EXHIBIT “A”
Scope of Services

The Scope of Work included in Amendment No. 1 is described in the attached proposal dated January 18, 2022.

1200 Roosevelt

• Irvine • CA 92620 • (949) 861
-
4999 • www.advantec
-
usa.com

Because We Care
!

January 18, 2022

Mr. John A. Corella, PE

Director of Engineer/Public Works

City of Cathedral City

68 -
700 Avenida Lalo Guerrero

Cathedral City, CA 92234

SUBJECT:

Additional

Professional
Services
for

HSIP Cycle 9 Project:

HSIPL
-
5430 (034)
,

Twelve

(
12 ) Intersections Traffic Signal Modifications (City Project: CO8752)

Mr.

Corella
,

ADVANTEC Consulting Engineers, Inc. (ADVANTEC), is pleased to present our addendum to provide additional professional traffic engineering services
associated with

City Project: CO8752
; HSIP Cycle 9
Project: HSIPL
-
5430 (034)
,

Twelve (12)

Intersections Traffic
Signal Modifications
.

The additional services are based

on

Caltrans approval of the City of
Cathedral City
's

HSIP Cycle 9 Project
Grant Application Scope Change Request
.

Details for the additional work is described in
Exhibit A
.

ADVANTEC appreciates the opportunity to submit this
letter proposal and looks forward working with
t
he City. Our scope of services and
schedule
are provided

in
Exhibit A
, and fees are provided in

Exhibit
B
.

If you have questions, please feel free to contact me
on my
cell

at

(714) 904
-
0067
or

jdorado@advantec
-
usa.com
.

Sincerely,

ADVANTEC Consulting Engineers, Inc.

John Dorado, PE

Project Manager

Carlos Ortiz, PE, TE, PTOE

Project Director

Chief Operating Officer/Principal

City Project: CO8752; HSIP Cycle 9 Project

-

Addendum No. 1

City of
Cathedral City

January 18, 2022

2 EXHIBIT A

SCOPE OF SERVICES

for
ADDENDUM NO. 1

City Project: CO8752; HSIP Cycle 9 Project: HSIPL
-
5430 (034),
Twelve
(12)

Intersections Traffic Signal Modifications

The additional services are based on Caltrans approval of the City of Cathedral City
's

HSIP Cycle 9 Project
Grant Application Scope Change R
equest
.

The work includes updating the design of five intersections that have overlapping improvements with the
Coachella Valley Association of Governments (CVAG) Phase I Regional Traffic Signal Synchronization Project (RTSSP)
that
is currently under co
nstruction
, and adding two intersections with traffic signal
improvements.

This requires updates to
project plans, te
chnical

specifications, and estimates
. This also
requires
revisions
to the environmental documentation

due
to
the change of work
at the five intersections
and
with the addition of two intersections.

Table 1

shows
the five intersections that have overlapping improvements with

CVAG RTSSP Phase
I
project.

Table 1

–

Overlapping Improvements

No.

Intersection

Description of

CVAG RTSSP Phase I Improvements that Overlap with Cathedral City HSIP Cycle 9 Grant Application

1 Ramon Road / Whispering
Palms Trail

1. New
Video Detection System

2. New Controller

2 Ramon Road / Cathedral
Canyon
Drive

1. New
Video Detection System

2. New Controller

3 El Dorado / Palm Canyon
Drive

1. New Video Detection System

2. New Controller

4 Ramon Road / Desert Vista
Road

1. New Video Detection System

2. New Controller

5 Da Vall Drive / Ramon Road

1. New
Video Detection System

2. New Controller

ADVANTEC will update
the five

traffic signal modification plans that we prepared to reflect these improvements by others.

Table 2

shows the
two
additional intersections including recommended
improvements.

City Project: CO8752; HSIP Cycle 9 Project

-

Addendum No. 1

City of
Cathedral City

January 18, 2022

3 Table
2 –

Additional Intersections and Recommended Improvements

No.

Intersection

No. of
Video
Detection
Cameras

New

Traffic
Signal

Controller

Countdown
Ped Heads

APS Ped
Push Buttons

1 Date Palm Drive at
Gerald Ford Drive

4 1

6 6

2 Dinah Shore Drive
and Cathedral
Canyon Drive

4 1

8 8

ADVANTEC will prepare
traffic signal modification plans for
two intersections and incorporate into the
project plan set.

The additional work
includes the following:

Project Management and Coordination

Field work

Utility Coordination

Environmental Documentation

Final Plans
-

Title Sheet, Traffic Signal Modifications, and Details

Technical Specifications

Final Estimate of Quantities and Costs

T
he following summarizes our tasks to complete the
additional
scope of services
:

Task 1

Project Management,
Coordination,

and Meetings

ADVANTEC will provide
additional P
roject Management activities
to manage the additional work and
tasks identified in this addendum. This includes additional coordination with project team task and the City including bi
-
weekly conference calls with the City’s Project Manager in order to provide up -
to
-
date
project statu
s, discuss any concerns or issues, and follow
-
ups on any requests or action items.

Deliverables:

Additional p
roj
ect management
, coordination, and meetings.

Task 2

Field Work

and Data Collection

ADVANTEC will coordinate with City staff, collect and revie w available data for use and reference
associate with the project improvements. ADVANTEC’s Senior Traffic Engineers/Field Technicians will conduct a thorough field review of existing conditions at the two (2) signalized intersections .

Upon completion of the above items, ADVANTEC will identify potential constraints that may be encountered in relation to the proposed improvements. This information will be used to prepare base mapping and proposed improvements at the project intersections.

Deliverables:

Data collection inventory matrix, field review notes, and photos

for two intersections.

Task 3

Utility Coordination

ADVANTEC will request locations for existing and proposed underground and overhead utilities for the two additional inters
ections. Utility notification and coordination will be required to ensure quality City Project: CO8752; HSIP Cycle 9 Project

-

Addendum No. 1

City of
Cathedral City

January 18, 2022

4 design and help eliminate utility conflicts during construction. Utility notifications will be provided to the various utility owners within the sphere of each project inters ection; the notifications will be prepared
using the City’s letterhead.

Please note: ADVANTEC’s fees do not include fees or costs associated with the processing and collection of as
-
built plans or documentation from the utility companies. Typically, fees

are waived
when submitting utility requests using the City’s letterhead .

Deliverables:

Utility notification and coordination, utility letters, utility plans and utility coordination matrix

for two intersections.

Task
4 Environmental Documentation

Our s
ubconsultant, Dudek, will
update the
environmental documentation

including

modifying the work
at

five intersections and adding two intersections.

Dudek will use the existing conditions information, updated project description, and photos provided by
ADVANTEC. This information will be used to update the PES form including attachments required for the City and Caltrans submittals, review and approval.

Deliverables:

Update the PES form including attachments required for the City and Caltrans

submittals review and approvals

for two intersections

Task
5 Final Plans

ADVANTEC will modify five traffic signal modification plans that we prepared to reflect improvements by others.

ADVANTEC will prepare two additional
traffic signal modification plans
and incorporate into the
project plan set.

The plans will include all
b
ase mapping, as
-
built information and utilities, and all
existing and proposed
dilemma zone improvements, traffic signal poles and equipment, communication infrastructure, advanced dilemma zone detection,

pole schedules, conductor schedules,

construction n
otes, and any
details necessary to facilitate the installation and construction of the project improvements.

The
traffic
signal modification
plans will be prepared at 1” =20’ scale in AutoCAD in accordance with the latest State, County, and City Standard
s. The design will conform to the latest State of California Department of Transportation (Caltrans) Standard Plans and Specifications and the California MUTCD.

Deliverables:

Modify the current plans set, updated five sheets, and add two traffic signal modifications plans sheets.

Task 6

Technical Specifications

ADVANTEC will
updated

the project Technical Specifications and Bid Documents based on the project design plans and the associated improvements per the City of Cathedral City requirements and the

latest Caltrans Standard Plans and Specifications; California Manual on Uniform Traffic Control Devices (CA MUTCD), and the GREENBOOK. The technical specifications will include a project description, preparation of bid schedules, bid item descriptions, pa yment methods, special provisions, technical
specifications, and any specification detail sheets or standard plans.

The project Technical Specifications
will be prepared and signed by a registered Civil Engineer in the State of California.

City Project: CO8752; HSIP Cycle 9 Project

-

Addendum No. 1

City of
Cathedral City

January 18, 2022

5 Deliverables:

U
pdate
Technical Specifications
.

Task 7
Construction Quantities and Engineer’s Estimate

ADVANTEC will
updated and
prepare construction quantity take
-
offs and construction cost estimates for
the
updated

traffic signal
imp
rovements

at five intersections, and adding two intersections. The

unit
costs will be based on current cost data and historical cost data associated with the identified bid items.

Preliminary and final quantities and construction cost estimates will be provided to the City.

Deliverables:

Updated Construction Quantities and Engineer’s Estimates .

Task
8 Environmental Technical Studies
-

APE Map/ASR/HPSR (Optional)

Our subconsultant, Dudek, will
provide additional environmental technical studies as an option due to additional
two intersections.

The
following cultural resources scope of work is designed to obtain the necessary project approvals in

consideration of effects to historic properties under Section 106 of the National Historic Preservation Act (NHPA).

All

cultural resources documentation will be completed in conformance with Caltrans requirements, as detailed in

the most current version of Volume 2 (Cultural Resources) of the Caltrans Standard Environmental Reference (SER)
.

Area of Potential Effects Map

In consideration of the finalized project description/project plans, Dudek will work closely with the City and Caltrans to develop the project’s cultural resources area of potential effect (APE) map. The APE will encompass all geographic areas in which the

proposed undertaking has the potential to directly or
indirectly affect the character or use of historic properties (36 CFR 800.16(d)). In addition to areas where construction activities are expected to occur, the APE map will consider construction stagin g areas,
temporary construction easements, utility relocation, and any other activity that has the potential to affect historic properties. The APE map will be plotted on an aerial background and will include the appropriate signature boxes for both Caltra
ns and local agency representatives. We assume a
discontiguous APE to cover up to 15 intersections proposed for improvement. This scope of work assumes a focus on archaeological resources. Therefore, the APE will only include a direct APE which will encomp
ass the area of archaeological study where ground disturbance is expected to occur and will include any resources that will be directly affected by proposed project activities.

Records Search

Upon completion of the APE map, Dudek will initiate a Californi a Historical Resource Information System
(CHRIS) records search of the project APE and a one
-
mile radius from each intersection at the Eastern
Information Center (EIC), which houses cultural resource records for Riverside County. The purpose of the records

search is to identify any previously recorded historic properties that may be located within or around the project APE. In addition to a review of previously prepared site records and reports, the records search will also review historical maps of the pro ject area, ethnographies, the National Register
of Historic Places (NRHP), the California Register of Historical Places (CRHR), the Built Environment Resource Directory (BERD), the California Historic Property Data File, and the lists of California State H
istorical Landmarks, California Points of Historical Interest, and Archaeological Determinations of Eligibility. Please note that the EIC searches are currently taking up to 5 -
months to return results. In
City Project: CO8752; HSIP Cycle 9 Project

-

Addendum No. 1

City of
Cathedral City

January 18, 2022

6 order to account for this, Dudek will plan to revie
w information provided through previous project
searches (as available) and proceed with the inventory process ahead of receiving these results. The report would be updated, once the project specific EIC results are received. In addition, and assuming this

approach to be acceptable by the reviewing agencies, it is understood that the Agua Caliente band of Cahuilla Indians maintains a current database of known cultural resources for the area. Early coordination with this tribe may allow them to share informa tion they have on hand to better inform
the inventory efforts up
-
front. It is anticipated that coordination with the tribe would be initiated by Dudek once the APE map has been approved by the reviewing agencies.

Native American Coordination

Upon specific

approval, Dudek will assist the City and Caltrans in their Native American consultation obligations by initiating contact with the California Native American Heritage Commission (NAHC) for a review of their Sacred Lands File. The NAHC will determine if an y Native American sacred lands on file
are located within or adjacent to the project APE. In addition, the NAHC will provide a list of Native American contacts for the project who should be contacted for additional information. If instructed to do so by th
e federal lead agency (Caltrans), Dudek will prepare and mail a letter to each of the NAHC -
listed contacts, requesting that they contact us if they know of any Native American cultural resources within or immediately adjacent to the project area. Two weeks

after the letters have been mailed,
Dudek will make follow
-
up phone calls to each NAHC
-
listed contact to demonstrate that good faith
follow
-
up efforts have been made.

Cultural Resources Survey

Upon receipt of the records search results, Dudek will conduc t an intensive pedestrian survey of the
project APE for historic properties (including both prehistoric and historic archaeological resources). An intensive pedestrian survey will be completed for all accessible portions of the APE utilizing transects spac
ed no more than 10 meters apart, as possible based on present conditions in the APE. Identified resources will be mapped using iPad technology with ESRI Collector software and a Trimble GeoXt GPS unit with sub
-
meter accuracy. No artifacts, samples, or spec
imens will be collected during the survey.

The survey will be conducted by one (1) qualified archaeologist, working no more than two (2) days to complete. Please note that the present scope does not account for a Native American monitor to be present. Shou
ld this be required, it is animated that the tribe would want to contract directly with the City, although Dudek is happy to assist with facilitating the processes. We assume the survey will be negative for both archaeological and historic built environmen t resources.

Archaeological Survey Report (ASR)

Dudek will prepare an ASR to demonstrate that a reasonable level of effort has been made to identify archaeological resources within the project APE. Dudek assumes the no previously recorded archaeological r
esources will be identified as a result of the records search requiring updates, nor will any new archaeological resources be identified as a result of the intensive -
level survey or Native
American coordination. No more than two (2) drafts of this report a re anticipated. The present scope
does not include documentation or evaluation efforts for built environment resources because it is assumed that no such resources would fall within the APE. If such efforts were required, an updated scope and budget would
be prepared for city review and approval.

Historic Properties Survey Report (HPSR)

Upon completion of the ASR, Dudek will prepare an HPSR to serve as the overarching summary City Project: CO8752; HSIP Cycle 9 Project

-

Addendum No. 1

City of
Cathedral City

January 18, 2022

7 document for all Section 106 compliance efforts. The APE map, ASR, and all applic able attachments will
be appended to the HPSR. No more than two (2) drafts of this document are anticipated.

Deliverables

(Optional)
:

Electronic version of the draft and updated PES Form, narrative, and figures

One (1) hard copy of the updated PES From,
narrative and figures to Caltrans, once approved.

Completion of the paperwork for a CEQA NOE with findings to be filed with the County Clerk and State

Clearinghouse

Electronic copy of Draft and Final version of the APE Map/ASR/HPSR to City

Hard copy of Fin
al version of APE Map/ASR/HPSR to Caltrans

SCHEDULE

Following our notice to proceed, ADVANTEC will begin services immedia tely.

EXCLUSIONS

Consulting services relating to any of the following tasks may be completed by ADVANTEC if negotiated under a
separate contract for an additional fee; but are presently excluded from this Agreement:

Additional
conference calls

Additional
meetings

on site

Collecting T
raffic
C
ounts

(AADT or Peak Hour Turning Movement)

Over 3 submittals

Additional
reports

EXHIBIT “B”
Schedule of Charges

A detailed breakdown of the not to exceed fee amount is included in the attached proposal dated January 18, 2022.

The contract summary is as follows:

Current Contract Amount: $216,110.48
Proposed Contract Amendment No. 1: $26,458.00
Optional Task in Proposed Contract Amendment $15,779.00

Total Proposed Amended Contract Amount: $258,347.48

City Project: CO8752; HSIP Cycle 9 Project

-

Addendum No. 1

City of
Cathedral City

January 18, 2022

8 EXHIBIT B

SCOPE OF SERVICES for
ADDENDUM NO. 1

FEE SCHEDULE

Compensation for our personnel directly engaged for the additional work outlined in Exhibit A

will be
billed
per the fee schedule provided below
.

As shown, c
ompensation for our
personnel directly engaged for the additional

work

outlined in
Exhibit A

will be for

$
18 ,
919

(ADVANTEC)

and
$7,539
(D
udek
)
for a total of

$26,458
.

Consequently, the original
budget for
the HSIP
i
mprovements

project is
$216,110,
and with the
addition of Addendum No. 1
,

it

will
be increased to the new total of
$
242,568
.

We will not exceed the budgeted amount without your
written authorization.

Dudek
TOTAL
ACE
TOTAL
COST
Task
Description
Carlos
Ortiz
John
Dorado
Jonathan
Delgado
Bryan
Elenes
Frank
Gomez
Madeleine
Ortiz
Billable Rates
$333.17
$213.21
$109.29
$106.60
$106.60
$99.95
1 Project
Management,
Coordination, and
Meetings
6 $1,279
$1,279
2 Field Work and
Data Collection
8 8
$161
$1,652
$1,813
3 Utility
Coordination
4 $400
$400
4 Environmental
4 $7,539
$7,539
$437
$7,976
5 Final Plans
6 8
44 44
16 $150
$13,134
$13,284
6 Technical
Specifications
2 4
$853
$853
7 Final Estimate of
Quantities and
Costs
2 2
2 6
$853
$853
Total Hours
16 12
50 54
28 160
Sub-Total Labor Cost
-
$

3,411
$

1,311
$

5,330
$

5,757
$

2,799
$

$7,539
$7,539
$311
$18,919
$26,458
TOTAL FEE (Not-To-Exceed)
$26,458
OPTIONAL SERVICES - HSIP Traffic Signal Improvements (HSIP Cycle 9) – City Project No. CO8752 - Addenum No. 1 8 Technical Studies:

APE
Map/ASR/HPSR
2 4
$14,915
$14,915
6 $864
$15,779

TOTAL WITH OPTIONAL SERVICES
Total Hours
(With Option)
18 16
50 54
28 166
Total Fee
(With Option)
-
$

3,838
$

192
$

5,330
$

5,757
$

2,799
$

$22,454
$22,454
$311
$19,783
$42,236
Note:

Other Direct Costs includes mileage and printing fees per task, as shown.

Project
Manager
Project
Director
Sub-Consultants
Assistant
Engineer
Assistant
Engineer
Assistant
Engineer
Assistant
Engineer
Other
Direct
Costs
Total Hours

TOTAL COST
City Project: CO8752; HSIP Cycle 9 Project

-

Addendum No. 1

City of
Cathedral City

January 18, 2022

9 If

the o
p
tional ser
vices are
requ
ired,

it

will be
an
additional

$
864

(ADVANTEC)

and
$
14,91
5 (D
udek
)
for
a total of

$
15,779
.

Consequently, the original budget for
the HSIP
i
mprovements

project is
$216,110,
and with the
addition of Addendum No. 1
,

it

will be increased to the new total of
$
2 58,347
.

We will not
exceed the budgeted amount without your written authorization.

Local Assistance Procedures Manual
EXHIBIT 10-H1
Cost Proposal
Note: Mark-ups are Not Allowed
Prime Consultant
Subconsultant
2nd Tier Subconsultant
Consultant
Project No.

HSIPL-5430(034)
Contract No.

CO8752 (Addendum No.1)
Date
01/18/2022

DIRECT LABOR
hours
Total
$0.00
18 $1,384.56
$0.00
$0.00
$0.00
$0.00
54 $2,076.84
50 $1,923.00
28 $1,009.68
16 $630.88
$0.00
$0.00
$0.00
$0.00
$0.00

LABOR COSTS
a) Subtotal Direct Labor Costs
$7,024.96
b) Anticipated Salary Increases (see page 2 for calculation) $0.00
c) TOTAL DIRECT LABOR COSTS [(a) + (b)]
$7,024.96

INDIRECT COSTS
d) Fringe Benefits
(Rate:

55.78%
)
e) Total Fringe Benefits [(c) x (d)]
$3,918.52
f) Overhead & G&A
(Rate:

96.20%
)
g) Overhead [(c) x (f)]
$6,758.01
(Rate:

0.00%
)
i) Gen & Admin [(c) x (h)]
$0.00
j)
Total Indirect Costs
[(e) + (g)
+ (i)]
$10,676.54

FIXED FEE
k)

TOTAL FIXED PROFIT

[(c) + (j)] x fixed fee

10.00%
]
$1,770.15
l)
CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add adiditonal pages if necessary) Unit
Total
miles
$161.00
ea
$150.00
$0.00
$0.00
$0.00
l)

TOTAL OTHER DIRECT COSTS
$311.00
m)
SUBCONSULTANTS' COSTS (Add additional pages if necessary) $7,538.69
$14,914.95
m)

TOTAL SUBCONSULTANTS' COSTS
$22,453.64
n)

TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS
[(l) + (m)]
$22,764.64

TOTAL COST
[(c) + (j) + (k) + (n)]
$42,236.29
NOTES:

3. Anticipated salary increases calculation (page 2) must accompany.

Page 1 of 9 ends

$46.64
$31.00
$38.46
$38.46
$36.06
$39.43
$31.25
$76.92
$101.93
$72.12
$51.75
$44.72
Joseantonio Hernandez
Robert Steaffens
David DeClue
Associate Engineer
Associate Engineer
ADVANTEC Consulting Engineers, Inc.

EXHIBIT 10-H1 COST PROPOSAL
PAGE 1 OF 3

ACTUAL COST-PLUS-FIXED FEE
OR

LUMP SUM
(FIRM FIXED PRICE) CONTRACTS
(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Classification/Title
Actual Hourly Rate
Name

1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.

2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans. h) General and Administrative (Rate:

Quantity
10 Unit Cost
$15.00
$0.575
Description
Printing
Project Director
Mileage Costs
Associate Engineer
Associate Engineer
Associate Engineer
Project Manager
QA/QC Manager
Senior Traffic Engineer
Systems Engineer
Associate Engineer
Associate Engineer
Associate Engineer
John Dorado
$120.20
$31.25
Ryan Miller
Associate Engineer
$43.27
Associate Engineer
Carlos Ortiz
Nicholas Park
Keith Rand
Jose Guedes
John Cox
Enrique Biche
Frank Gomez
Bryan Elenes
Madeleine Ortiz
Jonathan Delgado
Subconsultant 2: Dudek (Optional Services)
Subconsultant 1: Dudek
Subconsultant 3:

Subconsultant 4:
280
LPP 17-01
January 2018
Local Assistance Procedures Manual
EXHIBIT 10-H1
Cost Proposal

1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor
Subtotal
per Cost
Proposal
5 Year Contract Duration
$7,024.96
=
Year 1 Avg Hourly Rate
Avg Hourly Rate
Year 1
$42.32
+
=
Year 2 Avg Hourly Rate
Year 2
$42.32
+
=
Year 3 Avg Hourly Rate
Year 3
$42.32
+
=
Year 4 Avg Hourly Rate
Year 4
$42.32
+
=
Year 5 Avg Hourly Rate
Estimated %
Completed Each Year
Year 1

20.00%
*
=
Estimated Hours Year 1
Year 2

20.00%
*
=
Estimated Hours Year 2
Year 3

20.00%
*
=
Estimated Hours Year 3
Year 4

20.00%
*
=
Estimated Hours Year 4
Year 5

20.00%
*
=
Estimated Hours Year 5
Total
100%

=
Avg Hourly Rate
(calculated above)
Year 1
$42.32
*
=
Estimated Hours Year 1
Year 2
$42.32
*
=
Estimated Hours Year 2
Year 3
$42.32
*
=
Estimated Hours Year 3
Year 4
$42.32
*
=
Estimated Hours Year 4
Year 5
$42.32
*
=
Estimated Hours Year 5

=

=

=
Transfer to Page 1
NOTES:

1. 2.

3. 4.

Page 2 of 9 ends

EXHIBIT 10-H1 COST PROPOSAL
PAGE 2 OF 3

ACTUAL COST-PLUS-FIXED FEE
OR

LUMP SUM
(FIRM FIXED PRICE) CONTRACTS
(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Total Hours per Cost Proposal
Avg Hourly Rate
166

2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %) $42.32
$42.32
$42.32
$42.32
$42.32
Proposed Escalation
0%
0%
0%
0%

3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Total Hours
per Cost Proposal
Total Hours
per Year
166.00
166.00
166.00
166.00
166.00
166.00
Direct Labor Subtotal before Escalation
Estimated total of Direct Labor Salary Increase
33 33
33 33
33 Total Direct Labor Cost with Escalation

4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Estimated hours
(calculated above)
Total

33.20 33.20

33.20 33.20

33.20 This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year.

An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted.

Calculations for anticipated salary escalation must be provided.

Cost per Year
$1,404.99
$1,404.99
$1,404.99
$1,404.99
$1,404.99
$7,024.96
$7,024.96
$0.00
LPP 17-01
January 2018
Local Assistance Procedures Manual
EXHIBIT 10-H1
Cost Proposal
Certification of Direct Costs:

1. Generally Accepted Accounting Principles (GAAP)
CO87
52 (Adde
ndum
No.1)

2. Terms and conditions on the contract

3. Title 23 United States Code Section 112 - Letter of Contracts

4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures

5. 6.
48 Code of Federal Regulartions Part 9904 - Cost Accounting Standards Board (when applicable) Prime Consultant or Subconsultant Certifying:

Name:

Carlos Ortiz
Title *:

Chief Operative Officer
Date of Certification (mm/dd/yyyy):
1/18/2022
Email:
[email protected]
Phone Number:
949-861-4999
73710 Fred Waring Drive, Suite 120, Palm Desert, CA 92260 List services the consultant is providing under the proposed contract:

EXHIBIT 10-H1 COST PROPOSAL
PAGE 3 OF 3
Signature:

I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this conract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
23 Code of Federal Regulartions Part 172 - Procurement, Management, and Administration of Engineering and Desgin Related Service
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.

Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s).

Address:
* An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.

Traffic Engineering
LPP 17-01
January 2018
Local Assistance Procedures Manual Exhibit 10-H1
Cost Proposal
Consultant
Project No. Contract No. Date 1.7.2021

DIRECT LABOR
hours Actual Hourly Rate Total
10 $93.23 $932.31
18 $39.35 $708.35
14 $25.00 $350.00
10 $67.32 $673.17
15 $43.27 $649.04
15 $45.23 $678.48
24 $47.86 $1,148.72
40 $27.00 $1,080.00
8 $40.11 $320.87
8 $27.81 $222.48

LABOR COSTS
a) Subtotal Direct Labor Costs $6,763.43
b) Anticipated Salary Increases (see page 2 for sample) - $ c) TOTAL DIRECT LABOR COSTS [(a) + (b)]$6,763.43

INDIRECT COSTS
d) Fringe Benefits (Rate: 70.95% ) e) Total Fringe Benefits 4,798.65$ f) Overhead (Rate: 92.02% g) Overhead [(c)x(f)] 6,223.70 $ h) General and Administrative (Rate: 0.00%) i) Gen & Admin [(c) x (h)] 0 j) Total Indirect Costs [(e) + (g) + (i)] 11,022.35$
FIXED FEE k) TOTAL FIXED PROFIT [(c) + (j)] x fixed fee 15% 2,667.87 $ 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary Description of Item Quantity Unit(s) Unit Cost Total
Mileage Costs 257 mile 0.545$ 140.07$ Cultural Record Search 1 record search 1,859.93$ 1,859.93$ -$
-$
-$
1) TOTAL OTHER DIRECT COSTS 2,000.00$
Analyst I Madison Brown
Senior Specialist I Adam Giacinto
GIS Analyst IV Spenser Lucarelli
Technician I Javier Hernandez
Technical Editor lll Amy Seals
EXHIBIT 10-H1 COST PROPOSAL PAGE 1 OF 3

COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Dudek
Classification/Title Name
Note: Mark-ups are Not Allowed Prime Consultant * Subconsultant 2nd Tier Subconsultant Project Director/Environmental Jason Reynolds
Specialist IV Andrew Talbert
Linda Kry
Publications Specialist ll Rachel Dobrolenski
Specialist II Angela Pham
Specialist I
January 2018
Local Assistance Procedures Manual Exhibit 10-H1
Cost Proposal
m) SUBCONSULTANTS' COSTS (Add additional pages if necessary) Subconsultant 1: -$ Subconsultant 2: -$ Subconsultant 3: -$ Subconsultant 4: - $
m) TOTAL SUBCONSULTANTS' COSTS: -$
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS2,000.00$ TOTAL COST [(c) + (j) + (k) + (p)] 22,453.64$
NOTES:
1 Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**).

All costs must comply with the Federal cost principals. Subconsultants will provide their own cost proposals. 2 The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accounting period and established by a cognizant agency or accepted by Caltrans. 3 Anticipated salary increases calculation (page 2) must accompany.

January 2018
Local Assistance Procedures Manual Exhibit 10-H1
Cost Proposal

1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Avg Hourly 5 Year Contract
Rate Duration
$6,763.43 = $ 41.75 Year 1 Avg Hourly Rate

2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %) Avg Hourly Rate
Year 1 $41.75 + = $ 43.00 Year 2 Avg Hourly Rate Year 2 $43.00 + = $ 44.29 Year 3 Avg Hourly Rate Year 3 $44.29 + = $ 45.62 Year 4 Avg Hourly Rate Year 4 $45.62 + = $ 46.99 Year 5 Avg Hourly Rate Total Hours
per Year
Year 1 100.00% * = 162.0 Estimated Hours Year 1
Year 2 0.00% * = 0.0 Estimated Hours Year 2
Year 3 0.00% * = 0.0 Estimated Hours Year 3
Year 4 0.00% * = 0.0 Estimated Hours Year 4
Year 5 0.00% * = 0.0 Estimated Hours Year 5
Total 100% = 162.0
Year 1 $ 41.75 * = $ 6,763.43 Estimated Hours Year 1 Year 2 $ 43.00 * = $ - Estimated Hours Year 2 Year 3 $ 44.29 * = $ - Estimated Hours Year 3 = $ 6,763.43
= $ 6,763.43
= $ - Transfer to Page 1
NOTES:

This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year.

An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted.

Calculations for anticipated salary escalation must be approved.

3. Calculate estimated hours per year (Multiply estimate % each year by total hours) EXHIBIT 10-H1 COST PROPOSAL PAGE 2 OF 2

COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS Estimated total of Direct Labor Salary Increase
Total Direct Labor Cost with Escalation
Direct Labor Subtotal before Escalation

4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) 162.0
Total
0 (calculated above)
Avg Hourly Rate
(calculated above)
162
0 Estimated hours
162.0
162.0
Cost per Year
Estimated %
(CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
3%
Direct Labor Subtotal
per Cost Proposal per Cost Proposal
Total Hours
162
Proposed Escalation
3%
162.0
162.0
Total Hours
per Cost ProposalCompleted Each Year
3%
3%
January 2018
Local Assistance Procedures Manual Exhibit 10-H1
Cost Proposal
Certification of Direct Costs:

I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:

1. Generally Accepted Accounting Principals (GAAP)

2. Terms and conditions of the contract

3. Title 23 United States Code Section 112 - Letting of Contract

4. 48 Code of Federal Regulations Part 31 - Contract Cost Principals and Procedures

5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Services

6. 48 Code of Federal Regulations Part 9904 - Cost Accouting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.

Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s).

Prime Consultant or Subconsultant Certifying:

Name: Title:

Signature: Date of Certification (mm/dd/yyyy):

Email: Phone Number:

Address:
than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.

List of services the consultant is providing under the proposed contract: