CITY OF CATHEDRAL CITY
COVE CRACK REPAIR PROJECT
Bid Tabulation/ Analysis
CITY PROJECT No.: 8675
1 MOBILIZATION LS 1 59,854.25$ 59,854.25 $ 65,000.00 $ 65,000.00 $ 35,590.24 $ 35,590.24 $ 47,800.55 $ 47,800.55 $ 2 TRAFFIC CONTROL LS 1 9,975.71$ 9,975.71 $ 45,000.00 $ 45,000.00 $ 120,500.00 $ 120,500.00 $ 69,342.40 $ 69,342.40 $ 3 GRIND 2" AC PAVEMENT AND DISPOSE SF 80,352 0.90 $ 72,316.80$ 0.65 $ 52,228.80$ 1.11 $ 89,190.72$ 3.30 $ 265,161.60$ 4 REMOVE AND DISPOSE FULL DEPTH AC PAVEMENT AND
BASE MATERIAL UP TO A TOTAL DEPTH OF 4.5" (3" AC +
1.5" BASE)
SF
40,176 1.60 $ 64,281.60$ 2.00 $ 80,352.00$ 3.65 $ 146,642.40$ 2.15 $ 86,378.40$ 5 SAWCUT LF 53,568 5.50 $ 294,624.00$ 0.25 $ 13,392.00$ 0.14 $ 7,499.52$ 0.45 $ 24,105.60$ 6 1/2" HMA ASPHALT CONCRETE
TYPE III CLASS C-3, PG 70-10 TONS 2,120 120.00 $ 254,400.00$ 155.00 $ 328,600.00$ 195.00 $ 413,400.00$ 365.35 $ 774,542.00$ 7 SUBGRADE GEOTEXTILE (PETROMAT) SF 120,528 0.55 $ 66,290.40$ 0.95 $ 114,501.60$ 0.45 $ 54,237.60$ 0.90 $ 108,475.20$ 821,742.76$ 699,074.40 $ 867,060.48 $ 1,375,805.75 $ 8 CRACK SEAL LF 299,583 0.82 $ 245,658.06$ 0.65 $ 194,728.95$ 0.44 $ 131,816.52$ 0.60 $ 179,749.80$ 245,658.06$ 194,728.95 $ 131,816.52 $ 179,749.80 $ 1,067,400.82$ 893,803.35 $ 998,877.00 $ 1,555,555.55 $ TOTAL ALL BID ITEMS AND ALTERNATIVE VANCE CORP.
UNIT COST TOTAL
ONYX PAVING COMPANY INC.LCR EARTHWORK &
ENGINEERING CORP.
UNIT COST TOTAL
SUB-TOTAL ADDITIVE ALTERNATE BID SCHEDULE NO. 1
UNIT
BID SCHEDULE
ADDITIVE ALTERNATE BID SCHEDULE NO. 1: CRACK
SEAL
SUB-TOTAL BID SCHEDULE NO.1
ITEM DESCRIPTION TOTAL QUANTITY UNIT COST
Engineers Estimate
TOTAL UNIT COST