CITY OF CATHEDRAL CITY

CYPRESS ROAD AND SANTORO DRIVE RETENTION BASIN PROJECT

BID TABULATION
CITY PROJECT No.: 2609
1 MOBILIZATION 1 LS 4,000.00$ 4,000.00 $ 22,885.00 $ 22,885.00 $ 2 TRAFFIC CONTROL 1 LS 4,855.00$ 4,855.00 $ 2,875.00 $ 2,875.00 $ 3 REMOVE AND DISPOSE OF EXISTING CURB AND GUTTER 35 LF 35.00$ 1,225.00$ 54.21 $ 1,897.35$ 4 REMOVE AND DISPOSE OF EXISTING SIDEWALK 175 SF 8.00$ 1,400.00$ 10.92 $ 1,911.00$ 5 REMOVE AND DISPOSE OF EXISTING STORM DRAIN PIPE 1 EA 3,000.00$ 3,000.00 $ 1,725.00 $ 1,725.00 $ 6 CONSTRUCT LOCAL DEPRESSION PER COUNTY OF RIVERSIDE ROAD STANDARD NO. 311, CASE C (A=4', W=14', T=0.5')
1E A 6,000.00$ 6,000.00 $ 5,842.00 $ 5,842.00 $ 7 CONSTRUCT CURB INLET CATCH BASIN PER COUNTY OF RIVERSIDE ROAD STANDARD NO. 300 (H=3.5', W=14', T=0.5')
1E A 15,000.00$ 15,000.00 $ 16,675.00 $ 16,675.00 $ 8 INSTALL 2 ADS N-12 DUAL WALL WTIB PIPES (D=24", L=30', s=0.01166) 60 LF 300.00$ 18,000.00$ 208.15 $ 12,489.00$ 9 CONSTRUCT STRAIGHT HEADWALL PER CALTRANS STANDARD
PLAN D89 (W=18', H=4'11")
1E A 10,000.00$ 10,000.00 $ 22,749.00 $ 22,749.00 $ 10 CONSTRUCT APRON AND RIPRAP ENERGY DISSIPATOR AT STRAIGHT

HEADWALL OUTFALL PER COUNTY OF RIVERSIDE ROAD STANDARD
NO. 314 (WALL WIDTH=18', APRON WIDTH=8', T=1.25',t=0.5') 1E A
8,000.00$ 8,000.00 $ 40,020.00 $ 40,020.00 $ 11 CONTROLLED LOW STRENGTH MATERIAL (CLSM) BACKFILL

AROUND STORM DRAIN PIPES AT WALL CROSSING
4C Y 500.00$ 2,000.00 $ 632.50 $ 2,530.00$ 12 CONSTRUCT 6" PCC SIDEWALK PER COUNTY OF RIVERSIDE ROAD STANDARD NO. 401
105 SF 30.00$ 3,150.00$ 93.15 $ 9,780.75$ 13 CONSTRUCT TYPE A-6 PCC CURB AND GUTTER PER COUNTY OF RIVERSIDE ROAD STANDARD NO. 200
9L F 150.00$ 1,350.00 $ 230.00 $ 2,070.00 $ 14 INSTALL TYPE A FTCD PER COUNTY OF RIVERSIDE ROAD STANDARD NO. 313 (L=9.67', W=2X24', Hs=24", Hb=2.04', C=3', B=10", G=4", H=3.5') 1E A 5,000.00$ 5,000.00 $ 3,450.00 $ 3,450.00 $ 82,980.00$ 146,899.10 $

NARROW PATH
ENGINEERING, INC.

UNIT COST TOTAL
BID SCHEDULE NO. 1

THREE PEAKS

CORPORATION

UNIT COSTUNIT

TOTAL ALL BID ITEMS
NO. DESCRIPTION TOTAL QTY