Estimate Number MPS 305
Estimate Date Oct 7, 2022
Expiration Date Nov 6, 2022
Customer City of Cathedral City
Name Deanna Pressgrove
Phone (760) 770-0369
Email [email protected]
Sales Rep Charlotte Smith
Email [email protected]
Payment Terms Net 30
Project Name
Panorama Park -City of Cathedral City - Tables and Benches Item # & Description Quantity Total
JPPT63
TABLE 6 6' TABLE ON 3 LEGS RECYCLED PLASTIC
8 $12,368.00
JPSMBOLT
SET OF (4) 3/8" X 4" CONCRETE ANCHORS (1) 3/8" &
(1) 5/16" STANDRARD DRILL BIT
8 $656.00
PR6RIB
6' ROCK ISLAND BENCH RECYCLED PLASTIC
5 $2,795.00
PRSMKIT
SURFACE MOUNT KIT FOR RECYCLED PLASTIC
5 $345.00
SPD450
SQUARE PED. GRILL 3/16" THICK: TWO FLIP UP 43" x
51" GRATE & ADJ. ASH GRATE, SURFACE MOUNT
12 $18,552.00
$34,716.00
$3,037.658.75% Sales Tax
Product Total $37,753.65
$0.00
Description Quantity Rate
Freight Kaypark
Shipping and Handling charges for Kaypark equipment.
All prices are FOB Kaypark factory.
1 $5,769.55
$5,769.55
Sales Tax
Shipping, Handling and Non Taxable Services Total $5,769.55 Grand Total $43,523.20
NOTES AND EXCLUSIONS:
• This estimate shall not become binding until signed and returned for approval. • A signature indicates acceptance of all terms, conditions, and prices listed. • A signed quote will not substitute for a Purchase Order if one is required by the Customer. • Exclusions: All Unloading, Storage, Installation, Site Work, Fees & Permits, outside of the quoted above. • Footing calculations for playground equipment can be added for an additional fee if required • Please note, in most locations, any shade (METAL, FABRIC, or PLASTIC) in excess of 120 sqft requires a building permit.
• It is the CUSTOMER’S RESPONSIBILITY to con rm with the local building department if permitting is necessary.
• If permitting is necessary, it is the CUSTOMER’S RESPONSIBILTY to request, pay, and obtain these permits.
• WE will provide the stamped engineering that is required to obtain the permit – this is part of our quote.
The CUSTOMER provides everything else such as permit application, fee payment, site plan, etc. • Your shade order will not be placed in the manufacturing queue until you have provided us the approved drawings.
• Because the permitting process varies greatly between agencies, any stated lead time does NOT include the permitting process.