CITY OF CATHEDRAL CITY
TROPICAL STORM HILARY – SOIL REMOVAL FOR OFELIA BRINGAS BRIDGE GRADE CONTROL STRUCTURE

AND DATE PALM BRIDGE CHANNEL LINING

BID TABULATION
CITY PROJECT No.: M00023
Bid No: B24-67E
DATE: 05/28/2024
1 MOBILIZATION LS 1 196,766.00$ 196,766.00$ 250,000.00$ 250,000.00$ 48,477.20$ 48,477.20$ 535,000.00$ 535,000.00$ 100,425.00$ 100,425.00$ 2 TRAFFIC CONTROL LS 1 90,970.00$
90,970.00$
58,000.00$ 58,000.00$
83,377.36$
83,377.36$ 125,000.00$ 125,000.00$ 144,000.00$ 144,000.00$ 3 DUST CONTROL/ WATER POLLUTION CONTROL LS 1 250,085.00$ 250,085.00$ 24,000.00$ 24,000.00$ 56,467.00$
56,467.00$ 125,000.00$ 125,000.00$ 129,870.00$ 129,870.00$ 4 STORM WATER AND NONSTORM WATER
POLLUTION CONTROL LS 1 77,000.00$ 77,000.00$ 24,000.00$ 24,000.00$ 53,900.68$ 53,900.68$ 125,000.00$ 125,000.00$ 50,000.00$ 50,000.00$ 5 UNCLASSIFIED EXCAVATION EARTHWORK CY 110,000 18.87$ 2,075,700.00$ 26.00$ 2,860,000.00$ 28.36$ 3,119,600.00$ 25.25$ 2,777,500.00$ 30.84$ 3,392,400.00$ 2,690,521.00$ 3,216,000.00$ 3,361,822.24$ 3,687,500.00$ 3,816,695.00$ 1 MOBILIZATION LS 1 350,000.00$ 350,000.00$ 172,757.00$ 172,757.00$ 250,000.00$ 250,000.00$ 278,050.00$ 278,050.00$ 2 TRAFFIC CONTROL LS 1 50,000.00$
50,000.00$
76,011.00$ 76,011.00$
250,000.00$ 250,000.00$ 207,700.00$ 207,700.00$ 3 DUST CONTROL/ WATER POLLUTION CONTROL LS 1 350,000.00$ 350,000.00$ 229,835.00$ 229,835.00$ 50,000.00$ 50,000.00$ 663,475.00$ 663,475.00$ 4 STORM WATER AND NONSTORM WATER
POLLUTION CONTROL LS 1 50,000.00$ 50,000.00$ 163,944.00$ 163,944.00$ 35,000.00$ 35,000.00$ 72,900.00$ 72,900.00$ 5 UNCLASSIFIED EXCAVATION EARTHWORK CY 110,000 30.00$ 3,300,000.00$ 34.30$ 3,773,000.00$ 35.00$ 3,850,000.00$ 34.32$ 3,775,200.00$ 4,100,000.00$ 4,415,547.00$ 4,435,000.00$ 4,997,325.00$

TOTAL UNIT COST
Contera Construction Corporation

TOTAL UNIT COST TOTAL UNIT COST
Remedial Transportation Services, Inc.

TOTAL TOTAL
Vertex Civil LLC Tri-Star Contracting II, Inc. IE General Engineering

UNIT COST UNIT COST
TOTAL
Bosco Constructors, Inc.

UNIT COST TOTAL UNIT COST TOTAL
Empire Equipment Service, Inc. Riverside Construction, Inc.

UNIT COST TOTAL
Ames Construction, Inc.

UNIT COST

TOTAL BASE BID ITEMS

ITEM DESCRIPTION UNIT QUANTITY

BASE BID ITEMS

TOTAL BASE BID ITEMS

BASE BID ITEMS

ITEM DESCRIPTION UNIT QUANTITY