CITY OF CATHEDRAL CITY

CATHEDRAL CANYON DRIVE SIDEWALK IMPROVEMENT PROJTECT BETWEEN PASEO AZULEJO AND KIELEY ROAD BID NO 26-111E

BID TABULATION
CITY PROJECT No.:C02608
DATE: 03/11/2026
1 MOBILIZATION LS 1 2,500.00$ 2,500.00$ 4,450.00$ 4,450.00$ 10,000.00$ 10,000.00$ 6,500.00$ 6,500.00$ 20,000.00$ 20,000.00$ 2 TRAFFIC CONTROL LS 1 2,500.00$ 2,500.00$ 4,000.00$ 4,000.00$ 1,000.00$ 1,000.00$ 7,780.00$ 7,780.00$ 55,000.00$ 55,000.00$ 3 CLEARING AND GRUBBING (INCLUDES ROCK DISPLACEMENT
AND SALVAGE) LS 1 3,000.00$ 3,000.00$ 1,500.00$ 1,500.00$ 7,500.00$ 7,500.00$ 5,000.00$ 5,000.00$ 70,000.00$ 70,000.00$ 4 UNCLASSIFIED EXCAVATION (REMOVAL & HAUL 4" EXISTING
NATIVE SOIL FOR SIDEWALK CONSTRUCTION) CY 50 80.00$ 4,000.00$ 240.00$ 12,000.00$ 100.00$ 5,000.00$ 180.00$ 9,000.00$ 500.00$ 25,000.00$ 5 REMOVE AND DISPOSE OF CONCRETE/ASPHALT ON EXISTING
DRIVEWAYS SF 600 4.00$ 2,400.00$ 5.00$ 3,000.00$ 6.00$ 3,600.00$ 11.00$ 6,600.00$ 25.00$ 15,000.00$ 6 CONSTRUCTION 5'-6" WIDE PCC SIDEWALK PER RIVERSIDE
STANDARD 401 SF 4,000 11.50$ 46,000.00$ 10.00$ 40,000.00$ 7.00$ 28,000.00$ 13.00$ 52,000.00$ 14.00$ 56,000.00$ 7 CONSTRUCTION 8" PCC ADA PATH ON DRIVEWAY (4' WIDE) SF 600 15.00$ 9,000.00$ 15.00$ 9,000.00$ 18.00$ 10,800.00$ 20.00$ 12,000.00$ 40.00$ 24,000.00$ 8 CONSTRUCT 6" WIDE AND 8" TALL CURB (MONOLITHIC WITH
SIDEWALK - GRADE ADJUSTMENT) LF 130 80.00$ 10,400.00$ 35.00$ 4,550.00$ 45.00$ 5,850.00$ 24.00$ 3,120.00$ 65.00$ 8,450.00$ 9 ADJUST DESERT WATER AGENCY (DWA) METER TO GRADE EA 2 250.00$ 500.00$ 500.00$ 1,000.00$ 2,500.00$ 5,000.00$ 2,000.00$ 4,000.00$ 1,600.00$ 3,200.00$ 10 ADJUST DESERT WATER AGENCY (DWA) METER TO GRADE EA 5 250.00$ 1,250.00$ 500.00$ 2,500.00$ 1,200.00$ 6,000.00$ 5,000.00$ 25,000.00$ 2,200.00$ 11,000.00$ 81,550.00$ 82,000.00$ 82,750.00$ 131,000.00$ 287,650.00$ VAN ENGINEERING, INC.

UNIT COST TOTAL

GRANITE CONSTRUCTION

UNIT COST TOTAL

RIVERSIDE CONSTRUCTION
COMP

UNIT COST TOTAL TOTAL

S&H CIVILWORKS

GRAND TOTAL

ITEM DESCRIPTION UNIT QUANTITY

ROADWAY AND TRAFFIC BID ITEMS

UNIT COST

BASE BID
TOTAL

CARTER ENTERPRISES GROUP,
INC. DBA PAVEMENT REHAB CO.

UNIT COST