REQUEST for PROPOSALS
PROFESSIONAL CONSTRUCTION ENGINEERING
SUPPORT SERVICES FOR HIGHWAY SAFETY IMPROVEMENT
PROGRAM (HSIP) CYCLE 10: PEDESTRIAN CROSSING AT
RAMON ROAD NEAR CANDLEWOOD DRIVE, CIP NO. 08753
for:
CITY OF CATHEDRAL CITY
Attn: Andrew Lee
Assistant Engineer
68-700 Avenida Lalo Guerrero
Cathedral City, CA 92234
September 20, 2023
11:00AM
Prepared by:
TKE @ENGINEERING, INC.
2305 Chicago Avenue
Riverside, California 92507
(9.51 ) 6 8 0 - 0. 4 4 0
WW.TKEengineering.com
TABLE OF CONTENTS
A. Work Proposal
Section 1 Cover Letter
Section 2 Statement of Qualifications
Section 3 Scope of Work
Cost Proposal (Separate File)
Prepared for:
City of Cathedral City
68-700 Avenida Lalo Guerrero
Cathedral City, CA 92234
Cathedral City Contact: Andrew Lee | Assistant Engineer Phone: (760) 770-0340
Email: [email protected]
Prepared by:
TKE Engineering, Inc.
73-710 Fred Waring Drive, Suite 102
Palm Desert, CA 92260
TKE
Contact: Terry Renner, P.E., L.S., Q.S.D.
Senior Vice President
Phone: (760) 895-1949
E-mail: [email protected]
-TKE TKE ENGINEERING, INC.
NGINEERING
September 20, 2023
Andrew Lee, Assistant Engineer
CITY OF CATHEDRAL CITY
68-700 Avenida Lalo Guerrero
Cathedral City, CA 92234
Subject: Professional Construction Engineering Support Services for Highway Safety Improvement Program (HSIP) Cycle 10: Pedestrian Crossing at Ramon Road near Candlewood Drive, CIP No. 08753 Dear Mr. Lee,
Thank you for the opportunity to present our proposal as a response to the RFP for Professional Construction Engineering Support Services for Highway Safety Improvement Program (HSIP) Cycle 10: Pedestrian Crossing at Ramon Road near Candlewood Drive. Our proposal enclosed herein, outlines TKE Engineering, Inc's (TKE) qualifications to provide the requested services to the City of Cathedral City (City). TKE is a full service, multi- disciplinary consulting firm highly qualified to perform any and all City services required to successfully complete construction of the City's HSIP grant funded project. We are enthusiastic about the opportunity to assist the City and aware of the City's needs. Founded in 2000, TKE is a California Corporation with a local office at 73-993 Highway 111, Suite 201, Palm Desert, CA 92260.
Why should the City choose TKE to provide construction and inspection support services? Please consider the following:
1. Coachella Valley Experience - TKE has been working for various municipalities and/or District's in the Coachella Valley since 2001. Throughout the past 23 years, TKE has developed an extensive understanding of the requirements, agencies and events which are exclusive to the Coachella Valley. Our current experience with CV- Sync has allowed our proposed staff to further expand our knowledge of the traffic patterns and critical traffic issues within the Coachella Valley and Cathedral City in particular. Numerous members of TKE's staff are also PM-10 Certified.
2. Grant Experience - TKE has provided construction management, inspection and grant management on more than $500 million grant funded projects over the past 23 years. TKE has in-depth knowledge of Federal and State grant funding programs as well as Caltrans LAPM requirements.
3. Team Leadership - The City will benefit greatly by continuing the vision, leadership, and dedication to community exhibited by TKE's project team. TKE's numerous accomplishments and management skills will help maintain continuity in the delivery of the services. In particular, Terry Renner, TKE's Senior Vice President and Project Manager will be the client's representative, and primary contact. Mr. Renner is a registered civil engineer and licensed land surveyor, and his experience extends from project planning to design and bidding through construction. His excellent communication and management skills will provide a great benefit to the City. In particular, his experience with "cutting edge" creative engineering techniques focused on cost control, will ensure that projects provide the maximum value for the public's investment. Some of Mr. Renner's key strengths are communication, organization and issues resolution. His effective communication skills ensure that all stakeholders are constantly advised of project progress. He implements a proactive organizational program to effectively manage the Team's schedule, documents action items with required follow-up and conducts continuous budget and schedule reviews to anticipate needs for future action items. Lastly, Mr. Renner's 'can do' approach to all project issues always results in resolution. His perseverance and vast knowledge and experience of issues will resolve challenges while protecting City interests. The City will find that Mr. Renner's and TKE team approach provides the best working partnership to meet the City's construction inspection needs.
Supporting Mr. Renner will be TKE's key personnel, including Labor Compliance Specialist, Jeannette Barlow, and Senior Public Works Inspector, Nelson Blackwell, C.P.I.I. Aragon Geotechnical, Inc. will be providing Materials Testing Services, and all other services will be performed by TKE staff in-house. TKE's team includes the 2 3 0 5 Ch i cago Ave - Riverside - CA 92507
Ph. (951) 680-0440 F a x (951) 680-0490
SECTION A | COVER LETTER
12 principals of the firm. As such, they will remain in-place throughout the term of the contract. There will not be any changes in personnel during the contract duration without prior approval by the City.
4. Qualifications and Experience - TKE is a firm capable of managing and delivering municipal consulting engineering services. We specialize in City Engineering and Land Development Services including project management, pre project planning, permitting, design and construction administration of public works and development projects.
A brief list of on-call municipal clients, together with projects that TKE has successfully completed is presented in our proposal. The City will benefit from our broad range of experience through our intimate understanding of the common pitfalls for each project variation, and development processing challenges, and our past history of successfully overcoming these challenges.
In addition, TKE's experience includes a comprehensive understanding of the Standard Specifications for Public Works Construction (Green Book), project scheduling programs (including critical path methodology relating to interagency and interdepartmental coordination), and Caltrans Local Assistance project processing. Finally, TKE's extensive funding administration experience will also greatly benefit the City.
5. Our Commitment - TKE is committed to providing high quality, efficient services to meet all of the City's needs Our Project Manager will be in contact with project stakeholders as often as required to keep projects proceeding efficiently, on schedule and within allocated budgets. It is this personal touch and contact that define our 'loca service' approach. We consider ourselves community builders and take ownership of services requested from TKE, ensuring that our personnel will be allocated on an as-needed basis in order to successfully complete all projects.
Our broad array of services and in-house team provide the City a trusted consultant to turn to in any challenge, no matter how simple or complex. We pride ourselves in the management and completion of special, atypical projects and thrive on challenging budgets and deadlines. It is this commitment to service and diverse array of offerings that makes us unique and drives our long-standing relationships with our client base, and it is these qualities that make us 'the right fit' for the City.
6. Our Value - TKE's management team and staff are fundamentally committed to creating value in each task that we perform. As such, we have created a professional culture wherein each member of our staff constantly strives for increased efficiency, ultimately allowing us to provide highly professional services at competitive rates. This culture of constant value creation and increased efficiencies, ensures that the services contracted to, and provided by TKE, will always mean good stewardship of resources.
7. Addenda - TKE acknowledges Addendum No. 1, received on September 14, 2023.
Thank you for your consideration. TKE acknowledges and accepts all of the general terms and conditions presented in the RFP without any exception. TKE has read and understands the RFP in its entirety, including, without limitation, the scope and nature of the work, as well as the associated attachments and addenda. TKE would very much appreciate the opportunity to interview with the City and introduce our team in person to City staff. Terry Renner is authorized to negotiate and execute an Agreement with the City on behalf of TKE. If you have any questions, please call Terry Renner at our office at (760) 895-1949, by cell at (909) 240-6285 or email him at [email protected].
Sincerely,
Terry Renner, P.E., L.S., Q.S.D.
Senior Vice President
TKE Engineering, Inc.
SECTION 2 | STATEMENT OF QUALIFICATIONS Page 13
TKE Engineering, Inc. | AT A GLANCE SECTION 2 | STATEMENT OF
QUALIFICATIONS
City/District Enginee
TKE is the City District Engineer in 5
FIRM PROFILE
Cities/Districts
TKE Engineering, Inc. (TKE), a California Corporation,
Grant Administration
was established in June 2000, and in the last 23 years has TKE has managed more than $500M developed into one of Southern California's premier full- in Federal and State Grant Funded service consulting engineering firms. TKE was established Projects with the goal of providing turnkey services for municipal Municipal On-Call Contracts projects in order to benefit our community. As a result of the focus of a firm on this mission, TKE has earned a
TKE currently provides Inspection, reputation for thoroughness, rapid turnaround, cost
Construction Management, Traffic
Engineering, Civil Engineering efficiency and, overall quality of work. We are a highly Design, Project Support, and Survey motivated, dynamic firm with the goal of being your preferred consultant.
services for more than 30 Cities /
Counties / Districts throughout TKE provides turnkey municipal construction engineering Southern California
and inspection services to numerous municipalities
Size of Organization throughout Riverside, San Bernardino, Los Angeles, and 50 Professional Engineers, Orange Counties. The municipal services provided by our Inspectors, Construction Managers, firm include Inspection, Project and Construction Traffic Engineers, Project Managers, Management, Grant Funding, Federally/State Funded Surveyors, Plan Checkers, Designers, Project Management, Traffic Engineering, Project and Support Staff Development, Plan and Map Checking, CIP Design, Surveying, Program Management, Utility Company
Local Office Coordination and Management, Public Outreach, and TKE Engineering, Inc. Construction Surveying services.
73993 Highway 111, Suite 201, Palm
Desert, CA 92260 Our wide range of services provides our team with an Years in Business intimate knowledge and experience of the common pitfalls TKE has conducted business for the for each project variation and our past history of past 23 years and has 23 years of successfully overcoming these challenges. experience in providing traffic
engineering for development and TKE's headquarters is located in a business owned 7,000 Federal and State funded municipal square foot office building at 2305 Chicago Avenue in client projects Riverside located approximately 50 minutes from the City.
TKE also has an office in Palm Desert at 73710 Fred
Company Structure Waring Drive, Suite 102, allowing us to mobilize and TKE is a California Corporation respond to the City's needs promptly. TKE currently founded in June 2000. TKE has no maintains a staff of 50 inspectors, construction managers, affiliates or subsidiary companies. city engineers, plan and map checkers, project managers, California Business License Number: engineers, traffic engineers, surveyors, drafters, and
00109901 TKE DIR No. 1000413173 clerical personnel. TKE's Senior Vice President and Firm Owners proposed Principal-in-Charge/Construction Manager, Michael P. Thornton, P.E., P.L.S., Terry Renner, will notify the City if and when any person M.S. - President assigned to the City may need to change.
Terry Renner, P.E., L.S., Q. S.D. -
TYPES OF
Senior Vice President
ENGINEERING
Steven W. Ledbetter, P.E. Vice
President SERVICE S
Cathedral City Point of Contact TKE proudly serves Municipal Agencies on a variety of Terry Renner, P.E., L.S., Q.S.D. street improvement, traffic engineering and transportation Senior Vice President projects. TKE's experience includes project delivery from 2305 Chicago Avenue "cradle to grave". All of the engineering duties previously Riverside, CA 92507 discussed services effectively provide Phone: (951) 680-0440 routinely. We request that you verify our qualifications with Email: [email protected] the agencies presented in this section. TKE has provided SECTION 2 | STATEMENT OF QUALIFICATIONS Page 4
numerous municipalities and agencies throughout Implement security procedures Southern California with consulting services and staffing Issue notices for safety concerns and for every facet of Public Works. Below is a listing of violations services provided by TKE relevant to the Construction
Inspection category. Coordinate with survey, material testing and other construction consultants
NSPECTION Review and ensure compliance with control
TKE provides experienced, , highly qualified staff with documents, submittals, RFl's, change orders, significant technical expertise and strong public relations and work change directives skills for inspection services. All of TKE's inspectors have Compliance with Caltrans encroachment a background within design and construction, enabling permit requirements, if required TKE to provide well rounded inspectors capable of Preparation of punch list understanding the requirements to construct a project and Coordinate project closeouts activities which who are capable of identifying potential change orders and include staff report, Notice of Completion, design deficiencies before they occur. TKE is fully capable release of retention, warranty walk, and of providing staff on a full-time, part-time, on-call or interim archiving documents. project basis. Please refer to our project team, together
GRANT ADMINISTRATION
with our corporate resumes to verify our team's technical ability to deliver these services. TKE's Grant Administration team enables our TKE has provided similar services to those requested here municipal and agency partners of any size to find for a number of different agencies. TKE understands that potential funding sources and to prepare competitive each jurisdiction has its own development and capital funding applications. Additionally, after funds are improvement standards that were developed to meet the awarded to a partner, TKE ensures compliance with needs of that particular community. TKE has a thorough state and federal funding requirements. In the past understanding of these standards together with the needs few years, TKE has obtained millions of dollars in funding for our public works projects and
of the community needs. For each project that TKE is
assigned, TKE will verify compliance with all applicable transportation improvements standards. Furthermore, with our extensive experience in Our grant writing services are enhanced by integration other jurisdictions, TKE will be able to recommend with engineering services to facilitate and integrate improvements to these standards to ensure expedited project design. This expedites project start up and project delivery and enhanced public infrastructure. Our completion and ensures compliance with funding inspection portfolio includes: requirements.
Daily review and documentation of This service is so valued by our clients that our construction activities (daily reports and digital Funding Specialist is supported by several staff photo of significant issues and milestones) members including Planning Specialist, Monitor Contractor's daily labor force for Transportation Specialist and an Administrative compliance with state & federal labor laws. Analyst.
Field verification of traffic control procedures TKE has assisted clients secure funding from the and consistency with approved Traffic Control following programs:
Plan
Coordinate with agencies and different Highway Safety Improvements Program stakeholders to ensure smooth progress of (HSIP) Funding construction activities SRTS and SR2S (Safe Routes to Schools) Monitor project schedule Federal Transportation Funding thru Caltrans Local Assistance
Verify quantities and assuring quality control
Field observations of construction activities Community Development Block Grant Maintain complete and (CDBG) Funding
accurate project
records compliant with Caltrans manual Active Transportation Program (ATP) Funding Review and recommend approval/disapproval Congestion Mitigation and Air Quality of monthly progress pay estimates Improvement (MAQ)
Verify NPDES and SWPPP compliance SAFETEA-LU
Prepare weekly statement of working days State Proposition 1E Integrated Regional Review RFl's, change orders and progress Water Resource Program and 84 Flood Management Funding
payments
Coordinate punch list and as-built plans CONSTRUCTION MANAGEMEN Ensure that materials and completed work TKE has managed publicly funded construction projects comply with plans specifications and design throughout our history. The breadth of experience and criteria technical skill of our staff enable us to manage a wide SECTION 2 | STATEMENT OF QUALIFICATIONS Page 15
variety of projects, ranging from major infrastructure to the TKE's construction management services are enhanced restoration and rehabilitation of significant historical by integration with our knowledge and background of civil structures. TKE has routinely performed administration of engineering, traffic engineering and surveying to facilitate the contract (general contract administration and oversight and ensure all construction projects managed by TKE will of project), provided Resident Engineering services operate safely and efficiently. pursuant Caltrans/Federal requirements,
COMMUNITY TREACH PUBLIC
constructability reviews on project documents, managed
RELATIONS
preconstruction weekly progress meetings,
coordinated contractors, including multiple Depending on the City's needs, TKE's strategies are contractors simultaneously, coordinated with design designed to reach, inform and involve constituents and engineers for design changes corrections, stakeholders of planning proposals, projects and coordinated with the project inspector, reviewed and programs. If requested, we can provide opportunities for responded to RFI's, reviewed weekly statement of working interested parties to comments, enabling actionable days, reviewed quantities for monthly progress payments, analysis of feedback received. TKE's outreach methods reviewed extra work tickets and assessed them for result in building greater consensus and public buy- justification within the contract requirements, process in. Services include the design, planning and execution of:
control documents, submittals, change orders, and work
change directives, prepared and performed contract Marketing campaigns change orders and negotiations, coordinated with Public information meetings/Groundbreaking residents and businesses throughout construction ceremonies process, performed public outreach, represented City's Project branding with other agencies at numerous meetings, represented Project website design and construction engineering with the City's council and
Bilingual project collateral materials
meetings, managed engineering budgets and project
(brochures, presentation boards, etc.)
schedules, documented environmental compliance,
prepared and acquired right-of-way, coordinated utility Graphic design relocations, acquired and managed permits from GOAL ACCOMPLIS numerous agencies, including Caltrans, South Coast
AQMD, BNSF, UP, Riverside County Flood Control & The TKE Team is eager and prepared for an opportunity Conservation District, U.S Army Corps of to support the City of Cathedral City in accomplishing its Engineers, California Department of Fish and Wildlife, goals developed for their CIP and to establish the Regional Water Quality Control Board and many others, framework for making informed decisions regarding the managed numerous funding programs through Caltrans community's future success. Our team specializes in Local Assistance and various other State and Federal developing processes and procedures based on funding agencies. professional expertise and lessons learned, which we TKE has extensive experience with providing construction implement on all of our projects to ensure successful management services on all types of public works projects. delivery on schedule and within budget.
We are extremely familiar with the Greenbook,
requirements of plans and specifications, and California For all projects, the most important aspect of management public contract code in relation to construction projects and will be to ensure that the City's interest is protected to the various related work. We ensure that all work is completed maximum extent possible. TKE will ensure that public in accordance with funding contract specifications, terms, funds are maximized for the benefit of the community and conditions, state and federal laws and regulations, and that the project will fully comply with the grant agency client policy. Our construction management portfolio requirements to ensure full reimbursement. includes:
Street Widening Projects FINANCIAL
Sidewalk Repair and ADA Compliance CONDITION
Projects
Traffic Signal and Striping Projects TKE's organizational structure has steadily grown since our inception 23 years ago, which provides us with a solid Signing and Striping foundation and ensures successful completion of any Bus Transfer Stations agency project. TKE has an annual gross income of more Parking Lot Projects than 10 million dollars. In addition, over TKE's 23 years of Parks and Other Public Facilities business, not a single TKE project has gone through Grading and Retaining Walls litigation. There are no financial conditions that may Storm Drains and Channels impede TKE's ability to provide services or complete the services as outlined in the RFP. No conditions or
Retention and Detention Basins
organizational conflicts of interest exists that will affect the Site Improvement Projects ability of TKE to perform the required duties as described Major Infrastructure Projects in this proposal.
SECTION 2 | STATEMENT OF QUALIFICATIONS
4. TEAM
ORGANIZATION
Cathedral City
Principal-in-Charge/
Construction Manager
Terry Renner. P.E.. P.L.S.. Q.S.D.
Senior Public Works Inspector Labor Compliance Specialist Nelson Blackwell, C.P.I.L. Jeannette Barlow
SUPPORT TEAM
TKE (40 + Members)
Michael P. Thornton P.E., P.L.S. | President Jennifer Cioffi, P.E. I Project Manager Steve Ledbetter, P.E. | Vice President Steve Nix, P.E., P.L.S. | Senior Engineer Monae Pugh | Traffic Engineering Specialist Steve Libring, P.E., T.E. | Traffic Engineer Steve Dukett | Managing Director Development Services Brian Wolfe, P.E. | Project Manger Octavio Parada | Project Manager Justin Schlaefli, P.E., T.E., P.T.O.E. | Traffic Engineer Brett Enscoe | Survey Party Chief Ron Musser, P.L.S. | Director of Survey Jeff Lantosh, C.P.I.I. | Senior Public Works Inspector Marvin Lara, E.I.T. | Associate Engineer Mycal Batla | Survey Shelby Kelley, E.I.T. | Associate Engineer Brad Enscoe | Senior Public Works Inspector Daniel Melero, E.I.T. | Associate Engineer Patrick Palafox | Senior Public Works Inspector Chance Renner, EIT | Associate Engineer Michael Counce | Senior Public Works Inspector Metehan Gumustekin, EIT | Associate Engineer Jeffrey Lynn | Senior Public Works Inspector Travis Bradshaw, EIT | Associate Engineer Naeem Dulloo | Senior Public Works Inspector Emmanuel Perez, E.I.T. | Associate Engineer Tyler Ault | Senior Construction Inspector Jose Martinez | Associate Engineer Brian McDuffie | Senior Public Works Inspector Alex Estepa | Associate Engineer Stephen Biscotti | Senior Public Works Inspector Jose Hernandez | Associate Engineer Tony Tran| Senior Public Works Inspector Jayden Renner | Engineering Technician Ralph Martinez | Senior Public Works Inspector Aaron Vargas | Assistant Engineer Monae Pugh | Traffic Engineering Specialist Brian Chu | Assistant Engineer Michelle Sells | Accounting/Office Manager Aileen Morales | Assistant Engineer Deana Vilches | Clerical Oliver Zavala | Engineering Technician Brittany Simmons | Proposal Coordinator Rushdi Helo | Engineering Technician Genesi Lozano | Proposal Coordinator Tracey McLoughlin | Clerical Materials Testing Support
AGL
SECTION 2 | STATEMENT OF QUALIFICATIONS Page 17
5. RESUMES
Mr. Renner is the Senior Vice President of TKE and has over 23 years of experience in civil engineering design, plan checking, project management and construction management of both development and public works infrastructure projects, including grading improvements, street, traffic, transportation improvements, pavement
rehabilitation, drainage improvements, water and sewer improvements, public facilities, parks and recreation improvements. He currently provides project and construction management services for the Coachella Valley Association of Governments (CVAG), Mission Springs Water District and the cities of Coachella, Calimesa, Fontana, Wildomar, Highland, and Moreno Valley. He has managed design and construction on a variety of Capital Improvement Program and development projects of all sizes ranging from $100,000 to $80 Million. As a project manager, Mr. Renner has been responsible for TERRY field analysis of pavement deterioration, design production, supervising a staff of engineers and drafters, coordinating work between the RENNER, production team and the client, and for submitting all deliverables in a timely manner. As a construction manager, Mr. Renner has been responsible for construction coordination and scheduling, utility P.E., Q.S.D. relocation coordination, public relations, submittal review, supervising a Principle in staff of inspectors and subconsultants, weekly progress meetings, request for information responses, storm water management, progress Charge/Construction payments, change order review and negotiations, labor compliance, and project closeout.
Manager
DETAILED PROJECT EXPERIENCE
TKE Engineering, Inc. • CV Sync Traffic Signal Synchronization Project, Coachella Valley Association of Governments, CA- Mr. Renner serves as the EDUCATION Construction Manager in charge of oversight of CV Sync project.
This work involves plan review, management and approval of BS, Civil Engineering, California State
Polytechnic University, Pomona construction scheduling, budget, field work, local agency procedures and more. This project involves coordination and support across REGISTRATIONS twelve agencies in the Coachella Valley The project improvements include advanced traffic management systems (ATMS), advanced P.E. License Number 69984 (CA) transportation controllers (ATC), selected Intelligent Transportation Qualified SWPPP Developer and System (ITS) elements, ITS sub-systems, and Ethernet/|P-based Practitioner #24329 communications that will be expandable and scalable for future CERTIFICATIONS integration of ITS technologies and strategies, such as Integrated Corridor Management (ICM), Smart Cities, Connected
Caltrans SWPPP Certified QSP/QSD
Training Autonomous Vehicles, a Regional Traffic Management Center (RTMC) and local Traffic Operation Centers (TOC).
AFFILIATIONS • Sierra Avenue Widening Project, City of Fontana, CA - Mr. Renner American Public Works Association provides project and construction management services to the City American Council of Engineering of Fontana for the Sierra Avenue Widening Project. The project is Companies of California approximately 1 mile of widening for the City's primary north south arterial street widening the roadway from 4 lanes to 6 lanes. The project includes street widening, raised landscape median, new sewer main installation, traffic signal installation and modifications, traffic signal interconnect and fiber optic cable installation, and extensive utility coordination for water main replacement, Rule 20A and Rule 20B undergrounding work. He is currently responsible for management of utility coordination, right-of-way acquisition for 76 parcels, traffic analysis, review of construction plans, coordination with project design consultants, construction management and construction staking services.
SECTION 2 | STATEMENT OF QUALIFICATIONS Page 18
Mr. Blackwell has over 8 years of experience providing inspection services for capital projects to several agencies throughout Southern California. His services include but are not limited to site grading, sewer and waterline installation, street paving, American Disabilities Act (ADA) improvements, underground infrastructure, utilities installation, steel reinforcements, concrete and masonry, path/retaining walls, and parking lot installation.
Additionally, he is skilled in understanding project plans and specifications, accessing applicable code, maintaining good and proper relationships with project stakeholders and contractors, and helping to prepare final project documents. Mr. Blackwell has prepared daily inspection reports, developed construction photo logs, verified compliance with contract documents and approved project submittals, and verified public safety compliance.
NELSON DETAILED PROJECT EXPERIENCE
• City Wide Pavement Rehabilitation Program, City of Moreno BLACKWELL, Valley - Mr. Blackwell was the Senior Public Works Inspector for the Citywide Pavement Rehabilitation 2021/22 Project which included C.P.I.I.
monitoring to ensure construction of the project was in accordance Senior Public Works with the approved plans and specifications. The project included Inspector pavement crack sealing, grinding and isolated removal areas along with construction of street widening with asphalt rubberized hot mix TKE Engineering, Inc. overlay over conventional hot mix asphalt base paving, pavement replacement, rubberized asphalt concrete overlay, slurry seal and asphalt concrete curb installation.
EDUCATION • Boulder Ave Improvement Project, City of Highland - Mr.
Special Inspection Certification and Blackwell was the Senior Public Works Inspector for Boulder Avenue Training - Southwest Training and Improvement Project, a major collector street with 2 lanes each Calibration San Bernardino, CA direction separated by a median. The project included removal of curb, gutter, asphalt concrete pavement, signage, striping and CERTIFICATIONS construction of PCC curbs, gutters, curb ramps, driveways, asphalt concrete pavement, irrigation, median landscaping,
ICC - Special Inspector, Soils, Reinforced
Concrete, Reinforced Masonry and ACI hardscape, in-road bicycle detection, decorative way findings signs, Field Testing street lighting, trail lighting, anti-graffiti coating, architectural Technician Grade 1 treatment on existing sound wall and cape seal located on Boulder CPII - Certified Public Infrastructure Avenue from Greenspot Road to San Manual Village Plaza Inspector (CPII) (Highland Avenue).
• District Corp Yard/Field Ops Facility, Lake Arrowhead Community Services District - Mr. Blackwell performed inspections for all site construction activities including, but not limited to; Site grading, Underground utility installations, Parking lot construction, and Landscaping.
Roosevelt Elementary School, Pomona CA - Mr. Blackwell
performed inspection services for this $45 million expansion and modernization project. His services included professional construction observation of new buildings, storm water infiltration system installation, and parking lot installation.
SECTION 2 | STATEMENT OF QUALIFICATIONS Page 19
Ms. Barlow joined TKE in 2022 as the Executive Assistant to Senior Vice President and proposed Project Manager, Terry Renner. She has a collective 18 years of experience providing project coordinator services, including public outreach efforts for public works Capital Improvement Projects. Ms.
Barlow has supported the successful delivery of a wide range of projects for various clients, including the City of Rialto, where she is currently facilitating client and subconsultant coordination for potholing services. She maintains project records for clients across San Bernadino, Riverside, Los Angeles, and San Diego Counties. Ms. Barlow has specialized expertise and knowledge related to file structure organization, appointment and event JEANNETTE scheduling, social media marketing, screening and directing phone and email correspondence, taking detailed meeting minutes, and developing BARLOW PowerPoint presentations for project management meetings. Ms. Barlow is the best candidate for the Public Outreach Coordinator on this project because she leverages her strong interpersonal skills, takes initiative to Labor Compliance ensure execution of tasks on schedule, and is dedicated to exceeding client expectations by working in accordance with City Standards.
Specialist
DETAILED PROJECT EXPERIENCE
TKE Engineering, Inc.
• Willow Ave and San Bernardino Avenue Traffic Signal and Street Improvements, City of Rialto- Reporting directly to proposed Project Manager, Terry Renner, Ms. Barlow is currently providing project coordination and public outreach support services for the City of Rialto. She is coordinating with subconsultant, Air for potholing services and providing the City with status updates.
• Sierra Avenue Widening Project, City of Fontana- Ms. Barlow served Project Coordinator and provided public outreach support for the City of Fontana. She was responsible for extensive client, subconsultant, and agency coordination which held her accountable for emailing and mailing construction commencement notices to all parties involved with the multi-phase street widening and improvements project.
County Line Road Corridor Project, City of Calimesa- Ms. Barlow is currently managing the County Line Road Project, which can be found at https://www.clrproject.com/ and has an associated Facebook page. Ms. Barlow updates the website regularly and monitors all site content to verify accuracy of project status updates so the public has access to current information.
• CV Sync Traffic Signal Synchronization Project, Coachella Valley Association of Governments - Ms. Barlow is serving as public outreach coordinator and monitors the CV SYNC project website, which can be found at https://www.cv-sync.com/. CV Sync is an innovative approach to improving how residents and visitors travel in the Coachella Valley. The project consists of upgrading existing traffic signal controllers and revolutionizing the way traffic is managed by using the latest off-the-shelf technologies to coordinate traffic on major roadways. The first phase of CV Sync will focus on Highway 111, Ramon Road and Washington Street. Ultimately, the project will include 52 corridors in the Coachella Valley.
SECTION 2 | STATEMENT OF QUALIFICATIONS Page 10
6 REFERENCES
BOULDER AVENUE IMPROVEMENT PROJECT
City of Highland, CA RELEVANCE TO CATHEDRAL CITY
Client Contact: Carlos Zamano | Public Works Director ADA Ramp. Street and Median Phone Number: (909) 864-8732 ext. 254 Improvement Project Email: [email protected] • Pedestrian Facilities Project Cost: $3.3M Public Works Construction
Completion Date: Jan 2023 Management Inspection Project • State and Federal Grant
Management
DESCRIPTION Beautification Project
Boulder Avenue is a major collector street with 2 lanes each direction separated by a median. The scope of the project includes but is not limited to: removal of curb, gutter, asphalt concrete pavement, signage, striping and construction of PCC curbs, gutters, curb ramps, driveways, asphalt concrete pavement, irrigation, median curb, landscaping, hardscape, in-road bicycle detection, decorative way findings signs, street lighting, trail lighting, anti-graffiti coating, architectural treatment on existing sound wall and cape seal located on Boulder Avenue from Greenspot Road to San Manual Village Plaza(Highland Avenue) with in the City of Highland, in the county of San Bernardino, California.
SERVICES
Services include full-service construction management during the construction of the project, coordination, scheduling, administration, inspection, construction surveying and staking, geotechnical services, and materials testing along with biological monitoring and utility coordination for the project.
KEY STAFF
Terry Renner, P.E., L.S., Q.S.D, Monae Pugh, Jose Hernandez, Brian McDuffie, Nelson Blackwell, C.P.I.I.
SAFE ROUTES TO SCHOOL CYCLE 10 (SR2S)
City of Highland, CA
RELEVANCE TO CATHEDRAL CITY.
Client Contact: Carlos Zamano | Public Works Director
Phone Number: (909) 864-8732 ext. 254 • Bicycle and Pedestrian Email: [email protected] Enhancements
Project Cost: $1.9M Public Works Construction
Completion Date: August 2020 Management and Inspection
DESCRIPTION Project
State Grant Management
TKE provided construction management and inspections services for the Cycle 10 Safe nates tu denou want Springo, cuic anu cypress Elementary Schools Projects for the City of Highland. The City of Highland was awarded SR2S funding for the pedestrian path of travel enhancements to provide safe walking paths along 6th Street, Elm Street, Cole Avenue, Drummond Avenue, 10th Street and 14th Street.
Proposed improvements include sidewalk, curb access ramps, In-Roadway Lighting system, striping and signage improvements. The project includes approximately more than two miles of street and sidewalk improvements together with public outreach and coordination.
SERVICES
Services included utility relocation coordination, construction administration, construction management, inspection, right-of-entry coordination with property owners and materials testing.
KEY STAFF
Michael P. Thornton, P.E., L.S., Terry Renner, P.E., L.S. Q.S.D., Steven Biscotti SECTION 2 | STATEMENT OF QUALIFICATIONS Page |11
HSIP JURUPA VALLEY GUARDRAIL REPLACEMENT PROJECT
City of Jurupa Valley, CA RELEVANCE TO CATHEDRAL CITY
Client Contact: Octavio Duran, P.E. | • HSIP Grant Administration Assistant City Engineer • Coordination with Caltrans Local Phone Number: (951) 332-6464 ext. 242 Assistance
Email: [email protected] Project Development Team Meeting Project Cost: $500,000 Attendance
Completion Date: Current
Strict Compliance with State/Federal
DESCRIPTION
Policies and Procedures
This HSIP project located in Jurupa Valley involves a guardrail replacement, for which TKE is performing grant administration, construction management, and inspection services. TKE attends project development meetings on behalf of Jurupa Valley, assists with preparing requests for proposals, and tracks and reports on statuses with regard to the project budget and schedule. Our Team also composes various communications and reports required for the administration of this project related to its state and federal funding.
SERVICES
Services included, grant funding administration, construction management, construction inspection, reimbursement requests, agency coordination and compliance with state/federal policies and procedures.
KEY STAFF
Terry Renner, P.E., L.S., Q.S.D, Jose Hernandez, Nelson Blackwell
COUNTY LINE ROAD TRANSPORTATION CORRIDOR (LPP)
City of Calimesa, CA RELEVANCE TO CATHEDRAL CITY
Client Contact: Will Kolbow | City Manager • Bicycle and Pedestrian Phone Number: (909) 795-9801 Enhancements
Email: [email protected] Public Works Design, Construction Project Cost: $10.1 Million ($3.7 Million Management Inspection Project Grant) • State Grant Management
Completion Date: Current Community Outreach Efforts
DESCRIPTION
TKE prepared and obtained a grant for the City of Calimesa through the Road Repair and Accountability Act of 2017 (SB1) Local Partnership Program (LPP). TKE is preparing street widening and roundabout improvements for the construction of the County Line Road Transportation Corridor. The Project includes four (4) single-lane and one (1) multi-lane roundabouts, together with street, pedestrian, and bicycle improvements, to improve safety and efficiency throughout the corridor. The innovative approach to implement roundabout intersection throughout the corridor provides adequate capacity and level of service to remain a two-lane street; thus, significantly reducing right-of-way and construction costs to construct a four-lane corridor.
SERVICES
Services include grant coordination and management, design, topographic survey, right-of-way engineering, environmental assistance, roadway safety analysis, preparation of exhibits, cost estimates, coordination with California Transportation Commission, construction management, inspection, and construction staking.
KEY STAFF
Michael P. Thornton, P.E., L.S., Terry Renner, P.E., L.S., Q.S.D., Steven Ledbetter, P.E., Octavio Parada, Ron Musser, L.S., Monae Pugh, Justin Schlaefli, P.E., T.E., P.T.O.E. Jeff Lantosh, C.P.I.I., Brian McDuffie SECTION 2 | STATEMENT OF QUALIFICATIONS 112
GRANT-FUNDED CONSTRUCTION INSPECTION SERVICES
CV SYNC - PHASE | & II, COACHELLA VALLEY ASSOCIATION OF
GOVERNMENTS (CVAG), COACHELLA VALLEY, CA
for this CMAQ funded construction management project included Grant Administration LAPM Form Preparation
Reimbursement Assistance
ATP GRANT JUAN BAUTISTA DE ANZA TRAIL, CITY OF MORENO VALLEY GRANT SERVICES for this ATP funded construction management project included Grant Administration LAPM Form Preparation
Reimbursement Assistance
HSIP GRANT JURUPA VALLEY GUARDRAIL REPLACEMENT PROJECT, JURUPA VALLEY, CA GRANT SERVICES for this HSIP funded construction management project included Grant Administration LAPM Form Preparation
Reimbursement Assistance Fund Transfer
PNRS GRANT BOULDER AVENUE IMPROVEMENTS PROJECT, CITY OF HIGHLAND, CA GRANT SERVICES for this PNRS funded construction management project included Grant Administration Y LAPM Form Preparation
Reimbursement Assistance
LPP GRAN COUNTY LINE ROAD TRANSPORTATION CORRIDOR, CITY OF CALIMESA, CA GRANT SERVICES for this LPP funded construction management project included Project Analysis Reimbursement Assistance
Finance Letter LAPM Form Preparation
Request for Allocations Right-of-Way Certification
Grant Administration Fund Transfer
SR25 GRA T SAFE ROUTES TO SCHOOL CYCLE 10 (SR2S), CITY OF HIGHLAND, CA Grant Administration LAPM Form Preparation
Reimbursement Assistance
SECTION 2 | STATEMENT OF QUALIFICATIONS 113
5 PROJECT approach has consistently allowed our partner agencies to UNDERSTANDING fulfill their missions of delivering the best value for the public's investment.
The City desires to retain a highly qualified professional consultant firm to provide services for TKE's management approach includes:
Engineering Support in accordance with State-funded
COMMUNICATIO
HSIP project requirements. TKE understands the Project
in focus is the HSIP Cycle 10: Pedestrian Signal at Ramon Communications with City staff is another important Road near Candlewood Drive, CIP No. 08752. With the component to effective project management. In addition $776,600 in grant funds received, the entire Project to the monthly progress reports, TKE meets with clients as encompasses design and construction of a pedestrian needed to ensure the projects are proceeding as
crossing signal at Ramon Road near Candlewood Drive. anticipated. We document each discussion or meeting The project includes a pedestrian or median fencing on with notes and electronically mail them to the project team Ramon Road from Landau Boulevard to Whispering Palms within three days of the meeting/conference indicating Trail. The project requires construction engineering action items and a schedule for completion of these items. support which includes labor compliance monitoring and Finally, TKE welcomes direct lines of communication enforcement, inspection and materials testing in between the City and all Key Staff for any and all project accordance with State-funded HSIP requirements. TKE needs. staff is prepared to immediately mobilize and begin
providing the required services and related technical RECORD KEEPING engineering assistance. TKE keeps records in an organized filing system both in hard copy and electronic forms. This organized filing
ROJECT APPROACH
system follows Caltrans LAPM formatting and ensures
Whether the services required are city engineering, project compliance with the grant agency and allows TKE to management, planning, design, or construction related, access records immediately should they successful project delivery is our goal. Our definition of needed. Additionally, TKE can provide comprehensive successful project delivery is: project records to the City upon completion of the Project.
MEE
Project Completion that Protects City Interests
Project Completion that Meets All Project TKE meets with project stakeholders as needed including Requirements the public, permitting agencies, utilities, etc. We meet with them at the project's onset and throughout the course of Project Completion on Schedule project development to ensure all stakeholder project Project Completion within Budget needs are considered in the project design. All meeting IMPLEMENT preparation (City Staff Reports, agendas, exhibits, slide shows, etc.) will be prepared by TKE for each meeting
TKE's implementation plan includes the following key Again, meetings will be documented. TKE has provided elements which we routinely provide for each of our numerous similar presentations to Councils (closed projects: sessions, council meetings, community meetings, etc.).
PROJECT MANAGEMENT
7: CRITICAL ISSUES
TKE provides effective city engineering, land
development, and project management services to a STRICT CONSTRUCTION COMPLIANCE variety of clients. We have successfully delivered
extensive and highly visible development projects, street In order to ensure cost controls and maintain project improvement, traffic improvement, drainage improvement, budgets, it is imperative that City employ an experienced water, wastewater and facility improvement projects for the construction management team. Our construction Coachella Valley Association of Governments, County of management team has consistently delivered projects on- San Bernardino and Riverside, Cities of Coachella, time and within budget by maintaining an active dialogue Banning, Calimesa, Moreno Valley, Chino, Glendora, El and hands on approach with the project contractor, while Monte, South El Monte, Corona, Highland, Hesperia, ensuring that all construction is consistent with the bid Colton, Upland, Fontana, Yucaipa, Rialto, plans and specifications. We are familiar with applicable Redlands, Wildomar, Lake Elsinore, and Riverside and for standards and specifications, including but not limited to the Municipal Agencies San Bernardino Municipal Water numerous San Bernardino County Cities, County of San Department, Rubidoux Community Services District, Bernardino, CalTrans, and Greenbook.
Mission Springs Water District, East Valley Water District, Mission Springs Water District, Coachella Water Authority, PUBLIC RELATIONS San Bernardino Municipal Water Department, Rubidoux
Community Services District, East Valley Water District, TKE's Construction Manager and Inspector are Three Valleys Municipal Water District, Monte Vista Water experienced with public relations associated with District, and Maywood Mutual Water Company. TKE's construction projects. TKE performs initial site visits to all SECTION 2 | STATEMENT OF QUALIFICATIONS Page |14
potentially affected properties to discuss the upcoming project and any potential concerns the property owner
and/or tenant may have. TKE identifies improvements that Will benett the property owners to help them understand the importance of project construction. Our approach
builds a project coalition with the property owners and tenants which reduces public complaints at City Council meetings and provides a sense of ownership with the
TKE's Inspector also performs routine visits
during construction to check on the property owners
concerns and to see if there are any issues that need to be
FEDERAL / STATE FUNDING COMPLIANCE
TKE will verify that all construction activities, records management completed in
accordance with funding requirements including Caltrans Construction
requirements. TKE is already working closely with
Caltrans Local Assistance on numerous other projects and is very familiar with funding requirements ensuring that the City's projects will be delivered efficiently. TKE also has current experience with Caltrans District 8 preparing
requests for authorization to proceed to construction,
programming change requests, and variance to finance
letter requests to conform to actual bid amounts.
SECTION 3 | SCOPE OF WORK
8 15
SECTION 3| SCOPE OF WORK
A sample of TKE's scope of services for construction We will digitally photograph the activities and maintain inspection of a grant funded project is presented in the copies in the project files and our Construction Inspector following paragraphs: Will prepare daily field reports, which will document all GENERAL SERVICE observed project activity, including location of the activity, number of workers present, construction equipment used
quantities constructed, inspector present, weather
TKE will perform all construction inspection services and conditions, and construction progress. All project
provide correspondence, labor compliance, materials documentation will be completed on standard forms. All testing, and public outreach coordination to ensure
documents will be submitted in hard copy and electronic oversight of all activities related to construction of the copy formats. TKE will provide all inspection equipment project, maintain close liaison with the City Project
needed.
Manager and copy the City Project Manager on all project correspondence. General management services will also Our inspector will provide emergency contact information include coordination with the project design engineer and to allow for 24-hour accessibility. He will verify site safety City Project Manager for any required modifications to the conditions on a daily basis and, should conditions be construction plans and/or specifications during unsafe, advise the contractor of corrective actions. If the construction. contractor fails to remediate such condition, he will advise the City and request direction. Should an accident occur,
ASK LABOR COMP
we will notify the City and note all site conditions and photo TKE will perform labor compliance interviews with document the accident location. contractor and subcontractor personnel in accordance with DELIVERABLES:
the required schedule set forth in the LAPM. In addition, Daily Field Reports, Site Deficiency Reports, Batch Tickets, TKE will review certified payroll reports and ensure DBE Photographs, Accident Reports, Testing Reports, and Summary utilization in compliance Reports
requirements. Should deficiencies be noted, corrective
action will be requested from the contractors prior to TASK NO. 3 - MATERIALS TESTING payment release.
TKE has teamed with Aragon Geotechnical, . Inc. (AGI),
DELIVERABLES: who will be providing Materials Testing Services for the Labor Compliance Forms, Labor Compliance Checklist Project. AGI will be responsible for all the tests as required by the Caltrans Standard Specifications and Project
TASK NO. 2 - INSPECTION SERVICES
Special Provisions. They will perform materials testing TKE will provide daily construction inspection and services in accordance with the City's approved Quality reporting, to verify that the project is progressing in Assurance Program and the California Department of compliance with the contract documents. We will require Transportation. They will conduct all testing in their strict compliance with the contract documents for all Caltrans Certified Laboratory, utilizing a certified technician. Test results will site applicable contract
construction activities and for any equipment or materials to be furnished and installed. We already possess the requirements, tests, and/or analytical procedures usec AGI will keep records of all samples and tests in the proiec neasuring devices and testing equipment normally
required for inspecting public works construction files as permanent job records, and maintain a Testing Plan and Log.
projects. Our construction inspection personnel are
experienced and knowledgeable in the operation of said • DELIVERABLES:
devices and equipment, as well as the associated safety Test Plan Log, Records of Samples and Tests with equipment. Results, Acceptance Test of CIDH Concrete Piles.
All materials will be reviewed against approved material submittals as they arrive on-site. Batch tickets or weigh certificates will be collected upon material arrival.
Our Construction Inspector will verify SWPPP and safety provisions have been implemented at the start of each
work day, at the construction site. Any deviations will be documented. system service interruptions,
connections and abandonments will be coordinated with
stant. In addition, he will coordinate and schedule materials esting and survey requirements with appropriate partie:
to ensure there is no delay to the project construction and to minimize costly down periods for anyone onsite.