CITY OF CATHEDRAL CITY
HSIP CYCLE 11C
Bid Tabulation/ Analysis
CITY PROJECT No.: 8756
1 MOBILIZATION 1 LS 18,899.00 $ 18,899.00 $ 25,000.00 $ 25,000.00 $ 78,000.00 $ 78,000.00 $ 2 TRAFFIC CONTROL 1 LS 31,243.00 $ 31,243.00 $ 75,000.00 $ 75,000.00 $ 65,000.00 $ 65,000.00 $ 3 YELLOW RETROREFLECTIVE VEHICLE BACKPLATE
IMPROVEMENTS 778 EA 564.80 $ 439,414.40$ 477.00 $ 371,106.00$ 800.00 $ 622,400.00$ 4 LED LUMINAIRE IMPROVEMENTS 141 EA 533.00 $ 75,153.00$ 2,572.00 $ 362,652.00$ 800.00 $ 112,800.00$ 564,709.40$ 833,758.00 $ 878,200.00 $ 564,709.40$ 833,758.00 $ 878,200.00 $
UNIT COST TOTAL
BID SCHEDULE NO. 1: HSIP 11C
SUB-TOTAL BID SCHEDULE NO.1
TOTAL ALL BID ITEMS
UNIT COST TOTAL UNIT COST TOTAL
ECONOLITE SYSTEMS, INC. CALIFORNIA PROFESSIONAL ENGINEERING, INC. CALPROMAX ENGINEERING, INC.
ITEM DESCRIPTION QTY UNIT