ITEM NO. ITEM DESCRIPTION EST. QTY. UNIT UNIT PRICE
(IN FIGURES)
ITEM TOTAL
(IN FIGURES)
UNIT PRICE
(IN FIGURES)
ITEM TOTAL
(IN FIGURES)
UNIT PRICE
(IN FIGURES)
ITEM TOTAL
(IN FIGURES)
DOLLARS DOLLARS DOLLARS DOLLARS DOLLARS DOLLARS
1 MOBILIZATION 1 LS 100,000.00$ 100,000.00$ 109,000.00$ 109,000.00$ 125,000.00$ 125,000.00$ 2 TRAFFIC CONTROL 1 LS 30,000.00$ 30,000.00$ 61,000.12$ 61,000.12$ 155,005.85$ 155,005.85$ 3 DUST CONTROL 1 LS 20,000.00$ 20,000.00$ 9,400.00$ 9,400.00$ 2,500.00$ 2,500.00$ 4 SIGNING AND STRIPING 1 LS 20,000.00$ 20,000.00$ 6,300.00$ 6,300.00$ 12,000.00$ 12,000.00$ 5 COLD MILL 0.25' PAVEMENT AND REMOVAL 354,771 SF 0.68$ 241,244.28$ 0.28$ 99,335.88$ 0.42$ 149,003.82$ 6 CONSTRUCT 0.25' AC PAVEMENT OVERLAY 6,652 TON 120.00$ 798,240.00$ 84.00$ 558,768.00$ 83.00$ 552,116.00$ 7 REMOVE AND REPLACE TYPE A-6 CURB AND GUTTER PER RIVERSIDE COUNTY STDS 200 AND 205 200 LF 40.00 $ 8,000.00$ 60.00$ 12,000.00 $ 120.00$ 24,000.00 $ 8 REMOVAL OF EXISTING ADA RAMP BCR TO ECR 9 EA 1,000.00$ 9,000.00$ 1,380.00$ 12,420.00$ 3,700.00$ 33,300.00$ 9 CONSTRUCT A88A, CASE A ADA RAMP; INCLUDES NEW DEPRESSED CURB AT RETURNS 9 EA 5,000.00$ 45,000.00$ 2,950.00$ 26,550.00$ 9,600.00$ 86,400.00$ 10 RETROFIT-ADD TRUNCATED DOMES 4'X3' EPOXY STYLE (INCLUDES GRINDING LIP AT RAMP FOR 0" LIP) 3 EA 1,000.00$ 3,000.00$ 1,040.00$ 3,120.00$ 4,500.00$ 13,500.00$ 11 COLD MILL 0.25' PAVEMENT AND REMOVAL 75,047 SF 0.68$ 51,031.96$ 0.44$ 33,020.68$ 0.42$ 31,519.74$ 12 COONSTRUCT 0.25' AC PAVEMENT OVERLAY 1,408 TON 120.00$ 168,960.00$ 89.00$ 125,312.00$ 83.00$ 116,864.00$ 13 CONSTRUCT A-6 CURB AND GUTTER PER RIVERSIDE COUNTY STDS 200 AND 205 280 LF 40.00 $ 11,200.00 $ 43.00$ 12,040.00 $ 130.00$ 36,400.00 $ 14 REPLACE LOOP DETECTORS 5 EA 1,000.00$ 5,000.00$ 830.00$ 4,150.00$ 800.00$ 4,000.00$ 15 PULVERIZE 12" OF ROAD SECTION-TWO STEP PROCESS 37,244 SF 1.40$ 52,141.60$ 0.28$ 10,428.32$ 0.65$ 24,208.60$ 16 MINOR GRADING 1 LS 8,000.00$ 8,000.00$ 26,400.00$ 26,400.00$ 12,000.00$ 12,000.00$ 17 CONSTRUCT 0.25' AC PAVEMENT OVERLAY 699 TON 120.00$ 83,880.00$ 84.00$ 58,716.00$ 83.00$ 58,017.00$ 18 LOWER AND RIASE WATER VALVE TO GRADE PER CVWD STANDARDS 85 EA 1,000.00$ 85,000.00$ 1,340.00$ 113,900.00$ 100.00$ 8,500.00$ 19 LOWER AND RAISE SEWER MANHOLE TO GRADE PER CVWD STANDARDS 31 EA 1,000.00$ 31,000.00$ 1,220.00$ 37,820.00$ 100.00$ 3,100.00$ 20 LOWER AND RAISE SEWER CLEANOUT TO GRADE PER CVWD STANDARDS 6 EA 1,000.00 $ 6,000.00$ 910.00$ 5,460.00$ 100.00$ 600.00$ ADDITIVE BID ALTERNATE SCHEDULE 5
TOTAL ADDITIVE BID ALTERNATE 1 - BID ITEMS 18 THROUGH 20 122,000.00$ 157,180.00$ 12,200.00$ BID SCHEDULE 1
TOTAL BASE BID - BID ITEMS 5 THROUGH 10 1,104,484.28$ 712,193.88$ 858,319.82$ 185,700.12$ 294,505.85$
BID SCHEDULE 3: SARAH STREET REHAB
TOTAL BASE BID - BID ITEMS 15 THROUGH 17
TOTAL BASE BID - BID ITEMS 1 THROUGH 4 170,000.00$
BID SCHEDULE 4: AVENIDA LOS NINOS SURFACE WIDENING
TOTAL BASE BID - BID ITEMS 11 THROUGH 14 236,191.96$ 174,522.68$ 188,783.74$ ENGINEER'S ESTIMATE Matich Corporation
95,544.32$
ATP General Engineering Contractors
94,225.60$ 144,021.60$
BID SCHEDULE 2: CENTURY PARK NEIGHBORHOOD STREET REHAB
TOTAL OF ALL BID ITEMS 1,776,697.84$ 1,325,141.00$ 1,448,035.01$
CITY OF CATHEDRAL CITY
CENTURY PARK, SARAH, AVENIDA LOS NINOS
Bid Tab
CITY PROJECT No.: 8512, 8513, 8663
UNIT PRICE
(IN FIGURES)
ITEM TOTAL
(IN FIGURES)
UNIT PRICE
(IN FIGURES)
ITEM TOTAL
(IN FIGURES)
UNIT PRICE
(IN FIGURES)
ITEM TOTAL
(IN FIGURES)
UNIT PRICE
(IN FIGURES)
ITEM TOTAL
(IN FIGURES)
DOLLARS DOLLARS DOLLARS DOLLARS DOLLARS DOLLARS DOLLARS DOLLARS 144,510.00$ 144,510.00$ 72,647.34$ 72,647.34$ 27,000.00$ 27,000.00$ 118,231.00$ 118,231.00$ 60,000.00$ 60,000.00$ 177,000.00$ 177,000.00$ 130,140.00$ 130,140.00$ 221,336.00$ 221,336.00$ 31,485.00$ 31,485.00$ 16,000.00$ 16,000.00$ 10,260.00$ 10,260.00$ 4,400.00$ 4,400.00$ 5,000.00$ 5,000.00$ 8,000.00$ 8,000.00$ 27,000.00$ 27,000.00$ 22,136.00$ 22,136.00$
0.40$ 141,908.40 $ 0.37$ 131,265.27 $ 0.58$ 205,767.18 $ 1.00$ 354,771.00 $
90.00$ 598,680.00 $ 105.00$ 698,460.00 $ 113.00$ 751,676.00 $ 136.00$ 904,672.00 $
90.00$ 18,000.00 $ 84.00$ 16,800.00 $ 88.00$ 17,600.00 $ 224.00$ 44,800.00 $ 2,100.00$ 18,900.00$ 2,700.00$ 24,300.00$ 2,480.00$ 22,320.00$ 4,264.00$ 38,376.00$ 7,100.00$ 63,900.00$ 7,600.00$ 68,400.00$ 6,800.00$ 61,200.00$ 10,603.00$ 95,427.00$ 1,200.00$ 3,600.00$ 3,000.00$ 9,000.00$ 1,150.00$ 3,450.00$ 5,269.00$ 15,807.00$
0.35$ 26,266.45 $ 0.37$ 27,767.39 $ 0.73$ 54,784.31 $ 1.00$ 75,047.00 $ 100.00$ 140,800.00 $ 105.00$ 147,840.00 $ 110.00$ 154,880.00 $ 137.00$ 192,896.00 $
65.00$ 18,200.00 $ 84.00$ 23,520.00 $ 108.00$ 30,240.00 $ 171.00$ 47,880.00 $ 1,200.00$ 6,000.00$ 1,000.00$ 5,000.00$ 1,300.00$ 6,500.00$ 2,005.00$ 10,025.00$
0.25$ 9,311.00 $ 0.37$ 13,780.28 $ 1.62$ 60,335.28 $ 0.50$ 18,622.00 $ 25,000.15$ 25,000.15$ 42,824.72$ 42,824.72$ 7,880.00$ 7,880.00$ 87,877.00$ 87,877.00$ 110.00$ 76,890.00 $ 105.00$ 73,395.00 $ 117.00$ 81,783.00 $ 133.00$ 92,967.00$ 1,285.00$ 109,225.00$ 1,500.00$ 127,500.00$ 1,440.00$ 122,400.00$ 1,559.00$ 132,515.00$ 1,175.00$ 36,425.00$ 1,200.00$ 37,200.00$ 1,440.00$ 44,640.00$ 1,671.00$ 51,801.00$ 875.00$ 5,250.00$ 1,050.00$ 6,300.00$ 1,440.00$ 8,640.00$ 1,448.00$ 8,688.00$ 150,900.00$ 171,000.00$ 175,680.00$ 193,004.00$ 844,988.40$ 948,225.27$ 1,062,013.18$ 1,453,853.00$ 240,995.00$ 273,647.34$ 366,103.00$
204,127.39$ 246,404.31$ 325,848.00$
149,998.28$ 199,466.00$
191,266.45$
1,828,495.77$ 2,538,274.00$
Granite ONYX Paving Company Inc. Hardy and Harper AAA
111,201.15$ 130,000.00$
194,400.00$
1,727,000.00$ 1,539,351.00$