Cities Index.
14.10 Appendix G-1 Traffic Impact Analysis

Cathedral City City Council
January 8, 2025

Document
14.10 Appendix G-1 Traffic Impact Analysis
Meeting
January 8, 2025
Body
Cathedral City City Council
Pages
22
Original file
46.6 MB
Text extracted from the city's file for reading and search. Open the original on cathedralcity.primegov.com. That file is the official record.

The Wren Multiple-Family Development Project
Appendix G-1
The Wren Project Transportation Analysis
Integrated Engineering Group
July 2024
Prepared for:

Coachella Valley Community Development Group
36101 Bob Hope Drive, Suite E5
Rancho Mirage, CA 92270
Prepared by:
23905 Clinton Keith Road, 114-280
Wildomar, CA 92595
July 2024
The Wren Project
Transportation Analysis

Wren Project TA Executive Summary
i

EXECUTIVE SUMMARY

Purpose of the Report
The purpose of this transportation analysis (TA) report is to identify and document potential traffic deficiencies related to The Wren project (Project) in Cathedral City, according to the County of Riverside Transportation Analysis Guidelines for Level of Service (LOS) and Vehicle Miles Traveled (VMT), December 2020 (Guidelines) . This technical report will also recommend transportation improvements to address potential project deficiencies at local and regional transportation facilities.

Project Overview
The Project will be developed on a vacant site located on the northeast corner of Date Palm Drive and future Rosemount Road extension. The Project is proposing the construction of 204 multi-family (low- rise) dwelling units.

Under existing conditions, Rosemount Road does not extend to Date Palm Drive. The Project will be conditioned to construct half-width roadway improvement along the property frontage on Rosemount Road including curb, gutter, sidewalk and paving. Therefore, access to the Project site will be provided via one proposed driveway along Rosemount Road extension and one existing driveway along Date Palm Drive through an access easement to the adjacent Northgate Community Church site. Additionally, the Project will construct a traffic signal at the new intersection of Rosemount Road and Date Palm Drive.

The Project trip generation was calculated using the ITE Trip Generation Manual (1 1th Edition). It is estimated that the Project will generate 1,375 total daily trips, 81 AM peak hour trips and 104 PM peak hour trips. Project trip distribution and assignment were developed, in coordination with the Cathedral City staff, based on the land use characteristics of the Project and surrounding area, existing travel patterns within the study area, anticipated travel patterns to and from the Project site, and approved projects located in the vicinity of the Project site. Analysis scenarios and study area were then established in coordination with City staff to determine the potential project deficiencies on the transportation network. Refer to Appendix A for approved scoping agreement.

Analysis Scenarios:
• Existing Conditions Year 2023
• Project Completion Year 2025 (Existing plus Ambient plus Project) • Cumulative Year 2025 (Existing plus Ambient plus Cumulative plus Project) • Horizon Year 2045 No Project Conditions
• Horizon Year Plus Project Conditions

Study Area Intersections:

1. Date Palm Drive and McCallum Way

2. Date Palm Drive and Rosemount Road

3. Date Palm Drive and 30th Avenue

Study Roadway Segments:

1. Date Palm Drive, McCallum Way to Rosemount Road

2. Date Palm Drive, Rosemount Road to 30th Avenue

Wren Project TA Executive Summary
ii
Analysis Results and Recommendations

Existing Year 2023
All study area intersections operate at acceptable level of service ( LOS) under Existing Year 2023.

Additionally, all roadway segments have capacity at an acceptable LOS under Existing Year 202 3.

Therefore, no improvements are required by this Project.

Project Completion Year 2025
All study area intersections operate at acceptable LOS under Project Completion Year 202 5 Conditions. Additionally, all roadway segments have capacity at an acceptable LOS under Project Completion Year 2025. Therefore, no improvements are required by this Project.

Cumulative Year 2025
All study area intersections operate at acceptable LOS under Cumulative Year 202 5 Conditions.

Additionally, all roadway segments have capacity at an acceptable LOS under C umulative Year 2026 Conditions. Therefore, no improvements are required by this Project.

Horizon Year 2045 Scenario
All study area intersections operate at acceptable LOS under Horizon Year 20 45 No Project and Horizon Year Plus Project Conditions. Additionally, a ll roadway segments have capacity at an acceptable LOS under Horizon Year 20 45 No Project and Horizon Year Plus Project Conditions.

Therefore, no improvements are required by this Project.

Recommended Improvements
The proposed traffic signal at the new intersection of Date Palm Drive and Rosemount Road will be constructed by whichever project completes their final phase first between Date Palm Drive Mixed Use, the Wren Project, and the Future Shopping Center west of Date Palm Drive and Rosemount Road intersection. The City of Cathedral City Transportation Department staff has requested a fair share assessment to determine the percentage of new traffic volumes added to the intersection of Date Palm Drive and Rosemount Road . The three proposed developments are expected to add a total of 12,166 ADTs to the subject intersection. The three projects will contribute to the funding of this transportation improvement based on their portion of total ADT generated as follows:

1. Wren Development is projected to add 1,375 ADTs (13.43%),

2. Date Plam Mixed Use is projected to add 1,668 ADTs (16.29%)

3. Future Shopping Center to the west of Date Palm Drive and Rosemount Road intersection is projected to add 7,199 ADTs (70.29%)

Project will be conditioned to construct the signal and ensure full signal operation prior to the issuance of project first certificate of occupancy.

Table ES -1 shows the project fair contribution toward the construction of the new signalized intersection at Date Palm Drive and Rosemount Road.

Wren Project TA Executive Summary
iii

Table 6-1
Project Feature Contributions
Project Project ADT Project Share %
Wren Project 1,375 13.43%
Date Palm Drive Mixed Use1 1,668 16.29%
Future Shopping Center 7,199 70.29%
Total 12,116
Notes:
1 Assumed Scenario 1 as the viable option for this Date Palm Drive Mixed Use , since their Scenario 2, which includes the Vallarta Supermarket, is no longer a viable option because Vallarta has acquired the property to the west of Date Palm Drive to constr uct the supermarket

Future Date Palm Drive and Rosemount Road signalized intersection ultimate geometry will include the following:

1. Northbound – three thru lanes, one left turn lane and one exclusive right turn lane

2. Southbound – three thru lanes, one left turn lane and one exclusive right turn lane

3. Eastbound – one left turn lane and one thru-right turn lane

4. Westbound – one left turn lane, one thru lane and one exclusive right turn lane

VMT Screening Assessment
The Project is not anticipated to result in a significant transportation impact related to VMT under Base Year 2018, Opening Year 2025, or Horizon Year 2045 scenarios. VMT analysis is provided in a separate document.

The Wren TA Table of Content
i
Table of Contents
EXECUTIVE SUMMARY ............................................................................................................................................... I Purpose of the Report ..................................................................................................................................... i Project Overview ............................................................................................................................................. i Analysis Results and Recommendations ........................................................................................................ ii

1.0 PROJECT INTRODUCTION .............................................................................................................................. 1 PROJECT DESCRIPTION ............................................................................................................................................. 1 STUDY AREA .......................................................................................................................................................... 1 PROJECT TRIP GENERATION ....................................................................................................................................... 1 PROJECT TRIP DISTRIBUTION AND ASSIGNMENT ............................................................................................................. 2 PROJECT ACCESS ..................................................................................................................................................... 2 PARKING ............................................................................................................................................................... 2

2.0 METHODOLOGIES ....................................................................................................................................... 6 ANALYSIS SCENARIOS ............................................................................................................................................... 6 STUDY TIME PERIODS ............................................................................................................................................... 6 ANALYSIS METHODOLOGIES ...................................................................................................................................... 6 Intersection Capacity Analysis ....................................................................................................................... 7 Signalized Intersections .......................................................................................................................................... 7 Traffic Signal Warrant Analysis ..................................................................................................................... 8 City of Cathedral City 2040 General Plan Compliance ................................................................................... 9

3.0 EXISTING YEAR 2023 ................................................................................................................................. 10 ROADWAY NETWORK ............................................................................................................................................. 10 TRANSIT SYSTEM ................................................................................................................................................... 10 ACTIVE TRANSPORTATION SYSTEM ............................................................................................................................ 10 TRAFFIC VOLUMES ................................................................................................................................................ 10 ANALYSIS RESULTS ................................................................................................................................................ 11

4.0 PROJECT COMPLETION YEAR 2025 CONDITIONS ................................................................................................ 15 ANALYSIS RESULTS ................................................................................................................................................ 15

5.0 CUMULATIVE YEAR 2025 CONDITIONS ............................................................................................................ 18 ANALYSIS RESULTS AND RECOMMENDED IMPROVEMENTS ............................................................................................. 20

6.0 HORIZON YEAR 2045 CONDITIONS ................................................................................................................. 23 ANALYSIS RESULTS AND RECOMMENDED IMPROVEMENTS ............................................................................................. 24

7.0 VEHICLE MILES TRAVELED ............................................................................................................................ 29 SB 743 ............................................................................................................................................................... 29 VMT ANALYSIS GUIDELINES .................................................................................................................................... 29

The Wren TA Table of Content
ii

List of Figures
FIGURE 1-1 – PROJECT SITE PLAN .................................................................................................................................. 3 FIGURE 1-2 – PROJECT STUDY AREA AND TRIP DISTRIBUTION .............................................................................................. 4 FIGURE 1-3 – PROJECT VOLUMES ................................................................................................................................... 5 FIGURE 3-1 – CATHEDRAL CITY GENERAL PLAN MASTER ROADWAY CLASSIFICATIONS ............................................................ 12 FIGURE 3-2 – CATHEDRAL CITY GENERAL PLAN MULTI-MODAL FACILITIES ........................................................................... 13 FIGURE 3-3 – EXISTING YEAR 2023 AM/PM PEAK HOUR INTERSECTION VOLUMES .............................................................. 14 FIGURE 4-1 – PROJECT COMPLETION YEAR 2025 CONDITIONS AM/PM PEAK HOUR INTERSECTION VOLUMES .......................... 17 FIGURE 5-1 – CUMULATIVE PROJECT TRIP ASSIGNMENT ................................................................................................... 21 FIGURE 5-2 – CUMULATIVE YEAR 2025 CONDITIONS AM/PM PEAK HOUR INTERSECTION VOLUMES ...................................... 22 FIGURE 6-1 – DATE PALM DRIVE AND ROSEMOUNT ROAD INTERSECTION LANE CONFIGURATION ............................................. 26 FIGURE 6-2 – HORIZON YEAR 2045 NO PROJECT CONDITIONS AM/PM PEAK HOUR INTERSECTION VOLUMES .......................... 27 FIGURE 6-3 – HORIZON YEAR PLUS PROJECT CONDITIONS AM/PM PEAK HOUR INTERSECTION VOLUMES ................................ 28

List of Tables
TABLE ES-1 PROJECT FEATURE CONTRIBUTIONS ............................................................................................................... III TABLE 1-1 PROJECT TRIP GENERATION RATE .................................................................................................................... 2 TABLE 1-2 PROJECT TRIP GENERATION ........................................................................................................................... 2 TABLE 2-1 VEHICULAR LEVEL OF SERVICE DEFINITIONS ....................................................................................................... 7 TABLE 2-2 SIGNALIZED INTERSECTION LEVEL OF SERVICE HCM OPERATIONAL ANALYSIS METHOD .............................................. 8 TABLE 2-4 CATHEDRAL CITY GENERAL PLAN ROADWAY SEGMENT ADT THRESHOLDS .............................................................. 8 TABLE 3-1 EXISTING CONDITIONS 2023 INTERSECTION OPERATION ANALYSIS ...................................................................... 11 TABLE 3-2 EXISTING YEAR 2023 ROADWAY SEGMENT CAPACITY ANALYSIS .......................................................................... 11 TABLE 4-1 PROJECT COMPLETION YEAR 2025 CONDITIONS INTERSECTION OPERATION ANALYSIS ............................................ 16 TABLE 4-2 PROJECT COMPLETION YEAR 2025 CONDITIONS ROADWAY SEGMENT CAPACITY ANALYSIS ...................................... 16 TABLE 5-1 CUMULATIVE PROJECTS ............................................................................................................................... 18 TABLE 5-2 CUMULATIVE YEAR 2025 CONDITIONS INTERSECTION OPERATION ANALYSIS ......................................................... 20 TABLE 5-3 CUMULATIVE YEAR 2025 CONDITIONS ROADWAY SEGMENT CAPACITY ANALYSIS ................................................... 20 TABLE 6-1 PROJECT FEATURE CONTRIBUTIONS................................................................................................................ 24 TABLE 6-2 HORIZON YEAR 2045 CONDITIONS INTERSECTION OPERATION ANALYSIS .............................................................. 24 TABLE 6-3 HORIZON YEAR 2045 PLUS PROJECTS INTERSECTION QUEUE ANALYSIS ............................................................... 25 TABLE 6-4 HORIZON YEAR 2045 CONDITIONS ROADWAY SEGMENT CAPACITY ANALYSIS ........................................................ 25 TABLE 7-1 PROJECT VMT ANALYSIS .............................................................................................................................. 30

Appendices

APPENDIX A - SCOPING AGREEMENT

APPENDIX B - TRAFFIC VOLUME DATA
APPENDIX C - EXISTING YEAR 2023 CONDITIONS PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS APPENDIX D - PROJECT COMPLETION YEAR 2025 CONDITIONS PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS

APPENDIX E - CUMULATIVE PROJECT TRIP DISTRIBUTION
APPENDIX F - CUMULATIVE YEAR 2025 CONDITIONS PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS APPENDIX G - HORIZON YEAR 2045 VOLUME DEVELOPMENT
APPENDIX H - HORIZON YEAR 2045 NO PROJECT CONDITIONS PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS

APPENDIX I - HORIZON YEAR PLUS PROJECT CONDITIONS PEAK HOUR INTERSECTION OPERATION AND QUEUE ANALYSIS WORKSHEETS

APPENDIX J - WITH IMPROVEMENT PEAK HOUR INTERSECTION AND SIGNAL WARRANT ANALYSIS WORKSHEETS

APPENDIX K - TRANSIT ROUTE INFORMATION
The Wren TA Project Introduction
1 1.0 PROJECT INTRODUCTION

This transportation analysis (TA) report has been prepared for The Wren project (Project) in Cathedral City, according to the County of Riverside Transportation Analysis Guidelines for Level of Service (LOS) and Vehicle Miles Traveled (VMT), December 2020 (Guidelines).

PROJECT DESCRIPTION
The Project will be developed on a vacant site located on the northeast corner of Date Palm Drive and future Rosemount Road extension. The Project is proposing the construction of 204 multi-family (low- rise) dwelling units.

Figure 1-1 shows the project site plan.

STUDY AREA
The study area for this project was developed consistent with the Guidelines, including all intersections of “Collector” or higher classification streets with “Collector” or higher classification streets, at which the proposed project will add 50 or more peak hour trips. IEG prepared a project traffic study scoping agreement defining the study area, which was reviewed and approved by Cathedral City staff prior to the preparation of this technical report. Refer to Appendix A for approved scoping agreement.

Figure 1-2 presents the study area that includes the following key locations:

Study Area Intersections:

1. Date Palm Drive and McCallum Way

2. Date Palm Drive and Rosemount Road

3. Date Palm Drive and 30th Avenue

Study Roadway Segments:

1. Date Palm Drive, McCallum Way to Rosemount Road

2. Date Palm Drive, Rosemount Road to 30th Avenue

Turning movement counts for one weekday during the morning and evening peak hours and average daily traffic (ADT) counts were conducted on Tuesday May 9, 2023 . The turning movement and ADT counts are included in Appendix B. These counts will be utilized in Synchro 11 software to determine LOS at all study intersections and for roadway segment capacity analysis . Year 2025 without Project traffic volumes will be developed by adding a 3% annual growth for two years to the existing counts.

Horizon Year Plus Project volumes will be developed by applying an annual growth factor based on the growth from RIVCOM Base Year 2018 with Projects to Forecast Year 2045 with Projects.

PROJECT TRIP GENERATION
Trip generation is a measure or forecast of the number of trips that begin or end at the Project site.

These trips will result in some traffic increases on the streets where they occur. The rates used in this analysis were determined using Trip Generation, 11th Edition, published by the Institute of Transportation Engineers (ITE) , is the method preferred by the Guidelines . Project ITE average trip generation rates are presented in Table 1-1 and the calculated trip generation based on the number of dwelling units associated with the Project is shown in Table 1-2.

The Wren TA Project Introduction
2 Table 1-1
Project Trip Generation Rate
Land Use1 Units2 ITE LU
Code
AM Peak Hour PM Peak Hour Daily In Out Total In Out Total Multifamily Housing (Low-Rise) DU 220 0.10 0.30 0.40 0.32 0.19 0.51 6.74 1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, Eleventh Edition (2021). 2 DU = Dwelling Unit

Table 1-2
Project Trip Generation
Land Use1 Intensity Units2 AM Peak Hour PM Peak Hour Daily In Out Total In Out Total Multifamily Housing (Low-Rise) 204 DU 20 61 81 65 39 104 1,375 1Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, Eleventh Edition (2021). 2 DU = Dwelling Unit

As shown in Table 1-2, the Project is anticipated to generate approximately 1,375 total daily trips, 81 AM peak hour trips and 104 PM peak hour trips.

PROJECT TRIP DISTRIBUTION AND ASSIGNMENT
Trip distribution and assignment is the process of identifying the probable destinations, directions, and traffic routes that Project related traffic will affect. Once the proposed development’s trips have been estimated, they are assigned to the study area network. For this development, the Project trip distribution and assignment were developed, in coordination with City staff, based on the land use characteristics of the Project and surrounding area, existing travel patterns within the study area, anticipated travel patterns to and from the Project site, and approved projects lo cated in the vicinity of the Project site.

Figure 1-2 and 1-3 show Project study area, trip distribution, and trip assignment.

PROJECT ACCESS
Under existing conditions, Rosemount Road does not extend to Date Palm Drive. The Project will be conditioned to construct half-width roadway improvement along the property frontage on Rosemount Road including curb, gutter, sidewalk and paving. Therefore, access to the Project site will be provided via one proposed driveway along Rosemount Road extension and one existing driveway along Date Palm Drive through an access easement to the adjacent Northgate Community Church site. Additionally, the Project will construct a traffic signal at the new intersection of Rosemount Road and Date Palm Drive.

PARKING
The proposed development will provide on-site parking spaces consistent with Cathedral City parking requirements.

The Wren
Project Site Plan
Figure 1-1

The Wren
Project Study Area and Trip Distribution
Figure 1-2
LEGEND # Intersection

PROJECT SITE
25%
40%
35%
35%
40%
2 1
3 35%
20%
80%
15% %
55%
The Wren
Project Volumes
Figure 1-3

The Wren TA Methodologies
6 2.0 METHODOLOGIES

This section documents the methodologies and assumptions used to conduct the circulation impact analysis for the proposed project. This section contains the following background information:

• Analysis scenarios
• Study time periods
• Analysis methodologies

Refer to Appendix A for approved scoping agreement.

ANALYSIS SCENARIOS
This report presents an analysis of the study area intersections and roadway segments for the following anticipated timeframe scenarios:

• Existing Conditions Year 2023
• Project Completion Year 2025 (Existing Plus Ambient Plus Project) • Cumulative Year 2025 (Existing Plus Ambient Plus Cumulative Plus Project) • Horizon Year 2045 No Project
• Horizon Year Plus Project

STUDY TIME PERIODS
The Guidelines recommend the following peak hours for analysis:

• Weekday AM (peak hour between 7:00 AM and 9:00 AM)
• Weekday PM (peak hour between 4:00 PM and 6:00 PM)

ANALYSIS METHODOLOGIES
Street system operating conditions are typically described in terms of “level of service.” Level of service is a report-card scale used to indicate the quality of traffic flow on roadway segments and at intersections. Level of service (LOS) ranges from LOS A (free flow, little congestion) to LOS F (forced flow, extreme congestion). Table 2-1 describes generalized definitions of auto LOS A through F.

The Wren TA Methodologies
7 Table 2-1
Vehicular Level of Service Definitions
LOS Characteristics
A
Primarily free-flow operation. Vehicles are completely unimpeded in their ability to maneuver within the traffic stream. Controlled delay at the boundary intersections is minimal. The travel speed exceeds 85% of the base free-flow speed.

B
Reasonably unimpeded operation. The ability to maneuver within the traffic stream is only slightly restricted and control delay at the boundary intersections is not significant. The travel speed is between 67% and 85% of the base free-flow speed.

C
Stable operation. The ability to maneuver and change lanes at mid -segment locations may be more restricted than at LOS B. Longer queues at the boundary intersections may contribute to lower travel speeds. The travel speed is between 50% and 67% of the base free-flow speed.

D
Less stable condition in which small increases in flow may cause substantial increases in delay and decreases in travel speed. This operation may be due to adverse signal progression, high volume, or inappropriate signal timing at the boundary intersections. The travel speed is between 40% and 50% of the base free-flow speed.

E
Unstable operation and significant delay. Such operations may be due to some combination of adverse signal progression, high volume, and inappropriate signal timing at the boundary intersections. The travel speed is between 30% and 40% of the base free-flow speed.

F
Flow at extremely low speed. Congestion is likely occurring at the boundary intersections, as indicated by high delay and extensive queuing. The travel speed is 30% or less of the base free-flow speed. Also, LOS F is assigned to the subject direction of travel if the through movement at one or more boundary intersections have a volume-to-capacity ratio greater than 1.0.

Source: Highway Capacity Manual, Transportation Research Board (2016)

Intersection Capacity Analysis
The analysis of peak hour intersection performance was conducted using the Synchro 11 software program, which uses methodologies defined in the Highway Capacity Manual (HCM) 6th Edition to calculate LOS. Level of service (LOS) for intersections is determined by control delay. Control delay is defined as the total elapsed time from when a vehicle stops at the end of a queue to the time the vehicle departs from the stop line. The total elapsed time inclu des the time required for the vehicle to travel from t he last -in-queue position to the first -in-queue position, including deceleration of vehicles from free-flow speed to the speed of vehicles in the queue.

Signalized Intersections
The HCM analysis methodology for evaluating signalized intersections is based on the “operational analysis” procedure. This technique uses 1,900 passenger cars per hour of green per lane (pcphpl) as the maximum saturation flow of a single lane at an inter section. Table 2-2 summarizes the level of service criteria for signalized intersections.

The Wren TA Methodologies
8 Table 2-2
Signalized Intersection Level of Service HCM Operational Analysis Method

Average Control
Delay Per Vehicle
(seconds)
Level of Service (LOS) Characteristics
<10.0
LOS A occurs when the volume-to-capacity ratio is low and either progression is exceptionally favorable or the cycle length is very short. If it is due to favorable progression, most vehicles arrive during the green indication and travel through the intersection without stopping.

10.1 – 20.0 LOS B occurs when the volume-to-capacity ratio is low and either progression is highly favorable or the cycle length is short. More vehicles stop than with LOS A.

20.1 – 35.0
LOS C occurs when progression is favorable or the cycle length is moderate. The number of vehicles stopping is significant, although many vehicles still pass through the intersection without stopping.

35.1 – 55.0
LOS D occurs when the volume-to-capacity ratio is high and either progression is ineffective or the cycle length is long. Many vehicles stop and individual cycle failures are noticeable.

55.1 – 80.0 LOS E occurs when the volume-to-capacity ratio is high, progression is unfavorable, and the cycle length is long. Individual cycle failures are frequent. >80.0 LOS F occurs when the volume-to-capacity ratio is very high, progression is very poor, and the cycle length is long. Most cycles fail to clear the queue.

Source: Highway Capacity Manual, Transportation Research Board (2016)

Roadway Capacity Analysis
Roadway capacities are theoretical for planning purposes and are affected by factors such as intersection spacing, configuration, traffic control, access control, roadway grade, design geometrics, sight distance and vehicle mix. Roadway segment level of service is estimated by comparing the ADT on a roadway segment to the roadway ADT capacity. The City of Cathedral City 2040 General Plan provides roadway segment volume capacities based on street classifications. Table 2-4 shows these ADT thresholds.

Table 2-4
Cathedral City General Plan Roadway Segment ADT Thresholds Classification Typical Lane Configuration
ADT Capacity (Vehicles per day)

LOS A LOS B LOS C LOS D LOS E
Arterial Highway 6-Lane Divided 17,000 27,500 38,000 48,500 59,000 Source: City of Cathedral City 2040 General Plan Table CM-3, 2021

Traffic Signal Warrant Analysis
The Federal Highway Administration’s (FHWA) Manual on Uniform Traffic Control Devices (MUTCD), amended with California MUTCD 2014 Edition, presents warrant criteria for justifying the installation of a traffic signal at an unsignalized intersection. The cr iteria include studying traffic conditions, pedestrian characteristics, and physical characteristics of the intersection location. The MUTCD indicates that satisfaction of one or more of the traffic signal warrants does not in itself require the installation of a traffic control signal.

This study uses MUTCD Section 4C.04 Warrant 3, Peak Hour to assess the need of a traffic signal at the unsignalized intersections of Date Palm Drive and Rosemount Road . Signal warrant worksheets are included in Appendix J.

The Wren TA Methodologies
9 City of Cathedral City 2040 General Plan Compliance
In coordination with City staff, the transportation analysis will identify LOS deficiencies for compliance with City of Cathedral City 2040 General Plan goals. Cathedral City has established LOS “D” as the minimum allowable level of service at intersections and roadway segments . Therefore, any intersection or roadway segment resulting in an LOS worse than this minimum will be considered deficient for the purposes of this analysis.

The Wren TA Existing Year 2023
10 3.0 EXISTING YEAR 2023

This section documents the circulation system conditions within the study area of the Project under Existing Year 2023. This section also documents operational deficiencies on the existing local and regional circulation networks.

ROADWAY NETWORK
Locally significant roadway located within the study area of the proposed project is discussed below.

Date Palm Drive functions as a divided 6-lane roadway within the study area from McCallum Way to 30th Avenue. The posted speed limit is 45 miles per hour. Per the City of Cathedral City 2040 General Plan Circulation & Mobility Element, Date Palm Drive is at its buildout roadway classification of an arterial highway.

Figure 3-1 shows the City of Cathedral City 2040 General Plan Master Roadway Classifications.

TRANSIT SYSTEM
The SunLine Transit Agency (STA) is the main transit agency servicing Cathedral City. Currently, STA operates Route 4 within the vicinity of the project. Route 4 operates seven days a week and connects to Palm Springs west of the site and Palm Desert to the south . Weekday and weekend service frequency is 60 minutes. Bus stops for Route 4 is currently located within 350 ft of the site at the northeast corner of the Date Palm Drive and McCallum Way intersection for northbound service and at the southwest corner for southbound service . Pedestrian accessibility and connectivity from the project site to th ese bus stop s is provided along the frontage (e ast side of Date Palm Drive) with signalized crossings at the intersection where the bus stops are located . Bus r oute information is included in Appendix K.

ACTIVE TRANSPORTATION SYSTEM
Pedestrian facilities are provided within the study area of the project. Pedestrian crosswalks are generally provided at signalized intersections along Date Palm Drive with sidewalks on the west side from McCallum Way to 30th Avenue and on the east side from the Project limits to McCallum Way.

There are no existing bicycle facilities along Date Palm Drive. However, the City of Cathedral City 2045 General Plan Circulation & Mobility Element proposes a Class I off -road shared bike and pedestrian trail along Date Palm Drive.

Figure 3-2 shows the City of Cathedral City 2040 General Plan Multi-Modal Facilities.

TRAFFIC VOLUMES
The Existing Year 2023 peak hour intersection turning movement and ADT counts were counted on Tuesday May 9, 2023. The counts are provided in Appendix B.

The Wren TA Existing Year 2023
11 ANALYSIS RESULTS
Tables 3-1 and 3-2 show Existing Conditions intersection operation and roadway segment capacity analysis results.

Figure 3-3 shows peak hour intersection turning movement volumes under Existing Year 202 3 Conditions.

Table 3-1
Existing Conditions 2023 Intersection Operation Analysis Intersection Intersection Control Existing Conditions
Delay (a) LOS (b)
AM/PM Peak

1. Date Palm Drive and McCallum Way Signalized 11.9/11.3 B/B

3. Date Palm Drive and 30th Avenue Signalized 23.2/21.6 C/C Notes:
(a) Delay refers to the average control delay for the entire intersection, measured in seconds per vehicle. (b) LOS calculations are based on the methodology outlined in the Highway Capacity Manual 6th Edition and performed using Synchro 11.

Per the analysis results shown in Table 3-1, all analyzed intersections are operating at an acceptable LOS under Existing Year 2023 Conditions.

Existing Year 2023 Conditions peak hour analysis worksheets are provided in Appendix C.

Table 3-2
Existing Year 2023 Roadway Segment Capacity Analysis
Roadway Segment Classification LOS E
Capacity
Existing Year 2023

ADT V/C LOS
Date Palm Drive
McCallum Way to Rosemount Road 6-lane Arterial
Highway 59,000 21,195 0.359 B
Rosemount Road to 30th Avenue 6-lane Arterial
Highway 59,000 21,246 0.360 B

Per the analysis results shown in Table 3 -2, all analyzed roadway segments are operating at an acceptable LOS under Existing Year 2023 Conditions.

The Wren
Cathedral City General Plan Master Roadway Classifications Figure 3-1

Date Palm Drive Mixed Use
Cathedral City General Plan Multi-Modal Facilities
Figure 3-2

The Wren
Existing Year 2023 Peak Hour Intersection Volumes
Figure 3-3

The Wren TA Project Completion Year 2025
15 4.0 PROJECT COMPLETION YEAR 2025 CONDITIONS

This section documents the circulation system conditions within the study area of the project under Project Completion Year 2025 (Existing Plus Ambient Plus Project Phase 1) Conditions. The Project proposes half-width improvements of Rosemount Road including curb, gutter, sidewalk and paving .

Therefore, th is analysis assumes the construction of a traffic signal at the new intersection of Rosemount Road and Date Palm Drive by the Project . Signal warrant worksheets are provided in Appendix J. IEG understands that existing traffic patterns would change due to these improvements.

Adjusted Existing Year 2023 intersection peak hour traffic volumes for the Date Palm Drive Rosemount Road intersection were developed by redistributing forecast traffic from the Project’s RIVCOM 3 Traffic Analysis Zone (TAZ) to the intersection of Date Palm Drive and Rosemount Road.

The TAZ adjacent to the west side of Date Palm Drive loads approximately one -third of its base year 2018 daily traffic onto Date Palm Drive. The TAZ that the project is located within also loads approximately one-third of its 2018 daily traffic volume onto the intersection of Santoro Drive and 30th Avenue. Since both TAZs include similar residential and commercial retail components, the unadjusted zone connector volumes applied to the intersection of Santoro Drive and 30 th Avenue were also applied at the intersection of Date Palm Drive and Rosemount Road.

An annual growth factor based on the growth from Base Year 2018 to Forecast Year 2045 was applied to 2018 TAZ AM and PM peak hour volumes to calculate the redistributed volumes that would be applied to Existing Year 2023 counts. The turning movement distri bution percentages for the eastbound approach at the intersection of Date Palm Drive and 30 th Avenue was applied to the intersection of Date Palm Drive and Rosemount Road to calculate adjusted Year 2023 turning movement volumes. RIVCOM 3 model plots, annua l growth calculation, Date Palm Drive and 30 th Avenue distribution, and adjusted Year 2023 volumes are included in Appendix B.

Since the Project is expected to be built and operational in 202 5, a 3% annual growth factor for two years was applied to the Adjusted Existing 2023 volumes. Project traffic volumes are then added to these volumes to develop Project Completion Year 2025 Conditions traffic volumes. This section also documents potential operational deficiencies on the proposed local and regional circulation network.

ANALYSIS RESULTS

Tables 4-1 and 4-2 show Project Completion Year 2025 Conditions intersection operation and roadway segment capacity analysis results.

Figure 4-1 shows intersection turning movement volumes under Project Completion Year 2025 Conditions, respectively.

The Wren TA Project Completion Year 2025
16 Table 4-1
Project Completion Year 2025 Conditions Intersection Operation Analysis Intersection Intersection
Control
Project Completion Year 2025
Delay (a) LOS (b)
AM/PM Peak

1. Date Palm Drive and McCallum Way Signalized 12.7/11.9 B/B

2. Date Palm Drive and Rosemount Road Signalized 7.6/11.1 A/B

3. Date Palm Drive and 30th Avenue Signalized 22.2/18.5 C/B Notes:
(a) Delay refers to the average control delay for the entire intersection, measured in seconds/vehicle. (b) LOS calculations are based on the methodology outlined in the Highway Capacity Manual 6th Edition and performed using Synchro 11.

Per the analysis results shown in Table 4-1, all analyzed intersections are operating at an acceptable LOS under Project Completion Year 2025 Conditions. Project Completion Year 2025 Conditions peak hour analysis worksheets are provided in Appendix D.

Table 4-2
Project Completion Year 2025 Conditions Roadway Segment Capacity Analysis Roadway Segment Classification LOS E
Capacity
Project Completion Year 2025

ADT V/C LOS
Date Palm Drive
McCallum Way to Rosemount Road Arterial Highway 59,000 23,040 0.391 B Rosemount Drive to 30th Avenue Arterial Highway 59,000 23,021 0.390 B

Per the analysis results shown in Table 4-2, all analyzed roadway segments are operating at an acceptable LOS under Project Completion Year 2025 Conditions.

The Wren
Project Completion Year 2025
Peak Hour Intersection Volumes
Figure 4-1

The Wren TA Cumulative Year 2025
18 5.0 CUMULATIVE YEAR 2025 CONDITIONS

This section documents the circulation system conditions within the study area of the Project under Cumulative Year 2025 (Existing Plus Ambient Plus Cumulative Plus Project) Conditions. The Cumulative Conditions traffic volumes were developed by adding cumulative project trips to develop the P roject Completion 2025 Conditions traffic volumes. Th ese cumulative projects are listed in Table 5-1 and the cumulative project trip assign ment to the study area is shown in Figure 5-1. The locations and trip distribution for these cumulative projects are included in Appendix E.

Table 5-1
Cumulative Projects
ID1 Project Land Use Quantity Units2
1 Kroger Gas Station Service Station 10 VFP
2 Date Palm Drive Mixed Use (Phase I) Self Storage 115.054 TSF 3 Future Shopping Center (Phase I) Shopping Plaza 50 TSF 4 Canyon Springs Villas Residential 58 DU
5 Mountain View Estates Residential 110 DU
6 Tower Market Service Station with Convenience
Market 12 VFP
7 Cathedral Cove Center
Residential 200 DU
Retail 6.65 TSF
Fast-Food Restaurant 14.025 TSF
Service Station with Convenience
Market 12 VFP
C1 Ecoplex Park Phases 1 & 2 Cannabis Cultiviation 93.44 TSF C2 Horizon Gardens Senior Living 80 OB
C3 CCBC Restaurant Restaurant 2.5 TSF
C4 Quick Quack Carwash Carwash 3.5 TSF
C5 7‐Eleven Gas Station 8 VFP
C6 Ramon 19 Cannabis (Cultivation) Facility 486 TSF
Dispensary 3 TSF
C7 District East Residential 43 DU
C8 Greenscape Engineering (67587 Canyon Plaza) Cannabis Cultivation 40 TSF C9 Agua Caliente Casino
Casino 40 TSF
Shopping Center 24 TSF
High‐Turnover Sit‐Down
Restaurant 14 TSF
Quality Restaurant 14 TSF
Fast Casual Restaurant 6 TSF
Coffee Shop w/o Drive‐Thru 2 TSF
C10 Nirvana Estates Residential 103 DU
C11 Silver Torch Motel Motel 6 Rooms
C12 Cree Gas Station Convenience Store w/ Gas Station 8 VFP C13 Cathedral City Events Center (35900 Date Palm Dr) Event Center 80.0 TSF C14 Amazon Hub Center (35780 Date Palm Dr) Warehouse 94.0 TSF C15 Medicinal Healing (36555 Bankside Dr) Cannabis Cultivation Facility 11.0 TSF C16 Horizon Hotel (67670 Carey Rd) Hotel 68 Rooms
C17 MoGenCo (67555/67575 East Palm Canyon Drive) Cannabis Cultivation Facility 111.0 TSF C18 Desert Lexus (67855 East Palm Canyon Drive) Automobile Dealership 41.0 TSF C19 Cathedral City Community Amphitheater Amphitheater 2,909 Seats The Wren TA Cumulative Year 2025
19 P1 Canyon View / Summit Project by EHOF Canyon
View, LLC Residential 80 DU
P2 Palm Springs Surf Club Water Park 7.746 TSF
P3 Parker Hotel Expansion Hotel 32 Rooms
P4 Vibrante Condominium 41 DU
RM1 RM 38 JV LLC Residential 82 DU
RM2 Carefield Senior Living Residential 84 DU
RM3 ECHO at Rancho Mirage Residential 9 DU
RM4 Santa Barbara Cove Estates Residential 20 DU
RM5 Pulte Homes/ Del Webb Residential 1,200 DU
RM6 Veneto Residential 34 DU
RM7 Revelle Residential 32 DU
RM8 Bella Clancy Residential 20 DU
RM9 Mirada Villas Residential 46 DU
RM10 Estilo Residential 39 DU
RM11 RM Five‐1 LLC/Kilani Residential 4 DU
RM12 Heinrich/Steinberg Residential 4 DU
RM13 Rancho Mirage LLC Residential 4 DU
RM14 La Paloma Homes, Inc. Residential 13 DU
RM15 Monterey Medical Center Medical Office 75.164 TSF
RM16 38 JV, LLC c/o Meriwether Companies Residential 10 DU RM17 38 JV, LLC c/o Meriwether Companies Residential 97 DU RM18 38 JV, LLC c/o Meriwether Companies Residential 10 DU RM19 GRV Mirage, LLC (ECHO) Residential 9 DU
RM20 Ken Catanzarite Residential 20 DU
RM21 Miragedunes Properties Residential 9 DU
RM22 AMS Development Group (Bellavia) Residential 18 DU RM23 IN‐N‐OUT Burgers Commercial 3.995 TSF
RM24 DHO Medical Office Building Medical Office 13.80 TSF RM25 Chase Bank Bank 3.47 TSF
RM26 Section 31 Specific Plan Project
Hotel 400 Rooms
Commercial 175.00 TSF
Residential 1,932 DU
RM27 Tower Energy Group Commercial 5.565 TSF
RM28 Oasis Ranch LLC Hotel 60 Rooms
Residential 108 DU
RM29 Horizon Pacific Rancho Cove MSA Consulting
Commercial 20.00 TSF
Hotel 100 Rooms
Residential 35 DU
RM30 Ritz‐Carlton Residences Residential 106 DU
Commercial 6.966 TSF
RM31 Hazelden Betty Ford Center Office 6.399 TSF
Drug/Alcohol Treatment Ctr. 56 Beds
RM32 Rancho Mirage Highway 111 Dealerships Auto Sales (New) 58 TSF Auto Care Center 56 TSF
Notes:
1 Projects with C, P, or RM designation are based on Cathedral Cove Center Traffic Analysis dated April 8, 2022, and prepared by Urban Crossroads.

Volumes distributed north of Intersection 17 Date Palm Drive and Ramon Road were applied to study intersections as northbound and southbound through volumes.
2 DU = Dwelling Units, TSF = Thousand Square Feet, VFP = Vehicle Fueling Positions, and OB = Occupied Beds

This section also documents potential Cumulative Conditions operational deficiencies on the circulation network. Rosemount Road does not currently extend to Date Palm Drive. However, the Project proposes half-width improvements of Rosemount Road including curb, gutter, sidewalk and paving. Therefore, the The Wren TA Cumulative Year 2025
20 following analysis assumes a traffic signal at the new intersection of Date Palm Drive and Rosemount Road. Signal warrant worksheets are provided in Appendix J.

ANALYSIS RESULTS AND RECOMMENDED IMPROVEMENTS
Tables 5-2 and 5-3 show Cumulative Conditions intersection operation and roadway segment analysis results, respectively.

Figure 5-2 shows intersection turning movement under Cumulative Conditions.

Table 5-2
Cumulative Year 2025 Conditions Intersection Operation Analysis Intersection Intersection Control Cumulative Year 2025
Delay (a) LOS (b)
AM/PM Peak

1. Date Palm Drive and McCallum Way Signalized 13.4/13.8 B/B

2. Date Palm Drive and Rosemount Road Signalized 15.0/22.5 B/C

3. Date Palm Drive and 30th Avenue Signalized 23.8/22.0 C/C Notes:
(a) Delay refers to the average control delay for the entire intersection, measured in seconds/vehicle. (b) LOS calculations are based on the methodology outlined in the Highway Capacity Manual 6th Edition and performed using Synchro 11.

Per the analysis results shown in Table 5-2, all analyzed intersections are operating at an acceptable LOS under Cumulative Year 2025 Conditions. Cumulative Year 2025 Conditions peak hour analysis worksheets are provided in Appendix F.

Table 5-3
Cumulative Year 2025 Conditions Roadway Segment Capacity Analysis Roadway Segment Classification LOS E
Capacity
Cumulative Year 2025

ADT V/C LOS
Date Palm Drive
McCallum Way to Rosemount Road Arterial Highway 59,000 25,428 0.431 B Rosemount Road to 30th Avenue Arterial Highway 59,000 25,286 0.429 B

Per the analysis results shown in Table 5-3, all analyzed roadway segments are operating at an acceptable LOS under Cumulative Year 2025 Conditions.

The Wren
Cumulative Projects Trip Assignment
Figure 5-1

The Wren
Cumulative Year 2025 Peak Hour Intersection Volumes
Figure 5-2

The Wren TA Horizon Year 2045
23 6.0 HORIZON YEAR 2045 CONDITIONS

This section documents the circulation system conditions within the study area of the Project under Horizon Year 20 45 No Project and Horizon Year Plus Project Conditions. Rosemount Road does not currently extend to Date Palm Drive. However, the Project proposes half -width improvements of Rosemount Road including curb, gutter, sidewalk and paving. Therefore, the following analysis assumes a traffic signal at the new intersection of Date Palm Drive and Rosemount Road. Signal warrant worksheets are provided in Appendix J.

The proposed traffic signal at the new intersection of Date Palm Drive and Rosemount Road will be constructed by whichever project completes their final phase first between Date Palm Drive Mixed Use, the Wren Project, and the Future Shopping Center west of Da te Palm Drive and Rosemount Road intersection. The City of Cathedral City Transportation Department staff has requested a fair share assessment to determine the percentage of new traffic volumes added to the intersection of Date Palm Drive and Rosemount Road. The three proposed developments are expected to add a total of 12,166 ADTs to the subject intersection. The three projects will contribute to the funding of this transportation improvement based on their portion of total ADT generated as follows:

1. Wren Development is projected to add 1,375 ADTs (13.43%),

2. Date Plam Mixed Use is projected to add 1,668 ADTs (16.29%)

3. Future Shopping Center to the west of Date Palm Drive and Rosemount Road intersection is projected to add 7,199 ADTs (70.29%)

Future Date Palm Drive and Rosemount Road signalized intersection ultimate geometry will include the following:

1. Northbound – three thru lanes, one left turn lane and one exclusive right turn lane

2. Southbound – three thru lanes, one left turn lane and one exclusive right turn lane

3. Eastbound – one left turn lane and one thru-right turn lane

4. Westbound – one left turn lane, one thru lane and one exclusive right turn lane

Project will be conditioned to construct the signal and ensure full signal operation prior to the issuance of project first certificate of occupancy.

Figure 6-1 shows Date Palm Drive and Rosemount Road intersection future lane configuration.

Table 6-1 shows the project fair contribution toward the construction of the new signalized intersection at Date Palm Drive and Rosemount Road.

Trip generation is shown in Appendix G.

The Wren TA Horizon Year 2045
24 Table 6-1
Project Feature Contributions
Project Project ADT Project Share %
Wren Project 1,375 13.43%
Date Palm Drive Mixed Use1 1,668 16.29%
Future Shopping Center 7,199 70.29%
Total 12,116
Notes:
1 Assumed Scenario 1 as the viable option for this Date Palm Drive Mixed Use, since their Scenario 2, which includes the Vallarta Supermarket, is no longer a viable option because Vallarta has acquired the property to the west of Date Palm Drive to construct the super market

The Horizon Year Plus Project Conditions traffic volumes were developed by adding an annual growth factor based on the growth from RIVCOM 4.01 Base Year 2018 to Forecast Year 2045. The calculated growth factors are included in Appendix G. Horizon Year 2045 No Project volumes were developed by subtracting Project volumes from Horizon Year Plus Project volumes.

ANALYSIS RESULTS AND RECOMMENDED IMPROVEMENTS
Tables 6-2 through 6-4 show Horizon Year 2045 Conditions intersection operation, turn lane queue, and roadway segment analysis results, respectively.

Figures 6-2 and 6-3 show intersection turning movement s under Horizon Year 2045 No Project and Horizon Year Plus Project Conditions, respectively.

Table 6-2
Horizon Year 2045 Conditions Intersection Operation Analysis Intersection Intersection
Control
Horizon Year 2045 No Project Horizon Year Plus Project
Delay (a) LOS (b) Delay (a) LOS (b)
AM/PM Peak

1. Date Palm Drive and McCallum Way Signalized 30.5/29.9 C/C 31.1/30.3 C/C

2. Date Palm Drive and Rosemount Road Signalized Does not exist 22.4/47.3 C/D

3. Date Palm Drive and 30th Avenue Signalized 28.9/23.4 C/C 29.0/23.8 C/C Notes:
(a) Delay refers to the average control delay for the entire intersection, measured in seconds/vehicle. (b) LOS calculations are based on the methodology outlined in the Highway Capacity Manual 6th Edition and performed using Synchro 11.

Per the analysis results shown in Table 6-2, all analyzed intersections are operating at an acceptable LOS under Horizon Year 20 45 No Project and Horizon Year Plus Project Conditions. Horizon Year 20 45 No Project and Horizon Year Plus Project Conditions peak hour analysis worksheets are provided in Appendices H and I, respectively.

Table 6-3 shows the proposed turn lane lengths to accommodate the anticipated queue demand under Horizon Year 2045 Plus Project Conditions . For queues that exceed the proposed turn lane lengths, the excess queue is within one vehicle length (20 feet) and will be accommodated by taper lengths. Queue analysis worksheets are included in Appendix I.

The Wren TA Horizon Year 2045
25 Table 6-3
Horizon Year 2045 Plus Projects Intersection Queue Analysis Intersection Movement
Analyzed
Turn Lane
Length (ft)
Recommended
Minimum
Taper Length
(ft)
Queue (ft) Excess
Demand
Recommended
Turn Lane
Length (ft) AM PM AM PM
Date Palm Drive and
Rosemount Road
NBL 180 90 101 185 -- -- 200
NBR 100 90 53 103 -- -- 120
SBL 280 90 171 281 -- -- 300
SBR 140 90 136 75 -- -- 140
WBL 140 60 74 147 -- -- 160

Per the analysis results shown in Table 6-4, all analyzed roadway segments are operating at an acceptable LOS under Horizon Year 2045 Conditions.

Table 6-4
Horizon Year 2045 Conditions Roadway Segment Capacity Analysis Roadway Segment Classification LOS E
Capacity
Horizon Year 2045 No
Project
Horizon Year Plus
Project

ADT V/C LOS ADT V/C LOS
Date Palm Drive
McCallum Way to Rosemount Road Arterial
Highway 59,000 26,014 0.441 B 26,564 0.450 B
Rosemount Road to 30th Avenue Arterial
Highway 59,000 29,729 0.504 C 30,207 0.512 C

13 Date Palm Drive and Rosemount Road
Intersection Future Lane Configuration
Figure 6-1
Rancho Vista Blvd. & 30th St. West1
Wren Development
Rosemount Rd.

Date Palm
Drive
Mixed Use
Development
Future
Shopping
Center
*
* *
*
*
* Refer to table above for recommended turn lane length The Wren
Horizon Year 2045 No Project Peak Hour Intersection Volumes Figure 6-1

The Wren
Horizon Year 2045 Plus Project Peak Hour Intersection Volumes Figure 6-2

The Wren TA Vehicle Miles Traveled
29 7.0 VEHICLE MILES TRAVELED

The purpose of this section is to evaluate the project’s vehicle miles traveled (VMT) analysis requirements and compliance with Senate Bill 743 (SB 743) and the California Environmental Quality Act (CEQA).

SB 743
On September 27, 2013, SB 743 was signed into State law and started a process intended to fundamentally change transportation impact analysis as part of CEQA compliance. On December 28, 2018, the California Office of Administrative Law cleared the revised CEQA guidelines for use. Among the changes to the guidelines was removal of vehicle delay and level of service from consideration under CEQA. With the adopted guidelines, transportation impacts are to be evaluated based on a project’s effect on VMT.

VMT ANALYSIS GUIDELINES
The Project is within the jurisdiction of the City of Cathedral City (City). The City has not formally adopted its own guidance on evaluating VMT for transportation impacts under CEQA. In the absence of adopted lead agency guidance, and in consultation with the City, the Guidelines were selected as the most appropriate basis to evaluate VMT for this project.

VMT ANALYSIS
The VMT analysis was conducted by General Technologies & Solutions using RIVCOM 4.01 to assess the Project VMT.

The Guidelines recommend use of home-based production VMT per capita as the VMT metric to evaluate residential land uses. The home -based production VMT is computed by using attraction VMT for the Home-Based production trip purpose. Per the Guidelines, the project will constitute a significant impact if the Project VMT per capita is higher than the Riverside Countywide home -based production VMT per capita.

Both baseline (2018) and horizon year (2045) model runs were used to estimate the P roject’s VMT impacts. RIVCOM4.01 socioeconomic databases for the scenarios were updated with the Project land use to calculate Project VMT. Typically, Project VMT is calculated by isolating the Project in a new TAZ or multiple TAZs depending on the diversity of Project land uses and Project size. RIVCOM4.01 does not allow addition of new TAZs or TAZ splits, however it includes some empty zones. One empty zone was borrowed to model the Project. The Project TAZ was utilized to calculate project specific VMT per capita.

Table 7-1 shows the Project VMT metrics and regional VMT thresholds for both baseline (2018) and horizon year (2045) “with Project” model runs.

The Wren TA Vehicle Miles Traveled
30 Table 7-1
Project VMT analysis
Metric Wren Residential (a) Riverside County (b)
2018
Total Population 660 2,358,439
Total Employment - 759,857
Homebase Production HBP) VMT 10,375 42,904,715
HBP VMT per capita 15.7 18.2
2045
Total Population 660 3,424,454
Total Employment - 1,116,025
Homebase Production (HBP) VMT 9,785 63,396,364
HBP VMT per capita 14.8 18.5
(a) Estimated using RIVCOM4.01 “with project” model runs (b) Estimated using GTS No Project RIVCOM4.01 model runs

A detailed VMT analysis is provided in a separate document . Since the Project is anticipated to be constructed by Opening Year 2025, we utilized interpolation to determine the Project VMT and regional average VMT values for Year 2025. The interpolated values are calculated to a Project VMT of 15.5 and a regional average VMT of 18.3.

Additionally, the project will be constructing half -width of Rosemount Road along the property frontage including travel lanes, curb, gutter, and sidewalk. The addition of travel lanes is in compliant with the Cathedral City Circulation Element and not expected to ind uce demand since the VMT is not a newly generated VMT; instead, it is the existing residential neighborhood traffic that will redistribute throughout the local roadway network that residents currently travel to and from each day. T he roadway extension will provide the proposed project and existing residential neighborhood direct access to Date Palm Drive and to newly built commercial retail services within close proximity that will essentially reduce overall VMT. Therefore, it was determined that the Project and roadway extension are not anticipated to result in a significant transportation impact related to VMT under Base Year 2018, Opening Year 2025, or Horizon Year 2045 scenarios.

APPENDIX A ‐

SCOPING AGREEMENT

TAGSA v03092022

SCOPING AGREEMENT FOR TRANSPORTATION LOS ANALYSIS
This letter acknowledges Cathedral City Transportation Department requirements for transportation level of service analysis of the following project. The analysis must follow the Riverside County Transportation Department Transportation Analysis Guidelines, December 2020.

Case No.

Related Cases
Project Name:

Project Address:

Project Description:

Traffic Consultant Applicant/Developer
Name:

Address:

Telephone:

E-mail:

Current GP Land Use Proposed Land Use
Current Zoning Proposed Zoning
A. Trip Generation Source:

Current Trip Generation Proposed Trip Generation
In Out Total In Out Total
AM Trips
PM Trips
Internal Trip Allowance Yes No ( % Trip Discount)
Pass-By Trip Allowance Yes No ( % Trip Discount)
A pass-by trip discount of 25% is allowed for appropriate land uses. The pass-by trips at adjacent study area intersections and project driveways shall be indicated on a report figure.

B. Trip Geographic Distribution: N % S % E % W %
(attach exhibit for detailed assignment)
C. Background Traffic
Project Build-out Year: Annual Ambient Growth Rate: %
Phase Year(s)
Other projects to be analyzed:

Model/Forecast methodology
The Wren
NEC of Date Palm Drive and Rosemount Road
204 multifamily (low rise) dwelling units and Rosemount Road extension to Date Palm Drive
George Ghossain, Integrated Engineering Grp
23905 Clinton Keith Road 114-280
Wildomar, CA 92595
951-239-1546
[email protected]
Coachella Valley Comm Dev Group
36101 Bob Hope Drive, Ste E5
Rancho Mirage, CA 92270
626-277-6782
[email protected]
General Commercial
Planned Community Comm
High Density Residential
R3 Multi Family Res
ITE Trip Generation Manual, 11th Edition (2021)
0 0
0 0
0 0
20 65
61 39
81 104
✔
✔
N/A
N/A
35 40
25 0
2025
N/A
Date Palm Drive Mixed Use & Vallarta Shopping Center
RIVCOM 4 2018 BY & 2045 HY
3 TAGSA v03092022
D. Study intersections: (NOTE: Subject to revision after other projects, trip generation and distribution are determined, or comments from other agencies.)

1. 6.

2. 7.

3. 8.

4. 9.

5. 10.

E. Study Roadway Segments: (NOTE: Subject to revision after other projects, trip generation and distribution are determined, or comments from other agencies.)

1. 6.

2. 7.

3. 8.

4. 9.

5. 10.

F. Other Jurisdictional
Is this project within a City’s Sphere of Influence or one-mile radius of City boundaries? Yes No If yes, name of jurisdiction(s):

G. Site Plan (please attach reduced copy)
H. Specific i ssues to be addressed in the Study (in addition to the standard analysis described in the Guideline) (To be filled out by Transportation Department) (NOTE: If the traffic study states that “a traffic signal is warranted” (or “a traffic signal appears to be warranted,” or similar statement) at an existing unsignalized intersection under existing conditions, 8-hour approach traffic volume information must be submitted in addition to the peak hourly turning movement counts for that intersection.) I. Existing Conditions
Traffic count data must be new or recent. Provide traffic count dates if using other than new counts.

Date of counts______________________________________________________________________ *NOTE* Traffic Study Submittal Form and appropriate fee must be submitted with this form.

Recommended by: Approved Scoping Agreement
Traffic Consultant Date Cathedral City Transportation
Department
Date
Scoping Agreement Submitted on
Revised on
Integrated Engineering Group
Date Palm Drive & McCallum Way
Date Palm Drive & Rosemount Road
Date Palm Drive & 30th Avenue
Date Palm Dr, McCallum Wy to Rosemount Rd
Date Palm Dr, Rosemount Rd to 30th Ave
✔
Rancho Mirage
Date Palm Dr/Rosemount Rd - traffic signal warrant and queue analysis for exclusive SBL & NBR 05/09/2023
6/14/2024
6/18/2024

THE WREN PROJECT
SCOPING AGREEMENT | PAGE 1 OF 3

Date: Jun 2, 2024

To: John Corella, P.E., City Engineer/Public Works Director, Cathedral City

From: George Ghossain, Principal Engineer, Integrated Engineering Group

Subject: Scoping Agreement for The Wren Project

Integrated Engineering Group (IEG) is pleased to submit this scoping agreement for The Wren project (Project) located at the northeast corner of Date Palm Drive and future Rosemount Road connection within Cathedral City, California. The Project is proposing the construction of 204 multi-family (low-rise) dwelling units on a vacant 11.49- acre lot and the Rosemont Road extension between Date Palm Drive and the existing alignment at the residential subdivision to the east.

Our goal is to obtain comments from Cathedral City staff, to ensure this scoping agreement addresses the analysis requirements for the project, according to the County of Riverside Transportation Analysis Guidelines for Level of Service (LOS) and Vehicle Miles Traveled (VMT), December 2020 (Guidelines).

The preliminary site plan for the Project is shown in Attachment 1. It is anticipated that the proposed development will be built and occupied by Year 2025. Rosemount Road does not currently extend to Date Palm Drive. However, it is anticipated that the appropriate dedications and easements will be in place prior to Project opening. Therefore, access to the Project site will be provided via one proposed driveway along the Rosemount Road extension and one existing driveway along Date Palm Drive through a proposed access easement to the adjacent Northgate Community Church site. Additionally, the Project will construct a traffic signal at the new intersection of Rosemount Road and Date Palm Drive.

TRIP GENERATION FOR POTENTIAL USES
Trip generation is a measure or forecast of the number of trips that begin or end at the project site. The traffic generated is a function of the extent and type of development proposed for the site. These trips will result in some traffic increases on the streets where they occur. Per the Guidelines, project vehicular traffic generation characteristics should be estimated based on established rates contained in the Trip Generation Manual (TGM), 11th Edition, published by the Institute of Transportation Engineers (ITE). The proposed Project ITE average trip generation rates are shown in Table 1.

Table 1 - Project Trip Generation Rates
Land Use1 Units 2 ITE LU
Code
AM Peak Hour PM Peak Hour Daily In Out Total In Out Total Multifamily Housing (Low-Rise) DU 220 0.10 0.30 0.40 0.32 0.19 0.51 6.74 1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, Eleventh Edition (2021). 2 DU = Dwelling Unit

THE WREN PROJECT
SCOPING AGREEMENT | PAGE 2 OF 3

Table 2 - Project Trip Generation Summary
Land Use1 Intensity Units 2 AM Peak Hour PM Peak Hour Daily In Out Total In Out Total Multifamily Housing (Low-Rise) 204 DU 20 61 81 65 39 104 1,375 1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, Eleventh Edition (2021). 2 DU = Dwelling Unit

STUDY AREA
The study area for this project was developed consistent with the Guidelines, which includes all intersections of two (2) or more “Collector” or higher classification streets, at which the proposed project will add 50 or more peak hour trips, and the roadway segments between these intersections. Attachment 2 presents the study area that includes the key intersection and roadway segment locations identified in the scoping form.

24-hour segment and intersection counts will be conducted for one weekday (Tuesday through Thursday), with turning movements collected during the morning (7:00-9:00am) and evening (4:00-6:00) peak hours. The turning movement counts will be utilized in Synchro to determine level of service (LOS) at all study intersections.

TRIP DISTRIBUTION
Trip distribution and assignment is the process of identifying the probable destinations, directions, and traffic routes that project related traffic will likely affect. Trip distribution and assignment information can be estimated from observed traffic patterns, experience or through use of a computerized travel forecast model. Once the proposed developments trips have been estimated, they are assigned to the study area network. For this project, the trip distribution was developed based on the land use characteristics, surrounding land uses in the vicinity of the project site, anticipated travel patterns to and from the project site and existing travel patterns within the study area.

Attachments 2 and 3 show the project’s trip distribution and trip assignment, respectively.

ANALYSIS SCENARIOS
Analysis of the intersection operating conditions during the peak periods will be conducted for the following anticipated timeframe scenarios:
 Existing Conditions Year 2023
 Project Completion Year 2025 (Existing plus Ambient Growth plus Project)  Cumulative Year 2025 (Existing + Project + Ambient + Cumulative) Conditions  Horizon Year 2045 No Project Conditions
 Horizon Year Plus Project Conditions

Ambient growth is 3% per year.

Specific issues to be addressed in the Study (in addition to the standard analysis described in the Guideline)

The Study will include intersection queue analysis to determine the lengths of the following potential exclusive lanes:

THE WREN PROJECT
SCOPING AGREEMENT | PAGE 3 OF 3

 Southbound left turn lane length at the intersection of Date Palm Drive and Rosemount Road  Northbound right turn lane at the intersection of Date Palm Drive and Rosemount Road

VEHICLE MILES TRAVELED (VMT) ANALYSIS
Per the Guidelines, the Project does not screen out per the Small Project criteria and will be required to run the model in order to conduct a full VMT analysis. Once City staff provide their input, IEG will conduct the required VMT analysis to determine if the Project would result in a significant transportation VMT impact.

Sincerely,
Approved By:

Signature:

Name:

George Ghossain, MS, PE Address:

Principal Engineer

Attachments: 1 – Project Site Plan
2 – Project Study Area & Trip Distribution
3 – Project Trip Assignment

Attachment 1 - Vicinity Map and Project Site Plan
Steering Angle
Lock to Lock Time
Articulating Angle
WB-50
Trailer Track
Tractor Track
Trailer Width
Tractor Width

12.503.00
feet

8.50 : 8.50

8.00 8.00
:
:
:

0.00 3.00 35.50

7.50 42.50
:
:
: 6.0

17.7 70.0
CONFIDENTIALITY STATEMENT:

DEVELOPMENT INFORMATION:

SITE ADDRESS:

DRAWING TITLE:

SHEET NO.:

DATENO. REVISION DESCRIPTION
04/12/2021 16444

THIS DOCUMENT AND THE INFORMATION HEREIN RELATING

TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN

CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED
PERSONNEL. NO PART HEREOF SHALL BE COPIED,

DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE

TO OTHERS OR USED TO ANY EXTENT EXCEPT AS
EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP.

ANY PERSON, FIRM OR CORPORATION RECEIVING THIS

DOCUMENT, SHALL BE HELD TO THE FOREGOING
RESTRICTIONS.

W
GRAPHIC SCALE: 1" =
0 0 0 0 0 0 0 400' 600'200' 200'
200'

VICINITY MAP

PROJECT
SITE
FH

PROJECT SITE

The Wren
Project Site Plan
Attachment 1

The Wren
Project Study Area and Trip Distribution
Attachment 2
LEGEND # Intersection

PROJECT SITE
25%
40%
35%
35%
40%
2 1
3 35%
20%
80%
15% %
55%
The Wren
Project Trip Assignment
Attachment 3

APPENDIX B ‐
TRAFFIC VOLUME DATA
CITY: Cathedral City PROJECT:

AM Period NB SB PM Period NB SB
0:00 21 21 12:00 126 128
0:15 15 19 12:15 151 145
0:30 21 11 12:30 150 130
0:45 14 71 13 64 135 12:45 149 576 148 551 1127
1:00 14 6 13:00 173 155
1:15 21 17 13:15 182 121
1:30 10 6 13:30 161 157
1:45 6 51 9 38 89 13:45 174 690 164 597 1287
2:00 16 9 14:00 197 141
2:15 10 12 14:15 162 163
2:30 7 7 14:30 165 173
2:45 7 40 10 38 78 14:45 190 714 207 684 1398
3:00 9 11 15:00 207 165
3:15 10 6 15:15 204 163
3:30 10 13 15:30 205 172
3:45 10 39 16 46 85 15:45 231 847 253 753 1600
4:00 11 6 16:00 280 195
4:15 15 10 16:15 271 174
4:30 17 25 16:30 243 184
4:45 20 63 34 75 138 16:45 220 1014 182 735 1749
5:00 33 30 17:00 265 190
5:15 33 33 17:15 236 172
5:30 62 63 17:30 197 151
5:45 42 170 109 235 405 17:45 204 902 158 671 1573
6:00 59 102 18:00 206 160
6:15 67 134 18:15 140 125
6:30 71 143 18:30 183 141
6:45 86 283 169 548 831 18:45 168 697 135 561 1258
7:00 91 188 19:00 136 126
7:15 94 169 19:15 151 117
7:30 126 248 19:30 116 129
7:45 95 406 288 893 1299 19:45 152 555 135 507 1062
8:00 130 200 20:00 148 120
8:15 134 266 20:15 137 90
8:30 167 236 20:30 120 101
8:45 132 563 240 942 1505 20:45 110 515 73 384 899
9:00 86 155 21:00 117 70
9:15 125 131 21:15 111 72
9:30 116 156 21:30 116 62
9:45 121 448 144 586 1034 21:45 87 431 79 283 714
10:00 104 141 22:00 73 60
10:15 104 144 22:15 85 48
10:30 118 139 22:30 63 42
10:45 109 435 164 588 1023 22:45 62 283 47 197 480
11:00 110 124 23:00 62 32
11:15 119 157 23:15 39 28
11:30 152 181 23:30 33 28
11:45 133 514 158 620 1134 23:45 40 174 30 118 292
Total Vol. 3083 4673 7756 7398 6041 13439
NB SB Combined
10481 10714 21195
Split % 39.7% 60.3% 36.6% 55.0% 45.0% 63.4%
Peak Hour 8:00 7:30 7:45 15:45 15:45 15:45
Volume 563 1002 1516 1025 806 1831
P.H.F. 0.84 0.87 0.94 0.94 0.80 0.95
Tuesday, May 09, 2023 SC4010
ADT1 Date Palm north of Mccallum. Prepared by AimTD LLC tel. 714 253 7888 Daily Totals
AM PM
[email protected] Tell. 714 253 7888 CITY: Cathedral City PROJECT:

AM Period NB SB PM Period NB SB
0:00 19 24 12:00 130 125
0:15 16 18 12:15 143 144
0:30 20 10 12:30 157 133
0:45 14 69 13 65 134 12:45 152 582 155 557 1139
1:00 14 6 13:00 169 140
1:15 10 13 13:15 182 135
1:30 11 6 13:30 159 155
1:45 6 41 11 36 77 13:45 173 683 151 581 1264
2:00 15 9 14:00 186 151
2:15 10 11 14:15 167 155
2:30 7 8 14:30 154 177
2:45 7 39 10 38 77 14:45 193 700 191 674 1374
3:00 10 11 15:00 200 153
3:15 9 9 15:15 206 159
3:30 10 12 15:30 201 193
3:45 11 40 16 48 88 15:45 260 867 237 742 1609
4:00 10 7 16:00 264 176
4:15 16 12 16:15 250 187
4:30 18 24 16:30 243 162
4:45 19 63 37 80 143 16:45 233 990 181 706 1696
5:00 28 28 17:00 231 182
5:15 35 34 17:15 250 175
5:30 65 73 17:30 211 169
5:45 41 169 108 243 412 17:45 193 885 140 666 1551
6:00 60 98 18:00 212 156
6:15 69 141 18:15 151 130
6:30 70 137 18:30 184 147
6:45 83 282 172 548 830 18:45 176 723 143 576 1299
7:00 93 203 19:00 141 128
7:15 108 193 19:15 157 119
7:30 116 236 19:30 115 138
7:45 112 429 283 915 1344 19:45 155 568 120 505 1073
8:00 121 212 20:00 163 126
8:15 124 266 20:15 134 91
8:30 165 237 20:30 124 96
8:45 136 546 211 926 1472 20:45 110 531 73 386 917
9:00 98 169 21:00 117 65
9:15 116 125 21:15 116 77
9:30 121 152 21:30 123 60
9:45 123 458 139 585 1043 21:45 79 435 73 275 710
10:00 112 147 22:00 81 62
10:15 121 133 22:15 86 48
10:30 148 133 22:30 63 44
10:45 139 520 159 572 1092 22:45 57 287 46 200 487
11:00 113 136 23:00 65 30
11:15 120 150 23:15 37 27
11:30 146 171 23:30 38 33
11:45 137 516 146 603 1119 23:45 40 180 26 116 296
Total Vol. 3172 4659 7831 7431 5984 13415
NB SB Combined
10603 10643 21246
Split % 40.5% 59.5% 36.9% 55.4% 44.6% 63.1%
Peak Hour 11:45 7:45 7:45 15:45 15:30 15:45
Volume 567 998 1520 1017 793 1779
P.H.F. 0.90 0.88 0.95 0.97 0.84 0.89
Tuesday, May 09, 2023 SC4010
ADT2 Date Palm south of 30th. Prepared by AimTD LLC tel. 714 253 7888 Daily Totals
AM PM
[email protected] Tell. 714 253 7888

T218
DATE: LOCATION: PROJECT #: SC4010
Tue, May 9, 23NORTH & SOUTH: LOCATION #: 1
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 3 0 1 3 0 1 1 0 1 1 0 0 0 0 0
7:00 AM 6 71 6 14 163 11 12 29 26 12 17 8 375 0 0 0 0 0 7:15 AM 3 79 14 6 152 11 8 52 20 16 37 7 405 0 0 0 0 0
7:30 AM 10 98 10 13 228 7 20 45 34 18 48 8 539 0 0 0 0 0 7:45 AM 5 73 6 14 264 10 12 15 26 18 50 10 503 2 0 0 0 2 8:00 AM 7 109 10 22 164 14 12 50 22 11 21 8 450 0 1 0 0 1 8:15 AM 12 112 12 32 223 11 15 61 23 12 27 6 546 0 1 0 0 1 8:30 AM 16 136 14 16 208 12 13 65 23 18 34 18 573 1 0 0 0 1 8:45 AM 9 106 13 13 219 8 10 15 15 9 35 16 468 0 0 0 0 0 VOLUMES 68 784 85 130 1,621 84 102 332 189 114 269 81 3,859 3 2 0 0 5 APPROACH % 7% 84% 9% 7% 88% 5% 16% 53% 30% 25% 58% 17%
APP/DEPART 937 / 969 1,835 / 1,927 623 / 545 464 / 418 0

BEGIN PEAK HR
VOLUMES 40 430 42 84 859 47 52 191 94 59 132 42 2,072
APPROACH % 8% 84% 8% 8% 87% 5% 15% 57% 28% 25% 57% 18%
PEAK HR FACTOR 0.771 0.859 0.834 0.747 0.904
APP/DEPART 512 / 526 990 / 1,015 337 / 315 233 / 216 0
4:00 PM 17 238 22 13 165 17 22 25 17 28 49 18 631 0 2 0 0 2 4:15 PM 19 237 14 8 160 6 24 45 18 15 37 10 593 0 0 0 0 0 4:30 PM 24 219 11 15 155 14 10 19 15 9 20 14 525 1 0 0 0 1 4:45 PM 23 188 16 13 163 6 26 22 22 18 21 5 523 0 1 0 0 1 5:00 PM 29 234 14 12 172 6 18 17 16 8 25 12 563 1 1 0 0 2 5:15 PM 37 212 14 7 145 20 15 26 22 19 32 9 558 0 0 0 0 0 5:30 PM 19 168 9 9 133 9 19 25 23 13 24 9 460 0 1 0 0 1 5:45 PM 26 177 14 12 138 8 16 20 17 15 14 9 466 0 2 0 0 2 VOLUMES 194 1,673 114 89 1,231 86 150 199 150 125 222 86 4,319 2 7 0 0 9 APPROACH % 10% 84% 6% 6% 88% 6% 30% 40% 30% 29% 51% 20% APP/DEPART 1,981 / 1,916 1,406 / 1,508 499 / 395 433 / 500 0

BEGIN PEAK HR
VOLUMES 83 882 63 49 643 43 82 111 72 70 127 47 2,272
APPROACH % 8% 86% 6% 7% 87% 6% 31% 42% 27% 29% 52% 19%
PEAK HR FACTOR 0.928 0.942 0.761 0.642 0.900
APP/DEPART 1,028 / 1,014 735 / 786 265 / 220 244 / 252 0 Date Palm

NORTH SIDE
Mccallum WEST SIDE EAST SIDE Mccallum

SOUTH SIDE
Date Palm

N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 0 0 1 1 2 0 0 1 0 1 0 0 0 1 1
7:15 AM 0 1 1 0 2 0 1 1 0 2 0 0 0 0 0
7:30 AM 1 0 0 0 1 1 0 0 0 1 0 0 0 0 0
7:45 AM 0 0 0 2 2 0 0 0 2 2 0 0 0 0 0
8:00 AM 1 1 0 3 5 1 1 0 3 5 0 0 0 0 0
8:15 AM 0 2 0 3 5 0 1 0 2 3 0 1 0 1 2
8:30 AM 2 1 1 1 5 1 1 1 1 4 1 0 0 0 1
8:45 AM 0 3 2 0 5 0 2 2 0 4 0 1 0 0 1
TOTAL 4 8 5 10 27 3 6 5 8 22 1 2 0 2 5
AM BEGIN PEAK HR 2 3 1 8 14
4:00 PM 1 0 0 2 3 1 0 0 1 2 0 0 0 1 1
4:15 PM 0 2 1 1 4 0 1 1 1 3 0 1 0 0 1
4:30 PM 0 1 0 1 2 0 1 0 1 2 0 0 0 0 0
4:45 PM 0 1 1 0 2 0 1 1 0 2 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 2 0 1 3 0 2 0 1 3 0 0 0 0 0
5:30 PM 0 2 0 0 2 0 2 0 0 2 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 1 8 2 5 16 1 7 2 4 14 0 1 0 1 2
1 3 2 3 9

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected] Cathedral City
Date Palm
Mccallum
PM BEGIN PEAK HR 4:00 PM

BICYCLE CROSSINGSPEDESTRIAN CROSSINGS

U-TURNS
Date Palm Date Palm Mccallum Mccallum

AMPM AM
7:45 AM
PM
4:00 PM
PEDESTRIAN + BIKE CROSSINGS
7:45 AM
Add U-Turns to Left Turns
3,241 170 2,852 219 TOTAL 2,885
1,406 86 1,231 89 PM 1,916
1,835 84 1,621 130 AM 969
464 433 897
918 500 418
81 86 167 269 222 491

TOTALPMAM
114 125 239
252 150 102

AMPMTOTAL
531 199 332 339 150 189
545 395 940
1,122 499 623
1,927 AM 68 784 85 937
1,508 PM 194 1,673 114 1,981
3,435 TOTAL 262 2,457 199 2,918
1,725 90 1,502 133 TOTAL 1,540
735 43 643 49 PM 1,014
990 47 859 84 AM 526
233 244 477
468 252 216
42 47 89 132 127 259
TOTALPMAMAM 7:45 AM
8:45 AM
59 70 129
134 82 52
#N/A

AMPMTOTAL
302 111 191 PM 4:00 PM
5:45 PM
166 72 94
315 220 535
602 265 337
1,015 AM 40 430 42 512
786 PM 83 882 63 1,028
1,801 Total 123 1,312 105 1,540
AimTD LLC

TURNING MOVEMENT COUNTS
Date Palm
Mccallum
Mccallum
Cathedral City
SC4010

ALL HOURS
Date Palm
Date Palm
Date Palm
Mccallum
Mccallum

PEAK HOUR

T218
DATE: LOCATION: PROJECT #: SC4010
Tue, May 9, 23NORTH & SOUTH: LOCATION #: 3
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 3 0 1 3 0 1 1 0 1 1 0 0 0 0 0
7:00 AM 6 84 3 51 188 17 31 24 13 3 17 37 474 0 0 0 1 1 7:15 AM 9 88 11 67 161 19 40 48 29 3 34 68 577 0 0 0 0 0 7:30 AM 14 87 15 64 193 16 50 72 30 13 37 67 658 0 0 0 0 0 7:45 AM 15 87 10 52 255 20 33 57 18 10 35 52 644 0 1 0 0 1 8:00 AM 9 102 10 70 184 17 26 45 15 13 38 56 585 0 2 0 0 2 8:15 AM 13 96 15 100 205 13 15 70 29 31 68 68 723 1 0 0 0 1 8:30 AM 15 132 18 78 178 12 19 66 26 31 73 70 718 2 0 0 0 2 8:45 AM 16 113 7 40 167 11 22 33 23 20 52 53 557 1 0 0 0 1 VOLUMES 97 789 89 522 1,531 125 236 415 183 124 354 471 4,936 4 3 0 1 8 APPROACH % 10% 81% 9% 24% 70% 6% 28% 50% 22% 13% 37% 50% APP/DEPART 975 / 1,499 2,178 / 1,841 834 / 1,024 949 / 572 0

BEGIN PEAK HR
VOLUMES 52 417 53 300 822 62 93 238 88 85 214 246 2,670 APPROACH % 10% 80% 10% 25% 69% 5% 22% 57% 21% 16% 39% 45% PEAK HR FACTOR 0.791 0.905 0.919 0.783 0.923
APP/DEPART 522 / 759 1,184 / 998 419 / 588 545 / 325 0
4:00 PM 50 206 8 46 129 23 21 37 24 16 79 91 730 7 0 0 0 7 4:15 PM 35 207 8 32 152 24 28 31 22 7 41 61 648 6 0 0 0 6 4:30 PM 34 198 11 41 131 27 12 32 19 9 56 60 630 3 0 0 0 3 4:45 PM 28 197 8 35 147 20 22 26 21 9 43 47 603 4 0 0 0 4 5:00 PM 19 207 5 26 158 26 26 37 14 9 37 54 618 1 0 0 0 1 5:15 PM 28 211 11 45 154 20 23 28 14 4 45 44 627 3 1 0 0 4 5:30 PM 21 186 4 34 150 28 17 26 12 4 37 42 561 3 1 0 0 4 5:45 PM 25 149 19 40 108 27 16 43 17 8 36 45 533 7 0 0 0 7 VOLUMES 240 1,561 74 299 1,129 195 165 260 143 66 374 444 4,950 34 2 0 0 36 APPROACH % 13% 83% 4% 18% 70% 12% 29% 46% 25% 7% 42% 50% APP/DEPART 1,875 / 2,172 1,623 / 1,372 568 / 631 884 / 775 0

BEGIN PEAK HR
VOLUMES 147 808 35 154 559 94 83 126 86 41 219 259 2,611 APPROACH % 15% 82% 4% 19% 69% 12% 28% 43% 29% 8% 42% 50% PEAK HR FACTOR 0.938 0.970 0.899 0.698 0.894
APP/DEPART 990 / 1,150 807 / 706 295 / 315 519 / 440 0
Date Palm

NORTH SIDE
30th WEST SIDE EAST SIDE 30th

SOUTH SIDE
Date Palm

N SIDE S SIDE E SIDE W SIDE TOTAL N SIDE S SIDE E SIDE W SIDE TOTAL NS SS ES WS TOTAL 7:00 AM 0 6 0 0 6 0 2 0 0 2 0 4 0 0 4
7:15 AM 5 0 0 1 6 2 0 0 1 3 3 0 0 0 3
7:30 AM 2 4 0 0 6 0 4 0 0 4 2 0 0 0 2
7:45 AM 3 2 0 0 5 3 1 0 0 4 0 1 0 0 1
8:00 AM 2 5 0 0 7 2 3 0 0 5 0 2 0 0 2
8:15 AM 6 10 2 0 18 3 8 2 0 13 3 2 0 0 5
8:30 AM 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2
8:45 AM 0 2 0 1 3 0 0 0 0 0 0 2 0 1 3
TOTAL 18 31 2 2 53 10 18 2 1 31 8 13 0 1 22
AM BEGIN PEAK HR 8 12 2 0 22
4:00 PM 0 2 0 1 3 0 0 0 1 1 0 2 0 0 2
4:15 PM 0 1 0 1 2 0 1 0 1 2 0 0 0 0 0
4:30 PM 0 0 0 1 1 0 0 0 1 1 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 2 0 0 0 2 1 0 0 0 1 1 0 0 0 1
5:15 PM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1
5:30 PM 0 2 0 0 2 0 2 0 0 2 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 2 6 0 3 11 1 3 0 3 7 1 3 0 0 4
0 1 0 3 4

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected] Cathedral City
Date Palm
30th
PM BEGIN PEAK HR 4:00 PM

BICYCLE CROSSINGSPEDESTRIAN CROSSINGS

U-TURNS
Date Palm Date Palm 30th 30th

AMPM AM
7:45 AM
PM
4:00 PM
PEDESTRIAN + BIKE CROSSINGS
7:45 AM
Add U-Turns to Left Turns
3,801 320 2,660 821 TOTAL 3,671
1,623 195 1,129 299 PM 2,172
2,178 125 1,531 522 AM 1,499
949 884 1,833
1,347 775 572
471 444 915 354 374 728

TOTALPMAM
124 66 190
401 165 236

AMPMTOTAL
675 260 415 326 143 183
1,024 631 1,655
1,402 568 834
1,841 AM 97 789 89 975
1,372 PM 240 1,561 74 1,875
3,213 TOTAL 337 2,350 163 2,850
1,991 156 1,381 454 TOTAL 1,909
807 94 559 154 PM 1,150
1,184 62 822 300 AM 759
545 519 1,064
765 440 325
246 259 505 214 219 433
TOTALPMAMAM 7:45 AM
8:45 AM
85 41 126
176 83 93
#N/A

AMPMTOTAL
364 126 238 PM 4:00 PM
5:45 PM
174 86 88
588 315 903
714 295 419
998 AM 52 417 53 522
706 PM 147 808 35 990
1,704 Total 199 1,225 88 1,512
AimTD LLC

TURNING MOVEMENT COUNTS
Date Palm
30th
30th
Cathedral City
SC4010

ALL HOURS
Date Palm
Date Palm
Date Palm
30th
30th

PEAK HOUR
V
A
R
N
E
R

R
D
4 2
2 V
A
R
N
E
R

R
D
5 9
-
-
7 -
-
4 7
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
3 7
4 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
3 7
4 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
8 8
7 8
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
8 8
7 8
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
0 -
-
4 -
-
0 -
-
4 -
-
1 3
-
-
1 4
9 -
-
0 -
-
2 -
-
0 -
-
3 V
I
S
T
A

C
H
I
N
O
2 1
4 7
V
I
S
T
A

C
H
I
N
O
2 0
3 2
-
-
2 4
-
-
3 7
8 -
-
7 0
-
-
2 9
M
C

C
A
L
L
U
M

W
A
Y
3 6
8 M
C

C
A
L
L
U
M

W
A
Y
5 5
4 -
-
0 -
-
3 -
-
3 2
8 -
-
6 1
5 V
I
S
T
A

C
H
I
N
O
1 7
7 2
V
I
S
T
A

C
H
I
N
O
2 1
0 3
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 9
5 0
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 6
7 3
D
A
T
E

P
A
L
M

D
R
2 1
8 1
D
A
T
E

P
A
L
M

D
R
2 6
9 4
D
A

V
A
L
L

D
R
5 9
0 D
A

V
A
L
L

D
R
7 7
6 L
A
N
D
A
U

B
L
V
D
7 8
9 L
A
N
D
A
U

B
L
V
D
7 9
8 L
A
N
D
A
U

B
L
V
D
9 8
3 L
A
N
D
A
U

B
L
V
D
1 0
4 3
M
C

C
A
L
L
U
M

W
A
Y
2 6
3 M
C

C
A
L
L
U
M

W
A
Y
1 4
3 3
0 T
H

A
V
E
3 7
0 3
0 T
H

A
V
E
2 6
3 3
0 T
H

A
V
E
5 3
6 3
0 T
H

A
V
E
4 2
9 L
A
N
D
A
U

B
L
V
D
9 7
2 L
A
N
D
A
U

B
L
V
D
1 8
2 2
R
A
M
O
N

R
D
2 9
5 3
R
A
M
O
N

R
D
2 5
0 9
R
A
M
O
N

R
D
3 1
3 0
R
A
M
O
N

R
D
2 7
0 9
V
I
S
T
A

C
H
I
N
O
2 3
7 7
V
I
S
T
A

C
H
I
N
O
1 9
1 2
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
7 1
7 1
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
R
N
E
R

R
D
3 8
7 V
A
R
N
E
R

R
D
7 5
-
-
0 -
-
2 -
-
0 -
-
2 RAMON RD
2974

RAMON RD
2570
-
-
1 0
3 -
-
3 0
-
-
1 3
7 -
-
8 5
-
-
3 -
-
5 6
-
-
0 -
-
3 -
-
1 1
3 -
-
8 9
-
-
4 2
7 -
-
2 4
0 -
-
5 2
3 -
-
1 8
5 -
-
2 3
1 -
-
1 5
0 -
-
3 1
9 -
-
1 8
2 -
-
4 7
1 -
-
2 0
6 -
-
0 -
-
3 -
-
0 -
-
3 -
-
1 6
0 -
-
1 5
8 -
-
6 -
-
2 8
-
-
5 3
2 -
-
3 6
3 R
A
M
O
N

R
D
3 6
0 8
R
A
M
O
N

R
D
3 6
7 9
-
-
1 8
7 -
-
1 8
3 -
-
1 5
4 -
-
2 5
3 -
-
2 9
9 -
-
1 5
8 D
A

V
A
L
L

D
R
5 9
3 D
A

V
A
L
L

D
R
8 1
9 -
-
4 6
-
-
1 2
4 -
-
1 2
0 -
-
1 0
0 D
A
T
E

P
A
L
M

D
R
2 2
3 6
D
A
T
E

P
A
L
M

D
R
2 6
4 6
-
-
1 7
2 -
-
2 3
3 -
-
5 3
0 -
-
2 9
1 -
-
4 5
9 -
-
3 4
7 V
A
R
N
E
R

R
D
3 8
5 V
A
R
N
E
R

R
D
7 7
-
-
7 6
-
-
7 6
-
-
6 0
9 -
-
5 7
9 -
-
2 7
0 -
-
1 4
4 -
-
0 -
-
3 R
A
M
O
N

R
D
3 3
9 5
R
A
M
O
N

R
D
3 7
4 2
-
-
8 8
7 -
-
3 2
9 -
-
4 1
4 -
-
3 0
9 3
0 T
H

A
V
E
2 9
4 3
0 T
H

A
V
E
8 4
8 D
A
T
E

P
A
L
M

D
R
1 6
9 6
D
A
T
E

P
A
L
M

D
R
2 4
7 6
D
A
T
E

P
A
L
M

D
R
1 4
6 5
D
A
T
E

P
A
L
M

D
R
2 3
2 6
-
-
1 7
9 -
-
8 1
R
A
M
O
N

R
D
2 7
7 8
R
A
M
O
N

R
D
4 4
7 0
R
A
M
O
N

R
D
2 7
7 8
R
A
M
O
N

R
D
4 4
7 2
-
-
6 5
9 -
-
2 4
6 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 2
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
9 2
3 0
T
H

A
V
E
4 8
9 3
0 T
H

A
V
E
4 8
5 L
A
N
D
A
U

B
L
V
D
6 4
0 L
A
N
D
A
U

B
L
V
D
1 0
9 5
R
A
M
O
N

R
D
2 9
6 8
R
A
M
O
N

R
D
3 8
1 1
-
-
8 9
9 -
-
4 0
3 D
A

V
A
L
L

D
R
2 6
3 D
A

V
A
L
L

D
R
3 7
0 D
A

V
A
L
L

D
R
4 4
9 D
A

V
A
L
L

D
R
4 3
6 -
-
5 1
3 -
-
2 8
7 -
-
4 0
1 -
-
1 8
3 D
A
T
E

P
A
L
M

D
R
2 0
4 9
D
A
T
E

P
A
L
M

D
R
2 8
0 0
-
-
2 5
4 -
-
2 4
9 M
C

C
A
L
L
U
M

W
A
Y
6 4
5 M
C

C
A
L
L
U
M

W
A
Y
6 3
4 -
-
3 8
4 -
-
4 3
2 D
A
T
E

P
A
L
M

D
R
1 7
2 4
D
A
T
E

P
A
L
M

D
R
2 9
5 9
D
A
T
E

P
A
L
M

D
R
3 9
3 8
D
A
T
E

P
A
L
M

D
R
3 9
8 6
R
A
M
O
N

R
D
2 8
5 1
R
A
M
O
N

R
D
2 5
2 0

RAMON RD
3145

RAMON RD
2766
-
-
1 6
3 -
-
1 1
3 --
14 --
357
3 0
T
H

A
V
E
4 5
6 3
0 T
H

A
V
E
3 9
2 R
A
M
O
N

R
D
3 6
3 2
R
A
M
O
N

R
D
3 6
7 3
-
-
1 7
0 7
-
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
5 0
2 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 6
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 1
1 -
-
0 -
-
3 -
-
2 8
7 2
-
-
0 M
C

C
A
L
L
U
M

W
A
Y
6 4
5 M
C

C
A
L
L
U
M

W
A
Y
6 3
4 M
C

C
A
L
L
U
M

W
A
Y
5 7
6 M
C

C
A
L
L
U
M

W
A
Y
4 0
0 3
0 T
H

A
V
E
8 6
8 3
0 T
H

A
V
E
3 9
1 3
0 T
H

A
V
E
8 6
8 3
0 T
H

A
V
E
3 9
1 D
A
T
E

P
A
L
M

D
R
1 8
6 2
D
A
T
E

P
A
L
M

D
R
3 0
8 4
D
A
T
E

P
A
L
M

D
R
1 7
7 9
D
A
T
E

P
A
L
M

D
R
2 9
0 3
D
A
T
E

P
A
L
M

D
R
5 5
7 D
A
T
E

P
A
L
M

D
R
1 4
2 1
L
A
N
D
A
U

B
L
V
D
1 0
2 6
L
A
N
D
A
U

B
L
V
D
1 6
4 0
L
A
N
D
A
U

B
L
V
D
1 0
2 6
L
A
N
D
A
U

B
L
V
D
1 6
4 0
M
C

C
A
L
L
U
M

W
A
Y
4 1
0 M
C

C
A
L
L
U
M

W
A
Y
6 9
5 M
C

C
A
L
L
U
M

W
A
Y
3 1
4 M
C

C
A
L
L
U
M

W
A
Y
4 1
2 -
-
3 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 1
7 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 2
7 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 1
7 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 2
7 L
A
N
D
A
U

B
L
V
D
1 0
8 9
L
A
N
D
A
U

B
L
V
D
1 6
5 5
L
A
N
D
A
U

B
L
V
D
1 0
8 9
L
A
N
D
A
U

B
L
V
D
1 6
5 5
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 6
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 1
1 D
A

V
A
L
L

D
R
5 7
8 D
A

V
A
L
L

D
R
6 8
5 D
A

V
A
L
L

D
R
5 4
7 D
A

V
A
L
L

D
R
7 5
2 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 0
2 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 7
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 1
7 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 2
7 M
C

C
A
L
L
U
M

W
A
Y
5 7
6 M
C

C
A
L
L
U
M

W
A
Y
4 0
0 M
C

C
A
L
L
U
M

W
A
Y
5 7
6 M
C

C
A
L
L
U
M

W
A
Y
4 0
0 RAMON RD
2851

RAMON RD
2520
-
-
0 -
-
2 8
7 2
RIVCOM 3 - 2018 AM peak period volumes
0 .05
.1
.15
Miles

HCMTYPE
CC (6867)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12486)
PrArterial (8422)
V
A
R
N
E
R

R
D
1 2
6 V
A
R
N
E
R

R
D
3 3
5 -
-
5 0
-
-
1 1
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
5 3
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
5 3
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
4 6
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
4 6
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
3 -
-
2 -
-
3 -
-
2 -
-
1 2
3 -
-
2 8
-
-
1 -
-
1 -
-
2 -
-
1 V
I
S
T
A

C
H
I
N
O
2 5
7 7
V
I
S
T
A

C
H
I
N
O
2 4
7 5
-
-
3 0
4 -
-
6 4
-
-
4 3
-
-
8 6
M
C

C
A
L
L
U
M

W
A
Y
6 2
2 M
C

C
A
L
L
U
M

W
A
Y
5 0
7 -
-
2 -
-
1 -
-
6 7
8 -
-
5 0
9 V
I
S
T
A

C
H
I
N
O
2 4
8 3
V
I
S
T
A

C
H
I
N
O
2 1
4 3
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
3 4
4 6
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
3 6
5 0
D
A
T
E

P
A
L
M

D
R
3 2
7 3
D
A
T
E

P
A
L
M

D
R
2 7
8 0
D
A

V
A
L
L

D
R
9 1
0 D
A

V
A
L
L

D
R
7 4
3 L
A
N
D
A
U

B
L
V
D
1 0
1 1
L
A
N
D
A
U

B
L
V
D
9 4
1 L
A
N
D
A
U

B
L
V
D
1 3
3 4
L
A
N
D
A
U

B
L
V
D
1 2
0 2
M
C

C
A
L
L
U
M

W
A
Y
1 9
5 M
C

C
A
L
L
U
M

W
A
Y
2 8
5 3
0 T
H

A
V
E
3 2
6 3
0 T
H

A
V
E
4 0
3 3
0 T
H

A
V
E
5 5
5 3
0 T
H

A
V
E
6 1
8 L
A
N
D
A
U

B
L
V
D
2 0
9 6
L
A
N
D
A
U

B
L
V
D
1 4
4 1
R
A
M
O
N

R
D
3 2
1 4
R
A
M
O
N

R
D
3 5
7 8
R
A
M
O
N

R
D
3 4
2 8
R
A
M
O
N

R
D
3 7
9 4
V
I
S
T
A

C
H
I
N
O
2 5
0 4
V
I
S
T
A

C
H
I
N
O
2 6
6 1
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
3 5
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
R
N
E
R

R
D
1 3
6 V
A
R
N
E
R

R
D
3 0
3 -
-
1 -
-
1 -
-
2 -
-
1 RAMON RD
3301

RAMON RD
3650
-
-
5 6
-
-
1 0
9 -
-
1 2
2 -
-
1 5
9 -
-
3 6
-
-
7 -
-
2 -
-
1 -
-
1 2
4 -
-
1 4
0 -
-
3 6
7 -
-
4 8
7 -
-
3 3
2 -
-
5 6
2 -
-
2 1
5 -
-
2 0
1 -
-
2 7
6 -
-
3 6
4 -
-
3 2
7 -
-
5 1
0 -
-
2 -
-
1 -
-
2 -
-
1 -
-
2 1
1 -
-
2 0
4 -
-
2 8
-
-
1 3
-
-
4 7
5 -
-
5 9
2 R
A
M
O
N

R
D
4 6
6 0
R
A
M
O
N

R
D
4 5
1 0
-
-
2 1
9 -
-
2 2
6 -
-
3 2
2 -
-
2 4
0 -
-
2 4
5 -
-
3 4
3 D
A

V
A
L
L

D
R
9 2
2 D
A

V
A
L
L

D
R
7 4
0 -
-
1 3
6 -
-
8 0
-
-
1 3
2 -
-
1 4
4 D
A
T
E

P
A
L
M

D
R
3 2
3 1
D
A
T
E

P
A
L
M

D
R
2 8
0 9
-
-
2 5
4 -
-
2 5
4 -
-
4 2
9 -
-
6 0
4 -
-
4 7
2 -
-
5 5
5 V
A
R
N
E
R

R
D
1 3
7 V
A
R
N
E
R

R
D
3 0
2 -
-
1 0
2 -
-
1 0
2 -
-
7 4
0 -
-
7 5
7 -
-
2 0
7 -
-
3 0
3 -
-
2 -
-
1 R
A
M
O
N

R
D
4 6
6 7
R
A
M
O
N

R
D
4 3
1 3
-
-
5 5
7 -
-
9 5
6 -
-
4 1
0 -
-
4 6
8 3
0 T
H

A
V
E
9 0
4 3
0 T
H

A
V
E
5 2
0 D
A
T
E

P
A
L
M

D
R
2 9
6 3
D
A
T
E

P
A
L
M

D
R
2 2
5 6
D
A
T
E

P
A
L
M

D
R
2 7
4 8
D
A
T
E

P
A
L
M

D
R
2 0
5 5
-
-
1 3
5 -
-
2 0
2 R
A
M
O
N

R
D
5 3
3 8
R
A
M
O
N

R
D
3 9
2 1
R
A
M
O
N

R
D
5 3
3 9
R
A
M
O
N

R
D
3 9
2 2
-
-
4 2
3 -
-
7 1
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 0
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 6
3 0
T
H

A
V
E
6 0
3 3
0 T
H

A
V
E
6 1
9 L
A
N
D
A
U

B
L
V
D
1 2
2 3
L
A
N
D
A
U

B
L
V
D
9 1
5 R
A
M
O
N

R
D
4 6
9 0
R
A
M
O
N

R
D
3 9
2 8
-
-
6 3
0 -
-
1 0
3 9
D
A

V
A
L
L

D
R
4 0
3 D
A

V
A
L
L

D
R
3 2
6 D
A

V
A
L
L

D
R
5 1
2 D
A

V
A
L
L

D
R
5 0
1 -
-
4 2
3 -
-
6 5
6 -
-
2 7
6 -
-
4 4
5 D
A
T
E

P
A
L
M

D
R
3 3
4 5
D
A
T
E

P
A
L
M

D
R
2 6
8 5
-
-
2 5
4 -
-
2 9
1 M
C

C
A
L
L
U
M

W
A
Y
7 5
9 M
C

C
A
L
L
U
M

W
A
Y
7 7
7 -
-
5 0
6 -
-
4 5
0 D
A
T
E

P
A
L
M

D
R
3 4
4 8
D
A
T
E

P
A
L
M

D
R
2 3
8 6
D
A
T
E

P
A
L
M

D
R
5 0
8 0
D
A
T
E

P
A
L
M

D
R
4 7
4 4
R
A
M
O
N

R
D
3 2
3 4
R
A
M
O
N

R
D
3 5
3 4

RAMON RD
3547

RAMON RD
3888
-
-
1 6
1 -
-
1 9
8 --
279
--
41 3
0 T
H

A
V
E
5 0
2 3
0 T
H

A
V
E
5 6
3 R
A
M
O
N

R
D
4 6
4 4
R
A
M
O
N

R
D
4 5
1 1
-
-
3 1
1 7
-
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 0
1 0
9 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 4
3 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
6 0
2 -
-
2 -
-
1 -
-
2 4
2 4
-
-
0 M
C

C
A
L
L
U
M

W
A
Y
7 5
9 M
C

C
A
L
L
U
M

W
A
Y
7 7
7 M
C

C
A
L
L
U
M

W
A
Y
4 8
1 M
C

C
A
L
L
U
M

W
A
Y
7 3
2 3
0 T
H

A
V
E
6 1
1 3
0 T
H

A
V
E
9 5
9 3
0 T
H

A
V
E
6 1
1 3
0 T
H

A
V
E
9 5
9 D
A
T
E

P
A
L
M

D
R
3 6
3 7
D
A
T
E

P
A
L
M

D
R
2 5
7 8
D
A
T
E

P
A
L
M

D
R
3 4
1 0
D
A
T
E

P
A
L
M

D
R
2 4
3 2
D
A
T
E

P
A
L
M

D
R
1 4
8 9
D
A
T
E

P
A
L
M

D
R
8 5
9 L
A
N
D
A
U

B
L
V
D
1 9
2 6
L
A
N
D
A
U

B
L
V
D
1 4
1 1
L
A
N
D
A
U

B
L
V
D
1 9
2 6
L
A
N
D
A
U

B
L
V
D
1 4
1 1
M
C

C
A
L
L
U
M

W
A
Y
7 6
8 M
C

C
A
L
L
U
M

W
A
Y
5 7
2 M
C

C
A
L
L
U
M

W
A
Y
4 6
4 M
C

C
A
L
L
U
M

W
A
Y
3 8
7 -
-
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 9
2 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 8
4 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 9
2 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 8
4 L
A
N
D
A
U

B
L
V
D
1 9
3 2
L
A
N
D
A
U

B
L
V
D
1 4
7 3
L
A
N
D
A
U

B
L
V
D
1 9
3 2
L
A
N
D
A
U

B
L
V
D
1 4
7 3
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 4
3 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
6 0
2 D
A

V
A
L
L

D
R
7 8
5 D
A

V
A
L
L

D
R
6 8
3 D
A

V
A
L
L

D
R
8 4
4 D
A

V
A
L
L

D
R
6 7
5 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 5
9 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 4
9 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 9
2 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 8
4 M
C

C
A
L
L
U
M

W
A
Y
4 8
1 M
C

C
A
L
L
U
M

W
A
Y
7 3
2 M
C

C
A
L
L
U
M

W
A
Y
4 8
1 M
C

C
A
L
L
U
M

W
A
Y
7 3
2 RAMON RD
3234

RAMON RD
3534
-
-
0 -
-
2 4
2 4
0 .05
.1
.15
Miles

HCMTYPE
CC (6867)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12486)
PrArterial (8422)
RIVCOM 3 - 2018 PM peak period volumes
-
-
1 0
-
-
8 4
V
I
S
T
A

C
H
I
N
O
1 8
0 V
I
S
T
A

C
H
I
N
O
2 9
2 -
-
0 -
-
4 7
V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 -
-
1 -
-
6 -
-
2 8
-
-
1 3
-
-
5 9
-
-
2 0
8 -
-
0 -
-
1 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
0 1
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 -
-
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
3 0
4 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 4
5 4
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
I
S
T
A

C
H
I
N
O
2 2
7 0
V
I
S
T
A

C
H
I
N
O
2 6
2 3
-
-
9 2
-
-
4 9
5 -
-
1 8
4 -
-
1 5
1 -
-
2 -
-
7 D
A

V
A
L
L

D
R
9 9
0 D
A

V
A
L
L

D
R
1 3
2 2
M
C

C
A
L
L
U
M

W
A
Y
5 3
2 M
C

C
A
L
L
U
M

W
A
Y
6 7
9 V
I
S
T
A

C
H
I
N
O
2 0
9 8
V
I
S
T
A

C
H
I
N
O
2 7
0 0
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 5
6 5
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 2
6 9
-
-
6 7
6 -
-
9 0
0 L
A
N
D
A
U

B
L
V
D
1 4
1 3
L
A
N
D
A
U

B
L
V
D
1 6
2 8
M
C

C
A
L
L
U
M

W
A
Y
2 1
4 M
C

C
A
L
L
U
M

W
A
Y
1 5
8 3
0 T
H

A
V
E
7 6
2 3
0 T
H

A
V
E
3 0
9 R
A
M
O
N

R
D
3 3
8 8
R
A
M
O
N

R
D
3 5
2 9
L
A
N
D
A
U

B
L
V
D
1 3
3 2
L
A
N
D
A
U

B
L
V
D
1 6
8 5
L
A
N
D
A
U

B
L
V
D
1 0
8 3
L
A
N
D
A
U

B
L
V
D
2 2
5 8
D
A
T
E

P
A
L
M

D
R
2 1
4 3
D
A
T
E

P
A
L
M

D
R
3 1
6 0
3 0
T
H

A
V
E
6 7
5 3
0 T
H

A
V
E
1 5
0 R
A
M
O
N

R
D
3 5
3 7
R
A
M
O
N

R
D
3 7
2 7
V
I
S
T
A

C
H
I
N
O
2 4
6 7
V
I
S
T
A

C
H
I
N
O
2 5
5 4
V
A
R
N
E
R

R
D
1 0
6 4
V
A
R
N
E
R

R
D
1 4
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
6 1
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
5 -
-
3 0

RAMON RD
3427

RAMON RD
3524
-
-
1 -
-
6 -
-
1 0
9 -
-
4 1
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 7
6 4
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
2 0
4 -
-
1 1
3 -
-
1 0
-
-
6 9
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
4 4
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 4
6 6
9 -
-
1 9
9 -
-
1 4
7 -
-
8 3
2 -
-
4 5
6 -
-
1 -
-
4 -
-
5 9
1 -
-
2 2
7 -
-
2 3
7 -
-
2 5
2 -
-
3 7
9 -
-
2 1
9 -
-
5 4
0 -
-
3 3
8 -
-
6 1
-
-
2 0
-
-
1 -
-
5 -
-
1 6
6 -
-
1 4
1 D
A

V
A
L
L

D
R
1 5
2 8
D
A

V
A
L
L

D
R
1 2
7 5
-
-
1 3
-
-
6 0
R
A
M
O
N

R
D
3 3
3 6
R
A
M
O
N

R
D
3 9
1 7
R
A
M
O
N

R
D
3 2
4 8
R
A
M
O
N

R
D
5 8
4 1
-
-
3 5
0 -
-
3 0
8 -
-
1 8
8 -
-
3 1
3 -
-
0 -
-
0 -
-
4 9
7 -
-
4 5
3 -
-
2 8
0 -
-
1 4
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 7
6 4
7 3
0 T
H

A
V
E
9 5
3 3
0 T
H

A
V
E
4 0
7 V
A
R
N
E
R

R
D
1 1
1 6
V
A
R
N
E
R

R
D
1 5
3 D
A

V
A
L
L

D
R
1 0
3 4
D
A

V
A
L
L

D
R
1 3
2 2
D
A
T
E

P
A
L
M

D
R
2 2
3 0
D
A
T
E

P
A
L
M

D
R
3 0
4 0
-
-
2 0
2 -
-
1 9
9 L
A
N
D
A
U

B
L
V
D
1 2
6 7
L
A
N
D
A
U

B
L
V
D
2 1
6 1
R
A
M
O
N

R
D
3 5
6 2
R
A
M
O
N

R
D
3 7
3 5
-
-
5 9
2 -
-
3 1
6 D
A

V
A
L
L

D
R
1 1
5 D
A

V
A
L
L

D
R
2 3
2 -
-
0 -
-
0 -
-
2 5
7 -
-
4 2
5 -
-
6 7
-
-
6 4
-
-
7 1
9 -
-
7 0
1 -
-
1 5
9 -
-
2 5
3 R
A
M
O
N

R
D
3 7
9 5
R
A
M
O
N

R
D
4 6
7 2
-
-
9 5
7 -
-
3 6
5 -
-
3 -
-
9 -
-
4 3
0 -
-
3 5
5 3
0 T
H

A
V
E
3 2
0 3
0 T
H

A
V
E
8 6
1 D
A
T
E

P
A
L
M

D
R
2 2
2 6
D
A
T
E

P
A
L
M

D
R
3 1
2 9
-
-
6 3
8 -
-
1 6
5 V
A
R
N
E
R

R
D
1 0
6 0
V
A
R
N
E
R

R
D
1 5
1 -
-
1 9
4 -
-
1 0
0 D
A
T
E

P
A
L
M

D
R
1 9
8 9
D
A
T
E

P
A
L
M

D
R
2 8
7 7
-
-
4 5
-
-
1 3
6 -
-
7 2
5 -
-
3 1
8 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
8 6
-
-
1 2
7 -
-
0 3
0 T
H

A
V
E
4 9
2 3
0 T
H

A
V
E
4 4
0 D
A

V
A
L
L

D
R
9 6
7 D
A

V
A
L
L

D
R
1 1
0 1
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 7
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 1
6 -
-
9 9
4 -
-
4 5
3 -
-
6 8
3 -
-
4 4
6 L
A
N
D
A
U

B
L
V
D
1 3
1 6
L
A
N
D
A
U

B
L
V
D
2 1
0 6
D
A

V
A
L
L

D
R
1 0
0 1
D
A

V
A
L
L

D
R
1 2
7 4
-
-
3 8
2 -
-
1 6
5 D
A
T
E

P
A
L
M

D
R
2 0
4 2
D
A
T
E

P
A
L
M

D
R
3 2
2 8
-
-
4 0
3 -
-
3 5
1 M
C

C
A
L
L
U
M

W
A
Y
9 8
2 M
C

C
A
L
L
U
M

W
A
Y
8 6
5 -
-
4 2
1 -
-
5 2
6 -
-
1 2
7 -
-
0 L
A
N
D
A
U

B
L
V
D
1 0
5 6
L
A
N
D
A
U

B
L
V
D
1 5
2 1
D
A
T
E

P
A
L
M

D
R
2 5
4 4
D
A
T
E

P
A
L
M

D
R
3 5
4 8
D
A
T
E

P
A
L
M

D
R
3 8
4 8
D
A
T
E

P
A
L
M

D
R
5 0
6 3
-
-
6 5
8 -
-
0 -
-
6 5
8 -
-
0 -
-
8 2
-
-
4 5
7 -
-
1 5
0 -
-
1 1
3 M
C

C
A
L
L
U
M

W
A
Y
9 1
5 M
C

C
A
L
L
U
M

W
A
Y
6 5
4 3
0 T
H

A
V
E
4 9
2 3
0 T
H

A
V
E
3 5
4 -
-
7 9
5 -
-
0 -
-
0 -
-
0 R
A
M
O
N

R
D
3 4
4 7
R
A
M
O
N

R
D
4 0
1 0
R
A
M
O
N

R
D
3 2
4 3
R
A
M
O
N

R
D
5 8
1 2
-
-
2 4
0 0
-
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 4
5 4
2 V
I
S
T
A

C
H
I
N
O
2 9
2 V
I
S
T
A

C
H
I
N
O
1 8
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
4 5
7 R
A
M
O
N

R
D
3 2
1 2
R
A
M
O
N

R
D
3 7
6 7
-
-
4 7
1 -
-
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 4
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 2
7 D
A

V
A
L
L

D
R
1 1
5 D
A

V
A
L
L

D
R
2 3
2 -
-
2 8
4 7
-
-
0 D
A

V
A
L
L

D
R
1 3
4 7
D
A

V
A
L
L

D
R
9 8
3 -
-
2 -
-
6 M
C

C
A
L
L
U
M

W
A
Y
9 8
2 M
C

C
A
L
L
U
M

W
A
Y
8 6
5 R
A
M
O
N

R
D
3 3
4 7
R
A
M
O
N

R
D
4 7
6 5
-
-
2 8
4 7
-
-
0 D
A
T
E

P
A
L
M

D
R
2 7
2 3
D
A
T
E

P
A
L
M

D
R
4 0
2 0
M
C

C
A
L
L
U
M

W
A
Y
9 1
5 M
C

C
A
L
L
U
M

W
A
Y
6 5
4 M
C

C
A
L
L
U
M

W
A
Y
6 1
6 M
C

C
A
L
L
U
M

W
A
Y
1 0
0 2
-
-
0 -
-
0 D
A
T
E

P
A
L
M

D
R
2 0
1 7
D
A
T
E

P
A
L
M

D
R
3 0
1 3
D
A
T
E

P
A
L
M

D
R
2 6
0 9
D
A
T
E

P
A
L
M

D
R
3 7
8 1
M
C

C
A
L
L
U
M

W
A
Y
6 6
7 M
C

C
A
L
L
U
M

W
A
Y
6 7
6 -
-
6 D
A

V
A
L
L

D
R
1 0
4 4
D
A

V
A
L
L

D
R
1 2
3 4
-
-
7 9
5 -
-
0 D
A

V
A
L
L

D
R
5 7
6 D
A

V
A
L
L

D
R
3 4
9 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 4
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 2
7 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 7
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 1
6 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 8
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 8
6 RAMON RD
3212

RAMON RD
3767
-
-
4 7
1 -
-
0 D
A

V
A
L
L

D
R
1 1
5 D
A

V
A
L
L

D
R
2 3
2 D
A

V
A
L
L

D
R
1 0
0 9
D
A

V
A
L
L

D
R
1 2
9 3
R
A
M
O
N

R
D
3 3
4 7
R
A
M
O
N

R
D
4 7
6 5
D
A

V
A
L
L

D
R
5 7
6 D
A

V
A
L
L

D
R
3 4
9 D
A

V
A
L
L

D
R
5 7
6 D
A

V
A
L
L

D
R
3 4
9 RIVCOM 3 - 2045 AM peak period volumes
0 .05
.1
.15
Miles

HCMTYPE
CC (6867)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12486)
PrArterial (8422)
-
-
8 7
-
-
1 7
V
I
S
T
A

C
H
I
N
O
3 2
2 V
I
S
T
A

C
H
I
N
O
2 2
9 -
-
0 -
-
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 -
-
5 -
-
2 -
-
2 0
-
-
3 1
-
-
1 8
2 -
-
8 0
-
-
1 -
-
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 2
7 4
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
5 -
-
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
8 4
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 1
9 4
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
I
S
T
A

C
H
I
N
O
3 1
8 5
V
I
S
T
A

C
H
I
N
O
2 7
3 5
-
-
4 1
9 -
-
1 4
9 -
-
2 2
3 -
-
2 8
9 -
-
7 -
-
4 D
A

V
A
L
L

D
R
1 5
3 4
D
A

V
A
L
L

D
R
1 2
1 3
M
C

C
A
L
L
U
M

W
A
Y
7 8
1 M
C

C
A
L
L
U
M

W
A
Y
6 9
2 V
I
S
T
A

C
H
I
N
O
3 1
9 7
V
I
S
T
A

C
H
I
N
O
2 6
4 0
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 9
5 0
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
3 1
9 5
-
-
1 0
4 6
-
-
8 5
0 L
A
N
D
A
U

B
L
V
D
1 9
1 3
L
A
N
D
A
U

B
L
V
D
1 8
0 3
M
C

C
A
L
L
U
M

W
A
Y
1 4
3 M
C

C
A
L
L
U
M

W
A
Y
2 7
2 3
0 T
H

A
V
E
6 3
4 3
0 T
H

A
V
E
4 1
9 R
A
M
O
N

R
D
4 3
7 3
R
A
M
O
N

R
D
4 2
2 0
L
A
N
D
A
U

B
L
V
D
1 9
6 7
L
A
N
D
A
U

B
L
V
D
1 7
8 8
L
A
N
D
A
U

B
L
V
D
2 4
4 2
L
A
N
D
A
U

B
L
V
D
1 5
9 8
D
A
T
E

P
A
L
M

D
R
3 5
0 8
D
A
T
E

P
A
L
M

D
R
3 2
9 1
3 0
T
H

A
V
E
4 7
0 3
0 T
H

A
V
E
2 5
1 R
A
M
O
N

R
D
4 5
0 6
R
A
M
O
N

R
D
4 3
6 5
V
I
S
T
A

C
H
I
N
O
3 0
9 2
V
I
S
T
A

C
H
I
N
O
2 8
6 7
V
A
R
N
E
R

R
D
2 4
3 V
A
R
N
E
R

R
D
8 8
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
2 3
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
2 7
-
-
1 2

RAMON RD
4392

RAMON RD
4095
-
-
5 -
-
2 -
-
6 8
-
-
1 1
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
1 9
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 6
6 -
-
2 3
4 -
-
4 7
-
-
2 0
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
7 3
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 2
2 3
7 -
-
1 9
8 -
-
2 3
8 -
-
6 5
3 -
-
9 5
3 -
-
4 -
-
2 -
-
3 9
4 -
-
6 5
9 -
-
3 3
8 -
-
2 6
7 -
-
3 3
6 -
-
4 3
7 -
-
5 0
0 -
-
6 4
2 -
-
3 6
-
-
6 5
-
-
5 -
-
3 -
-
1 8
8 -
-
2 0
1 D
A

V
A
L
L

D
R
1 8
3 9
D
A

V
A
L
L

D
R
1 2
8 1
-
-
6 2
-
-
2 7
R
A
M
O
N

R
D
4 9
4 0
R
A
M
O
N

R
D
4 2
0 8
R
A
M
O
N

R
D
6 7
1 3
R
A
M
O
N

R
D
4 4
8 9
-
-
4 1
1 -
-
3 6
7 -
-
3 6
1 -
-
2 8
4 -
-
0 -
-
0 -
-
4 9
6 -
-
6 1
4 -
-
2 0
0 -
-
2 8
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
1 9
9 3
0 T
H

A
V
E
6 4
1 3
0 T
H

A
V
E
1 0
1 0
V
A
R
N
E
R

R
D
2 5
0 V
A
R
N
E
R

R
D
9 4
1 D
A

V
A
L
L

D
R
1 6
6 1
D
A

V
A
L
L

D
R
1 1
9 7
D
A
T
E

P
A
L
M

D
R
3 4
3 1
D
A
T
E

P
A
L
M

D
R
3 3
5 8
-
-
2 4
9 -
-
2 4
8 L
A
N
D
A
U

B
L
V
D
2 3
8 5
L
A
N
D
A
U

B
L
V
D
1 8
3 3
R
A
M
O
N

R
D
4 6
4 9
R
A
M
O
N

R
D
4 2
9 8
-
-
4 6
3 -
-
6 7
1 D
A

V
A
L
L

D
R
2 2
9 D
A

V
A
L
L

D
R
1 6
4 -
-
0 -
-
0 -
-
5 8
6 -
-
4 8
9 -
-
8 8
-
-
9 1
-
-
8 8
2 -
-
9 0
3 -
-
2 9
9 -
-
2 4
7 R
A
M
O
N

R
D
5 7
1 8
R
A
M
O
N

R
D
4 7
4 2
-
-
6 1
2 -
-
1 0
3 6
-
-
9 -
-
5 -
-
4 6
6 -
-
5 4
7 3
0 T
H

A
V
E
9 1
8 3
0 T
H

A
V
E
5 4
4 D
A
T
E

P
A
L
M

D
R
3 7
0 1
D
A
T
E

P
A
L
M

D
R
3 0
4 3
-
-
2 3
1 -
-
5 6
1 V
A
R
N
E
R

R
D
2 4
3 V
A
R
N
E
R

R
D
8 7
8 -
-
1 5
5 -
-
2 2
1 D
A
T
E

P
A
L
M

D
R
3 3
6 4
D
A
T
E

P
A
L
M

D
R
2 7
7 6
-
-
1 4
7 -
-
7 8
-
-
5 1
8 -
-
7 9
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
4 7
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
0 -
-
2 8
8 -
-
0 3
0 T
H

A
V
E
5 0
9 3
0 T
H

A
V
E
5 5
9 D
A

V
A
L
L

D
R
1 3
8 8
D
A

V
A
L
L

D
R
1 1
1 9
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 3
3 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 1
3 -
-
6 9
8 -
-
1 1
0 1
-
-
6 0
2 -
-
8 4
2 L
A
N
D
A
U

B
L
V
D
2 3
6 0
L
A
N
D
A
U

B
L
V
D
1 8
5 7
D
A

V
A
L
L

D
R
1 5
2 1
D
A

V
A
L
L

D
R
1 1
8 2
-
-
2 4
5 -
-
4 0
5 D
A
T
E

P
A
L
M

D
R
3 5
7 2
D
A
T
E

P
A
L
M

D
R
3 2
3 8
-
-
4 1
5 -
-
4 5
7 M
C

C
A
L
L
U
M

W
A
Y
1 0
9 2
M
C

C
A
L
L
U
M

W
A
Y
1 1
7 4
-
-
5 6
3 -
-
5 1
4 -
-
2 8
8 -
-
0 L
A
N
D
A
U

B
L
V
D
1 7
1 2
L
A
N
D
A
U

B
L
V
D
1 4
9 4
D
A
T
E

P
A
L
M

D
R
4 2
9 1
D
A
T
E

P
A
L
M

D
R
3 5
2 0
D
A
T
E

P
A
L
M

D
R
5 8
3 8
D
A
T
E

P
A
L
M

D
R
5 3
0 4
-
-
6 4
3 -
-
0 -
-
6 4
3 -
-
0 -
-
3 7
7 -
-
1 1
6 -
-
1 6
3 -
-
1 8
7 M
C

C
A
L
L
U
M

W
A
Y
8 1
4 M
C

C
A
L
L
U
M

W
A
Y
1 0
8 3
3 0
T
H

A
V
E
4 6
2 3
0 T
H

A
V
E
5 5
9 -
-
5 3
8 -
-
0 -
-
0 -
-
0 R
A
M
O
N

R
D
4 9
5 6
R
A
M
O
N

R
D
4 2
4 5
R
A
M
O
N

R
D
6 6
8 6
R
A
M
O
N

R
D
4 4
7 7
-
-
3 5
0 2
-
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 1
9 4
9 V
I
S
T
A

C
H
I
N
O
2 2
9 V
I
S
T
A

C
H
I
N
O
3 2
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 6
8 5
0 R
A
M
O
N

R
D
4 5
1 6
R
A
M
O
N

R
D
3 9
0 3
-
-
7 9
2 -
-
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 5
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 7
6 D
A

V
A
L
L

D
R
2 2
9 D
A

V
A
L
L

D
R
1 6
4 -
-
2 9
9 2
-
-
0 D
A

V
A
L
L

D
R
1 5
1 6
D
A

V
A
L
L

D
R
1 0
5 2
-
-
6 -
-
3 M
C

C
A
L
L
U
M

W
A
Y
1 0
9 2
M
C

C
A
L
L
U
M

W
A
Y
1 1
7 4
R
A
M
O
N

R
D
5 7
0 9
R
A
M
O
N

R
D
4 3
2 9
-
-
2 9
9 2
-
-
0 D
A
T
E

P
A
L
M

D
R
4 6
9 4
D
A
T
E

P
A
L
M

D
R
3 7
4 9
M
C

C
A
L
L
U
M

W
A
Y
8 1
4 M
C

C
A
L
L
U
M

W
A
Y
1 0
8 3
M
C

C
A
L
L
U
M

W
A
Y
1 1
9 0
M
C

C
A
L
L
U
M

W
A
Y
8 4
9 -
-
0 -
-
0 D
A
T
E

P
A
L
M

D
R
3 3
8 3
D
A
T
E

P
A
L
M

D
R
2 7
1 2
D
A
T
E

P
A
L
M

D
R
4 4
3 2
D
A
T
E

P
A
L
M

D
R
3 5
6 4
M
C

C
A
L
L
U
M

W
A
Y
8 8
1 M
C

C
A
L
L
U
M

W
A
Y
8 4
0 -
-
3 D
A

V
A
L
L

D
R
1 5
8 2
D
A

V
A
L
L

D
R
1 1
8 2
-
-
5 3
8 -
-
0 D
A

V
A
L
L

D
R
9 9
2 D
A

V
A
L
L

D
R
4 2
3 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 5
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 7
6 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 3
3 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 1
3 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 7
3 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 3
8 RAMON RD
4516

RAMON RD
3903
-
-
7 9
2 -
-
0 D
A

V
A
L
L

D
R
2 2
9 D
A

V
A
L
L

D
R
1 6
4 D
A

V
A
L
L

D
R
1 6
3 1
D
A

V
A
L
L

D
R
1 1
6 5
R
A
M
O
N

R
D
5 7
0 9
R
A
M
O
N

R
D
4 3
2 9
D
A

V
A
L
L

D
R
9 9
2 D
A

V
A
L
L

D
R
4 2
3 D
A

V
A
L
L

D
R
9 9
2 D
A

V
A
L
L

D
R
4 2
3 RIVCOM 3 - 2045 PM peak period volumes
0 .05
.1
.15
Miles

HCMTYPE
CC (6867)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12486)
PrArterial (8422)
In Out In Out
Model 2018 183 187 226 219
Model 2045 308 350 367 411
Annual Growth
Model 2023 Interpolated 209 187 257 219

2.88% 2.77%
AM PM
3,801 320 2,660 821 TOTAL 3,671
1,623 195 1,129 299 PM 2,172
2,178 125 1,531 522 AM 1,499
949 884 1,833
1,347 775 572
471 444 915 354 374 728

TOTALPMAM
124 66 190
401 165 236

AMPMTOTAL
675 260 415 326 143 183
1,024 631 1,655
1,402 568 834
1,841 AM 97 789 89 975
1,372 PM 240 1,561 74 1,875
3,213 TOTAL 337 2,350 163 2,850
1,991 156 1,381 454 TOTAL 1,909
807 94 559 154 PM 1,150
1,184 62 822 300 AM 759
545 519 1,064
AM PM
765 440 325
246 259 505
45% 50%
214 219 433
39% 42%
TOTALPMAMAM 7:45 AM
8:45 AM
85 41 126
16% 8%
176 83 93
#N/A

AMPMTOTAL
364 126 238 PM 4:00 PM
5:45 PM
174 86 88
588 315 903
714 295 419
998 AM 52 417 53 522
706 PM 147 808 35 990
1,704 Total 199 1,225 88 1,512
AimTD LLC

TURNING MOVEMENT COUNTS
Date Palm
30th
30th
Cathedral City
SC4010

ALL HOURS
Date Palm
Date Palm
Date Palm
30th
30th

PEAK HOUR
The Wren
Adjusted Year 2023
AM/PM Peak Hour Intersection Volumes

APPENDIX C ‐
EXISTING CONDITIONS PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS HCM 6th Signalized Intersection Summary The Wren Project 1: Date Palm Drive & McCallum Way 05/31/2024
Existing Year 2023 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 52 191 94 59 132 42 40 430 42 84 859 47 Future Volume (veh/h) 52 191 94 59 132 42 40 430 42 84 859 47 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 58 212 104 66 147 47 44 478 47 93 954 52 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 456 362 178 356 415 133 87 1374 133 147 1604 87 Arrive On Green 0.31 0.31 0.31 0.31 0.31 0.31 0.05 0.29 0.29 0.08 0.32 0.32 Sat Flow, veh/h 1187 1178 578 1062 1352 432 1781 4726 458 1781 4946 269 Grp Volume(v), veh/h 58 0 316 66 0 194 44 342 183 93 656 350 Grp Sat Flow(s),veh/h/ln 1187 0 1756 1062 0 1784 1781 1702 1780 1781 1702 1811 Q Serve(g_s), s 1.5 0.0 5.7 2.1 0.0 3.2 0.9 3.0 3.0 1.9 6.1 6.1 Cycle Q Clear(g_c), s 4.7 0.0 5.7 7.8 0.0 3.2 0.9 3.0 3.0 1.9 6.1 6.1 Prop In Lane 1.00 0.33 1.00 0.24 1.00 0.26 1.00 0.15
Lane Grp Cap(c), veh/h 456 0 539 356 0 548 87 990 518 147 1104 587 V/C Ratio(X) 0.13 0.00 0.59 0.19 0.00 0.35 0.50 0.35 0.35 0.63 0.59 0.60 Avail Cap(c_a), veh/h 913 0 1215 765 0 1235 237 1268 663 379 1540 819 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 11.9 0.0 11.0 14.3 0.0 10.1 17.4 10.5 10.5 16.7 10.6 10.6 Incr Delay (d2), s/veh 0.1 0.0 1.0 0.2 0.0 0.4 4.4 0.2 0.4 4.4 0.5 1.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.0 1.9 0.5 0.0 1.1 0.4 0.8 0.8 0.8 1.5 1.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 12.1 0.0 12.0 14.5 0.0 10.5 21.9 10.7 10.9 21.1 11.1 11.6 LnGrp LOS B A B B A B C B B C B B
Approach Vol, veh/h 374 260 569 1099
Approach Delay, s/veh 12.0 11.5 11.6 12.1
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.1 14.9 15.5 5.8 16.2 15.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 8.0 14.0 26.0 5.0 17.0 26.0 Max Q Clear Time (g_c+I1), s 3.9 5.0 7.7 2.9 8.1 9.8
Green Ext Time (p_c), s 0.1 2.0 2.1 0.0 3.9 1.3
Intersection Summary
HCM 6th Ctrl Delay 11.9
HCM 6th LOS B
HCM 6th Signalized Intersection Summary The Wren Project 3: Date Palm Drive & 30th Avenue 05/31/2024
Existing Year 2023 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 93 238 88 85 214 246 52 417 53 300 822 62 Future Volume (veh/h) 93 238 88 85 214 246 52 417 53 300 822 62 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 101 259 96 92 233 267 57 453 58 326 893 67 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 129 502 412 119 492 405 93 807 101 373 1614 121 Arrive On Green 0.07 0.27 0.27 0.07 0.26 0.26 0.05 0.18 0.18 0.21 0.33 0.33 Sat Flow, veh/h 1781 1870 1536 1781 1870 1541 1781 4590 577 1781 4845 362 Grp Volume(v), veh/h 101 259 96 92 233 267 57 334 177 326 627 333 Grp Sat Flow(s),veh/h/ln 1781 1870 1536 1781 1870 1541 1781 1702 1763 1781 1702 1804 Q Serve(g_s), s 3.2 6.7 2.8 2.9 6.0 8.9 1.8 5.1 5.3 10.1 8.6 8.7 Cycle Q Clear(g_c), s 3.2 6.7 2.8 2.9 6.0 8.9 1.8 5.1 5.3 10.1 8.6 8.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.33 1.00 0.20
Lane Grp Cap(c), veh/h 129 502 412 119 492 405 93 599 310 373 1134 601 V/C Ratio(X) 0.78 0.52 0.23 0.77 0.47 0.66 0.61 0.56 0.57 0.87 0.55 0.55 Avail Cap(c_a), veh/h 155 849 697 155 849 699 187 1247 646 373 1604 850 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.1 17.8 16.4 26.3 17.8 18.8 26.6 21.6 21.6 21.9 15.6 15.6 Incr Delay (d2), s/veh 18.9 0.8 0.3 15.8 0.7 1.8 6.5 0.8 1.7 19.9 0.4 0.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.9 2.5 0.9 1.6 2.3 2.8 0.8 1.8 2.0 5.5 2.6 2.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 45.1 18.6 16.6 42.1 18.5 20.7 33.1 22.4 23.3 41.8 16.0 16.4 LnGrp LOS D B B D B C C C C D B B
Approach Vol, veh/h 456 592 568 1286
Approach Delay, s/veh 24.1 23.1 23.7 22.7
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 16.0 14.1 7.8 19.4 7.0 23.1 8.2 19.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 12.0 21.0 5.0 26.0 6.0 27.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 12.1 7.3 4.9 8.7 3.8 10.7 5.2 10.9 Green Ext Time (p_c), s 0.0 2.4 0.0 1.5 0.0 5.0 0.0 1.9 Intersection Summary
HCM 6th Ctrl Delay 23.2
HCM 6th LOS C
HCM 6th Signalized Intersection Summary The Wren Project 1: Date Palm Drive & McCallum Way 05/31/2024
Existing Year 2023 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 82 111 72 70 127 47 83 882 63 49 643 43 Future Volume (veh/h) 82 111 72 70 127 47 83 882 63 49 643 43 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 91 123 80 78 141 52 92 980 70 54 714 48 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 413 281 183 401 348 128 149 1653 118 103 1533 102 Arrive On Green 0.27 0.27 0.27 0.27 0.27 0.27 0.08 0.34 0.34 0.06 0.31 0.31 Sat Flow, veh/h 1187 1051 683 1177 1302 480 1781 4863 347 1781 4879 326 Grp Volume(v), veh/h 91 0 203 78 0 193 92 685 365 54 497 265 Grp Sat Flow(s),veh/h/ln 1187 0 1734 1177 0 1782 1781 1702 1806 1781 1702 1801 Q Serve(g_s), s 2.4 0.0 3.5 2.1 0.0 3.2 1.8 6.0 6.0 1.1 4.2 4.2 Cycle Q Clear(g_c), s 5.6 0.0 3.5 5.6 0.0 3.2 1.8 6.0 6.0 1.1 4.2 4.2 Prop In Lane 1.00 0.39 1.00 0.27 1.00 0.19 1.00 0.18
Lane Grp Cap(c), veh/h 413 0 464 401 0 477 149 1157 614 103 1070 566 V/C Ratio(X) 0.22 0.00 0.44 0.19 0.00 0.40 0.62 0.59 0.59 0.52 0.46 0.47 Avail Cap(c_a), veh/h 956 0 1257 940 0 1292 348 1614 856 248 1424 754 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 13.1 0.0 10.9 13.2 0.0 10.8 15.9 9.8 9.8 16.4 9.9 9.9 Incr Delay (d2), s/veh 0.3 0.0 0.7 0.2 0.0 0.6 4.1 0.5 0.9 4.0 0.3 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 1.1 0.5 0.0 1.1 0.7 1.4 1.5 0.4 1.0 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 13.4 0.0 11.5 13.5 0.0 11.3 20.0 10.3 10.7 20.4 10.2 10.5 LnGrp LOS B A B B A B B B B C B B
Approach Vol, veh/h 294 271 1142 816
Approach Delay, s/veh 12.1 12.0 11.2 11.0
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.1 16.2 13.6 7.0 15.3 13.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 17.0 26.0 7.0 15.0 26.0 Max Q Clear Time (g_c+I1), s 3.1 8.0 7.6 3.8 6.2 7.6
Green Ext Time (p_c), s 0.0 4.1 1.5 0.0 2.9 1.3
Intersection Summary
HCM 6th Ctrl Delay 11.3
HCM 6th LOS B
HCM 6th Signalized Intersection Summary The Wren Project 3: Date Palm Drive & 30th Avenue 05/31/2024
Existing Year 2023 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 83 126 86 41 219 259 147 808 35 154 559 94 Future Volume (veh/h) 83 126 86 41 219 259 147 808 35 154 559 94 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 92 140 96 46 243 288 163 898 39 171 621 104 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 123 499 417 82 457 386 205 1375 60 214 1231 203 Arrive On Green 0.07 0.27 0.27 0.05 0.24 0.24 0.12 0.27 0.27 0.12 0.28 0.28 Sat Flow, veh/h 1781 1870 1562 1781 1870 1583 1781 5016 217 1781 4411 728 Grp Volume(v), veh/h 92 140 96 46 243 288 163 609 328 171 477 248 Grp Sat Flow(s),veh/h/ln 1781 1870 1562 1781 1870 1583 1781 1702 1830 1781 1702 1735 Q Serve(g_s), s 2.8 3.2 2.6 1.4 6.2 9.2 4.9 8.6 8.7 5.1 6.4 6.6 Cycle Q Clear(g_c), s 2.8 3.2 2.6 1.4 6.2 9.2 4.9 8.6 8.7 5.1 6.4 6.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.12 1.00 0.42
Lane Grp Cap(c), veh/h 123 499 417 82 457 386 205 933 501 214 950 484 V/C Ratio(X) 0.75 0.28 0.23 0.56 0.53 0.75 0.79 0.65 0.65 0.80 0.50 0.51 Avail Cap(c_a), veh/h 163 890 743 163 890 753 228 1308 703 228 1308 666 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 25.0 15.9 15.6 25.5 18.0 19.1 23.6 17.5 17.6 23.4 16.5 16.6 Incr Delay (d2), s/veh 12.6 0.3 0.3 5.9 1.0 2.9 16.0 0.8 1.5 17.0 0.4 0.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 1.2 0.8 0.7 2.3 3.1 2.7 2.9 3.2 2.8 2.0 2.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 37.6 16.2 15.9 31.4 18.9 22.0 39.5 18.3 19.0 40.4 16.9 17.4 LnGrp LOS D B B C B C D B B D B B
Approach Vol, veh/h 328 577 1100 896
Approach Delay, s/veh 22.1 21.4 21.7 21.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.6 19.0 6.5 18.6 10.3 19.3 7.8 17.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 21.0 5.0 26.0 7.0 21.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 7.1 10.7 3.4 5.2 6.9 8.6 4.8 11.2 Green Ext Time (p_c), s 0.0 4.0 0.0 0.9 0.0 3.2 0.0 2.0 Intersection Summary
HCM 6th Ctrl Delay 21.6
HCM 6th LOS C
APPENDIX D ‐
PROJECT COMPLETION YEAR 2025 CONDITIONS PEAK HOUR INTERSECTION ANALYSIS

WORKSHEETS
HCM 6th Signalized Intersection Summary The Wren Project 1: Date Palm Drive & McCallum Way 06/02/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 56 203 100 63 141 45 43 465 45 90 936 50 Future Volume (veh/h) 56 203 100 63 141 45 43 465 45 90 936 50 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 62 226 111 70 157 50 48 517 50 100 1040 56 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 448 374 184 343 430 137 92 1407 134 150 1630 88 Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.05 0.30 0.30 0.08 0.33 0.33 Sat Flow, veh/h 1173 1177 578 1042 1354 431 1781 4734 452 1781 4950 266 Grp Volume(v), veh/h 62 0 337 70 0 207 48 370 197 100 715 381 Grp Sat Flow(s),veh/h/ln 1173 0 1756 1042 0 1785 1781 1702 1782 1781 1702 1812 Q Serve(g_s), s 1.7 0.0 6.5 2.4 0.0 3.6 1.0 3.4 3.5 2.2 7.1 7.1 Cycle Q Clear(g_c), s 5.3 0.0 6.5 8.9 0.0 3.6 1.0 3.4 3.5 2.2 7.1 7.1 Prop In Lane 1.00 0.33 1.00 0.24 1.00 0.25 1.00 0.15
Lane Grp Cap(c), veh/h 448 0 558 343 0 567 92 1011 529 150 1121 597 V/C Ratio(X) 0.14 0.00 0.60 0.20 0.00 0.36 0.52 0.37 0.37 0.67 0.64 0.64 Avail Cap(c_a), veh/h 840 0 1145 691 0 1164 223 1195 626 357 1451 772 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 12.5 0.0 11.5 15.2 0.0 10.5 18.4 11.0 11.1 17.7 11.3 11.4 Incr Delay (d2), s/veh 0.1 0.0 1.1 0.3 0.0 0.4 4.5 0.2 0.4 5.1 0.6 1.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 2.2 0.5 0.0 1.2 0.5 0.9 1.0 0.9 1.8 2.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 12.7 0.0 12.5 15.5 0.0 10.9 22.9 11.3 11.5 22.8 12.0 12.5 LnGrp LOS B A B B A B C B B C B B
Approach Vol, veh/h 399 277 615 1196
Approach Delay, s/veh 12.6 12.1 12.3 13.0
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.3 15.8 16.7 6.1 17.1 16.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 8.0 14.0 26.0 5.0 17.0 26.0 Max Q Clear Time (g_c+I1), s 4.2 5.5 8.5 3.0 9.1 10.9
Green Ext Time (p_c), s 0.1 2.1 2.3 0.0 3.9 1.3
Intersection Summary
HCM 6th Ctrl Delay 12.7
HCM 6th LOS B
HCM 6th Signalized Intersection Summary The Wren Project 2: Date Palm Drive & Rosemount Road 06/02/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: AM Peak
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 60 205 528 37 106 952
Future Volume (veh/h) 60 205 528 37 106 952
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 65 223 574 40 115 1035
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2
Cap, veh/h 382 340 1344 93 184 2627
Arrive On Green 0.21 0.21 0.28 0.28 0.10 0.51
Sat Flow, veh/h 1781 1585 5045 337 1781 5274
Grp Volume(v), veh/h 65 223 399 215 115 1035
Grp Sat Flow(s),veh/h/ln 1781 1585 1702 1810 1781 1702
Q Serve(g_s), s 0.9 3.8 2.8 2.9 1.8 3.6
Cycle Q Clear(g_c), s 0.9 3.8 2.8 2.9 1.8 3.6
Prop In Lane 1.00 1.00 0.19 1.00
Lane Grp Cap(c), veh/h 382 340 938 499 184 2627
V/C Ratio(X) 0.17 0.66 0.43 0.43 0.62 0.39
Avail Cap(c_a), veh/h 1267 1127 2075 1103 543 5360
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 9.5 10.6 8.8 8.8 12.7 4.4
Incr Delay (d2), s/veh 0.2 2.1 0.3 0.6 3.4 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 1.1 0.7 0.8 0.7 0.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 9.7 12.7 9.1 9.4 16.1 4.5
LnGrp LOS A B A A B A
Approach Vol, veh/h 288 614 1150
Approach Delay, s/veh 12.0 9.2 5.6
Approach LOS B A A
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 7.1 12.1 19.2 10.3
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 9.0 18.0 31.0 21.0
Max Q Clear Time (g_c+I1), s 3.8 4.9 5.6 5.8
Green Ext Time (p_c), s 0.1 3.3 8.2 0.8
Intersection Summary
HCM 6th Ctrl Delay 7.6
HCM 6th LOS A
HCM 6th Signalized Intersection Summary The Wren Project 3: Date Palm Drive & 30th Avenue 06/02/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 99 253 94 56 135 158 148 568 24 220 978 66 Future Volume (veh/h) 99 253 94 56 135 158 148 568 24 220 978 66 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 108 275 102 61 147 172 161 617 26 239 1063 72 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 138 449 368 97 405 333 205 1316 55 290 1512 102 Arrive On Green 0.08 0.24 0.24 0.05 0.22 0.22 0.12 0.26 0.26 0.16 0.31 0.31 Sat Flow, veh/h 1781 1870 1533 1781 1870 1535 1781 5025 211 1781 4883 330 Grp Volume(v), veh/h 108 275 102 61 147 172 161 417 226 239 741 394 Grp Sat Flow(s),veh/h/ln 1781 1870 1533 1781 1870 1535 1781 1702 1831 1781 1702 1810 Q Serve(g_s), s 3.4 7.5 3.1 1.9 3.8 5.6 5.0 5.9 5.9 7.4 10.9 11.0 Cycle Q Clear(g_c), s 3.4 7.5 3.1 1.9 3.8 5.6 5.0 5.9 5.9 7.4 10.9 11.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.12 1.00 0.18
Lane Grp Cap(c), veh/h 138 449 368 97 405 333 205 891 480 290 1054 560 V/C Ratio(X) 0.78 0.61 0.28 0.63 0.36 0.52 0.79 0.47 0.47 0.82 0.70 0.70 Avail Cap(c_a), veh/h 156 854 700 156 854 701 313 1315 707 344 1374 731 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 25.8 19.3 17.6 26.4 19.0 19.7 24.5 17.7 17.7 23.0 17.3 17.4 Incr Delay (d2), s/veh 20.0 1.4 0.4 6.6 0.5 1.2 7.1 0.4 0.7 13.0 1.1 2.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.0 2.9 1.0 0.9 1.5 1.8 2.3 2.0 2.2 3.6 3.4 3.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 45.8 20.6 18.0 33.0 19.5 20.9 31.7 18.1 18.4 36.0 18.5 19.4 LnGrp LOS D C B C B C C B B D B B
Approach Vol, veh/h 485 380 804 1374
Approach Delay, s/veh 25.7 22.3 20.9 21.8
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 13.3 18.9 7.1 17.7 10.6 21.6 8.4 16.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 22.0 5.0 26.0 10.0 23.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 9.4 7.9 3.9 9.5 7.0 13.0 5.4 7.6 Green Ext Time (p_c), s 0.1 3.2 0.0 1.6 0.1 4.6 0.0 1.2 Intersection Summary
HCM 6th Ctrl Delay 22.2
HCM 6th LOS C
HCM 6th Signalized Intersection Summary The Wren Project 1: Date Palm Drive & McCallum Way 06/02/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 87 118 77 75 135 50 89 962 67 52 699 46 Future Volume (veh/h) 87 118 77 75 135 50 89 962 67 52 699 46 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 97 131 86 83 150 56 99 1069 74 58 777 51 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 403 289 190 390 358 134 152 1691 117 107 1572 103 Arrive On Green 0.28 0.28 0.28 0.28 0.28 0.28 0.09 0.35 0.35 0.06 0.32 0.32 Sat Flow, veh/h 1174 1047 687 1162 1297 484 1781 4875 337 1781 4888 319 Grp Volume(v), veh/h 97 0 217 83 0 206 99 746 397 58 540 288 Grp Sat Flow(s),veh/h/ln 1174 0 1734 1162 0 1781 1781 1702 1808 1781 1702 1803 Q Serve(g_s), s 2.8 0.0 3.9 2.4 0.0 3.6 2.0 6.9 7.0 1.2 4.8 4.9 Cycle Q Clear(g_c), s 6.4 0.0 3.9 6.3 0.0 3.6 2.0 6.9 7.0 1.2 4.8 4.9 Prop In Lane 1.00 0.40 1.00 0.27 1.00 0.19 1.00 0.18
Lane Grp Cap(c), veh/h 403 0 478 390 0 492 152 1181 627 107 1095 580 V/C Ratio(X) 0.24 0.00 0.45 0.21 0.00 0.42 0.65 0.63 0.63 0.54 0.49 0.50 Avail Cap(c_a), veh/h 885 0 1190 868 0 1223 329 1528 812 235 1348 714 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 13.8 0.0 11.3 14.0 0.0 11.2 16.8 10.3 10.4 17.3 10.4 10.4 Incr Delay (d2), s/veh 0.3 0.0 0.7 0.3 0.0 0.6 4.6 0.6 1.1 4.2 0.3 0.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.0 1.3 0.6 0.0 1.2 0.8 1.7 1.9 0.5 1.2 1.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 14.1 0.0 12.0 14.2 0.0 11.8 21.4 10.9 11.4 21.4 10.7 11.0 LnGrp LOS B A B B A B C B B C B B
Approach Vol, veh/h 314 289 1242 886
Approach Delay, s/veh 12.7 12.5 11.9 11.5
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.3 17.1 14.5 7.2 16.2 14.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 17.0 26.0 7.0 15.0 26.0 Max Q Clear Time (g_c+I1), s 3.2 9.0 8.4 4.0 6.9 8.3
Green Ext Time (p_c), s 0.0 4.1 1.6 0.0 3.1 1.4
Intersection Summary
HCM 6th Ctrl Delay 11.9
HCM 6th LOS B
HCM 6th Signalized Intersection Summary The Wren Project 2: Date Palm Drive & Rosemount Road 06/02/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: PM Peak
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 44 251 1060 40 157 647
Future Volume (veh/h) 44 251 1060 40 157 647
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 48 273 1152 43 171 703
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2
Cap, veh/h 401 357 1798 67 221 2953
Arrive On Green 0.23 0.23 0.36 0.36 0.12 0.58
Sat Flow, veh/h 1781 1585 5220 188 1781 5274
Grp Volume(v), veh/h 48 273 776 419 171 703
Grp Sat Flow(s),veh/h/ln 1781 1585 1702 1836 1781 1702
Q Serve(g_s), s 0.9 6.6 7.7 7.8 3.8 2.7
Cycle Q Clear(g_c), s 0.9 6.6 7.7 7.8 3.8 2.7
Prop In Lane 1.00 1.00 0.10 1.00
Lane Grp Cap(c), veh/h 401 357 1211 653 221 2953
V/C Ratio(X) 0.12 0.76 0.64 0.64 0.77 0.24
Avail Cap(c_a), veh/h 918 817 1504 811 394 3885
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 12.6 14.8 10.9 11.0 17.3 4.2
Incr Delay (d2), s/veh 0.1 3.4 0.6 1.2 5.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 2.3 2.3 2.6 1.7 0.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 12.7 18.2 11.6 12.1 22.9 4.2
LnGrp LOS B B B B C A
Approach Vol, veh/h 321 1195 874
Approach Delay, s/veh 17.4 11.8 7.9
Approach LOS B B A
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 9.1 18.5 27.6 13.2
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 9.0 18.0 31.0 21.0
Max Q Clear Time (g_c+I1), s 5.8 9.8 4.7 8.6
Green Ext Time (p_c), s 0.1 4.7 5.3 0.9
Intersection Summary
HCM 6th Ctrl Delay 11.1
HCM 6th LOS B
HCM 6th Signalized Intersection Summary The Wren Project 3: Date Palm Drive & 30th Avenue 06/02/2024
Project Completion Year 2025 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 89 134 92 16 125 139 265 1008 11 30 750 100 Future Volume (veh/h) 89 134 92 16 125 139 265 1008 11 30 750 100 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 99 149 102 18 139 154 294 1120 12 33 833 111 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 128 382 318 39 288 243 350 2282 24 65 1267 168 Arrive On Green 0.07 0.20 0.20 0.02 0.15 0.15 0.20 0.44 0.44 0.04 0.28 0.28 Sat Flow, veh/h 1781 1870 1560 1781 1870 1582 1781 5208 56 1781 4558 604 Grp Volume(v), veh/h 99 149 102 18 139 154 294 732 400 33 621 323 Grp Sat Flow(s),veh/h/ln 1781 1870 1560 1781 1870 1582 1781 1702 1860 1781 1702 1758 Q Serve(g_s), s 2.9 3.7 3.0 0.5 3.6 4.9 8.5 8.2 8.2 1.0 8.6 8.7 Cycle Q Clear(g_c), s 2.9 3.7 3.0 0.5 3.6 4.9 8.5 8.2 8.2 1.0 8.6 8.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.03 1.00 0.34
Lane Grp Cap(c), veh/h 128 382 318 39 288 243 350 1492 815 65 946 489 V/C Ratio(X) 0.77 0.39 0.32 0.46 0.48 0.63 0.84 0.49 0.49 0.51 0.66 0.66 Avail Cap(c_a), veh/h 167 911 760 167 911 770 400 1785 975 167 1339 691 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.3 18.4 18.1 25.8 20.6 21.2 20.6 10.7 10.7 25.3 17.0 17.1 Incr Delay (d2), s/veh 15.0 0.7 0.6 8.2 1.3 2.7 13.3 0.3 0.5 6.1 0.8 1.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.6 1.4 0.9 0.3 1.5 1.7 4.2 2.3 2.5 0.5 2.6 2.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 39.3 19.0 18.7 34.0 21.9 23.9 34.0 11.0 11.2 31.4 17.8 18.6 LnGrp LOS D B B C C C C B B C B B
Approach Vol, veh/h 350 311 1426 977
Approach Delay, s/veh 24.7 23.6 15.8 18.5
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 5.9 27.4 5.2 14.9 14.5 18.8 7.8 12.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 28.0 5.0 26.0 12.0 21.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.0 10.2 2.5 5.7 10.5 10.7 4.9 6.9 Green Ext Time (p_c), s 0.0 6.6 0.0 1.0 0.1 3.9 0.0 1.1 Intersection Summary
HCM 6th Ctrl Delay 18.5
HCM 6th LOS B
APPENDIX E ‐
CUMULATIVE PROJECT TRIP DISTRIBUTION/ASSIGNMENT
The Wren
Cumulative Project Locations
LEGEND # Cumulative Project
1 PROJECT SITE
4 5
6 2
3 7 See Cathedral Cove Center TA Excerpts below
Kroger Gas Station
Project Study Area and Trip Distribution
Figure 1-2
# Intersection Project Driveway Roadway SegmentLEGEND

PROJECT SITE
4 10%10%
30%30%
10%10%
20%20%
10%10%
5%5%5%5%
1 2
30%30%
3 5
5 Kroger Gas Station
Project Intersection Volumes
Figure 1-3
(AM/PM) Peak Hour Volumes
LEGEND
6 60%
10%
LEGEND # Instersection # Driveway

PROJECT SITE
15%
15%
25%
40%
60%
20%
15%6
5 1
3 5%
5% 4
20%
15%
Date Palm Drive Mixed Use - Study Area and Trip Distribution (Phase 1 Only) Figure 1-2a
Date Palm Drive Mixed Use
Scenarios 1 & 2 Phase 1 Volumes
Figure 1-3a

Vallarta Shopping Center
Trip Assignment
LEGEND # Intersection

PROJECT SITE
20%
10%
20%
5%
5%
5%
5%
4 5%
5%
1 5%25%
3 20%
265%
15%
25%
Vallarta Shopping Center (Phase I)
Trip Assignment

MOUNTAIN VIEW ESTATES ________________________________ ________________________________ ______________________ TRAFFIC IMPACT ANALYSIS

Page 21 ends

Exhibit 4-2 shows the forecast trip percent distribution of the proposed project within the study area and the trip assignment percentages for each intersection movement.

EXHIBIT 4-2: PROJECT TRAFFIC DISTRIBUTION AND ASSIGNMENT PERCENTAGES

MOUNTAIN VIEW ESTATES ________________________________ ________________________________ ______________________ TRAFFIC IMPACT ANALYSIS

Page 22 ends

Exhibit 4-3 shows the corresponding forecast assignment of the AM Peak Hour and PM Peak Hour project- generated trips assuming the trip percent distribution shown in Exhibit 4-2.

EXHIBIT 4-3: PROJECT TRAFFIC PEAK HOUR TRIP ASSIGNMENT

29 30

TRAFFIC ENGINEERING &

TRANSPORTATION PLANNING

CONSULTANTS
TJW ENGINEERING, INC.

Not to Scale
TEG-19-001 Tower Market Traffic Impact Analysis

ORTEGA RD

DATE PALM DR

RAMON RD

DINAH SHORE DR

ORTEGA RD
DRWY
DRWY

DATE PALM DR
Exhibit 5: Projected Trip Distribution of Proposed Project Trips Legend:

XX%
Study Intersection Location
Percent Trip Distribution (both directions)
2 X
1 10%
[Inbound] Percent Trip Distribution[XX%]
(Outbound) Percent Trip Distribution(XX%)
15%
3 5
4 25
4 15%
35%
35%
15%10% 10%
10% 10%

2.5% 2.5%
15%
(35)%
(50%)
(15%)
35%
(35%)
50%
(35%)
(15%)
15%
35%
(35%)
19|page

TRAFFIC ENGINEERING &

TRANSPORTATION PLANNING

CONSULTANTS
TJW ENGINEERING, INC.

Not to Scale
TEG-19-001 Tower Market Traffic Impact Analysis

ORTEGA RD

DATE PALM DR

RAMON RD

DINAH SHORE DR

ORTEGA RD
DRWY
DRWY

DATE PALM DR
Exhibit 6: Proposed Project Trip Assignment
1 2
4 5
3 DATE PALM DR
DRWY
ORTEGA
RD

DATE PALM DR
RAMON
RD

DATE PALM DR
DINAH

SHORE DR
1 2
3 Legend:

Project Site
Study Intersection Location
XX/XX AM/PM Peak Hour Trip Assignment
X
9/10
9/10
9/10
9/10
9/10
9/10
33/36
33/36
14/1663/70
-16/-18
33/36
14/16
19/21
-5/-5
ORTEGA
RD

DATE PALM DR
DRWY 4
5 30/34
52/57
33/3644/48
14/16
9/10
9/10
25 4
9/10
14/16
9/10
-11/-12
44/48
20|page
32 33
EXHIBIT 4-5: CUMULATIVE DEVELOPMENT MAP
Cathedral Cove Center Traffic Analysis
_N
12962 - 08 - CD Map.mxd

TERRACE RD
D ST
DAT
E PALM
DR
CATH
ED
RAL
CYN DR
P3
P4
P2
P1
C8
C7
C6C5C4
C9C3
C2
C1
C11
C13
C14
C16
C12 C17
C18
C19
C15
C10
RM8
RM6
RM4
RM9
RM5
RM7
RM2
RM1
RM11
RM32
RM10
RM16
RM21
RM19
RM17 RM15
RM31
RM26
RM27
RM28
RM12
RM13
RM23
RM25
RM29
RM30
RM24
SITE
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
34 45
46 APPENDIX F ‐
CUMULATIVE CONDITIONS PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS HCM 6th Signalized Intersection Summary The Wren Project 1: Date Palm Drive & McCallum Way 06/02/2024
Cumulative Year 2025 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 66 204 100 63 141 69 43 571 45 99 1056 56 Future Volume (veh/h) 66 204 100 63 141 69 43 571 45 99 1056 56 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 73 227 111 70 157 77 48 634 50 110 1173 62 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 414 372 182 332 371 182 91 1488 116 154 1704 90 Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.05 0.31 0.31 0.09 0.34 0.34 Sat Flow, veh/h 1144 1179 577 1041 1178 578 1781 4823 377 1781 4955 262 Grp Volume(v), veh/h 73 0 338 70 0 234 48 446 238 110 806 429 Grp Sat Flow(s),veh/h/ln 1144 0 1756 1041 0 1756 1781 1702 1797 1781 1702 1813 Q Serve(g_s), s 2.2 0.0 6.8 2.5 0.0 4.4 1.1 4.3 4.4 2.5 8.4 8.4 Cycle Q Clear(g_c), s 6.6 0.0 6.8 9.3 0.0 4.4 1.1 4.3 4.4 2.5 8.4 8.4 Prop In Lane 1.00 0.33 1.00 0.33 1.00 0.21 1.00 0.14
Lane Grp Cap(c), veh/h 414 0 553 332 0 553 91 1050 554 154 1171 624 V/C Ratio(X) 0.18 0.00 0.61 0.21 0.00 0.42 0.53 0.42 0.43 0.71 0.69 0.69 Avail Cap(c_a), veh/h 772 0 1102 657 0 1102 215 1151 607 344 1397 744 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 13.8 0.0 12.0 16.0 0.0 11.2 19.2 11.4 11.4 18.4 11.7 11.7 Incr Delay (d2), s/veh 0.2 0.0 1.1 0.3 0.0 0.5 4.6 0.3 0.5 6.0 1.1 2.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 2.0 0.5 0.0 1.2 0.5 1.0 1.2 1.1 2.3 2.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 14.0 0.0 13.1 16.3 0.0 11.7 23.8 11.7 11.9 24.4 12.8 13.8 LnGrp LOS B A B B A B C B B C B B
Approach Vol, veh/h 411 304 732 1345
Approach Delay, s/veh 13.3 12.8 12.6 14.1
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.6 16.8 17.0 6.1 18.2 17.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 8.0 14.0 26.0 5.0 17.0 26.0 Max Q Clear Time (g_c+I1), s 4.5 6.4 8.8 3.1 10.4 11.3
Green Ext Time (p_c), s 0.1 2.3 2.0 0.0 3.8 1.3
Intersection Summary
HCM 6th Ctrl Delay 13.4
HCM 6th LOS B
HCM 6th Signalized Intersection Summary The Wren Project 2: Date Palm Drive & Rosemount Road 06/02/2024
Cumulative Year 2025 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 12 12 15 61 20 206 25 643 37 109 1071 20 Future Volume (veh/h) 12 12 15 61 20 206 25 643 37 109 1071 20 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 13 13 16 66 22 224 27 699 40 118 1164 22 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 30 119 146 200 36 368 57 1375 78 155 1720 32 Arrive On Green 0.02 0.16 0.16 0.11 0.25 0.25 0.03 0.28 0.28 0.09 0.33 0.33 Sat Flow, veh/h 1781 763 939 1781 144 1463 1781 4942 282 1781 5159 97 Grp Volume(v), veh/h 13 0 29 66 0 246 27 480 259 118 768 418 Grp Sat Flow(s),veh/h/ln 1781 0 1701 1781 0 1607 1781 1702 1820 1781 1702 1853 Q Serve(g_s), s 0.3 0.0 0.6 1.5 0.0 5.9 0.6 5.2 5.2 2.8 8.5 8.5 Cycle Q Clear(g_c), s 0.3 0.0 0.6 1.5 0.0 5.9 0.6 5.2 5.2 2.8 8.5 8.5 Prop In Lane 1.00 0.55 1.00 0.91 1.00 0.15 1.00 0.05
Lane Grp Cap(c), veh/h 30 0 265 200 0 404 57 947 506 155 1135 618 V/C Ratio(X) 0.44 0.00 0.11 0.33 0.00 0.61 0.47 0.51 0.51 0.76 0.68 0.68 Avail Cap(c_a), veh/h 204 0 819 204 0 774 204 1248 667 286 1404 764 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.2 0.0 15.8 17.8 0.0 14.4 20.8 13.2 13.2 19.5 12.5 12.5 Incr Delay (d2), s/veh 9.8 0.0 0.2 1.0 0.0 1.5 6.0 0.4 0.8 7.4 1.0 1.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 0.2 0.6 0.0 2.0 0.3 1.5 1.7 1.3 2.4 2.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 31.0 0.0 16.0 18.8 0.0 15.9 26.8 13.7 14.0 26.9 13.5 14.3 LnGrp LOS C A B B A B C B B C B B
Approach Vol, veh/h 42 312 766 1304
Approach Delay, s/veh 20.6 16.5 14.3 14.9
Approach LOS C B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.8 16.1 8.9 10.8 5.4 18.5 4.7 15.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 16.0 5.0 21.0 5.0 18.0 5.0 21.0 Max Q Clear Time (g_c+I1), s 4.8 7.2 3.5 2.6 2.6 10.5 2.3 7.9 Green Ext Time (p_c), s 0.0 2.8 0.0 0.1 0.0 4.1 0.0 1.3 Intersection Summary
HCM 6th Ctrl Delay 15.0
HCM 6th LOS B
HCM 6th Signalized Intersection Summary The Wren Project 3: Date Palm Drive & 30th Avenue 06/02/2024
Cumulative Year 2025 Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 99 253 100 61 135 158 152 689 27 220 1109 66 Future Volume (veh/h) 99 253 100 61 135 158 152 689 27 220 1109 66 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 108 275 109 66 147 172 165 749 29 239 1205 72 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 138 440 360 99 399 327 207 1432 55 287 1619 97 Arrive On Green 0.08 0.24 0.24 0.06 0.21 0.21 0.12 0.28 0.28 0.16 0.33 0.33 Sat Flow, veh/h 1781 1870 1532 1781 1870 1535 1781 5044 195 1781 4926 294 Grp Volume(v), veh/h 108 275 109 66 147 172 165 505 273 239 833 444 Grp Sat Flow(s),veh/h/ln 1781 1870 1532 1781 1870 1535 1781 1702 1834 1781 1702 1816 Q Serve(g_s), s 3.6 8.0 3.5 2.2 4.1 6.0 5.5 7.6 7.6 7.9 13.2 13.2 Cycle Q Clear(g_c), s 3.6 8.0 3.5 2.2 4.1 6.0 5.5 7.6 7.6 7.9 13.2 13.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.11 1.00 0.16
Lane Grp Cap(c), veh/h 138 440 360 99 399 327 207 966 521 287 1119 597 V/C Ratio(X) 0.78 0.62 0.30 0.67 0.37 0.53 0.80 0.52 0.52 0.83 0.74 0.74 Avail Cap(c_a), veh/h 147 803 658 147 803 659 265 1237 666 324 1349 720 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.4 20.8 19.1 28.1 20.3 21.1 26.0 18.2 18.2 24.6 18.1 18.1 Incr Delay (d2), s/veh 22.3 1.5 0.5 7.6 0.6 1.3 12.2 0.4 0.8 15.2 1.8 3.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.2 3.2 1.1 1.1 1.6 2.0 2.8 2.6 2.8 4.0 4.3 4.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 49.7 22.2 19.5 35.7 20.9 22.4 38.2 18.7 19.1 39.8 19.9 21.5 LnGrp LOS D C B D C C D B B D B C
Approach Vol, veh/h 492 385 943 1516
Approach Delay, s/veh 27.7 24.1 22.2 23.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 13.8 21.2 7.4 18.2 11.1 23.9 8.7 16.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 22.0 5.0 26.0 9.0 24.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 9.9 9.6 4.2 10.0 7.5 15.2 5.6 8.0 Green Ext Time (p_c), s 0.1 3.7 0.0 1.6 0.1 4.7 0.0 1.2 Intersection Summary
HCM 6th Ctrl Delay 23.8
HCM 6th LOS C
HCM 6th Signalized Intersection Summary The Wren Project 1: Date Palm Drive & McCallum Way 06/02/2024
Cumulative Year 2025 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 98 119 77 75 136 68 89 1136 67 79 876 59 Future Volume (veh/h) 98 119 77 75 136 68 89 1136 67 79 876 59 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 109 132 86 83 151 76 99 1262 74 88 973 66 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 377 299 195 382 332 167 145 1741 102 136 1696 115 Arrive On Green 0.28 0.28 0.28 0.28 0.28 0.28 0.08 0.35 0.35 0.08 0.35 0.35 Sat Flow, veh/h 1152 1050 684 1161 1166 587 1781 4929 289 1781 4872 330 Grp Volume(v), veh/h 109 0 218 83 0 227 99 871 465 88 679 360 Grp Sat Flow(s),veh/h/ln 1152 0 1734 1161 0 1754 1781 1702 1814 1781 1702 1798 Q Serve(g_s), s 3.6 0.0 4.3 2.6 0.0 4.5 2.3 9.3 9.3 2.0 6.8 6.8 Cycle Q Clear(g_c), s 8.1 0.0 4.3 7.0 0.0 4.5 2.3 9.3 9.3 2.0 6.8 6.8 Prop In Lane 1.00 0.39 1.00 0.33 1.00 0.16 1.00 0.18
Lane Grp Cap(c), veh/h 377 0 493 382 0 499 145 1202 641 136 1185 626 V/C Ratio(X) 0.29 0.00 0.44 0.22 0.00 0.45 0.68 0.72 0.73 0.65 0.57 0.58 Avail Cap(c_a), veh/h 762 0 1074 771 0 1086 255 1379 735 212 1298 685 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 15.7 0.0 12.3 15.1 0.0 12.3 18.7 11.8 11.8 18.8 11.1 11.2 Incr Delay (d2), s/veh 0.4 0.0 0.6 0.3 0.0 0.6 5.5 1.6 3.1 5.1 0.5 1.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 0.0 1.3 0.6 0.0 1.3 0.9 2.3 2.8 0.9 1.8 2.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 16.1 0.0 12.9 15.4 0.0 13.0 24.3 13.4 14.9 23.9 11.7 12.1 LnGrp LOS B A B B A B C B B C B B
Approach Vol, veh/h 327 310 1435 1127
Approach Delay, s/veh 14.0 13.6 14.7 12.8
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.2 18.8 15.9 7.4 18.6 15.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 17.0 26.0 6.0 16.0 26.0 Max Q Clear Time (g_c+I1), s 4.0 11.3 10.1 4.3 8.8 9.0
Green Ext Time (p_c), s 0.0 3.5 1.4 0.0 3.5 1.3
Intersection Summary
HCM 6th Ctrl Delay 13.8
HCM 6th LOS B
HCM 6th Signalized Intersection Summary The Wren Project 2: Date Palm Drive & Rosemount Road 06/02/2024
Cumulative Year 2025 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 42 42 53 45 38 252 47 1237 40 161 831 38 Future Volume (veh/h) 42 42 53 45 38 252 47 1237 40 161 831 38 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 46 46 58 49 41 274 51 1345 43 175 903 41 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 80 150 189 151 50 337 86 1632 52 218 1980 90 Arrive On Green 0.04 0.20 0.20 0.08 0.24 0.24 0.05 0.32 0.32 0.12 0.40 0.40 Sat Flow, veh/h 1781 752 948 1781 210 1407 1781 5083 162 1781 5007 227 Grp Volume(v), veh/h 46 0 104 49 0 315 51 901 487 175 613 331 Grp Sat Flow(s),veh/h/ln 1781 0 1700 1781 0 1617 1781 1702 1841 1781 1702 1830 Q Serve(g_s), s 1.5 0.0 3.1 1.5 0.0 10.8 1.7 14.4 14.4 5.6 7.8 7.8 Cycle Q Clear(g_c), s 1.5 0.0 3.1 1.5 0.0 10.8 1.7 14.4 14.4 5.6 7.8 7.8 Prop In Lane 1.00 0.56 1.00 0.87 1.00 0.09 1.00 0.12
Lane Grp Cap(c), veh/h 80 0 339 151 0 388 86 1093 591 218 1346 724 V/C Ratio(X) 0.58 0.00 0.31 0.32 0.00 0.81 0.60 0.82 0.82 0.80 0.46 0.46 Avail Cap(c_a), veh/h 151 0 606 151 0 577 182 1157 626 242 1346 724 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.6 0.0 20.1 25.3 0.0 21.1 27.5 18.4 18.4 25.1 13.1 13.1 Incr Delay (d2), s/veh 6.4 0.0 0.5 1.2 0.0 5.5 6.5 4.8 8.4 16.0 0.2 0.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 0.0 1.2 0.7 0.0 4.4 0.8 5.3 6.4 3.1 2.4 2.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 33.9 0.0 20.6 26.6 0.0 26.6 33.9 23.2 26.9 41.2 13.4 13.6 LnGrp LOS C A C C A C C C C D B B
Approach Vol, veh/h 150 364 1439 1119
Approach Delay, s/veh 24.7 26.6 24.8 17.8
Approach LOS C C C B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.2 22.9 9.0 15.8 6.8 27.3 6.6 18.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 20.0 5.0 21.0 6.0 22.0 5.0 21.0 Max Q Clear Time (g_c+I1), s 7.6 16.4 3.5 5.1 3.7 9.8 3.5 12.8 Green Ext Time (p_c), s 0.0 2.5 0.0 0.4 0.0 4.5 0.0 1.3 Intersection Summary
HCM 6th Ctrl Delay 22.5
HCM 6th LOS C
HCM 6th Signalized Intersection Summary The Wren Project 3: Date Palm Drive & 30th Avenue 06/02/2024
Cumulative Year 2025 Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 89 134 99 22 125 139 272 1197 17 30 947 100 Future Volume (veh/h) 89 134 99 22 125 139 272 1197 17 30 947 100 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 97 146 108 24 136 151 296 1301 18 33 1029 109 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 124 437 358 49 358 293 342 2317 32 62 1356 143 Arrive On Green 0.07 0.23 0.23 0.03 0.19 0.19 0.19 0.45 0.45 0.03 0.29 0.29 Sat Flow, veh/h 1781 1870 1532 1781 1870 1531 1781 5190 72 1781 4687 496 Grp Volume(v), veh/h 97 146 108 24 136 151 296 853 466 33 747 391 Grp Sat Flow(s),veh/h/ln 1781 1870 1532 1781 1870 1531 1781 1702 1857 1781 1702 1779 Q Serve(g_s), s 3.3 4.0 3.6 0.8 3.9 5.5 10.0 11.5 11.5 1.1 12.4 12.4 Cycle Q Clear(g_c), s 3.3 4.0 3.6 0.8 3.9 5.5 10.0 11.5 11.5 1.1 12.4 12.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.04 1.00 0.28
Lane Grp Cap(c), veh/h 124 437 358 49 358 293 342 1520 829 62 985 515 V/C Ratio(X) 0.78 0.33 0.30 0.49 0.38 0.52 0.87 0.56 0.56 0.53 0.76 0.76 Avail Cap(c_a), veh/h 143 783 642 143 783 641 344 1535 838 143 1152 602 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.4 19.8 19.6 29.8 21.9 22.5 24.3 12.7 12.7 29.5 20.1 20.1 Incr Delay (d2), s/veh 21.0 0.4 0.5 7.5 0.7 1.4 19.8 0.5 0.8 6.8 2.5 4.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.0 1.6 1.2 0.4 1.6 1.9 5.6 3.5 3.9 0.5 4.3 4.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 49.4 20.2 20.1 37.3 22.6 23.9 44.1 13.2 13.5 36.3 22.6 24.9 LnGrp LOS D C C D C C D B B D C C
Approach Vol, veh/h 351 311 1615 1171
Approach Delay, s/veh 28.3 24.4 18.9 23.7
Approach LOS C C B C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.2 31.7 5.7 18.5 15.9 22.0 8.3 15.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 28.0 5.0 26.0 12.0 21.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.1 13.5 2.8 6.0 12.0 14.4 5.3 7.5 Green Ext Time (p_c), s 0.0 7.0 0.0 1.0 0.0 3.4 0.0 1.1 Intersection Summary
HCM 6th Ctrl Delay 22.0
HCM 6th LOS C
APPENDIX G ‐

HORIZON YEAR VOLUME DEVELOPMENT
In Out Total In Out Total
Shopping Plaza (40-150k)3 TSF 821 2.19 1.34 3.53 4.72 5.12 9.84 102.78 Mini-Warehouse TSF 151 0.05 0.04 0.09 0.07 0.08 0.15 1.45 In Out Total In Out Total
Shopping Plaza (40-150k) 54.725 TSF 120 73 193 258 280 538 5,625 0 0 0 103 112 215 2,250
120 73 193 155 168 323 3,375
Mini-Warehouse 115.054 TSF 6 5 50 8 9 17 167
126 78 243 163 177 340 3,542
1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, Eleventh Edition (2021). 2 TSF = Thousand Square Feet
3 Pass-by reduction percentage is based on the ITE methodology per 2021 Pass-By Tables for ITE Trip Generation Appendices.

Total
Pass-by Reduction (40% - PM Peak Hour & Daily)3
Subtotal
1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, Eleventh Edition (2021). 2 TSF = Thousand Square Feet
3 Peak hour and daily trip rates for LU 821 Shopping Plaza are based on fitted curve equations for total 54,725 sf of retail proposed for entire project.

Land Use1 Intensity Units2 AM Peak Hour PM Peak Hour Daily DailyLand Use1 Units2 ITE LUCode AM Peak Hour PM Peak Hour Date Palm Drive Mixed Use
In Out Total In Out Total
Shopping Plaza (40k-150k)3 TSF 821 2.19 1.34 3.53 4.13 4.48 8.61 88.08 Fast Food Restaurant w/ Drive-through Window TSF 934 22.75 21.86 44.61 17.18 15.85 33.03 467.48 In Out Total In Out Total
Shopping Plaza (40k-150k) 127.000 TSF 278 170 448 525 569 1,094 11,186 22 22 44 47 34 81 783
0 0 0 191 214 405 4,161
256 148 404 287 321 608 6,242
Fast Food Restaurant w/ Drive-through Window 7.000 TSF 159 153 312 120 111 231 3,272 22 21 43 35 46 81 1,145
69 66 135 47 36 83 1,170
68 66 134 38 29 67 957
324 214 538 325 350 675 7,199
1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, Eleventh Edition (2021). 2 TSF = Thousand Square Feet
3 Internal Capture percentage is based on NCHRP Report 684, as recommended in the ITE Trip Generation Handbook, 3rd Edition. 4 Pass-by reduction percentage is based on the ITE methodology per 2021 Pass-By Tables for ITE Trip Generation Appendices.

DailyLand Use1 Units2 ITE LUCode AM Peak Hour PM Peak Hour 1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual , Eleventh Edition (2021). 2 TSF = Thousand Square Feet
3 Peak hour and daily trip rates for LU 822 Strip Retail Plaza are based on fitted curve equations for total 127,000 sf of retail proposed for entire project.

Land Use1 Intensity Units2 AM Peak Hour PM Peak Hour Daily Total
Internal Capture (8% - AM In, 13% - AM Out, 9% - PM In, 6% - PM Out, 7% - Daily)3 Pass-by Reduction (40% - PM Peak Hour & Daily)4
Subtotal
Internal Capture (14% - AM In, 14% - AM Out, 29% - PM In, 41% - PM Out, 35% - Daily)3 Pass-by Reduction (50% - AM Peak Hour, 55% - PM Peak Hour & Daily)4 Subtotal
Vallarta Shopping Center
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 4
4 8
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 4
4 8
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
R
N
E
R

R
D
4 5
4 V
A
R
N
E
R

R
D
6 0
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
8 6
1 5
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
7 -
-
4 8
-
-
1 3
-
-
5 1
-
-
1 1
3 -
-
8 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 4
1 8
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 3
2 6
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 4
2 0
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 3
2 5
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
3 1
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
3 1
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 0
-
-
5 7
-
-
0 -
-
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
8 9
0 8
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
8 9
0 8
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 0
3 -
-
4 5
-
-
0 -
-
4 R
A
M
O
N

R
D
3 0
8 2
R
A
M
O
N

R
D
2 8
3 5
-
-
0 -
-
4 -
-
1 3
-
-
1 4
9 -
-
2 0
3 -
-
3 3
2 -
-
9 8
-
-
1 4
3 -
-
3 7
-
-
1 9
-
-
0 -
-
2 -
-
0 -
-
3 -
-
0 -
-
2 N

G
E
N
E

A
U
T
R
Y

T
R
L
2 4
8 3
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 4
3 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 3
8 4
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 6
4 9
-
-
7 -
-
1 1
-
-
8 8
-
-
4 4
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
4 2
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 5
8 3
-
-
0 -
-
0 -
-
6 1
-
-
1 4
2 -
-
0 -
-
3 -
-
4 5
5 -
-
6 3
0 -
-
0 -
-
3 -
-
2 5
-
-
5 4
D
I
N
A
H

S
H
O
R
E

D
R
7 2
0 D
I
N
A
H

S
H
O
R
E

D
R
4 4
8 -
-
8 -
-
3 1
-
-
9 -
-
2 8
A
V
E
I
D
A

Q
U
I
N
T
A
N
A
7 2
A
V
E
I
D
A

Q
U
I
N
T
A
N
A
7 8
-
-
2 2
6 -
-
3 7
5 V
I
S
T
A

C
H
I
N
O
2 2
1 6
V
I
S
T
A

C
H
I
N
O
2 0
6 1
-
-
1 3
9 -
-
4 0
1 -
-
2 4
-
-
3 8
1 -
-
2 4
-
-
2 8
-
-
3 -
-
1 7
-
-
1 0
2 -
-
0 M
C

C
A
L
L
U
M

W
A
Y
2 6
4 M
C

C
A
L
L
U
M

W
A
Y
1 4
6 -
-
0 -
-
3 DINAH SHORE DR
738

DINAH SHORE DR
822
-
-
3 4
0 -
-
6 1
7 DINAH SHORE DR
737

DINAH SHORE DR
755
D
I
N
A
H

S
H
O
R
E

D
R
7 3
7 D
I
N
A
H

S
H
O
R
E

D
R
7 5
5 V
I
S
T
A

C
H
I
N
O
1 8
5 2
V
I
S
T
A

C
H
I
N
O
2 1
5 6
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 9
8 4
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 6
7 1
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
9 3
4 C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 3
9 2
D
A
T
E

P
A
L
M

D
R
2 1
9 4
D
A
T
E

P
A
L
M

D
R
2 9
1 4
D
A

V
A
L
L

D
R
6 1
5 D
A

V
A
L
L

D
R
7 3
4 D
A

V
A
L
L

D
R
4 5
0 D
A

V
A
L
L

D
R
6 3
4 M
C

C
A
L
L
U
M

W
A
Y
3 9
1 M
C

C
A
L
L
U
M

W
A
Y
5 7
6 L
A
N
D
A
U

B
L
V
D
8 1
9 L
A
N
D
A
U

B
L
V
D
8 1
8 L
A
N
D
A
U

B
L
V
D
1 0
1 4
L
A
N
D
A
U

B
L
V
D
1 0
6 7
V
A
R
N
E
R

R
D
4 1
3 V
A
R
N
E
R

R
D
8 8
V
A
R
N
E
R

R
D
4 1
3 V
A
R
N
E
R

R
D
9 6
L
A
N
D
A
U

B
L
V
D
1 0
4 6
L
A
N
D
A
U

B
L
V
D
1 8
1 5
R
A
M
O
N

R
D
3 0
8 5
R
A
M
O
N

R
D
2 6
5 6
R
A
M
O
N

R
D
3 2
1 4
R
A
M
O
N

R
D
2 8
5 4
-
-
1 5
5 -
-
7 7
3 0
T
H

A
V
E
3 5
6 3
0 T
H

A
V
E
2 5
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
3 1
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
3 1
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
I
S
T
A

C
H
I
N
O
2 4
4 9
V
I
S
T
A

C
H
I
N
O
1 9
5 1
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
7 1
4 0
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
R
N
E
R

R
D
4 2
0 V
A
R
N
E
R

R
D
7 5
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
8 9
0 8
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
8 9
0 8
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 7
6 -
-
5 2
-
-
0 -
-
2 -
-
0 -
-
2 -
-
2 9
4 -
-
8 1

RAMON RD
3079

RAMON RD
2734
-
-
0 -
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
4 7
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
8 0
6 9
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
9 9
-
-
2 9
-
-
0 -
-
1 V
A
R
N
E
R

R
D
4 0
6 V
A
R
N
E
R

R
D
1 5
9 4
V
A
R
N
E
R

R
D
4 1
4 V
A
R
N
E
R

R
D
8 4
-
-
1 3
3 -
-
8 4
-
-
1 6
0 -
-
6 2
-
-
3 -
-
5 6
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 3
2 6
8 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 E

V
I
S
T
A

C
H
I
N
O
3 1
5 2
E

V
I
S
T
A

C
H
I
N
O
3 9
8 8
3 0
T
H

A
V
E
5 2
0 3
0 T
H

A
V
E
4 2
6 V
E
R
O
N
A

R
D
1 1
2 V
E
R
O
N
A

R
D
1 3
4 -
-
4 1
5 -
-
2 6
1 E

M
E
S
Q
U
I
T
E

A
V
E
6 9
7 E

M
E
S
Q
U
I
T
E

A
V
E
1 1
3 6
E

M
E
S
Q
U
I
T
E

A
V
E
7 3
3 E

M
E
S
Q
U
I
T
E

A
V
E
1 1
5 7
-
-
0 -
-
3 -
-
5 8
5 -
-
3 7
5 -
-
9 2
0 -
-
2 5
6 -
-
1 1
5 -
-
8 9
-
-
4 6
8 -
-
2 9
5 -
-
4 2
5 -
-
2 3
6 -
-
0 -
-
3 -
-
5 1
1 -
-
1 8
0 -
-
3 3
2 -
-
1 8
5 -
-
0 -
-
4 -
-
7 6
-
-
1 6
4 -
-
0 -
-
0 -
-
4 7
8 -
-
2 0
7 -
-
0 -
-
3 -
-
1 2
-
-
2 9
-
-
0 -
-
3 -
-
0 -
-
1 -
-
1 6
2 -
-
1 5
8 E
L

C
I
E
L
O

R
D
2 2
3 E
L

C
I
E
L
O

R
D
7 3
-
-
6 -
-
2 8
V
I
S
T
A

C
H
I
N
O
1 9
6 4
V
I
S
T
A

C
H
I
N
O
2 5
8 3
V
I
S
T
A

C
H
I
N
O
1 9
9 2
V
I
S
T
A

C
H
I
N
O
2 6
5 4
D
I
N
A
H

S
H
O
R
E

D
R
8 9
9 D
I
N
A
H

S
H
O
R
E

D
R
4 7
6 D
I
N
A
H

S
H
O
R
E

D
R
9 9
4 D
I
N
A
H

S
H
O
R
E

D
R
7 4
7 E

B
A
R
I
S
T
O

R
D
5 0
0 E

B
A
R
I
S
T
O

R
D
2 0
2 E

B
A
R
I
S
T
O

R
D
4 3
5 E

B
A
R
I
S
T
O

R
D
1 9
3 -
-
1 8
9 -
-
1 7
7 R
A
M
O
N

R
D
3 7
2 9
R
A
M
O
N

R
D
3 7
3 9
-
-
1 7
1 -
-
2 6
9 -
-
5 2
2 -
-
3 6
7 D
I
N
A
H

S
H
O
R
E

D
R
7 2
9 D
I
N
A
H

S
H
O
R
E

D
R
6 2
4 D
I
N
A
H

S
H
O
R
E

D
R
7 2
0 D
I
N
A
H

S
H
O
R
E

D
R
4 4
8 -
-
1 0
5 -
-
2 0
9 -
-
1 8
0 -
-
2 1
0 -
-
5 9
-
-
7 1
-
-
8 3
9 -
-
0 -
-
3 6
3 -
-
2 3
3 D
A
T
E

P
A
L
M

D
R
3 8
3 D
A
T
E

P
A
L
M

D
R
1 1
7 6
D
A
T
E

P
A
L
M

D
R
3 8
8 D
A
T
E

P
A
L
M

D
R
1 1
7 5
-
-
2 9
3 -
-
1 5
2 -
-
1 4
-
-
6 4

RAMON RD
1051

RAMON RD
752
-
-
6 2
1 -
-
3 1
6 -
-
0 -
-
0 D
A

V
A
L
L

D
R
5 8
6 D
A

V
A
L
L

D
R
7 9
0 -
-
7 4
6 -
-
2 6
5 -
-
1 8
7 -
-
8 4
-
-
2 0
2 -
-
5 2
2 -
-
3 5
6 -
-
2 7
7 -
-
5 6
-
-
1 3
2 -
-
1 1
8 -
-
9 8
D
A
T
E

P
A
L
M

D
R
2 2
6 0
D
A
T
E

P
A
L
M

D
R
2 8
8 0
D
I
N
A
H

S
H
O
R
E

D
R
8 9
9 D
I
N
A
H

S
H
O
R
E

D
R
4 7
6 -
-
0 -
-
3 C
R
O
S
S
L
E
Y

R
D
4 2
7 C
R
O
S
S
L
E
Y

R
D
4 7
0 C
R
O
S
S
L
E
Y

R
D
3 9
8 C
R
O
S
S
L
E
Y

R
D
2 9
9 -
-
2 1
0 -
-
2 5
3 -
-
9 8
7 -
-
1 2
1 4
-
-
5 1
2 -
-
2 8
3 -
-
4 6
4 -
-
3 4
5 V
A
R
N
E
R

R
D
4 1
8 V
A
R
N
E
R

R
D
7 8
-
-
7 2
-
-
7 1
-
-
5 7
8 -
-
5 6
3 -
-
2 6
2 -
-
1 4
1 E

R
A
M
O
N

R
D
2 5
2 4
E

R
A
M
O
N

R
D
3 8
3 5
-
-
0 -
-
3 V
E
R
O
N
A

R
D
1 9
0 V
E
R
O
N
A

R
D
2 0
5 V
E
R
O
N
A

R
D
0 V
E
R
O
N
A

R
D
0 R
A
M
O
N

R
D
3 4
0 1
R
A
M
O
N

R
D
3 7
2 4
-
-
8 8
6 -
-
3 2
5 -
-
0 -
-
3 -
-
1 0
3 -
-
2 1
4 -
-
4 2
6 -
-
3 0
1 N

G
E
N
E

A
U
T
R
Y

T
R
L
3 1
6 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 4
0 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 5
4 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 4
0 9
-
-
0 -
-
3 -
-
6 -
-
3 E

M
E
S
Q
U
I
T
E

A
V
E
4 2
3 E

M
E
S
Q
U
I
T
E

A
V
E
3 8
2 -
-
1 9
6 9
-
-
9 0
1 3
0 T
H

A
V
E
3 0
5 3
0 T
H

A
V
E
8 3
3 -
-
1 7
8 -
-
7 9
-
-
1 1
9 -
-
4 3
3 R
A
M
O
N

R
D
2 8
9 1
R
A
M
O
N

R
D
4 4
6 3
R
A
M
O
N

R
D
2 8
9 1
R
A
M
O
N

R
D
4 4
6 4
-
-
1 5
3 -
-
2 6
6 E

M
E
S
Q
U
I
T
E

A
V
E
7 0
2 E

M
E
S
Q
U
I
T
E

A
V
E
1 2
2 1
E

M
E
S
Q
U
I
T
E

A
V
E
5 8
3 E

M
E
S
Q
U
I
T
E

A
V
E
1 3
2 6
S

E
L

C
I
E
L
O

R
D
1 5
5 C
R
O
S
S
L
E
Y

R
D
4 3
4 C
R
O
S
S
L
E
Y

R
D
1 0
9 5
C
R
O
S
S
L
E
Y

R
D
4 2
1 C
R
O
S
S
L
E
Y

R
D
7 6
7 P
L
U
M
L
E
Y

R
D
0 P
L
U
M
L
E
Y

R
D
0 -
-
1 8
9 2
-
-
1 1
8 8
-
-
6 6
4 -
-
2 5
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 4
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 0
7 -
-
4 7
-
-
2 1
3 0
T
H

A
V
E
5 0
9 3
0 T
H

A
V
E
4 7
6 L
A
N
D
A
U

B
L
V
D
1 3
4 L
A
N
D
A
U

B
L
V
D
1 1
2 L
A
N
D
A
U

B
L
V
D
6 3
9 L
A
N
D
A
U

B
L
V
D
1 0
9 7
R
A
M
O
N

R
D
2 9
8 6
R
A
M
O
N

R
D
3 7
9 1
-
-
8 7
7 -
-
3 9
5 V
A
R
N
E
R

R
D
4 1
6 V
A
R
N
E
R

R
D
8 1
D
A

V
A
L
L

D
R
2 5
5 D
A

V
A
L
L

D
R
3 5
6 D
A

V
A
L
L

D
R
4 5
3 D
A

V
A
L
L

D
R
4 2
1 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 -
-
3 2
7 -
-
1 9
0 -
-
5 8
-
-
2 3
7 -
-
4 1
2 -
-
1 7
9 B
O
B

H
O
P
E

D
R
1 8
8 2
B
O
B

H
O
P
E

D
R
3 7
0 6
D
A
T
E

P
A
L
M

D
R
2 0
6 6
D
A
T
E

P
A
L
M

D
R
3 0
3 2
-
-
2 5
8 -
-
2 4
8 M
C

C
A
L
L
U
M

W
A
Y
7 9
5 M
C

C
A
L
L
U
M

W
A
Y
7 1
3 -
-
0 -
-
0 -
-
3 7
1 -
-
4 2
7 -
-
9 0
-
-
2 5
7 D
A
T
E

P
A
L
M

D
R
6 5
0 D
A
T
E

P
A
L
M

D
R
1 3
0 7
D
A
T
E

P
A
L
M

D
R
1 0
6 0
D
A
T
E

P
A
L
M

D
R
1 8
8 6
D
A
T
E

P
A
L
M

D
R
2 1
0 7
D
A
T
E

P
A
L
M

D
R
3 2
1 0
-
-
3 4
-
-
2 0
D
A
T
E

P
A
L
M

D
R
3 9
5 7
D
A
T
E

P
A
L
M

D
R
4 1
7 9
-
-
1 0
6 -
-
3 0
7 RAMON RD
2952

RAMON RD
2684
R
A
M
O
N

R
D
3 2
4 8
R
A
M
O
N

R
D
2 9
3 5
-
-
0 -
-
2 -
-
1 4
9 -
-
1 0
7 -
-
3 6
-
-
1 9
-
-
0 -
-
3 -
-
1 6
-
-
3 6
2 3
0 T
H

A
V
E
4 9
1 3
0 T
H

A
V
E
3 8
5 -
-
1 0
1 -
-
2 8
3 -
-
1 4
7 4
-
-
0 V
I
S
T
A

C
H
I
N
O
1 9
9 2
V
I
S
T
A

C
H
I
N
O
2 6
5 4
V
I
S
T
A

C
H
I
N
O
1 6
9 5
V
I
S
T
A

C
H
I
N
O
2 4
8 6
D
A
T
E

P
A
L
M

D
R
6 3
7 D
A
T
E

P
A
L
M

D
R
1 4
7 7
D
A
T
E

P
A
L
M

D
R
6 5
0 D
A
T
E

P
A
L
M

D
R
1 3
0 7
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 R
A
M
O
N

R
D
3 7
4 7
R
A
M
O
N

R
D
3 7
4 2
-
-
1 7
6 8
-
-
0 E

M
E
S
Q
U
I
T
E

A
V
E
7 3
3 E

M
E
S
Q
U
I
T
E

A
V
E
1 1
5 7
--
0 --
0 -
-
4 0
-
-
1 9
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
4 7
6 D
I
N
A
H

S
H
O
R
E

D
R
7 3
3 D
I
N
A
H

S
H
O
R
E

D
R
1 1
5 7
D
I
N
A
H

S
H
O
R
E

D
R
7 3
3 D
I
N
A
H

S
H
O
R
E

D
R
1 0
5 5
E
L

C
I
E
L
O

R
D
2 3
9 E
L

C
I
E
L
O

R
D
2 0
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
3 1
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 5
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 0
7 -
-
0 -
-
3 D
A
T
E

P
A
L
M

D
R
1 6
0 3
D
A
T
E

P
A
L
M

D
R
2 6
0 9
-
-
0 -
-
3 D
I
N
A
H

S
H
O
R
E

D
R
0 D
I
N
A
H

S
H
O
R
E

D
R
0 -
-
4 4
-
-
5 3
9 S
A
N

L
U
I
S

R
E
Y

D
R
0 S
A
N

L
U
I
S

R
E
Y

D
R
0 S
A
N

L
U
I
S

R
E
Y

D
R
5 4
9 S
A
N

L
U
I
S

R
E
Y

D
R
3 6
0 -
-
0 -
-
2 D
A

V
A
L
L

D
R
7 6
1 D
A

V
A
L
L

D
R
8 2
2 V
I
S
T
A

C
H
I
N
O
1 9
2 4
V
I
S
T
A

C
H
I
N
O
2 2
3 4
E

M
E
S
Q
U
I
T
E

A
V
E
1 5
E

M
E
S
Q
U
I
T
E

A
V
E
4 5
E

M
E
S
Q
U
I
T
E

A
V
E
1 5
E

M
E
S
Q
U
I
T
E

A
V
E
4 5
-
-
0 -
-
3 -
-
9 9
-
-
2 5
3 -
-
0 -
-
4 E

M
E
S
Q
U
I
T
E

A
V
E
1 5
E

M
E
S
Q
U
I
T
E

A
V
E
4 5
-
-
2 0
0 4
-
-
0 E

M
E
S
Q
U
I
T
E

A
V
E
4 2
3 E

M
E
S
Q
U
I
T
E

A
V
E
3 8
2 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 4
0 9
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 5
4 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 4
3 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 4
8 3
S
A
N

L
U
I
S

R
E
Y

D
R
2 9
5 S
A
N

L
U
I
S

R
E
Y

D
R
4 6
8 SAN LUIS REY DR
0 SAN LUIS REY DR
0 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 6
0 9
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 5
1 7
M
C

C
A
L
L
U
M

W
A
Y
5 5
2 M
C

C
A
L
L
U
M

W
A
Y
3 7
7 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 5
7 3
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 3
9 5
-
-
2 8
4 0
--
0 M
C

C
A
L
L
U
M

W
A
Y
7 9
5 M
C

C
A
L
L
U
M

W
A
Y
7 1
3 D
A
T
E

P
A
L
M

D
R
1 2
5 1
D
A
T
E

P
A
L
M

D
R
2 0
1 1
3 0
T
H

A
V
E
9 2
7 3
0 T
H

A
V
E
4 0
7 3
0 T
H

A
V
E
9 3
7 3
0 T
H

A
V
E
6 1
8 -
-
1 4
-
-
7 -
-
3 6
-
-
1 2
2 D
A
T
E

P
A
L
M

D
R
2 2
8 9
D
A
T
E

P
A
L
M

D
R
3 3
7 2
D
A
T
E

P
A
L
M

D
R
2 1
8 4
D
A
T
E

P
A
L
M

D
R
3 1
6 9
D
A
T
E

P
A
L
M

D
R
6 3
7 D
A
T
E

P
A
L
M

D
R
1 4
7 7
-
-
0 -
-
3 -
-
2 -
-
1 0
E

R
A
M
O
N

R
D
1 8
1 0
E

R
A
M
O
N

R
D
3 1
3 7
E

R
A
M
O
N

R
D
2 1
0 5
E

R
A
M
O
N

R
D
3 6
5 9
L
A
N
D
A
U

B
L
V
D
1 0
4 9
L
A
N
D
A
U

B
L
V
D
1 6
3 1
L
A
N
D
A
U

B
L
V
D
1 0
4 9
L
A
N
D
A
U

B
L
V
D
1 6
3 1
-
-
1 7
6 8
-
-
0 M
C

C
A
L
L
U
M

W
A
Y
5 1
9 M
C

C
A
L
L
U
M

W
A
Y
7 6
2 M
C

C
A
L
L
U
M

W
A
Y
4 3
5 M
C

C
A
L
L
U
M

W
A
Y
4 8
8 -
-
1 5
-
-
3 6
-
-
0 -
-
3 -
-
0 -
-
0 -
-
1 7
5 -
-
4 0
3 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
2 7
2 -
-
2 6
1 -
-
8 8
9 R
A
M
O
N

R
D
2 3
3 7
R
A
M
O
N

R
D
3 2
1 0
R
A
M
O
N

R
D
2 2
4 9
R
A
M
O
N

R
D
3 3
5 0
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 5
3 1
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 9
1 4
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 3
2 9
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 3
9 2
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 3
2 9
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 3
9 2
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 3
2 9
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 3
9 2
E

R
A
M
O
N

R
D
1 8
1 0
E

R
A
M
O
N

R
D
3 1
3 7
E

R
A
M
O
N

R
D
1 7
7 3
E

R
A
M
O
N

R
D
3 0
9 8
E

R
A
M
O
N

R
D
1 7
7 3
E

R
A
M
O
N

R
D
3 0
9 8
E

R
A
M
O
N

R
D
1 7
7 3
E

R
A
M
O
N

R
D
3 0
9 8
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 0
5 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 3
6 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 0
5 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 3
6 E

B
A
R
I
S
T
O

R
D
5 3
5 E

B
A
R
I
S
T
O

R
D
0 R
A
M
O
N

R
D
2 7
9 8
R
A
M
O
N

R
D
3 7
0 9
-
-
6 7
-
-
6 8
R
A
M
O
N

R
D
2 7
9 8
R
A
M
O
N

R
D
3 7
0 9
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 4
2 0
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 3
2 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 4
6 0
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 4
4 0
L
A
N
D
A
U

B
L
V
D
1 1
1 6
L
A
N
D
A
U

B
L
V
D
1 6
4 2
L
A
N
D
A
U

B
L
V
D
1 1
1 6
L
A
N
D
A
U

B
L
V
D
1 6
4 2
D
A
T
E

P
A
L
M

D
R
3 9
4 D
A
T
E

P
A
L
M

D
R
1 1
7 5
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
1 4
3 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 D
A
T
E

P
A
L
M

D
R
1 7
9 8
D
A
T
E

P
A
L
M

D
R
2 5
8 5
-
-
2 0
4 8
-
-
0 -
-
2 0
4 8
-
-
0 -
-
2 8
-
-
1 2
-
-
9 1
-
-
2 0
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
8 9
0 8
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
8 9
0 8
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 5
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 0
7 3
0 T
H

A
V
E
5 0
6 3
0 T
H

A
V
E
4 1
9 -
-
4 4
-
-
1 0
9 D
A

V
A
L
L

D
R
5 7
5 D
A

V
A
L
L

D
R
6 6
0 D
A

V
A
L
L

D
R
5 3
9 D
A

V
A
L
L

D
R
7 2
4 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
3 4
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 8
9 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 7
9 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 0
5 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 3
6 3
4 T
H

A
V
E
0 3
4 T
H

A
V
E
0 3
4 T
H

A
V
E
9 0
3 4
T
H

A
V
E
1 8
9 M
C

C
A
L
L
U
M

W
A
Y
3 4
4 M
C

C
A
L
L
U
M

W
A
Y
2 7
2 R
A
M
O
N

R
D
2 9
5 2
R
A
M
O
N

R
D
2 6
8 4
E

M
E
S
Q
U
I
T
E

A
V
E
1 5
E

M
E
S
Q
U
I
T
E

A
V
E
4 5
E

M
E
S
Q
U
I
T
E

A
V
E
1 5
E

M
E
S
Q
U
I
T
E

A
V
E
4 5
M
C

C
A
L
L
U
M

W
A
Y
3 4
4 M
C

C
A
L
L
U
M

W
A
Y
2 7
2 -
-
2 5
3 -
-
9 9
-
-
9 7
8 -
-
0 3
4 T
H

A
V
E
9 1
3 4
T
H

A
V
E
1 9
2 34TH AVE
90 34TH AVE
189
-
-
4 -
-
1 -
-
1 7
6 8
-
-
0 D
A
T
E

P
A
L
M

D
R
1 6
4 9
D
A
T
E

P
A
L
M

D
R
2 5
0 1
D
A
T
E

P
A
L
M

D
R
2 0
8 5
D
A
T
E

P
A
L
M

D
R
2 9
1 2
-
-
0 -
-
2 8
4 0
-
-
0 -
-
2 0
0 4
-
-
0 -
-
4 5
-
-
1 1
3 D
A
T
E

P
A
L
M

D
R
4 2
1 D
A
T
E

P
A
L
M

D
R
1 1
8 5
-
-
2 7
3 -
-
1 1
2 B
O
B

H
O
P
E

D
R
9 8
5 B
O
B

H
O
P
E

D
R
2 7
5 8
B
O
B

H
O
P
E

D
R
9 8
6 B
O
B

H
O
P
E

D
R
2 7
5 7
E

B
A
R
I
S
T
O

R
D
1 9
3 E

B
A
R
I
S
T
O

R
D
4 3
5 -
-
2 0
0 4
-
-
0 -
-
2 0
0 4
-
-
0 -
-
2 0
4 8
-
-
0 -
-
2 0
4 8
-
-
0 -
-
1 0
5 -
-
2 5
9 D
A
T
E

P
A
L
M

D
R
1 7
2 3
D
A
T
E

P
A
L
M

D
R
2 7
8 1

E BARISTO RD
430

E BARISTO RD
0 D
A
T
E

P
A
L
M

D
R
2 0
0 4
D
A
T
E

P
A
L
M

D
R
2 6
7 6
D
A
T
E

P
A
L
M

D
R
1 7
2 3
D
A
T
E

P
A
L
M

D
R
2 7
8 1
R
A
M
O
N

R
D
3 1
1 1
R
A
M
O
N

R
D
2 7
7 9
R
A
M
O
N

R
D
3 1
0 8
R
A
M
O
N

R
D
2 7
8 0
-
-
1 4
7 4
-
-
0 -
-
1 4
7 4
-
-
0 V
A
R
N
E
R

R
D
4 5
5 V
A
R
N
E
R

R
D
6 0
-
-
8 3
9 -
-
8 3
9 RIVCOM 4.01 - 2018 AM peak period volumes (Wren Resi + Date Palm + Vallarata) 0 .05
.1
.15
Miles
HCMType
CC (6866)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12488)
PrArterial (8422)
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 7
6 3
4 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 4
8 9
1 -
-
1 4
-
-
5 5
V
A
R
N
E
R

R
D
1 5
3 4
V
A
R
N
E
R

R
D
1 8
2 -
-
1 7
-
-
9 0
V
I
S
T
A

C
H
I
N
O
1 7
8 V
I
S
T
A

C
H
I
N
O
2 9
2 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
8 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
2 2
L
o
s

A
l
o
m
o
s

R
d
0 L
o
s

A
l
o
m
o
s

R
d
0 -
-
0 -
-
5 0
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
5 1
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 5
2 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 4
9 9
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 4
7 4
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 -
-
2 -
-
1 1
-
-
2 8
-
-
6 7
D
I
N
A
H

S
H
O
R
E

D
R
1 3
6 9
D
I
N
A
H

S
H
O
R
E

D
R
1 9
6 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 5
2 4
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 5
0 1
-
-
1 3
1 -
-
5 5
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 7
2 4
8 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 -
-
7 R
A
M
O
N

R
D
3 5
2 8
R
A
M
O
N

R
D
3 8
5 6
-
-
2 8
-
-
1 4
-
-
5 8
-
-
2 0
8 -
-
5 -
-
1 2
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 4
2 1
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 9
9 -
-
2 1
2 N

G
E
N
E

A
U
T
R
Y

T
R
L
3 1
9 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 8
5 7
-
-
4 1
2 -
-
2 4
0 -
-
0 -
-
1 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 -
-
1 3
0 -
-
4 7
1 -
-
1 2
-
-
1 1
-
-
2 4
1 -
-
1 2
0 E

V
I
S
T
A

C
H
I
N
O
3 7
6 2
E

V
I
S
T
A

C
H
I
N
O
4 6
7 8
-
-
6 8
-
-
9 8
-
-
0 -
-
0 -
-
6 2
-
-
1 5
4 S

G
E
N
E

A
U
T
R
Y

T
R
L
1 1
2 5
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 8
1 2
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
0 9
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
2 -
-
5 -
-
0 -
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
1 6
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
2 5
3 -
-
4 0
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 4
6 1
8 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 A
V
E
I
D
A

Q
U
I
N
T
A
N
A
1 1
1 A
V
E
I
D
A

Q
U
I
N
T
A
N
A
2 2
4 V
I
S
T
A

C
H
I
N
O
2 3
2 8
V
I
S
T
A

C
H
I
N
O
2 6
6 3
-
-
1 2
-
-
3 9
-
-
9 3
-
-
4 9
8 -
-
9 0
-
-
1 4
9 -
-
2 3
1 -
-
6 4
-
-
4 6
6 -
-
7 2
8 -
-
2 -
-
7 D
A

V
A
L
L

D
R
1 1
0 6
D
A

V
A
L
L

D
R
1 3
2 9
-
-
3 0
-
-
3 3
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 0
5 6
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 1
2 1
-
-
4 -
-
2 2

DINAH SHORE DR
1344

DINAH SHORE DR
1457
M
C

C
A
L
L
U
M

W
A
Y
5 2
8 M
C

C
A
L
L
U
M

W
A
Y
6 9
0 M
C

C
A
L
L
U
M

W
A
Y
1 8
8 M
C

C
A
L
L
U
M

W
A
Y
1 5
9 DINAH SHORE DR
1096

DINAH SHORE DR
1246
D
I
N
A
H

S
H
O
R
E

D
R
1 0
9 6
D
I
N
A
H

S
H
O
R
E

D
R
1 2
4 6
V
I
S
T
A

C
H
I
N
O
2 1
6 7
V
I
S
T
A

C
H
I
N
O
2 7
2 7
V
A
R
N
E
R

R
D
1 0
9 6
V
A
R
N
E
R

R
D
2 1
4 C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
1 0
6 4
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 4
2 1
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 5
9 3
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 2
7 6
-
-
6 8
3 -
-
9 0
9 L
A
N
D
A
U

B
L
V
D
1 3
8 1
L
A
N
D
A
U

B
L
V
D
1 8
2 8
R
A
M
O
N

R
D
3 4
1 0
R
A
M
O
N

R
D
3 4
9 9
L
A
N
D
A
U

B
L
V
D
1 3
2 8
L
A
N
D
A
U

B
L
V
D
1 8
9 7
L
A
N
D
A
U

B
L
V
D
1 1
7 9
L
A
N
D
A
U

B
L
V
D
2 4
4 5
D
A
T
E

P
A
L
M

D
R
2 1
9 8
D
A
T
E

P
A
L
M

D
R
3 2
0 5
V
A
R
N
E
R

R
D
1 0
9 0
V
A
R
N
E
R

R
D
1 7
6 3
0 T
H

A
V
E
6 7
1 3
0 T
H

A
V
E
1 5
1 D
A

V
A
L
L

D
R
8 9
2 D
A

V
A
L
L

D
R
1 2
4 3
-
-
1 6
9 -
-
9 -
-
0 -
-
4 R
A
M
O
N

R
D
3 5
5 1
R
A
M
O
N

R
D
3 7
8 4
V
I
S
T
A

C
H
I
N
O
2 5
2 3
V
I
S
T
A

C
H
I
N
O
2 5
9 7
V
A
R
N
E
R

R
D
1 1
0 4
V
A
R
N
E
R

R
D
1 6
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
6 6
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
5 -
-
2 9

RAMON RD
3482

RAMON RD
3619
-
-
1 -
-
6 -
-
0 -
-
0 D
A
T
E

P
A
L
M

D
R
1 7
7 8
D
A
T
E

P
A
L
M

D
R
2 8
4 1
-
-
6 1
3 -
-
1 2
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
5 2
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
2 6
3 -
-
1 0
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 3
5 3
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
9 -
-
4 0
-
-
1 0
5 -
-
4 0
-
-
1 7
-
-
2 0
D
I
N
A
H

S
H
O
R
E

D
R
1 2
8 4
D
I
N
A
H

S
H
O
R
E

D
R
1 2
5 9
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 7
5 2
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
R
N
E
R

R
D
1 0
9 2
V
A
R
N
E
R

R
D
1 7
0 -
-
2 0
3 -
-
1 1
2 V
A
R
N
E
R

R
D
7 7
9 V
A
R
N
E
R

R
D
3 0
7 5
-
-
6 0
1 -
-
4 1
5 -
-
9 -
-
6 6
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 6
0 5
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 D
I
N
A
H

S
H
O
R
E

D
R
1 5
3 4
D
I
N
A
H

S
H
O
R
E

D
R
1 2
7 9
3 0
T
H

A
V
E
7 4
3 3
0 T
H

A
V
E
3 2
4 V
E
R
O
N
A

R
D
7 5
9 V
E
R
O
N
A

R
D
4 4
8 -
-
7 2
4 -
-
5 2
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
5 1
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
3 2
7 -
-
1 5
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 4
7 4
3 -
-
1 9
8 -
-
1 4
7 -
-
8 2
7 -
-
4 5
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 6
6 3
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 -
-
4 -
-
1 -
-
4 -
-
5 7
7 -
-
2 2
8 E

B
A
R
I
S
T
O

R
D
1 1
0 7
E

B
A
R
I
S
T
O

R
D
1 2
4 4
-
-
3 8
7 -
-
2 1
8 -
-
4 8
3 -
-
4 3
3 D
I
N
A
H

S
H
O
R
E

D
R
1 3
0 6
D
I
N
A
H

S
H
O
R
E

D
R
1 7
3 4
-
-
2 8
6 -
-
1 2
4 -
-
2 1
2 -
-
2 5
8 V
E
R
O
N
A

R
D
0 V
E
R
O
N
A

R
D
0 -
-
0 -
-
0 V
I
S
T
A

C
H
I
N
O
2 3
1 4
V
I
S
T
A

C
H
I
N
O
3 3
1 3
-
-
5 4
9 -
-
3 4
3 -
-
6 1
-
-
2 0
-
-
1 -
-
5 -
-
1 3
-
-
3 3
-
-
9 6
-
-
9 2
E
L

C
I
E
L
O

R
D
4 9
8 -
-
1 7
1 -
-
1 4
2 D
A

V
A
L
L

D
R
1 4
9 1
D
A

V
A
L
L

D
R
1 2
6 5
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 3
9 9
4 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 5
-
-
6 2
E
L

C
I
E
L
O

R
D
2 9
3 D
I
N
A
H

S
H
O
R
E

D
R
1 2
1 9
D
I
N
A
H

S
H
O
R
E

D
R
1 3
4 2
L
A
N
D
A
U

B
L
V
D
1 5
2 1
L
A
N
D
A
U

B
L
V
D
1 2
4 8
V
I
S
T
A

C
H
I
N
O
2 2
4 2
V
I
S
T
A

C
H
I
N
O
3 1
9 4
C
R
O
S
S
L
E
Y

R
D
5 2
7 C
R
O
S
S
L
E
Y

R
D
6 4
9 R
A
M
O
N

R
D
3 3
4 4
R
A
M
O
N

R
D
3 6
9 8
R
A
M
O
N

R
D
3 3
2 0
R
A
M
O
N

R
D
5 7
8 7
-
-
4 6
7 -
-
4 4
5 -
-
3 8
4 -
-
3 1
6 -
-
2 0
2 -
-
3 2
8 -
-
0 -
-
0 D
A
T
E

P
A
L
M

D
R
6 1
7 D
A
T
E

P
A
L
M

D
R
1 5
5 9
-
-
4 4
1 -
-
4 7
4 -
-
4 9
0 -
-
2 9
3 E

M
E
S
Q
U
I
T
E

A
V
E
6 8
8 E

M
E
S
Q
U
I
T
E

A
V
E
3 9
6 -
-
1 2
1 2
-
-
0 -
-
1 0
3 -
-
2 0
0 -
-
2 0
7 -
-
1 0
0 D
A
T
E

P
A
L
M

D
R
2 1
6 0
D
A
T
E

P
A
L
M

D
R
2 8
8 0
E

M
E
S
Q
U
I
T
E

A
V
E
6 8
8 E

M
E
S
Q
U
I
T
E

A
V
E
3 9
6 -
-
2 7
5 -
-
1 3
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 7
5 2
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 D
I
N
A
H

S
H
O
R
E

D
R
1 2
8 4
D
I
N
A
H

S
H
O
R
E

D
R
1 2
5 9

RAMON RD
1975

RAMON RD
1251
V
A
R
N
E
R

R
D
1 1
5 5
V
A
R
N
E
R

R
D
1 6
4 -
-
5 9
-
-
2 9
6 E

B
A
R
I
S
T
O

R
D
1 1
1 4
E

B
A
R
I
S
T
O

R
D
1 2
0 2
-
-
6 3
8 -
-
3 7
1 -
-
9 6
-
-
7 2
7 -
-
0 -
-
0 D
A

V
A
L
L

D
R
1 0
3 5
D
A

V
A
L
L

D
R
1 3
0 6
-
-
1 7
4 -
-
8 5
-
-
5 3
5 -
-
1 9
4 -
-
7 2
9 -
-
4 7
6 D
A
T
E

P
A
L
M

D
R
2 2
9 7
D
A
T
E

P
A
L
M

D
R
3 0
9 8
E

R
A
M
O
N

R
D
1 8
4 3
E

R
A
M
O
N

R
D
3 2
3 7
-
-
1 9
9 -
-
1 9
8 L
A
N
D
A
U

B
L
V
D
1 2
6 1
L
A
N
D
A
U

B
L
V
D
2 3
5 1
R
A
M
O
N

R
D
3 6
0 7
R
A
M
O
N

R
D
3 8
2 4
-
-
5 8
0 -
-
3 1
2 D
A

V
A
L
L

D
R
1 1
6 D
A

V
A
L
L

D
R
4 7
7 N

G
E
N
E

A
U
T
R
Y

T
R
L
3 9
1 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 8
2 6
-
-
0 -
-
0 -
-
2 7
1 -
-
4 2
3 -
-
6 5
-
-
6 1
-
-
2 1
7 6
-
-
1 2
0 2
-
-
3 -
-
9 -
-
6 8
9 -
-
6 8
9 -
-
7 -
-
3 0
-
-
3 0
6 -
-
1 3
5 -
-
1 9
4 -
-
2 7
2 E

R
A
M
O
N

R
D
2 9
2 8
E

R
A
M
O
N

R
D
4 4
5 8
-
-
2 3
0 3
-
-
1 1
4 2
R
A
M
O
N

R
D
3 9
3 2
R
A
M
O
N

R
D
4 6
0 2
-
-
9 5
4 -
-
3 6
1 -
-
3 -
-
9 -
-
4 4
0 -
-
3 4
9 D
I
N
A
H

S
H
O
R
E

D
R
1 4
5 9
D
I
N
A
H

S
H
O
R
E

D
R
9 4
2 -
-
1 7
4 -
-
1 1
8 E

M
E
S
Q
U
I
T
E

A
V
E
1 3
3 6
E

M
E
S
Q
U
I
T
E

A
V
E
8 5
8 -
-
1 7
2 -
-
3 1
3 3
0 T
H

A
V
E
3 3
5 3
0 T
H

A
V
E
8 5
6 L
A
N
D
A
U

B
L
V
D
1 1
0 6
L
A
N
D
A
U

B
L
V
D
1 1
9 4
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
1 3
5 0
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 -
-
1 7
5 -
-
1 3
3 -
-
3 0
-
-
3 0
C
R
O
S
S
L
E
Y

R
D
5 6
1 C
R
O
S
S
L
E
Y

R
D
1 3
8 0
-
-
6 2
1 -
-
1 6
2 V
A
R
N
E
R

R
D
1 0
9 9
V
A
R
N
E
R

R
D
1 6
3 -
-
1 9
3 -
-
9 8
-
-
2 5
7 -
-
7 7
5 E

M
E
S
Q
U
I
T
E

A
V
E
1 2
9 8
E

M
E
S
Q
U
I
T
E

A
V
E
1 9
1 2
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 3
2 8
S

G
E
N
E

A
U
T
R
Y

T
R
L
2 2
7 1
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 2
4 3
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 8
6 2
E

M
E
S
Q
U
I
T
E

A
V
E
1 1
3 0
E

M
E
S
Q
U
I
T
E

A
V
E
1 8
8 4
S

E
L

C
I
E
L
O

R
D
7 8
8 -
-
5 4
-
-
1 4
3 P
L
U
M
L
E
Y

R
D
0 P
L
U
M
L
E
Y

R
D
0 S

G
E
N
E

A
U
T
R
Y

T
R
L
1 2
5 9
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 8
1 0
-
-
7 3
1 -
-
3 2
7 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
9 6
-
-
1 2
5 -
-
0 -
-
1 0
4 0
-
-
1 2
8 5
3 0
T
H

A
V
E
5 0
6 3
0 T
H

A
V
E
4 3
3 C
R
O
S
S
L
E
Y

R
D
7 6
0 C
R
O
S
S
L
E
Y

R
D
1 0
4 1
-
-
2 5
3 -
-
6 4
5 E

R
A
M
O
N

R
D
1 6
4 7
E

R
A
M
O
N

R
D
2 7
9 6
E

R
A
M
O
N

R
D
1 6
5 2
E

R
A
M
O
N

R
D
2 8
0 7
D
A

V
A
L
L

D
R
9 5
3 D
A

V
A
L
L

D
R
1 0
9 9
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 6
2 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 2
1 -
-
1 4
7 3
-
-
9 6
0 -
-
9 7
8 -
-
4 4
7 -
-
5 9
3 -
-
5 6
0 R
A
M
O
N

R
D
3 2
5 5
R
A
M
O
N

R
D
4 8
7 8
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 5
8 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 6
3 2
D
I
N
A
H

S
H
O
R
E

D
R
1 4
5 9
D
I
N
A
H

S
H
O
R
E

D
R
9 4
2 V
I
S
T
A

C
H
I
N
O
2 3
1 4
V
I
S
T
A

C
H
I
N
O
3 3
1 3
V
A
R
N
E
R

R
D
1 0
9 4
V
A
R
N
E
R

R
D
1 6
5 -
-
8 8
-
-
4 1
2 L
A
N
D
A
U

B
L
V
D
1 3
1 6
L
A
N
D
A
U

B
L
V
D
2 3
0 0
D
A

V
A
L
L

D
R
9 8
6 D
A

V
A
L
L

D
R
1 2
8 0
-
-
3 8
9 -
-
1 5
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 4
8 9
1 B
O
B

H
O
P
E

D
R
1 5
4 0
B
O
B

H
O
P
E

D
R
4 8
1 5
-
-
5 3
-
-
2 7
-
-
4 0
-
-
2 5
5 -
-
1 6
-
-
7 5
D
A
T
E

P
A
L
M

D
R
2 1
0 0
D
A
T
E

P
A
L
M

D
R
3 2
8 0
D
A
T
E

P
A
L
M

D
R
6 6
9 D
A
T
E

P
A
L
M

D
R
1 6
9 8
-
-
4 0
9 -
-
3 5
1 -
-
2 4
6 2
-
-
0 M
C

C
A
L
L
U
M

W
A
Y
1 1
5 3
M
C

C
A
L
L
U
M

W
A
Y
9 0
8 -
-
4 1
6 -
-
5 2
1 -
-
1 2
5 -
-
0 L
A
N
D
A
U

B
L
V
D
1 0
4 0
L
A
N
D
A
U

B
L
V
D
1 7
1 2
-
-
0 -
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 4
7 4
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 1
2 -
-
3 3
2 E
L

C
I
E
L
O

R
D
6 8
6 D
A
T
E

P
A
L
M

D
R
2 9
4 0
D
A
T
E

P
A
L
M

D
R
3 6
4 6
D
A
T
E

P
A
L
M

D
R
3 8
7 4
D
A
T
E

P
A
L
M

D
R
5 0
6 8
-
-
6 3
7 -
-
0 -
-
6 3
7 -
-
0 -
-
8 2
-
-
4 6
1 C
R
O
S
S
L
E
Y

R
D
4 3
2 C
R
O
S
S
L
E
Y

R
D
3 8
2 -
-
1 3
9 -
-
1 0
9 M
C

C
A
L
L
U
M

W
A
Y
8 1
7 M
C

C
A
L
L
U
M

W
A
Y
7 1
5 -
-
2 2
5 -
-
0 -
-
2 -
-
6 3
0 T
H

A
V
E
5 1
7 3
0 T
H

A
V
E
3 5
0 -
-
1 -
-
0 E

M
E
S
Q
U
I
T
E

A
V
E
6 8
8 E

M
E
S
Q
U
I
T
E

A
V
E
3 9
6 -
-
1 0
0 1
-
-
0 -
-
1 5
5 2
-
-
0 -
-
9 9
2 -
-
0 34TH AVE
107
34TH AVE
222
-
-
0 D
A

V
A
L
L

D
R
9 6
7 D
A

V
A
L
L

D
R
1 2
9 0
-
-
2 8
-
-
7 8
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 SAN LUIS REY DR
0 SAN LUIS REY DR
0 -
-
0 -
-
0 R
A
M
O
N

R
D
3 4
3 4
R
A
M
O
N

R
D
3 7
8 8
R
A
M
O
N

R
D
3 3
1 5
R
A
M
O
N

R
D
5 7
5 8
--
0 --
0 -
-
2 4
2 3
-
-
0 D
I
N
A
H

S
H
O
R
E

D
R
1 3
6 9
D
I
N
A
H

S
H
O
R
E

D
R
1 9
6 5
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 6
6 3
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 4
6 1
8 --
0 --
0 V
I
S
T
A

C
H
I
N
O
2 9
2 V
I
S
T
A

C
H
I
N
O
1 7
8 -
-
1 3
8 -
-
3 5
8 -
-
2 4
-
-
1 8
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
5 2
0 V
I
S
T
A

C
H
I
N
O
2 1
5 8
V
I
S
T
A

C
H
I
N
O
3 1
7 1
R
A
M
O
N

R
D
3 2
5 7
R
A
M
O
N

R
D
3 8
4 4
V
E
R
O
N
A

R
D
9 8
3 V
E
R
O
N
A

R
D
5 5
9 -
-
4 7
1 -
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
5 1
7 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 3
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 2
0 -
-
0 -
-
1 D
A

V
A
L
L

D
R
1 1
6 D
A

V
A
L
L

D
R
4 7
7 L
A
N
D
A
U

B
L
V
D
9 0
6 L
A
N
D
A
U

B
L
V
D
2 4
7 -
-
2 6
4 3
-
-
0 D
A

V
A
L
L

D
R
1 3
1 4
D
A

V
A
L
L

D
R
9 7
3 -
-
6 1
6 -
-
0 L
A
N
D
A
U

B
L
V
D
8 L
A
N
D
A
U

B
L
V
D
2 2
S
A
N

L
U
I
S

R
E
Y

D
R
0 S
A
N

L
U
I
S

R
E
Y

D
R
0 D
A
T
E

P
A
L
M

D
R
2 1
4 7
D
A
T
E

P
A
L
M

D
R
3 0
4 1
-
-
2 -
-
6 N

G
E
N
E

A
U
T
R
Y

T
R
L
2 0
4 7
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 1
6 8
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 8
6 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 2
4 3
-
-
2 -
-
6 M
C

C
A
L
L
U
M

W
A
Y
1 1
5 3
M
C

C
A
L
L
U
M

W
A
Y
9 0
8 S
A
N

L
U
I
S

R
E
Y

D
R
6 7
8 S
A
N

L
U
I
S

R
E
Y

D
R
5 0
6 V
I
S
T
A

C
H
I
N
O
2 2
7 9
V
I
S
T
A

C
H
I
N
O
2 9
5 1
-
-
0 -
-
4 R
A
M
O
N

R
D
3 4
9 5
R
A
M
O
N

R
D
4 6
9 6
-
-
9 4
-
-
2 5
6 -
-
1 7
2 9
-
-
0 -
-
2 6
4 3
--
0 D
A
T
E

P
A
L
M

D
R
2 2
6 4
D
A
T
E

P
A
L
M

D
R
3 3
6 5
3 0
T
H

A
V
E
9 9
7 3
0 T
H

A
V
E
4 2
6 3
0 T
H

A
V
E
1 0
2 5
3 0
T
H

A
V
E
6 7
5 -
-
1 6
6 -
-
7 1
-
-
1 0
0 1
-
-
0 -
-
5 7
-
-
6 -
-
4 8
-
-
1 7
5 D
A
T
E

P
A
L
M

D
R
3 1
5 4
D
A
T
E

P
A
L
M

D
R
4 1
3 8
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 8
5 7
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 1
9 2
M
C

C
A
L
L
U
M

W
A
Y
7 4
5 M
C

C
A
L
L
U
M

W
A
Y
1 0
2 6
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 9
9 9
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 9
9 3
M
C

C
A
L
L
U
M

W
A
Y
1 0
1 8
M
C

C
A
L
L
U
M

W
A
Y
8 1
7 -
-
0 -
-
0 D
A
T
E

P
A
L
M

D
R
2 1
2 1
D
A
T
E

P
A
L
M

D
R
3 0
6 1
D
A
T
E

P
A
L
M

D
R
3 0
2 2
D
A
T
E

P
A
L
M

D
R
3 8
8 1
-
-
2 4
2 3
-
-
0 D
A
T
E

P
A
L
M

D
R
8 6
7 D
A
T
E

P
A
L
M

D
R
2 1
0 0
-
-
2 -
-
6 -
-
0 -
-
0 M
C

C
A
L
L
U
M

W
A
Y
8 0
5 M
C

C
A
L
L
U
M

W
A
Y
7 0
9 B
O
B

H
O
P
E

D
R
1 3
4 8
B
O
B

H
O
P
E

D
R
3 5
7 0
R
A
M
O
N

R
D
2 5
7 6
R
A
M
O
N

R
D
4 3
7 2
-
-
2 -
-
6 -
-
2 0
-
-
4 6
R
A
M
O
N

R
D
2 6
4 8
R
A
M
O
N

R
D
4 1
2 8
-
-
1 9
2 -
-
5 0
8 -
-
7 6
-
-
8 6
E

B
A
R
I
S
T
O

R
D
1 1
6 4
E

B
A
R
I
S
T
O

R
D
0 D
A
T
E

P
A
L
M

D
R
2 3
4 1
D
A
T
E

P
A
L
M

D
R
3 0
1 4
E
L

C
I
E
L
O

R
D
7 1
8 D
A

V
A
L
L

D
R
1 0
4 6
D
A

V
A
L
L

D
R
1 2
2 2
-
-
0 -
-
0 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
8 0
7 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 3
4 T
H

A
V
E
0 3
4 T
H

A
V
E
0 -
-
2 8
1 -
-
9 8
5 -
-
9 9
2 -
-
0 -
-
7 9
-
-
2 1
0 D
A
T
E

P
A
L
M

D
R
2 1
2 1
D
A
T
E

P
A
L
M

D
R
3 0
6 1
-
-
3 3
-
-
1 5
L
A
N
D
A
U

B
L
V
D
1 5
2 1
L
A
N
D
A
U

B
L
V
D
1 2
4 8
D
I
N
A
H

S
H
O
R
E

D
R
1 2
8 4
D
I
N
A
H

S
H
O
R
E

D
R
1 2
5 9
-
-
5 2
-
-
1 1
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 3
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 2
0 3
0 T
H

A
V
E
6 8
6 3
0 T
H

A
V
E
3 1
8 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 6
2 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 2
1 -
-
1 7
2 9
-
-
0 -
-
2 4
6 2
-
-
0 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
9 8
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 7
2 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 9
4 R
A
M
O
N

R
D
3 2
5 7
R
A
M
O
N

R
D
3 8
4 4
-
-
4 7
1 -
-
0 D
A

V
A
L
L

D
R
1 1
6 D
A

V
A
L
L

D
R
4 7
7 -
-
2 5
6 -
-
9 4
D
A

V
A
L
L

D
R
1 0
0 9
D
A

V
A
L
L

D
R
1 2
7 9
-
-
2 9
1 -
-
0 3
4 T
H

A
V
E
9 0
3 4
T
H

A
V
E
1 8
0 -
-
3 -
-
1 -
-
2 4
2 3
-
-
0 -
-
8 9
7 -
-
0 S
A
N

L
U
I
S

R
E
Y

D
R
4 1
5 S
A
N

L
U
I
S

R
E
Y

D
R
6 0
1 -
-
8 9
7 -
-
0 R
A
M
O
N

R
D
3 4
9 5
R
A
M
O
N

R
D
4 6
9 6
D
A
T
E

P
A
L
M

D
R
2 1
5 3
D
A
T
E

P
A
L
M

D
R
2 9
3 6
D
A
T
E

P
A
L
M

D
R
2 4
2 3
D
A
T
E

P
A
L
M

D
R
3 1
4 3
-
-
1 7
2 9
-
-
0 -
-
2 7
6 -
-
1 1
4 R
A
M
O
N

R
D
3 5
5 1
R
A
M
O
N

R
D
3 7
8 4
-
-
1 5
5 2
-
-
0 D
A

V
A
L
L

D
R
5 7
7 D
A

V
A
L
L

D
R
5 9
1 -
-
2 2
5 -
-
0 -
-
5 3
-
-
1 1
4 V
A
R
N
E
R

R
D
1 5
4 9
V
A
R
N
E
R

R
D
1 9
5 -
-
6 1
6 -
-
0 D
A
T
E

P
A
L
M

D
R
9 3
6 D
A
T
E

P
A
L
M

D
R
2 1
7 4
E

B
A
R
I
S
T
O

R
D
1 2
4 4
E

B
A
R
I
S
T
O

R
D
1 1
0 7
D
A
T
E

P
A
L
M

D
R
6 6
8 D
A
T
E

P
A
L
M

D
R
1 6
8 4
-
-
1 2
1 2
B
O
B

H
O
P
E

D
R
1 3
4 8
B
O
B

H
O
P
E

D
R
3 5
7 0
-
-
1 0
8 -
-
2 1
9 D
A
T
E

P
A
L
M

D
R
2 0
6 5
D
A
T
E

P
A
L
M

D
R
4 1
7 3
D
A

V
A
L
L

D
R
5 7
7 D
A

V
A
L
L

D
R
5 9
1 E BARISTO RD
473

E BARISTO RD
0 D
A
T
E

P
A
L
M

D
R
2 5
5 1
D
A
T
E

P
A
L
M

D
R
3 0
9 3
D
A
T
E

P
A
L
M

D
R
2 0
6 5
D
A
T
E

P
A
L
M

D
R
4 1
7 3
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 BOB HOPE DR
1358

BOB HOPE DR
3530
L
A
N
D
A
U

B
L
V
D
1 1
5 6
L
A
N
D
A
U

B
L
V
D
1 1
9 4
RIVCOM 4.01 - 2045 AM peak period volumes (Wren Resi + Date Palm + Vallarata) 0 .05
.1
.15
Miles
HCMType
CC (6866)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12488)
PrArterial (8422)
AM Peak Hour Growth
Intersection ApproachRIVCOM
2018
RIVCOM
2045
RIVCOM
2018 to
RIVCOM
2045
Annual
Growth
Rate
Adjusted
2023 Plus 3
Projects
Adjusted
2045 Plus
Project
E 967 1218 0.96% 598 719
S 5661 7292 1.07% 1640 2008
W 616 1532 5.51% 630 1359
N 4997 5566 0.42% 1710 1861
E 153 163 0.24% 607 638
S 4383 5355 0.82% 1695 1987
W 352 350 0.19% 438 455
N 4212 5188 0.86% 1914 2259
E 925 1004 0.32% 831 886
S 4150 5089 0.84% 1959 2304
W 1555 1700 0.35% 805 863
N 5140 5395 0.18% 2073 2153
1 2
3 63% 37%
1079 1,710 631
↓ ↑
68 916 95
↙ ↓ ↘ ↖ 58
39% 248 ← ← 140 ← 257 43%
630 84 ↗ 2289 ↙ 59 598
61% 382 → 204 → → 341 57%
94 ↘ ↖ ↑ ↗
40 489 42
↓ ↑
1069 1,640 571
65% 35%
1156 1861 687
↓ ↑
155 953 48
↙ ↓ ↘ ↖ 26
535 ← ← 231 ← 303
1359 166 ↗ 2,939 ↙ 44 719
804 → 326 → → 410
311 ↘ ↖ ↑ ↗
149 495 34
↓ ↑
1309 2008 678
Existing Turning Movements
Existing Peak Hour Counts per intersection leg
Forecasted Peak Hour per intersection leg
Scenario:Adjusted 2023 Plus 3 Projects AM
N/S Street:Date Palm Drive
E/W Street:McCallum Way
Intersection #: 1
Scenario: 2045+P AM
N/S Street:Date Palm Drive
E/W Street:McCallum Way
Legend
59% 41%
1133 1,914 781
↓ ↑
79 897 157
↙ ↓ ↘ ↖ 205
58% 256 ← ← 79 ← 353 58%
438 56 ↗ 2327 ↙ 69 607
42% 182 → 56 → → 254 42%
70 ↘ ↖ ↑ ↗
98 520 41
↓ ↑
1036 1,695 659
61% 39%
1333 2259 922
↓ ↑
89 1072 172
↙ ↓ ↘ ↖ 227
266 ← ← 75 ← 372
455 63 ↗ 2,669 ↙ 70 638
189 → 53 → → 267
72 ↘ ↖ ↑ ↗
102 631 42
↓ ↑
1214 1987 775
Existing Turning Movements
Existing Peak Hour Counts per intersection leg
Forecasted Peak Hour per intersection leg
Scenario: 2045 Plus Project
N/S Street:Date Palm Drive
E/W Street:Rosemount Road
Legend
Scenario:Adjusted 2023 Plus 3 Projects
N/S Street:Date Palm Drive
E/W Street:Rosemount Road
Intersection #: 2
61% 39%
1255 2,073 818
↓ ↑
62 986 207
↙ ↓ ↘ ↖ 148
44% 351 ← ← 127 ← 349 42%
805 93 ↗ 2834 ↙ 74 831
56% 454 → 238 → → 482 58%
123 ↘ ↖ ↑ ↗
162 577 37
↓ ↑
1183 1,959 776
60% 40%
1348 2153 850
↓ ↑
45 1111 192
↙ ↓ ↘ ↖ 132
376 ← ← 128 ← 375
863 72 ↗ 3,131 ↙ 115 886
499 → 263 → → 514
165 ↘ ↖ ↑ ↗
204 646 59
↓ ↑
1391 2304 909
Existing Turning Movements
Existing Peak Hour Counts per intersection leg
Forecasted Peak Hour per intersection leg
Scenario:Adjusted 2023 Plus 3 Projects AM
N/S Street:Date Palm Drive
E/W Street:30th Avenue
Intersection #: 3
Scenario: 2045 + P AM
N/S Street:Date Palm Drive
E/W Street:30th Avenue
Legend
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
1 1
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
1 1
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
R
N
E
R

R
D
1 2
6 V
A
R
N
E
R

R
D
3 3
4 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 7
8 3
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
5 0
-
-
1 2
-
-
5 4
-
-
2 1
-
-
1 4
8 -
-
1 5
0 N

G
E
N
E

A
U
T
R
Y

T
R
L
3 9
2 0
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 2
7 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 9
2 0
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 2
7 3
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
5 6
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
5 6
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 7
-
-
2 9
-
-
2 -
-
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
5 0
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
5 0
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
7 3
-
-
1 1
1 -
-
3 -
-
2 R
A
M
O
N

R
D
3 5
2 8
R
A
M
O
N

R
D
3 7
6 6
-
-
3 -
-
2 -
-
1 2
4 -
-
2 9
-
-
3 8
3 -
-
2 8
8 -
-
1 7
4 -
-
1 3
2 -
-
2 9
-
-
4 9
-
-
1 -
-
1 -
-
2 -
-
1 -
-
1 -
-
1 N

G
E
N
E

A
U
T
R
Y

T
R
L
2 0
4 7
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 8
7 3
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 2
7 7
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 7
7 7
-
-
1 3
-
-
1 0
-
-
6 8
-
-
9 8
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 8
3 9
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 4
5 4
-
-
0 -
-
0 -
-
1 5
6 -
-
9 8
-
-
3 -
-
1 -
-
7 4
2 -
-
5 9
0 -
-
2 -
-
1 -
-
6 2
-
-
3 2
D
I
N
A
H

S
H
O
R
E

D
R
5 5
3 D
I
N
A
H

S
H
O
R
E

D
R
7 3
8 -
-
3 3
-
-
1 2
-
-
2 8
-
-
1 5
A
V
E
I
D
A

Q
U
I
N
T
A
N
A
8 7
A
V
E
I
D
A

Q
U
I
N
T
A
N
A
8 2
-
-
4 2
2 -
-
3 1
9 V
I
S
T
A

C
H
I
N
O
2 6
0 5
V
I
S
T
A

C
H
I
N
O
2 5
4 3
-
-
4 6
6 -
-
1 7
5 -
-
3 0
6 -
-
6 4
-
-
4 2
-
-
1 1
2 -
-
1 8
-
-
5 -
-
0 -
-
0 M
C

C
A
L
L
U
M

W
A
Y
1 9
6 M
C

C
A
L
L
U
M

W
A
Y
2 8
6 -
-
2 -
-
1 DINAH SHORE DR
860

DINAH SHORE DR
772
-
-
6 8
1 -
-
5 0
6 DINAH SHORE DR
822

DINAH SHORE DR
800
D
I
N
A
H

S
H
O
R
E

D
R
8 2
2 D
I
N
A
H

S
H
O
R
E

D
R
8 0
0 V
I
S
T
A

C
H
I
N
O
2 5
3 7
V
I
S
T
A

C
H
I
N
O
2 2
2 4
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
3 4
6 5
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
3 7
0 3
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 6
3 9
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
1 5
1 9
D
A
T
E

P
A
L
M

D
R
3 5
1 9
D
A
T
E

P
A
L
M

D
R
2 8
8 9
D
A

V
A
L
L

D
R
9 1
4 D
A

V
A
L
L

D
R
7 4
2 D
A

V
A
L
L

D
R
7 6
2 D
A

V
A
L
L

D
R
5 7
8 M
C

C
A
L
L
U
M

W
A
Y
6 4
7 M
C

C
A
L
L
U
M

W
A
Y
5 3
5 L
A
N
D
A
U

B
L
V
D
1 0
2 9
L
A
N
D
A
U

B
L
V
D
9 7
2 L
A
N
D
A
U

B
L
V
D
1 3
4 3
L
A
N
D
A
U

B
L
V
D
1 2
3 4
V
A
R
N
E
R

R
D
1 4
2 V
A
R
N
E
R

R
D
3 0
2 V
A
R
N
E
R

R
D
1 4
7 V
A
R
N
E
R

R
D
3 0
4 L
A
N
D
A
U

B
L
V
D
2 0
8 4
L
A
N
D
A
U

B
L
V
D
1 4
9 3
R
A
M
O
N

R
D
3 4
0 6
R
A
M
O
N

R
D
3 6
8 0
R
A
M
O
N

R
D
3 6
1 9
R
A
M
O
N

R
D
3 9
1 8
-
-
1 2
5 -
-
1 4
9 3
0 T
H

A
V
E
3 1
5 3
0 T
H

A
V
E
3 8
8 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
5 6
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
5 6
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
I
S
T
A

C
H
I
N
O
2 5
4 3
V
I
S
T
A

C
H
I
N
O
2 7
3 7
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 5
3 3
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
R
N
E
R

R
D
1 3
6 V
A
R
N
E
R

R
D
3 0
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
5 0
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
5 0
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 0
1 -
-
1 7
9 -
-
1 -
-
1 -
-
2 -
-
1 -
-
1 5
0 -
-
2 5
7 RAMON RD
3491

RAMON RD
3770
-
-
0 -
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 0
0 9
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 6
2 2
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
5 4
-
-
1 0
5 -
-
1 -
-
0 V
A
R
N
E
R

R
D
1 6
5 3
V
A
R
N
E
R

R
D
7 6
7 V
A
R
N
E
R

R
D
1 3
9 V
A
R
N
E
R

R
D
3 0
1 -
-
1 2
1 -
-
1 5
5 -
-
1 0
8 -
-
1 7
2 -
-
3 5
-
-
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 1
2 6
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 E

V
I
S
T
A

C
H
I
N
O
4 8
8 6
E

V
I
S
T
A

C
H
I
N
O
4 1
3 6
3 0
T
H

A
V
E
5 4
7 3
0 T
H

A
V
E
6 0
3 V
E
R
O
N
A

R
D
1 4
3 V
E
R
O
N
A

R
D
1 2
5 -
-
3 5
7 -
-
4 8
0 E

M
E
S
Q
U
I
T
E

A
V
E
1 0
7 7
E

M
E
S
Q
U
I
T
E

A
V
E
8 1
6 E

M
E
S
Q
U
I
T
E

A
V
E
1 1
0 6
E

M
E
S
Q
U
I
T
E

A
V
E
8 5
6 -
-
2 -
-
1 -
-
5 1
6 -
-
6 5
6 -
-
4 3
4 -
-
9 5
1 -
-
1 2
4 -
-
1 4
2 -
-
3 9
9 -
-
5 2
9 -
-
3 6
2 -
-
4 8
3 -
-
2 -
-
1 -
-
3 2
0 -
-
5 4
7 -
-
2 8
5 -
-
3 7
8 -
-
3 -
-
2 -
-
1 8
4 -
-
1 0
7 -
-
0 -
-
0 -
-
3 3
2 -
-
5 2
0 -
-
2 -
-
1 -
-
3 2
-
-
2 1
-
-
2 -
-
1 -
-
1 -
-
1 -
-
2 1
1 -
-
2 0
6 E
L

C
I
E
L
O

R
D
1 6
2 E
L

C
I
E
L
O

R
D
5 2
-
-
2 8
-
-
1 3
V
I
S
T
A

C
H
I
N
O
2 9
7 9
V
I
S
T
A

C
H
I
N
O
2 4
7 0
V
I
S
T
A

C
H
I
N
O
3 0
5 9
V
I
S
T
A

C
H
I
N
O
2 5
0 7
D
I
N
A
H

S
H
O
R
E

D
R
6 7
0 D
I
N
A
H

S
H
O
R
E

D
R
9 3
4 D
I
N
A
H

S
H
O
R
E

D
R
9 8
0 D
I
N
A
H

S
H
O
R
E

D
R
1 0
9 3
E

B
A
R
I
S
T
O

R
D
9 1
2 E

B
A
R
I
S
T
O

R
D
1 4
8 E

B
A
R
I
S
T
O

R
D
8 7
4 E

B
A
R
I
S
T
O

R
D
1 3
2 -
-
2 1
5 -
-
2 2
7 R
A
M
O
N

R
D
4 8
0 5
R
A
M
O
N

R
D
4 6
5 3
-
-
3 2
1 -
-
2 6
0 -
-
4 7
3 -
-
5 8
1 D
I
N
A
H

S
H
O
R
E

D
R
7 2
8 D
I
N
A
H

S
H
O
R
E

D
R
8 4
7 D
I
N
A
H

S
H
O
R
E

D
R
5 5
3 D
I
N
A
H

S
H
O
R
E

D
R
7 3
8 -
-
2 3
8 -
-
1 8
1 -
-
2 2
3 -
-
2 0
1 -
-
8 8
-
-
7 7
-
-
2 2
8 0
-
-
0 -
-
3 2
8 -
-
4 2
0 D
A
T
E

P
A
L
M

D
R
1 3
5 9
D
A
T
E

P
A
L
M

D
R
6 8
2 D
A
T
E

P
A
L
M

D
R
1 3
6 0
D
A
T
E

P
A
L
M

D
R
6 8
5 -
-
2 3
4 -
-
3 3
1 -
-
6 5
-
-
3 0

RAMON RD
1412

RAMON RD
293
-
-
4 8
5 -
-
6 8
9 -
-
0 -
-
0 D
A

V
A
L
L

D
R
8 9
2 D
A

V
A
L
L

D
R
7 2
5 -
-
4 7
2 -
-
8 0
2 -
-
1 3
3 -
-
2 1
0 -
-
5 8
6 -
-
3 5
1 -
-
3 5
1 -
-
4 0
1 -
-
1 4
5 -
-
9 0
-
-
1 3
0 -
-
1 4
2 D
A
T
E

P
A
L
M

D
R
3 4
9 4
D
A
T
E

P
A
L
M

D
R
2 9
3 1
D
I
N
A
H

S
H
O
R
E

D
R
6 7
0 D
I
N
A
H

S
H
O
R
E

D
R
9 3
4 -
-
2 -
-
1 C
R
O
S
S
L
E
Y

R
D
5 7
5 C
R
O
S
S
L
E
Y

R
D
5 9
3 C
R
O
S
S
L
E
Y

R
D
3 9
4 C
R
O
S
S
L
E
Y

R
D
5 0
4 -
-
3 0
7 -
-
2 9
5 -
-
1 4
3 6
-
-
1 2
1 6
-
-
4 1
4 -
-
5 8
3 -
-
4 7
0 -
-
5 5
9 V
A
R
N
E
R

R
D
1 3
6 V
A
R
N
E
R

R
D
3 0
2 -
-
9 5
-
-
9 6
-
-
7 1
0 -
-
7 2
0 -
-
2 0
1 -
-
2 9
5 E

R
A
M
O
N

R
D
4 4
4 8
E

R
A
M
O
N

R
D
3 2
7 6
-
-
2 -
-
1 V
E
R
O
N
A

R
D
2 2
5 V
E
R
O
N
A

R
D
2 1
2 V
E
R
O
N
A

R
D
0 V
E
R
O
N
A

R
D
0 R
A
M
O
N

R
D
4 7
2 5
R
A
M
O
N

R
D
4 3
3 6
-
-
5 5
4 -
-
9 5
3 -
-
2 -
-
1 -
-
2 4
2 -
-
1 5
7 -
-
4 0
8 -
-
4 7
7 N

G
E
N
E

A
U
T
R
Y

T
R
L
2 1
4 9
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 5
9 8
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 0
3 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 9
3 5
-
-
2 -
-
1 -
-
5 -
-
1 1
E

M
E
S
Q
U
I
T
E

A
V
E
4 5
4 E

M
E
S
Q
U
I
T
E

A
V
E
4 9
9 -
-
1 4
0 9
-
-
2 2
7 0
3 0
T
H

A
V
E
9 1
1 3
0 T
H

A
V
E
5 2
1 -
-
1 3
3 -
-
2 0
1 -
-
4 6
1 -
-
2 7
6 R
A
M
O
N

R
D
5 4
1 3
R
A
M
O
N

R
D
4 0
3 6
R
A
M
O
N

R
D
5 4
1 4
R
A
M
O
N

R
D
4 0
3 7
-
-
3 1
7 -
-
2 2
0 E

M
E
S
Q
U
I
T
E

A
V
E
1 1
9 7
E

M
E
S
Q
U
I
T
E

A
V
E
1 0
9 2
E

M
E
S
Q
U
I
T
E

A
V
E
1 2
8 2
E

M
E
S
Q
U
I
T
E

A
V
E
9 9
6 S

E
L

C
I
E
L
O

R
D
1 1
4 C
R
O
S
S
L
E
Y

R
D
1 2
0 6
C
R
O
S
S
L
E
Y

R
D
1 0
1 4
C
R
O
S
S
L
E
Y

R
D
7 4
4 C
R
O
S
S
L
E
Y

R
D
7 3
7 P
L
U
M
L
E
Y

R
D
0 P
L
U
M
L
E
Y

R
D
0 -
-
1 7
1 5
-
-
2 2
1 1
-
-
4 2
9 -
-
7 1
6 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 1
4 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
6 3
-
-
3 2
-
-
5 0
3 0
T
H

A
V
E
5 9
6 3
0 T
H

A
V
E
6 0
5 L
A
N
D
A
U

B
L
V
D
1 2
5 L
A
N
D
A
U

B
L
V
D
1 4
3 L
A
N
D
A
U

B
L
V
D
1 2
2 1
L
A
N
D
A
U

B
L
V
D
9 1
4 R
A
M
O
N

R
D
4 7
4 8
R
A
M
O
N

R
D
3 9
6 2
-
-
6 1
5 -
-
1 0
1 2
V
A
R
N
E
R

R
D
1 3
8 V
A
R
N
E
R

R
D
3 0
1 D
A

V
A
L
L

D
R
3 8
8 D
A

V
A
L
L

D
R
3 1
5 D
A

V
A
L
L

D
R
4 9
6 D
A

V
A
L
L

D
R
4 9
9 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 -
-
2 9
1 -
-
3 8
0 -
-
2 6
3 -
-
1 2
6 -
-
2 7
8 -
-
4 5
5 B
O
B

H
O
P
E

D
R
3 7
4 2
B
O
B

H
O
P
E

D
R
3 6
0 2
D
A
T
E

P
A
L
M

D
R
3 6
0 5
D
A
T
E

P
A
L
M

D
R
2 8
0 2
-
-
2 5
7 -
-
2 9
5 M
C

C
A
L
L
U
M

W
A
Y
8 9
2 M
C

C
A
L
L
U
M

W
A
Y
9 6
9 -
-
0 -
-
0 -
-
4 9
4 -
-
4 3
4 -
-
2 8
2 -
-
1 7
3 D
A
T
E

P
A
L
M

D
R
1 3
9 8
D
A
T
E

P
A
L
M

D
R
9 1
3 D
A
T
E

P
A
L
M

D
R
2 0
8 1
D
A
T
E

P
A
L
M

D
R
1 4
1 7
D
A
T
E

P
A
L
M

D
R
3 7
6 9
D
A
T
E

P
A
L
M

D
R
2 7
8 1
-
-
2 9
-
-
3 8
D
A
T
E

P
A
L
M

D
R
5 2
7 0
D
A
T
E

P
A
L
M

D
R
4 8
3 4
-
-
3 7
6 -
-
2 0
5 RAMON RD
3423

RAMON RD
3652
R
A
M
O
N

R
D
3 7
4 1
R
A
M
O
N

R
D
4 0
0 8
-
-
2 -
-
1 -
-
1 4
8 -
-
1 8
1 -
-
2 8
-
-
3 9
-
-
2 -
-
1 -
-
2 8
3 -
-
4 3
3 0
T
H

A
V
E
5 0
7 3
0 T
H

A
V
E
5 6
7 -
-
3 0
7 -
-
1 7
4 -
-
2 5
0 7
-
-
0 V
I
S
T
A

C
H
I
N
O
3 0
5 9
V
I
S
T
A

C
H
I
N
O
2 5
0 7
V
I
S
T
A

C
H
I
N
O
2 8
1 7
V
I
S
T
A

C
H
I
N
O
2 1
6 9
D
A
T
E

P
A
L
M

D
R
1 5
6 9
D
A
T
E

P
A
L
M

D
R
9 5
2 D
A
T
E

P
A
L
M

D
R
1 3
9 8
D
A
T
E

P
A
L
M

D
R
9 1
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 R
A
M
O
N

R
D
4 7
9 8
R
A
M
O
N

R
D
4 6
5 7
-
-
3 1
7 9
-
-
0 E

M
E
S
Q
U
I
T
E

A
V
E
1 1
0 6
E

M
E
S
Q
U
I
T
E

A
V
E
8 5
6 --
0 --
0 -
-
1 9
6 -
-
8 1
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 0
0 9
1 D
I
N
A
H

S
H
O
R
E

D
R
1 1
0 6
D
I
N
A
H

S
H
O
R
E

D
R
8 5
6 D
I
N
A
H

S
H
O
R
E

D
R
1 1
0 6
D
I
N
A
H

S
H
O
R
E

D
R
8 5
6 E
L

C
I
E
L
O

R
D
1 9
4 E
L

C
I
E
L
O

R
D
1 6
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 2
5 6
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 3
4 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 9
0 -
-
2 -
-
1 D
A
T
E

P
A
L
M

D
R
3 0
4 4
D
A
T
E

P
A
L
M

D
R
2 2
3 7
-
-
2 -
-
1 D
I
N
A
H

S
H
O
R
E

D
R
0 D
I
N
A
H

S
H
O
R
E

D
R
0 -
-
4 2
3 -
-
8 5
S
A
N

L
U
I
S

R
E
Y

D
R
0 S
A
N

L
U
I
S

R
E
Y

D
R
0 S
A
N

L
U
I
S

R
E
Y

D
R
4 8
7 S
A
N

L
U
I
S

R
E
Y

D
R
6 1
7 -
-
2 -
-
1 D
A

V
A
L
L

D
R
9 8
7 D
A

V
A
L
L

D
R
9 4
5 V
I
S
T
A

C
H
I
N
O
2 6
2 4
V
I
S
T
A

C
H
I
N
O
2 3
0 6
E

M
E
S
Q
U
I
T
E

A
V
E
4 5
E

M
E
S
Q
U
I
T
E

A
V
E
2 5
E

M
E
S
Q
U
I
T
E

A
V
E
4 5
E

M
E
S
Q
U
I
T
E

A
V
E
2 5
-
-
2 -
-
1 -
-
2 6
3 -
-
2 0
2 -
-
3 -
-
2 E

M
E
S
Q
U
I
T
E

A
V
E
4 5
E

M
E
S
Q
U
I
T
E

A
V
E
2 5
-
-
2 0
2 2
-
-
0 E

M
E
S
Q
U
I
T
E

A
V
E
4 5
4 E

M
E
S
Q
U
I
T
E

A
V
E
4 9
9 N

G
E
N
E

A
U
T
R
Y

T
R
L
2 9
3 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 0
3 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 8
7 3
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 0
4 7
S
A
N

L
U
I
S

R
E
Y

D
R
5 2
9 S
A
N

L
U
I
S

R
E
Y

D
R
3 9
9 SAN LUIS REY DR
0 SAN LUIS REY DR
0 N

G
E
N
E

A
U
T
R
Y

T
R
L
2 8
9 3
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 2
6 4
M
C

C
A
L
L
U
M

W
A
Y
4 8
4 M
C

C
A
L
L
U
M

W
A
Y
6 3
8 N

G
E
N
E

A
U
T
R
Y

T
R
L
2 7
5 7
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 1
9 5
-
-
2 4
6 9
--
0 M
C

C
A
L
L
U
M

W
A
Y
8 9
2 M
C

C
A
L
L
U
M

W
A
Y
9 6
9 D
A
T
E

P
A
L
M

D
R
2 2
7 8
D
A
T
E

P
A
L
M

D
R
1 6
8 0
3 0
T
H

A
V
E
6 5
0 3
0 T
H

A
V
E
9 9
7 3
0 T
H

A
V
E
8 8
5 3
0 T
H

A
V
E
1 0
6 2
-
-
1 0
-
-
1 5
-
-
1 3
7 -
-
6 9
D
A
T
E

P
A
L
M

D
R
3 9
8 3
D
A
T
E

P
A
L
M

D
R
3 0
2 3
D
A
T
E

P
A
L
M

D
R
3 7
4 9
D
A
T
E

P
A
L
M

D
R
2 8
4 9
D
A
T
E

P
A
L
M

D
R
1 5
6 9
D
A
T
E

P
A
L
M

D
R
9 5
2 -
-
2 -
-
1 -
-
2 -
-
1 2
E

R
A
M
O
N

R
D
2 9
5 6
E

R
A
M
O
N

R
D
2 7
4 5
E

R
A
M
O
N

R
D
3 5
9 1
E

R
A
M
O
N

R
D
3 1
6 0
L
A
N
D
A
U

B
L
V
D
1 9
2 2
L
A
N
D
A
U

B
L
V
D
1 4
2 2
L
A
N
D
A
U

B
L
V
D
1 9
2 2
L
A
N
D
A
U

B
L
V
D
1 4
2 2
-
-
3 1
7 9
-
-
0 M
C

C
A
L
L
U
M

W
A
Y
8 7
0 M
C

C
A
L
L
U
M

W
A
Y
7 1
8 M
C

C
A
L
L
U
M

W
A
Y
5 8
1 M
C

C
A
L
L
U
M

W
A
Y
5 5
0 -
-
4 0
-
-
2 9
-
-
2 -
-
1 -
-
0 -
-
0 -
-
4 4
6 -
-
3 0
3 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
1 9
6 -
-
9 6
4 -
-
4 1
9 R
A
M
O
N

R
D
4 0
2 2
R
A
M
O
N

R
D
2 8
5 1
R
A
M
O
N

R
D
4 1
3 4
R
A
M
O
N

R
D
2 8
1 9
S

G
E
N
E

A
U
T
R
Y

T
R
L
2 3
5 5
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 7
9 4
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 7
6 8
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 4
4 4
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 7
6 8
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 4
4 4
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 7
6 8
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 4
4 4
E

R
A
M
O
N

R
D
2 9
5 6
E

R
A
M
O
N

R
D
2 7
4 5
E

R
A
M
O
N

R
D
2 9
0 0
E

R
A
M
O
N

R
D
2 7
1 0
E

R
A
M
O
N

R
D
2 9
0 0
E

R
A
M
O
N

R
D
2 7
1 0
E

R
A
M
O
N

R
D
2 9
0 0
E

R
A
M
O
N

R
D
2 7
1 0
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 9
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 7
4 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 9
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 7
4 E

B
A
R
I
S
T
O

R
D
9 3
7 E

B
A
R
I
S
T
O

R
D
0 R
A
M
O
N

R
D
4 6
2 1
R
A
M
O
N

R
D
3 4
3 6
-
-
9 1
-
-
7 0
R
A
M
O
N

R
D
4 6
2 1
R
A
M
O
N

R
D
3 4
3 6
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 9
2 0
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 2
7 3
N

G
E
N
E

A
U
T
R
Y

T
R
L
4 0
3 7
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 3
4 7
L
A
N
D
A
U

B
L
V
D
1 9
2 6
L
A
N
D
A
U

B
L
V
D
1 4
8 7
L
A
N
D
A
U

B
L
V
D
1 9
2 6
L
A
N
D
A
U

B
L
V
D
1 4
8 7
D
A
T
E

P
A
L
M

D
R
1 3
6 2
D
A
T
E

P
A
L
M

D
R
6 8
9 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
2 0
6 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 D
A
T
E

P
A
L
M

D
R
3 0
9 9
D
A
T
E

P
A
L
M

D
R
2 4
0 0
-
-
1 2
9 4
-
-
0 -
-
1 2
9 4
-
-
0 -
-
2 0
-
-
3 0
-
-
2 3
5 -
-
1 6
4 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
5 0
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
5 0
9 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 3
4 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 9
0 3
0 T
H

A
V
E
5 3
7 3
0 T
H

A
V
E
5 8
8 -
-
1 2
6 -
-
8 0
D
A

V
A
L
L

D
R
7 6
1 D
A

V
A
L
L

D
R
6 7
4 D
A

V
A
L
L

D
R
8 1
3 D
A

V
A
L
L

D
R
6 5
9 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
2 2
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 6
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 4
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 9
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 7
4 3
4 T
H

A
V
E
0 3
4 T
H

A
V
E
0 3
4 T
H

A
V
E
2 1
4 3
4 T
H

A
V
E
1 4
0 M
C

C
A
L
L
U
M

W
A
Y
3 0
3 M
C

C
A
L
L
U
M

W
A
Y
4 0
0 R
A
M
O
N

R
D
3 4
2 3
R
A
M
O
N

R
D
3 6
5 2
E

M
E
S
Q
U
I
T
E

A
V
E
4 5
E

M
E
S
Q
U
I
T
E

A
V
E
2 5
E

M
E
S
Q
U
I
T
E

A
V
E
4 5
E

M
E
S
Q
U
I
T
E

A
V
E
2 5
M
C

C
A
L
L
U
M

W
A
Y
3 0
3 M
C

C
A
L
L
U
M

W
A
Y
4 0
0 -
-
2 0
2 -
-
2 6
3 -
-
1 2
2 1
-
-
0 3
4 T
H

A
V
E
2 2
2 3
4 T
H

A
V
E
1 4
1 34TH AVE
214
34TH AVE
140
-
-
3 -
-
5 -
-
3 1
7 9
-
-
0 D
A
T
E

P
A
L
M

D
R
2 9
4 2
D
A
T
E

P
A
L
M

D
R
2 2
5 2
D
A
T
E

P
A
L
M

D
R
3 5
1 6
D
A
T
E

P
A
L
M

D
R
2 7
6 5
-
-
0 -
-
2 4
6 9
-
-
0 -
-
2 0
2 2
-
-
0 -
-
1 3
1 -
-
8 3
D
A
T
E

P
A
L
M

D
R
1 3
7 9
D
A
T
E

P
A
L
M

D
R
7 1
8 -
-
1 7
9 -
-
3 0
1 B
O
B

H
O
P
E

D
R
3 0
8 4
B
O
B

H
O
P
E

D
R
1 5
8 8
B
O
B

H
O
P
E

D
R
3 0
8 3
B
O
B

H
O
P
E

D
R
1 5
8 7
E

B
A
R
I
S
T
O

R
D
1 3
2 E

B
A
R
I
S
T
O

R
D
8 7
4 -
-
2 0
2 2
-
-
0 -
-
2 0
2 2
-
-
0 -
-
1 2
9 4
-
-
0 -
-
1 2
9 4
-
-
0 -
-
2 8
6 -
-
1 6
9 D
A
T
E

P
A
L
M

D
R
3 1
1 6
D
A
T
E

P
A
L
M

D
R
3 1
2 7

E BARISTO RD
764

E BARISTO RD
0 D
A
T
E

P
A
L
M

D
R
3 2
6 3
D
A
T
E

P
A
L
M

D
R
2 6
3 5
D
A
T
E

P
A
L
M

D
R
3 1
1 6
D
A
T
E

P
A
L
M

D
R
3 1
2 7
R
A
M
O
N

R
D
3 4
8 4
R
A
M
O
N

R
D
3 7
8 2
R
A
M
O
N

R
D
3 4
8 4
R
A
M
O
N

R
D
3 7
8 0
-
-
2 5
0 7
-
-
0 -
-
2 5
0 7
-
-
0 V
A
R
N
E
R

R
D
1 2
6 V
A
R
N
E
R

R
D
3 3
5 -
-
2 2
8 0
-
-
2 2
8 0
RIVCOM 4.01 - 2018 PM peak period volumes (Wren Resi + Date Palm + Vallarata) 0 .05
.1
.15
Miles
HCMType
CC (6866)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12488)
PrArterial (8422)
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
8 0
8 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 1
9 3
7 -
-
5 7
-
-
2 2
V
A
R
N
E
R

R
D
3 0
9 V
A
R
N
E
R

R
D
1 1
0 5
-
-
9 3
-
-
2 3
V
I
S
T
A

C
H
I
N
O
3 0
2 V
I
S
T
A

C
H
I
N
O
2 2
5 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
2 3
V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
1 0
L
o
s

A
l
o
m
o
s

R
d
0 L
o
s

A
l
o
m
o
s

R
d
0 -
-
0 -
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
8 4
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 N

G
E
N
E

A
U
T
R
Y

T
R
L
3 9
7 6
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 4
2 8
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 2
2 6
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 -
-
1 1
-
-
4 -
-
3 3
-
-
3 6
D
I
N
A
H

S
H
O
R
E

D
R
2 0
0 2
D
I
N
A
H

S
H
O
R
E

D
R
1 7
0 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 9
7 7
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 4
2 8
-
-
8 8
-
-
1 4
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
0 2
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
6 -
-
2 R
A
M
O
N

R
D
4 6
1 8
R
A
M
O
N

R
D
4 5
1 7
-
-
2 1
-
-
3 1
-
-
1 8
2 -
-
8 0
-
-
1 2
-
-
8 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 1
5 4
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
2 6
9 -
-
3 1
6 N

G
E
N
E

A
U
T
R
Y

T
R
L
2 6
3 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 5
5 1
-
-
4 2
1 -
-
7 5
7 -
-
1 -
-
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 -
-
5 2
5 -
-
1 7
8 -
-
1 5
-
-
1 5
-
-
1 8
2 -
-
2 6
6 E

V
I
S
T
A

C
H
I
N
O
5 7
8 1
E

V
I
S
T
A

C
H
I
N
O
4 9
4 8
-
-
1 1
6 -
-
8 3
-
-
0 -
-
0 -
-
1 6
6 -
-
1 0
0 S

G
E
N
E

A
U
T
R
Y

T
R
L
1 9
3 3
S

G
E
N
E

A
U
T
R
Y

T
R
L
1 6
8 9
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 2
7 6
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
5 -
-
3 -
-
0 -
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
8 9
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
4 5
7 -
-
3 5
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 1
9 8
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 A
V
E
I
D
A

Q
U
I
N
T
A
N
A
2 3
6 A
V
E
I
D
A

Q
U
I
N
T
A
N
A
1 6
3 V
I
S
T
A

C
H
I
N
O
3 2
5 4
V
I
S
T
A

C
H
I
N
O
2 8
3 7
-
-
4 0
-
-
2 0
-
-
4 2
0 -
-
1 4
9 -
-
2 1
3 -
-
2 9
0 -
-
1 0
0 -
-
2 5
0 -
-
8 7
0 -
-
6 3
6 -
-
7 -
-
4 D
A

V
A
L
L

D
R
1 5
0 6
D
A

V
A
L
L

D
R
1 2
4 0
-
-
4 0
-
-
3 7
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 9
0 9
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 4
3 8
-
-
2 3
-
-
6 DINAH SHORE DR
1450

DINAH SHORE DR
1452
M
C

C
A
L
L
U
M

W
A
Y
7 9
1 M
C

C
A
L
L
U
M

W
A
Y
6 9
0 M
C

C
A
L
L
U
M

W
A
Y
1 4
1 M
C

C
A
L
L
U
M

W
A
Y
2 6
1 DINAH SHORE DR
1163

DINAH SHORE DR
1227
D
I
N
A
H

S
H
O
R
E

D
R
1 1
6 3
D
I
N
A
H

S
H
O
R
E

D
R
1 2
2 7
V
I
S
T
A

C
H
I
N
O
3 2
5 5
V
I
S
T
A

C
H
I
N
O
2 7
1 3
V
A
R
N
E
R

R
D
2 9
8 V
A
R
N
E
R

R
D
9 3
0 C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 6
9 7
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
1 6
3 9
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
2 9
4 4
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
3 1
9 0
-
-
1 0
4 7
-
-
8 5
4 L
A
N
D
A
U

B
L
V
D
1 9
3 5
L
A
N
D
A
U

B
L
V
D
1 7
8 1
R
A
M
O
N

R
D
4 4
3 6
R
A
M
O
N

R
D
4 3
8 2
L
A
N
D
A
U

B
L
V
D
2 0
0 3
L
A
N
D
A
U

B
L
V
D
1 7
8 3
L
A
N
D
A
U

B
L
V
D
2 5
2 8
L
A
N
D
A
U

B
L
V
D
1 6
8 2
D
A
T
E

P
A
L
M

D
R
3 7
0 3
D
A
T
E

P
A
L
M

D
R
3 3
8 4
V
A
R
N
E
R

R
D
2 6
3 V
A
R
N
E
R

R
D
9 2
2 3
0 T
H

A
V
E
5 2
1 3
0 T
H

A
V
E
2 6
2 D
A

V
A
L
L

D
R
1 3
9 4
D
A

V
A
L
L

D
R
1 1
5 1
-
-
1 3
-
-
1 5
-
-
3 -
-
2 R
A
M
O
N

R
D
4 5
5 5
R
A
M
O
N

R
D
4 5
2 2
V
I
S
T
A

C
H
I
N
O
3 1
7 4
V
I
S
T
A

C
H
I
N
O
2 9
7 3
V
A
R
N
E
R

R
D
2 5
4 V
A
R
N
E
R

R
D
9 3
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
2 2
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
2 7
-
-
1 2

RAMON RD
4508

RAMON RD
4273
-
-
6 -
-
3 -
-
0 -
-
0 D
A
T
E

P
A
L
M

D
R
3 1
7 0
D
A
T
E

P
A
L
M

D
R
2 3
5 4
-
-
2 1
1 -
-
3 4
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 6
8 9
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 7
5 -
-
2 8
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
6 0
8 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
4 2
-
-
1 4
-
-
6 6
-
-
1 1
3 -
-
2 2
-
-
1 9
D
I
N
A
H

S
H
O
R
E

D
R
1 2
2 5
D
I
N
A
H

S
H
O
R
E

D
R
1 4
1 3
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
2 6
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
R
N
E
R

R
D
2 5
9 V
A
R
N
E
R

R
D
9 2
1 -
-
1 6
4 -
-
2 3
2 V
A
R
N
E
R

R
D
2 8
8 4
V
A
R
N
E
R

R
D
1 3
4 8
-
-
5 5
0 -
-
6 9
5 -
-
4 6
-
-
1 8
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
0 8
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 D
I
N
A
H

S
H
O
R
E

D
R
1 3
1 6
D
I
N
A
H

S
H
O
R
E

D
R
1 4
0 8
3 0
T
H

A
V
E
7 0
1 3
0 T
H

A
V
E
4 3
4 V
E
R
O
N
A

R
D
6 0
0 V
E
R
O
N
A

R
D
8 4
1 -
-
6 8
3 -
-
8 2
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
8 4
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 8
1 -
-
2 2
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 2
2 6
5 -
-
1 9
7 -
-
2 3
6 -
-
6 4
5 -
-
9 4
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
6 7
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
4 -
-
2 -
-
4 -
-
2 -
-
3 8
3 -
-
6 4
2 E

B
A
R
I
S
T
O

R
D
2 3
8 9
E

B
A
R
I
S
T
O

R
D
7 2
9 -
-
3 3
6 -
-
4 4
5 -
-
5 3
3 -
-
5 3
5 D
I
N
A
H

S
H
O
R
E

D
R
1 7
5 3
D
I
N
A
H

S
H
O
R
E

D
R
1 6
0 3
-
-
2 0
0 -
-
3 1
5 -
-
3 0
9 -
-
2 5
2 V
E
R
O
N
A

R
D
0 V
E
R
O
N
A

R
D
0 -
-
0 -
-
0 V
I
S
T
A

C
H
I
N
O
3 8
9 9
V
I
S
T
A

C
H
I
N
O
3 0
2 1
-
-
5 0
8 -
-
6 1
0 -
-
3 6
-
-
6 4
-
-
5 -
-
3 -
-
3 8
-
-
2 1
-
-
1 1
6 -
-
1 2
0 E
L

C
I
E
L
O

R
D
4 2
9 -
-
1 9
0 -
-
2 0
5 D
A

V
A
L
L

D
R
1 8
5 1
D
A

V
A
L
L

D
R
1 2
5 2
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 0
9 6
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
6 3
-
-
2 9
E
L

C
I
E
L
O

R
D
2 7
2 D
I
N
A
H

S
H
O
R
E

D
R
1 2
9 0
D
I
N
A
H

S
H
O
R
E

D
R
1 3
7 3
L
A
N
D
A
U

B
L
V
D
1 3
4 2
L
A
N
D
A
U

B
L
V
D
1 7
2 1
V
I
S
T
A

C
H
I
N
O
3 7
6 1
V
I
S
T
A

C
H
I
N
O
2 9
3 2
C
R
O
S
S
L
E
Y

R
D
6 0
9 C
R
O
S
S
L
E
Y

R
D
6 7
1 R
A
M
O
N

R
D
4 9
3 3
R
A
M
O
N

R
D
4 2
7 6
R
A
M
O
N

R
D
6 7
7 1
R
A
M
O
N

R
D
4 6
2 3
-
-
4 8
3 -
-
5 9
4 -
-
4 2
1 -
-
3 8
9 -
-
3 7
9 -
-
3 0
0 -
-
0 -
-
0 D
A
T
E

P
A
L
M

D
R
1 7
9 8
D
A
T
E

P
A
L
M

D
R
1 0
6 2
-
-
5 8
7 -
-
5 6
2 -
-
4 1
6 -
-
5 6
2 E

M
E
S
Q
U
I
T
E

A
V
E
5 9
5 E

M
E
S
Q
U
I
T
E

A
V
E
4 2
9 -
-
2 6
5 7
-
-
0 -
-
2 2
9 -
-
1 7
3 -
-
1 5
5 -
-
2 2
8 D
A
T
E

P
A
L
M

D
R
3 2
5 2
D
A
T
E

P
A
L
M

D
R
2 8
0 3
E

M
E
S
Q
U
I
T
E

A
V
E
5 9
5 E

M
E
S
Q
U
I
T
E

A
V
E
4 2
9 -
-
1 9
4 -
-
3 1
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
2 6
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 D
I
N
A
H

S
H
O
R
E

D
R
1 2
2 5
D
I
N
A
H

S
H
O
R
E

D
R
1 4
1 3

RAMON RD
2622

RAMON RD
1116
V
A
R
N
E
R

R
D
2 6
2 V
A
R
N
E
R

R
D
9 8
9 -
-
3 0
1 -
-
1 1
7 E

B
A
R
I
S
T
O

R
D
2 3
5 6
E

B
A
R
I
S
T
O

R
D
6 9
6 -
-
5 3
9 -
-
7 2
7 -
-
5 8
9 -
-
1 6
0 -
-
0 -
-
0 D
A

V
A
L
L

D
R
1 6
2 6
D
A

V
A
L
L

D
R
1 1
7 9
-
-
1 3
3 -
-
2 0
6 -
-
3 5
6 -
-
5 7
1 -
-
6 2
1 -
-
7 9
9 D
A
T
E

P
A
L
M

D
R
3 6
0 7
D
A
T
E

P
A
L
M

D
R
3 4
7 2
E

R
A
M
O
N

R
D
3 0
0 5
E

R
A
M
O
N

R
D
2 8
3 4
-
-
2 4
7 -
-
2 4
5 L
A
N
D
A
U

B
L
V
D
2 4
4 6
L
A
N
D
A
U

B
L
V
D
1 8
1 8
R
A
M
O
N

R
D
4 7
6 6
R
A
M
O
N

R
D
4 4
7 6
-
-
4 5
5 -
-
6 5
6 D
A

V
A
L
L

D
R
2 3
5 D
A

V
A
L
L

D
R
1 6
5 N

G
E
N
E

A
U
T
R
Y

T
R
L
2 7
3 3
N

G
E
N
E

A
U
T
R
Y

T
R
L
4 3
2 0
-
-
0 -
-
0 -
-
5 8
3 -
-
3 4
3 -
-
8 4
-
-
8 7
-
-
1 6
5 0
-
-
2 4
4 5
-
-
9 -
-
5 -
-
8 5
5 -
-
8 6
7 -
-
3 0
-
-
1 0
-
-
2 0
6 -
-
3 4
3 -
-
3 2
8 -
-
2 8
4 E

R
A
M
O
N

R
D
5 3
8 4
E

R
A
M
O
N

R
D
3 5
5 3
-
-
1 7
1 7
-
-
2 5
7 5
R
A
M
O
N

R
D
5 7
0 0
R
A
M
O
N

R
D
4 7
9 7
-
-
6 0
8 -
-
1 0
3 0
-
-
9 -
-
5 -
-
4 6
5 -
-
5 5
4 D
I
N
A
H

S
H
O
R
E

D
R
9 1
6 D
I
N
A
H

S
H
O
R
E

D
R
1 2
4 2
-
-
1 6
4 -
-
2 0
7 E

M
E
S
Q
U
I
T
E

A
V
E
1 1
5 1
E

M
E
S
Q
U
I
T
E

A
V
E
1 1
6 7
-
-
5 3
3 -
-
2 9
6 3
0 T
H

A
V
E
9 6
1 3
0 T
H

A
V
E
5 5
4 L
A
N
D
A
U

B
L
V
D
1 2
0 7
L
A
N
D
A
U

B
L
V
D
1 3
4 5
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
7 8
0 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 -
-
1 7
4 -
-
2 0
9 -
-
3 6
-
-
3 7
C
R
O
S
S
L
E
Y

R
D
1 6
1 3
C
R
O
S
S
L
E
Y

R
D
9 7
0 -
-
2 2
6 -
-
7 0
1 V
A
R
N
E
R

R
D
2 5
4 V
A
R
N
E
R

R
D
9 2
6 -
-
1 5
3 -
-
2 1
9 -
-
8 4
2 -
-
4 8
6 E

M
E
S
Q
U
I
T
E

A
V
E
2 0
4 2
E

M
E
S
Q
U
I
T
E

A
V
E
1 6
4 7
S

G
E
N
E

A
U
T
R
Y

T
R
L
2 4
7 9
S

G
E
N
E

A
U
T
R
Y

T
R
L
2 3
2 7
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 6
4 8
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 6
2 4
E

M
E
S
Q
U
I
T
E

A
V
E
2 1
4 8
E

M
E
S
Q
U
I
T
E

A
V
E
1 5
1 5
S

E
L

C
I
E
L
O

R
D
5 9
7 -
-
1 5
4 -
-
8 9
P
L
U
M
L
E
Y

R
D
0 P
L
U
M
L
E
Y

R
D
0 S

G
E
N
E

A
U
T
R
Y

T
R
L
2 0
0 7
S

G
E
N
E

A
U
T
R
Y

T
R
L
2 1
4 2
-
-
5 2
7 -
-
7 9
6 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 0
5 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
7 -
-
2 8
0 -
-
0 -
-
1 4
9 4
-
-
1 2
9 4
3 0
T
H

A
V
E
5 5
4 3
0 T
H

A
V
E
5 6
9 C
R
O
S
S
L
E
Y

R
D
1 2
8 9
C
R
O
S
S
L
E
Y

R
D
1 0
1 9
-
-
7 1
2 -
-
4 2
5 E

R
A
M
O
N

R
D
2 5
2 2
E

R
A
M
O
N

R
D
2 5
5 0
E

R
A
M
O
N

R
D
2 5
2 9
E

R
A
M
O
N

R
D
2 5
6 0
D
A

V
A
L
L

D
R
1 3
5 2
D
A

V
A
L
L

D
R
1 0
9 0
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 8
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 0
7 -
-
1 3
3 9
-
-
1 7
8 5
-
-
6 8
4 -
-
1 0
8 3
-
-
7 6
2 -
-
8 8
8 R
A
M
O
N

R
D
5 7
4 3
R
A
M
O
N

R
D
4 2
5 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
4 1
1 4
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 5
2 2
D
I
N
A
H

S
H
O
R
E

D
R
9 1
6 D
I
N
A
H

S
H
O
R
E

D
R
1 2
4 2
V
I
S
T
A

C
H
I
N
O
3 8
9 9
V
I
S
T
A

C
H
I
N
O
3 0
2 1
V
A
R
N
E
R

R
D
2 5
6 V
A
R
N
E
R

R
D
9 2
2 -
-
4 4
7 -
-
2 0
1 L
A
N
D
A
U

B
L
V
D
2 4
2 3
L
A
N
D
A
U

B
L
V
D
1 8
4 5
D
A

V
A
L
L

D
R
1 4
9 8
D
A

V
A
L
L

D
R
1 1
5 8
-
-
2 4
8 -
-
4 1
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 1
9 3
7 B
O
B

H
O
P
E

D
R
3 9
3 5
B
O
B

H
O
P
E

D
R
4 1
5 2
-
-
4 1
-
-
6 0
-
-
9 0
-
-
6 2
-
-
7 6
-
-
3 3
D
A
T
E

P
A
L
M

D
R
3 7
4 2
D
A
T
E

P
A
L
M

D
R
3 3
4 4
D
A
T
E

P
A
L
M

D
R
1 9
4 8
D
A
T
E

P
A
L
M

D
R
1 1
5 0
-
-
4 1
7 -
-
4 6
3 -
-
1 7
6 2
-
-
0 M
C

C
A
L
L
U
M

W
A
Y
1 1
7 6
M
C

C
A
L
L
U
M

W
A
Y
1 3
4 5
-
-
5 5
4 -
-
5 0
5 -
-
2 8
0 -
-
0 L
A
N
D
A
U

B
L
V
D
1 7
6 3
L
A
N
D
A
U

B
L
V
D
1 4
8 4
-
-
0 -
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 2
2 6
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
4 0
1 -
-
2 2
0 E
L

C
I
E
L
O

R
D
4 7
7 D
A
T
E

P
A
L
M

D
R
4 4
5 6
D
A
T
E

P
A
L
M

D
R
3 9
1 0
D
A
T
E

P
A
L
M

D
R
6 0
1 5
D
A
T
E

P
A
L
M

D
R
5 4
1 8
-
-
6 2
5 -
-
0 -
-
6 2
5 -
-
0 -
-
3 7
9 -
-
1 1
6 C
R
O
S
S
L
E
Y

R
D
4 9
7 C
R
O
S
S
L
E
Y

R
D
5 5
2 -
-
1 5
3 -
-
1 7
4 M
C

C
A
L
L
U
M

W
A
Y
9 0
0 M
C

C
A
L
L
U
M

W
A
Y
1 0
9 4
-
-
5 8
2 -
-
0 -
-
6 -
-
3 3
0 T
H

A
V
E
4 6
8 3
0 T
H

A
V
E
5 8
1 -
-
1 -
-
1 E

M
E
S
Q
U
I
T
E

A
V
E
5 9
5 E

M
E
S
Q
U
I
T
E

A
V
E
4 2
9 -
-
1 1
2 9
-
-
0 -
-
2 3
2 0
-
-
0 -
-
5 8
2 -
-
0 34TH AVE
260
34TH AVE
167
-
-
0 D
A

V
A
L
L

D
R
1 4
5 7
D
A

V
A
L
L

D
R
1 2
3 3
-
-
8 3
-
-
4 6
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 SAN LUIS REY DR
0 SAN LUIS REY DR
0 -
-
0 -
-
0 R
A
M
O
N

R
D
4 9
6 4
R
A
M
O
N

R
D
4 3
1 9
R
A
M
O
N

R
D
6 7
4 4
R
A
M
O
N

R
D
4 6
1 1
--
0 --
0 -
-
3 5
3 2
-
-
0 D
I
N
A
H

S
H
O
R
E

D
R
2 0
0 2
D
I
N
A
H

S
H
O
R
E

D
R
1 7
0 2
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 8
6 7
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
2 1
9 8
5 --
0 --
0 V
I
S
T
A

C
H
I
N
O
2 2
5 V
I
S
T
A

C
H
I
N
O
3 0
2 -
-
3 8
5 -
-
2 3
4 -
-
2 6
-
-
2 3
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 6
8 9
3 V
I
S
T
A

C
H
I
N
O
3 6
5 5
V
I
S
T
A

C
H
I
N
O
2 8
2 4
R
A
M
O
N

R
D
4 7
7 6
R
A
M
O
N

R
D
4 0
7 6
V
E
R
O
N
A

R
D
7 6
2 V
E
R
O
N
A

R
D
1 0
7 8
-
-
7 7
6 -
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
1 9
8 4
6 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 4
5 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 6
1 -
-
1 -
-
1 D
A

V
A
L
L

D
R
2 3
5 D
A

V
A
L
L

D
R
1 6
5 L
A
N
D
A
U

B
L
V
D
9 9
3 L
A
N
D
A
U

B
L
V
D
5 9
2 -
-
2 9
9 7
-
-
0 D
A

V
A
L
L

D
R
1 5
4 9
D
A

V
A
L
L

D
R
1 0
2 7
-
-
3 4
8 -
-
0 L
A
N
D
A
U

B
L
V
D
2 3
L
A
N
D
A
U

B
L
V
D
1 0
S
A
N

L
U
I
S

R
E
Y

D
R
0 S
A
N

L
U
I
S

R
E
Y

D
R
0 D
A
T
E

P
A
L
M

D
R
3 7
2 7
D
A
T
E

P
A
L
M

D
R
3 0
0 3
-
-
6 -
-
3 N

G
E
N
E

A
U
T
R
Y

T
R
L
3 5
3 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 8
6 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 6
2 4
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 6
4 8
-
-
6 -
-
3 M
C

C
A
L
L
U
M

W
A
Y
1 1
7 6
M
C

C
A
L
L
U
M

W
A
Y
1 3
4 5
S
A
N

L
U
I
S

R
E
Y

D
R
6 4
7 S
A
N

L
U
I
S

R
E
Y

D
R
7 7
2 V
I
S
T
A

C
H
I
N
O
3 4
9 1
V
I
S
T
A

C
H
I
N
O
2 8
7 5
-
-
3 -
-
2 R
A
M
O
N

R
D
5 6
9 4
R
A
M
O
N

R
D
4 3
9 1
-
-
2 7
1 -
-
2 0
1 -
-
2 1
3 4
-
-
0 -
-
2 9
9 7
--
0 D
A
T
E

P
A
L
M

D
R
3 7
6 1
D
A
T
E

P
A
L
M

D
R
3 0
0 7
3 0
T
H

A
V
E
6 7
8 3
0 T
H

A
V
E
1 0
6 1
3 0
T
H

A
V
E
9 5
6 3
0 T
H

A
V
E
1 1
5 7
-
-
1 1
4 -
-
1 8
3 -
-
1 1
2 9
-
-
0 -
-
2 6
-
-
1 4
-
-
1 9
1 -
-
9 2
D
A
T
E

P
A
L
M

D
R
5 0
4 9
D
A
T
E

P
A
L
M

D
R
4 1
8 4
N

G
E
N
E

A
U
T
R
Y

T
R
L
3 5
5 1
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 6
3 2
M
C

C
A
L
L
U
M

W
A
Y
1 2
5 9
M
C

C
A
L
L
U
M

W
A
Y
9 9
2 N

G
E
N
E

A
U
T
R
Y

T
R
L
3 3
4 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
2 7
7 0
M
C

C
A
L
L
U
M

W
A
Y
1 0
7 3
M
C

C
A
L
L
U
M

W
A
Y
1 3
2 3
-
-
0 -
-
0 D
A
T
E

P
A
L
M

D
R
3 4
1 6
D
A
T
E

P
A
L
M

D
R
2 8
1 5
D
A
T
E

P
A
L
M

D
R
4 7
6 3
D
A
T
E

P
A
L
M

D
R
3 9
7 7
-
-
3 5
3 2
-
-
0 D
A
T
E

P
A
L
M

D
R
2 3
9 0
D
A
T
E

P
A
L
M

D
R
1 4
4 7
-
-
6 -
-
3 -
-
0 -
-
0 M
C

C
A
L
L
U
M

W
A
Y
9 4
4 M
C

C
A
L
L
U
M

W
A
Y
9 7
6 B
O
B

H
O
P
E

D
R
3 4
5 4
B
O
B

H
O
P
E

D
R
2 2
6 7
R
A
M
O
N

R
D
5 0
9 6
R
A
M
O
N

R
D
3 4
8 0
-
-
6 -
-
3 -
-
5 0
-
-
3 6
R
A
M
O
N

R
D
4 8
7 5
R
A
M
O
N

R
D
3 4
6 6
-
-
5 4
9 -
-
3 4
2 -
-
9 9
-
-
9 5
E

B
A
R
I
S
T
O

R
D
2 3
8 6
E

B
A
R
I
S
T
O

R
D
0 D
A
T
E

P
A
L
M

D
R
3 7
5 1
D
A
T
E

P
A
L
M

D
R
3 1
8 0
E
L

C
I
E
L
O

R
D
4 9
9 D
A

V
A
L
L

D
R
1 5
5 0
D
A

V
A
L
L

D
R
1 1
6 8
-
-
0 -
-
0 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
1 7
4 4
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 3
4 T
H

A
V
E
0 3
4 T
H

A
V
E
0 -
-
1 0
5 2
-
-
4 4
0 -
-
5 8
2 -
-
0 -
-
2 0
1 -
-
1 6
0 D
A
T
E

P
A
L
M

D
R
3 4
1 6
D
A
T
E

P
A
L
M

D
R
2 8
1 5
-
-
2 4
-
-
3 8
L
A
N
D
A
U

B
L
V
D
1 3
4 2
L
A
N
D
A
U

B
L
V
D
1 7
2 1
D
I
N
A
H

S
H
O
R
E

D
R
1 2
2 5
D
I
N
A
H

S
H
O
R
E

D
R
1 4
1 3
-
-
1 6
2 -
-
7 9
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 4
5 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
5 6
1 3
0 T
H

A
V
E
6 7
5 3
0 T
H

A
V
E
4 2
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 8
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 0
7 -
-
2 1
3 4
-
-
0 -
-
1 7
6 2
-
-
0 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
5 3
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 7
6 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
3 2
7 R
A
M
O
N

R
D
4 7
7 6
R
A
M
O
N

R
D
4 0
7 6
-
-
7 7
6 -
-
0 D
A

V
A
L
L

D
R
2 3
5 D
A

V
A
L
L

D
R
1 6
5 -
-
2 0
1 -
-
2 7
1 D
A

V
A
L
L

D
R
1 5
9 4
D
A

V
A
L
L

D
R
1 1
4 6
-
-
9 3
5 -
-
0 3
4 T
H

A
V
E
2 1
3 3
4 T
H

A
V
E
1 3
9 -
-
2 -
-
4 -
-
3 5
3 2
-
-
0 -
-
9 7
0 -
-
0 S
A
N

L
U
I
S

R
E
Y

D
R
6 9
5 S
A
N

L
U
I
S

R
E
Y

D
R
5 5
0 -
-
9 7
0 -
-
0 R
A
M
O
N

R
D
5 6
9 4
R
A
M
O
N

R
D
4 3
9 1
D
A
T
E

P
A
L
M

D
R
3 6
0 9
D
A
T
E

P
A
L
M

D
R
3 0
1 8
D
A
T
E

P
A
L
M

D
R
3 7
7 5
D
A
T
E

P
A
L
M

D
R
3 2
0 5
-
-
2 1
3 4
-
-
0 -
-
1 8
3 -
-
3 0
4 R
A
M
O
N

R
D
4 5
5 5
R
A
M
O
N

R
D
4 5
2 2
-
-
2 3
2 0
-
-
0 D
A

V
A
L
L

D
R
9 8
1 D
A

V
A
L
L

D
R
4 1
5 -
-
5 8
2 -
-
0 -
-
1 6
6 -
-
8 1
V
A
R
N
E
R

R
D
3 2
7 V
A
R
N
E
R

R
D
1 1
2 6
-
-
3 4
8 -
-
0 D
A
T
E

P
A
L
M

D
R
2 4
8 7
D
A
T
E

P
A
L
M

D
R
1 5
4 0
E

B
A
R
I
S
T
O

R
D
7 2
9 E

B
A
R
I
S
T
O

R
D
2 3
8 9
D
A
T
E

P
A
L
M

D
R
1 9
3 4
D
A
T
E

P
A
L
M

D
R
1 1
4 9
-
-
2 6
5 7
B
O
B

H
O
P
E

D
R
3 4
5 4
B
O
B

H
O
P
E

D
R
2 2
6 7
-
-
2 8
9 -
-
1 5
7 D
A
T
E

P
A
L
M

D
R
3 6
9 8
D
A
T
E

P
A
L
M

D
R
3 9
6 4
D
A

V
A
L
L

D
R
9 8
1 D
A

V
A
L
L

D
R
4 1
5 E BARISTO RD
731

E BARISTO RD
0 D
A
T
E

P
A
L
M

D
R
3 9
1 1
D
A
T
E

P
A
L
M

D
R
3 3
8 1
D
A
T
E

P
A
L
M

D
R
3 6
9 8
D
A
T
E

P
A
L
M

D
R
3 9
6 4
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 BOB HOPE DR
3415

BOB HOPE DR
2265
L
A
N
D
A
U

B
L
V
D
1 2
0 7
L
A
N
D
A
U

B
L
V
D
1 3
4 5
RIVCOM 4.01 - 2045 PM peak period volumes (Wren Resi + Date Palm + Vallarata) 0 .05
.1
.15
Miles
HCMType
CC (6866)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12488)
PrArterial (8422)
PM Peak Hour Growth
Intersection ApproachRIVCOM
2018
RIVCOM
2045
RIVCOM
2018 to
RIVCOM
2045
Annual
Growth
Rate
Adjusted
2023 Plus 3
Projects
Adjusted
2045 Plus
Project
E 1182 1481 0.94% 535 640
S 7006 9233 1.18% 1974 2462
W 703 1994 6.80% 620 1506
N 6281 6980 0.41% 2009 2183
E 206 241 0.63% 821 929
S 5499 6931 0.96% 1969 2368
W 465 472 0.06% 446 451
N 5281 6730 1.02% 2346 2847
E 1125 1095 0.19% 478 497
S 5194 6627 1.02% 2,307 2802
W 1947 2113 0.32% 840 896
N 6425 7079 0.38% 2,147 2317
1 2
3 43% 57%
866 2,009 1143
↓ ↑
78 721 67
↙ ↓ ↘ ↖ 63
49% 306 ← ← 145 ← 278 52%
620 115 ↗ 2569 ↙ 70 535
51% 314 → 127 → → 257 48%
72 ↘ ↖ ↑ ↗
83 965 63
↓ ↑
863 1,974 1111
44% 56%
938 2183 1242
↓ ↑
170 738 31
↙ ↓ ↘ ↖ 27
743 ← ← 245 ← 328
1506 244 ↗ 3,369 ↙ 56 640
752 → 224 → → 307
283 ↘ ↖ ↑ ↗
328 970 53
↓ ↑
1076 2462 1351
Existing Turning Movements
Existing Peak Hour Counts per intersection leg
Forecasted Peak Hour per intersection leg
Scenario: 2045+P PM
N/S Street:Date Palm Drive
E/W Street:McCallum Way
Legend
Scenario:Adjusted 2023 Plus 3 Projects PM
N/S Street:Date Palm Drive
E/W Street:McCallum Way
Intersection #: 1
40% 60%
944 2,346 1402
↓ ↑
66 609 269
↙ ↓ ↘ ↖ 279
48% 215 ← ← 66 ← 430 52%
446 71 ↗ 2791 ↙ 85 821
52% 231 → 71 → → 391 48%
89 ↘ ↖ ↑ ↗
83 1052 51
↓ ↑
783 1,969 1186
40% 60%
1146 2847 1701
↓ ↑
71 757 318
↙ ↓ ↘ ↖ 330
217 ← ← 64 ← 489
451 76 ↗ 3,303 ↙ 95 929
234 → 68 → → 442
90 ↘ ↖ ↑ ↗
83 1295 56
↓ ↑
942 2368 1435
Existing Turning Movements
Existing Peak Hour Counts per intersection leg
Forecasted Peak Hour per intersection leg
Scenario: 2045 Plus Project
N/S Street:Date Palm Drive
E/W Street:Rosemount Road
Legend
Scenario:Adjusted 2023 Plus 3 Projects
N/S Street:Date Palm Drive
E/W Street:Rosemount Road
Intersection #: 2
42% 58%
904 2,147 1243
↓ ↑
94 782 28
↙ ↓ ↘ ↖ 131
60% 505 ← ← 117 ← 287 60%
840 83 ↗ 2886 ↙ 39 478
40% 335 → 126 → → 191 40%
126 ↘ ↖ ↑ ↗
294 1029 37
↓ ↑
947 2,307 1360
41% 59%
994 2317 1341
↓ ↑
63 909 22
↙ ↓ ↘ ↖ 114
539 ← ← 112 ← 291
896 61 ↗ 3,229 ↙ 65 497
358 → 121 → → 199
176 ↘ ↖ ↑ ↗
365 1167 55
↓ ↑
1150 2802 1586
Existing Turning Movements
Existing Peak Hour Counts per intersection leg
Forecasted Peak Hour per intersection leg
Scenario:Adjusted 2023 Plus 3 Projects PM
N/S Street:Date Palm Drive
E/W Street:30th Avenue
Intersection #: 3
Scenario: 2045 + P PM
N/S Street:Date Palm Drive
E/W Street:30th Avenue
Legend
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 7
2 4
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 7
2 4
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
R
N
E
R

R
D
8 8
7 V
A
R
N
E
R

R
D
6 3
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 5
6 9
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
9 2
-
-
1 0
1 -
-
1 2
6 -
-
1 3
6 -
-
4 9
9 -
-
4 8
3 N

G
E
N
E

A
U
T
R
Y

T
R
L
9 7
7 3
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
5 9
2 N

G
E
N
E

A
U
T
R
Y

T
R
L
9 7
7 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
5 9
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 9
5 2
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 9
5 2
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
6 3
-
-
1 8
5 -
-
4 -
-
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 7
3 3
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 7
3 3
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
3 0
3 -
-
2 7
5 -
-
5 -
-
7 R
A
M
O
N

R
D
1 2
1 3
3 R
A
M
O
N

R
D
1 2
0 4
5 -
-
5 -
-
8 -
-
2 3
6 -
-
2 4
9 -
-
1 1
2 4
-
-
1 1
9 9
-
-
4 8
9 -
-
5 0
3 -
-
1 2
5 -
-
1 2
6 -
-
3 -
-
4 -
-
5 -
-
7 -
-
2 -
-
3 N

G
E
N
E

A
U
T
R
Y

T
R
L
8 5
0 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
8 0
1 4
N

G
E
N
E

A
U
T
R
Y

T
R
L
8 7
9 0
N

G
E
N
E

A
U
T
R
Y

T
R
L
8 3
0 5
-
-
4 3
-
-
4 5
-
-
2 7
6 -
-
2 5
6 S

G
E
N
E

A
U
T
R
Y

T
R
L
5 4
8 2
S

G
E
N
E

A
U
T
R
Y

T
R
L
5 8
2 6
-
-
0 -
-
0 -
-
4 5
5 -
-
5 0
0 -
-
5 -
-
7 -
-
2 2
4 1
-
-
2 3
2 2
-
-
4 -
-
5 -
-
1 5
6 -
-
1 6
2 D
I
N
A
H

S
H
O
R
E

D
R
2 2
2 9
D
I
N
A
H

S
H
O
R
E

D
R
2 0
6 0
-
-
7 4
-
-
8 1
-
-
7 2
-
-
8 2
A
V
E
I
D
A

Q
U
I
N
T
A
N
A
2 5
2 A
V
E
I
D
A

Q
U
I
N
T
A
N
A
2 7
6 -
-
1 2
1 6
-
-
1 3
0 0
V
I
S
T
A

C
H
I
N
O
8 5
8 4
V
I
S
T
A

C
H
I
N
O
8 2
5 9
-
-
1 2
0 2
-
-
1 1
7 9
-
-
5 5
4 -
-
5 9
9 -
-
1 4
3 -
-
2 5
8 -
-
3 7
-
-
4 0
-
-
1 0
2 -
-
0 M
C

C
A
L
L
U
M

W
A
Y
7 8
8 M
C

C
A
L
L
U
M

W
A
Y
7 2
3 -
-
4 -
-
5 DINAH SHORE DR
2593

DINAH SHORE DR
2670
-
-
2 0
1 1
-
-
2 1
8 0

DINAH SHORE DR
2607

DINAH SHORE DR
2553
D
I
N
A
H

S
H
O
R
E

D
R
2 6
0 7
D
I
N
A
H

S
H
O
R
E

D
R
2 5
5 3
V
I
S
T
A

C
H
I
N
O
7 7
6 6
V
I
S
T
A

C
H
I
N
O
7 8
0 6
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
1 1
3 1
2 C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
1 1
2 7
9 C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
6 5
0 1
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
6 9
7 1
D
A
T
E

P
A
L
M

D
R
1 0
2 2
7 D
A
T
E

P
A
L
M

D
R
1 0
3 2
9 D
A

V
A
L
L

D
R
2 8
0 2
D
A

V
A
L
L

D
R
2 7
2 7
D
A

V
A
L
L

D
R
2 2
2 9
D
A

V
A
L
L

D
R
2 2
6 8
M
C

C
A
L
L
U
M

W
A
Y
1 7
7 2
M
C

C
A
L
L
U
M

W
A
Y
1 9
3 7
L
A
N
D
A
U

B
L
V
D
3 2
3 9
L
A
N
D
A
U

B
L
V
D
3 1
2 7
L
A
N
D
A
U

B
L
V
D
4 2
3 3
L
A
N
D
A
U

B
L
V
D
4 1
0 6
V
A
R
N
E
R

R
D
8 4
9 V
A
R
N
E
R

R
D
6 2
8 V
A
R
N
E
R

R
D
8 5
8 V
A
R
N
E
R

R
D
6 4
3 L
A
N
D
A
U

B
L
V
D
5 6
1 8
L
A
N
D
A
U

B
L
V
D
5 9
7 8
R
A
M
O
N

R
D
1 1
9 3
3 R
A
M
O
N

R
D
1 1
6 8
6 R
A
M
O
N

R
D
1 2
5 5
4 R
A
M
O
N

R
D
1 2
4 0
1 -
-
5 0
3 -
-
3 8
6 3
0 T
H

A
V
E
1 1
0 8
3 0
T
H

A
V
E
1 0
9 3
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 9
5 2
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 9
5 2
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
I
S
T
A

C
H
I
N
O
8 8
7 0
V
I
S
T
A

C
H
I
N
O
8 4
1 1
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
3 8
5 4
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
R
N
E
R

R
D
8 4
9 V
A
R
N
E
R

R
D
6 1
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 7
3 3
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 7
3 3
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
4 7
6 -
-
4 0
2 -
-
2 -
-
3 -
-
3 -
-
5 -
-
7 3
6 -
-
5 9
2 RAMON RD
12134

RAMON RD
12142
-
-
0 -
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
3 9
9 3
8 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 1
9 3
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
2 6
5 -
-
2 2
9 -
-
1 -
-
2 V
A
R
N
E
R

R
D
3 4
8 1
V
A
R
N
E
R

R
D
4 0
4 1
V
A
R
N
E
R

R
D
8 4
7 V
A
R
N
E
R

R
D
6 2
2 -
-
4 4
6 -
-
4 2
0 -
-
4 6
5 -
-
4 1
1 -
-
6 3
-
-
7 8
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 3
4 8
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 E

V
I
S
T
A

C
H
I
N
O
1 4
6 0
1 E

V
I
S
T
A

C
H
I
N
O
1 4
9 3
5 3
0 T
H

A
V
E
1 7
8 6
3 0
T
H

A
V
E
1 8
0 4
V
E
R
O
N
A

R
D
4 3
4 V
E
R
O
N
A

R
D
3 9
9 -
-
1 3
4 9
-
-
1 3
1 0
E

M
E
S
Q
U
I
T
E

A
V
E
3 1
4 0
E

M
E
S
Q
U
I
T
E

A
V
E
3 3
8 8
E

M
E
S
Q
U
I
T
E

A
V
E
3 2
4 9
E

M
E
S
Q
U
I
T
E

A
V
E
3 4
8 8
-
-
4 -
-
5 -
-
1 9
4 2
-
-
1 8
0 4
-
-
2 2
6 7
-
-
1 9
6 6
-
-
4 4
8 -
-
4 3
2 -
-
1 5
2 8
-
-
1 4
3 6
-
-
1 3
8 9
-
-
1 2
9 1
-
-
4 -
-
6 -
-
1 4
1 8
-
-
1 2
6 4
-
-
1 0
8 5
-
-
1 0
0 7
-
-
5 -
-
8 -
-
4 8
2 -
-
5 1
5 -
-
0 -
-
0 -
-
1 3
9 8
-
-
1 2
7 8
-
-
4 -
-
6 -
-
9 3
-
-
1 0
3 -
-
4 -
-
6 -
-
2 -
-
3 -
-
6 8
4 -
-
6 7
8 E
L

C
I
E
L
O

R
D
6 6
5 E
L

C
I
E
L
O

R
D
2 0
5 -
-
6 1
-
-
7 4
V
I
S
T
A

C
H
I
N
O
8 8
5 7
V
I
S
T
A

C
H
I
N
O
9 0
7 8
V
I
S
T
A

C
H
I
N
O
9 0
5 0
V
I
S
T
A

C
H
I
N
O
9 2
7 9
D
I
N
A
H

S
H
O
R
E

D
R
2 7
8 7
D
I
N
A
H

S
H
O
R
E

D
R
2 5
2 7
D
I
N
A
H

S
H
O
R
E

D
R
3 5
4 4
D
I
N
A
H

S
H
O
R
E

D
R
3 3
6 5
E

B
A
R
I
S
T
O

R
D
2 5
2 0
E

B
A
R
I
S
T
O

R
D
6 4
4 E

B
A
R
I
S
T
O

R
D
2 3
0 6
E

B
A
R
I
S
T
O

R
D
5 8
6 -
-
7 0
1 -
-
6 7
7 R
A
M
O
N

R
D
1 5
6 5
6 R
A
M
O
N

R
D
1 5
6 4
2 -
-
9 3
0 -
-
1 0
1 7
-
-
1 7
2 9
-
-
1 5
7 6
D
I
N
A
H

S
H
O
R
E

D
R
2 5
9 7
D
I
N
A
H

S
H
O
R
E

D
R
2 5
5 8
D
I
N
A
H

S
H
O
R
E

D
R
2 2
2 9
D
I
N
A
H

S
H
O
R
E

D
R
2 0
6 0
-
-
7 7
1 -
-
8 6
6 -
-
6 9
1 -
-
6 3
5 -
-
2 8
5 -
-
2 8
9 -
-
5 3
9 9
-
-
0 -
-
1 2
3 9
-
-
1 1
8 8
D
A
T
E

P
A
L
M

D
R
2 9
7 1
D
A
T
E

P
A
L
M

D
R
3 2
7 9
D
A
T
E

P
A
L
M

D
R
2 9
7 8
D
A
T
E

P
A
L
M

D
R
3 2
8 2
-
-
9 1
0 -
-
8 4
3 -
-
1 4
3 -
-
1 7
0 RAMON RD
4728

RAMON RD
1573
-
-
1 9
3 0
-
-
1 7
8 4
-
-
0 -
-
0 D
A

V
A
L
L

D
R
2 4
7 7
D
A

V
A
L
L

D
R
2 6
5 8
-
-
2 1
0 3
-
-
1 8
6 2
-
-
5 6
6 -
-
5 2
0 -
-
1 6
5 1
-
-
1 8
4 1
-
-
1 2
7 3
-
-
1 2
0 9
-
-
4 2
3 -
-
4 6
6 -
-
4 4
8 -
-
4 4
3 D
A
T
E

P
A
L
M

D
R
1 0
1 9
0 D
A
T
E

P
A
L
M

D
R
1 0
3 9
0 D
I
N
A
H

S
H
O
R
E

D
R
2 7
8 7
D
I
N
A
H

S
H
O
R
E

D
R
2 5
2 7
-
-
4 -
-
6 C
R
O
S
S
L
E
Y

R
D
1 9
4 7
C
R
O
S
S
L
E
Y

R
D
2 0
5 4
C
R
O
S
S
L
E
Y

R
D
1 5
5 4
C
R
O
S
S
L
E
Y

R
D
1 5
6 1
-
-
9 8
0 -
-
1 0
3 9
-
-
4 2
7 4
-
-
4 2
6 9
-
-
1 6
2 5
-
-
1 5
3 2
-
-
1 6
6 0
-
-
1 6
2 7
V
A
R
N
E
R

R
D
8 4
6 V
A
R
N
E
R

R
D
6 1
5 -
-
2 9
6 -
-
2 9
6 -
-
2 4
4 0
-
-
2 4
6 6
-
-
8 2
3 -
-
7 7
6 E

R
A
M
O
N

R
D
1 2
6 0
5 E

R
A
M
O
N

R
D
1 2
9 0
5 -
-
4 -
-
6 V
E
R
O
N
A

R
D
7 1
0 V
E
R
O
N
A

R
D
6 5
1 V
E
R
O
N
A

R
D
0 V
E
R
O
N
A

R
D
0 R
A
M
O
N

R
D
1 4
9 0
4 R
A
M
O
N

R
D
1 4
9 2
3 -
-
2 4
5 8
-
-
2 2
1 2
-
-
4 -
-
6 -
-
7 4
5 -
-
8 0
7 -
-
1 4
3 0
-
-
1 3
7 7
N

G
E
N
E

A
U
T
R
Y

T
R
L
9 9
8 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
9 2
3 0
N

G
E
N
E

A
U
T
R
Y

T
R
L
8 5
9 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
8 0
7 4
-
-
4 -
-
6 -
-
1 9
-
-
2 1
E

M
E
S
Q
U
I
T
E

A
V
E
1 5
5 7
E

M
E
S
Q
U
I
T
E

A
V
E
1 5
6 7
-
-
5 8
5 1
-
-
5 5
2 1
3 0
T
H

A
V
E
2 0
8 4
3 0
T
H

A
V
E
2 3
1 0
-
-
5 4
4 -
-
4 9
2 -
-
1 2
0 4
-
-
1 4
4 1
R
A
M
O
N

R
D
1 5
3 8
0 R
A
M
O
N

R
D
1 5
9 3
1 R
A
M
O
N

R
D
1 5
3 8
2 R
A
M
O
N

R
D
1 5
9 3
4 -
-
1 0
1 9
-
-
1 0
7 8
E

M
E
S
Q
U
I
T
E

A
V
E
3 2
1 9
E

M
E
S
Q
U
I
T
E

A
V
E
4 0
9 9
E

M
E
S
Q
U
I
T
E

A
V
E
3 1
3 4
E

M
E
S
Q
U
I
T
E

A
V
E
4 1
3 3
S

E
L

C
I
E
L
O

R
D
4 9
5 C
R
O
S
S
L
E
Y

R
D
3 0
2 9
C
R
O
S
S
L
E
Y

R
D
4 1
2 6
C
R
O
S
S
L
E
Y

R
D
1 9
3 0
C
R
O
S
S
L
E
Y

R
D
2 7
8 9
P
L
U
M
L
E
Y

R
D
0 P
L
U
M
L
E
Y

R
D
0 -
-
6 3
3 3
-
-
6 1
5 9
-
-
1 8
8 4
-
-
1 6
9 5
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 6
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
2 9
4 -
-
1 4
6 -
-
1 3
3 3
0 T
H

A
V
E
1 9
0 2
3 0
T
H

A
V
E
1 8
8 2
L
A
N
D
A
U

B
L
V
D
3 9
9 L
A
N
D
A
U

B
L
V
D
4 3
4 L
A
N
D
A
U

B
L
V
D
3 2
7 8
L
A
N
D
A
U

B
L
V
D
3 5
3 1
R
A
M
O
N

R
D
1 4
2 8
3 R
A
M
O
N

R
D
1 4
4 7
4 -
-
2 6
3 2
-
-
2 4
6 0
V
A
R
N
E
R

R
D
8 4
6 V
A
R
N
E
R

R
D
6 1
8 D
A

V
A
L
L

D
R
1 0
9 3
D
A

V
A
L
L

D
R
1 1
0 8
D
A

V
A
L
L

D
R
1 5
5 0
D
A

V
A
L
L

D
R
1 6
0 9
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 -
-
1 1
2 8
-
-
1 0
5 8
-
-
5 7
6 -
-
6 6
3 -
-
1 1
9 0
-
-
1 1
0 2
B
O
B

H
O
P
E

D
R
9 6
8 2
B
O
B

H
O
P
E

D
R
1 3
5 0
1 D
A
T
E

P
A
L
M

D
R
1 0
1 5
0 D
A
T
E

P
A
L
M

D
R
1 0
3 5
7 -
-
8 6
5 -
-
8 8
9 M
C

C
A
L
L
U
M

W
A
Y
2 9
9 3
M
C

C
A
L
L
U
M

W
A
Y
2 9
6 1
-
-
0 -
-
0 -
-
1 5
3 2
-
-
1 3
6 7
-
-
7 7
8 -
-
8 9
1 D
A
T
E

P
A
L
M

D
R
3 7
0 8
D
A
T
E

P
A
L
M

D
R
3 8
5 4
D
A
T
E

P
A
L
M

D
R
5 3
7 8
D
A
T
E

P
A
L
M

D
R
5 8
0 5
D
A
T
E

P
A
L
M

D
R
1 0
4 8
6 D
A
T
E

P
A
L
M

D
R
1 0
7 1
2 -
-
1 0
5 -
-
1 0
2 D
A
T
E

P
A
L
M

D
R
1 6
5 4
7 D
A
T
E

P
A
L
M

D
R
1 6
1 9
0 -
-
9 9
4 -
-
1 0
5 5

RAMON RD
11780

RAMON RD
11815
R
A
M
O
N

R
D
1 2
9 2
0 R
A
M
O
N

R
D
1 2
9 5
1 -
-
4 -
-
5 -
-
5 1
0 -
-
4 9
9 -
-
1 0
8 -
-
9 8
-
-
4 -
-
6 -
-
4 9
8 -
-
5 0
5 3
0 T
H

A
V
E
1 7
2 0
3 0
T
H

A
V
E
1 6
6 7
-
-
8 2
8 -
-
9 3
1 -
-
7 1
5 4
-
-
0 V
I
S
T
A

C
H
I
N
O
9 0
5 0
V
I
S
T
A

C
H
I
N
O
9 2
7 9
V
I
S
T
A

C
H
I
N
O
7 9
9 2
V
I
S
T
A

C
H
I
N
O
8 2
9 7
D
A
T
E

P
A
L
M

D
R
4 0
1 7
D
A
T
E

P
A
L
M

D
R
4 2
6 5
D
A
T
E

P
A
L
M

D
R
3 7
0 8
D
A
T
E

P
A
L
M

D
R
3 8
5 4
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 R
A
M
O
N

R
D
1 5
6 1
3 R
A
M
O
N

R
D
1 5
6 2
5 -
-
8 7
8 6
-
-
0 E

M
E
S
Q
U
I
T
E

A
V
E
3 2
4 9
E

M
E
S
Q
U
I
T
E

A
V
E
3 4
8 8
--
0 --
0 -
-
4 2
0 -
-
4 9
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
3 9
9 3
8 D
I
N
A
H

S
H
O
R
E

D
R
3 2
4 9
D
I
N
A
H

S
H
O
R
E

D
R
3 4
8 8
D
I
N
A
H

S
H
O
R
E

D
R
3 2
4 9
D
I
N
A
H

S
H
O
R
E

D
R
3 3
8 6
E
L

C
I
E
L
O

R
D
7 5
7 E
L

C
I
E
L
O

R
D
6 3
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 9
5 2
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 5
0 4
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 3
7 0
-
-
4 -
-
6 D
A
T
E

P
A
L
M

D
R
8 1
8 5
D
A
T
E

P
A
L
M

D
R
8 6
4 5
-
-
4 -
-
6 D
I
N
A
H

S
H
O
R
E

D
R
0 D
I
N
A
H

S
H
O
R
E

D
R
0 -
-
8 2
7 -
-
8 4
8 S
A
N

L
U
I
S

R
E
Y

D
R
0 S
A
N

L
U
I
S

R
E
Y

D
R
0 S
A
N

L
U
I
S

R
E
Y

D
R
1 8
0 6
S
A
N

L
U
I
S

R
E
Y

D
R
1 6
8 5
-
-
3 -
-
5 D
A

V
A
L
L

D
R
3 0
5 6
D
A

V
A
L
L

D
R
3 1
1 0
V
I
S
T
A

C
H
I
N
O
8 0
1 8
V
I
S
T
A

C
H
I
N
O
8 0
8 2
E

M
E
S
Q
U
I
T
E

A
V
E
1 1
0 E

M
E
S
Q
U
I
T
E

A
V
E
1 2
8 E

M
E
S
Q
U
I
T
E

A
V
E
1 1
0 E

M
E
S
Q
U
I
T
E

A
V
E
1 2
8 -
-
4 -
-
6 -
-
7 8
8 -
-
9 8
4 -
-
5 -
-
8 E

M
E
S
Q
U
I
T
E

A
V
E
1 1
0 E

M
E
S
Q
U
I
T
E

A
V
E
1 2
8 -
-
7 3
0 4
-
-
0 E

M
E
S
Q
U
I
T
E

A
V
E
1 5
5 7
E

M
E
S
Q
U
I
T
E

A
V
E
1 5
6 7
N

G
E
N
E

A
U
T
R
Y

T
R
L
8 0
7 4
N

G
E
N
E

A
U
T
R
Y

T
R
L
8 5
9 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
8 0
1 4
N

G
E
N
E

A
U
T
R
Y

T
R
L
8 5
0 2
S
A
N

L
U
I
S

R
E
Y

D
R
1 4
3 6
S
A
N

L
U
I
S

R
E
Y

D
R
1 5
2 8

SAN LUIS REY DR
0 SAN LUIS REY DR
0 N

G
E
N
E

A
U
T
R
Y

T
R
L
8 4
2 7
N

G
E
N
E

A
U
T
R
Y

T
R
L
9 0
0 3
M
C

C
A
L
L
U
M

W
A
Y
1 9
1 4
M
C

C
A
L
L
U
M

W
A
Y
1 8
7 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
8 0
9 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
8 6
2 4
-
-
9 5
8 2
--
0 M
C

C
A
L
L
U
M

W
A
Y
2 9
9 3
M
C

C
A
L
L
U
M

W
A
Y
2 9
6 1
D
A
T
E

P
A
L
M

D
R
6 1
9 0
D
A
T
E

P
A
L
M

D
R
6 4
8 5
3 0
T
H

A
V
E
2 7
2 2
3 0
T
H

A
V
E
2 4
8 0
3 0
T
H

A
V
E
3 2
2 7
3 0
T
H

A
V
E
3 0
4 6
-
-
3 8
-
-
3 7
-
-
3 3
5 -
-
3 7
9 D
A
T
E

P
A
L
M

D
R
1 1
2 3
1 D
A
T
E

P
A
L
M

D
R
1 1
5 1
2 D
A
T
E

P
A
L
M

D
R
1 0
6 0
0 D
A
T
E

P
A
L
M

D
R
1 0
7 9
3 D
A
T
E

P
A
L
M

D
R
4 0
1 7
D
A
T
E

P
A
L
M

D
R
4 2
6 5
-
-
5 -
-
7 -
-
9 -
-
4 3
E

R
A
M
O
N

R
D
8 6
3 5
E

R
A
M
O
N

R
D
1 0
6 6
1 E

R
A
M
O
N

R
D
1 0
3 5
6 E

R
A
M
O
N

R
D
1 2
3 7
7 L
A
N
D
A
U

B
L
V
D
5 2
4 3
L
A
N
D
A
U

B
L
V
D
5 3
4 2
L
A
N
D
A
U

B
L
V
D
5 2
4 3
L
A
N
D
A
U

B
L
V
D
5 3
4 2
-
-
8 7
8 6
-
-
0 M
C

C
A
L
L
U
M

W
A
Y
2 5
2 4
M
C

C
A
L
L
U
M

W
A
Y
2 6
2 0
M
C

C
A
L
L
U
M

W
A
Y
1 8
4 4
M
C

C
A
L
L
U
M

W
A
Y
1 8
4 3
-
-
1 1
8 -
-
1 3
6 -
-
4 -
-
6 -
-
0 -
-
0 -
-
1 3
3 2
-
-
1 4
9 6
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
8 6
2 -
-
2 2
7 9
-
-
2 5
0 9
R
A
M
O
N

R
D
1 1
9 3
1 R
A
M
O
N

R
D
1 1
3 4
3 R
A
M
O
N

R
D
1 1
9 0
9 R
A
M
O
N

R
D
1 1
4 8
4 S

G
E
N
E

A
U
T
R
Y

T
R
L
7 5
7 2
S

G
E
N
E

A
U
T
R
Y

T
R
L
7 2
1 6
S

G
E
N
E

A
U
T
R
Y

T
R
L
5 9
2 1
S

G
E
N
E

A
U
T
R
Y

T
R
L
5 3
7 4
S

G
E
N
E

A
U
T
R
Y

T
R
L
5 9
2 1
S

G
E
N
E

A
U
T
R
Y

T
R
L
5 3
7 4
S

G
E
N
E

A
U
T
R
Y

T
R
L
5 9
2 1
S

G
E
N
E

A
U
T
R
Y

T
R
L
5 3
7 4
E

R
A
M
O
N

R
D
8 6
3 5
E

R
A
M
O
N

R
D
1 0
6 6
1 E

R
A
M
O
N

R
D
8 4
5 7
E

R
A
M
O
N

R
D
1 0
5 1
6 E

R
A
M
O
N

R
D
8 4
5 7
E

R
A
M
O
N

R
D
1 0
5 1
6 E

R
A
M
O
N

R
D
8 4
5 7
E

R
A
M
O
N

R
D
1 0
5 1
6 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
8 6
4 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
8 8
5 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
8 6
4 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
8 8
5 E

B
A
R
I
S
T
O

R
D
2 6
3 7
E

B
A
R
I
S
T
O

R
D
0 R
A
M
O
N

R
D
1 3
7 1
6 R
A
M
O
N

R
D
1 3
1 6
9 -
-
3 0
1 -
-
2 6
8 R
A
M
O
N

R
D
1 3
7 1
6 R
A
M
O
N

R
D
1 3
1 6
9 N

G
E
N
E

A
U
T
R
Y

T
R
L
9 7
7 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
5 9
2 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
0 5
2 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
9 1
6 L
A
N
D
A
U

B
L
V
D
5 2
8 5
L
A
N
D
A
U

B
L
V
D
5 5
4 9
L
A
N
D
A
U

B
L
V
D
5 2
8 5
L
A
N
D
A
U

B
L
V
D
5 5
4 9
D
A
T
E

P
A
L
M

D
R
2 9
9 0
D
A
T
E

P
A
L
M

D
R
3 2
9 0
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
6 2
8 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 D
A
T
E

P
A
L
M

D
R
8 7
4 0
D
A
T
E

P
A
L
M

D
R
8 9
6 0
-
-
6 0
3 1
-
-
0 -
-
6 0
3 1
-
-
0 -
-
8 5
-
-
7 7
-
-
7 1
5 -
-
8 0
4 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 7
3 3
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
4 7
3 3
1 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 5
0 4
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 3
7 0
3 0
T
H

A
V
E
1 7
4 9
3 0
T
H

A
V
E
1 7
6 6
-
-
3 6
1 -
-
4 0
5 D
A

V
A
L
L

D
R
2 2
0 8
D
A

V
A
L
L

D
R
2 3
3 2
D
A

V
A
L
L

D
R
2 2
3 8
D
A

V
A
L
L

D
R
2 4
1 3
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
1 0
1 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
9 5
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
9 0
4 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
8 6
4 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
8 8
5 3
4 T
H

A
V
E
0 3
4 T
H

A
V
E
0 3
4 T
H

A
V
E
5 4
3 3
4 T
H

A
V
E
5 8
6 M
C

C
A
L
L
U
M

W
A
Y
1 0
4 7
M
C

C
A
L
L
U
M

W
A
Y
1 1
0 1
R
A
M
O
N

R
D
1 1
7 8
0 R
A
M
O
N

R
D
1 1
8 1
5 E

M
E
S
Q
U
I
T
E

A
V
E
1 1
0 E

M
E
S
Q
U
I
T
E

A
V
E
1 2
8 E

M
E
S
Q
U
I
T
E

A
V
E
1 1
0 E

M
E
S
Q
U
I
T
E

A
V
E
1 2
8 M
C

C
A
L
L
U
M

W
A
Y
1 0
4 7
M
C

C
A
L
L
U
M

W
A
Y
1 1
0 1
-
-
9 8
4 -
-
7 8
8 -
-
3 7
5 4
-
-
0 3
4 T
H

A
V
E
5 5
4 3
4 T
H

A
V
E
5 9
4 34TH AVE
543
34TH AVE
586
-
-
1 5
-
-
1 2
-
-
8 7
8 6
-
-
0 D
A
T
E

P
A
L
M

D
R
8 0
8 6
D
A
T
E

P
A
L
M

D
R
8 4
8 5
D
A
T
E

P
A
L
M

D
R
1 0
1 2
0 D
A
T
E

P
A
L
M

D
R
1 0
2 8
9 -
-
0 -
-
9 5
8 2
-
-
0 -
-
7 3
0 4
-
-
0 -
-
3 7
3 -
-
4 2
0 D
A
T
E

P
A
L
M

D
R
3 0
8 3
D
A
T
E

P
A
L
M

D
R
3 3
7 3
-
-
7 6
9 -
-
7 0
7 B
O
B

H
O
P
E

D
R
7 3
8 0
B
O
B

H
O
P
E

D
R
8 1
3 3
B
O
B

H
O
P
E

D
R
7 3
7 9
B
O
B

H
O
P
E

D
R
8 1
3 1
E

B
A
R
I
S
T
O

R
D
5 8
6 E

B
A
R
I
S
T
O

R
D
2 3
0 6
-
-
7 3
0 4
-
-
0 -
-
7 3
0 4
-
-
0 -
-
6 0
3 1
-
-
0 -
-
6 0
3 1
-
-
0 -
-
6 7
0 -
-
7 3
1 D
A
T
E

P
A
L
M

D
R
8 6
4 8
D
A
T
E

P
A
L
M

D
R
1 0
5 6
9 E BARISTO RD
2137

E BARISTO RD
0 D
A
T
E

P
A
L
M

D
R
9 5
4 4
D
A
T
E

P
A
L
M

D
R
9 6
7 5
D
A
T
E

P
A
L
M

D
R
8 6
4 8
D
A
T
E

P
A
L
M

D
R
1 0
5 6
9 R
A
M
O
N

R
D
1 2
1 0
2 R
A
M
O
N

R
D
1 1
9 6
6 R
A
M
O
N

R
D
1 2
0 9
8 R
A
M
O
N

R
D
1 1
9 6
4 -
-
7 1
5 4
-
-
0 -
-
7 1
5 4
-
-
0 V
A
R
N
E
R

R
D
8 8
9 V
A
R
N
E
R

R
D
6 3
7 -
-
5 3
9 9
-
-
5 3
9 9
RIVCOM 4.01 - 2018 Daily Model Volumes (Wren Resi + Date Palm + Vallarata) 0 .05
.1
.15
Miles
HCMType
CC (6866)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12488)
PrArterial (8422)
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 7
5 0
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 6
3 9
0 -
-
1 3
2 -
-
1 4
5 V
A
R
N
E
R

R
D
2 4
4 7
V
A
R
N
E
R

R
D
1 8
0 9
-
-
1 8
7 -
-
2 0
4 V
I
S
T
A

C
H
I
N
O
8 8
6 V
I
S
T
A

C
H
I
N
O
8 8
8 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
4 7
V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
4 4
L
o
s

A
l
o
m
o
s

R
d
0 L
o
s

A
l
o
m
o
s

R
d
0 -
-
0 -
-
5 0
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 9
1 0
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
3 7
3 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 1
2 7
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 6
5 7
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 -
-
2 5
-
-
2 7
-
-
1 1
9 -
-
2 0
7 D
I
N
A
H

S
H
O
R
E

D
R
5 7
8 7
D
I
N
A
H

S
H
O
R
E

D
R
6 1
7 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
3 7
3 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 1
2 7
5 -
-
3 8
0 -
-
3 4
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 5
5 6
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 2
-
-
1 5
R
A
M
O
N

R
D
1 4
7 5
9 R
A
M
O
N

R
D
1 5
2 8
3 -
-
8 6
-
-
7 9
-
-
4 1
0 -
-
4 1
8 -
-
2 9
-
-
3 4
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 4
4 3
4 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 0
5 3
-
-
1 1
3 4
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
7 0
5 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
0 3
6 -
-
1 6
8 2
-
-
1 7
5 5
-
-
2 -
-
3 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 V
A
L
L
E
Y

C
E
N
T
E
R

B
L
V
D
0 -
-
1 2
9 1
-
-
1 3
1 7
-
-
5 2
-
-
5 2
-
-
7 5
4 -
-
6 9
5 E

V
I
S
T
A

C
H
I
N
O
1 7
8 4
1 E

V
I
S
T
A

C
H
I
N
O
1 8
1 4
4 -
-
3 2
5 -
-
3 3
0 -
-
0 -
-
0 -
-
4 7
4 -
-
5 2
5 S

G
E
N
E

A
U
T
R
Y

T
R
L
6 0
5 9
S

G
E
N
E

A
U
T
R
Y

T
R
L
6 8
5 5
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 8
1 1
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 4
-
-
1 6
-
-
0 -
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 8
7 9
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 3
4 6
-
-
1 4
3 2
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 5
8 7
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 A
V
E
I
D
A

Q
U
I
N
T
A
N
A
5 7
8 A
V
E
I
D
A

Q
U
I
N
T
A
N
A
6 6
8 V
I
S
T
A

C
H
I
N
O
1 0
1 5
3 V
I
S
T
A

C
H
I
N
O
1 0
0 9
6 -
-
1 0
5 -
-
1 1
7 -
-
8 6
9 -
-
9 0
6 -
-
6 7
5 -
-
7 9
1 -
-
5 1
2 -
-
4 7
7 -
-
2 5
0 2
-
-
2 6
2 0
-
-
1 9
-
-
2 1
D
A

V
A
L
L

D
R
4 6
2 0
D
A

V
A
L
L

D
R
4 6
9 3
-
-
1 2
4 -
-
1 2
6 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
9 9
1 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
3 7
9 -
-
4 7
-
-
5 1

DINAH SHORE DR
4580

DINAH SHORE DR
4802
M
C

C
A
L
L
U
M

W
A
Y
2 2
2 3
M
C

C
A
L
L
U
M

W
A
Y
2 4
0 0
M
C

C
A
L
L
U
M

W
A
Y
5 3
1 M
C

C
A
L
L
U
M

W
A
Y
6 9
0 DINAH SHORE DR
3645

DINAH SHORE DR
3895
D
I
N
A
H

S
H
O
R
E

D
R
3 6
4 5
D
I
N
A
H

S
H
O
R
E

D
R
3 8
9 5
V
I
S
T
A

C
H
I
N
O
9 9
1 3
V
I
S
T
A

C
H
I
N
O
1 0
0 1
3 V
A
R
N
E
R

R
D
1 9
1 4
V
A
R
N
E
R

R
D
1 6
1 8
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
6 7
4 7
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
7 3
0 4
C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
1 0
0 0
7 C
A
T
H
E
D
R
A
L

C
A
N
Y
O
N

D
R
9 9
9 1
-
-
3 1
1 5
-
-
3 2
1 4
L
A
N
D
A
U

B
L
V
D
5 8
4 4
L
A
N
D
A
U

B
L
V
D
6 1
5 7
R
A
M
O
N

R
D
1 4
2 3
2 R
A
M
O
N

R
D
1 4
6 1
2 L
A
N
D
A
U

B
L
V
D
5 9
4 0
L
A
N
D
A
U

B
L
V
D
6 2
9 9
L
A
N
D
A
U

B
L
V
D
6 4
3 4
L
A
N
D
A
U

B
L
V
D
7 0
7 7
D
A
T
E

P
A
L
M

D
R
1 0
7 9
2 D
A
T
E

P
A
L
M

D
R
1 2
0 2
8 V
A
R
N
E
R

R
D
1 8
2 9
V
A
R
N
E
R

R
D
1 5
2 1
3 0
T
H

A
V
E
2 0
5 6
3 0
T
H

A
V
E
6 7
8 D
A

V
A
L
L

D
R
4 0
5 7
D
A

V
A
L
L

D
R
4 2
5 4
-
-
2 0
8 -
-
4 8
-
-
6 -
-
9 R
A
M
O
N

R
D
1 4
6 7
8 R
A
M
O
N

R
D
1 5
1 5
0 V
I
S
T
A

C
H
I
N
O
1 0
3 0
9 V
I
S
T
A

C
H
I
N
O
1 0
1 6
0 V
A
R
N
E
R

R
D
1 8
3 0
V
A
R
N
E
R

R
D
1 5
0 7
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
5 7
1 6
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
5 7
-
-
7 2

RAMON RD
14459

RAMON RD
14569
-
-
1 3
-
-
1 6
-
-
0 -
-
0 D
A
T
E

P
A
L
M

D
R
8 5
9 6
D
A
T
E

P
A
L
M

D
R
9 0
3 5
-
-
1 2
1 2
-
-
8 2
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
5 8
2 2
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
7 3
6 -
-
6 6
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
5 9
6 9
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
9 2
-
-
1 0
1 -
-
2 9
4 -
-
2 6
2 -
-
5 5
-
-
7 1
D
I
N
A
H

S
H
O
R
E

D
R
4 1
6 0
D
I
N
A
H

S
H
O
R
E

D
R
4 3
1 4
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 6
5 0
4 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 V
A
R
N
E
R

R
D
1 8
2 3
V
A
R
N
E
R

R
D
1 5
1 1
-
-
6 3
9 -
-
5 9
8 V
A
R
N
E
R

R
D
6 0
1 1
V
A
R
N
E
R

R
D
7 1
4 9
-
-
2 0
3 8
-
-
1 9
3 9
-
-
9 2
-
-
1 1
2 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 1
4 4
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 D
I
N
A
H

S
H
O
R
E

D
R
4 6
2 7
D
I
N
A
H

S
H
O
R
E

D
R
4 5
0 8
3 0
T
H

A
V
E
2 4
4 4
3 0
T
H

A
V
E
1 3
3 5
V
E
R
O
N
A

R
D
2 3
8 3
V
E
R
O
N
A

R
D
2 1
8 7
-
-
2 4
8 0
-
-
2 3
5 3
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 9
1 0
7 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
7 5
8 -
-
6 3
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 6
5 7
5 -
-
7 2
4 -
-
7 0
7 -
-
2 5
7 5
-
-
2 4
5 0
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 3
8 9
6 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 0
-
-
1 1
-
-
1 0
-
-
1 1
-
-
1 6
7 0
-
-
1 5
2 5
E

B
A
R
I
S
T
O

R
D
5 9
7 1
E

B
A
R
I
S
T
O

R
D
3 3
5 5
-
-
1 2
6 6
-
-
1 1
8 0
-
-
1 7
6 6
-
-
1 6
6 2
D
I
N
A
H

S
H
O
R
E

D
R
5 3
1 0
D
I
N
A
H

S
H
O
R
E

D
R
5 6
6 0
-
-
8 5
8 -
-
7 8
3 -
-
9 4
3 -
-
9 4
9 V
E
R
O
N
A

R
D
0 V
E
R
O
N
A

R
D
0 -
-
0 -
-
0 V
I
S
T
A

C
H
I
N
O
1 1
4 9
8 V
I
S
T
A

C
H
I
N
O
1 1
7 9
6 -
-
1 9
0 6
-
-
1 7
6 6
-
-
1 6
6 -
-
1 4
6 -
-
1 3
-
-
1 4
-
-
1 0
2 -
-
1 1
2 -
-
4 0
3 -
-
4 0
6 E
L

C
I
E
L
O

R
D
1 5
8 8
-
-
6 5
2 -
-
6 2
9 D
A

V
A
L
L

D
R
5 9
4 2
D
A

V
A
L
L

D
R
4 4
0 2
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 3
0 0
9 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 4
6 -
-
1 7
1 E
L

C
I
E
L
O

R
D
9 4
8 D
I
N
A
H

S
H
O
R
E

D
R
4 1
7 2
D
I
N
A
H

S
H
O
R
E

D
R
4 3
9 7
L
A
N
D
A
U

B
L
V
D
5 0
9 9
L
A
N
D
A
U

B
L
V
D
5 0
7 8
V
I
S
T
A

C
H
I
N
O
1 1
1 2
7 V
I
S
T
A

C
H
I
N
O
1 1
4 1
6 C
R
O
S
S
L
E
Y

R
D
2 0
7 7
C
R
O
S
S
L
E
Y

R
D
2 2
7 0
R
A
M
O
N

R
D
1 5
0 9
8 R
A
M
O
N

R
D
1 5
2 1
0 R
A
M
O
N

R
D
1 8
0 0
8 R
A
M
O
N

R
D
1 9
0 0
6 -
-
1 6
3 5
-
-
1 7
0 4
-
-
1 4
1 6
-
-
1 1
6 8
-
-
1 0
7 3
-
-
1 1
7 5
-
-
0 -
-
0 D
A
T
E

P
A
L
M

D
R
4 2
8 3
D
A
T
E

P
A
L
M

D
R
4 7
6 8
-
-
1 9
4 5
-
-
1 9
8 0
-
-
1 6
1 6
-
-
1 5
3 8
E

M
E
S
Q
U
I
T
E

A
V
E
2 2
1 5
E

M
E
S
Q
U
I
T
E

A
V
E
1 4
0 7
-
-
6 8
8 6
-
-
0 -
-
7 4
4 -
-
8 2
8 -
-
6 3
3 -
-
5 7
9 D
A
T
E

P
A
L
M

D
R
9 7
9 8
D
A
T
E

P
A
L
M

D
R
1 0
0 4
0 E

M
E
S
Q
U
I
T
E

A
V
E
2 2
1 5
E

M
E
S
Q
U
I
T
E

A
V
E
1 4
0 7
-
-
7 6
3 -
-
7 4
1 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 6
5 0
4 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 D
I
N
A
H

S
H
O
R
E

D
R
4 1
6 0
D
I
N
A
H

S
H
O
R
E

D
R
4 3
1 4

RAMON RD
9222

RAMON RD
3604
V
A
R
N
E
R

R
D
1 9
3 4
V
A
R
N
E
R

R
D
1 6
0 7
-
-
6 4
2 -
-
7 4
9 E

B
A
R
I
S
T
O

R
D
5 9
4 9
E

B
A
R
I
S
T
O

R
D
3 2
2 9
-
-
2 0
6 0
-
-
1 9
4 9
-
-
1 2
1 5
-
-
1 2
4 8
-
-
0 -
-
0 D
A

V
A
L
L

D
R
4 5
7 1
D
A

V
A
L
L

D
R
4 3
7 5
-
-
5 5
8 -
-
5 2
5 -
-
1 5
2 7
-
-
1 3
3 8
-
-
2 3
4 8
-
-
2 1
2 8
D
A
T
E

P
A
L
M

D
R
1 0
7 2
3 D
A
T
E

P
A
L
M

D
R
1 2
0 9
7 E

R
A
M
O
N

R
D
8 6
5 3
E

R
A
M
O
N

R
D
1 0
8 1
2 -
-
7 9
9 -
-
7 9
7 L
A
N
D
A
U

B
L
V
D
6 4
9 1
L
A
N
D
A
U

B
L
V
D
7 0
3 9
R
A
M
O
N

R
D
1 5
2 0
6 R
A
M
O
N

R
D
1 5
3 5
7 -
-
1 8
2 7
-
-
1 7
1 1
D
A

V
A
L
L

D
R
5 8
9 D
A

V
A
L
L

D
R
9 0
1 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 2
3 0
2 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 1
3 7
3 -
-
0 -
-
0 -
-
1 7
8 8
-
-
1 6
8 1
-
-
2 6
5 -
-
2 6
3 -
-
6 6
1 1
-
-
6 3
8 2
-
-
2 4
-
-
2 7
-
-
2 8
8 7
-
-
2 9
4 0
-
-
7 1
-
-
7 7
-
-
9 0
3 -
-
8 3
9 -
-
1 0
2 5
-
-
1 0
9 3
E

R
A
M
O
N

R
D
1 4
5 7
9 E

R
A
M
O
N

R
D
1 4
1 2
2 -
-
6 9
9 8
-
-
6 5
5 7
R
A
M
O
N

R
D
1 7
1 3
2 R
A
M
O
N

R
D
1 7
2 6
0 -
-
2 6
8 1
-
-
2 4
1 8
-
-
2 4
-
-
2 7
-
-
1 6
2 4
-
-
1 6
2 6
D
I
N
A
H

S
H
O
R
E

D
R
3 7
3 0
D
I
N
A
H

S
H
O
R
E

D
R
3 4
9 2
-
-
6 3
7 -
-
6 0
4 E

M
E
S
Q
U
I
T
E

A
V
E
4 2
9 2
E

M
E
S
Q
U
I
T
E

A
V
E
3 4
8 1
-
-
1 4
5 6
-
-
1 4
5 3
3 0
T
H

A
V
E
2 2
0 2
3 0
T
H

A
V
E
2 3
9 1
L
A
N
D
A
U

B
L
V
D
4 1
0 7
L
A
N
D
A
U

B
L
V
D
4 3
3 1
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
3 6
5 3
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 -
-
6 2
4 -
-
6 1
4 -
-
1 6
7 -
-
1 6
7 C
R
O
S
S
L
E
Y

R
D
3 9
5 5
C
R
O
S
S
L
E
Y

R
D
4 4
8 8
-
-
1 2
3 0
-
-
1 2
2 9
V
A
R
N
E
R

R
D
1 8
2 4
V
A
R
N
E
R

R
D
1 5
0 4
-
-
6 0
4 -
-
5 5
5 -
-
2 2
3 1
-
-
2 5
6 1
E

M
E
S
Q
U
I
T
E

A
V
E
5 2
4 5
E

M
E
S
Q
U
I
T
E

A
V
E
5 6
3 3
S

G
E
N
E

A
U
T
R
Y

T
R
L
7 7
0 8
S

G
E
N
E

A
U
T
R
Y

T
R
L
9 1
5 8
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
8 5
9 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
1 8
5 E

M
E
S
Q
U
I
T
E

A
V
E
5 0
8 8
E

M
E
S
Q
U
I
T
E

A
V
E
5 4
7 3
S

E
L

C
I
E
L
O

R
D
2 4
4 7
-
-
4 2
7 -
-
4 7
6 P
L
U
M
L
E
Y

R
D
0 P
L
U
M
L
E
Y

R
D
0 S

G
E
N
E

A
U
T
R
Y

T
R
L
6 5
8 6
S

G
E
N
E

A
U
T
R
Y

T
R
L
7 8
0 6
-
-
2 1
8 7
-
-
1 9
9 5
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 2
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 2
0 -
-
7 0
0 -
-
0 -
-
4 4
4 4
-
-
4 4
7 2
3 0
T
H

A
V
E
1 7
5 1
3 0
T
H

A
V
E
1 6
7 7
C
R
O
S
S
L
E
Y

R
D
3 6
3 9
C
R
O
S
S
L
E
Y

R
D
3 8
3 2
-
-
2 0
1 1
-
-
2 2
4 2
E

R
A
M
O
N

R
D
7 3
7 6
E

R
A
M
O
N

R
D
9 5
0 8
E

R
A
M
O
N

R
D
7 3
9 6
E

R
A
M
O
N

R
D
9 5
4 4
D
A

V
A
L
L

D
R
3 9
5 7
D
A

V
A
L
L

D
R
3 8
6 9
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
7 1
4 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
6 9
2 -
-
5 0
2 4
-
-
4 8
9 2
-
-
2 8
8 5
-
-
2 6
5 8
-
-
2 5
9 2
-
-
2 6
6 8
R
A
M
O
N

R
D
1 6
3 4
0 R
A
M
O
N

R
D
1 6
7 9
0 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
7 1
5 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 1
6 6
0 D
I
N
A
H

S
H
O
R
E

D
R
3 7
3 0
D
I
N
A
H

S
H
O
R
E

D
R
3 4
9 2
V
I
S
T
A

C
H
I
N
O
1 1
4 9
8 V
I
S
T
A

C
H
I
N
O
1 1
7 9
6 V
A
R
N
E
R

R
D
1 8
1 9
V
A
R
N
E
R

R
D
1 5
0 3
-
-
9 4
2 -
-
1 0
9 9
L
A
N
D
A
U

B
L
V
D
6 4
6 5
L
A
N
D
A
U

B
L
V
D
7 0
7 9
D
A

V
A
L
L

D
R
4 4
0 0
D
A

V
A
L
L

D
R
4 2
3 8
-
-
1 0
7 9
-
-
9 8
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 6
3 9
0 B
O
B

H
O
P
E

D
R
9 4
0 8
B
O
B

H
O
P
E

D
R
1 7
2 7
0 -
-
1 7
4 -
-
1 6
1 -
-
2 8
7 -
-
4 8
7 -
-
1 6
5 -
-
1 9
5 D
A
T
E

P
A
L
M

D
R
1 0
7 3
3 D
A
T
E

P
A
L
M

D
R
1 2
0 9
1 D
A
T
E

P
A
L
M

D
R
4 6
4 6
D
A
T
E

P
A
L
M

D
R
5 1
7 2
-
-
1 4
3 6
-
-
1 3
4 9
-
-
7 6
6 4
-
-
0 M
C

C
A
L
L
U
M

W
A
Y
4 1
8 5
M
C

C
A
L
L
U
M

W
A
Y
4 0
0 4
-
-
1 6
8 3
-
-
1 6
1 7
-
-
7 0
0 -
-
0 L
A
N
D
A
U

B
L
V
D
4 9
2 6
L
A
N
D
A
U

B
L
V
D
5 3
9 6
-
-
0 -
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 6
5 7
5 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 -
-
1 0
5 8
-
-
1 1
4 1
E
L

C
I
E
L
O

R
D
2 0
1 7
D
A
T
E

P
A
L
M

D
R
1 3
6 5
1 D
A
T
E

P
A
L
M

D
R
1 4
0 8
7 D
A
T
E

P
A
L
M

D
R
1 8
1 3
7 D
A
T
E

P
A
L
M

D
R
1 9
2 2
5 -
-
2 2
8 8
-
-
0 -
-
2 2
8 8
-
-
0 -
-
7 7
4 -
-
7 5
8 C
R
O
S
S
L
E
Y

R
D
1 7
6 6
C
R
O
S
S
L
E
Y

R
D
1 7
7 1
-
-
5 1
4 -
-
4 9
5 M
C

C
A
L
L
U
M

W
A
Y
3 0
8 2
M
C

C
A
L
L
U
M

W
A
Y
3 1
2 9
-
-
1 4
2 5
-
-
0 -
-
1 6
-
-
1 8
3 0
T
H

A
V
E
1 6
9 3
3 0
T
H

A
V
E
1 6
1 9
-
-
3 -
-
2 E

M
E
S
Q
U
I
T
E

A
V
E
2 2
1 5
E

M
E
S
Q
U
I
T
E

A
V
E
1 4
0 7
-
-
3 6
0 9
-
-
0 -
-
7 2
6 8
-
-
0 -
-
2 6
0 3
-
-
0 34TH AVE
664
34TH AVE
711
-
-
0 D
A

V
A
L
L

D
R
4 3
1 9
D
A

V
A
L
L

D
R
4 4
9 1
-
-
2 1
3 -
-
2 4
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
0 SAN LUIS REY DR
0 SAN LUIS REY DR
0 -
-
7 0
6 -
-
0 R
A
M
O
N

R
D
1 5
2 3
6 R
A
M
O
N

R
D
1 5
4 0
0 R
A
M
O
N

R
D
1 7
9 5
1 R
A
M
O
N

R
D
1 8
9 3
4 --
0 --
0 -
-
1 0
9 4
7 -
-
0 D
I
N
A
H

S
H
O
R
E

D
R
5 7
8 7
D
I
N
A
H

S
H
O
R
E

D
R
6 1
7 2
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 4
6 0
3 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 5
8 7
5 --
0 --
0 V
I
S
T
A

C
H
I
N
O
8 8
8 V
I
S
T
A

C
H
I
N
O
8 8
6 -
-
1 0
6 8
-
-
1 2
0 2
-
-
9 2
-
-
7 7
S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
5 8
2 2
2 V
I
S
T
A

C
H
I
N
O
1 0
5 9
0 V
I
S
T
A

C
H
I
N
O
1 0
9 6
8 R
A
M
O
N

R
D
1 4
3 1
6 R
A
M
O
N

R
D
1 4
4 1
9 V
E
R
O
N
A

R
D
3 0
5 0
V
E
R
O
N
A

R
D
2 7
6 5
-
-
2 2
3 8
-
-
0 S
O
N
N
Y

B
O
N
O

M
E
M
O
R
I
A
L

F
W
Y
6 9
1 0
7 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 4
8 9
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 3
4 7
-
-
2 -
-
3 D
A

V
A
L
L

D
R
5 8
9 D
A

V
A
L
L

D
R
9 0
1 L
A
N
D
A
U

B
L
V
D
3 4
2 9
L
A
N
D
A
U

B
L
V
D
1 4
7 0
-
-
1 0
5 6
9 -
-
0 D
A

V
A
L
L

D
R
5 0
5 6
D
A

V
A
L
L

D
R
3 5
1 4
-
-
9 6
4 -
-
0 L
A
N
D
A
U

B
L
V
D
4 7
L
A
N
D
A
U

B
L
V
D
4 4
S
A
N

L
U
I
S

R
E
Y

D
R
0 S
A
N

L
U
I
S

R
E
Y

D
R
0 D
A
T
E

P
A
L
M

D
R
1 0
5 4
3 D
A
T
E

P
A
L
M

D
R
1 1
0 5
4 -
-
1 6
-
-
1 8
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
4 0
6 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 1
1 1
8 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
1 8
5 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
8 5
9 -
-
1 6
-
-
1 8
M
C

C
A
L
L
U
M

W
A
Y
4 1
8 5
M
C

C
A
L
L
U
M

W
A
Y
4 0
0 4
S
A
N

L
U
I
S

R
E
Y

D
R
2 3
0 8
S
A
N

L
U
I
S

R
E
Y

D
R
2 2
0 2
V
I
S
T
A

C
H
I
N
O
1 0
4 9
1 V
I
S
T
A

C
H
I
N
O
1 0
6 8
1 -
-
5 -
-
7 R
A
M
O
N

R
D
1 6
3 7
0 R
A
M
O
N

R
D
1 6
7 2
6 -
-
7 8
4 -
-
9 7
8 -
-
7 3
4 5
-
-
0 -
-
1 0
5 6
9 --
0 D
A
T
E

P
A
L
M

D
R
1 0
6 9
5 D
A
T
E

P
A
L
M

D
R
1 1
1 6
2 3
0 T
H

A
V
E
2 9
0 6
3 0
T
H

A
V
E
2 6
4 0
3 0
T
H

A
V
E
3 5
3 6
3 0
T
H

A
V
E
3 3
5 3
-
-
4 9
3 -
-
4 5
0 -
-
3 6
0 9
-
-
0 -
-
1 3
7 -
-
3 5
-
-
4 6
2 -
-
5 2
4 D
A
T
E

P
A
L
M

D
R
1 4
8 1
7 D
A
T
E

P
A
L
M

D
R
1 5
2 4
8 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
0 3
6 N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
7 0
5 M
C

C
A
L
L
U
M

W
A
Y
3 6
2 3
M
C

C
A
L
L
U
M

W
A
Y
3 6
5 2
N

G
E
N
E

A
U
T
R
Y

T
R
L
9 9
4 5
N

G
E
N
E

A
U
T
R
Y

T
R
L
1 0
5 9
3 M
C

C
A
L
L
U
M

W
A
Y
3 9
1 1
M
C

C
A
L
L
U
M

W
A
Y
3 8
7 4
-
-
0 -
-
0 D
A
T
E

P
A
L
M

D
R
1 0
0 3
4 D
A
T
E

P
A
L
M

D
R
1 0
4 1
0 D
A
T
E

P
A
L
M

D
R
1 4
0 6
1 D
A
T
E

P
A
L
M

D
R
1 4
3 9
0 -
-
1 0
9 4
7 -
-
0 D
A
T
E

P
A
L
M

D
R
5 8
2 1
D
A
T
E

P
A
L
M

D
R
6 4
5 7
-
-
1 6
-
-
1 9
-
-
0 -
-
0 M
C

C
A
L
L
U
M

W
A
Y
3 1
8 2
M
C

C
A
L
L
U
M

W
A
Y
3 0
8 5
B
O
B

H
O
P
E

D
R
8 9
5 6
B
O
B

H
O
P
E

D
R
1 0
6 7
6 R
A
M
O
N

R
D
1 4
0 3
2 R
A
M
O
N

R
D
1 4
5 8
8 -
-
1 6
-
-
1 8
-
-
1 5
1 -
-
1 7
2 R
A
M
O
N

R
D
1 3
8 0
6 R
A
M
O
N

R
D
1 4
1 5
1 -
-
1 5
4 0
-
-
1 7
5 1
-
-
3 2
7 -
-
3 4
2 E

B
A
R
I
S
T
O

R
D
6 0
9 7
E

B
A
R
I
S
T
O

R
D
0 D
A
T
E

P
A
L
M

D
R
1 1
0 6
7 D
A
T
E

P
A
L
M

D
R
1 1
3 8
3 E
L

C
I
E
L
O

R
D
2 1
0 6
D
A

V
A
L
L

D
R
4 4
5 1
D
A

V
A
L
L

D
R
4 2
0 4
-
-
0 -
-
0 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
4 3
3 3
P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 3
4 T
H

A
V
E
0 3
4 T
H

A
V
E
0 -
-
2 4
5 2
-
-
2 7
0 7
-
-
2 6
0 3
-
-
0 -
-
6 6
6 -
-
8 0
3 D
A
T
E

P
A
L
M

D
R
1 0
0 3
4 D
A
T
E

P
A
L
M

D
R
1 0
4 1
0 -
-
1 0
3 -
-
9 4
L
A
N
D
A
U

B
L
V
D
5 0
9 9
L
A
N
D
A
U

B
L
V
D
5 0
7 8
D
I
N
A
H

S
H
O
R
E

D
R
4 1
6 0
D
I
N
A
H

S
H
O
R
E

D
R
4 3
1 4
-
-
4 0
1 -
-
4 0
2 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 4
8 9
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
1 3
4 7
3 0
T
H

A
V
E
2 3
0 7
3 0
T
H

A
V
E
1 3
0 0
A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
7 1
4 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
6 9
2 -
-
7 3
4 5
-
-
0 -
-
7 6
6 4
-
-
0 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
2 7
5 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
9 6
6 A
V
E
N
I
D
A

M
A
R
A
V
I
L
L
A
9 2
2 R
A
M
O
N

R
D
1 4
3 1
6 R
A
M
O
N

R
D
1 4
4 1
9 -
-
2 2
3 8
-
-
0 D
A

V
A
L
L

D
R
5 8
9 D
A

V
A
L
L

D
R
9 0
1 -
-
9 7
8 -
-
7 8
4 D
A

V
A
L
L

D
R
4 4
6 1
D
A

V
A
L
L

D
R
4 2
6 2
-
-
2 0
1 8
-
-
0 3
4 T
H

A
V
E
5 5
0 3
4 T
H

A
V
E
5 8
3 -
-
1 2
-
-
1 0
-
-
1 0
9 4
7 -
-
0 -
-
3 3
8 2
-
-
0 S
A
N

L
U
I
S

R
E
Y

D
R
1 9
3 9
S
A
N

L
U
I
S

R
E
Y

D
R
2 0
3 8
-
-
3 3
8 2
-
-
0 R
A
M
O
N

R
D
1 6
3 7
0 R
A
M
O
N

R
D
1 6
7 2
6 D
A
T
E

P
A
L
M

D
R
1 0
3 5
4 D
A
T
E

P
A
L
M

D
R
1 0
9 0
3 D
A
T
E

P
A
L
M

D
R
1 1
3 5
6 D
A
T
E

P
A
L
M

D
R
1 1
6 5
8 -
-
7 3
4 5
-
-
0 -
-
7 8
1 -
-
7 1
6 R
A
M
O
N

R
D
1 4
6 7
8 R
A
M
O
N

R
D
1 5
1 5
0 -
-
7 2
6 8
-
-
0 D
A

V
A
L
L

D
R
2 7
5 5
D
A

V
A
L
L

D
R
1 5
2 8
-
-
1 4
2 5
-
-
0 -
-
4 1
1 -
-
4 1
4 V
A
R
N
E
R

R
D
2 5
1 1
V
A
R
N
E
R

R
D
1 8
5 8
-
-
9 6
4 -
-
0 D
A
T
E

P
A
L
M

D
R
6 1
4 3
D
A
T
E

P
A
L
M

D
R
6 7
7 7
E

B
A
R
I
S
T
O

R
D
3 3
5 5
E

B
A
R
I
S
T
O

R
D
5 9
7 1
D
A
T
E

P
A
L
M

D
R
4 6
2 6
D
A
T
E

P
A
L
M

D
R
5 1
5 5
-
-
6 8
8 6
B
O
B

H
O
P
E

D
R
8 9
5 6
B
O
B

H
O
P
E

D
R
1 0
6 7
6 -
-
6 8
1 -
-
6 4
4 D
A
T
E

P
A
L
M

D
R
1 0
5 4
9 D
A
T
E

P
A
L
M

D
R
1 4
8 6
2 D
A

V
A
L
L

D
R
2 7
5 5
D
A

V
A
L
L

D
R
1 5
2 8

E BARISTO RD
2136

E BARISTO RD
0 D
A
T
E

P
A
L
M

D
R
1 1
8 7
0 D
A
T
E

P
A
L
M

D
R
1 2
0 4
9 D
A
T
E

P
A
L
M

D
R
1 0
5 4
9 D
A
T
E

P
A
L
M

D
R
1 4
8 6
2 P
A
L
M

S
P
R
I
N
G
S

A
I
R
P
O
R
T

A
C
C
E
S
S

R
D
0 BOB HOPE DR
8911

BOB HOPE DR
10604
L
A
N
D
A
U

B
L
V
D
4 1
5 7
L
A
N
D
A
U

B
L
V
D
4 3
3 1
RIVCOM 4.01 - 2045 ADaily Model Volumes (Wren Resi + Date Palm + Vallarata) 0 .05
.1
.15
Miles
HCMType
CC (6866)
Collector (8161)
Freeway (8427)
HOV (893)
Local (3067)
MinArterial (12488)
PrArterial (8422)
AM Peak Hour Growth
Intersection ApproachRIVCOM
2018
RIVCOM
2045
RIVCOM
2018 to
RIVCOM
2045
Annual
Growth
Rate
Adjusted
2023 Plus 3
Projects
Adjusted
2045 Plus
Project
E 967 1218 0.96% 598 719
S 5661 7292 1.07% 1640 2008
W 616 1532 5.51% 630 1359
N 4997 5566 0.42% 1710 1861
E 153 163 0.24% 607 638
S 4383 5355 0.82% 1695 1987
W 352 350 0.19% 438 455
N 4212 5188 0.86% 1914 2259
E 925 1004 0.32% 831 886
S 4150 5089 0.84% 1959 2304
W 1555 1700 0.35% 805 863
N 5140 5395 0.18% 2073 2153
1 2
3 APPENDIX H ‐
HORIZON YEAR 2045 NO PROJECT CONDITIONS PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS
HCM 6th Signalized Intersection Summary The Wren Project 1: Date Palm Drive & McCallum Way 05/31/2024
Horizon Year 2045 No Project Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 166 326 311 44 231 26 149 487 34 48 929 155 Future Volume (veh/h) 166 326 311 44 231 26 149 487 34 48 929 155 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 184 362 346 49 257 29 166 541 38 53 1032 172 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 456 368 352 121 695 78 195 1671 116 85 1234 205 Arrive On Green 0.42 0.42 0.42 0.42 0.42 0.42 0.11 0.34 0.34 0.05 0.28 0.28 Sat Flow, veh/h 1092 872 834 741 1648 186 1781 4870 339 1781 4383 729 Grp Volume(v), veh/h 184 0 708 49 0 286 166 377 202 53 801 403 Grp Sat Flow(s),veh/h/ln 1092 0 1706 741 0 1834 1781 1702 1805 1781 1702 1708 Q Serve(g_s), s 8.9 0.0 26.3 0.7 0.0 6.8 5.9 5.2 5.3 1.9 14.2 14.2 Cycle Q Clear(g_c), s 15.7 0.0 26.3 27.0 0.0 6.8 5.9 5.2 5.3 1.9 14.2 14.2 Prop In Lane 1.00 0.49 1.00 0.10 1.00 0.19 1.00 0.43
Lane Grp Cap(c), veh/h 456 0 719 121 0 773 195 1168 619 85 958 481 V/C Ratio(X) 0.40 0.00 0.98 0.41 0.00 0.37 0.85 0.32 0.33 0.62 0.84 0.84 Avail Cap(c_a), veh/h 456 0 719 121 0 773 195 1168 619 167 1010 507 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 18.1 0.0 18.3 32.0 0.0 12.7 28.0 15.5 15.6 29.9 21.6 21.6 Incr Delay (d2), s/veh 0.6 0.0 29.5 2.2 0.0 0.3 28.7 0.2 0.3 7.3 6.0 11.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.0 0.0 14.0 0.8 0.0 2.3 3.7 1.6 1.8 0.9 5.6 6.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 18.7 0.0 47.8 34.1 0.0 13.0 56.7 15.7 15.9 37.2 27.6 33.0 LnGrp LOS B A D C A B E B B D C C
Approach Vol, veh/h 892 335 745 1257
Approach Delay, s/veh 41.8 16.1 24.9 29.7
Approach LOS D B C C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.1 26.0 31.0 11.0 22.0 31.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 6.0 20.0 27.0 7.0 19.0 27.0 Max Q Clear Time (g_c+I1), s 3.9 7.3 28.3 7.9 16.2 29.0 Green Ext Time (p_c), s 0.0 2.5 0.0 0.0 1.8 0.0
Intersection Summary
HCM 6th Ctrl Delay 30.5
HCM 6th LOS C
HCM 6th Signalized Intersection Summary The Wren Project 3: Date Palm Drive & 30th Avenue 05/31/2024
Horizon Year 2045 No Project Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 72 263 165 115 128 132 204 625 59 192 1104 45 Future Volume (veh/h) 72 263 165 115 128 132 204 625 59 192 1104 45 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 78 286 179 125 139 143 222 679 64 209 1200 49 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 102 438 359 158 498 410 266 1415 132 252 1459 60 Arrive On Green 0.06 0.23 0.23 0.09 0.27 0.27 0.15 0.30 0.30 0.14 0.29 0.29 Sat Flow, veh/h 1781 1870 1532 1781 1870 1541 1781 4748 444 1781 5031 205 Grp Volume(v), veh/h 78 286 179 125 139 143 222 485 258 209 812 437 Grp Sat Flow(s),veh/h/ln 1781 1870 1532 1781 1870 1541 1781 1702 1789 1781 1702 1833 Q Serve(g_s), s 2.9 9.3 6.8 4.6 4.0 5.1 8.2 7.9 8.0 7.7 15.0 15.0 Cycle Q Clear(g_c), s 2.9 9.3 6.8 4.6 4.0 5.1 8.2 7.9 8.0 7.7 15.0 15.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.25 1.00 0.11
Lane Grp Cap(c), veh/h 102 438 359 158 498 410 266 1014 533 252 987 531 V/C Ratio(X) 0.77 0.65 0.50 0.79 0.28 0.35 0.84 0.48 0.48 0.83 0.82 0.82 Avail Cap(c_a), veh/h 159 723 592 159 723 595 291 1113 585 265 1062 572 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.3 23.3 22.3 30.0 19.6 20.0 27.8 19.3 19.4 28.1 22.3 22.3 Incr Delay (d2), s/veh 11.4 1.7 1.1 22.8 0.3 0.5 17.4 0.4 0.7 18.9 5.0 8.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 3.8 2.3 2.8 1.6 1.7 4.4 2.8 3.0 4.2 5.6 6.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 42.7 25.0 23.4 52.8 19.9 20.5 45.2 19.7 20.1 47.0 27.3 31.2 LnGrp LOS D C C D B C D B C D C C
Approach Vol, veh/h 543 407 965 1458
Approach Delay, s/veh 27.0 30.2 25.7 31.3
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 13.5 24.1 10.0 19.8 14.0 23.5 7.8 21.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 22.0 6.0 26.0 11.0 21.0 6.0 26.0 Max Q Clear Time (g_c+I1), s 9.7 10.0 6.6 11.3 10.2 17.0 4.9 7.1 Green Ext Time (p_c), s 0.0 3.5 0.0 1.8 0.1 2.5 0.0 1.0 Intersection Summary
HCM 6th Ctrl Delay 28.9
HCM 6th LOS C
HCM 6th Signalized Intersection Summary The Wren Project 1: Date Palm Drive & McCallum Way 05/31/2024
Horizon Year 2045 No Project Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 244 224 283 56 245 27 328 944 53 31 722 170 Future Volume (veh/h) 244 224 283 56 245 27 328 944 53 31 722 170 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 271 249 314 62 272 30 364 1049 59 34 802 189 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 373 279 351 154 618 68 405 2070 116 62 926 216 Arrive On Green 0.37 0.37 0.37 0.37 0.37 0.37 0.23 0.42 0.42 0.03 0.23 0.23 Sat Flow, veh/h 1076 745 939 847 1652 182 1781 4944 278 1781 4100 957 Grp Volume(v), veh/h 271 0 563 62 0 302 364 722 386 34 665 326 Grp Sat Flow(s),veh/h/ln 1076 0 1684 847 0 1834 1781 1702 1817 1781 1702 1652 Q Serve(g_s), s 17.4 0.0 21.8 4.2 0.0 8.6 13.8 10.9 10.9 1.3 13.1 13.2 Cycle Q Clear(g_c), s 26.0 0.0 21.8 26.0 0.0 8.6 13.8 10.9 10.9 1.3 13.1 13.2 Prop In Lane 1.00 0.56 1.00 0.10 1.00 0.15 1.00 0.58
Lane Grp Cap(c), veh/h 373 0 630 154 0 686 405 1425 761 62 769 373 V/C Ratio(X) 0.73 0.00 0.89 0.40 0.00 0.44 0.90 0.51 0.51 0.55 0.86 0.87 Avail Cap(c_a), veh/h 373 0 630 154 0 686 410 1425 761 128 783 380 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.1 0.0 20.5 33.1 0.0 16.3 26.1 14.9 14.9 33.0 25.9 26.0 Incr Delay (d2), s/veh 6.9 0.0 15.2 1.7 0.0 0.4 21.9 0.3 0.6 7.5 9.8 19.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.7 0.0 9.9 1.0 0.0 3.2 7.5 3.4 3.7 0.7 5.7 6.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 33.0 0.0 35.6 34.7 0.0 16.7 48.0 15.2 15.5 40.5 35.6 45.4 LnGrp LOS C A D C A B D B B D D D
Approach Vol, veh/h 834 364 1472 1025
Approach Delay, s/veh 34.8 19.8 23.4 38.9
Approach LOS C B C D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.4 33.1 30.0 19.8 19.7 30.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 27.0 26.0 16.0 16.0 26.0 Max Q Clear Time (g_c+I1), s 3.3 12.9 28.0 15.8 15.2 28.0 Green Ext Time (p_c), s 0.0 5.4 0.0 0.0 0.5 0.0
Intersection Summary
HCM 6th Ctrl Delay 29.9
HCM 6th LOS C
HCM 6th Signalized Intersection Summary The Wren Project 3: Date Palm Drive & 30th Avenue 05/31/2024
Horizon Year 2045 No Project Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 61 121 176 65 112 114 365 1153 55 22 886 63 Future Volume (veh/h) 61 121 176 65 112 114 365 1153 55 22 886 63 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 66 132 191 71 122 124 397 1253 60 24 963 68 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 93 383 312 96 386 317 449 2412 116 48 1256 89 Arrive On Green 0.05 0.20 0.20 0.05 0.21 0.21 0.25 0.48 0.48 0.03 0.26 0.26 Sat Flow, veh/h 1781 1870 1527 1781 1870 1534 1781 4992 239 1781 4868 343 Grp Volume(v), veh/h 66 132 191 71 122 124 397 854 459 24 673 358 Grp Sat Flow(s),veh/h/ln 1781 1870 1527 1781 1870 1534 1781 1702 1827 1781 1702 1807 Q Serve(g_s), s 2.5 4.2 7.9 2.7 3.8 4.8 14.8 12.0 12.0 0.9 12.6 12.7 Cycle Q Clear(g_c), s 2.5 4.2 7.9 2.7 3.8 4.8 14.8 12.0 12.0 0.9 12.6 12.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.13 1.00 0.19
Lane Grp Cap(c), veh/h 93 383 312 96 386 317 449 1645 883 48 878 466 V/C Ratio(X) 0.71 0.35 0.61 0.74 0.32 0.39 0.88 0.52 0.52 0.50 0.77 0.77 Avail Cap(c_a), veh/h 129 704 575 129 704 577 567 1873 1005 129 1035 549 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.2 23.5 25.0 32.2 23.3 23.7 24.9 12.3 12.3 33.2 23.7 23.7 Incr Delay (d2), s/veh 10.5 0.5 1.9 14.1 0.5 0.8 13.0 0.3 0.5 8.0 2.9 5.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 1.7 2.7 1.5 1.6 1.6 7.1 3.7 4.0 0.5 4.6 5.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 42.7 24.0 26.9 46.3 23.7 24.5 37.9 12.6 12.8 41.2 26.6 29.2 LnGrp LOS D C C D C C D B B D C C
Approach Vol, veh/h 389 317 1710 1055
Approach Delay, s/veh 28.6 29.1 18.5 27.9
Approach LOS C C B C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 5.8 37.4 7.7 18.1 21.4 21.8 7.6 18.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 38.0 5.0 26.0 22.0 21.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 2.9 14.0 4.7 9.9 16.8 14.7 4.5 6.8 Green Ext Time (p_c), s 0.0 9.0 0.0 1.1 0.6 3.0 0.0 0.9 Intersection Summary
HCM 6th Ctrl Delay 23.4
HCM 6th LOS C
APPENDIX H ‐
HORIZON YEAR PLUS PROJECT CONDITIONS PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS
HCM 6th Signalized Intersection Summary The Wren Project 1: Date Palm Drive & McCallum Way 05/31/2024
Horizon Year Plus Project Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 166 326 311 44 231 26 149 495 34 48 953 155 Future Volume (veh/h) 166 326 311 44 231 26 149 495 34 48 953 155 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 184 362 346 49 257 29 166 550 38 53 1059 172 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 454 367 350 119 693 78 194 1682 115 85 1249 202 Arrive On Green 0.42 0.42 0.42 0.42 0.42 0.42 0.11 0.35 0.35 0.05 0.28 0.28 Sat Flow, veh/h 1092 872 834 741 1648 186 1781 4876 334 1781 4402 714 Grp Volume(v), veh/h 184 0 708 49 0 286 166 383 205 53 819 412 Grp Sat Flow(s),veh/h/ln 1092 0 1706 741 0 1834 1781 1702 1806 1781 1702 1711 Q Serve(g_s), s 8.9 0.0 26.4 0.6 0.0 6.9 5.9 5.3 5.4 1.9 14.6 14.6 Cycle Q Clear(g_c), s 15.8 0.0 26.4 27.0 0.0 6.9 5.9 5.3 5.4 1.9 14.6 14.6 Prop In Lane 1.00 0.49 1.00 0.10 1.00 0.18 1.00 0.42
Lane Grp Cap(c), veh/h 454 0 717 119 0 771 194 1175 623 85 966 485 V/C Ratio(X) 0.41 0.00 0.99 0.41 0.00 0.37 0.85 0.33 0.33 0.62 0.85 0.85 Avail Cap(c_a), veh/h 454 0 717 119 0 771 194 1175 623 166 1007 506 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 18.2 0.0 18.4 32.1 0.0 12.8 28.1 15.5 15.5 30.0 21.7 21.7 Incr Delay (d2), s/veh 0.6 0.0 30.3 2.3 0.0 0.3 29.2 0.2 0.3 7.3 6.7 12.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.0 0.0 14.2 0.8 0.0 2.4 3.7 1.7 1.8 0.9 5.9 6.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 18.8 0.0 48.7 34.3 0.0 13.1 57.3 15.7 15.8 37.3 28.4 34.2 LnGrp LOS B A D C A B E B B D C C
Approach Vol, veh/h 892 335 754 1284
Approach Delay, s/veh 42.6 16.2 24.9 30.6
Approach LOS D B C C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.1 26.2 31.0 11.0 22.2 31.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 6.0 20.0 27.0 7.0 19.0 27.0 Max Q Clear Time (g_c+I1), s 3.9 7.4 28.4 7.9 16.6 29.0 Green Ext Time (p_c), s 0.0 2.6 0.0 0.0 1.6 0.0
Intersection Summary
HCM 6th Ctrl Delay 31.1
HCM 6th LOS C
HCM 6th Signalized Intersection Summary The Wren Project 2: Date Palm Drive & Rosemount Road 05/31/2024
Horizon Year Plus Project Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 63 53 72 70 75 227 102 631 42 172 1072 89 Future Volume (veh/h) 63 53 72 70 75 227 102 631 42 172 1072 89 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 68 58 78 76 82 247 111 686 46 187 1165 97 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 106 157 211 167 103 311 142 1260 84 234 1486 124 Arrive On Green 0.06 0.22 0.22 0.09 0.25 0.25 0.08 0.26 0.26 0.13 0.31 0.31 Sat Flow, veh/h 1781 723 972 1781 411 1237 1781 4890 326 1781 4803 400 Grp Volume(v), veh/h 68 0 136 76 0 329 111 476 256 187 826 436 Grp Sat Flow(s),veh/h/ln 1781 0 1695 1781 0 1648 1781 1702 1812 1781 1702 1798 Q Serve(g_s), s 2.0 0.0 3.6 2.2 0.0 10.0 3.3 6.4 6.5 5.4 11.8 11.8 Cycle Q Clear(g_c), s 2.0 0.0 3.6 2.2 0.0 10.0 3.3 6.4 6.5 5.4 11.8 11.8 Prop In Lane 1.00 0.57 1.00 0.75 1.00 0.18 1.00 0.22
Lane Grp Cap(c), veh/h 106 0 368 167 0 414 142 877 467 234 1053 556 V/C Ratio(X) 0.64 0.00 0.37 0.46 0.00 0.79 0.78 0.54 0.55 0.80 0.78 0.78 Avail Cap(c_a), veh/h 167 0 668 167 0 649 167 958 510 267 1150 607 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.5 0.0 17.8 22.9 0.0 18.7 24.1 17.1 17.1 22.5 16.8 16.8 Incr Delay (d2), s/veh 6.3 0.0 0.6 1.9 0.0 3.7 18.2 0.5 1.0 14.1 3.3 6.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 0.0 1.4 0.9 0.0 3.9 1.9 2.1 2.3 2.9 4.1 4.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 30.8 0.0 18.4 24.8 0.0 22.3 42.3 17.6 18.1 36.6 20.1 23.0 LnGrp LOS C A B C A C D B B D C C
Approach Vol, veh/h 204 405 843 1449
Approach Delay, s/veh 22.5 22.8 21.0 23.1
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.0 17.7 9.0 15.6 8.2 20.5 7.2 17.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 15.0 5.0 21.0 5.0 18.0 5.0 21.0 Max Q Clear Time (g_c+I1), s 7.4 8.5 4.2 5.6 5.3 13.8 4.0 12.0 Green Ext Time (p_c), s 0.0 2.3 0.0 0.6 0.0 2.7 0.0 1.4 Intersection Summary
HCM 6th Ctrl Delay 22.4
HCM 6th LOS C
Queuing and Blocking Report The Wren Project
Horizon Year 2045 Plus Project 05/30/2024
HY+P AM SimTraffic Report
Intersection: 2: Date Palm Drive & Rosemount Road
Movement EB EB WB WB NB NB NB NB NB SB SB SB
Directions Served L TR L TR L T T T R L T T
Maximum Queue (ft) 84 108 87 181 120 147 129 135 68 201 229 247 Average Queue (ft) 35 41 40 80 59 79 74 69 21 100 122 137 95th Queue (ft) 68 85 74 149 101 125 119 114 53 171 202 224 Link Distance (ft) 425 430 560 560 560 1210 1210
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 140 180 100 280
Storage Blk Time (%) 0 1 1 0 1 0 0
Queuing Penalty (veh) 0 0 1 0 0 0 0
Intersection: 2: Date Palm Drive & Rosemount Road
Movement SB SB
Directions Served T R
Maximum Queue (ft) 249 180
Average Queue (ft) 147 59
95th Queue (ft) 237 136
Link Distance (ft) 1210
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 140
Storage Blk Time (%) 14 0
Queuing Penalty (veh) 13 0
HCM 6th Signalized Intersection Summary The Wren Project 3: Date Palm Drive & 30th Avenue 05/31/2024
Horizon Year Plus Project Synchro 11 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 72 263 165 115 128 132 204 646 59 192 1111 45 Future Volume (veh/h) 72 263 165 115 128 132 204 646 59 192 1111 45 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 78 286 179 125 139 143 222 702 64 209 1208 49 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 101 438 358 158 498 410 266 1422 129 252 1462 59 Arrive On Green 0.06 0.23 0.23 0.09 0.27 0.27 0.15 0.30 0.30 0.14 0.29 0.29 Sat Flow, veh/h 1781 1870 1532 1781 1870 1541 1781 4764 431 1781 5033 204 Grp Volume(v), veh/h 78 286 179 125 139 143 222 500 266 209 817 440 Grp Sat Flow(s),veh/h/ln 1781 1870 1532 1781 1870 1541 1781 1702 1791 1781 1702 1833 Q Serve(g_s), s 2.9 9.3 6.8 4.6 4.0 5.1 8.2 8.1 8.2 7.7 15.1 15.1 Cycle Q Clear(g_c), s 2.9 9.3 6.8 4.6 4.0 5.1 8.2 8.1 8.2 7.7 15.1 15.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.24 1.00 0.11
Lane Grp Cap(c), veh/h 101 438 358 158 498 410 266 1016 535 252 989 532 V/C Ratio(X) 0.77 0.65 0.50 0.79 0.28 0.35 0.84 0.49 0.50 0.83 0.83 0.83 Avail Cap(c_a), veh/h 159 721 591 159 721 594 291 1111 584 264 1060 571 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.4 23.3 22.4 30.1 19.6 20.0 27.9 19.4 19.5 28.2 22.3 22.3 Incr Delay (d2), s/veh 11.5 1.7 1.1 22.9 0.3 0.5 17.5 0.4 0.7 18.9 5.2 9.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 3.8 2.3 2.8 1.6 1.7 4.4 2.9 3.1 4.2 5.7 6.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 42.8 25.0 23.5 53.0 19.9 20.5 45.4 19.8 20.2 47.1 27.5 31.6 LnGrp LOS D C C D B C D B C D C C
Approach Vol, veh/h 543 407 988 1466
Approach Delay, s/veh 27.1 30.3 25.7 31.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 13.5 24.1 10.0 19.8 14.1 23.6 7.8 21.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 22.0 6.0 26.0 11.0 21.0 6.0 26.0 Max Q Clear Time (g_c+I1), s 9.7 10.2 6.6 11.3 10.2 17.1 4.9 7.1 Green Ext Time (p_c), s 0.0 3.5 0.0 1.8 0.1 2.4 0.0 1.0 Intersection Summary
HCM 6th Ctrl Delay 29.0
HCM 6th LOS C
HCM 6th Signalized Intersection Summary The Wren Project 1: Date Palm Drive & McCallum Way 05/31/2024
Horizon Year Plus Project Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 244 224 283 56 245 27 328 970 53 31 738 170 Future Volume (veh/h) 244 224 283 56 245 27 328 970 53 31 738 170 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 271 249 314 62 272 30 364 1078 59 34 820 189 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 372 278 351 153 617 68 405 2079 114 62 936 214 Arrive On Green 0.37 0.37 0.37 0.37 0.37 0.37 0.23 0.42 0.42 0.03 0.23 0.23 Sat Flow, veh/h 1076 745 939 847 1652 182 1781 4952 271 1781 4119 941 Grp Volume(v), veh/h 271 0 563 62 0 302 364 741 396 34 676 333 Grp Sat Flow(s),veh/h/ln 1076 0 1684 847 0 1834 1781 1702 1819 1781 1702 1656 Q Serve(g_s), s 17.4 0.0 21.9 4.1 0.0 8.6 13.8 11.2 11.3 1.3 13.3 13.5 Cycle Q Clear(g_c), s 26.0 0.0 21.9 26.0 0.0 8.6 13.8 11.2 11.3 1.3 13.3 13.5 Prop In Lane 1.00 0.56 1.00 0.10 1.00 0.15 1.00 0.57
Lane Grp Cap(c), veh/h 372 0 629 153 0 685 405 1429 764 62 773 376 V/C Ratio(X) 0.73 0.00 0.90 0.41 0.00 0.44 0.90 0.52 0.52 0.55 0.87 0.88 Avail Cap(c_a), veh/h 372 0 629 153 0 685 409 1429 764 128 782 380 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.2 0.0 20.6 33.2 0.0 16.4 26.1 15.0 15.0 33.1 26.0 26.0 Incr Delay (d2), s/veh 7.0 0.0 15.4 1.7 0.0 0.4 22.0 0.3 0.6 7.5 10.7 20.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.7 0.0 9.9 1.0 0.0 3.2 7.5 3.5 3.8 0.7 6.0 6.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 33.3 0.0 36.0 34.9 0.0 16.8 48.2 15.3 15.6 40.6 36.7 47.0 LnGrp LOS C A D C A B D B B D D D
Approach Vol, veh/h 834 364 1501 1043
Approach Delay, s/veh 35.1 19.9 23.4 40.1
Approach LOS D B C D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.4 33.2 30.0 19.8 19.8 30.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 27.0 26.0 16.0 16.0 26.0 Max Q Clear Time (g_c+I1), s 3.3 13.3 28.0 15.8 15.5 28.0 Green Ext Time (p_c), s 0.0 5.5 0.0 0.0 0.3 0.0
Intersection Summary
HCM 6th Ctrl Delay 30.3
HCM 6th LOS C
HCM 6th Signalized Intersection Summary The Wren Project 2: Date Palm Drive & Rosemount Road 05/31/2024
Horizon Year Plus Project Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 76 68 90 95 64 330 83 1295 56 318 757 71 Future Volume (veh/h) 76 68 90 95 64 330 83 1295 56 318 757 71 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 83 74 98 103 70 359 90 1408 61 346 823 77 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 106 167 221 121 63 322 116 1556 67 379 2175 203 Arrive On Green 0.06 0.23 0.23 0.07 0.24 0.24 0.06 0.31 0.31 0.21 0.46 0.46 Sat Flow, veh/h 1781 730 967 1781 265 1360 1781 5018 217 1781 4752 443 Grp Volume(v), veh/h 83 0 172 103 0 429 90 955 514 346 588 312 Grp Sat Flow(s),veh/h/ln 1781 0 1696 1781 0 1626 1781 1702 1831 1781 1702 1791 Q Serve(g_s), s 4.1 0.0 7.7 5.1 0.0 21.0 4.4 23.8 23.8 16.8 10.0 10.1 Cycle Q Clear(g_c), s 4.1 0.0 7.7 5.1 0.0 21.0 4.4 23.8 23.8 16.8 10.0 10.1 Prop In Lane 1.00 0.57 1.00 0.84 1.00 0.12 1.00 0.25
Lane Grp Cap(c), veh/h 106 0 388 121 0 385 116 1056 568 379 1558 820 V/C Ratio(X) 0.78 0.00 0.44 0.85 0.00 1.11 0.78 0.90 0.90 0.91 0.38 0.38 Avail Cap(c_a), veh/h 121 0 402 121 0 385 201 1076 579 382 1558 820 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 41.1 0.0 29.3 40.9 0.0 33.8 40.8 29.3 29.3 34.1 15.7 15.8 Incr Delay (d2), s/veh 24.7 0.0 0.8 41.3 0.0 80.2 10.6 10.7 17.6 25.8 0.2 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.5 0.0 3.2 3.6 0.0 16.7 2.2 10.5 12.4 9.5 3.5 3.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 65.8 0.0 30.1 82.1 0.0 114.0 51.4 40.0 46.9 59.8 15.9 16.1 LnGrp LOS E A C F A F D D D E B B
Approach Vol, veh/h 255 532 1559 1246
Approach Delay, s/veh 41.7 107.8 42.9 28.1
Approach LOS D F D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 22.8 31.5 10.0 24.3 9.8 44.6 9.3 25.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 19.0 28.0 6.0 21.0 10.0 37.0 6.0 21.0 Max Q Clear Time (g_c+I1), s 18.8 25.8 7.1 9.7 6.4 12.1 6.1 23.0 Green Ext Time (p_c), s 0.0 1.6 0.0 0.7 0.1 5.7 0.0 0.0 Intersection Summary
HCM 6th Ctrl Delay 47.3
HCM 6th LOS D
Queuing and Blocking Report The Wren Project
Horizon Year 2045 Plus Project 05/30/2024
HY+P PM SimTraffic Report
Intersection: 2: Date Palm Drive & Rosemount Road
Movement EB EB WB WB NB NB NB NB NB SB SB SB
Directions Served L TR L TR L T T T R L T T
Maximum Queue (ft) 122 193 190 331 236 327 327 285 177 307 189 180 Average Queue (ft) 53 69 70 148 81 220 192 153 33 177 68 84 95th Queue (ft) 98 138 147 267 185 314 280 235 103 281 160 162 Link Distance (ft) 425 430 560 560 560 1210 1210
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 140 180 100 280
Storage Blk Time (%) 1 4 0 11 0 16 15 2
Queuing Penalty (veh) 1 3 2 10 0 14 8 4
Intersection: 2: Date Palm Drive & Rosemount Road
Movement SB SB
Directions Served T R
Maximum Queue (ft) 208 113
Average Queue (ft) 98 27
95th Queue (ft) 179 75
Link Distance (ft) 1210
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 140
Storage Blk Time (%) 6 0
Queuing Penalty (veh) 4 0
HCM 6th Signalized Intersection Summary The Wren Project 3: Date Palm Drive & 30th Avenue 05/31/2024
Horizon Year Plus Project Synchro 11 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 61 121 176 65 112 114 365 1167 55 22 909 63 Future Volume (veh/h) 61 121 176 65 112 114 365 1167 55 22 909 63 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 66 132 191 71 122 124 397 1268 60 24 988 68 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 92 381 311 95 384 315 446 2437 115 47 1289 89 Arrive On Green 0.05 0.20 0.20 0.05 0.21 0.21 0.25 0.49 0.49 0.03 0.26 0.26 Sat Flow, veh/h 1781 1870 1527 1781 1870 1534 1781 4995 236 1781 4877 335 Grp Volume(v), veh/h 66 132 191 71 122 124 397 864 464 24 689 367 Grp Sat Flow(s),veh/h/ln 1781 1870 1527 1781 1870 1534 1781 1702 1827 1781 1702 1809 Q Serve(g_s), s 2.6 4.2 8.0 2.8 3.9 4.9 15.1 12.2 12.2 0.9 13.1 13.1 Cycle Q Clear(g_c), s 2.6 4.2 8.0 2.8 3.9 4.9 15.1 12.2 12.2 0.9 13.1 13.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.13 1.00 0.19
Lane Grp Cap(c), veh/h 92 381 311 95 384 315 446 1661 892 47 899 478 V/C Ratio(X) 0.72 0.35 0.61 0.75 0.32 0.39 0.89 0.52 0.52 0.51 0.77 0.77 Avail Cap(c_a), veh/h 127 694 567 127 694 569 534 1846 991 127 1069 568 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.7 23.9 25.4 32.7 23.7 24.1 25.3 12.3 12.3 33.6 23.8 23.8 Incr Delay (d2), s/veh 11.3 0.5 2.0 15.1 0.5 0.8 15.0 0.3 0.5 8.1 2.8 5.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 1.7 2.8 1.5 1.6 1.7 7.5 3.8 4.1 0.5 4.8 5.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 44.0 24.4 27.4 47.8 24.1 24.9 40.3 12.6 12.8 41.7 26.6 29.1 LnGrp LOS D C C D C C D B B D C C
Approach Vol, veh/h 389 317 1725 1080
Approach Delay, s/veh 29.2 29.7 19.0 27.8
Approach LOS C C B C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 5.9 38.2 7.7 18.3 21.5 22.5 7.6 18.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 38.0 5.0 26.0 21.0 22.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 2.9 14.2 4.8 10.0 17.1 15.1 4.6 6.9 Green Ext Time (p_c), s 0.0 9.1 0.0 1.1 0.5 3.3 0.0 0.9 Intersection Summary
HCM 6th Ctrl Delay 23.8
HCM 6th LOS C
APPENDIX J ‐
INTERSECTION 2 SIGNAL WARRANT WORKSHEETS
California MUTCD 2014 Edition Rev 6 Scenario: Project Completion Year 2025 Conditions Major Approach: Date Palm Drive
Minor Approach: Rosemount Road
Two
One or More
1904
295
The plotted point falls above the applicable curve in Figure 4C-3 (Urban Areas) OR The plotted point falls above the applicable curve in Figure 4C-4 (Rural Areas) Both Approaches - Major Street
Higher Approach - Minor Street

APPROACH LANES

ENTER CORRECT HOURS
Part BSATISFIEDThe satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.ENTER PEAK HOUR VOL.

WARRANT 3 - PEAK HOUR SATISFIEDPart A(All parts 1, 2, and 3 below must be satisfied for the sameSATISFIED(Part A or Part B must be satisfied)1. The total delay experienced by traffic on one minor street approach (one direction only) controlled by a STOP sign equals or exceeds four vehicle-hours for one-lane approach, or five vehicle-hours for a two-lane approach; AND2. The volume on the same minor street approach (one direction only) equals or exceeds100 vph for one moving lane of traffic or 150 vph for two moving lanes; AND3. The total entering volume serviced during the hour equals or exceeds 800 vph forintersections with four or more approaches or 650 vph for intersections with threeapproaches YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
0255075100125150175200225250275300325350375400425300 400 500 600 700 800 900 1000 1100 1200 1300Minor StreetHigher Volume Approach - VPHFMajor StreetTotal of BothApproaches -VPH My Results (Minimum Vehicles)295

California MUTCD 2014 Edition Rev 6 Scenario: Cumulative Year 2025 Conditions Major Approach: Date Palm Drive
Minor Approach: Rosemount Road
Two
One or More
2354
335

APPROACH LANES

ENTER CORRECT HOURS
The plotted point falls above the applicable curve in Figure 4C-3 (Urban Areas) OR The plotted point falls above the applicable curve in Figure 4C-4 (Rural Areas) Both Approaches - Major Street
Higher Approach - Minor Street
Part BSATISFIEDThe satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.ENTER PEAK HOUR VOL.

WARRANT 3 - PEAK HOUR SATISFIEDPart A(All parts 1, 2, and 3 below must be satisfied for the sameSATISFIED(Part A or Part B must be satisfied)1. The total delay experienced by traffic on one minor street approach (one direction only) controlled by a STOP sign equals or exceeds four vehicle-hours for one-lane approach, or five vehicle-hours for a two-lane approach; AND2. The volume on the same minor street approach (one direction only) equals or exceeds100 vph for one moving lane of traffic or 150 vph for two moving lanes; AND3. The total entering volume serviced during the hour equals or exceeds 800 vph forintersections with four or more approaches or 650 vph for intersections with threeapproaches YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
0255075100125150175200225250275300325350375400425300 400 500 600 700 800 900 1000 1100 1200 1300Minor StreetHigher Volume Approach - VPHFMajor StreetTotal of BothApproaches -VPH My Results (Minimum Vehicles)335

California MUTCD 2014 Edition Rev 6 Scenario: Horizon Year Plus Project Conditions Major Approach: Date Palm Drive
Minor Approach: Rosemount Road
Two
One or More
2580
489
The plotted point falls above the applicable curve in Figure 4C-3 (Urban Areas) OR The plotted point falls above the applicable curve in Figure 4C-4 (Rural Areas) Both Approaches - Major Street
Higher Approach - Minor Street

APPROACH LANES

ENTER CORRECT HOURS
Part BSATISFIEDThe satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.ENTER PEAK HOUR VOL.

WARRANT 3 - PEAK HOUR SATISFIEDPart A(All parts 1, 2, and 3 below must be satisfied for the sameSATISFIED(Part A or Part B must be satisfied)1. The total delay experienced by traffic on one minor street approach (one direction only) controlled by a STOP sign equals or exceeds four vehicle-hours for one-lane approach, or five vehicle-hours for a two-lane approach; AND2. The volume on the same minor street approach (one direction only) equals or exceeds100 vph for one moving lane of traffic or 150 vph for two moving lanes; AND3. The total entering volume serviced during the hour equals or exceeds 800 vph forintersections with four or more approaches or 650 vph for intersections with threeapproaches YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
050100150200250300350400450500300 400 500 600 700 800 900 1000 1100 1200 1300Minor StreetHigher Volume Approach - VPHFMajor StreetTotal of BothApproaches -VPH My Results (Minimum Vehicles)489

APPENDIX K ‐
TRANSIT ROUTE INFORMATION
49 48
Effective January 7, 2024 Efectivo 7 de enero de 2024SunLine Transit Agency • SunLine.org ROUTE
RUTA
4 PALM DESERT MALL

PALM SPRINGS
L
L

RATTLER RD
M
H
H

SOUTH PALM CANYON

INDIAN CANYON DR

EL CIELO RD RD

ROUTE / RUT A

POST OFFICE / OFICINA POST AL

HOSPIT AL

SCHOOL / ESCUELA

MALL / CENTRO COMERCIAL

SENIOR CENTER / CENTRO PARA ADUL TOS MA YORES
CASINO

AIRPORT / AEROPUERTO

CITY HALL / A YUNT AMIENTO

LIBRARY / BIBLIOTECA

SUNLINE TRANSIT AGENCY

TIMEPOINT / PUNTO DE TIEMPO

TRANSFER POINT / PUNTO DE TRANSFERENCIA

TOWN CENTER WA Y

BOB HOPE DR

DA TE PALM

MONTEREY AVE MONTEREY AVE

FARRELL DR

SUNRISE WA Y

VIST A CHINO
AVE 30TH

DINAH SHORE DR

GA TEWA Y DRN PALM CANYON DRN PALM CANYON DR

COUNTRY CLUB DR

RAMON RDRAMON RD

FRED WARING DR
HWY 111

EAST T AHQUITZ CANYON WA YEAST T AHQUITZ CANYON WA Y

RACQUET CLUB DR

ROSA PARKS RD

T ACHEVAH DR

STEVENS RD

AVENIDA MARAVILLA

E BARISTO
M
S

P ALM SPRINGS

P ALM SPRINGS

THOUSAND
P ALMS
RANCHO
MIRAGE
P ALM
DESERT

CA THEDRAL
CITY

N INDIAN CANYON
Route 4

WESTFIELD PALM DESERT - PALM SPRINGS
H
C
C
C

E SAN RAFAEL DR

GENE AUTRY GENE AUTRY

SHOPPERS LN
N
6 2
1WV
1EV
5 2
1WV
2 L
L

RATTLER RD
M
H
H

SOUTH PALM CANYON

INDIAN CANYON DR

EL CIELO RD RD

ROUTE / RUT A

POST OFFICE / OFICINA POST AL

HOSPIT AL

SCHOOL / ESCUELA

MALL / CENTRO COMERCIAL

SENIOR CENTER / CENTRO PARA ADUL TOS MA YORES
CASINO

AIRPORT / AEROPUERTO

CITY HALL / A YUNT AMIENTO

LIBRARY / BIBLIOTECA

SUNLINE TRANSIT AGENCY

TIMEPOINT / PUNTO DE TIEMPO

TRANSFER POINT / PUNTO DE TRANSFERENCIA

TOWN CENTER WA Y

BOB HOPE DR

DA TE PALM

MONTEREY AVE MONTEREY AVE

FARRELL DR

SUNRISE WA Y

VIST A CHINO
AVE 30TH

DINAH SHORE DR

GA TEWA Y DRN PALM CANYON DRN PALM CANYON DR

COUNTRY CLUB DR

RAMON RDRAMON RD

FRED WARING DR
HWY 111

EAST T AHQUITZ CANYON WA YEAST T AHQUITZ CANYON WA Y

RACQUET CLUB DR

ROSA PARKS RD

T ACHEVAH DR

STEVENS RD

AVENIDA MARAVILLA

E BARISTO
M
S

P ALM SPRINGS

P ALM SPRINGS

THOUSAND
P ALMS
RANCHO
MIRAGE
P ALM
DESERT

CA THEDRAL
CITY

N INDIAN CANYON
Route 4

WESTFIELD PALM DESERT - PALM SPRINGS
H
C
C
C

E SAN RAFAEL DR

GENE AUTRY GENE AUTRY

SHOPPERS LN
N
6 2
1WV
1EV
5 2
1WV
2 L
L

RATTLER RD
M
H
H

SOUTH PALM CANYON

INDIAN CANYON DR

EL CIELO RD RD

ROUTE / RUT A

POST OFFICE / OFICINA POST AL

HOSPIT AL

SCHOOL / ESCUELA

MALL / CENTRO COMERCIAL

SENIOR CENTER / CENTRO PARA ADUL TOS MA YORES
CASINO

AIRPORT / AEROPUERTO

CITY HALL / A YUNT AMIENTO

LIBRARY / BIBLIOTECA

SUNLINE TRANSIT AGENCY

TIMEPOINT / PUNTO DE TIEMPO

TRANSFER POINT / PUNTO DE TRANSFERENCIA

TOWN CENTER WA Y

BOB HOPE DR

DA TE PALM

MONTEREY AVE MONTEREY AVE

FARRELL DR

SUNRISE WA Y

VIST A CHINO
AVE 30TH

DINAH SHORE DR

GA TEWA Y DRN PALM CANYON DRN PALM CANYON DR

COUNTRY CLUB DR

RAMON RDRAMON RD

FRED WARING DR
HWY 111

EAST T AHQUITZ CANYON WA YEAST T AHQUITZ CANYON WA Y

RACQUET CLUB DR

ROSA PARKS RD

T ACHEVAH DR

STEVENS RD

AVENIDA MARAVILLA

E BARISTO
M
S

P ALM SPRINGS

P ALM SPRINGS

THOUSAND
P ALMS
RANCHO
MIRAGE
P ALM
DESERT

CA THEDRAL
CITY

N INDIAN CANYON
Route 4

WESTFIELD PALM DESERT - PALM SPRINGS
H
C
C
C

E SAN RAFAEL DR

GENE AUTRY GENE AUTRY

SHOPPERS LN
N
6 2
1WV
1EV
5 2
1WV
2 51
50 Effective January 7, 2024 Efectivo 7 de enero de 2024SunLine Transit Agency • SunLine.org ROUTE
RUTA
4 PALM DESERT MALL

PALM SPRINGS
Town Center Way

@ Hahn
Dinah Shore @ Shoppers Ln
Date Palm @

Ramon
Palm Cyn @ Stevens
Sunrise Way @ Vista Chino
Indian Canyon @ Ramon
El Cielo @ Kirk Douglas
6:10a 6:30a 6:46a 7:10a 7:25a 7:36a 7:47a
7:10a 7:30a 7:46a 8:10a 8:25a 8:36a 8:47a
8:10a 8:30a 8:46a 9:10a 9:25a 9:36a 9:47a
9:10a 9:30a 9:46a 10:10a 10:25a 10:36a 10:47a
10:10a 10:32a 10:49a 11:13a 11:28a 11:41a 11:53a
11:10a 11:32a 11:49a 12:13p 12:28p 12:41p 12:53p
12:10p 12:32p 12:49p 1:13p 1:28p 1:41p 1:53p
1:10p 1:32p 1:49p 2:13p 2:28p 2:41p 2:53p
2:10p 2:32p 2:49p 3:13p 3:28p 3:41p 3:53p
3:10p 3:32p 3:49p 4:13p 4:28p 4:41p 4:53p
4:10p 4:32p 4:49p 5:13p 5:28p 5:41p 5:53p
5:10p 5:31p 5:48p 6:12p 6:26p 6:40p 6:52p
6:10p 6:31p 6:48p 7:12p 7:26p 7:40p 7:52p
7:10p 7:31p 7:48p 8:12p 8:26p 8:40p 8:52p
8:10p 8:31p 8:47p 9:12p 9:26p 9:39p 9:50p
El Cielo @ Kirk Douglas
Vista Chino @ Sunrise Way
Ramon @

Date Palm
Dinah Shore @

Shoppers Ln
Town Center Way

@ Hahn
6:10a 6:42a 7:05a 7:20a 7:41a
7:10a 7:42a 8:05a 8:20a 8:41a
8:10a 8:42a 9:05a 9:20a 9:41a
9:10a 9:42a 10:05a 10:20a 10:41a
10:10a 10:43a 11:05a 11:20a 11:43a
11:10a 11:43a 12:05p 12:20p 12:43p
12:10p 12:43p 1:05p 1:20p 1:43p
1:10p 1:43p 2:05p 2:20p 2:43p
2:10p 2:43p 3:05p 3:20p 3:43p
3:10p 3:43p 4:05p 4:20p 4:43p
4:10p 4:43p 5:05p 5:20p 5:43p
5:10p 5:43p 6:07p 6:20p 6:40p
6:10p 6:43p 7:07p 7:20p 7:40p
7:10p 7:43p 8:07p 8:20p 8:40p
8:10p 8:42p 9:03p 9:20p 9:38p
WESTBOUND | HACIA EL OESTEEASTBOUND | HACIA EL ESTE

EVERY DAY / HOLIDAY
TODOS LOS DÍAS /DÍA FESTIVO
For the VillageFest Thursday night detour, please
see the map on page 36-37.

Para ver el desvío del jueves del VillageFest, por
favor vea el mapa en las páginas 36 y 37.

← All documents from this meeting