FY 2024-2025 DHN-EPC Bid Tabulation Final

Cathedral City City Council
February 26, 2025

Document
FY 2024-2025 DHN-EPC Bid Tabulation Final
Meeting
February 26, 2025
Body
Cathedral City City Council
Original file
88 KB
Text extracted from the city's file for reading and search. Open the original on cathedralcity.primegov.com. That file is the official record.

1 MOBILIZATION LS 1 15,000.00$ 15,000.00 $ 39,962.55 $ 39,962.55 $ 6,300.00 $ 6,300.00 $ 11,300.30 $ 11,300.30 $ 2 TRAFFIC CONTROL LS 1 15,000.00$ 15,000.00 $ 7,550.43 $ 7,550.43 $ 32,000.00 $ 32,000.00 $ 44,600.00 $ 44,600.00 $ 3 SIGNING AND STRIPING LS 1 5,000.00$ 5,000.00 $ 3,182.22 $ 3,182.22 $ 3,399.70 $ 3,399.70 $ 3,040.00 $ 3,040.00 $ 4 GRIND 0.12' (1.5") AC PAVEMENT AND DISPOSE SF 82,410 1.00 $ 82,410.00$ 0.17 $ 14,009.70$ 0.33 $ 27,195.30$ 0.27 $ 22,250.70$ 5 CONSTRUCT 0.12' (1.5") TYPE III C-3 PG 70-10 AC
PAVEMENT SECTION TON 773 125.00$ 96,625.00$ 123.51 $ 95,473.23$ 130.00 $ 100,490.00$ 112.00 $ 86,576.00$ 6 REMOVE AND DISPOSE EXISTING CURB RAMP
AND ALL CONCRETE FROM ECR TO BCR EA 2 4,500.00$ 9,000.00 $ 4,372.10 $ 8,744.20 $ 7,720.00 $ 15,440.00 $ 660.00 $ 1,320.00 $ 7 CONSTRUCT CURB RAMP PER CALTRANS STANDARD
PLAN A88A, CASE C, DETAIL B EA 2 5,500.00$ 11,000.00 $ 8,119.61 $ 16,239.22 $ 11,000.00 $ 22,000.00 $ 5,300.00 $ 10,600.00 $ 8 CONSTRUCT CROSS GUTTER AND SPANDREL PER
RIVERSIDE COUNTY STANDARD 209 SF 1,200 30.00 $ 36,000.00$ 25.98 $ 31,176.00$ 13.00 $ 15,600.00$ 32.00 $ 38,400.00$ 9 SAWCUT, MATCH EXISTING AND REMOVE
FULL DEPTH AC PAVEMENT SF 1,100 5.00 $ 5,500.00$ 4.61 $ 5,071.00$ 7.00 $ 7,700.00$ 4.55 $ 5,005.00$ 10 CONSTRUCT 3" TYPE III C-3 PG 70-10 AC PAVEMENT
OVER EXISTING 95% COMPACTED BASE MATERIAL TON 21 125.00$ 2,625.00 $ 121.54 $ 2,552.34$ 375.00 $ 7,875.00 $ 138.00 $ 2,898.00 $ 278,160.00$ 223,960.89 $ 238,000.00 $ 225,990.00 $ 11 MOBILIZATION LS 1 20,000.00$ 20,000.00 $ 17,369.13 $ 17,369.13 $ 5,300.00 $ 5,300.00 $ 10,600.10 $ 10,600.10 $ 12 TRAFFIC CONTROL LS 1 40,000.00$ 40,000.00 $ 4,242.56 $ 4,242.56 $ 14,680.00 $ 14,680.00 $ 28,800.00 $ 28,800.00 $ 13 SIGNING AND STRIPING LS 1 20,000.00$ 20,000.00 $ 15,209.93 $ 15,209.93 $ 14,382.75 $ 14,382.75 $ 18,700.00 $ 18,700.00 $ 14 COLD MILL 2" AC PAVEMENT AND DISPOSE SF 92,735 1.50 $ 139,102.50$ 0.36 $ 33,384.60$ 0.35 $ 32,457.25$ 0.34 $ 31,529.90$ 15 CONSTRUCT 2" TYPE III C-3 PG 70-10 AC PAVEMENT
SECTION TON 1,160 125.00 $ 145,000.00$ 116.46 $ 135,093.60$ 121.00 $ 140,360.00$ 106.00 $ 122,960.00$ 364,102.50$ 205,299.82 $ 207,180.00 $ 212,590.00 $ 642,262.50$ 429,260.71 $ 445,180.00 $ 438,580.00 $ A-1 LOWER AND RAISE WATER VALVE TO GRADE PER
CVWD STANDARDS EA 27 1,200.00$ 32,400.00 $ 1,347.83 $ 36,391.41 $ 1,380.00 $ 37,260.00 $ 2,030.00 $ 54,810.00 $ A-2 LOWER AND RAISE SEWER MANHOLE TO GRADE PER
CVWD STANDARDS EA 12 1,500.00$ 18,000.00 $ 1,348.68 $ 16,184.16 $ 1,380.00 $ 16,560.00 $ 2,350.00 $ 28,200.00 $ 50,400.00$ 52,575.57 $ 53,820.00 $ 83,010.00 $ 692,662.50$ 481,836.28 $ 499,000.00 $ 521,590.00 $ Engineer Estimate

UNIT COST TOTAL

TOTAL ALL BASE BID ITEMS
TOTAL AMOUNT BID SCHEDULE NO.1 (BID ITEMS 1-7)
TOTAL BID SCHEDULE NO.2 (BID ITEMS 1-7)

TOTAL ADDITIVE ALTERNATE BID SCHEDULE A

TOTAL ALL BID ITEMS AND ALL ALTERNATIVES

ITEM DESCRIPTION UNIT QUANTITY UNI T COST TOTAL UNI T COST TOTAL Vance Corporation Hardy & Harper Matich Corporation
ADDITIVE ALTERNATE BID SCHEDULE A:

UTILITY ADJUSTMENT
BID SCHEDULE NO. 1: SAN DIEGO DRIVE
BID SCHEDULE NO. 2: E PALM CANYON DRIVE

UNIT COST TOTAL
1 MOBILIZATION LS 1
2 TRAFFIC CONTROL LS 1
3 SIGNING AND STRIPING LS 1
4 GRIND 0.12' (1.5") AC PAVEMENT AND DISPOSE SF 82,410
5 CONSTRUCT 0.12' (1.5") TYPE III C-3 PG 70-10 AC
PAVEMENT SECTION TON 773
6 REMOVE AND DISPOSE EXISTING CURB RAMP
AND ALL CONCRETE FROM ECR TO BCR EA 2
7 CONSTRUCT CURB RAMP PER CALTRANS STANDARD
PLAN A88A, CASE C, DETAIL B EA 2
8 CONSTRUCT CROSS GUTTER AND SPANDREL PER
RIVERSIDE COUNTY STANDARD 209 SF 1,200
9 SAWCUT, MATCH EXISTING AND REMOVE
FULL DEPTH AC PAVEMENT SF 1,100
10 CONSTRUCT 3" TYPE III C-3 PG 70-10 AC PAVEMENT
OVER EXISTING 95% COMPACTED BASE MATERIAL TON 21
11 MOBILIZATION LS 1
12 TRAFFIC CONTROL LS 1
13 SIGNING AND STRIPING LS 1
14 COLD MILL 2" AC PAVEMENT AND DISPOSE SF 92,735
15 CONSTRUCT 2" TYPE III C-3 PG 70-10 AC PAVEMENT
SECTION TON 1,160
A-1 LOWER AND RAISE WATER VALVE TO GRADE PER
CVWD STANDARDS EA 27
A-2 LOWER AND RAISE SEWER MANHOLE TO GRADE PER
CVWD STANDARDS EA 12

TOTAL ALL BASE BID ITEMS
TOTAL AMOUNT BID SCHEDULE NO.1 (BID ITEMS 1-7)
TOTAL BID SCHEDULE NO.2 (BID ITEMS 1-7)

TOTAL ADDITIVE ALTERNATE BID SCHEDULE A

TOTAL ALL BID ITEMS AND ALL ALTERNATIVES

ITEM DESCRIPTION UNIT QUANTITY
ADDITIVE ALTERNATE BID SCHEDULE A:

UTILITY ADJUSTMENT
BID SCHEDULE NO. 1: SAN DIEGO DRIVE
BID SCHEDULE NO. 2: E PALM CANYON DRIVE
11,000.00$ 11,000.00 $
40,000.00$ 40,000.00 $
4,453.20$ 4,453.20 $

0.28$ 23,074.80$
123.00$ 95,079.00$
2,200.00$ 4,400.00 $
5,500.00$ 11,000.00 $

28.00$ 33,600.00$

4.00$ 4,400.00$
333.00$ 6,993.00 $
234,000.00$
11,000.00$ 11,000.00 $
55,000.00$ 55,000.00 $
17,008.05$ 17,008.05 $

0.37$ 34,311.95$
123.00$ 142,680.00$
260,000.00$
494,000.00$
1,000.00$ 27,000.00 $
1,000.00$ 12,000.00 $
39,000.00$
533,000.00$
Onyx Paving

UNIT COST TOTAL
1 MOBILIZATION LS 1
2 TRAFFIC CONTROL LS 1
3 SIGNING AND STRIPING LS 1
4 GRIND 0.12' (1.5") AC PAVEMENT AND DISPOSE SF 82,410
5 CONSTRUCT 0.12' (1.5") TYPE III C-3 PG 70-10 AC
PAVEMENT SECTION TON 773
6 REMOVE AND DISPOSE EXISTING CURB RAMP
AND ALL CONCRETE FROM ECR TO BCR EA 2
7 CONSTRUCT CURB RAMP PER CALTRANS STANDARD
PLAN A88A, CASE C, DETAIL B EA 2
8 CONSTRUCT CROSS GUTTER AND SPANDREL PER
RIVERSIDE COUNTY STANDARD 209 SF 1,200
9 SAWCUT, MATCH EXISTING AND REMOVE
FULL DEPTH AC PAVEMENT SF 1,100
10 CONSTRUCT 3" TYPE III C-3 PG 70-10 AC PAVEMENT
OVER EXISTING 95% COMPACTED BASE MATERIAL TON 21
11 MOBILIZATION LS 1
12 TRAFFIC CONTROL LS 1
13 SIGNING AND STRIPING LS 1
14 COLD MILL 2" AC PAVEMENT AND DISPOSE SF 92,735
15 CONSTRUCT 2" TYPE III C-3 PG 70-10 AC PAVEMENT
SECTION TON 1,160
A-1 LOWER AND RAISE WATER VALVE TO GRADE PER
CVWD STANDARDS EA 27
A-2 LOWER AND RAISE SEWER MANHOLE TO GRADE PER
CVWD STANDARDS EA 12

TOTAL ALL BASE BID ITEMS
TOTAL AMOUNT BID SCHEDULE NO.1 (BID ITEMS 1-7)
TOTAL BID SCHEDULE NO.2 (BID ITEMS 1-7)

TOTAL ADDITIVE ALTERNATE BID SCHEDULE A

TOTAL ALL BID ITEMS AND ALL ALTERNATIVES

ITEM DESCRIPTION UNIT QUANTITY
ADDITIVE ALTERNATE BID SCHEDULE A:

UTILITY ADJUSTMENT
BID SCHEDULE NO. 1: SAN DIEGO DRIVE
BID SCHEDULE NO. 2: E PALM CANYON DRIVE
35,400.00$ 35,400.00 $ 15,000.00 $ 15,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 $ 19,800.00$ 19,800.00 $ 45,000.00 $ 45,000.00 $ 12,952.95 $ 12,952.95 $ 35,000.00 $ 35,000.00 $ 3,050.00$ 3,050.00 $ 5,000.00 $ 5,000.00 $ 2,950.00 $ 2,950.00 $ 15,000.00 $ 15,000.00 $

0.45$ 37,084.50$ 0.50 $ 41,205.00$ 0.37 $ 30,491.70$ 0.44 $ 36,260.40$ 122.00$ 94,306.00$ 130.00 $ 100,490.00$ 138.00 $ 106,674.00$ 150.00 $ 115,950.00$ 4,300.00$ 8,600.00 $ 4,200.00 $ 8,400.00 $ 2,500.00 $ 5,000.00 $ 2,000.00 $ 4,000.00 $ 5,750.00$ 11,500.00 $ 5,615.00 $ 11,230.00 $ 9,500.00 $ 19,000.00 $ 5,000.00 $ 10,000.00 $

22.00$ 26,400.00$ 21.50 $ 25,800.00$ 30.00 $ 36,000.00$ 22.00 $ 26,400.00$

2.80$ 3,080.00$ 15.00 $ 16,500.00$ 15.00 $ 16,500.00$ 3.50 $ 3,850.00$ 650.00$ 13,650.00$ 1,000.00 $ 21,000.00 $ 500.00 $ 10,500.00$ 250.00 $ 5,250.00 $ 252,870.50$ 289,625.00 $ 252,068.65 $ 263,710.40 $ 11,600.00$ 11,600.00 $ 15,000.00 $ 15,000.00 $ 12,000.00 $ 12,000.00 $ 15,000.00 $ 15,000.00 $ 16,100.00$ 16,100.00 $ 25,000.00 $ 25,000.00 $ 45,000.00 $ 45,000.00 $ 28,000.00 $ 28,000.00 $ 14,400.00$ 14,400.00 $ 20,000.00 $ 20,000.00 $ 14,100.00 $ 14,100.00 $ 30,000.00 $ 30,000.00 $

0.57$ 52,858.95$ 0.45 $ 41,730.75$ 0.41 $ 38,021.35$ 0.56 $ 51,931.60$ 119.00$ 138,040.00$ 120.00 $ 139,200.00$ 148.00 $ 171,680.00$ 160.00 $ 185,600.00$ 232,998.95$ 240,930.75 $ 280,801.35 $ 310,531.60 $ 485,869.45$ 530,555.75 $ 532,870.00 $ 574,242.00 $ 2,100.00$ 56,700.00 $ 2,050.00 $ 55,350.00 $ 2,050.00 $ 55,350.00 $ 1,500.00 $ 40,500.00 $ 2,325.00$ 27,900.00 $ 2,275.00 $ 27,300.00 $ 2,275.00 $ 27,300.00 $ 1,800.00 $ 21,600.00 $ 84,600.00$ 82,650.00 $ 82,650.00 $ 62,100.00 $ 570,469.45$ 613,205.75 $ 615,520.00 $ 636,342.00 $ Calmex Engineering
TOTAL
Granite Contruction LCR Earthwork

UNIT COST TOTAL
Martin Marietta

UNIT COST TOTAL UNIT COST TOTAL UNIT COST