B-1
EXHIBIT "B"

COMPENSATION

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 11 COST PROPOSAL

Page 1 of 3 ends

SAMPLE COST PROPOSAL
Sample Only - Required Cost Proposal Template To Be Determined By Agency

COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Note: Mark-ups are Not Allowed X Prime Consultant ☐ Subconsultant ☐ 2nd Tier Subconsultant Consultant Ardurra Inc.

Project No. C-06-8696-110 Contract No. City C01020 Date January 14, 2025

DIRECT LABOR (NO OPTIONAL SERVICES)
Classification/Title Name Hours Actual Hourly Rate Total Principal/Project
Manager
Carmen Kasner 294 $150.00 $44,100.00
Grant Manager Amy Czajkowski 279 $123.05 $34,330.95 Assistant PM Jamie Fagnant 626 90.67 $56,759.42 Project Engineer Rick St. John 969 $71.80 $69,502.40 Engineer II William Augustine 3196 $61.32 $195,978.72 CAD Designer IV Dustin Payne 2018 $49.38 $99,648.84 Administrative IV Tana Bondy 102 $35.95 $3,666.90

LABOR COSTS
a) Subtotal Direct Labor Costs $503,987.23

b) Anticipated Salary Increases (see page 2 for calculation) $0 c) TOTAL DIRECT LABOR COSTS [(a) + (b)]

$503,987.23.00

INDIRECT COSTS
d) Fringe Benefits (Rate: 58.27%

) e) Total Fringe Benefits [(c) x (d)]

$ 295,941.30.00
f) Overhead (Rate: 108.89% ) g) Overhead [(c) x (f)] __$548,791.69 h) General and Administrative (Rate: ) i) Gen & Admin [(c) x (h)] $ 0.00 j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $844,733.00

FIXED FEE k) TOTAL FIXED FEE [(c) + (j)] x fixed fee 15.00% ] $202,308.03

l) CONSULTANT’S OTHER DIRECT COSTS (ODC) – ITEMIZE (Add additional pages if necessary) Description of Item Quantity Unit Unit Cost Total
Mileage Costs 5,440 miles $0.70 $3,808
Air Excavation (allowance) 35 Each $3,500 $ 87,000 Traffic Control (optional) $ 0.00
Plan Sheets $ 0.00
Test $ 0.00
l) TOTAL OTHER DIRECT COSTS $90,808
m) SUBCONSULTANTS’ COSTS (Add additional pages if necessary) Helix Environmental $250,499

Converse Consultants $ 99,330
Paradigm Geospatial $128,353

West Coast Civil $ 58,000

SAMPLE COST PROPOSAL 1
Reset Form

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 12

Page 1 of 3 ends

La Belle-Marvin (Optional) $0

m) TOTAL SUBCONSULTANTS’ COSTS
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(l)+(m)] TOTAL COST [(c) + (j) + (k) + (n)]

$ 626,989.
$2,178,017.56
NOTES:

1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.

2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans.

3. Anticipated salary increases calculation (page 2) must accompany.

COST PROPOSAL

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 13 COST PROPOSAL
__ _

SAMPLE COST PROPOSAL
Sample Only - Required Cost Proposal Template To Be Determined By Agency SAMPLE COST PROPOSAL 1
Certification of Direct Costs:

I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal{s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:

1. Generally Accepted Accounting Principles {GAAP)

2. Terms and conditions of the contract

3. Title 23 United States Code Section 112 - Letting of Contracts

4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures

5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service

6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board {when applicable)
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements.

Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.

Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate{s).

Prime Consultant or Subconsultant Certifying:

Name:_______________ Title*:

Signature:____ _____ __ Date of Certification {mm/dd/yyyy): _____ _______ Phone Number:Email: ______ _ _
Address:_________________________________
*An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.

List services the consultant is providinq under the proposed contract:

Page 3 of 3 ends

Carmen Kasner, PE Southwest Operations Director
01/13/2025
[email protected] 7 60.525.9995
43410 Business Park Drive, Temecula, CA 92590
See attached scope of services.

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 14 FEE PROPOSAL

CITY OF CATHEDRAL CITY

SEPTIC TO SEWER
FAR 168%
Principal &
QA/QC
Sr. Project
Manager
Assistant
Project
Manager
Project
Engineer
Engineer/
Designer
CADD
Designer Admin Environmental Survey Geotechnical Modeling Support
Pavement
evaluation
Labelle-
Marvin
Project Management $194,863
Project Schedule and Progress Reports (24 months) 24 48 24 96 $25,134 $0 $25,134 Meetings (12 virtual & 12 in-person) 80 40 80 24 224 $77,045 $2,688 $0 $79,733 Coordination with CVWD (6 meetings, 3 in person, 3 virtual) 36 18 36 6 96 $34,139 $336 $0 $34,475 Coordination with DWA (3 meetings, 2 in person, 1 virtual) 22 11 22 3 58 $20,789 $224 $0 $21,013 Council Meetings (5 in person) 40 40 20 5 105 $33,949 $560 $0 $34,509 Preliminary design report $225,414
Basis of Design Reports
Narrative Description 4 2 16 12 32 16 82 $18,188 $0 $18,188 Baseline Understanding & Alternative development 4 2 8 12 64 16 106 $21,994 $0 $21,994 Design criteria documentation 4 2 8 16 24 54 $12,899 $0 $12,899 Downstream connection locations 4 2 8 40 80 80 214 $40,923 $0 $40,923 Modeling of facilities (2 separate models) 1 2 4 7 $2,335 $48,000 $48,000 $50,335 Draft report submittals 2 4 16 80 160 24 24 310 $61,067 $0 $61,067 Final Report Submittal 1 2 16 24 32 8 16 99 $20,009 $0 $20,009 Enviornmental Documentation $267,552
$0 $0 $0
Subconsultant Coordination 2 16 32 50 $12,291 $0 $12,291 Graphics for Environmental documents 4 24 28 $4,763 $0 $4,763 Subconsultant tasks $0 $250,499 $250,499 $250,499
$0 $0 $0
CWSRF Construction Application $178,993
$0 $0 $0
Meetings with DWD & CVWD for information gathering (handled under PM) $0 $0 $0 General Information Package 40 8 80 120 248 $57,694 $0 $57,694 Package Technical Package 64 8 80 120 272 $66,781 $0 $66,781 Package Enviornmental Package 16 12 28 $8,709 $0 $8,709 Financial Security Package 16 48 32 60 156 $45,808 $0 $45,808 No submittal for Final budget Approval Package $0 $0 $0 $0 $0 $0
Project Plans & Specifications $1,275,463
30% plans 40 120 240 600 600 1600 $309,344 $6,000 $6,000 $309,344 Survey 2 16 18 $5,387 $92,353 $92,353 $97,740
Geotechnical Investigation 2 16 18 $5,387 $99,330 $99,330 $104,717 30% Submittal Design & Cost Opinion 2 8 16 32 58 $12,728 $0 $12,728 Roadway Rehabilitation Analysis 6 16 160 320 $86,045 $0 $86,045 Subsurface Utility Investigation (including allowance) 2 16 32 50 $11,425 $87,500 $0 $98,925 60% Plans, Specs & Cost Opinion 16 40 200 800 600 $304,846 $6,000 $6,000 $310,846 90% Plans, Specs & Cost Opinion 8 20 100 800 300 1228 $227,897 $3,000 $3,000 $230,897 100% Plans, Specs, & Cost Opinion 2 4 24 60 30 120 $23,221 $1,000 $1,000 $24,221 $0 $0 $0
Optional Services & Allowance $550,442
Pumpstation design 4 30 60 120 480 240 934 $183,492 $0 $183,492 Public Outreach $150,000 $0 $150,000
Roadway pavement analysis $0 $15,950 $15,950 $15,950
Allowance $0
$150,000 $0 $150,000
Optional survey for utility location $0 $36,000 $36,000 $36,000 Optional traffic control for utility dipping $0 $15,000 $0 $15,000 Total Hours Without Optional Services 294 279 626 968 3196 2018 0 0 0 102 5325 Ardurra Personnel
Task/Subtask Description HRS Subtask
Labor Cost
Helix Paradigm
Geospatial Converse West
Coast
Direct Cost Total
Cost
Subs
Subtotal

COST PROPOSAL
City of Cathedral City
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10)

COST PROPOSAL

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 15 RATE SCHEDULES (FOR ADDITIONAL SERVICES)
ARDURRA GROUP, INC.
2025 Standard Billing Rate Schedule
Rates Effective through December 31, 2025
(Future years subject to review for Consumer Price Index escalation or 3%, whichever is greater)

CALIFORNIA WATER PRACTICE
STAFF
HOURLY

RATE STAFF
HOURLY
RATE
Project Manager VI..........................................................

Project Manager V...........................................................

Project Manager IV..........................................................

Project Manager III..........................................................

Project Manager II...........................................................

Project Manager I............................................................

Project Engineer VI...........................................................

Project Engineer V............................................................

Project Engineer IV...........................................................

Project Engineer III...........................................................

Project Engineer II............................................................

Project Engineer I.............................................................

CAD Designer VI..............................................................

CAD Designer V...............................................................

CAD Designer IV..............................................................

CAD Designer III..............................................................

CAD Designer II...............................................................

CAD Designer I................................................................

Administrative Assistant VI...............................................

Administrative Assistant V................................................

Administrative Assistant IV...............................................

Administrative Assistant III...............................................

Administrative Assistant II................................................

Administrative Assistant II................................................

Intern III.............................................................................

Intern II..............................................................................

Intern I............................................................................... ....$ 345
....$ 337
....$ 290
....$ 270
....$ 250
....$ 220
....$ 290
....$ 230
....$ 220
....$ 1 90
....$ 165
....$ 1 45
....$ 200
....$ 1 90
....$ 1 75
....$ 160
....$ 1 55
....$ 1 40
....$ 1 30
....$ 1 20
....$ 1 10
....$ 100
....$ 95
....$ 90
....$ 1 10
....$ 100
....$ 90
Senior Construction Manager.........................................

Construction Manager.....................................................

Resident Engineer*...........................................................

Public Works Inspector*..................................................

Document Control and Administration*.........................

Senior Labor Compliance Specialist...............................

Labor Compliance Analyst..............................................

Program Manager VI......................................................

Program Manager V.......................................................

Program Manager IV......................................................

Program Manager III......................................................

Program Manager II.......................................................

Program Manager I........................................................

Planner VI..........................................................................

Planner V...........................................................................

Planner IV..........................................................................

Planner III..........................................................................

Planner II...........................................................................

Planner I............................................................................

Scientist VI.........................................................................

Scientist V..........................................................................

Scientist IV.........................................................................

Scientist III.........................................................................

Scientist II..........................................................................

Scientist I...........................................................................

Field Representative III.....................................................

Field Representative II......................................................

Field Representative I....................................................... ....$ 273
....$ 242
....$ 225
....$ 208
....$ 1 42
....$ 1 55
....$ 1 42
....$ 250
....$ 220
....$ 200
....$ 1 90
....$ 1 70
....$ 1 55
....$ 250
....$ 235
....$ 220
....$ 1 80
....$ 1 50
....$ 1 30
....$ 220
....$ 2 10
....$ 1 75
....$ 165
....$ 1 55
....$ 1 35
....$ 1 30
....$ 1 20
....$ 1 10
ARDURRA GROUP, INC.

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 16 RATE SCHEDULES (FOR ADDITIONAL SERVICES)
ARDURRA GROUP, INC.
2025 Standard Billing Rate Schedule
Rates Effective through December 31, 2025
(Future years subject to review for Consumer Price Index escalation or 3%, whichever is greater) NOTES
Notes:
* Positions noted with an asterisk are subject to overtime rates billed at 1.5 times regular rates for all time over eight (8) hours in a single day or work performed on Saturday; and double time rates for work performed on Sundays and holidays.

Project/Construction Management & Inspection Notes:
1 The above hourly rates include wages, fringe and general and administrative overhead and fee, as well as typical supplies, tools and equipment required to perform services. Construction management software is not included in the base rate. 2 Prevailing Wage Rates are subject to increases pursuant to the State of California’s Department of Industrial Relations Wage Rate Determinations.

Ardurra’s Billing Rates will increase in proportion to the DIR increase, plus overhead and profit. The current rates are based on Determination SD- 23-63-3-2023-2D, issued 8/22/2023.
3 The following minimum callout applies to Inspection staff, in accordance with Industrial Welfare Commission Order #16-2001: • Cancellation of 8 hours scheduled inspection after inspector’s arrival on site: 4-hour minimum • Cancellation of 4 hours scheduled inspection after inspector’s arrival on site: 2-hour minimum.
4 For contracts involving public works inspection services, Ardurra requires the awarding public agency to complete DIR form PWC-100 solely for Ardurra as the prime contractor specific to the awarded contract name and amount. A half-hour per week, per inspector labor compliance charge will be billed for all Prevailing Wage inspection assignments.

Overall Notes:

Reimbursable Expenses (Other Direct Costs) : Ordinary identifiable non-salary costs that are directly attributable to the project, such as regular commuter travel costs, standard equipment, tools and software, etc., are included in the fee estimated above. Extraordinary expenses, such as oversized and/or color reproduction costs, vehicle identification decals, site facility hard phone line and/or internet service charges, non-commuter project miles and/or other travel expenses to remote (over 50 miles one-way) fabrication yards / batch plants, overnight postage / couriers, etc., are billed at actual cost . Travel charges to a casting / fabrication yard or batch plant will include the hourly billing rate plus travel expenses as listed in the Caltrans Travel Guide (State rates). Mileage is billed at the current IRS rate (currently $0.655/mile). An allowance for Extraordinary charges is included as Other Direct Costs (ODC) in the fee table above. Extraordinary charges above and beyond the estimated ODC allowance will not be billed to the Client unless specifically included in the contract or requested and approved by the Client in writing prior to incurring the additional expense.

Fees for Subconsultant Services: Billed at actual cost, plus ten percent (10%) to cover overhead and administration.

Web Based Contract Administration: Selected / specified cloud based service billed at cost plus ten percent (10%).

Escalation: Unless specified otherwise (such as for prevailing wage personnel), all billing rates are subject to annual review for Consumer Price Index escalation or 3%, whichever is greater.

Exclusions to Scope and Fee: The following items are specifically excluded:
– Legal advice
– Specialized software (other than MS Office Suite and MS Project) ARDURRA GROUP, INC., CONTINUED

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 17 CONVERSE

RATE SCHEDULES (FOR ADDITIONAL SERVICES)
Converse Consultants P2025 Geotech

CONVERSE CONSULTANTS
Non-Prevailing Wage Schedule of Fees
Geotechnical Personnel
Introduction
It is the objective of Converse Consultants to provide its clients with quality professional and technical services and a continuing source of professional advice and opinions. Services will be performed in a manner consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing in the same locality under similar conditions. This fee schedule i s valid through December 31, 2025.

Hourly Charges for Personnel
Staff assignments will depend on personnel availability, job complexity, project site location, and experience level required to satisfy the technical requirements of the project and to meet the prevailing standard of professional care.

Field Technical Services (all including vehicle and equipment) Construction Inspector – ACI/ICC and/or AWS/CWI certified (concrete, post-tension, masonry, structural steel, fireproofing; includes concrete batch plant and local steel fabrication inspections) ................................. $90 Non-Destructive Testing Inspector (ultrasonic, magnetic particle, dye penetrant)...................................................................... 90 Construction Inspector/Technician (skidmore, pull testing, torque testing, Schmidt hammer, and pachometer)........................ 90 Coring Technician ...................................................................................................................................................................... 90 Soils Technician (soil, base, asphalt concrete, and moisture emission testing) ......................................................................... 90 Senior Soils Technician.............................................................................................................................................................. 95 Sample Pick-Up ......................................................................................................................................................................... 60 Professional Services (field and office)
Staff Professional ................................................................................................................................................................... $145 Senior Staff Professional.......................................................................................................................................................... 155 Project Professional ................................................................................................................................................................. 165 Project Manager....................................................................................................................................................................... 190 Senior Professional .................................................................................................................................................................. 190 Principal Professional............................................................................................................................................................... 230 Principal/Consultant ................................................................................................................................................................. 235 Laboratory Testing
Laboratory Technician...................................................................................................................................................... Per Test (See Geotechnical Laboratory Testing and Materials Testing Services fee schedules.) Laboratory Supervisor............................................................................................................................................................ $ 100 Office Support
Clerical/Word Processing......................................................................................................................................................... $ 90 Drafting....................................................................................................................................................................................... 90 CAD Operator/Drafting Manager.............................................................................................................................................. 100 An overtime charge of 50 percent of the above hourly rates (excluding Professional Services) will be added for time in excess of eight hours per day and for all time on Saturdays, Sundays and holidays. An overtime charge of 100 percent of the above hourly rates (excluding Professional Services) will be charged on Sunday if hours worked were seven continuous eight hours per day in one work week, not counting paid time off within the week. Travel time to and from the job site will be charged at the hourly rates for the appropriate personnel.

Expenses

1. Exploration expenses (drilling, trenching, etc.) are charged at cost plus fifteen percent.

2. Travel and subsistence expenses (transportation, room and board, etc.) for individuals on projects requiring travel and/or li ving 50 miles away from the project site are charged at cost plus fifteen percent.

3. Automobile and truck expenses are charged at cost plus fifteen percent (rentals) or at the current IRS mileage rate for company - owned vehicles traveling between principal office and project.

4. Other out-of-pocket direct project expenses (aerial photos, long-distance telephone calls, permits, outside printing services, tests, etc.) are charged at cost plus fifteen percent.

Invoices

1. Invoices will be submitted to the Client on a monthly basis, and a final bill will be submitted upon completion of services.

2. Payment is due upon presentation of invoice and is past-due thirty days from invoice date. In the event Client fails to make any payment to Converse when due, Converse may immediately cease work hereunder until said payment, together with a service charge at the rate of eighteen percent per annum (but not exceeding the maximum allowed by law) from the due date, has been received .

Furthermore, Converse may at its sole option and discretion refuse to perform any further work irrespective of payment from Clien t in the event Client fails to pay Converse for services when said payments are due.

3. Client shall pay attorneys’ fees or other costs incurred in collecting any delinquent amount.

General Conditions
The terms and provisions of the Converse General Conditions are incorporated into this fee schedule as though set forth in full. If a copy of the General Conditions does not accompany this fee schedule, Client should request a copy from this office.

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 18 CONVERSE, CONTINUED

RATE SCHEDULES (FOR ADDITIONAL SERVICES)
Converse Consultants GLT2025

CONVERSE CONSULTANTS
Schedule of Fees – Geotechnical Laboratory Testing
Compensation for laboratory testing services will be made in accordance with this fee schedule which includes test report(s) and engineering time. Costs of tests not on this schedule will be by quote and/or in accordance with our current hourly fee schedule. The rates are based on non-c ontaminated soil. A surcharge will be charged for handling contaminated material, which will be determined based on the project. This fee schedule is valid through December 31, 2025.

IDENTIFICATION AND INDEX PROPERTIES TESTS
Visual Classification, ASTM D2488................................... 15.00 Engineering Classification, ASTM D2487 .........................20.00 Moisture Content and Dry (bulk) Density,
ASTM D2216 and D2937 ............................................. 20.00 Moisture Content, ASTM D2216 .................................. 15.00 Shrinkage Limit, ASTM D4943.......................................... 85.00 Atterberg Limits, ASTM D4318
Several points ............................................................ 150.00 One Point ..................................................................... 50.00 Particle Size Analysis, ASTM D6913
Fine Sieve, from +#200 to #4..................................... 100.00 Coarse and Fine Sieve, from #200 to 3 in..................180.00 Hydrometer ................................................................ 120.00 Percent Passing #200 Sieve, ASTM D1140...................... 80.00 Specific Gravity
Fine, passing #4 sieve, ASTM D854............................90.00 Coarse, retained on #4 sieve, ASTM C127..................90.00 Sand Equivalent Test, ASTM D2419............................... 110.00 Double Hydrometer Dispersion, ASTM D4221................150.00

COMPACTION AND BEARING STRENGTH
Standard Proctor Compaction, ASTM D698 or ASTM D1557
Method A or B ............................................................ 200.00 Method C, 6” mold...................................................... 200.00 California Impact Method, Caltrans 216 .......................... 200.00 R-value, ASTM D2844 and CTM301............................... 250.00 California Bearing Ratio (CBR), ASTM D1883
1 Point........................................................................ 530.00 3 Points ...................................................................... 750.00 Relative Density

0.1 Cubic Foot Mold................................................... 200.00

0.5 Cubic Foot Mold................................................... 300.00

SHEAR STRENGTH
Torvane/Pocket Penetrometer .......................................... 25.00 Direct Shear
Quick Test.................................................................... 75.00 Consolidated, Drained, granular soil,
ASTM D3080 ........................................................ 200.00 Consolidated, Drained, fine grained soil,
ASTM D3080 ........................................................ 250.00 Consolidated, Undrained, fine grained soil.................200.00 Residual Strength, per cycle ........................................ 60.00 Remolded Specimens .................................................. 60.00

STATIC UNIAXIAL AND TRIAXIAL STRENGTH TESTS
(PER POINT)
Unconfined Compression, ASTM D2166 ........................ 150.00 Unconsolidated, Undrained, ASTM D2850 .....................160.00 Consolidated, Undrained, per point ................................ 700.00 Consolidated, Drained, per point .................................... 700.00 With Pore Pressure Measurement, per load...................150.00 Remolded Specimen......................................................... 90.00 CONSOLIDATION (ASTM2435) AND SWELL COLLAPSE
(ASTM D4546) TESTS
8 Load Increments .......................................................... 220.00 Additional Load Increment ................................................ 50.00 Time-Ratio, per load increment......................................... 90.00 Single Point, collapse test................................................. 90.00 Single Load Swell, ASTM D4546
Ring Sample, Field Moisture......................................... 90.00 Ring Sample, Air Dried ................................................. 90.00 Remolded Sample.............................................................. 60.00 Expansion Index Test, UBC 29-2/ASTM D4829................130.00

HYDRAULIC CONDUCTIVITY TESTS
Constant Head, ASTM D2434...........................................250.00 Falling Head Flexible Wall, ASTM D5084 .........................300.00 Triaxial Permeability, EPA 9100........................................350.00 Remolded Specimen.......................................................... 60.00

CHEMICAL TESTS
Corrosivity (pH, resistivity, sulfates, chlorides) ..................220.00 Organic Content, ASTM D2974.......................................... 80.00 Conditions: Unit rates presented on this fee schedule are for routinely performed geotechnical laboratory tests. Numerous other earth material physical tests can be performed in our geotechnical laboratories, including rock core, soil cement and soil lime mixture tests. Tests not listed can be quoted upon request.

Prices are based on the assumption that samples are uncontaminated and do not contain heavy metals, acids, carcinogens and/or volatile organics whi ch can be measured by an organic vapor analyzer or photoionization detector with a concentration greater than 50 parts -per-million (ppm). Quoted testing fees are based on the assumption that no protective clothing will be required to handle samples. If L evel D protective clothing will be required during handling of samples (as defined in Federal CFR Part 1910.120), then a 40% increase in fees presented in this schedule will be applied. Level C protective clothing will be a 60% increase in fees. Converse will not handle samples that require either Level B or Level A protection in our geotechnical laboratories.

Contaminated samples will be returned to the client. Uncontaminated samples will be disposed of 30 days after presentation of test results. The client must disclose the source of samples. Samples imported from out of state will be incinerated after testing in accordance with requirements of the United States Department of Agriculture. Soil samples obtained within the State of California currently designated quarantine areas will also be incinerated in accordance with the requirement of the State of California, Department of Food and Agriculture, Division of Plant Industry, Pest Exclusion. A $5.00 incineration fee will be added to each sample that is required to be incinerated in accordance with State and Federal law.

Test results requiring plots will be presented in a publishable format generated from computer programs. Otherwise, raw test numbers will be presented. A minimum laboratory fee of $50.00 will be charged to present and mail test results. Beyond the standard U.S. Mail delivery, specialized transmittal will be charged at additional cost (e.g., Federal Express, UPS, etc.). Geotechnical testing does not include engineering and/or geolog ic review and analysis.

Typical turnaround for geotechnical laboratory testing is two weeks (or roughly ten working days). To expedite test turnaround to five working days, a 50% increase in the fees in this schedule will be applied. Many geotechnical tests require at least one week to perform in accordance with ASTM or other standard specifications. Fees presented in this schedule for relatively undisturbed direct shear, consolidation or expansion pressure tests are based on the assumption that 2.416-inch inside diameter brass ring samples will be provided to the geotechnical laboratory for testing. Remolded specimens will be compacted in standard 2.5 -inch outside diameter brass rings for direct shear, consolidation and expansion pressure tests. All fees presented in this schedule are based on the assumption that the client will deliver samples to our laboratory at no additional cost to Converse.

Invoices will be issued monthly and are payable on receipt unless otherwise agreed upon. Interest of 1.5% per month (but not exceeding the maximum allowed by law) will be payable on any amount not paid within thirty days; payment thereafter to be applied first to accrued interest and then to the principle unpaid amount. The Client shall pay any attorneys' fe es or other costs incurred in collecting any delinquent amounts.

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 19 CONVERSE, CONTINUED

RATE SCHEDULES (FOR ADDITIONAL SERVICES)
Converse Consultants MTS2025

CONVERSE CONSULTANTS
Schedule of Fees – Materials Laboratory Testing
Compensation for laboratory testing services will be based on rates in accordance with this fee schedule which includes test report(s) and engineering time. Costs of tests not on this schedule will be by quote and/or in accordance with our current hourly fee schedule. Our services will be performed in accordance with the General Conditions. This fee schedule is valid through December 31, 2025.

AGGREGATES
Moisture Content, ASTM D2216.............................................. 15.00 Particle Size Analysis
Coarse, ASTM C136, each............................................... 100.00 Coarse and Fine, ASTM C136 & C137), each.................. 180.00 Specific Gravity & Absorption
Coarse Aggregate, ASTM C127......................................... 85.00 Fine Aggregate, ASTM C128 ............................................. 85.00 Unit Weight per Cubic Foot, ASTM C29 ............................. 75.00 Soundness, Sodium or Magnesium, ASTM C88, each..... 200.00 Potential Alkali Reactivity, ASTM D289............................ 300.00 Freeze Thaw Soundness.................................................. 175.00 Los Angeles Abrasion, per class, ASTM C131, C535....... 220.00 Sand Equivalent, ASTM D2419........................................ 110.00 Lightweight Particles, ASTM C123, each............................ 85.00 Clay Lumps & Friable Particles, ASTM C142, each.......... 120.00 Stripping Test, ASTM D1664, each .................................... 85.00 Organic Impurities, ASTM C40........................................... 75.00 Durability ...................................................................... By Quote

CONCRETE TESTS
Laboratory Trial Batch, ASTM C192 .................................. By Quote Laboratory Mix Design, Historical Data.............................. By Quote Compression Test, 6”x12” Cylinder, ASTM C39, each............. 50.00 Lightweight Concrete
Compression ...................................................................... 50.00 Unit Weight......................................................................... 50.00 Specimen Preparation, Trimming or Coring, each ................... 60.00 Bond Strength, ASTM C321
Prepared by Converse...................................................... 150.00 Prepared by Others............................................................ 80.00 Core Compression Test, ASTM C12, each.............................. 80.00 Flexure Test, 6”x6” Beams, ASTM C78, each........................ 110.00 Modulus of Elasticity, Static, ASTM C469, each .................... 150.00 Length Change, ASTM C157, 3 bars, 5 readings each,
up to 26 days.................................................................... 320.00 Splitting Tensile, 6”x12” Cylinders, each.................................. 80.00 Field Concrete Control (sampling, slump, temperature,
cast 4 cylinders, molds, cylinder pick-up, within 10 miles of office, stand-by extra), ASTM/UBC, hourly rate
schedule, or each cylinder.................................................. 95.00 Field Concrete Control (same as above plus air content test), ASTM/UBC, each cylinder.................................................. 95.00 Hold Cylinder........................................................................... 10.00 Cylinder Mold, sent to job site but not cast by Converse or returned to Converse............................................................ 5.00 MASONRY (ASTM C140, E447, UBC STANDARD 24-22)
Moisture Content, as received, each........................................ 20.00 Absorption, each...................................................................... 50.00 Compression, each.................................................................. 55.00 Shrinkage, ASTM C426, each ............................................... 100.00 Net Area and Volume, each..................................................... 25.00 Masonry Blocks, per set of 9.................................................. 450.00 Masonry Core Compression, each........................................... 55.00 Masonry Core Shear, each...................................................... 55.00 Masonry Core Trimming, each................................................. 55.00 Compression Test, grouted prisms, 8”x8”x16”, each.............. 120.00 Compression Test, grouted prisms, 12”x16”x16”, each.......... 130.00 Compression Test
2”x4” Mortar Cylinder, each................................................ 40.00 3”x6” Grout Prisms, each.................................................... 40.00 2” Cubes, ASTM C109, each.............................................. 40.00 Cast by Others......................................................................... 40.00 Mortar or Grout Mix Designs.............................................. By Quote

FIREPROOFING TESTS
Oven Dry Density, per sample................................................. 70.00

MOISTURE EMISSION TEST
Moisture Emission Test Kit......................................................7 0.00

ASPHALTIC CONCRETE
Stability, Flow, and Unit Weight, ASTM D6927 .....................200.00 Marshall ASTM D1559, ASTM D2726...................................200.00 Measured Maximum Specific Gravity of Mix, ASTM D2041,
Rice Method, each ............................................................95.00 Void Analysis of Cores or Marshall Specimens,
Calculations Only, ASTM D3203, set of 2 or 3...................60.00 Laboratory Mixing of Asphalt & Concrete, per sample.............75.00 Complete Asphalt Concrete Mix Design
Hveem or Marshall ...................................................... By Quote Extraction of Asphalt and Gradation, ASTM D2172, Method B, or California 310, including ash correction, each .............210.00 Extraction of Rubberized Asphalt & Gradation, each.............250.00 Specific Gravity, ASTM D2726 or ASTM D1188
Uncoated...........................................................................95.00 Coated.............................................................................105.00 Immersion-Compression.......................................................400.00 Particle Coating, ASTM D2489 ...............................................60 .00 Stripping, ASTM D1664 ..........................................................70.00 Moisture or Volatile Distillates in Paving Mixtures, or Materials Containing Petroleum Products or
By-Products.....................................................................220.00 Retained Strength, ASTM D1074/D1075, 6 specimens.....By Quote Retained Stability, Mil, Std, 520A, Method 104,
6 specimens ................................................................ By Quote CBR, ASTM D1883, including M/D Curve, 1 point ................350.00 Asphalt Temperature...............................................................15.00

STRUCTURAL STEEL
Tensile Test #9 Bar or Smaller, each ......................................6 0.00 Bend Test #9 Bar or Smaller, each .........................................6 0.00 Tensile Test #10 Bar or Greater, each ..................................280.00 Tensile Test #14 Bar, each ...................................................310.00 Rebar Coupler Tensile Test ..................................................100.00 Tensile Test, Welded #9 Bar or Smaller, each ......................100.00 Tensile Test, Welded #10 Bar or Greater, each ....................280.00 Tensile Test, Welded #14 Bar, each .....................................310.00 Tensile Test, Mechanically Spliced, #9 Bar or Smaller,
each ................................................................................180.00 Tensile Test, Mechanically Spliced, #10 Bar or Greater, each ................................................................................350.00

HIGH STRENGTH BOLT, NUT, AND WASHER TESTING
Wedge Tensile Test, A490 Bolts
Under 100,000 lbs., each ..................................................6 5.00 Over 100,000 lbs., each ....................................................7 5.00 Wedge Tensile Test, A325 Bolts
Under 100,000 lbs., each ..................................................7 0.00 Tensile Test, Anchor Bolts, tested with displacement
transducers, each............................................................300.00 Nut Hardness, Proof & Cone Proof Load Test, each...............50.00 Washer Hardness, each..........................................................40 .00 A325 or A490, Bolt Hardness Only, each................................40.00 Bolt A325 or A490 Wedge Tensile
Under 100,000 lbs. & Hardness, each...............................90.00 Over 100,000 lbs. & Hardness, each...............................100.00 Bolt, Nut & Washer, all tests per set with bolts
Under 100,000 lbs. ..........................................................300.00 Over 100,000 lbs.............................................................380.00 See Schedule of Fees – Geotechnical Laboratory Testing for soil testing. Hourly rates are available upon request. Field Laboratory rates are available upon request. Listed unit rates are based upon the assumption that samples will be delivered to our laboratory at no cost to Converse.

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 20 CONVERSE, CONTINUED

RATE SCHEDULES (FOR ADDITIONAL SERVICES)
Converse Consultants GC99-1

CONVERSE CONSULTANTS
General Conditions –

Right of Entry

Client warrants to Converse that it has full legal right to authorize Converse's entry upon the real property where Converse's services are to be performed ("Site" herein) and upon all property, if any, required for ingress and egress to the Site.

Client authorizes Converse to enter upon the Site and such adjoining property as is necessary to allow Converse to perform its services.

Converse will take reasonable precautions to minimize any damage to the Site; however, Client acknowledges that during the normal course of the performance of Converse's services, some damage to the Site may occur. The correction of any damage to the Site (surface or subterranean) shall be the obligation of the Client.

Information Supplied by Client

Client warrants the accuracy of any information supplied by it to Converse, acknowledges that Converse will not verify the accuracy of such information, and agrees that Converse is entitled to rely upon any such information.

Client shall immediately notify Converse in writing of any data, information or knowledge in the possession of or known to Client relating to conditions existing at the Site and shall provide Converse with the location, size and depth of an y and all underground tanks, piping or structures existing upon the Site.

Client shall defend, indemnify and save harmless Converse, its officers, agents and employees from and against any and all claims, costs, suits and damages, including attorneys' fees, arising out of errors, omissions and inaccuracies in documents and information provided to Converse by Client.

Ownership of Data and Documents; Samples

All reports, boring logs, field data, field notes, laboratory test data, calculations, estimates and other documents prepared by Converse shall remain the sole property of Converse.

Client shall have the right to the use of all data, recommendations, proposals, reports, design criteria and similar information provided to it by Converse ("information" h erein); provided, however, that the information shall not be used or relied upon by any party other than Client, save and except as may be required by the design and licensing requirements of the project for which the information is provided; further, such use shall be limited to the particular site and project for which the information is provided. To the extent Client utilizes Converse’s information by providing or making the same available to any third party (a) Client agrees to give written notice to any such third party that it may not utilize or rely on any aspect of Converse’s information and (b) Client agrees to defend, indemnify and hold Converse harmless against any and all claims, demands, costs, losses, damages and expenses, including attorneys fees, that may be asserted against or sought from Converse by any such third party.

Client's right to the use of the information is expressly conditioned upon Client's prompt payment to Converse of all sums due under the Client/Converse agreement. In th e event of Client's nonpayment or partial payment of said amounts, Client agrees that it shall not use any of the information for any purpose whatsoever and shall return the same to Converse within 2 business days upon demand.

Converse will retain all sam ples of soil, rock or other materials obtained in the course of performing its services for a period of thirty (30) days. Thereafter, further storage or transfer of samples to Client may be made at Client's expense upon written request from Client to Converse received by Converse prior to the expiration of the 30-day period.

Converse shall retain permanent records relating to the Converse services for a period of five (5) years following submittal of Converse's report, during which period the records will be made available to Client upon reasonable notice given by Client and upon payment to Converse of an amount sufficient to reimburse Converse for its necessary and reasonable expenses in making said records available.

Standard of Care and Professional Responsibility

Client acknowledges that the services to be performed by Converse involve the use of tests, calculations, analyses and procedures which are in a constant state of development, improvement and refinement and that, as such, improvements, changes in methods, and modifications of procedures have been made in the past, are now being made, and are expected to continue to be made in the future.

Further, Client recognizes that, while necessary for investigations, commonly used exploration methods, such as drilling borings or excavating trenches, involve an inherent risk. For example, exploration on a site containing contaminated materials may result in inducing cross - contamination, the prevention of which may not be complete using presently recognized sealing methods.

Client recognizes that the state of practice, including but not limited to the practice relating to contamination or hazardous waste conditions, is changing and evolving and that standards existing at the present time may subsequently change as knowledge increases and the state of the practice continues to improve.

Client recognizes that projects containing contaminated materials may not perform as anticipated by Client, even though Converse's services are performed in accordance with the level of care and skill required of it. Further, certain governmental regulations relating to hazardous waste sites may purport to require achievement of results which cannot be accomplished in an absolute sense. It is recognized that a satisfactoril y designed, constructed and maintained monitoring system may assist in the early detection of environmental changes allowing for early correction of problems. Unless it is specifically included in the scope of services to be performed by Converse, Client understands that Converse shall not perform such monitoring.

The services to be provided by Converse pursuant to the agreement to which these General Conditions are a part shall be provided in accordance with generally accepted professional engineering, environmental, and geologic practice in the area where these services are to be rendered and at the time that services are rendered. Client acknowledges that the present standard in the engineering and environmental professions does not include, and Converse does not extend to Client, a guarantee of perfection of the work contemplated hereby; further, that even in the exercise of normal and reasonable care, errors or omissions may from time to time occur. Except as expressly set forth in these General Conditions, no other warranty, express or implied, is extended by Converse.

Converse shall have no duty to supervise, coordinate or otherwise be involved in the performance of services or work by any third-party consultant, contractor or subcontractor.

Where Converse's services involve field observation of grading, filling and compaction (or any of them), it is agreed:

a. That Converse shall in no way be responsible for the manner in which such work is performed by any third party.

b. That in the event Converse is to provide periodic observation, Client acknowledges that Converse cannot be responsible for any work performed at a time or times when Converse was not performing its observation services.

Converse will not provide an opinion concerning the performance of any third party, save and except to the extent that said work was in fact observed and tested by Converse during the course of construction.

c. That where Converse's services include continuous observation, Client agrees not to allow grading, filling or compaction to be performed at any time or times when Converse is not physically present upon the Site and shall restrict the amount and extent of such grading, filling and compaction to that which can be properly observed by Converse personnel present on the Site.

d. That in the event Converse is to conduct test borings for Client, Client acknowledges that the accuracy of said test borings relates only to the specific location in which the boring itself was performed and that the nature of ma ny sites is such that differing subsurface soil characteristics can be experienced within a small distance. As such, Client acknowledges that greater accuracy is obtained when the number of test borings is increased.

Technical Limitations

Client acknowledges and agrees that: (1) it is unreasonable to expect Converse to be able to completely evaluate subsurface conditions, even after the most comprehensive exploratory program; (2) site conditions change frequently due to the passage of time, human activities, and climatic conditions and uncertainties are therefore inherent in the nature of Converse’s services and impossible to avoid; (3) the identification of geotechnical and environmental conditions and the prediction of future or concealed conditions is an inexact scientific endeavor; (4) the state of the art of geotechnical and environmental practice is such that Converse cannot guarantee that its recommendations will prove adequate on this project and the Client assumes the risk of any such failure, except as otherwise provided in these General Conditions and that (5) these General Conditions contains specific LIMITATIONS OF LIABILITY.

Indemnity of Client and Limitation of Liability

Converse shall indemnify Client, its officers, directors, agents or em ployees from any claim, demand or liability arising from personal injury or property loss or damage caused by the sole negligence or willful misconduct of Converse.

Anything to the contrary in the agreement to which these General Conditions are attached or in these General Conditions notwithstanding, Converse's liability shall be limited to the lesser of the fees charged to Client by Converse for the services performed for Client, or the sum of fifty thousand dollars. Client may, at its option, increase t he maximum amount for which Converse shall be liable by payment of an additional fee.

For the maximum liability sum of one hundred thousand dollars, the additional amount to be paid shall be four percent of the total Converse fee charged hereunder; for th e maximum liability sum of one million dollars, the additional amount to be paid shall be five percent of the total Converse fees charged hereunder Client acknowledges and agrees that its recovery, if any, shall be satisfied, in the first instance, from the proceeds of Converse’s insurance, and to the extent of any deficiency in the available insurance proceeds, then and only then, by Converse.

Client acknowledges that Converse has agreed to charge Client a reduced fee for services in exchange for the above limitation of liability and that said reduction in fees is consideration for said limitation.

Client shall defend and save harmless Converse, its officers, directors, agents and employees from all liability, claims and demands, including expenses of sui t and reasonable attorneys' fees arising from personal injuries, including disease and death, property loss or damage, injury to others (including personnel of Client, Converse or

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 21 CONVERSE, CONTINUED

RATE SCHEDULES (FOR ADDITIONAL SERVICES)
Converse Consultants GC99-1
subcontractors performing work hereunder), and air or ground pollution or en vironmental impairment arising out of or in any manner connected with or related to the performance of Converse's services, except where there is a judicial determination that such injury, loss or damage shall have been caused by the sole negligence or wil lful misconduct of Converse.

Client acknowledges that Converse has charged Client a reduced fee for services to be performed by it in exchange for this hold harmless and that the reduction in fees is consideration for said hold harmless provision.

Converse will not be liable for consequential damages of any kind, nature or description.

Hazardous Waste, Pollution and Health Hazard Projects ("Hazardous Projects" Herein)

Prior to the commencement of services by Converse on any hazardous project, Client agrees to advise Converse in writing of any known hazardous waste or materials existing on or near the Site or if any of said services are to be performed in an area where dust, fumes, gas, noise, vibrations or other particulate or nonparticulate matter is in the atmosphere where it raises a potential or possible health hazard or nuisance to anyone working within the area.

Anything in these General Conditions notwithstanding, Client shall indemnify and hold Converse, its officers, directors, agents, servants and employees, harmless from any claim, demand or action brought by any party whomsoever, including employees of Converse which claim, demand or action is based upon injury or damage caused or alleged to have been caused by hazardous wastes or hazardous m aterials whether or not such waste or materials were known to exist prior to the commencement of services.

Client agrees to be responsible for the removal and disposal of any hazardous waste uncovered as a result of the site investigation, including drill cuttings, unless specifically included within the scope of work

It is agreed that the discovery of unanticipated hazardous materials constitutes a changed condition mandating an immediate renegotiation of the scope of services or termination of services. Converse will at all times endeavor to perform in a faithful and trustworthy manner. Client understands that Client or Converse may be required by local and/or state and/or federal statute to report the discovery of hazardous materials to a government agency. Client also understands that Converse may be required by local and/or state and/or federal statute to report the discovery of hazardous materials to a government agency, and that Converse, when practical, will do so only after notifying Client. In the event Converse discovers hazardous material that we believe poses an immediate threat to public health and safety, Converse will use its best judgment to notify appropriate emergency personnel for immediate containment. Client agrees to take no action of any kind against Converse when Converse makes a good-faith effort to fulfill its obligations.

Client's Responsibilities

Client shall immediately provide Converse with full information in writing as to Client's requirements for the services to be pro vided by Converse and shall designate in writing within five (5) days of the effective date of the agreement to which these General Conditions are a part, a representative to act on Client's behalf in conjunction with the services to be provided hereunder. Client shall promptly review all documents, reports, data and recommendations submitted by Converse and shall communicate with Converse concerning such reviews for the purpose of avoiding delay in the performance of the services to be rendered by Converse.

Client shall notify any third party who may perform on the Site of the standard of care being undertaken by Converse pursuant hereto and of the limitations of liability contained herein.

Client shall require as a condition to the performance of any su ch third party a like indemnity and limitation of liability on their part against Converse.

Confidentiality

Converse shall hold all information provided to it by Client and the results of the work performed by it confidential and shall not disclose the s ame to any third party except where required by Governmental regulatory agencies or as otherwise required by law.

Disputes

Converse shall have the right to bring a legal action in a state or federal court against Client for any sums due or alleged to be due to it or for services rendered. Except for this right, Converse and Client agree that as an express condition to the right of either party to bring a legal action against the other, they shall first submit any dispute to mediation by a neutral person acceptable to both parties.

Each party shall bear its own attorneys' fees, costs and other expenses, except that each party shall be responsible and pay for one-half of the costs and expenses of the mediator.

In the event that legal action is required, th e prevailing party shall be entitled to recover all of its costs incurred in connection therewith including, without limitation, staff time, court costs, attorneys' fees, consultant and expert witness fees and any other related expenses. In this regard, in order to make the prevailing party whole, the parties acknowledge and agree that the prevailing party shall be entitled to recover all of its costs incurred in connection with the legal action and shall not be limited to “reasonable attorneys fees” as def ined in any statute or rule of court.

The obligations, responsibilities, warranties and liabilities of the parties shall be solely those expressly set forth herein. Remedies and limitations of liability shall apply regardless of whether an action is brou ght in contract, or is based on either party’s negligence, or another theory of law. All of the rights, remedies, obligations, terms, conditions and limitations of liability stated herein shall extend collectively to and be binding upon the parties’ partn ers, joint ventures, licensors, successors, assigns, insurers, and affiliates. Client and Converse agree that any legal action with respect to the services to be performed under these General Conditions shall be brought against the parties, and not agains t individual officers, employees or former employees of the parties. All legal actions by either party against the other for breach of these General Conditions or for the failure to perform in accordance with the applicable standard of care, however frame d, that are essentially based upon such breach or failure shall be barred two (2) years from the time claimant knew or should have known of its right to make a claim, but, in any event, not later than four (4) years from substantial completion of Converse’ s services.

Jobsite Safety

Converse shall be responsible for its activity and that of its employees on the Site.

This shall not be construed to relieve the Client, its general contractor or any subcontractor of their obligation to maintain a safe jobsite.

Neither the professional activities nor the presence of Converse or its employees and subcontractors shall be understood to control the operations of others, nor shall it be construed to be an acceptance of the responsibility for jobsite safety.

Converse will not direct, supervise or lay out the work of the Client, contractor, or any subcontractors. Converse's services will not include a review or evaluation of the adequacy of the contractor's safety measures on or near the Site.

Schedules

Unless otherwise specified in the agreement, Converse shall be obligated to perform within a reasonable period of time. Converse shall not be responsible for delays in the completion of its services created by reason of any unforeseeable cause or causes beyond the control and/or without the fault or negligence of Converse, including but not restricted to acts of God or the public enemy, acts of the Government of the United States or of the several states, or any foreign country, or any of them acting in their sover eign capacity, acts of other contractors with Client, fire, floods, epidemics, riots, quarantine restrictions, strikes, civil insurrections, freight embargoes, and unusually severe weather.

Should completion of any portion of the services to be rendered b y Converse be delayed beyond the estimated date of completion for any reason which is beyond the control of or without default or negligence of Converse, then and in that event Client and Converse shall mutually agree on the terms and conditions upon which the services may be continued or terminated.

Invoices

Converse shall submit monthly progress invoices to Client, and a final bill shall be submitted upon completion of the services. Within thirty (30) days after receipt of an invoice, Client shall pay the full amount of the invoice. If Client objects to all or any portion of any invoice, it shall so notify Converse of the same within fifteen (15) days from the date of receipt of said invoice and shall pay that portion of the invoice not in dispute, and the parties shall immediately make every effort to settle the disputed portion of the invoice.

If Client fails to make payment within thirty (30) days after receipt of an invoice, then Client shall pay an additional monthly service charge of one and one -half percent (1½ %) on all such amounts outstanding. The additional charge shall not apply to any disputed portion of any invoice resolved in favor of Client. In the event Client fails to pay any undisputed amount to Converse when due, Converse may immediately cease work until said payment together with a service charge at the rate of 1½ % per month, as specified above, from the due date has been received.

Further, Converse may, at its sole option and discretion, refuse to perform any further work irrespective of payment from Client.

In the event that all or any portion of the 1½ % service charge provided for herein is deemed to be an interest charge, then and in that event said interest charge shall be limited to the maximum amount legally allowed by law.

Client acknowledges Converse’s fee schedules are revised annually and agrees that the fee schedule in effect at the time the services are performed shall apply to such services.

Insurance

Converse represents that it now carries, and will continue to carry during the term of the contract to which these General Conditions are a part, Workers Compensation insurance and that, if requested, Converse shall provide to Client certificates as evidence of the aforementioned insurance.

Assignments

Client shall not assign this contract or any portion thereof to any other person or entity without the express written consent of Converse. Nothing contained in this contract or any part thereof shall be construed to create a right in any third party whomsoever, and nothing herein shall inure to the benefit of any third party.

Severability

If any provision of these General Conditions is finally determined to be contrary to, prohibited by, or invalid under applicable laws or regulations, such provision will be renegotiated so as to give effect to the intent of the parties to the maximum possible extent. Such determination and renegotiation shall not affect of invalidate the remaining provisions or these General Conditions.

Governing Law

These General Conditions shall be governed by and construed under the laws of the State of California.

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 22 HELIX ENVIRONMENTAL PLANNING

SCHEDULE OF FEES

HOURLY RATES
Principal $300-325
Principal Planner $250-310
Principal Biologist/Regulatory Specialist $235-310
Principal Noise/Air Quality Specialist $220-235
Principal Landscape Architect $220-250
Principal Cultural Resources Specialist $220-250
Safety Manager $215
Senior Noise/Air Quality Specialist $175-230
Senior Project Manager $185-230
Senior Environmental Planner $160-210
Senior Scientist/Regulatory Specialist $165-205
Project Manager $145-185
Assistant Project Manager $100-145
Regulatory Specialist $130-150
Environmental Compliance Specialist $195
Environmental Planner $110-145
Biologist $120-165
Noise/Air Quality Specialist $135-170
Senior Archaeologist/Architectural Historian $125-170
Senior Archaeology Field Director $135-145
Archaeology Field Director $125-135
Asst. Archaeology Field Director $95-120
Staff Archaeologist/Architectural Historian $90-135
Landscape Architect $140-190
Landscape Designer $110-140
Senior GIS Specialist $160-190
GIS Specialist/Graphics Specialist $115-150
Operations Manager $100-140
Technical Editor $115-125
Word Processor $90-100
Clerical $75-85
Director of Operations $220
Safety Manager $215
Senior Construction Project Manager $260-310
Construction Project Manager I-III $155-200
Assistant Construction Project Manager $125
Construction Foreman $104
Land Manager $104
Equipment Manager $104
Operator $158
Irrigation Technician $140
Senior Restoration Supervisor $153
Restoration Supervisor I-II $131-147
Assistant Restoration Supervisor $110
Restoration Foreman $104
Restoration Lead $86
Restoration Technician I-III $61-80
Nursery Manager $140
Nursery Technician $55
CONSULTING SERVICES Consulting services performed
by HELIX typically include, but are not necessarily limited to, office, field, meetings, hearings, and travel time. Consulting services for expert witness review , deposition, and/or testimony will be provided at one and one-half times our standard rates.

Overtime also may be charged at one and one-half times our standard rates. Rates are subject to change on a yearly basis.

PAYMENT Invoices will be submitted monthly. Payment on invoices is due within 30 days of receipt.

DIRECT COSTS Certain identifiable direct costs will be
charged to the project at cost plus ten percent. Examples of direct costs include subconsultants, vehicle or equipment rentals, airplane and train fares, parking, per diem and lodging, mileage (at IRS rates), communications, reproduction, and supplies. A 4-wheel drive premium will be charged at $25 per project day. There will be additional charges for use of noise monitors, GPS, and other field equipment, as well as for plotting, color printing, and aerial photographs.

RATE SCHEDULES (FOR ADDITIONAL SERVICES)

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 23 WEST COAST CIVIL

WCC | Standard Rate Sheet GROWING COMMUNITIES

STANDARD RATE SHEET
EFFECTIVE THROUGH DECEMBER 31, 2025

PROFESSIONAL SERVICES

Principal Engineer $265/Hour
Project Manager $235/Hour
Assistant Project Manager $220/Hour
Senior Engineer $200/Hour
Project Engineer II $195/Hour
Project Engineer I $185/Hour
Design Engineer III $175/Hour
Design Engineer II $165/Hour
Design Engineer I $155/Hour
CADD Manager $155/Hour
CAD Tech III $140/Hour
CAD Tech II $130/Hour
CAD Tech I $120/Hour
Survey Tech II $130/Hour
Survey Tech I $120/Hour
Field Tech I $120/Hour
Intern II $110/Hour
Intern I $100/Hour

EXPENSES
Expenses will be charged to an agreed-upon budget for each Contract. WCC will inform the client once the budget is 85% complete.

Outside Reprographics

1.10 x Cost
Plotting and In-house Reproduction

1.10 x Cost
Subsistence

1.10 x Cost
Sub-Consultants, Vendors or Subcontractors

1.15 x Cost
Mileage

Current IRS Rate

RATE SCHEDULES (FOR ADDITIONAL SERVICES)

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 24 PARADIGM GEOSPATIAL
Paradigm Geospatial - Rates
Date: 1/2025

Page 1 of 1 ends

2025 RATE SCHEDULE

CLASSIFICATION
TITLE
TOTAL

BURDENED
RATE ($$$)
Project Assistant $54.34
CADD Technician I $121.22
CADD Technician II $131.67
CADD Technician III $140.36
Mapping Supervisor $152.46
GIS Technician I $82.28
GIS Technician II $91.96
Senior GIS Analyst $111.31
Monitoring Tech $99.22
Monitoring Analyst $118.58
Monitoring Specialist $130.68
LiDAR Tech $99.22
LiDAR Analyst $118.58
LiDAR Specialist $145.20
Project Surveyor $154.66
Manager $157.80
Associate $179.08
Principal $198.55
Field Surveyor (PW) $173.07

Remarks:
• Any approved overtime will
be billed at 1.50 times the
base rate.

• As all our staff is locally
based, there will not be
charges for travel time.

• Any increase to the base
Prevailing Wage rate
greater than 5% will cause
the “Field Surveyor” rate to
have an subsequent
increase equal to that of the
base rate increase.

RATE SCHEDULES (FOR ADDITIONAL SERVICES)

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 25 LABELLE MARVIN
LaBelle Marvin, Inc.

PROFESSIONAL PAVEMENT ENGINEERING
2700 South Grand Avenue
Santa Ana, CA 92705
PH 714-546-3468
Effective: January 1, 2025 - January 1, 2026
A. PROFESSIONAL ENGINEERING SERVICES
$275.00/hr
$205.00/hr
$205.00/hr
$185.00/hr
$100.00/hr
$600.00/hr
$750.00/hr
$205.00/hr
$205.00/hr
Senior AutoCAD Designer $205.00/hr
$185.00/hr
$110.00/hr $165.00/hr $155.00/hr $205.00/hr
$110.00/hr $165.00/hr $155.00/hr $205.00/hr
$120.00/hr $180.00/hr $170.00/hr $225.00/hr
B. TESTING EQUIPMENT
$3,950.00/day $2,950.00/Half Day
$3,950.00/day $2,950.00/Half Day
$100.00/hr
$25.00/hr
AC Coring (Disposables) $15.00/inch
PCC Coring (Disposables) $20.00/inch
Core Trimming - Per Cut $50.00/cut
Traffic Control - MUTCD - Lane Closures $2,750.00/day $3,100.00/day Traffic Control - MUTCD - Shadow Vehicle $2,050.00/day $2,300.00/day High Speed - Highway Traffic Control By Qoute
2025 SCHEDULE OF FEES
LABELLE MARVIN, INC. - 2025 SCHEDULE OF FEES

1. ENGINEERING STAFF
Std. Rate Overtime Rate Prevailing Wage
Rates
Prevailing Wage
(OT)Key Personnel
Staff AutoCAD Technician
Principal Engineer
Project Engineer
Project Manager
Staff Engineer
Report Preparation / Office Support

2. EXPERT WITNESS
FWD Testing Equipment
Ground Penetrating Radar Equipment
Pavement Coring Vehicle Equipment

6. EQUIPMENT SURCHARGES
Expert Witness
Deposition / Testimony

3. SPECIALTY
FWD Data Analyst
Ground Penetrating Radar Specialist

4. TECHNICIAN STAFF
Field Technician
Lab Technicians
Nuclear Gauge Technician

5. TESTING EQUIPMENT
Special Rates Prevailing Wage
Rates
Prevailing Wage
(OT)

7. TRAFFIC CONTROL
Nuclear Gauge Devise Surcharge
Task Std. Rate
File: 2025 LaBelle Marvin Inc Schedule of Fees_Inhouse with Codes.Page 1 of 4 Print Date: 12/17/2024...8:39 AM

RATE SCHEDULES (FOR ADDITIONAL SERVICES)

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 26 C. LABORATORY TESTING
Std. Rate ASTM CALTRANS
Sieve Analysis, Coarse $105.00 C136 202-C
Sieve Analysis, Fine (wash) $125.00 C136 202-C
Specific Gravity, Bulk SSD, Coarse $115.00 C127 206
Specific Gravity, Fine $255.00 128 207
Absorption, Coarse $105.00 C127 206
Absorption, Fine $150.00 C128 207
Sand Equivalent (Ave. 3) $125.00 D2419 217
Durability Factor, Coarse or Fine $180.00 D3744 229
Cleanness Value $180.00 227
Los Angeles Rattler $370.00 C131 211
Unit Weight $115.00 C29 212
Plasticity Index $205.00 D424 204
Maximum Density and Optimum Moisture $235.00 D1557 216
R-Value $280.00 D2844 301
R-Value (Lime Treated) $370.00
R-Value (Supplier) $240.00 D2844 301
California Bearing Ratio (CBR) $555.00 D1883
California Bearing Ratio (CBR) - 1 Point $255.00
California Bearing Ratio (CBR) - Lime Treated $665.00
pH - Per Determination $135.00 C977
Retained Strength $500.00
pH – Eades & Grimm $505.00
Unconfined Compression $100.00
Muffle Oven/Organic Content $170.00
Crushed Particle $155.00 205
Flat & Elongated Particle $245.00 D4791
Angularity $215.00
Moisture Content $50.00 D2216 226
Subgrade Density (Drive Tube) $115.00 D2937
C. LABORATORY TESTING (Continued)
Std. Rate ASTM CALTRANS
Emulsion, Cement or Lime Stabil. Inv. By Quote
Investigation, Design, Spec. and QC By Quote
CTS / LTS Design Study By Quote
Mix Design Reviews By Quote
Slump Test (in Field) By Quote

10. PORTLAND CEMENT CONCRETE

8. SOILS, AGGREGATES AND AGGREGATE BASE

9. SOILS, AGGREGATES AND AGGREGATE BASE
File: 2025 LaBelle Marvin Inc Schedule of Fees_Inhouse with Codes.Page 2 of 4 Print Date: 12/17/2024...8:39 AM

LABELLE MARVIN, CONTINUED

RATE SCHEDULES (FOR ADDITIONAL SERVICES)

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 27 Asphalt Concrete Mix Design, Marshall Stability By Quote Hveem Stabilometer Method By Quote
Gyratory Maximum Density $235.00
Stability Tests - Hveem (s-Value) $305.00 D1560_D1561 304_366 Stability Tests - Marshal Stability & Flow $335.00
Stability Tests - Moisture Vapor Susceptility $335.00 307 Stability Tests - Swell $215.00 305
Stability Tests - Combined Marshall and Retained Stability $445.00 Maximum Lab. Density - Marshall or Hveem $235.00
Maximum Lab. Density - (Rice Gravity) Max. Theoretical U $150.00 D2041 Tensile Strength Ratio (TSR) $830.00
Tensile Strength Ratio (TSR) - Freeze/Thaw $885.00
Tensile Strength Ratio (TSR – CT 371) $1,955.00
Binder Content - Ignition Oven $275.00 382
pH – on Emulsion $135.00
Soundness $320.00 C88
Extraction, % Asphalt (Reflux) $275.00 D2172
Solvent Charge (Reflux) $100.00 for D2172*
% Rubber $115.00
Extraction, % Asphalt Recovery (Abson Method) $405.00 D2172_D1856 Gradation of Extracted Aggregate $125.00 C136 202
Density and Thickness on Core Samples $70.00 D1188_D2726_D3549 308 Stripping (pre-mixed sample) $145.00 D1664 302
Permeability, VDOT $255.00
Cohesion $270.00
Compatibility $130.00
Drain Down $335.00
C. LABORATORY TESTING (Continued)
Std. Rate ASTM CALTRANS
Viscosity SSF @ 77F° (25C°), sec. $200.00 D244
Viscosity SSF @ 122F° (50C°) $225.00
Settlement Five or Seven Day, % $490.00 D244
Demulsibility $150.00 D244
Particle Charge $180.00 D244 343
Sieve Test, % $130.00 D244
Cement Mixing Test $195.00 D244
Distillation and Percent Oil Determination $370.00 D402_D244 Residue by Evaporation Cook-Off or CA Method 330 $195.00 331 Wet Track Abrasion Test (WTAT) $140.00 D3910
Storage Stability, One Day $490.00 D244
Float Test $140.00 D139_D244
Cone Penetration $140.00 D243_D5
Solids Content by Muffle Oven Burn-Off AASHTO T 267 $170.00 Resiliency $125.00
Torsional Recovery $490.00
Elastic Recovery $115.00
Pavement Seal - Non Volatile Components $125.00

11. ASPHALT CONCRETE

12. ASPHALT CEMENT
File: 2025 LaBelle Marvin Inc Schedule of Fees_Inhouse with Codes.Page 3 of 4 Print Date: 12/17/2024...8:39 AM

LABELLE MARVIN, CONTINUED

RATE SCHEDULES (FOR ADDITIONAL SERVICES)

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 28 D. MISC.

Per Diem By Quote
Mileage $0.75/mi
$255.00/hr
Show-up time and no inspection performed or failure to cancel before 3:30 p.m. on the previous working day, two hours; one to four hours, four hour minimum; four to eight hours, eight hour minimum. Hourly charges will be on a portal to portal basis.

First eight hours between 7:00 a.m. and 5:00 p.m. Monday through Friday.

Over eight hours worked in one day (Monday through Friday), work before 7:00 a.m. and after 5:00 p.m., Sat and Sun., time and a half will be charged.

Double time and a half will be charged for work performed on holidays.

Special schedule nighttime field work between the hours of 6:00 p.m. and 6:00 a.m. will be subject to a Where location of work demands, a subsistence will be charged on a pre-arranged rate prior to commencement of inspection and/or testing service.

Outside services and reimbursable expenses such as rental of special equipment, fabrication of special test apparatus Air fares and car rental will be charged at cost plus fifteen percent.

Hourly, Daily, Weekly, or Monthly Nuclear Gauge surcharges apply Rates has been provided for your convenience. The cost of additional tests will be furnished upon request.

A preparation charge will be added to all samples submitted to our laboratory that are not ready for testing.

This preparation charge will be based on the actual time required at the Laboratory Technician's rate per hour.

Engineering time and Office Support charges may apply.

OUTSIDE SERVICES AND REIMBURSABLE EXPENSES
*COMPACTION TESTING

MATERIALS TESTING

MINIMUM HOURLY CHARGES

REGULAR HOURLY CHARGES

OVERTIME HOURLY CHARGES

SUBSISTENCE

13. MOBILIZATION COSTS
Mobilization
File: 2025 LaBelle Marvin Inc Schedule of Fees_Inhouse with Codes.Page 4 of 4 Print Date: 12/17/2024...8:39 AM

LABELLE MARVIN, CONTINUED

RATE SCHEDULES (FOR ADDITIONAL SERVICES)

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 29 CERTIFICATION OF INDIRECT COSTS & FINANCIAL SYSTEM
Certification of Indirect Costs and Financial Management System (Note: If a Safe Harbor Indirect Cost Rate is approved, this form is not required) Consultant’s Full Legal Name:

Important: Consultant means the individual or consultant providing engineering and design related services as a party of a contract with a recipient or sub-recipient of Federal assistance. Therefore, the Indirect Cost Rate(s) shall not be combined with its parent company or subsidiaries.

Indirect Cost Rate (ICR):

Combined Rate: Or
Home Office Rate: and Field Office Rate (if applicable):

Facilities Capital Cost of Money (if applicable):

Fiscal Period:*
* Fiscal period is annual one year applicable accounting period that the ICR was developed (not the contract period). The ICR is based on the consultant’s one-year applicable accounting period for which financial statements are regularly prepared by the consultant.

I have reviewed the proposal to establish an ICR(s) for the fiscal period as specified above and have determined to the best of my knowledge and belief that:
• All costs included in the cost proposal to establish the ICR(s) are allowable in accordance with the cost principles of the Federal Acquisition Regulation (FAR) 48, Code of Federal Regulations (CFR), Chapter 1, Part 31 (48 CFR Part 31).
• The cost proposal does not include any costs which are expressly unallowable under the cost principles of 48 CFR Part 31.
• The accounting treatment and billing of prevailing wage delta costs are consistent with our prevailing wage policy as either direct labor, indirect costs, or other direct costs on all federally-funded A&E Consultant Contracts.
• All known material transactions or events that have occurred subsequent to year-end affecting the consultant’s ownership, organization, and indirect cost rates have been disclosed as of the date of this certification.

I am providing the required and applicable documents as instructed on the Financial Document Review Request form.

Financial Management System:

Our labor charging, job costing, and accounting systems meet the standards for financial reporting, accounting records, and internal control adequate to demonstrate that costs claimed have been incurred, appropriately accounted for, are allocable to the contract, and comply with the federal requirements as set forth in Title 23 United States Code (U.S.C.) Section 112(b)(2); 48 CFR Part 31.201-2(d); 23 CFR, Chapter 1, Part 172.11(a)(2); and all applicable state and federal rules and regulations.

Our financial management system has the following attributes:
• Account numbers identifying allowable direct, indirect, and unallowable cost accounts; • Ability to accumulate and segregate allowable direct, indirect, and unallowable costs into separate cost accounts;
1 The Converse Professional Group
143.36
01/01/2023 - 12/31/2023

CONVERSE PROFESSIONAL GROUP

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 30 • Ability to accumulate and segregate allowable direct costs by project, contract and type of cost; • Internal controls to maintain integrity of financial management system; • Ability to account and record costs consistently and to ensure costs billed are in compliance with FAR; • Ability to ensure and demonstrate costs billed reconcile to general ledgers and job costing system; and • Ability to ensure costs are in compliance with contract terms and federal and state requirements.

Cost Reimbursements on Contracts:

I also understand that failure to comply with 48 CFR Part 16.301-3 or knowingly charge unallowable costs to Federal-Aid Highway Program (FAHP) contracts may result in possible penalties and sanctions as provided by the following:
• Sanctions and Penalties - 23 CFR Part 172.11(c)(4)
• False Claims Act - Title 31 U.S.C. Sections 3729-3733 • Statements or entries generally - Title 18 U.S.C. Section 1001 • Major Fraud Act - Title 18 U.S.C. Section 1031
All A&E Contract Information:
• Total participation amount ___________________ on all State and FAHP contracts for Architectural & Engineering services that the consultant received in the last three fiscal periods. • The number of states in which the consultant does business is • Years of consultant’s experience with 48 CFR Part 31 is • Identify the type of audits listed below that the consultant has had performed (if applicable):

Cognizant ICR Audit Local Govt ICR Audit
Caltrans ICR Audit
CPA ICR Audit Federal Govt ICR Audit
I, the undersigned, certify all of the above to the best of my knowledge and belief and that I have reviewed the ICR Schedule to determine that any costs which are expressly unallowable under the Federal cost principles have been removed and comply with Title 23 U.S.C. Section 112(b)(2), 48 CFR Part 31, 23 CFR Part 172, and all applicable state and federal rules and regulations. I also certify that I understand that all documentation of compliance must be retained by the consultant. I hereby acknowledge that costs that are noncompliant with the federal and state requirements are not eligible for reimbursement and must be returned to Caltrans.

Name:** Title**:

Signature: Date:

Phone**: Email**:
**An individual executive or financial officer of the consultant’s or subconsultant’s organization at a level no lower than a Vice President, a Chief Financial Officer, or equivalent, who has authority to represent the financial information used to establish the indirect cost rate.

Note: Both prime and subconsultants as parties of a contract must complete their own forms. Caltrans will not process local agency’s invoices until a complete form is accepted and approved by the Independent Office of Audits and Investigations.
2 Hashmi Quazi Principal in Charge
01/02/2025
909-474-2847 [email protected]
N/A
3 30
/uni2714

CERTIFICATION OF INDIRECT COSTS & FINANCIAL SYSTEM

CONVERSE PROFESSIONAL GROUP, CONTINUED

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 31 Certification of Indirect Costs and Financial Management System - Independent Office of Audits and Investigations - Revised 9/2022 Inspector General
California Department of Transportation
Certification of Indirect Costs and Financial Management System (Note: If a Safe Harbor Indirect Cost Rate is approved, this form is not required) Consultant’s Full Legal Name:

Important: Consultant means the individual or consultant providing engineering and design related services as a party of a contract with a recipient or sub-recipient of Federal assistance. Therefore, the Indirect Cost Rate(s) shall not be combined with its parent company or subsidiaries.

Indirect Cost Rate (ICR):

Combined Rate: Or
Home Office Rate: and Field Office Rate (if applicable):

Facilities Capital Cost of Money (if applicable):

Fiscal Period:*
* Fiscal period is annual one year applicable accounting period that the ICR was developed (not the contract period). The ICR is based on the consultant’s one-year applicable accounting period for which financial statements are regularly prepared by the consultant.

I have reviewed the proposal to establish an ICR(s) for the fiscal period as specified above and have determined to the best of my knowledge and belief that:
• All costs included in the cost proposal to establish the ICR(s) are allowable in accordance with the cost principles of the Federal Acquisition Regulation (FAR) 48, Code of Federal Regulations (CFR), Chapter 1, Part 31 (48 CFR Part 31).
• The cost proposal does not include any costs which are expressly unallowable under the cost principles of 48 CFR Part 31.
• The accounting treatment and billing of prevailing wage delta costs are consistent with our prevailing wage policy as either direct labor, indirect costs, or other direct costs on all federally-funded A&E Consultant Contracts.
• All known material transactions or events that have occurred subsequent to year-end affecting the consultant’s ownership, organization, and indirect cost rates have been disclosed as of the date of this certification.

I am providing the required and applicable documents as instructed on the Financial Document Review Request form.

Financial Management System:

Our labor charging, job costing, and accounting systems meet the standards for financial reporting, accounting records, and internal control adequate to demonstrate that costs claimed have been incurred, appropriately accounted for, are allocable to the contract, and comply with the federal requirements as set forth in Title 23 United States Code (U.S.C.) Section 112(b)(2); 48 CFR Part 31.201-2(d); 23 CFR, Chapter 1, Part 172.11(a)(2); and all applicable state and federal rules and regulations.

Our financial management system has the following attributes:
• Account numbers identifying allowable direct, indirect, and unallowable cost accounts; • Ability to accumulate and segregate allowable direct, indirect, and unallowable costs into separate cost accounts;
1 Helix Environmental Planning, Inc.
195.34
2023

HELIX ENVIRONMENTAL GROUP

CERTIFICATION OF INDIRECT COSTS & FINANCIAL SYSTEMCERTIFICATION OF INDIRECT COSTS & FINANCIAL SYSTEM

CITY OF CATHEDRAL CITY
Professional Engineering Design Services for CWSRF Septic to Sewer Planning Project City Project No.: (C01020) | SWB Project No.: (C-06-8696-1 10) 32 Certification of Indirect Costs and Financial Management System - Independent Office of Audits and Investigations - Revised 9/2022 • Ability to accumulate and segregate allowable direct costs by project, contract and type of cost; • Internal controls to maintain integrity of financial management system; • Ability to account and record costs consistently and to ensure costs billed are in compliance with FAR; • Ability to ensure and demonstrate costs billed reconcile to general ledgers and job costing system; and • Ability to ensure costs are in compliance with contract terms and federal and state requirements.

Cost Reimbursements on Contracts:

I also understand that failure to comply with 48 CFR Part 16.301-3 or knowingly charge unallowable costs to Federal-Aid Highway Program (FAHP) contracts may result in possible penalties and sanctions as provided by the following:
• Sanctions and Penalties - 23 CFR Part 172.11(c)(4)
• False Claims Act - Title 31 U.S.C. Sections 3729-3733 • Statements or entries generally - Title 18 U.S.C. Section 1001 • Major Fraud Act - Title 18 U.S.C. Section 1031
All A&E Contract Information:
• Total participation amount ___________________ on all State and FAHP contracts for Architectural & Engineering services that the consultant received in the last three fiscal periods. • The number of states in which the consultant does business is • Years of consultant’s experience with 48 CFR Part 31 is • Identify the type of audits listed below that the consultant has had performed (if applicable):

Cognizant ICR Audit Local Govt ICR Audit
Caltrans ICR Audit
CPA ICR Audit Federal Govt ICR Audit
I, the undersigned, certify all of the above to the best of my knowledge and belief and that I have reviewed the ICR Schedule to determine that any costs which are expressly unallowable under the Federal cost principles have been removed and comply with Title 23 U.S.C. Section 112(b)(2), 48 CFR Part 31, 23 CFR Part 172, and all applicable state and federal rules and regulations. I also certify that I understand that all documentation of compliance must be retained by the consultant. I hereby acknowledge that costs that are noncompliant with the federal and state requirements are not eligible for reimbursement and must be returned to Caltrans.

Name:** Title**:

Signature: Date:

Phone**: Email**:
**An individual executive or financial officer of the consultant’s or subconsultant’s organization at a level no lower than a Vice President, a Chief Financial Officer, or equivalent, who has authority to represent the financial information used to establish the indirect cost rate.

Note: Both prime and subconsultants as parties of a contract must complete their own forms. Caltrans will not process local agency’s invoices until a complete form is accepted and approved by the Independent Office of Audits and Investigations.
2 1/8/25

0.00 1
25 Kristin Olszak
/uni2714
CFO
[email protected](619) 462-1515

HELIX ENVIRONMENTAL GROUP, CONTINUED

CERTIFICATION OF INDIRECT COSTS & FINANCIAL SYSTEM
C-1
EXHIBIT "C"

INSURANCE
A. Insurance Coverages. Service Provider shall provide and maintain insurance, acceptable to the City, in full force and effect throughout the term of this Agreement, against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Services by Service Provider, its agents, representatives or employees. Service Provider shall procure and maintain the following scope and limits of insurance:

Only the following “marked” requirements are applicable:

X Commercial General Liability (CGL): Insurance written on an occurrence basis to protect Service Provider and City against liability or claims of liability which may arise out of this Agreement in the amount of one million dollars ($1,000,000) per occurrence and subject to an annual aggregate of two million dollars ($2,000,000).

Coverage shall be at least as broad as Insurance Services Office form Commercial General Liability coverage (Occurrence Form CG 0001). There shall be no endorsement or modification of the CGL limiting the scope of coverage for either insured vs. additional insured claims or contractual liability. All defense costs shall be outside the limits of the policy.

X Vehicle Liability Insurance: Vehicle liability insurance in an amount not less than $1,000,000 for injuries, including accidental death, to any one person, and subject to the same minimum for each person, in an amount not less than one million dollars ($1,000,000) for each accident, and property damage insurance in an amount of not less than one million dollars ($1,000,000). A combined single limit policy with aggregate limits in an amount of not less than $2,000,000 shall be considered equivalent to the said required minimum limits. Coverage shall be at least as broad as Insurance Services Office form number CA 0001 covering Automobile Liability, including code 1 "any auto" and endorsement CA 0025, or equivalent forms subject to the approval of the City.

X Workers’ Compensation Insurance: Workers’ Compensation insurance that includes a minimum of one million dollars ($1,000,000) of employers’ liability coverage.

Service Provider shall provide an endorsement that the insurer waives the right of subrogation against the City and its respective elected officials, officers, employees, agents and representatives. In the event a claim under the provisions of the California Workers’ Compensation Act is filed against City by a bona fide employee of Service Provider participating under this Agreement, Service Provider is to defend and indemnify the City from such claim.

X Professional Liability Insurance: Professional liability insurance appropriate to the Service Provider’s profession in an amount not less than one million dollars

C-2
$1,000,000 per occurrence. This coverage may be written on a “claims made” basis, and must include coverage for contractual liability. The professional liability insurance required by this Agreement must be endorsed to be applicable to claims based upon, arising out of or related to Services performed under this Agreement. The insurance must be maintained for at least three (3) consecutive years following the completion of Service Provider’s services or the termination of this Agreement. During this additional three (3) year period, Service Provider shall annually and upon request of the City submit written evidence of this continuous coverage.

B. Other Provisions . Insurance policies required by this Agreement shall contain the following provisions:

1. All Coverages.

a. Each insurance policy required by this Agreement shall be endorsed and state the coverage shall not be suspended, voided, cancelled by the insurer or either Party to this Agreement, reduced in coverage or in limits except after 30 days' prior written notice by certified mail, return receipt requested, has been given to City.

b. Insurance is to be placed with insurers with a current A.M.

Best's rating of no less than A:VII.

2. Commercial General Liability and Automobile Liability Coverages.

a. City, and its respective elected and appointed officers, officials, and employees and volunteers are to be covered as additional insureds as respects: liability arising out of activities Service Provider performs; products and completed operations of Service Provider; premises owned, occupied or used by Service Provider; or automobiles owned, leased, hired or borrowed by Service Provider.

The coverage shall contain no special limitations on the scope of protection afforded to City, and their respective elected and appointed officers, officials, or employees.

b. Service Provider’s insurance coverage shall be primary insurance with respect to City, and its respective elected and appointed, its officers, officials, employees and volunteers. Any insurance or self -insurance maintained by City, and its respective elected and appointed officers, officials, employees or volunteers, shall apply in excess of, and not contribute with, Service Provider’s insurance.

c. Service Provider’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.

C-3
d. Any failure to comply with the reporting or other provisions of the insurance policies, including breaches of warranties, shall not affect coverage provided to City, and its respective elected and appointed officers, officials, employees or volunteers.

e. The insurer waives all rights of subrogation against the City, its elected or appointed officers, officials, employees or agents.

3. Workers' Compensation Coverage . Unless the City Manager otherwise agrees in writing, the insurer shall agree to waive all rights of subrogation against City, and its respective elected and appointed officers, officials, employees and agents for losses arising from work performed by Service Provider.

C. Other Requirements. Service Provider agrees to deposit with City, at or before the effective date of this Agreement, certificates of insurance necessary to satisfy City that the insurance provisions of this contract have been complied with. The City may require that Service Provider furnish City with copies of original endorsements effecting coverage required by this Exhibit “C”. The certificates and endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. City reserves the right to inspect complete, certified copies of all required insurance policies, at any time.

1. Service Provider shall furnish certificates and endorsements from each sub-contractor identical to those Service Provider provides.

2. Any deductibles or self -insured retentions must be declared to and approved by City. At the option of City, either the insurer shall reduce or eliminate such deductibles or self -insured retentions as respects City or its respective elected or appointed officers, officials, employees and volunteers, or the Service Provider shall procure a bond guaranteeing payment of losses and related investigations, claim administration, defense expenses and claims.

3. The procuring of such required policy or policies of insurance shall not be construed to limit Service Provider’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.

Staff Report
City Council
Item No. 6.B
Meeting Date: February 26, 2025
From: John A. Corella, Director of Public Works
Title: Award a Construction Contract to Vance Corporation for the FY 2024-2025 Dream Homes Neighborhood Area and East Palm
Canyon Drive Pavement Rehabilitation Projects
RECOMMENDATION:

To award a construction contract to Vance Corporation in the amount of $481,836.28 for the fiscal year (FY) 2024-2025 Dream Homes Neighborhood Area (C08693) and East Palm Canyon Drive (C08694) Pavement Rehabilitation Projects; approve a twenty percent (20%) contingency in the amount of $96,373.72 for unforeseeable construction costs, thereby bringing the total project budget to the amount of $578;210.00; and, authorize the City Manager to execute the required contract documents; and, authorize the City Engineer to request bonds and insurance for the project, and issue the notice to proceed.

BACKGROUND:

The FY 2024-2025 Pavement Rehabilitation Projects (Projects) encompassed three (3) roadways segments in the Dream Homes Neighborhood Area leading to the entrances of Esperanza Park, and one (1) roadway segment on East Palm Canyon Drive to accomplish the Capital Improvements Program (CIP) Project originally listed on the City’s Biennial Budget as East Palm Canyon Drive REAS.

Engineering staff evaluated these roadway segments with the Pavement Management Program (PMP) and visual inspections to determine the appropriate asphalt treatment.

During the planning phase of these projects, engineering staff combined and issued one bid solicitation to get the best bulk price on material and labor for all projects, as opposed to requesting bids for each project individually and paying for higher unit costs on each project.

The following is a summary of the rehabilitation projects encompassed in the recent bid solicitation

1. Dream Homes Neighborhood Area Pavement Rehabilitation Projects (C08693) The roadway segments leading to the entrances of Esperanza Park selected for pavement rehabilitation are the following:
•San Diego Drive, from Mia Place to Chia Place (PCI 58) •Mia Place, from San Diego Drive to Esperanza Park (PCI 59) •Chia Place, from San Diego Drive to end (PCI 70)
In addition to these roadway segments the reconstruction of the intersection between Laguna Court and Mission Court was included as part of the pavement rehabilitation projects to address storm water drainage and avoid future flooding at the intersection.

The projects consist of the removal and demolition of existing asphalt pavement and outdated curb ramps, construction of asphalt concrete pavement, construction of updated curb ramps, construction of cross gutter and spandrels, pavement striping and markings, and traffic signage.

2. East Palm Canyon Drive Pavement Rehabilitation Project (C08694) The pavement rehabilitation proposed for East Palm Canyon Drive from Canyon Plaza to Canyon Plaza/El Dorado is being accomplished with available funding from the current FY 2024-25 East Palm Canyon Drive REAS project budget.

Engineering staff evaluated the roadway segments with the Pavement Management Program (PMP) and visual inspections and found that the roadway segment along East Palm Canyon Drive between Canyon Plaza and Canyon Plaza/El Dorado requires a more substantial asphalt treatment than slurry seal treatment (REAS). All other segments have a pavement condition that aligns with the slurry seal treatment proposed in the current CIP project and budget, respectively.

The current pavement condition index (PCI) for the roadway segment of East Palm Canyon Drive between Canyon Plaza and Canyon Plaza/El Dorado is 39 (poor pavement condition). The recommended treatment is to remove and install 2 inches of asphalt due to severe surface distress. Engineering staff removed this roadway segment from the REAS project and included the pavement rehabilitation of this roadway segment in this bid solicitation.

Note that the current FY 2024-25 budgeted REAS project from Cathedral Canyon Drive to the west city limits, except for any pavement work that will be included as part of the proposed east city limits MUP project currently under design, will be presented to the City Council at the March 12, 2025, Council meeting.

DISCUSSION:

On Friday, January 24, 2025, the city advertised the invitation to bid, requesting qualified contractors to perform the scope of work described in Bid No. B24-79E, which includes the Plans and Specifications for these Projects.

The bid solicitation was made available to contractors for fourteen (14) calendar days and advertised in the following locations:
•Desert Sun- Published on January 24, 2025
•PlanIt Print Works- From January 24, 2025, until February 6, 2025 •City’s Website- From January 24, 2025, until February 6, 2025 On February 6, 2025, the City received eight (8) bid proposals for these Projects. The following table ranks each qualified bidder by the total bid amount.

RANK CONTRACTOR AMOUNT
1 Vance Corporation – Beaumont, CA $ 481,836.28
2 Hardy and Harper, Inc. – Lake Forest, CA $ 499,000.00 3 Matich Corporation – San Bernardino, CA $ 521,590.00
4 Onyx Paving Company, Inc. – Anaheim, CA $ 533,000.00
5 Calmex Engineering, Inc. – Bloomington, CA $ 570,469.45 6 Martin Marietta San Diego Aggregates LLC – San Diego, CA $ 613,205.75 7 Granite construction Company – Indio, CA $ 615,520.00 8 LCR Earthwork and Engineering, Corp. – Jurupa Valley, CA $ 636,342.00 The bid tabulation prepared by the Engineering Division is attached to this report for reference.

Based on the bids received, the lowest responsive and responsible bidder who yields the lowest bid amount is Vance Corporation, from Beaumont, CA.

Engineering staff is recommending the City Council award a construction contract to Vance Corporation in the amount of $481,836.28 for the fiscal year (FY) 2024-2025 Dream Homes Neighborhood Area (C08693) and East Palm Canyon Drive (C08694) Pavement Rehabilitation Projects; approve a twenty percent (20%) contingency in the amount of $96,373.72 for unforeseeable construction costs, thereby bringing the total project budget to the amount of $578;210.00; and, authorize the City Manager to execute the required contract documents; and, authorize the City Engineer to request bonds and insurance for the project, and issue the notice to proceed
All work will be performed within the existing City right-of-way. Construction is expected to start in March 2025 and is estimated to be completed by April 2025.

Environmental Analysis:

These Projects are categorically excluded under the National Environmental Policy Act (NEPA) process for federally funded projects per 24CFR58.35 (a)(1) and Categorically Exempt under the California Environmental Quality Act (CEQA), Section 15301 for “Existing Facilities”.

FISCAL IMPACT:

Dream Homes Neighborhood Area (C08693)
All construction completed in the Dream Homes Neighborhood area will be funded with available Assessment District (AD) 2004-01 Funds.

East Palm Canyon Drive (C08694)
All construction completed on East Palm Canyon Drive will be funded with available Maintenance of Effort (MOE) funds.

The Bid Opening for these Projects was held on February 6, 2025, with the lowest bid amount of $481,836.28. The budget required for the construction of these projects will include the bid amount and a 20% contingency, in the amount of $96,373.72, thereby bringing the total construction budget for these projects to $578,210.00, as shown below.

Vance Corporation $481,836.28
20% Contingency $96,373.72
Construction Total $578,210.00

FISCAL YEAR DESCRIPTION

GENERAL
LEDGER

ACCOUNT
CODES

PROJECT
CODE AMOUNT ONE TIME or

ONGOING
2024-2025 AD 2004-01 353-100-150-
156-8800-8802 C08693 $310,820.00 One Time
2024-2025 MOE 100-100-150-
156-8800-8802 C08694 $267,390.00 One Time
2024-2025 Total $578,210.00
FIVE-YEAR STRATEGIC PLAN:

Goal-B: Community Investment
Objective: Cathedral City roads, gateways, public spaces, and other city infrastructure are well planned, designed, constructed, and maintained.

B-15: Develop a 5-Year pavement maintenance strategy and funding plan to achieve a citywide Pavement Quality Index that ranks in the Top 3 of Coachella Valley cities.

ATTACHMENTS:

1. FY 2024-2025 Dream Homes Area and East Palm Canyon Pavement Rehabilitation Projects – Contract

2. FY 2024-2025 Dream Homes Area and East Palm Canyon Pavement Rehabilitation Projects - Bid Tabulation
Agreement 1300-1
SECTION 1300

CONTRACT

THIS CONTRACT, by and between the CITY OF CATHEDRAL CITY, a municipal corporation, herein referred to as "City,” and Vance Corporation, herein referred to as, "Contractor."

W I T N E S S E T H:

In consideration of their mutual covenants, the parties hereto agree as follows:

1. Contractor shall furnish all necessary labor, material, equipment, transportation and services for Bid No. B24-79E
FY 2024-2025

DREAM HOMES NEIGHBORHOOD AREA AND EAST PALM CANYON DRIVE PAVEMENT

REHABILITATION PROJECTS

DREAM HOMES NEIGHBORHOOD AREA PAVEMENT REHABILITATION (C08693) EAST PALM CANYON DRIVE PAVEMENT REHABILITATION (C08694)

(the “Work”) in the City of Cathedral City, California. The Work shall be done in strict conformity with this Contract, approved Change Orders, the Invitation to Bid dated January 24, 2025, Instructions to Bidders, permits issued by the City or other agencies, the General and Specific Project Requirements, Standard Specifications , Plans, Referenced Specifications, the General Conditions, Supplementary Conditions the Contractor's Bid dated February 6, and any addenda thereto (the “Contract Documents”) all of which shall be considered a part hereof as though fully set herein.

2. Contractor will comply with all Federal, State, County, and City of Cathedral City laws, regulations, and policies, which are, as amended from time to time, incorporated herein by reference.

3. All work shall be done in a workman like manner and to the satisfaction of the City Engineer.

4. Time is of the essence in Contractor’s performance of the Work for this Contract. Contractor agrees to diligently pursue the performance and completion of the Work in every detail to the satisfaction of the City. Contractor shall commence work after the issuance of a written Notice to Proceed and agrees to have all work completed within Forty-five (45) calendar days from the date of Notification to Proceed.

5. In consideration of said Work, City agrees to pay Contractor such sums as shall be approved by the City Engineer at lump sums and/or unit prices stated in the Contractor's Bid. The total compensation to Contractor for all Work shall not exceed four -hundred eighty-one thousand, eight -hundred thirty-six dollars and twenty-eight cents ($481,836.28). All payments shall be subject to approval by the City Engineer and shall be in accordance with the terms, conditions, and procedures provided in the Contract Documents.

6. The Contractor, and any subcontractor engaged by Contractor, shall not pay less than the general prevailing rate for per diem wages, as determined by the State of California Department of Industrial Relations and referred to in the Invitation to Bid, to any workman employed for the work to be performed under this contract; and the Contractor shall forfeit as a penalty to the City up to Two Hundred Dollars ($200.00) for each calendar day, or fraction thereof, for every workman paid by Contractor or by any subcontractor engaged by Contractor, in violation of this provision (Sections 1770-1777, Labor Code of California).

7. Concurrently with the execution of this Contract, Contractor shall furnish bonds of a surety satisfactory to City, as provided in the Contract Documents, the cost of which shall be paid by Contractor.

Agreement 1300-2

8. Contractor agrees to indemnify, hold harmless, release and defend (even if the allegations are false, fraudulent or groundless), to the maximum extent permitted by law, the City, its City Council and each member thereof, and its officers, employees, commission members and representatives, from any and all liability, loss, suits, claims, damages, costs, judgments and expenses (including attorney's fees and costs of litigation) which in whole or in part are claimed to result from or to arise out of the usage or operation, including the malfunctioning of, or, any injury caused by, any product purchased herein; or any acts, errors or omissions (including, without limitation, professional negligence) of Contractor, its employees, representatives, subcontractors, or agents in connection with the performance of this Contract. This agreement to indemnify includes, but is not limited to, personal injury (including death at any time) and damage to property (including, but without limitation, contract or tort or patent , copyright, trade secret or trademark infringement) sustained by any person or persons (including, but not limited to, companies, or corporations, Contractor and its employees or agents, and members of the general public.

9. Except as otherwise required, Contractor shall concurrently with the execution of this Contract, furnish the City satisfactory evidence of insurance of the kinds and in the amounts provided in the Contract Documents. This insurance shall be kept in ful l force and effect by Contractor during this entire contract and all premiums thereon shall be promptly paid by it. Each policy shall further state that it cannot be canceled without 30 days unconditional written notice to the City and shall name the City as an additional insured. Contractor shall furnish evidence of having in effect, and shall maintain Workers Compensation Insurance coverage of not less than the statutory amount or otherwise show a certificate of self -insurance, in accordance with the Workers Compensation laws of the State of California. Failure to maintain the required amounts and types of coverage throughout the duration of this Contract shall constitute a material breach of this Contract.

10. Contractor shall forfeit as a penalty to City $25.00 for each laborer, workman, or mechanic employed in the execution of this Contract by said Contractor, or any subcontractor under it, upon any of the work herein mentioned, for each calendar day during which such laborer, workman, or mechanic is required or permitted to work at other than a rate of pay provided by law for more than 8 hours in any one calendar day and 40 hours in any one calendar week, in violation of the provisions of Sections 1810- 1815 of the Labor Code of the State of California.

11. In accepting this Contract, Contractor certifies that in the conduct of its business it does not deny the right of any individual to seek, obtain and hold employment without discrimination because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status as provided in the California Fair Employment Prac tice Act (Government Code Sections 12900, et seq.) Contractor agrees that a finding by the State Fair Employment Practices Commission that Contractor has engaged during the term of this Contract in any unlawful employment practice shall be deemed a breach of this Contract and Contractor shall pay to City $500.00 liquidated damages for each such breach committed under this Contract.

12. Contractor also agrees that for contracts in excess of $30,000 that apprentices will be employed without discrimination in an approved program in a ratio established in the apprenticeship standards of the craft involved (Sections 1777.5 and 1777.6, Lab or Code of California). Contractors who willfully fail to comply will be denied the right to bid on public projects for a period of six months in addition to other penalties provided by law.

13. This Contract shall not be assignable by Contractor without the written consent of the City.

14. Contractor shall notify the City Engineer (in writing) forthwith when the Contract is deemed completed.

15. In accepting this Contract, Contractor certifies that no member or officer of the firm or corporation is an officer or employee of the City except to the extent permitted by law.

16. Contractor certifies that it is the holder of any necessary California State Contractor's License and authorized to undertake the Work. Contractor must, at Contractor’s sole expense, obtain all necessary permits and licenses required for the Work, and give all necessary notices and pay all fees and taxes required by law, including, without limitation, any business license tax imposed by City. Contractor represents and declares to Agency that it has all licenses, permits, qualifications and approvals of whatever nature which are legally required to practice its profession.

Agreement 1300-3

17. The City, or its authorized auditors or representatives, shall have access to and the right to audit and reproduce any of the Contractor records to the extent the City deems necessary to insure it is receiving all money to which it is entitled under the contract and/or is paying only the amounts to which Contractor is properly entitled under the Contract or for other purposes relating to the Contract.

18. The Contractor shall maintain and preserve all such records for a period of at least three years after termination of the Contract.

19. The Contractor shall maintain all such records in the City of Cathedral City. If not, the Contractor shall, upon request, promptly deliver the records to the City or reimburse the City for all reasonable and extra costs incurred in conducting the audit at a location other than at City offices including, but not limited to, such additional (out of the City) expenses for personnel, salaries, private auditors, travel, lodging, meals and overhead.

20. In entering into this Contract or a contract with a subcontractor to supply goods, services, or materials pursuant to this Contract, Contractor and any or subcontractor is deemed to have offered and agreed to assign to City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700 of Part 2 of Division 7 of the California Business and Professions Code), arising from purchases of goods, services, or materials for the Contract. This assignment will be deemed made and will become effective at the time City tenders final payment to Contractor, without further acknowledgement by the Parties.

21. The Parties agree that, in accordance with the City’s Electronic Signature Use Policy, adopted on August 10, 2023, and as amended thereafter, the Parties may use electronic signatures to execute this Agreement.

Any use of electronic signatures to execute this Agreement shall comply with the City’s Electronic Signature Use Policy, and such signatures shall have the same force and effect as if this Agreement were executed by hand.

Contractor acknowledges that it has had an opportunity to request and rev iew the City’s Electronic Signature Use Policy, and Contractor agrees to comply with the Electronic Signature Use Policy. Contractor agrees to indemnify, defend, and hold the City harmless from any claim, damage, or liability associated with transmitting an electronic signature or an electronically signed record by electronic transmission.

Agreement 1300-4
IN WITNESS WHEREOF, the parties have executed this Contract as of the dates stated below "CITY"

CITY OF CATHEDRAL CITY,
a California municipal corporation

By:________________________________ Dated:______________________________ Charles P. McClendon, City Manager

ATTEST:

Dated: _____________________________
Tracey R. Hermosillo, City Clerk

APPROVED AS TO FORM:

Dated: _____________________________
Eric S. Vail, City Attorney

“CONTRACTOR”

Dated: By: _ _______________________________ Name: ______________________________
Title: _______________________________

Dated: By: _________________________________ Name: ________________________________
Title: ________________________________

[CONTRACTOR SIGNATURES MUST BE NOTARIZED. IF CONTRACTOR IS A CORPORATION OR LIMITED LIABILITY COMPANY, TWO SIGNATURES MUST BE PROVIDED.]

Faithful Performance Bond 1310-1
SECTION 1310

FAITHFUL PERFORMANCE BOND

KNOW ALL MEN BY THESE PRESENTS:

THAT the City of Cathedral City, a municipal corporation, hereinafter designated the City, has, on February 6, 2025, awarded to Vance Corporation, hereinafter designated as the Principal, a Contract for BID NO. B24-79E
FY 2024-2025

DREAM HOMES NEIGHBORHOOD AREA AND EAST PALM CANYON DRIVE PAVEMENT

REHABILITATION PROJECTS

DREAM HOMES NEIGHBORHOOD AREA PAVEMENT REHABILITATION (C08693) EAST PALM CANYON DRIVE PAVEMENT REHABILITATION (C08694)

WHEREAS, said Principal is required under the terms of said Contract to furnish a bond for the faithful performance of said Contract:

NOW, THEREFORE, we, the Principal, and _____________________________________, as Surety, are held and firmly bound unto the City in the just and full amount of four-hundred eighty-one thousand, eight - hundred thirty-six dollars and twenty-eight cents ($481,836.28) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, his or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, and well and truly keep and faithfully perform the covenants, conditions, and agreements in the said contract and any alterations made as therein provided, on his or their part to be kept and performed, at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless, the City, its officers and agents as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue.

It is acknowledged that the Contract provides for one- year guarantee period, during which time this bond remains in full force and effort.

And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the same shall, in any way, affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the Contract or to the work or to the specifications. Said Surety hereby waives the provisions of Sections 2819 and 2845 of the Civil Code of the State of California.

THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK

Faithful Performance Bond 1310-2
IN WITNESS WHEREOF, the Principal and Surety have executed this instrument under their seals this _________ day of _________________________________, 2024, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

Principal
(Seal)

Signature for Principal

Title of Signatory

Surety

(Seal)

Signature for Surety

Title of Signatory

Address of Surety

Phone # of Surety

Contact Person For Surety
Payment Bond 1320-1
SECTION 1320

PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS:

THAT the City of Cathedral City, a municipal corporation, hereinafter designated the City, has, on February 6, 2025, awarded to Vance Corporation, hereinafter designated as the Principal, a Contract for BID NO. B24-79E
FY 2024-2025

DREAM HOMES NEIGHBORHOOD AREA AND EAST PALM CANYON DRIVE PAVEMENT

REHABILITATION PROJECTS

DREAM HOMES NEIGHBORHOOD AREA PAVEMENT REHABILITATION (C08693) EAST PALM CANYON DRIVE PAVEMENT REHABILITATION (C08694)

WHEREAS, said Principal is required to furnish a bond in connection and with said Contract, providing that if said Principal, or any of it or its subcontractors shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, the Surety of this bond will pay the same to the extent hereinafter set forth:

NOW, THEREFORE, we, the Principal, and____________________________________, as Surety, are held and firmly bound unto the City in the just and full amount of four-hundred eighty-one thousand, eight-hundred thirty-six dollars and twenty -eight cents ($481,836.28), executors, administrators, and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, it or its heirs, executors, administrators, successors, or assigns, shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the work contracted to be done, or for any work or labor thereon of any kind or for amount due under the Unemployment Insurance Act with respect to such work or labor, or for any amounts due, or to be withheld pursuant to Sections 18806 of the Revenue and Taxation Code of the State of California with respect to such work or labor, then said surety will pay the same in or to an amount not exceeding the amount hereinabove set forth, and also will pay in case suit is brought upon this bond, such reasonable attorney's fees to the City as shall be fixed by the court.

This bond shall insure to the benefit of any and all persons, companies, and corporations named in Section 3181 of the Civil Code of the State of California so as to give a right of action to them or their assigns in any suit brought upon this bond.

And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition of the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the same shall, in any way, affect its obligations of this bond, and it does hereby waive notice of any change, extension of time, alteration, or addition to the terms of the contract or to the work or to the specifications. Said Surety hereby waives the provisions of Sections 2819 and 2845 of the Civil Code of the State of California.

THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK
Payment Bond 1320-2
IN WITNESS WHEREOF, the Principal and Surety have executed this instrument under their seals this _________ day of _________________________________, 2024, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

Principal
(Seal)

Signature for Principal

Title of Signatory

Surety

(Seal)

Signature for Surety

Title of Signatory

Address of Surety

Phone # of Surety

Contact Person For Surety
Workers' Compensation Insurance 1330-1
SECTION 1330

WORKERS' COMPENSATION INSURANCE CERTIFICATE

In accordance with California Labor Code Section 1861, prior to commencement of work on the Contract, the Contractor shall sign and file with the City the following certification:

"I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract."

Signature

Title

Date
Liability & Insurance Requirements 1340-1
SECTION 1340

LIABILITY AND INSURANCE REQUIREMENTS

1.0 INDEMNIFICATION

Contractor shall defend, indemnify and hold harmless the City, City Council and each member thereof, and every officer, employee and agent of City, from any claim, demand, damage, liability, loss, cost or expense (including, without limitation, attorney’s fees and costs) arising from any intentional , reckless, negligent, or otherwise wrongful acts, errors or omissions of the Contractor, or any of the Contractor'’ employees, or any of its subcontractors arising out of work under this Contract.

The City does not, and shall not, waive any rights that it may have against Contractor, any of the Contractor’s employees, or any of its subcontractors under this Section because of the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to this Contract. The hold harmless, indemnification and duty to defend provisions of this Section shall apply regardless of whether or not said insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense described herein. The City will not be liable for any accident, loss, or damage to the work prior to its completion and acceptance.

2.0 INSURANCE REQUIREMENTS

2.1 General

After award of Contract, the Contractor shall promptly obtain, at its own expense, all the insurance required by Paragraph 1340- 2.0, INSURANCE REQUIREMENTS, and shall submit coverage verification for review and approval by the City upon execution of the Contract.

The Notice to Proceed with the Work under this Contract will not be issued, and the Contractor shall not commence work, until such insurance has been approved by the City. The Contractor shall not allow any subcontractors to commence work on its subcontract until all similar insurance required of the subcontractor has been obtained and verified by Contractor. Such insurance shall remain in full force and effect at all times during the prosecution of the Work and until the final completion and acceptance thereof.

The Notice to Proceed does not relieve the Contractor of the duty to obtain such insurance as required by Paragraph 1340-2.0 INSURANCE REQUIREMENTS.

2.2 Commercial General Liability Policy

The Contractor shall take out and maintain during the life of the Contract, a Commercial General Liability Policy, on an occurrence basis, with a minimum limit of not less than One Million Dollars ($1,000,000) combined single limit for bodily injury and property damage for any one occurrence and a Two Million Dollar ($2,000,000) annual project aggregate, for all of the following:

Liability & Insurance Requirements 1340-2
a. Premises Operations, including Explosion, Collapse and Underground (X, C, and U) Coverage.

b. Completed Operations/Products, including X, C, and U Coverage.

c. Independent Contractors.

d. Blanket Contractual.

e. Deductible shall not exceed One Thousand Dollars ($1,000).

2.3 Commercial Business Auto Policy

The Contractor shall take out and maintain during the life of this Contract a Commercial Business Auto Policy, on an occurrence basis, with a minimum amount of not less than One Million Dollars ($1,000,000) combined single limit for bodily injury and property damage, providing at least all of the following coverage:

a. Coverage shall be applicable to any and all leased, owned, hired, or non-owned vehicles used in pursuit of any of the activities associated with this Contract.

b. Any and all mobile equipment, including cranes, which is not covered under said Commercial Business Auto Policy shall have said coverage provided for under the Commercial General Liability Policy.

c. Deductible shall not exceed One Thousand Dollars ($1,000).

2.4 Workers' Compensation Insurance

The Contractor shall take out and maintain during the life of the Contract, Worker's Compensation and Employers' Liability insurance providing coverage for any and all employees of Contractor:

a. The required policy shall provide coverage for Workers' Compensation (Coverage A).

b. This policy shall provide coverage for One Million Dollars ($1,000,000) Employers' Liability (Coverage B).

2.5 Endorsements

All of the following endorsements are required to be made a part of the policies described in this Section hereof:

a. "The City, City employees and officers, the City Engineer, its consultants, elected officials, agents, and sub- consultants are hereby added as additional insured insofar as Work done under this Contract is concerned."

b. "This policy shall be considered primary insurance as respects any other valid and collectible insurance, including self-insured retention, the City may Liability & Insurance Requirements 1340-3
possess, and any other insurance the City does possess shall be considered excess insurance only."

c. "This insurance shall act for each insured, and additional insured, as though a separate policy had been written for each. This, however, will not act to increase the limit of liability of the insuring company.

d. "Thirty (30) days prior written notice of cancellation shall be given to the City. Such notice shall be sent to:

City Manager
City of Cathedral City
68-700 Avenida Lalo Guerrero
Cathedral City, CA 92234

2.6 Change in Terms

The Contractor shall provide immediate written notice to the City of any change in terms and conditions and/or reduction in the coverage of any nature to the insurance policies. The notice shall be sent to the location identified in Paragraph 1340-2.6.d, Endorsements . The Contractor shall be obligated to pay any extra premium for maintaining the insurance requirements specified herein

Engineer Estimate

UNIT QUANTITY UNIT COST TOTAL
Vance Corporation

UNIT COST TOTAL
Hardy & Harper

UNIT COST TOTAL
Matich Corporation

UNIT COST TOTALITEM DESCRIPTION
BID SCHEDULE NO. 1: SAN DIEGO DRIVE
1 2
3 4

MOBILIZATION

TRAFFIC CONTROL

SIGNING AND STRIPING
LS
LS
LS
SF
1 1
1 $
$
$
$
15,000.00
15,000.00
5,000.00

1.00 $
$
$
$
15,000.00
15,000.00
5,000.00
$
$
$
39,962.55
7,550.43
3,182.22

0.17 $
$
$
$
39,962.55
7,550.43
3,182.22
14,009.70
$
$
$
$
6,300.00
32,000.00
3,399.70

0.33 $
$
$
$
6,300.00
32,000.00
3,399.70
$
$
$
$
11,300.30
44,600.00
3,040.00

0.27 $
$
$
$
11,300.30
44,600.00
3,040.00
GRIND 0.12' (1.5") AC PAVEMENT AND DISPOSE
CONSTRUCT 0.12' (1.5") TYPE III C-3 PG 70-10 AC

PAVEMENT SECTION

REMOVE AND DISPOSE EXISTING CURB RAMP

AND ALL CONCRETE FROM ECR TO BCR

CONSTRUCT CURB RAMP PER CALTRANS STANDARD
PLAN A88A, CASE C, DETAIL B

CONSTRUCT CROSS GUTTER AND SPANDREL PER
RIVERSIDE COUNTY STANDARD 209

SAWCUT, MATCH EXISTING AND REMOVE

FULL DEPTH AC PAVEMENT
CONSTRUCT 3" TYPE III C-3 PG 70-10 AC PAVEMENT
OVER EXISTING 95% COMPACTED BASE MATERIAL
82,410 82,410.00 $ 27,195.30 22,250.70
5 6
TON
EA
773
2 $
$
$
$
$
$
125.00
4,500.00
5,500.00

30.00 $
$
$
$
$
96,625.00
9,000.00
11,000.00
36,000.00
5,500.00
$ 123.51
4,372.10
8,119.61

25.98 $
$
$
$
$
$
95,473.23
8,744.20
16,239.22
31,176.00
5,071.00
$
$
$
$
$
$
130.00
7,720.00
11,000.00

13.00 $
$
$
$
$
$
100,490.00
15,440.00
22,000.00
15,600.00
7,700.00
$
$
$
$
$
$
112.00
660.00
5,300.00

32.00 $
$
$
$
$
$
86,576.00
1,320.00
10,600.00
38,400.00
5,005.00
$
7 EA
SF
2 $
8 1,200
1,100
21 $
9 SF 5.00 $
$

4.61 7.00 4.55
10 TON 125.00 $ 2,625.00 121.54 2,552.34 375.00 7,875.00 138.00 2,898.00 TOTAL AMOUNT BID SCHEDULE NO.1 (BID ITEMS 1-7) $ 278,160.00 $ 223,960.89 $ 238,000.00 $ 225,990.00 BID SCHEDULE NO. 2: E PALM CANYON DRIVE
11 MOBILIZATION
12 TRAFFIC CONTROL
13 SIGNING AND STRIPING
LS
LS
LS
SF
1 1
1 $
$
$
$
20,000.00
40,000.00
20,000.00

1.50 $
$
$
$
20,000.00
40,000.00
20,000.00
139,102.50
$
$
$
17,369.13
4,242.56
15,209.93

0.36 $
$
$
$
17,369.13
4,242.56
15,209.93
33,384.60
$
$
$
$
5,300.00
14,680.00
14,382.75

0.35 $
$
$
$
5,300.00
14,680.00
14,382.75
32,457.25
$
$
$
$
10,600.10
28,800.00
18,700.00

0.34 $
$
$
$
10,600.10
28,800.00
18,700.00
31,529.9014 COLD MILL 2" AC PAVEMENT AND DISPOSE
CONSTRUCT 2" TYPE III C-3 PG 70-10 AC PAVEMENT
92,735 $
15 TONSECTION 1,160 $ 125.00 $ 145,000.00 $ 116.46 $ 135,093.60 $ 121.00 $ 140,360.00 $ 106.00 $ 122,960.00 TOTAL BID SCHEDULE NO.2 (BID ITEMS 1-7) $ 364,102.50 $ 205,299.82 $ 207,180.00 $ 212,590.00 TOTAL ALL BASE BID ITEMS $ 642,262.50 $ 429,260.71 $ 445,180.00 $ 438,580.00 ADDITIVE ALTERNATE BID SCHEDULE A:

UTILITY ADJUSTMENT

LOWER AND RAISE WATER VALVE TO GRADE PER

CVWD STANDARDS

LOWER AND RAISE SEWER MANHOLE TO GRADE PER

CVWD STANDARDS
A-1
A-2
EA
EA
27 12
$
$
1,200.00
1,500.00
$ 32,400.00 $ 1,347.83
1,348.68
$ 36,391.41 $
$
1,380.00
1,380.00
$ 37,260.00 $
$
2,030.00
2,350.00
$ 54,810.00
$ 18,000.00 $ $ 16,184.16 $ 16,560.00 $ 28,200.00
TOTAL ADDITIVE ALTERNATE BID SCHEDULE A $ 50,400.00 $ 52,575.57 $ 53,820.00 $ 83,010.00 TOTAL ALL BID ITEMS AND ALL ALTERNATIVES $ 692,662.50 $ 481,836.28 $ 499,000.00 $ 521,590.00

Onyx Paving

UNIT COST TOTALITEM DESCRIPTION UNIT QUANTITY
BID SCHEDULE NO. 1: SAN DIEGO DRIVE
1 2
3 4

MOBILIZATION

TRAFFIC CONTROL

SIGNING AND STRIPING
LS
LS
LS
SF
1 1
1 $
$
$
$
11,000.00
40,000.00
4,453.20

0.28 $
$
$
$
11,000.00
40,000.00
4,453.20
GRIND 0.12' (1.5") AC PAVEMENT AND DISPOSE
CONSTRUCT 0.12' (1.5") TYPE III C-3 PG 70-10 AC

PAVEMENT SECTION

REMOVE AND DISPOSE EXISTING CURB RAMP

AND ALL CONCRETE FROM ECR TO BCR

CONSTRUCT CURB RAMP PER CALTRANS STANDARD
PLAN A88A, CASE C, DETAIL B

CONSTRUCT CROSS GUTTER AND SPANDREL PER
RIVERSIDE COUNTY STANDARD 209

SAWCUT, MATCH EXISTING AND REMOVE

FULL DEPTH AC PAVEMENT
CONSTRUCT 3" TYPE III C-3 PG 70-10 AC PAVEMENT
OVER EXISTING 95% COMPACTED BASE MATERIAL
82,410 23,074.80
5 6
TON
EA
773
2 $
$
$
$
$
$
123.00
2,200.00
5,500.00

28.00 $
$
$
$
$
95,079.00
4,400.00
11,000.00
33,600.00
4,400.00
7 EA
SF
2 8 1,200
1,100
21 9 SF 4.00
10 TON 333.00 $ 6,993.00
TOTAL AMOUNT BID SCHEDULE NO.1 (BID ITEMS 1-7) $ 234,000.00 BID SCHEDULE NO. 2: E PALM CANYON DRIVE
11 MOBILIZATION
12 TRAFFIC CONTROL
13 SIGNING AND STRIPING
LS
LS
LS
SF
1 1
1 $ 11,000.00
55,000.00
17,008.05

0.37 $
$
$
$
11,000.00
55,000.00
17,008.05
34,311.95
$
$
$14 COLD MILL 2" AC PAVEMENT AND DISPOSE
CONSTRUCT 2" TYPE III C-3 PG 70-10 AC PAVEMENT
92,735
15 TONSECTION 1,160 $ 123.00 $ 142,680.00
TOTAL BID SCHEDULE NO.2 (BID ITEMS 1-7) $ 260,000.00
TOTAL ALL BASE BID ITEMS $ 494,000.00
ADDITIVE ALTERNATE BID SCHEDULE A:

UTILITY ADJUSTMENT

LOWER AND RAISE WATER VALVE TO GRADE PER

CVWD STANDARDS

LOWER AND RAISE SEWER MANHOLE TO GRADE PER

CVWD STANDARDS
A-1
A-2
EA
EA
27 12
$
$
1,000.00
1,000.00
$ 27,000.00
$ 12,000.00
TOTAL ADDITIVE ALTERNATE BID SCHEDULE A $ 39,000.00
TOTAL ALL BID ITEMS AND ALL ALTERNATIVES $ 533,000.00

Calmex Engineering

UNIT QUANTITY UNIT COST TOTAL
Martin Marietta

UNIT COST TOTAL
Granite Contruction

UNIT COST TOTAL
LCR Earthwork

UNIT COST TOTALITEM DESCRIPTION
BID SCHEDULE NO. 1: SAN DIEGO DRIVE
1 2
3 4

MOBILIZATION

TRAFFIC CONTROL

SIGNING AND STRIPING
LS
LS
LS
SF
1 1
1 $
$
$
$
35,400.00
19,800.00
3,050.00

0.45 $
$
$
$
35,400.00 $
$
$
$
15,000.00
45,000.00
5,000.00

0.50 $
$
$
$
15,000.00
45,000.00
5,000.00
$
$
$
$
12,000.00
12,952.95
2,950.00

0.37 $
$
$
$
12,000.00 $
$
$
$
12,000.00
35,000.00
15,000.00

0.44 $
$
$
$
12,000.00
35,000.00
15,000.00
36,260.40
19,800.00
3,050.00
37,084.50
12,952.95
2,950.00
30,491.70GRIND 0.12' (1.5") AC PAVEMENT AND DISPOSE
CONSTRUCT 0.12' (1.5") TYPE III C-3 PG 70-10 AC

PAVEMENT SECTION

REMOVE AND DISPOSE EXISTING CURB RAMP

AND ALL CONCRETE FROM ECR TO BCR

CONSTRUCT CURB RAMP PER CALTRANS STANDARD
PLAN A88A, CASE C, DETAIL B

CONSTRUCT CROSS GUTTER AND SPANDREL PER
RIVERSIDE COUNTY STANDARD 209

SAWCUT, MATCH EXISTING AND REMOVE

FULL DEPTH AC PAVEMENT
CONSTRUCT 3" TYPE III C-3 PG 70-10 AC PAVEMENT
OVER EXISTING 95% COMPACTED BASE MATERIAL
82,410 41,205.00
5 6
TON
EA
773
2 $
$
$
$
$
$
122.00
4,300.00
5,750.00

22.00 $
$
$
$
$
$
94,306.00
8,600.00
11,500.00
26,400.00
3,080.00
$
$
$
$
$
$
130.00
4,200.00
5,615.00

21.50 $
$
$
$
$
$
100,490.00
8,400.00
$
$
$
$
$
$
138.00
2,500.00
9,500.00

30.00 $
$
$
$
$
$
106,674.00
5,000.00
$
$
$
$
$
$
150.00
2,000.00
5,000.00

22.00 $
$
$
$
$
$
115,950.00
4,000.00
7 EA
SF
2 11,230.00
25,800.00
16,500.00
19,000.00
36,000.00
16,500.00
10,000.00
26,400.00
3,850.00
8 1,200
1,100
21 9 SF 2.80 15.00 15.00 3.50
10 TON 650.00 13,650.00 1,000.00 21,000.00 500.00 10,500.00 250.00 5,250.00 TOTAL AMOUNT BID SCHEDULE NO.1 (BID ITEMS 1-7) $ 252,870.50 $ 289,625.00 $ 252,068.65 $ 263,710.40 BID SCHEDULE NO. 2: E PALM CANYON DRIVE
11 MOBILIZATION
12 TRAFFIC CONTROL
13 SIGNING AND STRIPING
LS
LS
LS
SF
1 1
1 $ 11,600.00
16,100.00
14,400.00

0.57 $
$
$
$
11,600.00
16,100.00
14,400.00
52,858.95
$ 15,000.00
25,000.00
20,000.00

0.45 $
$
$
$
15,000.00
25,000.00
20,000.00
41,730.75
$ 12,000.00
45,000.00
14,100.00

0.41 $
$
$
$
12,000.00
45,000.00
14,100.00
38,021.35
$
$
$
$
15,000.00
28,000.00
30,000.00

0.56 $
$
$
$
15,000.00
28,000.00
30,000.00
51,931.60
$
$
$
$
$
$
$
$
$14 COLD MILL 2" AC PAVEMENT AND DISPOSE
CONSTRUCT 2" TYPE III C-3 PG 70-10 AC PAVEMENT
92,735
15 TONSECTION 1,160 $ 119.00 $ 138,040.00 $ 120.00 $ 139,200.00 $ 148.00 $ 171,680.00 $ 160.00 $ 185,600.00 TOTAL BID SCHEDULE NO.2 (BID ITEMS 1-7) $ 232,998.95 $ 240,930.75 $ 280,801.35 $ 310,531.60 TOTAL ALL BASE BID ITEMS $ 485,869.45 $ 530,555.75 $ 532,870.00 $ 574,242.00 ADDITIVE ALTERNATE BID SCHEDULE A:

UTILITY ADJUSTMENT

LOWER AND RAISE WATER VALVE TO GRADE PER

CVWD STANDARDS

LOWER AND RAISE SEWER MANHOLE TO GRADE PER

CVWD STANDARDS
A-1
A-2
EA
EA
27 12
$
$
2,100.00
2,325.00
$ 56,700.00 $
$
2,050.00
2,275.00
$ 55,350.00 $
$
2,050.00
2,275.00
$ 55,350.00 $
$
1,500.00
1,800.00
$ 40,500.00
$ 27,900.00 $ 27,300.00 $ 27,300.00 $ 21,600.00
TOTAL ADDITIVE ALTERNATE BID SCHEDULE A $ 84,600.00 $ 82,650.00 $ 82,650.00 $ 62,100.00 TOTAL ALL BID ITEMS AND ALL ALTERNATIVES $ 570,469.45 $ 613,205.75 $ 615,520.00 $ 636,342.00