- 1 -
4886-8063-8473 v2
AGREEMENT FOR SERVICES
BETWEEN
THE CITY OF CATHEDRAL CITY, CALIFORNIA
AND
SCS ENGINEERS
This Agreement for Services (“Agreement”) is entered into as of this 6th day of May, 2025 by and between the City of Cathedral City, a municipal corporation (“City”) and SCS Engineers, a S Corporation (“Contractor”). City and Contractor are sometimes hereinafter individually referred to as “Party” and hereinafter collectively referred to as the “Parties.”
RECITALS
A. City has sought, by informal bid the performance of the services defined and described particularly in Section 2 of this Agreement.
B. Contractor, following submission of a proposal for the performance of the services defined and described particularly in Section 2 of this Agreement, was selected by the City to perform those services.
C. The Parties desire to formalize the selection of Contractor for performance of those services defined and described particularly in Section 2 of this Agreement and desire that the terms of that performance be as particularly defined and described herein.
OPERATIVE PROVISIONS
NOW, THEREFORE, in consideration of the mutual promises and covenants made by the Parties and contained here and other consideration, the value and adequacy of which are hereby acknowledged, the Parties agree as follows:
SECTION 1. TERM OF AGREEMENT.
Subject to the provisions of Section 20 "Termination of Agreement" of this Agreement, the Term of this Agreement is for 12 months commencing on the date first ascribed above.
SECTION 2. SCOPE OF SERVICES & SCHEDULE OF PERFORMANCE.
Contractor agrees to perform the services set forth in Exhibit “A” “Scope of Services” (hereinafter, the “Services”) and made a part of this Agreement by this reference. The Services shall be completed pursuant to the schedule specified in Exhibit “A.” Should the Services not be completed pursuant to that schedule, the Service Provider shall be deemed to be in Default of this Agreement. The City, in its sole discretion, ma y choose not to enforce the Default provisions of this Agreement and may instead allow Service Provider to continue performing the Services.
SECTION 3. ADDITIONAL SERVICES.
- 2 -
4886-8063-8473 v2
Contractor shall not be compensated for any work rendered in connection with its performance of this Agreement that are in addition to or outside of the Services unless such additional services are authorized in advance and in writing in accordance with Section 26 “ Administration and Implementation” or Section 28 “Amendment” of this Agreement. If and when such additional work is authorized, such additional work shall be deemed to be part of the Services.
SECTION 4. COMPENSATION AND METHOD OF PAYMENT.
(a) Subject to any limitations set forth in this Agreement, City agrees to pay Contractor the amounts specified in Exhibit “B” “Compensation” and made a part of this Agreement by this reference. The total compensation, including reimbursement for actual expenses, shall not exceed sixty thousand, five hundred dollars ($60,500), unless additional compensation is approved in writing in accordance with Section 26 “Administration and Implementation” or Section 28 “Amendment” of this Agreement. (b) Each month Contractor shall furnish to City an original invoice for all work performed and expenses incurred during the preceding month. The invoice shall detail charges by the following categories: labor (by sub-category), travel, materials, equipment, supplies, and subcontractor contracts. Subcontractor charges shall be detailed by the following categories: labor, travel, materials, equipment and supplies. If the compensation set forth in subsection (a) and Exhibit “B” include payment of labor on an hourly basis (as opposed to labor and materials being paid as a lump sum), the labor category in each invoice shall include detailed descriptions of task performed and the amount of time incurred for or allocated to that task. City shall independently review each invoice submitted by the Contractor to determine whether the work performed and expenses incurred are in compliance with the provisions of this Agreement. In the event that no charges or expenses are disputed, the invoice shall be approved and paid according to the terms set forth in subsection (c). In the event any charges or expenses are disputed by City, the original invoice shall be returned by City to Contractor for correction and resubmission.
(c) Except as to any charges for work performed or expenses incurred by Contractor which are disputed by City, City will use its best efforts to cause Contractor to be paid within thirty (30) days of receipt of Contractor’s correct and undisputed invoice. (d) Payment to Contractor for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Contractor.
SECTION 5. INSPECTION AND FINAL ACCEPTANCE.
City may inspect and accept or reject any of Contractor ’s work under this Agreement, either during performance or when completed. City shall reject or finally accept Contractor’s work within sixty (60) days after submitted to City. City shall reject work by a timely written explanation, otherwise Contractor’s work shall be deemed to have been accepted. City’s acceptance shall be conclusive as to such work except with respect to latent defects, fraud and such gross mistakes as amount to fraud, as determined by a court of competent jurisdiction. Acceptance of any of Contractor’s work by City shall not - 3 -
4886-8063-8473 v2
constitute a waiver of any of the provisions of this Agreement including, but not limited to, Section 16 “Indemnification” and Section 17 “Insurance.” SECTION 6. OWNERSHIP OF DOCUMENTS.
All original maps, models, designs, drawings, photographs, studies, surveys, reports, data, notes, computer files, files and other documents prepared, developed or discovered by Contractor in the course of providing the Services pursuant to this Agreement shall become the sole property of City and may be used, reused or otherwise disposed of by City without the permission of the Contractor. Upon completion, expiration or termination of this Agreement, Contractor shall turn over to City all such original maps, models, designs, drawings, photographs, studies, surveys, reports, data, notes, computer files, files and other documents.
If and to the extent that City utilizes for any purpose not related to this Agreement any maps, models, designs, drawings, photographs, studies, surveys, reports, data, notes, computer files, files or other documents prepared, developed or discovered by Contractor in the course of providing the Services pursuant to this Agreement, Contractor’s guarantees and warranties in Section 9 “Standard of Performance” of this Agreement shall not extend to such use of the maps, models, designs, drawings, photographs, s tudies, surveys, reports, data, notes, computer files, files or other documents.
All final work product developed by Contractor in the course of providing the Services pursuant to this Agreement shall become the joint property of City and Contractor and may be used, reused or otherwise disposed of by City without the permission of the Contractor . Upon completion, expiration or termination of this Agreement, Contractor shall turn over to City all such final work product if paid for by the City. This provision specifically excludes Contractor s’ work notes and drafts, which are owned by Contractor, not City.
SECTION 7. CONTRACTOR'S BOOKS AND RECORDS.
(a) Contractor shall maintain any and all documents and records demonstrating or relating to Contractor’s performance of the Services. Contractor shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, or other documents or records evidencing or relating to the Services, including expenditures and disbursements charged to City pursuant to this Agreement. Any and all such documents or records shall be maintained in accordance with generally accepted accounting principles and shall be sufficiently complete and detailed so as to permi t an accurate evaluation of the services provided by Contractor pursuant to this Agreement. Any and all such documents or records shall be maintained for three (3) years from the date of execution of this Agreement and to the extent required by laws relating to audits of public agencies and their expenditures. In accordance with California Government Code Section 8546.7, if the total compensation in Section 4 exceeds ten thousand dollars ($10,000.00), this Agreement and the Contractor's books and records related to this Agreement shall be subject to the examination and audit of the State Auditor, at the - 4 -
4886-8063-8473 v2
request of City or as part of any audit of the City, for a period of three (3) years after final payment under the Agreement.
(b) Any and all records or documents required to be maintained pursuant to this section shall be made available for inspection, audit and copying, at any time during regular business hours, upon request by City or its designated representative. Copies of such documents or records shall be provided directly to the City for inspection, audit and copying when it is practical to do so; otherwise, unless an alternative is mutually agreed upon, such documents and records shall be made available at Contractor’s address indicated for receipt of notices in this Agreement.
(c) Where City has reason to believe that any of the documents or records required to be maintained pursuant to this section may be lost or discarded due to dissolution or termination of Contractor’s business, City may, by written request, require that custody of such documents or records be given to the City. Access to such documents and records shall be granted to City, as well as to its successors -in-interest and authorized representatives.
SECTION 8. INDEPENDENT CONTRACTOR.
(a) Contractor is and shall at all times remain a wholly independent contractor and not an officer, employee or agent of City. Contractor shall have no authority to bind City in any manner, nor to incur any obligation, debt or liability of any kind on behalf of or against City, whether by contract or otherwise.
(b) The personnel performing the Services under this Agreement on behalf of Contractor shall at all times be under Contractor’s exclusive direction and control. Neither City, nor any elected or appointed boards, officers, officials, employees or agents of City, shall have control over the conduct of Contractor or any of Contractor’s personnel.
Contractor shall not at any time or in any manner represent that Contractor or any of Contractor’s personnel are in any manner officials, officers, or employees of City. (c) Neither Contractor, nor any of Contractor’s personnel shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City’s employees. Contractor expressly waives any claim Contractor, its officers, employees, agents or subcontractors, may have to any such rights. Contractor’s indemnity obligations in Section 16 “Indemnification” of this Agreement include the obligation to indemnify the City from and against any liability that may arise related to claims that Contractor, its officers, employees, agents or subcontractors, are entitled to retirement, health care or any other benefits that accrue to City employees. This provision shall survive the expiration or earlier termination of this Agreement.
SECTION 9. STANDARD OF PERFORMANCE.
(a) Contractor represents and warrants that it has the qualifications, experience and facilities necessary to properly perform the Services required under this Agreement in a thorough, competent and professional manner. Contractor shall at all times faithfully, competently and to the best of its ability, experience and talent, perform all Services. In meeting its obligations under this Agreement, Contractor shall employ, at a minimum, - 5 -
4886-8063-8473 v2
generally accepted standards and practices utilized by persons engaged in providing services similar to the Services required of Contractor under this Agreement. In addition to the general standards of performance set forth this section, additional specific standards of performance and performance criteria may be set forth in Exhibit “A” “Scope of Work” that shall also be applicable to Contractor’s work under this Agreement. Where there is a conflict between a general and a specific standard of performance or performance criteria, the specific standard or criteria shall prevail over the general. (b) Contractor warrants that (1) it has thoroughly investigated and considered the work to be performed, (2) it has investigated the issues, regarding the scope of services to be provided, (3) it has carefully considered how the work should be performed, and (4) it fully understands the facilities, difficulties and restrictions attending performance of the work under this Agreement.
SECTION 10. COMPLIANCE WITH APPLICABLE LAWS; PERMITS AND LICENSES.
Contractor shall keep itself informed of and comply with all applicable federal, state and local laws, statutes, codes, ordinances, regulations and rules in effect during the term of this Agreement. Contractor shall obtain any and all licenses, permits and authorizations necessary to perform the Services set forth in this Agreement. Neither City, nor any elected or appointed boards, officers, officials, employees or agents of City, shall be liable, at law or in equity, as a result of any failure of Contra ctor to comply with this section.
SECTION 11. PREVAILING WAGE LAWS
It is the understanding of City and Contractor that California prevailing wage laws do not apply to this Agreement because the Agreement does not involve any of the following services subject to prevailing wage rates pursuant to the California Labor Code or regulations promulgated thereunder: Construction, alteration, demolition, installation, or repair work performed on public buildings, facilities, streets or sewers done under contract and paid for in whole or in part out of public funds. In this context, “construction" includes work performed during the design and preconstruction phases of construction including, but not limited to, inspection and land surveying work.
SECTION 12. NONDISCRIMINATION.
Contractor shall not discriminate, in any way, against any person on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status in connection with or related to the performance of this Agreement.
SECTION 13. UNAUTHORIZED ALIENS.
Contractor hereby promises and agrees to comply with all of the provisions of the Federal Immigration and Nationality Act, 8 U.S.C.A. §§ 1101, et seq., as amended, and in connection therewith, shall not employ unauthorized aliens as defined therein. Should Contractor so employ such unauthorized aliens for the performance of the Services, and - 6 -
4886-8063-8473 v2
should the any liability or sanctions be imposed against City for such use of unauthorized aliens, Contractor hereby agrees to and shall reimburse City for the cost of all such liabilities or sanctions imposed, together with any and all costs, including attorneys' fees, incurred by City.
SECTION 14. CONFLICTS OF INTEREST.
(a) Contractor covenants that neither it, nor any officer or principal of its firm, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Contractor ’s performance of the Services. Contractor further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent or subcontractor without the express written consent of the City Manager. Contractor agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement. (b) City understands and acknowledges that Contractor is, as of the date of execution of this Agreement, independently involved in the performance of non- related services for other governmental agencies and private parties. Contractor is unaware of any stated position of City relative to such projects. Any future position of City on such projects shall not be considered a conflict of interest for purposes of this section. (c) City understands and acknowledges that Contractor will perform non- related services for other governmental agencies and private Parties following the completion of the Services under this Agreement. Any such future service shall not be considered a conflict of interest for purposes of this section. (d) City may determine that Contractor must disclose its financial interests by completing and filing a Fair Political Practices Commission Form 700, Statement of Economic Interests. If such a determination is made, Contractor shall file the subject Form 700 with the City Clerk’s Office pursuant to the written instructions provided by the Office of the City Clerk within ten (10) days of the request.
SECTION 15. CONFIDENTIAL INFORMATION; RELEASE OF INFORMATION. (a) All information gained or work product produced by Contractor in performance of this Agreement shall be considered confidential, unless such information is in the public domain or already known to Contractor. Contractor shall not release or disclose any such information or work product to persons or entities other than City without prior written authorization from the City Manager, except as may be required by law.
(b) Contractor, its officers, employees, agents or subcontractors, shall not, without prior written authorization from the City Manager or unless requested by the City Attorney of City, voluntarily provide declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the work performed under this Agreement. Response to a subpoena or court order shall not be considered "voluntary" provided Contractor gives City notice of such court order or subpoena.
- 7 -
4886-8063-8473 v2
(c) If Contractor, or any officer, employee, agent or subcontractor of Contractor, provides any information or work product in violation of this Agreement, then City shall have the right to reim bursement and indemnity from Contractor for any damages, costs and fees, including attorney's fees, caused by or incurred as a result of Contractor ’s conduct.
Contractor shall promptly notify City should Contractor , its officers, employees, agents or subcontractors, be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admiss ions or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed thereunder. City retains the right, but has no obligation, to represent Contractor or be present at any deposition, hearing or similar proceeding. Contractor agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Contractor. However, this right to review any such response does not imply or mean the right by City to control, direct, or rewrite said response. Contractor shall not be held criminally or civilly liable under any Federal or State trade secret law for the disclosure of a trade secret that is made in confidence to a Federal, State, or local government official or to an attorney solely for the purpose of reporting or investigating a suspected violation of law or for the disclosure of a trade secret that is made in a complaint or other document filed in a lawsuit or other proceeding, if such filing is made under seal.
SECTION 16. INDEMNIFICATION.
(a) Indemnification for Professional Liability. Where the law establishes a professional standard of care for Contractor’s services, to the fullest extent permitted by law, Contractor shall indemnify, protect, defend and hold harmless City and any and all of its officials, employees and agents (“Indemnified Parties”) from and against any and all liability (including liability for claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including attorneys ’ fees and costs, court costs, interest, defense costs, and expert witness fees) arise out of, are a consequence of, or are in any way attributable to, in whole or in part, any negligent or wrongful act, error or omission of Contractor, or by any individual or entity for which Contractor is legally liable, including but not limited to off icers, agents, employees or subcontractors of Contractor , in the performance of professional services under this Agreement. Notwithstanding the foregoing, to the extent that the Consultant’s services are subject to California Civil Code Section 2782.8, the above indemnity, including the cost to defend, shall be limited to the extent required by Civil Code Section 2782.8.
(b) Indemnification for Other than Professional Liability. Other than in the performance of professional services and to the full extent permitted by law, Contractor shall indemnify, protect, defend and hold harmless City, and any and all of its employees, officials and agents from and against any liability (including liability for claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including attorneys’ fees and costs, court costs, interest, defense costs, and expert witness fees), where the same arise out of, are a consequence of, or are in any way attributable to, in - 8 -
4886-8063-8473 v2
whole or in part, the performance of this Agreement by Contractor, or by any individual or entity for which Contractor is legally liable, including but not limited to off icers, agents, employees or subcontractors of Contractor.
(c) Indemnification from Subcontractors. Contractor agrees to obtain executed indemnity agreements with provisions identical to those set forth in this section from each and every subcontractor or any other person or entity involved by, for, with or on behalf of Contractor in the performance of this Agreement naming the Indemnified Parties as additional indemnitees. In the event Contractor fails to obtain such indemnity obligations from others as required herein, Contractor agrees to be fully responsible according to the terms of this section. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth herein is binding on the successors, assigns or heirs of Contractor and shall survive the termination of this Agreement or this section.
(d) City’s Negligence . The provisions of this section do not apply to claims occurring as a result of City’s sole negligence. The provisions of this section shall not release City from liability arising from gross negligence or willful acts or omissions of City or any and all of its officials, employees and agents.
SECTION 17. INSURANCE.
Contractor agrees to obtain and maintain in full force and effect during the term of this Agreement the insurance policies set forth in Exhibit “C” “Insurance” and made a part of this Agreement. All insurance policies shall be subject to approval by City as to form and content. These requirements are subject to amendment or waiver if so approved in writing by the City Manager. Contractor agrees to provide City with copies of required policies upon request.
SECTION 18. ASSIGNMENT.
The expertise and experience of Contractor are material considerations for this Agreement. City has an interest in the qualifications and capability of the persons and entities who will fulfill the duties and obligations imposed upon Contractor under this Agreement. In recognition of that interest, Contractor shall not assign or transfer this Agreement or any portion of this Agreement or the performance of any of Contractor ’s duties or obligations under this Agreement without the prior written consent of the City.
Any attempted assignment shall be ineffective, null and void, and shall constitute a material breach of this Agreement entitling City to any and all remedies at law or in equity, including termination of this Agreement pursuant to Section 20 “Termination of Agreement.” City acknowledges, however, that Contractor, in the performance of its duties pursuant to this Agreement, may utilize subcontractors.
SECTION 19. CONTINUITY OF PERSONNEL.
Contractor shall make every reasonable effort to maintain the stability and continuity of Contractor’s staff and subcontractors, if any, assigned to perform the Services. Contractor shall notify City of any changes in Contractor’s staff and - 9 -
4886-8063-8473 v2
subcontractors, if any, assigned to perform the Services prior to and during any such performance.
SECTION 20. TERMINATION OF AGREEMENT.
(a) City may terminate this Agreement, with or without cause, at any time by giving thirty (30) days written notice of termination to Contractor. In the event such notice is given, Contractor shall cease immediately all work in progress. (b) Contractor may terminate this Agreement for cause at any time upon thirty (30) days written notice of termination to City.
(c) If either Contractor or City fail to perform any material obligation under this Agreement, then, in addition to any other remedies, either Contractor , or City may terminate this Agreement immediately upon written notice. (d) Upon termination of this Agreement by either Contractor or City, all property belonging exclusively to City which is in Contractor’s possession shall be returned to City.
Contractor shall furnish to City a final invoice for work performed and expenses incurred by Contractor, prepared as set forth in Section 4 “Compensation and Method of Payment” of this Agreement. This final invoice shall be reviewed and paid in the same manner as set forth in Section 4 “Compensation and Method of Payment” of this Agreement.
SECTION 21. DEFAULT.
In the event that Contractor is in default under the terms of this Agreement, the City shall not have any obligation or duty to continue compensating Contractor for any work performed after the date of default. Instead, the City may give notice to Contractor of the default and the reasons for the default. The notice shall include the timeframe in which Contractor may cure the default. This timeframe is presumptively thirty (30) days, but may be extended, though not reduced, if circumstances warrant. Dur ing the period of time that Contractor is in default, the City shall hold all invoices and shall, when the default is cured, proceed with payment on the invoices. In the alternative, the City may, in its sole discretion, elect to pay some or all of the outstanding invoices during the period of default. If Contractor does not cure the default, the City may take necessary steps to terminate this Agreement under Section 20 “Termination of Agreement.” Any failure on the part of the City to give notice of the Contractor’s default shall not be deemed to result in a waiver of the City’s legal rights or any rights arising out of any provision of this Agreement.
SECTION 22. EXCUSABLE DELAYS.
Contractor shall not be liable for damages, including liquidated damages, if any, caused by delay in performance or failure to perform due to causes beyond the control of Contractor. Such causes include, but are not limited to, acts of God, acts of the public enemy, acts of federal, state or local governments, acts of City, court orders, fires, floods, - 10 -
4886-8063-8473 v2
epidemics, strikes, embargoes, and unusually severe weather. The term and price of this Agreement shall be equitably adjusted for any delays due to such causes.
SECTION 23. COOPERATION BY CITY.
All public information, data, reports, records, and maps as are existing and available to City as public records, and which are necessary for carrying out the Services shall be furnished to Contractor in every reasonable way to facilitate, without undue delay, the Services to be performed under this Agreement.
SECTION 24. NOTICES.
All notices required or permitted to be given under this Agreement shall be in writing and shall be personally delivered, or sent by certified mail, postage prepaid and return receipt requested, addressed as follows:
To City: City of Cathedral City
Attn: City Clerk
68700 Avenida Lalo Guerrero
Cathedral City, CA 92234
To Contractor: SCS Engineers
Attn: Paul Schafer
1601 N. Imperial Ave.
El Centro, CA 92243
Notice shall be deemed effective on the date personally delivered or, if mailed, three (3) days after deposit of the same in the custody of the United States Postal Service.
SECTION 25. AUTHORITY TO EXECUTE.
Each of the signatories hereto represents and warrants that he or she is competent and authorized to enter into this Agreement on behalf of the Party for whom he or she purports to sign. Each Party hereto agrees to defend, indemnify, and hold harmless the other Parties hereto against all claims, suits, actions, and demands, including necessary expenses of investigation and reasonable attorneys' fees and costs, arising out of claims that its signatory was not competent or so authorized to execute this Agreement.
SECTION 26. ADMINISTRATION AND IMPLEMENTATION.
This Agreement shall be administered and executed by the City Manager or his or her designated representative. The City Manager shall have the authority to issue interpretations and to make amendments to this Agreement, including amendments that commit additional funds, consistent with Section 28 “Amendment” and the City Manager’s contracting authority under the City of Cathedral City Municipal Code and its adopted policies and procedures.
- 11 -
4886-8063-8473 v2
SECTION 27. BINDING EFFECT.
This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the Parties.
SECTION 28. AMENDMENT.
No amendment to or modification of this Agreement shall be valid unless made in writing and approved by the Contractor and by the City. The City Manager shall have the authority to approve any amendment to this Agreement if it does not exceed the amount that may be approved administratively pursuant to the City Municipal Code. The Parties agree that the requirement for written modifications cannot be waived and that any attempted waiver shall be void. The City’s City Manager may, but is not required to, make minor amendments not affecting substantive terms without further authorization from the City Council. The City Council hereby authorizes the City Manager to execute any such amendments as required by this Agreement or that do not otherwise reduce City’s rights under this Agreement. All other amendments shall be approved by the City Council.
SECTION 29. WAIVER.
Waiver by any Party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any Party of any breach of the provisions of this Agreement shall not constitute a waiver of any other provision nor a waiver of any subsequent breach or violation of any provision of this Agreement. Acceptance by City of any work by Contractor shall not constitute a waiver of any of the provisions of this Agreement.
SECTION 30. LAW TO GOVERN; VENUE.
This Agreement shall be interpreted, construed and governed according to the laws of the State of California. In the event of litigation between the Parties, venue in state trial courts shall lie exclusively in the County of Riverside, California. In the event of litigation in a U.S. District Court, venue shall lie exclusively in the Central District of California, in Riverside.
SECTION 31. ATTORNEYS FEES, COSTS AND EXPENSES.
In the event litigation or other proceeding is required to enforce or interpret any provision of this Agreement, the prevailing Party in such litigation or other proceeding shall be entitled to an award of reasonable attorney's fees, costs and expenses, in addition to any other relief to which it may be entitled.
SECTION 32. ENTIRE AGREEMENT.
This Agreement, including the attached Exhibits "A" through "C", is the entire, complete, final and exclusive expression of the Parties with respect to the matters addressed therein and supersedes all other agreements or understandings, whether oral or wri tten, or entered into between Contractor and City prior to the execution of this Agreement. No statements, representations or other agreements, whether oral or written, - 12 -
4886-8063-8473 v2
made by any Party which are not embodied herein shall be valid and binding.
SECTION 33. SEVERABILITY.
If any term, condition or covenant of this Agreement is declared or determined by any court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall not be affected thereby and the Agreement shall be read and construed without the invalid, void or unenforceable provision(s).
SECTION 34. ELECTRONIC SIGNATURE
The Parties agree that, in accordance with the City’s Electronic Signature Use Policy, adopted on August 10, 2023, and as amended thereafter, the Parties may use electronic signatures to execute this Agreement. Any use of electronic signatures to execute this Agreement shall comply with the City’s Electronic Signature Use Policy, and such signatures shall have the same force and effect as if this Agreement were executed by hand. Contractor acknowledges that it has had an opportunity to request and review the City’s Electronic Signature Use Policy, and Contractor agrees to comply with the Electronic Signature Use Policy. Contractor agrees to indemnify, defend, and hold the City harmless from any claim, damage, or liability associated with transmitting an electronic signature or an electronically signed record by electronic transmission.
SECTION 35. CONFLICTING TERMS.
Except as otherwise stated herein, if the terms of this Agreement conflict with the terms of any Exhibit hereto, or with the terms of any document incorporated by reference into this Agreement, the terms of this Agreement shall control.
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement on the date and year first-above written.
[SIGNATURES ON FOLLOWING PAGE]
- 13 -
4886-8063-8473 v2
CITY OF CATHEDRAL CITY
___________________________
Charles P. McClendon
City Manager
ATTEST:
___________________________
Tracey R. Hermosillo
City Clerk
APPROVED AS TO FORM
_______________________________
Eric S. Vail
City Attorney
[CONTRACTOR NAME]
____
Paul Schafer
Vice President and Project Director
Charles McClendon (May 6, 2025 15:50 PDT)
Eric Vail (May 6, 2025 16:39 PDT)
4886-8063-8473 v2 A-1
EXHIBIT "A"
SCOPE OF SERVICES
Consultant shall support the development and implementation of cannabis odor control strategies based on the following scope of service and as is more specifically described in the Consultant’s proposal, incorporated herein as Attachment 1 to Exhibit “A”.
1. Regulatory Review and Best Practices Assessment:
o Provide specific recommendations for minimum, enforceable odor control requirements that establish clear, measurable, and attainable standards for cannabis odor mitigation as a condition of approval for a cannabis conditional use permit.
2. Odor Control Technology Evaluation:
o Evaluate and distinguish between odor control requirements for:
Cannabis cultivation and manufacturing operations, which typically have higher odor emissions.
Retail dispensaries, which may require different, less intensive controls.
o Offer recommendations on generally available, proven technologies (avoiding proprietary systems) and outline their effectiveness, costs, and maintenance needs.
o Identify the suitability of specific technologies by business type (cultivation, manufacturing, retail) and facility size.
3. Odor Control Permitting Process:
o Assess odor control permit processes from other jurisdictions (staff will provide a list of researched cities) to identify best practices. o Prepare specific recommendations for creating an odor control permit process, placing responsibility on cannabis businesses to design and propose site-specific odor control solutions.
o Outline the review and verification process, including:
Submittal checklists with detailed equipment specifications, maintenance schedules, and media replacement requirements. Minimum qualifications for third-party odor control plan preparers.
4886-8063-8473 v2 A-2
o Recommend a process for initial and renewal reviews of odor control permits.
4. Inspection and Verification Protocols:
o Prepare recommendations for inspection checklists and required documentation for both scheduled and ad hoc inspections. o Specify how cannabis businesses should demonstrate ongoing compliance, including requirements for performance testing or third-party verification.
o Identify enforcement triggers, such as data thresholds or complaint patterns, that warrant inspections or corrective action.
5. Stakeholder Engagement and Presentations:
o Review and comment on draft ordinance prepared by City staff. o Present to the City’s Cannabis Task Force, Planning Commission, and City Council on cannabis odor control strategies.
o Specify that the consultant will serve as a resource and subject matter expert during public meetings.
6. Training
o Provide training to planning and code enforcement staff on cannabis odor control, including any newly established odor control permitting process and post-construction inspections.
4886-8063-8473 v2
C-1
EXHIBIT "B"
COMPENSATION
The City shall pay Contractor a not-to-exceed amount of $60,500 based on the following table. For those tasks that are quoted on a time-and-material, not-to-exceed basis, the rate schedule contained in Attachment 1 to Exhibit “A” shall apply.
Task Type Budget
Task 1 – Regulatory Review and Best
Practices Assessment
LS $8,500.00
Task 2 – Odor Control Technology
Evaluation
LS $9,500.00
Task 3 – Odor Control Permitting Process LS $10,500.00
Task 4 – Inspection and Verification
Protocols
LS $12,000.00
Task 5 – Stakeholder Engagement and
Presentations
T&M NTE $10.000.00
Task 6 – Training T&M NTE $10,000.00
LS = Lump Sum
T&M NTE = Time and Materials Not to Exceed
4886-8063-8473 v2
C-1
EXHIBIT "C"
INSURANCE
A. Insurance Requirements. Contractor shall provide and maintain insurance, acceptable to the City, in full force and effect throughout the term of this Agreement, against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the S ervices by Contractor , its agents, representatives or employees. Insurance is to be placed with insurers with a current A.M.
Best's rating of no less than A:VII.
Contractor shall provide the following scope and limits of insurance:
1. Minimum Scope of Insurance. Coverage shall be at least as broad as:
(1) Commercial General Liability. Insurance Services Office form Commercial General Liability coverage (Occurrence Form CG 0001).
(2) Automobile. Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, including code 1 "any auto" and endorsement CA 0025, or equivalent forms subject to the written approval of the City.
(3) Workers’ Compensation. Workers' Compensation insurance as required by the Labor Code of State of California covering all persons providing Services on behalf of the Contractor and all risks to such persons under this Agreement.
(4) Professional Liability . Professional liability insurance appropriate to the Contractor ’s profession. This coverage may be written on a “claims made” basis, and must include coverage for contractual liability. The professional liability insurance required by this Agreement must be endorsed to be applicable to claims based upon, arising out of or related to Services performed under this Agreement. The insurance must be maintained for at least three (3) consecutive years following the completion of Contractor ’s services or the termination of this Agreement. During this additional three (3) year period, Contractor shall annually and upon request of the City submit written evidence of this continuous coverage.
2. Minimum Limits of Insurance. Contractor shall maintain limits of insurance no less than:
(1) Commercial General Liability. $1,000,000 general aggregate for bodily injury, personal injury and property damage.
(2) Automobile. $1,000,000 per accident for bodily injury and property damage. A combined single limit policy with aggregate limits in an amount of
4886-8063-8473 v2
C-2
not less than $2,000,000 shall be considered equivalent to the said required minimum limits set forth above.
(3) Workers' Compensation. Workers' Compensation as required by the Labor Code of the State of California of not less than $1,000,000 per occurrence.
(4) Professional Liability. $1,000,000 per occurrence.
B. Other Provisions . Insurance policies required by this Agreement shall contain the following provisions:
1. All Policies. Each insurance policy required by this Agreement shall be endorsed and state the coverage shall not be suspended, voided, cancelled by the insurer or either Party to this Agreement, reduced in coverage or in limits except after 30 days' prior written notice by certified mail, return receipt requested, has been given to City.
2. Commercial General Liability and Automobile Liability Coverages.
(1) City, and its respective elected and appointed officers, officials, and employees and volunteers are to be covered as additional insureds as respects: liability arising out of activities Contractor performs; products and completed operations of Contractor ; premises owned, occupied or used by Contractor ; or automobiles owned, leased, hired or borrowed by Contractor. The coverage shall contain no special limitations on the scope of protection afforded to City, and their respective elected and appointed officers, officials, or employees.
(2) Contractor’s insurance coverage shall be primary insurance with respect to City, and its respective elected and appointed, its officers, officials, employees and volunteers. Any insurance or self -insurance maintained by City, and its respective elected and appointed officers, officials, employees or volunteers, shall apply in excess of, and not contribute with, Contractor’s insurance.
(3) Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.
(4) Any failure to comply with the reporting or other provisions of the insurance policies, including breaches of warranties, shall not affect coverage provided to City, and its respective elected and appointed officers, officials, employees or volunteers.
3. Workers' Compensation Coverage. Unless the City Manager otherwise agrees in writing, the insurer shall agree to waive all rights of subrogation
4886-8063-8473 v2
C-3
against City, and its respective elected and appointed officers, officials, employees and agents for losses arising from work performed by Contractor.
C. Other Requirements. Contractor agrees to deposit with City, at or before the effective date of this Agreement, certificates of insurance necessary to satisfy City that the insurance provisions of this contract have been complied with. The City may require that Contractor furnish City with copies of original endorsements effecting coverage required by this Exhibit “C”. The certificates and endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. City reserves the right to inspect complete, certified copies of all required insurance policies, at any time.
1. Contractor shall furnish certificates and endorsements from each subcontractor identical to those Contractor provides.
2. Any deductibles or self -insured retentions must be declared to and approved by City. At the option of City, either the insurer shall reduce or eliminate such deductibles or self -insured retentions as respects City or its respective elected or appointed officers, officials, employees and volunteers, or the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration, defense expenses and claims.
3. The procuring of such required policy or policies of insurance shall not be construed to limit Contractor ’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.
A Proposal for Consulting Services –
Cannabis Odor Control
May 5th, 2025
1601 N. Imperial Ave.
El Centro, CA 92243
760-339-4969
Attachment 1 to Exhibit "A"
Section Page
Cathedral City – Proposal for Consulting Services Related to Cannabis Odor Control Page i www.scsengineers.com
Table of Contents
Summary........................................................................................................................ ..................... 1 Project Management Approach ......................................................................................................... 2 Consultant Overview ..................................................................................................... 2 Financial Stability ...................................................................................................... 2 Management Structure ............................................................................................. 2 Project Organization .................................................................................................. 2 Technical Work Plan and Response to Statement of Work (SOW) ................................................. 5 Task 1: Regulatory Review and Best Practices Assessment ..................................... 5 Task 2: Odor Control Technology Evaluation .............................................................. 5 Task 3: Odor Control Permitting Process .................................................................... 6 Task 4: Inspection and Verification Protocols ............................................................. 7 Task 5: Stakeholder Engagement and Presentations ................................................ 8 Task 6: Training ............................................................................................................ 9 Optional Task 7: Third Party Reviews of Odor Control Permits .................................. 9 Work Plan Schedule & Associated Costs ....................................................................................... 11 Schedule .................................................................................................................... 1 1 Budgets and Cost Estimates ..................................................................................... 11
Exhibits
Project Personnel .......................................................................................................... 3 Project Organization Chart ........................................................................................... 4 Project Schedule ........................................................................................................ 11 Proposer References ................................................................................................. 29
Appendices
Appendix A: Key Personnel Resumes
Appendix B: SCS Rate Sheet
Appendix C: References and Past Project Profiles
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
SUMMARY
SCS Engineers (SCS) is pleased to present this proposal to the City of Cathedral City (City) for consulting services related to the development and implementation of effective cannabis odor control strategies. This proposal has been prepared in response to the Scope of Work (SOW) provided to SCS on April 15th, 2025. Our proposal provides references and project descriptions that illustrate our expertise in this area. Additional sections detail the scope of work to be performed by task as well as associated budgets.
With the majority of United States and the District of Columbia having legalized recreational and/or medicinal cannabis, a significant problem has emerged in several regions related to the mitigation, regulation, and assessment of the odor generated by cannabis cultivation and processing activities.
This issue is complicated as odors are subjective and the nature and composition of cannabis odor are highly variable. In addition, different societies have inherently different levels of acceptance for odors in their communities. Regulators at the state, regional, and local levels are attempting to deal with these complex issues through a combination of permitting, land use, and nuisance rules. The cannabis odor situation in Cathedral City is no different, and currently, the municipality is working to find a balance between responsible cannabis cultivation and impacted citizens.
We feel strongly that SCS is an ideal candidate to successfully meet the City’s goals for several reasons, including the following:
Broad experience with development of effective odor control planning and abatement strategies for various applications and facility types. SCS has been a leading expert in odor control planning, air quality regulatory navigation and support, and empirically assessing odor using a brand-agnostic approach to solving odor issues with a focus on system efficacy. SCS has operated air monitoring stations, worked with various facility types, and supported various odor generating industries to resolve air quality and odor issues, reporting data to CA state and local agencies for over 30 years.
Strong familiarity with the challenges that arise in developing effective and tactful cannabis odor regulation. The nature of cannabis odor emissions is complex and influenced by a significant number of variables. SCS has assessed cannabis emissions with adequate spatial and temporal density to understand how variables such as light, type of process, cannabis strain, and stage of maturity affect how odor emissions occur. We understand project goals, and the proposed approach will reflect this.
We will work to develop and implement effective cannabis odor control strategies through regulatory review and best practice assessments. SCS’s experience with odor control technology evaluation, odor control permitting, inspection and verification will be a direct benefit to the City.
A strong project team with extensive experience working together, committed to supporting the project for its entire duration. We are a collaborative and responsive team, committed to dedicating the necessary resources to meet the project schedule while drawing on our proven history to deliver outstanding insight, quality, and service.
Local personnel. We have experienced, bilingual personnel based in the Imperial Valley who are also community members and stakeholders. Our personnel are employees, not subcontractors.
References and Past Project Profiles are provided as Appendix C. The following sections provide more detail as requested in the RFP.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
PROJECT MANAGEMENT APPROACH
The following sections provide the requisite details for how SCS plans to execute the project.
Consultant Overview
SCS Engineers (SCS), founded in 1970, is a full-service environmental engineering and contracting firm. Our operations are organized under two core service areas: Solid Waste and Environmental Services. Air Quality Monitoring (AQM) services are a key aspect of our Environmental Services practice. We have been providing these services for over 55 years.
As an “S” Corporation, SCS employs over 1,300 professional and support staff located in 66 offices, serving clients in all 50 states and internationally. Our employees hold approximately 75 different licenses and certifications. In California, nearly 300 employees located in 17 offices serve government agencies, commercial and private clients, and the US military throughout the state.
Many of our senior engineers, geologists, project managers, and division leaders have interdisciplinary training and experience and have been with SCS for most, if not all, of their working careers. Our exceptional workforce stability facilitates our ability to consistently meet client expectations and accomplish project objectives.
Financial Stability
SCS is financially strong, has not been purchased by another firm, and our staff have significant tenure. SCS has a solid financial base, as well as a lengthy track record in the environmental consulting industry.
This stability and history are indicative of a commitment to the local market and a high standard of performance and reliability. Proposed personnel will be involved for the duration of the project and will be committed to its successful completion.
Management Structure
As with all field projects managed and conducted by SCS, a vertical project organization is implemented. It has been our experience that this vertical structure approach is vital to effectively implementing complicated projects and associated tasks. This approach enables a single point of contact regarding project management and field operations to successfully execute the project plan. Exhibit 2 provides an organizational chart for this project.
Project Organization
This section describes the personnel for the project in terms of specific responsibilities. In addition to an organizational chart, we have provided names of the key people on the project as well as their specific responsibilities and their contact information.
All of the anticipated key people are provided in Exhibit 1 below.
SCS’s Key
Advantages
Significant Experience in
Cannabis Odor
Assessments
Dedicated Team of Expert
Personnel with the
Requisite Technical
Experience and a Local
Presence.
Excellent Working
Relationship with
Regulatory Agencies.
Expert communication with
clients, stake holders, and
community groups in
multiple languages.
SCS project management
and cost and schedule
control methods will
optimize the value of the
project.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Proje ct Personnel
Name & Title Contact Info rmation Normal Working
Days/Hours
Project Responsibilities
Paul Schafer
Project Manager
619-823-5333
[email protected]
om
Monday –Friday:
7:00am-4:00pm
1. Budget Oversight
2. Personn
el Oversight
3. City Interface
4. Technical support
Armando
Hurtado-García
Community
Engagement
805-621-266
8 ahurtado-
[email protected]
Monday –Friday:
8:00am-5:00pm
1. Stakeholder/Commu
nity
Meetings
2. Presentation Developme
nt
3. Support of other Tasks
Eva Luu
Field
Measurements
and Technology
Evaluations
805-345-177
2 eluu@scsen
gineers.com
Monday –Friday:
8:00am-5:00pm
1. Management
Of Odor
Assessment Projects
2. Odor Con
trol Technology
Evaluat
ions
3. Technical support
Christopher Petro
Project
Professional
805-348-420
8 cpetro@scsengineers.
com
Monday –Friday:
8:00am-5:00pm
1. Odor Control
Permitting
Lead
2. Regulatory Best Practices
José Landeros
Project
Professional
442-300-6392
[email protected]
om
Monday –Friday:
8:00am-5:00pm
1. Field Assessment Suppor
t
2. Site Visits
3. Data Collection
Sergio Valenzuela
Technician
760-498-9610
svalen
[email protected]
Monday –Friday:
8:00am-5:00pm
1. Site Visits
2. Data Collection
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Project Organization Chart
City of Cathedral
Andrew Firestine
Director of Community
and Economic
Development
SCS Engineers Project
Manager
Paul Schafer
Manager of Field
Measurements
Eva Luu
Field Technicians and
Engineers
Jose Landeros and
Sergio Valenzuela
Manager of
Community
Engagement
Armando Hurtado-
Garcia
Manager of Regulatory
Review and Permitting
Chris Petro
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
TECHNICAL WORK PLAN AND RESPONSE TO STATEMENT OF
WORK (SOW)
The City currently has 47 operating cannabis businesses with 67 licenses and another 17 non- operating businesses that hold 38 licenses. Currently the City has Municipal Code (9.108.080.A) that requires odor control. However, the City does not have a process for the periodic review and verification of system performance. The City does, however, have a public nuisance regulation under Section 13.80.240 that requires cannabis odors to not cross property lines or be detectable in an adjacent or nearby unit. Currently the City has a moratorium on new cannabis conditional use permits as of February 26th, 2025. This moratorium was put in place in response to a large influx of odor complaints in 2024 and continuing into 2025.
With a strong track record in environmental compliance and third-party verification, our team operates within some of the most stringently regulated sectors, including projects subject to U.S. EPA standards. This experience has reinforced our commitment to rigorous data integrity, thorough documentation practices, and defensible field methodologies, which directly inform our approach to regulatory compliance in the cannabis sector. We understand the importance of consistent, enforceable inspection protocols that support responsible operation within the community, while remaining practical for facility operators.
In addition, we can offer optional third-party audit services to The City on an as-needed basis, supporting enforcement efforts with field-tested, best practices.
Task 1: Regulatory Review and Best Practices Assessment The City has requested the following:
Provide specific recommendations for minimum, enforceable odor control requirements that establish clear, measurable, and attainable standards for cannabis odor mitigation as a condition of approval for a cannabis conditional use permit.
SCS recognizes the regulatory challenges of providing guidance to a relatively new and growing industry, particularly one fraught with legal complications, nuisance complaints, and public regulatory expectations related to managing nuisance odor. SCS is well-versed in odor science and has conducted scientific studies assessing the nature of cannabis odor, presented on odor science and regulatory guidance at national cannabis industry events, and conducts in-house olfactometry and odor abatement planning.
We will evaluate best practices in the cannabis industry to guide the development of the City’s odor mitigation and assessment standards, which will be required for cannabis conditional use permit approvals. SCS will make regulatory recommendations based on facility type, zoning, and provisional review of the operator’s odor control planning documentation.
Deliverable: Report section detailing our assessment of the City’s existing odor control and enforcement regulations related to cannabis activities, along with specific, enforceable recommendations for minimum odor mitigation standards required for conditional use permit approval.
Task 2: Odor Control Technology Evaluation
For this Task, the City has requested the following:
Evaluate and distinguish between odor control requirements for:
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
o Cannabis cultivation and manufacturing operations, which typically have higher odor emissions.
o Retail dispensaries, which may require different, less intensive controls. Offer recommendations on generally available, proven technologies (avoiding proprietary systems) and outline their effectiveness, costs, and maintenance needs. Identify the suitability of specific technologies by business type (cultivation, manufacturing, retail) and facility size.
SCS is well versed in odor investigations related to landfills, recycling centers, compost facilities, and water treatment plants. In the cannabis industry, we have extensive experience in vetting odor mitigation technologies as an independent third-party. We have been contracted by cannabis cultivators and odor control technology manufacturers alike to assess a range of solutions for their effectiveness in odor mitigation in-field. These technologies have included vapor phase odor neutralizers, carbon adsorption systems with various pretreatment options, photo-catalytic oxidation, as well as different chemical scrubbing technologies.
Previous project scopes have included:
Measuring single pass-through efficiencies of scrubber technologies; Assessing the odor reduction in a given space when an array of scrubbers are turned on compared to when they are off; and
Comparing up- and down-wind differentials in odor concentration to measure a facility’s impact at the fence-line or at down-wind communities.
All field investigations were conducted using established sampling methods and analyzed via olfactometry. In addition, specific chemical analysis was also performed.
While project details are subject to confidentiality agreements, this background gives us a unique vantage point on what technologies are most effective and practical for different types of cannabis operations.
For Task 2, we will:
Conduct a market-level review of available, non-proprietary odor control technologies; Differentiate technology suitability across business types, such as cultivation, manufacturing, and retail, with consideration for facility size and typical emission profiles; Provide comparative summaries based on each technology’s effectiveness in different situations, capital and operational costs, as well as maintenance needs and expected lifespans;
Develop basic standard operation procedures (SOPs) for routine maintenance and performance checks tailored to each technology type; and Provide third-party testing, if requested, using established field methodologies to assess odor control effectiveness.
Deliverable: Report section detailing an analysis of odor control technologies and assessment of their effectiveness while providing insight on operational parameters.
Task 3: Odor Control Permitting Process
For this Task, the City has requested the following:
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Assess odor control permit processes from other jurisdictions (staff will provide a list of researched cities) to identify best practices.
Prepare specific recommendations for creating an odor control permit process, placing responsibility on cannabis businesses to design and propose site-specific odor control solutions.
Outline the review and verification process, including:
o Submittal checklists with detailed equipment specifications, maintenance schedules, and media replacement requirements.
o Minimum qualifications for third-party odor control plan preparers. Recommend a process for initial and renewal reviews of odor control permits.
SCS has extensive experience in developing effective odor control systems and odor abatement plans using regulatory frameworks influenced by those in states like Washington and Colorado, where cannabis odors are addressed under general air quality regulations rather than cannabis- specific rules. We understand how to balance the need for strong, enforceable regulations with the practical challenges cannabis operators face in implementing and maintaining effective odor control strategies. SCS shall:
Assessment of Comparable Jurisdictions’ Odor Control Permitting Process Review odor control permit processes from the City-provided list of jurisdictions, identify best practices, regulatory frameworks, enforcement mechanisms, and common challenges, and summarize findings in a comparative matrix highlighting key similarities, differences, and innovative approaches.
Thorough Documentation for Best Practices for Odor Control Planning & Regulatory Review SCS will make specific recommendations for creating an odor control permit process with focus on balancing industry and regulatory needs within a robust and defensible odor control planning system, focusing on what presently works, is practical, and tested solutions from the odor control industry, with recommendations specific to the City’s review of odor control plans.
o With extensive background knowledge on existing odor mitigation technologies, we are able to provide quantifiable evidence related to effectiveness and recommended schedules for maintenance and consumables replacement.
o We will design a clear, step-by-step review and verification process for approving operator-chosen site-specific odor control solutions based on our experience in testing and assessing odor mitigation technologies.
Deliverable: Report section detailing recommendations for the odor control permitting process and renewal, with a focus on odor control solution specifications and qualifications for third-party authors of odor abatement plans.
Task 4: Inspection and Verification Protocols
For this Task, The City has requested the following:
Prepare recommendations for inspection checklists and required documentation for both scheduled and ad hoc inspections.
Specify how cannabis businesses should demonstrate ongoing compliance, including requirements for performance testing or third-party verification.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Identify enforcement triggers, such as data thresholds or complaint patterns that warrant inspections or corrective action.
SCS shall:
Develop Standardized Inspection Checklists and Required Documentation We will prepare comprehensive inspection templates for both scheduled and ad hoc site visits, tailored to the specific activities of cultivation, manufacturing, processing, and retail facilities. These checklists will include:
o Verification of odor control systems’ operational status and maintenance history o Documentation of employee training on odor mitigation protocols o Logs for odor complaints, community outreach, and response actions o Inspection of facility design features that influence odor containment (e.g., negative pressure zones, filtration systems)
o Air quality testing records, when applicable
Define Measures for Demonstrating Ongoing Compliance
To verify that facilities maintain continuous compliance, we will outline clear expectations, including:
o Minimum testing frequencies for odor control system performance (e.g., quarterly internal checks, annual third-party evaluations) using independent verification (e.g., olfactometry data, chemical analysis) to validate odor containment o Required documentation for equipment servicing and filter replacements Establish Enforcement Triggers Based on Objective Criteria We will identify actionable thresholds that justify City mediation, including:
o Complaint-based triggers
o Performance-based triggers (e.g., evidence of malfunctioning odor control systems or failure to meet testing benchmarks)
o Documentation lapses or repeat violations
o Exceedance of predefined odor detection levels
This approach can verify that cannabis businesses are held to consistent, transparent standards that protect community well-being while recognizing the operational realities of each license type. SCS already has several routine operations and maintenance checklists previously developed which are a great starting place for developing City specific documentation.
Deliverable: Report section detailing inspection and verification protocols, including inspection templates and checklists, descriptions for on-going compliance, and performance testing.
Task 5: Stakeholder Engagement and Presentations
For this Task, The City has requested the following:
Review and comment on draft ordinance prepared by City staff. Present to the City’s Cannabis Task Force, Planning Commission, and City Council on cannabis odor control strategies.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Specify that the consultant will serve as a resource and subject matter expert during public meetings.
SCS personnel will be made available for presentations to City staff, the City’s Cannabis Task Force, Planning Commission, and City Council on cannabis odor control strategies. Our team has provided expert witness testimony and odor management expertise support for several Board of Supervisor hearings on the topic of cannabis odor management. SCS Engineers’ Vice President and Project Director, Paul Schafer, is a designated SCS leading expert on Air Quality & Odor Management and he and his team are regularly brought into projects across the US to advise on air quality and odor issues. Mr. Schafer’s team has provided support on a multitude of odor management projects and has presented findings to both governmental and industry stakeholders nationally. Our team features bilingual capability and local expertise familiar with the Cathedral City region and can provide in-person and online advisement for a range of stakeholder engagements.
Deliverable: SCS Team on-call and in-person support, as requested by City personnel.
Task 6: Training
For this Task, the City has requested the following:
Provide training to planning and code enforcement staff on cannabis odor control, including any newly established odor control permitting process and post-construction inspections.
SCS will provide training to the City’s planning and code enforcement staff on cannabis odor control, covering topics such as methods for conducting both planned and ad hoc on-site inspections of cannabis odor-generating facilities, and the use of guided checklists for odor abatement plan reviews and site inspections. Drawing on our experience conducting odor audits within the cannabis industry, SCS is familiar with common nuisance odor issues, industry best practices, and methods for evaluating odors both on-site and through certified odor laboratories. We will advise the City on the appropriate use, benefits, and limitations of each evaluation approach.
Deliverable: Provide on-site inspection training to City staff, including supporting checklists and detailed instructions for reviewing odor control systems across different types of cannabis facilities.
Training will cover how to assess odor control technologies, evaluate operation and maintenance records, and review odor control plans, enabling inspectors and City personnel to conduct informed site visits and check compliance at cultivation, manufacturing, and retail locations.
Optional Task 7: Third Party Reviews of Odor Control Permits For this Task, The City has requested the following:
Perform third-party reviews of odor control permits, should an odor control permitting process be established by the City.
SCS has generated dozens of odor control and abatement plans for the cannabis industry across the nation and is widely considered a leading authority on Air Quality and Odor Science. SCS proposes on-going City odor control plan review to assess regulatory compliance with emphasis on measurable data and industry proven solutions, with focus on accountability and widespread industry-adoptability of technical odor control site recommendations. Some facets of regulatory review of odor control plans include:
Proactive mitigation strategies focused on:
o Facility siting and zoning compliance
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
o Adjacency to sensitive receptors: residential, schools, public facilities, etc. o Odor control planning integrated into facility design during tenant improvements Odor Abatement Technology Evaluation
o Carbon filtration
o Photocatalytic Oxidation (PCO)
o Electrostatic Precipitation (ESP)
o Combination of multiple systems noted above
o Vapor phase and misting system evaluation
o Vegetative & visual buffers
Monitoring & Maintenance Protocols
o Tiered response for repeat odor violations
o Facility odor point of contact stipulations
Deliverable: Comprehensive technical review of cannabis operators’ Odor Abatement Plan (OAP), including review of equipment monitoring and maintenance schedule, air exchange calculations, equipment submittals, complaint response, and any documentation related to the development of the cannabis facility site-specific plan.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
WORK PLAN SCHEDULE & ASSOCIATED COSTS
Schedule
The following table provides a rough schedule for the specific tasks outlined in this project.
Project Schedule
Task Responsible Person(s) Schedule
Tast 1: Regulatory Review and
Best Practices Assessment P. Schafer, C. Petro 8 Weeks: July, 2025 Task 2: Odor Control Technology
Evaluation P. Schafer, E. Luu 8 Weeks: July, 2025
Task 3: Odor Control Permitting
Process P. Schafer, C. Petro 8 Weeks: July, 2025
Task 4: Inspection and
Verification Protocols
P. Schafer, A. Hurtado-
Garcia 8 Weeks: July, 2025
Task 5: Stakeholder Engagement
and Presentations
P. Schafer, A. Hurtado-
Garcia
As requested. 2-week prep for each
presentation
Task 6: Training P. Schafer, A. Hurtado-
Garcia As requested. 2-week prep for each training
Optional Task 7: Third Party
Reviews of Odor Control Permits P. Schafer, C. Petro On-Going, as requested. 2-weeks for each OAP review
Budgets and Cost Estimates
The following table provides relative costs per Task and subtask and include all overhead, personnel, labor, travel and subcontractors, materials, sales tax, and reports.
Combined Tasks 1-7 Total Cost
Task Type Budget
Task 1 - Regulatory Review and Best Practices Assessment LS $8,500.00 Task 2 - Odor Control Technology Evaluation LS $9,500.00 Task 3 – Odor Control Permitting Process LS $10,500.00
Task 4 - Inspection and Verification Protocols LS $12,000.00 Task 5 – Stakeholder Engagement and Presentations T&M NTE $10,000.00 Task 6 – Training T&M NTE $10,000.00
Optional Task 7 – Third Party Reviews of Odor Control Permits (Fixed Cost)
$3,500.00 / ea.
LS = Lump Sum
T&M NTE = Time and Materials Not to Exceed
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Assumptions and Conditions*
Our scope of work, schedule, and price includes the following assumptions and conditions:
1. This Proposal and Assumptions and Conditions shall become part of a mutually satisfactory contract agreement or purchase order.
2. SCS has the right to rely on information provided by the City and the City’s contractors and is not responsible for issues that arise from reliance on this information.
3. The Proposal is valid for a period of 30 days from the date of this submittal.
4. Bid, performance, or payment bonds are excluded.
5. Liquidated/delay damages are not required.
6. The prices detailed are not stand-alone; if tasks are to be performed separately, SCS reserves the right to modify its prices.
7. The off-site portion of the Work Scope, labor schedule, and compensation for this Proposal assume that SCS personnel will perform these services Monday through Friday during regular working hours (7:30 AM PST to 4 PM PST), not including US Holidays. On-site work may include some over time work.
8. Due to ongoing supply chain issues, SCS may experience unforeseen delays or other impacts to its work beyond SCS’ control. Potential impacts include, but are not limited to, material/equipment shortages and significant delays in lead times due to supply chain limitations. SCS will keep you informed of any delays and their effect on overall job completion, and reserves the right to seek an extension of time and/or increase in contract price should supply chain-related issues/delays be encountered.
Force Majeure
Except for defaults of subcontractors, neither party shall be responsible for delays or failures in performance resulting from acts beyond the control of the offending party. Such acts shall include but shall not be limited to acts of God, fire, flood, earthquake, other natural disaster, nuclear accident, strike, lockout, riot, freight embargo, public regulated utility, or governmental statutes or regulations superimposed after the fact. If a delay or failure in performance by the Contractor arises out of a default of its subcontractor, and if such default of its subcontractor, arises out of causes beyond the control of both the Contractor and subcontractor, and without the fault or negligence of either of them, the Contractor shall not be liable for damages of such delay or failure, unless the supplies or services to be furnished by the subcontractor were obtainable from other sources in sufficient time to permit the Contractor to meet the required performance schedule.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Appendix A
Resumes
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
PAUL W. SCHAFER: VICE PRESIDENT, PROJECT DIRECTOR
Education
B.Sc. Chemical Engineering University of California, Santa Barbara Professional Registrations
Council-certified Indoor Environmental Consultant (CIEC #1012011) Climate Action Reserve (CAR) Lead Verifier
U.S EPA Method 9 Visible Emissions Evaluator (VEE) Certified (ID # 22868) OSHA HAZWOPER 40-hour Trained (OSHA 29 CFR 1910.120)
Professional Experience
Mr. Paul Schafer is a Vice President and Project Director at SCS Engineers. Paul is also SCS’s National Practice Leader for Ambient Air Monitoring Services. During his technical career at SCS, Mr. Schafer has assumed key roles on several nationally signific ant monitoring efforts. Mr. Schafer has in-depth experience in interfacing with regulatory agencies regarding the performance of monitoring systems, source emission tests, and continuous process monitors which are operated for our clientele. He has had direct working experience with the San Luis Obispo County APCD, San Joaquin Valley APCD, Imperial County APCD, South Coast AQMD, Santa Ba rbara APCD, San Diego County APCD, California Air Resources Board, EPA Region IX, and the General Services Administration regarding monitoring programs and air quality impact assessments.
Mr. Schafer offers decisive management skills, which contribute to the success of monitoring programs under his purview. Cost control manage ment and defensible technical performance are primary goals integral to all long term monitoring programs managed by Mr. Schafer. Paul has developed close business relationships with manu facturers and vendors in the ambient air quality monitoring field. Paul managed or continues to manage several projects during his employment with SCS Tracer, which include the following:
California Air Resource Board/U.S. EPA - Ambient Monitoring Program for Cities Along the California/Mexico Border . Program Manager for a 12 station monitoring network which measured urban baseline impacts for Tijuana and Mexicali, Ba ja California. Specific tasks include technician management, logistical planning, data review, equipment repairs, and QA/QC oversight. Each network supported criteria pollutant monitoring as well and particulates (PM 10), VOCs (TO-14) and air toxics
(aldehydes, metals). Recently a new contract was awarded to SCs to install and operate PM2.5 samplers and continuous instrumentation in Mexicali, Mexico.
California State Parks, Oceano Dunes SVRA: Project Manager for the installation, operation and maintenance of air quality and meteorological devices at Oceano Dunes State Vehicle Recreation Area (ODSVRA) in San Luis Obispo County, California. OD SVRA is subject to Rule 1001, Coastal Dunes Dust Control Requirements ( Dust Rule) by the San Luis Obispo County (SLO) Air Pollution Control District (APCD). The Dust Rule requires OD SVRA to, among other things, implement dust reduction activities and assess the reduction in particulate matter (PM10). The 2013-2015 phase of this project is a short- term effort to measure the effectiveness of specific dust control activities at reducing ambient particulate matter. A comprehensive Quality Assurance Project Plan was also developed as part of the project.
Los Angeles Department of Water and Power as Subcontractor to ESA: Project Manager for Air Monitoring related services to show compliance with the SCAQMD Fugitive Dust Rule (Rule 403) as well as providing real time PM-10 and meteorological measurements at Ivanhoe Elementary to assess Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
relative impacts of nearby construction. Duties also included attendance and speaking at public meetings and daily data reporting.
Los Angeles World Airports (LAWA) Source Apportionment Study: Mr. Schafer oversaw the design and installation of a multi-station network of ambient air monitors around Los Angeles International Airport.
Installation included attainment of permits, procurement of samplers and monitoring hardware, site assessments, equipment integration, as well as calibration. Seasonal collection of multiple data parameters will be used in a source-apportionment mo deling study. Paul was directly responsible for the installation and field calibration of all samplers and sensors. He also managed data logging and review of all field data.
County Sanitation Districts of Los Angeles County: SCS Engineers established and operated a particulate and meteorological monitoring networ k at the Mesquite Regional Landfill in Imperial county. Paul Schafer authored an extensive monitoring protocol for the landfill, which was accepted by the Imperial County APCD without revision. The network consists of three medium-volume samplers for PM
10 as well as one BAM-1020 unit for PM10. These samplers have also been modified in order to accurately measure PM2.5 according to EPA protocol and reference methods. The sampling program is supported by a PSD-quality meteorological monitoring station consisting of wind speed, wind direction, and temperature.
Granite Construction, Rosemary’s Quarry: SCS established and currently operates and maintains a network of particulate samplers surrounding a ro ck quarry in Fallbrook, CA. These samplers are configured for sampling PM10. Once per quarter, the samplers are reconfigured for PM4 sampling, which is accompanied by analysis for crystalline silica.
San Joaquin Valley Air Pollution Control District: SCS has designed and installed a complete PSD quality air monitoring station for the SJVAPCD in Madera, CA. All aspects of the installation including design, construction management, permitting, procuremen t of equipment, and equipment installation and verification where managed by Paul Schafer. Since th is original award, SCS has also been contracted to design, build and install air quality monitoring stations in Hanford, Manteca, and Fresno.
Freeport McMoRan Oil and Gas: SCS Tracer designed and constructe d a network of PSD stations in support of offshore oil production in Santa Barbara (CA) County. The network currently consists of four air quality and meteorological monitoring sites. The sites operate 24/7 and SCS handles all aspects of the project from operations and maintenance to reporting and regulatory management.
Venoco, Inc.: Operation and maintenance of a PSD and odor monitoring network in support of permit conditions for an offshore and onshore oil and gas recovery program. Continuous air quality measurements include ozone, NO/NO
2/NOx, THC, H 2S and SO 2. Meteorological monitoring is also included in the program.
Clean Harbors, Westmoreland: SCS has been contracted to perform all field work associated with the operation of a network of organic and inorganic samp lers at a Class I TSDF in California’s Imperial Valley. The work includes preparing all samplers for scheduled sampling runs, collection of all samples and data reporting. SCS is also responsible for the operation and maintenance of a meteorological monitor located on site. All work is performed within the guidelines of a restrictive QA/QC Plan.
Publications and Presentations
Schafer, Paul W., et. al. “Quality Assurance Project Plan – Arroyo Grande Oil Field, H 2S and Meteorological Monitoring” SCS Engineers Report to San Luis Obispo County APCD, January, 2016.
Schafer, Paul W., et. al. “Air Monitoring Tips and Technologies, The Power of Defensible Data” SCS Engineers Client Presentation, June 2015.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Schafer, Paul W., et. al. “Quality Assurance Pr oject Plan – Oceano Dunes SVRA” SCS Tracer Environmental Report to California State Parks and San Luis Obispo County APCD, June, 2014 and April, 2015.
Schafer, Paul W., et. al. “Air Monitoring Plan – Blanche Park” SCS Engineers Report to Miami-Dade County Dept. of Environmental Resources Management (DERM), April, 2014.
Schafer, Paul W., et. al. “PSD Monitoring Plan – West Campus” SCS Tracer Environmental Report to Santa Barbara County APCD, January, 2010.
Schafer, Paul W., et. al. “Quality Assurance/Quality Control Program Manual – West Campus/Ellwood Odor” SCS Tracer Environmental Report to Santa Barbara County APCD, February, 2010.
Schafer, Paul W., et. al. “Carpent eria Meteorological Monitoring Site - Quality Assurance/Quality Control Program Manual” SCS Tracer Environmental Report to Santa Barbara County APCD, January, 2009.
Schafer, Paul W., et. al. “Quality Assurance/Quality Control Program Manual – Carpenteria Monitoring Site” SCS Tracer Environmental Report to Santa Barbara County APCD, October, 2008.
Schafer, Paul W., et. al. “Meteo rological Monitoring Plan – Carpenteria Gas Plant” SCS Tracer Environmental Report to Santa Barbara County APCD, October, 2008.
Schafer, Paul W., et. al. “PSD Monitoring Plan – Lompoc Oil and Gas Plant – HS&P Monitoring Plan” SCS Tracer Environmental Report to Santa Barbara County APCD, September, 2008.
Schafer, Paul W., et. al. “PSD Monitoring Plan – Lompoc Oil and Gas Plant – Paradise Road Monitoring Plan” SCS Tracer Environmental Report to Santa Barbara County APCD, September, 2008.
Schafer, Paul W., et. al. “PSD Monitoring Plan – Lompoc Oil and Gas Plant – Odor Monitoring Plan” SCS Tracer Environmental Report to Santa Barbara County APCD, September, 2008.
Schafer, Paul W., et. al. “PSD Monitoring Plan – Gaviota Oil Heating Facility – Carpenteria Monitoring Plan” SCS Tracer Environmental Report to Santa Barbara County APCD, September, 2008.
Schafer, Paul W., et. al. “PM-10 Monitoring Protoc ol for the Mesquite Regional Landfill” SCS Tracer Environmental Report to Imperial County APCD, September, 2007.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
JOSÉ G. LANDEROS | PROJECT PROFESSIONAL
Education
M.Sc. Environmental Engineering University Autonomous of Baja California M.Sc. Real Estate and Industrial Valuation Technological Institute of Construction Architect University Autonomous of Baja California
Professional Registrations
U.S EPA Method 9 Visible Emissions Evaluator (VEE)
Expert appraiser (México)
Professional Experience
Mr. José Landeros is an Project Professional and Air Monitoring Technician at SCS Engineers. During h i s t e c h n i c a l c a r e e r M r . L a n d e r o s h a s b e e n i n c h a r g e o f A i r P o l l u t i o n N e t w o r k s i n B a j a C a l i f o r n i a , Mexico As a bilingual speaker in English and Spanish he has been able to work as a contractor in different projects through the California and Baja California border. Mr. Landeros has in-depth experience in the operation and maintenance of several air pollution monitors and analyzers.
Mr. Landeros operated or continues to operate se veral projects during his employment with SCS Engineers, which include the following:
SPA Baja California – Mexicali Ambient Monitoring Network. Air Monitoring Technician for a 6 station monitoring network which measured urban baseline impacts for Mexicali, Baja California. The network supported criteria pollutant monitoring as well and particulates (PM 10), and meteorological monitoring.
California Air Resource Board/U.S. EPA - Ambient Monitoring Program for Cities Along the California/Mexico Border . Air Monitoring Technician for a 6 station monitoring network which measured urban baseline impacts for Mexicali, Ba ja California. The network supported criteria pollutant monitoring as well and particulates (PM 10), VOCs (TO-14) and air toxics (aldehydes, metals) and meteorological monitoring. Recently a different contract was handled to SCs to install and operate PM2.5 samplers and continuous instrumentation in Mexicali, Mexico.
Intergen Air Monitoring Network, Mexicali, Mexico. Intergen had a network of NOx, SO2 and particulate monitors surrounding its La Rosita power plant that had fallen into disrepair. José was instrumental in identifying the condition of the network and assessing the effort needed to bring the monitors into good operating condition.
Clean Harbors, Westmoreland: SCS has been contracted to perform all field work associated with the operation of a network of organic and inorganic samp lers at a Class I TSDF in California’s Imperial Valley. The work includes preparing all samplers for scheduled sampling runs, collection of all samples and data reporting. SCS is also responsible for the operation and maintenance of a meteorological monitor located on site. All work is performed within the guidelines of a restrictive QA/QC Plan.
Mr. Landeros as a Certified Appraiser in México worked in the real estate area for more than 10 years for both public and private clients, including the City of Mexicali. The types of appraisals ranges from single homes, master appraisal for new home developments, up to assignment of cadastral values, industrial buildings and gas stations.
Publications and Presentations
Landeros, V.J.G., Garcia, C.O.R. y Quintero, N.M. 2007. “Análisis espacial del monóxido de carbono en Mexicali, B.C. y su relación con variables meteorológicas”, Coloquio de Posgrado Maestria y Doctorado, Noviembre, Mexicali, B.C. ISBN 978-970-735-098. pp 323-329 Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Landeros, V. J.G., Garcia, C. O.R., Quintero N.M. 2008. “Modelación estadística del monóxido de carbono en la atmósfera urbana de Mexicali, Baja California” 3er. Coloquio de Posgrado del Programa de Maestria y Doctorado en Ciencias e Ingeniería, Nov. Mexicali, B.C.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
CHRISTOPHER PETRO, MSCE, EIT | PROJECT PROFESSIONAL
Education
M.Sc. – Civil & Environmental Engineering, California Polytechnic University of San Luis Obispo, 2014 B.Sc. – Business Administration | Information Systems Management, California Polytechnic University of San Luis Obispo, 2007
Specialty Certifications
Engineer-In-Training – California (C-154837)
Dangerous Goods Shipping Certified
Certified Nasal Ranger Inspector – Odor Assessment & Measurement for Ambient Odors Professional Affiliations
American Society of Civil Engineers
Professional Experience
Mr. Petro is a Project Manager at SCS Engineers where he provides both technical and managerial support for various environmental, regulatory, and land use projects. Mr. Petro has 16 years of experience in planning, engineering, grant writing and construction development. His current responsibility is to manage projects in SCS’ Central California Compliance environmental air quality and odor monitoring services group with offices in Santa Maria and Bakersfield, California.
Mr. Petro’s tenure with SCS Engineers as a project manager includes conducting odor assessments and air quality management, including land use planning, odor auditing, odor abatement and control planning, SPCC development, dispersion modeling, olfactometry, air sampling and data management using a host of technologies and software, including ArcGIS, AutoCAD and client data management with eTools. Christopher is lab manager for the SCS Tracer Odor Lab, located in Santa Maria, CA. The odor lab includes ASTM compliant olfactometry and processes and analyzes odor samples weekly.
Mr. Petro’s previous experience includes working as an Engineer I/II for the City of Santa Maria (six years) and Engineering Technician III for the City of Santa Maria (seven years). Mr. Petro worked extensively with MPO, county, state and federal government regulatory bodies, including environmental review, clearance, permitting and all logistical issues pertaining to inter-jurisdictional needs for capital improvement projects. Mr. Petro has strong experience working with CEQA, state and county permitting procedures.
Mr. Petro planned, scoped, designed and managed the construction of millions of dollars’ worth of capital improvement projects for the City of Santa Maria, including managing the PCC improvement program, co-assisting the AC maintenance program, utility and site development improvement projects.
Mr. Petro managed development and application of over $5M in county, state, and federal grants.
He was the project manager for a two-year development of the City of Santa Maria’s first Active Transportation Plan, a multi-disciplinary plan detailing existing city infrastructure, harmonizing the bicycle, pedestrian, ADA and Safe Routes to School plans by analyzing different metrics (e.g. level of traffic stress, land use criteria) for existing and future infrastructure opportunities including accounting for ROW and zoning constraints. The project included working collaboratively with public and private stakeholders, political interests, and inter-departmental collaboration.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Public Works Capital Improvement Engineering
City of Santa Maria, California & ARRA Capital Improvement Projects, Project Design Engineer responsible for detailed review of existing facility deficiencies, field investigations, CEQA permitting, calculations, and design of $2.4M work of concrete and asphalt improvements for the City of Santa Maria Public Works Dept., Engineering Division.
City of Santa Maria, California, Low Impact Development Plan, Project Manager responsible for a development of the Low Impact Development (LID) Plan for the City of Santa Maria, including developing BMPs, surveying existing stormwater facilities and capacities, and other aspects included in the Utility Master Plan. LID is a stormwater management strategy that emphasizes conservation, and the use of existing natural site features integrated with distributed, small-scale stormwater controls to mimic natural hydrological patterns in residential, commercial, and industrial settings.
City of Santa Maria, California, Active Transportation Plan, Project Manager responsible for a two- year development of the 110k population City of Santa Maria's Active Transportation Plan, including public outreach, stakeholder advisory engagement, consultant management, data analysis and other aspects related to the development and council adoption of the first Active Transportation Plan in City history. Plan adopted by City Council January 2021.
Publications and Presentations
Petro, C., “Union Valley Parkway & California Blvd. Roundabout Study”, California Polytechnic University, San Luis Obispo, June 2014.
Petro, C., “Santa Maria’s Alternative Transportation Program”, City of Santa Maria, Santa Maria Chamber of Commerce, Santa Maria, CA, October 2020.
Petro, C., “Santa Maria’s Alternative Transportation Program”, City of Santa Maria, Democratic Club of Santa Maria Valley, Santa Maria, CA, June 2020.
Petro, C., “Odor Control Plans that Work – Essential Strategies for Cannabis Growers, Processors, Merchants & Regulators”, Lucky Leaf Minneapolis Convention Center Minnesota Cannabis Convention, Minneapolis, MN, February 2025.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
EVA LUU, E.I.T. | PROJECT MANAGER
Education
M.Sc. Environmental Engineering | Technical University of Munich, Germany, 2017 B.S. Environmental Engineering Science | University of California, Berkeley, 2015 Professional Licenses
NCEES Engineer in Training (EIT) License #156370
Method 9 Visual Opacity Emissions Certified
Professional Affiliations
Air & Waste Management Association
Professional Experience
Eva Luu is a Project Manager for SCS Engineers, based out of California’s Central Coast. She has 10 years of experience in ambient air monitoring, ranging from black carbon in the LA basin, formaldehyde at the highest peak in Germany, to odors in different applications around the nation.
On top of the routine operation and inspection of a meteorological & ambient air monitoring network of 7+ sites, and the calibration and operation of pollutant analyzers, meteorological sensors, chart recorders, data acquisition systems, computers and their associated software and peripherals, she manages employee exposure monitoring projects, coordinates field sampling operations, compiles monthly air monitoring reports and submits validated, processed data for air monitoring stations to the California Air Resource Board and the Santa Barbara County APCD. She has conducted a variety of odor assessment projects across the nation, ranging from alternative agriculture farms to landfills.
She is or has been involved in the following SCS projects:
Boat Emissions | California. Various parameters from sport fishing boats were measured, including NOx, real-time BC, as well as filter-based carbon emissions. These emissions were later used for emissions factor calculations to compare to state regulations. Ms. Luu was the head of the field operations team, including logistics and procurement.
Odor Study | City of Marina| California. Among the number of odor studies in various sectors including at alternative agriculture, landfill, and waste/water treatment facilities Ms. Luu has conducted, the one at the City of Marina was the largest in scope, involving a wide range of roles played, including outreach to members of the public to sit on SCS’s Odor Panel, assisting in operating SCS’s in-house olfactometer, being an odor panelist, and coordinating with multiple stakeholders to work out sampling logistics, while taking into consideration an ever-changing meteorological forecast.
Employee Health and Safety Exposure Assessment | Sentinel Peak Resources | California. Ms. Luu managed this multi-location and multi-weeks-long employee exposure monitoring project. Nine different compounds were sampled from the client’s field personnel’s daily activities. Measured concentrations were analyzed to determine if possible health hazards were present. This project required intricate planning, preparation, and coordination with labs, vendors, field personnel.
Ambient Air and Meteorological Monitoring | CA Air Resources Board | Mexicali, Mexico. This project was developed to assess air quality in the border region between California and Mexico.
Measurement parameters include PM
10 and PM2.5, metals, biomass markers, along with
meteorological parameters. Ms. Luu handled the data processing, daily review of data, preparation and submission of monthly reports to CARB, as well as monthly data upload to AQS.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Phosphine Measurement Study | Charge Bliss Inc. | Central California. The goal of this project was to measure the rooftop phosphine levels emitted from agricultural fumigation to determine if concentrations created a corrosive environment to potential electrical equipment atop the roof. Ms.
Luu singlehandedly organized and implemented onsite sampling and provided a data report with quick turnaround.
Odor Study | Strategic Materials, Inc. | Midwest. Ms. Luu planned and conducted onsite sampling at a glass recycling facility. Results were used to analyze appropriate odor mitigation practices. She trained and mentored a teammate in odor grab sampling and successfully conducted a virtual follow up measurement program.
Alternative Agriculture Emissions | CARP Growers Association | Central Coast, CA. Ms. Luu has designed and executed multiple odor, terpene, and VOC sample collection studies for alternative agricultural farms along the Central Coast. Results were used to design appropriately sized odor control systems and to develop best practices for odor mitigation.
Landfill Waste Relocation Air Quality Monitoring | DFW, TX. Ms. Luu set up a temporary particulate monitoring station to sample for particulate matter, respirable dust, and asbestos during waste relocation at a landfill. She also trained field tech the operations and maintenance of equipment.
Landfill Surface Pollutant Concentration Measurements | Waste Management | Louisiana. Ms. Luu was part of an SCS team that conducted an extensive field measurement program, following established EPA protocols and using recognized EPA and ASTM standards, to determine surface concentrations of a list of landfill-related gaseous compounds that have potential to cause odors.
She was also responsible for compiling the data and assisting in writing legal reports to gauge the odor emissions potential of the landfill.
Ambient Air Monitoring | Beacon West | Central Coast, CA. Ms. Luu provides assistance with the operation and maintenance of an odor and meteorological monitoring network by conducting biweekly site visits, monthly and semiannual calibrations, and maintenance to the sites as well as equipment. She uses technical knowledge and analytical skills to troubleshoot problems with instruments and compiles monthly reports regarding the following continuous air quality measurements: H2S, TRS, THC, and SO2, and meteorological parameters.
Lompoc PSD and Meteorological Monitoring | Santa Barbara APCD | Lompoc, CA. Ms. Luu assists in the operation and maintenance of sites in accordance with the Santa Barbara County APCD’s Protocol for Ambient Air and Meteorological Monitoring, including the processing, review, and validation of data, QA/QC compliance, calibrations, and data reporting. Measurements at these sites include H
2S, TRS, NO/NO2/NOX, O3, THC, SO2, and meteorological parameters such as wind speed, wind direction, and ambient air temperature.
PSD and Meteorological Monitoring | Freeport McMoRan | Central Coast, CA. Ms. Luu conducts routine site visits to ambient air monitoring sites in Carpenteria and within Los Padres National Forest in support of permit conditions for an on- and off-shore oil and gas recovery program. Tasks include review of data, assuring correct air flow and gas cylinder pressure, and maintaining instrumentation. On top of that, multipoint calibrations, data processing and validation, and QA/QC compliance are also conducted for pollutants such as NO/NO 2/NOX, O3, and meteorological
parameters.
Projects prior to SCS include:
Multiple Air Toxics Exposure Study | Southern California. Ms. Luu investigated DPM quantification in relation to the health risks associated with BC in the South Coast Air Basin. She processed and analyzed more than five years of NOx and BC data from the region in attempt to quantify DPM.
Additionally, she is familiar with numerous emissions regulations, specifically related to on-road diesel vehicles.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Climate and Environmental Research | UFS Schneefernerhaus, Bavaria, Germany. The Environmental Research Station Schneefernerhaus continuously measures atmospheric chemical and physical properties that influence weather and climate. Ms. Luu assisted with the selection, correction, and processing of four years of HCHO data collected from the station.
Publications and Presentations
Luu, Eva. “Cannabis in California: Odor Assessments.” ES College 2019, 14 Dec. 2019, Los Angeles, CA.
Landeros, Jose and Eva Luu. “Imperial Irrigation District: Salton Sea Air Quality Monitoring.” ES College 2019, 14 Dec 2019, Los Angeles, CA.
Luu, Eva and Armando Hurtado. “Industrial Clean Air: TRS and Odor.” ES College 2024, 10 Aug 2024, Chicago, IL.
Schafer, Paul and Eva Luu. “Cannabis Odors: State of the Science.” Lucky Leaf Expo, 27 Sept 2024, Albuquerque, NM.
Schafer, Paul and Eva Luu. “Cannabis Odors: Causes, Influences, and Solutions.” Lucky Leaf Expo, 28 Feb 2025, Minneapolis, MN.
Luu, Eva and Armando Hurtado. “Bridging the Gap Between Regulators and Operators.” CVCAN Business Mixer, 17 Apr 2025, Desert Hot Springs, CA.
Luu, Eva and Armando Hurtado. “Real-Time Monitoring of Odor Using Sulfur as a Surrogate.” A&WMA Air Quality Measurement: Methods and Technology Conference, 24 Apr 2025, Aurora, CO.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
ARMANDO HURTADO, VEE | PROJECT PROFESSIONAL
Education
B.S. Biochemistry, University of California, Los Angeles, 2015 Specialty Certifications
Certified Nasal Ranger Inspector – Odor Assessment & Measurement for Ambient Odors OSHA HAZWOPER 40-hour Trained (OSHA 29 CFR 1910.120)
Dangerous Goods Shipping Certified (OSHA 49 CFR 172.700-704) Method 9 Visual Opacity Emissions Certified
Professional Affiliations
Air & Waste Management Association
Professional Experience
Mr. Armando Hurtado is a Project Professional for SCS Engineers where he specializes in air quality, ambient air monitoring, and odor mitigation. Since joining SCS in 2021, he has worked on projects involving field data collection, regulatory compliance, and emissions assessments for industrial and municipal clients. His work includes designing and implementing air monitoring programs, analyzing pollutant trends, and developing mitigation strategies to address odor and air quality concerns.
Throughout his time at SCS, Mr. Hurtado has contributed to a wide range of projects that demonstrate his expertise and commitment to delivering practical, regulatory-compliant solutions for clients. His project experience spans industries such as wastewater treatment, landfills, transportation, and alternative agriculture, where he has led efforts in both the field and at the strategic planning level. Notable projects he has worked on, or is currently involved with, include:
Landfill Continuous Monitoring | California. Mr. Hurtado oversaw the project’s onsite sampling and calibration operations, ensuring smooth logistics and timely execution of all tasks. He regularly communicated with team members to provide support, troubleshoot any issues that arise, and guide them to maintain optimal calibration accuracy. He reviewed the calibration data submitted in monthly reports, performing in-depth checks to confirm it meets the requirements set by SCAQMD and EPA standards.
Controlled Methane Release| California. This project compared methane detection readings across five different methods: satellite imaging, plane flyovers, drone surveys, stationary monitoring devices, and walking surveys. Mr. Hurtado was responsible for procuring and setting up the instruments, as well as providing onsite troubleshooting under time-sensitive conditions. He had to coordinate closely with meteorological forecasts and the scheduled flyovers and satellite imaging windows. As head of the field operations team, Mr. Hurtado oversaw all logistics and managed data collection efforts to facilitate successful project execution.
Boat Emissions | California. Various emissions parameters from sport fishing boats were measured, including nitrogen oxides (NOx), real-time black carbon (BC), and filter-based carbon emissions. Mr.
Hurtado was a key member of the field operations team, where he worked directly with vendors to troubleshoot equipment issues onsite. He also consolidated and organized field data, which was later used to calculate emissions factors for comparison against state regulatory standards.
Odor Study | City of Marina| California. Among the many odor studies conducted across sectors such as alternative agriculture, landfill operations, and wastewater treatment facilities, the project for the City was the largest in scope. Mr. Hurtado supported this project by leading field sampling efforts and serving as a panelist on SCS’s in-house olfactometer. His responsibilities included Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
executing fieldwork under shifting meteorological conditions and ensuring that odor samples were collected accurately and efficiently to support the broader study objectives.
Employee Health and Safety Exposure Assessment | Sentinel Peak Resources | California. Mr.
Hurtado led field operations for a multi-location, multi-week employee exposure monitoring project.
Nine different compounds were sampled from client field personnel during their daily activities. The measured concentrations were later analyzed to assess potential health hazards. Mr. Hurtado’s role focused on executing the field sampling portion of the project, which required detailed planning, coordination with onsite personnel, and careful logistical preparation for successful data collection across all sites.
Alternative Agriculture Emissions | CARP Growers Association | Central Coast, CA. Mr. Hurtado has designed and executed multiple odor, terpene, and VOC sample collection studies for alternative agricultural farms along the Central Coast. Results were used to design appropriately sized odor control systems and to develop best practices for odor mitigation.
Ambient Air Monitoring | Beacon West | Central Coast, CA. Mr. Hurtado provided assistance with the operation and maintenance of an odor and meteorological monitoring network by conducting weekly site visits, monthly and semiannual calibrations, and maintenance to the sites and equipment. He used technical knowledge and analytical skills to troubleshoot instrumentation problems and compile data used for monthly reports regarding the following continuous air quality measurements:
H
2S, TRS, THC, and SO2, and meteorological parameters.
Lompoc PSD and Meteorological Monitoring | Santa Barbara APCD | Lompoc, CA. Mr. Hurtado assists in the operation and maintenance of sites in accordance with the Santa Barbara County APCD’s Protocol for Ambient Air and Meteorological Monitoring, including the processing, review, and validation of data, QA/QC compliance, calibrations, and data reporting. Measurements at these sites include H2S, TRS, NO/NO2/NOX, O3, THC, SO2, and meteorological parameters such as wind speed, wind direction, and ambient air temperature.
PSD and Meteorological Monitoring | Freeport McMoRan | Central Coast, CA. Mr. Hurtado conducts routine site visits to ambient air monitoring sites in Carpenteria and within Los Padres National Forest in support of permit conditions for an on- and off-shore oil and gas recovery program. Tasks include review of data, assuring correct air flow and gas cylinder pressure, and maintaining instrumentation. On top of that, multipoint calibrations, data processing and validation, and QA/QC compliance are also conducted for pollutants such as NO/NO2/NOX, O3, and meteorological parameters.
Publications and Presentations
Hurtado, A. “Cannabis and Odor Mitigation.” City Council Meeting, 18 Jan 2024, Parlier, CA.
Hurtado, A. and Luu, E. “Industrial Clean Air: TRS and Odor.” ES College 2024, 10 Aug 2024, Chicago, IL, Hyatt Centric Magnificent Mile.
Hurtado, A. and Luu, E. “Bridging the Gap Between Regulators and Operators.” CVCAN Business Mixer, 17 Apr 2025, Desert Hot Springs, CA, Miracle Springs Resort.
Hurtado, A. and Luu, E. “Real-Time Monitoring of Odor Using Sulfur as a Surrogate.” A&WMA Air Quality Measurement: Methods and Technology Conference, 24 Apr 2025, Aurora, CO.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Appendix B
SCS Rate Sheet
Attachment 1 to Exhibit "A"
5963 La Place Court, Suite 207, Carlsbad, CA 92008 | 760-744-9611 | Fax 760-744-8616 Environmental Consulting & Contracting
SCS ENGINEERS COMMERCIAL RATE SCHEDULE
(Effective April 1, 2025 through March 31, 2026)
Project quoted on a time -and-material, not-to-exceed basis. Extended rates will be charged for work performed on weekends (unless weekend work is part of scope of work), SCS Holidays, work performed between 7:00 pm and 6:00 am, and periods statutorily requiring overtime. Periods statutorily requiring double -time will be charged 1.7x the Normal Rates. Rates include cost, overhead, G&A and profit.
Normal Rates ($/man-hour) Extended Rates ($/man-hour)
Business Unit Director $ 300.00 $ 350.00
Project Director $ 280.00 $ 325.00
Sr. Project Manager $ 265.00 $ 300.00
Project Manager $ 210.00 $ 275.00
Sr. Project Professional $ 165.00 $ 205.00
Project Advisor $ 175.00 $ 225.00
Project Professional $ 160.00 $ 210.00
Marketing Manager $ 165.00 $ 205.00
Sr. Office Services Manager $ 165.00 $ 205.00
Senior Superintendent $ 150.00 $ 200.00
Staff Professional $ 125.00 $ 175.00
Senior Technician $ 110.00 $ 160.00
Associate Professional $ 105.00 $ 155.00
Technician $ 100.00 $ 150.00
Administrative Assistant $ 90.00 $ 140.00
Other Direct Costs (ODCs)
Lodging, Rental Car, Postage, Lab Costs, subcontractors, etc. Cost + 18% Per Diem $60/day +18%
Mileage $ 0.70 per mile + 18%
Air Sampling and Measurement Equipment: Quoted
Company Field Truck: $ 50/half-day
Billing Notes for Expert Witness Services
Travel time billed at normal labor rate for all categories.
Expert witness rates at 1.5x Normal Rates – includes depositions.
Expert Witness Rates for court/hearing appearances (including preparation time) at 2.0x Normal Rates.
Mileage may increase or decrease depending on regulatory standards.
Standard Terms
Invoicing is normally performed on a monthly basis. Unless prior arrangements are made, net invoice amount is due 30 days from the invoice date. Payments past 30 days will accrue a carrying charge at a rate of one and a half percent (1.5%) per month on the overdue amount. Invoices not paid 60 days from invoice date will be assessed a five percent (5.0%) late penalty in addition to any accrued carrying charges. Payment of SCS invoices for services performed will not be contingent upon the client's receipt of payment from other parties, unless otherwise agreed. Client agrees to pay legal costs, including attorney's fees, incurred by SCS in collecting any amounts past due and owing on client's account.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Appendix C
References and Past Project Profiles
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
REFERENCES
The following tables provide the requisite references of previous work SCS has performed of similar scope.
Proposer References
Reference 1
Name of Firm: Carpinteria Association of Responsible Producers Street Address: 1070 S Rice Ave
City: Oxnard State: CA County: Ventura Zip Code: 93033
Contact Person: Whitney Collie Title: President
Email Address:
[email protected]
Telephone Number: (401) 399-2991
Dates of Service: 2021-Present
Brief Description of Service Provided:
On-going odor control consulting expertise, including: odor abatement planning; odor auditing; installation and operation of a real-time meteorological station network; odor abatement systems validation and efficacy testing; odor and air quality sampling and analysis; Board of Supervisors and public hearing support; expert testimony; EPA AERMOD steady state plume dispersion modeling; and Total Reduced Sulfurs (TRS) monitoring.
Reference 2
Name of Firm: Pacific Stone / Coastal Blooms, LLC
Street Address: 4701 Foothill Road
City: Carpinteria State: CA County: Santa
Barbara
Zip Code: 93013
Contact Person: Phil Green Title: President
Email Address:
[email protected]
Telephone Number: (805) 881-8288
Dates of Service: August 2022 through December 2024
Brief Description of Service Provided:
Odor abatement planning and technical reporting, odor auditing, air quality and odor analysis.
Large odor control efficacy study and sampling campaign aimed to evaluate the effectiveness of a specific scrubber in reducing odors and odor-causing compounds inside a cannabis greenhouse. Two comparable greenhouses—one with scrubbers and one without—were monitored to assess di fferences in odor and sulfur levels.
Additionally, the study explored the use of low-level sulfur measurements as a surrogate for real-time monitoring of odor emissions.
Reference 3
Name of Firm: City of Marina, Public Works Dept.
Street Address: Department 221, Hillcrest Ave.
City: Marina State: CA Country: USA Zip Code: 93933
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Contact Person: Brian McMinn, PE, PLS Title: Public Works Director / City Engineer Email Address:
[email protected]
Telephone Number: (831) 884-1212
Dates of Service: 12-2022 through 12-2023 Value or Cost of Service: $120,000 Brief Description of Service Provided:
The City of Marina commissioned SCS Engineers, with support from ReGen Monterey and Monterey One Water, to conduct an Odor Attribution Study aimed at identifying and ranking potential sources of intermittent odor complaints. The study focused on assessing the relative contributions of a regional landfill, wastewater treatment plant, composting facility, and adjacent agricultural operations.
Using industry-standard methods and trained personnel, SCS developed and executed a detailed odor investigation plan, integrating odor complaint data, meteorological conditions, and direct source measurements. The study’s findings inform targeted mitigation strategies, ensuring resources are directed to the sources most responsible for odor impacts. The report also outlines recommended best practices, quality assurance protocols, and the next steps, and was reviewed with stakeholders during a public outreach meeting.
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
PROJECT PROFILES
The project profiles that follow have been selected as a representative sampling of work we have completed that is relevant to the scope requested by this RFP. We believe these project narratives demonstrate our ability to meet all City’s service needs and address the comprehensive scope, work plan and Statement of Work (SOW) tasks.
Pacific Stone Roadside Odor Study 2022-2023
Carpinteria, CA
Background
The purpose of this sampling campaign was to measure
and determine the efficiency of Envinity Group scrubbers inside a greenhouse relative to reducing odors and odor- responsible molecules. A secondary goal was to assess
the potential of trace level Total Reduced Sulfur (TRS) measurements to be used as a surrogate for odor
emission potential from a cannabis greenhouse.
Ultimately, the goal is to significantly reduce nuisance odors escaping greenhouse facilities. Two greenhouses of similar size, climate control methodologies, location—and thus, environmental factors—and plant composition were
used in this study: one equipped with fifteen (15)
operating scrubber units, and one with no scrubber units in operation.
A total of 240 air samples were collected from multiple predetermined indoor and outdoor locations over two-hour and four-hour intervals to assess odor emissions from two cannabis greenhouses. Uniform sampling tubing, pre-
labeled sample bags, and protective measures ensured
consistency and minimized contamination. Trained
personnel used a custom app to track samples and ensure analysis within a 36-hour holding time. Samples were
transported to a laboratory for sequential odor panel
evaluation using an olfactometer, followed by TRS concentration analysis via a proprietary monitoring system. Initial manual TRS readings were later automated with a multiplexer system.
Additional influent and effluent samples from selected scrubbers were collected to evaluate single- pass odor removal efficiency. The study showed that given adequate spatial density of scubbers, as demonstrated by this study, the scrubbers are capable of reducing odor emissions to a level that would result in no perceivable cannabis odors downwind from the subject facility. Results were provided to the client team in a comprehensive report.
The project cost was approximately $150,000 total over multiple studies.
𝐸𝑓𝑓𝑒𝑐𝑖𝑒𝑛𝑐𝑦 ሾ%ሿ ൌ ා ൮ 1.0
𝑂𝑑𝑜𝑟 𝑈𝑛𝑠𝑐𝑟𝑢𝑏𝑏𝑒𝑑
𝑂𝑑𝑜𝑟 𝑆𝑐𝑟𝑢𝑏𝑏𝑒𝑑 𝑋 𝑉𝑒𝑛𝑡𝑖𝑙𝑎𝑡𝑖𝑜𝑛 𝑈𝑛𝑠𝑐𝑟𝑢𝑏𝑏𝑒𝑑
𝑉𝑒𝑛𝑡𝑖𝑙𝑎𝑡𝑖𝑜𝑛 𝑆𝑐𝑟𝑢𝑏𝑏𝑒𝑑 𝑋 𝐶𝑟𝑜𝑝 𝑀𝑎𝑠𝑠 𝑈𝑛𝑠𝑐𝑟𝑢𝑏𝑏𝑒𝑑
𝐶𝑟𝑜𝑝 𝑀𝑎𝑠𝑠 𝑆𝑐𝑟𝑢𝑏𝑏𝑒𝑑
൲ 𝑋 100
ିି
்ୀିସ଼ .
Lung sampler at the Roadside
cannabis cultivation facility
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Challenges
Several key challenges
were encountered during
the study. First,
simultaneous harvests at
both greenhouses
required significant
coordination, deviating
from typical staggered
harvest practices.
Second, to analyze a
larger number of samples
within the 36-hour
holding window, the
project team established an in-house odor panel using a newly acquired olfactometer and screened nearly 90
individuals to identify 29 qualified panelists, enabling around-the-clock analysis. This eliminated reliance on a remote lab and avoided courier delays. Lastly, sourcing 60L PTFE sample bags from Scentroid presented logistical hurdles due to custom manufacturing, international shipping, and customs issues, though these bags offered superior odor compound retention and sample integrity compared to previously used materials. Considering these logistical challenges, SCS successfully accomplished the data collection and analytical efforts, and the project yielded a robust third-party report that detailed the efficacy of the novel greenhouse scrubber odor control technology.
Santa Barbara County – Odor Abatement Plans 2018-Present Multiple Clients, C A
Background
SCS Engineers has extensive experience in the development of Odor Abatement Plans (OAPs) to support cannabis cultivators, merchants, processors, and distributors in achieving compliance with Santa Barbara County cannabis regulations. As part of the permitting process for a range of facility types—including indoor, outdoor, and greenhouse operations—SCS has collaborated with both regulatory agencies and industry operators to produce comprehensive, site-specific OAPs.
Each OAP prepared by SCS addresses the full suite of regulatory requirements, including:
Site-specific information regarding facility layout, zoning compliance, and proximity to sensitive receptors
Identification and characterization of odor-emitting activities and operational phases Detailed descriptions of odor control technologies and mitigation methods Certification of the odor control system by a Certified Industrial Hygienist (CIH) and a Professional Engineer (PE)
Designation of a local primary contact for odor complaint response Olfactometry panelists analyzing samples
collected at the Roadside cannabis cultivation
facility remote odor lab
Attachment 1 to Exhibit "A"
Cathedral City | Proposal for Consulting Services Related to Cannabis Odor Control
Provision for regulatory access to facilities
Corrective action procedures in response to verified odor complaints The OAPs also outline requirements for odor sampling and testing, air exchange rates, system operation and maintenance protocols, and performance testing procedures to verify the efficacy of odor control measures.
Project cost per OAP typically ranges between $10,000 to $20,000, depending on the facility type and odor abatement strategy required to address the odor impacts on adjacent sensitive receptors.
Challenges
Given the dynamic regulatory landscape surrounding cannabis operations in Santa Barbara County, SCS routinely updates OAPs to reflect substantive changes to the County’s odor control ordinances.
To date, SCS has prepared dozens of OAPs for cannabis operators including Headwaters, Pacific Dutch Group, Everbloom, and others, and can provide sample OAPs upon request.
Attachment 1 to Exhibit "A"