Cities Index.
12 IS MND Appendices 06282024

Cathedral City City Council
September 11, 2024

Document
12 IS MND Appendices 06282024
Meeting
September 11, 2024
Body
Cathedral City City Council
Pages
22
Original file
18.0 MB
Text extracted from the city's file for reading and search. Open the original on cathedralcity.primegov.com. That file is the official record.

1.3 Kentucky 1993 — 68 22 10 32 2055 2

1.9 Kentucky 1993 33 67 24 9 33 2447 2

2.8 Florida 1995 47 66 — — 34 — 30

2.9 Florida 1996 271 41 41 18 59 — 30
3 Kentucky 1993 — 31 31 38 69 4250 2

3.1 Florida 1995 28 71 — — 29 — 30

3.1 Florida 1996 29 38 — — 62 — 30

3.2 Florida 1996 202 40 39 21 60 — 30

3.3 — 1996 — 62 — — 38 — 21

4.2 Indiana 1993 — 56 25 19 44 1632 2

4.3 Florida 1994 304 62 — — 38 — 30
General Urban/Suburban
Vehicle Pass-By Rates by Land Use
Source: ITE Trip Generation Manual , 11th Edition
934
Fast-Food Restaurant with Drive-Through Window
Weekday PM Peak Period
11 55%
Pass-By Characteristics for Individual Sites
State or Province
Survey
Year # Interviews
Pass-By
Trip (%)
Non-Pass-By Trips Adj Street Peak
Hour Volume
60%
10%
LEGEND # Instersection # Driveway

PROJECT SITE
15%
15%
25%
40%
60%
20%
15%6
5 1
3 5%
5% 4
20%
15%
Date Palm Drive Mixed Use - Study Area and Trip Distribution (Phase 1 Only) Attachment 3a
25%
45%
10%
15%
LEGEND # Instersection # Driveway

PROJECT SITE
15%
15%
25%
15%
30%
30%
55%
5%
5%6
5 1
2 3
5%
5% 4
20%
15%
Date Palm Drive Mixed Use - Study Area and Trip Distribution (Phase 1 and 2 Total) Attachment 3b
Date Palm Drive Mixed Use
Scenarios 1 & 2 Phase 1 Volumes
Attachment 4a

Date Palm Drive Mixed Use
Scenario 1 Phases 1 & 2
AM Peak Hour Intersection Volumes
Attachment 4b

Date Palm Drive Mixed Use
Scenario 2 Phases 1 & 2 Volumes
Attachment 4c

APPENDIX B ‐
TRAFFIC VOLUME DATA
CITY: Cathedral City PROJECT:

AM Period NB SB PM Period NB SB
0:00 21 21 12:00 126 128
0:15 15 19 12:15 151 145
0:30 21 11 12:30 150 130
0:45 14 71 13 64 135 12:45 149 576 148 551 1127
1:00 14 6 13:00 173 155
1:15 21 17 13:15 182 121
1:30 10 6 13:30 161 157
1:45 6 51 9 38 89 13:45 174 690 164 597 1287
2:00 16 9 14:00 197 141
2:15 10 12 14:15 162 163
2:30 7 7 14:30 165 173
2:45 7 40 10 38 78 14:45 190 714 207 684 1398
3:00 9 11 15:00 207 165
3:15 10 6 15:15 204 163
3:30 10 13 15:30 205 172
3:45 10 39 16 46 85 15:45 231 847 253 753 1600
4:00 11 6 16:00 280 195
4:15 15 10 16:15 271 174
4:30 17 25 16:30 243 184
4:45 20 63 34 75 138 16:45 220 1014 182 735 1749
5:00 33 30 17:00 265 190
5:15 33 33 17:15 236 172
5:30 62 63 17:30 197 151
5:45 42 170 109 235 405 17:45 204 902 158 671 1573
6:00 59 102 18:00 206 160
6:15 67 134 18:15 140 125
6:30 71 143 18:30 183 141
6:45 86 283 169 548 831 18:45 168 697 135 561 1258
7:00 91 188 19:00 136 126
7:15 94 169 19:15 151 117
7:30 126 248 19:30 116 129
7:45 95 406 288 893 1299 19:45 152 555 135 507 1062
8:00 130 200 20:00 148 120
8:15 134 266 20:15 137 90
8:30 167 236 20:30 120 101
8:45 132 563 240 942 1505 20:45 110 515 73 384 899
9:00 86 155 21:00 117 70
9:15 125 131 21:15 111 72
9:30 116 156 21:30 116 62
9:45 121 448 144 586 1034 21:45 87 431 79 283 714
10 :00 104 141 22:00 73 60
10:15 104 144 22:15 85 48
10:30 118 139 22:30 63 42
10:45 109 435 164 588 1023 22:45 62 283 47 197 480
11:00 110 124 23:00 62 32
11:15 119 157 23:15 39 28
11:30 152 181 23:30 33 28
11:45 133 514 158 620 1134 23:45 40 174 30 118 292
Total Vol. 3083 4673 7756 7398 6041 13439
NB SB Combined
10481 10714 21195
Split % 39.7% 60.3% 36.6% 55.0% 45.0% 63.4%
Peak Hour 8:00 7:30 7:45 15:45 15:45 15:45
Volume 563 1002 1516 1025 806 1831
P.H.F. 0.84 0.87 0.94 0.94 0.80 0.95
Tuesday, May 09, 2023 SC4010
ADT1 Date Palm north of Mccallum. Prepared by AimTD LLC tel. 714 253 7888 Daily Totals
AM PM
[email protected] Tell. 714 253 7888 CITY: Cathedral City PROJECT:

AM Period NB SB PM Period NB SB
0:00 19 24 12:00 130 125
0:15 16 18 12:15 143 144
0:30 20 10 12:30 157 133
0:45 14 69 13 65 134 12:45 152 582 155 557 1139
1:00 14 6 13:00 169 140
1:15 10 13 13:15 182 135
1:30 11 6 13:30 159 155
1:45 6 41 11 36 77 13:45 173 683 151 581 1264
2:00 15 9 14:00 186 151
2:15 10 11 14:15 167 155
2:30 7 8 14:30 154 177
2:45 7 39 10 38 77 14:45 193 700 191 674 1374
3:00 10 11 15:00 200 153
3:15 9 9 15:15 206 159
3:30 10 12 15:30 201 193
3:45 11 40 16 48 88 15:45 260 867 237 742 1609
4:00 10 7 16:00 264 176
4:15 16 12 16:15 250 187
4:30 18 24 16:30 243 162
4:45 19 63 37 80 143 16:45 233 990 181 706 1696
5:00 28 28 17:00 231 182
5:15 35 34 17:15 250 175
5:30 65 73 17:30 211 169
5:45 41 169 108 243 412 17:45 193 885 140 666 1551
6:00 60 98 18:00 212 156
6:15 69 141 18:15 151 130
6:30 70 137 18:30 184 147
6:45 83 282 172 548 830 18:45 176 723 143 576 1299
7:00 93 203 19:00 141 128
7:15 108 193 19:15 157 119
7:30 116 236 19:30 115 138
7:45 112 429 283 915 1344 19:45 155 568 120 505 1073
8:00 121 212 20:00 163 126
8:15 124 266 20:15 134 91
8:30 165 237 20:30 124 96
8:45 136 546 211 926 1472 20:45 110 531 73 386 917
9:00 98 169 21:00 117 65
9:15 116 125 21:15 116 77
9:30 121 152 21:30 123 60
9:45 123 458 139 585 1043 21:45 79 435 73 275 710
10 :00 112 147 22:00 81 62
10:15 121 133 22:15 86 48
10:30 148 133 22:30 63 44
10:45 139 520 159 572 1092 22:45 57 287 46 200 487
11:00 113 136 23:00 65 30
11:15 120 150 23:15 37 27
11:30 146 171 23:30 38 33
11:45 137 516 146 603 1119 23:45 40 180 26 116 296
Total Vol. 3172 4659 7831 7431 5984 13415
NB SB Combined
10603 10643 21246
Split % 40.5% 59.5% 36.9% 55.4% 44.6% 63.1%
Peak Hour 11:45 7:45 7:45 15:45 15:30 15:45
Volume 567 998 1520 1017 793 1779
P.H.F. 0.90 0.88 0.95 0.97 0.84 0.89
Tuesday, May 09, 2023 SC4010
ADT2 Date Palm south of 30th. Prepared by AimTD LLC tel. 714 253 7888 Daily Totals
AM PM
[email protected] Tell. 714 253 7888 CITY: Cathedral City PROJECT:

AM Period NB SB PM Period NB SB
0:00 19 29 12:00 146 148
0:15 19 20 12:15 161 158
0:30 23 13 12:30 166 123
0:45 13 74 14 76 150 12:45 157 630 150 579 1209
1:00 13 17 13:00 191 131
1:15 10 15 13:15 193 144
1:30 11 6 13:30 159 165
1:45 9 43 9 47 90 13:45 179 722 175 615 1337
2:00 17 11 14:00 215 169
2:15 13 11 14:15 177 166
2:30 9 8 14:30 183 180
2:45 10 49 11 41 90 14:45 239 814 213 728 1542
3:00 15 11 15:00 216 197
3:15 10 10 15:15 198 233
3:30 11 14 15:30 212 226
3:45 18 54 17 52 106 15:45 327 953 235 891 1844
4:00 13 7 16:00 297 197
4:15 26 14 16:15 282 204
4:30 30 30 16:30 271 203
4:45 27 96 34 85 181 16:45 262 1112 202 806 1918
5:00 38 34 17:00 283 210
5:15 53 42 17:15 270 227
5:30 65 55 17:30 243 207
5:45 68 224 107 238 462 17:45 204 1000 176 820 1820
6:00 88 109 18:00 234 176
6:15 109 147 18:15 192 152
6:30 129 152 18:30 219 148
6:45 135 461 189 597 1058 18:45 167 812 137 613 1425
7:00 158 258 19:00 143 121
7:15 202 243 19:15 185 126
7:30 207 279 19:30 126 126
7:45 176 743 292 1072 1815 19:45 156 610 122 495 1105 8:00 185 274 20:00 171 127
8:15 181 294 20:15 135 93
8:30 223 251 20:30 124 105
8:45 188 777 228 1047 1824 20:45 93 523 73 398 921
9:00 128 182 21:00 104 91
9:15 149 130 21:15 105 89
9:30 150 160 21:30 129 77
9:45 136 563 145 617 1180 21:45 76 414 74 331 745
10 :00 131 147 22:00 79 76
10:15 136 151 22:15 69 67
10:30 115 155 22:30 70 56
10:45 130 512 164 617 1129 22:45 67 285 49 248 533
11:00 136 135 23:00 62 39
11:15 146 151 23:15 38 36
11:30 150 194 23:30 38 45
11:45 149 581 160 640 1221 23:45 36 174 32 152 326
Total Vol. 4177 5129 9306 8049 6676 14725
NB SB Combined
12226 11805 24031
Split % 44.9% 55.1% 38.7% 54.7% 45.3% 61.3%
Peak Hour 8:00 7:30 7:30 15:45 15:00 15:45
Volume 777 1139 1888 1177 891 2016
P.H.F. 0.87 0.97 0.97 0.91 0.95 0.90
Tuesday, May 09, 2023 SC4010
ADT4 Date Palm north of Tortuga. Prepared by AimTD LLC tel. 714 253 7888 Daily Totals
AM PM
[email protected] Tell. 714 253 7888

T218
DATE: LOCATION: PROJECT #: SC4010
Tue, May 9, 23 NORTH & SOUTH: LOCATION #: 1
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 3 0 1 3 0 1 1 0 1 1 0 0 0 0 0
7:00 AM 6 71 6 14 163 11 12 29 26 12 17 8 375 0 0 0 0 0 7:15 AM 3 79 14 6 152 11 8 52 20 16 37 7 405 0 0 0 0 0
7:30 AM 10 98 10 13 228 7 20 45 34 18 48 8 539 0 0 0 0 0 7:45 AM 5 73 6 14 264 10 12 15 26 18 50 10 503 2 0 0 0 2 8:00 AM 7 109 10 22 164 14 12 50 22 11 21 8 450 0 1 0 0 1 8:15 AM 12 112 12 32 223 11 15 61 23 12 27 6 546 0 1 0 0 1 8:30 AM 16 136 14 16 208 12 13 65 23 18 34 18 573 1 0 0 0 1 8:45 AM 9 106 13 13 219 8 10 15 15 9 35 16 468 0 0 0 0 0 VOLUMES 68 784 85 130 1,621 84 102 332 189 114 269 81 3,859 3 2 0 0 5 APPROACH % 7% 84% 9% 7% 88% 5% 16% 53% 30% 25% 58% 17%
APP/DEPART 937 / 969 1,835 / 1,927 623 / 545 464 / 418 0

BEGIN PEAK HR
VOLUMES 40 430 42 84 859 47 52 191 94 59 132 42 2,072
APPROACH % 8% 84% 8% 8% 87% 5% 15% 57% 28% 25% 57% 18%
PEAK HR FACTOR 0.771 0.859 0.834 0.747 0.904
APP/DEPART 512 / 526 990 / 1,015 337 / 315 233 / 216 0
4:00 PM 17 238 22 13 165 17 22 25 17 28 49 18 631 0 2 0 0 2 4:15 PM 19 237 14 8 160 6 24 45 18 15 37 10 593 0 0 0 0 0 4:30 PM 24 219 11 15 155 14 10 19 15 9 20 14 525 1 0 0 0 1 4:45 PM 23 188 16 13 163 6 26 22 22 18 21 5 523 0 1 0 0 1 5:00 PM 29 234 14 12 172 6 18 17 16 8 25 12 563 1 1 0 0 2 5:15 PM 37 212 14 7 145 20 15 26 22 19 32 9 558 0 0 0 0 0 5:30 PM 19 168 9 9 133 9 19 25 23 13 24 9 460 0 1 0 0 1 5:45 PM 26 177 14 12 138 8 16 20 17 15 14 9 466 0 2 0 0 2 VOLUMES 194 1,673 114 89 1,231 86 150 199 150 125 222 86 4,319 2 7 0 0 9 APPROACH % 10% 84% 6% 6% 88% 6% 30% 40% 30% 29% 51% 20% APP/DEPART 1,981 / 1,916 1,406 / 1,508 499 / 395 433 / 500 0

BEGIN PEAK HR
VOLUMES 83 882 63 49 643 43 82 111 72 70 127 47 2,272
APPROACH % 8% 86% 6% 7% 87% 6% 31% 42% 27% 29% 52% 19%
PEAK HR FACTOR 0.928 0.942 0.761 0.642 0.900
APP/DEPART 1,028 / 1,014 735 / 786 265 / 220 244 / 252 0 Date Palm

NORTH SIDE
Mccallum WEST SIDE EAST SIDE Mccallum

SOUTH SIDE
Date Palm

N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 0 0 1 1 2 0 0 1 0 1 0 0 0 1 1
7:15 AM 0 1 1 0 2 0 1 1 0 2 0 0 0 0 0
7:30 AM 1 0 0 0 1 1 0 0 0 1 0 0 0 0 0
7:45 AM 0 0 0 2 2 0 0 0 2 2 0 0 0 0 0
8:00 AM 1 1 0 3 5 1 1 0 3 5 0 0 0 0 0
8:15 AM 0 2 0 3 5 0 1 0 2 3 0 1 0 1 2
8:30 AM 2 1 1 1 5 1 1 1 1 4 1 0 0 0 1
8:45 AM 0 3 2 0 5 0 2 2 0 4 0 1 0 0 1
TOTAL 4 8 5 10 27 3 6 5 8 22 1 2 0 2 5
AM BEGIN PEAK HR 2 3 1 8 14
4:00 PM 1 0 0 2 3 1 0 0 1 2 0 0 0 1 1
4:15 PM 0 2 1 1 4 0 1 1 1 3 0 1 0 0 1
4:30 PM 0 1 0 1 2 0 1 0 1 2 0 0 0 0 0
4:45 PM 0 1 1 0 2 0 1 1 0 2 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 2 0 1 3 0 2 0 1 3 0 0 0 0 0
5:30 PM 0 2 0 0 2 0 2 0 0 2 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 1 8 2 5 16 1 7 2 4 14 0 1 0 1 2
1 3 2 3 9

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected] Cathedral City
Date Palm
Mccallum
PM BEGIN PEAK HR 4:00 PM

BICYCLE CROSSINGSPEDESTRIAN CROSSINGS

U-TURNS
Date Palm Date Palm Mccallum Mccallum

AMPM AM
7:45 AM
PM
4:00 PM
PEDESTRIAN + BIKE CROSSINGS
7:45 AM
Add U-Turns to Left Turns
3,241 170 2,852 219 TOTAL 2,885
1,406 86 1,231 89 PM 1,916
1,835 84 1,621 130 AM 969
464
433
897
918
500
418
81 86
167
269
222
491
TOTAL
PM
AM
114
125
239
252
150
102
AM
PM
TOTAL
531
199
332
339
150
189
545
395
940
1,122
499
623
1,927 AM 68 784 85 937
1,508 PM 194 1,673 114 1,981
3,435 TOTAL 262 2,457 199 2,918
1,725 90 1,502 133 TOTAL 1,540
735 43 643 49 PM 1,014
990 47 859 84 AM 526
233
244
477
468
252
216
42 47
89 132
127
259
TOTAL
PM
AM AM 7:45 AM
8:45 AM
59 70
129
134
82 52
#N/A
AM
PM
TOTAL
302
111
191 PM 4:00 PM
5:45 PM
166
72 94
315
220
535
602
265
337
1,015 AM 40 430 42 512
786 PM 83 882 63 1,028
1,801 Total 123 1,312 105 1,540
AimTD LLC

TURNING MOVEMENT COUNTS
Date Palm
Mccallum
Mccallum
Cathedral City
SC4010

ALL HOURS
Date Palm
Date Palm
Date Palm
Mccallum
Mccallum

PEAK HOUR
T218
DATE: LOCATION: PROJECT #: SC4010
Tue, May 9, 23 NORTH & SOUTH: LOCATION #: 3
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 3 0 1 3 0 1 1 0 1 1 0 0 0 0 0
7:00 AM 6 84 3 51 188 17 31 24 13 3 17 37 474 0 0 0 1 1 7:15 AM 9 88 11 67 161 19 40 48 29 3 34 68 577 0 0 0 0 0 7:30 AM 14 87 15 64 193 16 50 72 30 13 37 67 658 0 0 0 0 0 7:45 AM 15 87 10 52 255 20 33 57 18 10 35 52 644 0 1 0 0 1 8:00 AM 9 102 10 70 184 17 26 45 15 13 38 56 585 0 2 0 0 2 8:15 AM 13 96 15 100 205 13 15 70 29 31 68 68 723 1 0 0 0 1 8:30 AM 15 132 18 78 178 12 19 66 26 31 73 70 718 2 0 0 0 2 8:45 AM 16 113 7 40 167 11 22 33 23 20 52 53 557 1 0 0 0 1 VOLUMES 97 789 89 522 1,531 125 236 415 183 124 354 471 4,936 4 3 0 1 8 APPROACH % 10% 81% 9% 24% 70% 6% 28% 50% 22% 13% 37% 50% APP/DEPART 975 / 1,499 2,178 / 1,841 834 / 1,024 949 / 572 0

BEGIN PEAK HR
VOLUMES 52 417 53 300 822 62 93 238 88 85 214 246 2,670 APPROACH % 10% 80% 10% 25% 69% 5% 22% 57% 21% 16% 39% 45% PEAK HR FACTOR 0.791 0.905 0.919 0.783 0.923
APP/DEPART 522 / 759 1,184 / 998 419 / 588 545 / 325 0
4:00 PM 50 206 8 46 129 23 21 37 24 16 79 91 730 7 0 0 0 7 4:15 PM 35 207 8 32 152 24 28 31 22 7 41 61 648 6 0 0 0 6 4:30 PM 34 198 11 41 131 27 12 32 19 9 56 60 630 3 0 0 0 3 4:45 PM 28 197 8 35 147 20 22 26 21 9 43 47 603 4 0 0 0 4 5:00 PM 19 207 5 26 158 26 26 37 14 9 37 54 618 1 0 0 0 1 5:15 PM 28 211 11 45 154 20 23 28 14 4 45 44 627 3 1 0 0 4 5:30 PM 21 186 4 34 150 28 17 26 12 4 37 42 561 3 1 0 0 4 5:45 PM 25 149 19 40 108 27 16 43 17 8 36 45 533 7 0 0 0 7 VOLUMES 240 1,561 74 299 1,129 195 165 260 143 66 374 444 4,950 34 2 0 0 36 APPROACH % 13% 83% 4% 18% 70% 12% 29% 46% 25% 7% 42% 50% APP/DEPART 1,875 / 2,172 1,623 / 1,372 568 / 631 884 / 775 0

BEGIN PEAK HR
VOLUMES 147 808 35 154 559 94 83 126 86 41 219 259 2,611 APPROACH % 15% 82% 4% 19% 69% 12% 28% 43% 29% 8% 42% 50% PEAK HR FACTOR 0.938 0.970 0.899 0.698 0.894
APP/DEPART 990 / 1,150 807 / 706 295 / 315 519 / 440 0
Date Palm

NORTH SIDE
30th WEST SIDE EAST SIDE 30th

SOUTH SIDE
Date Palm

N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 0 6 0 0 6 0 2 0 0 2 0 4 0 0 4
7:15 AM 5 0 0 1 6 2 0 0 1 3 3 0 0 0 3
7:30 AM 2 4 0 0 6 0 4 0 0 4 2 0 0 0 2
7:45 AM 3 2 0 0 5 3 1 0 0 4 0 1 0 0 1
8:00 AM 2 5 0 0 7 2 3 0 0 5 0 2 0 0 2
8:15 AM 6 10 2 0 18 3 8 2 0 13 3 2 0 0 5
8:30 AM 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2
8:45 AM 0 2 0 1 3 0 0 0 0 0 0 2 0 1 3
TOTAL 18 31 2 2 53 10 18 2 1 31 8 13 0 1 22
AM BEGIN PEAK HR 8 12 2 0 22
4:00 PM 0 2 0 1 3 0 0 0 1 1 0 2 0 0 2
4:15 PM 0 1 0 1 2 0 1 0 1 2 0 0 0 0 0
4:30 PM 0 0 0 1 1 0 0 0 1 1 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 2 0 0 0 2 1 0 0 0 1 1 0 0 0 1
5:15 PM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1
5:30 PM 0 2 0 0 2 0 2 0 0 2 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 2 6 0 3 11 1 3 0 3 7 1 3 0 0 4
0 1 0 3 4

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected] Cathedral City
Date Palm
30th
PM BEGIN PEAK HR 4:00 PM

BICYCLE CROSSINGSPEDESTRIAN CROSSINGS

U-TURNS
Date Palm Date Palm 30th 30th

AMPM AM
7:45 AM
PM
4:00 PM
PEDESTRIAN + BIKE CROSSINGS
7:45 AM
Add U-Turns to Left Turns
3,801 320 2,660 821 TOTAL 3,671
1,623 195 1,129 299 PM 2,172
2,178 125 1,531 522 AM 1,499
949
884
1,833
1,347
775
572
471
444
915
354
374
728
TOTAL
PM
AM
124
66 190
401
165
236
AM
PM
TOTAL
675
260
415
326
143
183
1,024
631
1,655
1,402
568
834
1,841 AM 97 789 89 975
1,372 PM 240 1,561 74 1,875
3,213 TOTAL 337 2,350 163 2,850
1,991 156 1,381 454 TOTAL 1,909
807 94 559 154 PM 1,150
1,184 62 822 300 AM 759
545
519
1,064
765
440
325
246
259
505
214
219
433
TOTAL
PM
AM AM 7:45 AM
8:45 AM
85 41
126
176
83 93
#N/A
AM
PM
TOTAL
364
126
238 PM 4:00 PM
5:45 PM
174
86 88
588
315
903
714
295
419
998 AM 52 417 53 522
706 PM 147 808 35 990
1,704 Total 199 1,225 88 1,512
AimTD LLC

TURNING MOVEMENT COUNTS
Date Palm
30th
30th
Cathedral City
SC4010

ALL HOURS
Date Palm
Date Palm
Date Palm
30th
30th

PEAK HOUR
T218
DATE: LOCATION: PROJECT #: SC4010
Tue, May 9, 23 NORTH & SOUTH: LOCATION #: 4
EAST & WEST: CONTROL: NO CONTROL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 3 X X 3 0 0 X 0 X X X 0 0 0 0
7:00 AM 5 153 0 0 246 2 7 0 12 0 0 0 425 0 0 0 0 0
7:15 AM 3 195 0 0 228 2 8 0 15 0 0 0 451 0 0 0 0 0
7:30 AM 11 196 0 0 263 3 7 0 16 0 0 0 496 0 0 0 0 0
7:45 AM 8 168 0 0 272 4 13 0 20 0 0 0 485 0 0 0 1 1
8:00 AM 12 173 0 0 248 1 4 0 26 0 0 0 464 0 0 0 0 0
8:15 AM 6 175 0 0 260 3 4 0 34 0 0 0 482 0 0 0 0 0
8:30 AM 21 199 0 0 235 5 4 0 18 0 0 0 482 0 0 0 0 0
8:45 AM 11 177 0 0 204 2 4 0 24 0 0 0 422 0 0 0 0 0
VOLUMES 77 1,436 0 0 1,956 22 51 0 165 0 0 0 3,708 0 0 0 1 1 APPROACH % 5% 95% 0% 0% 99% 1% 24% 0% 76% 0% 0% 0%
APP/DEPART 1,513 / 1,487 1,978 / 2,121 216 / 1 1 / 99 0

BEGIN PEAK HR
VOLUMES 37 712 0 0 1,043 11 28 0 96 0 0 0 1,928
APPROACH % 5% 95% 0% 0% 99% 1% 23% 0% 77% 0% 0% 0%
PEAK HR FACTOR 0.905 0.955 0.816 0.250 0.972
APP/DEPART 749 / 740 1,054 / 1,139 124 / 1 1 / 48 0
4:00 PM 23 274 0 0 186 9 5 0 11 0 0 0 508 0 0 0 0 0
4:15 PM 22 260 0 0 192 6 7 0 12 0 0 0 499 0 0 0 0 0
4:30 PM 18 253 0 0 187 16 4 0 21 0 0 0 499 0 0 0 0 0
4:45 PM 22 240 0 0 191 11 10 0 11 0 0 0 485 0 0 0 0 0
5:00 PM 19 259 0 0 200 12 4 0 10 0 0 0 504 0 0 0 0 0
5:15 PM 19 251 0 0 212 9 5 0 15 0 0 0 511 0 0 0 0 0
5:30 PM 16 227 0 0 198 6 4 0 9 0 0 0 460 0 0 0 0 0
5:45 PM 17 187 0 0 163 3 1 0 13 0 0 0 384 0 0 0 0 0
VOLUMES 156 1,951 0 0 1,529 72 40 0 102 0 0 0 3,850 0 0 0 0 0 APPROACH % 7% 93% 0% 0% 96% 4% 28% 0% 72% 0% 0% 0%
APP/DEPART 2,107 / 1,991 1,601 / 1,631 142 / 0 0 / 228 0

BEGIN PEAK HR
VOLUMES 78 1,003 0 0 790 48 23 0 57 0 0 0 1,999
APPROACH % 7% 93% 0% 0% 94% 6% 29% 0% 71% 0% 0% 0%
PEAK HR FACTOR 0.972 0.948 0.800 0.000 0.978
APP/DEPART 1,081 / 1,026 838 / 847 80 / 0 0 / 126 0
Date Palm

NORTH SIDE
Tachevah WEST SIDE EAST SIDE Tachevah

SOUTH SIDE
Date Palm

N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
AM BEGIN PEAK HR 0 0 0 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected] Cathedral City
Date Palm
Tachevah
PM BEGIN PEAK HR 4:30 PM

BICYCLE CROSSINGSPEDESTRIAN CROSSINGS

U-TURNS
Date Palm Date Palm Tachevah Tachevah

AMPM AM
7:30 AM
PM
4:30 PM
PEDESTRIAN + BIKE CROSSINGS
7:30 AM
Add U-Turns to Left Turns
3,579 94 3,485 0 TOTAL 3,478
1,601 72 1,529 0 PM 1,991
1,978 22 1,956 0 AM 1,487
1 0
1 327
228
99 0
0 0
0 0
0 TOTAL
PM
AM
0 0
0 91
40 51
AM
PM
TOTAL
0 0
0 267
102
165
1 0
1 358
142
216
2,121 AM 77 1,436 0 1,513
1,631 PM 156 1,951 0 2,107
3,752 TOTAL 233 3,387 0 3,620
1,892 59 1,833 0 TOTAL 1,766
838 48 790 0 PM 1,026
1,054 11 1,043 0 AM 740
1 0
1 174
126
48 0
0 0
0 0
0 TOTAL
PM
AM AM 7:30 AM
8:45 AM
0 0
0 51
23 28
#N/A
AM
PM
TOTAL
0 0
0 PM 4:30 PM
5:45 PM
153
57 96
1 0
1 204
80 124
1,139 AM 37 712 0 749
847 PM 78 1,003 0 1,081
1,986 Total 115 1,715 0 1,830
AimTD LLC

TURNING MOVEMENT COUNTS
Date Palm
Tachevah
Tachevah
Cathedral City
SC4010

ALL HOURS
Date Palm
Date Palm
Date Palm
Tachevah
Tachevah

PEAK HOUR

VARNER RD
422

VARNER RD
59 --
7--
47SONNY BONO MEMORIAL FWY
15374

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FW
Y
15374

SONNY BONO MEMORIAL FW
Y
0 SONNY BONO MEMORIAL FWY
8878

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FWY
8878

SONNY BONO MEMORIAL FWY
0 --
0--
4 --
0--
4 -- 13
-- 149
--
0--
2 --0--3

VISTA CHINO
2147

VISTA CHINO
2032
--
24--
378
--
70 --
29 MC CALLUM WAY
368

MC CALLUM WAY
554
--
0--
3 --
328
--
615

VISTA CHINO
1772

VISTA CHINO
2103

CATHEDRAL CANYON DR
2950

CATHEDRAL CANYON DR
2673

DATE PALM
DR
2181

DATE PALM
DR
2694
DA V
ALL DR
590

DA VALL D
R
776

LANDAU BLVD
789

LANDAU BLVD
798

LANDAU BLVD
983

LANDAU BLVD
1043

MC CALLUM WAY
263

MC CALLUM WAY
143
30TH AVE
370
30TH AVE
26330TH AVE
536
30TH AVE
429

LANDAU B
LV
D
972

LANDAU B
LV
D
1822

RAMON RD
2953

RAMON RD
2509 RAMON RD
3130

RAMON RD
2709

VISTA CHINO
2377

VISTA CHINO
1912

SONNY BONO MEMORIAL FWY
7171SONNY BONO MEMORIAL FWY
0 VARNER RD
387

VARNER RD
75 --0--2
-- 0-- 2

RAMON RD
2974

RAMON RD
2570
--103
--30
--
137
--
85--3
--56
-- 0
-- 3
-- 113-- 89
--
427
--
240
--
523--
185
--
231
--
150
--
319
--
182
--471
--206
--
0 --
3 --
0 --
3 --
160
--
158
--
6--
28 --532
--363

RAMON RD
3608

RAMON RD
3679
--
187--
183
--
154
--
253
--
299
--
158

DA VALL DR
593

DA VALL DR
819
--
46--
124
--
120
--
100

DATE PALM
DR
2236

DATE PALM
DR
2646
--172
--233
--
530
--
291
--
459--
347

VARNER RD
385

VARNER RD
77 --
76 --
76 --609
--579
--270
--144
-- 0-- 3

RAMON RD
3395

RAMON RD
3742
--887
--329
-- 414-- 309
30TH AVE
294
30TH AVE
848

DATE PALM
DR
1696

DATE PALM
DR
2476

DATE PALM
DR
1465

DATE PALM
DR
2326
--
179--
81 RAMON RD
2778

RAMON RD
4470 RAMON RD
2778

RAMON RD
4472
-- 659
-- 246
AVENID
A M
ARAVIL
LA
32AVENID
A M
ARAVIL
LA
92 30TH AVE
489
30TH AVE
485

LANDAU BLVD
640

LANDAU BLVD
1095

RAMON RD
2968

RAMON RD
3811
--899
--403

DA VALL DR
263

DA VALL DR
370

DA VALL DR
449

DA VALL DR
436
-- 513
-- 287
--
401
--
183

DATE PALM
DR
2049

DATE PALM
DR
2800
--254
--249

MC CALLUM WAY
645

MC CALLUM WAY
634
--
384--
432

DATE PALM
DR
1724

DATE PALM
DR
2959

DATE PALM
DR
3938

DATE PALM
DR
3986

RAMON RD
2851

RAMON RD
2520

RAMON RD
3145

RAMON RD
2766
--
163--
113
--
14--
357
30TH AVE
456
30TH AVE
392

RAMON RD
3632

RAMON RD
3673
--1707
--0

SONNY BONO MEMORIAL FWY
12502

AVENIDA M
ARAVIL
LA
561

AVENIDA M
ARAVIL
LA
211
--
0 --
3 --2872
--0

MC CALLUM WAY
645

MC CALLUM WAY
634

MC CALLUM WAY
576

MC CALLUM WAY
400
30TH AVE
868
30TH AVE
391
30TH AVE
868
30TH AVE
391

DATE PALM
DR
1862

DATE PALM
DR
3084

DATE PALM
DR
1779

DATE PALM
DR
2903

DATE PALM
DR
557

DATE PALM
DR
1421

LANDAU BLVD
1026

LANDAU BLVD
1640

LANDAU B
LV
D
1026

LANDAU B
LV
D
1640

MC CALLUM WAY
410

MC CALLUM WAY
695

MC CALLUM WAY
314

MC CALLUM WAY
412
-- 3
AVENID
A M

ARAVILLA
217
AVENID
A M

ARAVILLA
227
AVENID
A M

ARAVILLA
217
AVENID
A M

ARAVILLA
227

LANDAU B
LVD
1089

LANDAU B
LVD
1655

LANDAU BLVD
1089

LANDAU BLVD
1655

AVENIDA M

ARAVILLA
56 1

AVENIDA M

ARAVILLA
211

DA VALL DR
578

DA VALL DR
685

DA VALL DR
547

DA VALL DR
752

AVENIDA MARAVILLA
302

AVENIDA MARAVILLA
171

AVENIDA M

ARAVILLA
217

AVENIDA M

ARAVILLA
227

MC CALLUM WAY
576

MC CALLUM WAY
400

MC CALLUM WAY
576

MC CALLUM WAY
400

RAMON RD
2851

RAMON RD
2520
--
0 --2872
RIVCOM 3 - 2018 AM peak period volum
es
0 .05 .1 .15
Miles

HCMTYPE
CC (6867)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12486)
PrArterial (8422)

VARNER RD
863

VARNER RD
643
--
92--
101SONNY BONO MEMORIAL FWY
49800

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FW
Y
49800

SONNY BONO MEMORIAL FW
Y
0 SONNY BONO MEMORIAL FWY
47428

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FWY
47428

SONNY BONO MEMORIAL FWY
0 --
5--
8 --
5--
8 -- 231
-- 246
--
3--
4 --4--5

VISTA CHINO
8464

VISTA CHINO
8155
--
548--
595
--
200
--
250

MC CALLUM WAY
1709

MC CALLUM WAY
1863
--
4--
5 --
1980
--
2168

VISTA CHINO
7573

VISTA CHINO
7635

CATHEDRAL CANYON DR
11293

CATHEDRAL CANYON DR
11293

DATE PALM
DR
9809

DATE PALM
DR
9712
DA V
ALL DR
2768

DA VALL D
R
2771

LANDAU BLVD
3198

LANDAU BLVD
3073

LANDAU BLVD
4195

LANDAU BLVD
4043

MC CALLUM WAY
805

MC CALLUM WAY
731
30TH AVE
1163
30TH AVE
114830TH AVE
1845
30TH AVE
1857

LANDAU B
LV
D
5493

LANDAU B
LV
D
5911

RAMON RD
11397

RAMON RD
11271 RAMON RD
12090

RAMON RD
11990

VISTA CHINO
8737

VISTA CHINO
8288

SONNY BONO MEMORIAL FWY
38750SONNY BONO MEMORIAL FWY
0 VARNER RD
824

VARNER RD
620
--2--4
-- 3-- 5

RAMON RD
11586

RAMON RD
11651
--283
--246
--
459
--
434
--65
--81
-- 4
-- 5
-- 454-- 439
--
1418
--
1322
--
1479
--
1319
--
799
--
608
--
1052
--
984
--1392
--1276
--
4 --
6 --
4 --
6 --
687
--
683
--
60--
73 --1776
--1616

RAMON RD
15219

RAMON RD
15308
--
710--
691
--
880
--
948
--
952
--
885

DA VALL DR
2594

DA VALL DR
2789
--
373--
417
--
464
--
458

DATE PALM
DR
9707

DATE PALM
DR
9703
--789
--886
--
1717
--
1616
--
1672--
1645

VARNER RD
822

VARNER RD
622
--
318
--
318
--2606
--2618
--867
--817
-- 4-- 6

RAMON RD
14868

RAMON RD
14957
--2498
--2257
-- 1423
-- 1388
30TH AVE
2085
30TH AVE
2354

DATE PALM
DR
8262

DATE PALM
DR
8451

DATE PALM
DR
7463

DATE PALM
DR
7843
--
556--
506

RAMON RD
15033

RAMON RD
15719 RAMON RD
15035

RAMON RD
15722
-- 1882
-- 1694
AVENID
A M
ARAVIL
LA
236
AVENID
A M
ARAVIL
LA
257
30TH AVE
1897
30TH AVE
1925

LANDAU BLVD
3328

LANDAU BLVD
3575

RAMON RD
14213

RAMON RD
14483
--2748
--2568

DA VALL DR
1148

DA VALL DR
1163

DA VALL DR
1604

DA VALL DR
1670
-- 1685
-- 1757
--
1186
--
1110

DATE PALM
DR
9683

DATE PALM
DR
9686
--855
--895

MC CALLUM WAY
2422

MC CALLUM WAY
2456
--
1600--
1423

DATE PALM
DR
9149

DATE PALM
DR
9439

DATE PALM
DR
16338

DATE PALM
DR
15791

RAMON RD
11244

RAMON RD
11334

RAMON RD
12374

RAMON RD
12457
--
568--
549
--
486--
493
30TH AVE
1662
30TH AVE
1668

RAMON RD
15171

RAMON RD
15271
--8679
--0

SONNY BONO MEMORIAL FWY
40141

AVENIDA M
ARAVIL
LA
1568

AVENIDA M
ARAVIL
LA
1428
--
4 --
6 --9659
--0

MC CALLUM WAY
2422

MC CALLUM WAY
2456

MC CALLUM WAY
1773

MC CALLUM WAY
1976
30TH AVE
2558
30TH AVE
2376
30TH AVE
2558
30TH AVE
2376

DATE PALM
DR
9735

DATE PALM
DR
10066

DATE PALM
DR
9188

DATE PALM
DR
9451

DATE PALM
DR
3693

DATE PALM
DR
3973

LANDAU BLVD
5294

LANDAU BLVD
5411

LANDAU B
LV
D
5294

LANDAU B
LV
D
5411

MC CALLUM WAY
2097

MC CALLUM WAY
2221

MC CALLUM WAY
1350

MC CALLUM WAY
1379
-- 6
AVENID
A M

ARAVILLA
895
AVENID
A M

ARAVILLA
898
AVENID
A M

ARAVILLA
895
AVENID
A M

ARAVILLA
898

LANDAU B
LVD
5328

LANDAU B
LVD
5622

LANDAU BLVD
5328

LANDAU BLVD
5622

AVENIDA M

ARAVILLA
15 68

AVENIDA M

ARAVILLA
142
8 DA VALL DR
2297

DA VALL DR
2437

DA VALL DR
2350

DA VALL DR
2538

AVENIDA MARAVILLA
977

AVENIDA MARAVILLA
913

AVENIDA M

ARAVILLA
895

AVENIDA M

ARAVILLA
898

MC CALLUM WAY
1773

MC CALLUM WAY
1976

MC CALLUM WAY
1773

MC CALLUM WAY
1976

RAMON RD
11244

RAMON RD
11334
--
0 --9659
RIVCOM 3 - 2018 Daily volumes
0 .05 .1 .15
Miles

HCMTYPE
CC (6867)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12486)
PrArterial (8422)

VARNER RD
126

VARNER RD
335
--
50--
11SONNY BONO MEMORIAL FWY
12533

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FW
Y
12533

SONNY BONO MEMORIAL FW
Y
0 SONNY BONO MEMORIAL FWY
18469

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FWY
18469

SONNY BONO MEMORIAL FWY
0 --
3--
2 --
3--
2 -- 123
-- 28
--
1--
1 --2--1

VISTA CHINO
2577

VISTA CHINO
2475
--
304--
64 --
43 --
86 MC CALLUM WAY
622

MC CALLUM WAY
507
--
2--
1 --
678
--
509

VISTA CHINO
2483

VISTA CHINO
2143

CATHEDRAL CANYON DR
3446

CATHEDRAL CANYON DR
3650

DATE PALM
DR
3273

DATE PALM
DR
2780
DA V
ALL DR
910

DA VALL D
R
743

LANDAU BLVD
1011

LANDAU BLVD
941

LANDAU BLVD
1334

LANDAU BLVD
1202

MC CALLUM WAY
195

MC CALLUM WAY
285
30TH AVE
326
30TH AVE
40330TH AVE
555
30TH AVE
618

LANDAU B
LV
D
2096

LANDAU B
LV
D
1441

RAMON RD
3214

RAMON RD
3578 RAMON RD
3428

RAMON RD
3794

VISTA CHINO
2504

VISTA CHINO
2661

SONNY BONO MEMORIAL FWY
15352SONNY BONO MEMORIAL FWY
0 VARNER RD
136

VARNER RD
303
--1--1
-- 2-- 1

RAMON RD
3301

RAMON RD
3650
--56
--109
--
122
--
159
--36
--7
-- 2
-- 1
-- 124-- 140
--
367
--
487
--
332--
562
--
215
--
201
--
276
--
364
--327
--510
--
2 --
1 --
2 --
1 --
211
--
204
--
28--
13 --475
--592

RAMON RD
4660

RAMON RD
4510
--
219--
226
--
322
--
240
--
245
--
343

DA VALL DR
922

DA VALL DR
740
--
136--
80 --
132
--
144

DATE PALM
DR
3231

DATE PALM
DR
2809
--254
--254
--
429
--
604
--
472--
555

VARNER RD
137

VARNER RD
302
--
102
--
102
--740
--757
--207
--303
-- 2-- 1

RAMON RD
4667

RAMON RD
4313
--557
--956
-- 410-- 468
30TH AVE
904
30TH AVE
520

DATE PALM
DR
2963

DATE PALM
DR
2256

DATE PALM
DR
2748

DATE PALM
DR
2055
--
135--
202

RAMON RD
5338

RAMON RD
3921 RAMON RD
5339

RAMON RD
3922
-- 423
-- 710
AVENID
A M
ARAVIL
LA
101
AVENID
A M
ARAVIL
LA
56 30TH AVE
603
30TH AVE
619

LANDAU BLVD
1223

LANDAU BLVD
915

RAMON RD
4690

RAMON RD
3928
--630
--1039

DA VALL DR
403

DA VALL DR
326

DA VALL DR
512

DA VALL DR
501
-- 423
-- 656
--
276
--
445

DATE PALM
DR
3345

DATE PALM
DR
2685
--254
--291

MC CALLUM WAY
759

MC CALLUM WAY
777
--
506--
450

DATE PALM
DR
3448

DATE PALM
DR
2386

DATE PALM
DR
5080

DATE PALM
DR
4744

RAMON RD
3234

RAMON RD
3534

RAMON RD
3547

RAMON RD
3888
--
161--
198
--
279--
41 30TH AVE
502
30TH AVE
563

RAMON RD
4644

RAMON RD
4511
--3117
--0

SONNY BONO MEMORIAL FWY
10109

AVENIDA M
ARAVIL
LA
343

AVENIDA M
ARAVIL
LA
602
--
2 --
1 --2424
--0

MC CALLUM WAY
759

MC CALLUM WAY
777

MC CALLUM WAY
481

MC CALLUM WAY
732
30TH AVE
611
30TH AVE
959
30TH AVE
611
30TH AVE
959

DATE PALM
DR
3637

DATE PALM
DR
2578

DATE PALM
DR
3410

DATE PALM
DR
2432

DATE PALM
DR
1489

DATE PALM
DR
859

LANDAU BLVD
1926

LANDAU BLVD
1411

LANDAU B
LV
D
1926

LANDAU B
LV
D
1411

MC CALLUM WAY
768

MC CALLUM WAY
572

MC CALLUM WAY
464

MC CALLUM WAY
387
-- 1
AVENID
A M

ARAVILLA
292
AVENID
A M

ARAVILLA
284
AVENID
A M

ARAVILLA
292
AVENID
A M

ARAVILLA
284

LANDAU B
LVD
1932

LANDAU B
LVD
1473

LANDAU BLVD
1932

LANDAU BLVD
1473

AVENIDA M

ARAVILLA
34 3

AVENIDA M

ARAVILLA
602

DA VALL DR
785

DA VALL DR
683

DA VALL DR
844

DA VALL DR
675

AVENIDA MARAVILLA
259

AVENIDA MARAVILLA
349

AVENIDA M

ARAVILLA
292

AVENIDA M

ARAVILLA
284

MC CALLUM WAY
481

MC CALLUM WAY
732

MC CALLUM WAY
481

MC CALLUM WAY
732

RAMON RD
3234

RAMON RD
3534
--
0 --2424
0 .05 .1 .15
Miles

HCMTYPE
CC (6867)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12486)
PrArterial (8422)
RIVCOM 3 - 2018 PM peak period volumes
--
10--
84 VISTA CHINO
180VISTA CHINO
292
--0 --47

VALLEY CENT

ER BLVD
0 VALLEY CENT
ER
BLVD
0 --
1--
6 --
28--
13 --59
--208
--
0--
1 VALLEY CENTER BLVD
0 VALLEY CENTER BLVD
0 SONNY BONO MEMORIAL FWY
15013SONNY BONO MEMORIAL FWY
0 --1--5

SONNY BONO MEMORIAL FWY
18304

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FW
Y
14542SONNY BONO MEMORIAL FW
Y
0 VISTA CHINO
2270

VISTA CHINO
2623
--
92--
495
-- 184
-- 151
--
2--
7 DA VALL DR
990

DA VALL DR
1322

MC CALLUM WAY
532

MC CALLUM WAY
679

VISTA CHINO
2098

VISTA CHINO
2700

CATHEDRAL CANYON DR
2565

CATHEDRAL CANYON DR
2269
--
676
--
900

LANDAU BLVD
1413

LANDAU BLVD
1628

MC CALLUM WAY
214

MC CALLUM WAY
158
30TH AVE
762
30TH AVE
309

RAMON RD
3388

RAMON RD
3529

LANDAU BLVD
1332

LANDAU BLVD
1685

LANDAU B
LV
D
1083

LANDAU B
LV
D
2258

DATE PALM
DR
2143

DATE PALM
DR
3160
30TH AVE
675
30TH AVE
150

RAMON RD
3537

RAMON RD
3727

VISTA CHINO
2467

VISTA CHINO
2554

VARNER RD
1064

VARNER RD
149

SONNY BONO MEMORIAL FWY
12613SONNY BONO MEMORIAL FWY
0 --5--30

RAMON RD
3427

RAMON RD
3524
-- 1-- 6
--109
--41

SONNY BONO MEMORIAL FWY
17647

SONNY BONO MEMORIAL FWY
0 --
204
--
113--10
--69

SONNY BONO MEMORIAL FW
Y
18441

SONNY BONO MEMORIAL FW
Y
0 SONNY BONO MEMORIAL FW
Y
14669
-- 199-- 147
--
832
--
456
-- 1
-- 4
--
591
--
227
--
237
--
252
--
379
--
219
--540
--338
--
61 --
20 --
1 --
5 --
166
--
141

DA VALL DR
1528

DA VALL DR
1275
--
13--
60 RAMON RD
3336

RAMON RD
3917

RAMON RD
3248

RAMON RD
5841
--
350--
308
--
188
--
313
--0
--0
--497
--453
--
280
--
140

SONNY BONO MEMORIAL FWY
17647
30TH AVE
953
30TH AVE
407

VARNER RD
1116

VARNER RD
153

DA VALL DR
1034

DA VALL DR
1322

DATE PALM
DR
2230

DATE PALM
DR
3040
--
202
--
199

LANDAU BLVD
1267

LANDAU BLVD
2161

RAMON RD
3562

RAMON RD
3735
--
592
--
316

DA VALL D
R
115
DA V
ALL DR
232
--
0--
0 --
257--
425
--
67 --
64 --719
--701
--159
--253

RAMON RD
3795

RAMON RD
4672
--957
--365
-- 3-- 9
-- 430-- 355
30TH AVE
320
30TH AVE
861

DATE PALM
DR
2226

DATE PALM
DR
3129
--638
--165

VARNER RD
1060

VARNER RD
151
--
194--
100

DATE PALM
DR
1989

DATE PALM
DR
2877
-- 45-- 136
-- 725
-- 318
AVENID
A M
ARAVIL
LA
0AVENID
A M
ARAVIL
LA
86 --
127
--0
30TH AVE
492
30TH AVE
440

DA VALL DR
967

DA VALL DR
1101

AVENIDA M

ARAVILLA
170

AVENIDA M

ARAVILLA
216
--994
--453
-- 683
-- 446

LANDAU BLVD
1316

LANDAU BLVD
2106

DA VALL DR
1001

DA VALL DR
1274
--
382
--
165

DATE PALM
DR
2042

DATE PALM
DR
3228
--403
--351

MC CALLUM WAY
982

MC CALLUM WAY
865
--
421--
526
--127--0

LANDAU BLVD
1056

LANDAU BLVD
1521

DATE PALM
DR
2544

DATE PALM
DR
3548

DATE PALM
DR
3848

DATE PALM
DR
5063
--
658
--
0 --658
--0
--
82--
457--
150--
113

MC CALLUM WAY
915

MC CALLUM WAY
654
30TH AVE
492
30TH AVE
354
--
795
--
0 --0--0

RAMON RD
3447

RAMON RD
4010

RAMON RD
3243

RAMON RD
5812
--2400
--0

SONNY BONO MEMORIAL FWY
14542

VISTA CHINO
292

VISTA CHINO
180

SONNY BONO MEMORIAL FWY
15457

RAMON RD
3212

RAMON RD
3767
--
471
--
0 AVENIDA M
ARAVIL
LA
540

AVENIDA M
ARAVIL
LA
227

DA VALL DR
115

DA VALL DR
232
--2847
--
0 DA VALL DR
1347

DA VALL DR
983
--
2 --
6 MC CALLUM WAY
982

MC CALLUM WAY
865

RAMON RD
3347

RAMON RD
4765
--2847
--0

DATE PALM DR
2723

DATE PALM DR
4020

MC CALLUM WAY
915

MC CALLUM WAY
654

MC CALLUM WAY
616

MC CALLUM WAY
1002
--
0 --
0 DATE PALM
DR
2017

DATE PALM
DR
3013

DATE PALM
DR
2609

DATE PALM
DR
3781

MC CALLUM WAY
667

MC CALLUM WAY
676
--
6 DA VALL DR
1044

DA VALL DR
1234
--
795
--
0 DA VALL DR
576

DA VALL DR
349

AVENIDA M

ARAVILLA
54 0

AVENIDA M

ARAVILLA
227

AVENIDA M

ARAVILLA
170

AVENIDA M

ARAVILLA
216
AVENID
A M
ARAVIL
LA
281

AVENIDA M
ARAVIL
LA
186

RAMON RD
3212

RAMON RD
3767
--
471
--
0 DA V
ALL DR
115
DA V
ALL DR
232

DA VALL DR
1009

DA VALL DR
1293

RAMON RD
3347

RAMON RD
4765

DA VALL DR
576

DA VALL DR
349

DA VALL DR
576

DA VALL DR
349
RIVCOM 3 - 2045 AM peak period volum
es
0 .05 .1 .15
Miles

HCMTYPE
CC (6867)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12486)
PrArterial (8422)
--
154--
171

VISTA CHINO
923VISTA CHINO
912
--0 --47

VALLEY CENT

ER BLVD
0 VALLEY CENT
ER
BLVD
0 --
10--
13 --
86--
79 --412
--419
--
2--
2 VALLEY CENTER BLVD
0 VALLEY CENTER BLVD
0 SONNY BONO MEMORIAL FWY
67787SONNY BONO MEMORIAL FWY
0 --13--15

SONNY BONO MEMORIAL FWY
68684

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FW
Y
65493SONNY BONO MEMORIAL FW
Y
0 VISTA CHINO
9964

VISTA CHINO
9878
--
868--
906
-- 798
-- 813
--
18--
20 DA VALL DR
4530

DA VALL DR
4647

MC CALLUM WAY
2259

MC CALLUM WAY
2436

VISTA CHINO
9697

VISTA CHINO
9796

CATHEDRAL CANYON DR
10066

CATHEDRAL CANYON DR
10086
--
3110
--
3206

LANDAU BLVD
5887

LANDAU BLVD
6011

MC CALLUM WAY
582

MC CALLUM WAY
714
30TH AVE
2387
30TH AVE
1293

RAMON RD
14022

RAMON RD
14232

LANDAU BLVD
5912

LANDAU BLVD
6096

LANDAU B
LV
D
6170

LANDAU B
LV
D
6761

DATE PALM
DR
10355

DATE PALM
DR
11630
30TH AVE
2004
30TH AVE
671

RAMON RD
14510

RAMON RD
14706

VISTA CHINO
10112

VISTA CHINO
9935

VARNER RD
1779

VARNER RD
1447

SONNY BONO MEMORIAL FWY
56878SONNY BONO MEMORIAL FWY
0 --57--72

RAMON RD
14088

RAMON RD
13984
-- 9-- 11
--313
--278

SONNY BONO MEMORIAL FWY
66310

SONNY BONO MEMORIAL FWY
0 --
655
--
614--96
--119

SONNY BONO MEMORIAL FW
Y
68694

SONNY BONO MEMORIAL FW
Y
0 SONNY BONO MEMORIAL FW
Y
66232
-- 738-- 722
--
2635
--
2510
-- 10-- 11
--
1740
--
1583
--
1068
--
992
--
1294
--
1204
--1886
--1791
--
171
--
151
--
13 --
14 --
642
--
622

DA VALL DR
6057

DA VALL DR
4544
--
136
--
160

RAMON RD
15040

RAMON RD
15264

RAMON RD
17765

RAMON RD
18799
--
1360--
1138
--
1012
--
1115
--0
--0
--1726
--1772
--
788
--
722

SONNY BONO MEMORIAL FWY
66310
30TH AVE
2762
30TH AVE
2521

VARNER RD
1882

VARNER RD
1547

DA VALL DR
4674

DA VALL DR
4478

DATE PALM
DR
10269

DATE PALM
DR
11638
--
820
--
816

LANDAU BLVD
6476

LANDAU BLVD
6914

RAMON RD
14840

RAMON RD
14773
--
1862
--
1754

DA VALL D
R
592
DA V
ALL DR
657
--
0--
0 --
1799--
1854
--
280
--
279
--3040
--3076
--877
--960

RAMON RD
17087

RAMON RD
17291
--2733
--2471
-- 24-- 27
-- 1624
-- 1643
30TH AVE
2151
30TH AVE
2405

DATE PALM
DR
10721

DATE PALM
DR
11236
--1284
--1120

VARNER RD
1772

VARNER RD
1444
--
617--
570

DATE PALM
DR
9653

DATE PALM
DR
10245
-- 373-- 418
-- 2171
-- 1977
AVENID
A M
ARAVIL
LA
47AVENID
A M
ARAVIL
LA
86 --
738
--0
30TH AVE
1691
30TH AVE
1683

DA VALL DR
4068

DA VALL DR
3954

AVENIDA M

ARAVILLA
683

AVENIDA M

ARAVILLA
695
--2990
--2751
-- 2295
-- 2312

LANDAU BLVD
6437

LANDAU BLVD
6942

DA VALL DR
4518

DA VALL DR
4339
--
1077
--
992

DATE PALM
DR
10309

DATE PALM
DR
11661
--1439
--1358

MC CALLUM WAY
3647

MC CALLUM WAY
3547
--
1732--
1665
--738--0

LANDAU BLVD
4961

LANDAU BLVD
5270

DATE PALM
DR
12408

DATE PALM
DR
13019

DATE PALM
DR
17810

DATE PALM
DR
18896
--
2374
--
0 --2374
--0
--
771--
754--
557--
531

MC CALLUM WAY
3008

MC CALLUM WAY
3007
30TH AVE
1644
30TH AVE
1597
--
2384 --
0 --0--0

RAMON RD
15192

RAMON RD
15452

RAMON RD
17708

RAMON RD
18726
--
10909
--0

SONNY BONO MEMORIAL FWY
65493

VISTA CHINO
912

VISTA CHINO
923

SONNY BONO MEMORIAL FWY
57846

RAMON RD
13814

RAMON RD
13865
--
2293
--
0 AVENIDA M
ARAVIL
LA
1539

AVENIDA M
ARAVIL
LA
1400

DA VALL DR
592

DA VALL DR
657
--10838
--
0 DA VALL DR
5133

DA VALL DR
3632
--
16 --
18 MC CALLUM WAY
3647

MC CALLUM WAY
3547

RAMON RD
16283

RAMON RD
16725
--10838
--0

DATE PALM DR
13268

DATE PALM DR
14038

MC CALLUM WAY
3008

MC CALLUM WAY
3007

MC CALLUM WAY
3208

MC CALLUM WAY
3295
--
0 --
0 DATE PALM
DR
9750

DATE PALM
DR
10153

DATE PALM
DR
12599

DATE PALM
DR
13265

MC CALLUM WAY
2735

MC CALLUM WAY
2697
--
18 DA VALL DR
4539

DA VALL DR
4293
--
2384
--
0 DA VALL DR
2817

DA VALL DR
1326

AVENIDA M

ARAVILLA
15 39

AVENIDA M

ARAVILLA
140
0 AVENIDA M

ARAVILLA
683

AVENIDA M

ARAVILLA
695
AVENID
A M
ARAVIL
LA
982

AVENIDA M
ARAVIL
LA
928

RAMON RD
13814

RAMON RD
13865
--
2293
--
0 DA V
ALL DR
592
DA V
ALL DR
657

DA VALL DR
4562

DA VALL DR
4363

RAMON RD
16283

RAMON RD
16725

DA VALL DR
2817

DA VALL DR
1326

DA VALL DR
2817

DA VALL DR
1326
RIVCOM 3 - 2045 Daily volumes
0 .05 .1 .15
Miles

HCMTYPE
CC (6867)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12486)
PrArterial (8422)
--
87--
17 VISTA CHINO
322VISTA CHINO
229
--0 --0

VALLEY CENT

ER BLVD
0 VALLEY CENT
ER
BLVD
0 --
5--
2 --
20--
31 --182
--80
--
1--
0 VALLEY CENTER BLVD
0 VALLEY CENTER BLVD
0 SONNY BONO MEMORIAL FWY
22741SONNY BONO MEMORIAL FWY
0 --5--3

SONNY BONO MEMORIAL FWY
19842

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FW
Y
21949SONNY BONO MEMORIAL FW
Y
0 VISTA CHINO
3185

VISTA CHINO
2735
--
419--
149
-- 223
-- 289
--
7--
4 DA VALL DR
1534

DA VALL DR
1213

MC CALLUM WAY
781

MC CALLUM WAY
692

VISTA CHINO
3197

VISTA CHINO
2640

CATHEDRAL CANYON DR
2950

CATHEDRAL CANYON DR
3195
--
1046
--
850

LANDAU BLVD
1913

LANDAU BLVD
1803

MC CALLUM WAY
143

MC CALLUM WAY
272
30TH AVE
634
30TH AVE
419

RAMON RD
4373

RAMON RD
4220

LANDAU BLVD
1967

LANDAU BLVD
1788

LANDAU B
LV
D
2442

LANDAU B
LV
D
1598

DATE PALM
DR
3508

DATE PALM
DR
3291
30TH AVE
470
30TH AVE
251

RAMON RD
4506

RAMON RD
4365

VISTA CHINO
3092

VISTA CHINO
2867

VARNER RD
243

VARNER RD
882

SONNY BONO MEMORIAL FWY
19239SONNY BONO MEMORIAL FWY
0 --27--12

RAMON RD
4392

RAMON RD
4095
-- 5-- 2
--68
--116

SONNY BONO MEMORIAL FWY
19199

SONNY BONO MEMORIAL FWY
0 --
166
--
234--47
--20

SONNY BONO MEMORIAL FW
Y
19737

SONNY BONO MEMORIAL FW
Y
0 SONNY BONO MEMORIAL FW
Y
22237
-- 198-- 238
--
653
--
953
-- 4
-- 2
--
394
--
659
--
338
--
267
--
336
--
437
--500
--642
--
36 --
65 --
5 --
3 --
188
--
201

DA VALL DR
1839

DA VALL DR
1281
--
62--
27 RAMON RD
4940

RAMON RD
4208

RAMON RD
6713

RAMON RD
4489
--
411--
367
--
361
--
284
--0
--0
--496
--614
--
200
--
286

SONNY BONO MEMORIAL FWY
19199
30TH AVE
641
30TH AVE
1010

VARNER RD
250

VARNER RD
941

DA VALL DR
1661

DA VALL DR
1197

DATE PALM
DR
3431

DATE PALM
DR
3358
--
249
--
248

LANDAU BLVD
2385

LANDAU BLVD
1833

RAMON RD
4649

RAMON RD
4298
--
463
--
671

DA VALL D
R
229
DA V
ALL DR
164
--
0--
0 --
586--
489
--
88 --
91 --882
--903
--299
--247

RAMON RD
5718

RAMON RD
4742
--612
--1036
-- 9-- 5
-- 466-- 547
30TH AVE
918
30TH AVE
544

DATE PALM
DR
3701

DATE PALM
DR
3043
--231
--561

VARNER RD
243

VARNER RD
878
--
155--
221

DATE PALM
DR
3364

DATE PALM
DR
2776
-- 147-- 78
-- 518
-- 790
AVENID
A M
ARAVIL
LA
47AVENID
A M
ARAVIL
LA
0 --
288
--0
30TH AVE
509
30TH AVE
559

DA VALL DR
1388

DA VALL DR
1119

AVENIDA M

ARAVILLA
233

AVENIDA M

ARAVILLA
213
--698
--1101
-- 602
-- 842

LANDAU BLVD
2360

LANDAU BLVD
1857

DA VALL DR
1521

DA VALL DR
1182
--
245
--
405

DATE PALM
DR
3572

DATE PALM
DR
3238
--415
--457

MC CALLUM WAY
1092

MC CALLUM WAY
1174
--
563--
514
--288--0

LANDAU BLVD
1712

LANDAU BLVD
1494

DATE PALM
DR
4291

DATE PALM
DR
3520

DATE PALM
DR
5838

DATE PALM
DR
5304
--
643
--
0 --643
--0
--
377--
116--
163--
187

MC CALLUM WAY
814

MC CALLUM WAY
1083
30TH AVE
462
30TH AVE
559
--
538
--
0 --0--0

RAMON RD
4956

RAMON RD
4245

RAMON RD
6686

RAMON RD
4477
--3502
--0

SONNY BONO MEMORIAL FWY
21949

VISTA CHINO
229

VISTA CHINO
322

SONNY BONO MEMORIAL FWY
16850

RAMON RD
4516

RAMON RD
3903
--
792
--
0 AVENIDA M
ARAVIL
LA
351

AVENIDA M
ARAVIL
LA
576

DA VALL DR
229

DA VALL DR
164
--2992
--
0 DA VALL DR
1516

DA VALL DR
1052
--
6 --
3 MC CALLUM WAY
1092

MC CALLUM WAY
1174

RAMON RD
5709

RAMON RD
4329
--2992
--0

DATE PALM DR
4694

DATE PALM DR
3749

MC CALLUM WAY
814

MC CALLUM WAY
1083

MC CALLUM WAY
1190

MC CALLUM WAY
849
--
0 --
0 DATE PALM
DR
3383

DATE PALM
DR
2712

DATE PALM
DR
4432

DATE PALM
DR
3564

MC CALLUM WAY
881

MC CALLUM WAY
840
--
3 DA VALL DR
1582

DA VALL DR
1182
--
538
--
0 DA VALL DR
992

DA VALL DR
423

AVENIDA M

ARAVILLA
35 1

AVENIDA M

ARAVILLA
576

AVENIDA M

ARAVILLA
233

AVENIDA M

ARAVILLA
213
AVENID
A M
ARAVIL
LA
273

AVENIDA M
ARAVIL
LA
338

RAMON RD
4516

RAMON RD
3903
--
792
--
0 DA V
ALL DR
229
DA V
ALL DR
164

DA VALL DR
1631

DA VALL DR
1165

RAMON RD
5709

RAMON RD
4329

DA VALL DR
992

DA VALL DR
423

DA VALL DR
992

DA VALL DR
423
RIVCOM 3 - 2045 PM peak period volumes
0 .05 .1 .15
Miles

HCMTYPE
CC (6867)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12486)
PrArterial (8422)
In Out In Out
Model 2018 183 187 226 219
Model 2045 308 350 367 411
Annual Growth
Model 2023 Interpolated 209 187 257 219

2.88% 2.77%
AM PM
3,801 320 2,660 821 TOTAL 3,671
1,623 195 1,129 299 PM 2,172
2,178 125 1,531 522 AM 1,499
949
884
1,833
1,347
775
572
471
444
915
354
374
728
TOTAL
PM
AM
124
66 190
401
165
236
AM
PM
TOTAL
675
260
415
326
143
183
1,024
631
1,655
1,402
568
834
1,841 AM 97 789 89 975
1,372 PM 240 1,561 74 1,875
3,213 TOTAL 337 2,350 163 2,850
1,991 156 1,381 454 TOTAL 1,909
807 94 559 154 PM 1,150
1,184 62 822 300 AM 759
545
519
1,064
AM PM
765
440
325
246
259
505
45% 50%
214
219
433
39% 42%
TOTAL
PM
AM AM 7:45 AM
8:45 AM
85 41
126
16% 8%
176
83 93
#N/A
AM
PM
TOTAL
364
126
238 PM 4:00 PM
5:45 PM
174
86 88
588
315
903
714
295
419
998 AM 52 417 53 522
706 PM 147 808 35 990
1,704 Total 199 1,225 88 1,512
AimTD LLC

TURNING MOVEMENT COUNTS
Date Palm
30th
30th
Cathedral City
SC4010

ALL HOURS
Date Palm
Date Palm
Date Palm
30th
30th

PEAK HOUR
Date Palm Drive Mixed Use
Developed Year 2023
AM/PM Peak Hour Intersection Volumes

APPENDIX C ‐
EXISTING CONDITIONS PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 1: Date Palm Drive & McCallum Way 05/27/2023
Existing Year 2023 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 52 191 94 59 132 42 40 430 42 84 859 47 Future Volume (veh/h) 52 191 94 59 132 42 40 430 42 84 859 47 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 58 212 104 66 147 47 44 478 47 93 954 52 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 456 362 178 356 415 133 87 1374 133 147 1604 87 Arrive On Green 0.31 0.31 0.31 0.31 0.31 0.31 0.05 0.29 0.29 0.08 0.32 0.32 Sat Flow, veh/h 1187 1178 578 1062 1352 432 1781 4726 458 1781 4946 269 Grp Volume(v), veh/h 58 0 316 66 0 194 44 342 183 93 656 350 Grp Sat Flow(s),veh/h/ln 1187 0 1756 1062 0 1784 1781 1702 1780 1781 1702 1811 Q Serve(g_s), s 1.5 0.0 5.7 2.1 0.0 3.2 0.9 3.0 3.0 1.9 6.1 6.1 Cycle Q Clear(g_c), s 4.7 0.0 5.7 7.8 0.0 3.2 0.9 3.0 3.0 1.9 6.1 6.1 Prop In Lane 1.00 0.33 1.00 0.24 1.00 0.26 1.00 0.15
Lane Grp Cap(c), veh/h 456 0 539 356 0 548 87 990 518 147 1104 587 V/C Ratio(X) 0.13 0.00 0.59 0.19 0.00 0.35 0.50 0.35 0.35 0.63 0.59 0.60 Avail Cap(c_a), veh/h 913 0 1215 765 0 1235 237 1268 663 379 1540 819 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 11.9 0.0 11.0 14.3 0.0 10.1 17.4 10.5 10.5 16.7 10.6 10.6 Incr Delay (d2), s/veh 0.1 0.0 1.0 0.2 0.0 0.4 4.4 0.2 0.4 4.4 0.5 1.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.0 1.9 0.5 0.0 1.1 0.4 0.8 0.8 0.8 1.5 1.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 12.1 0.0 12.0 14.5 0.0 10.5 21.9 10.7 10.9 21.1 11.1 11.6 LnGrp LOS B A B B A B C B B C B B
Approach Vol, veh/h 374 260 569 1099
Approach Delay, s/veh 12.0 11.5 11.6 12.1
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.1 14.9 15.5 5.8 16.2 15.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 8.0 14.0 26.0 5.0 17.0 26.0 Max Q Clear Time (g_c+I1), s 3.9 5.0 7.7 2.9 8.1 9.8
Green Ext Time (p_c), s 0.1 2.0 2.1 0.0 3.9 1.3
Intersection Summary
HCM 6th Ctrl Delay 11.9
HCM 6th LOS B
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 3: Date Palm Drive & 30th Avenue 05/27/2023
Existing Year 2023 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 93 238 88 85 214 246 52 417 53 300 822 62 Future Volume (veh/h) 93 238 88 85 214 246 52 417 53 300 822 62 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 101 259 96 92 233 267 57 453 58 326 893 67 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 129 502 412 119 492 405 93 807 101 373 1614 121 Arrive On Green 0.07 0.27 0.27 0.07 0.26 0.26 0.05 0.18 0.18 0.21 0.33 0.33 Sat Flow, veh/h 1781 1870 1536 1781 1870 1541 1781 4590 577 1781 4845 362 Grp Volume(v), veh/h 101 259 96 92 233 267 57 334 177 326 627 333 Grp Sat Flow(s),veh/h/ln 1781 1870 1536 1781 1870 1541 1781 1702 1763 1781 1702 1804 Q Serve(g_s), s 3.2 6.7 2.8 2.9 6.0 8.9 1.8 5.1 5.3 10.1 8.6 8.7 Cycle Q Clear(g_c), s 3.2 6.7 2.8 2.9 6.0 8.9 1.8 5.1 5.3 10.1 8.6 8.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.33 1.00 0.20
Lane Grp Cap(c), veh/h 129 502 412 119 492 405 93 599 310 373 1134 601 V/C Ratio(X) 0.78 0.52 0.23 0.77 0.47 0.66 0.61 0.56 0.57 0.87 0.55 0.55 Avail Cap(c_a), veh/h 155 849 697 155 849 699 187 1247 646 373 1604 850 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.1 17.8 16.4 26.3 17.8 18.8 26.6 21.6 21.6 21.9 15.6 15.6 Incr Delay (d2), s/veh 18.9 0.8 0.3 15.8 0.7 1.8 6.5 0.8 1.7 19.9 0.4 0.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.9 2.5 0.9 1.6 2.3 2.8 0.8 1.8 2.0 5.5 2.6 2.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 45.1 18.6 16.6 42.1 18.5 20.7 33.1 22.4 23.3 41.8 16.0 16.4 LnGrp LOS D B B D B C C C C D B B
Approach Vol, veh/h 456 592 568 1286
Approach Delay, s/veh 24.1 23.1 23.7 22.7
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 16.0 14.1 7.8 19.4 7.0 23.1 8.2 19.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 12.0 21.0 5.0 26.0 6.0 27.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 12.1 7.3 4.9 8.7 3.8 10.7 5.2 10.9 Green Ext Time (p_c), s 0.0 2.4 0.0 1.5 0.0 5.0 0.0 1.9 Intersection Summary
HCM 6th Ctrl Delay 23.2
HCM 6th LOS C
Date Palm Drive Mixed UseHCM 6th TWSC
4: Date Palm Drive & Tachevah Drive 05/27/2023
Existing Year 2023 Synchro 11 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 1.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 28 96 37 712 1043 11
Future Vol, veh/h 28 96 37 712 1043 11
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 0 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 29 99 38 734 1075 11
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1451 543 1086 0 - 0
Stage 1 1081 - - - - -
Stage 2 370 - - - - -
Critical Hdwy 5.74 7.14 5.34 - - -
Critical Hdwy Stg 1 6.64 - - - - -
Critical Hdwy Stg 2 6.04 - - - - -
Follow-up Hdwy 3.82 3.92 3.12 - - -
Pot Cap-1 Maneuver 183 414 356 - - -
Stage 1 216 - - - - -
Stage 2 613 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 163 414 356 - - -
Mov Cap-2 Maneuver 163 - - - - -
Stage 1 193 - - - - -
Stage 2 613 - - - - -
Approach EB NB SB
HCM Control Delay, s 24.8 0.8 0

HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 356 - 307 - -
HCM Lane V/C Ratio 0.107 - 0.416 - -
HCM Control Delay (s) 16.3 - 24.8 - -
HCM Lane LOS C - C - -
HCM 95th %tile Q(veh) 0.4 - 2 - -
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 1: Date Palm Drive & McCallum Way 05/27/2023
Existing Year 2023 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 82 111 72 70 127 47 83 882 63 49 643 43 Future Volume (veh/h) 82 111 72 70 127 47 83 882 63 49 643 43 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 91 123 80 78 141 52 92 980 70 54 714 48 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 413 281 183 401 348 128 149 1653 118 103 1533 102 Arrive On Green 0.27 0.27 0.27 0.27 0.27 0.27 0.08 0.34 0.34 0.06 0.31 0.31 Sat Flow, veh/h 1187 1051 683 1177 1302 480 1781 4863 347 1781 4879 326 Grp Volume(v), veh/h 91 0 203 78 0 193 92 685 365 54 497 265 Grp Sat Flow(s),veh/h/ln 1187 0 1734 1177 0 1782 1781 1702 1806 1781 1702 1801 Q Serve(g_s), s 2.4 0.0 3.5 2.1 0.0 3.2 1.8 6.0 6.0 1.1 4.2 4.2 Cycle Q Clear(g_c), s 5.6 0.0 3.5 5.6 0.0 3.2 1.8 6.0 6.0 1.1 4.2 4.2 Prop In Lane 1.00 0.39 1.00 0.27 1.00 0.19 1.00 0.18
Lane Grp Cap(c), veh/h 413 0 464 401 0 477 149 1157 614 103 1070 566 V/C Ratio(X) 0.22 0.00 0.44 0.19 0.00 0.40 0.62 0.59 0.59 0.52 0.46 0.47 Avail Cap(c_a), veh/h 956 0 1257 940 0 1292 348 1614 856 248 1424 754 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 13.1 0.0 10.9 13.2 0.0 10.8 15.9 9.8 9.8 16.4 9.9 9.9 Incr Delay (d2), s/veh 0.3 0.0 0.7 0.2 0.0 0.6 4.1 0.5 0.9 4.0 0.3 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 1.1 0.5 0.0 1.1 0.7 1.4 1.5 0.4 1.0 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 13.4 0.0 11.5 13.5 0.0 11.3 20.0 10.3 10.7 20.4 10.2 10.5 LnGrp LOS B A B B A B B B B C B B
Approach Vol, veh/h 294 271 1142 816
Approach Delay, s/veh 12.1 12.0 11.2 11.0
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.1 16.2 13.6 7.0 15.3 13.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 17.0 26.0 7.0 15.0 26.0 Max Q Clear Time (g_c+I1), s 3.1 8.0 7.6 3.8 6.2 7.6
Green Ext Time (p_c), s 0.0 4.1 1.5 0.0 2.9 1.3
Intersection Summary
HCM 6th Ctrl Delay 11.3
HCM 6th LOS B
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 3: Date Palm Drive & 30th Avenue 05/27/2023
Existing Year 2023 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 83 126 86 41 219 259 147 808 35 154 559 94 Future Volume (veh/h) 83 126 86 41 219 259 147 808 35 154 559 94 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 92 140 96 46 243 288 163 898 39 171 621 104 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 123 499 417 82 457 386 205 1375 60 214 1231 203 Arrive On Green 0.07 0.27 0.27 0.05 0.24 0.24 0.12 0.27 0.27 0.12 0.28 0.28 Sat Flow, veh/h 1781 1870 1562 1781 1870 1583 1781 5016 217 1781 4411 728 Grp Volume(v), veh/h 92 140 96 46 243 288 163 609 328 171 477 248 Grp Sat Flow(s),veh/h/ln 1781 1870 1562 1781 1870 1583 1781 1702 1830 1781 1702 1735 Q Serve(g_s), s 2.8 3.2 2.6 1.4 6.2 9.2 4.9 8.6 8.7 5.1 6.4 6.6 Cycle Q Clear(g_c), s 2.8 3.2 2.6 1.4 6.2 9.2 4.9 8.6 8.7 5.1 6.4 6.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.12 1.00 0.42
Lane Grp Cap(c), veh/h 123 499 417 82 457 386 205 933 501 214 950 484 V/C Ratio(X) 0.75 0.28 0.23 0.56 0.53 0.75 0.79 0.65 0.65 0.80 0.50 0.51 Avail Cap(c_a), veh/h 163 890 743 163 890 753 228 1308 703 228 1308 666 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 25.0 15.9 15.6 25.5 18.0 19.1 23.6 17.5 17.6 23.4 16.5 16.6 Incr Delay (d2), s/veh 12.6 0.3 0.3 5.9 1.0 2.9 16.0 0.8 1.5 17.0 0.4 0.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 1.2 0.8 0.7 2.3 3.1 2.7 2.9 3.2 2.8 2.0 2.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 37.6 16.2 15.9 31.4 18.9 22.0 39.5 18.3 19.0 40.4 16.9 17.4 LnGrp LOS D B B C B C D B B D B B
Approach Vol, veh/h 328 577 1100 896
Approach Delay, s/veh 22.1 21.4 21.7 21.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.6 19.0 6.5 18.6 10.3 19.3 7.8 17.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 21.0 5.0 26.0 7.0 21.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 7.1 10.7 3.4 5.2 6.9 8.6 4.8 11.2 Green Ext Time (p_c), s 0.0 4.0 0.0 0.9 0.0 3.2 0.0 2.0 Intersection Summary
HCM 6th Ctrl Delay 21.6
HCM 6th LOS C
Date Palm Drive Mixed UseHCM 6th TWSC
4: Date Palm Drive & Tachevah Drive 05/27/2023
Existing Year 2023 Synchro 11 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 1.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 23 57 78 1003 790 48
Future Vol, veh/h 23 57 78 1003 790 48
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 0 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 23 58 80 1023 806 49
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1400 428 855 0 - 0
Stage 1 831 - - - - -
Stage 2 569 - - - - -
Critical Hdwy 5.74 7.14 5.34 - - -
Critical Hdwy Stg 1 6.64 - - - - -
Critical Hdwy Stg 2 6.04 - - - - -
Follow-up Hdwy 3.82 3.92 3.12 - - -
Pot Cap-1 Maneuver 194 492 460 - - -
Stage 1 306 - - - - -
Stage 2 483 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 160 492 460 - - -
Mov Cap-2 Maneuver 160 - - - - -
Stage 1 253 - - - - -
Stage 2 483 - - - - -
Approach EB NB SB
HCM Control Delay, s 20.9 1 0

HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 460 - 308 - -
HCM Lane V/C Ratio 0.173 - 0.265 - -
HCM Control Delay (s) 14.5 - 20.9 - -
HCM Lane LOS B - C - -
HCM 95th %tile Q(veh) 0.6 - 1 - -
APPENDIX D ‐
PROJECT COMPLETION YEAR 2025 CONDITIONS PEAK HOUR INTERSECTION ANALYSIS

WORKSHEETS
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 1: Date Palm Drive & McCallum Way 05/28/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 57 203 100 64 141 45 43 458 45 92 912 50 Future Volume (veh/h) 57 203 100 64 141 45 43 458 45 92 912 50 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 63 226 111 71 157 50 48 509 50 102 1013 56 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 451 376 185 346 432 138 92 1383 134 152 1611 89 Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.05 0.29 0.29 0.09 0.33 0.33 Sat Flow, veh/h 1173 1177 578 1042 1354 431 1781 4726 458 1781 4942 273 Grp Volume(v), veh/h 63 0 337 71 0 207 48 365 194 102 697 372 Grp Sat Flow(s),veh/h/ln 1173 0 1756 1042 0 1785 1781 1702 1780 1781 1702 1810 Q Serve(g_s), s 1.7 0.0 6.4 2.4 0.0 3.5 1.0 3.4 3.4 2.2 6.9 6.9 Cycle Q Clear(g_c), s 5.3 0.0 6.4 8.8 0.0 3.5 1.0 3.4 3.4 2.2 6.9 6.9 Prop In Lane 1.00 0.33 1.00 0.24 1.00 0.26 1.00 0.15
Lane Grp Cap(c), veh/h 451 0 560 346 0 570 92 996 521 152 1110 590 V/C Ratio(X) 0.14 0.00 0.60 0.21 0.00 0.36 0.52 0.37 0.37 0.67 0.63 0.63 Avail Cap(c_a), veh/h 847 0 1152 697 0 1172 225 1203 629 360 1461 777 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 12.4 0.0 11.4 15.1 0.0 10.4 18.3 11.1 11.1 17.6 11.3 11.3 Incr Delay (d2), s/veh 0.1 0.0 1.0 0.3 0.0 0.4 4.5 0.2 0.4 5.1 0.6 1.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 2.2 0.5 0.0 1.2 0.5 0.9 1.0 0.9 1.8 2.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 12.6 0.0 12.4 15.4 0.0 10.8 22.8 11.3 11.6 22.7 11.9 12.4 LnGrp LOS B A B B A B C B B C B B
Approach Vol, veh/h 400 278 607 1171
Approach Delay, s/veh 12.4 11.9 12.3 13.0
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.4 15.6 16.6 6.1 16.9 16.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 8.0 14.0 26.0 5.0 17.0 26.0 Max Q Clear Time (g_c+I1), s 4.2 5.4 8.4 3.0 8.9 10.8
Green Ext Time (p_c), s 0.1 2.1 2.3 0.0 3.9 1.3
Intersection Summary
HCM 6th Ctrl Delay 12.6
HCM 6th LOS B
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 3: Date Palm Drive & 30th Avenue 05/28/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 99 253 95 91 228 261 57 444 58 319 875 66 Future Volume (veh/h) 99 253 95 91 228 261 57 444 58 319 875 66 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 108 275 103 99 248 284 62 483 63 347 951 72 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 138 506 415 127 494 407 94 814 104 404 1705 129 Arrive On Green 0.08 0.27 0.27 0.07 0.26 0.26 0.05 0.18 0.18 0.23 0.35 0.35 Sat Flow, veh/h 1781 1870 1536 1781 1870 1541 1781 4578 587 1781 4842 366 Grp Volume(v), veh/h 108 275 103 99 248 284 62 357 189 347 668 355 Grp Sat Flow(s),veh/h/ln 1781 1870 1536 1781 1870 1541 1781 1702 1761 1781 1702 1803 Q Serve(g_s), s 3.8 7.9 3.3 3.4 7.1 10.5 2.2 6.1 6.2 11.8 10.0 10.0 Cycle Q Clear(g_c), s 3.8 7.9 3.3 3.4 7.1 10.5 2.2 6.1 6.2 11.8 10.0 10.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.33 1.00 0.20
Lane Grp Cap(c), veh/h 138 506 415 127 494 407 94 606 313 404 1199 635 V/C Ratio(X) 0.78 0.54 0.25 0.78 0.50 0.70 0.66 0.59 0.60 0.86 0.56 0.56 Avail Cap(c_a), veh/h 169 771 633 169 771 635 226 1187 614 565 1835 972 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.6 19.7 18.0 28.8 19.7 20.9 29.3 23.8 23.9 23.4 16.5 16.5 Incr Delay (d2), s/veh 17.1 0.9 0.3 15.2 0.8 2.2 7.8 0.9 1.9 9.3 0.4 0.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.1 3.1 1.1 1.9 2.8 3.5 1.0 2.2 2.5 5.2 3.1 3.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 45.7 20.6 18.3 44.0 20.5 23.1 37.1 24.7 25.7 32.7 16.9 17.3 LnGrp LOS D C B D C C D C C C B B
Approach Vol, veh/h 486 631 608 1370
Approach Delay, s/veh 25.7 25.4 26.3 21.0
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 18.3 15.2 8.5 21.1 7.3 26.2 8.9 20.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 20.0 22.0 6.0 26.0 8.0 34.0 6.0 26.0 Max Q Clear Time (g_c+I1), s 13.8 8.2 5.4 9.9 4.2 12.0 5.8 12.5 Green Ext Time (p_c), s 0.5 2.6 0.0 1.6 0.0 6.0 0.0 1.9 Intersection Summary
HCM 6th Ctrl Delay 23.7
HCM 6th LOS C
HCM 6th TWSC Date Palm Drive Mixed Use
4: Date Palm Drive & Tachevah Drive 05/28/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 2.2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 30 102 40 757 1108 12
Future Vol, veh/h 30 102 40 757 1108 12
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 250 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 31 105 41 780 1142 12

Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1542 577 1154 0 - 0
Stage 1 1148 - - - - -
Stage 2 394 - - - - -
Critical Hdwy 5.74 7.14 5.34 - - -
Critical Hdwy Stg 1 6.64 - - - - -
Critical Hdwy Stg 2 6.04 - - - - -
Follow-up Hdwy 3.82 3.92 3.12 - - -
Pot Cap-1 Maneuver 164 394 330 - - -
Stage 1 196 - - - - -
Stage 2 595 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 144 394 330 - - -
Mov Cap-2 Maneuver 144 - - - - -
Stage 1 172 - - - - -
Stage 2 595 - - - - -

Approach EB NB SB
HCM Control Delay, s 29 0.9 0

HCM LOS D

Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 330 - 283 - -
HCM Lane V/C Ratio 0.125 - 0.481 - -
HCM Control Delay (s) 17.5 - 29 - -
HCM Lane LOS C - D - -
HCM 95th %tile Q(veh) 0.4 - 2.5 - -
HCM 6th TWSC Date Palm Drive Mixed Use
5: Date Palm Drive & Project Driveway 05/28/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 2 556 2 0 1053
Future Vol, veh/h 0 2 556 2 0 1053
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 2 604 2 0 1145

Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 303 0 0 - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 591 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 591 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -

Approach WB NB SB
HCM Control Delay, s 11.1 0 0

HCM LOS B

Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h) - - 591 -
HCM Lane V/C Ratio - - 0.004 -
HCM Control Delay (s) - - 11.1 -
HCM Lane LOS - - B -
HCM 95th %tile Q(veh) - - 0 -
HCM 6th TWSC Date Palm Drive Mixed Use
6: San Vicente Avenue/Existing Driveway & McCallum Way 05/28/2024 Project Completion Year 2025 Synchro 11 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 2 337 0 0 248 2 0 0 0 1 0 1
Future Vol, veh/h 2 337 0 0 248 2 0 0 0 1 0 1
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 2 366 0 0 270 2 0 0 0 1 0 1

Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 272 0 0 366 0 0 642 642 366 641 641 271 Stage 1 - - - - - - 370 370 - 271 271 -
Stage 2 - - - - - - 272 272 - 370 370 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1291 - - 1193 - - 387 392 679 388 393 768 Stage 1 - - - - - - 650 620 - 735 685 -
Stage 2 - - - - - - 734 685 - 650 620 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1291 - - 1193 - - 386 391 679 387 392 768 Mov Cap-2 Maneuver - - - - - - 386 391 - 387 392 -
Stage 1 - - - - - - 649 619 - 734 685 -
Stage 2 - - - - - - 733 685 - 649 619 -

Approach EB WB NB SB
HCM Control Delay, s 0 0 0 12

HCM LOS A B

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1291 - - 1193 - - 515
HCM Lane V/C Ratio - 0.002 - - - - - 0.004
HCM Control Delay (s) 0 7.8 0 - 0 - - 12
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0 - - 0 - - 0
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 1: Date Palm Drive & McCallum Way 05/28/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 88 118 77 76 136 50 89 937 67 55 683 46 Future Volume (veh/h) 88 118 77 76 136 50 89 937 67 55 683 46 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 98 131 86 84 151 56 99 1041 74 61 759 51 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 405 290 191 393 361 134 152 1665 118 111 1558 104 Arrive On Green 0.28 0.28 0.28 0.28 0.28 0.28 0.09 0.34 0.34 0.06 0.32 0.32 Sat Flow, veh/h 1173 1047 687 1162 1300 482 1781 4865 345 1781 4879 326 Grp Volume(v), veh/h 98 0 217 84 0 207 99 728 387 61 528 282 Grp Sat Flow(s),veh/h/ln 1173 0 1734 1162 0 1782 1781 1702 1806 1781 1702 1801 Q Serve(g_s), s 2.8 0.0 3.9 2.4 0.0 3.6 2.0 6.8 6.8 1.3 4.7 4.8 Cycle Q Clear(g_c), s 6.4 0.0 3.9 6.3 0.0 3.6 2.0 6.8 6.8 1.3 4.7 4.8 Prop In Lane 1.00 0.40 1.00 0.27 1.00 0.19 1.00 0.18
Lane Grp Cap(c), veh/h 405 0 481 393 0 494 152 1165 618 111 1087 575 V/C Ratio(X) 0.24 0.00 0.45 0.21 0.00 0.42 0.65 0.62 0.63 0.55 0.49 0.49 Avail Cap(c_a), veh/h 886 0 1193 870 0 1227 377 1532 813 236 1262 668 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 13.8 0.0 11.3 13.9 0.0 11.2 16.7 10.4 10.4 17.2 10.4 10.4 Incr Delay (d2), s/veh 0.3 0.0 0.7 0.3 0.0 0.6 4.6 0.6 1.0 4.1 0.3 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.0 1.3 0.6 0.0 1.2 0.8 1.6 1.8 0.5 1.2 1.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 14.1 0.0 11.9 14.2 0.0 11.7 21.3 10.9 11.4 21.3 10.7 11.0 LnGrp LOS B A B B A B C B B C B B
Approach Vol, veh/h 315 291 1214 871
Approach Delay, s/veh 12.6 12.4 12.0 11.5
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.4 16.9 14.5 7.2 16.1 14.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 17.0 26.0 8.0 14.0 26.0 Max Q Clear Time (g_c+I1), s 3.3 8.8 8.4 4.0 6.8 8.3
Green Ext Time (p_c), s 0.0 4.1 1.6 0.1 2.8 1.4
Intersection Summary
HCM 6th Ctrl Delay 11.9
HCM 6th LOS B
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 3: Date Palm Drive & 30th Avenue 05/28/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 89 134 93 44 233 275 157 860 40 164 596 100 Future Volume (veh/h) 89 134 93 44 233 275 157 860 40 164 596 100 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 99 149 103 49 259 306 174 956 44 182 662 111 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 127 517 432 84 472 400 216 1393 64 216 1228 203 Arrive On Green 0.07 0.28 0.28 0.05 0.25 0.25 0.12 0.28 0.28 0.12 0.28 0.28 Sat Flow, veh/h 1781 1870 1562 1781 1870 1583 1781 5002 230 1781 4408 730 Grp Volume(v), veh/h 99 149 103 49 259 306 174 650 350 182 509 264 Grp Sat Flow(s),veh/h/ln 1781 1870 1562 1781 1870 1583 1781 1702 1828 1781 1702 1734 Q Serve(g_s), s 3.2 3.6 3.0 1.6 6.9 10.3 5.5 9.8 9.9 5.8 7.3 7.5 Cycle Q Clear(g_c), s 3.2 3.6 3.0 1.6 6.9 10.3 5.5 9.8 9.9 5.8 7.3 7.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.13 1.00 0.42
Lane Grp Cap(c), veh/h 127 517 432 84 472 400 216 948 509 216 948 483 V/C Ratio(X) 0.78 0.29 0.24 0.58 0.55 0.77 0.81 0.69 0.69 0.84 0.54 0.55 Avail Cap(c_a), veh/h 154 842 703 154 842 712 216 1237 664 216 1237 630 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.4 16.4 16.2 27.0 18.7 20.0 24.7 18.6 18.6 24.9 17.7 17.7 Incr Delay (d2), s/veh 18.8 0.3 0.3 6.3 1.0 3.1 19.7 1.1 2.0 25.0 0.5 1.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.9 1.4 0.9 0.7 2.7 3.5 3.2 3.4 3.7 3.5 2.3 2.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 45.2 16.7 16.5 33.3 19.7 23.1 44.4 19.6 20.6 49.9 18.2 18.7 LnGrp LOS D B B C B C D B C D B B
Approach Vol, veh/h 351 614 1174 955
Approach Delay, s/veh 24.7 22.5 23.6 24.3
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.0 20.1 6.7 20.0 11.0 20.1 8.1 18.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 21.0 5.0 26.0 7.0 21.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 7.8 11.9 3.6 5.6 7.5 9.5 5.2 12.3 Green Ext Time (p_c), s 0.0 4.0 0.0 1.0 0.0 3.3 0.0 2.0 Intersection Summary
HCM 6th Ctrl Delay 23.7
HCM 6th LOS C
HCM 6th TWSC Date Palm Drive Mixed Use
4: Date Palm Drive & Tachevah Drive 05/28/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 1.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 25 61 83 1066 840 51
Future Vol, veh/h 25 61 83 1066 840 51
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 250 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 26 62 85 1088 857 52

Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1488 455 909 0 - 0
Stage 1 883 - - - - -
Stage 2 605 - - - - -
Critical Hdwy 5.74 7.14 5.34 - - -
Critical Hdwy Stg 1 6.64 - - - - -
Critical Hdwy Stg 2 6.04 - - - - -
Follow-up Hdwy 3.82 3.92 3.12 - - -
Pot Cap-1 Maneuver 175 472 433 - - -
Stage 1 285 - - - - -
Stage 2 463 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 141 472 433 - - -
Mov Cap-2 Maneuver 141 - - - - -
Stage 1 229 - - - - -
Stage 2 463 - - - - -

Approach EB NB SB
HCM Control Delay, s 23.5 1.1 0

HCM LOS C

Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 433 - 281 - -
HCM Lane V/C Ratio 0.196 - 0.312 - -
HCM Control Delay (s) 15.3 - 23.5 - -
HCM Lane LOS C - C - -
HCM 95th %tile Q(veh) 0.7 - 1.3 - -
HCM 6th TWSC Date Palm Drive Mixed Use
5: Date Palm Drive & Project Driveway 05/28/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 5 1073 2 0 783
Future Vol, veh/h 0 5 1073 2 0 783
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 6 1192 2 0 870

Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 597 0 0 - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 382 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 382 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -

Approach WB NB SB
HCM Control Delay, s 14.6 0 0

HCM LOS B

Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h) - - 382 -
HCM Lane V/C Ratio - - 0.015 -
HCM Control Delay (s) - - 14.6 -
HCM Lane LOS - - B -
HCM 95th %tile Q(veh) - - 0 -
HCM 6th TWSC Date Palm Drive Mixed Use
6: San Vicente Avenue/Existing Driveway & McCallum Way 05/28/2024 Project Completion Year 2025 Synchro 11 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 3 237 0 0 259 3 0 0 0 1 0 2
Future Vol, veh/h 3 237 0 0 259 3 0 0 0 1 0 2
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 3 258 0 0 282 3 0 0 0 1 0 2

Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 285 0 0 258 0 0 549 549 258 548 548 284 Stage 1 - - - - - - 264 264 - 284 284 -
Stage 2 - - - - - - 285 285 - 264 264 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1277 - - 1307 - - 446 443 781 447 444 755 Stage 1 - - - - - - 741 690 - 723 676 -
Stage 2 - - - - - - 722 676 - 741 690 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1277 - - 1307 - - 444 442 781 446 443 755 Mov Cap-2 Maneuver - - - - - - 444 442 - 446 443 -
Stage 1 - - - - - - 739 688 - 721 676 -
Stage 2 - - - - - - 720 676 - 739 688 -

Approach EB WB NB SB
HCM Control Delay, s 0.1 0 0 10.9

HCM LOS A B

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1277 - - 1307 - - 613
HCM Lane V/C Ratio - 0.003 - - - - - 0.005
HCM Control Delay (s) 0 7.8 0 - 0 - - 10.9
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0 - - 0 - - 0
APPENDIX E ‐
PROJECT COMPLETION YEAR 2027 CONDITIONS PEAK HOUR INTERSECTION ANALYSIS

WORKSHEETS
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 1: Date Palm Drive & McCallum Way 05/28/2024
Project Completion Year 2027 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 59 228 106 67 157 48 46 503 48 95 979 53 Future Volume (veh/h) 59 228 106 67 157 48 46 503 48 95 979 53 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 66 253 118 74 174 53 51 559 53 106 1088 59 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 446 403 188 330 460 140 95 1403 131 150 1616 88 Arrive On Green 0.34 0.34 0.34 0.34 0.34 0.34 0.05 0.30 0.30 0.08 0.33 0.33 Sat Flow, veh/h 1152 1200 560 1010 1370 417 1781 4743 445 1781 4947 268 Grp Volume(v), veh/h 66 0 371 74 0 227 51 399 213 106 748 399 Grp Sat Flow(s),veh/h/ln 1152 0 1759 1010 0 1788 1781 1702 1783 1781 1702 1811 Q Serve(g_s), s 2.0 0.0 7.5 2.8 0.0 4.1 1.2 4.0 4.0 2.4 8.0 8.0 Cycle Q Clear(g_c), s 6.0 0.0 7.5 10.3 0.0 4.1 1.2 4.0 4.0 2.4 8.0 8.0 Prop In Lane 1.00 0.32 1.00 0.23 1.00 0.25 1.00 0.15
Lane Grp Cap(c), veh/h 446 0 590 330 0 600 95 1007 527 150 1112 592 V/C Ratio(X) 0.15 0.00 0.63 0.22 0.00 0.38 0.54 0.40 0.40 0.71 0.67 0.67 Avail Cap(c_a), veh/h 769 0 1084 614 0 1101 211 1129 592 338 1371 730 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 13.0 0.0 11.8 16.1 0.0 10.7 19.5 11.9 11.9 18.8 12.3 12.3 Incr Delay (d2), s/veh 0.2 0.0 1.1 0.3 0.0 0.4 4.6 0.3 0.5 6.0 1.0 1.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 2.6 0.6 0.0 1.4 0.5 1.1 1.2 1.1 2.2 2.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 13.1 0.0 12.9 16.5 0.0 11.1 24.1 12.1 12.4 24.8 13.2 14.1 LnGrp LOS B A B B A B C B B C B B
Approach Vol, veh/h 437 301 663 1253
Approach Delay, s/veh 12.9 12.4 13.1 14.5
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.6 16.5 18.2 6.2 17.8 18.2
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 8.0 14.0 26.0 5.0 17.0 26.0 Max Q Clear Time (g_c+I1), s 4.4 6.0 9.5 3.2 10.0 12.3
Green Ext Time (p_c), s 0.1 2.2 2.5 0.0 3.7 1.4
Intersection Summary
HCM 6th Ctrl Delay 13.6
HCM 6th LOS B
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 2: Date Palm Drive & Rosemount Road 05/28/2024
Project Completion Year 2027 Synchro 11 Report
Timing Plan: AM Peak
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 50 220 578 41 162 1010
Future Volume (veh/h) 50 220 578 41 162 1010
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 54 239 628 45 176 1098
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2
Cap, veh/h 378 337 1321 94 227 2698
Arrive On Green 0.21 0.21 0.27 0.27 0.13 0.53
Sat Flow, veh/h 1781 1585 5034 346 1781 5274
Grp Volume(v), veh/h 54 239 438 235 176 1098
Grp Sat Flow(s),veh/h/ln 1781 1585 1702 1808 1781 1702
Q Serve(g_s), s 0.8 4.3 3.3 3.4 3.0 4.0
Cycle Q Clear(g_c), s 0.8 4.3 3.3 3.4 3.0 4.0
Prop In Lane 1.00 1.00 0.19 1.00
Lane Grp Cap(c), veh/h 378 337 924 491 227 2698
V/C Ratio(X) 0.14 0.71 0.47 0.48 0.78 0.41
Avail Cap(c_a), veh/h 1212 1078 1654 879 404 4301
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 9.9 11.3 9.4 9.4 13.0 4.4
Incr Delay (d2), s/veh 0.2 2.8 0.4 0.7 5.6 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 1.3 0.9 1.0 1.3 0.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 10.0 14.0 9.8 10.1 18.7 4.5
LnGrp LOS B B A B B A
Approach Vol, veh/h 293 673 1274
Approach Delay, s/veh 13.3 9.9 6.4
Approach LOS B A A
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 7.9 12.4 20.3 10.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 7.0 15.0 26.0 21.0
Max Q Clear Time (g_c+I1), s 5.0 5.4 6.0 6.3
Green Ext Time (p_c), s 0.1 3.0 8.0 0.8
Intersection Summary
HCM 6th Ctrl Delay 8.4
HCM 6th LOS A
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 3: Date Palm Drive & 30th Avenue 05/28/2024
Project Completion Year 2027 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 105 268 119 65 143 167 169 600 29 233 1062 70 Future Volume (veh/h) 105 268 119 65 143 167 169 600 29 233 1062 70 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 114 291 129 71 155 182 184 652 32 253 1154 76 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 144 452 371 102 407 334 229 1363 67 300 1534 101 Arrive On Green 0.08 0.24 0.24 0.06 0.22 0.22 0.13 0.27 0.27 0.17 0.31 0.31 Sat Flow, veh/h 1781 1870 1533 1781 1870 1536 1781 4986 244 1781 4893 322 Grp Volume(v), veh/h 114 291 129 71 155 182 184 444 240 253 803 427 Grp Sat Flow(s),veh/h/ln 1781 1870 1533 1781 1870 1536 1781 1702 1825 1781 1702 1811 Q Serve(g_s), s 3.9 8.6 4.3 2.4 4.4 6.5 6.2 6.7 6.8 8.5 13.1 13.1 Cycle Q Clear(g_c), s 3.9 8.6 4.3 2.4 4.4 6.5 6.2 6.7 6.8 8.5 13.1 13.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.13 1.00 0.18
Lane Grp Cap(c), veh/h 144 452 371 102 407 334 229 931 499 300 1067 568 V/C Ratio(X) 0.79 0.64 0.35 0.70 0.38 0.54 0.80 0.48 0.48 0.84 0.75 0.75 Avail Cap(c_a), veh/h 144 788 646 144 788 647 289 1214 651 318 1269 675 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.8 21.0 19.4 28.6 20.6 21.4 26.1 18.7 18.7 24.9 19.0 19.0 Incr Delay (d2), s/veh 24.9 1.5 0.6 8.4 0.6 1.4 12.2 0.4 0.7 17.6 2.1 4.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.5 3.4 1.4 1.2 1.7 2.2 3.1 2.3 2.6 4.5 4.4 5.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 52.7 22.5 19.9 36.9 21.2 22.8 38.4 19.1 19.5 42.4 21.2 23.0 LnGrp LOS D C B D C C D B B D C C
Approach Vol, veh/h 534 408 868 1483
Approach Delay, s/veh 28.3 24.6 23.3 25.3
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.4 20.9 7.5 18.9 11.9 23.3 9.0 17.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 22.0 5.0 26.0 10.0 23.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 10.5 8.8 4.4 10.6 8.2 15.1 5.9 8.5 Green Ext Time (p_c), s 0.0 3.3 0.0 1.7 0.1 4.2 0.0 1.2 Intersection Summary
HCM 6th Ctrl Delay 25.2
HCM 6th LOS C
HCM 6th TWSC Date Palm Drive Mixed Use
4: Date Palm Drive & Tachevah Drive 05/28/2024
Project Completion Year 2027 Synchro 11 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 2.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 32 115 46 814 1193 13
Future Vol, veh/h 32 115 46 814 1193 13
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 250 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 33 119 47 839 1230 13

Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1667 622 1243 0 - 0
Stage 1 1237 - - - - -
Stage 2 430 - - - - -
Critical Hdwy 5.74 7.14 5.34 - - -
Critical Hdwy Stg 1 6.64 - - - - -
Critical Hdwy Stg 2 6.04 - - - - -
Follow-up Hdwy 3.82 3.92 3.12 - - -
Pot Cap-1 Maneuver 141 368 298 - - -
Stage 1 173 - - - - -
Stage 2 570 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 119 368 298 - - -
Mov Cap-2 Maneuver 119 - - - - -
Stage 1 146 - - - - -
Stage 2 570 - - - - -

Approach EB NB SB
HCM Control Delay, s 38.4 1 0

HCM LOS E

Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 298 - 253 - -
HCM Lane V/C Ratio 0.159 - 0.599 - -
HCM Control Delay (s) 19.4 - 38.4 - -
HCM Lane LOS C - E - -
HCM 95th %tile Q(veh) 0.6 - 3.5 - -
HCM 6th TWSC Date Palm Drive Mixed Use
5: Date Palm Drive & Project Driveway 05/28/2024
Project Completion Year 2027 Synchro 11 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 23 596 13 0 1127
Future Vol, veh/h 0 23 596 13 0 1127
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 25 648 14 0 1225

Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 331 0 0 - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 567 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 567 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -

Approach WB NB SB
HCM Control Delay, s 11.6 0 0

HCM LOS B

Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h) - - 567 -
HCM Lane V/C Ratio - - 0.044 -
HCM Control Delay (s) - - 11.6 -
HCM Lane LOS - - B -
HCM 95th %tile Q(veh) - - 0.1 -
HCM 6th TWSC Date Palm Drive Mixed Use
6: San Vicente Avenue/Existing Driveway & McCallum Way 05/28/2024 Project Completion Year 2027 Synchro 11 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 13 357 0 0 263 6 0 0 0 4 0 8
Future Vol, veh/h 13 357 0 0 263 6 0 0 0 4 0 8
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 14 388 0 0 286 7 0 0 0 4 0 9

Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 293 0 0 388 0 0 710 709 388 706 706 290 Stage 1 - - - - - - 416 416 - 290 290 -
Stage 2 - - - - - - 294 293 - 416 416 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1269 - - 1170 - - 348 359 660 351 361 749 Stage 1 - - - - - - 614 592 - 718 672 -
Stage 2 - - - - - - 714 670 - 614 592 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1269 - - 1170 - - 340 354 660 347 356 749 Mov Cap-2 Maneuver - - - - - - 340 354 - 347 356 -
Stage 1 - - - - - - 605 584 - 708 672 -
Stage 2 - - - - - - 706 670 - 605 584 -

Approach EB WB NB SB
HCM Control Delay, s 0.3 0 0 11.8

HCM LOS A B

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1269 - - 1170 - - 540
HCM Lane V/C Ratio - 0.011 - - - - - 0.024
HCM Control Delay (s) 0 7.9 0 - 0 - - 11.8
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0 - - 0 - - 0.1
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 1: Date Palm Drive & McCallum Way 05/28/2024
Project Completion Year 2027 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 93 141 82 79 161 53 94 1017 71 56 751 49 Future Volume (veh/h) 93 141 82 79 161 53 94 1017 71 56 751 49 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 103 157 91 88 179 59 104 1130 79 62 834 54 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 391 325 189 380 397 131 152 1683 118 111 1576 102 Arrive On Green 0.29 0.29 0.29 0.29 0.29 0.29 0.09 0.35 0.35 0.06 0.32 0.32 Sat Flow, veh/h 1140 1104 640 1130 1345 443 1781 4871 340 1781 4892 316 Grp Volume(v), veh/h 103 0 248 88 0 238 104 789 420 62 579 309 Grp Sat Flow(s),veh/h/ln 1140 0 1743 1130 0 1789 1781 1702 1807 1781 1702 1804 Q Serve(g_s), s 3.3 0.0 4.7 2.8 0.0 4.4 2.3 8.0 8.0 1.4 5.6 5.6 Cycle Q Clear(g_c), s 7.6 0.0 4.7 7.5 0.0 4.4 2.3 8.0 8.0 1.4 5.6 5.6 Prop In Lane 1.00 0.37 1.00 0.25 1.00 0.19 1.00 0.17
Lane Grp Cap(c), veh/h 391 0 514 380 0 527 152 1176 624 111 1097 581 V/C Ratio(X) 0.26 0.00 0.48 0.23 0.00 0.45 0.68 0.67 0.67 0.56 0.53 0.53 Avail Cap(c_a), veh/h 791 0 1124 775 0 1154 265 1436 762 221 1351 716 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 14.7 0.0 11.7 14.8 0.0 11.6 17.9 11.2 11.2 18.4 11.2 11.2 Incr Delay (d2), s/veh 0.4 0.0 0.7 0.3 0.0 0.6 5.3 0.9 1.7 4.4 0.4 0.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 0.0 1.6 0.7 0.0 1.5 1.0 2.1 2.4 0.6 1.5 1.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 15.0 0.0 12.4 15.1 0.0 12.2 23.3 12.2 13.0 22.8 11.6 11.9 LnGrp LOS B A B B A B C B B C B B
Approach Vol, veh/h 351 326 1313 950
Approach Delay, s/veh 13.2 13.0 13.3 12.4
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.5 17.9 15.9 7.4 17.0 15.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 17.0 26.0 6.0 16.0 26.0 Max Q Clear Time (g_c+I1), s 3.4 10.0 9.6 4.3 7.6 9.5
Green Ext Time (p_c), s 0.0 3.9 1.8 0.0 3.3 1.6
Intersection Summary
HCM 6th Ctrl Delay 13.0
HCM 6th LOS B
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 2: Date Palm Drive & Rosemount Road 05/28/2024
Project Completion Year 2027 Synchro 11 Report
Timing Plan: PM Peak
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 73 302 1163 42 262 686
Future Volume (veh/h) 73 302 1163 42 262 686
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 79 328 1264 46 285 746
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2
Cap, veh/h 451 402 1605 58 340 3000
Arrive On Green 0.25 0.25 0.32 0.32 0.19 0.59
Sat Flow, veh/h 1781 1585 5226 184 1781 5274
Grp Volume(v), veh/h 79 328 851 459 285 746
Grp Sat Flow(s),veh/h/ln 1781 1585 1702 1837 1781 1702
Q Serve(g_s), s 1.7 9.8 11.4 11.4 7.8 3.5
Cycle Q Clear(g_c), s 1.7 9.8 11.4 11.4 7.8 3.5
Prop In Lane 1.00 1.00 0.10 1.00
Lane Grp Cap(c), veh/h 451 402 1080 583 340 3000
V/C Ratio(X) 0.18 0.82 0.79 0.79 0.84 0.25
Avail Cap(c_a), veh/h 744 662 1151 621 354 3147
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 14.7 17.7 15.6 15.6 19.6 5.0
Incr Delay (d2), s/veh 0.2 4.1 3.5 6.4 15.7 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 3.6 4.3 5.1 4.3 0.8
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 14.9 21.8 19.2 22.0 35.3 5.1
LnGrp LOS B C B C D A
Approach Vol, veh/h 407 1310 1031
Approach Delay, s/veh 20.4 20.1 13.4
Approach LOS C C B
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 13.6 20.0 33.6 16.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 10.0 17.0 31.0 21.0
Max Q Clear Time (g_c+I1), s 9.8 13.4 5.5 11.8
Green Ext Time (p_c), s 0.0 2.5 5.6 1.0
Intersection Summary
HCM 6th Ctrl Delay 17.7
HCM 6th LOS B
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 3: Date Palm Drive & 30th Avenue 05/28/2024
Project Completion Year 2027 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 94 142 121 25 132 148 308 1098 21 32 812 106 Future Volume (veh/h) 94 142 121 25 132 148 308 1098 21 32 812 106 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 104 158 134 28 147 164 342 1220 23 36 902 118 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 133 371 309 55 289 244 403 2416 46 67 1278 167 Arrive On Green 0.07 0.20 0.20 0.03 0.15 0.15 0.23 0.47 0.47 0.04 0.28 0.28 Sat Flow, veh/h 1781 1870 1560 1781 1870 1582 1781 5159 97 1781 4568 595 Grp Volume(v), veh/h 104 158 134 28 147 164 342 805 438 36 671 349 Grp Sat Flow(s),veh/h/ln 1781 1870 1560 1781 1870 1582 1781 1702 1852 1781 1702 1759 Q Serve(g_s), s 3.5 4.5 4.5 0.9 4.4 5.9 11.1 9.9 9.9 1.2 10.7 10.8 Cycle Q Clear(g_c), s 3.5 4.5 4.5 0.9 4.4 5.9 11.1 9.9 9.9 1.2 10.7 10.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.05 1.00 0.34
Lane Grp Cap(c), veh/h 133 371 309 55 289 244 403 1594 867 67 952 492 V/C Ratio(X) 0.78 0.43 0.43 0.51 0.51 0.67 0.85 0.50 0.51 0.54 0.70 0.71 Avail Cap(c_a), veh/h 177 836 698 148 805 681 590 2030 1105 177 1240 641 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.4 21.2 21.2 28.8 23.4 24.1 22.4 11.2 11.2 28.5 19.5 19.5 Incr Delay (d2), s/veh 14.7 0.8 1.0 7.0 1.4 3.2 7.7 0.2 0.5 6.6 1.3 2.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.9 1.8 1.5 0.5 1.8 2.2 4.9 2.9 3.2 0.6 3.5 3.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 42.2 22.0 22.2 35.8 24.8 27.3 30.1 11.4 11.6 35.1 20.8 22.0 LnGrp LOS D C C D C C C B B D C C
Approach Vol, veh/h 396 339 1585 1056
Approach Delay, s/veh 27.4 26.9 15.5 21.7
Approach LOS C C B C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.3 32.3 5.9 16.0 17.6 20.9 8.5 13.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 36.0 5.0 27.0 20.0 22.0 6.0 26.0 Max Q Clear Time (g_c+I1), s 3.2 11.9 2.9 6.5 13.1 12.8 5.5 7.9 Green Ext Time (p_c), s 0.0 8.3 0.0 1.1 0.6 3.9 0.0 1.1 Intersection Summary
HCM 6th Ctrl Delay 20.0
HCM 6th LOS B
HCM 6th TWSC Date Palm Drive Mixed Use
4: Date Palm Drive & Tachevah Drive 05/28/2024
Project Completion Year 2027 Synchro 11 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 26 73 97 1156 914 55
Future Vol, veh/h 26 73 97 1156 914 55
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 250 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 27 74 99 1180 933 56

Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1631 495 989 0 - 0
Stage 1 961 - - - - -
Stage 2 670 - - - - -
Critical Hdwy 5.74 7.14 5.34 - - -
Critical Hdwy Stg 1 6.64 - - - - -
Critical Hdwy Stg 2 6.04 - - - - -
Follow-up Hdwy 3.82 3.92 3.12 - - -
Pot Cap-1 Maneuver 147 445 396 - - -
Stage 1 255 - - - - -
Stage 2 428 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 110 445 396 - - -
Mov Cap-2 Maneuver 110 - - - - -
Stage 1 191 - - - - -
Stage 2 428 - - - - -

Approach EB NB SB
HCM Control Delay, s 29.3 1.3 0

HCM LOS D

Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 396 - 247 - -
HCM Lane V/C Ratio 0.25 - 0.409 - -
HCM Control Delay (s) 17.1 - 29.3 - -
HCM Lane LOS C - D - -
HCM 95th %tile Q(veh) 1 - 1.9 - -
HCM 6th TWSC Date Palm Drive Mixed Use
5: Date Palm Drive & Project Driveway 05/28/2024
Project Completion Year 2027 Synchro 11 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.8
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 87 1146 27 0 855
Future Vol, veh/h 0 87 1146 27 0 855
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 97 1273 30 0 950

Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 652 0 0 - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 352 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 352 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -

Approach WB NB SB
HCM Control Delay, s 19.1 0 0

HCM LOS C

Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h) - - 352 -
HCM Lane V/C Ratio - - 0.275 -
HCM Control Delay (s) - - 19.1 -
HCM Lane LOS - - C -
HCM 95th %tile Q(veh) - - 1.1 -
HCM 6th TWSC Date Palm Drive Mixed Use
6: San Vicente Avenue/Existing Driveway & McCallum Way 05/28/2024 Project Completion Year 2027 Synchro 11 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 1.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 27 251 0 0 275 13 0 0 0 14 0 29
Future Vol, veh/h 27 251 0 0 275 13 0 0 0 14 0 29
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 29 273 0 0 299 14 0 0 0 15 0 32

Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 313 0 0 273 0 0 653 644 273 637 637 306 Stage 1 - - - - - - 331 331 - 306 306 -
Stage 2 - - - - - - 322 313 - 331 331 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1247 - - 1290 - - 380 391 766 390 395 734 Stage 1 - - - - - - 682 645 - 704 662 -
Stage 2 - - - - - - 690 657 - 682 645 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1247 - - 1290 - - 356 380 766 382 384 734 Mov Cap-2 Maneuver - - - - - - 356 380 - 382 384 -
Stage 1 - - - - - - 664 628 - 685 662 -
Stage 2 - - - - - - 660 657 - 664 628 -

Approach EB WB NB SB
HCM Control Delay, s 0.8 0 0 11.9

HCM LOS A B

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1247 - - 1290 - - 565
HCM Lane V/C Ratio - 0.024 - - - - - 0.083
HCM Control Delay (s) 0 8 0 - 0 - - 11.9
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0.1 - - 0 - - 0.3
APPENDIX F ‐
CUMULATIVE PROJECT TRIP DISTRIBUTION/ASSIGNMENT
Date Palm Drive Mixed Use
Cumulative Project Locations
Figure 6-1
LEGEND # Cumulative Project
1 PROJECT SITE
4 5
6 1
3 7 See Cathedral Cove Center TA Excerpts below
Kroger Gas Station
Project Study Area and Trip Distribution
Figure 1-2
# Intersection Project Driveway Roadway SegmentLEGEND

PROJECT SITE
4 10%10%
30%30%
10%10%
20%20%
10%10%
5%5%5%5%
1 2
30%30%
3 5
5 Kroger Gas Station
Project Intersection Volumes
Figure 1-3
(AM/PM) Peak Hour Volumes
LEGEND
6 The Wren Project
Project Study Area and Trip Distribution
Attachment 2
LEGEND # Intersection

PROJECT SITE
25%
40%
35%
35%
40%
2 1
3 35%
20%
80%15% %
55%
Wren Project
Trip Assignment

Vallarta Shopping Center
Trip Assignment
LEGEND # Intersection

PROJECT SITE
20%
10%
20%
5%
5%
5%
5%
4 5%
5%
1 5%25%
3 20%
265%
15%
25%
Vallarta Shopping Center
Trip Assignment

MOUNTAIN VIEW ESTATES ______________________________________________________________________________________ TRAFFIC IMPACT ANALYSIS

Page 21 ends

Exhibit 4-2 shows the forecast trip percent distribution of the propo sed project within the study area and the trip assignment percentages for each intersection movement.

EXHIBIT 4-2: PROJECT TRAFFIC DISTRIBUTION AND ASSIGNMENT PERCENTAGES

MOUNTAIN VIEW ESTATES ______________________________________________________________________________________ TRAFFIC IMPACT ANALYSIS

Page 22 ends

Exhibit 4-3 shows the corresponding forecast assignment of the AM Pea k Hour and PM Peak Hour project- generated trips assuming the trip percent distribution shown in Exhibit 4-2.

EXHIBIT 4-3: PROJECT TRAFFIC PEAK HOUR TRIP ASSIGNMENT

29 30

TRAFFIC ENGINEERING &

TRANSPORTATION PLANNING

CONSULTANTS
TJW ENGINEERING, INC.

Not to Scale
TEG-19-001 Tower Market Traffic Impact Analysis

ORTEGA RD

DATE PALM DR

RAMON RD

DINAH SHORE DR

ORTEGA RD
DRWY
DRWY

DATE PALM DR
Exhibit 5: Projected Trip Distribution of Proposed Project Trips Legend:

XX%
Study Intersection Location
Percent Trip Distribution (both directions)
2 X
1 10%
[Inbound] Percent Trip Distribution[XX%]
(Outbound) Percent Trip Distribution(XX%)
15%
3 5
4 25
4 15%
35%
35%
15%10% 10%
10% 10%

2.5% 2.5%
15%
(35)%
(50%)
(15%)
35%
(35%)
50%
(35%)
(15%)
15%
35%
(35%)
19|page

TRAFFIC ENGINEERING &

TRANSPORTATION PLANNING

CONSULTANTS
TJW ENGINEERING, INC.

Not to Scale
TEG-19-001 Tower Market Traffic Impact Analysis

ORTEGA RD

DATE PALM DR

RAMON RD

DINAH SHORE DR

ORTEGA RD
DRWY
DRWY

DATE PALM DR
Exhibit 6: Proposed Project Trip Assignment
1 2
4 5
3 DATE PALM DR
DRWY
ORTEGA
RD

DATE PALM DR
RAMON
RD

DATE PALM DR
DINAH

SHORE DR
1 2
3 Legend:

Project Site
Study Intersection Location
XX/XX AM/PM Peak Hour Trip Assignment
X
9/10
9/10
9/10
9/10
9/10
9/10
33/36
33/36
14/1663/70
-16/-18
33/36
14/16
19/21
-5/-5
ORTEGA
RD

DATE PALM DR
DRWY 4
5 30/34
52/57
33/3644/48
14/16
9/10
9/10
25 4
9/10
14/16
9/10
-11/-12
44/48
20|page
32 33
EXHIBIT 4-5: CUMULATIVE DEVELOPMENT MAP
Cathedral Cove Center Traffic Analysis
_N
12962 - 08 - CD Map.mxd

TERRACE RD
D ST
DAT
E PALM
DR
CATH
ED
RAL
CYN DR
P3
P4
P2
P1
C8
C7
C6C5C4
C9C3
C2
C1
C11
C13
C14
C16
C12 C17
C18
C19
C15
C10
RM8
RM6
RM4
RM9
RM5
RM7
RM2
RM1
RM11
RM32
RM10
RM16
RM21
RM19
RM17 RM15
RM31
RM26
RM27
RM28
RM12
RM13
RM23
RM25
RM29
RM30
RM24
SITE
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
34 45
46 APPENDIX G ‐
CUMULATIVE CONDITIONS PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 1: Date Palm Drive & McCallum Way 05/30/2024
Cumulative Year 2027 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 91 228 106 67 157 83 46 638 48 112 1137 74 Future Volume (veh/h) 91 228 106 67 157 83 46 638 48 112 1137 74 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 101 253 118 74 174 92 51 709 53 124 1263 82 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 401 402 188 320 384 203 93 1484 110 160 1680 109 Arrive On Green 0.34 0.34 0.34 0.34 0.34 0.34 0.05 0.31 0.31 0.09 0.34 0.34 Sat Flow, veh/h 1112 1200 560 1010 1145 605 1781 4844 360 1781 4887 317 Grp Volume(v), veh/h 101 0 371 74 0 266 51 497 265 124 880 465 Grp Sat Flow(s),veh/h/ln 1112 0 1759 1010 0 1750 1781 1702 1800 1781 1702 1801 Q Serve(g_s), s 3.5 0.0 7.9 3.0 0.0 5.3 1.2 5.3 5.4 3.0 10.2 10.2 Cycle Q Clear(g_c), s 8.8 0.0 7.9 10.9 0.0 5.3 1.2 5.3 5.4 3.0 10.2 10.2 Prop In Lane 1.00 0.32 1.00 0.35 1.00 0.20 1.00 0.18
Lane Grp Cap(c), veh/h 401 0 590 320 0 587 93 1043 551 160 1170 619 V/C Ratio(X) 0.25 0.00 0.63 0.23 0.00 0.45 0.55 0.48 0.48 0.77 0.75 0.75 Avail Cap(c_a), veh/h 675 0 1023 569 0 1018 199 1066 564 319 1294 685 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 15.1 0.0 12.5 17.1 0.0 11.6 20.7 12.6 12.6 19.9 13.0 13.0 Incr Delay (d2), s/veh 0.3 0.0 1.1 0.4 0.0 0.5 4.9 0.3 0.7 7.7 2.3 4.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 0.0 2.8 0.7 0.0 1.8 0.6 1.5 1.7 1.4 3.1 3.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 15.4 0.0 13.6 17.5 0.0 12.2 25.5 12.9 13.3 27.7 15.3 17.2 LnGrp LOS B A B B A B C B B C B B
Approach Vol, veh/h 472 340 813 1469
Approach Delay, s/veh 14.0 13.3 13.8 16.9
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 8.0 17.7 19.0 6.3 19.4 19.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 8.0 14.0 26.0 5.0 17.0 26.0 Max Q Clear Time (g_c+I1), s 5.0 7.4 10.8 3.2 12.2 12.9 Green Ext Time (p_c), s 0.1 2.4 2.6 0.0 3.1 1.7
Intersection Summary
HCM 6th Ctrl Delay 15.3
HCM 6th LOS B
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 2: Date Palm Drive & Rosemount Road 05/30/2024
Cumulative Year 2027 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 56 56 70 74 79 229 98 696 45 169 1129 79 Future Volume (veh/h) 56 56 70 74 79 229 98 696 45 169 1129 79 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 61 61 76 80 86 249 107 757 49 184 1227 86 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 99 163 204 166 107 311 137 1291 83 230 1539 108 Arrive On Green 0.06 0.22 0.22 0.09 0.25 0.25 0.08 0.26 0.26 0.13 0.32 0.32 Sat Flow, veh/h 1781 757 943 1781 423 1226 1781 4902 316 1781 4872 341 Grp Volume(v), veh/h 61 0 137 80 0 335 107 525 281 184 857 456 Grp Sat Flow(s),veh/h/ln 1781 0 1701 1781 0 1650 1781 1702 1813 1781 1702 1809 Q Serve(g_s), s 1.8 0.0 3.7 2.3 0.0 10.2 3.2 7.2 7.2 5.4 12.3 12.4 Cycle Q Clear(g_c), s 1.8 0.0 3.7 2.3 0.0 10.2 3.2 7.2 7.2 5.4 12.3 12.4 Prop In Lane 1.00 0.55 1.00 0.74 1.00 0.17 1.00 0.19
Lane Grp Cap(c), veh/h 99 0 367 166 0 418 137 896 478 230 1075 571 V/C Ratio(X) 0.62 0.00 0.37 0.48 0.00 0.80 0.78 0.59 0.59 0.80 0.80 0.80 Avail Cap(c_a), veh/h 166 0 666 166 0 646 166 952 507 266 1143 607 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.8 0.0 17.9 23.1 0.0 18.8 24.3 17.2 17.2 22.7 16.8 16.8 Incr Delay (d2), s/veh 6.1 0.0 0.6 2.2 0.0 4.1 17.7 0.8 1.6 13.9 3.8 7.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 0.0 1.4 1.0 0.0 3.9 1.9 2.6 2.9 3.0 4.8 5.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 30.8 0.0 18.6 25.2 0.0 22.8 42.1 18.0 18.8 36.6 20.6 23.8 LnGrp LOS C A B C A C D B B D C C
Approach Vol, veh/h 198 415 913 1497
Approach Delay, s/veh 22.3 23.3 21.1 23.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.9 18.1 9.0 15.6 8.1 20.9 7.0 17.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 15.0 5.0 21.0 5.0 18.0 5.0 21.0 Max Q Clear Time (g_c+I1), s 7.4 9.2 4.3 5.7 5.2 14.4 3.8 12.2 Green Ext Time (p_c), s 0.0 2.5 0.0 0.6 0.0 2.6 0.0 1.4 Intersection Summary
HCM 6th Ctrl Delay 22.7
HCM 6th LOS C
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 3: Date Palm Drive & 30th Avenue 05/30/2024
Cumulative Year 2027 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 105 268 135 81 143 167 180 756 40 233 1220 70 Future Volume (veh/h) 105 268 135 81 143 167 180 756 40 233 1220 70 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 114 291 147 88 155 182 196 822 43 253 1326 76 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 133 441 361 113 419 345 238 1481 77 292 1624 93 Arrive On Green 0.07 0.24 0.24 0.06 0.22 0.22 0.13 0.30 0.30 0.16 0.33 0.33 Sat Flow, veh/h 1781 1870 1532 1781 1870 1537 1781 4968 259 1781 4939 283 Grp Volume(v), veh/h 114 291 147 88 155 182 196 563 302 253 914 488 Grp Sat Flow(s),veh/h/ln 1781 1870 1532 1781 1870 1537 1781 1702 1823 1781 1702 1818 Q Serve(g_s), s 4.2 9.4 5.4 3.3 4.7 7.0 7.2 9.3 9.4 9.3 16.5 16.5 Cycle Q Clear(g_c), s 4.2 9.4 5.4 3.3 4.7 7.0 7.2 9.3 9.4 9.3 16.5 16.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.14 1.00 0.16
Lane Grp Cap(c), veh/h 133 441 361 113 419 345 238 1015 543 292 1120 598 V/C Ratio(X) 0.86 0.66 0.41 0.78 0.37 0.53 0.82 0.55 0.56 0.86 0.82 0.82 Avail Cap(c_a), veh/h 133 726 595 133 726 596 239 1118 599 292 1220 651 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.6 23.2 21.6 30.9 22.0 22.9 28.3 19.8 19.8 27.3 20.6 20.6 Incr Delay (d2), s/veh 39.2 1.7 0.7 21.9 0.5 1.3 20.3 0.5 0.9 22.6 4.1 7.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.1 3.9 1.8 2.0 1.9 2.4 4.1 3.3 3.6 5.2 5.9 6.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 69.9 24.9 22.4 52.8 22.5 24.1 48.6 20.3 20.7 49.9 24.8 28.1 LnGrp LOS E C C D C C D C C D C C
Approach Vol, veh/h 552 425 1061 1655
Approach Delay, s/veh 33.5 29.5 25.6 29.6
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 15.0 24.0 8.2 19.8 12.9 26.0 9.0 19.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 22.0 5.0 26.0 9.0 24.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 11.3 11.4 5.3 11.4 9.2 18.5 6.2 9.0 Green Ext Time (p_c), s 0.0 3.8 0.0 1.7 0.0 3.5 0.0 1.2 Intersection Summary
HCM 6th Ctrl Delay 29.0
HCM 6th LOS C
HCM 6th TWSC Date Palm Drive Mixed Use
4: Date Palm Drive & Tachevah Drive 05/30/2024
Cumulative Year 2027 Synchro 11 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 32 115 46 970 1351 13
Future Vol, veh/h 32 115 46 970 1351 13
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 250 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 33 119 47 1000 1393 13

Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1894 703 1406 0 - 0
Stage 1 1400 - - - - -
Stage 2 494 - - - - -
Critical Hdwy 5.74 7.14 5.34 - - -
Critical Hdwy Stg 1 6.64 - - - - -
Critical Hdwy Stg 2 6.04 - - - - -
Follow-up Hdwy 3.82 3.92 3.12 - - -
Pot Cap-1 Maneuver 107 326 248 - - -
Stage 1 137 - - - - -
Stage 2 529 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 87 326 248 - - -
Mov Cap-2 Maneuver 87 - - - - -
Stage 1 111 - - - - -
Stage 2 529 - - - - -

Approach EB NB SB
HCM Control Delay, s 61 1 0

HCM LOS F

Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 248 - 204 - -
HCM Lane V/C Ratio 0.191 - 0.743 - -
HCM Control Delay (s) 22.9 - 61 - -
HCM Lane LOS C - F - -
HCM 95th %tile Q(veh) 0.7 - 4.9 - -
HCM 6th TWSC Date Palm Drive Mixed Use
5: Date Palm Drive & Project Driveway 05/30/2024
Cumulative Year 2027 Synchro 11 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.1
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 23 811 13 0 1306
Future Vol, veh/h 0 23 811 13 0 1306
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 25 882 14 0 1420

Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 448 0 0 - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 477 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 477 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -

Approach WB NB SB
HCM Control Delay, s 13 0 0

HCM LOS B

Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h) - - 477 -
HCM Lane V/C Ratio - - 0.052 -
HCM Control Delay (s) - - 13 -
HCM Lane LOS - - B -
HCM 95th %tile Q(veh) - - 0.2 -
HCM 6th TWSC Date Palm Drive Mixed Use
6: San Vicente Avenue/Existing Driveway & McCallum Way 05/30/2024 Cumulative Year 2027 Synchro 11 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 13 374 0 0 298 6 0 0 0 4 0 8
Future Vol, veh/h 13 374 0 0 298 6 0 0 0 4 0 8
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 14 407 0 0 324 7 0 0 0 4 0 9

Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 331 0 0 407 0 0 767 766 407 763 763 328 Stage 1 - - - - - - 435 435 - 328 328 -
Stage 2 - - - - - - 332 331 - 435 435 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1228 - - 1152 - - 319 333 644 321 334 713 Stage 1 - - - - - - 600 580 - 685 647 -
Stage 2 - - - - - - 681 645 - 600 580 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1228 - - 1152 - - 311 328 644 317 329 713 Mov Cap-2 Maneuver - - - - - - 311 328 - 317 329 -
Stage 1 - - - - - - 591 571 - 675 647 -
Stage 2 - - - - - - 673 645 - 591 571 -

Approach EB WB NB SB
HCM Control Delay, s 0.3 0 0 12.3

HCM LOS A B

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1228 - - 1152 - - 503
HCM Lane V/C Ratio - 0.012 - - - - - 0.026
HCM Control Delay (s) 0 8 0 - 0 - - 12.3
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0 - - 0 - - 0.1
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 1: Date Palm Drive & McCallum Way 05/30/2024
Cumulative Year 2027 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 126 141 82 79 161 81 94 1238 71 95 965 84 Future Volume (veh/h) 126 141 82 79 161 81 94 1238 71 95 965 84 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 140 157 91 88 179 90 104 1376 79 106 1072 93 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 377 359 208 393 380 191 140 1688 97 141 1635 142 Arrive On Green 0.33 0.33 0.33 0.33 0.33 0.33 0.08 0.34 0.34 0.08 0.34 0.34 Sat Flow, veh/h 1109 1104 640 1130 1167 587 1781 4936 283 1781 4770 413 Grp Volume(v), veh/h 140 0 248 88 0 269 104 949 506 106 765 400 Grp Sat Flow(s),veh/h/ln 1109 0 1743 1130 0 1754 1781 1702 1815 1781 1702 1780 Q Serve(g_s), s 5.5 0.0 5.3 3.1 0.0 5.8 2.7 12.1 12.1 2.8 9.0 9.1 Cycle Q Clear(g_c), s 11.3 0.0 5.3 8.5 0.0 5.8 2.7 12.1 12.1 2.8 9.0 9.1 Prop In Lane 1.00 0.37 1.00 0.33 1.00 0.16 1.00 0.23
Lane Grp Cap(c), veh/h 377 0 568 393 0 571 140 1164 621 141 1167 610 V/C Ratio(X) 0.37 0.00 0.44 0.22 0.00 0.47 0.74 0.82 0.82 0.75 0.66 0.66 Avail Cap(c_a), veh/h 624 0 956 645 0 962 225 1220 651 188 1167 610 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.2 0.0 12.6 15.9 0.0 12.7 21.4 14.2 14.2 21.4 13.2 13.2 Incr Delay (d2), s/veh 0.6 0.0 0.5 0.3 0.0 0.6 7.5 4.2 7.6 11.0 1.3 2.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 0.0 1.9 0.8 0.0 2.1 1.2 4.0 4.9 1.4 2.7 3.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 17.8 0.0 13.1 16.2 0.0 13.3 28.9 18.5 21.9 32.4 14.5 15.8 LnGrp LOS B A B B A B C B C C B B
Approach Vol, veh/h 388 357 1559 1271
Approach Delay, s/veh 14.8 14.0 20.3 16.4
Approach LOS B B C B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.8 20.2 19.4 7.7 20.3 19.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 17.0 26.0 6.0 16.0 26.0 Max Q Clear Time (g_c+I1), s 4.8 14.1 13.3 4.7 11.1 10.5 Green Ext Time (p_c), s 0.0 2.2 1.8 0.0 2.9 1.8
Intersection Summary
HCM 6th Ctrl Delay 17.7
HCM 6th LOS B
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 2: Date Palm Drive & Rosemount Road 05/30/2024
Cumulative Year 2027 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 71 71 89 89 66 308 83 1350 55 285 870 66 Future Volume (veh/h) 71 71 89 89 66 308 83 1350 55 285 870 66 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 77 77 97 97 72 335 90 1467 60 310 946 72 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 99 171 216 123 69 323 116 1640 67 346 2203 167 Arrive On Green 0.06 0.23 0.23 0.07 0.24 0.24 0.07 0.33 0.33 0.19 0.46 0.46 Sat Flow, veh/h 1781 752 948 1781 288 1341 1781 5032 206 1781 4841 368 Grp Volume(v), veh/h 77 0 174 97 0 407 90 992 535 310 665 353 Grp Sat Flow(s),veh/h/ln 1781 0 1700 1781 0 1629 1781 1702 1833 1781 1702 1804 Q Serve(g_s), s 3.7 0.0 7.7 4.7 0.0 21.0 4.3 24.2 24.2 14.8 11.5 11.6 Cycle Q Clear(g_c), s 3.7 0.0 7.7 4.7 0.0 21.0 4.3 24.2 24.2 14.8 11.5 11.6 Prop In Lane 1.00 0.56 1.00 0.82 1.00 0.11 1.00 0.20
Lane Grp Cap(c), veh/h 99 0 387 123 0 392 116 1110 598 346 1549 821 V/C Ratio(X) 0.78 0.00 0.45 0.79 0.00 1.04 0.78 0.89 0.89 0.90 0.43 0.43 Avail Cap(c_a), veh/h 123 0 409 123 0 392 204 1132 610 368 1549 821 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 40.6 0.0 29.0 40.0 0.0 33.1 40.1 28.0 28.0 34.3 16.1 16.1 Incr Delay (d2), s/veh 21.9 0.0 0.8 28.7 0.0 55.4 10.6 9.3 15.5 22.8 0.2 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.2 0.0 3.2 3.0 0.0 14.0 2.2 10.8 12.7 8.4 4.3 4.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 62.6 0.0 29.8 68.6 0.0 88.4 50.7 37.2 43.5 57.1 16.3 16.5 LnGrp LOS E A C E A F D D D E B B
Approach Vol, veh/h 251 504 1617 1328
Approach Delay, s/veh 39.8 84.6 40.0 25.8
Approach LOS D F D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 20.9 32.4 10.0 23.8 9.7 43.7 8.8 25.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 18.0 29.0 6.0 21.0 10.0 37.0 6.0 21.0 Max Q Clear Time (g_c+I1), s 16.8 26.2 6.7 9.7 6.3 13.6 5.7 23.0 Green Ext Time (p_c), s 0.1 2.2 0.0 0.7 0.1 7.4 0.0 0.0 Intersection Summary
HCM 6th Ctrl Delay 41.0
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.

HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 3: Date Palm Drive & 30th Avenue 05/30/2024
Cumulative Year 2027 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 94 142 137 41 132 148 326 1321 39 32 1052 106 Future Volume (veh/h) 94 142 137 41 132 148 326 1321 39 32 1052 106 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 102 154 149 45 143 161 354 1436 42 35 1143 115 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 130 409 335 73 349 286 400 2463 72 62 1383 139 Arrive On Green 0.07 0.22 0.22 0.04 0.19 0.19 0.22 0.48 0.48 0.03 0.29 0.29 Sat Flow, veh/h 1781 1870 1530 1781 1870 1531 1781 5098 149 1781 4713 474 Grp Volume(v), veh/h 102 154 149 45 143 161 354 959 519 35 825 433 Grp Sat Flow(s),veh/h/ln 1781 1870 1530 1781 1870 1531 1781 1702 1843 1781 1702 1783 Q Serve(g_s), s 4.1 5.1 6.1 1.8 4.9 6.9 13.9 14.6 14.6 1.4 16.3 16.3 Cycle Q Clear(g_c), s 4.1 5.1 6.1 1.8 4.9 6.9 13.9 14.6 14.6 1.4 16.3 16.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.08 1.00 0.27
Lane Grp Cap(c), veh/h 130 409 335 73 349 286 400 1645 891 62 999 523 V/C Ratio(X) 0.78 0.38 0.45 0.61 0.41 0.56 0.88 0.58 0.58 0.56 0.83 0.83 Avail Cap(c_a), veh/h 148 674 551 148 674 552 469 1699 920 148 1086 569 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.9 24.0 24.4 34.0 25.8 26.6 27.1 13.4 13.4 34.3 23.8 23.8 Incr Delay (d2), s/veh 21.0 0.6 0.9 8.0 0.8 1.7 16.2 0.5 0.9 7.7 5.0 9.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.4 2.1 2.1 0.9 2.0 2.4 7.1 4.6 5.1 0.7 6.2 7.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 53.8 24.6 25.3 42.0 26.6 28.4 43.2 13.9 14.3 42.0 28.8 32.9 LnGrp LOS D C C D C C D B B D C C
Approach Vol, veh/h 405 349 1832 1293
Approach Delay, s/veh 32.2 29.4 19.7 30.5
Approach LOS C C B C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.5 38.8 7.0 19.8 20.2 25.2 9.3 17.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 36.0 6.0 26.0 19.0 23.0 6.0 26.0 Max Q Clear Time (g_c+I1), s 3.4 16.6 3.8 8.1 15.9 18.3 6.1 8.9 Green Ext Time (p_c), s 0.0 9.3 0.0 1.1 0.3 2.8 0.0 1.1 Intersection Summary
HCM 6th Ctrl Delay 25.5
HCM 6th LOS C
HCM 6th TWSC Date Palm Drive Mixed Use
4: Date Palm Drive & Tachevah Drive 05/30/2024
Cumulative Year 2027 Synchro 11 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 2.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 26 73 97 1379 1154 55
Future Vol, veh/h 26 73 97 1379 1154 55
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 250 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 27 75 100 1422 1190 57

Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1988 624 1247 0 - 0
Stage 1 1219 - - - - -
Stage 2 769 - - - - -
Critical Hdwy 5.74 7.14 5.34 - - -
Critical Hdwy Stg 1 6.64 - - - - -
Critical Hdwy Stg 2 6.04 - - - - -
Follow-up Hdwy 3.82 3.92 3.12 - - -
Pot Cap-1 Maneuver 95 367 297 - - -
Stage 1 177 - - - - -
Stage 2 379 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 63 367 297 - - -
Mov Cap-2 Maneuver 63 - - - - -
Stage 1 117 - - - - -
Stage 2 379 - - - - -

Approach EB NB SB
HCM Control Delay, s 59 1.5 0

HCM LOS F

Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 297 - 162 - -
HCM Lane V/C Ratio 0.337 - 0.63 - -
HCM Control Delay (s) 23.2 - 59 - -
HCM Lane LOS C - F - -
HCM 95th %tile Q(veh) 1.4 - 3.5 - -
HCM 6th TWSC Date Palm Drive Mixed Use
5: Date Palm Drive & Project Driveway 05/30/2024
Cumulative Year 2027 Synchro 11 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.8
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 87 1416 27 0 1150
Future Vol, veh/h 0 87 1416 27 0 1150
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 95 1539 29 0 1250

Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 784 0 0 - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 288 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 288 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -

Approach WB NB SB
HCM Control Delay, s 23.5 0 0

HCM LOS C

Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h) - - 288 -
HCM Lane V/C Ratio - - 0.328 -
HCM Control Delay (s) - - 23.5 -
HCM Lane LOS - - C -
HCM 95th %tile Q(veh) - - 1.4 -
HCM 6th TWSC Date Palm Drive Mixed Use
6: San Vicente Avenue/Existing Driveway & McCallum Way 05/30/2024 Cumulative Year 2027 Synchro 11 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 1.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 27 290 0 0 303 13 0 0 0 14 0 29
Future Vol, veh/h 27 290 0 0 303 13 0 0 0 14 0 29
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 29 315 0 0 329 14 0 0 0 15 0 32

Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 343 0 0 315 0 0 725 716 315 709 709 336 Stage 1 - - - - - - 373 373 - 336 336 -
Stage 2 - - - - - - 352 343 - 373 373 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1216 - - 1245 - - 340 356 725 349 359 706 Stage 1 - - - - - - 648 618 - 678 642 -
Stage 2 - - - - - - 665 637 - 648 618 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1216 - - 1245 - - 318 346 725 341 349 706 Mov Cap-2 Maneuver - - - - - - 318 346 - 341 349 -
Stage 1 - - - - - - 629 600 - 658 642 -
Stage 2 - - - - - - 635 637 - 629 600 -

Approach EB WB NB SB
HCM Control Delay, s 0.7 0 0 12.5

HCM LOS A B

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1216 - - 1245 - - 524
HCM Lane V/C Ratio - 0.024 - - - - - 0.089
HCM Control Delay (s) 0 8 0 - 0 - - 12.5
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0.1 - - 0 - - 0.3
APPENDIX H ‐

WITH IMPROVEMENTS PEAK HOUR ANALYSIS AND SIGNAL

WARRANT WORKSHEETS
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 4: Date Palm Drive & Tachevah Drive 05/28/2024
Project Completion Year 2027 With Improvements Synchro 11 Report Timing Plan: AM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 32 115 46 814 1193 13
Future Volume (veh/h) 32 115 46 814 1193 13
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 33 119 47 839 1230 13
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 2 2 2 2 2 2
Cap, veh/h 43 156 96 3121 2213 23
Arrive On Green 0.12 0.12 0.05 0.61 0.42 0.42
Sat Flow, veh/h 351 1264 1781 5274 5378 55
Grp Volume(v), veh/h 153 0 47 839 804 439
Grp Sat Flow(s),veh/h/ln 1625 0 1781 1702 1702 1860
Q Serve(g_s), s 2.7 0.0 0.8 2.3 5.4 5.4
Cycle Q Clear(g_c), s 2.7 0.0 0.8 2.3 5.4 5.4
Prop In Lane 0.22 0.78 1.00 0.03
Lane Grp Cap(c), veh/h 201 0 96 3121 1446 790
V/C Ratio(X) 0.76 0.00 0.49 0.27 0.56 0.56
Avail Cap(c_a), veh/h 1292 0 295 4735 2142 1171
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 12.8 0.0 13.9 2.7 6.5 6.5
Incr Delay (d2), s/veh 5.8 0.0 3.8 0.0 0.3 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.1 0.0 0.3 0.0 0.5 0.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 18.6 0.0 17.7 2.8 6.9 7.2
LnGrp LOS B A B A A A
Approach Vol, veh/h 153 886 1243
Approach Delay, s/veh 18.6 3.6 7.0
Approach LOS B A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 22.5 7.7 5.6 16.8
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 28.0 24.0 5.0 19.0
Max Q Clear Time (g_c+I1), s 4.3 4.7 2.8 7.4
Green Ext Time (p_c), s 5.2 0.4 0.0 5.5
Intersection Summary
HCM 6th Ctrl Delay 6.4
HCM 6th LOS A
Notes
User approved volume balancing among the lanes for turning movement.

HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 4: Date Palm Drive & Tachevah Drive 05/28/2024
Project Completion Year 2027 With Improvements Synchro 11 Report Timing Plan: PM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 26 73 97 1156 914 55
Future Volume (veh/h) 26 73 97 1156 914 55
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 27 74 99 1180 933 56
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 2 2 2 2 2 2
Cap, veh/h 43 117 172 3109 1803 108
Arrive On Green 0.10 0.10 0.10 0.61 0.37 0.37
Sat Flow, veh/h 433 1186 1781 5274 5095 295
Grp Volume(v), veh/h 102 0 99 1180 644 345
Grp Sat Flow(s),veh/h/ln 1635 0 1781 1702 1702 1817
Q Serve(g_s), s 1.6 0.0 1.5 3.2 4.0 4.1
Cycle Q Clear(g_c), s 1.6 0.0 1.5 3.2 4.0 4.1
Prop In Lane 0.26 0.73 1.00 0.16
Lane Grp Cap(c), veh/h 161 0 172 3109 1246 665
V/C Ratio(X) 0.63 0.00 0.58 0.38 0.52 0.52
Avail Cap(c_a), veh/h 1435 0 521 5228 1992 1063
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 11.9 0.0 11.8 2.7 6.8 6.8
Incr Delay (d2), s/veh 4.1 0.0 3.0 0.1 0.3 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.0 0.4 0.0 0.4 0.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 15.9 0.0 14.8 2.8 7.1 7.4
LnGrp LOS B A B A A A
Approach Vol, veh/h 102 1279 989
Approach Delay, s/veh 15.9 3.7 7.2
Approach LOS B A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 20.7 6.7 6.6 14.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 28.0 24.0 8.0 16.0
Max Q Clear Time (g_c+I1), s 5.2 3.6 3.5 6.1
Green Ext Time (p_c), s 7.7 0.3 0.1 3.9
Intersection Summary
HCM 6th Ctrl Delay 5.7
HCM 6th LOS A
Notes
User approved volume balancing among the lanes for turning movement.

California MUTCD 2014 Edition Rev 6 Scenario: Project Completion Year 2027 Conditions Major Approach: Date Palm Drive
Minor Approach: Tachevah Drive
Two
One or More
2066
147

APPROACH LANES

ENTER CORRECT HOURS
The plotted point falls above the applicable curve in Figure 4C-3 (Urban Areas) OR The plotted point falls above the applicable curve in Figure 4C-4 (Rural Areas) Both Approaches - Major Street
Higher Approach - Minor Street
Part B

SATISFIED
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.

ENTER PEAK HOUR VOL.

WARRANT 3 - PEAK HOUR

SATISFIED
Part A
(All parts 1, 2, and 3 below must be satisfied for the same

SATISFIED
(Part A or Part B must be satisfied)

1. The total delay experienced by traffic on one minor street approach (one direction only) controlled by a STOP sign equals or exceeds four vehicle-hours for one-lane approach, or five vehicle-hours for a two-lane approach; AND

2. The volume on the same minor street approach (one direction only) equals or exceeds 100 vph for one moving lane of traffic or 150 vph for two moving lanes; AND

3. The total entering volume serviced during the hour equals or exceeds 800 vph for intersections with four or more approaches or 650 vph for intersections with three approaches
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
0 25
50 75
100
125
150
175
200
225
250
275
300
325
350
375
400
425
300 400 500 600 700 800 900 1000 1100 1200 1300
Minor Street
Higher Volume Approach - VPH
F
Major Street
Total of Both Approaches - VPH
My Results (Minimum
Vehicles)
147

HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 4: Date Palm Drive & Tachevah Drive 05/30/2024
Cumulative Year 2027 With Improvements Synchro 11 Report Timing Plan: AM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 32 115 46 970 1351 13
Future Volume (veh/h) 32 115 46 970 1351 13
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 33 119 47 1000 1393 13
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 2 2 2 2 2 2
Cap, veh/h 43 157 95 3192 2328 22
Arrive On Green 0.12 0.12 0.05 0.63 0.45 0.45
Sat Flow, veh/h 351 1264 1781 5274 5385 49
Grp Volume(v), veh/h 153 0 47 1000 909 497
Grp Sat Flow(s),veh/h/ln 1625 0 1781 1702 1702 1862
Q Serve(g_s), s 2.9 0.0 0.8 2.9 6.4 6.4
Cycle Q Clear(g_c), s 2.9 0.0 0.8 2.9 6.4 6.4
Prop In Lane 0.22 0.78 1.00 0.03
Lane Grp Cap(c), veh/h 201 0 95 3192 1519 831
V/C Ratio(X) 0.76 0.00 0.49 0.31 0.60 0.60
Avail Cap(c_a), veh/h 1224 0 279 4485 2029 1110
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 13.5 0.0 14.7 2.8 6.7 6.7
Incr Delay (d2), s/veh 5.8 0.0 3.9 0.1 0.4 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.2 0.0 0.3 0.0 0.6 0.8
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 19.3 0.0 18.6 2.8 7.0 7.4
LnGrp LOS B A B A A A
Approach Vol, veh/h 153 1047 1406
Approach Delay, s/veh 19.3 3.5 7.2
Approach LOS B A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 23.9 7.9 5.7 18.2
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 28.0 24.0 5.0 19.0
Max Q Clear Time (g_c+I1), s 4.9 4.9 2.8 8.4
Green Ext Time (p_c), s 6.4 0.4 0.0 5.8
Intersection Summary
HCM 6th Ctrl Delay 6.4
HCM 6th LOS A
Notes
User approved volume balancing among the lanes for turning movement.

HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 4: Date Palm Drive & Tachevah Drive 05/30/2024
Cumulative Year 2027 With Improvements Synchro 11 Report Timing Plan: PM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 26 73 97 1379 1154 55
Future Volume (veh/h) 26 73 97 1379 1154 55
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 27 74 99 1407 1178 56
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 2 2 2 2 2 2
Cap, veh/h 41 113 166 3272 2075 99
Arrive On Green 0.10 0.10 0.09 0.64 0.42 0.42
Sat Flow, veh/h 433 1186 1781 5274 5163 237
Grp Volume(v), veh/h 102 0 99 1407 803 431
Grp Sat Flow(s),veh/h/ln 1635 0 1781 1702 1702 1828
Q Serve(g_s), s 1.8 0.0 1.6 4.1 5.5 5.5
Cycle Q Clear(g_c), s 1.8 0.0 1.6 4.1 5.5 5.5
Prop In Lane 0.26 0.73 1.00 0.13
Lane Grp Cap(c), veh/h 156 0 166 3272 1414 759
V/C Ratio(X) 0.66 0.00 0.60 0.43 0.57 0.57
Avail Cap(c_a), veh/h 1296 0 353 4721 2023 1086
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 13.2 0.0 13.2 2.7 6.8 6.8
Incr Delay (d2), s/veh 4.6 0.0 3.4 0.1 0.4 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.7 0.0 0.5 0.0 0.6 0.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 17.9 0.0 16.6 2.8 7.1 7.4
LnGrp LOS B A B A A A
Approach Vol, veh/h 102 1506 1234
Approach Delay, s/veh 17.9 3.7 7.2
Approach LOS B A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 23.4 6.9 6.8 16.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 28.0 24.0 6.0 18.0
Max Q Clear Time (g_c+I1), s 6.1 3.8 3.6 7.5
Green Ext Time (p_c), s 9.4 0.3 0.0 5.1
Intersection Summary
HCM 6th Ctrl Delay 5.7
HCM 6th LOS A
Notes
User approved volume balancing among the lanes for turning movement.

California MUTCD 2014 Edition Rev 6 Scenario: Cumulative Year 2027 Conditions Major Approach: Date Palm Drive
Minor Approach: Tachevah Drive
Two
One or More
2380
147

APPROACH LANES

ENTER CORRECT HOURS
The plotted point falls above the applicable curve in Figure 4C-3 (Urban Areas) OR The plotted point falls above the applicable curve in Figure 4C-4 (Rural Areas) Both Approaches - Major Street
Higher Approach - Minor Street
Part B

SATISFIED
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.

ENTER PEAK HOUR VOL.

WARRANT 3 - PEAK HOUR

SATISFIED
Part A
(All parts 1, 2, and 3 below must be satisfied for the same

SATISFIED
(Part A or Part B must be satisfied)

1. The total delay experienced by traffic on one minor street approach (one direction only) controlled by a STOP sign equals or exceeds four vehicle-hours for one-lane approach, or five vehicle-hours for a two-lane approach; AND

2. The volume on the same minor street approach (one direction only) equals or exceeds 100 vph for one moving lane of traffic or 150 vph for two moving lanes; AND

3. The total entering volume serviced during the hour equals or exceeds 800 vph for intersections with four or more approaches or 650 vph for intersections with three approaches
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
0 25
50 75
100
125
150
175
200
225
250
275
300
325
350
375
400
425
300 400 500 600 700 800 900 1000 1100 1200 1300
Minor Street
Higher Volume Approach - VPH
F
Major Street
Total of Both Approaches - VPH
My Results (Minimum
Vehicles)
147

APPENDIX J ‐
INTERSECTION 2 SIGNAL WARRANT WORKSHEETS
California MUTCD 2014 Edition Rev 6 Scenario: Project Completion Year 2027 Conditions Major Approach: Date Palm Drive
Minor Approach: Rosemount Road
Two
One or More
2153
375

APPROACH LANES

ENTER CORRECT HOURS
The plotted point falls above the applicable curve in Figure 4C-3 (Urban Areas) OR The plotted point falls above the applicable curve in Figure 4C-4 (Rural Areas) Both Approaches - Major Street
Higher Approach - Minor Street
Part B

SATISFIED
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.

ENTER PEAK HOUR VOL.

WARRANT 3 - PEAK HOUR

SATISFIED
Part A
(All parts 1, 2, and 3 below must be satisfied for the same

SATISFIED
(Part A or Part B must be satisfied)

1. The total delay experienced by traffic on one minor street approach (one direction only) controlled by a STOP sign equals or exceeds four vehicle-hours for one-lane approach, or five vehicle-hours for a two-lane approach; AND

2. The volume on the same minor street approach (one direction only) equals or exceeds 100 vph for one moving lane of traffic or 150 vph for two moving lanes; AND

3. The total entering volume serviced during the hour equals or exceeds 800 vph for intersections with four or more approaches or 650 vph for intersections with three approaches
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
0 25
50 75
100
125
150
175
200
225
250
275
300
325
350
375
400
425
300 400 500 600 700 800 900 1000 1100 1200 1300
Minor Street
Higher Volume Approach - VPH
F
Major Street
Total of Both Approaches - VPH
My Results (Minimum
Vehicles)
375

California MUTCD 2014 Edition Rev 6 Scenario: Cumulative Year 2027 Conditions Major Approach: Date Palm Drive
Minor Approach: Rosemount Road
Two
One or More
2709
463

APPROACH LANES

ENTER CORRECT HOURS
The plotted point falls above the applicable curve in Figure 4C-3 (Urban Areas) OR The plotted point falls above the applicable curve in Figure 4C-4 (Rural Areas) Both Approaches - Major Street
Higher Approach - Minor Street
Part B

SATISFIED
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.

ENTER PEAK HOUR VOL.

WARRANT 3 - PEAK HOUR

SATISFIED
Part A
(All parts 1, 2, and 3 below must be satisfied for the same

SATISFIED
(Part A or Part B must be satisfied)

1. The total delay experienced by traffic on one minor street approach (one direction only) controlled by a STOP sign equals or exceeds four vehicle-hours for one-lane approach, or five vehicle-hours for a two-lane approach; AND

2. The volume on the same minor street approach (one direction only) equals or exceeds 100 vph for one moving lane of traffic or 150 vph for two moving lanes; AND

3. The total entering volume serviced during the hour equals or exceeds 800 vph for intersections with four or more approaches or 650 vph for intersections with three approaches
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
0 50
100
150
200
250
300
350
400
450
500
300 400 500 600 700 800 900 1000 1100 1200 1300
Minor Street
Higher Volume Approach - VPH
F
Major Street
Total of Both Approaches - VPH
My Results (Minimum
Vehicles)
463

APPENDIX J ‐
SCENARIO 1 AM PEAK HOUR ANALYSIS AND SIGNAL

WARRANT WORKSHEETS
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 1: Date Palm Drive & McCallum Way 05/28/2024
Synchro 11 ReportProject (Scenario 1) Completion Year 2027 Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 59 225 106 67 158 48 46 499 48 95 981 53 Future Volume (veh/h) 59 225 106 67 158 48 46 499 48 95 981 53 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 66 250 118 74 176 53 51 554 53 106 1090 59 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 444 400 189 331 461 139 95 1404 133 150 1619 88 Arrive On Green 0.33 0.33 0.33 0.33 0.33 0.33 0.05 0.30 0.30 0.08 0.33 0.33 Sat Flow, veh/h 1150 1195 564 1013 1379 415 1781 4742 449 1781 4950 268 Grp Volume(v), veh/h 66 0 368 74 0 229 51 396 211 106 749 400 Grp Sat Flow(s),veh/h/ln 1150 0 1759 1013 0 1794 1781 1702 1787 1781 1702 1814 Q Serve(g_s), s 2.0 0.0 7.4 2.8 0.0 4.1 1.2 3.9 4.0 2.4 8.0 8.0 Cycle Q Clear(g_c), s 6.1 0.0 7.4 10.2 0.0 4.1 1.2 3.9 4.0 2.4 8.0 8.0 Prop In Lane 1.00 0.32 1.00 0.23 1.00 0.25 1.00 0.15
Lane Grp Cap(c), veh/h 444 0 588 331 0 600 95 1008 529 150 1114 593 V/C Ratio(X) 0.15 0.00 0.63 0.22 0.00 0.38 0.54 0.39 0.40 0.71 0.67 0.67 Avail Cap(c_a), veh/h 769 0 1086 618 0 1108 212 1132 594 338 1375 732 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 13.0 0.0 11.8 16.1 0.0 10.7 19.4 11.8 11.8 18.8 12.2 12.2 Incr Delay (d2), s/veh 0.2 0.0 1.1 0.3 0.0 0.4 4.6 0.2 0.5 5.9 0.9 1.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 2.6 0.6 0.0 1.4 0.5 1.1 1.2 1.1 2.2 2.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 13.2 0.0 12.9 16.4 0.0 11.1 24.1 12.1 12.3 24.7 13.2 14.0 LnGrp LOS B A B B A B C B B C B B
Approach Vol, veh/h 434 303 658 1255
Approach Delay, s/veh 12.9 12.4 13.1 14.4
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.6 16.5 18.1 6.2 17.8 18.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 8.0 14.0 26.0 5.0 17.0 26.0 Max Q Clear Time (g_c+I1), s 4.4 6.0 9.4 3.2 10.0 12.2
Green Ext Time (p_c), s 0.1 2.2 2.5 0.0 3.8 1.4
Intersection Summary
HCM 6th Ctrl Delay 13.6
HCM 6th LOS B
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 2: Date Palm Drive & Rosemount Road 05/28/2024
Synchro 11 ReportProject (Scenario 1) Completion Year 2027 Timing Plan: AM Peak
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 63 233 582 44 186 1010
Future Volume (veh/h) 63 233 582 44 186 1010
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 68 253 633 48 202 1098
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2
Cap, veh/h 398 354 1281 96 259 2717
Arrive On Green 0.22 0.22 0.26 0.26 0.15 0.53
Sat Flow, veh/h 1781 1585 5012 365 1781 5274
Grp Volume(v), veh/h 68 253 444 237 202 1098
Grp Sat Flow(s),veh/h/ln 1781 1585 1702 1805 1781 1702
Q Serve(g_s), s 1.0 4.8 3.6 3.6 3.6 4.2
Cycle Q Clear(g_c), s 1.0 4.8 3.6 3.6 3.6 4.2
Prop In Lane 1.00 1.00 0.20 1.00
Lane Grp Cap(c), veh/h 398 354 900 477 259 2717
V/C Ratio(X) 0.17 0.71 0.49 0.50 0.78 0.40
Avail Cap(c_a), veh/h 1144 1018 1561 828 381 4059
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 10.3 11.7 10.2 10.2 13.5 4.6
Incr Delay (d2), s/veh 0.2 2.7 0.4 0.8 6.1 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 1.5 1.0 1.1 1.6 0.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 10.5 14.4 10.6 11.0 19.6 4.7
LnGrp LOS B B B B B A
Approach Vol, veh/h 321 681 1300
Approach Delay, s/veh 13.6 10.7 7.0
Approach LOS B B A
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 8.8 12.7 21.4 11.3
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 7.0 15.0 26.0 21.0
Max Q Clear Time (g_c+I1), s 5.6 5.6 6.2 6.8
Green Ext Time (p_c), s 0.1 3.0 7.9 0.9
Intersection Summary
HCM 6th Ctrl Delay 9.0
HCM 6th LOS A
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 3: Date Palm Drive & 30th Avenue 05/28/2024
Synchro 11 ReportProject (Scenario 1) Completion Year 2027 Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 105 268 115 64 143 167 171 603 30 233 1056 70 Future Volume (veh/h) 105 268 115 64 143 167 171 603 30 233 1056 70 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 117 298 128 71 159 186 190 670 33 259 1173 78 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 149 402 335 103 354 299 235 1428 70 308 1600 106 Arrive On Green 0.08 0.21 0.21 0.06 0.19 0.19 0.13 0.29 0.29 0.17 0.33 0.33 Sat Flow, veh/h 1781 1870 1561 1781 1870 1583 1781 4984 244 1781 4889 325 Grp Volume(v), veh/h 117 298 128 71 159 186 190 457 246 259 817 434 Grp Sat Flow(s),veh/h/ln 1781 1870 1561 1781 1870 1583 1781 1702 1825 1781 1702 1810 Q Serve(g_s), s 3.8 8.9 4.2 2.3 4.5 6.4 6.2 6.6 6.7 8.4 12.7 12.7 Cycle Q Clear(g_c), s 3.8 8.9 4.2 2.3 4.5 6.4 6.2 6.6 6.7 8.4 12.7 12.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.13 1.00 0.18
Lane Grp Cap(c), veh/h 149 402 335 103 354 299 235 975 523 308 1114 592 V/C Ratio(X) 0.78 0.74 0.38 0.69 0.45 0.62 0.81 0.47 0.47 0.84 0.73 0.73 Avail Cap(c_a), veh/h 149 814 679 149 814 689 268 1254 672 328 1368 727 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.8 21.9 20.0 27.6 21.5 22.2 25.2 17.6 17.6 23.9 17.8 17.8 Incr Delay (d2), s/veh 23.4 2.7 0.7 7.9 0.9 2.1 14.9 0.4 0.7 16.9 1.6 3.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.4 3.6 1.4 1.1 1.8 2.3 3.3 2.2 2.5 4.4 4.1 4.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 50.3 24.6 20.8 35.5 22.4 24.4 40.1 17.9 18.2 40.8 19.4 20.8 LnGrp LOS D C C D C C D B B D B C
Approach Vol, veh/h 543 416 893 1510
Approach Delay, s/veh 29.2 25.5 22.7 23.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.3 21.1 7.5 16.8 11.9 23.5 9.0 15.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 22.0 5.0 26.0 9.0 24.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 10.4 8.7 4.3 10.9 8.2 14.7 5.8 8.4 Green Ext Time (p_c), s 0.0 3.4 0.0 1.7 0.0 4.8 0.0 1.3 Intersection Summary
HCM 6th Ctrl Delay 24.4
HCM 6th LOS C
HCM 6th TWSC Date Palm Drive Mixed Use
4: Date Palm Drive & Tachevah Drive 05/28/2024
Synchro 11 ReportProject (Scenario 1) Completion Year 2027 Timing Plan: AM Peak
Intersection
Int Delay, s/veh 2.8
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 32 114 47 816 1189 13
Future Vol, veh/h 32 114 47 816 1189 13
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 250 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 33 116 48 833 1213 13
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1649 613 1226 0 - 0
Stage 1 1220 - - - - -
Stage 2 429 - - - - -
Critical Hdwy 5.74 7.14 5.34 - - -
Critical Hdwy Stg 1 6.64 - - - - -
Critical Hdwy Stg 2 6.04 - - - - -
Follow-up Hdwy 3.82 3.92 3.12 - - -
Pot Cap-1 Maneuver 144 373 304 - - -
Stage 1 177 - - - - -
Stage 2 571 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 121 373 304 - - -
Mov Cap-2 Maneuver 121 - - - - -
Stage 1 149 - - - - -
Stage 2 571 - - - - -
Approach EB NB SB
HCM Control Delay, s 36.9 1 0

HCM LOS E
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 304 - 256 - -
HCM Lane V/C Ratio 0.158 - 0.582 - -
HCM Control Delay (s) 19 - 36.9 - -
HCM Lane LOS C - E - -
HCM 95th %tile Q(veh) 0.6 - 3.3 - -
HCM 6th TWSC Date Palm Drive Mixed Use
5: Date Palm Drive & Project Driveway 05/28/2024
Synchro 11 ReportProject (Scenario 1) Completion Year 2027 Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 50 595 18 0 1129
Future Vol, veh/h 0 50 595 18 0 1129
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 56 661 20 0 1254
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 341 0 0 - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 559 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 559 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach WB NB SB
HCM Control Delay, s 12.1 0 0

HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h) - - 559 -
HCM Lane V/C Ratio - - 0.099 -
HCM Control Delay (s) - - 12.1 -
HCM Lane LOS - - B -
HCM 95th %tile Q(veh) - - 0.3 -
HCM 6th TWSC Date Palm Drive Mixed Use
6: San Vicente Avenue/Existing Driveway & McCallum Way 05/28/2024 Synchro 11 ReportProject (Scenario 1) Completion Year 2027 Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 18 357 0 0 263 9 0 0 0 8 0 17
Future Vol, veh/h 18 357 0 0 263 9 0 0 0 8 0 17
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 20 388 0 0 286 10 0 0 0 9 0 18
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 296 0 0 388 0 0 728 724 388 719 719 291 Stage 1 - - - - - - 428 428 - 291 291 -
Stage 2 - - - - - - 300 296 - 428 428 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1265 - - 1170 - - 339 352 660 344 354 748 Stage 1 - - - - - - 605 585 - 717 672 -
Stage 2 - - - - - - 709 668 - 605 585 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1265 - - 1170 - - 325 345 660 339 347 748 Mov Cap-2 Maneuver - - - - - - 325 345 - 339 347 -
Stage 1 - - - - - - 593 573 - 703 672 -
Stage 2 - - - - - - 691 668 - 593 573 -
Approach EB WB NB SB
HCM Control Delay, s 0.4 0 0 12

HCM LOS A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1265 - - 1170 - - 540
HCM Lane V/C Ratio - 0.015 - - - - - 0.05
HCM Control Delay (s) 0 7.9 0 - 0 - - 12
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0 - - 0 - - 0.2
California MUTCD 2014 Edition Rev 6 Scenario: Project (Scenario 1) Completion Year 2027 Conditions Major Approach: Date Palm Drive
Minor Approach: Rosemount Road
Two
One or More
1822
296
The plotted point falls above the applicable curve in Figure 4C-3 (Urban Areas) OR The plotted point falls above the applicable curve in Figure 4C-4 (Rural Areas) Both Approaches - Major Street
Higher Approach - Minor Street

APPROACH LANES

ENTER CORRECT HOURS
Part B

SATISFIED
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.

ENTER PEAK HOUR VOL.

WARRANT 3 - PEAK HOUR

SATISFIED
Part A
(All parts 1, 2, and 3 below must be satisfied for the same

SATISFIED
(Part A or Part B must be satisfied)

1. The total delay experienced by traffic on one minor street approach (one direction only) controlled by a STOP sign equals or exceeds four vehicle-hours for one-lane approach, or five vehicle-hours for a two-lane approach; AND

2. The volume on the same minor street approach (one direction only) equals or exceeds 100 vph for one moving lane of traffic or 150 vph for two moving lanes; AND

3. The total entering volume serviced during the hour equals or exceeds 800 vph for intersections with four or more approaches or 650 vph for intersections with three approaches
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
0 25
50 75
100
125
150
175
200
225
250
275
300
325
350
375
400
425
300 400 500 600 700 800 900 1000 1100 1200 1300
Minor Street
Higher Volume Approach - VPH
F
Major Street
Total of Both Approaches - VPH
My Results (Minimum
Vehicles)
296

HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 1: Date Palm Drive & McCallum Way 05/30/2024
Cumulative Year 2027 (Scenario 1) Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 91 225 106 67 158 83 46 634 48 112 1139 74 Future Volume (veh/h) 91 225 106 67 158 83 46 634 48 112 1139 74 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 101 250 118 74 176 92 51 704 53 124 1266 82 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 399 399 188 321 384 201 94 1487 111 160 1684 109 Arrive On Green 0.33 0.33 0.33 0.33 0.33 0.33 0.05 0.31 0.31 0.09 0.34 0.34 Sat Flow, veh/h 1110 1195 564 1013 1150 601 1781 4841 362 1781 4888 317 Grp Volume(v), veh/h 101 0 368 74 0 268 51 494 263 124 882 466 Grp Sat Flow(s),veh/h/ln 1110 0 1759 1013 0 1751 1781 1702 1800 1781 1702 1801 Q Serve(g_s), s 3.5 0.0 7.9 3.0 0.0 5.4 1.2 5.2 5.3 3.0 10.2 10.2 Cycle Q Clear(g_c), s 8.9 0.0 7.9 10.8 0.0 5.4 1.2 5.2 5.3 3.0 10.2 10.2 Prop In Lane 1.00 0.32 1.00 0.34 1.00 0.20 1.00 0.18
Lane Grp Cap(c), veh/h 399 0 588 321 0 585 94 1045 553 160 1173 620 V/C Ratio(X) 0.25 0.00 0.63 0.23 0.00 0.46 0.55 0.47 0.48 0.77 0.75 0.75 Avail Cap(c_a), veh/h 674 0 1024 573 0 1020 199 1067 564 319 1296 686 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 15.2 0.0 12.5 17.1 0.0 11.7 20.6 12.5 12.6 19.9 12.9 12.9 Incr Delay (d2), s/veh 0.3 0.0 1.1 0.4 0.0 0.6 4.9 0.3 0.6 7.7 2.3 4.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 0.0 2.8 0.7 0.0 1.9 0.6 1.5 1.6 1.4 3.1 3.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 15.5 0.0 13.6 17.4 0.0 12.2 25.5 12.9 13.2 27.6 15.2 17.2 LnGrp LOS B A B B A B C B B C B B
Approach Vol, veh/h 469 342 808 1472
Approach Delay, s/veh 14.0 13.4 13.8 16.9
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 8.0 17.7 18.9 6.3 19.4 18.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 8.0 14.0 26.0 5.0 17.0 26.0 Max Q Clear Time (g_c+I1), s 5.0 7.3 10.9 3.2 12.2 12.8 Green Ext Time (p_c), s 0.1 2.4 2.5 0.0 3.1 1.7
Intersection Summary
HCM 6th Ctrl Delay 15.2
HCM 6th LOS B
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 2: Date Palm Drive & Rosemount Road 05/30/2024
Cumulative Year 2027 (Scenario 1) Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 56 56 70 87 79 242 98 700 48 193 1129 79 Future Volume (veh/h) 56 56 70 87 79 242 98 700 48 193 1129 79 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 61 61 76 95 86 263 107 761 52 210 1227 86 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 99 170 212 164 106 324 137 1195 81 258 1524 107 Arrive On Green 0.06 0.22 0.22 0.09 0.26 0.26 0.08 0.24 0.24 0.14 0.31 0.31 Sat Flow, veh/h 1781 757 943 1781 406 1241 1781 4882 332 1781 4872 341 Grp Volume(v), veh/h 61 0 137 95 0 349 107 530 283 210 857 456 Grp Sat Flow(s),veh/h/ln 1781 0 1701 1781 0 1647 1781 1702 1811 1781 1702 1809 Q Serve(g_s), s 1.8 0.0 3.7 2.8 0.0 10.8 3.2 7.6 7.6 6.2 12.6 12.6 Cycle Q Clear(g_c), s 1.8 0.0 3.7 2.8 0.0 10.8 3.2 7.6 7.6 6.2 12.6 12.6 Prop In Lane 1.00 0.55 1.00 0.75 1.00 0.18 1.00 0.19
Lane Grp Cap(c), veh/h 99 0 382 164 0 430 137 833 443 258 1065 566 V/C Ratio(X) 0.62 0.00 0.36 0.58 0.00 0.81 0.78 0.64 0.64 0.81 0.81 0.81 Avail Cap(c_a), veh/h 164 0 656 164 0 636 164 939 499 262 1126 598 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 25.1 0.0 17.8 23.7 0.0 18.9 24.7 18.4 18.4 22.6 17.2 17.2 Incr Delay (d2), s/veh 6.2 0.0 0.6 5.1 0.0 5.0 18.2 1.2 2.3 17.5 4.2 7.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 0.0 1.4 1.3 0.0 4.3 2.0 2.8 3.1 3.6 4.9 5.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 31.3 0.0 18.4 28.8 0.0 23.9 42.9 19.6 20.7 40.0 21.3 24.7 LnGrp LOS C A B C A C D B C D C C
Approach Vol, veh/h 198 444 920 1523
Approach Delay, s/veh 22.4 24.9 22.6 24.9
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.9 17.3 9.0 16.2 8.2 21.0 7.0 18.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 15.0 5.0 21.0 5.0 18.0 5.0 21.0 Max Q Clear Time (g_c+I1), s 8.2 9.6 4.8 5.7 5.2 14.6 3.8 12.8 Green Ext Time (p_c), s 0.0 2.4 0.0 0.6 0.0 2.4 0.0 1.4 Intersection Summary
HCM 6th Ctrl Delay 24.1
HCM 6th LOS C
HCM 6th Signalized Intersection Summary Date Palm Drive Mixed Use 3: Date Palm Drive & 30th Avenue 05/30/2024
Cumulative Year 2027 (Scenario 1) Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 105 268 131 80 143 167 182 759 41 233 1214 70 Future Volume (veh/h) 105 268 131 80 143 167 182 759 41 233 1214 70 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 114 291 142 87 155 182 198 825 45 253 1320 76 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 133 440 361 111 418 343 240 1479 80 293 1621 93 Arrive On Green 0.07 0.24 0.24 0.06 0.22 0.22 0.13 0.30 0.30 0.16 0.33 0.33 Sat Flow, veh/h 1781 1870 1532 1781 1870 1536 1781 4955 269 1781 4938 284 Grp Volume(v), veh/h 114 291 142 87 155 182 198 566 304 253 910 486 Grp Sat Flow(s),veh/h/ln 1781 1870 1532 1781 1870 1536 1781 1702 1821 1781 1702 1818 Q Serve(g_s), s 4.2 9.4 5.2 3.2 4.7 7.0 7.2 9.4 9.4 9.3 16.4 16.4 Cycle Q Clear(g_c), s 4.2 9.4 5.2 3.2 4.7 7.0 7.2 9.4 9.4 9.3 16.4 16.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.15 1.00 0.16
Lane Grp Cap(c), veh/h 133 440 361 111 418 343 240 1016 543 293 1118 597 V/C Ratio(X) 0.86 0.66 0.39 0.78 0.37 0.53 0.83 0.56 0.56 0.86 0.81 0.81 Avail Cap(c_a), veh/h 133 727 595 133 727 597 240 1119 599 293 1221 652 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.6 23.2 21.6 30.9 22.0 22.9 28.2 19.8 19.8 27.2 20.6 20.6 Incr Delay (d2), s/veh 39.0 1.7 0.7 21.6 0.5 1.3 20.6 0.5 1.0 22.5 4.0 7.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.1 3.9 1.7 1.9 1.9 2.4 4.2 3.3 3.6 5.2 5.9 6.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 69.6 24.9 22.2 52.5 22.6 24.2 48.8 20.3 20.7 49.7 24.6 27.9 LnGrp LOS E C C D C C D C C D C C
Approach Vol, veh/h 547 424 1068 1649
Approach Delay, s/veh 33.5 29.4 25.7 29.4
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 15.0 24.0 8.2 19.8 13.0 26.0 9.0 18.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 22.0 5.0 26.0 9.0 24.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 11.3 11.4 5.2 11.4 9.2 18.4 6.2 9.0 Green Ext Time (p_c), s 0.0 3.8 0.0 1.7 0.0 3.6 0.0 1.2 Intersection Summary
HCM 6th Ctrl Delay 29.0
HCM 6th LOS C
HCM 6th TWSC Date Palm Drive Mixed Use
4: Date Palm Drive & Tachevah Drive 05/30/2024
Cumulative Year 2027 (Scenario 1) Synchro 11 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 32 114 47 972 1347 13
Future Vol, veh/h 32 114 47 972 1347 13
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 250 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 33 118 48 1002 1389 13

Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1893 701 1402 0 - 0
Stage 1 1396 - - - - -
Stage 2 497 - - - - -
Critical Hdwy 5.74 7.14 5.34 - - -
Critical Hdwy Stg 1 6.64 - - - - -
Critical Hdwy Stg 2 6.04 - - - - -
Follow-up Hdwy 3.82 3.92 3.12 - - -
Pot Cap-1 Maneuver 107 327 249 - - -
Stage 1 138 - - - - -
Stage 2 527 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 86 327 249 - - -
Mov Cap-2 Maneuver 86 - - - - -
Stage 1 111 - - - - -
Stage 2 527 - - - - -

Approach EB NB SB
HCM Control Delay, s 61 1.1 0

HCM LOS F

Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 249 - 203 - -
HCM Lane V/C Ratio 0.195 - 0.741 - -
HCM Control Delay (s) 22.9 - 61 - -
HCM Lane LOS C - F - -
HCM 95th %tile Q(veh) 0.7 - 4.9 - -
HCM 6th TWSC Date Palm Drive Mixed Use
5: Date Palm Drive & Project Driveway 05/30/2024
Cumulative Year 2027 (Scenario 1) Synchro 11 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 50 810 18 0 1308
Future Vol, veh/h 0 50 810 18 0 1308
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 54 880 20 0 1422

Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 450 0 0 - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 476 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 476 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -

Approach WB NB SB
HCM Control Delay, s 13.5 0 0

HCM LOS B

Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h) - - 476 -
HCM Lane V/C Ratio - - 0.114 -
HCM Control Delay (s) - - 13.5 -
HCM Lane LOS - - B -
HCM 95th %tile Q(veh) - - 0.4 -
HCM 6th TWSC Date Palm Drive Mixed Use
6: San Vicente Avenue/Existing Driveway & McCallum Way 05/30/2024 Cumulative Year 2027 (Scenario 1) Synchro 11 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 18 374 0 0 298 9 0 0 0 8 0 17
Future Vol, veh/h 18 374 0 0 298 9 0 0 0 8 0 17
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 20 407 0 0 324 10 0 0 0 9 0 18

Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 334 0 0 407 0 0 785 781 407 776 776 329 Stage 1 - - - - - - 447 447 - 329 329 -
Stage 2 - - - - - - 338 334 - 447 447 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1225 - - 1152 - - 310 326 644 315 328 712 Stage 1 - - - - - - 591 573 - 684 646 -
Stage 2 - - - - - - 676 643 - 591 573 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1225 - - 1152 - - 297 319 644 310 321 712 Mov Cap-2 Maneuver - - - - - - 297 319 - 310 321 -
Stage 1 - - - - - - 579 561 - 670 646 -
Stage 2 - - - - - - 658 643 - 579 561 -

Approach EB WB NB SB
HCM Control Delay, s 0.4 0 0 12.6

HCM LOS A B

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1225 - - 1152 - - 503
HCM Lane V/C Ratio - 0.016 - - - - - 0.054
HCM Control Delay (s) 0 8 0 - 0 - - 12.6
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0 - - 0 - - 0.2
California MUTCD 2014 Edition Rev 6 Scenario: Cumulative Year 2027 Conditions (Scenario 1) Major Approach: Date Palm Drive
Minor Approach: Rosemount Road
Two
One or More
2274
408

APPROACH LANES

ENTER CORRECT HOURS
The plotted point falls above the applicable curve in Figure 4C-3 (Urban Areas) OR The plotted point falls above the applicable curve in Figure 4C-4 (Rural Areas) Both Approaches - Major Street
Higher Approach - Minor Street
Part B

SATISFIED
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.

ENTER PEAK HOUR VOL.

WARRANT 3 - PEAK HOUR

SATISFIED
Part A
(All parts 1, 2, and 3 below must be satisfied for the same

SATISFIED
(Part A or Part B must be satisfied)

1. The total delay experienced by traffic on one minor street approach (one direction only) controlled by a STOP sign equals or exceeds four vehicle-hours for one-lane approach, or five vehicle-hours for a two-lane approach; AND

2. The volume on the same minor street approach (one direction only) equals or exceeds 100 vph for one moving lane of traffic or 150 vph for two moving lanes; AND

3. The total entering volume serviced during the hour equals or exceeds 800 vph for intersections with four or more approaches or 650 vph for intersections with three approaches
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
0 25
50 75
100
125
150
175
200
225
250
275
300
325
350
375
400
425
300 400 500 600 700 800 900 1000 1100 1200 1300
Minor Street
Higher Volume Approach - VPH
F
Major Street
Total of Both Approaches - VPH
My Results (Minimum
Vehicles)
408

APPENDIX K ‐
HORIZON YEAR 2045 PLUS PROJECTS QUEUE

ANALYSIS
In Out Total In Out Total
Multifamily Housing (Low-Rise) DU 220 0.10 0.30 0.40 0.32 0.19 0.51 6.74 In Out Total In Out Total
Multifamily Housing (Low-Rise) 204 DU 20 61 81 65 39 104 1,375 20 61 81 65 39 104 1,375
1Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, Eleventh Edition (2021). 2 DU = Dwelling Unit
Daily
1Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual , Eleventh Edition (2021). 2DU = Dwelling Unit
Land Use1 Units2 ITE LUCode AM Peak Hour PM Peak Hour
Total
PM Peak Hour DailyLand Use1 Intensity Units2 AM Peak Hour Wren Project
In Out Total In Out Total
Shopping Plaza (40k-150k)3 TSF 821 2.19 1.34 3.53 4.13 4.48 8.61 88.08 Fast Food Restaurant w/ Drive-through Window TSF 934 22.75 21.86 44.61 17.18 15.85 33.03 467.48 In Out Total In Out Total
Shopping Plaza (40k-150k) 127.000 TSF 278 170 448 525 569 1,094 11,186 22 22 44 47 34 81 783
0 0 0 191 214 405 4,161
256 148 404 287 321 608 6,242
Fast Food Restaurant w/ Drive-through Window 7.000 TSF 159 153 312 120 111 231 3,272 22 21 43 35 46 81 1,145
69 66 135 47 36 83 1,170
68 66 134 38 29 67 957
324 214 538 325 350 675 7,199
1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, Eleventh Edition (2021). 2 TSF = Thousand Square Feet
3 Internal Capture percentage is based on NCHRP Report 684, as recommended in the ITE Trip Generation Handbook, 3rd Edition. 4 Pass-by reduction percentage is based on the ITE methodology per 2021 Pass-By Tables for ITE Trip Generation Appendices.

DailyLand Use1 Units2 ITE LUCode AM Peak Hour PM Peak Hour 1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual , Eleventh Edition (2021). 2 TSF = Thousand Square Feet
3 Peak hour and daily trip rates for LU 822 Strip Retail Plaza are based on fitted curve equations for total 127,000 sf of retail proposed for entire project.

Land Use1 Intensity Units2 AM Peak Hour PM Peak Hour Daily Total
Internal Capture (8% - AM In, 13% - AM Out, 9% - PM In, 6% - PM Out, 7% - Daily)3 Pass-by Reduction (40% - PM Peak Hour & Daily)4
Subtotal
Internal Capture (14% - AM In, 14% - AM Out, 29% - PM In, 41% - PM Out, 35% - Daily)3 Pass-by Reduction (50% - AM Peak Hour, 55% - PM Peak Hour & Daily)4 Subtotal
Vallarta Shopping Center

SONNY BONO MEMORIAL FWY
14480

SONNY BONO MEMORIAL FWY
14480

SONNY BONO MEMORIAL FWY
0 VARNER RD
454

VARNER RD
60 SONNY BONO MEMORIAL FWY
8615

SONNY BONO MEMORIAL FWY
0 --
7--
48 --13--51
-- 113-- 85

N GENE AUTRY TRL
1418

N GENE AUTRY TRL
3326

N GENE A
UTRY T
RL
1420

N GENE A
UTRY T
RL
3325

SONNY BONO MEMORIAL FWY
15316

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FW
Y
15316

SONNY BONO MEMORIAL FW
Y
0 --10
--57
--
0 --
3 SONNY BONO MEMORIAL FWY
8908

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FW
Y
8908

SONNY BONO MEMORIAL FWY
0 --
103
--
45 --
0--
4 RAMON RD
3082

RAMON RD
2835
--
0--
4 -- 13
-- 149
--203--332
--98--143
--
37 --
19 --
0--
2 --
0--
3 --
0--
2 N GENE AUTRY TRL
2483

N GENE AUTRY TRL
1435

N GENE AUTRY TRL
2384

N GENE AUTRY TRL
1649
--7--11
--
88 --
44 S GENE AUTRY TRL
1042

S GENE AUTRY TRL
1583
--0
--0
-- 61
-- 142
--
0--
3 -- 455-- 630
--0--3
--25--54

DINAH SHORE DR
720

DINAH SHORE DR
448
--
8--
31 --9
--28

AVEIDA QUINTANA
72AVEIDA QUINTANA
78 --
226
--
375

VISTA CHINO
2216

VISTA CHINO
2061
--
139
--
401
--
24--
381
--
24--
28 -- 3-- 17
--102
--0

MC CALLUM WAY
264

MC CALLUM WAY
146
--
0--
3 DINAH SHORE DR
738

DINAH SHORE DR
822
--
340
--
617

DINAH SHORE DR
737

DINAH SHORE DR
755

DINAH SHORE DR
737

DINAH SHORE DR
755

VISTA CHINO
1852

VISTA CHINO
2156

CATHEDRAL CANYON DR
2984

CATHEDRAL CANYON DR
2671

CATHEDRAL CANYON DR
934

CATHEDRAL CANYON DR
2392

DATE PALM
DR
2194

DATE PALM
DR
2914
DA V
ALL DR
615
DA V
ALL DR
734
DA V
ALL DR
450
DA V
ALL DR
634

MC CALLUM WAY
391

MC CALLUM WAY
576

LANDAU BLVD
819

LANDAU BLVD
818

LANDAU BLVD
1014

LANDAU BLVD
1067

VARNER RD
413

VARNER RD
88 VARNER RD
413

VARNER RD
96 LANDAU BLVD
1046

LANDAU BLVD
1815

RAMON RD
3085

RAMON RD
2656 RAMON RD
3214

RAMON RD
2854
--
155--
77 30TH AVE
356
30TH AVE
255

SONNY BONO MEMORIAL FWY
15316

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FWY
15316

SONNY BONO MEMORIAL FWY
0 VISTA CHINO
2449

VISTA CHINO
1951

SONNY BONO MEMORIAL FWY
7140

SONNY BONO MEMORIAL FWY
0 VARNER RD
420

VARNER RD
75 SONNY BONO MEMORIAL FWY
8908SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FWY
8908

SONNY BONO MEMORIAL FWY
0 -- 176
--
52 --0--2
-- 0-- 2
-- 294
-- 81

RAMON RD
3079

RAMON RD
2734
--0--0

SONNY BONO MEMORIAL FWY
12476

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FWY
8069

SONNY BONO MEMORIAL FWY
0 --99
--29
--0--1

VARNER RD
406VA

RNER RD
1594

VARNER RD
414

VARNER RD
84 --
133
--
84 --160
--62
--3
--56

SONNY BONO MEMORIAL FWY
13268

SONNY BONO MEMORIAL FWY
0 E VISTA CHINO
3152

E VISTA CHINO
3988
30TH AVE
520
30TH AVE
426

VERONA RD
112

VERONA RD
134
--
415
--
261

E MESQUITE AVE
697

E MESQUITE AVE
1136

E MESQU

ITE AVE
733

E MESQU

ITE AVE
1157
-- 0
-- 3
-- 585
-- 375
--920
--256
-- 115-- 89
--
468
--
295
--
425
--
236
-- 0-- 3
--
511
--
180
--
332
--
185
--
0 --
4 --
76 --
164
--0
--0
--478
--207
--
0 --
3 --12--29
--
0 --
3 --0--1
--
162
--
158

EL CIELO RD
223

EL CIELO RD
73 --
6--
28 VISTA CHINO
1964

VISTA CHINO
2583

VISTA CHINO
1992

VISTA CHINO
2654

DINAH SHORE DR
899

DINAH SHORE DR
476 DINAH SHORE DR
994

DINAH SHORE DR
747

E BARISTO RD
500

E BARISTO RD
202

E BARISTO RD
435

E BARISTO RD
193
--
189--
177

RAMON RD
3729

RAMON RD
3739
--
171
--
269
--522
--367

DINAH SHORE DR
729

DINAH SHORE DR
624

DINAH SHORE DR
720

DINAH SHORE DR
448
--105
--209
-- 180
-- 210
--
59 --
71 --
839
--
0 --
363--
233

DATE PALM
DR
383

DATE PALM DR
1176

DATE PALM
DR
388

DATE PALM
DR
1175
--
293
--
152
--14--64

RAMON RD
1051

RAMON RD
752
--
621
--
316
--0 --0

DA VALL DR
586

DA VALL DR
790
--746
--265
-- 187
-- 84
--
202--
522
--356
--277
--
56 --
132
--
118
--
98 DATE PALM
DR
2260

DATE PALM
DR
2880

DINAH SHORE DR
899

DINAH SHORE DR
476
--
0 --
3 CROSSLEY RD
427

CROSSLEY RD
470

CROSSLEY RD
398

CROSSLEY RD
299
--210
--253
-- 987-- 1214
--
512
--
283
--
464--
345

VARNER RD
418

VARNER RD
78 --
72 --
71 --578
--563
--262
--141

E RAMON RD
2524

E RAMON RD
3835
-- 0-- 3

VERONA RD
190

VERONA RD
205

VERONA RD
0 VERONA RD
0 RAMON RD
3401

RAMON RD
3724
--886
--325
--
0--
3 --103
--214
-- 426-- 301

N GENE AUTRY
TR
L
3165

N GENE AUTRY
TR
L
1402

N GENE AUTRY TRL
2545

N GENE AUTRY TRL
1409
--
0--
3 -- 6-- 3

E MESQUITE AVE
423

E MESQUITE AVE
382
--
1969
--
901
30TH AVE
305
30TH AVE
833
--
178--
79 --
119
--
433

RAMON RD
2891

RAMON RD
4463 RAMON RD
2891

RAMON RD
4464
--153
--266

E MESQUITE AVE
702

E MESQUITE AVE
1221 E MESQUITE AVE
583

E MESQUITE AVE
1326
S E
L CIE
LO R
D
155

CROSSLEY RD
434

CROSSLEY RD
1095

CROSSLEY RD
421

CROSSLEY RD
767
PLUM
LEY RD
0PLUM
LEY RD
0 --
1892--
1188
-- 664
-- 250
AVENID
A M

ARAVILLA
34AVENID
A M

ARAVILLA
107
--
47--
21 30TH AVE
509
30TH AVE
476

LANDAU BLVD
134

LANDAU BLVD
112

LANDAU BLVD
639

LANDAU BLVD
1097

RAMON RD
2986

RAMON RD
3791
--877
--395

VARNER RD
416

VARNER RD
81 DA VALL DR
255

DA VALL DR
356

DA VALL DR
453

DA VALL DR
421
PALM

SPRINGS AIRPORT ACCESS RD
0PALM

SPRINGS AIRPORT ACCESS RD
0 -- 327
-- 190
--58
--237
--
412
--
179

BOB HOPE DR
1882

BOB HOPE DR
3706

DATE PALM
DR
2066

DATE PALM
DR
3032
--258
--248

MC CALLUM WAY
795

MC CALLUM WAY
713
-- 0-- 0
--
371--
427
--
90 --
257

DATE PALM
DR
650

DATE PALM
DR
1307

DATE PALM
DR
1060

DATE PALM
D
R
1886

DATE PALM
DR
2107

DATE PALM
DR
3210
-- 34-- 20

DATE PALM
DR
3957

DATE PALM
DR
4179
-- 106-- 307

RAMON RD
2952

RAMON RD
2684

RAMON RD
3248

RAMON RD
2935
--
0 --
2 --
149--
107
--
36 --
19 --0--3
--
16--
362
30TH AVE
491
30TH AVE
385
--
101
--
283
--
1474--
0 VISTA CHINO
1992

VISTA CHINO
2654

VISTA CHINO
1695

VISTA CHINO
2486

DATE PALM
DR
637

DATE PALM
DR
1477

DATE PALM
DR
650

DATE PALM
DR
1307

SONNY BONO MEMORIAL FWY
0 RAMON RD
3747

RAMON RD
3742
--1768
--0
E MESQUITE AVE733
E MESQUITE AVE1157
--
0 --
0 --
40--
191

SONNY BONO MEMORIAL FWY
12476

DINAH SHORE DR
733

DINAH SHORE DR
1157 DINAH SHORE DR
733

DINAH SHORE DR
1055

EL CIELO RD
239

EL CIELO RD
200

SONNY BONO MEMORIAL FWY
15316

SONNY BONO MEMORIAL FWY
0 AVENID
A M

ARAVILLA
550
AVENID
A M

ARAVILLA
207
--
0 --
3 DATE PALM
DR
1603

DATE PALM
DR
2609
--
0 --
3 DINAH SHORE DR
0 DINAH SHORE DR
0 --
44--
539

SAN LUIS REY DR
0 SAN LUIS REY DR
0 SAN LUIS
REY D
R
549SAN LUIS
REY DR
360
--0
--2

DA VALL DR
761

DA VALL DR
822

VISTA CHINO
1924

VISTA CHINO
2234

E MESQUITE AVE
15E MESQUITE AVE
45 E MESQUITE AVE
15 E MESQUITE AVE
45 --
0 --
3 --
99 --
253
--
0 --
4 E MESQUITE AVE
15 E MESQUITE AVE
45 --2004
--0

E MESQUITE AVE
423

E MESQUITE AVE
382

N GENE AU

TRY TRL
1409

N GENE AU

TRY TRL
2545

N GENE AUTRY TRL
1435

N GENE AUTRY TRL
2483

SAN LUIS REY DR
295

SAN LUIS REY DR
468

SAN LUIS REY DR
0 SAN LUIS REY DR
0 N GENE AUTRY TRL
1609

N GENE AUTRY TRL
2517

MC CALLUM WAY
552

MC CALLUM WAY
377

N GENE AUTRY TRL
1573

N GENE AUTRY TRL
2395
--2840
--
0 MC CALLUM WAY
795

MC CALLUM WAY
713

DATE PALM
DR
1251

DATE PALM
DR
2011
30TH AVE
927
30TH AVE
407
30TH AVE
937
30TH AVE
618
--
14 --
7 --
36--
122

DATE PALM
DR
2289

DATE PALM
DR
3372

DATE PALM
DR
2184

DATE PALM
DR
3169

DATE PALM
DR
637

DATE PALM
DR
1477
-- 0-- 3
--
2 --
10 E RAMON RD
1810

E RAMON RD
3137

E RAMON RD
2105

E RAMON RD
3659

LANDAU BLVD
1049

LANDAU BLVD
1631

LANDAU BLVD
1049

LANDAU BLVD
1631
--1768
--0

MC CALLUM WAY
519

MC CALLUM WAY
762

MC CALLUM WAY
435

MC CALLUM WAY
488
--
15 --
36 -- 0
-- 3
--0--0
--175
--403

PALM SPRINGS AIRPORT ACCESS RD
272
--
261
--
889

RAMON RD
2337

RAMON RD
3210

RAMON RD
2249

RAMON RD
3350

S GENE AUTRY TRL
1531

S GENE AUTRY TRL
1914

S GENE A

UTRY TRL
1329

S GENE AUTRY TRL
1392

S GENE AUTRY TRL
1329

S GENE AUTRY TRL
1392
S G
ENE A

UTRY TRL
1329
S G
ENE A

UTRY TRL
13 92

E RAMON RD
1810

E RAMON RD
3137

E RAMON RD
1773

E RAMON RD
3098

E RAMON RD
1773

E RAMON RD
3098

E RAMON RD
1773

E RAMON RD
3098
AVENID
A M
ARAVIL
LA
205
AVENID
A M
ARAVIL
LA
236
AVENID
A M

ARAVILLA
205
AVENID
A M

ARAVILLA
236

E BARISTO RD
535

E BARISTO RD
0 RAMON RD
2798

RAMON RD
3709
-- 67-- 68

RAMON RD
2798

RAMON RD
3709

N GENE AUTRY TRL
1420

N GENE AUTRY TRL
3325

N GENE A

UTRY TRL
1460

N GENE AUTRY TRL
3440

LANDAU B
LV
D
111
6 LANDAU B
LV
D
1642

LANDAU BLVD
1116

LANDAU BLVD
1642

DATE PALM
DR
394

DATE PALM
DR
1175
PALM

SPRINGS AIRPORT ACCESS RD
143
PALM

SPRINGS AIRPORT ACCESS RD
0 DATE PALM
DR
1798

DATE PALM
DR
2585
--2048
--0
--2048
--0
--28--12
--
91 --
206

SONNY BONO MEMORIAL FWY
8908

SONNY BONO MEMORIAL FWY
8908

AVENIDA M

ARAVILLA
550

AVENIDA M

ARAVILLA
207
30TH AVE
506
30TH AVE
419
--
44--
109

DA VALL DR
575

DA VALL DR
660

DA VALL DR
539

DA VALL DR
724
PALM SPRINGS AIRPORT ACCESS RD34
PALM SPRINGS AIRPORT ACCESS RD0

AVENIDA M

ARAVILLA
289

AVENIDA M

ARAVILLA
179
AVENID
A M

ARAVILLA
205
AVENID
A M

ARAVILLA
236
34TH AVE
0 34TH AVE
034TH AVE
90 34TH AVE
189

MC CALLUM WAY
344

MC CALLUM WAY
272

RAMON RD
2952

RAMON RD
2684

E MESQUITE AVE
15 E MESQUITE AVE
45 E MESQUITE AVE
15E MESQUITE AVE
45 MC CALLUM WAY
344

MC CALLUM WAY
272
--
253--
99 --
978
--
0 34TH AVE
91 34TH AVE
192
34TH AVE
90 34TH AVE
189
--4 --1
--
1768--
0 DATE PALM
DR
1649

DATE PALM
DR
2501

DATE PALM
DR
2085

DATE PALM
DR
2912
--0
--2840
--0
--
2004
--0
-- 45-- 113

DATE PALM
DR
421

DATE PALM
DR
1185
--273--112

BOB HOPE DR
985

BOB HOPE DR
2758

BOB HOPE DR
986BOB HOPE DR
2757

E BARISTO RD
193E BARISTO RD
435
--2004 --0
--2004
--0
--2048
--0
--2048
--0
--
105
--
259

DATE PALM
DR
1723

DATE PALM
DR
2781

E BARISTO RD
430

E BARISTO RD
0 DATE PALM
DR
2004

DATE PALM
DR
2676

DATE PALM
DR
1723

DATE PALM
DR
2781

RAMON RD
3111

RAMON RD
2779

RAMON RD
3108

RAMON RD
2780
--
1474--
0 --
1474--
0 VARNER RD
455

VARNER RD
60 --
839 --
839
RIVCOM 4.01 - 2018 AM
peak period volumes (Wren Resi + Date Palm + Vallarata) 0 .05 .1 .15
Miles
HCMType
CC (6866)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12488)
PrArterial (8422)

SONNY BONO MEMORIAL FWY
17634

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FWY
14891
--14--55

VARNER RD
1534

VARNER RD
182
--
17--
90 VISTA CHINO
178VISTA CHINO
292

VALLEY CENTER BLVD
8 VALLEY CENTER BLVD
22 Los Alom
os Rd
0 Los Alom
os Rd
0 --
0 --
50 SONNY BONO MEMORIAL FWY
18517

SONNY BONO MEMORIAL FWY
0 N G

ENE AUTRY T
RL
1525
N G

ENE AUTRY T
RL
3499

SONNY BONO MEMORIAL FWY
14743

SONNY BONO MEMORIAL FWY
0 VALLEY CENTER BLVD
0 VALLEY CENTER BLVD
0 --
2 --
11 --28
--67

DINAH SHORE DR
1369

DINAH SHORE DR
1965

N GENE AUTRY TRL
1524

N GENE AUTRY TRL
3501
--
131
--
55 SONNY BONO MEMORIAL FWY
17248

SONNY BONO MEMORIAL FWY
0 --
1--
7 RAMON RD
3528

RAMON RD
3856
--
28--
14 --58
--208
--5
--12

SONNY BONO MEMORIAL FWY
14219SONNY BONO MEMORIAL FWY
0 --199--212

N GENE AUTRY TRL
3192

N GENE AUTRY TRL
1857
--
412
--
240
--
0--
1 VALLEY CENTER BLVD
0 VALLEY CENTER BLVD
0 --
130
--
471
--12--11
--
241
--
120

E VISTA CHINO
3762

E VISTA CHINO
4678
--68--98
--0
--0
-- 62
-- 154

S GENE AUTRY TRL
1125

S GENE AUTRY TRL
1812

SONNY BONO MEMORIAL FWY
15090

SONNY BONO MEMORIAL FWY
0 --2--5
--
0--
0 SONNY BONO MEMORIAL FWY
18162

SONNY BONO MEMORIAL FWY
0 --
253
--
402

SONNY BONO MEMORIAL FW
Y
14618

SONNY BONO MEMORIAL FWY
0 AVEIDA QUINTANA
111AVEIDA QUINTANA
224

VISTA CHINO
2328

VISTA CHINO
2663
--12
--39
--
93--
498
-- 90
-- 149
-- 231
-- 64
-- 466-- 728
--
2--
7 DA VALL DR
1106

DA VALL DR
1329
--
30--
33 N GENE AU

TRY TRL
3056

N GENE AUTRY TRL
2121
-- 4-- 22

DINAH SHORE DR
1344

DINAH SHORE DR
1457

MC CALLUM WAY
528

MC CALLUM WAY
690

MC CALLUM WAY
188

MC CALLUM WAY
159

DINAH SHORE DR
1096

DINAH SHORE DR
1246

DINAH SHORE DR
1096

DINAH SHORE DR
1246

VISTA CHINO
2167

VISTA CHINO
2727

VARNER RD
1096

VARNER RD
214

CATHEDRAL CANYON DR
1064

CATHEDRAL CANYON DR
2421

CATHEDRAL CANYON DR
2593

CATHEDRAL CANYON DR
2276
--
683
--
909

LANDAU BLVD
1381

LANDAU BLVD
1828

RAMON RD
3410

RAMON RD
3499

LANDAU BLVD
1328

LANDAU BLVD
1897

LANDAU BLVD
1179

LANDAU BLVD
2445

DATE PALM
DR
2198

DATE PALM
DR
3205

VARNER RD
1090

VARNER RD
176
30TH AVE
671
30TH AVE
151

DA VALL DR
892

DA VALL DR
1243
--
169--
9 --
0--
4 RAMON RD
3551

RAMON RD
3784

VISTA CHINO
2523

VISTA CHINO
2597

VARNER RD
1104

VARNER RD
160

SONNY BONO MEMORIAL FWY
12667

SONNY BONO MEMORIAL FWY
0 --5--29

RAMON RD
3482

RAMON RD
3619
-- 1-- 6
--0--0

DATE PALM
DR
1778

DATE PALM
D
R
2841
--
613
--
121

SONNY BONO MEMORIAL FWY
15520

SONNY BONO MEMORIAL FWY
0 -- 263
-- 109

SONNY BONO MEMORIAL FWY
13531

SONNY BONO MEMORIAL FWY
0 --
9--
40 --105
--40
--17--20

DINAH SHORE DR
1284

DINAH SHORE DR
1259

SONNY BONO MEMORIAL FWY
17525

SONNY BONO MEMORIAL FWY
0 VARNER RD
1092

VARNER RD
170
--
203
--
112

VARNER RD
779VA

RNER RD
3075
--
601
--
415
--9
--66

SONNY BONO MEMORIAL FWY
16055

SONNY BONO MEMORIAL FWY
0 DINAH SHORE DR
1534

DINAH SHORE DR
1279
30TH AVE
743
30TH AVE
324

VERONA RD
759

VERONA RD
448
-- 724
-- 526

SONNY BONO MEMORIAL FWY
18517

SONNY BONO MEMORIAL FWY
0 --
327
--
150

SONNY BONO MEMORIAL FWY
14743
-- 198-- 147
--
827
--
450

SONNY BONO MEMORIAL FWY
16633

SONNY BONO MEMORIAL FWY
0 -- 1
-- 4
-- 1-- 4
--
577
--
228

E BARISTO RD
1107

E BARISTO RD
1244
--
387
--
218
--483
--433

DINAH SHORE DR
1306

DINAH SHORE DR
1734
--
286
--
124
--
212
--
258

VERONA RD
0 VERONA RD
0 --0
--0

VISTA CHINO
2314

VISTA CHINO
3313
--549
--343
--
61 --
20 --
1 --
5 --13--33
--96--92

EL CIELO RD
498
--
171
--
142

DA VALL DR
1491

DA VALL DR
1265

SONNY BONO MEMORIAL FWY
13994SONNY BONO MEMORIAL FWY
0 --
15 --
62 EL CIELO RD
293

DINAH SHORE DR
1219

DINAH SHORE DR
1342

LANDAU BLVD
1521

LANDAU BLVD
1248

VISTA CHINO
2242

VISTA CHINO
3194

CROSSLEY RD
527

CROSSLEY RD
649

RAMON RD
3344

RAMON RD
3698

RAMON RD
3320

RAMON RD
5787
--467
--445
--
384--
316
--
202
--
328
--
0--
0 DATE PALM DR
617

DATE PALM DR
1559
--
441
--
474
--
490--
293

E MESQUITE AVE
688E MESQUITE AVE
396
--
1212
--
0 --103
--200
--207
--100

DATE PALM
DR
2160

DATE PALM
DR
2880

E MESQUITE AVE
688

E MESQUITE AVE
396
--
275
--
137

SONNY BONO MEMORIAL FWY
17525

SONNY BONO MEMORIAL FW
Y
0 DINAH SHORE DR
1284

DINAH SHORE DR
1259

RAMON RD
1975

RAMON RD
1251

VARNER RD
1155

VARNER RD
164
--
59 --
296

E BARISTO RD
1114

E BARISTO RD
1202
--
638
--
371
--96--727
--0 --0

DA VALL DR
1035

DA VALL DR
1306
-- 174-- 85
--535
--194
-- 729
-- 476

DATE PALM
DR
2297

DATE PALM
DR
3098

E RAMON RD
1843

E RAMON RD
3237
--
199
--
198

LANDAU BLVD
1261

LANDAU BLVD
2351

RAMON RD
3607

RAMON RD
3824
--
580
--
312

DA VALL DR
116

DA VALL DR
477

N GENE AUTRY
TR
L
3912

N GENE AUTRY
TR
L
1826
--
0 --
0 --
271--
423
--
65 --
61 --
2176
--
1202
--
3 --
9 --689
--689
--
7--
30 --
306--
135
--194
--272

E RAMON RD
2928

E RAMON RD
4458
--
2303
--
1142

RAMON RD
3932

RAMON RD
4602
--954
--361
-- 3-- 9
-- 440-- 349

DINAH SHORE DR
1459

DINAH SHORE DR
942
--
174--
118

E MESQUITE AVE
1336

E MESQUITE AVE
858
--172
--313
30TH AVE
335
30TH AVE
856

LANDAU BLVD
1106

LANDAU BLVD
1194
PALM

SPRINGS AIRPORT ACCESS RD
1350
PALM

SPRINGS AIRPORT ACCESS RD
0 --
175
--
133
--30 --30

CROSSLEY RD
561

CROSSLEY RD
1380
--621
--162

VARNER RD
1099

VARNER RD
163
--
193--
98 --
257
--
775

E MESQUITE AVE
1298

E MESQUITE AVE
1912

S GENE AUTRY TRL
1328

S GENE AUTRY TRL
2271

N GENE AUTRY TRL
3243

N GENE AUTRY TRL
1862

E MESQUITE AVE
1130

E MESQUITE AVE
1884
S E
L CIE
LO R
D
788
-- 54-- 143
PLUM
LEY RD
0PLUM
LEY RD
0 S GENE AUTRY TRL
1259

S GENE AUTRY TRL
1810
-- 731
-- 327
AVENID
A M

ARAVILLA
2AVENID
A M

ARAVILLA
96 --
125
--0
--1040
--1285
30TH AVE
506
30TH AVE
433

CROSSLEY RD
760

CROSSLEY RD
1041
--
253--
645

E RAMON RD
1647

E RAMON RD
2796

E RAMON RD
1652

E RAMON RD
2807

DA VALL DR
953

DA VALL DR
1099
AVENID
A M

ARAVILLA
162
AVENID
A M

ARAVILLA
221
--
1473--
960
--978
--447
-- 593
-- 560

RAMON RD
3255

RAMON RD
4878

N GENE A

UTRY TRL
1582

N GENE AUTRY TRL
3632

DINAH SHORE DR
1459

DINAH SHORE DR
942

VISTA CHINO
2314

VISTA CHINO
3313

VARNER RD
1094

VARNER RD
165
--88
--412

LANDAU BLVD
1316

LANDAU BLVD
2300

DA VALL DR
986

DA VALL DR
1280
--
389
--
157

SONNY BONO MEMORIAL FWY
14891

BOB HOPE DR
1540

BOB HOPE DR
4815
--53 --27
--
40 --
255
--16--75

DATE PALM
DR
2100

DATE PALM
DR
3280

DATE PALM
DR
669

DATE PALM
DR
1698
--409
--351
--2462
--0

MC CALLUM WAY
1153

MC CALLUM WAY
908
--
416--
521
--125--0

LANDAU BLVD
1040

LANDAU BLVD
1712
-- 0-- 0

SONNY BONO MEMORIAL FWY
14743SONNY BONO MEMORIAL FWY
0 -- 112-- 332

EL CIELO RD
686

DATE PALM
DR
2940

DATE PALM
DR
3646

DATE PALM
DR
3874

DATE PALM
DR
5068
--
637
--
0 --637
--0
--
82--
461

CROSSLEY RD
432

CROSSLEY RD
382
--
139--
109

MC CALLUM WAY
817

MC CALLUM WAY
715
--225
--0
--2--6
30TH AVE
517
30TH AVE
350
--
1 --
0 E MESQUITE AVE
688

E MESQUITE AVE
396
--1001
--0
--
1552--
0 --
992
--
0 34TH AVE
107
34TH AVE
222
--0

DA VALL D
R
967

DA VALL D
R
1290
--
28 --
78 SONNY BONO MEMORIAL FWY
0 SAN LUIS REY DR
0 SAN LUIS REY DR
0 --0
--0

RAMON RD
3434

RAMON RD
3788

RAMON RD
3315

RAMON RD
5758
--
0--
0 --2423
--0
DINAH SHORE DR1369
DINAH SHORE DR1965

SONNY BONO MEMORIAL FWY
16633

SONNY BONO MEMORIAL FWY
14618
--
0 --
0 VISTA CHINO
292

VISTA CHINO
178
--
138--
358
--
24 --
18 SONNY BONO MEMORIAL FWY
15520

VISTA CHINO
2158

VISTA CHINO
3171

RAMON RD
3257

RAMON RD
3844

VERONA RD
983

VERONA RD
559
--
471 --
0 SONNY BONO MEMORIAL FWY
18517
AVENID
A M

ARAVILLA
531
AVENID
A M

ARAVILLA
220
--0
--1

DA VALL DR
116

DA VALL DR
477

LANDAU BLVD
906LANDAU BLVD
247
--2643
--0
DA

VALL DR
1314
DA

VALL DR
973
--
616
--
0 LANDAU BLVD
8 LANDAU BLVD
22 SAN LUIS REY DR
0 SAN LUIS REY DR
0 DATE PALM
DR
2147

DATE PALM
DR
3041
--
2 --
6 N GENE AUTRY TRL
2047

N GENE AUTRY TRL
3168

N GENE AUTRY TRL
1862

N GENE AUTRY TRL
3243
--
2 --
6 MC CALLUM WAY
1153

MC CALLUM WAY
908

SAN LUIS REY DR
678

SAN LUIS REY DR
506

VISTA CHINO
2279

VISTA CHINO
2951
--
0 --
4 RAMON RD
3495

RAMON RD
4696
--
94 --
256
--1729
--0
--2643
--
0 DATE PALM
DR
2264

DATE PALM
DR
3365
30TH AVE
997
30TH AVE
426
30TH AVE
1025
30TH AVE
675
--
166
--
71 --1001
--0
--
57 --
6 --
48--
175

DATE PALM DR
3154

DATE PALM DR
4138

N GENE AUTRY TRL
1857

N GENE AUTRY TRL
3192

MC CALLUM WAY
745

MC CALLUM WAY
1026

N GENE AUTRY TRL
1999

N GENE AUTRY TRL
2993

MC CALLUM WAY
1018

MC CALLUM WAY
817
--0
--0

DATE PALM
DR
2121

DATE PALM
DR
3061

DATE PALM
DR
3022

DATE PALM
DR
3881
--2423
--0

DATE PALM
DR
867

DATE PALM
DR
2100
--2--6
--0--0

MC CALLUM WAY
805

MC CALLUM WAY
709

BOB HOPE DR
1348

BOB HOPE DR
3570

RAMON RD
2576

RAMON RD
4372
--
2 --
6 --
20 --
46 RAMON RD
2648

RAMON RD
4128
--192
--508
--
76 --
86 E BARISTO RD
1164

E BARISTO RD
0 DATE P
ALM
D
R
2341
DATE P
ALM
D
R
3014

EL CIELO RD
718

DA VALL DR
1046

DA VALL DR
1222
--0--0
PALM

SPRINGS AIRPORT ACCESS RD
807
PALM

SPRINGS AIRPORT ACCESS RD
0 34TH AVE
0 34TH AVE
0 --
281
--
985
--
992
--
0 --
79 --
210

DATE PALM
DR
2121

DATE PALM
DR
3061
--33--15

LANDAU BLVD
1521

LANDAU BLVD
1248

DINAH SHORE DR
1284

DINAH SHORE DR
1259
--
52--
111

AVENIDA M

ARAVILLA
531

AVENIDA M

ARAVILLA
220
30TH AVE
686
30TH AVE
318

AVENIDA M

ARAVILLA
162

AVENIDA M

ARAVILLA
221
--1729
--0
--2462
--0
PALM SPRINGS AIRPORT ACCESS RD98
PALM SPRINGS AIRPORT ACCESS RD0

AVENIDA M

ARAVILLA
272

AVENIDA M

ARAVILLA
194

RAMON RD
3257

RAMON RD
3844
--
471--
0 DA VALL D
R
116

DA VALL D
R
477
--
256--
94 DA VALL DR
1009

DA VALL DR
1279
--
291
--
0 34TH AVE
90 34TH AVE
180
--3 --1
--
2423--
0 --
897
--0

SAN LUIS REY DR
415

SAN LUIS REY DR
601
--897
--0

RAMON RD
3495

RAMON RD
4696

DATE PALM
DR
2153

DATE PALM
DR
2936

DATE PALM
DR
2423

DATE PALM
DR
3143
--
1729
--0
--276--114

RAMON RD
3551

RAMON RD
3784
--
1552--
0 DA VALL DR
577

DA VALL DR
591
--225
--0
-- 53-- 114

VARNER RD
1549

VARNER RD
195
--
616
--
0 DATE PALM
DR
936

DATE PALM
DR
2174

E BARISTO RD
1244

E BARISTO RD
1107

DATE PALM
DR
668

DATE PALM
DR
1684
--
1212

BOB HOPE DR
1348

BOB HOPE DR
3570
--
108
--
219

DATE PALM
DR
2065

DATE PALM
DR
4173

DA VALL DR
577

DA VALL DR
591

E BARISTO RD
473

E BARISTO RD
0 DATE PALM
DR
2551

DATE PALM
DR
3093

DATE PALM
DR
2065

DATE PALM
DR
4173

PALM SPRINGS AIRPORT ACCESS RD
0 BOB HOPE DR
1358

BOB HOPE DR
3530

LANDAU BLVD
1156

LANDAU BLVD
1194
RIVCOM 4.01 - 2045 AM
peak period volumes (Wren Resi + Date Palm + Vallarata) 0 .05 .1 .15
Miles
HCMType
CC (6866)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12488)
PrArterial (8422)
AM Peak Hour Growth
Intersection Approach RIVCOM
2018
RIVCOM
2045
RIVCOM
2018 to
RIVCOM
2045
Annual
Growth
Rate
Adjusted
2023 + 3
Projects
Adjusted
2045 Plus
Project
E 153 163 0.24% 607 638
S 4383 5355 0.82% 1695 1987
W 352 350 0.19% 438 455
N 4212 5188 0.86% 1914 2259
2 59% 41%
1133 1,914 781
↓ ↑
79 897 157
↙ ↓ ↘ ↖ 205
58% 256 ← ← 79 ← 353 58%
438 56 ↗ 2327 ↙ 69 607
42% 182 → 56 → → 254 42%
70 ↘ ↖ ↑ ↗
98 520 41
↓ ↑
1036 1,695 659
61% 39%
1333 2259 922
↓ ↑
89 1072 172
↙ ↓ ↘ ↖ 227
266 ← ← 75 ← 372
455 63 ↗ 2,669 ↙ 70 638
189 → 53 → → 267
72 ↘ ↖ ↑ ↗
102 631 42
↓ ↑
1214 1987 775
Existing Turning Movements
Existing Peak Hour Counts per intersection leg
Forecasted Peak Hour per intersection leg
Scenario: 2045 Plus Project
N/S Street: Date Palm Drive
E/W Street: Rosemount Road
Legend
Scenario: Adjusted 2023 Plus 3 Projects
N/S Street: Date Palm Drive
E/W Street: Rosemount Road
Intersection #: 2

SONNY BONO MEMORIAL FWY
12113

SONNY BONO MEMORIAL FWY
12113

SONNY BONO MEMORIAL FWY
0 VARNER RD
126

VARNER RD
334

SONNY BONO MEMORIAL FWY
17837

SONNY BONO MEMORIAL FWY
0 --
50--
12 --54--21
-- 148
-- 150

N GENE AUTRY TRL
3920

N GENE AUTRY TRL
2272

N GENE A
UTRY T
RL
3920

N GENE A
UTRY T
RL
2273

SONNY BONO MEMORIAL FWY
12561

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FW
Y
12561

SONNY BONO MEMORIAL FW
Y
0 --17
--29
--
2 --
1 SONNY BONO MEMORIAL FWY
18509

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FW
Y
18509

SONNY BONO MEMORIAL FWY
0 --
73 --
111
--
3--
2 RAMON RD
3528

RAMON RD
3766
--
3--
2 -- 124
-- 29
--383--288
--174
--132
--
29 --
49 --
1--
1 --
2--
1 --
1--
1 N GENE AUTRY TRL
2047

N GENE AUTRY TRL
2873

N GENE AUTRY TRL
2277

N GENE AUTRY TRL
2777
--13--10
--
68 --
98 S GENE AUTRY TRL
1839

S GENE AUTRY TRL
1454
--0
--0
--
156
-- 98
--
3--
1 -- 742-- 590
--2--1
--62--32

DINAH SHORE DR
553

DINAH SHORE DR
738
--
33--
12 --28
--15

AVEIDA QUINTANA
87AVEIDA QUINTANA
82 --
422
--
319

VISTA CHINO
2605

VISTA CHINO
2543
--
466
--
175
--
306--
64 --
42--
112
-- 18-- 5
--0 --0

MC CALLUM WAY
196

MC CALLUM WAY
286
--
2--
1 DINAH SHORE DR
860

DINAH SHORE DR
772
--
681
--
506

DINAH SHORE DR
822

DINAH SHORE DR
800

DINAH SHORE DR
822

DINAH SHORE DR
800

VISTA CHINO
2537

VISTA CHINO
2224

CATHEDRAL CANYON DR
3465

CATHEDRAL CANYON DR
3703

CATHEDRAL CANYON DR
2639

CATHEDRAL CANYON DR
1519

DATE PALM
DR
3519

DATE PALM
DR
2889
DA V
ALL DR
914
DA V
ALL DR
742
DA V
ALL DR
762
DA V
ALL DR
578

MC CALLUM WAY
647

MC CALLUM WAY
535

LANDAU BLVD
1029

LANDAU BLVD
972

LANDAU BLVD
1343

LANDAU BLVD
1234

VARNER RD
142

VARNER RD
302

VARNER RD
147

VARNER RD
304

LANDAU BLVD
2084

LANDAU BLVD
1493

RAMON RD
3406

RAMON RD
3680 RAMON RD
3619

RAMON RD
3918
--
125--
149
30TH AVE
315
30TH AVE
388

SONNY BONO MEMORIAL FWY
12561

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FWY
12561

SONNY BONO MEMORIAL FWY
0 VISTA CHINO
2543

VISTA CHINO
2737

SONNY BONO MEMORIAL FWY
15330

SONNY BONO MEMORIAL FWY
0 VARNER RD
136

VARNER RD
302

SONNY BONO MEMORIAL FWY
18509SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FWY
18509

SONNY BONO MEMORIAL FWY
0 -- 101
-- 179
--1--1
-- 2-- 1
-- 150
-- 25
7 RAMON RD
3491

RAMON RD
3770
--0--0

SONNY BONO MEMORIAL FWY
10091

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FWY
16229

SONNY BONO MEMORIAL FWY
0 --54
--105
--1--0

VARNER RD
1653VA

RNER RD
767

VARNER RD
139

VARNER RD
301
--
121
--155
--108
--172
--35
--7

SONNY BONO MEMORIAL FWY
11267

SONNY BONO MEMORIAL FWY
0 E VISTA CHINO
4886

E VISTA CHINO
4136
30TH AVE
547
30TH AVE
603

VERONA RD
143

VERONA RD
125
--
357
--
480

E MESQUITE AVE
1077

E MESQUITE AVE
816

E MESQU

ITE AVE
1106

E MESQU

ITE AVE
856
-- 2
-- 1
-- 516
-- 656
--434
--951
-- 124-- 142
--
399
--
529
--
362
--
483
-- 2-- 1
--
320
--
547
--
285
--
378
--
3 --
2 --
184
--
107
--0
--0
--332
--520
--
2 --
1 --32--21
--
2 --
1 --1--1
--
211
--
206

EL CIELO RD
162

EL CIELO RD
52 --
28 --
13 VISTA CHINO
2979

VISTA CHINO
2470

VISTA CHINO
3059

VISTA CHINO
2507

DINAH SHORE DR
670

DINAH SHORE DR
934 DINAH SHORE DR
980

DINAH SHORE DR
1093

E BARISTO RD
912

E BARISTO RD
148

E BARISTO RD
874

E BARISTO RD
132
--
215--
227

RAMON RD
4805

RAMON RD
4653
--
321
--
260
--473
--581

DINAH SHORE DR
728

DINAH SHORE DR
847

DINAH SHORE DR
553

DINAH SHORE DR
738
--238
--181
-- 223
-- 201
--
88 --
77 --
2280
--
0 --
328--
420

DATE PALM
DR
1359

DATE PALM DR
682

DATE PALM
DR
1360

DATE PALM
DR
685
--
234
--
331
--65--30

RAMON RD
1412

RAMON RD
293
--
485
--
689
--0 --0

DA VALL DR
892

DA VALL DR
725
--472
--802
-- 133
-- 210
--
586--
351
--351
--401
--
145
--
90 --
130
--
142

DATE PALM
DR
3494

DATE PALM
DR
2931

DINAH SHORE DR
670

DINAH SHORE DR
934
--
2 --
1 CROSSLEY RD
575

CROSSLEY RD
593

CROSSLEY RD
394

CROSSLEY RD
504
--307
--295
-- 1436-- 1216
--
414
--
583
--
470--
559

VARNER RD
136

VARNER RD
302
--
95 --
96 --710
--720
--201
--295

E RAMON RD
4448

E RAMON RD
3276
-- 2-- 1

VERONA RD
225

VERONA RD
212

VERONA RD
0 VERONA RD
0 RAMON RD
4725

RAMON RD
4336
--554
--953
--
2--
1 --242
--157
-- 408-- 477

N GENE AUTRY
TR
L
2149

N GENE AUTRY
TR
L
3598

N GENE AUTRY TRL
2032

N GENE AUTRY TRL
2935
--
2--
1 -- 5-- 11

E MESQUITE AVE
454

E MESQUITE AVE
499
--
1409
--
2270
30TH AVE
911
30TH AVE
521
--
133--
201
--
461
--
276

RAMON RD
5413

RAMON RD
4036 RAMON RD
5414

RAMON RD
4037
--317
--220

E MESQUITE AVE
1197

E MESQUITE AVE
1092 E MESQUITE AVE
1282

E MESQUITE AVE
996
S E
L CIE
LO R
D
114

CROSSLEY RD
1206

CROSSLEY RD
1014

CROSSLEY RD
744

CROSSLEY RD
737
PLUM
LEY RD
0PLUM
LEY RD
0 --
1715--
2211
-- 429
-- 716
AVENID
A M

ARAVILLA
114
AVENID
A M

ARAVILLA
63 --
32--
50 30TH AVE
596
30TH AVE
605

LANDAU BLVD
125

LANDAU BLVD
143

LANDAU BLVD
1221

LANDAU BLVD
914

RAMON RD
4748

RAMON RD
3962
--615
--1012

VARNER RD
138

VARNER RD
301

DA VALL DR
388

DA VALL DR
315

DA VALL DR
496

DA VALL DR
499
PALM

SPRINGS AIRPORT ACCESS RD
0PALM

SPRINGS AIRPORT ACCESS RD
0 -- 291
-- 380
--263
--126
--
278
--
455

BOB HOPE DR
3742

BOB HOPE DR
3602

DATE PALM
DR
3605

DATE PALM
DR
2802
--257
--295

MC CALLUM WAY
892

MC CALLUM WAY
969
-- 0-- 0
--
494--
434
--
282
--
173

DATE PALM
DR
1398

DATE PALM
DR
913

DATE PALM
DR
2081

DATE PALM
D
R
1417

DATE PALM
DR
3769

DATE PALM
DR
2781
-- 29-- 38

DATE PALM
DR
5270

DATE PALM
DR
4834
-- 376-- 205

RAMON RD
3423

RAMON RD
3652

RAMON RD
3741

RAMON RD
4008
--
2 --
1 --
148--
181
--
28 --
39 --2--1
--
283--
43 30TH AVE
507
30TH AVE
567
--
307
--
174
--
2507--
0 VISTA CHINO
3059

VISTA CHINO
2507

VISTA CHINO
2817

VISTA CHINO
2169

DATE PALM
DR
1569

DATE PALM
DR
952

DATE PALM
DR
1398

DATE PALM
DR
913

SONNY BONO MEMORIAL FWY
0 RAMON RD
4798

RAMON RD
4657
--3179
--0
E MESQUITE AVE1106
E MESQUITE AVE856
--
0 --
0 --
196
--
81 SONNY BONO MEMORIAL FWY
10091

DINAH SHORE DR
1106

DINAH SHORE DR
856 DINAH SHORE DR
1106

DINAH SHORE DR
856

EL CIELO RD
194

EL CIELO RD
165

SONNY BONO MEMORIAL FWY
12561

SONNY BONO MEMORIAL FWY
0 AVENID
A M

ARAVILLA
334
AVENID
A M

ARAVILLA
590
--
2 --
1 DATE PALM
DR
3044

DATE PALM
DR
2237
--
2 --
1 DINAH SHORE DR
0 DINAH SHORE DR
0 --
423--
85 SAN LUIS REY DR
0 SAN LUIS REY DR
0 SAN LUIS
REY D
R
487SAN LUIS
REY DR
617
--2
--1

DA VALL DR
987

DA VALL DR
945

VISTA CHINO
2624

VISTA CHINO
2306

E MESQUITE AVE
45E MESQUITE AVE
25 E MESQUITE AVE
45 E MESQUITE AVE
25 --
2 --
1 --
263
--
202
--
3 --
2 E MESQUITE AVE
45 E MESQUITE AVE
25 --2022
--0

E MESQUITE AVE
454

E MESQUITE AVE
499

N GENE AU

TRY TRL
2935

N GENE AU

TRY TRL
2032

N GENE AUTRY TRL
2873

N GENE AUTRY TRL
2047

SAN LUIS REY DR
529

SAN LUIS REY DR
399

SAN LUIS REY DR
0 SAN LUIS REY DR
0 N GENE AUTRY TRL
2893

N GENE AUTRY TRL
2264

MC CALLUM WAY
484

MC CALLUM WAY
638

N GENE AUTRY TRL
2757

N GENE AUTRY TRL
2195
--2469
--
0 MC CALLUM WAY
892

MC CALLUM WAY
969

DATE PALM
DR
2278

DATE PALM
DR
1680
30TH AVE
650
30TH AVE
997
30TH AVE
885
30TH AVE
1062
--
10 --
15 --
137--
69 DATE PALM
DR
3983

DATE PALM
DR
3023

DATE PALM
DR
3749

DATE PALM
DR
2849

DATE PALM
DR
1569

DATE PALM
DR
952
-- 2-- 1
--
2 --
12 E RAMON RD
2956

E RAMON RD
2745

E RAMON RD
3591

E RAMON RD
3160

LANDAU BLVD
1922

LANDAU BLVD
1422

LANDAU BLVD
1922

LANDAU BLVD
1422
--3179
--0

MC CALLUM WAY
870

MC CALLUM WAY
718

MC CALLUM WAY
581

MC CALLUM WAY
550
--
40 --
29 -- 2
-- 1
--0--0
--446
--303

PALM SPRINGS AIRPORT ACCESS RD
196
--
964
--
419

RAMON RD
4022

RAMON RD
2851

RAMON RD
4134

RAMON RD
2819

S GENE AUTRY TRL
2355

S GENE AUTRY TRL
1794

S GENE A

UTRY TRL
1768

S GENE AUTRY TRL
1444

S GENE AUTRY TRL
1768

S GENE AUTRY TRL
1444
S G
ENE A

UTRY TRL
1768
S G
ENE A

UTRY TRL
14 44

E RAMON RD
2956

E RAMON RD
2745

E RAMON RD
2900

E RAMON RD
2710

E RAMON RD
2900

E RAMON RD
2710

E RAMON RD
2900

E RAMON RD
2710
AVENID
A M
ARAVIL
LA
291
AVENID
A M
ARAVIL
LA
274
AVENID
A M

ARAVILLA
291
AVENID
A M

ARAVILLA
274

E BARISTO RD
937

E BARISTO RD
0 RAMON RD
4621

RAMON RD
3436
-- 91-- 70

RAMON RD
4621

RAMON RD
3436

N GENE AUTRY TRL
3920

N GENE AUTRY TRL
2273

N GENE A

UTRY TRL
4037

N GENE AUTRY TRL
2347

LANDAU B
LV
D
1926

LANDAU B
LV
D
1487

LANDAU BLVD
1926

LANDAU BLVD
1487

DATE PALM
DR
1362

DATE PALM
DR
689
PALM

SPRINGS AIRPORT ACCESS RD
206
PALM

SPRINGS AIRPORT ACCESS RD
0 DATE PALM
DR
3099

DATE PALM
DR
2400
--1294
--0
--1294
--0
--20--30
--
235
--
164

SONNY BONO MEMORIAL FWY
18509

SONNY BONO MEMORIAL FWY
18509

AVENIDA M

ARAVILLA
334

AVENIDA M

ARAVILLA
590
30TH AVE
537
30TH AVE
588
--
126--
80 DA VALL DR
761

DA VALL DR
674

DA VALL DR
813

DA VALL DR
659
PALM SPRINGS AIRPORT ACCESS RD22
PALM SPRINGS AIRPORT ACCESS RD0

AVENIDA M

ARAVILLA
261

AVENIDA M

ARAVILLA
340
AVENID
A M

ARAVILLA
291
AVENID
A M

ARAVILLA
274
34TH AVE
0 34TH AVE
034TH AVE
214
34TH AVE
140

MC CALLUM WAY
303

MC CALLUM WAY
400

RAMON RD
3423

RAMON RD
3652

E MESQUITE AVE
45 E MESQUITE AVE
25 E MESQUITE AVE
45E MESQUITE AVE
25 MC CALLUM WAY
303

MC CALLUM WAY
400
--
202--
263
--
1221
--
0 34TH AVE
222
34TH AVE
141
34TH AVE
214
34TH AVE
140
--3 --5
--
3179--
0 DATE PALM
DR
2942

DATE PALM
DR
2252

DATE PALM
DR
3516

DATE PALM
DR
2765
--0
--2469
--0
--
2022
--0
-- 131-- 83

DATE PALM
DR
1379

DATE PALM
DR
718
--179--301

BOB HOPE DR
3084

BOB HOPE DR
1588

BOB HOPE DR
3083

BOB HOPE DR
1587

E BARISTO RD
132E BARISTO RD
874
--2022 --0
--2022
--0
--1294
--0
--1294
--0
--
286
--
169

DATE PALM
DR
3116

DATE PALM
DR
3127

E BARISTO RD
764

E BARISTO RD
0 DATE PALM
DR
3263

DATE PALM
DR
2635

DATE PALM
DR
3116

DATE PALM
DR
3127

RAMON RD
3484

RAMON RD
3782

RAMON RD
3484

RAMON RD
3780
--
2507--
0 --
2507--
0 VARNER RD
126

VARNER RD
335
--
2280
--
2280
RIVCOM 4.01 - 2018 PM peak
period volumes (Wren Resi + Date Palm + Vallarata)
0 .05 .1 .15
Miles
HCMType
CC (6866)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12488)
PrArterial (8422)

SONNY BONO MEMORIAL FWY
19808

SONNY BONO MEMORIAL FWY
0 SONNY BONO MEMORIAL FWY
21937
--57--22

VARNER RD
309

VARNER RD
1105
--
93--
23 VISTA CHINO
302VISTA CHINO
225

VALLEY CENTER BLVD
23 VALLEY CENTER BLVD
10 Los Alom
os Rd
0 Los Alom
os Rd
0 --
0 --
0 SONNY BONO MEMORIAL FWY
19846

SONNY BONO MEMORIAL FWY
0 N G

ENE AUTRY T
RL
3976
N G

ENE AUTRY T
RL
2428

SONNY BONO MEMORIAL FWY
22265

SONNY BONO MEMORIAL FWY
0 VALLEY CENTER BLVD
0 VALLEY CENTER BLVD
0 --
11 --
4 --33
--36

DINAH SHORE DR
2002

DINAH SHORE DR
1702

N GENE AUTRY TRL
3977

N GENE AUTRY TRL
2428
--
88 --
141

SONNY BONO MEMORIAL FWY
19027

SONNY BONO MEMORIAL FWY
0 --
6--
2 RAMON RD
4618

RAMON RD
4517
--
21--
31 --182
--80
--12--8

SONNY BONO MEMORIAL FWY
21549SONNY BONO MEMORIAL FWY
0 --269--316

N GENE AUTRY TRL
2632

N GENE AUTRY TRL
3551
--
421
--
757
--
1--
0 VALLEY CENTER BLVD
0 VALLEY CENTER BLVD
0 --
525
--
178
--15--15
--
182
--
266

E VISTA CHINO
5781

E VISTA CHINO
4948
--116--83
--0
--0
--
166
-- 100

S GENE AUTRY TRL
1933

S GENE AUTRY TRL
1689

SONNY BONO MEMORIAL FWY
22761

SONNY BONO MEMORIAL FWY
0 --5--3
--
0--
0 SONNY BONO MEMORIAL FWY
19890

SONNY BONO MEMORIAL FWY
0 --
457
--
353

SONNY BONO MEMORIAL FW
Y
21985

SONNY BONO MEMORIAL FWY
0 AVEIDA QUINTANA
236AVEIDA QUINTANA
163

VISTA CHINO
3254

VISTA CHINO
2837
--40
--20
--
420--
149
-- 213
-- 290
-- 100
-- 250
-- 870-- 636
--
7--
4 DA VALL DR
1506

DA VALL DR
1240
--
40--
37 N GENE AU

TRY TRL
2909

N GENE AUTRY TRL
3438
-- 23-- 6

DINAH SHORE DR
1450

DINAH SHORE DR
1452

MC CALLUM WAY
791

MC CALLUM WAY
690

MC CALLUM WAY
141

MC CALLUM WAY
261

DINAH SHORE DR
1163

DINAH SHORE DR
1227

DINAH SHORE DR
1163

DINAH SHORE DR
1227

VISTA CHINO
3255

VISTA CHINO
2713

VARNER RD
298

VARNER RD
930

CATHEDRAL CANYON DR
2697

CATHEDRAL CANYON DR
1639

CATHEDRAL CANYON DR
2944

CATHEDRAL CANYON DR
3190
--
1047
--
854

LANDAU BLVD
1935

LANDAU BLVD
1781

RAMON RD
4436

RAMON RD
4382

LANDAU BLVD
2003

LANDAU BLVD
1783

LANDAU BLVD
2528

LANDAU BLVD
1682

DATE PALM
DR
3703

DATE PALM
DR
3384

VARNER RD
263

VARNER RD
922
30TH AVE
521
30TH AVE
262

DA VALL DR
1394

DA VALL DR
1151
--
13--
15 --
3--
2 RAMON RD
4555

RAMON RD
4522

VISTA CHINO
3174

VISTA CHINO
2973

VARNER RD
254

VARNER RD
930

SONNY BONO MEMORIAL FWY
19229

SONNY BONO MEMORIAL FWY
0 --27--12

RAMON RD
4508

RAMON RD
4273
-- 6-- 3
--0--0

DATE PALM
DR
3170

DATE PALM
D
R
2354
--
211
--
349

SONNY BONO MEMORIAL FWY
16893

SONNY BONO MEMORIAL FWY
0 -- 175
-- 283

SONNY BONO MEMORIAL FWY
19608

SONNY BONO MEMORIAL FWY
0 --
42--
14 --66
--113
--22--19

DINAH SHORE DR
1225

DINAH SHORE DR
1413

SONNY BONO MEMORIAL FWY
19265

SONNY BONO MEMORIAL FWY
0 VARNER RD
259

VARNER RD
921
--
164
--
232

VARNER RD
2884VA

RNER RD
1348
--
550
--
695
--46
--18

SONNY BONO MEMORIAL FWY
18085

SONNY BONO MEMORIAL FWY
0 DINAH SHORE DR
1316

DINAH SHORE DR
1408
30TH AVE
701
30TH AVE
434

VERONA RD
600

VERONA RD
841
-- 683
-- 822

SONNY BONO MEMORIAL FWY
19846

SONNY BONO MEMORIAL FWY
0 --
181
--
220

SONNY BONO MEMORIAL FWY
22265
-- 197-- 236
--
645
--
945

SONNY BONO MEMORIAL FWY
18679

SONNY BONO MEMORIAL FWY
0 -- 4
-- 2
-- 4-- 2
--
383
--
642

E BARISTO RD
2389

E BARISTO RD
729
--
336
--
445
--533
--535

DINAH SHORE DR
1753

DINAH SHORE DR
1603
--
200
--
315
--
309
--
252

VERONA RD
0 VERONA RD
0 --0
--0

VISTA CHINO
3899

VISTA CHINO
3021
--508
--610
--
36 --
64 --
5 --
3 --38--21
--116--120

EL CIELO RD
429
--
190
--
205

DA VALL DR
1851

DA VALL DR
1252

SONNY BONO MEMORIAL FWY
20967SONNY BONO MEMORIAL FWY
0 --
63 --
29 EL CIELO RD
272

DINAH SHORE DR
1290

DINAH SHORE DR
1373

LANDAU BLVD
1342

LANDAU BLVD
1721

VISTA CHINO
3761

VISTA CHINO
2932

CROSSLEY RD
609

CROSSLEY RD
671

RAMON RD
4933

RAMON RD
4276

RAMON RD
6771

RAMON RD
4623
--483
--594
--
421--
389
--
379
--
300
--
0--
0 DATE PALM DR
1798

DATE PALM DR
1062
--
587
--
562
--
416--
562

E MESQUITE AVE
595E MESQUITE AVE
429
--
2657
--
0 --229
--173
--155
--228

DATE PALM
DR
3252

DATE PALM
DR
2803

E MESQUITE AVE
595

E MESQUITE AVE
429
--
194
--
319

SONNY BONO MEMORIAL FWY
19265

SONNY BONO MEMORIAL FW
Y
0 DINAH SHORE DR
1225

DINAH SHORE DR
1413

RAMON RD
2622

RAMON RD
1116

VARNER RD
262

VARNER RD
989
--
301
--
117

E BARISTO RD
2356

E BARISTO RD
696
--
539
--
727
--589--160
--0 --0

DA VALL DR
1626

DA VALL DR
1179
-- 133-- 206
--356
--571
-- 621
-- 799

DATE PALM
DR
3607

DATE PALM
DR
3472

E RAMON RD
3005

E RAMON RD
2834
--
247
--
245

LANDAU BLVD
2446

LANDAU BLVD
1818

RAMON RD
4766

RAMON RD
4476
--
455
--
656

DA VALL DR
235

DA VALL DR
165

N GENE AUTRY
TR
L
2733

N GENE AUTRY
TR
L
4320
--
0 --
0 --
583--
343
--
84 --
87 --
1650
--
2445
--
9 --
5 --855
--867
--
30--
10 --
206--
343
--328
--284

E RAMON RD
5384

E RAMON RD
3553
--
1717
--
2575

RAMON RD
5700

RAMON RD
4797
--608
--1030
-- 9-- 5
-- 465-- 554

DINAH SHORE DR
916

DINAH SHORE DR
1242
--
164--
207

E MESQUITE AVE
1151

E MESQUITE AVE
1167
--533
--296
30TH AVE
961
30TH AVE
554

LANDAU BLVD
1207

LANDAU BLVD
1345
PALM

SPRINGS AIRPORT ACCESS RD
780
PALM

SPRINGS AIRPORT ACCESS RD
0 --
174
--
209
--36 --37

CROSSLEY RD
1613

CROSSLEY RD
970
--226
--701

VARNER RD
254

VARNER RD
926
--
153--
219
--
842
--
486

E MESQUITE AVE
2042

E MESQUITE AVE
1647

S GENE AUTRY TRL
2479

S GENE AUTRY TRL
2327

N GENE AUTRY TRL
2648

N GENE AUTRY TRL
3624

E MESQUITE AVE
2148

E MESQUITE AVE
1515
S E
L CIE
LO R
D
597
-- 154-- 89
PLUM
LEY RD
0PLUM
LEY RD
0 S GENE AUTRY TRL
2007

S GENE AUTRY TRL
2142
-- 527
-- 796
AVENID
A M

ARAVILLA
105
AVENID
A M

ARAVILLA
7 --
280
--0
--1494
--1294
30TH AVE
554
30TH AVE
569

CROSSLEY RD
1289

CROSSLEY RD
1019
--
712--
425

E RAMON RD
2522

E RAMON RD
2550

E RAMON RD
2529

E RAMON RD
2560

DA VALL DR
1352

DA VALL DR
1090
AVENID
A M

ARAVILLA
281
AVENID
A M

ARAVILLA
207
--
1339--
1785
--684
--1083
-- 762
-- 888

RAMON RD
5743

RAMON RD
4252

N GENE A

UTRY TRL
4114

N GENE AUTRY TRL
2522

DINAH SHORE DR
916

DINAH SHORE DR
1242

VISTA CHINO
3899

VISTA CHINO
3021

VARNER RD
256

VARNER RD
922
--447
--201

LANDAU BLVD
2423

LANDAU BLVD
1845

DA VALL DR
1498

DA VALL DR
1158
--
248
--
412

SONNY BONO MEMORIAL FWY
21937

BOB HOPE DR
3935

BOB HOPE DR
4152
--41 --60
--
90 --
62 --76--33

DATE PALM
DR
3742

DATE PALM
DR
3344

DATE PALM
DR
1948

DATE PALM
DR
1150
--417
--463
--1762
--0

MC CALLUM WAY
1176

MC CALLUM WAY
1345
--
554--
505
--280--0

LANDAU BLVD
1763

LANDAU BLVD
1484
-- 0-- 0

SONNY BONO MEMORIAL FWY
22265SONNY BONO MEMORIAL FWY
0 -- 401-- 220

EL CIELO RD
477

DATE PALM
DR
4456

DATE PALM
DR
3910

DATE PALM
DR
6015

DATE PALM
DR
5418
--
625
--
0 --625
--0
--
379--
116

CROSSLEY RD
497

CROSSLEY RD
552
--
153--
174

MC CALLUM WAY
900

MC CALLUM WAY
1094
--582
--0
--6--3
30TH AVE
468
30TH AVE
581
--
1 --
1 E MESQUITE AVE
595

E MESQUITE AVE
429
--1129
--0
--
2320--
0 --
582
--
0 34TH AVE
260
34TH AVE
167
--0

DA VALL D
R
1457

DA VALL D
R
1233
--
83 --
46 SONNY BONO MEMORIAL FWY
0 SAN LUIS REY DR
0 SAN LUIS REY DR
0 --0
--0

RAMON RD
4964

RAMON RD
4319

RAMON RD
6744

RAMON RD
4611
--
0--
0 --3532
--0
DINAH SHORE DR2002
DINAH SHORE DR1702

SONNY BONO MEMORIAL FWY
18679

SONNY BONO MEMORIAL FWY
21985
--
0 --
0 VISTA CHINO
225

VISTA CHINO
302
--
385--
234
--
26 --
23 SONNY BONO MEMORIAL FWY
16893

VISTA CHINO
3655

VISTA CHINO
2824

RAMON RD
4776

RAMON RD
4076

VERONA RD
762

VERONA RD
1078
--
776 --
0 SONNY BONO MEMORIAL FWY
19846
AVENID
A M

ARAVILLA
345
AVENID
A M

ARAVILLA
561
--1
--1

DA VALL DR
235

DA VALL DR
165

LANDAU BLVD
993LANDAU BLVD
592
--2997
--0
DA

VALL DR
1549
DA

VALL DR
1027
--
348
--
0 LANDAU BLVD
23 LANDAU BLVD
10 SAN LUIS REY DR
0 SAN LUIS REY DR
0 DATE PALM
DR
3727

DATE PALM
DR
3003
--
6 --
3 N GENE AUTRY TRL
3535

N GENE AUTRY TRL
2862

N GENE AUTRY TRL
3624

N GENE AUTRY TRL
2648
--
6 --
3 MC CALLUM WAY
1176

MC CALLUM WAY
1345

SAN LUIS REY DR
647

SAN LUIS REY DR
772

VISTA CHINO
3491

VISTA CHINO
2875
--
3 --
2 RAMON RD
5694

RAMON RD
4391
--
271
--
201
--2134
--0
--2997
--
0 DATE PALM
DR
3761

DATE PALM
DR
3007
30TH AVE
678
30TH AVE
1061
30TH AVE
956
30TH AVE
1157
--
114
--
183
--1129
--0
--
26 --
14 --
191--
92 DATE PALM DR
5049

DATE PALM DR
4184

N GENE AUTRY TRL
3551

N GENE AUTRY TRL
2632

MC CALLUM WAY
1259

MC CALLUM WAY
992

N GENE AUTRY TRL
3345

N GENE AUTRY TRL
2770

MC CALLUM WAY
1073

MC CALLUM WAY
1323
--0
--0

DATE PALM
DR
3416

DATE PALM
DR
2815

DATE PALM
DR
4763

DATE PALM
DR
3977
--3532
--0

DATE PALM
DR
2390

DATE PALM
DR
1447
--6--3
--0--0

MC CALLUM WAY
944

MC CALLUM WAY
976

BOB HOPE DR
3454

BOB HOPE DR
2267

RAMON RD
5096

RAMON RD
3480
--
6 --
3 --
50 --
36 RAMON RD
4875

RAMON RD
3466
--549
--342
--
99 --
95 E BARISTO RD
2386

E BARISTO RD
0 DATE P
ALM
D
R
3751
DATE P
ALM
D
R
3180

EL CIELO RD
499

DA VALL DR
1550

DA VALL DR
1168
--0--0
PALM

SPRINGS AIRPORT ACCESS RD
1744
PALM

SPRINGS AIRPORT ACCESS RD
0 34TH AVE
0 34TH AVE
0 --
1052
--
440
--
582
--
0 --
201
--
160

DATE PALM
DR
3416

DATE PALM
DR
2815
--24--38

LANDAU BLVD
1342

LANDAU BLVD
1721

DINAH SHORE DR
1225

DINAH SHORE DR
1413
--
162--
79 AVENIDA M

ARAVILLA
345

AVENIDA M

ARAVILLA
561
30TH AVE
675
30TH AVE
420

AVENIDA M

ARAVILLA
281

AVENIDA M

ARAVILLA
207
--2134
--0
--1762
--0
PALM SPRINGS AIRPORT ACCESS RD53
PALM SPRINGS AIRPORT ACCESS RD0

AVENIDA M

ARAVILLA
276

AVENIDA M

ARAVILLA
327

RAMON RD
4776

RAMON RD
4076
--
776--
0 DA VALL D
R
235

DA VALL D
R
165
--
201--
271

DA VALL DR
1594

DA VALL DR
1146
--
935
--
0 34TH AVE
213
34TH AVE
139
--2 --4
--
3532--
0 --
970
--0

SAN LUIS REY DR
695

SAN LUIS REY DR
550
--970
--0

RAMON RD
5694

RAMON RD
4391

DATE PALM
DR
3609

DATE PALM
DR
3018

DATE PALM
DR
3775

DATE PALM
DR
3205
--
2134
--0
--183--304

RAMON RD
4555

RAMON RD
4522
--
2320--
0 DA VALL DR
981

DA VALL DR
415
--582
--0
-- 166-- 81

VARNER RD
327

VARNER RD
1126
--
348
--
0 DATE PALM
DR
2487

DATE PALM
DR
1540

E BARISTO RD
729E BARISTO RD
2389

DATE PALM
DR
1934

DATE PALM
DR
1149
--
2657

BOB HOPE DR
3454

BOB HOPE DR
2267
--
289
--
157

DATE PALM
DR
3698

DATE PALM
DR
3964

DA VALL DR
981

DA VALL DR
415

E BARISTO RD
731

E BARISTO RD
0 DATE PALM
DR
3911

DATE PALM
DR
3381

DATE PALM
DR
3698

DATE PALM
DR
3964

PALM SPRINGS AIRPORT ACCESS RD
0 BOB HOPE DR
3415

BOB HOPE DR
2265

LANDAU BLVD
1207

LANDAU BLVD
1345
RIVCOM 4.01 - 2045 PM peak
period volumes (Wren Resi + Date Palm + Vallarata)
0 .05 .1 .15
Miles
HCMType
CC (6866)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12488)
PrArterial (8422)
PM Peak Hour Growth
Intersection Approach RIVCOM
2018
RIVCOM
2045
RIVCOM
2018 to
RIVCOM
2045
Annual
Growth
Rate
Adjusted
2023 + 3
Projects
Adjusted
2045 Plus
Project
E 206 241 0.63% 821 929
S 5499 6931 0.96% 1969 2368
W 465 472 0.06% 446 451
N 5281 6730 1.02% 2346 2847
2 40% 60%
944 2,346 1402
↓ ↑
66 609 269
↙ ↓ ↘ ↖ 279
48% 215 ← ← 66 ← 430 52%
446 71 ↗ 2791 ↙ 85 821
52% 231 → 71 → → 391 48%
89 ↘ ↖ ↑ ↗
83 1052 51
↓ ↑
783 1,969 1186
40% 60%
1146 2847 1701
↓ ↑
71 757 318
↙ ↓ ↘ ↖ 330
217 ← ← 64 ← 489
451 76 ↗ 3,303 ↙ 95 929
234 → 68 → → 442
90 ↘ ↖ ↑ ↗
83 1295 56
↓ ↑
942 2368 1435
Existing Turning Movements
Existing Peak Hour Counts per intersection leg
Forecasted Peak Hour per intersection leg
Scenario: 2045 Plus Project
N/S Street: Date Palm Drive
E/W Street: Rosemount Road
Legend
Scenario: Adjusted 2023 Plus 3 Projects
N/S Street: Date Palm Drive
E/W Street: Rosemount Road
Intersection #: 2
Queuing and Blocking Report Date Palm Drive Mixed Use
Horizon Year 2045 Plus Project 05/30/2024
HY+P AM SimTraffic Report
Intersection: 2: Date Palm Drive & Rosemount Road
Movement EB EB WB WB NB NB NB NB NB SB SB SB
Directions Served L TR L TR L T T T R L T T
Maximum Queue (ft) 84 108 87 181 120 147 129 135 68 201 229 247 Average Queue (ft) 35 41 40 80 59 79 74 69 21 100 122 137 95th Queue (ft) 68 85 74 149 101 125 119 114 53 171 202 224 Link Distance (ft) 425 430 560 560 560 1210 1210
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 140 180 100 280
Storage Blk Time (%) 0 1 1 0 1 0 0
Queuing Penalty (veh) 0 0 1 0 0 0 0
Intersection: 2: Date Palm Drive & Rosemount Road
Movement SB SB
Directions Served T R
Maximum Queue (ft) 249 180
Average Queue (ft) 147 59
95th Queue (ft) 237 136
Link Distance (ft) 1210
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 140
Storage Blk Time (%) 14 0
Queuing Penalty (veh) 13 0
Queuing and Blocking Report Date Palm Drive Mixed Use
Horizon Year 2045 Plus Project 05/30/2024
HY+P PM SimTraffic Report
Intersection: 2: Date Palm Drive & Rosemount Road
Movement EB EB WB WB NB NB NB NB NB SB SB SB
Directions Served L TR L TR L T T T R L T T
Maximum Queue (ft) 122 193 190 331 236 327 327 285 177 307 189 180 Average Queue (ft) 53 69 70 148 81 220 192 153 33 177 68 84 95th Queue (ft) 98 138 147 267 185 314 280 235 103 281 160 162 Link Distance (ft) 425 430 560 560 560 1210 1210
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 140 180 100 280
Storage Blk Time (%) 1 4 0 11 0 16 15 2
Queuing Penalty (veh) 1 3 2 10 0 14 8 4
Intersection: 2: Date Palm Drive & Rosemount Road
Movement SB SB
Directions Served T R
Maximum Queue (ft) 208 113
Average Queue (ft) 98 27
95th Queue (ft) 179 75
Link Distance (ft) 1210
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 140
Storage Blk Time (%) 6 0
Queuing Penalty (veh) 4 0
APPENDIX L ‐
TRANSIT ROUTE INFORMATION
49 48
Effective January 7, 2024 Efectivo 7 de enero de 2024SunLine Transit Agency • SunLine.org ROUTE
RUTA
4 PALM DESERT MALL

PALM SPRINGS
L
L

RA TTLER RD
M
H
H

SOUTH PALM CANYON

INDIAN CANYON DR

EL CIELO RD RD

ROUTE / RUT A

POST OFFICE / OFICINA POST AL

HOSPIT AL

SCHOOL / ESCUELA

MALL / CENTRO COMERCIAL

SENIOR CENTER / CENTRO PARA ADUL TOS MA YORES
CASINO

AIRPORT / AEROPUERTO

CITY HALL / A YUNT AMIENTO

LIBRARY / BIBLIOTECA

SUNLINE TRANSIT AGENCY

TIMEPOINT / PUNTO DE TIEMPO

TRANSFER POINT / PUNTO DE TRANSFERENCIA

TOWN CENTER WA Y

BOB HOPE DR

DA TE PALM

MONTEREY AVE MONTEREY AVE

FARRELL DR

SUNRISE WA Y

VIST A CHINO
AVE 30TH

DINAH SHORE DR

GA TEWA Y DRN PALM CANYON DRN PALM CANYON DR

COUNTRY CLUB DR

RAMON RDRAMON RD

FRED WARING DR
HWY 111

EAST T AHQUITZ CANYON WA YEAST T AHQUITZ CANYON WA Y

RACQUET CLUB DR

ROSA PARKS RD

T ACHEVAH DR

STEVENS RD

AVENIDA MARAVILLA

E BARISTO
M
S

P ALM SPRINGS

P ALM SPRINGS

THOUSAND
P ALMS
RANCHO
MIRAGE
P ALM
DESERT

CA THEDRAL
CITY

N INDIAN CANYON
Route 4

WESTFIELD PALM DESERT - PALM SPRINGS
H
C
C
C

E SAN RAFAEL DR

GENE AUTRY GENE AUTRY

SHOPPERS LN
N
6 2
1WV
1EV
5 2
1WV
2 L
L

RA TTLER RD
M
H
H

SOUTH PALM CANYON

INDIAN CANYON DR

EL CIELO RD RD

ROUTE / RUT A

POST OFFICE / OFICINA POST AL

HOSPIT AL

SCHOOL / ESCUELA

MALL / CENTRO COMERCIAL

SENIOR CENTER / CENTRO PARA ADUL TOS MA YORES
CASINO

AIRPORT / AEROPUERTO

CITY HALL / A YUNT AMIENTO

LIBRARY / BIBLIOTECA

SUNLINE TRANSIT AGENCY

TIMEPOINT / PUNTO DE TIEMPO

TRANSFER POINT / PUNTO DE TRANSFERENCIA

TOWN CENTER WA Y

BOB HOPE DR

DA TE PALM

MONTEREY AVE MONTEREY AVE

FARRELL DR

SUNRISE WA Y

VIST A CHINO
AVE 30TH

DINAH SHORE DR

GA TEWA Y DRN PALM CANYON DRN PALM CANYON DR

COUNTRY CLUB DR

RAMON RDRAMON RD

FRED WARING DR
HWY 111

EAST T AHQUITZ CANYON WA YEAST T AHQUITZ CANYON WA Y

RACQUET CLUB DR

ROSA PARKS RD

T ACHEVAH DR

STEVENS RD

AVENIDA MARAVILLA

E BARISTO
M
S

P ALM SPRINGS

P ALM SPRINGS

THOUSAND
P ALMS
RANCHO
MIRAGE
P ALM
DESERT

CA THEDRAL
CITY

N INDIAN CANYON
Route 4

WESTFIELD PALM DESERT - PALM SPRINGS
H
C
C
C

E SAN RAFAEL DR

GENE AUTRY GENE AUTRY

SHOPPERS LN
N
6 2
1WV
1EV
5 2
1WV
2 L
L

RA TTLER RD
M
H
H

SOUTH PALM CANYON

INDIAN CANYON DR

EL CIELO RD RD

ROUTE / RUT A

POST OFFICE / OFICINA POST AL

HOSPIT AL

SCHOOL / ESCUELA

MALL / CENTRO COMERCIAL

SENIOR CENTER / CENTRO PARA ADUL TOS MA YORES
CASINO

AIRPORT / AEROPUERTO

CITY HALL / A YUNT AMIENTO

LIBRARY / BIBLIOTECA

SUNLINE TRANSIT AGENCY

TIMEPOINT / PUNTO DE TIEMPO

TRANSFER POINT / PUNTO DE TRANSFERENCIA

TOWN CENTER WA Y

BOB HOPE DR

DA TE PALM

MONTEREY AVE MONTEREY AVE

FARRELL DR

SUNRISE WA Y

VIST A CHINO
AVE 30TH

DINAH SHORE DR

GA TEWA Y DRN PALM CANYON DRN PALM CANYON DR

COUNTRY CLUB DR

RAMON RDRAMON RD

FRED WARING DR
HWY 111

EAST T AHQUITZ CANYON WA YEAST T AHQUITZ CANYON WA Y

RACQUET CLUB DR

ROSA PARKS RD

T ACHEVAH DR

STEVENS RD

AVENIDA MARAVILLA

E BARISTO
M
S

P ALM SPRINGS

P ALM SPRINGS

THOUSAND
P ALMS
RANCHO
MIRAGE
P ALM
DESERT

CA THEDRAL
CITY

N INDIAN CANYON
Route 4

WESTFIELD PALM DESERT - PALM SPRINGS
H
C
C
C

E SAN RAFAEL DR

GENE AUTRY GENE AUTRY

SHOPPERS LN
N
6 2
1WV
1EV
5 2
1WV
2 51
50 Effective January 7, 2024 Efectivo 7 de enero de 2024SunLine Transit Agency • SunLine.org ROUTE
RUTA
4 PALM DESERT MALL

PALM SPRINGS
Town Center Way @ Hahn
Dinah Shore @
Shoppers Ln
Date Palm @

Ramon
Palm Cyn @
Stevens
Sunrise W
a
y @
Vista Chino
Indian Canyon @
Ramon
El Cielo @
Kirk Douglas
6:10a 6:30a 6:46a 7:10a 7:25a 7:36a 7:47a
7:10a 7:30a 7:46a 8:10a 8:25a 8:36a 8:47a
8:10a 8:30a 8:46a 9:10a 9:25a 9:36a 9:47a
9:10a 9:30a 9:46a 10:10a 10:25a 10:36a 10:47a
10:10a 10:32a 10:49a 11:13a 11:28a 11:41a 11:53a
11:10a 11:32a 11:49a 12:13p 12:28p 12:41p 12:53p
12:10p 12:32p 12:49p 1:13p 1:28p 1:41p 1:53p
1:10p 1:32p 1:49p 2:13p 2:28p 2:41p 2:53p
2:10p 2:32p 2:49p 3:13p 3:28p 3:41p 3:53p
3:10p 3:32p 3:49p 4:13p 4:28p 4:41p 4:53p
4:10p 4:32p 4:49p 5:13p 5:28p 5:41p 5:53p
5:10p 5:31p 5:48p 6:12p 6:26p 6:40p 6:52p
6:10p 6:31p 6:48p 7:12p 7:26p 7:40p 7:52p
7:10p 7:31p 7:48p 8:12p 8:26p 8:40p 8:52p
8:10p 8:31p 8:47p 9:12p 9:26p 9:39p 9:50p
El Cielo @
Kirk Douglas
Vista Chino @
Sunrise Way
Ramon @ Date Palm
Dinah Shore @
Shoppers Ln
Town C
enter Wa
y
@ Hahn
6:10a 6:42a 7:05a 7:20a 7:41a
7:10a 7:42a 8:05a 8:20a 8:41a
8:10a 8:42a 9:05a 9:20a 9:41a
9:10a 9:42a 10:05a 10:20a 10:41a
10:10a 10:43a 11:05a 11:20a 11:43a
11:10a 11:43a 12:05p 12:20p 12:43p
12:10p 12:43p 1:05p 1:20p 1:43p
1:10p 1:43p 2:05p 2:20p 2:43p
2:10p 2:43p 3:05p 3:20p 3:43p
3:10p 3:43p 4:05p 4:20p 4:43p
4:10p 4:43p 5:05p 5:20p 5:43p
5:10p 5:43p 6:07p 6:20p 6:40p
6:10p 6:43p 7:07p 7:20p 7:40p
7:10p 7:43p 8:07p 8:20p 8:40p
8:10p 8:42p 9:03p 9:20p 9:38p
WESTBOUND | HACIA EL OESTEEASTBOUND | HACIA EL ESTE

EVERY DAY / HOLIDAY
TODOS LOS DÍAS /DÍA FESTIVO
For the VillageFest Thursday night detour, please
see the map on page 36-37.

Para ver el desvío del jueves del VillageFest, por
favor vea el mapa en las páginas 36 y 37.

Prepared for:

The Altum Group
44-600 Village Court Ste 100
Palm Desert, CA 92260
Prepared by:
23905 Clinton Keith 114-280
Wildomar, CA 92595
June 2024
Date Palm Drive Mixed Use
Vehicle Miles Traveled
Screening Assessment
Date Palm Drive Mixed Use

1.0 PROJECT INTRODUCTION
The purpose of this report is to evaluate the project’s Vehicle Miles Traveled (VMT) analysis requirements and compliance with Senate Bill 743 (SB 743) and the California Environmental Quality Act (CEQA).

1.1 PROJECT DESCRIPTION
The project will be developed on a vacant site located on the southeast corner of Date Palm Drive and Rosemount Road in Cathedral City. The project is proposing the construction of the following two land use scenarios, each in two phases:

Scenario 1
 Phase 1:
o 115,054 sf of mini warehouse (self-storage facility including office space)  Phase 2:
o 11,159 sf of strip retail plaza
o 7,030 sf of fast-food restaurant with drive-through window Scenario 2
 Phase 1:
o 115,054 sf of mini warehouse (self-storage facility including office space)  Phase 2:
o 54,725 sf of shopping plaza (including 50,000 sf of supermarket and 4,725 sf of retail) Additionally, Rosemount Road does not currently extend to Date Palm Drive. It is anticipated that the appropriate dedications and easements will be in place prior to project opening. Therefore, this report will address the following access scenarios:
 Alternative 1: Rosemount Road extension in place prior to opening year. Access to the project site will be provided via two driveways along Date Palm Drive and one driveway along Rosemount Road.
 Alternative 2: Rosemount Road extension not constructed prior to opening year. Access would be limited to two driveways along Date Palm Drive.

Figures 1-1 and 1-2 show Scenario 1 and 2 site plans, respectively.

1.2 SENATE BILL 743
On September 27, 2013, SB 743 was signed into State law and started a process intended to fundamentally change transportation impact analysis as part of the CEQA compliance. The California Natural Resource Agency updated the CEQA transportation analysis guidelines in 2018. In this update automobile delay and LOS metrics are no longer to be used in determining transportation impacts.

Instead VMT metrics will serve as the basis in determining impacts. Furthermore, the guidelines stated that after July 1, 2020, transportation analysis under CEQA must use VMT to determine impacts for land use projects.

Date Palm Drive Mixed Use

1.3 GUIDANCE DOCUMENTS
The project is within Cathedral City and the County of Riverside. The City has not adopted guidance on evaluating VMT for transportation impacts under CEQA. Therefore, the County of Riverside Transportation Analysis Guidelines for Level of Service (LOS) and Vehicle Miles Traveled (VMT), December 2020, hereafter referred to as Guidelines, will be used for this analysis.

Date Palm Drive Mixed Use
Project Site Plan (Scenario 1)
Figure 1-1
Rosemount Road

NOT A PART

NOT A PART
Date Palm Drive Mixed Use
Project Site Plan (Scenario 2)
Figure 1-2
Rosemount Road

NOT A PART

NOT A PART
Date Palm Drive Mixed Use
5 2.0 ANALYSIS METHODOLGY
The Guidelines outline 5 major-steps1 for CEQA assessment and VMT analysis:
 Evaluation of land use type
 Screening criteria under which projects are not required to submit a detailed VMT analysis  Significance thresholds
 VMT analysis methodologies
 Mitigation measures for significant and unavoidable impacts

2.1 SCREENING CRITERIA
The Guidelines recognize that certain projects based on type, location, size and other contexts could lead to a presumption of less than significance (i.e. the project’s VMT would not cause a transportation impact under CEQA) and would not need additional VMT analysis. The Guidelines provide the following screening criteria2:

1. Small Projects –
a. Single Family Housing projects less than or equal to 110 Dwelling Units; or b. Multi Family (low rise) Housing projects less than or equal to 147 Dwelling Units; or c. Multi Family (mid-rise) Housing projects less than or equal to 194 Dwelling Units; or d. General Office Building with area less than or equal to 165,000 SF; or e. Retail buildings with area less than or equal to 60,000 SF; or f. Warehouse (unrefrigerated) buildings with area less than or equal to 208,000 SF; or g. General Light Industrial buildings with area less than or equal to 179,000 SF Project GHG emissions less than 3,000 Metric Tons of Carbon Dioxide Equivalent (MTCO2e) as determined by a methodology acceptable to the Transportation Department; or h. Unless specified above, project trip generation is less than 110 trips per day per the ITE Manual or other acceptable source determined by Riverside County.

2. Projects near high quality transit – The project is located within half mile of an existing major transit stop and maintains a service interval frequency of 15 minutes or less during the morning and afternoon peak commute periods.

3. Local-serving retail – No single store on-site exceeds 50,000 SF and project is local-serving as determined by the Transportation Department

4. Affordable Housing – A high percentage of affordable housing is provided as determined by the Riverside County Planning and Transportation Departments.

5. Local Essential Services –
a. Project is local-serving as determined by the Transportation Department; and b. Local-serving and Day care center; or
c. Police or Fire facility; or
d. Medical/Dental office building under 50,000 square feet; or e. Government offices (in-person services such as post office, library, and utilities); or f. Local or Community Parks

6. Map-based Screening – Area of development is under threshold as shown on screening map as allowed by the Transportation Department

7. Redevelopment projects – Project replaces an existing VMT-generating land use and does not result in a net overall increase in VMT.
1 Guidelines, Pages 18-24
2 Guidelines, Figure 3, pages 19-21
Date Palm Drive Mixed Use
6 2.2 VMT THRESHOLDS
A land use project should determine the appropriate VMT measure and threshold of significance to apply. The thresholds3 as defined by the Guidelines are as follows:
 Residential Projects: Existing county-wide average 15.2 VMT per capita  Office: Existing county-wide average 14.2 VMT per employee  Retail: No net increase in total regional VMT
 Other Employment: Existing county-wide average 14.2 VMT per employee  Other Customer: No net increase in total regional VMT  Mixed-Use Projects: Respective VMT threshold for its multiple distinct land uses

2.3 VMT ASSESSMENT
Projects that do not meet any of the screening criteria identified would need to assess its project VMT using one of the following methods per the Guidelines:
 Riverside County Sketch Planning Tool; or
 RIVTAM/RIVCOM or other approved travel demand forecasting model.

3.0 PROJECT ANALYSIS
The Project proposes the construction of the following two land use scenarios, each in two phases:

Scenario 1
 Phase 1:
o 115,054 sf of mini warehouse (self-storage facility including office space)  Phase 2:
o 11,159 sf of strip retail plaza
o 7,030 sf of fast-food restaurant with drive-through window Scenario 2
 Phase 1:
o 115,054 sf of mini warehouse (self-storage facility including office space) o Phase 2:54,725 sf of shopping plaza (including 50,000 sf of supermarket and 4,725 sf of retail)

3.1 SCREENING CRITERIA ASSESSMENT

1. Small Project
Project Phase 1 proposes 115,054 SF of mini warehouse. This land use component is a warehouse building with area less than or equal to 208,000 SF. Therefore, the mini warehouse component of the Project would be presumed to cause a less than significant impact based on this criterion.

2. Projects Near High Quality Transit
3 Guidelines, Figure 6, page 22
Date Palm Drive Mixed Use
7 The Project is not located within half mile of an existing major transit stop and it’s the nearest transit stop does not maintain a service interval frequency of 15 minutes or less during the morning and afternoon peak commute periods. Therefore, the Project does not qualify for this criterion.

3. Local-serving Retail
Scenario 1 Phase 2 proposes 11,159 SF of strip retail plaza and 7,030 SF of fast-food restaurant with drive-through. Additionally, Scenario 2 Phase 2 proposes 50,000 SF of supermarket and 4,725 SF of retail. Each of these single retail uses in Scenarios 1 and 2 do not exceed 50,000 SF and are local-serving. Therefore, the retail plaza, fast-food restaurant, and supermarket components of the Project would be presumed to cause a less than significant impact based on this criterion.

4. Affordable Housing
Scenarios 1 & 2 are not affordable housing projects and therefore do not qualify for this criterion.

5. Local Essential Service
The Project proposes mini warehouse, strip retail, shopping plaza, and fast-food restaurant land uses. Scenarios 1 and 2 do not include local essential service land use components and therefore, do not qualify for this criterion.

6. Map-Based Screening
The Project proposes mini warehouse, strip retail, shopping plaza, and fast-food restaurant land uses. Scenarios 1 and 2 do not include residential and office land use components and therefore, do not qualify for this criterion.

7. Redevelopment Project
The Project is proposed on a vacant lot and does not replace an existing VMT-generating land use. Therefore, the Project does not qualify for this criterion.

3.2 CONCLUSION
As concluded in Section 3.1 of this report, the proposed project screens out from VMT analysis since the mini warehouse component satisfies the Small Project screening criterion, and the strip retail plaza, shopping plaza, and fast-food restaurant components meet the Local-serving retail screening criterion. Therefore, Scenario 1 and 2 land use components are presumed to cause less than significant VMT impacts. It is our recommendation that the project be approved with no additional project-level VMT analysis.

← All documents from this meeting