Cities Index.
FINAL ELECT-VEHICLE-CHARGE-STATION-CHECKLIST

Cathedral City City Council
January 10, 2024

Document
FINAL ELECT-VEHICLE-CHARGE-STATION-CHECKLIST
Meeting
January 10, 2024
Body
Cathedral City City Council
Original file
642 KB
Text extracted from the city's file for reading and search. Open the original on cathedralcity.primegov.com. That file is the official record.

CATHEDRAL CITY – EVCS CHECKLIST
Mandatory Checklist for
Expedited Permitting
of Electric Vehicle Chargi ng Station(s) (EVCS)
The purpose of this document provides the checklist and guidelines necessary to expedite and streamline the permitting process for qualifying Electric Vehicle Charging Stating(s) (EVCS) within Cathedral City.

Once the appropriate application, documents, and plans have been submitted to the building department for review, an expedited plan review will occur no later than five business days (5) following the day the application is reviewed and deemed complete. Once your project has been reviewed and approved, you will be notified that the building permit is available for issuance.

Please complete the checklist to determine if your application is eligible for expedited EVCS processing. If any item is checked “NO”, you may revise your design, otherwise your application must go through the standard review process.

JOB ADDRESS: _________________________________________ APN:____________________________ USE OF BUILDING OR AREA (check one):

Single Family Residence Commercial Multi-Family LOCATION AND QUANITY OF EVCS TO BE INSTALLED:
______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ APPLICANT(s) INFORMATION:

Name: ___________________________________________________ Phone Number: _______________________ Email Address: _________________________________________________________________________________ Address: ______________________________________________________________________________________ CONTRACTOR INFORMATION:

Name: ___________________________________________________ Phone Number: _______________________ Email Address: ___________________________________ License No. & Type: ____________________________ Address: ______________________________________________________________________________________

PROPERTY OWNER INFORMATION:

Name: ___________________________________________________ Phone Number: _______________________ Email Address: _________________________________________________________________________________ Address: ______________________________________________________________________________________ TYPE OF EVSC (ch
eck one):

Type of Charging Station Power Levels
(Specify Circuit Rating)
___________________________
___________________________
___________________________
Level 1
Level 2
Level 3
Other: (specify and provide details and rating):

Permit Application
A. Is the permit application complete with the following information: Project address, parcel #, property owner’s name, contractor’s name, valid contractor’s license, email address, phone number, valuation, original (wet signed) signatures etc? If electronically signed, certifications(s) must be provided.

Yes No
B. Does the application include EVCS manufacturer’s specification and installation guidelines? Yes No Electric Load Calculation Worksheet
Yes No
Yes No
Yes No
A. Is an electrical load calculation worksheet included? (CEC 220) B. Based on the electrical load calculation sheet,
is a new electrical service panel upgrade required?

1. If yes, do plans include the electrical service panel upgrade? Site Plan & Single Line Diagram
Yes No A. Is a site plan and electrical plan with a single-line diagram included with the permit application? Compliance with 2022 California Electrical Code (Title 24 Part 3) Yes No Yes No
Yes No
Yes No
A. Do the plans specify that the electrical vehicle charging system shall be installed in accordance with manufacturer’s installation instructions and shall be suitable for t he environment (indoor/outdoor) in which they will be installed?
Yes No
Compliance with 2022 California Green Code Requirements Does the number of proposed electrical vehicle charging spaces conform to the Tier 1 requirements of the California Green Building Code
(CGBC)? (CGBC A4.106.8.2 and
A5.106.5.3)[Note: only applies to
newly constructed multi-family residential and newly constructed non- residential projects.]
Compliance with 2022 California Building Code Accessibility Requirements [Note: Accessibility requirements are required for public and common use areas, public accommodations, commercial facilities and public housing as defined in the CA Building Code.] Name of Person Completing Checklist (print name): _____________________________________________ Signature: __________________________________ License No. / Type: ___________________________

← All documents from this meeting