Cities Index.
Agenda packet

Carson City Council
October 6, 2026

Document
Agenda packet
Meeting
October 6, 2026
Body
Carson City Council
Pages
35
Original file
104.5 MB
Text extracted from the city's file for reading and search. Open the original on s3.us-west-004.backblazeb2.com. That file is the official record.

195982-01
Sep 01, 2026

CITY OF CARSON
ATTN: ACCOUNTS PAYABLE
701 E CARSON ST
CARSON, California 90745-2224
Attention: CHRIS HOLT
Dear Sir,
We would like to thank you for your interest in our company and our products, and are pleased to quote the following for your consideration.

One (1) New Caterpillar Inc. Model: 416 Backhoe Loader including standard and optional equipment as listed below.

Sourcewell #011723 - CAT
We wish to thank you for the opportunity of quoting on your equipment needs. This quotation is valid for 60 days, after which time we reserve the right to re-quote. If there are any questions, please do not hesitate to contact me.

Sincerely,
Leo Jasso
Machine Sales Representative
Quote 195982-01

Page 2 of 5 ends

One (1) New Caterpillar Inc. Model: 416 Backhoe Loader including standard and optional equipment as listed below.

STANDARD EQUIPMENT
BOOMS, STICKS, AND LINKAGES -BACKHOE -- 14'4'' Center pivot backhoe -4.3 Meters -- Boom and swing transport locks -- Mechanical operated backhoe and -stabilizer controls -- Street type stabilizer shoes -LOADER -- Single Tilt Loader -- Lift cylinder brace -- Self-leveling loader with single -lever control -- Return-to-dig -(automatic bucket positioner) -- Transmission neutralizer switch -- Bucket level indicator
POWERTRAIN -- Water separator -- Thermal starting aid system -- Dry type axial seal air cleaner with -integral precleaner -- Automatic dust ejection system -- Filter condition indicator -- Hydraulically boosted multi-plate -wet disk brake with dual pedals & -interlock -- Differential lock -- Drive-line parking brake -- Torque converter -- Transmission-four speed manual shift -- Neutral safety switch -- Spin-on filters for -Fuel -Engine oil -Transmission oil -- Outboard Planetary Rear Axles -- Diesel particulate filter -- Hydrostatic power steering -
HYDRAULICS -- Load sensing, variable flow system -with 35 gpm (132 L/min) axial piston -pump -- 6 micron hydraulic filter -- Caterpillar XT-3 hose -- Hydraulic oil cooler -- Flow-Sharing Hydraulic Valves -- Hydraulic suction strainer ELECTRICAL -- 12 volt electrical start -- Horn, front and rear -- Backup alarm -- Hazard flashers/turn signals -- Halogen head lights (2) -- Halogen rear flood lights (2) -- Stop and tail lights -- Audible system fault alarm -- Key start/stop system -- 850 CCA maintenance free battery -- Battery disconnect switch -- External Power Receptacle (12v) OPERATOR ENVIRONMENT -- Interior rearview mirror -- Rear fenders -- ROPS canopy -- 2-inch (50mm) retractable seat belt -- Hand and foot throttle -- Air suspension seat -- Coat Strap -- Lockable storage area FLUIDS -Antifreeze - Extended Life Coolant --30C (-20F) OTHER STANDARD EQUIPMENT -- Standard Storage Box -- Transport tie-down points -- Ground line fill fuel tank with -42.3 gal (160L) capacity & 5 gal (19L) -diesel exhaust fluid -- Rubber impact strips on radiator -guard -- CD-ROM Parts Manual -- Safety Manual -- Operations and Maintenance Manual -- Lockable hood -- Tire Valve Stem Protection Quote 195982-01

Page 3 of 5 ends

MACHINE SPECIFICATIONS
416 07A BHL CFG2 543-3339

HRC - MACHINE
LANE 2-AVAILABLE FROM CLAYTON AND WACO DIST.CENTERS FOR US-A

ONLY(SAP)
LANE 2-AVAILABLE FROM LEICESTER FACTORY FOR CANADA ONLY (SAP), LANE 3-AVAILABLE FROM CLAYTON AND WACO DIST.CENTERS FOR US-A

ONLY(SAP)
LANE 3-AVAILABLE FROM LEICESTER FACTORY FOR CANADA ONLY (SAP).

LANE3-AVAILABLE FROM CLAYTON AND WACO DIST.CENTERS FOR CHILE

ONLY(SAP)
BUCKET-HD, 18'', 4.9 FT3, PL 247-1949
HAMMER, B8 532-9108
LINES, B6-B8 HAMMER, BHL 570-6298
BRACKET, 1/4YD PL, LG 443-7285
LANE 3 ORDER 0P-9003
STICK, EXT, 14', PILOT 543-4282
PT, 2WS, PSHF, PILOT 544-0933
ENG, 70KW, C3.6, T4F 542-7779
HYD, MP, 6FCN, PILOT 542-7765
CAB, STD 557-4932
DISPLAY, STD 545-5047
WORKLIGHTS (8) LED LAMPS 657-7707
SEAT, FABRIC 677-7606
BELT, SEAT, 3'' 670-7049
AIR CONDITIONER, T4F 542-7810
PRODUCT LINK, CELLULAR, PLE643 639-4880
CTWT, 1015 LBS 337-9696
STABILIZER PADS, FLIP-OVER 9R-6007
LOADER BUCKET PINS 545-8548
BUCKET-MP, 1.3 YD3, PO 337-7436
CUTTING EDGE, TWO PIECE 9R-5321
COUPLER, PIN LOCK, BL F 544-1901
INSTRUCTIONS, ANSI 559-0872
SERIALIZED TECHNICAL MEDIA KIT 421-8926
TIRES, 340 80R18/500 70R24, MX 533-0479
Quote 195982-01

Page 4 of 5 ends

Base Model Part # List Price
416
183,166.00
July 2% Price increase
3,663.32
Sub Total, Machine
186,829.32
Min Member Disc 22.0%
(41,102.45)
Machine / Option Price
145,726.87
Customer Invoice
Machine / Option Price
145,726.87
Work Tool / Attachments Price
222.18
Pre-Tax Total
145,949.04
Pre-Prep Total
145,949.04
Nondiscountable Items
Delivery
650.00
PDI
856.25

INSTALL AND TEST HAMMER ATTACHMENT

700.00
Manuals, (1) set CD/DVD
1,200.00
Front Radiator Guard

4,783.16
Total 154,138.45
Quote 195982-01

Page 5 of 5 ends

WARRANTY & COVERAGE
Standard Warranty: 12 MONTHS FULL MACHINE
SELL PRICE $154,138.45
NET BALANCE DUE $154,138.45
TIRE FEE $7.00
SALES TAX (10.5%) $16,184.54
AFTER TAX BALANCE $170,329.99

PAYMENT TERMS
Cash Invoice Terms

CASH WITH ORDER
$0.00
F.O.B/TERMS:

City Of Industry Machine
Accepted by___________________________________ on ____________________ ______________________________
Signature
73"(4)0':)8)4)10:
::3410:
53$$5:
3410: : 

:

 
(F9N
-L4WN<>LW8IBWNEWI4HP4LNW.DW4T4CGN>EDW5IEBW5EIB.AW0>33>D:W.D3 EIWSI>NN4DW1EDNI.1NWI4HP>I4B4DNLW
GPILP.DNWNEW<.GN4IWW'PI1<.L>D:W+ULN4BWE5W
IO>1A4W"#W
3C>D>LNI.N>EDWE5WN<4W.ILEDW%PD>1>G.AW
E34W%W,<>LWS.>R4IWCPLNW04W1EBGA4N43W045FI4WGIE1443>D:WS>N<WGIE1PI4B4DNW.1N>R>NU W T4BGN>EDWLEP:<N
W 13.,:)##)0':
$"5)10:


3)55$0:1053"5:
$"5)10:


::)))
'PILP.DNWNEW%W+41N>EDWW
# .$3'$0"9:73"(4)0':
$"5)10:
:#
$
1,$:
173"$:73"(4)0':
$"5)10:

:$
& )''9!"+:73"(4)0':
$"5)10:
:&
':112$35)8$:73"(4)0':
$"5)10:

:'
) 5($3:73"(4$4:
$"5)10:

:):5(317'(:
$5W5WEIW:W.I4WL4A41N43W.0ER4WLG41>5UWN<4WB.LN4IW1EDNI.1NW34N.>ALW

I:
)1$N
$1KN +EPI14S4AAW

41A;AN 
,W

41A:AN!"C)GNA N 

W
+G41>9WGPI1<.L4W34N.>ALW

/5D2B
N 
W
 2
5;
N )P>DDW
,W
5.*
*BB*52NW *!'W
52B;
BNJ6*;B*52
N 

W
 2
5;
N )P>DDW
,W
;+BB 2N,D>B*"*
B*52
?:)7A)41N4!N7D<&?NJ6.*2ND;% 2
LN6;5
D
BND2*8D 2 >>N2
N
*2B 3

ND> N
BB
'N..N; . H2BN
-D6N
5 D/ 2BB*53N
!EIWN<4WGPI1<.L4WE5WED4WD4SWWEIWD4S4IW.N4IG>AA.IW"D1 WBE34AWW0.1@<E4WAE.34IWNEW
C.>DN.>DWN<4W>NULWIE.3S.UL
W+N.56WI4:PA.IAUWPN>A>V4W<4.RUW4HP>GC4DNWR4<>1A4LWLP1<W.LW.W NI.1NEIW0.1@<E4
W,<4W&G4I.N>EDLW.D3W%.>DN4D.D14W3>R>L>EDW1PII4DNAUWPL4LW.WW0.1@<E4W BE34AWS<4DWG4I5EIB>D:WB.>DN4D.D14WL4KR>14L
W,<4W1PII4DNWR4<>1A4W>LWCEI4WN<.DWWU4.ILWEA3W
.D3W>LWDEWAED:4IWI4A>.0A4WEIW1ELN4741N>R4WNEWB.>DN.>DW5FIWL.54W3.>AUWEG4I.N>EDL W

EA&4:)M
NN =01AN@A!#N (QJ2=/M?D;
W
*%2BD;
N
B
N 
 /%
*6-%:











CITY OF CARSON 701 East Carson Street
Report to Honorable Mayor and City Council
Tuesday, October 6, 2026, 5:00 PM
CONSENT 28.

To: Honorable Mayor and City Council
From: Michael Whittiker, Community Services Director CS Community Services Subject: CONSIDER APPROVAL OF AMENDMENT NO. 4 TO CONTRACT NO. 23-270 WITH T&G GLOBAL, LLC, DBA ST. NICK’S CHRISTMAS LIGHTING & DÉCOR, TO EXTEND THE AGREEMENT AND AUTHORIZE ADDITIONAL HOLIDAY DECORATION ENHANCEMENTS FOR THE 2026 HOLIDAY SEASON (CITY COUNCIL) I. SUMMARY
On October 3, 2023, the City Council approved an agreement with T&G Global, LLC, doing business as St. Nick’s Christmas Lighting and Décor (“St. Nick’s”), to provide holiday decorating services at City Hall, the Carson Event Center, and designated City streets and public areas. The agreement established an initial three-year term at an annual base cost of $157,894, for a total base contract amount of $473,682 (Exhibit No. 1).

Since approval of the original agreement, the City Council has approved three amendments authorizing additional holiday decorations and enhancements beyond the original scope of services. Amendment No. 1, approved November 21, 2023, authorized $48,525 in enhancements for the 2023 holiday season (Exhibit No. 2).

Amendment No. 2, approved September 17, 2024, authorized $49,056 in enhancements for the 2024 holiday season (Exhibit No. 3). Amendment No. 3, approved September 30, 2025, authorized $63,035 in enhancements for the 2025 holiday season (Exhibit No. 4). Staff now recommends approval of the proposed Amendment No. 4, which would exercise the first of the City’s two optional one-year extensions and authorize additional decorations and enhancements for the 2026 holiday season (Exhibits Nos. 5 and 6). The amendment would extend the agreement through the 2026 holiday season, with one additional one-year extension remaining available to the City.

If approved, Amendment No. 4 would authorize the annual base contract amount of $157,894 for the additional year, along with $49,364 for the proposed 2026 enhancements. This would increase the total authorized contract amount from $634,298 to $841,556 over the four-year contract period.

II. RECOMMENDATION
TAKE the following actions:

1. APPROVE the proposed Amendment No. 4 to Contract No. 23-270 with T&G Global, LLC, doing business as St. Nick’s Christmas Lighting & Décor, extending the Agreement for one additional year and authorizing additional holiday decoration enhancements for the 2026 holiday season, for a revised total contract amount not to exceed $841,556; and,

2. AUTHORIZE the Mayor to execute Amendment No. 4, following approval as to form by the City Attorney.

III. ALTERNATIVES

1. TAKE any other action the City Council deems appropriate and consistent with applicable law.

IV. BACKGROUND
On June 29, 2023, the City of Carson issued Request for Proposals (RFP) No. 23-022 to competitively solicit a qualified contractor to provide holiday decorating services at City Hall, the Carson Event Center, and designated City streets and public areas. The requested services included furnishing, installing, maintaining, and removing holiday decorations. Following the competitive selection process, T&G Global, LLC, doing business as St. Nick’s Christmas Lighting and Décor (“St. Nick’s”), was selected based on its qualifications, experience, project understanding, staffing and service capacity, past performance, and familiarity with the City’s holiday decorating program.

On October 3, 2023, the City Council approved a three-year agreement with St. Nick’s, with two optional one-year extensions that may be exercised by the City (Exhibit No. 1). The agreement established an annual base cost of $157,894, for an initial three-year contract amount of $473,682. The base services provide the City’s recurring holiday decorating program, while additional enhancements may be considered separately based on the City’s needs and available funding.

Since approval of the original agreement, the City Council has authorized additional holiday decorations and enhancements each year. On November 21, 2023, the City Council approved Amendment No. 1, authorizing $48,525 in additional decorations for the 2023 holiday season and increasing the total authorized contract amount to $522,207 (Exhibit No. 2). On September 17, 2024, the City Council approved Amendment No. 2, authorizing an additional $49,056 for the 2024 holiday season and increasing the total contract amount to $571,263 (Exhibit No. 3). On September 30, 2025, the City Council approved Amendment No. 3, authorizing an additional $63,035 for the 2025 holiday season and increasing the total contract amount to $634,298 (Exhibit No. 4).

For the 2026 holiday season, staff is recommending approval of Amendment No. 4 (Exhibit No. 6), which would accomplish two purposes. First, the amendment would exercise the first of the City’s two optional one-year extensions, allowing St. Nick’s to continue providing holiday decorating services through the 2026 season.

Exercising this option would extend the agreement from its original three-year term to a fourth year, with one additional one-year extension remaining available to the City. Second, Amendment No. 4 would authorize $49,364 in additional holiday decorations and enhancements identified in St. Nick’s proposal (Exhibit No. 5). The proposed 2026 enhancements would expand and refresh holiday decorations throughout the Civic Center area.

At the Carson Event Center, the enhancements include a 14-foot illuminated “Happy Holidays” sign with an eight-foot illuminated red bow, a decorated 20-foot live Christmas tree with warm white lighting in the Atrium, and a 10-foot walk-through illuminated star with a gift-box display. The proposal also includes decorations for newly constructed areas of the Carson Event Center.

At the City Hall Bridge, the proposed enhancements include six 10-foot red-and-white illuminated arches, a 14-foot illuminated “Happy Holidays” sign, additional warm white lighting in the median, and lighting on pine and smaller trees along Civic Center Drive.

At City Hall, the enhancements include a decorated 14-foot live Christmas tree with warm white lighting in the lobby, nine-foot garlands along both sides of the staircase, warm white lighting in the planter boxes near the entrance, and 36-inch red bows with gold trim on trees in front of City Hall.

Along Carson Street and Avalon Boulevard, the proposed enhancements include illuminated tree wraps on the west and south sides of City Hall, 40 eight-foot illuminated pole-mounted displays, and warm white lighting in landscaping along Avalon Boulevard between City Hall and Desford Street.

Together, these improvements are intended to provide a coordinated and consistent holiday display throughout the Civic Center and surrounding public areas. The additional cost of the proposed 2026 enhancements is $49,364 (Exhibit No. 5). This amount is separate from the annual base contract amount of $157,894, which is already included in the City’s adopted Fiscal Year 2026-27 budget. Accordingly, approval of Amendment No. 4 would authorize continuation of the City’s existing holiday decorating program for the 2026 season, exercise the first optional one-year contract extension, and authorize the proposed additional holiday enhancements.

V. FISCAL IMPACT
Funding for the annual base contract amount of $157,894 is included in the City’s adopted Fiscal Year 2026-27 Operating Budget for the Community Services Department, Carson Event Center, in Account No. 101-90-960-930- 6004. If the City Council approves the proposed 2026 holiday decoration enhancements, the additional $49,364 will also be funded from Account No. 101-90-960-930-6004. Therefore, the total cost for holiday decorating services for the 2026 season will be $207,258, consisting of the $157,894 annual base contract amount and $49,364 in additional enhancements. No additional appropriation is required as a result of this action.

VI. EXHIBITS

1. Contract No. 23-270

2. Amendment No. 1 to Contract No. 23-270

3. Amendment No. 2 to Contract No. 23-270

4. Amendment No. 3 to Contract No. 23-270

5. 2026 Holiday Decorations Cost Proposal

6. (Proposed) Amendment No. 4 to Contract No. 23-270
Attachments
Contract 23-270.pdf
Amendment 1 to Contract 23-270.pdf
Amendment 2 to Contract 23-270.pdf
Amendment 3 to Contract 23-270.pdf
2026 Additional Holiday Decorations Cost Proposal.pdf
Amendment No. 4 to Contract No. 23-270.pdf

AMENDMENT NO. 1

TO AGREEMENT FOR CONTRACT SERVICES

THIS AMENDMENT TO THE AGREEMENT FOR CONTRACT SERVICES
(“Amendment”) by and between the CITY OF CARSON, a California municipal corporation (“City”) and T&G GLOBAL, LLC dba St. Nick’s Christmas Lighting & Décor, a California limited liability company (“Consultant”), is effective as of the aT gies of November, 2023.

RECITALS
A. Pursuant to a Request for Proposals (“RFP”) issued by the City, City and Consultant entered into that certain Agreement for Contract Services dated October 24, 2023 (“Agreement”) whereby Consultant agreed to provide the City with winter holiday decoration services for the 2023-24, 2024-25, and 2025-26 holiday seasons in exchange for compensation in the amount of $157,894 per year, or a not-to-exceed Contract Sum of $473,682.

B. City and Consultant now desire to amend the Agreement to add further decoration services for the 2023 winter holiday season, and in certain cases to replace or provide clarifications to decoration services already included in the Agreement. The total cost of the additional decoration services is $48,525, and the parties desire to increase the not-to-exceed Contract Sum by said amount, for an amended Contract Sum of $522,207. c. The additional decorations are within the scope of the RFP, which provided the contract awarded pursuant thereto would allow the City to rent holiday decorations and street banner products and services on an “as needed” basis, and which requested proposers to submit their total line of available products and services, to include a separate holiday decoration enhancements addendum (“enhancements” was defined for this purpose in the RFP as items that may be added to the RFP at the City Council’s sole discretion based on the available options) with pricing for consideration in addition to the basic package. Consultant did so, but due to timing issues, City approved the Agreement prior to determining the desired enhancements. Inclusion of the additional decorations in the Agreement when it was originally approved would not have impacted the selection of Consultant for the award, as the RFP was issued pursuant to CMC 2611(b) and was not required to be awarded to the “lowest responsive and responsible bidder.” Per the RFP, the proposers were ranked based on the evaluation criteria set forth in the RFP, which did not include cost, and St. Nick’s received the highest score. Staff also found that St. Nick’s rates were fair, reasonable and competitive with the other proposers.

TERMS

1. Contract Changes. The Agreement is amended as provided herein (additions shown in bold italics, deletions in strikethrough).

A. Section 1.2, “Consultant’s Proposal,” is hereby amended as follows:
“1.2 Consultant’s Proposal.
01007.0001/934464.3
The Scope of Service shall include the Consultant’s proposal submitted in response to City’s Request for Proposals No. 23-022, which proposal shall be incorporated herein by this reference as though fully set forth herein (“Proposal”). For the 2023/24 Holiday Program, the Proposal shall also be deemed to include the document entitled “Holiday Decorations with Scope Additions” which Consultant submitted to the Contract Officer’s staff on November 8, 2023. In the event of any inconsistency between the terms of the Proposal and this Agreement, the terms of this Agreement shall govern.”
B. Section 2.1, “Contract Sum,” is hereby amended as follows:
“2.1 Contract Sum.

Subject to any limitations set forth in this Agreement, City agrees to pay Consultant the amounts specified in the “Schedule of Compensation” attached hereto as Exhibit “C” and incorporated herein by this reference.

The total compensation, including reimbursement for actual expenses, shall not exceed Five Hundred Twenty-Two Thousand Two Hundred Seven Dollars ($522,207) FourHundred-Seventy—Three-TSihxo uHusnadnredd Eighty-TPwe Dellats_and No-Cents_($473,682,00) (the “Contract Sum”), unless additional compensation is approved pursuant to Section 1.8.” Cs A new subsection E is hereby added to Section I of Exhibit “A,” “Scope of Services,” to read as follows:
01007.0001/934464.3
“E. The following additional/replacement Décor and Lighting shall be provided for the 2023/24 Holiday Program:

Somunanity Center « East entrance
12FT Warm White LED Walkthrough Arch (Swap for 12FT 1
Walkthrough Ornaments)
Community Center - North East Entrance
14FT Lighted Happy Holidays Sign - Red
36" lighted tear drop sprays
8FT Red Lighted Sleigh

Pip [NX le
8FT Lighted Red Bow
Carson Event Center - North Lobby
Increase 6.5FT tree size to 8-9FT 1
Decorate and Light 8FT Tree with Warm White Lights and St 1 Nick's Ornaments

Community Center - Atrium
|

12FT Lighted Gift Box (Swap for Walkthrough Ornament) 1 10FT Lighted Tinsel Santa Motif with Bench

Decorate and Light 20FT Live Tree - Warm White LED Lights 1 and St Nick's Ornaments
, Community Center - Patio A Courtyard
Small bushes with LED mini lights (net lighting, approx. 20 nets) 20 - Lights Warm White, Red and Green (clarification only) City Hall - Fountain Area
24FT Light and decorate live tree - Tree Decorated with Red, 1 White and Silver Ornaments (clarification only)
Medium light posts wrapped with lit garland and red bows - Garland Decorated Red, White and Silver Ornaments 2
(clarification only)
City Hall - Main Entrance
9FT stairs inside City Hall leading to Council Chambers garland 5 with lights - Garland for Second Side of the stairs
36" Red bows With Gold Trim on Trees in Front of City Hall 21 Warm White Mini Lights in City Hall Entrance Planter Boxes 22 Decorate and Light 14FT Live Tree - Warm White LED Lights 1 and St Nick's Ornaments
City Hall - Bridge Area
‘| 10FT Red/White Archway over the bridge - 6 Total Arches 1 14FT Lighted Happy Holidays Sign - Red 1
New Tree Wraps - Carson and Avalon
New Small Trees Wrapped with Warm White LED Lights, West 12 Side of City Hall - 4 Strands per Tree
New Small Trees Wrapped with Warm White LED Lights, South 24

Side of City Hall - 4 Strands per Tree
D. The following table is hereby added to Section I of Exhibit “C,” “Schedule of Compensation” to provide the pricing for the additional décor and lighting for the 2023/24 Holiday Program:

P

ricing for Additional/Replacement Lig

12FT Warm White LED Walkthrough Arch 1 cS ; é.
(Swap for 12FT Walkthrough Ornaments)
Community Center ~ North East Entrance
14FT Lighted Happy Holidays Sign - Red 1 S 750.00 | $750.00 36" lighted tear drop sprays 2 § 225.00 | $450.00
8FT Red Lighted Sleigh 1 $1,850.00 | $1,850.00

8FT Lighted Red Bow 1 $3,250.00 | $3,250.00
01007.0001/934464.3

Carson Event Center - North Lobby

per Tree
Increase 6.5FT tree size to 8-9FT 1 S 295.00 | $295.00
Decorate and Light 8FT Tree with Warm White 1 $ 975.00 | $975.00 Lights and St Nick's Ornaments
Community Center - Atrium
12FT Lighted Gift Box (Swap for Walkthrough
Ornament) S - S10FT Lighted Tinsel Santa Motif with Bench $9,750.00 | $9,750.00 Decorate and Light 2OFT Live Tree - Warm 1 $7,250.00 | $7,250.00 White LED Lights and St Nick's Ornaments
Community Center - Patio A Courtyard
Small bushes with LED mini lights (net lighting,
approx. 20 nets) - Lights Warm White, Red and 20
Green (clarification only) S- SCity Hall - Fountain Area 24FT Light and decorate live tree - Tree
Decorated with Red, White and Silver 1 S- SOrnaments (clarification only) Medium light posts wrapped with lit garland
and red bows - Garland Decorated Red, White 2 S- Sand Silver Ornaments (clarification only) City Hall - Main Entrance
9FT stairs inside City Hall leading to Council
Chambers garland with lights - Garland for 2 S 325.00 | S 650.00 Second Side of the stairs
36" Red bows With Gold Trim on Trees in Front
of City Hall 21 S 95.00 | $ 1,995.00
Warm White Mini Lights in City Hall Entrance 2 $ 150,00 | § 3,300.00 Planter Boxes
Decorate and Light 14FT Live Tree - Warm
White LED Lights and St Nick's Ornaments 1 24,750.00 | $ 4,750,00 City Hall - Bridge Area
10FT Red/White Archway over the bridge - 6
Total Arches 1 $6,750.00 |S 6,750.00
14FT Lighted Happy Holidays Sign - Red 1 § 750.00 |$ 750.00 New Tree Wraps - Carson and Avalon
New Small Trees Wrapped with Warm White
LED Lights, West Side of City Hall - 4 Strands per 12_ | $ 160.00 | $ 1,920.00 Tree |
New Small Trees Wrapped with Warm White

LED Lights, South Side of City Hall - 4 Strands 24 5 160.00 |S 3,840.00 01007,0001/934464.3

E, Section IV of Exhibit “C,” “Schedule of Compensation,” is hereby amended as follows:
“TV, The total compensation for the Services shall not exceed $522,207 $473,682.09 as provided in Section 2.1 of this Agreement.” Ze Continuing Effect of Agreement. Except as amended by this Amendment, all provisions of the Agreement shall remain unchanged and in full force and effect. From and after the date of this Amendment, whenever the term “Agreement” appears in the Agreement, it shall mean the Agreement, as amended by this Amendment to the Agreement. 3, Affirmation of Agreement; Warranty Re Absence of Defaults. City and Consultant each ratify and reaffirm each and every one of the respective rights and obligations arising under the Agreement. Each party represents and warrants to the other that there have been no written or oral modifications to the Agreement other than as provided herein. Each party represents and warrants to the other that the Agreement is currently an effective, valid, and binding obligation.

Consultant represents and warrants to City that, as of the date of this Amendment, City is not in default of any material term of the Agreement and that there have been no events that, with the passing of time or the giving of notice, or both, would constitute a material default under the Agreement.

City represents and warrants to Consultant that, as of the date of this Amendment, Consultant is not in default of any material term of the Agreement and that there have been no events that, with the passing of time or the giving of notice, or both, would constitute a material default under the Agreement.
4, Adequate Consideration. The parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment.

5. Authority. The persons executing this Amendment on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Amendment on behalf of said party, (iii) by so executing this Amendment, such party is formally bound to the provisions of this Amendment, and (iv) the entering into this Amendment does not violate any provision of any other agreement to which said party is bound. [SIGNATURES ON FOLLOWING PAGE] .
01007.0001/934464.3
IN WITNESS WHEREOF, the parties hereto have executed this Amendment on the date and year first-above written.

CITY:

CITY/OF CARSON, a municipal corporation
Lyla Davis-Holmes, Mayor
ATTEST:

A Goda ba ur, Dr. Khaleah K, Bradshaw, City Clerk /
ie

APPROVED AS TO FORM:

ALESHIRE & WYNDER, LLP
Sunny K. Soltani, City Attorney
[brj]

CONSULTANT:

T&G GLOBAL, LLC DBA ST. NICK’S

CHRISTMAS LIGHTING AND DECOR
»y, Fil le Bx
Naife: Daniel Chests
Title: Nirgetar ot q les>
By: GA CIB CB
ate: WW Chiles Adour
Title: Kote te
Address: 6861 Walker St.

La Palma, CA 90623
If Consultant is a limited liability company, any one of the following options will satisfy City’s signature requirements pursuant to the Corporations Code. Option A: One signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. Option B: Signatures required from two managers unless the LLC is managed by one manager per its articles of organization, in which case only one signature from that manager is required. Option C: One signature required from any member unless the LLC is manager-managed per its articles of organization. Option D: One signature required from any manager if the LLC is managermanaged per its articles of organization. CONSULTANT’S SIGNATURES SHALL BE DULY NOTARIZED,

AND APPROPRIATE ATTESTATIONS SHALL BE INCLUDED AS MAY BE REQUIRED BY THE

BYLAWS, ARTICLES OF ORGANIZATION, OR OTHER RULES OR REGULATIONS APPLICABLE TO CONSULTANT'S BUSINESS ENTITY.
01007.0001/934464.3
IN WITNESS WHEREOF, the parties hereto have executed this Amendment on the date and year first-above written.

CITY:

CITY OF CARSON, a municipal corporation

Lula Davis-Holmes, Mayor
ATTEST:

Dr. Khaleah K. Bradshaw, City Clerk
APPROVED AS TO FORM:

ALESHIRE & WYNDER, LLP
Sunny K. Soltani, City Attorney
[br]
CONSULTANT:

T&G GLOBAL, LLC DBA ST. NICK’S

CHRISTMAS LIGHTING AND DECOR
By: all le Ex a
Name: Saute Chvist-es“
Title: hs ZY at Soles.

Ze
Sede Tas = Ads var
C Re Fotmgle
Address: 6861 Walker St.

La Palma, CA 90623

By:

If Consultant is a limited liability company, any one of the following options will satisfy City’s signature requirements pursuant to the Corporations Code. Option A: One signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. Option B: Signatures required from two managers unless the LLC is managed by one manager per its articles of organization, in which case only one signature from that manager is required. Option C: One signature required from any member unless the LLC is manager-managed per its articles of organization. Option D: One signature required from any manager if the LLC is inanagermanaged per its articles of organization. CONSULTANT’S SIGNATURES SHALL BE DULY NOTARIZED,

AND APPROPRIATE ATTESTATIONS SHALL BE INCLUDED AS MAY BE REQUIRED BY THE

BYLAWS, ARTICLES OF ORGANIZATION, OR OTHER RULES OR REGULATIONS APPLICABLE TO CONSULTANT’S BUSINESS ENTITY.
01007.0001/934464.3

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT

A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document.

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
peiagy Pybli c
On Nov. Z7__,2023 before me, box L/h Soath ersonally appeared Me/ulas Adams __, proved to me on the basis of satisfactory evidenceto be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing Paragraph | is true and correct. ' all Da fBedl

TAASE "ELLEESE SHITH
Notary Public- California 2
Los Angeles County
2 Ss AAT Commissspiiroesn# h2a4y0 32534,72 006
Signature: Z S, ta 4 Xs y Comm, Expires May 25, 2026
mw SONORA EPC ATPL
WITNESS my hand and official seal.

ZA. OPTIONAL
rough the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT INDIVIDUAL |

CORPORATE
T
O
I
FF
TLE
I
(
C
S
E
)
R

TITLE OR TYPE OF DOCUMENT
PARTNER(S) [] LIMITED
Cc GENERAL

ATTORNEY-IN-FACT

TRUSTEE(S) NUMBER OF PAGES

GUARDIAN/CONSERVATOR
OTHER

OOOO
O oO§F§58F
SIGNER
IS REPRESENTING:

DATE OF DOCUMENT

(NAME OF PERSON(S) OR ENTITY(IES))
SI

GNER(S) OTHER THAN NAMED ABOVE
01007.0001/934464.3

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT

A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document.

‘

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
~ jay bic
On Nov. Z7__, 2023 before me, Fall Prarsonally appeared 2yje/ hasten , proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

Pinner A tebe

JAASE ELLEESE SMITH
Notary Public - California
WITNESS my hand and official seal.

Los Angeles County
. Fe FA " Commission # 2403547
Signature: <hr.

San i ureess” My Comm, Expires May 25, 2026 B
— “
Le

LYNN PREP

‘l prevent fraudulent reattachment of this form.

A
a OPTIONAL
‘Though the data below is not required by law, it may prove valuable to persons relying on the document and could

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT

INDIVIDUAL

CORPORATE
T
O
IT
FF
LE
I
(
C
S
E
)
R

TITLE OR TYPE OF DOCUMENT
PARTNER(S) [] LIMITED
C] GENERAL

ATTORNEY-IN-FACT

TRUSTEE(S) NUMBER OF PAGES

GUARDIAN/CONSERVATOR
OTHER

OOOO
O O§F85F
SIGNER
IS REP

RESENTING:

DATE OF DOCUMENT

(NAME OF PERSON(S) OR ENTITY(IES))
SI

GNER(S) OTHER THAN NAMED ABOVE
01007.0001/934464.3
T & G Global, LLC
6861 Walker Street
La Palma, CA 90623
LLC Resolution
The following resolution is hereby adopted by all members of T & G Global, LLC:

Resolved, that Allen Wade Francis as managing member, Nicholas Adams as managing member, and/or Daniel Christenson as Director of Sales are hereby authorized to enter into contracts on behalf of T & G Global, LLC; and to sign all associated documents, Only one signature is required to bind T & G Global, LLC unless more signatures are required by the client. This resolution is valid for two years from the date stated below.

This resolution is adopted May 1, 2023 and acknowledged by all members. (Weel Day ree) 5/1/23
Date Allen Wade Francis
(oe
a
C
g
Harles Ad
e
ame
shule

Date

T & G Global, LLC
6861 Walker Street
La Palma, CA 90623
LLC Resolution
The following resolution is hereby adopted by all members of T & G Global, LLC:

Resolved, that Allen Wade Francis as managing member, Nicholas Adams as managing member, and/or Daniel Christenson as Director of Sales are hereby authorized to enter into contracts on behalf of T & G Global, LLC; and to sign all associated documents, Only one signature is required to bind T & G Global, LLC unless more signatures are required by the client. This resolution is valid for two years from the date stated below.

This resolution is adopted May 1, 2023 and acknowledged by all members. (Weel Day ree) 5/1/23
Date Allen Wade Francis
(oe
a
C
g
Harles Ad
e
ame
shule

Date

1 Invoice Date : 23 Sep 2026
Terms : Due on Receipt
Due Date : 23 Sep 2026
P.O.# : Additions to Holiday
Scope - 2026
St. Nick's Christmas Lighting & Decor
6861 Walker Street
La Palma California 90623
U.S.A
Invoice
# INV-4489
Balance Due
$49,364.00
Bill To
City of Carson
**IF PAYING BY ACH, THEN PLEASE EMAIL CONFIRMATION TO [email protected]** # Item & Description Qty Rate Amount
1 14FT Lighted Happy Holidays Sign - Red 1 750.00 750.00 2 8FT Lighted Red Bow 1 3,250.00 3,250.00
3 Decorate and Light 20FT Live Tree - Warm White LED Lights and St Nick's Ornaments
1 7,250.00 7,250.00
4 10FT 2D Walkthrough Star with Gift Box Display - design upgrade differential **Upgrade differential over the 8FT Photo Frame with Decorated Tree Display already included in the base contracted scope.
1 1,600.00 1,600.00
5 9FT stairs inside City Hall leading to Council Chambers garland with lights - Garland for Second Side of the stairs
2 325.00 650.00
6 36" Red bows With Gold Trim on Trees in Front of City Hall 21 95.00 1,995.00 7 Warm White Mini Lights in City Hall Entrance Planter Boxes - 5 Strands of Light per planter
22 150.00 3,300.00
8 Decorate and Light 14FT Live Tree - Warm White LED Lights and St Nick's Ornaments
1 4,750.00 4,750.00
9 10FT Red/White Archway over the bridge - 6 Total Arches 1 6,750.00 6,750.00 10 14FT Lighted Happy Holidays Sign - Red 1 750.00 750.00 2 Sub Total 49,364.00
Tax (8.75%) 0.00
Rental (0%) 0.00
Total $49,364.00
Balance Due $49,364.00
# Item & Description Qty Rate Amount
11 Additional Warm White Lights in Small Trees 7 160.00 1,120.00 12 Additional Warm White Lights in Medium Pine Trees - Median 2 250.00 500.00 13 Additional Warm White Lights in Medium Pine Trees 9 210.00 1,890.00 14 Additional Warm White Lights in Center Median 1 985.00 985.00 15 Small Trees Wrapped with Warm White LED Lights, West Side of City Hall - 4 Strands per Tree
12 160.00 1,920.00
16 Small Trees Wrapped with Warm White LED Lights, South Side of City Hall - 4 Strands per Tree
24 160.00 3,840.00
17 Avalon - Warm White Lights in Bushes from city hall to Desford 1 0.00 0.00 18 Larger 8FT Lighted Pole Mount Displays
(Per-unit rate reduced 40%: $336.00 - 40% = $201.60)
40 201.60 8,064.00
Notes
For any questions, please call the St Nick's office, (562)-438-0017.

Terms & Conditions
NOTE: Invoices are due upon receipt. St. Nick’s has three:
ways to pay: 1. ACH – Routing#121137522,
ACCT#1895327672 (name on account: T&G Global LLC);
or, 2. By check, payable to T&G Global at 6861 Walker St.

La Palma, CA 90623 3. Zelle - [email protected]
**IF PAYING BY ACH, THEN PLEASE EMAIL CONFIRMATION TO [email protected]** * A late fee of 1.5% per month applies to all invoices over 30 days. *Checks returned for NSF will be charged a $35 fee, plus 1.5% if good funds are sent after 30 days AMENDMENT NO. 4

TO AGREEMENT FOR CONTRACT SERVICES

THIS AMENDMENT TO THE AGREEMENT FOR CONTRACT SERVICES
(“Amendment No. 4”) by and between the CITY OF CARSON, a California municipal corporation (“City”) and T&G GLOBAL, LLC dba ST. NICK’S CHRISTMAS LIGHTING & DÉCOR, a California limited liability company (“Consultant”), is effective as of the ____ day of __________, 2026.

RECITALS
A. Pursuant to a Request for Proposals (“RFP”) issued by the City, City and Consultant entered into that certain Agreement for Contract Services dated October 24, 2023 (“Agreement”), whereby Consultant agreed to provide the City with winter holiday decoration services for the 2023-24, 2024-25, and 2025-26 holiday seasons in exchange for compensation in the amount of $157,894 per year, or a not-to-exceed Contract Sum of $473,682.

B. Effective November 27, 2023, City and Consultant entered into Amendment No. 1 to the Agreement to add further decoration services for the 2023 winter holiday season, and in certain cases to replace (for the 2023 winter holiday season) or provide clarifications to decoration services already included in the Agreement. The total cost of the additional decoration services was $48,525, and Amendment No. 1 increased the not-to-exceed Contract Sum by said amount, for an amended Contract Sum of $522,207.

C. Effective September 18, 2024, City and Consultant entered into Amendment No. 2 to the Agreement to add further decoration services for the 2024 winter holiday season, and in certain cases to replace (for the 2024 winter holiday season) or provide clarifications to decoration services already included in the Agreement. The total cost of the additional decoration services was $49,056, and Amendment No. 2 increased the not-to-exceed Contract Sum by said amount, for an amended Contract Sum of $571,263.

D. Effective October 1, 2025, City and Consultant entered into Amendment No. 3 to the Agreement to add further decoration services for the 2025 winter holiday season, and in certain casesto replace (for the 2025 winter holiday season) or provide clarificationsto decoration services already included in the Agreement. The total cost of the additional decoration services was $63,035, and Amendment No. 3 increased the not-to-exceed Contract Sum by said amount, for an amended Contract Sum of $634,298.

E. City and Consultant, by this Amendment No. 4, desire to amend the Agreement to (i) exercise the first option to extend the Term of the Agreement by one year pursuant to Section

3.4 of the Agreement, and (ii) add further decoration services for the 2026 winter holiday season, and in certain cases to replace (for the 2026 winter holiday season) or provide clarifications to decoration services already included in the Agreement. The total cost of the additional decoration services is $49,364 and the base compensation is $157,894, and the Parties desire, by this Amendment No. 4, to increase the not-to-exceed Contract Sum by said amount, for an amended Contract Sum of $841,556.

F. The additional decorations are within the scope of the RFP, which provided the contract awarded pursuant thereto would allow the City to rent holiday decorations and street banner products and services on an “as needed” basis, and which requested proposers to submit their total line of available products and services, to include a separate holiday decoration enhancements addendum (“enhancements” was defined for this purpose in the RFP as items that may be added to the RFP at the City Council’s sole discretion based on the available options) with pricing for consideration in addition to the basic package. Consultant submitted its enhancements addendum for the 2023 and 2024 winter holiday season as part of its proposal in response to the RFP and has now submitted its enhancements addendum for the 2026 winter holiday season, which is similar to its approved enhancements addendum for the 2023, 2024, and 2025 winter holiday seasons, but with additional enhancements. Inclusion of the additional decorations in the Agreement when it was originally approved would not have been feasible and would not have impacted the selection of Consultant for the award, as the RFP was issued pursuant to CMC 2611(b) and was not required to be awarded to the “lowest responsive and responsible bidder.” Per the RFP, the proposers were ranked based on the evaluation criteria set forth in the RFP, which did not include cost, and St. Nick’s received the highest score. Staff and the City Council also found that St. Nick’s rates were and continue to be fair, reasonable and competitive with the other proposers.

TERMS

1. Incorporation of Recitals. The Recitals set forth above are incorporated into and are a part of this Amendment No. 4.

2. Terms and Definitions. All words, terms and phrases used or referenced in this Amendment No. 4, not expressly defined in this Amendment No. 4, shall have the same meaning ascribed to them in the Agreement.

3. Contract Changes. The Agreement is amended as provided herein (additions shown in bold italics, deletions in strikethrough).

A. Section 1.2, “Consultant’s Proposal,” is hereby amended asfollows:
“1.2 Consultant’s Proposal.

The Scope of Service shall include the Consultant’s proposal submitted in response to City’s Request for Proposals No. 23-022, which proposal shall be incorporated herein by this reference as though fully set forth herein (“Proposal”). For the 2023/24 Holiday Program, the Proposal shall also be deemed to include the document entitled “Holiday Decorations with Scope Additions” which Consultant submitted to the Contract Officer’s staff on November 8, 2023. For the 2024/25 Holiday Program, the Proposal shall also be deemed to include the document entitled “Holiday Decorations with Scope Additions” which Consultant submitted to the Contract Officer’s staff on May 7, 2024. For the 2025/26 Holiday Program, the Proposal shall also be deemed to include the document entitled “Holiday Decorations with Scope Additions” which Consultant submitted to the Contract Officer’s staff on September 11, 2025. For the 2026/27 Holiday Program, the Proposal shall also be deemed to include the document entitled “2026 Additional Holiday Decorations Cost Proposal” dated September 23, 2026. In the event of any inconsistency between the terms of the Proposal and this Agreement, the terms of this Agreement shall govern.” B. Section 2.1, “Contract Sum,” is hereby amended as follows:
“2.1 Contract Sum.

Subject to any limitations set forth in this Agreement, City agrees to pay Consultant the amounts specified in the “Schedule of Compensation” attached hereto as Exhibit “C” and incorporated herein by this reference.

The total compensation, including reimbursement for actual expenses, shall not exceed Six Hundred Thirty-Four Thousand Two Hundred Ninety-Eight Dollars ($634,298) Eight Hundred Forty-One Thousand Five Hundred Fifty-Six Dollars ($841,556) (the “Contract Sum”), unless additional compensation is approved pursuant to Section 1.8.”

C. Section 3.4, “Term,” is hereby amended as follows:
“3.4 Term.

Unless earlier terminated in accordance with Article 7 of this Agreement, this Agreement shall continue in full force and effect until completion of the services but not exceeding four (4) three (3) years from the date hereof, except as otherwise provided in the Schedule of Performance (Exhibit “D”).

City, at its sole discretion, has the option to extend the term of the Agreement for up to two one additional one-year periods upon written notice to Consultant.”
D. A new subsection H is hereby added to Section I of Exhibit “A,” “Scope of Services,” to read as follows:
“H. The following additional/replacement Décor and Lighting shall be provided for the 2026/27 Holiday Program:

Description Quantity
Community Center - North East Entrance
14FT Lighted Happy Holidays Sign - Red 1
8FT Lighted Red Bow 1
Community Center - Atrium
Decorate and Light 20FT Live Tree - Warm White LED Lights and St Nick's Ornaments 1 10FT 2D Walkthrough Star with Gift Box Display– design upgrade differential *Upgrade differential over the 8FT Photo Frame with Decorated Tree Display already 1 included in the base contract scope
City Hall - Main Entrance
9FT stairs inside City Hall leading to Council Chambers garlands with lights – Garland for Second Side of the stairs 2
36" Red bows With Gold Trim on Trees in Front of City Hall 21 Warm White Mini Lights in Planter Boxes – 5 Strands of Lights per planter 22 Decorate and Light 14FT Live Tree - Warm White LED Lights and St Nick's Ornaments 1 City Hall - Bridge Area
10FT Red/Warm-White Archway over the bridge - 6 Total Arches 1 14FT Lighted Happy Holidays Sign - Red 1
Additional Warm White Lights in Small Trees 7
Additional Warm White Lights in Medium Pine Trees – Median 2 Additional Warm White Lights in Medium Pine Trees 9
Additional Warm White Lights in Center Median 1
Carson & Avalon – Right Side of Street
Small Trees Wrapped with Warm White LED Lights, West Side of City Hall - 4 Strands per Tree 12 Small Trees Wrapped with Warm White LED Lights, South Side of City Hall - 4 Strands per Tree 24 Avalon – Warm White Lights in Bushes from City Hall to Desford Street 1 Street Banners – Carson & Avalon
Larger 8FT Lighted Pole Mount Displays 40
E. The following table is hereby added to Section I of Exhibit “C,” “Schedule of Compensation,” to provide the pricing for the additional décor and lighting for the 20265/276 Holiday Program:

Pricing for Additional/Replacement Lighting & Décor for 2026/27 Winter Program:

Description Quantity Unit Price Total Price
Community Center - North East Entrance
14FT Lighted Happy Holidays Sign - Red 1 $ 750.00 $750.00 8FT Lighted Red Bow 1 $3,250.00 $3,250.00
Community Center - Atrium
Decorate and Light 20FT Live Tree - Warm White LED
Lights and St. Nick's Ornaments 1 $7,250.00 $7,250.00
10FT 2D Walkthrough Star with Gift Box Display– design
upgrade differential
*Upgrade differential over the 8FT Photo Frame with
Decorated Tree Display already included in the base
contract scope
1 $1,600.00 $1,600.00
F. Section IV of Exhibit “C,” “Schedule of Compensation,” is hereby amended as follows:
“IV. The total compensation for the Services shall not exceed $841,556 $634,298 as provided in Section 2.1 of this Agreement.”

4. Continuing Effect of Agreement. Except as amended by Amendment No. 1, City Hall - Main Entrance
9FT stairs inside City Hall leading to Council Chambers garlands with lights – Garland for Second Side of the stairs 2 $ 325.00 $650.00 36" Red bows With Gold Trim on Trees in Front of City
Hall 21 $ 95.00 $1,995.00
Warm White Mini Lights in City Hall Entrance Planter
Boxes – 5 Strands of Lights per planter 22 $ 150.00 $3,300.00 Decorate and Light 14FT Live Tree - Warm White LED
Lights and St. Nick's Ornaments 1 $4,750.00 $4,750.00
City Hall - Bridge Area
10FT Red/Warm-White Archway over the bridge - 6 Total
Arches
1 $6,750.00 $6,750.00
14FT Lighted Happy Holidays Sign - Red 1 $750.00 $750.00 Additional Warm White Lights in Small Trees 7 $160.00 $1,120.00 Additional Warm White Lights in Medium Pine Trees –
Median
2 $250.00 $500.00
Additional Warm White Lights in Medium Pine Trees 9 $210.00 $1,890.00 Additional Warm White Lights in Center Median 1 $985.00 $985.00 Carson & Avalon – Right Side of Street
Small Trees Wrapped with Warm White LED Lights, West
Side of City Hall - 4 Strands per Tree 12 $160.00 $1,920.00 Small Trees Wrapped with Warm White LED Lights, South
Side of City Hall - 4 Strands per Tree 24 $160.00 $3,840.00 Avalon – Warm White Lights in Bushes from City Hall to
Desford Street 1 $0 $0
Street Banners – Carson & Avalon
Larger 8FT Lighted Pole Mount Displays
(Per-Unit Rate Reduced 40% of $336 equals $201.60) 40 $201.60 $8,064.00 Amendment No. 2, Amendment No. 3, and this Amendment No. 4, all provisions of the Agreement shall remain unchanged and in full force and effect. From and after the date of this Amendment No. 4, whenever the term “Agreement” appears in the Agreement, it shall mean the Agreement, as amended by Amendment No. 1, Amendment No. 2, Amendment No. 3, and this Amendment No. 4 to the Agreement.

5. Affirmation of Agreement; Warranty Re Absence of Defaults. City and Consultant each ratify and reaffirm each and every one of the respective rights and obligations arising under the Agreement. Each party represents and warrants to the other that there have been no written or oral modifications to the Agreement other than as provided herein and in Amendment No. 1, Amendment No. 2, and Amendment No. 3. Each party represents and warrants to the other that the Agreement is currently an effective, valid, and binding obligation.

Consultant represents and warrants to City that, as of the date of this Amendment No. 4, City is not in default of any material term of the Agreement and that there have been no events that, with the passing of time or the giving of notice, or both, would constitute a material default under the Agreement.

City represents and warrants to Consultant that, as of the date of this Amendment No. 4, Consultant is not in default of any material term of the Agreement and that there have been no events that, with the passing of time or the giving of notice, or both, would constitute a material default under the Agreement.

6. Adequate Consideration. The parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment No. 4.

7. Authority. The persons executing this Amendment No. 4 on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Amendment No. 4 on behalf of said party, (iii) by so executing this Amendment No. 4, such party is formally bound to the provisions of this Amendment No. 4, and (iv) the entering into this Amendment No. 4 does not violate any provision of any other agreement to which said party is bound.

8. Counterparts. This Amendment No. 4 may be executed in any number of counterparts and each of such counterparts shall for all purposes be deemed to be an original, whether the signatures are originals, electronic, facsimiles or digital. All such counterparts shall together constitute but one and the same Amendment No. 4. [SIGNATURES ON FOLLOWING PAGE]
IN WITNESS WHEREOF, the parties hereto have executed this Amendment No. 4 on the date and year first-above written.

CITY:

CITY OF CARSON, a municipal corporation
Lula Davis-Holmes, Mayor
ATTEST:

Dr. Khaleah K. Bradshaw, City Clerk
APPROVED AS TO FORM:

ALESHIRE & WYNDER, LLP
Sunny K. Soltani, City Attorney
CONSULTANT:

T&G GLOBAL, LLC DBA ST. NICK’S
CHRISTMAS LIGHTING AND DÉCOR
By:

Name:

Title:

By:

Name:

Title:

Address: 6861 Walker St.

La Palma, CA 90623
If Consultant is a limited liability company, any one of the following options will satisfy City’s signature requirements pursuant to the Corporations Code. Option A: One signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. Option B: Signatures required from two managers unless the LLC is managed by one manager per its articles of organization, in which case only one signature from that manager is required. Option C: One signature required from any member unless the LLC is manager-managed per its articles of organization. Option D: One signature required from any manager if the LLC is manager - managed per its articles of organization. APPROPRIATE ATTESTATIONS SHALL BE INCLUDED AS

MAY BE REQUIRED BY THE BYLAWS, ARTICLES OF ORGANIZATION, OR OTHER RULES OR REGULATIONS APPLICABLE TO CONSULTANT’S BUSINESS ENTITY.

CITY OF CARSON 701 East Carson Street
Report to Honorable Mayor and City Council
Tuesday, October 6, 2026, 5:00 PM
CONSENT 29.

To: Honorable Mayor and City Council
From: Michael Whittiker, Community Services Director CS Community Services Subject: CONSIDER APPROVAL OF AMENDMENT NO. 3 TO THE CONTRACT SERVICES AGREEMENT WITH CHOURA VENUE SERVICES TO EXTEND THE AGREEMENT THROUGH DECEMBER 31, 2028, AND

AUTHORIZE ADDITIONAL FUNDING FOR CONTINUED CATERING SERVICES AT THE CARSON EVENT

CENTER (CITY COUNCIL)
I. SUMMARY
On December 6, 2022, the City Council approved Contract No. 23-022 (Agreement) with Choura Venue Services (Choura) to provide on-call catering services at the Carson Event Center (Center). The Agreement established an initial three-year term from January 1, 2023, through December 31, 2025 (Exhibit No. 1). On May 2, 2023, the City Council approved Amendment No. 1, which revised the payment process for catering services provided for Citysponsored and City co-sponsored events. Under Amendment No. 1, Choura bills the City separately for these services rather than deducting the costs from the monthly revenue payments Choura makes to the City.

Amendment No. 1 established a total contract amount not to exceed $473,000 for the initial three-year term (Exhibit No. 2). On August 5, 2025, the City Council approved Amendment No. 2, exercising the first of two optional oneyear extensions and extending the Agreement through December 31, 2026. Amendment No. 2 also provided additional funding to address higher-than-anticipated demand for catering services at City-sponsored and City cosponsored events. Specifically, the amendment authorized an additional $110,000 for the remainder of 2025 and $220,000 for the 2026 extension period. These increases brought the total contract amount to an amount not to exceed $803,000 through December 31, 2026 (Exhibit No. 3).

The proposed Amendment No. 3 (Exhibit No. 4) would exercise the second optional one-year extension for calendar year 2027 and provide an additional one-year extension through December 31, 2028, unless earlier terminated in accordance with the Agreement. Extending the Agreement through 2028 would provide continuity of catering services during a period when the City anticipates increased event activity associated with its 60th anniversary and the Olympic and Paralympic Games. Amendment No. 3 would also authorize additional funding for the remainder of the Agreement. An additional $40,000 is proposed for the remainder of 2026 because demand for catering services at City-sponsored and City co-sponsored events has been higher than anticipated, resulting in existing contract funding being used more quickly than projected. The amendment would authorize an additional $250,000 for calendar year 2027 and $400,000 for calendar year 2028. The higher amount proposed for 2028 reflects the anticipated increase in catering needs associated with the City's 60th anniversary and the Olympic and Paralympic Games taking place in Carson.

In total, proposed Amendment No. 3 would add $690,000 to the Agreement, increasing the total contract amount from $803,000 to an amount not to exceed $1,493,000 and extending the Agreement through December 31, 2028.

Approval would allow the City to maintain uninterrupted catering services for City-sponsored and City co-sponsored events through the proposed extension period.

II. RECOMMENDATION
TAKE the following actions:

1. DETERMINE that waiving the re-solicitation requirement is in the City’s best interest and WAIVE the resolicitation requirement pursuant to Carson Municipal Code Section 2611(m)(2);and,

2. APPROVE the proposed Amendment No. 3 to Contract No. 23-022 with Choura Venue Services, a California corporation, extending the Agreement through December 31, 2028, and increasing the total contract amount by $690,000, from $803,000 to an amount not to exceed $1,493,000 (Exhibit No. 4); and,

3. AUTHORIZE the Mayor to execute Amendment No. 3, following approval as to form by the City Attorney.

III. ALTERNATIVES
TAKE any other action the City Council deems appropriate and consistent with applicable law.

IV. BACKGROUND
On December 6, 2022, following a competitive Request for Proposals (RFP) process, the City Council approved Contract No. 23-022 with Choura Venue Services (Choura) to provide on-call catering services at the Carson Event Center. The original agreement was for a three-year term beginning January 1, 2023, and ending December 31, 2025 (Exhibit No. 1). Under the agreement, Choura provides catering services for private events held at the Carson Event Center and pays the City an agreed-upon percentage of the revenue generated from those services.

Choura also provides catering services for certain City-sponsored and City co-sponsored events held at the facility.

On May 2, 2023, the City Council approved Amendment No. 1 to establish a separate payment process for catering provided at City-sponsored and City co-sponsored events. Rather than deducting these costs from the revenue Choura pays to the City for private-event catering, Choura bills the City directly for authorized City-sponsored and City co-sponsored events. Funding for these events is provided through the City's annual budget process.

Amendment No. 1 authorized expenditures of up to $172,000 per fiscal year, prorated when applicable, and established a total contract amount not to exceed $473,000 for the original three-year term (Exhibit No. 2).

On August 5, 2025, the City Council approved Amendment No. 2, exercising the first of two optional one-year extensions and extending the agreement through December 31, 2026. Amendment No. 2 also increased the available funding for City-sponsored and City co-sponsored events in response to higher-than-anticipated demand for catering services. The amendment authorized an additional $110,000 for the remainder of calendar year 2025 and $220,000 for calendar year 2026, for a total increase of $330,000. This increased the total contract amount from $473,000 to an amount not to exceed $803,000 through December 31, 2026 (Exhibit No. 3).

The City is now approaching the end of the current contract term and must determine how to provide catering services at the Carson Event Center beyond December 31, 2026. The proposed Amendment No. 3 would exercise the second one-year extension authorized under the existing agreement, covering calendar year 2027, and would add one additional year through December 31, 2028. The additional year would allow the City to maintain continuity of catering services during 2028, when increased activity is anticipated in connection with the City's 60th anniversary and the Olympic and Paralympic Games taking place in Carson.

For calendar year 2027, staff recommends authorizing up to $250,000 for catering services associated with Citysponsored and City co-sponsored events. For calendar year 2028, staff recommends authorizing up to $400,000.

The higher amount proposed for 2028 reflects the anticipated increase in City events and activities associated with the City's 60th anniversary and the Olympic and Paralympic Games. Based on current usage and anticipated event activity, staff believes these amounts will provide sufficient capacity to meet the City's catering needs during the proposed extension period. Amendment No. 3 would also provide an additional $40,000 for the remainder of calendar year 2026. Demand for catering at City-sponsored and City co-sponsored events during 2026 has exceeded earlier projections, resulting in the existing contract authorization being used more quickly than anticipated. Without additional funding, the currently authorized amount is expected to be exhausted before the agreement expires on December 31, 2026. The proposed $40,000 increase is intended to provide sufficient contract capacity to maintain uninterrupted catering services through the remainder of the year. In total, Amendment No. 3 would authorize an additional $690,000, consisting of $40,000 for the remainder of 2026, $250,000 for 2027, and $400,000 for 2028. Approval would increase the total contract amount from $803,000 to an amount not to exceed $1,493,000 and extend the agreement through December 31, 2028. Approval would therefore allow the City to continue using Choura for authorized catering services at City-sponsored and City cosponsored events without interruption through 2028.

Because the proposed amendment exceeds $75,000, the City Council must also consider the City's contracting requirements. Carson Municipal Code (CMC) Section 2611(m)(2) generally requires the City to conduct a new competitive solicitation when an amendment to a City Council-approved contract exceeds $75,000. However, the same section allows the City Council to waive that requirement when it determines that doing so is in the City's best interest. In this case, staff recommends that the City Council make the required determination and waive the resolicitation requirement. Choura was originally selected through a competitive process and has provided catering services at the Carson Event Center since 2023. Continuing with the existing provider would maintain continuity of operations and avoid a transition in catering services as the City approaches a period of increased activity at the Event Center, particularly during 2028. Choura is also familiar with the facility, its operations, and the City's event requirements, reducing the operational disruption and administrative effort associated with transitioning to a new provider during the proposed extension period.

Consequently, staff recommends that the City Council determine that waiving the re-solicitation requirement under CMC Section 2611(m)(2) is in the City's best interest and approve Amendment No. 3 with Choura Venue Services. The amendment would provide additional contract capacity for the remainder of 2026, maintain catering services through 2027, and provide continuity through 2028 as the City prepares for its 60th anniversary and its role as a host city for the Olympic and Paralympic Games.

V. FISCAL IMPACT
Funding for these services is included in the City’s adopted Fiscal Year 2026-27 budget under Account No. 101-90- 960-930-6004. Funding required for subsequent years of the proposed contract extension will be incorporated into the City’s future annual budgets, as appropriate and subject to City Council approval.

VI. EXHIBITS

1. Contract No. 23-022

2. Amendment No. 1 to Contract No. 23-022

3. Amendment No. 2 to Contract No. 23-022

4. Proposed Amendment No. 3 to Contract No. 23-022
Attachments
Contract No. 23-022.pdf
Amendment No. 1 to Contract No. 23-022.pdf
Amendment No. 2 to Contract No. 23-022.pdf
(Proposed) Amendment No. 3 to Contract No. 23-022.pdf

AMENDMENT NO. 1

TO AGREEMENT FOR CONTRACT SERVICES

THIS AMENDMENT TO THE AGREEMENT FOR CONTRACT SERVICES
(“Amendment”) by and between the CITY OF CARSON, a California municipal corporation (“City”) and CHOURA VENUE SERVICES, a California corporation (“Caterer”) is effective as of the 1st day of April, 2023.

RECITALS
A. City and Caterer entered into that certain Agreement for Contract Services effective January 1, 2023 (“Agreement”), whereby Caterer agreed to provide on-call catering services for functions held at the City’s Juanita Millender-McDonald Community Center, and for Caterer to receive compensation through the sales generated from patrons from such functions net of a user fee payable monthly to the City for non-City functions. The Agreement also authorized City to procure Caterer’s services for City sponsored or co-sponsored events or activities at a 20% discount rate, with the costs incurred by City for such services to be deducted from the monthly user fees due to City as detailed in Section III of Exhibit “C” (Schedule of Compensation).

B. Subsequent to effectiveness of the Agreement, City staff determined that this method of compensation for City sponsored or co-sponsored events or activities creates accounting, purchasing and personnel-related complications for the City and does not conform to best practices from a City financial tracking, accounting or recordkeeping perspective.

Accordingly, City staff determined that Caterer’s service charges for City sponsored or cosponsored events or activities should be billed directly to the City by Caterer, separate and independent from the monthly user fee payments due from Caterer to City, rather than being included as deductions or offsets from or against the monthly user fee payments. Caterer is agreeable to this modification. Therefore, City and Consultant now desire to amend the Agreement to effectuate the same, including amending the Contract Sum to reflect the independent nature of the payments to be made by City for City sponsored or co-sponsored events or activities (which are anticipated not to exceed $172,000 annually).

C. The parties, by entering into this Amendment, do not intend to change the rates of compensation or the anticipated total/final compensation that will be received by Caterer or City under the Agreement, as the changes effectuated by this Amendment are intended to relate only to separating the process of invoicing and payment of the monthly user fees due to the City from the process of invoicing and payment of the costs incurred by the City for City sponsored or cosponsored events or activities under the Agreement.

TERMS

1. Contract Changes. The Agreement is amended as provided herein (added text shown in bold italics, deleted text shown in strikethrough).

A. Section 2.1 is hereby amended to read in its entirety as follows:
01007.0001/863482.3
“2.1 Contract Sum. For the services rendered pursuant to this Agreement, Consultant shall be compensated in accordance with the “Schedule of Compensation” attached hereto as Exhibit “C” and incorporated herein by this reference, but net-exeeedine the maximum eentract-amount payable by City to Consultant for City sponsored or co-sponsored events or activities (which shall be independent of and shall not reflect deduction or setoff for monthly user fees payable by Consultant to City under this Agreement, as detailed in Section III of Exhibit “C”) shall not exceed Four Hundred Seventy Three Thousand Dollars ($473,000) Zero-Dellars-and NoCents $0.00) (“Contract Sum’).” B. Section III of Exhibit “C” (Schedule of Compensation) is hereby amended to read in its entirety as follows:
“II. Any costs for catering services incurred by City for City sponsored or cosponsored events or activities shall be billed and paid separately deducted from the monthly user fee due to City under this Agreement. The costs incurred by City for services provided at City sponsored or co-sponsored events or activities will be stated on separate invoices, and will not be included in the monthly user fee reports prepared by Consultant pursuant to Section 2.2 nor deducted from the calculation or payment of monthly user fees due to City in connection with such reports pursuant to Section 2.2, but such costs are nonetheless within the scope of and subject to the provisions of this Agreement. 1n+the-eventsuch-cests-exceed MO CI 5 held Cl a oS

C. Section VI of Exhibit “C” (Schedule of Compensation) is hereby amended to read in its entirety as follows:
“VI. The total compensation from City for the Services shall not exceed $473,000 $9.00, as provided in Section 2.1 of this Agreement.”

2. Continuing Effect of Agreement. Except as amended by this Amendment, all provisions of the Agreement shall remain unchanged and in full force and effect. From and after the date of this Amendment, whenever the term “Agreement” appears in the Agreement, it shall mean the Agreement, as amended by this Amendment to the Agreement.

Be Affirmation of Agreement; Warranty Re Absence of Defaults. City and Caterer each ratify and reaffirm each and every one of the respective rights and obligations arising under the Agreement. Each party represents and warrants to the other that there have been no written or oral modifications to the Agreement other than as provided herein. Each party represents and warrants to the other that the Agreement is currently an effective, valid, and binding obligation. 01007.0001/863482.3
Caterer represents and warrants to City that, as of the date of this Amendment, City is not in default of any material term of the Agreement and that there have been no events that, with the passing of time or the giving of notice, or both, would constitute a material default under the Agreement.

City represents and warrants to Caterer that, as of the date of this Amendment, Caterer is not in default of any material term of the Agreement and that there have been no events that, with the passing of time or the giving of notice, or both, would constitute a material default under the Agreement.

4. Adequate Consideration. The parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment.

5. Authority. The persons executing this Amendment on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Amendment on behalf of said party, (iii) by so executing this Amendment, such party is formally bound to the provisions of this Amendment, and (iv) the entering into this Amendment does not violate any provision of any other agreement to which said party is bound. 01007.0001/863482.3
IN WITNESS WHEREOF, the parties hereto have executed this Amendment on the date(s) and year(s) set forth below, with express intent that this Amendment shall be effective as of the date first-above written.

ATTEST:

Dr. Khaleah K. Bradshaw, City Clerk
APPROVED AS TO FORM:

ALESHIRE & WYNDER, LLP

Sunny K. Soltani, City Attorney
[BRJ]
CITY:

CITY OF CARSON, a municipal corporation

Lula Davis-Holmes, Mayor
Date: , 2023
CATERER:

CHOURA VENUE SERVICES, a California
corporation
mx Larers Liem —
pcs” @: Choura
Mpc
fe Tete 7: sa
Title: President
Address: 4101 E. Willow St.

Long Beach, CA 90815
Date: heer is , 2023
Two corporate officer signatures required for Caterer, with one signature required from each of the following groups: 1) Chairman of the Board, CEO, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. CATERER’S SIGNATURES SHALL BE

DULY NOTARIZED, AND APPROPRIATE ATTESTATIONS SHALL BE INCLUDED AS MAY BE

REQUIRED BY THE BYLAWS, ARTICLES OF INCORPORATION, OR OTHER RULES OR REGULATIONS APPLICABLE TO CATERER’S BUSINESS ENTITY.
01007.0001/863482.3

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT

A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document.

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
3 Mi folk Choura On 6, 2023 before me, Den Of ey appeared J Qmcs ohn , proved to me on the basis offsatisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
j LISA DENVER i
Cot SM Notary Public- California 3

WITNESS my hand fficial seal. Los Angeles County z
Commission # 2438723
My Comm. Expires Mar 18, 2027

Signature: a

OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT

INDIVIDUAL

CORPORATE

TITLE(S)

OFFICER

TITLE OR TYPE OF DOCUMENT
PARTNER(S) [] LIMITED
C] GENERAL ATTORNEY-IN-FACT

TRUSTEE(S) NUMBER OF PAGES GUARDIAN/CONSERVATOR
OTHER

OOOH sO
SIGNER IS REPRESENTING:

DATE OF DOCUMENT

(NAME OF PERSON(S) OR ENTITY(IES))

SIGNER(S) OTHER THAN NAMED ABOVE
01007.0001/863482.3

01007.0001 2187413.4
AMENDMENT NO. 3

TO AGREEMENT FOR CONTRACT SERVICES
THIS AMENDMENT NO. 3 TO THE AGREEMENT FOR CONTRACT
SERVICES (“Amendment No. 3”) by and between the CITY OF CARSON, a California municipal corporation (“City”) and CHOURA VENUE SERVICES, a California corporation (“Caterer”) is effective as of the __ day of _______, 2026.

RECITALS
A. City and Caterer entered into that certain Agreement for Contract Services effective January 1, 2023 (“Agreement”), whereby Caterer agreed to provide on-call catering services for functions held at the City’s Juanita Millender-McDonald Community Center, and for Caterer to receive compensation through the sales generated from patrons from such functions net of a user fee payable monthly to the City for non-City functions. The Agreement also authorized City to procure Caterer’s services for City sponsored or co-sponsored events or activities at a 20% discount rate, with the costs incurred by City for such services to be deducted from the monthly user fees due to City as detailed in Section III of Exhibit “C” (Schedule of Compensation).

B. On April 1, 2023, the City and Caterer entered into Amendment No. 1 to the Agreement to amend the method of compensation so Caterer’s service charges for City sponsored or co-sponsored events or activities are billed directly to the City by Caterer, separate and independent from the monthly user fee payments due from Caterer to City, rather than being included as deductions or offsets from or against the monthly user fee payments. City and Caterer agreed to amend the Agreement by Amendment No. 1 to effectuate the same, including amending the Contract Sum to reflect the independent nature of the payments to be made by City for City sponsored or co-sponsored events or activities (which were anticipated not to exceed $172,000 annually). Amendment No. 1 was not intended to, and did not, change the rates of compensation or the anticipated total/final compensation that would be received by Caterer or City under the Agreement, as the changes effectuated by Amendment No. 1 were intended to relate only to separating the process of invoicing and payment of the monthly user fees due to the City from the process of invoicing and payment of the costs incurred by the City for City sponsored or cosponsored events or activities under the Agreement.

C. On September 2, 2025, the City and Caterer entered into Amendment No. 2 to the Agreement to exercise the City’s first of two options to extend the Term of the Agreement by oneyear, through December 31, 2026, and to increase the Contract Sum by $330,000 in order to fund services through December 31, 2026, thereby increasing the total Contract Sum to $803,000 over the 4-year term of the Agreement.

D. Due to higher-than-anticipated demand for Caterer’s services for City sponsored or co-sponsored events or activities under the Agreement during 2026 to date, the Contract Sum has been expended faster than anticipated, and unless increased, will likely be exhausted prior to the scheduled expiration of the four-year term of the Agreement (December 31, 2026). Accordingly, the City and Caterer now desire to amend the Agreement to increase the Contract Sum by $40,000 01007.0001 2187413.4
to authorize additional funding sufficient to cover the anticipated demand for such services through December 31, 2026.

E. Furthermore, the City and Caterer now desire to exercise the second of the City’s two options to extend the Term of the Agreement by one year pursuant to Section 3.4 of the Agreement and to further extend the Term for an additional one year beyond said option period (at the same rate of compensation as set forth in Exhibit “C” for the existing term), thereby extending the Agreement term through December 31, 2028. City and Caterer also desire to increase the Contract Sum by $250,000 for the extension period from January 1, 2027 to December 31, 2027, and due to anticipated increased demand attributable to the City’s 60th anniversary and the presence of the Olympic and Paralympic Games in the City in 2028, by $400,000 for the extension period from January 1, 2028 to December 31, 2028, to provide sufficient funding for anticipated demand for such services over the two-year extension period (January 1, 2027 – December 31, 2028).

F. The current Contract Sum is $803,000. The Contract Sum increases described in Recitals D and E above, collectively, equal $690,000, resulting in an amended Contract Sum of $1,493,000.

G. Section 2611(m)(2) of the City’s Municipal Code provides “[a]ny amendment to a contract that exceeds $75,000 requires re-solicitation unless (i) the City Council waives the resolicitation requirement following determination that such waiver is in the City’s best interest or (ii) the amendment concerns a change order in which event bidding will not be required irrespective of the amount.”
H. Due to the Consultant’s long-standing relationship with the City and their extensive knowledge of the City’s operations, which ensures continued efficiency and cost-effectiveness, the City Council has determined that re-solicitation for this amendment is not required and is in the City’s best interest, pursuant to Section 2611(m)(2) of the Municipal Code.

TERMS

1. Incorporation of Recitals. The Recitals set forth above are incorporated into and are a part of this Amendment No. 3

2. Terms and Definitions. All words, terms and phrases used or referenced in this Amendment No. 3, not expressly defined in this Amendment No. 3, shall have the same meaning ascribed to them in the Agreement.

3. Contract Changes. The Agreement is amended as provided herein (added text shown in bold italics, deleted text shown in strikethrough).

A. Section 2.1 is hereby amended to read in its entirety as follows:
“2.1 Contract Sum. For the services rendered pursuant to this Agreement, Consultant shall be compensated in accordance with the “Schedule of Compensation” attached hereto as Exhibit “C” and incorporated herein by this reference, but the maximum amount payable by City to Consultant for City sponsored or co-sponsored events or activities (which shall be independent of and 01007.0001 2187413.4
shall not reflect deduction or setoff for monthly user fees payable by Consultant to City under this Agreement, as detailed in Section III of Exhibit “C”) shall not exceed One Million Four Hundred Ninety-Three Thousand Dollars ($1,493,000) Eight Hundred Three Thousand Dollars ($803,000) (“Contract Sum”).” B. Section 3.4 is hereby amended to read in its entirety as follows:
“3.4 Term. Unless earlier terminated in accordance with Article 7 of this Agreement, this Agreement shall continue in full force and effect until completion of the services but not exceeding six (6) four (4) years from the date hereof, except as otherwise provided in the Schedule of Performance (Exhibit ‘D’). The City has the option, at its sole discretion, to extend the term of the Agreement by up to one (1) additional year, in a one (1) year increment, at the same rate of compensation as set forth in Exhibit “C” for the initial four-year term.” C. Section VI of Exhibit “C” (Schedule of Compensation) is hereby amended to read in its entirety as follows:
“VI. The total compensation from City for the Services shall not exceed $1,493,000 $803,000, as provided in Section 2.1 of this Agreement.”

4. Continuing Effect of Agreement. Except as amended by Amendment No. 1, Amendment No. 2 and this Amendment No. 3, all provisions of the Agreement shall remain unchanged and in full force and effect. From and after the date of this Amendment No. 3, whenever the term “Agreement” appears in the Agreement, it shall mean the Agreement, as amended by Amendment No. 1, Amendment No. 2 and this Amendment No. 3 to the Agreement.

5. Affirmation of Agreement; Warranty Re Absence of Defaults. City and Caterer each ratify and reaffirm each and every one of the respective rights and obligations arising under the Agreement, Amendment No. 1 and Amendment No. 2. Each Party represents and warrants to the other that there have been no written or oral modifications to the Agreement other than as provided herein and in Amendment No. 1 and Amendment No. 2. Each Party represents and warrants to the other that the Agreement, as amended by Amendment No. 1 and Amendment No. 2, is currently an effective, valid, and binding obligation.

Caterer represents and warrants to City that, as of the date of this Amendment No. 3, City is not in default of any material term of the Agreement and that there have been no events that, with the passing of time or the giving of notice, or both, would constitute a material default under the Agreement.

City represents and warrants to Caterer that, as of the date of this Amendment No. 3, Caterer is not in default of any material term of the Agreement and that there have been no events that, with the passing of time or the giving of notice, or both, would constitute a material default under the Agreement.

6. Adequate Consideration. The Parties irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment No. 3.
01007.0001 2187413.4

7. Authority. The persons executing this Amendment No. 3 on behalf of the Parties warrant that (i) such Party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Amendment No. 3 on behalf of said Party, (iii) by so executing this Amendment No. 3, such Party is formally bound to the provisions of this Amendment No. 3, and (iv) the entering into this Amendment No. 3 does not violate any provision of any other agreement to which said Party is bound.

8. Counterparts. This Amendment No. 3 may be executed in any number of counterparts and each of such counterparts shall for all purposes be deemed to be an original, whether the signatures are originals, electronic, facsimiles, or digital. All such counterparts shall together constitute but one and the same Amendment No. 3. [SIGNATURES ON FOLLOWING PAGE]
01007.0001 2187413.4
IN WITNESS WHEREOF, the Parties have executed this Amendment No. 3 on the date and year first set forth above.

CITY:

CITY OF CARSON, a municipal corporation
Lula Davis-Holmes, Mayor
ATTEST:

Dr. Khaleah K. Bradshaw, City Clerk
APPROVED AS TO FORM:

ALESHIRE & WYNDER, LLP
Sunny K. Soltani, City Attorney
[pks; brj]
CATERER:

CHOURA VENUE SERVICES, a California
corporation
By:

Name: James Choura
Title: CEO
By:

Name: Daniel D’sa
Title: President
Two corporate officer signatures required for Caterer, with one signature required from each of the following groups: 1) Chairman of the Board, CEO, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. APPROPRIATE ATTESTATIONS SHALL

BE INCLUDED AS MAY BE REQUIRED BY THE BYLAWS, ARTICLES OF INCORPORATION, OR OTHER RULES OR REGULATIONS APPLICABLE TO CATERER’S BUSINESS ENTITY.

CITY OF CARSON 701 East Carson Street
Report to Honorable Mayor and City Council
Tuesday, October 6, 2026, 5:00 PM
CONSENT 30.

To: Honorable Mayor and City Council
From: Dr. Arlington Rodgers, Director of Public Works PW Engineering Subject: CONSIDER APPROVAL OF A CONTRACT SERVICES AGREEMENT WITH Z&K CONSULTANTS, INC. FOR CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR PROJECT NO. 1636 – MILLS PARK SITE RECONSTRUCTION AND PROJECT NO. 1795 – MILLS PARK RECREATION CENTER BUILDING

RENOVATION (CITY COUNCIL)
I. SUMMARY
Project No. 1636 – Mills Park Site Reconstruction and Project No. 1795 – Mills Park Recreation Center Building Renovation are included in the City’s Fiscal Year 2026-27 Capital Improvement Program. Together, the projects will significantly improve Mills Park through new and upgraded recreational amenities, including a playground, sports and fitness courts, recreation center expansion and renovation, a new splash pad, and related site and infrastructure improvements. Given the size and complexity of the planned improvements, professional construction management and inspection services are needed to oversee construction, verify that the work is completed in accordance with the approved plans and specifications, and help keep the projects on schedule and within budget.

On June 29, 2026, the City issued Request for Qualifications (RFQ) No. 26-001Q to solicit qualified firms to provide construction management and inspection services for both Mills Park projects. The RFQ was advertised through PlanetBids from June 29 through July 29, 2026. The City received 12 Statements of Qualifications, which were reviewed and ranked by an Engineering staff selection committee using the evaluation criteria established in the RFQ (Exhibit No. 1). Following the competitive evaluation process, Z&K Consultants, Inc. was identified as the highest-ranked and most qualified firm.

Following the selection process, staff negotiated the scope of services and compensation with Z&K Consultants, Inc. Staff therefore recommends that the City Council approve a five-year Contract Services Agreement with Z&K Consultants, Inc. in an amount not to exceed $500,720 to provide construction management and inspection services for Project Nos. 1636 and 1795 (Exhibit No. 2).

II. RECOMMENDATION
TAKE the following actions:

1. APPROVE a five-year Contract Services Agreement with Z&K Consultants, Inc. in an amount not to exceed $500,720 to provide construction management and inspection services for Project No. 1636 – Mills Park Site Reconstruction Project and Project No. 1795 – Mills Park Recreation Center Building Renovation; and,

2. AUTHORIZE the Mayor to execute the Contract Services Agreement, following approval as to form by the City Attorney.

III. ALTERNATIVES

1. DO NOT APPROVE the proposed Contract Services Agreement with Z&K Consultants, Inc.

2. TAKE any other action the City Council deems appropriate and consistent with applicable law.

IV. BACKGROUND
Mills Park is an approximately 4.45-acre community park located at the southeast corner of Central Avenue and East Dimondale Drive in the City of Carson. The City is preparing to undertake two significant capital improvement projects at Mills Park that will substantially renovate both the park grounds and the existing recreation center.

Project No. 1636 – Mills Park Site Reconstruction Project is included in the City's Fiscal Year 2026-27 Capital Improvement Program (CIP), which identifies and funds major improvements to City facilities and infrastructure. The project will reconstruct and modernize significant portions of the park. Planned improvements include a new playground with shade structures; a full-size basketball court; a fitness court with a shade structure; reconstructed picnic areas; new concrete walkways; expanded drainage and irrigation systems; new turf; and new site furnishings. The picnic areas will also incorporate permeable paving, which allows stormwater to filter into the ground rather than immediately flowing into the storm drain system, helping the project comply with applicable stormwater and Low Impact Development requirements.

Project No. 1795 – Mills Park Recreation Center Building Renovation will renovate and expand the existing recreation center and improve the surrounding recreational amenities. The project includes an approximately 1,400-square-foot building expansion to provide additional office space, new exterior public restrooms, a dedicated equipment room for the proposed splash pad, and additional storage. Improvements to the existing building will include exterior façade enhancements, new flooring, kitchen upgrades, restroom improvements, and expanded office space. The project also includes new concrete walkways and replacement of the existing wading pool with a new splash pad featuring integrated bleacher seating.

Together, these projects represent a substantial investment in Mills Park and involve multiple types of construction occurring within the same park, including building renovation and expansion, recreational facilities, landscaping, irrigation, drainage, concrete work, and specialized park improvements. Given the size and complexity of the work, the City requires professional construction management and inspection services to provide day-to-day oversight and help ensure that the projects are constructed properly.

Construction management and inspection services serve as an extension of City staff during construction. Among other responsibilities, the consultant will monitor construction progress; inspect the contractor's work; coordinate among the City, contractors, utility companies, and other agencies; verify compliance with the City's approved plans and specifications; monitor project schedules and budgets; review contractor payment requests; evaluate construction-related questions and proposed changes; coordinate required material testing and special inspections; maintain project records; and assist with project completion and final acceptance. These services are intended to identify and resolve construction issues promptly, protect the City's investment, and help keep the projects on schedule and within their approved budgets.

To obtain these professional services, the City issued Request for Qualifications (RFQ) No. 26-001Q on June 29, 2026. A Request for Qualifications is a competitive selection process in which consulting firms are evaluated primarily on their experience, qualifications, personnel, and ability to perform the required work. The RFQ was advertised through PlanetBids, the City's electronic procurement system, from June 29 through July 29, 2026. The City received 12 Statements of Qualifications from consulting firms in response to the RFQ. A selection committee consisting of City Engineering staff reviewed and ranked all 12 submissions using the evaluation criteria established in the RFQ. Based on that competitive evaluation, Z&K Consultants, Inc. (Z&K) was identified as the highest-ranked and most qualified firm. Following the selection process, City staff negotiated the detailed scope of services and compensation with Z&K.

Under the proposed agreement, Z&K will provide comprehensive construction management and inspection services for both Mills Park projects. The firm's responsibilities will include resident engineering and overall construction management; construction inspection; coordination with City staff, contractors, utility companies, and regulatory agencies; review and processing of contractor submittals, requests for information, and proposed change orders; monitoring of construction schedules and project budgets; review of contractor payment requests; documentation and reporting of construction progress; quality assurance and quality control oversight; and assistance with project closeout and final acceptance. These services will supplement existing City staff resources and provide dedicated technical expertise throughout construction. This additional oversight is particularly important because the two projects include numerous improvements being constructed within the same park and require careful coordination to ensure that the work conforms to the City's approved plans, specifications, contractual requirements, and applicable construction standards.

Z&K provides construction management, construction inspection, plan review, program management, construction administration, pre-construction inspection, staff augmentation, and other professional engineering consulting services. The firm has experience providing similar services to local public agencies and is certified as a Disadvantaged Business Enterprise (DBE), Women's Business Enterprise (WBE), and Small Business Enterprise (SBE).

Based on the competitive qualifications-based selection process, Z&K's experience, and the negotiated scope of services, staff recommends that the City Council approve a five-year Contract Services Agreement with Z&K Consultants, Inc. in an amount not to exceed $500,720 to provide professional construction management and inspection services for Project No. 1636, Mills Park Site Reconstruction, and Project No. 1795, Mills Park Recreation Center Building Renovation. Approval of the agreement will provide the City with dedicated professional oversight throughout construction and will help ensure that these significant improvements to Mills Park are properly coordinated, documented, inspected, and completed in accordance with the City's plans, specifications, budget, and quality standards.

V. FISCAL IMPACT
This action is part of the City’s coordinated use of Development Impact Fee (DIF) Fund 289 to support eligible Capital Improvement Program projects, including Project No. 1636 – Mills Park Site Reconstruction and Project No. 1795 – Mills Park Recreation Center Building Renovation. Both projects are included in the City’s Fiscal Year 2026-27 Capital Improvement Program and will provide significant improvements to Mills Park’s recreational amenities, public facilities, and supporting site infrastructure. At its September 15, 2026, meeting, the City Council considered Resolution No. 26-099 (Exhibit No. 3), which appropriates $5,699,000 from the available DIF Fund balance to address identified funding needs for various eligible capital improvement and community development projects, including the Mills Park projects. The proposed agreement with Z&K Consultants, Inc. represents a specific use of this funding to provide the professional construction management and inspection services necessary to support the delivery of both Mills Park projects. If approved, the proposed $500,720 Contract Services Agreement with Z&K Consultants, Inc. will be funded entirely from DIF Fund Account No. 289-99-999-904- 8008, using funding appropriated through Resolution No. 26-099. No additional appropriation is required, and approval of the agreement will have no impact on the City’s General Fund.

VI. EXHIBITS

1. Bid Register

2. Proposed Z&K Consultants, Inc. Professional Service Agreement

3. Resolution No. 26-099 (Exhibit No. 3) – For Reference Only; previously considered at the September 15, 2026 City Council meeting. No signature required.

Attachments

1. Bid Register

2. Z&K Consultants, Inc. Professional Service Agreement

3. Resolution 26-099

CONTRACT SERVICES AGREEMENT
By and Between

CITY OF CARSON
and
Z & K CONSULTANTS, INC.

01007.0006 2180822.1 -1-

AGREEMENT FOR CONTRACT SERVICES

BETWEEN THE CITY OF CARSON AND
Z & K CONSULTANTS, INC.

THIS AGREEMENT FOR CONTRACT SERVICES (herein “Agreement”) is made and entered into this ____ day of ________, 2026 by and between the CITY OF CARSON, a California municipal corporation (“City”) and Z & K CONSULTANTS, INC., a California corporation (“Consultant”). City and Consultant are sometimes hereinafter individually referred to as “Party” and hereinafter collectively referred to as the “Parties.”

RECITALS
A. City has sought, by issuance of a Request for Proposals or Invitation for Bids, the performance of the services defined and described particularly in Article 1 of this Agreement.

B. Consultant, following submission of a proposal or bid for the performance of the services defined and described particularly in Article 1 of this Agreement, was selected by the City to perform those services.

C. Pursuant to the City of Carson’s Municipal Code, City has authority to enter into and execute this Agreement.

D. The Parties desire to formalize the selection of Consultant for performance of those services defined and described particularly in Article 1 of this Agreement and desire that the terms of that performance be as particularly defined and described herein.

OPERATIVE PROVISIONS
NOW, THEREFORE, in consideration of the mutual promises and covenants made by the Parties and contained herein and other consideration, the value and adequacy of which are hereby acknowledged, the parties agree as follows:

ARTICLE 1. SERVICES OF CONSULTANT

1.1 Scope of Services.

In compliance with all terms and conditions of this Agreement, the Consultant shall provide those services specified in the “Scope of Services” attached hereto as Exhibit “A” and incorporated herein by this reference, which may be referred to herein as the “services” or “work” hereunder.

As a material inducement to the City entering into this Agreement, Consultant represents and warrants that it has the qualifications, experience, and facilities necessary to properly perform the services required under this Agreement in a thorough, competent, and professional manner, and is experienced in performing the work and services contemplated herein. Consultant shall at all times faithfully, competently and to the best of its ability, experience and talent, perform all services described herein. Consultant covenants that it shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be both of good quality as well as fit for the purpose intended. For purposes of this Agreement, the phrase “highest 01007.0006 2180822.1 -2-
professional standards” shall mean those standards of practice recognized by one or more firstclass firms performing similar work under similar circumstances.

1.2 Consultant’s Proposal.

The Scope of Service shall include the Consultant’s scope of work or bid which shall be incorporated herein by this reference as though fully set forth herein. In the event of any inconsistency between the terms of such proposal and this Agreement, the terms of this Agreement shall govern.

1.3 Compliance with Law.

Consultant shall keep itself informed concerning, and shall render all services hereunder in accordance with, all ordinances, resolutions, statutes, rules, and regulations of the City and any Federal, State or local governmental entity having jurisdiction in effect at the time service is rendered.

1.4 Licenses, Permits, Fees and Assessments.

Consultant shall obtain at its sole cost and expense such licenses, permits and approvals as may be required by law for the performance of the services required by this Agreement. Consultant shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the Consultant’s performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City, its officers, employees or agents of City, against any such fees, assessments, taxes, penalties or interest levied, assessed or imposed against City hereunder.

1.5 Familiarity with Work.

By executing this Agreement, Consultant warrants that Consultant (i) has thoroughly investigated and considered the scope of services to be performed, (ii) has carefully considered how the services should be performed, and (iii) fully understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. If the services involve work upon any site, Consultant warrants that Consultant has or will investigate the site and is or will be fully acquainted with the conditions there existing, prior to commencement of services hereunder. Should the Consultant discover any latent or unknown conditions, which will materially affect the performance of the services hereunder, Consultant shall immediately inform the City of such fact and shall not proceed except at Consultant’s risk until written instructions are received from the Contract Officer.

1.6 Care of Work.

The Consultant shall adopt reasonable methods during the life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans, studies and/or other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the work by City, except such losses or damages as may be caused by City’s own negligence.
01007.0006 2180822.1 -3-

1.7 Further Responsibilities of Parties.

Both parties agree to use reasonable care and diligence to perform their respective obligations under this Agreement. Both parties agree to act in good faith to execute all instruments, prepare all documents and take all actions as may be reasonably necessary to carry out the purposes of this Agreement. Unless hereafter specified, neither party shall be responsible for the service of the other.

1.8 Additional Services.

City shall have the right at any time during the performance of the services, without invalidating this Agreement, to order extra work beyond that specified in the Scope of Services or make changes by altering, adding to or deducting from said work. No such extra work may be undertaken unless a written order is first given by the Contract Officer to the Consultant, incorporating therein any adjustment in (i) the Contract Sum for the actual costs of the extra work, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of the Consultant. Any increase in compensation of up to ten percent (10%) of the Contract Sum or $25,000, whichever is less; or, in the time to perform of up to one hundred eighty (180) days, may be approved by the Contract Officer. Any greater increases, taken either separately or cumulatively, must be approved by the City Council. It is expressly understood by Consultant that the provisions of this Section shall not apply to services specifically set forth in the Scope of Services. Consultant hereby acknowledges that it accepts the risk that the services to be provided pursuant to the Scope of Services may be more costly or time consuming than Consultant anticipates and that Consultant shall not be entitled to additional compensation therefor. City may in its sole and absolute discretion have similar work done by other contractors. No claims for an increase in the Contract Sum or time for performance shall be valid unless the procedures established in this Section are followed.

1.9 Special Requirements.

Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in the “Special Requirements” attached hereto as Exhibit “B” and incorporated herein by this reference. In the event of a conflict between the provisions of Exhibit “B” and any other provisions of this Agreement, the provisions of Exhibit “B” shall govern.

ARTICLE 2. COMPENSATION AND METHOD OF PAYMENT.

2.1 Contract Sum.

Subject to any limitations set forth in this Agreement, City agrees to pay Consultant the amounts specified in the “Schedule of Compensation” attached hereto as Exhibit “C” and incorporated herein by this reference. The total compensation, including reimbursement for actual expenses, shall not exceed Five Hundred Thousand Seven Hundred Twenty Dollars ($500,720.00) (the “Contract Sum”), unless additional compensation is approved pursuant to Section 1.8.
01007.0006 2180822.1 -4-

2.2 Method of Compensation.

The method of compensation may include: (i) a lump sum payment upon completion; (ii) payment in accordance with specified tasks or the percentage of completion of the services; (iii) payment for time and materials based upon the Consultant’s rates as specified in the Schedule of Compensation, provided that (a) time estimates are provided for the performance of sub tasks, (b) contract retention is maintained, and (c) the Contract Sum is not exceeded; or (iv) such other methods as may be specified in the Schedule of Compensation.

2.3 Reimbursable Expenses.

Compensation may include reimbursement for actual and necessary expenditures for reproduction costs, telephone expenses, and travel expenses approved by the Contract Officer in advance, or actual subcontractor expenses of an approved subcontractor pursuant to Section 4.5, and only if specified in the Schedule of Compensation. The Contract Sum shall include the attendance of Consultant at all project meetings reasonably deemed necessary by the City.

Coordination of the performance of the work with City is a critical component of the services. If Consultant is required to attend additional meetings to facilitate such coordination, Consultant shall not be entitled to any additional compensation for attending said meetings.

2.4 Invoices.

Each month Consultant shall furnish to City an original invoice for all work performed and expenses incurred during the preceding month in a form approved by City’s Director of Finance.

By submitting an invoice for payment under this Agreement, Consultant is certifying compliance with all provisions of the Agreement. The invoice shall detail charges for all necessary and actual expenses by the following categories: labor (by sub-category), travel, materials, equipment, supplies, and sub-contractor contracts. Sub-contractor charges shall also be detailed by such categories. Consultant shall not invoice City for any duplicate services performed by more than one person.

City shall independently review each invoice submitted by the Consultant to determine whether the work performed and expenses incurred are in compliance with the provisions of this Agreement. Except as to any charges for work performed or expenses incurred by Consultant which are disputed by City, or as provided in Section 7.3, City will use its best efforts to cause Consultant to be paid within forty-five (45) days of receipt of Consultant’s correct and undisputed invoice; however, Consultant acknowledges and agrees that due to City warrant run procedures, the City cannot guarantee that payment will occur within this time period. In the event any charges or expenses are disputed by City, the original invoice shall be returned by City to Consultant for correction and resubmission. Review and payment by City for any invoice provided by the Consultant shall not constitute a waiver of any rights or remedies provided herein or any applicable law.

2.5 Waiver.

Payment to Consultant for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Consultant.
01007.0006 2180822.1 -5-
ARTICLE 3. PERFORMANCE SCHEDULE

3.1 Time of Essence.

Time is of the essence in the performance of this Agreement.

3.2 Schedule of Performance.

Consultant shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s) established in the “Schedule of Performance” attached hereto as Exhibit “D” and incorporated herein by this reference. When requested by the Consultant, extensions to the time period(s) specified in the Schedule of Performance may be approved in writing by the Contract Officer but not exceeding one hundred eighty (180) days cumulatively.

3.3 Force Majeure.

The time period(s) specified in the Schedule of Performance for performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the City, if the Consultant shall within ten (10) days of the commencement of such delay notify the Contract Officer in writing of the causes of the delay. The Contract Officer shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the Contract Officer such delay is justified. The Contract Officer’s determination shall be final and conclusive upon the parties to this Agreement. In no event shall Consultant be entitled to recover damages against the City for any delay in the performance of this Agreement, however caused, Consultant’s sole remedy being extension of the Agreement pursuant to this Section.

3.4 Term.

Unless earlier terminated in accordance with Article 7 of this Agreement, this Agreement shall continue in full force and effect until completion of the services but not exceeding five (5) years from the date hereof, except as otherwise provided in the Schedule of Performance (Exhibit “D”).

ARTICLE 4. COORDINATION OF WORK

4.1 Representatives and Personnel of Consultant.

The following principals of Consultant (“Principals”) are hereby designated as being the principals and representatives of Consultant authorized to act in its behalf with respect to the work specified herein and make all decisions in connection therewith:

Crystal Fraire, PE, OSD/P Principal-in-Charge
(Name) (Title)
01007.0006 2180822.1 -6-

(Name) (Title)
(Name) (Title)
It is expressly understood that the experience, knowledge, capability and reputation of the foregoing principals were a substantial inducement for City to enter into this Agreement.

Therefore, the foregoing principals shall be responsible during the term of this Agreement for directing all activities of Consultant and devoting sufficient time to personally supervise the services hereunder. All personnel of Consultant, and any authorized agents, shall at all times be under the exclusive direction and control of the Principals. For purposes of this Agreement, the foregoing Principals may not be replaced nor may their responsibilities be substantially reduced by Consultant without the express written approval of City. Additionally, Consultant shall utilize only competent personnel to perform services pursuant to this Agreement. Consultant shall make every reasonable effort to maintain the stability and continuity of Consultant’s staff and subcontractors, if any, assigned to perform the services required under this Agreement. Consultant shall notify City of any changes in Consultant’s staff and subcontractors, if any, assigned to perform the services required under this Agreement, prior to and during any such performance.

4.2 Status of Consultant.

Consultant shall have no authority to bind City in any manner, or to incur any obligation, debt or liability of any kind on behalf of or against City, whether by contract or otherwise, unless such authority is expressly conferred under this Agreement or is otherwise expressly conferred in writing by City. Consultant shall not at any time or in any manner represent that Consultant or any of Consultant’s officers, employees, or agents are in any manner officials, officers, employees or agents of City. Neither Consultant, nor any of Consultant’s officers, employees or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City’s employees. Consultant expressly waives any claim Consultant may have to any such rights.

4.3 Contract Officer.

The Contract Officer shall be Gilbert Marquez, City Engineer, or as otherwise designated by the City Manager. It shall be the Consultant’s responsibility to assure that the Contract Officer is kept informed of the progress of the performance of the services and the Consultant shall refer any decisions which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer.

The Contract Officer shall have authority, if specified in writing by the City Manager, to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement.

4.4 Independent Consultant.

Neither the City nor any of its employees shall have any control over the manner, mode or means by which Consultant, its agents or employees, perform the services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision or control of Consultant’s employees, servants, representatives or agents, or in fixing their number, compensation or hours of service. Consultant shall perform all services required herein as an 01007.0006 2180822.1 -7-
independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Consultant shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Consultant in its business or otherwise or a joint venturer or a member of any joint enterprise with Consultant.

4.5 Prohibition Against Subcontracting or Assignment.

The experience, knowledge, capability and reputation of Consultant, its principals and employees were a substantial inducement for the City to enter into this Agreement. Therefore, Consultant shall not contract with any other entity to perform in whole or in part the services required hereunder without the express written approval of the City. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of Consultant, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release the Consultant or any surety of Consultant of any liability hereunder without the express consent of City.

ARTICLE 5. INSURANCE AND INDEMNIFICATION

5.1 Insurance Coverages.

The Consultant shall procure and maintain, at its sole cost and expense, in a form and content satisfactory to City, during the entire term of this Agreement including any extension thereof, the following policies of insurance which shall cover all elected and appointed officers, employees and agents of City:
(a) General Liability Insurance (Coverage Form ISO CGL CG 00 01 or equivalent). A policy of comprehensive general liability insurance written on a per occurrence basis for bodily injury, personal injury and property damage. The policy of insurance shall be in an amount not less than $1,000,000.00 per occurrence or if a general aggregate limit is used, then the general aggregate limit shall be twice the occurrence limit. (b) Worker’s Compensation Insurance. A policy of worker’s compensation insurance in such amount as will fully comply with the laws of the State of California and which shall indemnify, insure and provide legal defense for the Consultant against any loss, claim or damage arising from any injuries or occupational diseases occurring to any worker employed by or any persons retained by the Consultant in the course of carrying out the work or services contemplated in this Agreement, with Employer’s Liability insurance coverage limits of at least $1,000,000.00.
(c) Automotive Insurance (Coverage Form ISO CA 00 01 including “any auto” and endorsement CA 0025 or equivalent). A policy of comprehensive automobile liability insurance written on a per occurrence for bodily injury and property damage in an amount not less 01007.0006 2180822.1 -8-
than $1,000,000. Said policy shall include coverage for owned, non-owned, leased, hired cars and any automobile.
(d) Professional Liability. Professional liability insurance appropriate to the Consultant’s profession, as determined by the City’s Risk Manager, provided that the limits shall be no less than $1,000,000 per claim and no less than $1,000,000 general aggregate. This coverage may be written on a “claims made” basis, and must include coverage for contractual liability. The professional liability insurance required by this Agreement must be endorsed to be applicable to claims based upon, arising out of or related to services performed under this Agreement. The insurance must be maintained for at least 5 consecutive years following the completion of Consultant’s services or the termination of this Agreement. During this additional 5-year period, Consultant shall annually and upon request of the City submit written evidence of this continuous coverage.
(e) Subcontractors. Consultant shall include all subcontractors as insureds under its policies or shall furnish separate certificates and certified endorsements for each subcontractor. All coverages for subcontractors shall include all of the requirements stated herein. (f) Additional Insurance. Policies of such other insurance, as may be required in the Special Requirements in Exhibit “B”.
(g) Broader Coverages and Higher Limits. Notwithstanding anything else herein to the contrary, if Consultant maintains broader coverages and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverages and/or higher limits maintained by Consultant.

5.2 General Insurance Requirements.

All of the above policies of insurance shall be primary insurance and shall name the City, its elected and appointed officers, employees and agents as additional insureds and any insurance maintained by City or its officers, employees or agents may apply in excess of, and not contribute with Consultant’s insurance. The insurer is deemed hereof to waive all rights of subrogation and contribution it may have against the City, its officers, employees and agents and their respective insurers. Moreover, the insurance policy must specify that where the primary insured does not satisfy the self-insured retention, any additional insured may satisfy the self-insured retention.

All of said policies of insurance shall provide that said insurance may not be amended or cancelled by the insurer or any party hereto without providing thirty (30) days prior written notice by certified mail return receipt requested to the City. In the event any of said policies of insurance are cancelled, the Consultant shall, prior to the cancellation date, submit new evidence of insurance in conformance with Section 5.1 to the Contract Officer.

No work or services under this Agreement shall commence until the Consultant has provided the City with Certificates of Insurance, additional insured endorsement forms or appropriate insurance binders evidencing the above insurance coverages and said Certificates of Insurance or binders are approved by the City. City reserves the right to inspect complete, certified copies of and endorsements to all required insurance policies at any time. Any failure to comply 01007.0006 2180822.1 -9-
with the reporting or other provisions of the policies including breaches or warranties shall not affect coverage provided to City.

All certificates shall name the City as additional insured (providing the appropriate endorsement) and shall conform to the following “cancellation” notice:

CANCELLATION:

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE

CANCELLED BEFORE THE EXPIRATION DATED THEREOF,
THE ISSUING COMPANY SHALL MAIL THIRTY (30)-DAY

ADVANCE WRITTEN NOTICE TO CERTIFICATE HOLDER
NAMED HEREIN.
[to be initialed] ______________
Consultant Initials
City, its respective elected and appointed officers, directors, officials, employees, agents and volunteers are to be covered as additional insureds as respects: liability arising out of activities Consultant performs; products and completed operations of Consultant; premises owned, occupied or used by Consultant; or any automobiles owned, leased, hired or borrowed by Consultant. The coverage shall contain no special limitations on the scope of protection afforded to City, and their respective elected and appointed officers, officials, employees or volunteers. Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

Any deductibles or self-insured retentions must be declared to and approved by City. At the option of City, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City or its respective elected or appointed officers, officials, employees and volunteers or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration, defense expenses and claims. The Consultant agrees that the requirement to provide insurance shall not be construed as limiting in any way the extent to which the Consultant may be held responsible for the payment of damages to any persons or property resulting from the Consultant’s activities or the activities of any person or persons for which the Consultant is otherwise responsible nor shall it limit the Consultant’s indemnification liabilities as provided in Section 5.3.

In the event the Consultant subcontracts any portion of the work in compliance with Section 4.5 of this Agreement, the contract between the Consultant and such subcontractor shall require the subcontractor to maintain the same policies of insurance that the Consultant is required to maintain pursuant to Section 5.1, and such certificates and endorsements shall be provided to City.

5.3 Indemnification.

To the full extent permitted by law, Consultant agrees to indemnify, defend and hold harmless the City, its officers, employees and agents (“Indemnified Parties”) against, and will hold and save them and each of them harmless from, any and all actions, either judicial, administrative, 01007.0006 2180822.1 -10-
arbitration or regulatory claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities whether actual or threatened (herein “claims or liabilities”) that may be asserted or claimed by any person, firm or entity arising out of or in connection with the negligent performance of the work, operations or activities provided herein of Consultant, its officers, employees, agents, subcontractors, or invitees, or any individual or entity for which Consultant is legally liable (“indemnitors”), or arising from Consultant’s or indemnitors’ reckless or willful misconduct, or arising from Consultant’s or indemnitors’ negligent performance of or failure to perform any term, provision, covenant or condition of this Agreement, and in connection therewith:
(a) Consultant will defend any action or actions filed in connection with any of said claims or liabilities and will pay all costs and expenses, including legal costs and attorneys’ fees incurred in connection therewith;
(b) Consultant will promptly pay any judgment rendered against the City, its officers, agents or employees for any such claims or liabilities arising out of or in connection with the negligent performance of or failure to perform such work, operations or activities of Consultant hereunder; and Consultant agrees to save and hold the City, its officers, agents, and employees harmless therefrom;
(c) In the event the City, its officers, agents or employees is made a party to any action or proceeding filed or prosecuted against Consultant for such damages or other claims arising out of or in connection with the negligent performance of or failure to perform the work, operation or activities of Consultant hereunder, Consultant agrees to pay to the City, its officers, agents or employees, any and all costs and expenses incurred by the City, its officers, agents or employees in such action or proceeding, including but not limited to, legal costs and attorneys’ fees.

Consultant shall incorporate similar indemnity agreements with its subcontractors and if it fails to do so Consultant shall be fully responsible to indemnify City hereunder therefore, and failure of City to monitor compliance with these provisions shall not be a waiver hereof. This indemnification includes claims or liabilities arising from any negligent or wrongful act, error or omission, or reckless or willful misconduct of Consultant in the performance of professional services hereunder. The provisions of this Section do not apply to claims or liabilities occurring as a result of City’s sole negligence or willful acts or omissions, but, to the fullest extent permitted by law, shall apply to claims and liabilities resulting in part from City’s negligence, except that design professionals’ indemnity hereunder shall be limited to claims and liabilities arising out of the negligence, recklessness or willful misconduct of the design professional. The indemnity obligation shall be binding on successors and assigns of Consultant and shall survive termination of this Agreement.

5.4 Sufficiency of Insurer.

Insurance required by this Agreement shall be satisfactory only if issued by companies qualified to do business in California, rated “A-” or better in the most recent edition of Best Rating Guide, The Key Rating Guide or in the Federal Register, and only if they are of a financial category Class VII or better, unless such requirements are waived by the Risk Manager of the City (“Risk 01007.0006 2180822.1 -11-
Manager”) due to unique circumstances. If this Agreement continues for more than 3 years duration, or in the event the Risk Manager determines that the work or services to be performed under this Agreement creates an increased or decreased risk of loss to the City, the Consultant agrees that the minimum limits of the insurance policies may be changed accordingly upon receipt of written notice from the Risk Manager.

ARTICLE 6. RECORDS, REPORTS, AND RELEASE OF INFORMATION

6.1 Records.

Consultant shall keep, and require subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports, studies or other documents relating to the disbursements charged to City and services performed hereunder (the “books and records”), as shall be necessary to perform the services required by this Agreement and enable the Contract Officer to evaluate the performance of such services. Any and all such documents shall be maintained in accordance with generally accepted accounting principles and shall be complete and detailed. The Contract Officer shall have full and free access to such books and records at all times during normal business hours of City, including the right to inspect, copy, audit and make records and transcripts from such records. Such records shall be maintained for a period of three (3) years following completion of the services hereunder, and the City shall have access to such records in the event any audit is required. In the event of dissolution of Consultant’s business, custody of the books and records may be given to City, and access shall be provided by Consultant’s successor in interest. Notwithstanding the above, the Consultant shall fully cooperate with the City in providing access to the books and records if a public records request is made and disclosure is required by law including but not limited to the California Public Records Act.

6.2 Reports.

Consultant shall periodically prepare and submit to the Contract Officer such reports concerning the performance of the services required by this Agreement as the Contract Officer shall require. Consultant hereby acknowledges that the City is greatly concerned about the cost of work and services to be performed pursuant to this Agreement. For this reason, Consultant agrees that if Consultant becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the work or services contemplated herein or, if Consultant is providing design services, the cost of the project being designed, Consultant shall promptly notify the Contract Officer of said fact, circumstance, technique or event and the estimated increased or decreased cost related thereto and, if Consultant is providing design services, the estimated increased or decreased cost estimate for the project being designed.

6.3 Ownership of Documents.

All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents and other materials (the “documents and materials”) prepared by Consultant, its employees, subcontractors and agents in the performance of this Agreement shall be the property of City and shall be delivered to City upon request of the Contract Officer or upon the termination of this Agreement, and Consultant shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of 01007.0006 2180822.1 -12-
ownership use, reuse, or assignment of the documents and materials hereunder. Any use, reuse or assignment of such completed documents for other projects and/or use of uncompleted documents without specific written authorization by the Consultant will be at the City’s sole risk and without liability to Consultant, and Consultant’s guarantee and warranties shall not extend to such use, reuse or assignment. Consultant may retain copies of such documents for its own use. Consultant shall have the right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any documents or materials prepared by them, and in the event Consultant fails to secure such assignment, Consultant shall indemnify City for all damages resulting therefrom. Moreover, with respect to any documents and materials that may qualify as “works made for hire” as defined in 17 U.S.C. § 101, such documents and materials are hereby deemed “works made for hire” for the City.

6.4 Confidentiality and Release of Information.
(a) All information gained or work product produced by Consultant in performance of this Agreement shall be considered confidential, unless such information is in the public domain or already known to Consultant. Consultant shall not release or disclose any such information or work product to persons or entities other than City without prior written authorization from the Contract Officer.
(b) Consultant, its officers, employees, agents or subcontractors, shall not, without prior written authorization from the Contract Officer or unless requested by the City Attorney, voluntarily provide documents, declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the work performed under this Agreement. Response to a subpoena or court order shall not be considered “voluntary” provided Consultant gives City notice of such court order or subpoena. (c) If Consultant, or any officer, employee, agent or subcontractor of Consultant, provides any information or work product in violation of this Agreement, then City shall have the right to reimbursement and indemnity from Consultant for any damages, costs and fees, including attorneys fees, caused by or incurred as a result of Consultant’s conduct. (d) Consultant shall promptly notify City should Consultant, its officers, employees, agents or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed there under. City retains the right, but has no obligation, to represent Consultant or be present at any deposition, hearing or similar proceeding. Consultant agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Consultant. However, this right to review any such response does not imply or mean the right by City to control, direct, or rewrite said response.

ARTICLE 7. ENFORCEMENT OF AGREEMENT AND TERMINATION

7.1 California Law.

This Agreement shall be interpreted, construed and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions 01007.0006 2180822.1 -13-
concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Los Angeles, State of California, or any other appropriate court in such county, and Consultant covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. In the event of litigation in a U.S. District Court, venue shall lie exclusively in the Central District of California, in the County of Los Angeles, State of California.

7.2 Disputes; Default.

In the event that Consultant is in default under the terms of this Agreement, the City shall not have any obligation or duty to continue compensating Consultant for any work performed after the date of default. Instead, the City may give notice to Consultant of the default and the reasons for the default. The notice shall include the timeframe in which Consultant may cure the default.

This timeframe is presumptively thirty (30) days, but may be extended, though not reduced, if circumstances warrant. During the period of time that Consultant is in default, the City shall hold all invoices and shall, when the default is cured, proceed with payment on the invoices. In the alternative, the City may, in its sole discretion, elect to pay some or all of the outstanding invoices during the period of default. If Consultant does not cure the default, the City may take necessary steps to terminate this Agreement under this Article. Any failure on the part of the City to give notice of the Consultant’s default shall not be deemed to result in a waiver of the City’s legal rights or any rights arising out of any provision of this Agreement.

7.3 Retention of Funds.

Consultant hereby authorizes City to deduct from any amount payable to Consultant (whether or not arising out of this Agreement) (i) any amounts the payment of which may be in dispute hereunder or which are necessary to compensate City for any losses, costs, liabilities, or damages suffered by City, and (ii) all amounts for which City may be liable to third parties, by reason of Consultant’s acts or omissions in performing or failing to perform Consultant’s obligation under this Agreement. In the event that any claim is made by a third party, the amount or validity of which is disputed by Consultant, or any indebtedness shall exist which shall appear to be the basis for a claim of lien, City may withhold from any payment due, without liability for interest because of such withholding, an amount sufficient to cover such claim. The failure of City to exercise such right to deduct or to withhold shall not, however, affect the obligations of the Consultant to insure, indemnify, and protect City as elsewhere provided herein.

7.4 Waiver.

Waiver by any party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any party of any breach of the provisions of this Agreement shall not constitute a waiver of any other provision or a waiver of any subsequent breach or violation of any provision of this Agreement.

Acceptance by City of any work or services by Consultant shall not constitute a waiver of any of the provisions of this Agreement. No delay or omission in the exercise of any right or remedy by a non-defaulting party on any default shall impair such right or remedy or be construed as a waiver.

Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement. 01007.0006 2180822.1 -14-

7.5 Rights and Remedies are Cumulative.

Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party.

7.6 Legal Action.

In addition to any other rights or remedies, either party may take legal action, in law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. Notwithstanding any contrary provision herein, Consultant shall file a statutory claim pursuant to Government Code Sections 905 et. seq. and 910 et. seq., in order to pursue a legal action under this Agreement.

7.7 Termination Prior to Expiration of Term.

This Section shall govern any termination of this Agreement except as specifically provided in the following Section for termination for cause. The City reserves the right to terminate this Agreement at any time, with or without cause, upon thirty (30) days’ written notice to Consultant, except that where termination is due to the fault of the Consultant, the period of notice may be such shorter time as may be determined by the Contract Officer. In addition, Consultant may terminate this Agreement if and only if all of the following criteria are met: (i) City is in default under the terms of this Agreement; (ii) Consultant has given City thirty (30) days’ written notice (or longer, if circumstances warrant) of the default and the reasons for the default; and (iii) City has failed to cure the default within said cure period. Upon receipt of any notice of termination, Consultant shall immediately cease all services hereunder except such as may be specifically approved by the Contract Officer. Except where the Consultant has initiated termination, the Consultant shall be entitled to compensation for all services rendered prior to the effective date of the notice of termination and for any services authorized by the Contract Officer thereafter in accordance with the Schedule of Compensation or such as may be approved by the Contract Officer, except as provided in Section 7.3. In the event the Consultant has initiated termination, the Consultant shall be entitled to compensation only for the reasonable value of the work product actually produced hereunder. In the event of City’s termination without cause pursuant to this Section, the City need not provide the Consultant with the opportunity to cure pursuant to Section 7.2.

7.8 Termination for Default of Consultant.

If termination is due to the failure of the Consultant to fulfill its obligations under this Agreement, City may, after compliance with the provisions of Section 7.2, take over the work and prosecute the same to completion by contract or otherwise, and the Consultant shall be liable to the extent that the total cost for completion of the services required hereunder exceeds the compensation herein stipulated (provided that the City shall use reasonable efforts to mitigate such 01007.0006 2180822.1 -15-
damages), and City may withhold any payments to the Consultant for the purpose of set-off or partial payment of the amounts owed the City therefor.

7.9 Attorneys’ Fees.

If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorney’s fees. Attorney’s fees shall include attorney’s fees on any appeal, and in addition a party entitled to attorney’s fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment.

ARTICLE 8. CITY OFFICERS AND EMPLOYEES: NON-DISCRIMINATION

8.1 Non-liability of City Officers and Employees.

No officer or employee of the City shall be personally liable to the Consultant, or any successor in interest, in the event of any default or breach by the City or for any amount which may become due to the Consultant or to its successor, or for breach of any obligation of the terms of this Agreement.

8.2 Conflict of Interest.

Consultant covenants that neither it, nor any officer or principal of its firm, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Consultant’s performance of services under this Agreement. Consultant further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent or subcontractor without the express written consent of the Contract Officer. Consultant agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement.

No officer or employee of the City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to the Agreement which affects her/his financial interest or the financial interest of any corporation, partnership or association in which (s)he is, directly or indirectly, interested, in violation of any State statute or regulation. The Consultant warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement.

8.3 Covenant Against Discrimination.

Consultant covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry or other protected class in the performance of 01007.0006 2180822.1 -16-
this Agreement. Consultant shall take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry or other protected class.

8.4 Unauthorized Aliens.

Consultant hereby promises and agrees to comply with all of the provisions of the Federal Immigration and Nationality Act, 8 U.S.C.A. §§ 1101, et seq., as amended, and in connection therewith, shall not employ unauthorized aliens as defined therein. Should Consultant so employ such unauthorized aliens for the performance of work and/or services covered by this Agreement, and should any liability or sanctions be imposed against City for such use of unauthorized aliens, Consultant hereby agrees to and shall reimburse City for the cost of all such liabilities or sanctions imposed, together with any and all costs, including attorneys’ fees, incurred by City.

ARTICLE 9. MISCELLANEOUS PROVISIONS

9.1 Notices.

Any notice, demand, request, document, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class mail, in the case of the City, to the City Manager and to the attention of the Contract Officer (with her/his name and City title), City of Carson, 701 East Carson, Carson, California 90745 and in the case of the Consultant, to the person(s) at the address designated on the execution page of this Agreement. Either party may change its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated at the time personally delivered or in seventy-two (72) hours from the time of mailing if mailed as provided in this Section.

9.2 Interpretation.

The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply.

9.3 Counterparts.

This Agreement may be executed in any number of counterparts and each of such counterparts shall for all purposes be deemed to be an original, whether the signatures are originals, electronic, facsimiles or digital. All such counterparts shall together constitute but one and the same Agreement.

9.4 Integration; Amendment.

This Agreement including the attachments hereto is the entire, complete and exclusive expression of the understanding of the parties. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements and understandings, if any, between the parties, and none shall be used to interpret this Agreement. No amendment to or modification 01007.0006 2180822.1 -17-
of this Agreement shall be valid unless made in writing and approved by the Consultant and by the City Council. The parties agree that this requirement for written modifications cannot be waived and that any attempted waiver shall be void.

9.5 Severability.

In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless.

9.6 Warranty & Representation of Non-Collusion.

No official, officer, or employee of City has any financial interest, direct or indirect, in this Agreement, nor shall any official, officer, or employee of City participate in any decision relating to this Agreement which may affect his/her financial interest or the financial interest of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any State or municipal statute or regulation. The determination of “financial interest” shall be consistent with State law and shall not include interests found to be “remote” or “non-interests” pursuant to Government Code Sections 1091 or 1091.5. Consultant warrants and represents that it has not paid or given, and will not pay or give, to any third party including, but not limited to, any City official, officer, or employee, any money, consideration, or other thing of value as a result or consequence of obtaining or being awarded any agreement.

Consultant further warrants and represents that (s)he/it has not engaged in any act(s), omission(s), or other conduct or collusion that would result in the payment of any money, consideration, or other thing of value to any third party including, but not limited to, any City official, officer, or employee, as a result of consequence of obtaining or being awarded any agreement. Consultant is aware of and understands that any such act(s), omission(s) or other conduct resulting in such payment of money, consideration, or other thing of value will render this Agreement void and of no force or effect.

Consultant’s Authorized Initials _______

9.7 Corporate Authority.

The persons executing this Agreement on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties. [SIGNATURES ON FOLLOWING PAGE]
01007.0006 2180822.1 A-1
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first-above written.

CITY:

CITY OF CARSON, a municipal corporation

Lula Davis-Holmes, Mayor
ATTEST:

Dr. Khaleah K. Bradshaw, City Clerk
APPROVED AS TO FORM:

ALESHIRE & WYNDER, LLP

Sunny K. Soltani, City Attorney
[pks; rjl]
CONSULTANT:

Z & K CONSULTANTS, INC., a California
corporation
By:

Name:

Title:

By:

Name:

Title:

Address: 17130 Van Buren Blvd., #11
Riverside, CA 92504
Two corporate officer signatures required when Consultant is a corporation, with one signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. APPROPRIATE ATTESTATIONS

SHALL BE INCLUDED AS MAY BE REQUIRED BY THE BYLAWS, ARTICLES OF INCORPORATION, OR OTHER RULES OR REGULATIONS APPLICABLE TO CONSULTANT’S BUSINESS ENTITY. 01007.0006 2180822.1 A-2
EXHIBIT “A”

SCOPE OF SERVICES
I. Consultant will perform the following services and any additional Services outlined in the Proposal, in connection with City’s Request for Qualification (RFQ26-011Q), Construction Management and Inspection Services for Capital Improvement Project No. 1636 Mills Park Site Improvements and Project No. 1795 Mills Park Building Renovations and Building Perimeter Site Improvements:

A. General construction management services include, but not limited to:

1. Review plans, specifications, and all documents included in the bid package

2. Coordinating and conducting Pre-Construction meetings.

3. Preparation and distribution of meeting minutes.

4. Quality assurance and quality control.

5. Administration and management of construction contracts.

6. Ensure construction efforts are completed per approved plans, on-schedule, and onbudget.

7. Ensure that local and state inspections have been completed as necessary.

8. Review construction schedule, including activity sequences and duration, schedule of submittals and delivery schedule of long lead materials and equipment. Review contractor’s updates and revisions as may be required to reflect actual progress of work.

9. Provide construction schedule and budget updates to City’s Contract Officer.

10. Schedule and conduct progress meetings to discuss contract issues, procedures, progress, problems, Construction Change Orders (CCO), submittals, requests for information (RFIs), deficiencies and schedules.

11. Process, review and approve contractor’s submittals for City staff. Process and review project design consultant’s submittals and provide recommendation to the City.

12. Process, review, and track RFIs, submittals, shop drawings, proposed change orders and revisions, and provide recommendation to the City.

13. Review, evaluate and recommend approval for proposed CCOs. Review estimates for reasonableness and cost effectiveness and render recommendations to City.

Administrate contracts, process CCOs (provide merit determination, quantification of cost and schedule impacts, render recommendations), review pay requests for accuracy. 01007.0006 2180822.1 A-3

14. Maintain cost accounting records on authorized work performed under contract unit costs and additional work performed based on actual costs of time (labor) and materials (T&M).

15. Review contractor submittals for extra or unforeseen work. Review potential CCO for accuracy and provide recommendation(s) to the City’s Construction Management and Inspection Services Project Manager for proper course of action and processing of CCOs.

16. Assist City in coordinating services of other consultants (design, geotechnical, National Pollutant Discharge Elimination System (NPDES), materials testing, inspection, special laboratory, etc.) that may be hired or selected for the project.

17. Coordinate with project designer the contractor’s requests for interpretation or clarification of meaning and intent of project plans and specifications.

18. Coordinate construction activities with City’s Public Works Maintenance Department.

19. Coordinate and oversee public notifications and public inquiries.

20. Establish and implement job safety procedures in compliance with CAL-OSHA requirements. Monitor contractor’s compliance with established safety program, respond to deficiencies and hazards, and investigate and report on accidents.

21. Track quantities of work completed for progress payment(s). Develop and implement procedures for review and processing of progress payment applications. Assist the City with review(s) and certification for payment(s).

22. Establish procedures and monitor contractor compliance with federal and state prevailing wage regulations and requirements.

23. Provide a recovery plan and/or work-around schedule as necessary to mitigate any project impacts.

24. Confirm delivery and storage of all materials, supplies, and equipment.

25. Provide recommendation and assistance to the city and the Design/Engineering Team in resolving any dispute(s) arising from the performance of the contractor and subcontractors.

26. Ensure that the Prime/General Contractor has an appropriate safety program in place.

27. Recommend the accrual and assessment of Liquidated Damages as necessary.

28. City’s Construction Manager shall manage and coordinate with contractor the project Substantial Completion Punchlist.
01007.0006 2180822.1 A-4

29. Provide a Construction Project Close-Out Report with all construction-related project documents.

B. Inspection services (as part of Construction Management Services) include, but not limited to:

30. Become familiar with construction documents, traffic control plans, construction schedules, construction sequences, and permit requirements from other agencies.

31. Photograph and log a pre-work video documenting existing conditions prior, during, and after construction.

32. Attend pre-construction meetings and present special concerns, if any.

33. Interpret plans, specifications and regulations and ensure that contractors and subcontractors are following their contracts, and any Federal, State, or local regulations in effect at time work is performed.

34. Inspect construction activities to ensure projects are constructed in accordance with the approved construction documents (including, but not limited to plans, specifications, as- built drawings, reports, etc.).

35. Document in writing and notify construction contractors about non-compliance; and direct Contractor in writing to correct non-compliance items as soon as they are discovered. Maintain a status log of all non-compliant items discovered and identified during the performance of this project.

36. Prepare and maintain daily Inspection Reports showing site and weather conditions; traffic control measures taken by contractors; labor (record headcount of prime contractor and subcontractors/vendors), equipment and materials used; quantity of work performed; and major incidents/safety violations. Daily Inspection Reports shall be submitted to City upon project completion.

37. Review and maintain record of construction progress on a regular basis; verify schedules are on track with project milestones; identify deviations; and ensure that corrective actions are taken to bring projects back on schedule.

38. Provide accurate measurements of work completed by contractors in accordance with contract documents.

39. Review soil compaction and materials testing certifications of compliance (COC).

40. Coordinate with materials testing firms regarding quality of work completed.

41. Ensure that contractors do not install materials without approved material testing certifications. Any failed tests shall be reported to the City, and Consultant shall direct contractor to take correction measures to achieve compliance. 01007.0006 2180822.1 A-5

42. Monitor contractors’ utility coordination to minimize utility conflict delays and potential need for utility relocations. Report potential conflicts to utilities and advise them to relocate or remove conflicting utilities and report outcome to City.

43. Coordinate with contractor access to adjacent businesses/residents during construction.

44. Provide inspection of traffic control, channelization, and all other traffic-related work.

45. Observe construction safety, public safety and convenience, and report discovered problems to City.

46. Monitor compliance with the City’s NPDES permits and requirements. Monitor compliance with all other local, state, and federal laws and regulations.

47. Monitor compliance with City’s Construction Demolition and Recycling Ordinance, including State requirements for organic waste diversion.

48. Maintain data for change orders and record information regarding time of dispute, time of notification by contractor, and action taken by inspector.

49. Coordinate preparation and submittal of “As-Built” plans to City upon project completion.

50. Prepare and issue preliminary and final punch list, including schedule for punch list completion. Monitor and follow through with contractor until completion of all punch list items.

51. Evaluate completion of work and recommend to City when work is ready for final inspection.

52. Conduct final inspection/walk-through with City staff.

53. Secure and transmit required guarantees, certifications, affidavits, leases, easement deeds, operating & maintenance manuals, warranties, and other documents as stipulated in contract documents.

C. Construction material testing (as part of Construction Management Services) include, but not limited to:

54. Review, recommend and implement testing lab studies and reports.

55. Collect concrete samples and test their strength.

56. Provide soil testing services.

57. Check subgrade compaction for concrete and asphalt construction.

58. Perform tests for sieve analysis, sand equivalent and cleanness, as needed. 01007.0006 2180822.1 A-6

59. Perform plant inspection at facilities supplying concrete and hot mix asphalt.

60. Provide summary report of testing results.

61. Verify that sampling and testing procedures are being performed properly.

62. Verify certifications of samplers and testers.

63. Perform split sample tests as necessary.

64. Maintain witness test records.

65. Verify that all testing equipment used for acceptance testing is in good condition and properly calibrated.

66. Verify that all plant inspections are being performed correctly by qualified testers.

67. Provide summary report of quality assurance results.

II. As part of the Services, Consultant will prepare and deliver the following tangible work products to the City:

1. See Section I of the Scope of Services.

III. In addition to the requirements of Section 6.2, during performance of the Services, Consultant will keep the City apprised of the status of performance by delivering the following status reports:

1. See Section I of the Scope of Services.

2. Meeting minutes

3. Construction schedule and budget updates

4. Construction Project Close-Out Report

5. Inspection Reports

6. Accurate measurement of work completed

7. Summary report of test results

8. Summary report of quality assurance results

9. Summary report of building & safety inspections (open, closed, failed, etc.) IV. All work product is subject to review and acceptance by the City, and must be revised by the Consultant without additional charge to the City until found satisfactory and accepted by City.
01007.0006 2180822.1 A-7
V. Consultant will utilize the following personnel to accomplish the Services:

1. Zack Faqih, Construction Manager

2. Jesse Guzman, Construction Inspector

3. Adrian Galinari, Office Construction Project Engineer

4. Tom Dawson, Specialty Inspector

5. Converse Consultants, Subcontractor, Materials Testing 01007.0006 2180822.1 B-1
EXHIBIT “B”

SPECIAL REQUIREMENTS
(Superseding Contract Boilerplate)
The Agreement is hereby amended as follows (deletions shown in strikethrough and additions shown in bold italics):

I. A new Section 1.10 (Compliance with Labor and Wage Laws) is hereby added to the Agreement to read in its entirety as follows:
“1.10 Compliance with Labor and Wage Laws.

Certain portions of the Services may be subject to prevailing wages under the Labor Code and to the extent such is true, the below provisions will apply. (a) Public Work. The Parties acknowledge that the work to be performed under this Agreement is a “public work” as defined in Labor Code Section 1720 and that this Agreement is therefore subject to the requirements of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works contracts and the rules and regulations established by the Department of Industrial Relations (“DIR”) implementing such statutes. The work performed under this Agreement is subject to compliance monitoring and enforcement by the DIR. Consultant shall post job site notices, as prescribed by regulation. (b) Registration with DIR. Pursuant to Labor Code section 1771.1, Consultant and all subcontractors must be registered with, and pay an annual fee to, the DIR prior to and during the performance of any work under this Agreement.
(c) Prevailing Wages. Consultant shall pay prevailing wages to the extent required by Labor Code Section 1771. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages are on file at City Hall and will be made available to any interested party on request. By initiating any work under this Agreement, Consultant acknowledges receipt of a copy of the DIR determination of the prevailing rate of per diem wages, and Consultant shall post a copy of the same at each job site where work is performed under this Agreement. If this Agreement is subject to the payment of federal prevailing wages under the Davis-Bacon Act (40 U.S.C. § 3141 et seq.), then Consultant shall pay the higher of either the state for federal prevailing wage applicable to each laborer.
(d) Penalty for Failure to Pay Prevailing Wages. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Consultant shall, as a penalty to the City, forfeit two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Consultant or by any subcontractor.
(e) Payroll Records. Consultant shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Consultant and each subcontractor to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 01007.0006 2180822.1 B-2
1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform the City of the location of the records.
(f) Apprentices. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1777.5, 1777.6, and 1777.7 and California Code of Regulations Title 8, Section 200 et seq. concerning the employment of apprentices on public works projects. Consultant shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations.

Prior to commencing work under this Agreement, Consultant shall provide City with a copy of the information submitted to any applicable apprenticeship program. Within sixty (60) days after concluding work pursuant to this Agreement, Consultant and each of its subcontractors shall submit to the City a verified statement of the journeyman and apprentice hours performed under this Agreement.
(g) Eight-Hour Work Day. Consultant acknowledges that eight (8) hours labor constitutes a legal day’s work. Consultant shall comply with and be bound by Labor Code Section 1810.
(h) Penalties for Excess Hours. Consultant shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours.

Consultant shall, as a penalty to the City, forfeit twenty-five dollars ($25) for each worker employed in the performance of this Agreement by Consultant or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code section 1815, work performed by employees of Consultant in excess of eight (8) hours per day, and forty (40) hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of 8 hours per day at not less than one and one-half (1½) times the basic rate of pay.
(i) Workers’ Compensation. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees if it has employees. In accordance with the provisions of California Labor Code Section 1861, Consultant certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake selfinsurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.” (j) Consultant’s Responsibility for Subcontractors. For every subcontractor who will perform work under this Agreement, Consultant shall be responsible for such subcontractor’s compliance with Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code, and shall make such compliance a requirement in any contract with any subcontractor for work under this Agreement. Consultant shall be required to take all actions necessary to enforce such contractual provisions and ensure subcontractor’s compliance, including without limitation, conducting a review of the certified payroll records of the subcontractor on a periodic basis or upon becoming aware of the failure of the subcontractor to pay his or her workers the specified 01007.0006 2180822.1 B-3
prevailing rate of wages. Consultant shall diligently take corrective action to halt or rectify any such failure by any subcontractor.”
01007.0006 2180822.1 C-1
EXHIBIT “C”

SCHEDULE OF COMPENSATION
I. Consultant shall perform the following tasks at the following rates:

II. Within the budgeted amounts for each Task, and with the approval of the Contract Officer, funds may be shifted from one Task sub-budget to another so long as the Contract Sum is not exceeded per Section 2.1, unless Additional Services are approved per Section 1.8.

III. The City will compensate Consultant for the Services performed upon submission of a valid invoice. Each invoice is to include:

1. Line items for all personnel describing the work performed, the number of hours worked, and the hourly rate.

2. Line items for all materials and equipment properly charged to the Services.

3. Line items for all other approved reimbursable expenses claimed, with supporting documentation.

4. Line items for all approved subcontractor labor, supplies, equipment, materials, and travel properly charged to the Services.

IV. The total compensation for the Services shall not exceed $500,720.00 as provided in Section 2.1 of this Agreement.

V. The Consultant’s billing rates for all personnel are attached as Exhibit C-1. 01007.0006 2180822.1 C-2
EXHIBIT C-1
CONSULTANT’S BILLING RATES
I. Consultant’s and subcontractors’ rates are as follows:
01007.0006 2180822.1 C-3
01007.0006 2180822.1 C-4
01007.0006 2180822.1 C-5
01007.0006 2180822.1 D-1
EXHIBIT “D”

SCHEDULE OF PERFORMANCE
I. Consultant shall perform all services timely in accordance with the following schedule:

All Services will be completed within sixty (60) calendar days after the Notice of Completion is filed.

II. Consultant shall deliver the following tangible work products to the City by the following dates.

See Section I of the Scope of Services.

III. The Contract Officer may approve extensions for performance of the services in accordance with Section 3.2.

RESOLUTION NO. 26-099

A RESOLUTION OF THE CITY OF CARSON CITY COUNCIL AMENDING THE FISCAL YEAR 2026–27 BUDGET IN THE GENERAL FUND, SPECIAL REVENUE

FUNDS, AND THE CAPITAL IMPROVEMENT PROGRAM (CIP) FUND
WHEREAS, the City Council adopted the Fiscal Year 2026-27 budget on June 16, 2026, for the General Fund and Special Revenue Funds of the City via Resolution No. 26-063; and WHEREAS, the City Council desires to amend the Fiscal Year 2026-27 budget; and WHEREAS, the City Council has determined it necessary to amend the Fiscal Year 2026-27 General Fund budget, Special Revenue Funds, Enterprise Funds, and Capital Improvement Program (CIP) budget.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF CARSON DOES HEREBY RESOLVE, FIND, DETERMINE, AND ORDER AS FOLLOWS:

Section 1. The following amendment(s) will be made to the City’s Fiscal Year 2026-27 budget.

Account Description Increase/(Decrease)
101-99-999-904-8008-PW1636 Improvements Other Than Bldg ($2,000,000.00) 101-99-999-904-8005-PW1795 Improvements Other Than Bldg ($2,000,000.00) 101-99-999-904-6004-PW1852 Professional Services $500,000.00 101-99-999-904-8019-PW1452 Bus/Bike Lane & Related CIP $2,303,000.00 101-99-999-904-8023-PW1657 CIP - Traffic Signal $1,197,000.00 289-99-999-999-3601 DIF Fund Balance ($5,699,000.00)
289-99-999-904-8008-PW1368 Improvements Other Than Bldg $870,000.00 289-99-999-904-8008-PW1636 Improvements Other Than Bldg $2,000,000.00 289-99-999-904-8005-PW1795 Improvements Other Than Bldg $2,000,000.00 289-99-999-904-8019-PW1452 Bus/Bike Lane & Related CIP $500,000.00 289-99-999-904-8023-PW1657 CIP - Traffic Signal $300,000.00 289-99-999-904-8008-PW1726 Improvements Other Than Bldg $29,000.00 Section 2. The City Clerk shall certify the adoption of this resolution and shall keep a copy of this resolution attached to the Fiscal Year 2026-27 budget on file, and effective as of October 6, 2026, the same shall be in force and effect.

PASSED, APPROVED, and ADOPTED this 6th day of October, 2026.

APPROVED AS TO FROM:CITY OF CARSON:
_________________________ ________________________
Sunny K. Soltani, City Attorney Lula Davis-Holmes, Mayor ATTEST:
______________________________
Dr. Khaleah K. Bradshaw, City Clerk

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.

CITY OF CARSON )
I, Dr. Khaleah K. Bradshaw, City Clerk of the City of Carson, California, hereby attest to and certify that the foregoing resolution, being Resolution No. 26-099 adopted by the City of Carson City Council at its meeting held on October 6, 2026 by the following vote:

AYES: COUNCIL MEMBERS:

NOES: COUNCIL MEMBERS:

ABSTAIN: COUNCIL MEMEBES:

ABSENT: COUNCIL MEMBERS:
_____________________________
Dr. Khaleah K. Bradshaw, City Clerk
CITY OF CARSON 701 East Carson Street
Report to Honorable Mayor and City Council
Tuesday, October 6, 2026, 5:00 PM
DISCUSSION 31.

To: Honorable Mayor and City Council
From: Saron Shiferaw, Senior Clerk CMO Administration
Subject: CONSIDER AN UPDATE ON CITY PROJECTS (CITY COUNCIL) I. SUMMARY
This report transmits a monthly ongoing informational update to the City Council, at Mayor Davis-Holmes’ request, regarding various City projects that are underway or will begin soon. Detailed updates on projects are provided in the following City function areas: Community Development Department (Exhibit 1), Public Works Department (Exhibit 2), Information Technology Department (Exhibit 3), and the Public Safety Department within the City Manager’s Office (Exhibit 4)
II. RECOMMENDATION
RECEIVE and FILE this report.

III. ALTERNATIVES
TAKE another action the City Council deems appropriate and that is consistent with applicable laws.

IV. BACKGROUND
The projects included in this report are meant to provide an update on current projects underway and those that will begin soon.

V. FISCAL IMPACT
The purpose of this item is to provide information only and there is no direct fiscal impact associated with this staff report. Most of the projects included within this report have fiscal impacts and these expenditures have either already been approved by the City Council or will be presented to the City Council for approval once ready and as needed. Any item that staff identifies as needing additional or new funding beyond the budgets that were previously approved by the City Council will be addressed separately from this report.

VI. EXHIBITS

1. Community Development Projects

2. Public Works Projects

3. Information Technology and Security Projects

4. Emergency Management and Public Safety Projects
Attachments
Community Development Projects
Public Works Projects
Information Technology and Security Projects
Emergency Management and Public Safety Projects

COMMUNITY & ECONOMIC DEVELOPMENT

PROJECT STATUS REPORT
October 10, 2026

CITY COUNCIL

Page 1 of 22 ends

Planning Division
# Name Description Status
1 D1
Envision Carson
Apartments
Manhattan Square
Townhomes
21207 S. Avalon Blvd. Existing: 27.31 acres. Proposed:
1,115 residential dwelling units (consisting of 351
townhomes, 764 apartments), 10,000 square feet of
restaurant area, and 111,581 square feet of publicly
accessible but privately maintained open space
Temporary CofO issued for model
homes. Grand opening for Product A,
B, and D models occurred July 11, 2026
Approved CofO for Phase 1 units.

Planning staff conducted site visit for
Product C models and Phase 1 occurred
on Aug. 26, 2026.

Under Construction - Estimated
completion 24 months.

Building C-D building submittal
forthcoming. Amended and Restated
DA and assignments completed June
24, 2026
Remaining phases of Townhomes in
plan check – revisions to solar,
recreation area. First phase
anticipated mid-September
Six-month deferral issued on signal
COA on April 6 to allow temporary
CofOs for townhome product.

Grace Avenue improvements required
prior to first CofO for any building. Staff
met with PW team to discuss. COA
cleared.

Reimbursement agreement for Lennar
approved.

Amended and Restated Development
Agreement approved by City Council
April 7, 2026.

Waiting on Grace Ave. encroachments.

Community & Economic Development Project Status Report
October 10, 2026

CITY COUNCIL

Page 2 of 22 ends

Planning Division
# Name Description Status
Completing reimbursement agreement
review process for Lennar.
2 D4
Carson Triangle
Kott property at
Avalon and 213th St.
21140 S. Avalon Blvd. Existing: automobile dealerships
and vehicle storage. Proposed: 315-unit residential
project including 283 townhomes and 32 very lowincome affordable rental units on 14 acres. No proposal has been received on the remaining parcels
Affordable housing covenant executed.

Faring to develop affordable parcel
Under Construction - Estimated
completion 20 months. Demolition
complete
Building permits stamped ok to plan
check only on April 6. Outstanding
COAs
Final Map in Progress – recordation
pending provision of adequate
recreation amenities, drainage
easement declaration, and other COAs.

3 D1
The District Specific
Plan Amendment
Carson Goose
Owner LLC
Cells 3, 4 and 5.

Existing: Former landfill. Proposed: Cells 3, 4 and 5
will contain 1,567,090 square feet of light industrial
development including 75,000 square feet of office
space and approximately 12 acres of publicly
accessible but privately owned and maintained open
space community amenity areas and 10,000 square
feet of commercial/retail uses, 12,600 square feet of
restaurants
In Plan Check
(Specific Plan Planning Areas 3)
Lenardo Street improvements – second
plan check for rough grading approved,
structural footings, traffic signal
location adjustments review in
progress, and Del Amo median
improvements in plan check with
public works – planning approved.

August 11, 2026, PC held public hearing
and recommended approval of Specific
Plan Amendment, Amended and
Restated DA, and related applications
CC approved Specific Plan
Amendment, Amended and Restated
DA, and related applications on 9/1/26
and the Second Reading for SPA, AR-DA
was approved on 9/15/26
4 D2
Kim Family Trust 21240-21250 Main St. Existing: Vacant lot. Proposed:
19-unit market rate apartment consisting of two
separate three-story buildings with at grade parking
Under Construction. Anticipate
completion by end of year.
5 D2
Golden State
Alliance, LLC
138 W. 223rd St. Existing: Single Family Residence.

Proposed: Ten (10) attached condominiums consisting
Closed due to inactivity.

Community & Economic Development Project Status Report
October 10, 2026

CITY COUNCIL

Page 3 of 22 ends

Planning Division
# Name Description Status
of two separate buildings with all market rate units, at grade 2 car garages, guest parking and private
driveway
6 D1
Chevron 17453-17455 Central Ave. Existing: Chevron service station with McDonald’s restaurant. Proposed: Add a
new self-service car wash
Approved by Planning Commission
7 D3
21611 Perry Street
LLC
21611 S. Perry St. Existing: Vacant lot. Proposed: Self storage facility comprised of approximately 120,000
SF in a mix of one and two-story buildings and a 5,000
SF retail component. New application submitted
requesting 62 residential condominium units
Approved. Residential application for
62 units was approved by Planning
Commission and City Council. DA fully
executed on 9/15/25. Agreement to
Conditions executed on 9/15/25. Site
is subject to a CLRRA agreement.

Site is subject to a CLRRA agreement.

Deposit replenishment on 7/21/25.

Faring is transferring property to
Lennar May 2026 (pending). Lennar
will coordinate cleanup with DTSC
through CLRRA process. Cleanup has
not started. Construction schedule
pending approval of Remediation
Action Plan by DTSC.

Lennar assume DA and
establish reimbursement agreement.
8 D2
Carson Main Street
LLC
20601 S. Main St. Existing: Vacant lot (formerly KL
Fenix). Proposed: Three industrial buildings comprised
of approximately 256,000 square feet including
137,000 square feet of warehouse, 92,000 square feet
of manufacturing, 23,000 square feet of office, and
4,000 square-foot retail pad with 419 parking spaces,
18 dock doors, 6 at grade doors, and 3 trailer stalls
Approved. Pending plan check
submittal
9 D3
Watson Land 2277 E. 220th St. Existing: two-story office buildings.

Proposed: One 58,937 SF industrial building with 73
parking spaces and 12 dock doors. Development
Agreement requesting increase in FAR from 0.4 to 0.5
Under construction Planning
Commission approved on 11/25/25.
10 D4
Prologis 24760 Main St., Permit trucking activities (existing building) within 100 feet from residential properties
Complete
11 D4
LiT 9th St. 223rd
Carson LP
2104 E. 223rd St. Existing: Former Poly One
Corporation facility. Proposed: one industrial building comprised of approximately 130,000 square feet
including 124,324 square feet of warehouse, 5,000
square feet of office, 5,000 square feet of mezzanine
with 122 parking stalls and 15 dock doors
Construction complete.
12 D3

BSREP III
Dominguez, LLC
2001 E. Dominguez St. Existing: Western Tube &
Conduit Corporation. Proposed: one industrial
Complete
Community & Economic Development Project Status Report
October 10, 2026

CITY COUNCIL

Page 4 of 22 ends

Planning Division
# Name Description Status
building comprised of approximately 424,000 square
feet including 408,990 square feet of warehouse,
15,000 square feet of office with 283 parking stalls,
136 trailer parking stalls and 68 dock doors
13 D3
California Water
Service Group
21718 S. Alameda St. California Water has completed
construction of a new groundwater production well to
provided potable water to the public. Water quality of
a new well has been established and has provided
design parameters for the future onsite
improvements. A new building will be used to house
the well appurtenances, electrical, controls and
pumping equipment. The preliminary building will be
approximately 1,000 square feet
In Plan Check
14 D4
Avocet Battery 23320 Alameda. Existing: Aggregate recycling center.

Proposed: A 200-megawatt Battery Energy Storage
system on an approximately seven-acre site that will
help augment Edison during power shortages
Approved. In Plan Check. Conditions
under review. AMMR approved. CAO
confirmed License Agreement is not
needed since applicant has an
agreement with railroad for
encroachment purposes. All required
fees paid. In Plan check for landscape,
grading, demolition, and walls.

Demolition plans approved.
15 D1
Ormat for VESI 18800 Broadway. Existing: Industrial/topsoil supplier operation. Proposed: A 100-megawatt Battery Energy
Storage system on an approximately three-acre site
that will help augment Edison during power
shortages
Approved. In Plan Check. Grading
plans and wall details in plan check
Item scheduled for 3/10/26 PC public
hearing meeting and PC approved
denial in 5-2 vote. An appeal to be
heard by the CC was submitted on
3/23/26. Under review. Appeal heard
on 5/5/26. Approval resolution with DA
additional community benefits/point
of sale & 1st reading of DA approval
ordinance occurred on 5/20/26.
5/20/26 CC in 3-2 vote restored DA to
original with CC community benefits
and applicant’s defined point of sale.

On 6/3/26, the 2nd reading ordinance
was adopted.
16 D2
Chris Barker 605 W. 228th St. Proposed closure of existing Ocean Villa mobile home park
PAR considered withdrawn (inactive)
17 D1
Carson TH 18101 Avalon Blvd. Existing: Religious institution.

Proposed: A 30-unit condominium development
Project closed April 4, 2026, due to
inactivity
Community & Economic Development Project Status Report
October 10, 2026

CITY COUNCIL

Page 5 of 22 ends

Planning Division
# Name Description Status
18 D2
Maupin
Development
215 W. Carson Street. Existing: 64,500 SF (4 lots),
comprised of 3 single-family homes, storage sheds and
an unpaved empty lot. Proposed: 35 Townhomes –
two floors over parking; 29 units/3 bedrooms; 6
units/2 bedrooms with common and private open
space
Approved. Applicant working with
Engineering to schedule Final Map to
CC. Landscape in plan check
Obtained approval for a one-year
extension of time application.
19 D1
Anastasi 336 E. Carson Street. Existing: 90,000 SF (lot), formerly a collection of automotive repair businesses within
two multi-tenant buildings measuring a total of 40,000
SF. Proposed: 50 Townhomes – two floors over
parking; all 3 bedrooms/2 baths with common and
private opens space
Approved. Applicant working with
Engineering to schedule Final Map to
CC. Obtained approval for a one-year
extension of time application.
20 D4
Infinity CF, LLC 23820 Avalon Blvd. Existing: Former Scottsdale Discount Center building. Proposed: Two lot
subdivision with a proposed Starbucks on one parcel
and a carwash on the other
Construction complete.
21 D2
DOR 1959-24, TTM
1000008-24
21135 ½ Bolsa Ave., Eight (individual) single-family
residences (SFR)
Concurrence letter signed. On 12/9/25
Planning Commission continued the
matter. Community meeting held
6:30PM on March 4, 2026, at Carson
Park Activity Room. Follow-up
Community Meeting required.

Applicant preparing redesign in
response to community concerns.
22 D2
Vinfast 2009 East 223rd St. Vinfast electric car showroom, service center, and car storage for delivery to
customers
Site vacated (business decision).

Vinfast has submitted a letter to the
City stating they will be vacating the
site by end of June 2025. 07/29/25
staff conducted a site visit, confirmed
unoccupied, and noted the property is
for sale.
23 D2
SyWest 20100 Figueroa St. (placeholder address 20151 Main St.) Specific Plan, General Plan Amendment,
Development Agreement, DOR for development of a
big box user and associated retail
Under Review
The preparation of the Specific Plan
and technical studies for the DEIR are
underway.
24 D4
Carson Hospitality
Group Inc.
888 E. Dominguez St. Existing: Vacant restaurant.

Proposed: Marriot TownePlace Suites Hotel and new
bar/lounge, (111 key) and Tentative Parcel Map
(TPM) to split one lot into two so that the new hotel
Hotel development project
withdrawn/closed out. Plan Check for
the new hotel expired. Applicant
allowed entitlement to expire. Related
Tentative Parcel Map (TPM) approved.

Applicant moving forward with TPM.

Community & Economic Development Project Status Report
October 10, 2026

CITY COUNCIL

Page 6 of 22 ends

Planning Division
# Name Description Status
25 D4
Target 20700 Avalon Blvd. Drive-up spaces Under Construction/Awaiting Final Inspection
26 D4
Air Products 23300 Alameda St. Hydrogen Pipeline Approved 27 D2
Birch Specific Plan 21809-21811 S. Figueroa St. Existing: Residential structures. Proposed: 4-story, 32-unit condominium
development with public seating & public art
Partially constructed and going
through ownership change.
28 D1
Argo Warehouse 439 W. Gardena Blvd. Existing: Vacant lot. Proposed:

New 3,754 SF warehouse
Under Construction
29 D4
Mobile Mini 22632 S. Alameda St. Construction of a cargo container storage facility that will consist of three
modular office units and a maintenance canopy
structure on a 14-acre site
Complete
30 D4
Air Products 23000 Alameda St. Existing: Industrial gas supplier.

Proposed: Construct a new 2,626 SF modular bldg.
with parking lot at the existing facility
Approved. In Plan Check
31 D4
Live Wire EV
dealership
20507 Belshaw Ave. EV Motorcycle Dealership (Live
Wire)
Approved. Operating
32 D4
Petroleum Tanks 2365 E. Sepulveda Blvd. Installation of two petroleum tanks at an existing tank farm. Capacity increasing
from 22 to 24 storage tanks
Under Construction
33 D4
AT&T Monopine
Foisia Park
23410 Catskill Ave. Wireless Communication antenna On Hold 34 D4
Hyundai Dealership 2201 E. 223rd St. Existing: Car dealership. Proposed:

New Service Building
Under Construction
35 D2
Grace Orthodox
Presbyterian Church
22511 Figueroa, A request for approval of a Tentative
Parcel Map to subdivide a 1.59-acre parcel into two
parcels
Approved
36 D1

South Bay Fleet
Specialist
17126 S. Broadway St. Conditional Use Permit to
operate an auto body and paint shop including a
paint spray booth located inside the existing
building.

Approved. Monitoring completion of
conditions of approval
37 D1

ASPCA Animal Clinic 16300 Figueroa St. Existing: Vacant Proposed:

Redevelop industrial site with a new animal clinic
Construction Complete
38 D1

PowerPlay Pickleball 19401 S. Main St. Existing: Industrial building.

Proposed: Redevelop site with a pickleball facility.

This is a three-phased project. Interior tenant
improvement: Indoor court and commercial areas
(Phase 1), clubhouse (Phase 2) and outdoor courts
(Phases 3). Commercial (10,264 SF) and court area
(30,663 SF)
Phase 1:

Ten (10) Indoor Courts
Closed. Business was closed by
business owner. Property owner is
considering reopening business and
completing development.

Phase 1: Ten (10) Indoor Courts
Status: Built
Commercial (10,264 SF) consists of
office, retail, employee areas, podcast
Community & Economic Development Project Status Report
October 10, 2026

CITY COUNCIL

Page 7 of 22 ends

Planning Division
# Name Description Status
Status: Built
Commercial (10,264 SF) consists of office, retail,
employee areas, podcast studio, athlete recovery
rooms, and seating area for juice bar portion
Status: Under construction
Phase 2:
6,878 SF Clubhouse includes a restaurant
Status: Approved
Phase 3:

Twenty-one (21) Outdoor Courts
Status: Under Review
studio, athlete recovery rooms, and
seating area for juice bar portion
Status: Under Construction
A temporary certificate of occupancy
(TCO) was issued while awaiting
completion of the second-floor space.

Phase 2: 6,878 SF Clubhouse includes a
restaurant has been approved by
Planning for obtaining permits.

Phase 3:

Withdrawn.

Applicant is not in business anymore.
39 D1
16325 -16407 S

MAIN ST
Renovate an existing 159,373 SF industrial building on
a 5.88-acre site including removing approx. 6,503 SF
of existing office/mezzanine/warehouse space,
exterior building facade improvement, interior tenant
improvement and site and landscaping
improvements. After renovation, the new building
footprint will be reduced to approx.138,616 SF. The
project also includes a lot line adjustment of the
parcels
Approved
40 D1

KB Home 427 E. 220th St. Willow (formerly Cambria Ct.)
Existing: Residential structures. Proposed: 35-unit
condominiums designed as 2-story detached homes
Construction complete.
41 D2
22511 Figueroa St. Specific Plan, DOR, Zone Change for 28-unit residential apartment development on a .69-acre lot
Under Review
42 D4

Carson Companies 1281 E. University Dr. at the northwest corner of University Dr. and Central Ave. Existing: Vacant site.

Proposal: 5-acre retail center development with
approx. 29,000 square feet of retail shops, 11,300
square feet of restaurant space, 25,500 square foot
Boys and Girls Club
Under Review
43 D4

Shippers 1150 E. Sepulveda Blvd. Existing: 20AC lot in the Manufacturing Heavy, GP Heavy Industrial zone.

Proposed: Request approval for a conditional use
permit for truck parking, cargo container storage
yard, installation of (4) modular enclosures with 5
standard vehicle parking spaces
Under Review, pending resubmittal.

Site vacated per settlement
agreement.
44 D1

Dutch Bros. 20377 Avalon Blvd. Existing: Former Pizza Hut.

Proposed: 950 SF coffee business with drive-through.

Under construction
45 D2
Cal-Water 410 W Carson St. Updating and adding new
equipment at an existing Cal Water facility
Formal submittal is pending
Community & Economic Development Project Status Report
October 10, 2026

CITY COUNCIL

Page 8 of 22 ends

Planning Division
# Name Description Status
46 D2
iONNA Electric
Vehicle Charging
Station
22309 Main St. Existing: Vacant former gas station
Proposed: Redevelop site with vehicle charging
station and reuse existing building as a convenience
store
Under review
Application submitted 7/31/26

47 D1

Carson Plaza Façade
Improvement
615 E University Dr. Existing: Multi-tenant
commercial center Proposed: Commercial façade
improvement of an existing retail plaza
Approved
48 D1

Woojin Is. America
Inc.
130 W. Victoria St. Existing: Industrial site. Admin
DOR, tenant improvement (TI). Proposed:

Refurbishing facility that provides transit vehicle
assembly for Metro trains at an existing industrial
building site
Approved. Under Construction
49 D1

Haro Property 20715 Avalon Blvd. Existing: Multi-tenant office building with retail and restaurant; Proposed:

Hawaiian BBQ restaurant with drive through
On Hold (Interim Urgency Ordinance
Moratorium Drive-through
Restaurants)
50 D1

Rain for Rent 400 & 436 W. Walnut St. Existing: A warehouse & office building. Proposed: Demolish the warehouse
and develop equipment rental yard (400) and retain
the office (436) building with site and landscape
improvements throughout both parcels (new
landscaping, pavement, construction of an 8-foot-tall
perimeter wall, add a new driveway, interior tenant
improvements to support the operation of the
equipment rental company)
Withdrawn
51 D1
404 E. Carson St. 404 E. Carson St. Existing: Samoan Federation Building, Proposed: Three-story, podium style mixeduse residential & commercial development (rental).

Three 2-bed/2-bath townhouse units, two 1-bed/1-
bath flats, and four studio units totaling 9 units built over ground floor level 752 SF commercial retail
space and parking area on a 9,772 SF (0.22 AC) lot
Under Review, pending resubmittal
52 D2
316 W. 214th St 316 W. 214th St., Existing: Single-family residence Proposed: 4 rental units
Approved
53 D1
SUR Auto Body 510 E. Alondra Blvd. Existing: Multi-tenant Warehouse 16,840 SF Proposed: Building 2 (approx.
7,200 SF), change use from warehouse to an auto
body repair business located on a 0.90 AC lot
Under Review, pending resubmittal
54 D3
Crown Castle 21350 Alameda St. Existing: Wireless communications facility (cell tower) Proposed: Major modification to
conditions request for extended expiration date
Approved
55 D3

Porsche Engineering
U.S.
1154 Annalee Ln. Existing: Warehouse Proposed:

Porsche Lithium Battery Evaluation Facility
Approved. Fire determined the amount
(one to two EV batteries per month) is
not considered to be hazardous
material, so no CUP is required.

Community & Economic Development Project Status Report
October 10, 2026

CITY COUNCIL

Page 9 of 22 ends

Planning Division
# Name Description Status
56 D4

A Better Tomorrow 20630 Leapwood Ave., Unit F Existing: Multi-tenant Industrial Condo center. Proposed: Social Services
Office replacing former office use
Complete
57 D1

KL Fenix 19204 Figueroa, Existing: Warehouse. Proposed:

New 83,770 SF warehouse/office building with 6 dock
doors replacing existing structures
Under Review, pending resubmittal
58 D1
J&J Carson, LLC 100 Carson Mall, Existing: 1 parcel. Proposed:

Subdivide 1 parcel into 3 parcels
Approved
59 D1
ECM Management 18001 Main St. Proposed: New 60558 SF speculative warehouse building
Complete
60 D2

Maupin
Development
438 W. Carson St. Existing: Credit Union Bank;
Proposed: Acquire a portion of the property to build
a 51-unit condo development with related site
improvements. The bank remains as located.

Approved. Next step: applicant work
with Transtech Engineering and
Engineering Services and for Final Map
61 D1
Manilla Sunrise
Restaurant
21828 Main St. Existing: Restaurant Proposed:

Kitchen addition
Under Review, pending resubmittal
62 D4
Hyundai / Chevrolet
Dealership Lot Split
2201 E. 223rd St. Proposed: Lot split. Division of a
single lot containing two existing new car dealerships, Carson Hyundai and Carson Chevrolet.

Approved
63 D1

125 W. 219th Pl. Lot
Split
125 W. 219th Pl. Proposed: Lot Split of a single parcel between two single family residences
Approved. Next step: applicant work
with Transtech Engineering and
Engineering Services for Final Map
64 D1
Carson Plaza Sign
Program
Modification
603 E. University Dr. Proposed: Sign Program
Modification
Approved
65 D1

Auto
Collision/Repair
16200 Main Street. Existing Light Industrial Building,
Proposed: Change use from
warehouse/manufacturing to auto collision/repair
Approved
66 D1

Rexford Warehouse
Pre-application
Review
1065 E. Walnut St., Existing: 143,640 SF warehouse;
Proposed: Demolish the existing warehouse and
construct a new 135,760 SF industrial building
(127,760 SF warehouse space and 8,000 SF ground
floor/mezzanine office space) with associated
loading, parking, and landscaping areas.

Complete
67 D1

2 Luv One Another 520 E Carson Plaza Ct Unit 104 Existing Multi-tenant Office Building. Proposed: social service center to
replace a former medical office
Complete
68 D3

1443 E. Carson St 1443 E. Carson St. Proposed: Demo an existing house and construct a 13-unit multifamily apartment and
associated Tentative Parcel Map (TPM)
Due to inactivity, application is pending
closure by staff.
69 D2

20920 Jamison Ave. 20920 Jamison Ave. Existing: Single-family residence Proposed: Build two new single-family residences
Approved, in plan check
70 D3
Papadakis
Engineering
20909 S Brant Ave. Existing: Papadakis Racing +
Engineering Division provides prototype Fuel Cell
Withdrawn
Community & Economic Development Project Status Report
October 10, 2026

CITY COUNCIL

Page 10 of 22 ends

Planning Division
# Name Description Status
System (testing); Proposed: CUP for storage of
Bottled Hydrogen on site for intermittent testing
process of new prototype Fuel Cell System (RSOC)
71 D3

Preapplication
Review (PAR)
2320 E. Dominguez St. Existing: Proposed: “Dockzilla”
Relocate and install new dock high modular building
(33,600 SF) including new foundations, building slab,
& necessary electrical, mechanical, and plumbing
Completed
72 D2
Target (South
Carson)
651 W. Sepulveda Blvd. Existing: Target Proposed:

Façade improvement and remodel signage
Approved
73 D2
United Oil
Convenience Store
Remodel
22235 Figueroa St. Updated Façade, Interior
renovation, and exterior repairs/maintenance
Approved, awaiting plan check
submittal
74 D3

Promise Energy
BESS
2011 E Carson St. Installation of new 368.64-Kilowatt
BESS system and related new inverters to be
integrated with an existing photovoltaic (solar)
system
Under Review, pending resubmittal
75 D3
Lamberton Truck
Yard
20915 Lamberton Avenue. Existing: Vacant Proposed:
vehicle dismantling facility
Under Review, pending resubmittal
76 D3

CenterPoint 2850 E. Del Amo Blvd. Existing: 264,000-square-foot warehouse building Proposed: Redevelop 19.18 acre
with a new 154,351-square-foot concrete tilt-up
building, truck yard, container/trailer storage, and
related site improvements.

Under Review, pending resubmittal
77 D4

Phillips 66 1520 E. Sepulveda Blvd. Existing: Phillips 66 refinery Proposed: Diamond Gateway Project. Demolition,
remediations, and redevelop 223-acre site with six (6)
new tilt-up industrial buildings with ancillary office
uses. Three of the proposed industrial buildings
would include cross-docks. Specific Plan and EIR
required.

Under Review. DEIR technical studies
and Specific Plan preparation are in
progress.

NOP concluded: Scoping meeting held
Wed., April 29, 2026. NOP initial public
comment period April 13-May 12 was
extended another 30 days ending on
June 12, 2026. Responses to comment
letters are being completed. High level
list of agencies that submitted
comments: DTSC, Water Board,
SCAQMD, Caltrans, Port of LB, LA
County Sheriff, UP RR, LAUSD
78 D1

Avalon West 21243 Avalon Blvd. and 640 E. 213th St. Proposed:
157-unit condominium project (17 deed-restricted
very low income HH units, and 140 market-rate units)
Under Review, pending traffic scoping
memo submittal and TPM resubmittal
79 D1

North Carson
Residences
1760, 1762, 1800 E. Glenn Curtiss St., 18701
Wilmington Ave., and 1815 University Dr. Existing:

Business Park facilities Proposed: 396-unit multiplefamily development (356 market-rate townhomes and 40 affordable housing rental units)
Under Review
Community & Economic Development Project Status Report
October 10, 2026

CITY COUNCIL

Page 11 of 22 ends

Planning Division
# Name Description Status
80 D3
Dominguez Pizza 2653 E. Carson St. Construct a new two-story, 4,445 SF mixed-use building containing a restaurant at
ground level and three rental units above. Also
requesting reduction in required parking spaces.

Under Review, pending resubmittal
81 D2
Preapplication
Review (PAR)
KB Homes
23529 Figueroa St. PAR proposal to demolish a
storage facility and redevelop site with a new gated
82-unit condominium designed as townhomes.

Review completed and response letter
provided.
82 D1
18700 Broadway 18700 Broadway. Transloading company proposing to demolish the existing building, have outdoor storage,
and related parking improvements.

Under Review
83 D1
18121 Broadway Renovation of 4-unit warehouse building and parking lot
Under Review
84 D1
Tower Mobility LLC 19204 Figueroa, Existing: Warehouse. Proposed:
privately-owned EV fleet dispatch hub operation
Project Withdrawn
85 D1
Carson Court
Apartments by AMG
Land
520 E. Carson Plaza Ct., Existing: Multi-tenant office
building. Proposed: 5-story podium style building
over grade-level parking, Residential Density Bonus
and 100% affordable housing project: multi-family
residential rental containing 123 units including the
manager’s unit
Under Review, pending resubmittal
Entitlement application initiated
86 D2
Slick City 21010 Figueroa St. Existing: warehouse Proposed:

Interior improvement converting an existing
warehouse to a family entertainment facility
Under Review
87 D3
Carson Plaza (East)
(Rosario’s)
1329-1347 E. Carson St. Commercial Façade
Improvement
Pending Under Review, Admin-DOR
submitted as placeholder while
development plans are being
completed
88 Union South Bay
Awning
Proposed 12.58-foot-wide awning located at tenant
space B4 doorway.

Under Review, application incomplete
pending applicant response to
requested information
Admin. DOR
89 D4
Carson Civic Center
Specific Plan
Propose a Specific Plan for the Carson Civic Center
campus redevelopment
1/6/26 City Council approved, RFQ/P
underway, submitted proposals under
review
90 D3
Preapplication
Review (PAR)
Nathan Battle
21111 Wilmington Ave. Pre-application review.
(Conceptual) Proposing construct a 52,500 SF
warehouse containing 5,000 SF front office area
including mezzanine, eight (8) loading doors and one
drive-in door.

Complete
91 D4
Preapplication
Review (PAR)
Pacific Industrial
2403 E 223rd St. Pre-application review. Existing:

Vacant. (Conceptual) Proposing to redevelop an
approximately 4.2-acre site with a private, fleetoriented electric vehicle charging facility Complete
Community & Economic Development Project Status Report
October 10, 2026

CITY COUNCIL

Page 12 of 22 ends

Planning Division
# Name Description Status
92 D2
Preapplication
Review (PAR)
LA County
Sanitation
21024 Main Street. Pre-application review. Existing:

Small structure identified as an existing pumping
plant and generator. (Conceptual) Proposing new LA
County Sanitation pumping plant, small building
above ground, and major underground work.

Complete
93 City of Carson Proposed Ordinance to satisfy HCD requirements to Certify the City’s Housing Element
Approved at the May 13th Planning
Commission and the June 3rd City
Council meeting. 2nd Reading approved
on June 17, 2025. June 18, 2025, the
signed Ordinance was provided to
HCD. On June 25, 2025, received HCD
HE certification letter.
94 City of Carson Carson 2040 General Plan Update, the Housing Element update will be presented to the Planning
Commission in January and to the City Council in
February to meet the state mandated deadlines
HCD approved. City has completed
necessary rezones to address the
shortfall of sites to accommodate the
Regional Housing Needs Allocation
(RHNA). Staff worked with HCD to
make necessary revisions to the City’s
zoning code and obtained the City’s
Housing Element certification. The
implementation of the General Plan
and the Housing Element are ongoing
95 City of Carson Phase 1 Comprehensive Zoning Code Update to implement the General Plan.

NOTE: Phase 1 excludes the non-residential portions
of the code which will be prepared and presented
later as Phase 2
Approved by Planning Commission
and City Council
96 City of Carson Phase 2 Comprehensive Zoning Code Update to implement the General Plan.

NOTE: Phase 2 includes non-residential portions of
the code
In Progress
97 City of Carson Refining the Zoning Code - Amend Noise Ordinance and Noise Element for consistency purposes
On February 17, 2026, Approved by the
City Council. Planning Commission
recommended approval to City
Council.
98 City of Carson Focused sign ordinance amendment proposing to update and clarify on-site, business signage-related
code sections.

Under Review. On June 24, 2025, the
Planning Commission continued the
item.
99 City of Carson General Plan Amendment to request Safety Element Update in order recognizing the City of Carson Local
Hazard Mitigation Plan as approved by the California
Governor’s Office of Emergency Services (Cal OES)
and the Federal Emergency Management Agency
(FEMA) and to amend the safety element of the
general plan to incorporate the city's 2024 Local
Approved.

On March 25, 2025, approved by the
Planning Commission; and approved by
the Council on April 1, 2025.

On June 17, 2025, the related GPA was
continued by the Council to September
Community & Economic Development Project Status Report
October 10, 2026

CITY COUNCIL

Page 13 of 22 ends

Planning Division
# Name Description Status
Hazard Mitigation Plan in accordance with Assembly
Bill 2140
2, 2025. Approved by Council on
September 2, 2025.
100 City of Carson Urgency Moratorium Carwash In Progress. City Council approved extension. At the 9/22/26 PC public
hearing, item was continued to the
next PC meeting 10/13/26.
101 City of Carson Urgency Moratorium Drive-through Restaurants In Progress. City Council approved 45- day moratorium. CC Approved Urgency
Ord. No. 26-2604U extension request
on 3/3/26.

On 9/22/26, PC adopted resolution
recommending approval to CC for Zone
Text Amendment establishing uniform
development & operational standards
for this use.

Scheduled for 10/20/26 CC public
hearing.
102 City of Carson Artificial Turf Ordinance for all residential uses only In Progress.

On 9/22/26, PC adopted resolution
recommending approval to CC for Zone
Text Amendment establishing uniform
development & operational standards
for this use.

Scheduled for 10/20/26 CC public
hearing
103 City of Carson Proposed amendment allowing administrative approval of tract and parcel maps for condominium
purposes (Subdivision Ordinance)
Presented to the Planning Commission
(PC) 2/25/25, PC approved
recommendation for City Council
adoption, Continued by City Council.

On June 17, 2025, Ordinance Second
Reading approved by City Council
104 City of Carson Zone Text Amendment to consider approving various amendments to the text of the City’s Zoning
Ordinance related to the Community Development
Director approval authority and requirements and
City Council review procedures
June 10, 2025, Planning Commission
recommended approval; Ordinances
presented to the City Council on July 1,
2025. Second Reading approved by City
Council
105 City of Carson Consider approval of Resolution regarding authority for certain Density Bonus applications to the City’s
Community Development Director with the
concurrence of the City Manager
June 10, 2025, Planning Commission
approved Resolution No. 2889 and
ratified adoption and execution of the
PC Resolution with the corrected title
as a Consent item on June 24, 2025.

Community & Economic Development Project Status Report
October 10, 2026

CITY COUNCIL

Page 14 of 22 ends

Planning Division
# Name Description Status
106 City of Carson Prohibition of storage of hazardous materials Completed. Matter including new buildings in industrial zone over 5,000
square feet requiring a CUP held at
April 5th City Council meeting,
continued off calendar by City Council
Subcommittee has met with the
business community and has obtained
their input
Approved by City Council. Staff
notified over 2,000 business that are
potentially affected by the ordinance
and would require submittal of an
application for Director’s Permit. Staff
received applications from businesses.

Next step is to issue an RFP to hire an
inspection consultant. RFP prep
complete, staff working with City
Attorney’s office
107 City of Carson Short Term Rentals A subcommittee meeting was held, and Subcommittee provided direction
to staff. Public Safety lead. City
Attorney’s office will be drafting the
ordinance.

COMMUNITY & ECONOMIC DEVELOPMENT

PROJECT STATUS REPORT
October 10, 2026

CITY COUNCIL

Page 15 of 22 ends

Real Property Services Division
Effective July 1, 2026, the former Special Projects Division within the Community & Economic Development Department and the Housing Division within the City Manager’s Office were consolidated into the newly established Real Property Services Division under the Community & Economic Development Department.

The Real Property Services Division advances City priorities through housing implementation, redevelopment initiatives, public-private partnerships, grant-funded projects, and innovative financing tools that support Carson's long-term economic, environmental, and community development goals. Below is the status of report for the Division’s projects.

Real Property & Development (Publicly Owned Properties) # Subject Description Status
1 D2
20280 S. Main Street
(Main & Torrance)
Ongoing pre-development activities
to facilitate future affordable
housing development.

Environmental due diligence is underway to
evaluate feasibility of future affordable housing
development; Phase 2 Environmental
Assessments are in progress with sampling taken
at the end of June 2026.
2 D2
526 W. Carson &
21704 S. Figueroa
(Carson & Figueroa)
Ongoing pre-development activities
to facilitate future affordable
housing development.

Environmental Site Assessment work underway to
determine viability of future affordable housing
development; Workplan submitted 06/04 and
approved 07/20.
3 D4
24205 S. Avalon
(Former Domenick’s
Pizza)
Acquired property for affordable
housing for Veterans.

The property has been secured and boarded to
deter unauthorized access and encampments, and
the locks have been replaced. Due to the age of
the building, lead-based paint and asbestos
inspections are required before demolition can
proceed. Bid requests for the necessary
environmental services, including the asbestos
inspection, have been issued.
4 D4
Cell Tower Foisia
Park Lease
Existing cell tower lease on park
property.

Staff periodically review proposals from
telecommunications providers related to lease
extensions, easements, and potential new tower
installations.
5 D3
Friendship Mini Park
Site Expansion
Successfully was awarded $1.43
Million from LA County Regional
Park and Open Space District
(RPOSD)
The City and Marathon met on 7/23 to discuss to
purchase the former BP Arco site for expansion for
Friendship Mini Park. On 8/17, Marathon stated
that it no longer wishes to sell the site to the City.
6 D2
Reflection’s Mini
Park
Passive mini-park consisting of
19,000 sq. ft. adjacent to a
proposed residential project at
21135 (1/2) Bolsa Avenue.

As the first step in the disposition process, the City
declared the property exempt surplus on July 21.

Brownfield/ Environmental Site Assessment & Remediation (Privately Owned Properties, Grant Funded) Community and Economic Development Project Status Report October 10, 2026

CITY COUNCIL

Page 16 of 22 ends

# Subject Description Status
1 D2
Sywest
Development –
20151 S. Main Street
Site assessment to determine
lateral extent of former landfill for
redevelopment purposes.

Council previously approved a License Agreement
for access to LADWP property. Revised boring
locations were approved due to conflicts with
existing pipelines, with field work rescheduled for
August 12-13 and completed.
2 D1
Alma Backyard
Farms – 17505 S.

Main Street
Proposed urban farm by
community-based non-profit group
providing fresh produce,
educational programs, workforce
training, and healthy food access.

With City support for site selection and
environmental due diligence, Alma Backyard
Farms acquired a Carson site for a new urban
farm. Site design is underway and includes a
learning lab, teaching kitchen, raised beds, farm
stands, and community spaces. The applicant has
been referred to Planning Division for formal
review.
3 D1
Victoria Park Plaza
(Chinollo’s Plaza) –
18409 S. Avalon
Dry Cleaner property created
groundwater contamination. City
assessing extent of contamination.

Sampling and Analysis Plan submitted to EPA for
review. Once approved, monitoring well
development to commence.
4 D2
Former Burgeno
Drums Property –
229 W. Francisco
Street
City assisting with environmental
assessment and marketing of longvacant “Burgeno Drums” parcel to attract prospective buyers.

Phase I Environmental Assessment finalized.

Phase II recommended and to begin in the
upcoming weeks.
5 D1
404 E. Carson The site contains a vacant
community‑serving building and is
planned for mixed‑use
redevelopment with housing and
commercial space.

A Phase I Environmental Assessment was
completed using EPA grant funds for the property
owner, and the site was determined to be suitable
for redevelopment.

Commercial Façade Improvement Program (City funded, Owner Match) – Intradepartmental: Real Property (funding & administration), Planning (expedited entitlement review), Economic Development (referrals & admin. support) # Subject Description Status
1 D1
Victoria Park Plaza Prospective Façade Loan Applicant
& Round 1 Grant Applicant
Staff is coordinating with the property owner and
contractor to begin construction for CJ Wing's
Round 1 Façade Improvement Program grant.

Construction is anticipated to start in late August.

Staff is awaiting the remaining documentation to
process the loan for the plaza-wide remodel.
2 D4
Walmart Plaza Prospective Façade Loan Applicant Multiple outreach attempts to the property owner regarding façade loan program participation have
received no response.
3 D1
302 E. Carson street Awarded Round 1 Grant Applicant Funding agreement fully executed; planning approval and building permits obtained.

Requested submission of DAS-140 forms prior to
commencement of onsite work to ensure
compliance with applicable apprenticeship
requirements.

Community and Economic Development Project Status Report October 10, 2026

CITY COUNCIL

Page 17 of 22 ends

4 D3
East Carson Plaza
1329 to 1347 E.

Carson Street
Awarded Round 2 Grant Applicant Funding Agreement fully executed. The City’s architect is drafting of architectural plans, the
Admin-DOR application will be submitted after.
5 D1
219th and Avalon Awarded Round 2 Grant Applicant The applicant is currently out of the country. Upon return, staff will work with owner to continue
moving the project forward.
6 D2
Ding Tea, 114 W.

Carson Street
Awarded Round 2 Grant Applicant Awarded applicants are replacing storefront doors. Staff is obtaining required insurance.
7 D3
East Carson Corridor Awarded Grant Applicants (Nomatch required) Staff have received signed funding agreements from six of the thirteen properties with many
more scheduled for signature in the coming
weeks. There are 13 properties in this corridor
eligible for funding. Once agreements are fully
executed and all insurance is received, the
contractor can commence construction.
8 D4
Ralphs Plaza Potential Applicant Staff met with a potential applicant on June 17 to review program requirements. The applicant is
developing a project scope for inclusion with the
application submittal.

Strategic Initiatives, Project Funding & Infrastructure Financing # Subject Description Status
1 City of Carson -
Comprehensive CD
Fee Study
Study to analyze various
development-based fees including:
(1) Development Impact Fees; (2)
Community Benefits (3)
Inclusionary Housing, In-Lieu Fees,
Commercial & Industrial Linkage
Fees, and (4) Community Facilities
Districts or other Alternative
Funding Mechanisms.

Consulting team have completed draft analysis of
each proposed fee programs. The draft has been
circulated to departmental staff for internal
review, including Planning Division staff. A
meeting to discuss with stakeholders including BIA
and developers is being scheduled for August 31st
at 3PM via Microsoft teams.
2 Transformative
Climate
Communities (TCC)
Grant initiative funded by the
Strategic Growth Council to
support climate-resilient,
community-driven projects that
bring environmental, economic,
and public health benefits to
disadvantaged communities, with a
core goal of reducing GHG
emissions.

Currently in the grant application phase. A preproposal has been submitted, and the final application is due September 30. The application
and project list are currently being developed in
collaboration with various co-applicants and
partners. This effort is/will be presented to
Planning Commission, Brownfield Advisory
Committee, and the Economic Development
Commission.
3 Regional
Waterboard
Petroleum
Underground
Storage Tank Grant
Program
Orphan Site Cleanup Fund grant
application for Housing Authority
parcels at 526 W. Carson & 21704 S.

Figueroa.

The City will soon apply for additional funding
cleanup funds for the Housing Authority parcels. A
draft application is completed.

Community and Economic Development Project Status Report October 10, 2026

CITY COUNCIL

Page 18 of 22 ends

4 State Water Board
Site Cleanup
Subaccount
Program (SCAP)
Grant program for environmental
assessment and cleanup of
contaminated properties.

The City assisted the owner of Victoria Park Plaza
with a grant application to secure funding for
environmental cleanup related to historic drycleaner contamination on the site. 5 EPA Community
Wide Assessment
(CWA)
Provides funding to assess multiple
properties across the city to better
understand environmental
conditions and support
redevelopment efforts.

Awarded in 2024, the grant currently funds
environmental assessments for 7 sites.

Assessments for 2 of these sites are complete and
the properties are ready for reuse.
6 EPA Revolving Loan
Fund
Provides low-interest loans and
subgrants for environmental
cleanups and infrastructure.

Awarded in 2025. A consultant has been procured
to provide grant management and technical
support services.
7 EPA Brownfield Job
Training Grant
(BFJT)
Expands local workforce
opportunities by providing training
for residents pursuing
environmental careers. Training is
conducted in partnership with the
South Bay Workforce Investment
Board.

Awarded in 2026 – the SBWIB subaward
agreement has been approved by Council on 7/21.
8 DTSC Equitable
Community
Revitalization Grant
(ECRG) – Site
Specific
Investigations
The ECRG site-specific grant focuses
on individual properties with known
or suspected environmental issues,
providing funding to investigate and
determine cleanup needs.

Awarded for the Sywest site in Rounds 1 and 2,
with an additional award in Round 2 for the
Carson & Figueroa site. Phase 2 environmental
assessments are currently ongoing for these
properties.

City Council item scheduled on September 1
budget to accept and appropriate an additional
$375,000 in DTSC Equitable Community
Revitalization Grant (ECRG) funds for continued
environmental site investigation at the Housing
Authority parcels at 526 W. Carson St. & 21704 S.

Figueroa
9 DTSC Equitable
Community
Revitalization Grant
(ECRG) –
Community Wide
Assessments (CWA)
The ECRG CWA grant supports a
broader, citywide approach,
funding assessments across
multiple sites and enabling
community engagement and
outreach efforts related to
brownfield redevelopment such as
the Story Map and Fellowship
development.

Awarded for 5 sites in Round 2 with
environmental assessments underway.
10 DTSC Community
Wide Assessment
Grant (CWAG)
A US EPA funded grant award to
DTSC to conduct environmental
assessments for sites throughout
the state.

On 4/20, staff submitted four Carson sites for
funding consideration under the DTSC
Community-Wide Assessment Grant. On 8/5,
DTSC awarded two sites (Sywest) and (Alma
Backyard) for funding; Details forthcoming.

Community and Economic Development Project Status Report October 10, 2026

CITY COUNCIL

Page 19 of 22 ends

11 Brownfield
Fellowship
The City of Carson launched its first
Brownfield Fellowship Program in
collaboration with CSUDH’s Office
of Sustainability to give students
exposure to environmental
remediation and land-reuse
concepts through expert-led
lectures. Funded by DTSC ECRG
community wide assessment grant.

Fellows created a “Perfect Pitch” for a potential
brownfield redevelopment project in Carson,
outlining site history, cleanup needs, reuse
concepts, funding options, community
engagement, and an implementation timeline.

They presented their proposals at CSUDH’s Earth
Day event, where the top three were selected.
12 Brownfield Story
Map & Video
Funded by the DTSC ECRG CWA
grant, this project will produce a
public-facing story map highlighting
the City’s brownfield program, its
grant initiatives, and
redevelopment success stories. The
story map and accompanying video
are being developed in
collaboration with CSUDH.

The project is in its final design phase and is
expected to be completed in August 2026, with
publication on the City’s brownfield website
shortly thereafter.
13 Grow America -
Grow Carson Fund /
Brownfield RLF
Under Grow America, this program
provides access to capital for
eligible businesses while Grow
America administers all
underwriting, loan servicing, and
program management. Grow
America also provides technical
assistance to the US EPA for the
Brownfield Revolving Loan Fund.

Staff is working with Grow America to explore
reestablishing the Grow Carson Fund, a small
business loan program that leverages City funding
to expand access to financing for Carson
businesses. This effort will be coordinated
between the Real Property Services and Economic
Development Divisions. Staff is also engaging
Grow America regarding potential opportunities
related to the City's Brownfield Revolving Loan
Fund, leveraging Grow America's role as a
technical advisor to the U.S. EPA.
14 SCIP / BOLD
Programs
These financing programs provide
developers with access to taxexempt bond financing to fund eligible public infrastructure and
development impact fees through
Community Facilities Districts
without reducing or waiving City
fees.

Staff is coordinating with developers to evaluate
potential participation in the SCIP/BOLD financing
programs, which would allow eligible
development impact fees to be financed through
annexation into a Community Facilities District.
15 Opportunity Zone

2.0 Evaluation
A proposed federal economic
development initiative that would
expand and update the Opportunity
Zone program to encourage private
investment and job creation in
designated low-income
communities through targeted tax
incentives.

Real Property Services evaluated the eligibility of
Carson's census tracts for Opportunity Zone
designation and determined that none of the
City's census tracts are eligible.

Community and Economic Development Project Status Report October 10, 2026

CITY COUNCIL

Page 20 of 22 ends

16 FY 26-27 CIP & DIF
Reallocation
Amends the FY 2026–27 budget to
reallocate $4.0M in General Fund
appropriations among CIP projects
(Traffic Signal Upgrades, Bike
Lane/Median Mods, new CD special
projects account), and appropriates
$8.699M from the DIF Fund (289)
balance to backfill Mills Park
projects and fund related CIP needs
(Carriage Crest Park, Community
Center Courtyard/Parking Lot
Staff report and resolution scheduled for Council
adoption at the September 15, 2026 meeting
(Consent). No net General Fund impact.

Oil & Gas (Good Neighbor Provision & Pipeline Franchise) # Subject Description Status
1 Cooper & Brain
Carson
Audit of facilities complete on
October 27, 2025.

Annual Audit of Oil and Gas Operations. Draft
facility audit reports have been completed. Final
reports will be presented to the City Council at a
future meeting.
2 Bridgeland Bishop
Lease Dominguez
Facility
Audit of facilities complete on
March 26, 2026.
3 E&B Natural
Resources
Audit of facilities complete on
October 27, 2025.
4 Bridge Point Carson Audit of facilities complete on
October 27, 2025.
5 Brea Canon All oil wells have been abandoned.

No additional audits will be
conducted for this site.

N/A
6 Pipeline Franchise
Ordinance
Update to pipeline franchise
ordinance to modernize provisions
and update fees and rates.

Ordinance was adopted on February 17.

Administration duties remain in Finance / Public
Works.

Mobile Home Rent Control (Park owner request for rent increase) # Subject Description Status
1 Carson Harbor
Village
Fair Return Rent Application In Progress. Mobilehome Rental Review Board (MRRB) meeting scheduled for July 29 to consider
update. Meeting postponed due to lack of
quorum. To be continued to a date TBD.
2 Park Avalon CPI Rent Increase Application Owner submitted 1/6/2026. Approved 3/26. 3 Carson Gardens CPI Rent Increase Application Owner submitted 1/29/2026. Approved 2/23. 4 Laco CPI Rent Increase Application Owner submitted 1/29/2026. Approved 2/23. 5 Colony Cove CPI Rent Increase Application Owner submitted 4/6/2026. Approved 4/14. 6 Shangri Lodge CPI Rent Increase Application Owner submitted 4/16/2026. Approved 4/16. 7 Rancho Dominguez CPI Rent Increase Application Owner submitted 4/20/2026. Approved 4/21. 8 Flamingo Gardens CPI Rent Increase Application Owner submitted 4/29/2026. Approved 4/30. 9 Ocean Villa CPI Rent Increase Application Owner submitted 7/13. Approved 7/13. 10 Park Villa MHE CPI Rent Increase Application Owner submitted 08/13. In review.

Former Housing Division
# Subject Description Status
Community and Economic Development Project Status Report October 10, 2026

CITY COUNCIL

Page 21 of 22 ends

1 Organizational
Change
Housing Division Transition to Real
Property Services
Community & Economic Development
Department and City Manager’s Office have been
coordinating a successful transition for Housing
Division back to Department under Real Property
Services Division effective July 1
2 Section 8 The City has contracted with AvantGarde to develop a feasibility study to determine whether the City of
Carson is eligible to administer the
Housing Choice Voucher Program.

On June 23, 2026, a follow-up letter from Mayor
Davis-Holmes was sent to Acting Director Alison E.

Bell at HUD requesting a written response to the
City’s request to administer the Housing Choice
Voucher Program.
3 Neighborhood Pride
Program
The Neighborhood Pride Program
offers grants to low- and moderateincome homeowners to help create decent, safe, and sanitary housing
conditions.
15 projects in the pipeline from bid to
construction phase, with 10 new applications
currently under review.
206 residents on the waiting list
4 First Time
Homebuyers
Program
PLHA funds in the amount of
$1,337,441 is available for the FirstTime Homebuyer Program.

Draft program guidelines have been reviewed by
the City Attorney’s Office, HCD, and staff. The
guidelines are currently under review by the
Community Development Director and Real
Property Services Manager. Final review by the
Housing Ad Hoc Committee is needed before
final approval by City Council.

Staff has received approval by HCD to request
funding to be re-allocated for the FTHB Program.
5 Foreclosure
Registration
Program
Real Property Services manages the
registration of properties currently
in the foreclosure process.

As of August 2026, there are 55 registered
foreclosure properties citywide:

District 1, 20 properties;
District 2, 14 properties;
District 3, 10 properties; and
District 4, 11 properties.
6 CDBG Subrecipient –
Public Service
Agencies
Administers CDBG-funded public
service programs through eligible
subrecipients, including
agreements, compliance,
reimbursements, monitoring,
reporting, and future funding in
accordance with HUD
requirements.

CDBG Programs (Neighborhood Pride Program
(NPP), Fair Housing – Housing Rights Center, Boys
& Girls Club of Carson, Venice family Clinic, Office
of Samoan Affairs, Program Administration) were
manually entered in IDIS for 2026-2027 fiscal
year.
7 H.R. 6644 21st Century ROAD to Housing Act -
federal housing law intended to
increase the nation's housing
supply, reduce barriers to
development, modernize HUD
programs, and expand financing
options for affordable housing
Staff is reviewing the potential impacts of this
legislation on the City of Carson. The bill may
affect housing production, Community
Development Block Grant (CDBG) programs, HUD
programs, and affordable housing financing.

Carson Entities Administration (Successor Agency, Housing Authority, EIFD Public Financing Authority) Community and Economic Development Project Status Report October 10, 2026

CITY COUNCIL

Page 22 of 22 ends

# Subject Description Status
1 Carson Enhanced
Infrastructure
Financing District
(EIFD)
Formed tax increment entity in
partnership with County to fund
affordable housing, environmental
remediation, and public
infrastructure.

Annual Meeting was held on June 15.

County is working with City on obtaining EIFD
funds to pay for community engagement and preplanning activities on Victoria Golf Course Site for $500k. An amendment to the Infrastructure
Financing Plan is required. A meeting will be
scheduled for fall for approval.
2 Carson Successor
Agency
Administration functions of the
former Carson Redevelopment
Agency
The Department of Finance approved the 2026-
2027 ROPS in April 2026. The next major Successor
Agency administrative requirement is submission
of the Prior Period Adjustment Expenditure
Report to DOF by October 1.
3 Carson Housing
Authority
Administration functions of the
Housing Authority (and Housing
Successor of former Carson
Redevelopment Agency)
A housing authority annual report must be filed
with HCD by October 1.

CITY OF CARSON

PUBLIC WORKS DEPARTMENT
18620 S. Broadway, Carson CA 90248
September 2026
Monthly Report
Dr. Arlington Rodgers Jr., Director
The Public Works Department is comprised of three divisions: Administration, Engineering, and Operations. The Department maintains a total area of nineteen (19) square miles of streets which also includes maintaining twelve (12) park building facilities, two (2) aquatic centers, two (2) pools, a sports complex, and a boxing and weightlifting center, Carson Event Center, City Hall, and Corporate Yard. The Public Works staff is comprised of 116 positions with 103 full-time regular employees and 13 part-time employees. The Public Works team collaborates both internally and externally to accomplish projects that enrich the quality of life for Carson's residents and visitors.

ENGINEERING DIVISION
The Engineering Division provides the technical foundation for a modern Public Works Department, and its primary responsibility is to assist the Administration and Operations & Maintenance Divisions with project management and specialized design and construction skills. The Engineering Division determines which studies are needed to advise the department on deficiencies, regulatory requirements, compliance with applicable local, state, and federal laws, cost effectiveness, prudent approaches, and strategic plans.

These activities inform executive management and the City Council in determining project priorities.

Street Improvements
• PW675: SEPULVEDA BRIDGE WIDENING FROM ALAMEDA TO EAST CITY LIMIT o Location: Sepulveda Blvd. from Alameda to East City Limit o Description: The project involves the widening and improvement of the roadway and bridge along Sepulveda Boulevard to provide three lanes of traffic in both directions, construction of new sidewalk, relocation of existing electrical poles, and the modification of the existing traffic signal.
o Budget: $12,000,000.00
o Current Phase: FINAL DESIGN
o Status as of February 19, 2026: Pre-construction activities with the contractor, submittal review and utility coordination.
o Status as of March 19, 2026: Submittal review and approval o Status as of April 23, 2026: Construction is underway. Traffic control is in place, and the contractor is demolishing the site.
o Status as of May 21, 2026:
o Status as of June 25, 2026: The contractor is working on removing the contaminated soils on the southwest segment of the project o Status as of July 23, 2026: Contractor continues to work on removal of contaminated soil and roadway work.
o Status as of August 31,2026: SCE is currently relocating lines for the shoofly for construction
o Status as of September 30, 2026: Contractor is working on the Pad design with Marathon Oil for the Crane, Utility relocation and Soil Removal • PW1536: BUS AMENITY AND WAYFINDING PROJECT
o Location: Various locations throughout the city
Public Works Department September 2026 Monthly Report

Page 2 ends

o Description: Installation of monument signs, bike racks, and wayfinding signs. o Budget: $852,859.00
o Status: Initial scope of work completed; preparing for additional work o Status as of January 22, 2026: The team met with Metro on January 20, 2026; to discuss grant status, follow-up meeting is scheduled for January 22, 2026. o Status as of February 19, 2026: Submitted a Project Closeout Plan to MTA on January 28, 2026, to close out this project.
o Status as of March 19, 2026: Continuing to work with MTA to close the project out. o Status as of April 23, 2026: No update
o Status as of June 25, 2026:
o Status as of July 23, 2026:
o Status as of August 31, 2026: No update
o Status of September 30, 2026: No update
• PW1823: WAYFINDING SIGNS – PLANNING AND DESIGN CONCEPT ONLY o Location: Citywide
o Description: Comprehensive Signage Plan – Planning and Design Concepts Only o Budget: $23,500.00
o Consultant: Graphic Solutions
o Schedule: 3 Months
o Contract: 25-282
o Purchase Order FY 25/26: 22061283
o Status as of December 17, 2025: Received proposal from Graphic Solutions on November 26, 2025. Certificate of Insurance was approved on December 9, 2025. Agreement was drafted by the City Attorney’s office and signed by Graphic Solutions on December 11, 2025. Agreement was signed by City Attorney and the Public Works Director on December 17, 2025. Contract is pending signature from City Clerk and generation of a purchase order. o Status as of January 22, 2026: Project kick-off meeting was held on January 14, 2026. First deliverable item is expected the first week of February 2026. o Status as of February 19, 2026: A meeting took place on Thursday, January 29, 2026, with Graphic Solutions and the City of Carson stakeholders to review first conceptual drawing package. A second deliverable from Graphic Solutions is expected by the end of February 2026. Planning phase with Graphic Solutions is expected to be complete by March 2026. o Status as of March 19, 2026: Vendor: “Graphic Solutions” has failed to submit final deliverables. 3-month project schedule ends on March 22,2026. Staff has requested a recovery schedule from vendor.
o Status as of April 23, 2026: The recovery schedule from Graphic Solutions shows the final comprehensive signage plan to be submitted to the City by April 24, 2026. Staff has not received final comprehensive signage plan from Graphic Solutions. o Status as of May 21, 2026:
o Status as of June 25, 2026:
o Status as of July 23, 2026:
• PW1608: MLK JR. STREET/ROAD IMPROVEMENTS
o Status as of February 20, 2025: Going to City Council on March 4, 2025, for approval of CEQA and authorization to go out to bid.
o Status as of March 20, 2025: Council approved PSE and recording a “Notice of Exemption” with the LA County Clerk and the State Clearing House on March 4, City Council Meeting.

Public Works Department September 2026 Monthly Report

Page 3 ends

o Status as of April 21, 2025: Awaiting report from consultant on the report for the GPR testing.
o Status as of May 22, 2025: Additional soil testing performed over the landfill area on the western part of project between Main Street and the bridge. o Status as of June 18, 2025: Consultant is preparing a schedule for designs next steps, to adjust the design to incorporate landfill areas.
o Status as of July 24, 2025: Design consultant is requesting additional funding for hydrology study and design of storm drains.
o Status as of August 20, 2025: Tait is now working on re-design of road, survey this month.

Final plans are due October 6, 2025.
o Status as of September 18, 2025: No update
o Status as of October 23, 2025: On schedule to open bids mid-November. o Status as of November 20, 2025: Project is out for bids. o Status as of December 17, 2025: Bid opening is currently scheduled for January 5, 2026. o Status as of January 22, 2026: Lowest Responsible Bidder: RJ Noble at $4.9 Million. o Status as of February 19, 2026: Seeking to identify funding for project. o Status as of March 19, 2026: Continuing to pursue funding for the project. o Status as of May 21, 2026:
o Status as of June 25, 2026: Funding has been identified. Staff report is set for second meeting in July for Council approval.
o Status as of July 23, 2026: NOI was released and Staff Report for Award of Contract to RJ Noble has been created for the August 4, 2026, City Council Meeting. ▪ Status as of August 31, 2026: contracts being routed for signature ▪ Status as of September 30, 2026: PO has been issued, asking contractor for submittals and schedule.
• PW1655: CARSON ST. REHABILITATION PROJECT
o Location: Carson Street from Recreation Rd. to Santa Fe Ave. o Description: The length of this corridor is 2.2 miles, and the project includes concrete reconstruction, tree removal and replacement, asphalt concrete pavement overlay, repair of damaged sidewalks, driveway approaches, curbs and gutters, and access ramps.
o Budget: $2,799,100.00
o Status: COMPLETION AND CLOSEOUT
• Status as of February 20, 2025: Working on design for left-turn pocket repairs. • Status as of March 20, 2025: No update
• Status as of April 21, 2025: Working on design for left-turn pocket repairs. • Status as of May 22, 2025: Left turn repairs 50% design received on May 9, 2025. • Status as of June 18, 2025: No update
• Status as of July 24, 2025: No update
• Status as of August 20, 2025: No update
• Status as of September 18, 2025: No update
• Status as of October 23, 2025: Contractor is scheduled to complete repairs during the second week of December.
• Status as of November 20, 2025: No update
• Status as of December 17, 2025: No update
• Status as of January 22, 2026: No update
• Status as of February 19, 2026: Pending completion of repairs. • Status as of May 21, 2026:
• Status as of June 25, 2026:

Public Works Department September 2026 Monthly Report

Page 4 ends

• Status as of July 23, 2026: Project complete
• PW1687: CARSON ST. INTELLIGENT TRANSPORTATION SYSTEM
▪ Location: Carson St. from 405 Fwy to Figueroa Street
▪ Description: The project involves the installation of CCTV cameras and appurtenant hardware at ten (10) intersections along Carson Street, connecting these to existing fiber optic cable, and tying the existing fiber optic cable into City Hall. The project will also include the establishment of a Traffic Management Center in City Hall for the purposes of traffic signal synchronization, traffic management, surveillance, and traffic monitoring. ▪ Budget: $700,000.00
▪ Status as of March 20, 2025: No update
▪ Status as of April 21, 2025: No update
▪ Status as of May 22, 2025: No update
▪ Status as of June 18, 2025: No update
▪ Status as of July 24, 2025: No update
▪ Status as of August 20, 2025: 90% PS&E package being reviewed by staff. Equipment to be ordered ahead of construction utilizing Prop C funds. ▪ Status as of September 18, 2025: Award of contract for equipment order tentatively scheduled to go to City Council on September 30, 2025.
▪ Status as of October 23, 2025: Award of the contract for equipment order was approved by City Council on September 30, 2025. Staff working to place the order. ▪ Status as of November 20, 2025: Equipment order expected to arrive by November 20, 2025. Consultant working to address revisions on final PS&E package. ▪ Status as of December 17, 2025: No update
▪ Status as of January 22, 2026: No update
▪ Status as of February 19, 2026: Consultant performing final review of PS&E package, FA amendment approved by City Council on February 17, 2026. ▪ Status as of March 19, 2026: City to conduct final review of plans and sign. ▪ Status as of April 23, 2026: Completed final review. Consultant is finalizing PS&E package. ▪ Status as of June 25, 2026: Coordinating with IT on specifications ▪ Status as of July 23, 2026: No update
▪ Status as of August 31, 2026: No update
▪ Status as of September 30, 2026: Finalizing equipment specifications. • PW1765: LOMITA BLVD
• Status as of February 19, 2026: Issuing task order for potholing and storm water design work.
• Status as of March 19, 2026: Consultant is doing geotechnical and utility investigation.
• Status as of April 23, 2026: Consultant is reviewing the geotechnical and utility data. • Status as of May 21, 2026:
• Status as of June 25, 2026: The designer is finishing up the design of the storm drain and confirming the Utility locations
• Status as of July 23, 2026: The designer continues to work on the design of storm drainage system.
• Status as of August 31, 2026: Consultant is working on the storm drain design for the project.
• Status as of September 30, 2026: Consultant is finalizing the Temporary storm water drainage fix.

Public Works Department September 2026 Monthly Report

Page 5 ends

• PW1775: 213TH ST. STREET LIGHTS
o Location: East 213th Street between Chico Ave and Wilmington Blvd o Description: Installation of streetlights
o Budget: $800,000
o Status: DESIGN PROCUREMENT
• Status as of January 16, 2025: County still reviewing. SCE will need to do major work to install these streetlights, so they are requesting a meeting with City staff about potentially putting in aerial cable instead of an underground to complete the project faster.
• Status as of February 20, 2025: No update
• Status as of March 20, 2025: Waiting for draft SCE design. • Status as of April 21, 2025: SCE committed to providing a draft service design this month.
• Status as of May 22, 2025: LA County reviewing plans. • Status as of June 18, 2025: No update
• Status as of July 24, 2025: No update
• Status as of August 20, 2025: No update
• Status as of September 18, 2025: No update
• Status as of October 23, 2025: No update
• Status as of November 20, 2025: No update
• Status as of December 17, 2025: No update
• Status as of January 22, 2026: No update
• Status as of March 19, 2026: SCE provided an update stating they anticipate completing the lighting plan by June 2026.
• Status as of June 25, 2026:
• Status as of July 23, 2026:
• Status as of August 31, 2026: No update, plans still with SCE • Status as of September 30, 2026: No update
• PW1779: WALNUT AVENUE (AVALON TO BILLINGS)
o Status as of March 20, 2025: No update
o Status as of April 21, 2025: No update
o Status as of May 22, 2025: No update
o Status as of June 18, 2025: No update
o Status as of July 24, 2025: No update
o Status as of August 20, 2025: No update
o Status as of September 18, 2025: No update
o Status as of October 23, 2025:
o Status as of November 20, 2025: No update
o Status as of December 17, 2025: No update
o Status as of January 22, 2026: No update
o Status as of June 25, 2026:
o Status as of July 23, 2026:
• PW1780: VICTORIA TRANSIT CENTER
o Location: Victoria Street near Tamcliff Avenue
o Design and construction of a new transit center adjacent to CSUDH.

Public Works Department September 2026 Monthly Report

Page 6 ends

o Budget: $3,525,000
o Status as of February 19, 2026: Consultant submitted design documents for review by staff.

Staff report for naming transit center anticipated to go to City Council in March 2026. o Status as of March 19, 2026: Staff reviewed design documents and submitted comments back to the design consultant.
o Status as of April 23, 2026: Consultant working on utility plan with CSUDH staff. o Status as of May 21, 2026: Consultant is finalizing the utility plan and beginning to work with CSUDH coordinating the work for the Mobility Hub. Staff are reviewing traffic study. o Status as of June 25, 2026:
o Status as of July 23, 2026:
o Status as of August 31, 2026: NTP issued August 4, 2026 to proceed with offsite design.

Consultant coordinating with CSUDH on mobility hub elements. o Status as of September 30, 2026: Consultant continuing design and coordination with CSUDH. Staff working with CSUDH on funding agreement amendment to include CSUDH’s mobility hub scope.
• PW1785: BICYCLE MASTER PLAN UPDATE
o Location: City-wide
o Description: Update City Bicycle Master Plan
o Budget: $897,000
o Status: PRE-DESIGN
o Status as of March 20, 2025: Contract services agreement for Toole Design Group approved by City Council on March 18, 2025.
o Status as of February 19, 2026: Planning project ongoing. After first period of outreach, consultant’s focus is now on conceptual design development and policy development. o Status as of March 19, 2026: Staff is reviewing design deliverables; staff coordinating internal stakeholder engagement meeting for late April. o Status as of April 23, 2026: Internal stakeholder engagement meeting took place on April 20, 2026. Concept development is ongoing. Planning for the second public engagement phase.
o Status as of May 21, 2026: Internal stakeholder meetings with Public Safety and Community Development were held on May 12, 2026. Concept development and outreach planning ongoing.
o Status as of June 25, 2026:
o Status as of July 23, 2026:
o Status as of August 31, 2026: Staff reviewed and provided comments on the Administrative Draft of the Bicycle Action Plan. The second and final phase of engagement has begun, to solicit feedback on project concepts. o Status as of September 30, 2026: Project team completed the second phase of engagement. Project team continues to refine street concepts. • PW1753: UNIVERSITY DRIVE STREET IMPROVEMENT – AVALON TO WILMINGTON FEDERAL PROJECT NO. STPL-5403(033)
o Status as of February 19, 2026: Request for Authorization for Construction was submitted to Caltrans on February 17, 2026.
o Status as of March 19, 2026: Staff is working on finalizing right-of-way certification. Rightof-way approval is pending utility agreements. o Status as of April 23, 2026: Staff received comments from Caltrans regarding the Request for Authorization/Preliminary Environmental Study on April 20, 2026. Staff is reviewing comments and will resubmit application week of April 27, 2026.

Public Works Department September 2026 Monthly Report

Page 7 ends

o Status as of August 31, 2026: Bids closed on Monday August 24,2026. A “Notice of Intent to Award” was sent to R.J. Noble on Wednesday August 26,2026. Engineering staff will be recommending to award a construction contract to R.J. Noble at the October 6,2026 Council Meeting. Estimated construction start date is October 2026/November 2026. Estimated construction completion date is March 2027.
o Status as of September 30, 2026: Staff will recommend awarding a Construction Contract to R.J.

Noble on the October 6,2026 council meeting.
• PW1757: MAIN STREET – 228TH TO LOMITA
o Location: Main Street from 228th Street to Lomita Boulevard o Description: The project includes concrete reconstruction, tree removal and replacement, asphalt concrete pavement overlay, repair of damaged sidewalks, driveway approaches, curbs and gutters, and access ramps.
o Budget: $2,100,000
o Status: DESIGN
o Status as of July 23, 2026:
• PW1801: MEDIAN STREETSCAPE – CIVIC CORRIDOR, ALONG CARSON STREET (From the I-405 Freeway to Grace Avenue) and Avalon Boulevard (From 220th Street to I-405 Freeway, and from Del Amo Boulevard to the SR-91 Freeway) o Location: Carson Street and Avalon Boulevard
o Description: Irrigation upgrades, landscaping upgrades in City medians o Budget: $2,000,000
o Status: DESIGN COMPLETE
o Status as of February 19, 2026: Funding anticipated to be secured for current fiscal year.

Consultant working to address revisions to PS&E package. o Status as of March 19, 2026: Staff has reviewed PS&E package and requested final changes from the consultant. Advertisement for construction is anticipated for next week.
o Status as of April 23, 2026: Project was advertised on March 26, 2026. Bid opening is anticipated for May 4, 2026.
o Status as of May 21, 2026:
o Status as of June 25, 2026: The plans were submitted to LADWP. As requested, the bid opening date was extended by an additional two weeks, to July 7, 2026. o Status as of July 23, 2026:
o Status as of August 31, 2026: Evaluation of the bids is underway. Staff report to reject all bids and staff report to award the contract have been sent to Gilbert and admin staff. o Status as of September 30, 2026: Finance was given direction to send the NOI to award contract.

Traffic Signal Improvements
• PW1612: TRAFFIC SIGNAL INSTALLATION – BROADWAY AND GRIFFITH o Location: Intersection of Broadway and Griffith Street o Description: Installation of new traffic signal
o Budget: $600,000
o Status: DESIGN
o Status as of January 22, 2026: City returned comments to consultant on the 60% plans; consultant is working to address comments.

Public Works Department September 2026 Monthly Report

Page 8 ends

o Status as of May 21, 2026: Consultant is working on 90% plans. o Status as of June 25, 2026:
o Status as of July 23, 2026: SCE working on electrical plans. Staff has reached out to the property owners at 18800 Broadway about recording an easement or dedication. o Status as of September 30, 2026: Work ongoing with SCE and with property owners regarding securing an easement.
• PW1647: I-110 FREEWAY ARTERIAL IMPROVEMENTS
o Location: Del Amo Blvd at Vermont Ave; Del Amo Blvd at Figueroa St; Del Amo Blvd at Main St; Hamilton Ave at I-110 SB on/off-ramps; Figueroa St at I-110 NB on/off ramps; Figueroa St at Torrance Blvd; Main St at Torrance Blvd; Carson St at Vermont Ave; Carson St at Figueroa St; and Avalon Blvd at Carson St
o Description: Traffic Signal Improvement at 6 intersections near I-110 /FOLA with Metro Express lanes Net Toll Revenue Reinvestment Grant
o Budget: $3,520,000 = $1,760,000 (Grant Fund) + $1,760,000 (Local Fund) o Status: DESIGN
o Status as of January 16, 2025: A meeting was held with the designers and LA County to discuss the LA County traffic signal included in this scope. Staff working to reply to the designer’s data request.
o Status as of February 19, 2026: City submitted revised Scope of Work Change Request to MTA on January 28, 2026, for their review.
o Status as of March 19, 2026: MTA confirmed that Scope of Work Change Request is being reviewed.
o Status as of June 25, 2026:
o Status as of July 23, 2026:
o Status as of August 31, 2026: As requested by Metro, Staff resubmitted the Scope of Work Change Request on July 30, 2026.
o Status as of September 30, 2026: Awaiting Metro’s response on Scope of Work Change Request.
• PW1649: HSIP H8-07-003 TRAFFIC SIGNAL UPGRADE
o Location: Intersections of Avalon Blvd at Victoria St, Main St at Sepulveda Blvd, Main St at 223rd St, and Figueroa St at Torrance Blvd
o Description: Traffic Signal Upgrades for 4 intersections with HSIP Grant o Budget: $3,330,583 = $1,522,350 (HSIP Fund) + $1,058,233 (DIF Traffic) + $750,000 (DIF MBK)
o Status: CONSTRUCTION
o Status as of February 19, 2026: Notice to Proceed issued February 4, 2026. Contractor working on submittals and getting excavation permit.
o Status as of March 19, 2026: Contractor is continuing to work through submittals. o Status as of May 21, 2026:
o Status as of June 25, 2026:
o Status as of August 31, 2026: Traffic signal poles ordered in August. Conduit work anticipated to begin in September, 2026.
o Status as of September 30, 2026: Potholing work for conduit runs and conduit installation work as begun.
• PW1657: FOR MR 312.46 AND MR 312.41, TRAFFIC SIGNAL UPGRADES Public Works Department September 2026 Monthly Report

Page 9 ends

o Location: Figueroa St at Victoria St; Main St at 220th St; Main St at Victoria St. o Main St at Albertoni St; and Figueroa St at 223rd St; and Figueroa Street at 234th St. o Description: Traffic Signal Upgrade at six (6) intersections. The proposed upgrades aim to improve signal coordination and traffic progression to alleviate arterial congestion by installing, replacing and/or updating traffic signal poles, mast arms, signal heads, controllers, cabinets, left turn phasing, CCTVs, countdown pedestrian signal heads, ADA compliant curb ramps and pedestrian push buttons, and traffic signal timing. o Budget: $5,950,000 (Measure R Grant + Local Funds)
o Status: CONSTRUCTION
▪ Status as of February 19, 2026: City Staff, LA County, and CM consultant performed site walk on February 5, 2026, to review clearances and respond to RFIs. ▪ Status as of March 19, 2026: Contractor is working on submittals. ▪ Status as of May 21, 2026:
▪ Status as of June 25, 2026:
▪ Status as of August 31, 2026: Contractor nearly complete with conduit and subsurface work. Working to relocate final traffic signal pole locations. ▪ Status as of September 30, 2026: Contractor beginning civil improvements. • PW1667: TRAFFIC SIGNAL IMPROVEMENT AT AVALON BLVD. & GARDENA BLVD. o Location: Intersection of Avalon Blvd and Gardena Blvd o Description: Traffic signal upgrade design to include protected left-turn phasing for northsouth traffic. o Budget: $1,000,000 (Measure M Grant)
o Status: CONSTRUCTION
o Status as of February 19, 2026: Contractor performed potholing, submittals of RFIs and equipment orders.
o Status as of March 19, 2026: Contractor working on proposal for additional work to address required changes from plans.
o Status as of August 31, 2026: Traffic signal pole order anticipated for delivery in December 2026, construction work to resume prior to that.
o Status as of September 30, 2026: No update.
• PW1784: CENTRAL AVE. AT UNIVERSITY DR. TRAFFIC SIGNAL IMPROVEMENT o Location: Intersection of Central Avenue and University Drive. o Description: Installation of left turn arrows at existing signalized intersection o Budget: $800,000
o Status: CONSTRUCTION
▪ Consultant preparing 60% plans.
▪ Status as of February 19, 2026: Bidding is still in progress. ▪ Status as of March 19, 2026: Bidding closed March 12, 2026. Seven bids were received. Notice of intent to award was issued March 17, 2026. ▪ Status as of May 21, 2026:
▪ Status as of June 25, 2026:
▪ Status as of August 31, 2026: Held a project kick off meeting. Contractor is mobilizing to provide material submittals and obtain encroachment permit for potholing.

Public Works Department September 2026 Monthly Report

Page 10 ends

▪ Status as of September 30, 2026: Utility potholing is underway and long-lead time materials have been approved.
▪
Summary of All Traffic Signal Projects:

Location/Intersection Construction Start Date Anticipated Construction Completion Date PW 1612 – Broadway at Griffith St In Design TBD
PW 1667-Avalon Blvd at Gardena Blvd February 2026 TBD
PW 1649-Avalon Blvd at Victoria Ave March 2026 TBD
PW 1784- Central Ave at University Dr September 2026 June 2027 PW 1647-Del Amo Blvd at Figueroa St In Design TBD
PW 1736 Dolores St. at 223rd St. (CIP 24-25 Design)
PW 1657-Main St at 220th St March 2026 TBD
PW 1649 -Main St at 223rd St March 2026 TBD
PW 1657-Main St at Albertoni St March 2026 TBD
PW 1649-Main St at Sepulveda Blvd March 2026 TBD
PW 1657-Main St at Victoria St March 2026 TBD
PW 1657-Figueroa St at 223rd St March 2026 TBD
PW 1657-Figueroa St at 234th St March 2026 TBD
PW 1649-Figueroa St at Torrance Blvd March 2026 TBD
PW 1657-Figueroa St at Victoria St March 2026 TBD
* Delays due to long-lead items and supply chain issues Stormwater Improvements
• PW1682: STORMWATER FACILITIES & IMPLEMENTATION PLAN
▪ Location: Citywide
▪ Description: Developing a plan to identify potential new stormwater facilities that are needed for compliance with the City’s National Pollutant Discharge Elimination Systems (NPDES) permit. Ensures that we have clean water in our local waterbodies and helps with climate resiliency through water capture and pre-treatment and reduces our impact on the oceans.

To also update the Enhanced Watershed Management Plan, which is a document that is used to maintain compliance with the City’s NPDES permit. This is needed to keep up to date with permits from the State.
▪ Current Phase: PLAN DEVELOPMENT AND SITE SELECTION
▪ Status as of March 19, 2026: Grant funding opportunities are being processed through the Safe Clean Water Program and we expect updates by the end of the fiscal year.
▪ Status as of April 23, 2026: Grants were provisionally awarded for two projects. ▪ Status as of August 31, 2026: Working with consultant on the Victoria Park Feasibility Study. This will be spun into a new CIP project. • PW1776 CALAS PARK STORMWATER SUPPLEMENTAL ENVIRONMENTAL PROJECT ▪ Location: Calas Park
▪ Description: Joint project with Los Angeles County Sanitation Districts to construct a stormwater treatment and capture facility. This project will divert water from the Public Works Department September 2026 Monthly Report

Page 11 ends

storm drain and allow it to be cleaned and/or reused in the park while also improving park facilities.
▪ Current Phase: Request for Proposals to perform design services. ▪ Status as of February 19, 2026: Authorization for construction scheduled for the March 17, 2026, City Council meeting.
▪ Status as of March 19, 2026: Approved through City Council. Finalizing the documents required for permits and awaiting approval from the State Water Boards for changes in design.
▪ Status as of April 23, 2026: Awaiting final approval and permits. ▪ Status as of August 31, 2026: LACFCD required revised agreement for final permit, awaiting City Council authorization for first meeting of September.

Once permit is issued, will proceed with construction bidding. • PW1676 STORMWATER GREEN STREET ENGINEERING, DESIGN &

IMPLEMTATION
▪ Location: Gardena and Main Street
▪ Description: Stormwater treatment project to construct tree wells and a dry well on Gardena and Main Street, which will filter and clean water from the streets. ▪ Current Phase: In Design
▪ Status as of February 19, 2026: 90% Design has been submitted and is under review. ▪ Status as of March 19, 2026: Comments to be provided on 90% design ▪ Status as of April 23, 2026: Field review was performed on April 22, 2026, in preparation for the final design.
▪ Status as of August 31, 2026: Reviewing 100% design
Bike Lane Projects
• PW1451 & 1452: BIKE LANE INSTALLATION
▪ Location: Figueroa Street, Main Street, Victoria Street, and Carson Street. University Drive, Avalon Boulevard, Central Avenue, Del Amo Boulevard, and 223rd Street. ▪ Description: Design and construction of bike lane facilities ▪ Budget: PW1451 = $4,900,000.00; PW1452 = $4,900,000.00 ▪ Current Phase: DESIGN
▪ Final design plan review to be completed in January 2024 ▪ Status as of February 19, 2026: No update on SCE plans, Program Supplemental Agreement for 1451 approved at City Council on February 17, 2026. ▪ Status as of March 19, 2026: SCE communicated that City should receive 60% electrical plans for City to review in April 2026.
▪ Status as of August 31, 2026: Developing 90% design plans for streetlight relocation work.

Bid package is drafted and ready for final plans
▪ Status as of September 30, 2026: Developing 100% design plans for streetlight relocation work. RFP for construction management and inspection was advertised. ▪
• PW1490 & 1600: DOMINGUEZ CHANNEL BIKE PATH INSTALLATION PHASES I & II ▪ Location – Phase I: Main Street to Avalon Boulevard
▪ Location – Phase II: Avalon Boulevard to Carson St.
▪ Description: Installation of Bike path along Dominguez Channel ▪ Budget: $9,000,000.00 (PW1490); $5,500,000.00 (PW1600) ▪ Current Phase: DESIGN AND PERMITTING
Public Works Department September 2026 Monthly Report

Page 12 ends

▪ Status as of March 19, 2026: Structural engineer is working on reaction loads and anticipates completion by end of March 2026. The environmental document will be updated, and the civil plan can be revised.
▪ Status as of July 23, 2026:
▪ Status as of August 31, 2026: Consultant submited plans for LA County review. ▪ Status as of September 30, 2026: No update.
• PW1534: ACTIVE TRANSPORTATION PROGRAM – SANTA FE BIKE LANE ▪ Location: Santa Fe Ave and City-wide
▪ Description: Construct bike lane on Santa Fe Ave; install curb ramps city-wide; install speed feedback signs city-wide; install crosswalks city-wide; install pedestrian push buttons and countdown heads city-wide
▪ Budget: $3,491,000
▪ Status: DESIGN
▪ Status as of July 23, 2026: Notice of Exemption was filed with LA County ▪ Status as of August 31, 2026: Consultant is preparing existing conditions plans. ▪ Status as of September 30, 2026: Existing conditions plans are under review.

Park Improvements
• PW 1368: CARRIAGE CREST PARK REDEVELOPMENT
o Location: Carriage Crest Park
o Description: Improve site condition of existing park and develop newly acquired 10-acre parcel for new athletic ballfields (baseball & soccer) with a new dog park, installation of allabilities playground, renovation to the existing building, construction of new picnic shelters, concession stand, restroom, and walking path. o Status: Construction
▪ Status as of February 19, 2026: Playground Equipment has been set and foundations poured. The structure is fully installed and progressing well toward completion. Restroom & Storage Buildings Concrete slabs have been poured, and CMU block walls are rising — currently at four (4) feet of constructed block. Door frames are set, underground plumbing is in place, and work continues to advance toward enclosure. Concession Stand / Restroom Building Over-excavation has been completed, and foundations are progressing. BMPs have been deployed to protect the work from rain impacts. Monument Sign Steel structure has been installed, and concrete footings are poured. Both MWS #1 and MWS #2 have been installed and backfill is currently underway. Manhole installations are complete and walkway/manhole structure concrete pours are ongoing. In the Figueroa parking lot, gutters and flow lines have been cut and are ready for compaction and inspection. ▪ Status as of March 19, 2026: Monument Sign CMU has been installed to the second level and is ready for the second/bottom arch installation. CMU work for the Sepulveda parking lot buildings is complete. V-ditch installation along the retaining wall is complete. Methane mitigation barrier installation is underway at the concession building, where sewer pipe encasement in concrete has also been completed. MWS #1 inlet storm drain has been installed and backfilled, and MWS outlet storm drain installation is currently underway. Concrete pours are ongoing along the north side of the park, with north-side walkway forms and rebar having been installed and poured. Pickleball and exercise area grading is complete and has Public Works Department September 2026 Monthly Report

Page 13 ends

been submitted for inspection. Restroom and storage building CMU work around the Sepulveda parking lot is complete, with formwork and successive lifts of block installation having progressed through the reporting period. BMPs were deployed during a rain event earlier in the reporting period, with standing water at MWS #1 subsequently pumped out and grading operations in the northwest corner of the site resumed.
▪ Status as of April 23, 2026: Methane mitigation barrier for the Concession Building has been installed and tested (test #1 passed). Rebar and foundation work completed, footings cured, and the building is now ready for the first lift of CMU.

Methane mitigation work remains ongoing. Monument Sign CMU installed to the second level, with the reader board, arches, and ironwork all complete. Blockwork is ongoing as the structure awaits remaining CMU installation. Sepulveda Parking Lot CMU work for the parking lot buildings is complete. Roof framing is underway for the storage shed and restroom buildings. Curb and island concrete work has also been completed. Site Utilities & Drainage MWS backfill and storm drain outlet work completed. MWS unit filters have been filled with gravel. Storm drain outlet installation is finished. Concrete & flatwork concrete and flatwork have been progressing continuously throughout the park, including along the north side. The Figueroa driveway approach concrete work is complete. CCTV / Electrical Change order request (COR) work is underway for CCTV and electrical systems.

Scoreboards have been installed. General Sitework V-ditch installation along the retaining wall is complete. Playground equipment is visible and in place. ▪ Status as of June 25, 2026: Concrete work surrounding the playground and fitness areas is substantially complete. Fitness equipment has been installed in the designated zones. Block work on the concession building is underway, and installation of the door frames is in progress. Planting has been carried out along the northern perimeter hillside, with new shrubs and groundcover placed along the slope above the retaining wall. The sub-drain barrier for the soccer field has been installed, along with the associated pump stations.
▪ Status as of July 23, 2026:
▪ Status as of August 31, 2026: Completed milestones include CMU work at the concession building, the Moneta entrance stairs, the playground rubberized surface (substantially complete), restroom building plumbing, storage building trusses, installation of the steel plate over the storm drain, red decomposed granite installation, removal of trees interfering with SCE gear, erection of the gable shade structure, installation of the Moneta entrance posts with curb and footing poured, outfield netting post installation at Ballfields 2 and 3, sod installation at Ballfield 1 and the volleyball court, and storm drain connections at MWS #1 and #2.1806
▪ Work currently under construction includes fescue sod installation, Bermuda turf establishment in the ballfield and volleyball areas, asphalt concrete paving at the Figueroa parking lot, storage building roof work, court surfacing, SCE transformer pad and retaining wall preparation, CMU block installation at the trash enclosure, dugout fencing mesh installation, and the playground shade sails and splash pad area, which is reported as nearing completion.
▪ Status as of September 30, 2026:

Completed
• Pickleball and basketball court surfacing and striping Public Works Department September 2026 Monthly Report

Page 14 ends

• Sepulveda parking lot asphalt (two lifts), concrete curbs and gutters • Sheet metal roofing on the Sepulveda parking lot buildings (storage and restroom)
• Transformer pad and conduit installation
• Switchgear enclosure installation
• Transformer retaining wall; SCE inspections passed
• Ballfield outfield netting (substantially complete)
Under Construction
• Figueroa parking lot asphalt
• Dog park mow curb concrete pour
• Concession building interior work
• Infield mix installation on all three ballfields
• Final sod installation along Sepulveda
• PW1515: CARRIAGE CREST PARK STORMWATER CAPTURE
o Location: Northeast corner of Sepulveda and Figueroa St. o Description: Installation of Stormwater chambers to capture and divert stormwater to Los Angeles County Sanitation District. This water will be used to augment the reclaimed water for regional use. This type of stormwater project is the first of its kind in California. o Status as of February 19, 2026: Facility is capturing water, LACSD is working on repairs to the outfall actuators and testing instrumentation.
o Status as of March 19, 2026: Facility is capturing water, grading issues and final punch list items are being addressed.
o Status as of April 23, 2026: Storm drain connections are being completed along with the Carriage Crest Park Expansion Project.
o Status as of May 21, 2026:
o Status as of June 25, 2026: The plant is in operation. The Sanitation District staff is fine tuning and moving to the Operations & Maintenance phase of the project. o Status as of July 23, 2026: Staff is collaborating with the Sanitation District to develop the Operations and Maintenance Agreement.
o Status as of September 30,2026: Sanitation is operating the plant within the agreement of the Operation and Maintenance Agreement.
• PW 1610: FOISIA PARK DESIGN
o Location: Foisia Park
o Description: Improve site condition of the existing park with the construction of new stage area, new picnic area, shade structures and new outdoor exercise stations as well as renovations to the athletic ballfields, playground, restrooms, concession building, marquee sign and parking lot
o Status: DESIGN
o Status as of February 19, 2026: Construction is complete. Finalizing punch list items. o Status as of March 19, 2026: Still working through punch list items. Maintenance is active. o Status as of April 23, 2026: Still working through punch list items. Maintenance is active. o Status as of July 23, 2026:

Public Works Department September 2026 Monthly Report

Page 15 ends

• PW 1636: MILLS PARK DESIGN
o Location: Mills Park
o Description: Improve site condition of the existing park with construction of new splash pad, outdoor restroom, and an outdoor full-court basketball area as well as renovations to picnic areas, installation of shade structures, marquee sign and parking lot o Status: AWARD CONTRACT
▪ Status as of February 19, 2026: Mills Park Building and Site will be combined into one project which will be advertised March 2026. ▪ Status as of March 19, 2026: Rebid plans for site work were revised based on current site conditions. Project is ready to be advertised as a stand-alone project or with Mills Park Building Project No. 1795.
▪ Status as of April 23, 2026: Project Nos. 1636 and 1795 will be advertised in one bid package. Proposed advertise date is April 30, 2026. o Status as of August 31, 2026: Engineering staff received copy of executed construction contract on August 31,2026. After a requisition is entered a Purchase Order can be issued.

Estimated construction start date is September 2026. Estimated Completion Date is March 2027 for Project No. 1636 and September for Project No. 1795. o Status as of September 30, 2026: Construction to start October 13,2026. Staff has not been issued a purchase order.
• PROJECT NO. 1795: MILLS PARK BLDG RENOVATION
• Status as of February 19, 2026: Mills Park Building and Site will be combined into one project which will be advertised March 2026.
• Status as of March 19, 2026: Staff rejected building and perimeter sitework plans from consultant due to the lack of quality control. Designer is currently revising and doing a quality review on plans. Staff is also reviewing plans with Park Maintenance division. Estimated date to advertise project is April 9, 2026. • Status as of April 23, 2026: Project Nos. 1636 and 1795 will be advertised in one bid package. Proposed advertise date is April 30, 2026. • Status as of August 31, 2026: Engineering staff received copy of executed construction contract on August 31,2026. After a requisition is entered a Purchase Order can be issued. Estimated construction start date is September 2026. Estimated Completion Date is March 2027 for Project No. 1636 and September for Project No. 1795.Status as of August 31, 2026: Engineering staff received copy of executed construction contract on August 31,2026. After a requisition is entered a Purchase Order can be issued. Estimated construction start date is September 2026. Estimated Completion Date is March 2027 for Project No. 1636 and September for Project No. 1795. o Status as of September 30, 2026: Construction to start October 13,2026. Staff has not been issued a purchase order.
• PW 1806: DEL AMO PARK IMPROVEMENTS
• Location: Del Amo Park
• Description: Improve drainage on the northeastern portion of the park’s field, improve condition of the basketball court and improve play structures.

Public Works Department September 2026 Monthly Report

Page 16 ends

• Budget: $600,000 (Design)
• Status: Request for Proposals
• Status as of February 19, 2026: Proposals for design are due on March 5, 2026. • Status as of March 19, 2026: Proposals were received on March 10, 2026, and are being reviewed.
• Status as of August 31, 2026: Due to high bids well above budget, solicitation was paused. Negotiating lower design cost with consultant.
* On-going and maintenance related efforts at the Parks are also included within other categories below depending on the project management and type of work.

Building Improvements
• PW1632: COMMUNITY CENTER COILING WALL
o Location: Carson Community Center – 801 Carson St.
o Description: Removal and replacement of existing coiling wall at Community Center Hall A, B, and C. Renovations shall include, at a minimum upgrade to bring the facilities up to current standards and applicable California Building Code (CBC) standards. The project also includes upgrades to the existing lighting and sound system in Hall A, B, and C. o Budget: $1,700,000.00
o Status as of February 19, 2026: Working through disputed items. o Status as of March 19, 2026: Several panels experienced delamination; repair work is being scheduled for repairs.
o Status as of April 23, 2026: Wall panes are expected to arrive in August. Staff is still working with the vendor to reconcile disputed items.
o Status as of August 31, 2026: contractor has not accepted a settlement offer. • PW1693: ELECTRIC VEHICLE CHARGING INFRASTRUCTURE (SCE CHARGE

READY PROGRAM)
o Location: 10 City Parks and Corporate Yard
o Description: Install 126 EV Chargers in City Parks and at the Corporate Yard o Budget: City staff labor to Project Manage, but no capital fund costs to City o Current Phase: DESIGN / PLAN CHECK
o Status as of July 23, 2026:

Electric Vehicle Charging
Infrastructure Location
Construction Start Date Anticipated Construction
Completion Date
Veterans Park Plan Review TBD
Dominguez Park Plan Review TBD
Anderson Park Submitted to Plan Check TBD
Corporate Yard 1 Plan Review TBD
Corporate Yard 2 In Design TBD
Carriage Crest Park Plan Review TBD
Carson Park Plan Review TBD
Dolphin Park Plan Review TBD
Stevens Park Plan Review TBD
Hemmingway Park Plan Review TBD
Hemmingway Aquatic Center Plan Review TBD
Public Works Department September 2026 Monthly Report

Page 17 ends

• PW1720: ELEVATORS AT CITY HALL AND COMMUNITY CENTER
o Location: City-Hall and Community Center
o Description: Refurbish and Modernize Elevators at the Community Center and City Hall due to end-of-service life and maintainability. Elevators will be out of service during the active repair work for a duration of less than three months. o Status: CONSTRUCTION IN PROGRESS
▪ Contracts for construction are being routed for signatures. ▪ Working with vendors to meet the insurance requirements. o Status as of July 23, 2026:
• PW 1726/1727: COMMUNITY CENTER COURTYARD & EAST PARKING LOT o Location: Community Event Center
o Description: Construction of Courtyard, outdoor amphitheater stage, wedding venues and installation of shade structures.
o Status as of February 19, 2026: Punch list items are expected to be complete by March 19, 2026. Permanent louver installation for two pergolas is estimated to start May 2026. o Status as of March 19, 2026: Three punch list items are open. ▪ Pergola Louvers – expected to be complete by July 2026 ▪ Broken B12 irrigation lid – complete by week of March 23, 2026 ▪ Missing bolts on circular irrigation lids – complete by week of March 23, 2026 o Status as of April 23, 2026: Landscape maintenance period was completed on April 9, 2026.

All punch list items are complete. Louver for pergolas will be delivered in June 2026.

General contractor (PCN3) will complete louver installation two weeks after delivery. o Status as of September 30, 2026: Pergola A & B Louver installation was completed and signed off by building and safety on September 28,2026. Project is complete. • PROJECT: UNDERGROUND STORAGE TANK PROJECT
o Location: City Hall
o Description: Repairing the underground fuel storage tank due to the secondary pipe being cracked. The backup generator remains operational, and the main fuel pipe remains in good working condition.
o Status: CONSTRUCTION IN PROGRESS
▪ New fuel has been installed in the fuel tank, the fuel pump on the day tank needs to be repaired before Cummings can finalize the repairs. o Status as of July 23, 2026:
• PW1786: CITY HALL RESTROOM AND KITCHENETTE UPGRADES
o Status as of May 20,2024: Material palette for all restrooms and City Council break room was selected on 5/14/2024. Estimated accelerated project schedule is as follows:
▪ 100% Construction Drawings June 2024
▪ Submit to Building and Safety for Plan Check June 2024 ▪ Advertise July 2024
▪ Award Construction Contract August 2024
▪ Execute Contract and Issue Purchase Order August 2024 ▪ Preconstruction and Material Order August 2024
▪ Re-locate Staff August 2024
▪ Start Construction (2nd Floor and Council Area) September 2024 Public Works Department September 2026 Monthly Report

Page 18 ends

o Status as of February 19, 2026: Contractor is expected to finalize the installation of the redesigned toilet compartments in the second-floor lobby restrooms by February 27,2026.

The remaining portion of the project is on hold.
o Status as of March 19, 2026: Alternate toilet compartments at the second-floor restrooms have been installed. Installation of the water heater door is pending, expected to be installed March 26, 2026. Proposed contractor by management: “Jacome Construction / Golden State Builder” is nonresponsive to submitting a proposal for the City Council breakroom and single occupant restroom.
o Status as of April 23, 2026: Project is on hold. Staff and management met with Rene Cortez from United Building Maintenance for potential proposal for council restroom and breakroom renovations.
o Status as of August 31, 2026:
▪ Council Breakroom Renovation: City staff called Rene from United Building & Development Services at 1:36 PM on August 31,2026 and Rene was still reviewing the agreement that City staff sent to him on August 6,2026. To date, City staff has not received a signed agreement, original bond copies, non-collusion affidavit, and certificate of non-discrimination from Rene (UB&DS, LLC). Rene from UB&DS LLC has not been able to confirm when the requested documents will be sent to the City. ▪ City Hall Restroom/Kitchenette Renovations (1st Floor): Project is suspended. City staff is reviewing a credit change order from contractor (Caltec) for all change orders approved but not completed. City staff is also reviewing a request for extended general conditions from the Contractor.
o Status as of September 30, 2026:
▪ Council Breakroom Renovation: United Building & Development Services started work on September 19,2026. Contract is for 60 Calendar Days.
▪ City Hall Restroom/Kitchenette Renovations (1st Floor): Project is suspended. City staff is reviewing a credit change order from contractor (Caltec) for all change orders approved but not completed. City staff is also reviewing a request for extended general conditions from the Contractor.

OPERATIONS AND MAINTENANCE DIVISION
The Operations and Maintenance (O&M) Division is the second half of Public Works' Operations at the Corporate Yard. This Division is responsible for maintaining infrastructure within the public right-of-way (ROW) to ensure public safety. Additionally, the O&M Division is responsible for environmental and hazardous waste clean-up, signage, pavement markings, striping, streets – asphalt & concrete, sidewalk sweeping, materials abatement, and construction. O&M also works with solid waste management including demolition and waste diversion, used oil collection, solid and organic waste, and streetlight maintenance/signal light malfunctions, electronic & beverage container recycling management. The assets of the Division include warehouse inventory, fleet vehicles, and heavy equipment. O&M also provides landscaping by tree trimming, ROW maintenance, median maintenance, and parkway trees. These services enable the safe use of public spaces, enhance the cleanliness of the city, and provide greenery to increase the beautification of the public ROW.

PROJECT: CONCRETE SIDEWALK GRINDING
This is an ongoing maintenance operation throughout the year for safe pedestrian travel. o Location: Citywide
o Description: The project involves grinding sidewalks and pathways identified as requiring grinding due to uplifting or posing a hazard to pedestrians.

Public Works Department September 2026 Monthly Report

Page 19 ends

o In-house staff will be grinding sidewalk lifts per maintenance zones 1-7 as needed to eliminate sidewalk hazards immediately.
o Status as of September 30: Staff will be grinding sidewalk lifts per maintenance zones 1-7 as needed to eliminate sidewalk hazards immediately. o
PROJECT: ANNUAL CITYWIDE PAVEMENT MAINTENANCE
o Status as of January 16, 2025
▪ Award of contract (consideration) pending City Council approval. ▪ Phase five (5) anticipated to start March/April 2025, contingent upon contract award by City Council.
o Status as of February 20, 2025:
▪ Contract awarded to All American Asphalt; Phase Five anticipated to start mid to late April.
o Status as of March 20, 2025: Citywide paving is scheduled to start mid to late April. o Status as of April 21, 2025: Phase Five is still on schedule to begin work mid to late April. o Status as of May 22, 2025: Phase Five is currently underway. The streets for Phases Six (6) and Seven (7) have been shared with the contractor.

Status as of June 18, 2025: Currently working on Phases 6 and 7 of the Annual Citywide Paving Maintenance Project.
o Status as of July 24, 2025: Phases 6 and 7 are complete. Stripping is being completed, along with finishing touches to the roadway.
o Status as of August 20, 2025: Phase 8 of the Annual Paving Project is scheduled to begin in late September.
o Status as of September 18, 2025: The Annual Paving project has been re-scheduled to start at the end of October.
o Status as of October 23, 2025: No update
o Status as of November 20, 2025: Staff are meeting with the team on November 24, 2025, to begin coordinating the next phase.
o Status as of December 17, 2025: Contractor is addressing arterials (Figueroa & Avalon) The list of streets for Phase 9 of citywide residential paving is currently being finalized. o Status as of January 22, 2026: Phase 9 of the Annual Paving Maintenance started as of January 19, 2026.
o Status as of February 19, 2026: Phase 9 is nearing completion and Phase 10 will start up as soon as weather permits.
o Status as of March 19, 2026: Phase 10 of the Annual Paving Maintenance began on March 19, 2026.
o Status as of April 23, 2026: Phase 10 is nearing completion. The contractors are restriping the recently paved streets as well as raising manholes and installing signal loops. o Status as of June 25, 2026: Funds were approved at the June 16, 2026, City Council Meeting, to continue with the citywide paving. Phase 11 will be starting up soon. o Status as of July 23, 2026:
o Status as of September 30: finishing up striping and adjusting utility lids. • ENVIRONMENTAL SERVICES-ONGOING
o Perform regular routine patrol to identify and coordinate removal of illegal dumping, hazardous waste, and proper removal for bulky items.
o Monitoring construction & demolition projects for residents & businesses Public Works Department September 2026 Monthly Report

Page 20 ends

o Monitoring of street sweeping contractor.
o Perform Inspections & enforcement for SB 1383 – Organic Recycling, Edible Food Recovery, Food Recovery Organizations and Food Recovery Services o Interface with LA County Hazardous Waste Team to identify Haz. Mat. Items in the Right of Way.
o Status as of March 19, 2026: Preparing for the E-Waste Recycling and Paper Shredding event scheduled for Saturday, May 9, 2026.
o Status as of April 23, 2026: Currently planning and preparing logistics for E-Waste & Paper Shredding Event on Saturday, May 9th. 2026. Draft emails to assemblymember representatives, City departments, and other vendors to coordinate attendance and logistics. Interface with PIO and other City departments to broadcast and bring awareness to the event.
o Status as of May 21, 2026:
o Status as of June 25, 2026: Performed regular routine patrols to identify and coordination removal of illegal dumping, hazardous waste, and proper removal for bulky items. o Status as of July 23, 2026:
o Status as of September 30: Currently planning and preparing logistics for E-Waste & Paper Shredding Event on Saturday, October 11th. 2026. Draft emails to assemblymember representatives, City departments, and other vendors to coordinate attendance and logistics. Interface with PIO and other City departments to broadcast and bring awareness to the event.
o
• MAINTENANCE: CONCRETE & ASPHALT
o Location: Citywide
o Description: Monthly summary of work performed by City maintenance crews who regularly inspect the City’s infrastructure and perform preventive maintenance to ensure safe and cost-effective operations
o Status as of February 19, 2026: University Drive sidewalk project has been completed and work on Santa Fe will begin once the identified trees have been removed. The crew is scheduled to start pouring concrete on February 19, 2026. o Status as of March 19, 2026: Currently working on curbs, sidewalks, and gutters in Maintenance Zone 4. The sidewalk on Santa Fe Avenue is approximately 70% complete. o Status as of April 23, 2026: Completed Santa Fe concrete project. Continuing to follow up on work orders by district and maintenance zones on a two-week rotation. o Status as of June 25, 2026: Asphalt team is skin patching Avalon from 228th to Sepulveda and various arterial streets. Concrete team is working through work orders in each district for sidewalk maintenance.
o Status as of July 23, 2026:

Status as of September 30: Staff will be grinding sidewalk lifts per maintenance zones 1-7 as needed to eliminate sidewalk hazards immediately. o
• MAINTENANCE: SIGNING & STRIPING AND GRAFFITI ABATEMENT o Location: Citywide
o Description: Monthly summary of work performed by City maintenance crews who regularly inspect the City’s infrastructure and perform preventative maintenance to ensure safe and cost-effective operations.
o Status as of January 16, 2025:
▪ Layout and re-striping of newly slurry sealed streets city-wide, weather permitting. • ONGOING
Public Works Department September 2026 Monthly Report

Page 21 ends
← All documents from this meeting