1 MOBILIZATION LS 1 15,000.00$ 15,000.00 $ 39,962.55 $ 39,962.55 $ 6,300.00 $ 6,300.00 $ 11,300.30 $ 11,300.30 $ 2 TRAFFIC CONTROL LS 1 15,000.00$ 15,000.00 $ 7,550.43 $ 7,550.43 $ 32,000.00 $ 32,000.00 $ 44,600.00 $ 44,600.00 $ 3 SIGNING AND STRIPING LS 1 5,000.00$ 5,000.00 $ 3,182.22 $ 3,182.22 $ 3,399.70 $ 3,399.70 $ 3,040.00 $ 3,040.00 $ 4 GRIND 0.12' (1.5") AC PAVEMENT AND DISPOSE SF 82,410 1.00 $ 82,410.00$ 0.17 $ 14,009.70$ 0.33 $ 27,195.30$ 0.27 $ 22,250.70$ 5 CONSTRUCT 0.12' (1.5") TYPE III C-3 PG 70-10 AC
PAVEMENT SECTION TON 773 125.00$ 96,625.00$ 123.51 $ 95,473.23$ 130.00 $ 100,490.00$ 112.00 $ 86,576.00$ 6 REMOVE AND DISPOSE EXISTING CURB RAMP
AND ALL CONCRETE FROM ECR TO BCR EA 2 4,500.00$ 9,000.00 $ 4,372.10 $ 8,744.20 $ 7,720.00 $ 15,440.00 $ 660.00 $ 1,320.00 $ 7 CONSTRUCT CURB RAMP PER CALTRANS STANDARD
PLAN A88A, CASE C, DETAIL B EA 2 5,500.00$ 11,000.00 $ 8,119.61 $ 16,239.22 $ 11,000.00 $ 22,000.00 $ 5,300.00 $ 10,600.00 $ 8 CONSTRUCT CROSS GUTTER AND SPANDREL PER
RIVERSIDE COUNTY STANDARD 209 SF 1,200 30.00 $ 36,000.00$ 25.98 $ 31,176.00$ 13.00 $ 15,600.00$ 32.00 $ 38,400.00$ 9 SAWCUT, MATCH EXISTING AND REMOVE
FULL DEPTH AC PAVEMENT SF 1,100 5.00 $ 5,500.00$ 4.61 $ 5,071.00$ 7.00 $ 7,700.00$ 4.55 $ 5,005.00$ 10 CONSTRUCT 3" TYPE III C-3 PG 70-10 AC PAVEMENT
OVER EXISTING 95% COMPACTED BASE MATERIAL TON 21 125.00$ 2,625.00 $ 121.54 $ 2,552.34$ 375.00 $ 7,875.00 $ 138.00 $ 2,898.00 $ 278,160.00$ 223,960.89 $ 238,000.00 $ 225,990.00 $ 11 MOBILIZATION LS 1 20,000.00$ 20,000.00 $ 17,369.13 $ 17,369.13 $ 5,300.00 $ 5,300.00 $ 10,600.10 $ 10,600.10 $ 12 TRAFFIC CONTROL LS 1 40,000.00$ 40,000.00 $ 4,242.56 $ 4,242.56 $ 14,680.00 $ 14,680.00 $ 28,800.00 $ 28,800.00 $ 13 SIGNING AND STRIPING LS 1 20,000.00$ 20,000.00 $ 15,209.93 $ 15,209.93 $ 14,382.75 $ 14,382.75 $ 18,700.00 $ 18,700.00 $ 14 COLD MILL 2" AC PAVEMENT AND DISPOSE SF 92,735 1.50 $ 139,102.50$ 0.36 $ 33,384.60$ 0.35 $ 32,457.25$ 0.34 $ 31,529.90$ 15 CONSTRUCT 2" TYPE III C-3 PG 70-10 AC PAVEMENT
SECTION TON 1,160 125.00 $ 145,000.00$ 116.46 $ 135,093.60$ 121.00 $ 140,360.00$ 106.00 $ 122,960.00$ 364,102.50$ 205,299.82 $ 207,180.00 $ 212,590.00 $ 642,262.50$ 429,260.71 $ 445,180.00 $ 438,580.00 $ A-1 LOWER AND RAISE WATER VALVE TO GRADE PER
CVWD STANDARDS EA 27 1,200.00$ 32,400.00 $ 1,347.83 $ 36,391.41 $ 1,380.00 $ 37,260.00 $ 2,030.00 $ 54,810.00 $ A-2 LOWER AND RAISE SEWER MANHOLE TO GRADE PER
CVWD STANDARDS EA 12 1,500.00$ 18,000.00 $ 1,348.68 $ 16,184.16 $ 1,380.00 $ 16,560.00 $ 2,350.00 $ 28,200.00 $ 50,400.00$ 52,575.57 $ 53,820.00 $ 83,010.00 $ 692,662.50$ 481,836.28 $ 499,000.00 $ 521,590.00 $ Engineer Estimate
UNIT COST TOTAL
TOTAL ALL BASE BID ITEMS
TOTAL AMOUNT BID SCHEDULE NO.1 (BID ITEMS 1-7)
TOTAL BID SCHEDULE NO.2 (BID ITEMS 1-7)
TOTAL ADDITIVE ALTERNATE BID SCHEDULE A
TOTAL ALL BID ITEMS AND ALL ALTERNATIVES
ITEM DESCRIPTION UNIT QUANTITY UNI T COST TOTAL UNI T COST TOTAL Vance Corporation Hardy & Harper Matich Corporation
ADDITIVE ALTERNATE BID SCHEDULE A:
UTILITY ADJUSTMENT
BID SCHEDULE NO. 1: SAN DIEGO DRIVE
BID SCHEDULE NO. 2: E PALM CANYON DRIVE
UNIT COST TOTAL
1 MOBILIZATION LS 1
2 TRAFFIC CONTROL LS 1
3 SIGNING AND STRIPING LS 1
4 GRIND 0.12' (1.5") AC PAVEMENT AND DISPOSE SF 82,410
5 CONSTRUCT 0.12' (1.5") TYPE III C-3 PG 70-10 AC
PAVEMENT SECTION TON 773
6 REMOVE AND DISPOSE EXISTING CURB RAMP
AND ALL CONCRETE FROM ECR TO BCR EA 2
7 CONSTRUCT CURB RAMP PER CALTRANS STANDARD
PLAN A88A, CASE C, DETAIL B EA 2
8 CONSTRUCT CROSS GUTTER AND SPANDREL PER
RIVERSIDE COUNTY STANDARD 209 SF 1,200
9 SAWCUT, MATCH EXISTING AND REMOVE
FULL DEPTH AC PAVEMENT SF 1,100
10 CONSTRUCT 3" TYPE III C-3 PG 70-10 AC PAVEMENT
OVER EXISTING 95% COMPACTED BASE MATERIAL TON 21
11 MOBILIZATION LS 1
12 TRAFFIC CONTROL LS 1
13 SIGNING AND STRIPING LS 1
14 COLD MILL 2" AC PAVEMENT AND DISPOSE SF 92,735
15 CONSTRUCT 2" TYPE III C-3 PG 70-10 AC PAVEMENT
SECTION TON 1,160
A-1 LOWER AND RAISE WATER VALVE TO GRADE PER
CVWD STANDARDS EA 27
A-2 LOWER AND RAISE SEWER MANHOLE TO GRADE PER
CVWD STANDARDS EA 12
TOTAL ALL BASE BID ITEMS
TOTAL AMOUNT BID SCHEDULE NO.1 (BID ITEMS 1-7)
TOTAL BID SCHEDULE NO.2 (BID ITEMS 1-7)
TOTAL ADDITIVE ALTERNATE BID SCHEDULE A
TOTAL ALL BID ITEMS AND ALL ALTERNATIVES
ITEM DESCRIPTION UNIT QUANTITY
ADDITIVE ALTERNATE BID SCHEDULE A:
UTILITY ADJUSTMENT
BID SCHEDULE NO. 1: SAN DIEGO DRIVE
BID SCHEDULE NO. 2: E PALM CANYON DRIVE
11,000.00$ 11,000.00 $
40,000.00$ 40,000.00 $
4,453.20$ 4,453.20 $
0.28$ 23,074.80$
123.00$ 95,079.00$
2,200.00$ 4,400.00 $
5,500.00$ 11,000.00 $
28.00$ 33,600.00$
4.00$ 4,400.00$
333.00$ 6,993.00 $
234,000.00$
11,000.00$ 11,000.00 $
55,000.00$ 55,000.00 $
17,008.05$ 17,008.05 $
0.37$ 34,311.95$
123.00$ 142,680.00$
260,000.00$
494,000.00$
1,000.00$ 27,000.00 $
1,000.00$ 12,000.00 $
39,000.00$
533,000.00$
Onyx Paving
UNIT COST TOTAL
1 MOBILIZATION LS 1
2 TRAFFIC CONTROL LS 1
3 SIGNING AND STRIPING LS 1
4 GRIND 0.12' (1.5") AC PAVEMENT AND DISPOSE SF 82,410
5 CONSTRUCT 0.12' (1.5") TYPE III C-3 PG 70-10 AC
PAVEMENT SECTION TON 773
6 REMOVE AND DISPOSE EXISTING CURB RAMP
AND ALL CONCRETE FROM ECR TO BCR EA 2
7 CONSTRUCT CURB RAMP PER CALTRANS STANDARD
PLAN A88A, CASE C, DETAIL B EA 2
8 CONSTRUCT CROSS GUTTER AND SPANDREL PER
RIVERSIDE COUNTY STANDARD 209 SF 1,200
9 SAWCUT, MATCH EXISTING AND REMOVE
FULL DEPTH AC PAVEMENT SF 1,100
10 CONSTRUCT 3" TYPE III C-3 PG 70-10 AC PAVEMENT
OVER EXISTING 95% COMPACTED BASE MATERIAL TON 21
11 MOBILIZATION LS 1
12 TRAFFIC CONTROL LS 1
13 SIGNING AND STRIPING LS 1
14 COLD MILL 2" AC PAVEMENT AND DISPOSE SF 92,735
15 CONSTRUCT 2" TYPE III C-3 PG 70-10 AC PAVEMENT
SECTION TON 1,160
A-1 LOWER AND RAISE WATER VALVE TO GRADE PER
CVWD STANDARDS EA 27
A-2 LOWER AND RAISE SEWER MANHOLE TO GRADE PER
CVWD STANDARDS EA 12
TOTAL ALL BASE BID ITEMS
TOTAL AMOUNT BID SCHEDULE NO.1 (BID ITEMS 1-7)
TOTAL BID SCHEDULE NO.2 (BID ITEMS 1-7)
TOTAL ADDITIVE ALTERNATE BID SCHEDULE A
TOTAL ALL BID ITEMS AND ALL ALTERNATIVES
ITEM DESCRIPTION UNIT QUANTITY
ADDITIVE ALTERNATE BID SCHEDULE A:
UTILITY ADJUSTMENT
BID SCHEDULE NO. 1: SAN DIEGO DRIVE
BID SCHEDULE NO. 2: E PALM CANYON DRIVE
35,400.00$ 35,400.00 $ 15,000.00 $ 15,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 $ 19,800.00$ 19,800.00 $ 45,000.00 $ 45,000.00 $ 12,952.95 $ 12,952.95 $ 35,000.00 $ 35,000.00 $ 3,050.00$ 3,050.00 $ 5,000.00 $ 5,000.00 $ 2,950.00 $ 2,950.00 $ 15,000.00 $ 15,000.00 $
0.45$ 37,084.50$ 0.50 $ 41,205.00$ 0.37 $ 30,491.70$ 0.44 $ 36,260.40$ 122.00$ 94,306.00$ 130.00 $ 100,490.00$ 138.00 $ 106,674.00$ 150.00 $ 115,950.00$ 4,300.00$ 8,600.00 $ 4,200.00 $ 8,400.00 $ 2,500.00 $ 5,000.00 $ 2,000.00 $ 4,000.00 $ 5,750.00$ 11,500.00 $ 5,615.00 $ 11,230.00 $ 9,500.00 $ 19,000.00 $ 5,000.00 $ 10,000.00 $
22.00$ 26,400.00$ 21.50 $ 25,800.00$ 30.00 $ 36,000.00$ 22.00 $ 26,400.00$
2.80$ 3,080.00$ 15.00 $ 16,500.00$ 15.00 $ 16,500.00$ 3.50 $ 3,850.00$ 650.00$ 13,650.00$ 1,000.00 $ 21,000.00 $ 500.00 $ 10,500.00$ 250.00 $ 5,250.00 $ 252,870.50$ 289,625.00 $ 252,068.65 $ 263,710.40 $ 11,600.00$ 11,600.00 $ 15,000.00 $ 15,000.00 $ 12,000.00 $ 12,000.00 $ 15,000.00 $ 15,000.00 $ 16,100.00$ 16,100.00 $ 25,000.00 $ 25,000.00 $ 45,000.00 $ 45,000.00 $ 28,000.00 $ 28,000.00 $ 14,400.00$ 14,400.00 $ 20,000.00 $ 20,000.00 $ 14,100.00 $ 14,100.00 $ 30,000.00 $ 30,000.00 $
0.57$ 52,858.95$ 0.45 $ 41,730.75$ 0.41 $ 38,021.35$ 0.56 $ 51,931.60$ 119.00$ 138,040.00$ 120.00 $ 139,200.00$ 148.00 $ 171,680.00$ 160.00 $ 185,600.00$ 232,998.95$ 240,930.75 $ 280,801.35 $ 310,531.60 $ 485,869.45$ 530,555.75 $ 532,870.00 $ 574,242.00 $ 2,100.00$ 56,700.00 $ 2,050.00 $ 55,350.00 $ 2,050.00 $ 55,350.00 $ 1,500.00 $ 40,500.00 $ 2,325.00$ 27,900.00 $ 2,275.00 $ 27,300.00 $ 2,275.00 $ 27,300.00 $ 1,800.00 $ 21,600.00 $ 84,600.00$ 82,650.00 $ 82,650.00 $ 62,100.00 $ 570,469.45$ 613,205.75 $ 615,520.00 $ 636,342.00 $ Calmex Engineering
TOTAL
Granite Contruction LCR Earthwork
UNIT COST TOTAL
Martin Marietta
UNIT COST TOTAL UNIT COST TOTAL UNIT COST