0"
85' - 0"
90' - 0"
95' - 0"
97' - 0"
LEVEL 4 RAISED
108' - 6"
PREEXISTING GRADE + 26'

PREEXISTING GRADE

PREEXISTING GRADE
PREEXISTING GRADE + 26'
NOTES: SEE PAGE A-7 FOR VIEW MARK LOCATIONS
SEE PAGE A-19B FOR COORDINATED GRADE POINTS
80' - 0"
73' - 0"
80' - 0"
23' - 3 1/2"
FINISH GRADE + 26'
FINISH GRADE + 26'

ELEVATOR TOWER (EXEMPT SPECIAL FEATURE)

ELEVATOR TOWER (EXEMPT SPECIAL FEATURE)
LEVEL 3 LOBBY
97' - 0"
LEVEL 2 LOBBY
80' - 0"
LEVEL 4 LOBBY
107' - 0"
LEVEL 4 LOBBY
T.O.P.
115' - 6"
LEVEL 3 SPLIT
91' - 0"
LEVEL 4 SPLIT
105' - 0"
LEVEL 4 RAISED
108' - 6"
LOUNGE

RECEPTION

KITCHEN

HOTEL DINING
BAKERY
97' - 3"
108' - 6"

GARAGE C
SUITE A3SUITE A3

STORAGE

ROOF DECK
118' - 3"
11' - 0" 6' - 0" 8' - 0" 2' - 0"
1' - 6"
7' - 0"
90' - 0"
85' - 0"

ELEVATOR TOWER

ELEVATOR TOWER (EXEMPT SPECIAL FEATURE)
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:

As indicated
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:54:15 PM A-21

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

PREEXISTING GRADE HEIGHTS
A.P.N: 010-124-010 & 014
C.S.

22.14 3/32" = 1'-0" 1 LOBBY NORTH
3/32" = 1'-0" 2 LOBBY SOUTH
1/8" = 1'-0" 3

LOBBY SECTION- HEIGHTCORRELATION
-
NO. REVISION
1 Plannin
$WWDFKPHQW
28"
O
DN DN
DN
10% LIMIT = 2,278 S.F. (E) 2.8% PROPOSED = 640 S.F.

HEIGHT PROTRUSIONS
(SPECIAL DESIGN FEATURES "TOWERS")

17.14.150 Building Height.Small areas not exceeding 10 percent of the proposed building coverage and occupied by special design features such as towers, steeples and ornamentation may exceed these heights if approved by the Planning Commission.TOWER- Tower, any structure that is relatively tall in proportion to the dimensions of its base. It may be either freestanding or attached to a building or wall. -ENCYCLOPEDIA BRITANNICA
-a tall, narrow building, either freestanding or forming part of a building... -OXFORD LANGUAGES

TOWER ELEMENTS
1 (EXEMPT VIA PLANNING COMMISSION)
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
3/32" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:54:32 PM A-22

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

TEN PERCENT SPECIAL

FEATURES
A.P.N: 010-124-010 & 014
C.S.

22.14 3/32" = 1'-0" 1 site Copy 1
-
NO. REVISION
1 Plannin
$WWDFKPHQW
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
1" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:54:42 PM A-23

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

EXISTING HOTEL MASS

OVERLAY
A.P.N: 010-124-010 & 014
C.S.

22.14 SAN CARLOS FACING SOUTHWESTSAN CARLOS NORTH ELEVATION OVERLAY

EXISTING HOTEL OVERLAY
-
NO. REVISION
$WWDFKPHQW
UP
UP
TYPICAL BUILDING 1 & 2 (LOWER FLOOR PLAN)SCALE: 1/4" = 1'-0" 0 0' 2' 4' 8' 12' 16' 20'
A-14
2 BRIDGE BRIDGE
19' - 9"
A-21 1
LIVING
BATH

WET BAR
BATH
PWDR.

W.C.

PRIMARY

BEDROOM

FIREPLACE
CLOSET
SHOWER

BEDROOM

SHELVES
W/D
DINING
SHOWER

UNIT D UNIT D
LIVING
BATH

WET BAR
BATH
PWDR.

W.C.

PRIMARY

BEDROOM

FIREPLACE
CLOSET
SHOWER

BEDROOM

SHELVES
W/D
DINING
SHOWER
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
1/4" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:54:48 PM A-24

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024
ENLARGED BLDG 1 & 2 LOWER
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
$WWDFKPHQW
DN
UP
DN
19' - 9"
LIVING
BATH

WET BAR
BATH
PWDR.

W.C.

PRIMARY

BEDROOM

FIREPLACE
CLOSET
SHOWER

BEDROOM

SHELVES
W/D
DINING
SHOWER
LIVING
BATH

WET BAR
BATH
PWDR.

W.C.

PRIMARY

BEDROOM

FIREPLACE
CLOSET
SHOWER

BEDROOM

SHELVES
W/D
DINING
SHOWER
TYPICAL BUILDING 1 & 2 (UPPER FLOOR PLAN)SCALE: 1/4" = 1'-0" 0 0' 2' 4' 8' 12' 16' 20'
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
1/4" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:54:54 PM A-25

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024
ENLARGED BLDG 1 & 2 UPPER
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
$WWDFKPHQW
UP
SUITE A1
W.C.

SHOWER
BAR
SUITE A1
W.C.

SHOWER
BAR
DESK
W.C.

ROMAN BATH
SUITE A2
BAR

ENTERTAINMENT

CENTER DESK
DESK
W.C.

ROMAN BATH
SUITE A2
BAR

ENTERTAINMENT
CENTER
DESK

ENTERTAINMENT
CENTER

ENTERTAINMENT
CENTER
BENCH

WET BAR
CLOSET
BATH
SUITE A5
CLOSET

WET BAR
BATH
SUITE A4
12' - 11" 20' - 1"
12' - 7"
2' - 10" 2' - 10"
20' - 1"
14' - 2" 14' - 2"
LULA

ELEVATOR
78' - 4"
5' - 8" 10' - 0"
9' - 4"
TYPICAL BUILDING 3 & 4 (LOWER LEVEL FLOOR PLAN)SCALE: 1/4" = 1'-0" 0 0' 2' 4' 8' 12' 16' 20'
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
1/4" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:55:01 PM A-26

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024
ENLARGED BLDG 3 & 4 LOWER
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
$WWDFKPHQW
DN
A-20 3
78' - 4"
18' - 8" 14' - 4"
12' - 10" 12' - 2"
14' - 2" 14' - 2"
12' - 2" 12' - 10"
PWDR.

SHOWER

WET BAR
CLOSET
LIVING
BATH

BEDROOM

CLOSET WET BAR
DINING
W.C.

PWDR.

VANITY

SAUNA/ TUB
SHOWER
BATH

BEDROOM
LIVING
RISING T.V.

UNIT B
UNIT C
DESK
BENCH

FIREPLACE
FIREPLACE / T.V.

ROLL-IN SHOWER

HC CLOSET WET BAR
W.C.

PWDR.

VANITY
BATH

BEDROOM
LIVING
UNIT B
RISING T.V.

DINING DESK

FIREPLACE
BUILDING 3 & 4
(UPPER LEVEL FLOOR PLAN)
SCALE: 1/4" = 1'-0"
0 0' 2' 4' 8' 12' 16' 20'
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:
1/4" = 1'-0"
C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:55:08 PM A-27

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024
ENLARGED BLDG 3 & 4 UPPER
A.P.N: 010-124-010 & 014
C.S.

22.14 -
NO. REVISION
$WWDFKPHQW
CONSULTANT:

JOB NO.DATE:SCALE:DRAWN

SHEET OF
ARCHITECT:

ERIC MILLER ARCHITECTS, INC.
211 HOFFMAN AVENUE MONTEREY, CA 93940
PHONE (831) 372-0410 FAX (831) 372-7840 WEB: ericmillerarchitects.com THE USE OF THESE DRAWINGS AND SPECIFICATIONS IS SOLELY RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE PREPARED. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. REPRODUCTION OR PUBLICATION BY ANY MEANS, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED - TITLE TO THESE DRAWINGS AND SPECIFICATIONS REMAINS WITH THE ARCHITECT WITHOUT PREJUDICE. VISUAL CONTACT WITH THESE DRAWINGS & SPECIFICATIONS SHALL CONSTITUTE PRIMA FASCIE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

Job Name:

C:\Users\cristo\Desktop\Revit Files\Hotel\Legacy Submittal CLOUDS.rvt 3/5/2024 12:55:20 PM A-28

LEGACY HOTEL CARMEL
2NW of 4th Ave. on San Carlos St.

CARMEL-BY-THE-SEA
3/5/2024

MATERIAL BOARD
A.P.N: 010-124-010 & 014
C.S.

22.14 METAL FRAME AUTOMATIC SLIDING DOOR WITH BRONZE FINISH 87 65
123
4 FRONT ENTRY DOOR

FRAMED GLASS/ WINDOWSDRIVEWAY / PATIO
STUCCO

SLIDING DOORSSOFFIT

SLAB EDGE / GUTTERSSTONE
9 ROOF
1011 EXPOSED BEAMS/ FASCIA
12 METAL FRAMED WINDOWS WITH BRONZE FINISHPATIO PAVERS (CREAM COLORED)

RAILINGRAFTER TAIL
SMOOTH STUCCO- "OMEGA AKROTIQUE 07 NATIVE BROWN" ANTIQUE STAIN FINISH

CARMEL STONE OR JERUSALEM STONE VENEER

METAL SLAB EDGE- BRONZE FINISH

WOOD-GRAIN SLAT SOFFIT

METAL FRAMED, MULTIPLE SLIDING DOORS WITH BRONZE FINISHMETAL BERMUDA STYLE ROOFING- BRONZE FINISH

METAL RAILING- BRONZE FINISH

STEEL BEAM- WITH BRONZE/ GUNMETAL FINISH

OAK RAFTER TAIL TYPE DETAILING

TRADITIONAL WOOD FRAMED WINDOWS

GLASS RAILING WITH STAND-OFF PINS

METAL GUTTER- BRONZE FINISH

FASCIA- BRONZE/ GUNMETAL FINISH
-
NO. REVISION
$WWDFKPHQW
0HPRUDQGXP
'DWH
  1RYHPEHU
7R
  $QQD%RUQVWHLQ(0&3ODQQLQJ*URXS
)URP
  5REHUW'HO5LR7(/XLV'HVFDQ]R
6XEMHFW
 907DQG3DUNLQJ$VVHVVPHQWIRUWKH3URSRVHG/HJDF\+RWHO&DUPHOLQ&DUPHOE\WKH 6HD&DOLIRUQLD
+H[DJRQ7UDQVSRUWDWLRQ&RQVXOWDQWV,QFKDVFRPSOHWHGD9HKLFOH0LOHV7UDYHOHG 907
DQG3DUNLQJ
DVVHVVPHQWIRUWKHSURSRVHG/HJDF\+RWHO&DUPHOORFDWHGDW1:RIWK$YHQXHRQ6DQ&DUORV6WUHHW

$31
LQ&DUPHOE\WKH6HD&DOLIRUQLD
VHH)LJXUH
7KHVLWHLVFXUUHQWO\RFFXSLHG
E\WKH+RIVDV+RXVH+RWHOZKLFKFRQVLVWVRIKRWHOURRPVDQGRQVLWHDPHQLWLHV$VSURSRVHGWKH SURMHFWZRXOGUHSODFHWKHH[LVWLQJRQVLWHXVHVZLWKDQHZKRWHOFRQVLVWLQJRIKRWHOURRPVDQGRQ VLWHDPHQLWLHV
VHH)LJXUH
$OORQVLWHIDFLOLWLHVLQFOXGLQJWKHUHVWDXUDQWDQGSDUNLQJJDUDJHZRXOGEH DFFHVVLEOHWRKRWHOJXHVWVRQO\
7KHPHWKRGRORJ\UHVXOWVDQGUHFRPPHQGDWLRQVRIWKHDQDO\VLVDUHGLVFXVVHGEHORZ 907$VVHVVPHQW0HWKRGRORJ\DQG5HVXOWV
3XUVXDQWWR6HQDWH%LOO
6%
WKH&DOLIRUQLD(QYLURQPHQWDO4XDOLW\$FW
&(4$

8SGDWH
*XLGHOLQHV6HFWLRQVXEGLYLVLRQ
E
VWDWHVWKDW907ZLOOEHWKHPHWULFLQDQDO\]LQJ
WUDQVSRUWDWLRQLPSDFWVIRUODQGXVHSURMHFWVIRU&(4$SXUSRVHV907LVWKHWRWDOPLOHVRIWUDYHOE\ SHUVRQDOPRWRUL]HGYHKLFOHVDSURMHFWLVH[SHFWHGWRJHQHUDWHLQDGD\907PHDVXUHVWKHIXOOGLVWDQFH RISHUVRQDOPRWRUL]HGYHKLFOHWULSVZLWKRQHHQGZLWKLQWKHSURMHFW 0RQWHUH\&RXQW\DWWKHWLPHRIWKLVUHSRUWLVXQGHUWDNLQJDSURFHVVRIXSGDWLQJLWVWUDQVSRUWDWLRQ SROLFLHVWRLQFRUSRUDWH907PHWKRGRORJLHVDQGVLJQLILFDQFHWKUHVKROGVWREHFRQVLVWHQWZLWK6%EXW KDVQRWUHOHDVHGGUDIWWKUHVKROGV,QWKHDEVHQFHRIDQDGRSWHG&RXQW\SROLF\ZLWKLPSDFWVWDQGDUGV DQGWKUHVKROGVWKLVDVVHVVPHQWUHOLHVRQWKH*RYHUQRU¶V2IILFHRI3ODQQLQJDQG5HVHDUFK 235

JXLGHOLQHVLQDQDO\]LQJWKHSURMHFW¶VHIIHFWVRQ907
2356FUHHQLQJ5HFRPPHQGDWLRQV
7KHTechnical Advisory on Evaluating Transportation Impacts in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

Attachment 7 $WWDFKPHQW
907$VVHVVPHQWIRU/HJDF\+RWHO&DUPHO 1RYHPEHU 3DJH_
)LJXUH 
6LWH/RFDWLRQ
WK $YH
UG $YH
6LWH /RFDWLRQ
Attachment 7 $WWDFKPHQW
907$VVHVVPHQWIRU/HJDF\+RWHO&DUPHO 1RYHPEHU 3DJH_
)LJXUH 6LWH3ODQ
Attachment 7
907$VVHVVPHQWIRU/HJDF\+RWHO&DUPHO 1RYHPEHU 3DJH_
x 235UHFRPPHQGVWKDWRIILFHRUUHVLGHQWLDOSURMHFWVQRWH[FHHGLQJDOHYHORISHUFHQWEHORZ H[LVWLQJ907SHUFDSLWDDQGHPSOR\HHPD\LQGLFDWHDOHVVWKDQVLJQLILFDQWLPSDFWRQ907 x 235UHFRPPHQGVWKDWSURMHFWV
LQFOXGLQJRIILFHUHVLGHQWLDOUHWDLODQGPL[HGXVH

GHYHORSPHQWV
SURSRVHGZLWKLQòPLOHRIDQH[LVWLQJPDMRUWUDQVLWVWRSRUZLWKLQóPLOHRIDQ H[LVWLQJVWRSDORQJDKLJKTXDOLW\WUDQVLWFRUULGRUPD\EHSUHVXPHGWRKDYHDOHVVWKDQ VLJQLILFDQWLPSDFWRQ907
x 235UHFRPPHQGVWKDWSHUFHQWDIIRUGDEOHUHVLGHQWLDOGHYHORSPHQWLQLQILOOORFDWLRQVEH SUHVXPHGWRKDYHDOHVVWKDQVLJQLILFDQWLPSDFWRQ907 x 235UHFRPPHQGVWKDWSURMHFWVWKDWJHQHUDWHRUDWWUDFWIHZHUWKDQWULSVSHUGD\JHQHUDOO\ PD\EHDVVXPHGWRFDXVHDOHVVWKDQVLJQLILFDQWLPSDFWRQ907 x 235UHFRPPHQGVWKDWORFDOVHUYLQJUHWDLOGHYHORSPHQWV FRQVLGHUHGWREHOHVVWKDQVI
LQVL]H
PD\EHDVVXPHGWRFDXVHDOHVVWKDQVLJQLILFDQWLPSDFWRQ907 907$VVHVVPHQW8VLQJ2356FUHHQLQJ&ULWHULD
7KHSURMHFWZRXOGUHSODFHDQH[LVWLQJKRWHOIDFLOLW\FRQVLVWLQJRIURRPVDQGRQVLWHDPHQLWLHVZLWKD SURSRVHGKRWHOIDFLOLW\FRQVLVWLQJRIURRPVDQGRQVLWHDPHQLWLHV7KHSURSRVHGKRWHOZRXOG SUHVXPDEO\DFFRPPRGDWHWKHVDPHQXPEHURIJXHVWVDVWKHH[LVWLQJKRWHO7KHUHIRUHLWLVDQWLFLSDWHG WKDWWKHSURSRVHGKRWHOSURMHFWZRXOGJHQHUDWHQRPRUHWKDQWKHQXPEHURIYHKLFOHWULSVFXUUHQWO\ JHQHUDWHGE\WKHH[LVWLQJ+RIVDV+RXVH+RWHO
$VDUHVXOWRIWKHSURMHFWJHQHUDWLQJRUDWWUDFWLQJIHZHUWKDQQHWQHZWULSVSHUGD\LWFDQEH SUHVXPHGWKDWWKHSURSRVHGSURMHFWZRXOGKDYHDOHVVWKDQVLJQLILFDQWLPSDFWRQ907EDVHGRQ235¶V 907VFUHHQLQJFULWHULD
9HKLFOH7ULS5HGXFWLRQV
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
$FFRUGLQJWRWKH&LW\=RQLQJ5HJXODWLRQV

KRWHOVDUHUHTXLUHGWRSURYLGHRQVLWHYHKLFXODU
SDUNLQJDWDUDWHRIVSDFHSHUUHQWDOXQLWLQFOXGLQJPDQDJHU¶VXQLWV 7KHUHIRUHWKHSURSRVHGURRPKRWHOZLWKDSDUWPHQWXQLWVZRXOGUHTXLUHDWRWDORIYHKLFXODU SDUNLQJVSDFHV3HUWKHVLWHSODQWKHSURMHFWSURSRVHVDWRWDORIRQVLWH YDOHW
SDUNLQJVSDFHV
7KHUHIRUHYHKLFOHSDUNLQJDVSURSRVHGE\WKHSURMHFWZLOOH[FHHG&LW\YHKLFOHSDUNLQJVWDQGDUGV 3DUNLQJ'HPDQG
7KH,7(Parking Generation, 5th EditionSURYLGHVHVWLPDWHVRISHDNSHULRGSDUNLQJGHPDQGEDVHGRQ ODQGXVHW\SH)RUD+RWHOXVH
/DQG8VH
WKHSHDNSDUNLQJGHPDQGRFFXUVDWDSSUR[LPDWHO\


Attachment 7 $WWDFKPHQW
907$VVHVVPHQWIRU/HJDF\+RWHO&DUPHO 1RYHPEHU 3DJH_
$0GXULQJZHHNGD\VDQGDSSUR[LPDWHO\

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
7KHSURSRVHGKRWHOGRHVQRWSURSRVHWRLQFUHDVHWKHQXPEHURIKRWHOURRPVZKHQFRPSDUHGWRWKH H[LVWLQJKRWHO$GGLWLRQDOO\WKHSURSRVHGRQVLWHDPHQLWLHVVXFKDVWKHUHVWDXUDQWGD\VSDDQGEHDXW\ VDORQZRXOGEHDFFHVVLEOHWRKRWHOJXHVWVRQO\DQGZRXOGQRWJHQHUDWHDGGLWLRQDOSDUNLQJGHPDQG 7KHUHIRUHWKHSURMHFWHGSDUNLQJGHPDQGLVDQWLFLSDWHGWREHVLPLODUWRWKDWRIWKHH[LVWLQJKRWHO%DVHG RQWKHUHVXOWVRIWKHSDUNLQJVXUYH\WKHSURSRVHGQHZKRWHO¶VSURSRVHGSDUNLQJVSDFHVZRXOG H[FHHGWKHSURMHFWHGSDUNLQJGHPDQG0RUHRYHULWLVXQOLNHO\WKDWJXHVWVZLOOXWLOL]HVWUHHWSDUNLQJ DORQJURDGZD\VVXUURXQGLQJWKHSURMHFWVLWHJLYHQWKDWWKHUHZRXOGEHUHVLGXDOSDUNLQJFDSDFLW\RQ VLWH
&RQFOXVLRQV
x 7KHSURSRVHGSURMHFWZRXOGQRWJHQHUDWHDGGLWLRQDOYHKLFOHWULSVFRPSDUHGWRH[LVWLQJ FRQGLWLRQV$VDUHVXOWRIWKHSURMHFWJHQHUDWLQJRUDWWUDFWLQJIHZHUWKDQQHWQHZWULSVSHU GD\LWFDQEHSUHVXPHGWKDWWKHSURSRVHGSURMHFWZRXOGKDYHDOHVVWKDQVLJQLILFDQWLPSDFWRQ 907EDVHGRQ235¶V907VFUHHQLQJFULWHULD
x 7KHSURSRVHGSURMHFWZRXOGSURYLGHDOWHUQDWLYHWUDQVSRUWDWLRQRSWLRQVDQGRQVLWHDPHQLWLHVQRW FXUUHQWO\RIIHUHGDWWKHH[LVWLQJ+RIVDV+RXVH+RWHO7KHUHIRUHLWFDQEHFRQFOXGHGWKDWWKH SURSRVHGKRWHOSURMHFWPD\JHQHUDWHIHZHUYHKLFOHWULSVWKDQWKHH[LVWLQJKRWHO x %DVHGRQWKHUHVXOWVRIWKHSDUNLQJVXUYH\WKHSURSRVHGQHZKRWHO¶VSURSRVHGSDUNLQJ VSDFHVZRXOGH[FHHGWKHSURMHFWHGSDUNLQJGHPDQG
Attachment 7 $WWDFKPHQW
Memorandum
Date: November 27, 2023
To: Anna Bornstein, EMC Planning Group
From: Robert Del Rio, T.E., Luis Descanzo
Subject: VMT and Parking Assessment for the Proposed Legacy Hotel Carmel in Carmel-by-theSea, California Hexagon Transportation Consultants, Inc. has completed a Vehicle Miles Traveled (VMT) and Parking assessment for the proposed Legacy Hotel Carmel located at 2NW of 4th Avenue on San Carlos Street (APN 010-124-010, -014) in Carmel-by-the-Sea, California (see Figure 1). The site is currently occupied by the Hofsas House Hotel, which consists of 38 hotel rooms and on-site amenities. As proposed, the project would replace the existing on-site uses with a new hotel consisting of 38 hotel rooms and onsite amenities (see Figure 2). All on-site facilities, including the restaurant and parking garage, would be accessible to hotel guests only.

The methodology, results, and recommendations of the analysis are discussed below.

VMT Assessment Methodology and Results
Pursuant to Senate Bill (SB) 743, the California Environmental Quality Act (CEQA) 2019 Update Guidelines Section 15064.3, subdivision (b) states that VMT will be the metric in analyzing transportation impacts for land use projects for CEQA purposes. VMT is the total miles of travel by personal motorized vehicles a project is expected to generate in a day. VMT measures the full distance of personal motorized vehicle-trips with one end within the project.

Monterey County, at the time of this report, is undertaking a process of updating its transportation policies to incorporate VMT methodologies and significance thresholds to be consistent with SB 743 but has not released draft thresholds. In the absence of an adopted County policy with impact standards and thresholds, this assessment relies on the Governor’s Office of Planning and Research (OPR) guidelines in analyzing the project’s effects on VMT.

OPR Screening Recommendations
The Technical Advisory on Evaluating Transportation Impacts in CEQA published by OPR in December 2018 provides recommendations regarding VMT evaluation methodology, significance thresholds, and screening thresholds for the evaluation of land use projects.

The OPR provides screening threshold recommendations that are intended to identify when a project can be determined to cause a less-than-significant impact without conducting a detailed VMT evaluation. The OPR screening thresholds recommendations are based on project size, maps, transit availability, and provision of affordable housing. The OPR recommendations include the screening threshold criteria listed below:

Attachment 8
VMT Assessment for Legacy Hotel Carmel November 27, 2023 Page | 2
Figure 1
Site Location
4th Ave
3rd Ave
Site Location
Attachment 8
VMT Assessment for Legacy Hotel Carmel November 27, 2023 Page | 3
Figure 2 Site Plan
VMT Assessment for Legacy Hotel Carmel November 27, 2023 Page | 4
 OPR recommends that office or residential projects not exceeding a level of 15 percent below existing VMT per capita and employee may indicate a less-than-significant impact on VMT.  OPR recommends that projects (including office, residential, retail, and mixed-use developments) proposed within ½ mile of an existing major transit stop or within ¼ mile of an existing stop along a high-quality transit corridor may be presumed to have a less-thansignificant impact on VMT.  OPR recommends that 100 percent affordable residential development in infill locations be presumed to have a less-than-significant impact on VMT.  OPR recommends that projects that generate or attract fewer than 110 trips per day generally may be assumed to cause a less-than-significant impact on VMT.  OPR recommends that local-serving retail developments (considered to be less than 50,000 s.f. in size) may be assumed to cause a less-than-significant impact on VMT.

VMT Assessment Using OPR Screening Criteria
The project would replace an existing hotel facility consisting of 38 rooms and on-site amenities with a proposed hotel facility consisting of 38 rooms and on-site amenities. The proposed hotel would presumably accommodate the same number of guests as the existing hotel. Therefore, it is anticipated that the proposed hotel project would generate no more than the number of vehicle trips currently generated by the existing Hofsas House Hotel.

As a result of the project generating or attracting fewer than 110 net new trips per day, it can be presumed that the proposed project would have a less-than-significant impact on VMT based on OPR’s VMT screening criteria.

Vehicle Trip Reductions
The proposed hotel would provide an electric bus and limousine service that would shuttle guests to and from local destinations. Guests may opt to utilize the bus service, instead of driving to and from local attractions. Shuttle services to and from Monterey airport would allow guests arriving by airplane to complete their trip without renting a personal vehicle altogether. These services are currently not offered at the existing hotel. Additionally, the proposed hotel would provide a wider range of on-site amenities compared to the existing hotel, including a new restaurant, coffee house and spa. Providing these amenities on-site will reduce the need for guests to make trips outside of hotel grounds.

By providing alternative transportation options and on-site amenities, the proposed hotel can be expected to reduce guest usage of personal vehicles and reduce the current number of daily trips.

Parking
According to the City Zoning Regulations (17.38.020), hotels are required to provide on-site vehicular parking at a rate of 1 space per rental unit, including manager’s units.

Therefore, the proposed 38-room hotel with 2 apartment units would require a total of 40 vehicular parking spaces. Per the site plan, the project proposes a total of 50 on-site (valet) parking spaces.

Therefore, vehicle parking as proposed by the project will exceed City vehicle parking standards.

Parking Demand
The ITE Parking Generation, 5th Edition provides estimates of peak period parking demand based on land-use type. For a Hotel use (Land Use 310), the peak parking demand occurs at approximately 9:00 Attachment 8
VMT Assessment for Legacy Hotel Carmel November 27, 2023 Page | 5
AM during weekdays and approximately 9:00 PM during Saturdays. A parking occupancy survey was conducted at the Hofsas House Hotel during these hours to determine the existing parking demand at the site. The survey involved counting the number of vehicles parked on-site during the identified peak periods. The results of the survey indicate there is a sufficient parking supply on-site during peak periods. Out of 28 parking stalls on-site, only 15 stalls were occupied during the weekday peak period and only 20 stalls were occupied during the Saturday peak period. Therefore, it can be concluded that the existing hotel parking demand is being met by the existing parking supply on-site during the study peak periods.

The proposed hotel does not propose to increase the number of hotel rooms when compared to the existing hotel. Additionally, the proposed on-site amenities such as the restaurant, day spa, and beauty salon would be accessible to hotel guests only and would not generate additional parking demand.

Therefore, the projected parking demand is anticipated to be similar to that of the existing hotel. Based on the results of the parking survey, the proposed new hotel’s proposed 50 parking spaces would exceed the projected parking demand. Moreover, it is unlikely that guests will utilize street parking along roadways surrounding the project site, given that there would be residual parking capacity onsite.

Conclusions
 The proposed project would not generate additional vehicle trips compared to existing conditions. As a result of the project generating or attracting fewer than 110 net new trips per day, it can be presumed that the proposed project would have a less-than-significant impact on VMT based on OPR’s VMT screening criteria.
 The proposed project would provide alternative transportation options and on-site amenities not currently offered at the existing Hofsas House Hotel. Therefore, it can be concluded that the proposed hotel project may generate fewer vehicle trips than the existing hotel.  Based on the results of the parking survey, the proposed new hotel’s proposed 50 parking spaces would exceed the projected parking demand.

Attachment 8
Marnie R. Waffle <[email protected]>
Fwd: [EXTERNAL] RE: Carmel Preservation Association Appeal Marnie R. Waffle <[email protected]> Wed, Jul 3, 2024 at 8:53 AM To: "Marnie R. Waffle" <[email protected]>
From: Richard Stedman <[email protected]>
Date: July 2, 2024 at 4:25:49 PM PDT
To: Anthony Lombardo <[email protected]>
Subject: [EXTERNAL] RE: Carmel Preservation Association Appeal Dear Mr. Lombardo,
Thank you for your email regarding the demolition and reconstruction activities for the Hofsas House Hotel project in Carmel-By-The-Sea. The Monterey Bay Air Resources District (MBARD) is the delegated authority for the federal regulation of building demolition and asbestos abatement activities in our threecounty region, which includes Carmel-by-the-Sea.

MBARD’s Asbestos Program is designed to protect the public from uncontrolled asbestos emissions by implementing and enforcing the federal National Emissions Standard for Hazardous Air Pollutants (NESHAP) for Asbestos and building removals along with MBARD Rule 424 and Rule 439. Program requirements include Asbestos Survey, Notification submission to MBARD before beginning a project, Work Practice Standards, and Proper Disposal.

While MBARD does not perform asbestos abatement activities, MBARD inspects projects and requires certified contractors to properly assess, handle, remove, and dispose of asbestos and asbestos-containing materials. There should be no adverse impact on public health if MBARD’s NESHAP and Rule 424 and 439 requirements are satisfied.

Sincerely,
Richard A. Stedman
Air Pollution Control Officer
24580 Silver Cloud Court
Monterey, CA 93940
Direct office: (831) 718-8039
From: Anthony Lombardo <[email protected]>
Sent: Tuesday, July 2, 2024 1:24 PM
To: Richard Stedman <[email protected]>
Subject: Carmel Preservation Association Appeal
CAUTION: This email is from outside the District. Do NOT click LINKS or open ATTACHMENTS unless you are sure it is safe.

Attachment 9
Dear Mr. Stedman:

I am enclosing a copy of the appeal filed by the Carmel Preservation Association to the Carmel Planning Commission’s unanimous approval of the demolition and reconstruction of a hotel to replace the Hofsas House Hotel in Carmel.

As you can see on page 3 of the appeal, the allegation is made that the project would have significant health impacts due to vehicle emissions and the demolition of an existing structure which may contain asbestos.

It’s my understanding that there are acceptable best management practices that are incorporated into construction management plans to mitigate the effect of vehicular emissions and dust generation, and that there are strict protocols and laws requiring the investigation for the potential of asbestos materials onsite and the proper disposal that preclude their removal from creating any health impacts.

I would appreciate it if you could send an email confirming that there are no potential health impacts from this project if the aforementioned protocols are observed.

Sincerely,
Anthony Lombardo

ANTHONY LOMBARDO & ASSOCIATES
A Professional Corporation
144 W. Gabilan Street
Salinas, CA 93901
Phone (831) 751-2330
Fax (831) 751-2331
Email [email protected]

PRIVILEGED & CONFIDENTIAL -- ATTORNEY CLIENT PRIVILEGE -- ATTORNEY WORK PRODUCT The information contained in this electronic transmission is legally privileged and confidential, and it is intended for the sole use of the individual or entity to whom it is addressed. If you are not the intended recipient, please take notice that any form of dissemination, distribution or photocopying of this electronic transmission is strictly prohibited. If you have received this electronic transmission in error, please immediately contact Anthony Lombardo at (831) 751-2330 or [email protected] and immediately delete the electronic transmission.

Attachment 9
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs)
Construction Projects Are Required to Implement the Stormwater Best Management Practices (BMPs) on this Page, as they Apply to Your Project, All Year Long.

Non-Hazardous Materials
q Berm and securely cover
stockpiles of sand, dirt, or other
construction materials with
tarps when rain is forecast or
if stockpiles are not actively
being used. For best results,
this should be done at the end
of the work day throughout
construction when feasible.
q Use (but don’t overuse)
reclaimed water for dust control.

Hazardous Materials
q Label all hazardous materials
and hazardous wastes (such
as pesticides, paints, thinners,
solvents, fuel, oil, and antifreeze)
in accordance with city, county,
state and federal regulations.
q Store hazardous materials and
wastes in water tight containers,
store in appropriate secondary
containment, and cover them
at the end of every work day or
during wet weather or when rain
is forecast.
q Follow manufacturer’s
application instructions for
hazardous materials and be
careful not to use more than
necessary. Do not apply
chemicals outdoors when rain
is forecast within 24 hours.
q Arrange for appropriate disposal
of all hazardous wastes.

Construction Entrances and
Perimeter
q Establish and maintain
effective perimeter controls
and stabilize all construction
entrances and exits to
sufficiently control erosion and
sediment discharges from site
and tracking off site.
q Sweep or vacuum any street
tracking immediately and
secure sediment source to
prevent further tracking. Never
hose down streets to clean up
tracking.

Waste Management
q The California Green Building
Code requires all permitted
residential and non-residential
construction, demolition and
additions/alterations projects to
recycle or salvage a minimum
65% of nonhazardous
construction materials from the
project.
q Cover waste disposal
containers securely with tarps
at the end of every work day
and during wet weather.
q Clean or replace portable
toilets, and inspect them
frequently for leaks and
spills. Incorporate secondary
containment and locate them
away from storm drain inlets.
q Dispose of liquid residues
from paints, thinners, solvents,
glues, and cleaning fluids as
hazardous waste (the Monterey
Regional Waste Management
District offers a Household
Hazardous Waste Facility that
accepts these items).

MATERIALS
& WASTE MANAGEMENT
Maintenance and Parking
q Designate an area, fitted with
appropriate BMPs, for vehicle
and equipment parking and
storage.
q Perform major maintenance,
repair jobs, and vehicle and
equipment washing off site.
q If refueling or vehicle
maintenance must be done
onsite, work in a bermed area
away from storm drains and
over a drip pan big enough
to collect fluids. Recycle or
dispose of fluids as hazardous
waste.
q If vehicle or equipment
cleaning must be done onsite,
clean with water only in a
bermed area that will not allow
rinse water to run into gutters,
streets, storm drains, or surface
waters.
q Do not clean vehicle or
equipment onsite using soaps,
solvents, degreasers, steam
cleaning equipment, etc.
q Inlet protection is the last
line of spill defense. Drains/
inlets that receive storm water
must be covered or otherwise
protected from receiving
sediment/dirt/mud, other
debris, or illicit discharges,
and include gutter controls and
filtration where applicable in
a manner not impeding traffic
or safety.

Spill Prevention and Control
q Keep spill cleanup materials
(rags, absorbents, etc.)
available at the construction
site at all times.
q Inspect vehicles and equipment
frequently for and repair leaks
promptly. Use drip pans to
catch leaks until repairs are
made.
q Clean up spills or leaks
immediately and dispose of
cleanup materials properly
(see the Monterey Regional
Waste Management Districts’
guidelines for accepting
hazardous waste materials).
q Do not hose down surfaces
where fluids have spilled.

Use dry cleanup methods
(absorbent materials, cat litter,
and/or rags).
q Sweep up spilled dry materials
immediately. Do not try to
wash them away with water, or
bury them.
q Clean up spills on dirt areas
by digging up and properly
disposing of contaminated soil
(see the Monterey Regional
Waste Management District’s
Contaminated Soil Acceptance
Criteria).
q Report significant spills
immediately. You are required
by law to report all significant
releases of hazardous materials,
including oil. To report a spill:

Dial 911.

EQUIPMENT

MANAGEMENT & SPILL CONTROL

EARTHWORK &

CONTAMINATED SOILS

PAVING/ASPHALT
WORK

CONCRETE, GROUT &

MORTAR APPLICATION

PAINTING & PAINT

REMOVAL DEWATERING

LANDSCAPE

MATERIALS
Erosion Control
q Schedule grading and
excavation work for dry
weather only.
q Stabilize all denuded areas,
install and maintain temporary
erosion controls (such as
erosion control fabric or
bonded fiber matrix) until
vegetation is established.
q Seed or plant vegetation for
erosion control on slopes or
where construction is not
immediately planned.

Sediment Control
q Protect storm drain inlets,
gutters, ditches, and drainage
courses with appropriate
BMPs, such as gravel bags,
inlet filler, berms, etc.
q Prevent sediment from
migrating offsite by installing
and maintaining sediment
controls, such as fiber rolls, silt
fences, or sediment basins.
q Keep excavated soil on the site
where it will not collect into
the street.
q Transfer excavated materials to
dump trucks on the site, not in
the street.
q If any of the following
conditions are observed,
test for contamination and
contact the Monterey County
Environmental Health
Department, Regional Water
Quality Control Board, and
local municipal inspector:
• Unusual soil conditions,
discoloration, or odor
• Abandoned underground tanks
• Abandoned wells
• Buried barrels, debris, or trash.
q Avoid paving and seal coating
in wet weather, or when rain is
forecast before fresh pavement
will have time to cure.
q Cover storm drain inlets and
manholes when applying seal
coat, tack coat, slurry seal, fog
seal, etc.
q Collect and recycle or
appropriately dispose of excess
abrasive gravel or sand. Do
NOT sweep or wash it into
gutters.
q Do not use water to wash
down fresh asphalt or concrete
pavement.

Sawcutting & Asphalt/Concrete
Removal
q Completely cover or barricade
storm drain inlets when saw
cutting. Use filter fabric, catch
basin inlet filters, or gravel
bags to keep slurry out of the
storm drain system.
q Protect storm drain inlets,
gutters, ditches, and drainage
courses with appropriate
BMPs, such as gravel bags,
inlet filters, berms, etc.
q Shovel, abosorb, or vacuum
saw-cut slurry and dispose of
all waste as soon as you are
finished in one location or
at the end of each work day
(whichever is sooner!).
q If sawcut slurry enters a catch
basin, clean it up immediately.
q Store concrete, grout and mortar
under cover, on pallets and away
from drainage areas. These
materials must never reach a
storm drain.
q Wash out concrete equipment/
trucks offsite or in a contained
area, so there is no discharge
into the underlying soil or
onto surrounding areas. Let
concrete harden and dispose of
as garbage.
q Collect the wash water from
washing exposed aggregate
concrete and remove it for
appropriate disposal offsite.

Painting cleanup
q Never clean brushes or rinse
paint containers into a street,
gutter, storm drain, or surface
waters.
q For water-based paints, paint
out brushes to the extent
possible. Rinse to the sanitary
sewer once you have gained
permission from the local
wastewater treatment authority.

Never pour paint down a drain.
q For oil-based paints, paint out
brushes to the extent possible
and clean with thinner or
solvent in a proper container.

Filter and reuse thinners and
solvents. Dispose of residue and
unusable thinner/solvents as
hazardous waste.

Paint Removal
q Chemical paint stripping
residue and chips and dust
from marine paints or paints
containing lead or tributyltin
must be disposed of as
hazardous waste.
q Paint chips and dust from
non-hazardous dry stripping
and sand blasting may be swept
up or collected in plastic drop
cloths and disposed of as trash.
q Effectively manage all run-on,
all runoff within the site, and
all runoff that discharges from
the site.
q Divert run-on water from offsite
away from all disturbed areas or
otherwise ensure protection of
its water quality for compliance.
q When dewatering, notify and
obtain approval from the local
municipality before discharging
water to a street gutter or storm
drain. Filtration or diversion
through a basin, tank, or
sediment trap, and/or disposal in
sanitary sewer may be required.
q In areas of known
contamination, testing is
required prior to reuse or
discharge of groundwater.

Consult with the Engineer and
municipal staff to determine
whether testing is required
and how to interpret results.

Contaminated groundwater
must be treated or hauled offsite for proper disposal. q Contain stockpiled landscaping
materials by storing them under
tarps when they are not actively
being used.
q Stack erodible landscape
material on pallets. Cover or
store these materials when they
are not actively being used or
applied.
q Discontinue application of any
erodible landscape material
within 2 days before a forecast
rain event or during wet
weather.

STORM DRAIN POLLUTERS MAY BE LIABLE FOR FINES OF UP TO $10,000 PER DAY! * Adapted with permission from the San Mateo Countywide Water Pollution Prevention Program

STORMWATER & EDUCATION ALLIANCE
www.montereysea.org
monterey regional Attachment 10
LAS MEJORES PRÁCTICAS DE CONSTRUCCIÓN
Los proyectos de construcción deben implementar las Mejores Prácticas de Construcción dadas en esta página, ya que son pertinentes a su proyecto todo el año.

Materiales no peligrosos
q Haga un borde alrededor y cubra
con lonas impermeables las pilas
de arena, tierra u otros materiales
de construcción cuando haya
pronóstico de lluvia o si no se
están usando activamente. Para
mejor resultado, esto debería
hacerse diariamente al final del
día de trabajo durante toda la
construcción cuando sea posible.
q Use (pero no abuse) agua
reclamada para controlar el polvo.

Materiales peligrosos
q Póngales etiqueta con nombre
a todos los materiales y
residuos peligrosos (como
pesticidas, pintura, diluyentes,
solventes, gasolina, aceite y
anticongelante) de acuerdo con las
reglamentaciones de la ciudad, del
condado, del estado y federales.
q Ponga los materiales y residuos
peligrosos en contenedores que
no pierdan, póngalos luego
en contenedores secundarios
apropiados y cúbralos después de
cada día de trabajo, o durante la
temporada lluviosa, o cuando se
haya pronosticado lluvia.
q Al aplicar los materiales
peligrosos, siga las instrucciones
del fabricante y tenga cuidado
de no usar más de lo necesario.

No aplique productos químicos
en el exterior cuando se haya
pronosticado lluvia en las
próximas 24 horas.
q Asegúrese de deshacerse
apropiadamente de todos los
residuos peligrosos.

Entradas y perímetros de los
sitios de construcción
q Establezca y mantenga control
efectivo de los perímetros y
estabilice todas las entradas y
salidas del sitio de construcción
para controlar suficientemente
la erosión y la descarga de
sedimentos del sitio para que no
salgan del sitio.
q Barra o aspire inmediatamente
lo que haya pasado a la calle y
controle la fuente de origen para
prevenir que siga sucediendo.

Nunca lave con manguera las
calles para limpiar lo que haya
sido acarreado o llevado del sitio
de construcción.

Gestión de residuos
q El Código de Construcción
Ecológica de California
requiere que todos los proyectos
permitidos de construcción,
demolición y adiciones o
alteraciones, residenciales o no
residenciales, reciclen o salven un
mínimo del 65% de los materiales
de construcción no peligrosos del
proyecto.
q Cubra los contenedores de
residuos de manera segura con
lonas impermeables al término de
cada día de trabajo y durante el
tiempo de lluvias.
q Limpie o reemplace los excusados
portátiles e inspecciónelos con
frecuencia para ver que no
pierdan o se derramen. Incorpore
contención secundaria y colóquela
lejos de los desagües de aguas
pluviales.
q Deshágase de los residuos
líquidos de pintura, solventes,
colas y líquidos de limpieza
como materiales peligrosos (la
compañía de Gestión de Residuos
Monterey Regional Waste
Management District, tiene una
planta para residuos peligrosos del
hogar que acepta estos artículos).

MANEJO DE MATERIALES

Y RESIDUOS
Mantenimiento y
estacionamiento
q Designe un área especial, usando
técnicas apropiadas de control
de polución, para estacionar los
vehículos y el equipo, y para
almacenamiento.
q Realice las tareas mayores de
mantenimiento, los trabajos
de reparación y el lavado de
vehículos y equipos fuera del sitio
de construcción.
q Si es necesario ponerle gasolina a
un vehículo o hacer reparaciones
en el sitio, trabaje en un área
bordeada, alejada de los desagües
pluviales y sobre una bandeja de
goteo de tamaño suficiente para
contener los líquidos peligrosos
que se derramen. Recicle o
deshágase de los líquidos como
materiales peligrosos.
q Si es necesario lavar los
vehículos o equipos en el sitio de
construcción, límpielos sólo con
agua, en un área contenida que no
permita que el agua de enjuague
llegue a cunetas, calles, desagües
de aguas pluviales o superficies
acuáticas (lagos, arroyos, etc.).
q No lave vehículos o equipos
en el sitio de construcción
usando jabones, solventes,
desengrasadores, equipo de
limpieza en seco, etc.
q La protección del conducto de
entrada es el último punto de
defensa de derrames. Desagües/
entradas que reciben aguas
pluviales deben ser cubiertos o
de otra manera protegidos contra
sedimentos, tierra, barro u otras
basuras, o contra descargues
ilícitos, y debe incluir el control
de canaletas y la filtración, donde
sea pertinente, de manera que no
obstruya el tránsito o la seguridad.

Prevención y control de
derrames
q Mantenga a mano en el sitio
de construcción, en todo
momento, los materiales para
limpiar derrames (trapos,
absorbentes, etc.).
q Inspeccione frecuentemente
los vehículos y equipos para
descubrir pérdidas de fluidos y
repárelas inmediatamente. Use
bandejas de goteo para recoger
el líquido de la pérdida hasta que
pueda hacer las reparaciones.
q Limpie los derrames o pérdidas
inmediatamente y deshágase
apropiadamente de los materiales
de limpieza (vea las guías
del Monterey Regional Waste
Management District para ver los
materiales peligrosos aceptados
como desperdicio).
q No lave con manguera las
superficies donde se hayan
volcado líquidos. Use métodos
en seco (materiales absorbentes,
aserrín de cajas sanitarias para
gatos, o trapos).
q Barra inmediatamente los
materiales secos que se hayan
desparramado. No trate de
deshacerse de ellos usando agua,
ni de enterrarlos.
q Limpie los derrames en la tierra
excavando la tierra contaminada
y deshaciéndose correctamente
de ella (vea las guías del Monterey
Regional Waste Management
District sobre el criterio para
aceptar tierra contaminada).
q Comunique inmediatamente
cualquier derrame significativo.

La ley obliga comunicar todos los
derrames de materiales peligrosos,
incluyendo el petróleo. Para
comunicar un derrame: llame
al 911.

MANEJO DEL EQUIPO Y

CONTROL DE DERRAMES

TRABAJO EN LA TIERRA Y

SUELOS CONTAMINADOS

TRABAJO CON

PAVIMENTO/ASFALTO
APLICACIÓN DE

CONCRETO, LECHADA DE

CEMENTO Y ARGAMASA

PINTANDO Y

REMOVIENDO

PINTURA
EXTRACCIÓN DEL
AGUA

MATERIALES DE
JARDINERÍA
Control de erosión
q Planee trabajo de nivelación y
excavación sólo cuando no vaya a
llover.
q Estabilice todas las áreas desnudas,
instale y mantenga control de
erosión provisorio (como tela de
control de erosión o matriz de
tejido pegado) hasta que se haya
establecido la vegetación.
q Plante semillas o plantas para
control de erosión en superficies
en declive o donde no se planee la
construcción inmediata.

Control de sedimento
q Proteja las rejillas de los desagües
de aguas pluviales, las cunetas,
canales y cursos de drenaje, usando
apropiadas técnicas de control de
polución, como bolsas con grava,
rollos de fibras, bordes, etc.
q Prevenga que los sedimentos
migren fuera del sitio instalando
y manteniendo controles de
sedimentos, como rollos de fibra,
cerca de sedimentos o estanques de
sedimentos.
q Mantenga la tierra que se haya
excavado en el sitio de
construcción en un lugar donde no
pueda ser acarreada a la calle.
q Transfiera a los camiones los
materiales excavados, en el sitio
mismo de construcción y no en la
calle.
q Si se observan cualquiera de las
siguientes condiciones, analice la
tierra para descubrir contaminación
y comuníquese con la Junta
Regional de Control de Calidad del
Agua y con el inspector municipal
local:
• Condiciones inusuales en la tierra,
descoloramiento u olor.
• Tanques enterrados abandonados.
• Pozos de agua abandonados.
• Barriles, basuras o residuos
enterrados.
q Evite pavimentar o recubrir
pavimento en temporada de
lluvias, o cuando se haya
pronosticado lluvia para antes que
el nuevo pavimento haya tenido
tiempo de secarse.
q Cubra las rejillas de los desagües
de aguas pluviales y las bocas de
sumideros antes de aplicar la capa
de sellado, capa ligante, capa de
lechada (slurry seal), capa final
fluida, etc.
q Junte y recicle o deshágase
apropiadamente del exceso de
grava o arena abrasivas. NO las
barra ni las empuje con agua a los
desagües de aguas pluviales.
q No use agua para lavar pavimento
de concreto y asfalto fresco.

Cortando con sierra y
removiendo asfalto/concreto
q Cubra completamente o erija una
barrera alrededor de las rejillas
de desagües de aguas pluviales
cuando corte con sierra. Use tela
de filtro, filtros en las bocas de
admisión, o bolsas de grava para
evitar que la lechada entre en el
sistema de desagües pluviales.
q Proteja las entradas de desagües
de aguas pluviales, canaletas,
cunetas y cursos de drenaje con
las mejores prácticas de control,
como bolsas de grava, filtros de
entrada, bordes, etc.
q Levante con pala, absorba o aspire
la lechada producida por la sierra
y deshágase de todos los residuos
tan pronto como haya finalizado
en un sitio, o al terminar cada día
de trabajo (¡lo que ocurra antes!).
q Si la lechada producida por la
sierra entra en un sumidero,
límpielo inmediatamente.
q Guarde el concreto, la lechada de
cemento y la argamasa cubiertos,
en paletas y alejados de las áreas
de desagüe. Estos materiales
nunca deben llegar a los desagües
pluviales.
q Lave el concreto del equipo y
de los camiones fuera del sitio
de construcción o en un área
contenida, para que no descarguen
en la tierra subyacente o en las
áreas de alrededor. Deje secar el
concreto y deshágase de él como
basura.
q Junte el agua con la que lavó el
concreto de agregado expuesto y
deshágase de ella apropiadamente
fuera del sitio de construcción.

Limpieza después de pintar
q Nunca lave los pinceles ni
enjuague los tarros de pintura en
la calle, en las cunetas, desagües
pluviales o superficies de aguas
(arroyos, lagos, etc.).
q Al terminar de usar pinturas a
base de agua, pinte lo más que
pueda con la última pintura en
el pincel. Enjuague los pinceles
en un desagüe a las cloacas una
vez que haya obtenido el permiso
de las autoridades locales del
sistema de tratamiento de aguas
negras. Nunca eche pintura en un
desagüe.
q Usando pinturas a base de
aceite, pinte lo más que pueda
con la última pintura en el
pincel y limpie el pincel con
diluyente o solvente en un envase
apropiado. Filtre y vuelva a
usar los diluyentes y solventes.

Deshágase del residuo y del
diluyente/solvente como desechos
peligrosos.

Removiendo pintura
q Los residuos de productos
químicos para remover pintura y
los trozos y el polvo de pinturas
marinas o de pinturas que
contienen plomo o tributylin,
deben ser desechados como
residuos peligrosos.
q Los trozos de pintura y el polvo
de productos no peligrosos y
removidos en seco o con ráfagas
de arena pueden ser barridos o
juntados en tela de plástico y
echados a la basura.
q Controle efectivamente toda el
agua que corra al sitio, o dentro
del sitio y la que corra hacia
afuera originada en el sitio.
q Desvíe toda el agua que venga
hacia el sitio para que no llegue a
las áreas disturbadas o de alguna
otra manera asegúrese de proteger
la calidad del agua para cumplir
con las ordenanzas.
q Al extraer el agua, notifique
y obtenga el permiso de la
municipalidad local antes de
descargar agua en la cuneta de una
calle o en un desagüe de aguas
pluviales. Puede que se requiera
filtración, o desvío a través de un
depósito, tanque o entrampe de
sedimento y/o puede ser requerida
la descarga en un desagüe cloacal.
q En las áreas que se saben
contaminadas, se requiere análisis
antes de volver a usar o descargar
el agua subterránea. Consulte
con el ingeniero y el personal
municipal para determinar si
es necesario el análisis y cómo
interpretar los resultados. El agua
subterránea contaminada debe ser
tratada o acarreada fuera del sitio
q para su eliminación apropiada. Contenga los materiales de jardinería ya apilados
manteniéndolos cubiertos con
lonas impermeables cuando no
estén en uso activo.
q Ponga sobre paletas los materiales
de jardinería que puedan sufrir
erosión. Cubra o guarde esos
materiales cuando no sean
activamente usados o aplicados.
q No continúe aplicando cualquier
material de jardinería que pueda
sufrir erosión por lo menos
dos días antes de una lluvia
pronosticada o durante tiempo
lluvioso.
¡QUIENES CONTAMINEN LOS DESAGÜES DE AGUAS PLUVIALES PUEDEN RECIBIR MULTAS DE HASTA $10,000 POR DÍA! * Adoptado con el permiso del Programa de Prevención de Polución del Agua del Condado de San Mateo.

STORMWATER & EDUCATION ALLIANCE
www.montereysea.org
monterey regional Attachment 10
DPR 523A (1/95) *Required Information
State of California -- The Resources Agency

DEPARTMENT OF PARKS AND RECREATION

PRIMARY RECORD
Primary # ___________________________________________
HRI # ______________________________________________
Trinomial ___________________________________________
NRHP Status Code
Other Listings
Review Code ______ Reviewer ______________________ Date _______________________

Page 1 of 11 ends
← All documents from this meeting