FY 26-27 CIP Draft
PHASE PROJ # TYPE PROJECT NAME DESCRIPTION Total Project Estimate FY26-27 Estimate FY27-28 Estimate FY28-29 Estimate FY29-30 Estimate FY30-31 Estimate Funding Source 2 Design PW1615 Traffic Traffic Signal Installation -
Lenardo Dr at Stamps Dr
Traffic signal installation at intersection - Lenardo Dr and Stamps Dr 600,000.00$ -$ -$ -$ -$ -$ Measure MR-MM Bonds
2 Design PW1616 Traffic Traffic Signal Installation-3
Driveways - Lenardo Dr at
FOLA Driveways
Traffic signal installation at intersection - Lenardo Dr and FOLA Driveways 1,500,000.00$ -$ -$ -$ -$ -$ Measure MR-MM Bonds
2 Design PW1617 Roadways Lenardo Drive Construction of new roadway to serve the 157 acre site development 24,181,173.00$ -$ 2024 Lease Revenue Bond
2 Design PW1617 Roadways Lenardo Drive Construction of new roadway to serve the 157 acre site development 49,750,000.00$ 15,367.00$ -$ -$ -$ -$ Measure MR-MM Bonds
2 Design PW1617 Roadways Lenardo Drive Construction of new roadway to serve the 157 acre site development 1,174,122.00$ -$ Measure MR-MM Bonds
2 Design PW1617 Roadways Lenardo Drive Construction of new roadway to serve the 157 acre site development 7,944,581.00$ -$ Measure MR-MM Bonds
2 Design PW1617 Roadways Lenardo Drive Construction of new roadway to serve the 157 acre site development 1,250,000.00$ -$ Measure MR-MM Bonds
2 Design PW1617 Roadways Lenardo Drive Construction of new roadway to serve the 157 acre site development 750,000.00$ -$ Development Impact Fee
2 Design PW1617 Roadways Lenardo Drive Construction of new roadway to serve the 157 acre site development 18,000.00$ -$ 2024 Lease Revenue Bond
2 Design PW1620 Roadways Lomita Blvd-Street
Improvement - Figueroa to
Avalon
Lomita Blvd - The project includes pavement rehabilitation, tree removal and replacement, and concrete reconstruction. (Combine PW1620, 1393-5, 1411-5) 5,000,000.00$ -$ 5,000,000.00$ -$ -$ -$ None 1 Construction PW1630 Parks Anderson Park Electrical
Panel- Design and
Construction
Replace and upgrade main electrical switch gear and lighting control panel. (Combined PW1630 & PW1671)
75,000.00$ -$ -$ -$ -$ -$ Park Development
(Quimby) - Fund
216
1 Construction PW1632 Buildings Community Center Coiling Wall & Seismic Analysis
Repair coiling wall at Community Center Main Hall - Seismic Analysis 1,484,000.00$ -$ -$ -$ -$ -$ General Fund 1 Construction PW1636 Parks Mills Park Renovations Install new shade structure over picnic shelters and outdoor exercise equipment, Construct Unisex restrooms (pre-fabrication) for public use, monument sign, wading pool demo - Per Capita Grant
3,483,335.00$ -$ -$ -$ -$ -$ OGALS 1 Construction PW1636 Parks Mills Park Site Reconstruction Project
Reconstruction and modernization of Mills Park to enhance recreational amenities, accessibility, and public use. Improvements include installation of new shade structures over picnic shelters and outdoor exercise equipment areas, construction of prefabricated unisex restroom facilities for public use, installation of a new monument sign, demolition and removal of the existing wading pool, and related site improvements. Additional work may include concrete improvements, accessibility upgrades, landscaping, irrigation, utility connections, and other appurtenant work necessary to complete the project.
-$ -$ -$ -$ -$ -$ County Park Open Space/ Measure A
1 Construction PW1636 Parks Mills Park Site Reconstruction Project
Reconstruction and modernization of Mills Park to enhance recreational amenities, accessibility, and public use. Improvements include installation of new shade structures over picnic shelters and outdoor exercise equipment areas, construction of prefabricated unisex restroom facilities for public use, installation of a new monument sign, demolition and removal of the existing wading pool, and related site improvements. Additional work may include concrete improvements, accessibility upgrades, landscaping, irrigation, utility connections, and other appurtenant work necessary to complete the project.
-$ -$ -$ -$ -$ -$ DIF Park & Related Facilities
(4942)
FY 26-27 CIP Draft
PHASE PROJ # TYPE PROJECT NAME DESCRIPTION Total Project Estimate FY26-27 Estimate FY27-28 Estimate FY28-29 Estimate FY29-30 Estimate FY30-31 Estimate Funding Source 1 Construction PW1636 Parks Mills Park Site Reconstruction Project
Reconstruction and modernization of Mills Park to enhance recreational amenities, accessibility, and public use. Improvements include installation of new shade structures over picnic shelters and outdoor exercise equipment areas, construction of prefabricated unisex restroom facilities for public use, installation of a new monument sign, demolition and removal of the existing wading pool, and related site improvements. Additional work may include concrete improvements, accessibility upgrades, landscaping, irrigation, utility connections, and other appurtenant work necessary to complete the project.
-$ -$ -$ -$ -$ -$ Park Development
(Quimby) - Fund
216
1 Construction PW1636 Parks Mills Park Site Reconstruction Project
Reconstruction and modernization of Mills Park to enhance recreational amenities, accessibility, and public use. Improvements include installation of new shade structures over picnic shelters and outdoor exercise equipment areas, construction of prefabricated unisex restroom facilities for public use, installation of a new monument sign, demolition and removal of the existing wading pool, and related site improvements. Additional work may include concrete improvements, accessibility upgrades, landscaping, irrigation, utility connections, and other appurtenant work necessary to complete the project.
2,000,000.00$ -$ General Fund 3 Maintenance PW1639 Parks Veterans Park Office &
Meeting Room & Kitchen
Refurbishment
Replace counters, counter tops, cabinets and plumbing fixtures, flooring in Activity rooms and office and remodel Kitchen with new floor/cabinets/appliances 500,000.00$ -$ 500,000.00$ -$ -$ -$ None 2 Design PW1640 Parks Replace Park Rubberized Play
Surface and Playground
Structures- Phase 2
Replace the entire rubberized play surface and play structures at Parks and Mini Parks 12,000,000.00$ 2,500,000.00$ 8,000,000.00$ -$ -$ -$ General Fund 2 Design PW1647 Traffic I-110 Freeway Arterial
Improvements - Figueroa St
at Del Amo Blvd, Figueroa St
at I-110 NB Ramps, Figueroa
St at I-110 SB Ramps, Main St
at I-405 SB On Ramp, Main St
at I-405 SB Off Ramp, and
Hamilton Ave at Del Amo
Blvd
Traffic signal system improvement on the arterial roadways along the east and west side of the i-110 corridor at 6 Intersections - Figueroa St at Del Amo Blvd, Figueroa St at I-110 NB Ramps, Figueroa St at I-110 SB Ramps, Main St at I-405 SB On Ramp, Main St at I-405 SB Off Ramp, and Hamilton Ave at Del Amo Blvd
Pending MTA's approval for scope change and time extension 6,000,000.00$ -$ 3,499,181.00$ -$ -$ -$ None 2 Design PW1647 Traffic I-110 Freeway Arterial
Improvements - Figueroa St
at Del Amo Blvd, Figueroa St
at I-110 NB Ramps, Figueroa
St at I-110 SB Ramps, Main St
at I-405 SB On Ramp, Main St
at I-405 SB Off Ramp, and
Hamilton Ave at Del Amo
Blvd
Traffic signal system improvement on the arterial roadways along the east and west side of the i-110 corridor at 6 Intersections - Figueroa St at Del Amo Blvd, Figueroa St at I-110 NB Ramps, Figueroa St at I-110 SB Ramps, Main St at I-405 SB On Ramp, Main St at I-405 SB Off Ramp, and Hamilton Ave at Del Amo Blvd
Pending MTA's approval for scope change and time extension -$ 740,819.00$ -$ -$ -$ -$ DIF Transportation
(4945)
2 Design PW1647 Traffic I-110 Freeway Arterial
Improvements - Figueroa St
at Del Amo Blvd, Figueroa St
at I-110 NB Ramps, Figueroa
St at I-110 SB Ramps, Main St
at I-405 SB On Ramp, Main St
at I-405 SB Off Ramp, and
Hamilton Ave at Del Amo
Blvd
Traffic signal system improvement on the arterial roadways along the east and west side of the i-110 corridor at 6 Intersections - Figueroa St at Del Amo Blvd, Figueroa St at I-110 NB Ramps, Figueroa St at I-110 SB Ramps, Main St at I-405 SB On Ramp, Main St at I-405 SB Off Ramp, and Hamilton Ave at Del Amo Blvd
Pending MTA's approval for scope change and time extension -$ 1,760,000.00$ -$ -$ -$ -$ Metro Grant 1 Construction PW1648 Parks *Athletic Field and walking path replacement Lighting -
LED
Upgrade athletic field lights to central control lighting system and convert the existing lights to LED - All Parks
-$ -$ -$ -$ -$ -$ Load Shed - Fund 246
1 Construction PW1648 Parks *Athletic Field and walking path replacement Lighting -
LED
Upgrade athletic field lights to central control lighting system and convert the existing lights to LED - All Parks
1,226,494.30$ -$ -$ -$ -$ -$ Park Development
(Quimby) - Fund
216
1 Construction PW1648 Parks *Athletic Field and walking path replacement Lighting -
LED
Upgrade athletic field lights to central control lighting system and convert the existing lights to LED - All Parks
1,707,457.00$ 1,513,102.00$ -$ -$ -$ DIF Park & Related Facilities
(4942)
FY 26-27 CIP Draft
PHASE PROJ # TYPE PROJECT NAME DESCRIPTION Total Project Estimate FY26-27 Estimate FY27-28 Estimate FY28-29 Estimate FY29-30 Estimate FY30-31 Estimate Funding Source 1 Construction PW1648 Parks *Athletic Field and walking path replacement Lighting -
LED
Upgrade athletic field lights to central control lighting system and convert the existing lights to LED - All Parks
454,000.00$ -$ -$ -$ -$ -$ DIF Utilities & Sustainability
(4946)
1 Construction PW1648 Parks *Athletic Field and walking path replacement Lighting -
LED
Upgrade athletic field lights to central control lighting system and convert the existing lights to LED - All Parks
-$ -$ 2,400,000.00$ -$ -$ -$ None 1 Construction PW1649 Traffic Traffic Signal Intersection Upgrades - Avalon Blvd at
Victoria, Main St at
Sepulveda, Main St at 223rd
St, and Figueroa St at
Torrance Blvd
Traffic Signal Upgrades at 4 Intersections - Avalon Blvd at Victoria, Main St at Sepulveda, Main St and 223rd St, Figueroa St at Torrance Blvd) 3,529,123.00$ 1,522,350.00$ -$ -$ -$ -$ HSIP 1 Construction PW1649 Traffic Traffic Signal Intersection Upgrades - Avalon Blvd at
Victoria, Main St at
Sepulveda, Main St at 223rd
St, and Figueroa St at
Torrance Blvd
Traffic Signal Upgrades at 4 Intersections - Avalon Blvd at Victoria, Main St at Sepulveda, Main St and 223rd St, Figueroa St at Torrance Blvd) -$ 1,058,233.00$ -$ -$ -$ -$ DIF Traffic (4941) 1 Construction PW1649 Traffic Traffic Signal Intersection Upgrades - Avalon Blvd at
Victoria, Main St at
Sepulveda, Main St at 223rd
St, and Figueroa St at
Torrance Blvd
Traffic Signal Upgrades at 4 Intersections - Avalon Blvd at Victoria, Main St at Sepulveda, Main St and 223rd St, Figueroa St at Torrance Blvd) -$ 750,000.00$ -$ -$ -$ -$ DIF MBK 1 Construction PW1657 Traffic *Traffic Signal Upgrades
(M312.41 and M312.46) -
Figueroa St at 234th St,
Figueroa St at 223rd St,
Figueroa St at Victoria
St/190th St, Main St at 220th
St, Main St at Albertoni St,
and Main St at Victoria St
The work includes replacement and upgrade of existing traffic signal equipment, installation of new traffic signal poles, mast arms, signal heads, traffic signal controller cabinets, conduit and wiring. Additional improvements may include pavement striping and markings, signage, curb ramp upgrades for ADA compliance, utility adjustments, and related civil and electrical work. The project is intended to improve traffic operations, enhance pedestrian safety and accessibility, modernize aging infrastructure, and increase the overall reliability and efficiency of the traffic signal system.
5,661,686.00$ 4,323,500.00$ -$ -$ -$ -$ Measure R Grant 1 Construction PW1657 Traffic Traffic Signal Upgrades
(M312.41 and M312.46) -
Figueroa St at 234th St,
Figueroa St at 223rd St,
Figueroa St at Victoria
St/190th St, Main St at 220th
St, Main St at Albertoni St,
and Main St at Victoria St
The work includes replacement and upgrade of existing traffic signal equipment, installation of new traffic signal poles, mast arms, signal heads, traffic signal controller cabinets, conduit and wiring. Additional improvements may include pavement striping and markings, signage, curb ramp upgrades for ADA compliance, utility adjustments, and related civil and electrical work. The project is intended to improve traffic operations, enhance pedestrian safety and accessibility, modernize aging infrastructure, and increase the overall reliability and efficiency of the traffic signal system.
-$ 1,208,686.00$ -$ -$ -$ -$ General Fund 1 Construction PW1667 Traffic *Upgrade existing traffic signal - Avalon Bl at Gardena
Bl
Traffic Signal Upgrade to include addition of left turn phase on north and south bound direction of Avalon Blvd.
1,000,000.00$ 1,000,000.00$ -$ -$ -$ -$ Metro Measure M Grant
2 Design PW1671 Parks **Dolphin Park Electrical
Panel Upgrade - design and
Construction
Replace and upgrade electrical panels and lighting control for field lights. (Combined PW1671 & PW1630 & 1648)
100,000.00$ -$ -$ -$ -$ -$ none 3 Maintenance PW1673 Parks **Pool Slides Replacement at Dominguez Park and
Hemingway Park
Replace and install new pool slides for Dominguez Pool and Hemingway Pool 900,000.00$ -$ -$ -$ 450,000.00$ -$ None
FY 26-27 CIP Draft
PHASE PROJ # TYPE PROJECT NAME DESCRIPTION Total Project Estimate FY26-27 Estimate FY27-28 Estimate FY28-29 Estimate FY29-30 Estimate FY30-31 Estimate Funding Source 1 Construction PW1674 Safety **Security Cameras Install tamper proof security cameras at parks. Work on broadband requirements. (Johnson Contols)
7,351,975.08$ -$ -$ -$ -$ -$ General Fund 1 Construction PW1674 Safety **Security Cameras Install tamper proof security cameras at parks. Work on broadband requirements. (Johnson Contols)
-$ -$ -$ -$ -$ -$ Park Development
(Quimby) - Fund
216
1 Construction PW1674 Safety **Security Cameras Install tamper proof security cameras at parks. Work on broadband requirements. (Johnson Contols)
-$ -$ -$ -$ -$ -$ 2024 Lease Revenue Bond
1 Construction PW1676 Stormwater City of Carson Stormwater Green Street Engineering,
Design & Implementation
(Gardena & Main Street &
Avalon)
Compliance to the RWQCB stormwater - Includes engineered systems, permeable pavements & nature-based systems. The goal is to comply with regulations. 3,000,000.00$ 2,500,000.00$ -$ -$ -$ -$ Measure W 2 Design PW1682 Stormwater Stormwater Master and
Implementation Plan
Create a comprehensive Stormwater Implementation Plan to inform strategic stormwater capital planning, maintenance, operations, and program management in the City. The plan must consolidate municipal stormwater quality compliance; targeted drainage and flood improvements; operations, maintenance, and non-structural program management; and financial strategy (government grants, regional programs and partnerships, City funds if required, General Fund and Safe, Clean Water Program) into one guiding program.
1,364,143.00$ -$ -$ -$ -$ -$ Measure W 1 Construction PW1687 Traffic Carson Street Intelligent Transportation System (ITS)
Project
Installation of new fiber cables, the installation of 100' conduit gap across Main Street, CCTV cameras, hardware, software, and other elements that improve traffic flow on Carson Street from the 405 Fwy to Figueroa
1,297,012.00$ 997,012.00$ -$ -$ -$ -$ Measure M Grant 1 Construction PW1687 Traffic Carson Street Intelligent Transportation System (ITS)
Project
Installation of new fiber cables, the installation of 100' conduit gap across Main Street, CCTV cameras, hardware, software, and other elements that improve traffic flow on Carson Street from the 405 Fwy to Figueroa
-$ 4,793.72$ -$ -$ -$ -$ Proposition C 1 Construction PW1688 Traffic Traffic Signal Synchronization Project (TSSP) - Avalon Bl
from 126th St to Sepulveda Bl
Traffic signal synchronization at intersection (Total of 21 TSSP) along Avalon Bl from 126th St to Sepulveda Bl
1,000,000.00$ -$ 1,000,000.00$ -$ -$ -$ Metro Grant 1 Construction PW1691 Roadways Avalon Street Rehabilitation Avalon Blvd. Street Rehabilitation from Carson St. to 223rd Street. The project includes asphalt pavement grind and overlay, local removal and replacement of roadway section. It also includes concrete reconstruction, tree removal and replacement, repair of damage sidewalk, driveway approaches, curbs and gutter, access ramps. 4,500,000.00$ -$ 4,500,000.00$ -$ -$ -$ None 3 Maintenance PW1692 Stormwater *Carson Stormwater &
Runoff Project (O&M
Carriage Crest Park)
Operation & Maintenance of stormwater capture facility at Carriage Crest Park. Safe clean water program requirements
1,037,500.00$ 373,234.39$ 207,500.00$ -$ -$ -$ Safe Clean Water 3 Maintenance PW1692 Stormwater *Carson Stormwater &
Runoff Project (O&M
Carriage Crest Park)
Operation & Maintenance of stormwater capture facility at Carriage Crest Park. Safe clean water program requirements
1,037,500.00$ -$ 207,500.00$ 207,500.00$ -$ -$ General Fund 2 Design PW1698 Roadways *City Utilities Master Plan 1. Sewer & Storm Drain Line Evaluation throughout the City to determine capacity for future delvelopment.
2. Update reclaimed water pipeline network throughout the City. Working with WBMWD's engineering division
325,000.00$ -$ 325,000.00$ -$ -$ -$ DIF Administraion (4940)
3 Maintenance PW1699 Buildings Community Center Upgrades - Dominguez Halls and Kitchen
Upgrades to facility kitchen and halls (Dominguez Halls) at community center (Later to avoid construction conflicts w/ coiling wall)
1,870,000.00$ -$ 1,870,000.00$ -$ -$ -$ None
FY 26-27 CIP Draft
PHASE PROJ # TYPE PROJECT NAME DESCRIPTION Total Project Estimate FY26-27 Estimate FY27-28 Estimate FY28-29 Estimate FY29-30 Estimate FY30-31 Estimate Funding Source 2 Design PW1702 Roadways Lomita Boulevard Safety
Improvements - Wilmington
to Alameda
Street reconstruction of Lomita Blvd (Carson side) 6,240,379.00$ 2,000,000.00$ -$ -$ -$ -$ Cal Trans 2 Design PW1702 Roadways Lomita Boulevard Safety
Improvements - Wilmington
to Alameda
Street reconstruction of Lomita Blvd (Carson side) -$ -$ 4,240,379.00$ -$ -$ -$ None 2 Design PW1706 Parks Stevenson Park Bungalow
Removal
Removal of bungalow "North End" (Combine PW1706 & PW1707) -$ -$ 500,000.00$ -$ -$ -$ General Fund 2 Design PW1707 Parks Stevenson Park Picnic Installation of New Picnic Shelters (Combine PW1707 & PW1706) 2,500,000.00$ -$ 2,000,000.00$ -$ -$ -$ None 2 Design PW1710 Roadways Walnut St rehabilitation
(Avalon to Central)
Walnut St rehabilitation from Avalon to Central. The project includes asphalt pavement grind and overlay, local removal and replacement of roadway section. It also includes concrete reconstruction, tree removal and replacement, repair of damage sidewalk, driveway approaches, curbs and gutter, access ramps.
3,900,000.00$ -$ 3,900,000.00$ -$ -$ -$ None 3 Maintenance PW1712 Buildings Civic Buildng Mechanical Upgrade
Replacement of the heat exchanger at City Hall 500,000.00$ 500,000.00$ -$ -$ -$ -$ General Fund 3 Maintenance PW1720 Buildings City Hall & Community
Center Elevators
Full modification of City Hall & Community Center Elevator 1,500,000.00$ -$ -$ -$ -$ -$ None 2 Design PW1723 Buildings International Scuplture
Garden
City Council request, the existing statue of Jose Rizal is the first of potentially several historical leaders to be memorialized in the international sculpture garden. Staff recommendation is to congregate all sculptures in an accessible area adjacent to the Community Center and outside of the footprint of the proposed Teen/Innovation Center.
200,000.00$ -$ -$ -$ -$ 200,000.00$ None 1 Construction PW1726 Buildings Community Center Courtyard (West) & Community Center
East Parking Lot
Redesign/Upgrade Courtyard area. Outdoor entertainment - Although used occasionally by the public, the West courtyard and garden area of the Community Center it is not optimized for reservations in private events. The project proposes redesigning to include a raised Amphitheatre stage, large shade sales , open grass and concrete seating areas , and enclosed fenced perimeter to accommodate private rentals. Additional lighting , sound , and landscape amenities will also be included.
Redesign Parking lot island in front of East entrance - With the addition of a mobile stage for large scale citywide special events come on the east parking lot of the Community Center is in need of modification to allow for easy set up and orientation of the stage to accommodate better visibility and access by the community. Parking lot adjustments will include the full or partial elimination of a single parking lot planter and associated landscape adjustments. The resulting design will allow for the stage to be erected at the east entrance of the Community Center with the stage facing toward the east.
10,000,000.00$ 161,000.00$ -$ -$ -$ -$ 2024 Lease Revenue Bond
1 Construction PW1726 Buildings Community Center Courtyard (West) & Community Center
East Parking Lot
Redesign/Upgrade Courtyard area. Outdoor entertainment - Although used occasionally by the public, the West courtyard and garden area of the Community Center it is not optimized for reservations in private events. The project proposes redesigning to include a raised Amphitheatre stage, large shade sales , open grass and concrete seating areas , and enclosed fenced perimeter to accommodate private rentals. Additional lighting , sound , and landscape amenities will also be included.
Redesign Parking lot island in front of East entrance - With the addition of a mobile stage for large scale citywide special events come on the east parking lot of the Community Center is in need of modification to allow for easy set up and orientation of the stage to accommodate better visibility and access by the community. Parking lot adjustments will include the full or partial elimination of a single parking lot planter and associated landscape adjustments. The resulting design will allow for the stage to be erected at the east entrance of the Community Center with the stage facing toward the east.
-$ -$ -$ -$ -$ -$ DIF Park & Related Facilities
(4942)
FY 26-27 CIP Draft
PHASE PROJ # TYPE PROJECT NAME DESCRIPTION Total Project Estimate FY26-27 Estimate FY27-28 Estimate FY28-29 Estimate FY29-30 Estimate FY30-31 Estimate Funding Source 1 Construction PW1726 Buildings Community Center Courtyard (West) & Community Center
East Parking Lot
Redesign/Upgrade Courtyard area. Outdoor entertainment - Although used occasionally by the public, the West courtyard and garden area of the Community Center it is not optimized for reservations in private events. The project proposes redesigning to include a raised Amphitheatre stage, large shade sales , open grass and concrete seating areas , and enclosed fenced perimeter to accommodate private rentals. Additional lighting , sound , and landscape amenities will also be included.
Redesign Parking lot island in front of East entrance - With the addition of a mobile stage for large scale citywide special events come on the east parking lot of the Community Center is in need of modification to allow for easy set up and orientation of the stage to accommodate better visibility and access by the community. Parking lot adjustments will include the full or partial elimination of a single parking lot planter and associated landscape adjustments. The resulting design will allow for the stage to be erected at the east entrance of the Community Center with the stage facing toward the east.
-$ -$ -$ -$ -$ -$ Park Development
(Quimby) - Fund
216
2 Design PW1732 Parks Solar @ Vets Park Microgrid-Solar panels and Battery Storage Systems at SportsComplex Parking Lot and some areas of roofing.
2,000,000.00$ 2,000,000.00$ -$ -$ -$ -$ Fed Gov't Appropriation
from HUD Grant#
B-23-CP-0CA-
0076
2 Design PW1748 Buildings Corporate Yard Energy
Efficient & Other
Improvements - Evaluate and
construct, if viable
• Commercial Vehicle Protection: Installation of prefabricated covered parking structures with integrated lighting to protect multi-million-dollar fleet and equipment from environmental exposure, directly reducing maintenance costs Estimated at $2,600,000
• Perimeter Security & Aesthetics: Replacement of the deteriorated northern chain-link fence with a durable cinder block wall to enhance site security and improve the facility's visual profile. Estimated at $1,058,400
• Operational Efficiency: A full parking lot redesign and restriping to optimize space utilization for a growing fleet and staff. Estimated at $150,000 • Maintenance Infrastructure: Construction of a new industrial wash rack station to facilitate routine maintenance and ensure the longevity and cleanliness of the city's vehicle and equipment inventory. Estimated at $1,850,000 • Soft Costs & Owner Contingency Engineering & Local Permitting: Civil engineering, prefab structural calculations review, Geo-technical soil samples and possible soil remediation. Construction Contingency: Expanded approximately 10% project-wide safety buffer safeguarding against material price volatility or unforeseen field conditions. Estimated at $1,341,600.
7,000,000.00$ -$ 7,000,000.00$ -$ -$ -$ General Fund 2 Design PW1748 Buildings Corporate Yard Energy
Efficient & Other
Improvements - Evaluate and
construct, if viable
• Commercial Vehicle Protection: Installation of prefabricated covered parking structures with integrated lighting to protect multi-million-dollar fleet and equipment from environmental exposure, directly reducing maintenance costs . Estimated at $2,600,000
• Perimeter Security & Aesthetics: Replacement of the deteriorated northern chain-link fence with a durable cinder block wall to enhance site security and improve the facility's visual profile. Estimated at $1,058,400
• Operational Efficiency: A full parking lot redesign and restriping to optimize space utilization for a growing fleet and staff. Estimated at $150,000 • Maintenance Infrastructure: Construction of a new industrial wash rack station to facilitate routine maintenance and ensure the longevity and cleanliness of the city's vehicle and equipment inventory. Estimated at $1,850,000 • Soft Costs & Owner Contingency Engineering & Local Permitting: Civil engineering, prefab structural calculations review, Geo-technical soil samples and possible soil remediation. Construction Contingency: Expanded approximately 10% project-wide
-$ -$ -$ -$ -$ -$ DIF Gov Facilities (4944)
FY 26-27 CIP Draft
PHASE PROJ # TYPE PROJECT NAME DESCRIPTION Total Project Estimate FY26-27 Estimate FY27-28 Estimate FY28-29 Estimate FY29-30 Estimate FY30-31 Estimate Funding Source 2 Design PW1748 Buildings Corporate Yard Energy
Efficient & Other
Improvements - Evaluate and
construct, if viable
• Commercial Vehicle Protection: Installation of prefabricated covered parking structures with integrated lighting to protect multi-million-dollar fleet and equipment from environmental exposure, directly reducing maintenance costs. Estimated at $2,600,000
• Perimeter Security & Aesthetics: Replacement of the deteriorated northern chain-link fence with a durable cinder block wall to enhance site security and improve the facility's visual profile. Estimated at $1,058,400
• Operational Efficiency: A full parking lot redesign and restriping to optimize space utilization for a growing fleet and staff. Estimated at $150,000 • Maintenance Infrastructure: Construction of a new industrial wash rack station to facilitate routine maintenance and ensure the longevity and cleanliness of the city's vehicle and equipment inventory. Estimated at $1,850,000 • Soft Costs & Owner Contingency Engineering & Local Permitting: Civil engineering, prefab structural calculations review, Geo-technical soil samples and possible soil remediation. Construction Contingency: Expanded approximately 10% project-wide safety buffer safeguarding against material price volatility or unforeseen field conditions. Estimated at $1,341,600.
-$ -$ -$ -$ -$ -$ DIF Utilities & Sustainability
(4946)
2 Design PW1749 Buildings EV Bus Chargers Installation of EV bus chargers with electrical conduits and potential transformer 250,000.00$ 250,000.00$ -$ -$ -$ -$ DIF Utilities & Sustainability
(4946)
2 Design PW1753 Roadways University Drive
Rehabilitation - Avalon Blvd
to Wilmington Ave
University Dr. Rehabilitation (1.8 miles) from Avalon to Wilmington Ave. The project includes removal and replacement of asphalt pavement section and base, grind and overlay, local removal and replacement of roadway section. It also includes concrete reconstruction, tree removal and replacement, repair of damage sidewalk, driveway approaches, curbs and gutter, access ramps.
-$ -$ 1,966,000.00$ -$ -$ -$ None 2 Design PW1753 Roadways University Drive
Rehabilitation - Avalon Blvd
to Wilmington Ave
University Dr. Rehabilitation (1.8 miles) from Avalon to Wilmington Ave. The project includes removal and replacement of asphalt pavement section and base, grind and overlay, local removal and replacement of roadway section. It also includes concrete reconstruction, tree removal and replacement, repair of damage sidewalk, driveway approaches, curbs and gutter, access ramps.
-$ 35,000.00$ -$ -$ -$ -$ Community Facilities District
(CFD)
2 Design PW1753 Roadways University Drive
Rehabilitation - Avalon Blvd
to Wilmington Ave
University Dr. Rehabilitation (1.8 miles) from Avalon to Wilmington Ave. The project includes removal and replacement of asphalt pavement section and base, grind and overlay, local removal and replacement of roadway section. It also includes concrete reconstruction, tree removal and replacement, repair of damage sidewalk, driveway approaches, curbs and gutter, access ramps.
4,375,000.00$ 2,409,000.00$ -$ -$ -$ -$ Surface Transporation
Program Local
(STPL)
2 Design PW1755 Roadways Santa Fe Ave. Rehabilitation - Carson St. to Del Amo Ave.
Santa Fe Ave. (1.1 miles) Grind and overlay from Carson to Del Amo. The project includes asphalt pavement grind and overlay, local removal and replacement of roadway section. It also includes concrete reconstruction, tree removal and replacement, repair of damage sidewalk, driveway approaches, curbs and gutter, access ramps.
4,800,000.00$ -$ 4,800,000.00$ -$ -$ -$ None 3 Maintenance PW1756 Roadways Figueroa Street - Lomita to 223rd St.
1.8 miles. Figueroa St. Grind and overlay. (Combine with PW1774) 7,900,000.00$ -$ 7,900,000.00$ -$ -$ -$ None 2 Design PW1757 Roadways Main Street Rehabilitation -
Lomita to 228th St
Main St. (1.41 miles) Grind and overlay from Lomita Blvd. to 228th St. The project includes asphalt pavement grind and overlay, local removal and replacement of roadway section. It also includes concrete reconstruction, tree removal and replacement, repair of damage sidewalk, driveway approaches, curbs and gutter, access ramps.
6,556,047.00$ 6,200,000.00$ -$ -$ -$ -$ RMRA (SB1) - Fund 288
2 Design PW1757 Roadways Main Street Rehabilitation -
Lomita to 228th St
Main St. (1.41 miles) Grind and overlay from Lomita Blvd. to 228th St. The project includes asphalt pavement grind and overlay, local removal and replacement of roadway section. It also includes concrete reconstruction, tree removal and replacement, repair of damage sidewalk, driveway approaches, curbs and gutter, access ramps.
-$ -$ -$ -$ -$ -$ General Fund 2 Design PW1757 Roadways Main Street Rehabilitation -
Lomita to 228th St
Main St. (1.41 miles) Grind and overlay from Lomita Blvd. to 228th St. The project includes asphalt pavement grind and overlay, local removal and replacement of roadway section. It also includes concrete reconstruction, tree removal and replacement, repair of damage sidewalk, driveway approaches, curbs and gutter, access ramps.
-$ 300,000.00$ -$ None 2 Design PW1758 Roadways Main Street - 228th St to
Carson Street
Main St. (0.9 miles) Grind and overlay from 228th St. to Carson St. The project includes asphalt pavement grind and overlay, local removal and replacement of roadway section. It also includes concrete reconstruction, tree removal and replacement, repair of damage sidewalk, driveway approaches, curbs and gutter, access ramps. 4,000,000.00$ -$ -$ -$ -$ -$ RMRA (SB1) - Fund 288
FY 26-27 CIP Draft
PHASE PROJ # TYPE PROJECT NAME DESCRIPTION Total Project Estimate FY26-27 Estimate FY27-28 Estimate FY28-29 Estimate FY29-30 Estimate FY30-31 Estimate Funding Source 2 Design PW1758 Roadways Main Street - 228th St to
Carson Street
Main St. (0.9 miles) Grind and overlay from 228th St. to Carson St. The project includes asphalt pavement grind and overlay, local removal and replacement of roadway section. It also includes concrete reconstruction, tree removal and replacement, repair of damage sidewalk, driveway approaches, curbs and gutter, access ramps. -$ -$ 4,000,000.00$ -$ -$ -$ None 3 Maintenance PW1762 Roadways Wilmington Ave - Lomita
Boulevard to 223rd Street -
Roadway Reconstruction
Reconstruction and rehabilitation of existing roadway infrastructure to improve pavement conditions, traffic operations, drainage, and public safety. The work includes asphalt pavement reconstruction, cold milling and asphalt concrete overlay, localized full-depth pavement repairs, and replacement of deteriorated roadway sections.
Concrete-related improvements include removal and replacement of damaged curb and gutter, sidewalks, driveway approaches, cross gutters, access ramps, and other miscellaneous concrete improvements. Additional work may include subgrade preparation, adjustment of utility manholes and valve covers to grade, pavement striping and markings, traffic control, and drainage improvements. 7,900,000.00$ -$ 7,900,000.00$ -$ -$ -$ General Fund 1 Construction PW1774 Roadways Sepulveda (110 Fwy to
Figueroa)
Sepulveda Blvd. Grind and Overlay. The project includes asphalt pavement grind and overlay, local removal and replacement of roadway section. It also includes concrete reconstruction, tree removal and replacement, repair of damage sidewalk, driveway approaches, curbs and gutter, access ramps. (Combined with PW1756) 700,000.00$ -$ 700,000.00$ -$ -$ -$ None 2 Design PW1775 Roadways 213th St. Street Lights Chico to Wilmington 800,000.00$ -$ 800,000.00$ -$ -$ -$ Future Carson Street-Lighting
District Funds
2 Design PW1776 Stormwater Calas Park Stormwater
Infiltration and Water Quality
Improvements
Supplemental Environment Project (SEP) 6,000,000.00$ 5,980,000.00$ -$ -$ -$ -$ LA County Sanitation
Districts
2 Design PW1780 Traffic Victoria Street Transit Center Construction of a new transit center adjacent to CSUDH 11,477,000.00$ 5,738,500.00$ 5,738,500.00$ -$ -$ -$ Metro Grant 2 Design PW1780 Traffic Victoria Street Transit Center Construction of a new transit center adjacent to CSUDH -$ -$ -$ -$ -$ -$ None 1 Construction PW1784 Traffic Traffic Signal Modification Traffic Signal modification at Central Avenue and University Drive: Install left turn arrows on all approaches at the intersection of Central Avenue and University Drive. 800,000.00$ 800,000.00$ -$ -$ -$ -$ DIF Traffic (4941) 1 Construction PW1784 Roadways Traffic Signal Modification Traffic Signal modification at Central Avenue and University Drive: Install left turn arrows on all approaches at the intersection of Central Avenue and University Drive. -$ -$ -$ -$ -$ -$ None 2 Design PW1785 Bikeways Carson Bicycle Action Plan Carson's Master Bicycle Action Plan will serve as an informative guide when developing a framework that improves the city's physical bicycle system and reduces transportation inequities. With 18.7 sq miles of grid street networks (including California State University, Dominguez Hills), connecting Carson’s communities can enable widespread mode shifts to bicycling.
897,000.00$ 553,625.05$ -$ -$ -$ -$ ATP Cycle 6
FY 26-27 CIP Draft
PHASE PROJ # TYPE PROJECT NAME DESCRIPTION Total Project Estimate FY26-27 Estimate FY27-28 Estimate FY28-29 Estimate FY29-30 Estimate FY30-31 Estimate Funding Source 1 Construction PW1786 Buildings City Hall Bathroom and
Kitchenette Renovations
Renovating all City Hall restrooms and upgrading to current Americans with Disabilities Act standards and applicable California Building Codes. -$ 138,459.24$ -$ -$ -$ -$ DIF Gov Facilities (4944)
1 Construction PW1786 Buildings City Hall Bathroom and
Kitchenette Renovations
Renovating all City Hall restrooms and upgrading to current Americans with Disabilities Act standards and applicable California Building Codes. 1,697,000.00$ 898,308.25$ -$ -$ -$ -$ 2024 Lease Revenue Bond
1 Construction PW1790 Technology Community Center and
Amphitheatre Lighting and
AV Equipment Upgrade
Installation of AV Equipment and Operating System for Premier Events 2,500,000.00$ -$ 2,500,000.00$ -$ -$ -$ None 3 Maintenance PW1791 Roadways Street Repair Citywide Pavement Program (Previously titled Citywide Street Repair) 32,000,000.00$ -$ 1,000,000.00$ -$ -$ -$ General Fund 3 Maintenance PW1791 Roadways Street Repair Citywide Pavement Program (Previously titled Citywide Street Repair) -$ -$ -$ -$ -$ -$ 2024 Lease Revenue Bond
2 Design PW1792 Traffic Traffic Reliability
Improvements
Replace obsolete traffic signal battery backup systems, controllers, loop detection systems, with state of the art equipment capable of detecting bicycles, pedestrians, neighborhood electric vehicles, and prepare Carson for emerging transportation and communication technologies.
2,400,000.00$ -$ 2,400,000.00$ -$ -$ -$ None 2 Design PW1793 Trees URBAN FORESTRY MASTER
PLAN & IMPLEMENTATION
Develop and Implement an Urban Forestry Master Plan 1,000,000.00$ 401,189.00$ 378,010.00$ 49,993.00$ -$ -$ USDA Grant 1 Construction PW1795 Parks Mills Park Recreation Center Building Renovation
The project includes interior and exterior renovations to the recreation center building, including upgrades to community rooms, classrooms, restrooms, office spaces, kitchen facilities, storage areas, and multi-purpose activity areas. Improvements include replacement of outdated building systems such as HVAC, electrical, plumbing, lighting, flooring, roofing, doors, and windows, as well as ADA accessibility upgrades to ensure compliance with current building and accessibility standards. 3,000,000.00$ -$ -$ -$ -$ -$ 2024 Lease Revenue Bond
1 Construction PW1795 Parks Mills Park Recreation Center Building Renovation
The project includes interior and exterior renovations to the recreation center building, including upgrades to community rooms, classrooms, restrooms, office spaces, kitchen facilities, storage areas, and multi-purpose activity areas. Improvements include replacement of outdated building systems such as HVAC, electrical, plumbing, lighting, flooring, roofing, doors, and windows, as well as ADA accessibility upgrades to ensure compliance with current building and accessibility standards. -$ -$ -$ -$ -$ -$ County Park Open Space/ Measure A
1 Construction PW1795 Parks Mills Park Recreation Center Building Renovation
The project includes interior and exterior renovations to the recreation center building, including upgrades to community rooms, classrooms, restrooms, office spaces, kitchen facilities, storage areas, and multi-purpose activity areas. Improvements include replacement of outdated building systems such as HVAC, electrical, plumbing, lighting, flooring, roofing, doors, and windows, as well as ADA accessibility upgrades to ensure compliance with current building and accessibility standards. -$ 2,000,000.00$ -$ -$ -$ -$ General Fund 2 Design PW1796 Buildings Carson Civic Center
Redevelopment
Carson Civic Center Redevelopment 550,000.00$ -$ -$ -$ -$ -$ General Fund 2 Design PW1797 Technology Citywide Municipal Fiber
Optic Network Phase I
Phase I of Citywide Municipal Fiber Optic Network 30,000,000.00$ 6,250,000.00$ -$ -$ -$ -$ Community Broadband
Capital Outlay
Enterprise Fund
2 Design PW1798 Roadways Delores Rehabilitation from
Sepulveda to Carson Street
Delores Rehabilitation from Sepulveda to Carson Street 8,000,000.00$ -$ 8,000,000.00$ -$ -$ -$ None 2 Design PW1799 Roadways Del Amo Rehabilitation from
Main Street to Figueroa
Del Amo Rehabilitation from Main Street to Figueroa 2,000,000.00$ -$ 2,000,000.00$ -$ -$ -$ None 2 Design PW1800 Stormwater Citywide Stromdrain Repair Repair all City-owned stormdrains 3,000,000.00$ -$ 3,000,000.00$ -$ -$ -$ None 2 Design PW1801 Roadways Streetscape Master Plan -
Civic
Design and construction of median landscaping for segments on Avalon Blvd. and Carson St. identified as Civic-type land use.
6,700,000.00$ -$ -$ -$ -$ -$ General Fund 2 Design PW1801 Roadways Streetscape Master Plan -
Civic
Design and construction of median landscaping for segments on Avalon Blvd. and Carson St. identified as Civic-type land use.
300,000.00$ -$ Measure R
FY 26-27 CIP Draft
PHASE PROJ # TYPE PROJECT NAME DESCRIPTION Total Project Estimate FY26-27 Estimate FY27-28 Estimate FY28-29 Estimate FY29-30 Estimate FY30-31 Estimate Funding Source 2 Design PW1801 Roadways Streetscape Master Plan -
Civic
Design and construction of median landscaping for segments on Avalon Blvd. and Carson St. identified as Civic-type land use.
200,000.00$ -$ Measure M 2 Design PW1801 Roadways Streetscape Master Plan -
Civic
Design and construction of median landscaping for segments on Avalon Blvd. and Carson St. identified as Civic-type land use.
200,000.00$ -$ DIF Beautification (4943)
2 Design PW1801 Roadways Streetscape Master Plan -
Civic
Design and construction of median landscaping for segments on Avalon Blvd. and Carson St. identified as Civic-type land use.
456,000.00$ -$ Raised Medians 2 Design PW1803 Parks Friendship Mini Park Land
Acquisition & Expansion
Aquire land & expand current Friendship Mini Park; $1.43M grant for 0.44 acre acquisition
-$ 1,430,000.00$ -$ -$ -$ -$ County Park Open Space/ Measure A
2 Design PW1803 Parks Friendship Mini Park Land
Acquisition & Expansion
Aquire land & expand current Friendship Mini Park; $1.43M grant for 0.44 acre acquisition
1,430,000.00$ -$ -$ -$ -$ -$ None 2 Design PW1805 Parks Calas Park Removal of Wading Pool/New Picnic Shelter/ADA Pathway improvements 1,500,000.00$ -$ -$ 1,500,000.00$ -$ -$ None 2 Design PW1806 Parks Del Amo Park Fix storm drain run-off/Elevate Basketball courts/Building & Playground ADA upgrades/ irrigation and turf upgrades
20,000,000.00$ -$ 500,000.00$ -$ -$ -$ General Fund 2 Design PW1806 Parks Del Amo Park Fix storm drain run-off/Elevate Basketball courts/Building & Playground ADA upgrades/ irrigation and turf upgrades
-$ 4,500,000.00$ -$ None 2 Design PW1807 Parks Foisia Park Aquatic Repairs pool building/new mechanical equipment/electrical panels 500,000.00$ 500,000.00$ -$ -$ -$ -$ General Fund 2 Design PW1808 Parks Concrete Repairs at Pools
Citywide
Redo the concrete at Carson Pool, Dominguez Aquatic Center, Foisia Pool, and Hemingway Aquatics Center
2,000,000.00$ -$ 2,000,000.00$ -$ -$ -$ General Fund 2 Design PW1809 Parks Veterans Sports Complex
Installation of HVAC, Solar
Panels and Generator
Installation of new HVAC systems, backup generator facilities, and solar panel infrastructure at Veterans Park to improve energy efficiency, operational reliability, and facility resiliency. Replacement and upgrade of existing HVAC equipment, installation of new heating and cooling systems, ducting, electrical connections, controls, and related mechanical improvements. It also includes installation of a standby emergency generator with associated electrical equipment and transfer switch systems to provide backup power during outages. Also included is the installation of solar photovoltaic panels and related electrical infrastructure to support renewable energy generation and reduce energy consumption. Additional work may include structural improvements, concrete pads, utility upgrades, trenching, and site restoration. (Combined with PW1732)
-$ 2,000,000.00$ -$ -$ -$ -$ General Fund 2 Design PW1810 Parks Walnut Mini-Park Fix concrete sloping/landscaping clean up 750,000.00$ -$ 750,000.00$ -$ -$ -$ None 2 Design PW1811 Parks Carson Event Center Replace Early Childhood Education (ECE) playground so it is all abilities and ADA compliant
500,000.00$ -$ -$ 500,000.00$ -$ -$ None 2 Design PW1812 Parks Dominguez Park Room and Kitchen Remodel 1,000,000.00$ -$ 1,000,000.00$ -$ -$ -$ None 2 Design PW1813 Parks Dolphin Park, Dominguez
Park
New irrigation system for the entire park 1,000,000.00$ -$ 1,000,000.00$ -$ -$ -$ None 2 Design PW1814 Parks Reflections Park New redesign and landscaping 750,000.00$ -$ 750,000.00$ -$ -$ -$ None 2 Design PW1815 Parks Veterans Park Skate park To improve and fix the skate park at Veterans Park 500,000.00$ -$ 500,000.00$ -$ -$ -$ None 2 Design PW1816 Parks Dominguez Park Pickleball
Courts
Additional pickleball courts 500,000.00$ -$ -$ 500,000.00$ -$ -$ None 2 Design PW1817 Parks Foisia Park Pickleball Courts Conversion of handball courts into two pickleball courts 100,000.00$ 100,000.00$ -$ -$ -$ General Fund 2 Design PW1818 Safety Security Cameras Installation of Surveillance Cameras at mini-parks. 390,000.00$ -$ -$ -$ -$ -$ General Fund 2 Design PW1819 Safety Phase projection for installing
an enhanced intrusion alarm
and Halo smart sensor
system.
The project focuses on installing an upgraded intrusion alarm and Halo smart sensor system. This system will improve security by using advanced technology for real-time monitoring and alerts for unauthorized access or suspicious activity. The Halo smart sensors will include environmental monitoring and automated alerts, providing a complete security solution.
1,436,000.00$ -$ -$ -$ -$ -$ General Fund 2 Design PW1820 Safety Fire suppression system
installation at the Carson
Community Event Center
The project involves the installation of a fire suppression system at the Carson Community Event Center to enhance safety and comply with fire safety regulations.
This system will include advanced features such as sprinklers, alarm systems, and emergency exit signage to protect both the facility and its occupants from potential fire hazards.
580,000.00$ -$ 580,000.00$ -$ -$ -$ None
FY 26-27 CIP Draft
PHASE PROJ # TYPE PROJECT NAME DESCRIPTION Total Project Estimate FY26-27 Estimate FY27-28 Estimate FY28-29 Estimate FY29-30 Estimate FY30-31 Estimate Funding Source 2 Design PW1821 Roadways Caltrans Interchanges Caltrans areas -$ -$ -$ -$ -$ -$ None 2 Design PW1822 Buildings Teen Center Design and Construction of City Teen Center -$ -$ -$ -$ -$ -$ None 2 Design PW1823 Roadways Wayfinding Signs Design and placement of wayfinding signage throughout the City. (combine PW1823, PW1825, and PW1826)
1,000,000.00$ -$ -$ DIF Beautification (4943)
2 Design PW1823 Roadways Wayfinding Signs Design and placement of wayfinding signage throughout the City. (combine PW1823, PW1825, and PW1826)
-$ -$ -$ -$ -$ -$ DIF Transportation
(4945)
2 Design PW1824 Roadways Avalon Blvd. & Central Ave.
from Turmont to University
Dr. - Fence/Wall Replacement
Project.
The project consists of the removal and replacement of deteriorated fence walls along Avalon Boulevard and Central Avenue from Turmont to University Dr. that have become structurally deficient and pose a safety hazard to pedestrians and the public.
The work includes demolition and disposal of existing collapsing wall sections, construction of new fence walls and foundations, and installation of related structural and architectural improvements. Additional work may include sidewalk restoration, grading, drainage improvements, utility adjustments, landscaping restoration, traffic and pedestrian control. The project is intended to improve public safety, enhance pedestrian accessibility, restore structural integrity, and improve the overall appearance and functionality of the corridor.
10,000,000.00$ 500,000.00$ 9,500,000.00$ -$ -$ -$ General Fund 2 Design PW1825 Roadways Installation of Archways,
Monuments Signs, and
Wayfinding Signs - Citywide
Archways and Wayfinding Signs - The project includes the design, fabrication, and installation of gateway archways at key entry corridors, monument signs at prominent locations, and a comprehensive wayfinding signage system directing motorists, bicyclists, and pedestrians to major destinations, civic facilities, parks, commercial centers, and community landmarks. Improvements may include decorative architectural features, illuminated signage, landscaping enhancements, public art elements, branding components, and ADA-compliant directional signage designed to reflect the City’s character and community identity. The goal of the project is to strengthen community identity, improve accessibility and navigation, enhance streetscape aesthetics, and create welcoming gateways throughout the City. (combine PW1823 - Wayfinding Signs, PW1825 - Archways, and PW1826 - Monuments) 2,500,000.00$ -$ -$ -$ -$ -$ Measure R 2 Design PW1825 Roadways Installation of Archways,
Monuments Signs, and
Wayfinding Signs - Citywide
Archways and Wayfinding Signs - The project includes the design, fabrication, and installation of gateway archways at key entry corridors, monument signs at prominent locations, and a comprehensive wayfinding signage system directing motorists, bicyclists, and pedestrians to major destinations, civic facilities, parks, commercial centers, and community landmarks. Improvements may include decorative architectural features, illuminated signage, landscaping enhancements, public art elements, branding components, and ADA-compliant directional signage designed to reflect the City’s character and community identity. The goal of the project is to strengthen community identity, improve accessibility and navigation, enhance streetscape aesthetics, and create welcoming gateways throughout the City. (combine PW1823 - Wayfinding Signs, PW1825 - Archways, and PW1826 - Monuments) -$ 4,000,000.00$ 1,000,000.00$ -$ -$ -$ General Fund 2 Design PW1826 Roadways Monuments Planning and design development for new monuments throughout the City. (combine PW1823, PW1825, and PW1826)
-$ -$ -$ -$ -$ -$ DIF Transportation
(4945)
2 Design PW1826 Roadways Monuments Planning and design development for new monuments throughout the City. (combine PW1823, PW1825, and PW1826)
1,500,000.00$ -$ -$ -$ -$ -$ Measure R
FY 26-27 CIP Draft
PHASE PROJ # TYPE PROJECT NAME DESCRIPTION Total Project Estimate FY26-27 Estimate FY27-28 Estimate FY28-29 Estimate FY29-30 Estimate FY30-31 Estimate Funding Source 2 Design PW1826 Roadways Monuments Planning and design development for new monuments throughout the City. (combine PW1823, PW1825, and PW1826)
-$ -$ -$ None 2 Design PW1827 Roadways Shared Central Ave Project
with City of Compton
Shared Central Ave Project with City of Compton 874,908.13$ 874,908.13$ -$ Community Facilities District
(CFD)
2 Design PW1828 Traffic South Bay Travel Network Design and Construct a Local Travel Network (LTN) within Carson to establish routes for low speed travel using neighborhood electric vehicles (NEV) as well as other slow-speed zero-emission modes
4,512,915.00$ 3,858,096.00$ -$ -$ -$ -$ Measure M Grant 2 Design PW1829 Traffic Olympic Ready ITS Improve the Intelligent Transportation Systems (ITS) infrastructure in the corridors leading towards the Dignity Health Sports Complex
750,000.00$ 500,000.00$ -$ -$ -$ -$ Measure M Grant 2 Design PW1832 Traffic Traffic Signal Installation at
Grace Ave and 213th St
Traffic Signal Installation at Grace Ave and 213th St 100,000.00$ -$ -$ -$ -$ -$ Developer Funds 2 Design PW1833 Roadways Citywide Street Name Sign
Replacement
Replacement of Street Name Signs Citywide to align with new style guidelines 1,000,000.00$ -$ -$ -$ -$ -$ General Fund 2 Design PW1833 Roadways Citywide Street Name Sign
Replacement
Replacement of Street Name Signs Citywide to align with new style guidelines -$ 1,000,000.00$ -$ -$ -$ General Fund 2 Design PW1834 Technology Citywide Municipal Fiber
Optic Network Phase 2
Phase II of Citywide Municipal Fiber Optic Network 55,000,000.00$ 55,000,000.00$ -$ Community Broadband
Capital Outlay
Enterprise Fund
1 Construction PW1835 Buildings Community Center Flooring Replace carpeting/flooring at Community Center West Wing 300,000.00$ -$ -$ -$ -$ -$ General Fund 2 Design PW1836 Buildings EV Chargers at City Facilities* Additional chargers at City Hall, Foisia Park, and Carriage Crest Park 750,000.00$ 500,000.00$ 250,000.00$ -$ -$ -$ General Fund 2 Design PW1837 Buildings Digital Banners* Digital Banners for community messaging 500,000.00$ 500,000.00$ -$ -$ -$ -$ General Fund 2 Design PW1839 Traffic Traffic Signal Modification at
Delores & Sepulveda
Traffic Signal Modification at Delores & Sepulveda 709,300.00$ 638,370.00$ -$ HSIP 2 Design PW1839 Traffic Traffic Signal Modification at
Delores & Sepulveda
Traffic Signal Modification at Delores & Sepulveda 70,930.00$ -$ AQMD 2 Design PW1840 Traffic Avalon Traffic Signal and
Crosswalk Upgrades
Upgrade to the traffic signals and crosswalks at Avalon & University and Avalon & MLK 385,000.00$ 346,500.00$ -$ HSIP 2 Design PW1840 Traffic Avalon Traffic Signal and
Crosswalk Upgrades
Upgrade to the traffic signals and crosswalks at Avalon & University and Avalon & MLK 38,500.00$ -$ AQMD 2 Design PW1841 Traffic Safe Streets for All (SS4A) The City of Carson’s SS4A project aims to create programs and identify strategies to achieve zero traffic-related fatalities. These programs may include a Safe Routes to School Pilot Program, a Neighborhood Traffic Management Pilot Program, and a traffic safety implementation committee. Strategies may include safety countermeasures and temporary/low-cost pilot and demonstration activities to address speeding, cut- through traffic, and enhance safety for all users.
1,209,800.00$ 967,840.00$ -$ FedHWY 2 Design PW1841 Traffic Safe Streets for All (SS4A) The City of Carson’s SS4A project aims to create programs and identify strategies to achieve zero traffic-related fatalities. These programs may include a Safe Routes to School Pilot Program, a Neighborhood Traffic Management Pilot Program, and a traffic safety implementation committee. Strategies may include safety countermeasures and temporary/low-cost pilot and demonstration activities to address speeding, cut- through traffic, and enhance safety for all users.
161,960.00$ -$ DIF Transportation
(4945)
FY 26-27 CIP Draft
PHASE PROJ # TYPE PROJECT NAME DESCRIPTION Total Project Estimate FY26-27 Estimate FY27-28 Estimate FY28-29 Estimate FY29-30 Estimate FY30-31 Estimate Funding Source 2 Design PW1841 Traffic Safe Streets for All (SS4A) The City of Carson’s SS4A project aims to create programs and identify strategies to achieve zero traffic-related fatalities. These programs may include a Safe Routes to School Pilot Program, a Neighborhood Traffic Management Pilot Program, and a traffic safety implementation committee. Strategies may include safety countermeasures and temporary/low-cost pilot and demonstration activities to address speeding, cut- through traffic, and enhance safety for all users.
80,000.00$ -$ TDA 2 Design PW1842 Traffic Traffic Signal Upgrade at
Wilmington & Lomita
Traffic Signal Upgrade at Wilmington & Lomita -$ -$ -$ -$ -$ -$ None 2 Design PW1843 Traffic Traffic Signal Upgrade at
Avalon & Desford
Traffic Signal Upgrade at Avalon & Desford -$ -$ -$ -$ -$ -$ None 2 Design PW1844 Parks Park Marquee Signs New Marquee signs at parks citywide 1,732,500.00$ 1,500,000.00$ 232,500.00$ -$ -$ -$ General Fund 2 Design PW1845 Stormwater Dominguez Channel Estuary
Assessment Study
City's portion of the shared cost of the Dominguez Channel Estuary Assessment Study 304,201.00$ 304,201.00$ -$ Measure W 2 Design PW1846 Traffic Traffic Analysis for the
Upcoming LA 2028 Olympics
and Paralympics
The Project will evaluate and develop comprehensive traffic management and mobility strategies to support regional transportation operations during the 2028 Olympic and Paralympic Games hosted in the Los Angeles region. The project will assess existing and projected traffic conditions associated with Olympic venues, training facilities, transit hubs, designated event routes, and surrounding communities to minimize congestion, maintain emergency access, and enhance overall mobility and safety. The project scope includes traffic data collection, traffic modeling and simulation, intersection analysis, roadway capacity evaluations, parking and curb management assessments, transit coordination, and development of transportation demand management (TDM) strategies. The study will also evaluate temporary traffic control measures, shuttle and bus operations, freight movement impacts, pedestrian and bicycle circulation, signal timing optimization, intelligent transportation systems (ITS), and coordination with regional agencies including LA28, Los Angeles County Metropolitan Transportation Authority, Caltrans, and local jurisdictions.
200,000.00$ 200,000.00$ -$ -$ -$ -$ General Fund 1 Construction PW1847 Traffic Traffic Signal Installation at Carriage Crest Entrance and
Sepulveda Blvd.
Installation of a new traffic signal system which includes traffic signal poles, mast arms, signal heads, and related civil improvements such as pavement striping and markings, curb ramps compliant with ADA requirements. The project is intended to enhance traffic operations, provide safe crossings for park users and the public, and accommodate increased traffic and pedestrian activity to serve the expanded area of Carriagecrest Park.
750,000.00$ 700,000.00$ -$ -$ -$ -$ General Fund 1 Construction PW1848 Roadways Citywide Concrete Program Concrete Repair Citywide 500,000.00$ 500,000.00$ -$ -$ -$ -$ General Fund 2 Design PW1849 Roadways Streetscape Master Plan -
223rd
Design and construction of median landscaping for segments on 223rd from Lucerne to Alameda
3,650,000.00$ 150,000.00$ 3,500,000.00$ -$ General Fund 1 Construction PW1850 Buildings Public Works and Community Services Corporate Yard Roof
Improvements
Comprehensive rehabilitation including a full "tear off and replacement" of Public Works (Building A) roof and protective seal coating of Community Services Roof (Building C), and Warehouse and Fleet Mechanics Roof (Building B) to extend the service life of the existig systems and prevent future degradation. 2,000,000.00$ 2,000,000.00$ -$ -$ -$ -$ General Fund 575,564,870.45$ 208,939,153.78$ 182,041,812.00$ 2,757,493.00$ 450,000.00$ 200,000.00$
CITY OF CARSON
File #: Version:
Report to Honorable Mayor and City Council
Wednesday, May 20, 2026, 5:00 PM
DISCUSSION 38. To: Honorable Mayor and City Council From: Dr. Khaleah K. Bradshaw, City Clerk CCO Administration Subject: CONSIDERATION OF ONLY LOCAL UNCONTESTED APPOINTMENTS TO THE CITY’SCOMMISSIONS, COMMITTEES, AND BOARDS, AND CITY AFFILIATED ORGANIZATIONS BY MAYOR ANDCITY COUNCIL AND CONSIDER ALL (CONTESTED AND UNCONTESTED) APPOINTMENTS TO ALLCOMMISSIONS (CITY COUNCIL) I. SUMMARY
This item is on the agenda to consider only uncontested appointments of City Commission, Committee, andBoard members in accordance with the City Charter, Article VI, by Mayor and City Council.
Also, consider all (contested and uncontested) appointments to all commissions and also considerappointments to City Affiliated Organizations.
Pursuant to Section 602 of the City Charter provides, in part, the mayor and each member of the city councilmay appoint one member to a position on each City board or City commission, and the remainingmembership positions shall be appointed by the mayor and approved by a majority of the city council,including the three alternates.
II. RECOMMENDATION
TAKE the following actions:
1. CONSIDER and only APPOINT uncontested members to the City Commissions, Committees, and Boards;
2. CONSIDER and APPOINT all (contested and uncontested) members to all commissions except Planning Commission and Environmental Commission;
3. CONSIDER and APPOINT members to City Affiliated Organizations;
4. DIRECT the City Clerk to notify all affected appointments of this action in writing;
5. IF APPLICABLE, DIRECT the City Clerk to post and publish in accordance with the Maddy Act III. ALTERNATIVES
N/A
IV. BACKGROUND
701 East Carson Street
Every two years after the municipal election, most Commission and Board appointments expire. As unscheduled vacancies occur and/or members are frequently absent, it is best practice to consider new appointments.
Invitations to submit an appointment application for all interested person(s) were posted in accordance with the Maddy Act. Applications for individuals requesting appointments were previously provided under separate cover to the Mayor and City Council.
V. FISCAL IMPACT
Funds for member stipends are already budgeted for Fiscal Year 2025-2026.
VI. EXHIBITS
1. Updated Local Appointments List for Commissions, Committees, and Boards Attachments
Updated Local Appointments List for Commissions Committees and Boards.pdf
LOCAL APPOINTMENTS LIST FOR COMMISSIONS, COMMITTEES, AND BOARDS
(Pursuant to Government Code Section 54970 et seq.)
NOTICE IS HEREBY GIVEN that the current terms for the following Commissioners, Committee, and Board Members will expire as indicated for the respective bodies listed. Any interested resident of the City of Carson, California, is eligible to serve on any of the commissions, committees, or boards below, unless otherwise specified. Applications are available at the City Clerk's Office by request at (310) 952-1720.
* The following appointed positions may receive compensation ** Mayor's uncontested appointment
Vacant
I. COMMISSIONS
Article VI, §602 of the City Charter:
To be qualified for appointment, the member
shall be a qualified elector of the City, shall be domiciled in the City for at least sixty (60) days immediately preceding their appointment, and shall continue to reside in the City for the duration of his or her tenure, unless otherwise provided by ordinance.
The mayor and each member of the city council may appoint one member to a position on each City board, committee or commission, and the remaining membership positions shall be appointed by the mayor and approved by a majority of the city council, including the three alternates.
[1] Economic Development Commission
Established by: Ordinance No. 00-1191. §1 (CMC §27104.1); Ordinance No. 21- 2108
Membership: 9 members; 3 alternates
Qualification: Shall be and remain a resident of, or have a place of employment or business in the City of Carson, and be at least 18 years of age. Shall include representatives of all major sectors of the Carson business community as determined in the sole discretion of the City Council.
Meetings: 1st Thursday, 8:00 a.m. (Executive Conference Room) Staff Liaison: John Raymond, Asst. City Mgr x1773;
Support Staff: Sandy Solis, Division Secretary x1325
Commissioner
Appointed Term Expire
Aldridge Jr., Ray (LDH)** 12-06-22 11-30-26
Childers, Christopher (CH) 12-06-22 11-30-26
Embry, Darren (LDH) 04-04-23 11-30-26
Kelley, Blake (LDH) 04-04-23 11-30-26
Jimenez, Trini (AR) 12-06-22 11-30-26
Luevano, Jose (JH) 06-17-25 11-30-26
Sparrow, Clyde (LDH) 04-04-23 11-30-26
Wallace, Deborah (LDH) 04-04-23 11-30-26
Baddeley, Kevin (JD) 06-17-25 11-30-26
Cordova, Ted (LDH) Alt. 1 04-04-23 11-30-26
Ibarra, Victor (LDH) Alt. 2 02-06-24 11-30-26
Vacant (LDH) Alt. 3 11-30-26
[2] Environmental Commission*
Established by: Ordinance No. 70-128; §1 (CMC §2750); Ordinance No. 21-2103 Membership: 9 members; 3 alternates
Qualification: Shall be and remain a resident of the City of Carson and be at least eighteen (18) years of age at the time of the member's appointment Meetings: 1st Wednesday, 6:30 p.m. (Executive Conference Room) Staff Liaison: Reata Kulcsar, Innovation & Sustainability Officer x1312 Support Staff: Jessica Coria, Division Secretary x1823; Evelyne Carmona, Senior Administrative Analyst x1636; Kristin Smith, Council Aide x1743 Commissioner Appointed Term Expire
Rojas, Alejandro (JH) 04-21-26 11-30-26
Swayzer, Ezekiel (LDH) 12-03-24 11-30-26
Hopson, Lillian (LDH)** 12-03-24 11-30-26
Ford, Brittney (LDH) 05-21-25 11-30-26
Koons, William (JD) 12-03-24 11-30-26
Peralta, Maribel (AR) 01-07-25 11-30-26
Hunt, Joseph (LDH) 05-21-25 11-30-26
Taylor, Hourie (CH) 12-06-22 11-30-26
Watkins, Freeman (LDH) 12-03-24 11-30-26
Vacant (LDH) Alt. 1 11-30-26
Vacant (LDH) Alt. 2 11-30-26
Vacant (LDH) Alt. 3 11-30-26
[3] Human Relations Commission*
Established by: Ordinance No. 74-294; Ordinance No. 87-812, §1; Ordinance No. 89-883,§1
Membership: 11 members (7 general, 2 youth, 2 w/ a focus on disability-related matters); 3 alternates
Qualification:Shall be a resident of the City of Carson. Youth members shall be 16- 21 years of age, enrolled in school at time of appointment, maintain a 2.0 GPA, shall have interest in human relations.
Meetings: 3rd Wednesday, 6:30 p.m. (City Manager Conference Room) Staff Liaison: Cac Le, Council Aide x1722
Support Staff:
Commissioner
Appointed Term Expire
Junio, Teresita (LDH) 12-03-24 11-30-26
Calhoun, Jill (AR) 12-06-22 11-30-26
Davenport, Kimberley (JH) 04-04-23 11-30-26
Fuentes, Sonia (JD) 12-02-25 11-30-26
Ramos, Jessica (LDH) 12-03-24 11-30-26
Reed, Cassandra (CH) 12-06-22 11-30-26
Russ, Harriett (LDH)** 12-03-24 11-30-26
Ifeacho, Dr. Chinyere (LDH) Alt. 1 12-03-24 11-30-26
Viernes, Irene (LDH) Alt. 2 12-03-24 11-30-26
Ahaiwe-Simpson, Stacy (LDH) Alt. 3 02-17-26 11-30-26
Thompson, Audra (LDH) Disability Advocate 10-21-25 11-30-26 Padua, Luz (LDH) Disability Advocate 10-21-25 11-30-26
Paxton, Cameron (LDH) Youth 02-18-25 11-30-26
Vacant (LDH) Youth 11-30-26
[4] Parks, Recreation, and Cultural Arts Commission*
Established by: Ordinance No. 69-65 (CMC §2735); Ordinance No. 21-2106 Membership: 9 members; 3 alternates
Qualification: Resident of City of Carson
Meetings: Last Thursday, 6:30 p.m. (Executive Conference Room) Staff Liaison: Michael Whittiker, Jr. Director of Community Services x3571 Support Staff: Kimberyly Madrigal, Administrative Secretary x3581 Commissioner
Appointed Term Expire
Cainglet, Jesus-Alex (CH) 12-06-22 11-30-26
Cortado, Kimberly (JH) 06-20-23 11-30-26
Dahilig Jr., Cesar (LDH) 12-03-24 11-30-26
Lawrence, Shannon (LDH) 12-03-24 11-30-26
Gonzalez, Walter (LDH) 12-03-24 11-30-26
Hilliard, Kisa (JD) 12-03-24 11-30-26
Hunter, Edwina (AR) 12-06-22 11-30-26
Langston, DeAnthony (LDH) 12-03-24 11-30-26
Johnson, Jo Jacqueline (LDH)** 04-01-25 11-30-26
Brown Sr., Kelvin (LDH) Alt. 1 12-03-24 11-30-26
Vacant (LDH) Alt. 2 11-30-26
Brillantes, Rudolfo (LDH) Alt. 3 12-03-24 11-30-26
[5] Planning Commission*
Established by: Ordinance No. 13 (CMC §2700); § 606 of the City Charter Membership: 9 members; 3 alternates
Qualification: Resident of City of Carson
Meetings: 2nd and 4th Tuesday, 6:30 p.m. (City Council Chambers) Staff Liaison: Christopher Palmer, Economic Development Manager x1365 Support Staff: McKina Alexander, Planning Manager x1326; Laura Gonzalez, Planning Secretary x 1328
Commissioner
Appointed Term Expire
Diaz, Louie (JD) 12-03-24 11-30-26
Docdocil, Frederick (LDH)** 12-03-24 11-30-26
Guerra, Carlos (LDH) 12-03-24 11-30-26
Balgimino, Jay (AR) *Pending Oath 02-03-26 11-30-26
Huff, Del (LDH) 12-03-24 11-30-26
Wilson, Leticia (LDH) 12-03-24 11-30-26
Mfume, DeQuita (LDH) 12-03-24 11-30-26
Johnson, Clarence (JH) 03-19-24 11-30-26
Thomas, Dianne (CH) 12-06-22 11-30-26
Montecarlo, Jaime (LDH) Alt. 1 12-03-24 11-30-26
Vacant (LDH) Alt. 2 11-30-26
Vacant (LDH) Alt. 3 11-30-26
[6] Public Relations Commission*
Established by: Ordinance No. 01-1239, §2 (CMC §27105.1) Membership: 9 members; 3 alternates
Qualification: Shall be a resident of the City of Carson and be at least eighteen (18) years of age at the time of the member's appointment.
Meetings: 4th Tuesday, 12:00 p.m. (City Manager Conference Room) Staff Liaison: Danielle Halsey, Public Information Analyst x1606 Support Staff: Christine Foisia, Senior Clerk x1740
Commissioner
Appointed Term Expire
Eatman, Sonya (LDH) Community Rep. 12-03-24 11-30-26
Waddis, Dorcas (LDH)* Community Rep. 06-17-25 11-30-26
Stewart, Linda (LDH) Community Rep. 12-03-24 11-30-26
Sandoz, Jeretta (AR) Community Rep. 12-03-24 11-30-26
Ross, Dorothy (JD)
Public Relations
Specialist 12-03-24 11-30-26
Nunley, Madalyn (LDH)
Public Relations
Specialist 12-03-24 11-30-26
Pitcher, Pamela (LDH)
Public Relations
Specialist 12-03-24 11-30-26
Smith, Byron (CH)
Public Relations
Specialist 03-06-24 11-30-26
Price, Dr. Denice (JH)
Public Relations
Specialist 04-04-23 11-30-26
Washington, Deborah (LDH) Alt. 1 06-17-25 11-30-26
Smith, Shirley (LDH) Alt. 2 03-03-26 11-30-26
Page, Brent (LDH) Alt. 3 02-18-25 11-30-26
[7] Public Safety Commission*
Established by: Ordinance No. 99-1160 §1; Ordinance No. 01-1239 §1 (CMC §27103.6); Ordinance No. 21-2104
Membership: 9 members; 3 alternates
Qualification: Shall be a resident of the City of Carson and be at least eighteen (18) years of age at the time of the member's appointment.
Meetings: 3rd Thursday, 6:30 p.m. (Executive Conference Room) Staff Liaison: Priscilla Palma, Division Secretary x1787 Support Staff:
Commissioner
Appointed Term Expire
Allen, Jeffrey (LDH) 12-03-24 11-30-26
Arnold, Keith (LDH) 12-03-24 11-30-26
Flinton, Lawrence (AR) 08-06-24 11-30-26
Dacus, Samuel (LDH) 12-03-24 11-30-26
Dorsey, Donnie (CH) 12-06-22 11-30-26
Lewis, Prentiss (JH) 04-04-23 11-30-26
Rivers, Angela (LDH) 12-03-24 11-30-26
Romero, Heidi (LDH)** 12-03-24 11-30-26
Cogut, Louis (JD) 12-03-24 11-30-26
Wilson, Michael (LDH) Alt. 1 12-03-24 11-30-26
Brown, Randy (LDH) Alt. 2 12-03-24 11-30-26
Vacant (LDH) Alt. 3 11-30-26
[8] Public Works Commission*
Established by: Ordinance No. 99-1181 §2 (CMC §2798.6)
Membership: 9 members; 3 alternates
Qualification: Have interest, experience or ability in construction, transportation, traffic, or circulation areas to ensure that traffic, vehicle parking, bikeways, and transportation systems and other City facilities are regulated and constructed in a manner calculated to best provide for the safety and welfare of the public. Shall be and remain a resident of, or have a place of employment or business in, the City of Carson, and be at least eighteen (18) years of age at the time of the member’s appointment.
Meetings: 2nd Monday, 6:30 p.m. (Executive Conference Room) Staff Liaison: Gilbert Marquez, Principle City/Civil Engineer x1813 Support Staff: Taelour James, Division Secretary x1801
Commissioner
Appointed Term Expire
Fields, Brandon (AR) 02-03-26 11-30-26
Calhoun, James (JD) 01-20-26 11-30-26
Fe'esago, Uli (LDH) 01-20-26 11-30-26
McNichols, Ryan (LDH) 12-03-24 11-30-26
Howard, Kobii (LDH) 01-20-26 11-30-26
Hollaway, John (LDH) 04-07-26 11-30-26
Vacant (CH) 11-30-26
Martin, Jr., Marion (LDH) 12-03-24 11-30-26
Vacant (JH) 11-30-26
Obiora, Emmanuel (LDH) Alt. 1 12-03-24 11-30-26
Vacant (LDH) Alt. 2 11-30-26
Wilson, Daniel (LDH) Alt. 3 01-20-26 11-30-26
[9] Senior Citizens Advisory Commission*
Established by: Ordinance No. 97-1119, §1 (CMC §2799.6) Membership: 11 members; 3 alternates
Qualification: Resident of the City of Carson and be at least 50 years of age at the time of appointment.
Meetings: 2nd Monday, 4:00 p.m. (Community Center, Carson/Donminguez room) Staff Liaison: Mike Whittiker, Jr., Director of Community Services x1780; Dani Cook, Human Services Supervisor x1480
Support Staff: Brenda Reed, Senior Clerk x1775
Commissioner
Appointed Term Expire
Graves, Shirley (LDH)** 12-03-24 11-30-26
Lopez, Delia (LDH) 12-03-24 11-30-26
Leverette, Ernestine (AR) 05-06-25 11-30-26
Dunn, Linda (LDH) 12-03-24 11-30-26
Bates, Billye (LDH) 12-03-24 11-30-26
Patterson, Patricia (LDH) 12-03-24 11-30-26
Ronquillo, Myrna (JD) 12-03-24 11-30-26
Ruiz-Raber, Julie (CH) 12-06-22 11-30-26
Seymore, Dr. Vergie (JH) 04-04-23 11-30-26
Simpson-Lott, Darlene (LDH) 12-03-24 11-30-26
Walker, Itelia (LDH) 12-03-24 11-30-26
Brown, LaRhonda (LDH) Alt. 1 12-03-24 11-30-26
Vacant (LDH) Alt. 2 11-30-26
Davis, Pauline (LDH) Alt. 3 12-03-24 11-30-26
[10] Veterans Affairs Commission*
Established by: Ordinance No. 99-1154, §1 (CMC §27102.6) Membership: 11 members; 3 alternates
Qualification: Shall be a resident of the City of Carson and be at least eighteen (18) years of age at the time of the member's appointment.
Meetings: 3rd Monday, 6:00 p.m. (Veterans Sports Complex - Activity Room) Staff Liaison: Kisheen Tulloss, Council Aide x1711
Support Staff: Mikala Multiauaopele, Division Secretary x3557 Commissioner Appointed Term Expire
Batucal, Arthur (JH) 04-04-23 11-30-26
Boyd, Robert (JD) 12-03-24 11-30-26
Branch, Jr., Roger (LDH) 12-03-24 11-30-26
Da Silva, Manuel (LDH) 12-03-24 11-30-26
Raber, Brian (CH) 12-06-22 11-30-26
Salomon, Emmanuel (LDH) 12-03-24 11-30-26
Mosequera, Nemie P. (LDH)** 12-03-24 11-30-26
Woods, Richard (LDH) 12-03-24 11-30-26
Woods, Thomas (LDH) 12-03-24 11-30-26
Seay, Al (LDH) 12-03-24 11-30-26
Wilvert, Karl (AR) 12-06-22 11-30-26
Vacant (LDH) Alt. 1 11-30-26
Vacant (LDH) Alt. 2 11-30-26
Vacant (LDH) Alt. 3 11-30-26
[11] Women's Issues Commission*
Established by: Ordinance No. 02-1246, §1 (CMC §27106.6) Membership: 9 members; 3 alternates
Qualification: Shall be a resident of the City of Carson or work in the City of Carson during their tenure on the Commission and shall be at least eighteen (18) years of age at the time of the member's appointment
Meetings: 4th Monday, 6:00 p.m. (City Manager Conference Room) Staff Liaison: Keichun Graves, Council Aide x1799
Support Staff:
Commissioner
Appointed Term Expire
De La Cruz Manio, Connie (LDH) 02-03-26 11-30-26
Fielder, Yolanda (LDH) 12-03-24 11-30-26
Fields-Robinson, Dr. Leandrea (LDH)** 12-03-24 11-30-26 Foster, Carolyn (LDH) 12-03-24 11-30-26
Finley, Stephanie (JD) 10-21-25 11-30-26
Odom Houze, Susan (JH) 04-04-23 11-30-26
Price, Dr. Greta (AR) 12-06-22 11-30-26
Williams, Maria (CH) 12-03-24 11-30-26
Tresvant, Sheila (LDH) 12-03-24 11-30-26
Vacant (LDH) Alt. 1 11-30-26
Mackson, Monique (LDH) Alt. 2 12-03-24 11-30-26
Gills Washington, Christina (LDH) *Pending Oath Alt. 3 04-07-26 11-30-26 [12] Youth Commission*
Established by: Ordinance No. 98-1132, §1 (CMC §27100.6) Membership: 11 members; 3 alternates
Qualification: Resident of the City of Carson and be at least 13, but not more than 18 years of age at the time of appointment.
Meetings: 2nd Wednesday, 7:00 p.m. (Executive Conference Room) Staff Liaison: Brian Legaspi, Council Aide x 1721
Support Staff:
Commissioner
Appointed Term Expire
Mitchell, Hannah (LDH) 06-06-24 11-30-26
Moore, Joshua (JH) 06-06-24 11-30-26
Redway, Khristopher (LDH) 06-06-24 11-30-26
Estrada, Juan (LDH) 06-06-24 11-30-26
Villasana, Andrea (JD) 12-03-24 11-30-26
Mitchell, Jazcidi (LDH) 12-03-24 11-30-26
Zulueta, Nathaniel (LDH)** 02-17-26 11-30-26
Smith, Zoey (CH) 06-06-24 11-30-26
Vacant (LDH) 11-30-26
Homna, Kayla (AR) 01-07-25 11-30-26
Macias, Lea (LDH) 01-07-25 11-30-26
Ortiz, Miranda (LDH) Alt. 1 01-06-26 11-30-26
Cones-Canx, Sydney (LDH) Alt. 2 01-06-26 11-30-26
Cruz, Jayden (LDH) *Pending Oath Alt. 3 01-06-26 11-30-26 II. BOARDS & COMMITTEES
Article VI, §602 of the City Charter: To be qualified for appointment, the member shall be a qualified elector of the City, shall be domiciled in the City for at least sixty (60) days immediately preceding their appointment, and shall continue to reside in the City for the duration of his or her tenure, unless otherwise provided by ordinance.
The mayor and each member of the city council may appoint one member to a position on each City board, committee or commission, and the remaining membership positions shall be appointed by the mayor and approved by a majority of the city council, including the three alternates.
[13] Measure C and Measure K Budget Oversight Committee Established by: Ordinance No. 09-1423 (CMC §61119); Amended by Resolution No. 19-027; Amended by Resolution No. 221-030
Membership: 5 members; 2 alternates
Qualification: Resident of the City of Carson
Meetings: 2nd Tuesday, 6:30 p.m. (Community Center)
Staff Liaison: William Jefferson, Director of Finance x1756 Support Staff: Vicki Hernandez, Senior Clerk x1744
Appointed
Term Expire
Dorsey-Reeves, Vera (CH) 04-04-23 11-30-26
Cottrell-Fulbright, Lisa (AR) 05-06-25 11-30-26
Hunter, Cynthia (LDH) 04-04-23 11-30-26
Momoli, Nora (JD) 12-03-24 11-30-26
Hemphill, Dr. Afia (JH) 12-03-24 11-30-26
Vacant (LDH) Alt. 1 11-30-26
Vacant (LDH) Alt. 2 11-30-26
[14] Mobilehome Park Rental Review Board
Established by: Ordinance No. 79-485U, §4702; §607 of the City Charter Membership: 7 members (2 resident homeowners, 2 park owners, 3 at-large who are residents of the City and not homeowners, park owners, landlords, property managers or tenant in multifamily housing); 8 alternates (2 resident homeowners, 2 park owners, 4 at-large)
Qualification: See membership.
Meetings: 2nd and 4th Wednesday, 6:30 p.m. (City Council Chambers) Staff Liaison: Tara Matthew, Interim Housing Program Manager x1708 Support Staff: Sandy Solis, Division Secretary x1325
Appointed
Term Expire
Vacant (JH) At-large 11-30-26
Valdez, Daniel (JD) At-large 12-03-24 11-30-26
Hernandez, Susan (AR) At-large 04-21-26 11-30-26
Clark Harris, Dr. Alice (LDH) At-large Alt. 1 04-04-23 11-30-26 Muhammad, Nafis (LDH) At-large Alt. 2 04-04-23 11-30-26 Perez, Karey (LDH) At-large Alt. 3 04-04-23 11-30-26
Hayes, Phyllis (LDH) At-large Alt. 4 04-04-23 11-30-26
Horton, Maria (LDH) Park Owner 12-02-25 11-30-26
Forbath, Susy (LDH) Park Owner 04-04-23 11-30-26
Dzikowski, Barbara (LDH) Park Owner Alt. 1 12-02-25 11-30-26 Kleege, Robert Bruce (LDH) Park Owner Alt. 2 03-04-25 11-30-26 Richardson, Sheila (LDH)** Resident Homeowner 01-20-26 11-30-26 King, Tom (CH) Resident Homeowner 01-17-23 11-30-26
Davis, William (LDH) Resident Homeowner
Alt. 1 04-04-23 11-30-26
Vacant (LDH) Resident Homeowner
Alt. 2 11-30-26
[15] Relocation Appeals Board
Established by: Ordinance No. 74-313 (CMC §21004)
Membership: 9 members; 3 alternates
Qualification: Resident of the City of Carson
Meetings: Only when necessary
Staff Liaison: Sandy Solis, Economic Development Liaison x1325 Support Staff:
Appointed
Term Expire
Batucal, Dennis (LDH) 04-04-23 11-30-26
Evans, Linda (LDH) 04-04-23 11-30-26
Tate, Dorothy (LDH)** 01-23-24 11-30-26
Guray, Jr., Tancredo "Jun" (JD) 12-03-24 11-30-26
Witherspoon, Murphy (LDH) 01-07-25 11-30-26
Anson, Jr., Oscar (LDH) 01-23-24 11-30-26
Vacant (CH) 11-30-26
Morrison, Christopher (JH) 09-16-25 11-30-26
Vacant (AR) 11-30-26
Vacant (LDH) Alt. 1 11-30-26
Vacant (LDH) Alt. 2 11-30-26
Vacant (LDH) Alt. 3 11-30-26
III. SPECIAL COMMITTEE
[16] General Plan Advisory Committee
Established by: Minute Action 10-03-17; Amended by Resolution No. 19-029; Amended by Resolution No. 21-031
Membership: 7 members; 2 alternates
Meetings: Only when necessary
Staff Liaison: McKina Alexander, Planning Manager x1326 Support Staff: Planning Technician x1327
Appointed
Term Expire
Mayor Lula Davis-Holmes (LDH) 04-04-23 11-30-26
Councilmember Jim Dear (JD) 12-03-24 11-30-26
Brimmer, Charlotte (LDH)** 04-04-23 11-30-26
Dudley-Kimble, Monica (CH) 04-04-23 11-30-26
Gonzalez, Leonor (AR) 04-04-23 11-30-26
Hamilton, Dr. John (JH) 04-04-23 11-30-26
Sheriff Department Representative (LDH) 04-04-23 11-30-26 Cottrell-Fulbright, Lisa (LDH) Alt. 1 04-04-23 11-30-26 Lott, Aminika (LDH) Alt. 2 04-04-23 11-30-26
IV. SPECIAL BOARD
[17] Carson Reclamation Joint Powers Authority (CRJPA)
Established by: Resolution No. 15-01-CRJPA; Resolution No. 21-02-CRJPA Membership: 5 members
Meetings: 1st Monday, 4:00 p.m. (Helen Kawagoe Council Chambers) Staff Liaison: John Raymond, Executive Director x1773
Support Staff: Sylvia Rubio, Executive Assistant x1318
Appointed
Term Expire
Authority Chair Lula Davis-Holmes 01-20-26 01-20-31
Vice Chair Cedric Hicks 01-20-26 01-20-31
Board Member Ray Aldridge, Jr. 01-20-26 01-20-31
Board Member Lillian Hopson 01-20-26 01-20-31
Board Member Dianne Thomas 01-20-26 01-20-31
V. COUNCIL SUB-COMMITTEES
[18] Bingo/Fireworks
Established by: Minute Order 04-02-19
Appointed
Mayor Davis-Holmes 12-03-24
Councilmember Rojas 12-03-24
[19] Community Development/Housing/Logistics & Transit Standing Committee
Established by: Minute Order 04-02-19
Appointed
Mayor Davis-Holmes 12-03-24
Mayor Pro Tempore Hicks, Sr. 12-03-24
[20] Dignity Health Sports Park/CSUDH/Community Center Standing Committee
Established by: Minute Order 04-02-19
Appointed
Mayor Pro Tempore Hicks, Sr. 06-01-21
Councilmember Dr. Hilton 06-01-21
[21] Legislative Ad Hoc Committee
Established by: Minute Order 02-16-21
Appointed
Mayor Pro Tempore Hicks, Sr. 12-03-24
Councilmember Dr. Hilton 12-03-24
[22] City Hall/Community Center Renovation Ad Hoc Committee Established by: Minute Order 01-16-21
Appointed
Mayor Davis-Holmes 01-26-21
Councilmember Dr. Hilton 01-26-21
[23] Economic Development/E-Commerce Ad-Hoc Committee
Established by: Minute Order 03-02-21
Appointed
Mayor Davis-Holmes 03-02-21
Mayor Pro Tempore Hicks, Sr. 03-02-21
[24] Conditional Use Permit Ad Hoc Committee
Established by: Minute Order 04-05-22
Appointed
Mayor Davis-Holmes 04-05-22
Councilmember Dr. Hilton 04-05-22
[25] Housing Ad Hoc Committee
Established by: Minute Order 03-16-21
Appointed
Councilmember Dr. Hilton 12-03-24
Mayor Pro Tempore Hicks, Sr. 12-03-24
[26] Diversity, Equity and Inclusion Ad Hoc Committee
Established by: Minute Order 09-07-21
Appointed
Councilmember Dr. Hilton 09-07-21
Councilmember Rojas 03-01-22
[27] Standard Management Procedures and Special Ecents Ad Hoc Committee Established by: Minute Order 01-04-22
Appointed
Mayor Davis-Holmes 01-04-22
Councilmember Dr. Hilton 01-04-22
[28] Cell 2 Settlement Ad Hoc Committee
Established by: Minute Order 02-07-22 (Carson Reclamation Authority) Appointed
Authority Chair Lula Davis-Holmes 02-07-22
Board Member Dianne Thomas 02-07-22
[29] School Safety Ad Hoc Committee
Established by: Minute Order 02-15-22
Appointed
Councilmember Dr. Hilton 12-03-24
Councilmember Rojas 12-03-24
Captain Jones Norman 12-03-24
[30] Carson Finance and Audit Committee
Established by: Minute Order 06-20-23
Appointed
Mayor Davis-Holmes 06-20-23
Councilmember Rojas 06-20-23
Mayor Pro Tempore Hicks, Sr. 02-18-24
[31] Short-Term Rentals Ad Hoc Committee
Established by: Minute Order 03-02-21
Established by: Minute Order 10-03-23
Appointe
d
Mayor Davis-Holmes 10-03-23
Councilmember Dr. Hilton 10-03-23
[32] Special Event Ad Hoc Committee
Established by: Minute Order 06-06-24
Appointed
Mayor Davis-Holmes 06-06-24
Councilmember Dr. Hilton 06-06-24
[33] LA '28 Olympics Ad Hoc Committee
Established by: Minute Order 07-16-24
Appointed
Mayor Davis-Holmes 07-16-24
Councilmember Dr. Hilton 07-16-24 [34] Refinery Ad Hoc Committee
Established by: Minute Order 12-03-24
Appointed
Mayor Davis-Holmes 12-03-24
Mayor Pro Tempore Hicks, Sr. 12-03-24
[35] Grocery Store Ad Hoc Committee
Established by: Minute Order 06-18-24
Appointed
Councilmember Dr. Hilton 06-18-24
Mayor Pro Tempore Hicks, Sr. 06-18-24
[36] Gil Smith Mermorial Ad Hoc Committee
Established by: Minute Order 01-07-25
Appointed
Mayor Pro Tempore Hicks, Sr. 02-03-26
Councilmember Dr. Hilton 01-07-25
[37] Energy Ad Hoc Committee
Established by: Minute Order 09-16-25
Appointed
Mayor Pro Tempore Hicks, Sr. 09-16-25
Councilmember Dr. Hilton 09-16-25
[38] Transportation and Dial-A-Ride Services Ad Hoc Committee Established by: Minute Order 11-05-25
Appointed
Mayor Pro Tempore Hicks, Sr. 11-05-25
Councilmember Dr. Hilton 11-05-25
[39] Drive Construction Project Ad Hoc Committee
Established by: Minute Order 03-03-25
Appointed
Mayor Lula Davis-Holmes 03-03-26
Board Member Dianne Thomas 03-03-26
VI. CITY AFFILIATED ORGANIZATIONS
[40] California Contract Cities Association
Appointed
Mayor Pro Tempore Hicks, Sr. Delegate 12-03-24
Mayor Davis-Holmes Alternate 12-03-24
[41] Clean Power Alliance
Ord. No. 17-1633; LACCE Joint Powers (Authority)
Appointe
d
Mayor Pro Tempore Hicks, Sr. Delegate 11-15-22
Councilmember Rojas Alt. 1 12-03-24
Staff Member Reata Kulcsar Alt. 2 11-15-22
[42] County of Los Angeles Public Library Commission
Appointe
d
Mayor Davis-Holmes Delegate 12-03-24
[43] County SanitationDistricts of Los Angeles (Dist. No. 8)* Automatic designation of Mayor as Delegate per Health and Safety Code Section 4730. City Council as governing body, must select an alternate to act in place of presiding officer (Mayor) in absence, inability, or refusal to act.
Appointe
d
Mayor Davis-Holmes Delegate 01-26-21
Councilmember Dr. Hilton Alternate 12-03-24
[44] Greater Los Angeles County Vector Control District (Formerly SE Mosquito Abatement)*
The District’s governing power is vested in its 35 members of the Board of Trustees. One trustee is appointed by each of the 34 cities and the County Board of Supervisors appoints one to represent unincorporated areas of Los Angeles County. To be appointed, the member must reside in and be a resident voter of the representative city (or county for county member) in the District.
Board member duties and responsibilities include setting policy, establishing the budget, approving expenditures, and retaining legal counsel. The vector Trustee appointment and term are governed by the State Health and Safety Code and begin and end on the first Monday in January. Additionally, the State Health and Safety code does not allow for alternate members to be appointed.
Appointed
Term Expire
Councilmember Dear Delegate 01-26-21 01-05-26
(effective 01-03-22)
[45] L.A. County City Selection Committee
Per Government Code Section 50270, the membership of each such City Selection Committee shall consist of the Mayor of each city within the county. Members of the LA County City Selection Committee include the Mayor of each city within Los Angeles County. Each city appoints an elected official as a delegate to the City Selection Committee; it usually is the Mayor. The term of office for each Member of the LA County City Selection Committee coincides with City Mayor terms, and the Committee meets three or four times a year, at the call of the Chairman.
Their duties are to appoint City representatives to such Boards, Commissions and Agencies as may be required by law, i.e., LAFCO, South Coast Air Quality Management District, Los Angeles County Metropolitan Transportation Authority, Los Angeles County Hazardous Waste Management Advisory Committee; and to nominate for appointment Members to the California Coastal Commission. Nominations for the City Selection Committee appointees to the MTA are made by the Sector Subcommittees for the Sectors whose representatives’ terms are expiring. The cities assigned to one of the four regions in Los Angeles County. Nominations for the City Selection Committee appointees to the MTA are made by the Sector Subcommittees for the Sectors whose representatives’ terms are expiring. The cities assigned to one of the four regions in Los Angeles County (North County/San Fernando Valley, San Gabriel Valley, Southeast Long Beach and Southwest Corridor) shall meet as a Sector Subcommittee. Each candidate with a majority weighted vote will then be nominated from that Sector for consideration for appointment to the MTA.
Appointe
d
Mayor Davis-Holmes Delegate 01-26-21
Councilmember Dr. Hilton Alternate 01-23-24
[46] League of California Cities
Appointed
Councilmember Rojas Delegate 03-01-22
Councilmember Dr. Hilton Alt. 1 01-26-21
Mayor Davis-Holmes Alt. 2 12-03-24
[47] League of California Cities (Los Angeles Co. Division) Appointed
Councilmember Dr. Hilton Delegate 12-03-24
Councilmember Rojas Alt. 1 01-26-21
Mayor Davis-Holmes Alt. 2 12-03-24
[48] National League of Cities
Appointe
d
Mayor Pro Tempore Hicks, Sr. Delegate 01-26-21
Councilmember Rojas Alt. 1 12-03-24
Councilmember Dr. Hilton Alt. 2 12-03-24
[49] South Bay Cities Council of Govts (Joint Powers Authority) Appointe
d
Mayor Pro Tempore Hicks, Sr. Delegate 01-26-21
Mayor Davis-Holmes Alternate 12-03-24
[50] South Bay Workforce Investment Board
Appointed
Term Expire
Ted Cordova Member 06-18-24 06-30-28
Jeffrey Jennison Member 06-18-24 06-30-28
Janice Jimenez Member 07-01-21 06-30-25
Tamala Lewis Member 07-01-19 06-30-23
Tami Lorenzen-Fanselow Member 07-01-19 06-30-23
[51] Southern California Association of Governments (SCAG) Appointe
d
Councilmember Dr. Hilton Delegate 01-26-21
Mayor Davis-Holmes Alt. 1 01-26-21
Councilmember Rojas Alt. 2 12-03-24
[52] U.S. Conference of Mayors
Appointe
d
Mayor Davis-Holmes Delegate 01-26-21
Councilmember Rojas Alt. 1 03-01-22
Mayor Pro Tempore Hicks, Sr. Alt. 2 01-26-21
[53] West Basin Water Association
Appointe
d
Mayor Davis-Holmes Delegate 12-03-24
Mayor Pro Tempore Hicks, Sr. Alternate 01-26-21