Kevin Biersack, Financial Services Director, provided an update on the Fountain of Life.
The following points were presented:
Fountain of Life History
Build Process
Structure
Current Status
Evaluation
Vault Repairs
Near-Term Plan
Options and Conceptual Plans
After discussion the City Council provided the following direction:
Have water on center fountain structure only
Install minimal fencing around center fountain structure only Remove entire soft surface and replace with colored concrete base Complete the following repairs to the subterranean equipment vault:
oFilter units
oAutomated time controller
oIsolation Valves
oShunt-trip units
It was the consensus of the City Council to continue the discussion of some type of water play feature at a future date to be determined.