Cities Index.
STC Traffic, Inc. - Proposal

Cathedral City City Council
January 22, 2025

Document
STC Traffic, Inc. - Proposal
Meeting
January 22, 2025
Body
Cathedral City City Council
Original file
4.5 MB
Text extracted from the city's file for reading and search. Open the original on cathedralcity.primegov.com. That file is the official record.

STC Traffic, Inc
Mailing and Business Address:
5973 Avenida Encinas, Suite 218
Carlsbad, CA 92008
Principal Contact: Jason Stack, President
P: (760) 602-4290
Submitted By:

Qualifications/Proposal For:

Professional Engineering Design Services for:

Traffic Signal Design at Cathedral Canyon Drive and
Canyon Shores
City of Cathedral City | January 3, 2025
STC Traffic, Inc. | Cathedral City – Traffic Signal Design at Cathedral Canyon Drive & Canyon Shores 1

STC Traffic, Inc. | Cathedral City – Traffic Signal Design at Cathedral Canyon Drive & Canyon Shores 2

STC Traffic, Inc. | Cathedral City – Traffic Signal Design at Cathedral Canyon Drive & Canyon Shores 3

STC Traffic, Inc. | Cathedral City – Traffic Signal Design at Cathedral Canyon Drive & Canyon Shores 4

STC Traffic, Inc. | Cathedral City – Traffic Signal Design at Cathedral Canyon Drive & Canyon Shores 5

STC Traffic, Inc. | Cathedral City – Traffic Signal Design at Cathedral Canyon Drive & Canyon Shores 6 •
•
•
•
•

STC Traffic, Inc. | Cathedral City – Traffic Signal Design at Cathedral Canyon Drive & Canyon Shores 7 •
•
•
•

STC Traffic, Inc. | Cathedral City – Traffic Signal Design at Cathedral Canyon Drive & Canyon Shores 8 •
•

STC Traffic, Inc. | Cathedral City – Traffic Signal Design at Cathedral Canyon Drive & Canyon Shores 9 •
•
•

STC Traffic, Inc. | Cathedral City – Traffic Signal Design at Cathedral Canyon Drive & Canyon Shores 10 •
•

Employee Name Blough,
Rob
Lambarth,
Christian Kern, Phil Walters,
Joseph
O'Neal,
Trevor
Principal
Manager
Principal
Manager
Senior Principal
Manager
Sr. Project
Engineer
Associate
Engineer Topographic Survey
24-Hour &
Turning
Movement Counts
Standard Billing Rate $230.00 $230.00 $250.00 $200.00 $150.00 Lump Sum Lump Sum Task Task Description Total
Hours Total Cost
Task 1.0 Project Management & Coordination 18 - 4 - - 22 5,140.00$ Task 2.1 As-Built Research and Utility Coordination 2 - 2 4 8 16 2,960.00$ Task 2.2 Field Meeting & Field Work 8 - - 8 - 16 3,440.00$ Task 2.3 Topographic Survey - - - - - 12,500.00$ 12,500.00$ Task 2.4 Traffic Signal & Ped Hybrid Beacon Warrant Study 8 24 8 2,000.00$ 9,840.00$ Task 2.5 Preliminary Plans & Basis of Design 8 1 4 16 32 61 11,070.00$ Task 3.1 Plans (Traffic Signal, Signing/Striping, Civil at 90%, 100%) 4 1 8 32 74 119 20,650.00$ Task 3.2 Specifications (90%, 100%) 2 1 2 12 12 29 5,390.00$ Task 3.3 Engineer's Cost Estimate (90%, 100%) 2 - - 4 12 18 3,060.00$ Task 4.0 Bidding and Construction Support 4 - - 24 - 28 5,720.00$ 56 3 20 124 146 309
$12,880.00 $690.00 $5,000.00 $24,800.00 $21,900.00 12,500.00$ 2,000.00$ 79,770.00$ -$
79,770.00$
Fee Proposal
Total Hours
Total Cost
ODC: Other Direct Costs
Subtotal Labor
STC Traffic | Cathedral City - Traffic Signal Design at Cathedral Canyon Drive & Canyon Shores Subcontractors
STC Traffic, Inc. | Cathedral City – Traffic Signal Design at Cathedral Canyon Drive & Canyon Shores 11

← All documents from this meeting