PROJECT
NO. COUNTERMEASURE(S) LOCATION(S) PROJECT DESCRIPTION HSIP GRANT CONSIDERATIONSCITY

MATCH BENEFIT FUNDING AT BCR
= 20
1 SI18PB - Install pedestrian countdown signal headsDinah Shore Dr & Date Palm Dr Install Pedestrian Countdown Signal Heads 1 Fatal Injury (2023) 10% $3,925,000 $196,250 2 Dinah Shore Dr & Date Palm Dr Implement Lead Pedestrian Interval Phasing at multiple locations. 1 Fatal Injury (2023) 10% $4,710,000 $235,500

2.1 E Palm Canyon Dr & Cathedral Canyon Dr Implement Lead Pedestrian Interval Phasing at multiple locations. Pedestrian and Bicycle Crashes Only10% $386,000 $19,300 Dinah Shore Dr & Corregidor DrPedestrian Ramp Upgrades, Signing and Striping Pedestrian and Bicycle Crashes Only10% $3,027,500 $151,375 San Eljay & Doral Way* Pedestrian Ramp Upgrades, Signing and Striping Pedestrian and Bicycle Crashes Only10% $252,500 $12,625 Note: * = Crosswalk near K-12 Public School
CATHEDRAL CITY HSIP 12 FEASIBILITY ANALYSIS
SI22PB - Modify signal phasing to implement a
Leading Pedestrian Interval (LPI)
3 NS22PB - Install pedestrian crossing at uncontrolled
locations (signs and markings only)