Cities Index.
Agenda packet

Cathedral City City Council
April 22, 2026

Document
Agenda packet
Meeting
April 22, 2026
Body
Cathedral City City Council
Pages
72
Original file
26.3 MB
Text extracted from the city's file for reading and search. Open the original on cathedralcity.primegov.com. That file is the official record.

73 XVI PUB SERVICES + FACILITIES
No Action Underway/Ongoing Complete
Policy 5 Ongoing Ongoing; Building permit applications, now submitted through the CSS Portal, require the payment of school fees for applicable projects.

Policy 6
Responsible Parties Schedule Description
Planning, Public Works,

PSUSD, COD
Immediate; Ongoing
Ongoing
Ongoing; Stakeholder engagement for development of the Active Transportation Plan included school principals for Rio Vista Elementary, Landau Elementary, and James Workman Middle School. The goals, objectives, and proposals for routes and wayfinding in the ATP address safe routes to schools and wayfinding to the library - the ongoing implementation of the ATP will implement these objectives.

Goal 4
Policy 1
Responsible Parties Schedule Description
Planning, Public Works,
CVWD, DWA, Riverside
County Flood Control,
SCE, SCG, Frontier,
Spectrum
Immediate; every five
years
No Action
Policy 2
Responsible Parties Schedule Description
Planning, Public Works,
CVWD, DWA, Riverside
County Flood Control,
SCE, SCG, Frontier,
Spectrum.

Immediate; every five
years
Ongoing
Ongoing; The City's CIP is updated on a regulate (biennial) basis. Updates on CIP projects were presented to the City Council in April and October 2025.

Policy 3
Responsible Parties Schedule Description
Planning, Public Works,
CVWD, DWA, Riverside
County Flood Control,
SCE, SCG, Frontier,
Spectrum.

Immediate; Ongoing
Ongoing
Ongoing; The Planning Division reviews plans for new maintenance and utility facilities during both the development review process (when applicable) and the plan check process, to ensure that architecture and landscaping is adequately integrated with surroundings.

Policy 4
Responsible Parties Schedule Description
Planning, Southern
California Edison
Immediate; Ongoing
Ongoing
Ongoing; The City continues to charge the Master Undergrounding Plan (MUP) fee, used to underground existing overhead utility lines, on all new construction ($0.15 per square foot of roofed area). The AB1600 Fee Justification Nexus Study completed in September 2023 recommended the City conduct an undergrounding study, which would involve consultation with SCE.

Policy 5
Responsible Parties Schedule Description
Planning, Public Works Immediate; Ongoing
Ongoing
Ongoing; The development services committee reviews all new development proposals for critical structures. The Engineering and Public Works Department reviews applicable plans for geological and hydrologic safety, and technical studies are requested when necessary to evaluate engineering site conditions.

Policy 6 Public facilities shall be responsive to the needs of the community and maintained in a manner that enhances the comfort and safety of community members, City employees, and other occupants.

To the greatest extent practicable, the City shall encourage the undergrounding of electrical power lines.

Program 4.A
Consult and coordinate with Southern California Edison regarding the costs, methods, potential barriers to, and feasibility of undergrounding electrical power lines.

Implementation Status
Critical structures and facilities (including civic administrative center, hospitals, fire stations, police stations, schools and major communications facilities) shall be restricted from geologically and hydrologically hazardous areas, to the greatest extent practical.

Program 5.A
The City shall review all development proposals for new critical structures to assure they demonstrate safety in terms of geologic, hydrologic and other engineering conditions of the site.

Implementation Status
The City shall routinely evaluate and update, as appropriate, its Capital Improvement Program.

Program 2.A
Establish and implement a Capital Improvement Program review and update schedule, which includes annual reviews, analysis and comprehensive revisions every five years.

Implementation Status
Coordinate with public utility providers and other public/quasi-public agencies to assure that utility buildings and facilities are compatible with the surrounding landscape
Program 3.A
All new maintenance and utility facilities (and their signage) shall be integrated into the surrounding environment using landscape treatments, architectural elements, and/or other appropriate design mechanisms. Whether as a regulatory or advisory function, design plans shall be reviewed by the Planning Department.

Implementation Status

PUBLIC FACILITIES
Public buildings and facilities that optimize functionality, while being compatible with surrounding land uses and aesthetically integrated into the City’s built and natural environments.

The Land Use Element shall assure the long-term availability of sites for future public and quasipublic buildings, infrastructure, and other facilities.

Program 1.A
The City shall periodically review its official Land Use Map and development patterns to assure the availability of adequate sites for future public and quasi- public buildings, infrastructure, and other facilities. The City shall confer and coordinate with utilities and other public and quasi-public agencies regarding their long-term needs.

Implementation Status
Description
The City shall cooperate in securing school impact fees from developers, in accordance with state law.

Ensure provision of safe pedestrian access for students of new and existing school sites throughout the city.

Program 6.A
The City shall coordinate with PSUSD, COD and the Riverside County Library System to ensure that safe routes and means to school and library facilities through the thoughtful implementation of the Circulation and Mobility Element and the Active Transportation Plan.

Implementation Status
Program No. Program Responsible Parties Schedule Implementation Status

Page 71 ends

74 XVI PUB SERVICES + FACILITIES
No Action Underway/Ongoing Complete
Program 6.A
Investigate the feasibility of expanding the City’s existing corporate yard to accommodate larger office space, parking lots, and maintenance facilities.

Planning, Public Works Immediate; Ongoing
No Action
Program 6.B
Continue to investigate the feasibility of constructing a new community center, including potential sites, constraints, and funding opportunities.

Planning, Parks and
Recreation
Ongoing
Ongoing
Ongoing; Measure W passed in November 2024, which will allow the City to begin the process of exploring a future community center, including consideration for potential sites as well as evaluation of the City's needs for size and type of facilities. In 2025, a site selection and feasibility study was completed with a consultant, Group 4 Architecture.

Program 6.C
Establish a facilities upkeep and restoration master plan for City-owned facilities. Facilities Services Division
Ongoing
Complete Complete; A Facilities Master Plan, including a Facilities Condition Assessment, Ten-Year Budget Forecast and a Preventative Maintenance Program, was completed in August 2023.

Goal 5
Policy 1
Responsible Parties Schedule Description
City Manager, Public
Works, Finance, CVWD,
DWA
Ongoing
Ongoing
Ongoing; Engineering and Public Works staff are reviewing the funding agreement with the State Water Resource Control Board for the Septic to Sewer Planning Project, and preparing an RFP for the design and environmental phase of the project. Staff are also working on the potential establishment of community facilities districts to provide sewer systems, including for the Sarah Road area. In 2025, the Final Preliminary Engineering Reports for the Septic to Sewer Project were submitted to the SWRCB. The project is on track to complete PS&E by early 2027.

In community outreach for the Sarah Street Assessment District was conducted in July and October 2025. Based on the lack of demonstrated property owener support, in January 2026, Council voted not to proceed with Phase 2B of the project.

Policy 2
Responsible Parties Schedule Description
DWA, CVWD Ongoing No Action
Policy 3
Responsible Parties Schedule Description
Planning, Public Works,
SCE
Immediate; Ongoing
Ongoing
Ongoing; The City supports the increasing adoption of roof-top solar and storage systems, including in compliance with increasingly stringent Title 24 requirements. Building and Safety Division review of residential roof-mounted photovoltaic plans are streamlined through the use of SolarAPP+.

Program 3.B
The City shall explore avenues for the expansion of renewable sources of natural gas from landfills, hydrogen fuels, and associated storage systems.

Planning, Public Works,
SoCal Gas, SunLine
Transit Agency
Immediate; Ongoing
No Action
Policy 4
Responsible Parties Schedule Description
Planning, Public Works,
SCE
Immediate; Ongoing
Ongoing
Ongoing; The City continues to coordinate with SCE on undergrounding projects, particularly along image corridors. Current projects including a joint use agreement with SCE for undergrounding of power lines as a part of the Ramon Bridge and Street Widening Project.

Policy 5 Ongoing
Ongoing; The City continues to partner with Burrtec on an annual Refuse and Recycling Guide for residents, funded through the City's AB 939 Environmental Conservation Fund.

To enhance their long-term viability and to protect against service disruptions due to earthquakes, floods and extreme weather, utility lines shall be undergrounded wherever practicable. Those most subject to disruption and located along major streets and image corridors shall have primary consideration for undergrounding.

Program 4.A
The City shall confer and coordinate with SCE to identify existing above-ground power lines that are candidates for cost-effective undergrounding, with a special emphasis on those occurring along City image corridors.

Implementation Status
The City shall confer and coordinate with the local solid waste hauler/manager and identify and evaluate the potential to expand waste recycling, encourage use of packaging materials that are most recyclable, and eliminate non-recyclable packaging from the waste stream.

Monitor resource management activities of the CVWD, DWA, and California Regional Water Quality Control Board (CRWQCB) to preserve and protect water resources and quality.

Program 2.A
The City shall support the efforts of DWA and CVWD to construct and expand facilities that treat and distribute reclaimed water.

Implementation Status
The City shall encourage and, to the extent practicable, facilitate the diversification of the energy resources through the development of renewable sources of electricity, natural gas and hydrogen fuels.

Program 3.A
The City shall explore avenues for the expansion of roof-top solar and utility-scale wind energy development, and the implementation of domestic and utility-scale storage systems.

Implementation Status
Description

WATER, SEWER AND UTILITIES
Economical utility services and facilities that adequately and safely meet the immediate and long-term needs of the community.

The City shall encourage CVWD and DWA to implement short- and long-term plans for a fully integrated, city-wide sewer system.

Program 1.A
Confer and coordinate with CVWD and DWA on methods to finance the upgrading and expansion of the sewer and domestic water systems, including the establishment of assessment and/or community facilities districts that also provide financial assistance for economically disadvantaged neighborhoods.

Implementation Status
Program No. Program Responsible Parties Schedule Implementation Status

Page 72 ends

75 1
4 3
9 Staff Report
City Council
Item No. 4.A
Meeting Date: April 22, 2026
From: Kevin Biersack, Financial Services Director
Title: AB 1600 Development Impact Fee Annual Inflationary Update RECOMMENDATION:

Staff recommend City Council conduct a Public Hearing and Adopt by Resolution an authorized inflationary adjustment to the City’s Assembly Bill (AB) 1600 Development Impact Fees.

BACKGROUND:

Development Impact Fees (DIF Fees) are established by the City Council. They are one- time fees charged to new development. DIF fees are intended to pay for backbone infrastructure and capital facilities required to serve new development activities.

Municipalities are prohibited from using DIF fees to fund ongoing operations, maintenance, or to make up for existing service deficiencies. DIF fees must be accounted for, set aside, and saved until the municipality has the required funding to build the needed facilities.

This Fee Schedule for Development Impact Fees includes:

Parks
Transportation
General Government Facilities
Fire Facilities
Police Facilities

On September 27, 2023, the City Council Adopted an updated DIF Schedule to reflect the adopted recommendations based on the results of a comprehensive cost of service study.

Built into the schedule is an automatic Fee Adjustment using the Construction Cost index (CCI) for the 20-City Average as reported by Engineering News Record (ENR) for a twelve- month period/year or a similar published index if the CCI is no longer available.

Construction costs have continued to increase since 2023. With those increased costs, there 1 1
4 3
9 could be a shortfall between current development impact fees and what it will cost to build the municipal facilities required to serve future residents. This automatic fee adjustment helps to mitigate that shortfall; however, per Government Code 66016, the inflationary adjustments do not exceed the costs to provide the City infrastructure.

During interim years, i.e., between comprehensive studies, the City Council has authorized inflationary adjustments to fees. July 1, 2025 represented the first annual inflationary update after the comprehensive fee study was implemented in January 2024.

On April 8, 2026, staff presented to City Council the findings and recommendations from the recently completed annual update. With these impact fees established by City Council, staff received direction and feedback to proceed with conducting a public hearing held in conformance with Government Code Section 66016.

DISCUSSION:

With a full cost-of-service study completed every eight (8) years, incremental annual inflationary updates occur in the years in between comprehensive studies. This report presents an inflationary adjustment for the AB 1600 Development Impact Fees in Fiscal Year (FY) 2026/2027. This update will apply 3.6% CCI inflationary adjustment for the 20-City Average as reported by ENR for the twelve-month period of December 2025 over December 2024.

In anticipation of this Public Hearing, the City Clerk sent/published the following notices to:

Agua Caliente, BIA of So Cal, Desert Valley Builders Association (DVBA), Riverside County BIA, So Cal Gas, So Cal Edison on April 3, 2026
Desert Sun 1 st publication on April 2, 2026
Desert Sun 2 nd publication on April 8, 2026

On April 8, 2026, this update to include the 3.6% annual inflationary adjustment to the AB 1600 Development Impact Fees was presented to City Council for review and feedback.

Feedback from City Council was incorporated in the attached table.

In holding this Public Hearing and subsequent City Council approval, staff will then implement the adjusted fees on July 1, 2026.

FISCAL IMPACT:

With the 3.6% ENR compounded CCI increase along with equivalent development activity from FY 2024/2025, DIF revenues could provide additional DIF funds’ revenue up to $75,000 for FY 2026/2027.

FIVE-YEAR STRATEGIC PLAN:

The implementation of updated Development Impact Fees supports the following strategic plan goals:

2 1
4 3
9 GOAL B: COMMUNITY INVESTMENT Objective: Cathedral City roads, gateways, public spaces, and other city infrastructure are well planned, designed, constructed, and maintained.

GOAL C: FISCAL STABILITY AND SUSTAINABILITY Objective: Cathedral City has economically prospered by facilitating the investment of private dollars in high-quality development which benefits the community. We remain financially solvent by implementing prudent fiscal policies and transparent financial practices.

ATTACHMENTS:

1. Proposed FY 2026_2027 Development Impact Fees w/ CCI ENR Annual Increase

2. Draft Resolution
3 Development Type
PY Proposed PY Proposed PY Proposed PY Proposed PY Proposed PY Proposed Residential:
(Per Square Foot)
Single Family 3.46 3.52 0.66 0.67 1.29 1.31 0.71 0.73 0.49 0.50 $6.63 $6.73 Multi-Family 4.88 4.96 0.63 0.62 1.82 1.85 1.00 1.01 0.69 0.70 $9.02 $9.14 Non-Residential:
(Per 1,000 Square Feet)
Commercial N/A N/A 2,211.92 2,247.31 608.13 617.86 335.32 340.69 231.05 234.75 $3,386.43 $3,440.61 Office N/A N/A 1,858.60 1,888.34 1,336.55 1,357.93 736.96 748.76 507.80 515.93 $4,439.92 $4,510.96 Industrial N/A N/A 281.86 286.37 133.65 135.79 73.69 74.87 50.78 51.59 $539.98 $548.62 Development Type
PY Proposed PY Proposed PY Proposed PY Proposed PY Proposed PY Proposed Residential:
(Per Square Foot)
Single Family 3.34 3.40 0.64 0.65 1.25 1.27 0.69 0.70 0.48 0.48 $6.40 $6.50 Multi-Family 4.71 4.79 0.61 0.62 1.75 1.78 0.96 0.98 0.67 0.68 $8.71 $8.85 Non-Residential:
(Per 1,000 Square Feet)
Commercial N/A N/A 2,135.06 2,169.22 587.00 596.39 323.67 328.85 223.02 226.59 $3,268.75 $3,321.05 Office N/A N/A 1,794.02 1,822.72 1,290.10 1,310.75 711.36 722.74 490.16 498.00 $4,285.64 $4,354.21 Industrial N/A N/A 272.06 276.42 129.01 131.07 71.13 72.27 49.01 49.80 $521.21 $529.55 Total
Total
Calendar Year 2025 over 2024 (1.6%) ENR CCI
Calendar Year 2026 over 2025 (3.6%) ENR CCI
Parks Transportation Gen Gov't Facilities Fire Facilities Police Facilities Parks Transportation Gen Gov't Facilities Fire Facilities Police Facilities 4 RESOLUTION NO. 2026-

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF CATHEDRAL CITY, CALIFORNIA, ADOPTING A

SCHEDULE OF DEVELOPMENT IMPACT FEES FOR

FUTURE CITY SERVICES BASED ON NEW

CONSTRUCTION
WHEREAS, development impact fees (AB 1600) are established by the City Council; and
WHEREAS, the City completed a study in 2023 to identify the impact of new construction effect on the cost of providing City services; related to one- time fees charged on New Development intended to pay for backbone infrastructure and capital facilities required to serve the new developments and new residents.

WHEREAS, the study examined the cost of services provided by the City to the residents, related to one-time fees charged on new development intended to pay for backbone infrastructure and capital facilities required to serve the new development and its residents; and
WHEREAS, the City Council finds that providing these services is of special benefit to applicants both separate and apart from the general benefit to the public; and therefore, in the interests of fairness to the general public, the City desires to better recover the costs of providing these services from applicants who have sought or require the City's services by revising its schedule of fees; and
WHEREAS, the City Council hereby finds that the study provides adequate evidence to conclude that the revised fees do not exceed the cost to provide the services for which the fees are charged; and WHEREAS, the City Council desires that annually the City Manager automatically adjust the fees using the Construction Cost Index (CCI) for the 20-City Average as reported by Engineering News Record (ENR) for a twelve- month period or a similar published index if the CCI Index is no longer available; and
WHEREAS, in adopting this Resolution, the City Council is taking action only on those fees for the services, programs or products set forth in Exhibit “A” which have been modified from prior resolutions of the City Council. The remaining fees that have not been modified from prior resolutions shall remain in full force and effect.
5 NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF CATHEDRAL CITY, DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:

SECTION 1. INCORPORATION OF RECITALS
The City Council hereby finds the recitals set forth above are true and correct.

SECTION 2. ESTABLISHMENT AND UPDATE OF FEES, CHARGES, AND RATES
The City Council hereby adopts the fees, charges, and rates as set forth in Exhibit “A” attached and incorporated by this reference.

SECTION 3. EFFECTIVE DATE
Any new or adjusted fees adopted by this Resolution shall go into effect July 1, 2026.

SECTION 4. CERTIFICATION
The City Clerk shall attest to and certify the vote adopting this resolution.

PASSED, APPROVED, AND ADOPTED at a regular meeting of the City Council of the City of Cathedral City held on this 22 nd day of April 2026, by the following vote:

Ayes:

Noes:

Absent:

Abstain:
______________________________
Raymond Gregory, Mayor
ATTEST:
______________________________
Christina Burton, City Clerk
APPROVED AS TO FORM:
______________________________
Eric S. Vail, City Attorney
6 7

“Exhibit A”
8 1
4 3
8 Staff Report
City Council
Item No. 4.B
Meeting Date: April 22, 2026
From: Kevin Biersack, Financial Services Director
Title: City User and Regulatory Fees Annual Update
RECOMMENDATION:

Staff recommend City Council conduct a Public Hearing and Adopt by Resolution an annual adjustment to the City’s Master Schedule of User and Regulatory Fees.

BACKGROUND:

In 1987, following the California State Supreme Court Nollan vs. California Coastal Commission decision, the California Mitigation Fee Act was passed. These actions set the stage for Assembly Bill 1600, and Government Code sections 66000-66011. Later, Ehlrich vs. City of Culver City (1993), Doland vs. City of Tigard (1994), and Proposition 218 (1997) (among others) occurred, enabling public agencies to impose a user fee for government services when:

The individual’s decision to use the governmental service is voluntary, and The fee charged is reasonably related to both the level and cost of the service to be provided.

Most recently on April 23, 2025, following the completion of a comprehensive user and regulatory fee study, the City Council adopted Resolution 2025-04 updating the City’s Master Schedule of User and Regulatory Fees. The amounts adopted were based on a formally established fee policy identifying general cost recovery targets for various services.

On April 8, 2026, staff presented to City Council the findings and recommendations from the recently completed annual update. With user and regulatory fees established by City Council, staff received direction and feedback to proceed with conducting a public hearing held in conformance with Government Code Section 66016.

DISCUSSION:

The fee schedule is intended to be reviewed annually by City staff as part of the normal 1 1
4 3
8 course of operations. With a full cost-of-service study completed every five (5) years, incremental updates occur in the years in between comprehensive studies. This update represents an interim year update with minor, incremental, corrections/changes proposed incorporating feedback received along with any new fees added during the past year since last year’s adoption of the current fee schedule.

During these interim years, the inflationary adjustment is based on the annual percentage change in the Bureau of Labor Statistics (BLS) Consumer Price Index (CPI) for All Urban Consumers (CPI-U) for Riverside-San Bernardino-Ontario. For this measurement period (December 2025 over December 2024, published in January 2026), the annual percentage change in CPI was 3.28%.

In the attached Illustration of Current and Proposed Fees 2627 – Final, the changes/recommendations are listed below:

Administrative Fees Section, page 1
Administrative Appeal Fee, existing fee inadvertently left off the schedule in prior years
Credit Card Transaction Processing Fee. Increasing the fee from 2.75% to

3.0%.
Building Fees, page 2
Service Panel Upgrade, existing fee that was inadvertently removed from the schedule in the prior year
Building Fees, page 7
Clarification of refund policy, no fee refunds once work covered by them is commenced
Cannabis Licensing and User Permit Fees, page 10
Odor Control and Plan Review Permit Fees and Fines for Cannabis Nuisance Odor, new fees adopted by City Council since the previous schedule was adopted
Code Compliance Fees, page 11
Release of Notice of Pendency, correction of error, fee should have been set to $265 rather than the $662 listed in the prior year schedule Plastic Beverage Straws fine, existing fine that was not previously included in the prior year

In addition, this illustration exhibit includes the same proposed 3.28% increase to the hourly billing rates for fee related services, see pages 56-62. Per Government Code 66016, the fee increases highlighted above, the updated hourly billing rates, and the inflationary adjustments do not exceed the costs to provide these City services.

In anticipation of this Public Hearing, the City Clerk sent/published the following notices to:

Agua Caliente, BIA of So Cal, Desert Valley Builders Association (DVBA), Riverside County BIA, So Cal Gas, So Cal Edison on April 3, 2026
Desert Sun 1 st publication on April 2, 2026
Desert Sun 2 nd publication on April 8, 2026

With this attached Master Schedule of User and Regulatory Fees 2627 – Final being adopted 2 1
4 3
8 by City Council on April 22, 2026 along with a 60-day ratification period, these changes will become effective July 1, 2026.

FISCAL IMPACT:

With the 3.28% CPI and equivalent (FY 2024/2025) license/permit/fee/service revenues, this increase could provide additional revenues up to $250,000 for FY 2026/2027.

FIVE-YEAR STRATEGIC PLAN:

The implementation of updated User and Regulatory Fees supports the following strategic plan goals:

GOAL C: FISCAL STABILITY AND SUSTAINABILITY Objective: Cathedral City has economically prospered by facilitating the investment of private dollars in high-quality development which benefits the community. We remain financially solvent by implementing prudent fiscal policies and transparent financial practices.

ATTACHMENTS:

1. Illustration of Current and Proposed Fees 2627 - Final

2. Master Schedule of User and Regulatory Fees 2627- Final

3. Draft Resolution
3 Illustration of Current and Proposed Fees
4 Fees Page
ADMINISTRATIVE FEES 1
BUILDING AND SAFETY FEES 2
BUSINESS LICENSE APPLICATION REVIEW AND INSPECTION FEES 8 CANNABIS LICENSING AND USER PERMIT FEES AND FINES 10
CODE COMPLIANCE FEES (GARAGE SALE PERMIT, STREET VENDOR PERMIT, ETC.) 11 LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT PERMIT FEES 12 EVENT FEES 29
FIRE PREVENTION AND AMBULANCE FEES 31
PLANNING FEES 39
POLICE FEES 46
SHORT TERM RENTAL PERMIT FEES AND ADMINISTRATIVE CITATIONS 49 SPORTS FIELDS AND PARK FACILITIES RESERVATION FEES 51
HOURLY BILLING RATES FOR FEE RELATED SERVICES 56
City of Cathedral City
Illustration of Current and Proposed Fees
Table of Contents
5 City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - ADMINISTRATIVE FEES
Current Fee Proposed Fee Change Charge Basis Note CPI
1 Administrative Appeal Fee $100 $100 $0 each N
2 Returned Check Fee
a) First Check $25 $25 $0 each [a] N
b) Each Additional Check $35 $35 $0 each [a] N
3 EFT/ACH Return / Error $25 $25 $0 each N
4 Credit Card Transaction Processing Fee 2.75% 3.00% 0.25% % of fees paid by credit card [b] N 5 E-Check Transaction Processing Fee $1.95 $1.95 $0.00 per transaction [c] N 6 Technology Fee 3% 3% 0% percent of permit fee [d] N
7 Postage Actual Cost Actual Cost each N
8 Digital Media Device $10 $10 $0 each N
9 Documents - Hard Copy
a) Standard Size $0.25 $0.25 $0.00 per single-sided page N b) Non-standard Size Actual Cost Actual Cost per page N 10 Subpoena Response / Retrieval Fees Max. Authorized by State Max. Authorized by State per request N [a] California Civil Code Sec. 1719.
[b] Passthrough of credit card transaction fees charged by vendor. [c] Passthrough of E-Check transaction fees charged by vendor. [d] Applied to any permit issued by the City.

Fee Description
1 6

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Change Charge Basis Note CPI
1 Expedited HVAC Change-Out $206 $213 $7 [a] Y
2 Residential Solar Photovoltaic System - Solar Permit per permit a) Residential Solar Photovoltaic System - Solar Permit $450 $450 $0 per permit [a] N i) With Battery Storage $54 $54 $0 [a] N
ii) With EV Charging (Electric Vehicle) $54 $54 $0 per permit [a] N 3 Commercial Solar Photovoltaic System - Solar Permit
a) 50kW or less $1,000 $1,000 $0 per permit [b] N
b) 50kW – 250kW – Base $1,000 $1,000 $0 per permit [b] N c) 50kW – 250kW – per kW above 50kW $7 $7 $0 per permit [b] N d) Above 250kW – base $2,400 $2,400 $0 per permit [b] N e) Above 250kW – per kW $5 $5 $0 per permit [b] N
4 Energy Storage Systems (Battery Backup) $358 $370 $12 per permit Y 5 Service Panel Upgrade - Residential $54 $56 $2 per permit Y 6 Expedited Service Panel Upgrade - Residential $269 $277 $9 per permit Y 7 Service Panel Upgrade - Commercial $448 $462 $15 per permit Y 8 EV Charger - Residential $358 $370 $12 per permit Y
9 EV Charger - Commercial See Table B. Permit
Valuation Table
See Table B. Permit
Valuation Table
per permit N
10 Expedited Water Heater Changeout $206 $213 $7 per permit Y 11 Expedited New Sewer Connection $295 $305 $10 per permit Y 12 Expedited Residential Re-Roof per permit
a) Up to 2,000 SF (Roof Area) $206 $213 $7 per permit Y b) Each Add'l 1,000 SF or fraction thereof $90 $92 $3 per permit Y 13 Commercial Re-Roof
a) Up to 2,000 SF (Roof Area) $448 $462 $15 per permit Y b) Each Add'l 1,000 SF or fraction thereof $179 $185 $6 per permit Y 14 Demolition $448 $462 $15 Y
A. Fees for Commonly Requested Building Permit Types. Fees shown in this section (Section A.) include all applicable inspection, and plan review fees. Additional permit processing fees apply. Additional fees may apply for services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Fee Description
2 7

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Change Charge Basis Note CPI
A. Fees for Commonly Requested Building Permit Types. Fees shown in this section (Section A.) include all applicable inspection, and plan review fees. Additional permit processing fees apply. Additional fees may apply for services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Fee Description
15 Temporary Power Pole $269 $277 $9 Y
16 Swimming Pool/Spa
a) Swimming Pool / Spa $716 $739 $23 per permit Y
b) Water Feature $358 $370 $12 per permit Y
c) Pool Alteration $716 $739 $23 per permit Y
d) Equipment Change-out Alone $358 $370 $12 per permit Y 17 Patio
a) Standard (Wood/Metal Frame) $269 $277 $9 per permit Y b) Upgraded (with electrical, stucco, etc.) $522 $539 $17 Y 18 Expedited Window / Doors
a) Retrofit / Repair
i) Up to 5 $233 $240 $8 Y
ii) Each additional 5 $90 $92 $3 each Y
19 Block/Masonry Wall
a) 0 - 100 ft $358 $370 $12 Y
b) Each Add'l 25 ft $17 $18 $1 Y
20 Trash Enclosure $448 $463 $15 Y
[a] California Government Code Section 66015(a)(1), establishes maximum fees for residential solar energy systems. For photovoltaic systems, fees shall not exceed $450 plus $15 per kW for each kilowatt above 15kW. For thermal systems, fees shall not exceed $450, plus $15 per kWth for each kilowatt thermal above 10kWth. Fees in excess of these amounts require written findings and resolution or ordinance.
[b] California Government Code Section 66015(b)(1), establishes maximum fees for commercial solar energy systems. Fees shall not exceed $1,000 for systems up to 50kW plus $7 per kilowatt for each kilowatt between 51kW and 250kW, plus $5 for each kilowatt above 250kW. For thermal systems, fees shall not exceed $1,000 up to the 30kWth, plus $7 per kWth for each kWth between the 30th and 260th kWth, plus $5 for each kWth above 260kWth. Fees in excess of these amounts require written findings and resolution or ordinance. 3 8

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Change Charge Basis Note CPI
B. Permit Fee for New Buildings, Additions, Tenant
Improvements, Residential Remodels, and Combined Mechanical, Electrical, and/or Plumbing Permits
1 $1 - $10,000 $448 $462 $15 Y
2 $10,001 - $50,000 $895 $924 $29 Y
3 $50,001 - $100,000 $1,790 $1,849 $59 Y
4 $100,001 - $500,000 $2,685 $2,773 $88 Y
5 $500,001 - $1,000,000 $6,534 $6,748 $214 Y
6 $1,000,001 and up $9,308 $9,613 $305 Y
C. Permit Fee for Stand-Alone Mechanical Permit
7 Up to $2,000 $268.50 $277.00 $8.50 Y
8 $2,001 - $10,000 $447.50 $462.00 $14.50 Y
9 $10,001 and up $716.00 $739.00 $23.00 Y
D. Permit Fee for Stand-Alone Plumbing Permit
10 Up to $2,000 $268.50 $277.00 $8.50 Y
11 $2,001 - $10,000 $447.50 $462.00 $14.50 Y
12 $10,001 and up $716.00 $739.00 $23.00 Y
E. Permit Fee for Stand-Alone Electrical Permit
13 Up to $2,000 $268.50 $277.00 $8.50 Y
14 $2,001 - $10,000 $447.50 $462.00 $14.50 Y
15 $10,001 and up $716.00 $739.00 $23.00 Y
Activity Description
4 9

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Change Charge Basis Note CPI
F. Building Plan Review Fees
1 Plan Check Fees
a) Plan Review Fee, if applicable 65% of Building Permit Fee 65% of Building Permit Fee [a] N b) Phased Plan Check (when applicable) 1.5x full plan check fee for entire bldg

1.5x full plan check fee for
entire bldg
N
c) Expedited Plan Check (when applicable) 1.5x standard plan check fee

1.5x standard plan check
fee
N
d) Master Plan Review
i) Tract Homes $179 $185 $6 per hour [a];[b] Y
ii) Solar Systems for Tract Homes $179 $185 $6 per hour [b] Y e) Alternate Materials and Materials Review (per hour) $179 $185 $6 Y f) Individual Plan Check / Revisions of Approved Plans $90 $92 $3 per half hour Y Activity Description
When applicable, plan check fees shall be paid at the time of application for a building permit.

The plan checking fee is in addition to the building permit fee. [a] Includes up to three plan checks. The City will bill hourly for additional plan review required. [b] For identical buildings built by the same builder on the same lot or in the same tract and for which building permits are issued at the same time. 5 10

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Change Charge Basis Note CPI
G. Other Fees
1 Permit Issuance Fee $90 $92 $3 Y
2 General Plan Maintenance Fee (fee per $1,000 valuation) $0.71 $0.73 $0.02 [a] Y 3 Strong Motion Instrumentation (SMI) Fee Calculation
a) Residential $0.50 or valuation x .00013 $0.50 or valuation x .00013 N b) Commercial $0.50 or valuation x .00028 $0.50 or valuation x .00028 N 4 Building Standards (SB 1473) Fee Calculation (Valuation) a) $1 - $25,000 $1 $1 $0 N
b) $25,001 - $50,000 $2 $2 $0 N
c) $50,001 - $75,000 $3 $3 $0 N
d) $75,001 - $100,000 $4 $4 $0 N
e) Each Add'l $25,000 or fraction thereof Add $1 Add $1 N 5 Certificate of Occupancy
a) Temporary Certificate of Occupancy (per 30 Days) $537 $555 $18 Y b) Certificate of Occupancy
i) Single Family Residential $179 $185 $6 Y
ii) Multi-Family Residential / Commercial $358 $370 $12 Y Copies, Re-Print, Change Of Contractor
6 Change of Contractor $27 $28 $1 Y
Violation Fees
7 Investigation Fee For Work Done Without Permits
(In addition to applicable permit fees)
equal to
permit fee
equal to
permit fee
N
Other Fees
8 Street Name Change/Addressing
a) Without GIS Support $2,685 $2,773 $88 Y
b) With GIS Support $5,370 $5,546 $176 Y
9 Individual, Investigation, Re-Inspection Fee (All-Inclusive) $206 $213 $7 [b] Y 10 After Hours Inspection (per hour) (2-hour minimum) $224 $231 $7 Y 11 Fees for Services Not Listed in this Fee Schedule (per 1/2 hour) $90 $92 $3 Y 12 Mobile Home Permit Fees See Title 25 of the Housing
& Community
Development
See Title 25 of the Housing
& Community
Development
N
13 Permit Renewal Fee within 1 year of Last Inspection 50% of original fee 50% of original fee N Activity Description
6 11

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 14 Refunds
a) Fees Erroneously Paid or Collected by the City 100% refund 100% refund [c] N b) Fees Prior to Work Being Commenced up to 80% refund of permit fee
up to 80% refund of permit
fee
N
c) No fees are refundable once the work covered by them is commenced
no refund no refund N
d) 180 Days After Payment of Fees no refund no refund [d] N [a] Fee only applies to permits for new construction and additions. [b] Reinspection fee applies after the first re-inspection. [c] The Building Official may authorize refunding of any fee paid, or portion thereof, which was erroneously paid or collected by the city. [d] Whether work has commenced or not, no fees are refundable more than 180 days after their payment. 7 12

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - BUSINESS LICENSE APPLICATION REVIEW AND INSPECTION FEES Current Fee Proposed Fee Change Charge Basis Note CPI
1 Business License Processing Fee
a) New $83 $86 $3 each Y
b) Renewal $42 $43 $1 each Y
2 Duplicate License $5 $5 $0 each N
3 Review for Home Occupation License $93 $96 $3 each Y
4 Fire Inspection Review for Business License $109 $112 $4 each Y 5 Building Inspection for Business License $90 $92 $3 each Y 6 Planning Inspection for Business License, If Required $93 $96 $3 each Y 7 Engineering Inspection for Business License, If Required $110 $113 $4 each Y 8 Code Inspection for Business License, if Required $74 $76 $2 each Y 9 Police Inspection for Business License
a) Massage - Establishment
i) Initial $264 $273 $9 each Y
ii) Renewal Inspection (if required) $88 $91 $3 each Y
b) Massage - Therapist / Practitioner
i) Initial $264 $273 $9 each Y
ii) Renewal Inspection (if required) $88 $91 $3 each Y
c) Pawnbroker, Secondhand dealer, ice cream truck, etc. i) Initial - (pawnbroker, secondhand dealer, handbills, ice cream truck, etc.)
$132 $136 $4 each Y
ii) Renewal - (pawnbroker, secondhand dealer, handbills, ice cream truck, etc.)
$88 $91 $3 each Y
d) Sexually Oriented Business
i) Initial $264 $273 $9 each Y
Fee Description
8 13

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - BUSINESS LICENSE APPLICATION REVIEW AND INSPECTION FEES Current Fee Proposed Fee Change Charge Basis Note CPIFee Description e) All Others, If Required
i) Initial $132 $136 $4 each Y
ii) Renewal $88 $91 $3 each Y
10 Bingo Permit $50 $50 $0 each [a] N
[a] Maximum permit fee established by State of California. 9 14

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - CANNABIS LICENSING AND USER PERMIT FEES AND FINES Current Fee Proposed Fee Change Charge Basis Note CPI
1 Cannabis License
a) New Application $5,003 $5,167 $164 flat fee [a] Y
b) Renewal or Modification of License
i) License Renewal $4,752 $4,908 $156 flat fee Y
ii) Change of Ownership $5,003 $5,167 $164 flat fee [b] Y ii) Amendment $614 $634 $20 flat fee [b] Y
c) Background Investigation (per person) $2,764 $2,855 $91 flat fee per person Y 2 Odor Control Plan Review and Permit
a) Odor Control Plan and Amendments (Cultivation and
Manufacturing)
$3,980 $4,111 $131 Y
b) Odor Control Plan and Amendments (Consumption Lounge) $3,980 $4,111 $131 Y c) Odor Control Plan and Amendments (Dispensary, Distribution, and Testing Lab)
$480 $496 $16 Y
d) Odor Control Plan Annual Certification $480 $496 $16 Y 3 Fine for Cannabis Nuisance Odor
a) Per Violation Per Day $1,000 $1,000 $0 per violation per day [c] N b) For failure to obtain approval of, comply with, or maintain an odor control plan
$5,000 $5,000 $0 per month N
[a] Requires background investigation, per person.
[b] May require background investigation, per person.
[c] For each day a violation exists for those cannabis businesses with an approved odor control plan compliant with Sections 5.88 and 9.108 of the CCMC. [d] For those cannabis businesses required to obtain approval of an odor control plan pursuant to Chapter 5.88 of the CCMC that have failed to obtain approval of, comply with, or maintain an odor control plan.

Fee Description
10 15

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - CODE COMPLIANCE FEES
Current Fee Proposed Fee Change Charge Basis Note CPI
1 Garage Sale Permit
a) Individual $25 $25 $0 each N
b) Group $250 $250 $0 per HOA event, per HOA
gated community
[a] N
2 Street Vendor Permit
a) Initial $52 $52 $0 each N
b) Renewal $52 $52 $0 each N
3 Release of Notice of Pendency Fee
a) Initial Notice $265 $274 $9 per recorded document Y
b) Each Additional Notice After the Initial Notice $121 $125 $4 per additional recorded document
Y
4 Abandoned Property Registration & Monitoring Fee
a) Registration Fee
i) Initial $74 $76 $2 per year Y
ii) Renewal $74 $76 $2 per year Y
b) Monitoring Fee
i) Initial $368 $380 $12 per year Y
ii) Renewal $368 $380 $12 per year Y
5 Abandoned Shopping Cart Impoundment $74 $77 $2 Y
6 Plastic Beverage Straws $1,000 $1,000 $0 [b] N
[a] For gated community HOA permits only, per event, per community. [b] Pursuant to Section 5.94.030 of the CMCC.

Fee Description
11 16

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPI

PROJECT SUBMITTAL
Pre-Entitlement
1 Title Report
a) Review $383 $395 $13 Y
2 Preliminary Grading Plan
a) Initial Sheet $438 $452 $14 Y
b) Each Additional Sheet $438 $452 $14 Y
c) Revisions - > 2 Each Sheet $219 $226 $7 Y
3 Geotechnical Studies
a) Soils Report Review $438 $452 $14 per report Y
b) Infiltrations Study Review $109 $113 $4 Y
c) Revisions - > 2 Reviews $109 $113 $4 Y
4 Environmental
a) Phase 1 Report Review $438 $452 $14 Y
b) Phase 2 Report Review $438 $452 $14 Y
5 Hydrology
a) Preliminary Hydrology Report Review $656 $678 $22 Y
b) Preliminary CLOMR Review $875 $904 $29 Y
c) Revisions - > 2 Reviews $219 $226 $7 Y
6 WQMP
a) WQMP Summary Data Form Review $109 $113 $4 Y
b) Preliminary WQMP Review $656 $678 $22 Y
c) Preliminary Storm Water Pollution Prevention Plan Review $547 $565 $18 Y d) Revisions - > 2 Reviews $328 $339 $11 Y
Activity Description
12 17

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 7 Traffic
a) Traffic Study Scoping Agreement Review $1,313 $1,356 $43 per agreement Y b) Revisions - > 2 Reviews Per Scoping Agreement $547 $565 $18 Y c) Traffic Study Review $2,626 $2,712 $86 per study Y
d) Revisions - Each TS Review $875 $904 $29 Y
e) Traffic Letter Review $438 $452 $14 per letter Y
f) Revisions - > 2 TL Reviews $219 $226 $7 Y
g) VMT Scoping Submittal Review $328 $339 $11 Y
h) Revisions - > 2 VMT Scoping Reviews $219 $226 $7 Y
i) VMT Screening Memo Review - Under Threshold $547 $565 $18 Y j) Revisions - > Each VMT Screening Revision $328 $339 $11 Y k) VMT Analysis Report Over Threshold $2,626 $2,712 $86 Y l) Revisions - > Each VMT Analysis Revision $438 $452 $14 Y 8 Conditions of Approval
a) COA Preparation - Level 1 (up to 5 hours) $1,094 $1,130 $36 [a] Y b) COA Preparation - Level 2 ( >5 up to 10 hours) $2,188 $2,260 $72 [a] Y c) COA Preparation - Level 3 ( >10 up to 15 hours) $3,282 $3,390 $108 [a] Y d) COA Preparation - Level 4 ( >15 up to 20 hours) $4,376 $4,520 $144 [a] Y e) COA Preparation - Level 5 ( >20 up to 30 hours) $6,565 $6,780 $215 [a] Y f) COA Preparation - per hour beyond Level 5 $219 $226 $7 per hour Y 9 Miscellaneous Pre-Entitlement Review $219 $226 $7 per hour Y 13 18

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description

POST ENTITLEMENT
Land Subdivision
10 Final Parcel Map
a) Final Parcel Map
i) Initial Sheet $3,720 $3,842 $122 Y
ii) Each Additional Sheet $875 $904 $29 per sheet Y
iii) Reviews > 2 Reviews Each Set $219 $226 $7 Y
b) Final Parcel Map - Amendment
i) Initial Sheet $3,720 $3,842 $122 Y
ii) Each Additional Sheet $875 $904 $29 per sheet Y
iii) Reviews > 2 Reviews Each Set $219 $226 $7 Y
11 Final Tract Map
a) Final Tract Map
i) Initial Sheet $4,158 $4,294 $136 Y
ii) Each Additional Sheet $1,313 $1,356 $43 per sheet Y iii) Reviews > 2 Reviews Each Set $328 $339 $11 Y
b) Final Tract Map - Amendment
i) Initial Sheet $3,939 $4,068 $129 Y
ii) Each Additional Sheet $1,313 $1,356 $43 per sheet Y iii) Reviews > 2 Reviews Each Set $328 $339 $11 Y
c) Substantial Conformance Review
i) Initial Sheet $3,775 $3,898 $124 Y
ii) Each Additional Sheet $1,641 $1,695 $54 per sheet Y iii) Reviews > 2 Reviews Each Set $547 $565 $18 Y
12 Reversion to Acreage:
a) Initial Sheet $3,720 $3,842 $122 Y
b) Each Additional Sheet $875 $904 $29 per sheet Y
i) Reviews > 2 Reviews Each Set $438 $452 $14 Y
14 19

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 13 Lot Line Adjustment
a) Lot Line Adjustment $2,407 $2,486 $79 per request Y
b) Reviews > 2 Reviews Each Set $438 $452 $14 Y
14 Parcel Merger
a) Parcel Merger $2,407 $2,486 $79 per request Y
b) Reviews > 2 Reviews Each Set $438 $452 $14 Y
15 Street Dedication/Vacation
a) Land Action Documents
(Right-of-Way Easements/Grant Deeds, etc.)
$2,845 $2,938 $93 per request Y
b) Vacation of Street/Public Right-of-Way $4,595 $4,746 $151 per request Y c) Reviews > 2 Reviews Each Set $438 $452 $14 Y
16 Land Survey
a) Record of Survey $711 $734 $23 per request Y
b) Certificate of Compliance/Correction $930 $960 $31 per request Y c) Reviews > 2 Reviews Each Set $438 $452 $14 Y

FINAL REPORTS AND AGREEMENTS
17 Final Hydrology Study Report $1,969 $2,034 $65 per report Y a) Final Hydrology Report Review $2,626 $2,712 $86 Y
b) Reviews > 2 Reviews Each Report $656 $678 $22 Y
c) Conditional Letter of Map Revision (CLOMR) $219 $226 $7 Y d) Letter of Map Revision $219 $226 $7 Y
15 20

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 18 Final Water Quality Mgmt. Plan Report (WQMP)
a) Final WQMP Report $2,626 $2,712 $86 per report Y
b) WQMP Report Revisions> 2 Revisions Each Report $438 $452 $14 per report Y b) WQMP Plan (per sheet) $219 $226 $7 per sheet Y
c) WQMP Plan Revisions (per sheet) $109 $113 $4 per sheet Y d) WQMP Covenant $875 $904 $29 per covenant Y
19 Final Stormwater Pollution Prevention Plan (SWPPP)
a) Final SWPPP Review $656 $678 $22 per plan Y
b) Reviews > 2 Reviews Each Report $219 $226 $7 Y
20 Covenants, Conditions and Restrictions (CC&Rs)
a) CC&R Review (per request) $3,501 $3,616 $115 Y
i) Reviews > 3 Reviews Each Report $438 $452 $14 Y
b) CC&Rs Revisions Review $875 $904 $29 Y
i) Revisions Review > 3 Reviews Each Report $219 $226 $7 Y c) Misc Covenant Review & Approval
i) Reciprical Drainage Covenant $875 $904 $29 Y
ii) Reciprical Parking Covenant $875 $904 $29 Y
iii) Reciprical Access Covenant $875 $904 $29 Y
iv) Maintenance Covenant $875 $904 $29 Y
d) Subdivision Improvement Agreement (SIA)
i) SIA Preparation $3,063 $3,164 $100 per request Y
ii) SIA Time Extension $1,532 $1,582 $50 per request Y
iii) Assignment & Assumptions Agreement $3,063 $3,164 $100 per request Y 16 21

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description

PROJECT IMPROVEMENT PLANS REVIEW
21 Mass Grading / Stockpile Plans
a) Initial Sheet $1,532 $1,582 $50 Y
b) Each Additional Sheet $766 $791 $25 per sheet Y
c) Reviews > 2 Reviews Each Set $328 $339 $11 Y
d) Revisions - Each Additional Sheet $438 $452 $14 per sheet Y 22 Rough Grading Plans
a) Initial Sheet $2,079 $2,147 $68 Y
b) Each Additional Sheet $985 $1,017 $32 per sheet Y
c) Reviews > 2 Reviews Each Set $328 $339 $11 Y
d) Revisions - Each Additional Sheet $438 $452 $14 per sheet Y 23 Precise Grading - Commercial
a) Initial Sheet $2,626 $2,712 $86 Y
b) Each Additional Sheet $1,532 $1,582 $50 per sheet Y
c) Reviews > 2 Reviews Each Set $328 $339 $11 Y
d) Revisions - Each Additional Sheet $438 $452 $14 per sheet Y 24 Precise Grading - Tract Homes
a) Initial Sheet $1,751 $1,808 $57 Y
b) Each Additional Sheet
i) Without ADU $547 $565 $18 per sheet Y
ii) With ADU $602 $621 $20 per sheet Y
c) Reviews > 2 Reviews Each Set $328 $339 $11 Y
d) Revisions - Each Additional Sheet $438 $452 $14 per sheet Y 17 22

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 25 Precise Grading Plans Infill or Custom Homes
a) Infill Home $1,094 $1,130 $36 Y
b) Custom Home $1,313 $1,356 $43 Y
i) Custom Home with ADU $1,422 $1,469 $47 Y
c) Standalone ADU $656 $678 $22 Y
d) Reviews > 2 Reviews Each Set $219 $226 $7 Y
e) Revisions - Each Sheet $219 $226 $7 per sheet Y
26 Erosion Control Plans
a) Initial Sheet $438 $452 $14 Y
b) Each Additional Sheet $219 $226 $7 per sheet Y
c) Reviews > 2 Reviews Each Set $109 $113 $4 Y
d) Revisions - Each Sheet $109 $113 $4 per sheet Y
27 Street Improvements
a) Initial Sheet $2,626 $2,712 $86 Y
b) Each Additional Sheet $875 $904 $29 per sheet Y
c) Reviews > 2 Reviews Each Set $438 $452 $14 Y
d) Revisions - Each Sheet $656 $678 $22 per sheet Y
28 Storm Drain Plans
a) Initial Sheet $2,626 $2,712 $86 Y
b) Each Additional Sheet $875 $904 $29 per sheet Y
c) Reviews > 2 Reviews Each Set $438 $452 $14 Y
d) Revisions - Each Sheet $656 $678 $22 per sheet Y
18 23

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 29 Street Lights - Onsite
a) Onsite Street Light Location And Photometric Review $328 $339 $11 Y b) Reviews > 2 Reviews Each Set $109 $113 $4 Y
c) Revisions - Each Sheet $219 $226 $7 Y
30 Street Lights - Offsite
a) Offsite Street Light Location And Photometric Review $328 $339 $11 Y b) Reviews > 2 Reviews Each Set $109 $113 $4 Y
c) Revisions - Each Sheet $219 $226 $7 Y
d) SCE Streetlight Application Review (1 light) $438 $452 $14 per application Y i) Each additional light $109 $113 $4 each Y
e) Streetlight Covenant $875 $904 $29 per agreement Y
31 Signing and Striping Plans
a) Initial Sheet $1,751 $1,808 $57 Y
b) Each Additional Sheet $875 $904 $29 per sheet Y
c) Reviews > 2 Reviews Each Set $328 $339 $11 Y
d) Revisions - Initial Sheet $438 $452 $14 Y
e) Revisions - Each Additional Sheet $219 $226 $7 per sheet Y 32 Traffic Signal Plans
a) Initial Sheet $3,063 $3,164 $100 Y
b) Each Additional Sheet $1,313 $1,356 $43 per sheet Y
c) Reviews > 2 Reviews Each Set $438 $452 $14 Y
d) Revisions - Initial Sheet $1,094 $1,130 $36 Y
e) Revisions - Each Additional Sheet $656 $678 $22 per sheet Y 19 24

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 33 Sidewalk Plans (when submitted separately from grading plan) a) Initial Sheet $1,094 $1,130 $36 Y
b) Each Additional Sheet $438 $452 $14 per sheet Y
c) Reviews > 2 Reviews Each Set $219 $226 $7 Y
d) Revisions - Initial Sheet $875 $904 $29 Y
e) Revisions - Each Additional Sheet $438 $452 $14 per sheet Y 34 Project Traffic Control Plans
a) Initial Sheet $1,313 $1,356 $43 Y
b) Each Additional Sheet $656 $678 $22 per sheet Y
c) Reviews > 2 Reviews Each Set $328 $339 $11 Y
d) Revisions - Initial Sheet $547 $565 $18 Y
e) Revisions - Each Additional Sheet $219 $226 $7 per sheet Y 35 Sewer and Water - Onsite
a) Initial Sheet $875 $904 $29 Y
b) Each Additional Sheet $328 $339 $11 per sheet Y
c) Reviews > 2 Reviews Each Set $219 $226 $7 Y
d) Revisions - Each Sheet $219 $226 $7 per sheet Y
36 Sewer and Water - Offsite
a) Initial Sheet $219 $226 $7 Y
b) Each Additional Sheet $109 $113 $4 per sheet Y
c) Reviews > 2 Reviews Each Set $109 $113 $4 Y
d) Revisions - Each Sheet $109 $113 $4 per sheet Y
20 25

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 37 PM 10 (Fugitive Dust Control)
a) PM 10 Packet $547 $565 $18 each Y
b) PM 10 Full Size Plan $875 $904 $29 each Y
c) Reviews > 2 Reviews Each Set $219 $226 $7 Y
d) Revisions - Packet $438 $452 $14 per sheet Y
e) Revisions - Full Size Plan $328 $339 $11 per sheet Y 38 Record Drawings Review
a) Initial Sheet $1,094 $1,130 $36 Y
b) Each Additional Sheet $438 $452 $14 per sheet Y
c) Reviews > 2 Reviews Each Set $219 $226 $7 Y
39 Expedited Plan Review Fee (< 2 week turnaround) 1.5x standard fee 1.5x standard fee [b] N

INSPECTIONS - ONSITE
40 Mass Grading / Stockpile
a) Per 1,000 CY $438 $452 $14 Y
41 Rough Grading
a) First 3 Acres $1,094 $1,130 $36 Y
b) Each Additional Acre $164 $169 $5 Y
42 Precise Grading
a) Single Family Infill Lot $656 $678 $22 Y
i) plus ADU $219 $226 $7 per lot Y
b) Single Family Custom Home Lot $875 $904 $29 Y
i) plus ADU $219 $226 $7 per lot Y
c) Tract Home (per lot) $438 $452 $14 Y
i) plus ADU $219 $226 $7 per lot Y
d) Standalone ADU $438 $452 $14 Y
21 26

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description e) All Others (Typically Commercial)
i) Without Rough Grading
a) First 3 Acres $1,094 $1,130 $36 Y
b) Each Additional Acre $219 $226 $7 Y
ii) Subsequent to Rough Grading
a) First 3 Acres $656 $678 $22 Y
b) Each Additional Acre $109 $113 $4 Y
43 Street Improvements - On-Site Curb, Gutter and Roadway a) Up to 500 LF $2,626 $2,712 $86 [e],[g] Y
b) 501 - 1,000 LF $4,376 $4,520 $144 [e],[f],[g] Y
c) Each Additional 1,000 LF $2,188 $2,260 $72 [e],[f],[g] Y 44 On-Site Improvements Other Than Street
a) Up to 5,000 Sq Ft $2,845 $2,938 $93 [f],[g] Y
b) 5,001 Sq Ft - 10,000 Sq Ft $5,471 $5,650 $179 [f],[g] Y c) Each Additional 10,000 Sq Ft $656 $678 $22 [f],[g] Y 45 Sidewalk - Onsite
a) Up to 20 LF $328 $339 $11 [f],[g] Y
b) 21 - 100 LF $492 $508 $16 [f],[g] Y
c) Each Additional 100 LF $219 $226 $7 [f],[g] Y
46 Signing and Striping - Onsite
a) Up to 500 LF $875 $904 $29 [h] Y
b) 501 - 1,000 LF $1,751 $1,808 $57 [e],[g] Y
c) Each Additional 1,000 LF $328 $339 $11 [e],[g] Y
22 27

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 47 Storm Drain - Onsite
a) Up to 500 LF $1,751 $1,808 $57 Y
b) 501 - 1,000 LF $3,063 $3,164 $100 Y
c) Each Additional 1,000 LF $1,313 $1,356 $43 Y
48 Storm Drain Inlets /Outlet Structures - Onsite
a) Up to 5 $875 $904 $29 Y
b) Each Additional $219 $226 $7 Y
49 Stormwater Retention - Onsite
a) Above Ground System $438 $452 $14 Y
b) Underground Drywell System $656 $678 $22 Y
c) Underground Chamber System $1,751 $1,808 $57 Y
d) WQMP Final Inspection $438 $452 $14 Y
50 Sewer or Water - On Site
a) Up to 500 LF $1,094 $1,130 $36 Y
b) 501 - 1,000 LF $1,532 $1,582 $50 Y
c) Each Additional 1,000 LF $219 $226 $7 Y
51 PM10 (per year)
a) Single Family Infill Lot <10,000 Sq Ft $875 $904 $29 [c] Y b) > 10,000 Sq Ft - < 10 Acres $2,626 $2,712 $86 [c] , [d] Y c) 10 - 50 Acres $3,939 $4,068 $129 [c] , [d] Y
d) 51 - 200 Acres $5,252 $5,424 $172 [c] , [d] Y
e) > 200 Acres $6,565 $6,780 $215 [c] , [d] Y
f) PM10 Deposit $2,000 $2,066 $66 deposit - per acre or portion thereof
[c] , [d] Y
23 28

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 52 SWPPP (NPDES) - Onsite
a) Single Family Infill Lot <10,000 Sq Ft $438 $452 $14 per year [i] Y b) > 10,000 Sq Ft - < 10 Acres $1,313 $1,356 $43 per year [i] Y c) 10 - 50 Acres $1,969 $2,034 $65 per year [i] Y
d) 51 - 200 Acres $2,626 $2,712 $86 per year [i] Y
e) > 200 Acres $3,282 $3,390 $108 per year [i] Y

INSPECTIONS ENCROACHMENT - OFFSITE
Encroachment Permits
53 Street Improvements - Off-Site
a) Up to 500 LF $3,720 $3,842 $122 [e] Y
b) 500 - 1,000 LF $6,127 $6,328 $201 [e],[f] Y
c) Each Additional 1,000 LF $2,845 $2,938 $93 [e],[f] Y 54 Driveway
a) Residential $547 $565 $18 Y
b) Commercial $875 $904 $29 Y
Sidewalk
a) Up to 20 Lineal Feet $328 $339 $11 Y
b) 20 - 100 Lineal Feet $492 $508 $16 Y
c) Each Additional 100 Lineal Feet $219 $226 $7 Y
55 Excavation / Trenching
a) First 20 LF $328 $339 $11 Y
b) 21 - 50 LF $383 $395 $13 Y
c) 51 - 100 LF $547 $565 $18 Y
d) Each Additional 100 LF $109 $113 $4 Y
24 29

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 56 Bore/Vault
a) Bore Holes $274 $282 $9 Y
b) Vault Installation $438 $452 $14 Y
57 Cut/Pot Hole
a) Cut or Pothole $109 $113 $4 each Y
58 Off-site Signing and Striping - Offsite
a) Up to 500 LF $875 $904 $29 [h] Y
b) 500 - 1,000 LF $1,751 $1,808 $57 [f],[h] Y
c) Each Additional 1,000 LF $328 $339 $11 [f],[h] Y
59 Storm Drain Line - Offsite
a) Up to 500 LF $1,751 $1,808 $57 Y
b) 501 - 1,000 LF $3,063 $3,164 $100 [f] Y
c) Each Additional 1,000 LF $1,313 $1,356 $43 [f] Y
60 Stormwater Retention - Offsite
a) Above Ground System $438 $452 $14 each Y
b) Underground Drywell System $656 $678 $22 each Y
c) Underground Chamber System $1,751 $1,808 $57 each Y
d) WQMP Final Inspection $438 $452 $14 each Y
61 Traffic Signals
a) Vehicular Traffic Signal $7,002 $7,232 $230 Y
b) Pedestrian Hawk Signal $6,127 $6,328 $201 Y
c) High Visibility Crosswalk $1,094 $1,130 $36 Y
d) Submittal Review (each submittal) $219 $226 $7 each Y 25 30

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 62 Traffic Control
a) Up to Two Consecutive Days $274 $282 $9 [l] Y
b) Three - Five Consecutive Days $656 $678 $22 Y
c) Each Additional Consecutive Day (Up to 10 Days) $164 $169 $5 per day Y d) 11+ Days (Up to 60 Calendar Days Max) $2,188 $2,260 $72 Y 63 SWPPP (NPDES) - Offsite
a) Up to 500 LF of Roadway Frontage $656 $678 $22 Y
b) 501 - 1,000 LF of Roadway Frontage $1,094 $1,130 $36 Y c) Each Additional 1,000 LF of Roadway Frontage $219 $226 $7 Y 64 Final Inspection / Acceptance
a) Single Family Lot <10,000 Sq Ft $219 $226 $7 [j] Y
b) > 10,000 Sq Ft - < 2 Acres $656 $678 $22 [k] Y
c) > 2 Acres - < 10 Acres $875 $904 $29 [k] Y
d) > 10 - < 50 Acres $1,313 $1,356 $43 [k] Y
e) > 50 - 200 Acres $1,751 $1,808 $57 [k] Y
f) > 200 Acres $2,188 $2,260 $72 [k] Y
65 Night Work $1,751 $1,808 $57 per night Y
66 Excess Inspection / Missed Inspection / Re-Inspection / Re-Call Compliance Inspections
$219 $226 $7 Y
67 Stop Work Notice Release $656 $678 $22 Y
68 Bond Reduction Request $2,516 $2,599 $83 Y
26 31

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description

ADMINISTRATIVE
Research/Administrative
69 Flood Plain (FEMA)
a) Research/FEMA App $656 $678 $22 per request Y
b) Community Acknowledgement Form $328 $339 $11 per request Y 70 Bid Protest Review $1,751 $1,808 $57 Y
71 Misc Research (per request, per hour) $219 $226 $7 [m] Y 72 Misc Covenant Review & Approval $656 $678 $22 per agreement Y 73 Reactivation of Permit
a) Reactivation of an Expired Minor Permit 10% of original permit fee 10% of original permit fee each [n] N b) Reactivation of an Expired Major Permit 20% of original permit fee 20% of original permit fee each [n] N

MISCELLANEOUS ENGINEERING FEES
Miscellaneous
74 Transportation Permits
a) Annual $90 $90 $0 each N
b) Single Event $16 $16 $0 each N
75 Pool Drain Permit $36 $37 $1 each Y
76 NPDES Inspections
a) Food Use $219 $226 $7 Y
b) Hazardous Waste
i) without Storage $219 $226 $7 Y
ii) with Storage $274 $282 $9 Y
77 Permit Issuance Fee $109 $113 $4 Y
27 32

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description [a] If project exceeds assigned level, project will be reassigned to next level and additional fees will be charged prior to receiving conditions of approval. [b] Expedited Plan Review request is subject to City Engineer approval. It is dependent on staff availability and workload. [c] For PM10 annual permit.
[d] Fee generally assumes one inspection per month. Additional inspections billed using re-inspection fee. [e] Includes, curb, gutter, and sidewalk. Excludes driveways. [f] Rounded up to nearest thousand feet.
[g] Excluding building foundation footprint.
[h] Footage based on centerline street length.
[i] Annual inspection cost.
[j] Includes tract single family homes, does not include tract final. [k] Includes tract finals.
[l] Permanent patching of pavement at same location will count as a subsequent consecutive day. [m] Estimate provided up front.
[n] Assumes no changes to original permit.
28 33

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - EVENT FEES
Current Fee Proposed Fee Change Charge Basis Note CPI
1 Banner and Electronic Sign Sponsorship Program
a) Up to Four $601 $621 $20 Y
b) Each Thereafter $357 $369 $12 Y
2 Special Event Permit Fee $706 $729 $23 Y
3 Amphitheater Rent - Non-Profit (Full Day)
a) Full Day $2,575 $2,659 $84 Y
b) Half-Day Before Event Setup $1,275 $1,317 $42 Y
4 Amphitheater Rent - For Profit
a) Full Day $5,125 $5,293 $168 Y
b) Half-Day Before Event Setup $2,575 $2,659 $84 Y
5 Amphitheater Rent - Special Weekends
a) Coachella Weekend 1 $100,000 or Best Offer $100,000 or Best Offer N b) Coachella Weekend 2 $30,000 or Best Offer $30,000 or Best Offer N c) Stage Coach Weekend $15,000 or Best Offer $15,000 or Best Offer N d) Splash Weekend $10,000 or Best Offer $10,000 or Best Offer N 6 Amphitheater - Deposit $1,025 $1,059 $34 Y
7 Avenida Lalo Guerrero Rent
a) Non-Profit $1,550 $1,601 $51 Y
b) For Profit $2,575 $2,659 $84 Y
c) Deposit $620 $640 $20 Y
8 Festival Lawn Rent
a) Non-Profit $770 $795 $25 Y
b) For Profit $1,025 $1,059 $34 Y
c) Deposit $620 $640 $20 Y
9 Town Square Park Rent
a) Non-Profit $380 $392 $12 Y
b) For Profit $510 $527 $17 Y
c) Deposit $620 $640 $20 Y
Fee Description
29 34

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - EVENT FEES
Current Fee Proposed Fee Change Charge Basis Note CPIFee Description 10 Civic Center Plaza Rent
a) Non-Profit $230 $238 $8 Y
b) For Profit $310 $320 $10 Y
c) Deposit $620 $640 $20 Y
30 35

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION AND AMBULANCE FEES Current Fee Proposed Fee Change Charge Basis Note CPI
1 Water Based Fire Protection Systems (1)
a) Fire Sprinkler Commercial/Multi Family/Other - New System or Alteration
i) Plan Review (up to 25 heads) $217 $224 $7 per installation Y ii) Inspection (up to 25 heads) $434 $448 $14 per installation Y b) Fire Sprinkler Commercial/Multi Family/Other - New System or Alteration
i) Plan Review (up to 50 heads) $434 $448 $14 per installation Y ii) Inspection (up to 50 heads) $543 $560 $18 per installation Y c) Fire Sprinkler Commercial/Multi Family/Other - New System or Alteration
i) Plan Review (each additional 25 heads, or fraction thereof) $54 $56 $2 per head Y ii) Inspection (each additional 25 heads, or fraction thereof) $217 $224 $7 per head Y d) Fire Sprinkler Single Family/Duplex - New System
i) Plan Review $326 $336 $11 per installation Y
ii) Inspection $543 $560 $18 per installation Y
e) Fire Sprinkler Single Family/Duplex - Alteration of Existing System
i) Plan Review $326 $336 $11 per installation Y
ii) Inspection $326 $336 $11 per installation Y
f) Standpipe
i) Plan Review $651 $672 $21 per system Y
ii) Inspection (per vertical standpipe) $434 $448 $14 per system Y g) Fire Protection Underground System
i) Plan Review $326 $336 $11 each Y
ii) Inspection $434 $448 $14 each Y
h)Fire Service Under Ground
i) No Hydrant $217 $224 $7 each Y
ii) With Hydrant $326 $336 $11 each Y
i) Per Additional Sprinkler Riser or Hydrant
i) Inspection $217 $224 $7 each Y
Activity Description
31 36

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION AND AMBULANCE FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 2 Fire Alarm System (1):
a) Fire Alarm - New System
i) Plan Review (up to 25 devices) $217 $224 $7 per system Y ii) Inspection (up to 25 devices) $217 $224 $7 per system Y b) Fire Alarm - Alteration
i) Plan Review (up to 5 devices) $217 $224 $7 per system Y ii) Inspection (up to 5 devices) $217 $224 $7 per system Y c) Per Additional Device
i) Inspection - New or Alteration $4 $4 $0 per device Y 3 Alternative Automatic Extinguishing Systems (Dry, Wet, CO2, Halon, UL 300, Clean Agent, Spray Booth, Other) (2):
a) Plan Review $326 $336 $11 per system Y
b) Inspection $217 $224 $7 per system Y
4 Other Fire Construction Reviews and Inspections (2):
a) LPG, Cryogenics, Compressed Gas, Medical Gas, Battery Storage Systems, Industrial Oven, & other Fire Construction Permit
i) Plan Review $326 $336 $11 per system Y
ii) Inspection
a) Battery Storage System $434 $448 $14 per review Y
b) Other Systems $217 $224 $7 Y
5 Hazardous Activities Installation/Removal Permits Above Ground - Hazardous Materials Tank and/or Pipe Installation or Removal (1 tank, Includes Class I to Class II and sudden asphyxiants)(4):
a) Plan Review $217 $224 $7 per system Y
b) Inspection $217 $224 $7 per system Y
6 Technical Report, Alternate Means & Methods
a) Plan Review $326 $336 $11 per submittal Y
b) Inspection $217 $224 $7 per hour Y
32 37

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION AND AMBULANCE FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 7 Architectural - New Construction or Tenant Improvement Plan Check:
a) Plan Review $326 $336 $11 per project Y
b) Inspection $217 $224 $7 per project Y
8 Fire Hood and Duct Systems
a) Fire Hood and Duct - Plan Check $217 $224 $7 Y
b) Fire Hood and Duct - Inspection $217 $224 $7 Y
9 Fire (Emergency) Access permit
a) Fire (Emergency) Access permit - Plan Check $326 $336 $11 Y b) Fire (Emergency) Access permit - Inspection $217 $224 $7 Y 10 Above Ground Tank Installation
a) Above Ground Tank Installation - Plan Check $217 $224 $7 Y b) Above Ground Tank Installation - Inspection $217 $224 $7 Y 11 Fire Pump System
a) Fire Pump System - Plan Check $217 $224 $7 Y
b) Fire Pump System - Inspection $217 $224 $7 Y
12 Fire Alarm Monitoring Systems
a) Plan Review (up to 25 devices) $163 $168 $5 Y
b) Inspection (up to 25 devices) * Addl $3 per dev above 25 $217 $224 $7 Y 13 Generators
a) Permit Fee $109 $112 $4 Y
Permits to Operate (Type of Permit Activity)
14 Candles and Open Flames $217 $224 $7 Y
15 Carnivals and Fairs: Amusement rides, generators, bounce houses $217 $224 $7 per hour, min 2 hours Y 16 Combustible Dust Operations $217 $224 $7 Y
17 Dry Cleaning Plant $217 $224 $7 Y
18 Exhibits and Trade Shows $217 $224 $7 Y
19 Explosives or Blasting Agents $217 $224 $7 Y
33 38

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION AND AMBULANCE FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 20 Hazardous Materials Storage:
a) S1 occupancy, up to maximum quantities as permitted for S1 per code
$434 $448 $14 Y
b) F or H occupancy, up to maximum quantities as permitted per occupancy type per code
$434 $448 $14 Y
c) B or M occupancy, up to maximum quantities as permitted per occupancy type per code
$109 $112 $4 Y
d) Bulk CO2 $271 $280 $9 Y
e) Miscellaneous moderate risk storage not specified herein. $217 $224 $7 per hour, min 2 hours Y 21 High Pile Storage $217 $224 $7 Y
22 Hot Work Operations $109 $112 $4 Y
23 Industrial Ovens $109 $112 $4 Y
24 Lumber Yards $217 $224 $7 Y
25 Misc. Combustible Storage $217 $224 $7 Y
26 Mobile Fueling $109 $112 $4 Y
27 Recreational or Bon Fire $217 $224 $7 Y
28 Repair Garage $217 $224 $7 Y
29 Spraying and Dipping (No Spray Booth) $217 $224 $7 Y 30 Theatrical Fire Performance $434 $448 $14 Y
31 Tire Storage: up to quantities allowed per fire code $217 $224 $7 Y 32 Places of Assembly
a) Less than 300 occupant load $217 $224 $7 Y
b) 300 - 999 occupant load $217 $224 $7 Y
c) 1,000 or more occupant load $434 $448 $14 Y
34 39

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION AND AMBULANCE FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 33 Commercial Day Care Facility
a) 7 - 49 persons $217 $224 $7 Y
b) 50 - 149 persons $217 $224 $7 Y
c) 150 or more persons $326 $336 $11 Y
34 Institutional
a) Less than 6 patients $109 $112 $4 Y
b) 6 or more patients $217 $224 $7 Y
c) Detention facilities $434 $448 $14 Y
35 Apartments/Hotels/Motels
a) 3 - 16 units $217 $224 $7 Y
b) 17 - 32 units $326 $336 $11 Y
c) 33 or more units $434 $448 $14 Y
36 850 Inspections
a) 850 Inspection (at hourly rate) $163 $168 $5 Y
37 Temporary Membrane Structures (Tents/Canopies)
a) 401 - 1,499 SF $217 $224 $7 Y
b) 1,500 - 2,999 SF $217 $224 $7 Y
c) 3,000 - 5,999 SF $217 $224 $7 Y
d) 6,000 or more SF $326 $336 $11 Y
38 Christmas Tree Lot $217 $224 $7 Y
39 Pyrotechnics Display $543 $560 $18 Y
40 Annual Inspection: Above Ground - Flammable / Combustible Liquid Tank and/or Pipe
$217 $224 $7 per tank system Y
35 40

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION AND AMBULANCE FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 41 New Construction Plan Check (6):
a) A - Assembly $543 $560 $18 each Y
b) B, I, M - Business, Institutional, Mercantile $434 $448 $14 each Y c) E, R-1, R-2 - Educational, Multi-Family $543 $560 $18 each Y d) F, S, H - Factory, Storage, Hazardous $543 $560 $18 each Y e) R-3 - Single Family $217 $224 $7 each Y
f) All Tenant Improvements $217 $224 $7 each Y
g) U - Utility Structures and Buildings $217 $224 $7 each Y h) All Shell Buildings $217 $224 $7 each Y
Other Miscellaneous Fees
42 Renewal of Expired Construction Permit $217 $217 $0 N 43 Copy of Incident Report (per incident) $16 $16 $0 N
44 Media Reproduction (audio, video, photographic) Actual Cost Actual Cost N 45 Emergency Response Caused by DUI Actual Cost Actual Cost N 46 Code Appeal (per hour) $217 $224 $7 Y
47 Fire Flow / Hydrant Test $651 $672 $21 Y
48 Minimum Intake Fee $217 $224 $7 Y
49 Voluntary Inspection $217 $224 $7 Y
50 Technical Report (alternate material or method request) $868 $896 $28 Y 51 Inspection Requests (after normal business hours) (7) 1.5 x charge amount 1.5 x charge amount N 52 Excessive resubmittals and inspections $217 $224 $7 each Y 53 Administrative Fee (work without a permit) $434 $448 $14 Y 54 Code Review or Design Consultation (per hour) $217 $224 $7 Y 55 Fire Prevention Division Hourly Rate $217 $224 $7 Y
56 Re-inspection Fee - Fire $109 $112 $4 Y
36 41

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION AND AMBULANCE FEES Current Fee Proposed Fee Change Charge Basis Note CPIActivity Description 57 Inspection Fee - Fire $109 $112 $4 Y
58 Reprint Job Card/Permit $109 $112 $4 Y
59 Late Payment Penalty for Permits
a) 30 days past due $50 $50 $0 N
b) 60 days past due $100 $100 $0 N
c) 90 days past due $200 $200 $0 N
60 Special Request for Fire Department Personnel Services overtime rate by rank overtime rate by rank per hour N (1) Fee includes up to two plan checks or three inspections. Additional costs to be recovered at staff hourly rate. (2) Fee includes up to two plan checks or two inspections. Additional costs to be recovered at staff hourly rate. (3) Actual costs - may also be charged by actual costs using the fully burdened hourly rates plus any outside consultant costs if applicable.

Review time exceeding initial hours assumed for establishing deposit is billed at hourly rate. (4) Fee includes plan check and up to two inspections. Additional costs to be recovered at staff hourly rate. (5) Each fee listed in this schedule is based on the estimated number of hours required to perform a standard service request.

The standard number of hours estimated can be calculated by dividing the fee amount by $170, the Division's fully-burdened hourly rate.

For example, a fee amount of $340 assumes roughly 2.00 hours will be required to perform a standard request for the fee related service.

Review and inspection efforts that exceed the standard number of hours used to calculate the fee by more than one hour will be billed hourly for any time spent in excess of the standard hours built into the fee. (6) Planning submittals for fire review and related correspondence, meetings, etc. may be charged for at hourly rate during the construction plan review. (7) Inspection outside normal work hours will require hourly fees in addition to other required fees.

Note: Items in red font are existing fees that were inadvertently excluded from prior fee schedule. 37 42

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION AND AMBULANCE FEES Current Fee Proposed Fee Change Charge Basis Note CPI
1 ALS and BLS Base Rate $2,100 $2,169 $69 Y
2 Mileage per loaded mile $35 $35 $0 per mile N
3 Oxygen $120 $120 $0 N
4 Misc. Supplies $50 $50 $0 N
5 EKG Fee $150 $150 $0 N
6 Treat & Release (Patient care non-transport) $250 $250 $0 N 7 First Responder Fee $150 $150 $0 N
Activity Description
38 43

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Current Proposed
Fixed Fee
Minimum Fee / Initial
Deposit Fixed Fee
Minimum Fee / Initial
Deposit Charge Basis Note CPI
ADULT ORIENTED BUSINESSES:
1 Sexually Oriented Business New Permit $2,418 $2,497 flat fee Y 2 Sexually Oriented Business Renewal Permit $1,209 $1,249 flat fee Y 3 ANNEXATION TO CATHEDRAL CITY: $39,990 $41,302 minimum fee / initial deposit Y APPEALS:
4 Appeal Fee of determination of City Planner,
Architectural Review Committee, or Planning
Commission
$1,070 $1,070 flat fee N
CHRISTMAS TREE LOT PERMIT:
5 Christmas Tree Lot Permit $636 $656 flat fee Y
6 Christmas Tree Lot Deposit (Refundable) $186 $192 flat fee Y SIMILAR USE DETERMINATION:
7 Similar use determination - Administration $465 $480 flat fee Y 8 Similar use determination by PC $1,721 $1,777 flat fee Y CONDITIONAL USE PERMITS:
9 CUP - Including design review for new structure or
modification
$9,023 $9,318 flat fee [a] Y
10 CUP - Use only - no structural alteration /
modification
$5,720 $5,907 flat fee [a] Y
11 CUP - Revisions / Modifications - Major $6,674 $6,892 flat fee [a] Y 12 CUP - Revisions / Modifications - Minor $2,151 $2,222 flat fee [a] Y Activity Description
39 44

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Current Proposed
Fixed Fee
Minimum Fee / Initial
Deposit Fixed Fee
Minimum Fee / Initial
Deposit Charge Basis Note CPI

Activity Description
DESIGN REVIEWS:
13 Design Review - Administrative Approval
a) without Architectural Review Committee
Required
$1,826 $1,885 flat fee [a] Y
b) with Architectural Review Committee Required $3,209 $3,314 flat fee [a] Y 14 Design Review - Discretionary Approval $9,023 $9,318 flat fee [a] Y 15 Design Review - Duplex 5 units or less $1,860 $1,921 flat fee [a] Y 16 Design Review - Revision $6,674 $6,892 flat fee [a] Y ENVIRONMENTAL PROCESSING:
17 Negative Declaration $4,650 $4,803 minimum fee / initial deposit Y 18 Environmental Impact Report $16,182 $16,713 minimum fee / initial deposit Y 19 CEQA Finding of Consistency $558 $576 flat fee Y
20 CEQA Exemption $279 $288 flat fee Y
21 Reimbursement of County Filing Fees actual cost actual cost actual cost Y FILM PERMITS:
22 Film Permit - Still Fee/Video $1,731 $1,788 flat fee Y HISTORICAL PRESERVATION APPLICATION PERMIT:
23 Application to Obtain Historic Designation $99 $99 flat fee N 24 Certification of Appropriateness $1,902 $1,964 flat fee Y 25 Application to Remove or Downgrade Designation $2,960 $3,057 flat fee Y 40 45

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Current Proposed
Fixed Fee
Minimum Fee / Initial
Deposit Fixed Fee
Minimum Fee / Initial
Deposit Charge Basis Note CPI

Activity Description
PEDDLER PERMIT:
26 Peddler permit $1,674 $1,729 flat fee Y
PLANNED UNIT DEVELOPMENTS:
27 PUD $16,683 $17,230 minimum fee / initial deposit Y 28 Amended/Revised PUD
a) Major $6,767 $6,988 minimum fee / initial deposit Y b) Minor $3,651 $3,771 flat fee [a] Y
PLANS:
29 General Plan Amendment $6,557 $6,772 flat fee [a] Y 30 Change of Zone $6,557 $6,772 flat fee [a] Y
31 Change of Zone w / GPA $6,557 $6,772 flat fee [a] Y 32 Zone Ordinance Amendment $7,440 $7,684 flat fee [a] Y 33 Specific Plan $19,716 $20,363 minimum fee / initial deposit Y 34 Specific Plan - Minor $2,883 $2,978 flat fee Y
35 Specific Plan Amendment $8,370 $8,645 minimum fee / initial deposit Y 36 Development Agreements $8,277 $8,549 minimum fee / initial deposit Y SIGN PERMITS:
37 Master Sign Program $3,348 $3,458 flat fee [a] Y
38 Master Sign Program w/development application $1,674 $1,729 flat fee [a] Y 41 46

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Current Proposed
Fixed Fee
Minimum Fee / Initial
Deposit Fixed Fee
Minimum Fee / Initial
Deposit Charge Basis Note CPI

Activity Description
39 Window Signs $93 $96 flat fee [b] Y
40 Drive thru menu boards $558 $576 flat fee [b] Y
41 Subdivision sign $558 $576 flat fee [b] Y
42 New Sign - Wall $372 $384 flat fee [b] Y
43 Monument Signs
a) Shopping Center $744 $768 flat fee [b] Y
b) All Others $558 $576 flat fee [b] Y
44 Billboards $5,952 $6,147 flat fee [b] Y
45 Temporary Signs $93 $96 flat fee [b] Y
46 Alteration of sign face $93 $96 flat fee [b] Y
47 Special permit for noncommercial murals fixed by resolution, section 9.62.070, ord
554,2001
fixed by resolution,
section 9.62.070, ord
554,2001
N
SUBDIVISION MAPS:
48 Tentative / Vesting Parcel Maps-up to 4 parcels $7,325 $7,565 flat fee [a] Y 49 Tentative / Vesting Tract Maps-up to 10 lots $7,542 $7,789 flat fee [a] Y 50 Tentative Tract Maps - per additional lot $47 $48 flat fee Y 51 Map Revisions
a) Minor $2,756 $2,846 flat fee [a] Y
b) Major $5,685 $5,872 flat fee [a] Y
42 47

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Current Proposed
Fixed Fee
Minimum Fee / Initial
Deposit Fixed Fee
Minimum Fee / Initial
Deposit Charge Basis Note CPI

Activity Description
52 Reversion to Acreage $4,569 $4,719 flat fee [a] Y
MISCELLANEOUS:

INSPECTIONS:
53 Re-inspections for Final Approval $186 $192 flat fee Y 54 Final Landscape Inspection $279 $288 flat fee Y
55 Inspection - Commercial (up to 2)
a) Alterations/Additions - Non-Residential $279 $288 flat fee Y b) New Construction - Up to 5 acres $465 $480 flat fee Y c) New Construction - 5 acres or greater $1,116 $1,153 flat fee Y 56 Inspection - Residential (up to 2)
a) Alterations/Additions - Residential $93 $96 flat fee Y b) Residential - SFD $186 $192 flat fee Y
c) Residential - MFD - up to 4 units $465 $480 flat fee Y d) Residential - Multi-family over 4 units $1,116 $1,153 flat fee Y PLAN CHECK:
57 Standalone Plan Check $1,116 $1,153 flat fee [a] Y
58 Plan Check Fee - Commercial
a) Alterations / Additions - Non-Residential $279 $288 flat fee [a] Y b) Up to 5 acres $2,046 $2,113 flat fee [a] Y
c) 5 acres or greater $3,069 $3,170 flat fee [a] Y
43 48

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Current Proposed
Fixed Fee
Minimum Fee / Initial
Deposit Fixed Fee
Minimum Fee / Initial
Deposit Charge Basis Note CPI

Activity Description
59 Plan Check Fees - Residential
a) Alterations / Additions - Residential $186 $192 flat fee [a] Y b) Residential - SFD $326 $336 flat fee [a] Y
c) Residential - MFD - up to 4 units $744 $768 flat fee [a] Y d) Residential - Multi-family over 4 units $2,418 $2,497 flat fee [a] Y e) Master Plans $2,418 $2,497 flat fee [a] Y
TIME EXTENSIONS:
60 Time Extensions $3,720 $3,842 flat fee Y
SPECIAL USE PERMITS:
61 Special Use Permits (SUP) - Minor $849 $877 flat fee Y 62 Special Use Permits (SUP) $1,878 $1,940 flat fee Y
63 Dance Permit $1,395 $1,441 flat fee Y
VARIANCES:
64 Variance $4,883 $5,043 flat fee [a] Y
65 Administrative Variance $558 $576 flat fee Y
OTHER FEES:
66 General Plan & Zoning Letter (Zoning Confirmation
Letter)
$279 $288 flat fee Y
67 Zoning Compliance Letter $1,488 $1,537 flat fee Y
68 RV Parking Permit $419 $432 flat fee Y
69 Handbill Permit $837 $864 flat fee Y
44 49

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Current Proposed
Fixed Fee
Minimum Fee / Initial
Deposit Fixed Fee
Minimum Fee / Initial
Deposit Charge Basis Note CPI

Activity Description
HOUSING:
70 Senate Bill (SB) 330 Application Review $1,860 $1,921 flat fee Y PRE-APPLICATION / CONCEPTUAL DESIGN REVIEW:
71 Conceptual Design Review $1,769 $1,769 flat fee N
72 PUBLIC NOTICING:

Public Noticing, plus actual publishing costs $775 $800 flat fee Y

HOURLY BILLING RATES FOR DEPOSITS
73 Hourly Billing Rates $186 $192 per hour Y
[a] Fees include up to three reviews. Subsequent reviews following the initial three will be billed at 50% of the initial fee. [b] Fee reduced by 50% if part of sign program.

Overview of Fee Structure
Fees may be either fixed fees, deposits, or deposits with a minimum fee amount due. When a fee is deposit-based, the City will collect the initial depots and bill against that deposit. The minimum total amount charged for deposit-based fees shall be the amount shown in the minimum fee / initial deposit column.

Full Cost Deposits and Deposit Replenishment
Applicants for full cost (deposit-based) submittals shall pay for all City staff and contract service provider time and materials required to process the application. A full cost reimbursement agreement shall be included with the project application submittal package. Projects outside the scope of this fee schedule will be subject to a full cost reimbursement agreement to be approved by the City Manager and/or City Council. This reimbursement agreement will include the identification of a work program and will include cost estimates for both City staff time and consultant services based on a defined scope of work.

Initial deposits will be collected and held by the City in a deposit account at the time the application is submitted. Project billing amounts will be drawn from the deposit account. A positive account balance shall be maintained at all times during the review process. No work will be performed on a project with a negative fund balance. If the deposit is reduced to below 20% of the initial deposit amount, the applicant will be notified and required to supplement the deposit account with an additional amount no less than 50% of the original deposit.

Funds expended for staff time shall not be dependent upon the City’s approval or disapproval of the application request. Any deposit amounts remaining after final project close out will be returned to applicant (less bond amounts held by the City).

As may be required for project evaluation or environmental review, all payment for consultant work shall be the responsibility of the applicant. 45 50

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - POLICE FEES
Current Fee Proposed Fee Change Charge Basis Note CPI
1 Report Copies
a) Traffic Collision Report $30 $30 $0 per report N
b) All Other Reports $0.25 / page $0.25 / page per page N c) Photos / Digital Media (e.g. Flash Drive) if provided by City $22 $23 $1 per device Y 2 Citation Sign-Off
a) CCPD Citation, CC Resident No Charge No Charge per citation N b) Non-CCPD Citation, CC Resident $20 $21 $1 per citation Y c) Non-Resident $39 $40 $1 per citation Y
3 Residency Letter $60 $62 $2 per request Y
4 Local Criminal History $60 $62 $2 per request Y
5 ABC Letter $67 $69 $2 per request Y
6 Vehicle Identification Number (VIN) Verification (No Charge for Cathedral City Residents)
a) Resident No Charge No Charge per request N
b) Non-Resident $99 $102 $3 per request Y
7 Vehicle Release $275 $284 $9 per request Y
8 DUI Traffic Collision Vehicle Release Fee $885 $914 $29 per incident Y 9 Repossession Receipt $30 $30 $0 each [a] N
10 Alarm User Permit
a) Initial permit application $35 $35 $0 each N
b) Renewal permit application $30 $30 $0 each N
c) Late Filing Fees
i) 30 days Late Fee (add to base permit fee) $22 $23 $1 each Y ii) 90 Days Late Fee (add to base permit fee) $44 $46 $1 each Y Fee Description
46 51

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - POLICE FEES
Current Fee Proposed Fee Change Charge Basis Note CPIFee Description d) Re-Issued Alarm User Permit $200 $200 $0 each N
11 Excessive False Alarms (Permitted Alarm Systems):
a) First false alarm
i) Burglary No Charge No Charge each N
ii) Duress/robbery No Charge No Charge each N
b) Second false alarm
i) Burglary $100 $100 $0 each N
ii) Duress/robbery $100 $100 $0 each N
c) Third false alarm
i) Burglary $150 $150 $0 each N
ii) Duress/robbery $150 $150 $0 each N
d) Fourth false alarm and Each Additional
i) Burglary $200 $200 $0 each N
ii) Duress/robbery $200 $200 $0 each N
12 Excessive False Alarms (Non-Permitted Alarm Systems):
a) First false alarm
i) Burglary $100 $100 $0 each N
ii) Duress/robbery $100 $100 $0 each N
b) Second and Each Additional
i) Burglary $200 $200 $0 each N
ii) Duress/robbery $200 $200 $0 each N
13 Online Alarm Education Diversion Course $25 $25 $0 each N 14 Carry Concealed Weapon License
a) Initial Application (Plus applicable DOJ fees) $300 $300 $0 per application N b) Renewal (Plus applicable DOJ fees) $25 $25 $0 per application [b] N c) Duplicate / Amended License (Plus applicable DOJ fees) $10 $10 $0 per request [b] N 47 52

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - POLICE FEES
Current Fee Proposed Fee Change Charge Basis Note CPIFee Description d) Psychological Testing, if Required (Plus applicable DOJ fees) Actual Cost Actual Cost each [b] N 15 Loud Party Response / Noise Disturbance (Second and Each Add'l Response)
$252 $261 $8 per response Y
16 Special Service Requests
a) Regular Time
i) Police Sergeant $258 $266 $8 per hour Y
ii) Police Officer $174 $180 $6 per hour Y
b) Over-Time
i) Police Sergeant $328 $338 $11 per hour Y
ii) Police Officer $221 $228 $7 per hour Y
17 Second Hand Dealer/Pawn Broker/Loan Broker
a) Initial Application (Plus applicable DOJ fees) $345 $357 $11 per application Y b) Renewal $118 $122 $4 per application Y
18 Firearm Dealer
a) Initial Application $200 $207 $7 per application Y
b) Renewal $200 $207 $7 per application Y
[a] Fee established by State of California.
[b] Maximum fee allowed per California Penal Code Section 26190. 48 53

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - SHORT TERM RENTAL PERMIT FEES AND ADMINISTRATIVE CITATIONS Current Fee Proposed Fee Change Charge Basis Note CPI
1 Short-Term Rental Permit Fee
a) Home sharing Permit $513 $530 $17 per year Y
b) Short-Term Vacation Rental Permit $2,053 $2,121 $67 per year Y 2 Inspections
a) STVR - Health and Safety Inspection $147 $151 $5 each Y b) STVR - Health and Safety Reinspection $147 $151 $5 each Y Fee Description
49 54

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - SHORT TERM RENTAL PERMIT FEES AND ADMINISTRATIVE CITATIONS Current Fee Proposed Fee Change Charge Basis Note CPI
SHORT-TERM RENTALS:
1 Operation without a permit, Subject to any past transient occupancy tax, including penalties and interest
a) 1st Violation $5,000 $5,000 $0 N
b) 2nd Violation $10,000 $10,000 $0 N
c) 3rd Violation $15,000 $15,000 $0 N
2 False Complaints
a) 1st Violation $100 $100 $0 N
b) 2nd Violation $250 $250 $0 N
c) 3rd Violation & Subsequent $500 $500 $0 N
3 Short-Term Vacation Rental Violation
a) 1st Violation $1,000 $1,000 $0 N
b) 2nd Violation $3,000 $3,000 $0 N
c) 3rd Violation & Subsequent $5,000 $5,000 $0 N
4 Short-Term Vacation Rental Hosting Violation $1,000 $1,000 $0 N 5 STVR Complaint Advertisement
a) 1st Violation $2,500 $2,500 $0 N
b) 2nd Violation $5,000 $5,000 $0 N
c) 3rd Violation $7,500 $7,500 $0 N
6 STVR Multiple Violations $1,000 $1,000 $0 N
7 STVR No Response Violations $500 $500 $0 N
8 STVR Noise Complaint Violations $250 $250 $0 N
Fee Description
50 55

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - SPORTS FIELDS AND PARK FACILITIES RESERVATION FEES Current Fee Proposed Fee Change Charge Basis Note CPI
Administrative Fees
1 Commercial Century Park $40 $40 $0 Single Use/Multi. Use N 2 Commercial Ocotillo Park $40 $40 $0 Single Use/Multi. Use N 3 Commercial Panorama Park $40 $40 $0 Single Use/Multi. Use N 4 Non-Profit Century Park $20 $20 $0 Single Use/Multi. Use N 5 Non-Profit Ocotillo Park $20 $20 $0 Single Use/Multi. Use N 6 Non-Profit Panorama Park $20 $20 $0 Single Use/Multi. Use N 7 Non-Resident Century Park $30 $30 $0 Single Use/Multi. Use N 8 Non-Resident Ocotillo Park $30 $30 $0 Single Use/Multi. Use N 9 Non-Resident Panorama Park $30 $30 $0 Single Use/Multi. Use N 10 Resident Century Park $20 $20 $0 Single Use/Multi. Use N 11 Resident Ocotillo Park $20 $20 $0 Single Use/Multi. Use N 12 Resident Panorama Park $20 $20 $0 Single Use/Multi. Use N Daily Rate Fees
13 Commercial Century Park $300 $300 $0 Multi. Use N
14 Commercial Ocotillo Park $300 $300 $0 Multi. Use N 15 Commercial Panorama Park $300 $300 $0 Multi. Use N 16 Non-Profit Century Park $75 $75 $0 Multi. Use N
17 Non-Profit Ocotillo Park $75 $75 $0 Multi. Use N
18 Non-Profit Panorama Park $75 $75 $0 Multi. Use N
19 Non-Resident Century Park $262 $262 $0 Multi. Use N 20 Non-Resident Ocotillo Park $262 $262 $0 Multi. Use N 21 Non-Resident Panorama Park $262 $262 $0 Multi. Use N 22 Resident Century Park $225 $225 $0 Multi. Use N
23 Resident Ocotillo Park $225 $225 $0 Multi. Use N
24 Resident Panorama Park $225 $225 $0 Multi. Use N
Fee Description
51 56

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - SPORTS FIELDS AND PARK FACILITIES RESERVATION FEES Current Fee Proposed Fee Change Charge Basis Note CPIFee Description Daytime Field Use Hourly Fees
25 Commercial Century Park $40 $40 $0 Single Use/Multi. Use N 26 Commercial Ocotillo Park $40 $40 $0 Single Use/Multi. Use N 27 Commercial Panorama Park $40 $40 $0 Single Use/Multi. Use N 28 Non-Profit Century Park $75 $75 $0 Single Use/Multi. Use N 29 Non-Profit Ocotillo Park $75 $75 $0 Single Use/Multi. Use N 30 Non-Profit Panorama Park $75 $75 $0 Single Use/Multi. Use N 31 Non-Resident Century Park $35 $35 $0 Single Use/Multi. Use N 32 Non-Resident Ocotillo Park $35 $35 $0 Single Use/Multi. Use N 33 Non-Resident Panorama Park $35 $35 $0 Single Use/Multi. Use N 34 Resident Century Park $30 $30 $0 Single Use/Multi. Use N 35 Resident Ocotillo Park $30 $30 $0 Single Use/Multi. Use N 36 Resident Panorama Park $30 $30 $0 Single Use/Multi. Use N Field Preparation
37 Century Park $60 $60 $0 Single Use/Multi. Use N
38 Ocotillo Park $60 $60 $0 Single Use/Multi. Use N
39 Panorama Park $60 $60 $0 Single Use/Multi. Use N
Lighted Field Use Fee
40 Commercial Grp Ocotillo Park $60 $60 $0 Single Use/Multi. Use N 41 Non-Profit Grp Ocotillo Park $30 $30 $0 Single Use/Multi. Use N 42 Non-Residential Grp Ocotillo Park $40 $40 $0 Single Use/Multi. Use N 43 Residential Grp Ocotillo Park $30 $30 $0 Single Use/Multi. Use N Concession Stand Fee
44 Non-Profit Grp Ocotillo Park $25 $25 $0 Single Use/Multi. Use N 45 Non-Profit Grp Panorama Park $25 $25 $0 Single Use/Multi. Use N 46 Non-Resident Grp Ocotillo Park $30 $30 $0 Single Use/Multi. Use N 47 Non-Resident Grp Panorama Park $30 $30 $0 Single Use/Multi. Use N 52 57

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - SPORTS FIELDS AND PARK FACILITIES RESERVATION FEES Current Fee Proposed Fee Change Charge Basis Note CPIFee Description 48 Resident Grp Ocotillo Park $25 $25 $0 Single Use/Multi. Use N 49 Resident Grp Panorama Park $25 $25 $0 Single Use/Multi. Use N 50 Commercial Grp Ocotillo Park $35 $35 $0 Single Use/Multi. Use N 51 Commercial Grp Panorama Park $35 $35 $0 Single Use/Multi. Use N 52 Concession Stand Security Deposit $500 $500 $0 Single Use/Multi. Use N 53 Field Cleaning/Security Deposit $275 $275 $0 Single Use/Multi. Use N Park Reservation Fees
54 Park Res Shelter w/Elec Non-Resident Fee Century
a) up to 50 attendees $60 $60 $0 N
b) 51 - 100 attendees $150 $150 $0 N
c) More than 100 attendees $250 $250 $0 N
55 Park Res Shelter w/Elec Resident Fee Century Park
a) up to 50 attendees $35 $35 $0 N
b) 51 - 100 attendees $100 $100 $0 N
c) More than 100 attendees $150 $150 $0 N
56 Park Shelter Only Res Fee - Non-Resident Ocotillo
a) up to 50 attendees $50 $50 $0 N
b) 51 - 100 attendees $100 $100 $0 N
c) More than 100 attendees $250 $250 $0 N
57 Park Shelter Only Res Fee - Resident Ocotillo Park
a) up to 50 attendees $25 $25 $0 N
b) 51 - 100 attendees $75 $75 $0 N
c) More than 100 attendees $150 $150 $0 N
58 Park Reservation Deposit
a) up to 100 attendees $100 $100 $0 N
b) More than 100 attendees $200 $200 $0 N
53 58

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - SPORTS FIELDS AND PARK FACILITIES RESERVATION FEES Current Fee Proposed Fee Change Charge Basis Note CPIFee Description 59 Park Res Shelter w/Elec Non-Resident Fee Panorama
a) up to 50 attendees $60 $60 $0 N
b) 51 - 100 attendees $150 $150 $0 N
c) More than 100 attendees $250 $250 $0 N
60 Park Res Shelter w/Elec Resident Fee Panorama Park
a) up to 50 attendees $35 $35 $0 N
b) 51 - 100 attendees $100 $100 $0 N
c) More than 100 attendees $150 $150 $0 N
61 Park Shelter Only Res Fee - Non-Resident Century
a) up to 50 attendees $50 $50 $0 N
b) 51 - 100 attendees $100 $100 $0 N
c) More than 100 attendees $250 $250 $0 N
62 Park Shelter Only Res Fee - Non-Resident Panorama
a) up to 50 attendees $50 $50 $0 N
b) 51 - 100 attendees $100 $100 $0 N
c) More than 100 attendees $250 $250 $0 N
63 Park Shelter Only Res Fee - Resident Century Park
a) up to 50 attendees $25 $25 $0 N
b) 51 - 100 attendees $75 $75 $0 N
c) More than 100 attendees $150 $150 $0 N
64 Park Shelter Only Res Fee - Resident Panorama Park
a) up to 50 attendees $25 $25 $0 N
b) 51 - 100 attendees $75 $75 $0 N
c) More than 100 attendees $150 $150 $0 N
65 Park Shelter Res Fee-Non-Resident 0-50 Panorama Pk
a) up to 50 attendees $50 $50 $0 N
66 Park Shelter Res Fee-Non-Resident 0-50 Ocotillo Pk
a) up to 50 attendees $50 $50 $0 N
54 59

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - SPORTS FIELDS AND PARK FACILITIES RESERVATION FEES Current Fee Proposed Fee Change Charge Basis Note CPIFee Description 67 Park Shelter Res Fee-Non-Resident 0-50 Century Pk
a) up to 50 attendees $50 $50 $0 N
55 60

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - HOURLY BILLING RATES

BILLING RATES FOR FEE-RELATED SERVICES (HOURLY / T&M BILLINGS) Position Current Hourly Billing
Rate
Proposed Hourly
Billing Rate
Inflator Added to Base
Salary Note CPI
1 City Manager Analyst II $111 $115 Y
2 City Manager Assistant City Manager $295 $305 Y
3 City Manager City Manager $326 $336 Y
4 City Manager All Other Positions 2.42 [a] N
5 Human Resources Human Resources Assistant $111 $115 Y 6 Human Resources Human Resources Director $268 $277 Y
7 Human Resources Human Resources Manager $255 $263 Y
8 Human Resources Human Resources Specialist $142 $147 Y 9 Human Resources Senior Human Resources Specialist $149 $154 Y 10 Human Resources All Other Positions 2.94 [a] N
11 Communications and Events Communications and Events Manager $227 $234 Y 12 Communications and Events Events & Recreation Coordinator $146 $151 Y 13 Communications and Events Webmaster and Graphic Designer $146 $151 Y 14 Communications and Events All Other Positions 3.19 [a] N 15 City Clerk City Clerk $205 $211 Y
16 City Clerk Deputy City Clerk $108 $112 Y
17 City Clerk All Other Positions 2.36 [a] N
18 Information Technology Chief Technology Officer $211 $218 Y 19 Information Technology Enterprise Applications Engineer $143 $148 Y 20 Information Technology Enterprise Systems Analyst $143 $148 Y 21 Information Technology GIS Engineer $143 $148 Y
22 Information Technology Information Tech Technician $101 $104 Y 23 Information Technology Senior Network Engineer $150 $155 Y 24 Information Technology All Other Positions 2.44 N
25 Finance Administration Administrative Assistant I $93 $96 Y Fee Category / Division
56 61

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - HOURLY BILLING RATES

BILLING RATES FOR FEE-RELATED SERVICES (HOURLY / T&M BILLINGS) Position Current Hourly Billing
Rate
Proposed Hourly
Billing Rate
Inflator Added to Base
Salary Note CPIFee Category / Division
26 Finance Administration Financial Services Director $253 $261 Y 27 Finance Administration Senior Analyst $122 $126 Y
28 Finance Administration All Other Positions 2.40 [a] N 29 Finance Accountant I $100 $104 Y
30 Finance Accountant II $138 $143 Y
31 Finance Accounting Services Manager $205 $211 Y
32 Finance Accounting Technician $87 $90 Y
33 Finance Analyst I $98 $102 Y
34 Finance Analyst II $109 $112 Y
35 Finance Deputy Finance Director $226 $233 Y
36 Finance Fiscal Officer $177 $183 Y
37 Finance Licensing Officer $145 $150 Y
38 Finance Management Analyst $138 $143 Y
39 Finance Office Assistant I $68 $70 Y
40 Finance Part Time Office Assistant $53 $55 Y
41 Finance Payroll Coordinator $109 $112 Y
42 Finance Payroll Specialist $98 $102 Y
43 Finance Senior Accountant $145 $150 Y
44 Finance Senior Analyst $120 $124 Y
45 Finance All Other Positions 2.36 [a] N
46 Facilities Assistant Facilities Maintenance Supervisor $166 $171 Y 47 Facilities Facilities Maintenance Worker I $90 $93 Y 48 Facilities Facilities Maintenance Worker II $104 $107 Y 49 Facilities Facilities Manager $245 $253 Y
50 Facilities Senior Facilities Maintenance Worker $129 $134 Y 57 62

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - HOURLY BILLING RATES

BILLING RATES FOR FEE-RELATED SERVICES (HOURLY / T&M BILLINGS) Position Current Hourly Billing
Rate
Proposed Hourly
Billing Rate
Inflator Added to Base
Salary Note CPIFee Category / Division
51 Facilities All Other Positions 3.12 [a] N
52 Community and Economic Development Admin Administrative Assistant I $99 $102 Y 53 Community and Economic Development Admin Director of Community and Economic Development $263 $272 Y 54 Community and Economic Development Admin Deputy Director of Community and Economic Development
$238 $246 Y
55 Community and Economic Development Admin Analyst II $120 $124 Y 56 Community and Economic Development Admin Economic Development Manager $216 $223 Y 57 Community and Economic Development Admin All Other Positions 2.62 [a] N 58 Planning Associate Planner $191 $197 Y
59 Planning Assistant Planner $156 $162 Y
60 Planning Planning Assistant $108 $112 Y
61 Planning Planning Manager $269 $278 Y
62 Planning All Other Positions 3.10 [a] N
63 Building Building Inspector II $166 $171 [c] Y
64 Building Chief Building Official $292 $302 [c] Y
65 Building Office Assistant I $107 $110 [c] Y
66 Building Administrative Assistant I $141 $145 [c] Y
67 Building Building Inspector I $143 $148 [c] Y
68 Building Permit Technician I $124 $128 [c] Y
69 Building Permit Technician II $140 $144 [c] Y
70 Building Plans Examiner I $166 $171 [c] Y
71 Building Plans Examiner II $188 $194 [c] Y
72 Building All Other Positions 3.72 [a] N
73 Code Enforcement Administrative Assistant II $126 $130 Y 74 Code Enforcement Analyst I $136 $140 Y
58 63

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - HOURLY BILLING RATES

BILLING RATES FOR FEE-RELATED SERVICES (HOURLY / T&M BILLINGS) Position Current Hourly Billing
Rate
Proposed Hourly
Billing Rate
Inflator Added to Base
Salary Note CPIFee Category / Division
75 Code Enforcement Analyst II $150 $155 Y
76 Code Enforcement Code Compliance Manager $232 $240 Y 77 Code Enforcement Senior Code Compliance Officer $156 $161 Y 78 Code Enforcement Code Compliance Officer I $117 $121 Y 79 Code Enforcement Code Compliance Officer II $135 $140 Y 79 Code Enforcement Office Assistant I $94 $97 Y
80 Code Enforcement Office Assistant II $103 $107 Y
80 Code Enforcement All Other Positions 3.26 [a] N
81 Engineering Administrative Assistant I $126 $130 Y
82 Engineering Analyst II $153 $158 Y
83 Engineering Assistant Civil Engineer $168 $173 Y
84 Engineering Associate Civil Engineer $205 $212 Y
85 Engineering City Engineer $318 $329 Y
86 Engineering Senior Engineer $226 $233 Y
87 Engineering Engineering Field Project Manager $195 $202 Y 88 Engineering Director of Public Works $351 $362 Y
89 Engineering Engineering Technician I $128 $132 Y
90 Engineering Engineering Technician II $148 $153 Y
91 Engineering Junior Engineer $160 $165 Y
92 Engineering Land Development Engineer $215 $222 Y
93 Engineering All Other Positions 3.33 [a] N
94 Public Works - Fleet and Equipment Fleet & Equipment Maintenance Coordinator $137 $142 Y 95 Public Works - Fleet and Equipment Public Works Supervisor $164 $169 Y 96 Public Works - Fleet and Equipment All Other Positions 3.08 [a] N 97 Street Maintenance Street Maintenance Worker I $79 $82 Y 59 64

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - HOURLY BILLING RATES

BILLING RATES FOR FEE-RELATED SERVICES (HOURLY / T&M BILLINGS) Position Current Hourly Billing
Rate
Proposed Hourly
Billing Rate
Inflator Added to Base
Salary Note CPIFee Category / Division
98 Street Maintenance Street Maintenance Worker II $91 $94 Y 99 Street Maintenance All Other Positions 2.75 [a] N
100 Public Works Environmental Conservation Public Works/Environmental Conservation Manager $199 $205 Y 101 Public Works Environmental Conservation Analyst II $116 $120 Y 102 Public Works Environmental Conservation All Other Positions 2.53 [a] N 103 Police Analyst I $133 $137 Y
104 Police Analyst II $146 $151 Y
105 Police Background Investigator (3 Part-Time) $124 $128 Y 106 Police Deputy Police Chief $319 $329 Y
107 Police Police Chief $369 $381 Y
108 Police Police Commander $303 $313 Y
109 Police Police Officer $174 $180 Y
110 Police Police Records Specialist I $91 $94 Y
111 Police Police Records Specialist II $119 $123 Y
112 Police Police Sergeant $258 $267 Y
113 Police Police Service Assistant $91 $94 Y
114 Police Police Training Coordinator $119 $123 Y
115 Police Senior Analyst $161 $166 Y
116 Police Community Service Officer $103 $107 Y
117 Police Police Cadet (4 Part-Time) $52 $54 Y
118 Police Crime Analyst $142 $146 Y
119 Police Property Evidence Technician I $103 $107 Y
120 Police Property Evidence Technician II $132 $136 Y
121 Police Public Safety Dispatcher I $114 $118 Y
122 Police Public Safety Dispatcher II $132 $136 Y
60 65

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - HOURLY BILLING RATES

BILLING RATES FOR FEE-RELATED SERVICES (HOURLY / T&M BILLINGS) Position Current Hourly Billing
Rate
Proposed Hourly
Billing Rate
Inflator Added to Base
Salary Note CPIFee Category / Division
123 Police Safety Dispatcher Part Time (5 Part-Time) $111 $115 Y 124 Police All Other Positions 3.18 [a] N
125 Fire Administration Administrative Analyst II $107 $110 Y 126 Fire Administration Analyst I $115 $119 Y
127 Fire Administration Deputy Fire Chief $278 $287 Y
128 Fire Administration Fire Battalion Chief $166 $172 Y 129 Fire Administration Fire Chief $321 $332 Y
130 Fire Administration All Other Positions 2.77 [a] N
131 Emergency Services Fire Battalion Chief $196 $203 Y 132 Emergency Services Fire Captain $235 $242 Y
133 Emergency Services Fire Engineer $137 $141 Y
134 Emergency Services Firefighter Paramedic $187 $193 Y 135 Emergency Services Firefighter EMT $161 $166 Y
136 Emergency Services All Other Positions 3.22 N
137 Fire Prevention Fire Life Safety Inspector $159 $164 Y 138 Fire Prevention Fire Marshal $332 $343 Y
139 Fire Prevention All Other Positions 4.43 [a] N
140 Ambulance Services Ambulance Operator/Paramedic $87 $90 Y 141 Ambulance Services Ambulance Operator/EMT $83 $86 Y 142 Ambulance Services Firefighter EMT $135 $140 Y
143 Ambulance Services Firefighter Paramedic $225 $225
144 Ambulance Services All Other Positions 3.89 [a] N
145 Citywide Contract Service Support Pass-through + 15% Admin
Pass-through + 15%
Admin
[b] N
61 66

City of Cathedral City

BEFORE AND AFTER ILLUSTRATION - HOURLY BILLING RATES

BILLING RATES FOR FEE-RELATED SERVICES (HOURLY / T&M BILLINGS) Position Current Hourly Billing
Rate
Proposed Hourly
Billing Rate
Inflator Added to Base
Salary Note CPIFee Category / Division
[b] For deposit-based or pass-through billings.
[c] Positional billings are not used for building fees. Use uniform hourly billing rate when required. [a] To calculate hourly rate for positions not listed, multiply base salary rate per hour by factor shown. Outcome is fully-burdened hourly rate. Fully-burdened hourly rate includes benefits, adjustment for productive hours, indirect costs, etc. Example: $90,000 annual salary / 2,080 hours = $43.27/hr. Multiple by factor of 3.89 to calculate fully-burdened hourly rate of $168/hr. 62 67

Master Schedule of User and Regulatory Fees
68 Fees Page
ADMINISTRATIVE FEES 1
BUILDING AND SAFETY FEES 2
BUSINESS LICENSE APPLICATION REVIEW AND INSPECTION FEES 8 CANNABIS LICENSING AND USER PERMIT FEES AND FINES 9
CODE COMPLIANCE FEES 10
LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES 11
EVENT FEES 24
FIRE PREVENTION AND AMBULANCE FEES 25
PLANNING FEES 31
POLICE FEES 36
SHORT TERM RENTAL PERMIT FEES AND ADMINISTRATIVE CITATIONS 39 SPORTS FIELDS AND PARK FACILITIES RESERVATION FEES 41
HOURLY BILLING RATES FOR FEE RELATED SERVICES 44
City of Cathedral City
Master Schedule of User and Regulatory Fees
Table of Contents
69 City of Cathedral City

MASTER FEE SCHEDULE - ADMINISTRATIVE FEES
Fee Charge Basis Note CPI
1 Administrative Appeal Fee $100 each N
2 Returned Check Fee
a) First Check $25 each [a] N
b) Each Additional Check $35 each [a] N
3 EFT/ACH Return / Error $25 each N
4 Credit Card Transaction Processing Fee 3.00% % of fees paid by credit card [b] N 5 E-Check Transaction Processing Fee $1.95 per transaction [c] N 6 Technology Fee $0 percent of permit fee [d] N
7 Postage Actual Cost each N
8 Digital Media Device $10 each N
9 Documents - Hard Copy
a) Standard Size $0.25 per single-sided page N
b) Non-standard Size Actual Cost per page N
10 Subpoena Response / Retrieval Fees Max. Authorized by State per request N [a] California Civil Code Sec. 1719.
[b] Passthrough of credit card transaction fees charged by vendor. [c] Passthrough of E-Check transaction fees charged by vendor. [d] Applied to any permit issued by the City.

Fee Description
1 70

City of Cathedral City

MASTER FEE SCHEDULE - BUILDING FEES
Proposed Fee Charge Basis Note CPI
1 Expedited HVAC Change-Out $213 [a] Y
2 Residential Solar Photovoltaic System - Solar Permit per permit a) Residential Solar Photovoltaic System - Solar Permit $450 per permit [a] N i) With Battery Storage $54 [a] N
ii) With EV Charging (Electric Vehicle) $54 per permit [a] N 3 Commercial Solar Photovoltaic System - Solar Permit
a) 50kW or less $1,000 per permit [b] N
b) 50kW – 250kW – Base $1,000 per permit [b] N
c) 50kW – 250kW – per kW above 50kW $7 per permit [b] N d) Above 250kW – base $2,400 per permit [b] N
e) Above 250kW – per kW $5 per permit [b] N
4 Energy Storage Systems (Battery Backup) $370 per permit Y 5 Service Panel Upgrade - Residential $56 per permit Y
6 Expedited Service Panel Upgrade - Residential $277 per permit Y 7 Service Panel Upgrade - Commercial $462 per permit Y
8 EV Charger - Residential $370 per permit Y
9 EV Charger - Commercial See Table B. Permit
Valuation Table
per permit N
10 Expedited Water Heater Changeout $213 per permit Y
11 Expedited New Sewer Connection $305 per permit Y
12 Expedited Residential Re-Roof per permit
a) Up to 2,000 SF (Roof Area) $213 per permit Y
b) Each Add'l 1,000 SF or fraction thereof $92 per permit Y 13 Commercial Re-Roof
a) Up to 2,000 SF (Roof Area) $462 per permit Y
b) Each Add'l 1,000 SF or fraction thereof $185 per permit Y 14 Demolition $462 Y
15 Temporary Power Pole $277 Y
16 Swimming Pool/Spa
a) Swimming Pool / Spa $739 per permit Y
b) Water Feature $370 per permit Y
c) Pool Alteration $739 per permit Y
d) Equipment Change-out Alone $370 per permit Y
17 Patio
a) Standard (Wood/Metal Frame) $277 per permit Y
b) Upgraded (with electrical, stucco, etc.) $539 Y
A. Fees for Commonly Requested Building Permit Types. Fees shown in this section (Section A.) include all applicable inspection and plan review fees.

Additional permit processing fees apply. Additional fees may apply for services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Fee Description
2 71

City of Cathedral City

MASTER FEE SCHEDULE - BUILDING FEES
Proposed Fee Charge Basis Note CPI
A. Fees for Commonly Requested Building Permit Types. Fees shown in this section (Section A.) include all applicable inspection and plan review fees.

Additional permit processing fees apply. Additional fees may apply for services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Fee Description
18 Expedited Window / Doors
a) Retrofit / Repair
i) Up to 5 $240 Y
ii) Each additional 5 $92 each Y
19 Block/Masonry Wall
a) 0 - 100 ft $370 Y
b) Each Add'l 25 ft $18 Y
20 Trash Enclosure $463 Y
[a] California Government Code Section 66015(a)(1), establishes maximum fees for residential solar energy systems. For photovoltaic systems, fees shall not exceed $450 plus $15 per kW for each kilowatt above 15kW. For thermal systems, fees shall not exceed $450, plus $15 per kWth for each kilowatt thermal above 10kWth. Fees in excess of these amounts require written findings and resolution or ordinance. [b] California Government Code Section 66015(b)(1), establishes maximum fees for commercial solar energy systems. Fees shall not exceed $1,000 for systems up to 50kW plus $7 per kilowatt for each kilowatt between 51kW and 250kW, plus $5 for each kilowatt above 250kW. For thermal systems, fees shall not exceed $1,000 up to the 30kWth, plus $7 per kWth for each kWth between the 30th and 260th kWth, plus $5 for each kWth above 260kWth. Fees in excess of these amounts require written findings and resolution or ordinance. 3 72

City of Cathedral City

MASTER FEE SCHEDULE - BUILDING FEES
Total Valuation Permit Fee CPI
$1 to $10,000 $462.18 for the first $10,000 Y
$10,001 to $50,000 $924.36 for the first $10,000 plus $23.11 for each add'l $1,000 or fraction thereof, to and including $50,000
Y
$50,001 to $100,000 $1,848.72 for the first $50,000 plus $18.49 for each add'l $1,000 or fraction thereof, to and including $100,000
Y
$100,001 to $500,000 $2,773.08 for the first $100,000 plus $9.94 for each add'l $1,000 or fraction thereof, to and including $500,000
Y
$500,001 to $1,000,000 $6,747.83 for the first $500,000 plus $5.73 for each add'l $1,000 or fraction thereof, to and including $1,000,000
Y
$1,000,001 and up $9,613.36 for the first $1,000,000 plus $4.58 for each additional $1,000 or fraction thereof over $1,000,000
Y
N
Total Valuation Permit Fee CPI
Up to $2,000 $277.00 Y
$2,001 to $10,000 $462.00 for the first $1,000 plus $34.63 for each additional $1,000 or fraction thereof over $2,000
Y
$10,001 and up $739.00 for the first $10,000 plus $13.85 for each additional $1,000 or fraction thereof over $10,000
Y
Total Valuation Permit Fee CPI
Up to $2,000 $277.00 Y
$2,001 to $10,000 $462.00 for the first $1,000 plus $34.63 for each additional $1,000 or fraction thereof over $2,000
Y
$10,001 and up $739.00 for the first $10,000 plus $13.85 for each additional $1,000 or fraction thereof over $10,000
Y
D. Permit Fee for Stand-Alone Plumbing Permit
Determination of Valuation for Fee-Setting Purposes
● Project valuations shall be based on the total value of all construction work, including all finish work, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment. If in the opinion of the Building Official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the Building Official. Final building permit valuation shall be set by the Building Official. For determining project valuations for new construction, the Building Official may use data published by the International Code Council (ICC) (building valuation data table, typically updated in February and August of each year). The final building permit valuation shall be set at an amount that allows the City to recover its costs of applicant plan check, permit and inspection activities.

Note: For construction projects with permit fees calculated using Section B, C, D, or E, additional fees apply for permit issuance. Additional fees may apply for services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California). Additional fees apply for plan review, when applicable.

B. Permit Fee for New Buildings, Additions, Tenant Improvements, Residential Remodels, and Combined Mechanical, Electrical, and/or Plumbing Permits
Accessibility inspection fees = Base permit fee x .10
C. Permit Fee for Stand-Alone Mechanical Permit
4 73

City of Cathedral City

MASTER FEE SCHEDULE - BUILDING FEES
Total Valuation Permit Fee CPI
Up to $2,000 $277.00 Y
$2,001 to $10,000 $462.00 for the first $1,000 plus $34.63 for each additional $1,000 or fraction thereof over $2,000
Y
$10,001 and up $739.00 for the first $10,000 plus $13.85 for each additional $1,000 or fraction thereof over $10,000
Y
E. Permit Fee for Stand-Alone Electrical Permit
Clarification of Fee Structure Application for Permit Fees Assigned project valuation for fee-setting purposes is intended to correlate to the typical level of inspections required.

The example provided below is applicable to stand-alone trade permits:

Valuation up to $10,000 = 3 to 4 inspections typically required (2.5 hours) Valuation $10,000 an Up = 4 or more inspections typically required (4 or more hours) Additional fees will apply for permit processing and plan review, as required.

Building Permit fees are also established to correspond to the typical level of inspections required. 5 74

City of Cathedral City

MASTER FEE SCHEDULE - BUILDING FEES
Fee Charge Basis Note CPI
1 Plan Check Fees
a) Plan Review Fee, if applicable 65% of Building Permit Fee [a] N b) Phased Plan Check (when applicable) 1.5x full plan check fee for entire bldg N c) Expedited Plan Check (when applicable) 1.5x standard plan check fee N d) Master Plan Review
i) Tract Homes $185 per hour [a];[b] Y
ii) Solar Systems for Tract Homes $185 per hour [b] Y
e) Alternate Materials and Materials Review (per hour) $185 Y f) Individual Plan Check / Revisions of Approved Plans $92 per half hour Y F. Building Plan Review Fees
Activity Description
When applicable, plan check fees shall be paid at the time of application for a building permit.

The plan checking fee is in addition to the building permit fee. [a] Includes up to three plan checks. The City will bill hourly for additional plan review required. [b] For identical buildings built by the same builder on the same lot or in the same tract and for which building permits are issued at the same time.
6 75

City of Cathedral City

MASTER FEE SCHEDULE - BUILDING FEES
Proposed Fee Note CPI
1 Permit Issuance Fee $92 Y
2 General Plan Maintenance Fee (fee per $1,000 valuation) $0.73 [a] Y 3 Strong Motion Instrumentation (SMI) Fee Calculation
a) Residential $0.50 or valuation x .00013 N
b) Commercial $0.50 or valuation x .00028 N
4 Building Standards (SB 1473) Fee Calculation (Valuation) a) $1 - $25,000 $1 N
b) $25,001 - $50,000 $2 N
c) $50,001 - $75,000 $3 N
d) $75,001 - $100,000 $4 N
e) Each Add'l $25,000 or fraction thereof Add $1 N
5 Certificate of Occupancy
a) Temporary Certificate of Occupancy (per 30 Days) $555 Y b) Certificate of Occupancy
i) Single Family Residential $185 Y
ii) Multi-Family Residential / Commercial $370 Y
Copies, Re-Print, Change Of Contractor
6 Change of Contractor $28 Y
Violation Fees
7 Investigation Fee For Work Done Without Permits
(In addition to applicable permit fees)
equal to
permit fee
N
Other Fees
8 Street Name Change/Addressing
a) Without GIS Support $2,773 Y
b) With GIS Support $5,546 Y
9 Individual, Investigation, Re-Inspection Fee (All-Inclusive) $213 [b] Y 10 After Hours Inspection (per hour) (2-hour minimum) $231 Y 11 Fees for Services Not Listed in this Fee Schedule (per 1/2 hour) $92 Y 12 Mobile Home Permit Fees See Title 25 of the Housing & Community Development
N
13 Permit Renewal Fee within 1 year of Last Inspection 50% of original fee N 14 Refunds
a) Fees Erroneously Paid or Collected by the City 100% refund [c] N b) Fees Prior to Work Being Commenced up to 80% refund of permit fee N c) No fees are refundable once the work covered by them is commenced no refund N d) 180 Days After Payment of Fees no refund [d] N
[a] Fee only applies to permits for new construction and additions. [b] Reinspection fee applies after the first re-inspection. [c] The Building Official may authorize refunding of any fee paid, or portion thereof, which was erroneously paid or collected by the city. [d] Whether work has commenced or not, no fees are refundable more than 180 days after their payment.

G. Other Fees
Activity Description
7 76

City of Cathedral City

MASTER FEE SCHEDULE - BUSINESS LICENSE APPLICATION REVIEW AND INSPECTION FEES Fee Charge Basis Note CPI
1 Business License Processing Fee
a) New $86 each Y
b) Renewal $43 each Y
2 Duplicate License $5 each N
3 Review for Home Occupation License $96 each Y
4 Fire Inspection Review for Business License $112 each Y 5 Building Inspection for Business License $92 each Y
6 Planning Inspection for Business License, If Required $96 each Y 7 Engineering Inspection for Business License, If Required $113 each Y 8 Code Inspection for Business License, if Required $76 each Y 9 Police Inspection for Business License
a) Massage - Establishment
i) Initial $273 each Y
ii) Renewal Inspection (if required) $91 each Y
b) Massage - Therapist / Practitioner
i) Initial $273 each Y
ii) Renewal Inspection (if required) $91 each Y
c) Pawnbroker, Secondhand dealer, ice cream truck, etc. i) Initial - (pawnbroker, secondhand dealer, handbills, ice cream truck, etc.)
$136 each Y
ii) Renewal - (pawnbroker, secondhand dealer, handbills, ice cream truck, etc.)
$91 each Y
d) Sexually Oriented Business
i) Initial $273 each Y
e) All Others, If Required
i) Initial $136 each Y
ii) Renewal $91 each Y
10 Bingo Permit $50 each [a] N
[a] Maximum permit fee established by State of California.

Fee Description
8 77

City of Cathedral City

MASTER FEE SCHEDULE - CANNABIS LICENSING AND USER PERMIT FEES AND FINES Proposed Fee Charge Basis Note CPI
1 Cannabis License
a) New Application $5,167 flat fee [a] Y
b) Renewal or Modification of License
i) License Renewal $4,908 flat fee Y
ii) Change of Ownership $5,167 flat fee [b] Y
ii) Amendment $634 flat fee [b] Y
c) Background Investigation (per person) $2,855 flat fee per person Y 2 Odor Control Plan Review and Permit
a) Odor Control Plan and Amendments (Cultivation and
Manufacturing)
$4,111 Y
b) Odor Control Plan and Amendments (Consumption Lounge) $4,111 Y c) Odor Control Plan and Amendments (Dispensary, Distribution, and Testing Lab)
$496 Y
d) Odor Control Plan Annual Certification $496 Y
3 Fine for Cannabis Nuisance Odor
a) Per Violation Per Day $1,000 per violation per day [c] N b) For failure to obtain approval of, comply with, or maintain an odor control plan
$5,000 per month N
[a] Requires background investigation, per person.
[b] May require background investigation, per person.
[c] For each day a violation exists for those cannabis businesses with an approved odor control plan compliant with Sections 5.88 and 9.108 of the CCMC.

Fee Description
[d] For those cannabis businesses required to obtain approval of an odor control plan pursuant to Chapter 5.88 of the CCMC that have failed to obtain approval of, comply with, or maintain an odor control plan. 9 78

City of Cathedral City

MASTER FEE SCHEDULE - CODE COMPLIANCE FEES
Fee Charge Basis Note CPI
1 Garage Sale Permit
a) Individual $25 each N
b) Group $250 per HOA event, per
HOA gated community
[a] N
2 Street Vendor Permit
a) Initial $52 each N
b) Renewal $52 each N
3 Release of Notice of Pendency Fee
a) Initial Notice $274 per recorded
document
Y
b) Each Additional Notice After the Initial Notice $125 per additional recorded document
Y
4 Abandoned Property Registration & Monitoring Fee
a) Registration Fee
i) Initial $76 per year Y
ii) Renewal $76 per year Y
b) Monitoring Fee
i) Initial $380 per year Y
ii) Renewal $380 per year Y
5 Abandoned Shopping Cart Impoundment $77 Y
6 Plastic Beverage Straws $1,000 [b] N
[a] For gated community HOA permits only, per event, per community. [b] Pursuant to Section 5.94.030 of the CMCC.

Fee Description
10 79

City of Cathedral City

MASTER FEE SCHEDULE - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Fee Charge Basis Note CPI

PROJECT SUBMITTAL
Pre-Entitlement
1 Title Report
a) Review $395 Y
2 Preliminary Grading Plan
a) Initial Sheet $452 Y
b) Each Additional Sheet $452 Y
c) Revisions - > 2 Each Sheet $226 Y
3 Geotechnical Studies
a) Soils Report Review $452 per report Y
b) Infiltrations Study Review $113 Y
c) Revisions - > 2 Reviews $113 Y
4 Environmental
a) Phase 1 Report Review $452 Y
b) Phase 2 Report Review $452 Y
5 Hydrology
a) Preliminary Hydrology Report Review $678 Y
b) Preliminary CLOMR Review $904 Y
c) Revisions - > 2 Reviews $226 Y
6 WQMP
a) WQMP Summary Data Form Review $113 Y
b) Preliminary WQMP Review $678 Y
c) Preliminary Storm Water Pollution Prevention Plan Review $565 Y d) Revisions - > 2 Reviews $339 Y
Activity Description
11 80

City of Cathedral City

MASTER FEE SCHEDULE - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Fee Charge Basis Note CPIActivity Description
7 Traffic
a) Traffic Study Scoping Agreement Review $1,356 per agreement Y b) Revisions - > 2 Reviews Per Scoping Agreement $565 Y c) Traffic Study Review $2,712 per study Y
d) Revisions - Each TS Review $904 Y
e) Traffic Letter Review $452 per letter Y
f) Revisions - > 2 TL Reviews $226 Y
g) VMT Scoping Submittal Review $339 Y
h) Revisions - > 2 VMT Scoping Reviews $226 Y
i) VMT Screening Memo Review - Under Threshold $565 Y j) Revisions - > Each VMT Screening Revision $339 Y
k) VMT Analysis Report Over Threshold $2,712 Y
l) Revisions - > Each VMT Analysis Revision $452 Y
8 Conditions of Approval
a) COA Preparation - Level 1 (up to 5 hours) $1,130 [a] Y b) COA Preparation - Level 2 ( >5 up to 10 hours) $2,260 [a] Y c) COA Preparation - Level 3 ( >10 up to 15 hours) $3,390 [a] Y d) COA Preparation - Level 4 ( >15 up to 20 hours) $4,520 [a] Y e) COA Preparation - Level 5 ( >20 up to 30 hours) $6,780 [a] Y f) COA Preparation - per hour beyond Level 5 $226 per hour Y 9 Miscellaneous Pre-Entitlement Review $226 per hour Y

POST ENTITLEMENT
Land Subdivision
10 Final Parcel Map
a) Final Parcel Map
i) Initial Sheet $3,842 Y
ii) Each Additional Sheet $904 per sheet Y
iii) Reviews > 2 Reviews Each Set $226 Y
b) Final Parcel Map - Amendment
i) Initial Sheet $3,842 Y
ii) Each Additional Sheet $904 per sheet Y
iii) Reviews > 2 Reviews Each Set $226 Y
12 81

City of Cathedral City

MASTER FEE SCHEDULE - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Fee Charge Basis Note CPIActivity Description
11 Final Tract Map
a) Final Tract Map
i) Initial Sheet $4,294 Y
ii) Each Additional Sheet $1,356 per sheet Y
iii) Reviews > 2 Reviews Each Set $339 Y
b) Final Tract Map - Amendment
i) Initial Sheet $4,068 Y
ii) Each Additional Sheet $1,356 per sheet Y
iii) Reviews > 2 Reviews Each Set $339 Y
c) Substantial Conformance Review
i) Initial Sheet $3,898 Y
ii) Each Additional Sheet $1,695 per sheet Y
iii) Reviews > 2 Reviews Each Set $565 Y
12 Reversion to Acreage:
a) Initial Sheet $3,842 Y
b) Each Additional Sheet $904 per sheet Y
i) Reviews > 2 Reviews Each Set $452 Y
13 Lot Line Adjustment
a) Lot Line Adjustment $2,486 per request Y
b) Reviews > 2 Reviews Each Set $452 Y
14 Parcel Merger
a) Parcel Merger $2,486 per request Y
b) Reviews > 2 Reviews Each Set $452 Y
15 Street Dedication/Vacation
a) Land Action Documents
(Right-of-Way Easements/Grant Deeds, etc.)
$2,938 per request Y
b) Vacation of Street/Public Right-of-Way $4,746 per request Y c) Reviews > 2 Reviews Each Set $452 Y
16 Land Survey
a) Record of Survey $734 per request Y
b) Certificate of Compliance/Correction $960 per request Y c) Reviews > 2 Reviews Each Set $452 Y
13 82

City of Cathedral City

MASTER FEE SCHEDULE - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Fee Charge Basis Note CPIActivity Description

FINAL REPORTS AND AGREEMENTS
17 Final Hydrology Study Report $2,034 per report Y
a) Final Hydrology Report Review $2,712 Y
b) Reviews > 2 Reviews Each Report $678 Y
c) Conditional Letter of Map Revision (CLOMR) $226 Y
d) Letter of Map Revision $226 Y
18 Final Water Quality Mgmt. Plan Report (WQMP)
a) Final WQMP Report $2,712 per report Y
b) WQMP Report Revisions> 2 Revisions Each Report $452 per report Y b) WQMP Plan (per sheet) $226 per sheet Y
c) WQMP Plan Revisions (per sheet) $113 per sheet Y
d) WQMP Covenant $904 per covenant Y
19 Final Stormwater Pollution Prevention Plan (SWPPP)
a) Final SWPPP Review $678 per plan Y
b) Reviews > 2 Reviews Each Report $226 Y
20 Covenants, Conditions and Restrictions (CC&Rs)
a) CC&R Review (per request) $3,616 Y
i) Reviews > 3 Reviews Each Report $452 Y
b) CC&Rs Revisions Review $904 Y
i) Revisions Review > 3 Reviews Each Report $226 Y
c) Misc Covenant Review & Approval
i) Reciprical Drainage Covenant $904 Y
ii) Reciprical Parking Covenant $904 Y
iii) Reciprical Access Covenant $904 Y
iv) Maintenance Covenant $904 Y
d) Subdivision Improvement Agreement (SIA)
i) SIA Preparation $3,164 per request Y
ii) SIA Time Extension $1,582 per request Y
iii) Assignment & Assumptions Agreement $3,164 per request Y

PROJECT IMPROVEMENT PLANS REVIEW
21 Mass Grading / Stockpile Plans
a) Initial Sheet $1,582 Y
b) Each Additional Sheet $791 per sheet Y
c) Reviews > 2 Reviews Each Set $339 Y
d) Revisions - Each Additional Sheet $452 per sheet Y 14 83

City of Cathedral City

MASTER FEE SCHEDULE - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Fee Charge Basis Note CPIActivity Description
22 Rough Grading Plans
a) Initial Sheet $2,147 Y
b) Each Additional Sheet $1,017 per sheet Y
c) Reviews > 2 Reviews Each Set $339 Y
d) Revisions - Each Additional Sheet $452 per sheet Y 23 Precise Grading - Commercial
a) Initial Sheet $2,712 Y
b) Each Additional Sheet $1,582 per sheet Y
c) Reviews > 2 Reviews Each Set $339 Y
d) Revisions - Each Additional Sheet $452 per sheet Y 24 Precise Grading - Tract Homes
a) Initial Sheet $1,808 Y
b) Each Additional Sheet
i) Without ADU $565 per sheet Y
ii) With ADU $621 per sheet Y
c) Reviews > 2 Reviews Each Set $339 Y
d) Revisions - Each Additional Sheet $452 per sheet Y 25 Precise Grading Plans Infill or Custom Homes
a) Infill Home $1,130 Y
b) Custom Home $1,356 Y
i) Custom Home with ADU $1,469 Y
c) Standalone ADU $678 Y
d) Reviews > 2 Reviews Each Set $226 Y
e) Revisions - Each Sheet $226 per sheet Y
26 Erosion Control Plans
a) Initial Sheet $452 Y
b) Each Additional Sheet $226 per sheet Y
c) Reviews > 2 Reviews Each Set $113 Y
d) Revisions - Each Sheet $113 per sheet Y
27 Street Improvements
a) Initial Sheet $2,712 Y
b) Each Additional Sheet $904 per sheet Y
c) Reviews > 2 Reviews Each Set $452 Y
d) Revisions - Each Sheet $678 per sheet Y
15 84

City of Cathedral City

MASTER FEE SCHEDULE - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Fee Charge Basis Note CPIActivity Description
28 Storm Drain Plans
a) Initial Sheet $2,712 Y
b) Each Additional Sheet $904 per sheet Y
c) Reviews > 2 Reviews Each Set $452 Y
d) Revisions - Each Sheet $678 per sheet Y
29 Street Lights - Onsite
a) Onsite Street Light Location And Photometric Review $339 Y b) Reviews > 2 Reviews Each Set $113 Y
c) Revisions - Each Sheet $226 Y
30 Street Lights - Offsite
a) Offsite Street Light Location And Photometric Review $339 Y b) Reviews > 2 Reviews Each Set $113 Y
c) Revisions - Each Sheet $226 Y
d) SCE Streetlight Application Review (1 light) $452 per application Y i) Each additional light $113 each Y
e) Streetlight Covenant $904 per agreement Y
31 Signing and Striping Plans
a) Initial Sheet $1,808 Y
b) Each Additional Sheet $904 per sheet Y
c) Reviews > 2 Reviews Each Set $339 Y
d) Revisions - Initial Sheet $452 Y
e) Revisions - Each Additional Sheet $226 per sheet Y
32 Traffic Signal Plans
a) Initial Sheet $3,164 Y
b) Each Additional Sheet $1,356 per sheet Y
c) Reviews > 2 Reviews Each Set $452 Y
d) Revisions - Initial Sheet $1,130 Y
e) Revisions - Each Additional Sheet $678 per sheet Y
33 Sidewalk Plans (when submitted separately from grading plan) a) Initial Sheet $1,130 Y
b) Each Additional Sheet $452 per sheet Y
c) Reviews > 2 Reviews Each Set $226 Y
d) Revisions - Initial Sheet $904 Y
e) Revisions - Each Additional Sheet $452 per sheet Y
16 85

City of Cathedral City

MASTER FEE SCHEDULE - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Fee Charge Basis Note CPIActivity Description
34 Project Traffic Control Plans
a) Initial Sheet $1,356 Y
b) Each Additional Sheet $678 per sheet Y
c) Reviews > 2 Reviews Each Set $339 Y
d) Revisions - Initial Sheet $565 Y
e) Revisions - Each Additional Sheet $226 per sheet Y
35 Sewer and Water - Onsite
a) Initial Sheet $904 Y
b) Each Additional Sheet $339 per sheet Y
c) Reviews > 2 Reviews Each Set $226 Y
d) Revisions - Each Sheet $226 per sheet Y
36 Sewer and Water - Offsite
a) Initial Sheet $226 Y
b) Each Additional Sheet $113 per sheet Y
c) Reviews > 2 Reviews Each Set $113 Y
d) Revisions - Each Sheet $113 per sheet Y
37 PM 10 (Fugitive Dust Control)
a) PM 10 Packet $565 each Y
b) PM 10 Full Size Plan $904 each Y
c) Reviews > 2 Reviews Each Set $226 Y
d) Revisions - Packet $452 per sheet Y
e) Revisions - Full Size Plan $339 per sheet Y
38 Record Drawings Review
a) Initial Sheet $1,130 Y
b) Each Additional Sheet $452 per sheet Y
c) Reviews > 2 Reviews Each Set $226 Y
39 Expedited Plan Review Fee (< 2 week turnaround) 1.5x standard fee [b] N

INSPECTIONS - ONSITE
40 Mass Grading / Stockpile
a) Per 1,000 CY $452 Y
41 Rough Grading
a) First 3 Acres $1,130 Y
b) Each Additional Acre $169 Y
17 86

City of Cathedral City

MASTER FEE SCHEDULE - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Fee Charge Basis Note CPIActivity Description
42 Precise Grading
a) Single Family Infill Lot $678 Y
i) plus ADU $226 per lot Y
b) Single Family Custom Home Lot $904 Y
i) plus ADU $226 per lot Y
c) Tract Home (per lot) $452 Y
i) plus ADU $226 per lot Y
d) Standalone ADU $452 Y
e) All Others (Typically Commercial)
i) Without Rough Grading
a) First 3 Acres $1,130 Y
b) Each Additional Acre $226 Y
ii) Subsequent to Rough Grading
a) First 3 Acres $678 Y
b) Each Additional Acre $113 Y
43 Street Improvements - On-Site Curb, Gutter and Roadway a) Up to 500 LF $2,712 [e],[g] Y
b) 501 - 1,000 LF $4,520 [e],[f],[g] Y
c) Each Additional 1,000 LF $2,260 [e],[f],[g] Y
44 On-Site Improvements Other Than Street
a) Up to 5,000 Sq Ft $2,938 [f],[g] Y
b) 5,001 Sq Ft - 10,000 Sq Ft $5,650 [f],[g] Y
c) Each Additional 10,000 Sq Ft $678 [f],[g] Y
45 Sidewalk - Onsite
a) Up to 20 LF $339 [f],[g] Y
b) 21 - 100 LF $508 [f],[g] Y
c) Each Additional 100 LF $226 [f],[g] Y
46 Signing and Striping - Onsite
a) Up to 500 LF $904 [h] Y
b) 501 - 1,000 LF $1,808 [e],[g] Y
c) Each Additional 1,000 LF $339 [e],[g] Y
18 87

City of Cathedral City

MASTER FEE SCHEDULE - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Fee Charge Basis Note CPIActivity Description
47 Storm Drain - Onsite
a) Up to 500 LF $1,808 Y
b) 501 - 1,000 LF $3,164 Y
c) Each Additional 1,000 LF $1,356 Y
48 Storm Drain Inlets /Outlet Structures - Onsite
a) Up to 5 $904 Y
b) Each Additional $226 Y
49 Stormwater Retention - Onsite
a) Above Ground System $452 Y
b) Underground Drywell System $678 Y
c) Underground Chamber System $1,808 Y
d) WQMP Final Inspection $452 Y
50 Sewer or Water - On Site
a) Up to 500 LF $1,130 Y
b) 501 - 1,000 LF $1,582 Y
c) Each Additional 1,000 LF $226 Y
51 PM10 (per year)
a) Single Family Infill Lot <10,000 Sq Ft $904 [c] Y
b) > 10,000 Sq Ft - < 10 Acres $2,712 [c] , [d] Y
c) 10 - 50 Acres $4,068 [c] , [d] Y
d) 51 - 200 Acres $5,424 [c] , [d] Y
e) > 200 Acres $6,780 [c] , [d] Y
f) PM10 Deposit $2,066 deposit - per acre
or portion thereof
[c] , [d] Y
52 SWPPP (NPDES) - Onsite
a) Single Family Infill Lot <10,000 Sq Ft $452 per year [i] Y b) > 10,000 Sq Ft - < 10 Acres $1,356 per year [i] Y
c) 10 - 50 Acres $2,034 per year [i] Y
d) 51 - 200 Acres $2,712 per year [i] Y
e) > 200 Acres $3,390 per year [i] Y
19 88

City of Cathedral City

MASTER FEE SCHEDULE - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Fee Charge Basis Note CPIActivity Description

INSPECTIONS ENCROACHMENT - OFFSITE
Encroachment Permits
53 Street Improvements - Off-Site
a) Up to 500 LF $3,842 [e] Y
b) 500 - 1,000 LF $6,328 [e],[f] Y
c) Each Additional 1,000 LF $2,938 [e],[f] Y
54 Driveway
a) Residential $565 Y
b) Commercial $904 Y
Sidewalk
a) Up to 20 Lineal Feet $339 Y
b) 20 - 100 Lineal Feet $508 Y
c) Each Additional 100 Lineal Feet $226 Y
55 Excavation / Trenching
a) First 20 LF $339 Y
b) 21 - 50 LF $395 Y
c) 51 - 100 LF $565 Y
d) Each Additional 100 LF $113 Y
56 Bore/Vault
a) Bore Holes $282 Y
b) Vault Installation $452 Y
57 Cut/Pot Hole
a) Cut or Pothole $113 each Y
58 Off-site Signing and Striping - Offsite
a) Up to 500 LF $904 [h] Y
b) 500 - 1,000 LF $1,808 [f],[h] Y
c) Each Additional 1,000 LF $339 [f],[h] Y
59 Storm Drain Line - Offsite
a) Up to 500 LF $1,808 Y
b) 501 - 1,000 LF $3,164 [f] Y
c) Each Additional 1,000 LF $1,356 [f] Y
20 89

City of Cathedral City

MASTER FEE SCHEDULE - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Fee Charge Basis Note CPIActivity Description
60 Stormwater Retention - Offsite
a) Above Ground System $452 each Y
b) Underground Drywell System $678 each Y
c) Underground Chamber System $1,808 each Y
d) WQMP Final Inspection $452 each Y
61 Traffic Signals
a) Vehicular Traffic Signal $7,232 Y
b) Pedestrian Hawk Signal $6,328 Y
c) High Visibility Crosswalk $1,130 Y
d) Submittal Review (each submittal) $226 each Y
62 Traffic Control
a) Up to Two Consecutive Days $282 [l] Y
b) Three - Five Consecutive Days $678 Y
c) Each Additional Consecutive Day (Up to 10 Days) $169 per day Y d) 11+ Days (Up to 60 Calendar Days Max) $2,260 Y
63 SWPPP (NPDES) - Offsite
a) Up to 500 LF of Roadway Frontage $678 Y
b) 501 - 1,000 LF of Roadway Frontage $1,130 Y
c) Each Additional 1,000 LF of Roadway Frontage $226 Y
64 Final Inspection / Acceptance
a) Single Family Lot <10,000 Sq Ft $226 [j] Y
b) > 10,000 Sq Ft - < 2 Acres $678 [k] Y
c) > 2 Acres - < 10 Acres $904 [k] Y
d) > 10 - < 50 Acres $1,356 [k] Y
e) > 50 - 200 Acres $1,808 [k] Y
f) > 200 Acres $2,260 [k] Y
65 Night Work $1,808 per night Y
66 Excess Inspection / Missed Inspection / Re-Inspection / Re-Call Compliance Inspections
$226 Y
67 Stop Work Notice Release $678 Y
68 Bond Reduction Request $2,599 Y
21 90

City of Cathedral City

MASTER FEE SCHEDULE - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Fee Charge Basis Note CPIActivity Description

ADMINISTRATIVE
Research/Administrative
69 Flood Plain (FEMA)
a) Research/FEMA App $678 per request Y
b) Community Acknowledgement Form $339 per request Y
70 Bid Protest Review $1,808 Y
71 Misc Research (per request, per hour) $226 [m] Y
72 Misc Covenant Review & Approval $678 per agreement Y 73 Reactivation of Permit
a) Reactivation of an Expired Minor Permit 10% of original permit fee
each [n] N
b) Reactivation of an Expired Major Permit 20% of original permit fee
each [n] N

MISCELLANEOUS ENGINEERING FEES
Miscellaneous
74 Transportation Permits
a) Annual $90 each N
b) Single Event $16 each N
75 Pool Drain Permit $37 each Y
76 NPDES Inspections
a) Food Use $226 Y
b) Hazardous Waste
i) without Storage $226 Y
ii) with Storage $282 Y
77 Permit Issuance Fee $113 Y
22 91

City of Cathedral City

MASTER FEE SCHEDULE - LAND DEVELOPMENT ENGINEERING AND ENCROACHMENT FEES Fee Charge Basis Note CPIActivity Description
[a] If project exceeds assigned level, project will be reassigned to next level and additional fees will be charged prior to receiving conditions of approval. [b] Expedited Plan Review request is subject to City Engineer approval. It is dependent on staff availability and workload. [c] For PM10 annual permit.
[d] Fee generally assumes one inspection per month. Additional inspections billed using re-inspection fee. [e] Includes, curb, gutter, and sidewalk. Excludes driveways. [f] Rounded up to nearest thousand feet.
[g] Excluding building foundation footprint.
[h] Footage based on centerline street length.
[i] Annual inspection cost.
[j] Includes tract single family homes, does not include tract final. [k] Includes tract finals.
[l] Permanent patching of pavement at same location will count as a subsequent consecutive day. [m] Estimate provided up front.
[n] Assumes no changes to original permit.
23 92

City of Cathedral City

MASTER FEE SCHEDULE - EVENT FEES
Fee Charge Basis Note CPI
1 Banner and Electronic Sign Sponsorship Program
a) Up to Four $621 Y
b) Each Thereafter $369 Y
2 Special Event Permit Fee $729 Y
3 Amphitheater Rent - Non-Profit (Full Day)
a) Full Day $2,659 Y
b) Half-Day Before Event Setup $1,317 Y
4 Amphitheater Rent - For Profit
a) Full Day $5,293 Y
b) Half-Day Before Event Setup $2,659 Y
5 Amphitheater Rent - Special Weekends
a) Coachella Weekend 1 $100,000 or Best Offer N
b) Coachella Weekend 2 $30,000 or Best Offer N
c) Stage Coach Weekend $15,000 or Best Offer N
d) Splash Weekend $10,000 or Best Offer N
6 Amphitheater - Deposit $1,059 Y
7 Avenida Lalo Guerrero Rent
a) Non-Profit $1,601 Y
b) For Profit $2,659 Y
c) Deposit $640 Y
8 Festival Lawn Rent
a) Non-Profit $795 Y
b) For Profit $1,059 Y
c) Deposit $640 Y
9 Town Square Park Rent
a) Non-Profit $392 Y
b) For Profit $527 Y
c) Deposit $640 Y
10 Civic Center Plaza Rent
a) Non-Profit $238 Y
b) For Profit $320 Y
c) Deposit $640 Y
Fee Description
24 93

City of Cathedral City

MASTER FEE SCHEDULE - FIRE PREVENTION AND AMBULANCE FEES Fee Charge Basis Note CPI
1 Water Based Fire Protection Systems (1)
a) Fire Sprinkler Commercial/Multi Family/Other - New System or Alteration
i) Plan Review (up to 25 heads) $224 per installation Y ii) Inspection (up to 25 heads) $448 per installation Y b) Fire Sprinkler Commercial/Multi Family/Other - New System or Alteration
i) Plan Review (up to 50 heads) $448 per installation Y ii) Inspection (up to 50 heads) $560 per installation Y c) Fire Sprinkler Commercial/Multi Family/Other - New System or Alteration
i) Plan Review (each additional 25 heads, or fraction thereof) $56 per head Y ii) Inspection (each additional 25 heads, or fraction thereof) $224 per head Y d) Fire Sprinkler Single Family/Duplex - New System
i) Plan Review $336 per installation Y
ii) Inspection $560 per installation Y
e) Fire Sprinkler Single Family/Duplex - Alteration of Existing System i) Plan Review $336 per installation Y
ii) Inspection $336 per installation Y
f) Standpipe
i) Plan Review $672 per system Y
ii) Inspection (per vertical standpipe) $448 per system Y g) Fire Protection Underground System
i) Plan Review $336 each Y
ii) Inspection $448 each Y
h)Fire Service Under Ground
i) No Hydrant $224 each Y
ii) With Hydrant $336 each Y
i) Per Additional Sprinkler Riser or Hydrant
i) Inspection $224 each Y
2 Fire Alarm System (1):
a) Fire Alarm - New System
i) Plan Review (up to 25 devices) $224 per system Y
ii) Inspection (up to 25 devices) $224 per system Y
b) Fire Alarm - Alteration
i) Plan Review (up to 5 devices) $224 per system Y
ii) Inspection (up to 5 devices) $224 per system Y
c) Per Additional Device
i) Inspection - New or Alteration $4 per device Y
3 Alternative Automatic Extinguishing Systems (Dry, Wet, CO2, Halon, UL 300, Clean Agent, Spray Booth, Other) (2):a) Plan Review $336 per system Y b) Inspection $224 per system Y
Activity Description
25 94

City of Cathedral City

MASTER FEE SCHEDULE - FIRE PREVENTION AND AMBULANCE FEES Fee Charge Basis Note CPIActivity Description
4 Other Fire Construction Reviews and Inspections (2):
a) LPG, Cryogenics, Compressed Gas, Medical Gas, Battery Storage Systems, Industrial Oven, & other Fire Construction Permiti) Plan Review $336 per system Y ii) Inspection
a) Battery Storage System $448 per review Y
b) Other Systems $224 Y
5 Hazardous Activities Installation/Removal Permits Above Ground - Hazardous Materials Tank and/or Pipe Installation or Removal (1 tank, a) Plan Review $224 per system Y b) Inspection $224 per system Y
6 Technical Report, Alternate Means & Methods
a) Plan Review $336 per submittal Y
b) Inspection $224 per hour Y
7 Architectural - New Construction or Tenant Improvement Plan Check:
a) Plan Review $336 per project Y
b) Inspection $224 per project Y
8 Fire Hood and Duct Systems
a) Fire Hood and Duct - Plan Check $224 Y
b) Fire Hood and Duct - Inspection $224 Y
9 Fire (Emergency) Access permit
a) Fire (Emergency) Access permit - Plan Check $336 Y
b) Fire (Emergency) Access permit - Inspection $224 Y
10 Above Ground Tank Installation
a) Above Ground Tank Installation - Plan Check $224 Y
b) Above Ground Tank Installation - Inspection $224 Y
11 Fire Pump System
a) Fire Pump System - Plan Check $224 Y
b) Fire Pump System - Inspection $224 Y
12 Fire Alarm Monitoring Systems
a) Plan Review (up to 25 devices) $168 Y
b) Inspection (up to 25 devices) * Addl $3 per dev above 25 $224 Y 13 Generators
a) Permit Fee $112 Y
Permits to Operate (Type of Permit Activity)
14 Candles and Open Flames $224 Y
15 Carnivals and Fairs: Amusement rides, generators, bounce houses $224 per hour, min 2 hours
Y
16 Combustible Dust Operations $224 Y
17 Dry Cleaning Plant $224 Y
18 Exhibits and Trade Shows $224 Y
19 Explosives or Blasting Agents $224 Y
26 95

City of Cathedral City

MASTER FEE SCHEDULE - FIRE PREVENTION AND AMBULANCE FEES Fee Charge Basis Note CPIActivity Description
20 Hazardous Materials Storage:
a) S1 occupancy, up to maximum quantities as permitted for S1 per code $448 Y b) F or H occupancy, up to maximum quantities as permitted per occupancy type per code
$448 Y
c) B or M occupancy, up to maximum quantities as permitted per occupancy type per code
$112 Y
d) Bulk CO2 $280 Y
e) Miscellaneous moderate risk storage not specified herein. $224 per hour, min 2 hours
Y
21 High Pile Storage $224 Y
22 Hot Work Operations $112 Y
23 Industrial Ovens $112 Y
24 Lumber Yards $224 Y
25 Misc. Combustible Storage $224 Y
26 Mobile Fueling $112 Y
27 Recreational or Bon Fire $224 Y
28 Repair Garage $224 Y
29 Spraying and Dipping (No Spray Booth) $224 Y
30 Theatrical Fire Performance $448 Y
31 Tire Storage: up to quantities allowed per fire code $224 Y 32 Places of Assembly
a) Less than 300 occupant load $224 Y
b) 300 - 999 occupant load $224 Y
c) 1,000 or more occupant load $448 Y
33 Commercial Day Care Facility
a) 7 - 49 persons $224 Y
b) 50 - 149 persons $224 Y
c) 150 or more persons $336 Y
34 Institutional
a) Less than 6 patients $112 Y
b) 6 or more patients $224 Y
c) Detention facilities $448 Y
35 Apartments/Hotels/Motels
a) 3 - 16 units $224 Y
b) 17 - 32 units $336 Y
c) 33 or more units $448 Y
36 850 Inspections
a) 850 Inspection (at hourly rate) $168 Y
27 96

City of Cathedral City

MASTER FEE SCHEDULE - FIRE PREVENTION AND AMBULANCE FEES Fee Charge Basis Note CPIActivity Description
37 Temporary Membrane Structures (Tents/Canopies)
a) 401 - 1,499 SF $224 Y
b) 1,500 - 2,999 SF $224 Y
c) 3,000 - 5,999 SF $224 Y
d) 6,000 or more SF $336 Y
38 Christmas Tree Lot $224 Y
39 Pyrotechnics Display $560 Y
40 Annual Inspection: Above Ground - Flammable / Combustible Liquid Tank and/or Pipe
$224 per tank system Y
41 New Construction Plan Check (6):
a) A - Assembly $560 each Y
b) B, I, M - Business, Institutional, Mercantile $448 each Y c) E, R-1, R-2 - Educational, Multi-Family $560 each Y
d) F, S, H - Factory, Storage, Hazardous $560 each Y
e) R-3 - Single Family $224 each Y
f) All Tenant Improvements $224 each Y
g) U - Utility Structures and Buildings $224 each Y
h) All Shell Buildings $224 each Y
Other Miscellaneous Fees
42 Renewal of Expired Construction Permit $217 N
43 Copy of Incident Report (per incident) $16 N
44 Media Reproduction (audio, video, photographic) Actual Cost N 45 Emergency Response Caused by DUI Actual Cost N
46 Code Appeal (per hour) $224 Y
47 Fire Flow / Hydrant Test $672 Y
48 Minimum Intake Fee $224 Y
49 Voluntary Inspection $224 Y
50 Technical Report (alternate material or method request) $896 Y 51 Inspection Requests (after normal business hours) (7) 1.5 x charge amount N 52 Excessive resubmittals and inspections $224 each Y
53 Administrative Fee (work without a permit) $448 Y
54 Code Review or Design Consultation (per hour) $224 Y 55 Fire Prevention Division Hourly Rate $224 Y
56 Re-inspection Fee - Fire $112 Y
57 Inspection Fee - Fire $112 Y
28 97

City of Cathedral City

MASTER FEE SCHEDULE - FIRE PREVENTION AND AMBULANCE FEES Fee Charge Basis Note CPIActivity Description
58 Reprint Job Card/Permit $112 Y
59 Late Payment Penalty for Permits
a) 30 days past due $50 N
b) 60 days past due $100 N
c) 90 days past due $200 N
60 Special Request for Fire Department Personnel Services overtime rate by rank per hour N (1) Fee includes up to two plan checks or three inspections. Additional costs to be recovered at staff hourly rate. (2) Fee includes up to two plan checks or two inspections. Additional costs to be recovered at staff hourly rate. (3) Actual costs - may also be charged by actual costs using the fully burdened hourly rates plus any outside consultant costs if applicable.

Review time exceeding initial hours assumed for establishing deposit is billed at hourly rate. (4) Fee includes plan check and up to two inspections. Additional costs to be recovered at staff hourly rate. (5) Each fee listed in this schedule is based on the estimated number of hours required to perform a standard service request.

The standard number of hours estimated can be calculated by dividing the fee amount by $170, the Division's fully-burdened hourly rate.

For example, a fee amount of $340 assumes roughly 2.00 hours will be required to perform a standard request for the fee related service.

Review and inspection efforts that exceed the standard number of hours used to calculate the fee by more than one hour will be billed hourly for any time spent in excess of the standard hours built into the fee. (6) Planning submittals for fire review and related correspondence, meetings, etc. may be charged for at hourly rate during the construction plan review. (7) Inspection outside normal work hours will require hourly fees in addition to other required fees.

Note: Items in red font are existing fees that were inadvertently excluded from prior fee schedule. 29 98

City of Cathedral City

MASTER FEE SCHEDULE - FIRE PREVENTION AND AMBULANCE FEES Fee Charge Basis Note CPI
1 ALS and BLS Base Rate $2,169 Y
2 Mileage per loaded mile $35 per mile N
3 Oxygen $120 N
4 Misc. Supplies $50 N
5 EKG Fee $150 N
6 Treat & Release (Patient care non-transport) $250 N
7 First Responder Fee $150 N
Activity Description
30 99

City of Cathedral City

MASTER FEE SCHEDULE - PLANNING FEES
Fixed Fee
Minimum Fee /
Initial Deposit Charge Basis Note CPI
ADULT ORIENTED BUSINESSES:
1 Sexually Oriented Business New Permit $2,497 flat fee Y 2 Sexually Oriented Business Renewal Permit $1,249 flat fee Y 3 ANNEXATION TO CATHEDRAL CITY: $41,302 minimum fee / initial deposit Y APPEALS:
4 Appeal Fee of determination of City Planner,
Architectural Review Committee, or Planning
Commission
$1,070 flat fee N
CHRISTMAS TREE LOT PERMIT:
5 Christmas Tree Lot Permit $656 flat fee Y
6 Christmas Tree Lot Deposit (Refundable) $192 flat fee Y SIMILAR USE DETERMINATION:
7 Similar use determination - Administration $480 flat fee Y 8 Similar use determination by PC $1,777 flat fee Y
CONDITIONAL USE PERMITS:
9 CUP - Including design review for new structure or
modification
$9,318 flat fee [a] Y
10 CUP - Use only - no structural alteration /
modification
$5,907 flat fee [a] Y
11 CUP - Revisions / Modifications - Major $6,892 flat fee [a] Y 12 CUP - Revisions / Modifications - Minor $2,222 flat fee [a] Y DESIGN REVIEWS:
13 Design Review - Administrative Approval
a) without Architectural Review Committee
Required
$1,885 flat fee [a] Y
b) with Architectural Review Committee Required $3,314 flat fee [a] Y 14 Design Review - Discretionary Approval $9,318 flat fee [a] Y 15 Design Review - Duplex 5 units or less $1,921 flat fee [a] Y 16 Design Review - Revision $6,892 flat fee [a] Y
ENVIRONMENTAL PROCESSING:
17 Negative Declaration $4,803 minimum fee / initial deposit Y 18 Environmental Impact Report $16,713 minimum fee / initial deposit Y Activity Description
31 100

City of Cathedral City

MASTER FEE SCHEDULE - PLANNING FEES
Fixed Fee
Minimum Fee /
Initial Deposit Charge Basis Note CPI

Activity Description
19 CEQA Finding of Consistency $576 flat fee Y
20 CEQA Exemption $288 flat fee Y
21 Reimbursement of County Filing Fees actual cost actual cost Y FILM PERMITS:
22 Film Permit - Still Fee/Video $1,788 flat fee Y
HISTORICAL PRESERVATION APPLICATION PERMIT:
23 Application to Obtain Historic Designation $99 flat fee N 24 Certification of Appropriateness $1,964 flat fee Y
25 Application to Remove or Downgrade Designation $3,057 flat fee Y PEDDLER PERMIT:
26 Peddler permit $1,729 flat fee Y
PLANNED UNIT DEVELOPMENTS:
27 PUD $17,230 minimum fee / initial deposit Y
28 Amended/Revised PUD
a) Major $6,988 minimum fee / initial deposit Y
b) Minor $3,771 flat fee [a] Y
PLANS:
29 General Plan Amendment $6,772 flat fee [a] Y
30 Change of Zone $6,772 flat fee [a] Y
31 Change of Zone w / GPA $6,772 flat fee [a] Y
32 Zone Ordinance Amendment $7,684 flat fee [a] Y
33 Specific Plan $20,363 minimum fee / initial deposit Y 34 Specific Plan - Minor $2,978 flat fee Y
35 Specific Plan Amendment $8,645 minimum fee / initial deposit Y 36 Development Agreements $8,549 minimum fee / initial deposit Y SIGN PERMITS:
37 Master Sign Program $3,458 flat fee [a] Y
38 Master Sign Program w/development application $1,729 flat fee [a] Y 32 101

City of Cathedral City

MASTER FEE SCHEDULE - PLANNING FEES
Fixed Fee
Minimum Fee /
Initial Deposit Charge Basis Note CPI

Activity Description
39 Window Signs $96 flat fee [b] Y
40 Drive thru menu boards $576 flat fee [b] Y
41 Subdivision sign $576 flat fee [b] Y
42 New Sign - Wall $384 flat fee [b] Y
43 Monument Signs
a) Shopping Center $768 flat fee [b] Y
b) All Others $576 flat fee [b] Y
44 Billboards $6,147 flat fee [b] Y
45 Temporary Signs $96 flat fee [b] Y
46 Alteration of sign face $96 flat fee [b] Y
47 Special permit for noncommercial murals fixed by
resolution,
section 9.62.070,
ord 554,2001
N
SUBDIVISION MAPS:
48 Tentative / Vesting Parcel Maps-up to 4 parcels $7,565 flat fee [a] Y 49 Tentative / Vesting Tract Maps-up to 10 lots $7,789 flat fee [a] Y 50 Tentative Tract Maps - per additional lot $48 flat fee Y 51 Map Revisions
a) Minor $2,846 flat fee [a] Y
b) Major $5,872 flat fee [a] Y
52 Reversion to Acreage $4,719 flat fee [a] Y
MISCELLANEOUS:

INSPECTIONS:
53 Re-inspections for Final Approval $192 flat fee Y
54 Final Landscape Inspection $288 flat fee Y
55 Inspection - Commercial (up to 2)
a) Alterations/Additions - Non-Residential $288 flat fee Y b) New Construction - Up to 5 acres $480 flat fee Y
c) New Construction - 5 acres or greater $1,153 flat fee Y 33 102

City of Cathedral City

MASTER FEE SCHEDULE - PLANNING FEES
Fixed Fee
Minimum Fee /
Initial Deposit Charge Basis Note CPI

Activity Description
56 Inspection - Residential (up to 2)
a) Alterations/Additions - Residential $96 flat fee Y
b) Residential - SFD $192 flat fee Y
c) Residential - MFD - up to 4 units $480 flat fee Y
d) Residential - Multi-family over 4 units $1,153 flat fee Y PLAN CHECK:
57 Standalone Plan Check $1,153 flat fee [a] Y
58 Plan Check Fee - Commercial
a) Alterations / Additions - Non-Residential $288 flat fee [a] Y b) Up to 5 acres $2,113 flat fee [a] Y
c) 5 acres or greater $3,170 flat fee [a] Y
59 Plan Check Fees - Residential
a) Alterations / Additions - Residential $192 flat fee [a] Y b) Residential - SFD $336 flat fee [a] Y
c) Residential - MFD - up to 4 units $768 flat fee [a] Y d) Residential - Multi-family over 4 units $2,497 flat fee [a] Y e) Master Plans $2,497 flat fee [a] Y
TIME EXTENSIONS:
60 Time Extensions $3,842 flat fee Y
SPECIAL USE PERMITS:
61 Special Use Permits (SUP) - Minor $877 flat fee Y
62 Special Use Permits (SUP) $1,940 flat fee Y
63 Dance Permit $1,441 flat fee Y
VARIANCES:
64 Variance $5,043 flat fee [a] Y
65 Administrative Variance $576 flat fee Y
OTHER FEES:
66 General Plan & Zoning Letter (Zoning Confirmation
Letter)
$288 flat fee Y
67 Zoning Compliance Letter $1,537 flat fee Y
68 RV Parking Permit $432 flat fee Y
69 Handbill Permit $864 flat fee Y
HOUSING:
70 Senate Bill (SB) 330 Application Review $1,921 flat fee Y 34 103

City of Cathedral City

MASTER FEE SCHEDULE - PLANNING FEES
Fixed Fee
Minimum Fee /
Initial Deposit Charge Basis Note CPI

Activity Description
PRE-APPLICATION / CONCEPTUAL DESIGN REVIEW:
71 Conceptual Design Review $1,769 flat fee N
72 PUBLIC NOTICING:

Public Noticing, plus actual publishing costs $800 flat fee Y

HOURLY BILLING RATES FOR DEPOSITS
73 Hourly Billing Rates $192 per hour Y
$0 $0 [a] Fees include up to three reviews. Subsequent reviews following the initial three will be billed at 50% of the initial fee. [b] Fee reduced by 50% if part of sign program.

Overview of Fee Structure
Fees may be either fixed fees, deposits, or deposits with a minimum fee amount due. When a fee is deposit-based, the City will collect the initial depots and bill against that deposit. The minimum total amount charged for deposit-based fees shall be the amount shown in the minimum fee / initial deposit column.

Full Cost Deposits and Deposit Replenishment
Applicants for full cost (deposit-based) submittals shall pay for all City staff and contract service provider time and materials required to process the application. A full cost reimbursement agreement shall be included with the project application submittal package. Projects outside the scope of this fee schedule will be subject to a full cost reimbursement agreement to be approved by the City Manager and/or City Council. This reimbursement agreement will include the identification of a work program and will include cost estimates for both City staff time and consultant services based on a defined scope of work.

Initial deposits will be collected and held by the City in a deposit account at the time the application is submitted. Project billing amounts will be drawn from the deposit account. A positive account balance shall be maintained at all times during the review process. No work will be performed on a project with a negative fund balance. If the deposit is reduced to below 20% of the initial deposit amount, the applicant will be notified and required to supplement the deposit account with an additional amount no less than 50% of the original deposit.

Funds expended for staff time shall not be dependent upon the City’s approval or disapproval of the application request. Any deposit amounts remaining after final project close out will be returned to applicant (less bond amounts held by the City).

As may be required for project evaluation or environmental review, all payment for consultant work shall be the responsibility of the applicant. 35 104

City of Cathedral City

MASTER FEE SCHEDULE - POLICE FEES
Fee Charge Basis Note CPI
1 Report Copies
a) Traffic Collision Report $30 per report N
b) All Other Reports $0.25 / page per page N
c) Photos / Digital Media (e.g. Flash Drive) if provided by City $23 per device Y 2 Citation Sign-Off
a) CCPD Citation, CC Resident No Charge per citation N
b) Non-CCPD Citation, CC Resident $21 per citation Y
c) Non-Resident $40 per citation Y
3 Residency Letter $62 per request Y
4 Local Criminal History $62 per request Y
5 ABC Letter $69 per request Y
6 Vehicle Identification Number (VIN) Verification (No Charge for Cathedral City Residents)
a) Resident No Charge per request N
b) Non-Resident $102 per request Y
7 Vehicle Release $284 per request Y
8 DUI Traffic Collision Vehicle Release Fee $914 per incident Y 9 Repossession Receipt $30 each [a] N
10 Alarm User Permit
a) Initial permit application $35 each N
b) Renewal permit application $30 each N
c) Late Filing Fees
i) 30 days Late Fee (add to base permit fee) $23 each Y ii) 90 Days Late Fee (add to base permit fee) $46 each Y d) Re-Issued Alarm User Permit $200 each N
11 Excessive False Alarms (Permitted Alarm Systems):
a) First false alarm
i) Burglary No Charge each N
ii) Duress/robbery No Charge each N
b) Second false alarm
i) Burglary $100 each N
ii) Duress/robbery $100 each N
Fee Description
36 105

City of Cathedral City

MASTER FEE SCHEDULE - POLICE FEES
Fee Charge Basis Note CPIFee Description
c) Third false alarm
i) Burglary $150 each N
ii) Duress/robbery $150 each N
d) Fourth false alarm and Each Additional
i) Burglary $200 each N
ii) Duress/robbery $200 each N
12 Excessive False Alarms (Non-Permitted Alarm Systems):
a) First false alarm
i) Burglary $100 each N
ii) Duress/robbery $100 each N
b) Second and Each Additional
i) Burglary $200 each N
ii) Duress/robbery $200 each N
13 Online Alarm Education Diversion Course $25 each N
14 Carry Concealed Weapon License
a) Initial Application (Plus applicable DOJ fees) $300 per application N b) Renewal (Plus applicable DOJ fees) $25 per application [b] N c) Duplicate / Amended License (Plus applicable DOJ fees) $10 per request [b] N d) Psychological Testing, if Required (Plus applicable DOJ fees) Actual Cost each [b] N 15 Loud Party Response / Noise Disturbance (Second and Each Add'l Response)
$261 per response Y
16 Special Service Requests
a) Regular Time
i) Police Sergeant $266 per hour Y
ii) Police Officer $180 per hour Y
b) Over-Time
i) Police Sergeant $338 per hour Y
ii) Police Officer $228 per hour Y
17 Second Hand Dealer/Pawn Broker/Loan Broker
a) Initial Application (Plus applicable DOJ fees) $357 per application Y b) Renewal $122 per application Y
37 106

City of Cathedral City

MASTER FEE SCHEDULE - POLICE FEES
Fee Charge Basis Note CPIFee Description
18 Firearm Dealer
a) Initial Application $207 per application Y
b) Renewal $207 per application Y
[a] Fee established by State of California.
[b] Maximum fee allowed per California Penal Code Section 26190. 38 107

City of Cathedral City

MASTER FEE SCHEDULE - SHORT TERM RENTAL PERMIT FEES AND ADMINISTRATIVE CITATIONS Fee Charge Basis Note CPI
1 Short-Term Rental Permit Fee 0
a) Home sharing Permit $530 per year Y
b) Short-Term Vacation Rental Permit $2,121 per year Y
2 Inspections 0
a) STVR - Health and Safety Inspection $151 each Y
b) STVR - Health and Safety Reinspection $151 each Y
Fee Description
39 108

City of Cathedral City

MASTER FEE SCHEDULE - SHORT TERM RENTAL PERMIT FEES AND ADMINISTRATIVE CITATIONS Fee Charge Basis Note CPI
SHORT-TERM RENTALS:
1 Operation without a permit, Subject to any past transient occupancy tax, including penalties and interest
a) 1st Violation $5,000 N
b) 2nd Violation $10,000 N
c) 3rd Violation $15,000 N
2 False Complaints
a) 1st Violation $100 N
b) 2nd Violation $250 N
c) 3rd Violation & Subsequent $500 N
3 Short-Term Vacation Rental Violation
a) 1st Violation $1,000 N
b) 2nd Violation $3,000 N
c) 3rd Violation & Subsequent $5,000 N
4 Short-Term Vacation Rental Hosting Violation $1,000 N 5 STVR Complaint Advertisement
a) 1st Violation $2,500 N
b) 2nd Violation $5,000 N
c) 3rd Violation $7,500 N
6 STVR Multiple Violations $1,000 N
7 STVR No Response Violations $500 N
8 STVR Noise Complaint Violations $250 N
Fee Description
40 109

City of Cathedral City

MASTER FEE SCHEDULE - SPORTS FIELDS AND PARK FACILITIES RESERVATION FEES Fee Charge Basis Note CPI
Administrative Fees
1 Commercial Century Park $40 Single Use/Multi. Use N
2 Commercial Ocotillo Park $40 Single Use/Multi. Use N
3 Commercial Panorama Park $40 Single Use/Multi. Use N 4 Non-Profit Century Park $20 Single Use/Multi. Use N 5 Non-Profit Ocotillo Park $20 Single Use/Multi. Use N 6 Non-Profit Panorama Park $20 Single Use/Multi. Use N
7 Non-Resident Century Park $30 Single Use/Multi. Use N 8 Non-Resident Ocotillo Park $30 Single Use/Multi. Use N 9 Non-Resident Panorama Park $30 Single Use/Multi. Use N 10 Resident Century Park $20 Single Use/Multi. Use N
11 Resident Ocotillo Park $20 Single Use/Multi. Use N 12 Resident Panorama Park $20 Single Use/Multi. Use N Daily Rate Fees
13 Commercial Century Park $300 Multi. Use N
14 Commercial Ocotillo Park $300 Multi. Use N
15 Commercial Panorama Park $300 Multi. Use N
16 Non-Profit Century Park $75 Multi. Use N
17 Non-Profit Ocotillo Park $75 Multi. Use N
18 Non-Profit Panorama Park $75 Multi. Use N
19 Non-Resident Century Park $262 Multi. Use N
20 Non-Resident Ocotillo Park $262 Multi. Use N
21 Non-Resident Panorama Park $262 Multi. Use N
22 Resident Century Park $225 Multi. Use N
23 Resident Ocotillo Park $225 Multi. Use N
24 Resident Panorama Park $225 Multi. Use N
Daytime Field Use Hourly Fees
25 Commercial Century Park $40 Single Use/Multi. Use N 26 Commercial Ocotillo Park $40 Single Use/Multi. Use N 27 Commercial Panorama Park $40 Single Use/Multi. Use N 28 Non-Profit Century Park $75 Single Use/Multi. Use N 29 Non-Profit Ocotillo Park $75 Single Use/Multi. Use N 30 Non-Profit Panorama Park $75 Single Use/Multi. Use N 31 Non-Resident Century Park $35 Single Use/Multi. Use N 32 Non-Resident Ocotillo Park $35 Single Use/Multi. Use N 33 Non-Resident Panorama Park $35 Single Use/Multi. Use N 34 Resident Century Park $30 Single Use/Multi. Use N Fee Description
41 110

City of Cathedral City

MASTER FEE SCHEDULE - SPORTS FIELDS AND PARK FACILITIES RESERVATION FEES Fee Charge Basis Note CPIFee Description
35 Resident Ocotillo Park $30 Single Use/Multi. Use N 36 Resident Panorama Park $30 Single Use/Multi. Use N Field Preparation
37 Century Park $60 Single Use/Multi. Use N
38 Ocotillo Park $60 Single Use/Multi. Use N
39 Panorama Park $60 Single Use/Multi. Use N
Lighted Field Use Fee
40 Commercial Grp Ocotillo Park $60 Single Use/Multi. Use N 41 Non-Profit Grp Ocotillo Park $30 Single Use/Multi. Use N 42 Non-Residential Grp Ocotillo Park $40 Single Use/Multi. Use N 43 Residential Grp Ocotillo Park $30 Single Use/Multi. Use N Concession Stand Fee
44 Non-Profit Grp Ocotillo Park $25 Single Use/Multi. Use N 45 Non-Profit Grp Panorama Park $25 Single Use/Multi. Use N 46 Non-Resident Grp Ocotillo Park $30 Single Use/Multi. Use N 47 Non-Resident Grp Panorama Park $30 Single Use/Multi. Use N 48 Resident Grp Ocotillo Park $25 Single Use/Multi. Use N 49 Resident Grp Panorama Park $25 Single Use/Multi. Use N 50 Commercial Grp Ocotillo Park $35 Single Use/Multi. Use N 51 Commercial Grp Panorama Park $35 Single Use/Multi. Use N 52 Concession Stand Security Deposit $500 Single Use/Multi. Use N 53 Field Cleaning/Security Deposit $275 Single Use/Multi. Use N Park Reservation Fees
54 Park Res Shelter w/Elec Non-Resident Fee Century
a) up to 50 attendees $60 N
b) 51 - 100 attendees $150 N
c) More than 100 attendees $250 N
55 Park Res Shelter w/Elec Resident Fee Century Park
a) up to 50 attendees $35 N
b) 51 - 100 attendees $100 N
c) More than 100 attendees $150 N
56 Park Shelter Only Res Fee - Non-Resident Ocotillo
a) up to 50 attendees $50 N
b) 51 - 100 attendees $100 N
c) More than 100 attendees $250 N
42 111

City of Cathedral City

MASTER FEE SCHEDULE - SPORTS FIELDS AND PARK FACILITIES RESERVATION FEES Fee Charge Basis Note CPIFee Description
57 Park Shelter Only Res Fee - Resident Ocotillo Park
a) up to 50 attendees $25 N
b) 51 - 100 attendees $75 N
c) More than 100 attendees $150 N
58 Park Reservation Deposit
a) up to 100 attendees $100 N
b) More than 100 attendees $200 N
59 Park Res Shelter w/Elec Non-Resident Fee Panorama
a) up to 50 attendees $60 N
b) 51 - 100 attendees $150 N
c) More than 100 attendees $250 N
60 Park Res Shelter w/Elec Resident Fee Panorama Park
a) up to 50 attendees $35 N
b) 51 - 100 attendees $100 N
c) More than 100 attendees $150 N
61 Park Shelter Only Res Fee - Non-Resident Century
a) up to 50 attendees $50 N
b) 51 - 100 attendees $100 N
c) More than 100 attendees $250 N
62 Park Shelter Only Res Fee - Non-Resident Panorama
a) up to 50 attendees $50 N
b) 51 - 100 attendees $100 N
c) More than 100 attendees $250 N
63 Park Shelter Only Res Fee - Resident Century Park
a) up to 50 attendees $25 N
b) 51 - 100 attendees $75 N
c) More than 100 attendees $150 N
64 Park Shelter Only Res Fee - Resident Panorama Park
a) up to 50 attendees $25 N
b) 51 - 100 attendees $75 N
c) More than 100 attendees $150 N
65 Park Shelter Res Fee-Non-Resident 0-50 Panorama Pk
a) up to 50 attendees $50 N
66 Park Shelter Res Fee-Non-Resident 0-50 Ocotillo Pk
a) up to 50 attendees $50 N
67 Park Shelter Res Fee-Non-Resident 0-50 Century Pk
a) up to 50 attendees $50 N
43 112

City of Cathedral City

MASTER FEE SCHEDULE - HOURLY BILLING RATES

BILLING RATES FOR FEE-RELATED SERVICES (HOURLY / T&M BILLINGS) Position Proposed Hourly
Billing Rate
Inflator Added to
Base Salary Note CPI
1 City Manager Analyst II $115 Y
2 City Manager Assistant City Manager $305 Y
3 City Manager City Manager $336 Y
4 City Manager All Other Positions 2.42 [a] N
5 Human Resources Human Resources Assistant $115 Y
6 Human Resources Human Resources Director $277 Y
7 Human Resources Human Resources Manager $263 Y
8 Human Resources Human Resources Specialist $147 Y
9 Human Resources Senior Human Resources Specialist $154 Y 10 Human Resources All Other Positions 2.94 [a] N
11 Communications and Events Communications and Events Manager $234 Y 12 Communications and Events Events & Recreation Coordinator $151 Y 13 Communications and Events Webmaster and Graphic Designer $151 Y 14 Communications and Events All Other Positions 3.19 [a] N 15 City Clerk City Clerk $211 Y
16 City Clerk Deputy City Clerk $112 Y
17 City Clerk All Other Positions 2.36 [a] N
18 Information Technology Chief Technology Officer $218 Y 19 Information Technology Enterprise Applications Engineer $148 Y 20 Information Technology Enterprise Systems Analyst $148 Y 21 Information Technology GIS Engineer $148 Y
22 Information Technology Information Tech Technician $104 Y 23 Information Technology Senior Network Engineer $155 Y 24 Information Technology All Other Positions 2.44 N
25 Finance Administration Administrative Assistant I $96 Y 26 Finance Administration Financial Services Director $261 Y 27 Finance Administration Senior Analyst $126 Y
28 Finance Administration All Other Positions 2.40 [a] N 29 Finance Accountant I $104 Y
30 Finance Accountant II $143 Y
31 Finance Accounting Services Manager $211 Y
32 Finance Accounting Technician $90 Y
33 Finance Analyst I $102 Y
34 Finance Analyst II $112 Y
35 Finance Deputy Finance Director $233 Y
Fee Category / Division
44 113

City of Cathedral City

MASTER FEE SCHEDULE - HOURLY BILLING RATES

BILLING RATES FOR FEE-RELATED SERVICES (HOURLY / T&M BILLINGS) Position Proposed Hourly
Billing Rate
Inflator Added to
Base Salary Note CPIFee Category / Division
36 Finance Fiscal Officer $183 Y
37 Finance Licensing Officer $150 Y
38 Finance Management Analyst $143 Y
39 Finance Office Assistant I $70 Y
40 Finance Part Time Office Assistant $55 Y
41 Finance Payroll Coordinator $112 Y
42 Finance Payroll Specialist $102 Y
43 Finance Senior Accountant $150 Y
44 Finance Senior Analyst $124 Y
45 Finance All Other Positions 2.36 [a] N
46 Facilities Assistant Facilities Maintenance Supervisor $171 Y 47 Facilities Facilities Maintenance Worker I $93 Y
48 Facilities Facilities Maintenance Worker II $107 Y
49 Facilities Facilities Manager $253 Y
50 Facilities Senior Facilities Maintenance Worker $134 Y 51 Facilities All Other Positions 3.12 [a] N
52 Community and Economic Development Admin Administrative Assistant I $102 Y 53 Community and Economic Development Admin Director of Community and Economic Development
$272 Y
54 Community and Economic Development Admin Deputy Director of Community and Economic Development
$246 Y
55 Community and Economic Development Admin Analyst II $124 Y 56 Community and Economic Development Admin Economic Development Manager $223 Y 57 Community and Economic Development Admin All Other Positions 2.62 [a] N 58 Planning Associate Planner $197 Y
59 Planning Assistant Planner $162 Y
60 Planning Planning Assistant $112 Y
61 Planning Planning Manager $278 Y
62 Planning All Other Positions 3.10 [a] N
63 Building Building Inspector II $171 [c] Y
64 Building Chief Building Official $302 [c] Y
65 Building Office Assistant I $110 [c] Y
66 Building Administrative Assistant I $145 [c] Y
67 Building Building Inspector I $148 [c] Y
68 Building Permit Technician I $128 [c] Y
69 Building Permit Technician II $144 [c] Y
70 Building Plans Examiner I $171 [c] Y
45 114

City of Cathedral City

MASTER FEE SCHEDULE - HOURLY BILLING RATES

BILLING RATES FOR FEE-RELATED SERVICES (HOURLY / T&M BILLINGS) Position Proposed Hourly
Billing Rate
Inflator Added to
Base Salary Note CPIFee Category / Division
71 Building Plans Examiner II $194 [c] Y
72 Building All Other Positions 3.72 [a] N
73 Code Enforcement Administrative Assistant II $130 Y
74 Code Enforcement Analyst I $140 Y
75 Code Enforcement Analyst II $155 Y
76 Code Enforcement Code Compliance Manager $240 Y
77 Code Enforcement Senior Code Compliance Officer $161 Y 78 Code Enforcement Code Compliance Officer I $121 Y
79 Code Enforcement Code Compliance Officer II $140 Y
79 Code Enforcement Office Assistant I $97 Y
80 Code Enforcement Office Assistant II $107 Y
80 Code Enforcement All Other Positions 3.26 [a] N
81 Engineering Administrative Assistant I $130 Y
82 Engineering Analyst II $158 Y
83 Engineering Assistant Civil Engineer $173 Y
84 Engineering Associate Civil Engineer $212 Y
85 Engineering City Engineer $329 Y
86 Engineering Senior Engineer $233 Y
87 Engineering Engineering Field Project Manager $202 Y 88 Engineering Director of Public Works $362 Y
89 Engineering Engineering Technician I $132 Y
90 Engineering Engineering Technician II $153 Y
91 Engineering Junior Engineer $165 Y
92 Engineering Land Development Engineer $222 Y
93 Engineering All Other Positions 3.33 [a] N
94 Public Works - Fleet and Equipment Fleet & Equipment Maintenance Coordinator $142 Y 95 Public Works - Fleet and Equipment Public Works Supervisor $169 Y 96 Public Works - Fleet and Equipment All Other Positions 3.08 [a] N 97 Street Maintenance Street Maintenance Worker I $82 Y 98 Street Maintenance Street Maintenance Worker II $94 Y 99 Street Maintenance All Other Positions 2.75 [a] N
100 Public Works Environmental Conservation Public Works/Environmental Conservation Manager $205 Y 101 Public Works Environmental Conservation Analyst II $120 Y 102 Public Works Environmental Conservation All Other Positions 2.53 [a] N 103 Police Analyst I $137 Y
46 115

City of Cathedral City

MASTER FEE SCHEDULE - HOURLY BILLING RATES

BILLING RATES FOR FEE-RELATED SERVICES (HOURLY / T&M BILLINGS) Position Proposed Hourly
Billing Rate
Inflator Added to
Base Salary Note CPIFee Category / Division
104 Police Analyst II $151 Y
105 Police Background Investigator (3 Part-Time) $128 Y 106 Police Deputy Police Chief $329 Y
107 Police Police Chief $381 Y
108 Police Police Commander $313 Y
109 Police Police Officer $180 Y
110 Police Police Records Specialist I $94 Y
111 Police Police Records Specialist II $123 Y
112 Police Police Sergeant $267 Y
113 Police Police Service Assistant $94 Y
114 Police Police Training Coordinator $123 Y
115 Police Senior Analyst $166 Y
116 Police Community Service Officer $107 Y
117 Police Police Cadet (4 Part-Time) $54 Y
118 Police Crime Analyst $146 Y
119 Police Property Evidence Technician I $107 Y
120 Police Property Evidence Technician II $136 Y
121 Police Public Safety Dispatcher I $118 Y
122 Police Public Safety Dispatcher II $136 Y
123 Police Safety Dispatcher Part Time (5 Part-Time) $115 Y 124 Police All Other Positions 3.18 [a] N
125 Fire Administration Administrative Analyst II $110 Y 126 Fire Administration Analyst I $119 Y
127 Fire Administration Deputy Fire Chief $287 Y
128 Fire Administration Fire Battalion Chief $172 Y
129 Fire Administration Fire Chief $332 Y
130 Fire Administration All Other Positions 2.77 [a] N
131 Emergency Services Fire Battalion Chief $203 Y
132 Emergency Services Fire Captain $242 Y
133 Emergency Services Fire Engineer $141 Y
134 Emergency Services Firefighter Paramedic $193 Y
135 Emergency Services Firefighter EMT $166 Y
136 Emergency Services All Other Positions 3.22 N
137 Fire Prevention Fire Life Safety Inspector $164 Y
138 Fire Prevention Fire Marshal $343 Y
47 116

City of Cathedral City

MASTER FEE SCHEDULE - HOURLY BILLING RATES

BILLING RATES FOR FEE-RELATED SERVICES (HOURLY / T&M BILLINGS) Position Proposed Hourly
Billing Rate
Inflator Added to
Base Salary Note CPIFee Category / Division
139 Fire Prevention All Other Positions 4.43 [a] N
140 Ambulance Services Ambulance Operator/Paramedic $90 Y 141 Ambulance Services Ambulance Operator/EMT $86 Y
142 Ambulance Services Firefighter EMT $140 Y
143 Ambulance Services Firefighter Paramedic $225
144 Ambulance Services All Other Positions 3.89 [a] N
145 Citywide Contract Service Support Pass-through +
15% Admin
[b] N
[b] For deposit-based or pass-through billings.
[c] Positional billings are not used for building fees. Use uniform hourly billing rate when required. [a] To calculate hourly rate for positions not listed, multiply base salary rate per hour by factor shown. Outcome is fully-burdened hourly rate. Fully- burdened hourly rate includes benefits, adjustment for productive hours, indirect costs, etc. Example: $90,000 annual salary / 2,080 hours = $43.27/hr.

Multiple by factor of 3.89 to calculate fully-burdened hourly rate of $168/hr. 48 117

RESOLUTION NO. 2026-

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF CATHEDRAL CITY, CALIFORNIA, ADOPTING A

SCHEDULE OF USER AND REGULATORY FEES FOR

VARIOUS CITY SERVICES
WHEREAS, user and regulatory fees are established by the City Council; and
WHEREAS, the City recently completed a study to identify the cost of providing various user and regulatory fee-related services; and WHEREAS, the study examined fee-related services provided by the City, the costs reasonably borne by the City in providing those services, the beneficiaries of those services, and the revenues produced by those paying fees and charges for special services; and
WHEREAS, the City Council finds that providing these services is of special benefit to applicants both separate and apart from the general benefit to the public; and therefore, in the interests of fairness to the general public, the City desires to better recover the costs of providing these services from applicants who have sought or require the City's services by revising its schedule of fees; and
WHEREAS, the City Council hereby finds that the study provides adequate evidence to conclude that the revised fees do not exceed the cost to provide the services for which the fees are charged; and WHEREAS, the City Council desires that annually the City Manager may update the various fees based on the percentage change, for 12-months ending January of the current fiscal year, in the All-Urban Consumers Price Index for Riverside-San Bernardino-Ontario (CPI). If the CPI-U does not change or goes down in a given year, no change shall be made to the fee schedule that year; and
WHEREAS, in order to assist staff in implementing the requested annual adjustments, if any, Exhibit “A” includes a column identified as “CPI” that illustrates the recommended annual adjustment pattern for the fees set forth in Exhibit “A”; and
WHEREAS, in adopting this Resolution, the City Council is taking action only on those fees for the services, programs or products set forth in Exhibit “A” which have been modified from prior resolutions of the City Council. The remaining fees that have not been modified from prior resolutions shall remain in full force and effect.
118

NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF CATHEDRAL

CITY DOES HEREBY RESOLVE, DETERMINE AND ORDER AS
FOLLOWS:

SECTION 1. INCORPORATION OF RECITALS
The City Council hereby finds the recitals set forth above are true and correct.

SECTION 2. ESTABLISHMENT AND UPDATE OF FEES, CHARGES, AND RATES
The City Council hereby adopts the fees, charges, and rates as set forth in Exhibit “A” attached and incorporated by this reference.

SECTION 3. EFFECTIVE DATE
Any new or adjusted fees adopted by this Resolution shall go into effect sixty days after adoption of this resolution.

SECTION 4. CERTIFICATION
The City Clerk shall attest to and certify the vote adopting this resolution.

PASSED, APPROVED, AND ADOPTED at a regular meeting of the City Council of the City of Cathedral City held on this 22nd day of April 2026, by the following vote:

Ayes:

Noes:

Absent:

Abstain:
______________________________
Raymond Gregory, Mayor
ATTEST:
______________________________
Christina Burton, City Clerk
APPROVED AS TO FORM:
______________________________
Eric S. Vail, City Attorney
119

Staff Report
City Council
Item No. 5.A
Meeting Date: April 22, 2026
From: John A. Corella, Director of Public Works
Title: Construction Contract Award to for the Sunny Sands Neighborhood Pavement Rehabilitation and Cathedral Canyon Drive Street Rehabilitation Projects (C02612 & C02613)
RECOMMENDATION:

To award a construction contract to Matich Corporation in the amount of $1,114,672.00 for the Sunny Sands Neighborhood Pavement Rehabilitation Project (C02612) and the Cathedral Canyon Drive from Perez Road to Ofelia Bringas Bridge Street Rehabilitation Project (C02613); approve a twenty percent (20%) contingency in the amount of $222,934.40 for unforeseeable construction costs; approve a proposal from LandMark Consultants, Inc. in the not to exceed amount of $7,000.00 to provide material testing services during construction, thereby bringing the total construction budget to the amount of $1,344,606.40; and, authorize the City Manager to execute the required contract documents; and, authorize the City Engineer to execute LandMark Consultants, Inc. proposal, request bonds and insurance for the project, and issue the notice to proceed.

BACKGROUND:

In May 2023, Cathedral City’s Engineering Department adopted a pavement management program (PMP) to support the monitoring, maintenance, and rehabilitation of the city’s street network. The PMP establishes a dynamic and continuously updated Pavement Condition Index (PCI) for all streets throughout the city. PCI values range from 0 to 100 and classify pavement conditions as very good, good, fair, poor, or very poor. This program, combined with field observations, provides the basis for identifying the most effective and cost-efficient rehabilitation strategies for specific roadway segments.

On May 28, 2025, the City Council adopted the FY 2025–2026 and FY 2026–2027 Biennial Budget, which included the Sunny Sands Neighborhood Pavement Rehabilitation project (FY 2027/2028) and Cathedral Canyon Drive Street Rehabilitation project (FY 2026/2027) as part of the 5-Year Capital Improvement Project (CIP) Plan.

On March 25, 2026, Engineering staff presented an update to the FY 2025-2026 CIP and recommended adjustments to the 5-year CIP plan to ensure timely use of Maintenance of Effort (MOE) funds in accordance with annual expenditure requirements. 1 As part of these adjustments, staff recommended advancing the following projects to FY 2025–2026:

1. Sunny Sands Neighborhood Pavement Rehabilitation Project (C02612) Originally scheduled for construction in FY 2027–2028 utilizing MOE and SB-1 funds, this project includes pavement rehabilitation on the following streets:
Baristo Road (PCI = 41), from Date Palm Drive to the eastern end. El Toro Road (PCI = 48), Victor Road (PCI = 53), and Neuma Drive (PCI = 55), from Ramon Road to Baristo Road
Proposed improvements include pavement resurfacing, restriping, upgrading curb ramps to meet Americans with Disabilities Act (ADA) requirements, and adjusting water and other underground utility facilities to grade.

2. Cathedral Canyon Drive Street Rehabilitation Project (C02613) Originally scheduled for construction in FY 2026–2027 utilizing MOE funds, this project includes pavement rehabilitation along Cathedral Canyon Drive from Perez Road to Paseo Azulejo (average PCI = 24).

Proposed improvements include pavement resurfacing, restriping, and adjustment of water and other underground utility facilities to grade.

Engineering staff prepared plans, specifications and estimates (PS&E) for both projects in- house. The PS&E package was completed on March 26, 2026, and served as the basis for bid solicitation and will govern construction of the projects.

DISCUSSION:

On March 31, 2026, the city advertised an Invitation to Bid for Bid No. B26-118E, seeking qualified contractors to perform the scope of work described in the plans and specifications of the project. The bid documents included an additive alternate for the adjustment of Coachella Valley Water District (CVWD) facilities (valves, manholes, and cleanout lids) to match new asphalt pavement elevations, with the associated costs to be borne by CVWD.

The bid solicitation was advertised for 10 calendar days through the following platforms:
• The Desert Sun - Published on March 31, 2026
• PlanIt Print Works - From March 27, 2026, until April 10, 2026 • City’s Website - From March 27, 2026, until April 10, 2026 On April 10, 2026, the city received 7 bid proposals. The following table ranks each qualified bidder by the base bid amount.

Rank Contractor Amount
1 Matich Corporation – San Bernardino, CA $ 1,114,672.00 2 Hardy & Harper Inc. – Lake Forest, CA $ 1,203,290.00
3 Onyx Paving Company Inc. – Yorba Linda, CA $ 1,217,000.00 2 4 Calmex Engineering Inc. – Bloomington, CA $ 1,226,420.90 5 Granite Construction Company – Indio, CA $ 1,249,000.00 6 Romero General Construction Corp – Escondido, CA $ 1,327,330.00 7 Vance Corporation – Beaumont, CA $ 1,332,898.36
The bid tabulation prepared by the Engineering Division is attached to this report for reference. The lowest responsive and responsible bidder for the base bid schedule is Matich Corporation from San Bernardino, CA.

Following the bid review, CVWD rejected the additive alternate submitted by Matich Corporation and elected to perform this work separately using its on-call contractor during construction. As a result, the city will not include the CVWD-related water facility adjustments in this contract.

Based on the bids received and CVWD’s decision, the lowest responsive and responsible bidder who yields the lowest contract price is Matich Corporation from San Bernardino, CA.

Engineering staff recommend the City Council award a construction contract to Matich Corporation in the amount of $1,114,672.00 for the Sunny Sands Neighborhood Pavement Rehabilitation Project (C02612) and the Cathedral Canyon Drive from Perez Road to Ofelia Bringas Bridge Street Rehabilitation Project (C02613); approve a twenty percent (20%) contingency in the amount of $222,934.40 for unforeseeable construction costs; approve a proposal from LandMark Consultants, Inc. in the not to exceed amount of $7,000.00 to provide material testing services during construction, thereby bringing the total construction budget to the amount of $1,344,606.40; and, authorize the City Manager to execute the required contract documents; and, authorize the City Engineer to execute LandMark Consultants, Inc. proposal, request bonds and insurance for the project, and issue the notice to proceed.

Environmental Analysis
These projects are categorically excluded under the National Environmental Policy Act (NEPA) process for federally funded projects per 24CFR58.35 (a)(1) and Categorically Exempt under the California Environmental Quality Act (CEQA), Section 15301 for “Existing Facilities”.

FISCAL IMPACT:

FY 2025-2026 (CIP) Biennial Budget
Both projects are included in the approved FY 2025-2026 CIP and programmed to be funded as described below:

1. The Sunny Sands Neighborhood Pavement Rehabilitation Project (C02612) had an estimated programmed construction cost of $1,340,000, with a plan for funding to be $840,000 from General Fund Maintenance of Effort (MOE) funds and $500,000 from RMRA/SB-1 funds.

2. The Cathedral Canyon Drive Street Rehabilitation Project (C02613) had an estimated programmed construction cost of $540,000 with a plan for funding to be General Fund MOE funds.
3 The combined estimated construction cost for both projects, as programmed in the CIP Plan totaled $1,880,000 and is shown below:

Sunny Sands Neighborhood (C02612) $ 1,340,000.00
Cathedral Canyon Drive (C02613) $ 540,000.00
Combined Estimated Construction Cost $ 1,880,000.00
Construction Budget
The city received a combined base bid of $1,114,672.00 from Matich Corporation for both projects. The base bid amounts by project are as follows:

Sunny Sands Neighborhood (C02612) $ 674,579.00
Cathedral Canyon Drive (C02613) $ 440,093.00
Total Base Bid $ 1,114,672.00
Staff recommends approval of a 20% contingency in the amount of $222,934.40, to account for potential unforeseen construction costs, as well as $7,000.00 for material testing services to be provided by LandMark Consultants, Inc., thereby bringing the total actual construction budget to $1,344,606.40, as shown below:

Total Bid Cost (Matich Corporation) $ 1,114,672.00
20% Contingency $ 222,934.40
Material Testing Services (LandMark Consultants, Inc.) $ 7,000.00 Total Construction Budget $ 1,344,606.40
Proposed Funding Sources
The programmed CIP amounts for both projects were based on planning-level cost estimates and included allocations from Maintenance of Effort (MOE) and RMRA/SB-1 funds.

Based on the bids received, the total construction budget, including contingency and materials testing, is $1,344,606.40, which is lower than the programmed CIP estimates. This reduction allows both projects to be fully funded with available General Fund MOE without the need to utilize RMRA/SB-1 funds.

Accordingly, staff are proposing to prioritize the use of available MOE funds to ensure the city meets the FY 2025–2026 MOE expenditure requirements.

The following table summarizes the budget allocations for the construction of the projects Fiscal
Year DESCRIPTION

GENERAL
LEDGER

ACCOUNT
CODES

PROJECT

CODE AMOUNT

ONE TIME
or

ONGOING
2025-26 Sunny Sands Neighborhood
Construction
100-100-150-
156-8800-8802 C02612 $674,579.00 ONE TIME
2025-26 Cathedral Canyon Drive
Construction
100-100-150-
156-8800-8802 C02613 $440,093.00 ONE TIME
2025-26 20% Construction
Contingency
100-100-150-
156-8800-8802
C02612
C02613
$134,915.80
$ 88,018.60 ONE TIME
4 2025-26 Material Testing 100-100-150-
156-8800-8802
C02612
C02613
$ 3,500.00
$ 3,500.00 ONE TIME
2025-26 Total $1,344,606.40
FIVE-YEAR STRATEGIC PLAN:

Goal-B: Community Investment
Objective: Cathedral City roads, gateways, public spaces, and other city infrastructure are well planned, designed, constructed, and maintained.

ATTACHMENTS:

1. Sunny Sands Neighborhood and Cathedral Canyon Drive – Vicinity Map

2. Sunny Sands Neighborhood and Cathedral Canyon Drive – Bid Tab

3. Sunny Sands Neighborhood and Cathedral Canyon Drive – Contract

4.LandMark Consultants, Inc. Proposal
5 6

7 8

CITY OF CATHEDRAL CITY
FY 2025-2026 SUNNY SANDS NEIGHBORHOOD AND CATHEDRAL CANYON DRIVE

PAVEMENT REHABILITATION PROJECTS
BID TABULATION/ANALYSIS CITY PROJECT NO. 2612 and 2613
1 MOBILIZATION LS 1 80,000.00$ 80,000.00 $ 50,000.00 $ 50,000.00 $ 2 TRAFFIC CONTROL LS 1 25,000.00$ 25,000.00 $ 38,000.40 $ 38,000.40 $ 3 STRIPING LS 1 15,000.00$ 15,000.00 $ 6,800.00 $ 6,800.00 $ 4 COLD MILL 3" AC PAVEMENT AND DISPOSE SF 236,156 0.75 $ 177,117.00$ 0.35 $ 82,654.60$ 5 CONSTRUCT 3" TYPE III C-3 PG 70-10 AC PAVEMENT SECTION TON 4,428 152.00 $ 673,056.00$ 103.00 $ 456,084.00$ 6 REMOVE AND DISPOSE EXISTING CURB RAMP AND
ALL CONCRETE FROM BCR TO ECR EA 8 3,000.00$ 24,000.00 $ 1,030.00 $ 8,240.00 $ 7 CONSTRUCT CURB RAMP PER CALTRANS STANDARD PLAN
A88A (MODIFIED; SEE PLANS) EA 8 7,000.00$ 56,000.00 $ 4,100.00 $ 32,800.00 $ 1,050,173.00$ 674,579.00 $
1 MOBILIZATION LS 1 36,000.00$ 36,000.00 $ 27,600.00 $ 27,600.00 $ 2 TRAFFIC CONTROL LS 1 11,000.00$ 11,000.00 $ 42,000.12 $ 42,000.12 $ 3 STRIPING LS 1 15,000.00$ 15,000.00 $ 9,300.00 $ 9,300.00 $ 8 REMOVE AND DISPOSE 4.5" AC PAVEMENT AND BASE SF 91,612 0.75 $ 68,709.00$ 0.74 $ 67,792.88$ 9 CONSTRUCT 4.5" TYPE III C-3 PG 70-10 AC PAVEMENT SECTION TON 2,600 152.00 $ 395,200.00$ 108.00 $ 280,800.00$ 10 LOWER AND RAISE WATER VALVE TO GRADE PER DWA
STANDARDS EA 2 1,500.00$ 3,000.00 $ 2,700.00 $ 5,400.00 $ 11 LOWER AND RAISE SEWER CLEANOUT TO GRADE PER DWA
STANDARDS EA 1 2,150.00$ 2,150.00 $ 3,600.00 $ 3,600.00 $ 12 LOWER AND RAISE SEWER MANHOLE TO GRADE PER DWA
STANDARDS EA 1 2,150.00$ 2,150.00 $ 3,600.00 $ 3,600.00 $ 533,209.00$ 440,093.00 $
1,583,382.00$ 1,114,672.00 $
Engineer Estimate

UNIT COST TOTAL

TOTAL ALL BASE BID ITEMS
TOTAL BASE BID AMOUNT (BID ITEMS 1-7)
TOTAL BID SCHEDULE NO.2 (BID ITEMS 1-3, 8-12)
TOTAL
Matich Corporation

ITEM DESCRIPTION UNIT QUANTITY UNIT COST
BID SCHEDULE NO. 1: SUNNY SANDS NEIGHBORHOOD
BID SCHEDULE NO. 2: CATHEDRAL CANYON DRIVE
9 CITY OF CATHEDRAL CITY
FY 2025-2026 SUNNY SANDS NEIGHBORHOOD AND CATHEDRAL CANYON DRIVE

PAVEMENT REHABILITATION PROJECTS
BID TABULATION/ANALYSIS CITY PROJECT NO. 2612 and 2613
Engineer Estimate

UNIT COST TOTAL TOTAL
Matich Corporation

ITEM DESCRIPTION UNIT QUANTITY UNIT COST
A-1 LOWER AND RAISE WATER VALVE TO GRADE PER CVWD
STANDARDS EA 31 1,500.00$ 46,500.00 $ 1,970.00 $ 61,070.00 $ A-2 LOWER AND RAISE SEWER CLEANOUT TO GRADE PER CVWD
STANDARDS EA 1 2,150.00$ 2,150.00 $ 2,800.00 $ 2,800.00 $ A-3 LOWER AND RAISE SEWER MANHOLE TO GRADE PER CVWD
STANDARDS EA 12 2,150.00$ 25,800.00 $ 2,800.00 $ 33,600.00 $ 74,450.00$ 97,470.00 $
1,657,832.00$ 1,212,142.00 $
ADDITIVE ALTERNATE BID SCHEDULE A: UTILITY

ADJUSTMENT

TOTAL ADDITIVE ALTERNATE BID SCHEDULE A

TOTAL ALL BID ITEMS AND ALL ALTERNATIVES
10 CITY OF CATHEDRAL CITY
FY 2025-2026 SUNNY SANDS NEIGHBORHOOD AND CATHEDRAL CANYON DRIVE

PAVEMENT REHABILITATION PROJECTS
BID TABULATION/ANALYSIS CITY PROJECT NO. 2612 and 2613
1 MOBILIZATION LS 1
2 TRAFFIC CONTROL LS 1
3 STRIPING LS 1
4 COLD MILL 3" AC PAVEMENT AND DISPOSE SF 236,156
5 CONSTRUCT 3" TYPE III C-3 PG 70-10 AC PAVEMENT SECTION TON 4,428 6 REMOVE AND DISPOSE EXISTING CURB RAMP AND
ALL CONCRETE FROM BCR TO ECR EA 8
7 CONSTRUCT CURB RAMP PER CALTRANS STANDARD PLAN
A88A (MODIFIED; SEE PLANS) EA 8
1 MOBILIZATION LS 1
2 TRAFFIC CONTROL LS 1
3 STRIPING LS 1
8 REMOVE AND DISPOSE 4.5" AC PAVEMENT AND BASE SF 91,612 9 CONSTRUCT 4.5" TYPE III C-3 PG 70-10 AC PAVEMENT SECTION TON 2,600 10 LOWER AND RAISE WATER VALVE TO GRADE PER DWA
STANDARDS EA 2
11 LOWER AND RAISE SEWER CLEANOUT TO GRADE PER DWA
STANDARDS EA 1
12 LOWER AND RAISE SEWER MANHOLE TO GRADE PER DWA
STANDARDS EA 1

TOTAL ALL BASE BID ITEMS
TOTAL BASE BID AMOUNT (BID ITEMS 1-7)
TOTAL BID SCHEDULE NO.2 (BID ITEMS 1-3, 8-12)

ITEM DESCRIPTION UNIT QUANTITY
BID SCHEDULE NO. 1: SUNNY SANDS NEIGHBORHOOD
BID SCHEDULE NO. 2: CATHEDRAL CANYON DRIVE
15,040.00$ 15,040.00 $ 24,842.00 $ 24,842.00 $ 45,678.80$ 45,678.80 $ 50,000.00 $ 50,000.00 $ 4,725.00$ 4,725.00 $ 8,000.00 $ 8,000.00 $

0.45$ 106,270.20$ 0.50 $ 118,078.00$ 112.00$ 495,936.00$ 110.00 $ 487,080.00$ 1,310.00$ 10,480.00 $ 3,000.00 $ 24,000.00 $ 4,020.00$ 32,160.00 $ 4,000.00 $ 32,000.00 $ 710,290.00$ 2,500.00 $ 744,000.00$
10,500.00$ 10,500.00 $ 21,065.60 $ 21,065.60 $ 33,142.40$ 33,142.40 $ 37,000.00 $ 37,000.00 $ 13,125.00$ 13,125.00 $ 9,000.00 $ 9,000.00 $

1.05$ 96,192.60$ 1.20 $ 109,934.40$ 124.00$ 322,400.00$ 110.00 $ 286,000.00$ 4,620.00$ 9,240.00 $ 2,500.00 $ 5,000.00 $ 4,200.00$ 4,200.00 $ 2,500.00 $ 2,500.00 $ 4,200.00$ 4,200.00 $ 2,500.00 $ 2,500.00 $ 493,000.00$ 473,000.00 $
1,203,290.00$ 1,217,000.00 $

UNIT COST TOTAL
Hardy & Harper, Inc.

UNIT COST TOTAL
Onyx Paving Company, Inc.
11 CITY OF CATHEDRAL CITY
FY 2025-2026 SUNNY SANDS NEIGHBORHOOD AND CATHEDRAL CANYON DRIVE

PAVEMENT REHABILITATION PROJECTS
BID TABULATION/ANALYSIS CITY PROJECT NO. 2612 and 2613

ITEM DESCRIPTION UNIT QUANTITY
A-1 LOWER AND RAISE WATER VALVE TO GRADE PER CVWD
STANDARDS EA 31
A-2 LOWER AND RAISE SEWER CLEANOUT TO GRADE PER CVWD
STANDARDS EA 1
A-3 LOWER AND RAISE SEWER MANHOLE TO GRADE PER CVWD
STANDARDS EA 12
ADDITIVE ALTERNATE BID SCHEDULE A: UTILITY

ADJUSTMENT

TOTAL ADDITIVE ALTERNATE BID SCHEDULE A

TOTAL ALL BID ITEMS AND ALL ALTERNATIVES

UNIT COST TOTAL
Hardy & Harper, Inc.

UNIT COST TOTAL
Onyx Paving Company, Inc.
1,575.00$ 48,825.00 $ 2,000.00 $ 62,000.00 $ 1,145.00$ 1,145.00 $ 2,000.00 $ 2,000.00 $ 1,145.00$ 13,740.00 $ 2,000.00 $ 24,000.00 $ 63,710.00$ 88,000.00 $
1,267,000.00$ 1,305,000.00 $
12 CITY OF CATHEDRAL CITY
FY 2025-2026 SUNNY SANDS NEIGHBORHOOD AND CATHEDRAL CANYON DRIVE

PAVEMENT REHABILITATION PROJECTS
BID TABULATION/ANALYSIS CITY PROJECT NO. 2612 and 2613
1 MOBILIZATION LS 1
2 TRAFFIC CONTROL LS 1
3 STRIPING LS 1
4 COLD MILL 3" AC PAVEMENT AND DISPOSE SF 236,156
5 CONSTRUCT 3" TYPE III C-3 PG 70-10 AC PAVEMENT SECTION TON 4,428 6 REMOVE AND DISPOSE EXISTING CURB RAMP AND
ALL CONCRETE FROM BCR TO ECR EA 8
7 CONSTRUCT CURB RAMP PER CALTRANS STANDARD PLAN
A88A (MODIFIED; SEE PLANS) EA 8
1 MOBILIZATION LS 1
2 TRAFFIC CONTROL LS 1
3 STRIPING LS 1
8 REMOVE AND DISPOSE 4.5" AC PAVEMENT AND BASE SF 91,612 9 CONSTRUCT 4.5" TYPE III C-3 PG 70-10 AC PAVEMENT SECTION TON 2,600 10 LOWER AND RAISE WATER VALVE TO GRADE PER DWA
STANDARDS EA 2
11 LOWER AND RAISE SEWER CLEANOUT TO GRADE PER DWA
STANDARDS EA 1
12 LOWER AND RAISE SEWER MANHOLE TO GRADE PER DWA
STANDARDS EA 1

TOTAL ALL BASE BID ITEMS
TOTAL BASE BID AMOUNT (BID ITEMS 1-7)
TOTAL BID SCHEDULE NO.2 (BID ITEMS 1-3, 8-12)

ITEM DESCRIPTION UNIT QUANTITY
BID SCHEDULE NO. 1: SUNNY SANDS NEIGHBORHOOD
BID SCHEDULE NO. 2: CATHEDRAL CANYON DRIVE
36,000.00$ 36,000.00 $ 55,000.00 $ 55,000.00 $ 11,347.00$ 11,347.00 $ 10,000.00 $ 10,000.00 $ 6,752.00$ 6,752.00 $ 6,545.00 $ 6,545.00 $

0.63$ 148,778.28$ 0.50 $ 118,078.00$ 111.00$ 491,508.00$ 115.00 $ 509,220.00$ 2,908.00$ 23,264.00 $ 3,500.00 $ 28,000.00 $ 4,162.00$ 33,296.00 $ 6,500.00 $ 52,000.00 $ 750,945.28$ 778,843.00 $
27,925.00$ 27,925.00 $ 30,906.80 $ 30,906.80 $ 8,871.00$ 8,871.00 $ 25,000.00 $ 25,000.00 $ 9,264.00$ 9,264.00 $ 8,980.00 $ 8,980.00 $

1.47$ 134,669.64$ 0.85 $ 77,870.20$ 109.00$ 283,400.00$ 120.00 $ 312,000.00$ 2,372.00$ 4,744.00 $ 4,300.00 $ 8,600.00 $ 3,301.00$ 3,301.00 $ 4,100.00 $ 4,100.00 $ 3,301.00$ 3,301.00 $ 2,700.00 $ 2,700.00 $ 475,475.64$ 470,157.00 $
1,226,420.92$ 1,249,000.00 $
Granite Construction Company

UNIT COST TOTAL UNIT COST TOTAL
Calmex Engineering, Inc.
13 CITY OF CATHEDRAL CITY
FY 2025-2026 SUNNY SANDS NEIGHBORHOOD AND CATHEDRAL CANYON DRIVE

PAVEMENT REHABILITATION PROJECTS
BID TABULATION/ANALYSIS CITY PROJECT NO. 2612 and 2613

ITEM DESCRIPTION UNIT QUANTITY
A-1 LOWER AND RAISE WATER VALVE TO GRADE PER CVWD
STANDARDS EA 31
A-2 LOWER AND RAISE SEWER CLEANOUT TO GRADE PER CVWD
STANDARDS EA 1
A-3 LOWER AND RAISE SEWER MANHOLE TO GRADE PER CVWD
STANDARDS EA 12
ADDITIVE ALTERNATE BID SCHEDULE A: UTILITY

ADJUSTMENT

TOTAL ADDITIVE ALTERNATE BID SCHEDULE A

TOTAL ALL BID ITEMS AND ALL ALTERNATIVES
Granite Construction Company

UNIT COST TOTAL UNIT COST TOTAL
Calmex Engineering, Inc.
2,092.00$ 64,852.00 $ 4,300.00 $ 133,300.00$ 3,023.00$ 3,023.00 $ 2,700.00 $ 2,700.00 $ 3,023.00$ 36,276.00 $ 4,100.00 $ 49,200.00 $ 104,151.00$ 185,200.00 $
1,330,571.92$ 1,434,200.00 $
14 CITY OF CATHEDRAL CITY
FY 2025-2026 SUNNY SANDS NEIGHBORHOOD AND CATHEDRAL CANYON DRIVE

PAVEMENT REHABILITATION PROJECTS
BID TABULATION/ANALYSIS CITY PROJECT NO. 2612 and 2613
1 MOBILIZATION LS 1
2 TRAFFIC CONTROL LS 1
3 STRIPING LS 1
4 COLD MILL 3" AC PAVEMENT AND DISPOSE SF 236,156
5 CONSTRUCT 3" TYPE III C-3 PG 70-10 AC PAVEMENT SECTION TON 4,428 6 REMOVE AND DISPOSE EXISTING CURB RAMP AND
ALL CONCRETE FROM BCR TO ECR EA 8
7 CONSTRUCT CURB RAMP PER CALTRANS STANDARD PLAN
A88A (MODIFIED; SEE PLANS) EA 8
1 MOBILIZATION LS 1
2 TRAFFIC CONTROL LS 1
3 STRIPING LS 1
8 REMOVE AND DISPOSE 4.5" AC PAVEMENT AND BASE SF 91,612 9 CONSTRUCT 4.5" TYPE III C-3 PG 70-10 AC PAVEMENT SECTION TON 2,600 10 LOWER AND RAISE WATER VALVE TO GRADE PER DWA
STANDARDS EA 2
11 LOWER AND RAISE SEWER CLEANOUT TO GRADE PER DWA
STANDARDS EA 1
12 LOWER AND RAISE SEWER MANHOLE TO GRADE PER DWA
STANDARDS EA 1

TOTAL ALL BASE BID ITEMS
TOTAL BASE BID AMOUNT (BID ITEMS 1-7)
TOTAL BID SCHEDULE NO.2 (BID ITEMS 1-3, 8-12)

ITEM DESCRIPTION UNIT QUANTITY
BID SCHEDULE NO. 1: SUNNY SANDS NEIGHBORHOOD
BID SCHEDULE NO. 2: CATHEDRAL CANYON DRIVE
55,000.00$ 55,000.00 $ 50,000.00 $ 50,000.00 $ 43,000.00$ 43,000.00 $ 15,000.00 $ 15,000.00 $ 6,455.00$ 6,455.00 $ 8,173.00 $ 8,173.00 $

0.50$ 118,078.00$ 0.30 $ 70,846.80$ 125.00$ 553,500.00$ 101.00 $ 447,228.00$ 1,000.00$ 8,000.00 $ 1,093.00 $ 8,744.00 $ 4,000.00$ 32,000.00 $ 4,371.00 $ 34,968.00 $ 816,033.00$ 634,959.80 $
35,000.00$ 35,000.00 $ 21,365.00 $ 21,365.00 $ 40,106.80$ 40,106.80 $ 13,132.00 $ 13,132.00 $ 8,980.00$ 8,980.00 $ 9,020.00 $ 9,020.00 $

0.85$ 77,870.20$ 1.13 $ 103,521.56$ 130.00$ 338,000.00$ 206.00 $ 535,600.00$ 3,175.00$ 6,350.00 $ 3,825.00 $ 7,650.00 $ 2,995.00$ 2,995.00 $ 3,825.00 $ 3,825.00 $ 1,995.00$ 1,995.00 $ 3,825.00 $ 3,825.00 $ 511,297.00$ 697,938.56 $
1,327,330.00$ 1,332,898.36 $

UNIT COST TOTAL
Romero General Construction Corp. Vance Corporation

UNIT COST TOTAL
15 CITY OF CATHEDRAL CITY
FY 2025-2026 SUNNY SANDS NEIGHBORHOOD AND CATHEDRAL CANYON DRIVE

PAVEMENT REHABILITATION PROJECTS
BID TABULATION/ANALYSIS CITY PROJECT NO. 2612 and 2613

ITEM DESCRIPTION UNIT QUANTITY
A-1 LOWER AND RAISE WATER VALVE TO GRADE PER CVWD
STANDARDS EA 31
A-2 LOWER AND RAISE SEWER CLEANOUT TO GRADE PER CVWD
STANDARDS EA 1
A-3 LOWER AND RAISE SEWER MANHOLE TO GRADE PER CVWD
STANDARDS EA 12
ADDITIVE ALTERNATE BID SCHEDULE A: UTILITY

ADJUSTMENT

TOTAL ADDITIVE ALTERNATE BID SCHEDULE A

TOTAL ALL BID ITEMS AND ALL ALTERNATIVES

UNIT COST TOTAL
Romero General Construction Corp. Vance Corporation

UNIT COST TOTAL
2,400.00$ 74,400.00 $ 2,350.00 $ 72,850.00 $ 2,300.00$ 2,300.00 $ 2,350.00 $ 2,350.00 $ 2,200.00$ 26,400.00 $ 2,350.00 $ 28,200.00 $ 103,100.00$ 103,400.00 $
1,430,430.00$ 1,436,298.36 $
16 Agreement 1300-1

SECTION 1300

CONTRACT

THIS CONTRACT, by and between the CITY OF CATHEDRAL CITY, a municipal corporation, herein referred to as "City”, and Matich Corporation., herein referred to as, "Contractor."

W I T N E S S E T H:

In consideration of their mutual covenants, the parties hereto agree as follows:

1. Contractor shall furnish all necessary labor, material, equipment, transportation and services for

BID NO. B26-118E
FY 2025-2026

SUNNY SANDS NEIGHBORHOOD AND CATHEDRAL CANYON DRIVE

PAVEMENT REHABILITATION PROJECTS
SUNNY SANDS NEIGBORHOOD PAVEMENT RECONSTRUCTION (C02612)

CATHEDRAL CANYON DRIVE FROM PEREZ ROAD TO OFELIA BRINGAS BRIDGE STREET RHABILITATION (C02613)

(the “Work”), in the City of Cathedral City, California. The Work shall be done in strict conformity with this Contract, approved Change Orders, the Invitation to Bid dated March 31, 2026, Instruction to Bidders, permits issued by the City or other agencies, the General and Specific Project Requirements, Standard Specifications, Plans, Referenced Specifications, the General Conditions, Supplementary Conditions, the Contractor’s Bid dated April 10, 2026, and any addenda thereto (the “Contract Documents”), all of which shall be considered a part hereof as though fully set herein.

2. Contractor will comply with all Federal, State, County, and City of Cathedral City laws, regulations, and policies, which are, as amended from time to time, incorporated herein by reference.

3. All work shall be done in a workman-like manner and to the satisfaction of the City Engineer.

4. Time is of the essence in the Contractor’s performance of the Work for this Contract. The contractor agrees to diligently pursue the performance and completion of the Work in every detail to the satisfaction of the City. The contractor shall commence work after the issuance of a written Notice to Proceed and agrees to have all work completed within Twenty (20) working days from the date of Notification to Proceed.

5. In consideration of said work, City agrees to pay Contractor such sums as shall be approved by the City Engineer at lump sums and/or unit prices stated in the Contractor's Bid. The total consideration to Contractor for all Work shall not exceed one million, one-hundred and fourteen thousand, six-hundred and seventy-two dollars, and zero cents ($1,114,672.00). All payments shall be subject to approval by the City Engineer and shall be in accordance with the terms, conditions, and procedures provided in the Contract Documents.

6. The Contractor shall not knowingly pay less than the general prevailing rate for per diem wages, as determined by the State of California Department of Industrial Relations and referred to in the Invitation to Bid, to any workman employed for the work to be performed under this contract; and the Contractor shall forfeit as a penalty to the City the sum of Twenty-Five Dollars ($25.00) for each calendar day, or fraction thereof, for such workman paid by him or by any subcontractor under him in violation of this provision (Sections 1770-1777, Labor Code of California).

17 Agreement 1300-2

7. Concurrently with the execution of this Contract, Contractor shall furnish bonds of a surety satisfactory to City, as provided in the Contract Documents, the cost of which shall be paid by Contractor.

8. Contractor agrees to indemnify, hold harmless, release and defend (even if the allegations are false, fraudulent or groundless), to the maximum extent permitted by law, the City, its City Council and each member thereof, and its officers, employees, commission members and representatives, from any and all liability, loss, suits, claims, damages, costs, judgments and expenses (including attorney's fees and costs of litigation) which in whole or in part are claimed to result from or to arise out of the usage or operation, including the malfunctioning of, or, any injury caused by, any product purchased herein; or any acts, errors or omissions (including, without limitation, professional negligence) of Contractor, its employees, representatives, subco ntractors, or agents in connection with the performance of this Contract. This agreement to indemnify includes, but is not limited to, personal injury (including death at any time) and damage to property (including, but without limitation, contract or tor t or patent, copyright, trade secret or trademark infringement) sustained by any person or persons (including, but not limited to, companies, or corporations, Contractor and its employees or agents, and members of the general public.

9. Except as otherwise required, Contractor shall concurrently with the execution of this Contract, furnish the City satisfactory evidence of insurance of the kinds and in the amounts provided in the Contract Documents. This insurance shall be kept in full force and effect by Contractor during this entire contract and all premiums thereon shall be promptly paid by it. Each policy shall further state that it cannot be canceled without 30 days unconditional written notice to the City and shall name the City as an additional insured. The Contractor shall furnish evidence of having in effect, and shall maintain Workers Compensation Insurance coverage of not less than the statutory amount or otherwise show a certificate of self-insurance, in accordance with the Workers Compensation laws of the State of California. Failure to maintain the required amounts and types of coverage throughout the duration of this Contract shall constitute a material breach of this Contract.

10. Contractor shall forfeit as a penalty to City $25.00 for each laborer, workman, or mechanic employed in the execution of this Contract by said Contractor, or any subcontractor under it, upon any of the work herein mentioned, for each calendar day during w hich such laborer, workman, or mechanic is required or permitted to work at other than a rate of pay provided by law for more than 8 hours in any one calendar day and 40 hours in any one calendar week, in violation of the provisions of Sections 1810- 1815 of the Labor Code of the State of California.

11. In accepting this Contract, Contractor certifies that in the conduct of its business it does not deny the right of any individual to seek, obtain and hold employment without discrimination because of race, religious creed, color, national origin, ancestry , physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status as provided in the California Fair Employment Prac tice Act (Government Code Sections 12900, et seq.) Contractor agrees that a finding by the State Fair Employment Practices Commission that Contractor has engaged during the term of this Contract in any unlawful employment practice shall be deemed a breach of this Contract and Contractor shall pay to City $500.00 liquidated damages for each such breach committed under this contract.

12. Contractor also agrees that for contracts in excess of $30,000 that apprentices will be employed without discrimination in an approved program in a ratio established in the apprenticeship standards of the craft involved (Sections 1777.5 and 1777.6, Labor Code of California). Contractors who willfully fail to comply will be denied the right to bid on public projects for a period of six months in addition to other penalties provided by law.

13. Contractor shall maintain and keep books and records on a current basis, recording all transactions pertaining to this agreement in a form in accordance with generally acceptable accounting principles. Said books and records shall be made available to the County, the State of California, the Federal government, and to any authorized representative thereof for the purposes of audit at all 18 Agreement 1300-3

reasonable times and places. All such books and records shall be retained for such periods of time as required by law, provided, however, notwithstanding any shorter periods of retention, all books, records, and supporting detail shall be retained for a period of at least four (4) years after the expiration of the term of this Agreement.

14. This Contract shall not be assignable by Contractor without the written consent of City.

15. Contractor shall notify the City Engineer (in writing) forthwith when the Contract is deemed completed.

16. In accepting this Contract, Contractor certifies that no member or officer of the firm or corporation is an officer or employee of the City except to the extent permitted by law.

17. Contractor certifies that it is the holder of any necessary California State Contractor's License and authorized to undertake the Work. The Contractor must, at the Contractor’s sole expense, obtain all necessary permits and licenses required for the Work, give all necessary notices and pay all fees and taxes required by law, including without limitation, any business license tax imposed by City. The Contractor represents and declares to Agency that it has all licenses, permits ,qualifications, and approvals of whatever nature which are legally required to practice its professions.

18. The City, or its authorized auditors or representatives, shall have access to and the right to audit and reproduce any of the Contractor records to the extent the City deems necessary to insure it is receiving all money to which it is entitled under the contract and/or is paying only the amounts to which Contractor is properly entitled under the Contract or for other purposes relating to the Contract.

19. The Contractor shall maintain and preserve all such records for a period of at least three years after termination of the contract.

20. The Contractor shall maintain all such records in the City of Cathedral City. If not, the Contractor shall, upon request, promptly deliver the records to the City or reimburse the City for all reasonable and extra costs incurred in conducting the audit at a location other than at City offices including, but not limited to, such additional (out of the City) expenses for personnel, salaries, private auditors, travel, lodging, meals and overhead.

21. In entering into this Contract or a contract with a subcontractor to supply goods, services, or materials pursuant to this Contract, Contractor and any or subcontractor are deemed to have offered and agreed to assign to City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C Sec. 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700 of Part 2 of Division 7 of the California Business and Professions Code), arising from purchases of goods, services, or materials for the Contract. This assignment will be deemed made and will be come effective at the time City tenders final payment to Contractor, without further acknowledgement by the Parties.

22. The Parties agree that, in accordance with the City’s Electronic Signature Use Policy, adopted on August 10, 2023, and as amended thereafter, the Parties may use electronic signatures to execute this Agreement. Any use of electronic signatures to exec ute this Agreement shall comply with the City’s Electronic Signature Use Policy, and such signatures shall have the same force and effect as if this Agreement were executed by hand. Contractor acknowledges that it has had an opportunity to request and rev iew the City’s Electronic Signature Use Policy, and Contractor agrees to comply with the Electronic Signature Use Policy. Contractor agrees to indemnify, defend, and hold the City harmless from any claim, damage, or liability associated with transmitting an electronic signature or an electronically signed record by electronic transmission.

19 Agreement 1300-4

IN WITNESS WHEREOF, the parties have executed this Agreement as of the dates stated below.

"CITY"

CITY OF CATHEDRAL CITY,

By:
_____________________________ Dated: _____________________________ Andrew Firestine, City Manager

ATTEST:

Dated: _____________________________
Christina Burton, City Clerk

APPROVED AS TO FORM:

Dated: _____________________________
Eric S. Vail, City Attorney

“CONTRACTOR”

Dated: By: __________________________________ Name: __________________________________
Title: __________________________________

Dated: By: __________________________________ Name: __________________________________
Title: __________________________________

[CONTRACTOR SIGNATURES MUST BE NOTARIZED. IF CONTRACT IS A CORPORATION OR LIMITED LIABILITY COMPANY, TWO SIGNATURES MUST BE PROVIDED]

20 Faithful Performance Bond 1310-1
SECTION 1310

FAITHFUL PERFORMANCE BOND

KNOW ALL MEN BY THESE PRESENTS:

THAT the City of Cathedral City, a municipal corporation, hereinafter designated the City, has, on April 22, 2026, awarded to Matich Corporation hereinafter designated as the Principal, a Contract for Bid No. B26-118E, Project No. (C02612), (C02613), and

WHEREAS, said Principal is required under the terms of said Contract to furnish a bond for the faithful performance of said Contract:

NOW, THEREFORE, we, the Principal, and _____________________________________, as Surety, are held and firmly bound unto the City in the just and full amount of one million, one-hundred and fourteen thousand, six -hundred and seventy -two dollars, and zero cents ($1,114,672.00) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, his or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, and well and truly keep and faithfully perform the covenants, conditions, and agreements in the said contract and any alterations made as therein provided, on his or their part to be kept and performed, at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless, the City, its officers and agents as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue.

It is acknowledged that the Contract provides for one-year guarantee period, during which time this bond remains in full force and effort.

And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the same shall, in any way, affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the Contract or to the work or to the specifications. Said Surety hereby waives the provisions of Sections 2819 and 2845 of the Civil Code of the State of California.

THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK
21 Faithful Performance Bond 1310-2
IN WITNESS WHEREOF, the Principal and Surety have executed this instrument under their seals this _________ day of _________________________________, 2026, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

Principal
(Seal)

Signature for Principal

Title of Signatory

Surety

(Seal)

Signature for Surety

Title of Signatory

Address of Surety

Phone # of Surety

Contact Person For Surety
22 Payment Bond 1320-1
SECTION 1320

PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS:

THAT the City of Cathedral City, a municipal corporation, hereinafter designated the City, has, on April 22, 2026, awarded to Matich Corporation, hereinafter designated as the Principal, a Contract for Bid No. B26-118E, Project No. (C02612), (C02613), and

WHEREAS, said Principal is required to furnish a bond in connection and with said Contract, providing that if said Principal, or any of it or its subcontractors shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, the Surety of this bond will pay the same to the extent hereinafter set forth:

NOW, THEREFORE, we, the Principal, and ____________________________________, as Surety, are held and firmly bound unto the City in the just and full amount of one million, one-hundred and fourteen thousand, six-hundred and seventy-two dollars, and zero cents ($1,114,672.00), executors, administrators, and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, it or its heirs, executors, administrators, successors, or assigns, shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the work contracted to be done, or for any work or labor thereon of any kind or for amount due under the Unemployment Insurance Act with respect to such work or labor, or for any amounts due, or to be withheld pursuant to Sections 18806 of the Revenue and Taxation Code of the State of California with respect to such work or labor, then said surety will pay the same in or to an amount not exceeding the amount hereinabove set forth, and also will pay in case suit is brought upon this bond, such reasonable attorney's fees to the City as shall be fixed by the court.

This bond shall insure to the benefit of any and all persons, companies, and corporations named in Section 3181 of the Civil Code of the State of California so as to give a right of action to them or their assigns in any suit brought upon this bond.

And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition of the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the same shall, in any way, affect its obligations of this bond, and it does hereby waive notice of any change, extension of time, alteration, or addition to the terms of the contract or to the work or to the specifications. Said Surety hereby waives the provisions of Sections 2819 and 2845 of the Civil Code of the State of California.

THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK
23 Payment Bond 1320-2
IN WITNESS WHEREOF, the Principal and Surety have executed this instrument under their seals this _________ day of _________________________________, 2026, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

Principal
(Seal)

Signature for Principal

Title of Signatory

Surety

(Seal)

Signature for Surety

Title of Signatory

Address of Surety

Phone # of Surety

Contact Person For Surety
24 Workers' Compensation Insurance 1330-1
SECTION 1330

WORKERS' COMPENSATION INSURANCE CERTIFICATE

In accordance with California Labor Code Section 1861, prior to commencement of work on the Contract, the Contractor shall sign and file with the City the following certification:

"I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with suc h provisions before commencing the performance of the work of this contract."

Signature

Title

Date
25 Workers' Compensation Insurance 1330-1

SECTION 1340

LIABILITY AND INSURANCE

REQUIREMENTS

1.0 INDEMNIFICATION

Contractor shall defend, indemnify and hold harmless the City, City Council and each member thereof, and every officer, employee and agent of City, from any claim, demand, damage, liability, loss, cost or expense (including, without limitation, attorney’s fees and costs) arising from any intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of the Contractor, or any of the Contractor'’ employees, or any of its subcontractors arising out of work under this Contract.

The City does not, and shall not, waive any rights that it may have against Contractor, any of the Contractor’s employees, or any of its subcontractors under this Section because of the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to this Contract. The hold harmless, indemnification and duty to defend provisions of this Section shall apply regardless of whether or not said insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense described herein. The City will not be liable for any accident, loss, or damage to the work prior to its completion and acceptance.

2.0 INSURANCE REQUIREMENTS

2.1 General

After award of Contract, the Contractor shall promptly obtain, at its own expense, all the insurance required by Paragraph 1340- 2.0, INSURANCE REQUIREMENTS, and shall submit coverage verification for review and approval by the City upon execution of the Contract.

The Notice to Proceed with the Work under this Contract will not be issued, and the Contractor shall not commence work, until such insurance has been approved by the City. The Contractor shall not allow any subcontractors to commence work on its subcontract until all similar insurance required of the subcontractor has been obtained and verified by Contractor. Such insurance shall remain in full force and effect at all times during the prosecution of the Work and until the final completion and acceptance thereof.

The Notice to Proceed does not relieve the Contractor of the duty to obtain such insurance as required by Paragraph 1340- 2.0 INSURANCE REQUIREMENTS.
26 Workers' Compensation Insurance 1330-1

2.2 Commercial General Liability Policy

The Contractor shall take out and maintain during the life of the Contract, a Commercial General Liability Policy, on an occurrence basis, with a minimum limit of not less than One Million Dollars ($1,000,000) combined single limit for bodily injury and property damage for any one occurrence and a Two Million Dollar ($2,000,000) annual project aggregate, for all of the following:

a. Premises Operations, including Explosion, Collapse and Underground (X, C, and U) Coverage.

b. Completed Operations/Products, including X, C, and U Coverage.

c. Independent Contractors.

d. Blanket Contractual.

e. Deductible shall not exceed One Thousand Dollars ($1,000).

2.3 Commercial Business Auto Policy

The Contractor shall take out and maintain during the life of this Contract a Commercial Business Auto Policy, on an occurrence basis, with a minimum amount of not less than One Million Dollars ($1,000,000) combined single limit for bodily injury and property damage, providing at least all of the following coverage:

a. Coverage shall be applicable to any and all leased, owned, hired, or non-owned vehicles used in pursuit of any of the activities associated with this Contract.

b. Any and all mobile equipment, including cranes, which is not covered under said Commercial Business Auto Policy shall have said coverage provided for under the Commercial General Liability Policy.

c. Deductible shall not exceed One Thousand Dollars ($1,000).

2.4 Workers' Compensation Insurance

The Contractor shall take out and maintain during the life of the Contract, Worker's Compensation and Employers' Liability insurance providing coverage for any and all employees of Contractor:

27 Workers' Compensation Insurance 1330-1

a. The required policy shall provide coverage for Workers' Compensation (Coverage A).

b. This policy shall provide coverage for One Million Dollars ($1,000,000) Employers' Liability (Coverage B).

2.5 Endorsements

All of the following endorsements are required to be made a part of the policies described in this Section hereof:

a. "The City, City employees and officers, the City Engineer, its consultants, elected officials, agents, and sub-consultants are hereby added as additional insured insofar as Work done under this Contract is concerned."

b. "This policy shall be considered primary insurance as respects any other valid and collectible insurance, including self-insured retention, the City may possess, and any other insurance the City does possess shall be considered excess insurance only."

c. "This insurance shall act for each insured, and additional insured, as though a separate policy had been written for each. This, however, will not act to increase the limit of liability of the insuring company.

d. "Thirty (30) days prior written notice of cancellation shall be given to the City. Such notice shall be sent to:

Kevin Biersack, Administrative Services Director
City of Cathedral City
68-700 Avenida Lalo Guerrero
Cathedral City, CA 92234

2.6 Change in Terms

The Contractor shall provide immediate written notice to the City of any change in terms and conditions and/or reduction in the coverage of any nature to the insurance policies.

The notice shall be sent to the location identified in Paragraph 1340-2.6.d, Endorsements. The Contractor shall be obligated to pay any extra premium for maintaining the insurance requirements specified herein. 28 29

30 Staff Report
City Council
Item No. 5.B
Meeting Date: April 22, 2026
From: John A. Corella, Director of Public Works
Title: Construction Contract Award to Riverside Slurry Seal, Inc. for the Dream Homes Neighborhood Crack Repair Project (C02611)
RECOMMENDATION:

To award a construction contract to Riverside Slurry Seal, Inc. in the amount of $396,772.08 for the Dream Homes Neighborhood Crack Repair Project (C02611), and, approve a ten percent (10%) contingency in the amount of $39,677.21 for unforeseeable construction costs, thereby bringing the total construction budget to the amount of $436,449.29; and, authorize the City Manager to execute the required contract documents; and, authorize the City Engineer to request bonds and insurance for the project, and issue the notice to proceed.

BACKGROUND:

In May 2023, Cathedral City’s Engineering Department adopted a pavement management program (PMP) to support the monitoring, maintenance, and rehabilitation of the city’s street network. The PMP establishes a dynamic and continuously updated Pavement Condition Index (PCI) for all streets throughout the city. PCI values range from 0 to 100 and classify pavement conditions as very good, good, fair, poor, or very poor. This program, combined with field observations, provides the basis for identifying the most effective and cost-efficient rehabilitation strategies for specific roadway segments.

On May 28, 2025, the City Council adopted the FY 2025–2026 and FY 2026–2027 Biennial Budget, including the 5-Year Capital Improvement Project (CIP) Plan. The CIP identified two (2) separate street maintenance projects required for the same streets within the Dream Homes neighborhood. The two (2) projects represent the two (2) stages of work needed to complete the overall required street rehabilitation for this neighborhood’s streets.

The first stage of the street maintenance required for the Dream Homes neighborhood is the completion of The Dream Homes Neighborhood Crack Repair Project (current project). The second stage of the street maintenance required for the Dream Homes neighborhood is the completion of a Rubberized Emulsion Aggregate Slurry (REAS) project for the Dream Homes neighborhood (future), which will be applied subsequent to the first stage crack repair project.

Depending on available Measure W funds, it is anticipated the second stage REAS project will be brought before the City Council for approval in the Fall of 2026 or Spring of 2027. 1 The average PCI within the Dream Homes neighborhood is 63, which falls within the “fair” category. Based on PMP data and field inspections, staff determined that performing crack repair at this stage, followed by a future REAS application, is the most cost-effective approach to preserve the pavement and avoid more extensive repairs.

The proposed project includes repairing wide asphalt cracks using a mastic binder and sealing narrower cracks to prevent water intrusion, reduce pavement deterioration, and extend the service life of the roadway.

Plans, specifications, and estimates (PS&E) for the project were prepared in-house and completed on March 18, 2026.

DISCUSSION:

On March 22, 2026, the city advertised an Invitation to Bid for Bid No. B26-117E, seeking qualified contractors to perform the work described in the project plans and specifications.

The bid solicitation was made available to contractors for 11 calendar days through the following publication and platforms:
• The Desert Sun - Published on March 22, 2026
• PlanIt Print Works - From March 20, 2026, until April 2, 2026 • City’s Website - From March 20, 2026, until April 2, 2026 On April 2, 2026, the city received 2 bid proposals. The following table ranks each qualified bidder by the base bid amount.

Rank Contractor Amount
1 Riverside Slurry Seal, Inc. – Riverside, CA $396,772.08 2 Vance Corporation – Beaumont, CA $539,015.90
The bid tabulation prepared by the Engineering Division is attached to this report for reference.

Riverside Slurry Seal, Inc., was determined to be the lowest responsive and responsible bidder.

Staff recommend City Council award a construction contract to Riverside Slurry Seal, Inc. in the amount of $396,772.08 for the Dream Homes Neighborhood Crack Repair Project (C02611), and, approve a ten percent (10%) contingency in the amount of $39,677.21 for unforeseeable construction costs, thereby bringing the total construction budget to the amount of $436,449.29; and, authorize the City Manager to execute the required contract documents; and, authorize the City Engineer to request bonds and insurance for the project, and issue the notice to proceed.

Environmental Analysis
The project is categorically excluded under the National Environmental Policy Act (NEPA) pursuant to 24 CFR 58.35(a)(1) and is categorically exempt under the California Environmental Quality Act (CEQA) pursuant to Section 15301(c), “Existing Facilities”.

FISCAL IMPACT:
2 FY 2025-2026 Capital Improvement Project (CIP) Plan
The Dream Homes Neighborhood Crack Repair Project is included in the FY 2025-2026 CIP, with a programmed budget of $300,000, funded from available Assessment District (AD) 04- 01 funds.

Construction Budget
The total construction budget for the project is $436,449.29, which includes the lowest responsive bid of $396,772.08 submitted by Riverside Slurry Seal, Inc., and a 10% contingency of $39,677.21 for unforeseen construction costs. The current construction budget reflects competitive bid results and prevailing market conditions.

The total construction budget is summarized below.

Total Bid Cost (Riverside Slurry Seal, Inc.) $396,772.08 10% Contingency $39,677.21
Construction Budget $436,449.29
Proposed Funding Sources
Assessment District (AD) 04-01 remains active and has additional funding as a result of debt service savings.

The original programmed CIP amount of $300,000 was based on planning-level estimates and available AD 04-01 fund balance at the time of the CIP development. The AD 04-01 fund balance has increased to approximately $450,000. As a result, sufficient funds are available within AD 04-01 to fully fund this project.

The following table summarizes the total budget allocation for the construction of the project.

Fiscal Year DESCRIPTION

GENERAL
LEDGER

ACCOUNT
CODES

PROJECT

CODE AMOUNT

ONE TIME
or

ONGOING
2025-2026 Assessment District
04-01 Construction
353-100-150-
156-8800-8802 C02611 $436,449.29 ONE TIME
2025-2026 Total $436,449.29
FIVE-YEAR STRATEGIC PLAN:

Goal-B: Community Investment
Objective: Cathedral City roads, gateways, public spaces, and other city infrastructure are well planned, designed, constructed, and maintained.

ATTACHMENTS:

1. Dream Homes Neighborhood Crack Repair Project – Vicinity Map

2. Dream Homes Neighborhood Crack Repair Project – Bid Tab

3. Dream Homes Neighborhood Crack Repair Project – Contract 3 4

CITY OF CATHEDRAL CITY
FY 2025-2026 DREAM HOMES NEIGHBORHOOD CRACK REPAIR PROJECT

BID TABULATION/ANALYSIS
CITY PROJECT No.: 2611
1 MOBILIZATION LS $ $ 18,000.00 1 18,000.00 $ $ 20,000.00 20,000.00 2 TRAFFIC CONTROL LS $ $ 12,000.00 1 12,000.00 $ $ 30,000.00 30,000.00 3 CRACK REPAIR WITH MASTIC ASPHALT BINDER LB $ $ 169,355 325,161.60 1.92 $ $ 287,903.50 1.70 4 CRACK SEAL LF $ $ 70,926 46,101.90 0.65 $ $ 58,868.58 0.83 $ 05.362,104 $ 80.277,693
Engineer Estimate

UNIT COST TOTAL
TOTAL BASE BID AMOUNT (BID ITEMS 1-4)

ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL
Riverside Slurry Seal, Inc.

BASE BID
5 CITY OF CATHEDRAL CITY
FY 2025-2026 DREAM HOMES NEIGHBORHOOD CRACK REPAIR PROJECT

BID TABULATION/ANALYSIS
CITY PROJECT No.: 2611
1 MOBILIZATION LS 1
2 TRAFFIC CONTROL LS 1
3 CRACK REPAIR WITH MASTIC ASPHALT BINDER LB 169,355 4 CRACK SEAL LF 70,926
TOTAL BASE BID AMOUNT (BID ITEMS 1-4)

ITEM DESCRIPTION UNIT QUANTITY

BASE BID
$ $ 100,000.00 100,000.00
$ $ 55,000.00 55,000.00
$ $ 355,645.50 2.10
$ $ 28,370.40 0.40
$ 09.510,935

UNIT COST TOTAL
Vance Corporation
6 Agreement 1300-1

SECTION 1300

CONTRACT

THIS CONTRACT, by and between the CITY OF CATHEDRAL CITY, a municipal corporation, herein referred to as "City”, and Riverside Slurry Seal, Inc., herein referred to as, "Contractor."

W I T N E S S E T H:

In consideration of their mutual covenants, the parties hereto agree as follows:

1. Contractor shall furnish all necessary labor, material, equipment, transportation and services for

BID NO. B26-117E
FY 2025-2026
DREAM HOMES NEIGHBORHOOD CRACK REPAIR PROJECT (C02611)

(the “Work”), in the City of Cathedral City, California. The Work shall be done in strict conformity with this Contract, approved Change Orders, the Invitation to Bid dated March 22, 2026 , Instruction to Bidders, permits issued by the City or other agencies, the General and Specific Project Requirements, Standard Specifications, Plans, Referenced Specifications, the General Conditions, Supplementary Conditions, the Contractor’s Bid dated April 2, 2026, and any addenda thereto (the “Contract Documents”), all of which shall be considered a part hereof as though fully set herein.

2. Contractor will comply with all Federal, State, County, and City of Cathedral City laws, regulations, and policies, which are, as amended from time to time, incorporated herein by reference.

3. All work shall be done in a workman-like manner and to the satisfaction of the City Engineer.

4. Time is of the essence in the Contractor’s performance of the Work for this Contract. The contractor agrees to diligently pursue the performance and completion of the Work in every detail to the satisfaction of the City. The contractor shall commence work after the issuance of a written Notice to Proceed and agrees to have all work completed within Twenty (20) working days from the date of Notification to Proceed.

5. In consideration of said work, City agrees to pay Contractor such sums as shall be approved by the City Engineer at lump sums and/or unit prices stated in the Contractor's Bid. The total consideration to Contractor for all Work shall not exceed three -hundred ninety -six thousand, seven -hundred and seventy-two dollars, and eight cents ($396,772.08). All payments shall be subject to approval by the City Engineer and shall be in accordance with the terms, conditions, and procedures provided in the Contract Documents.

6. The Contractor shall not knowingly pay less than the general prevailing rate for per diem wages, as determined by the State of California Department of Industrial Relations and referred to in the Invitation to Bid, to any workman employed for the work to be performed under this contract; and the Contractor shall forfeit as a penalty to the City the sum of Twenty-Five Dollars ($25.00) for each calendar day, or fraction thereof, for such workman paid by him or by any subcontractor under him in violation of this provision (Sections 1770-1777, Labor Code of California).

7. Concurrently with the execution of this Contract, Contractor shall furnish bonds of a surety satisfactory to City, as provided in the Contract Documents, the cost of which shall be paid by Contractor.

8. Contractor agrees to indemnify, hold harmless, release and defend (even if the allegations are false, fraudulent or groundless), to the maximum extent permitted by law, the City, its City Council and each member thereof, and its officers, employees, commission members and representatives, from any 7 Agreement 1300-2

and all liability, loss, suits, claims, damages, costs, judgments and expenses (including attorney's fees and costs of litigation) which in whole or in part are claimed to result from or to arise out of the usage or operation, including the malfunctioning of, or, any injury caused by, any product purchased herein; or any acts, errors or omissions (including, without limitation, professional negligence) of Contractor, its employees, representatives, subcontractors, or agents in connection with the performanc e of this Contract. This agreement to indemnify includes, but is not limited to, personal injury (including death at any time) and damage to property (including, but without limitation, contract or tort or patent, copyright, trade secret or trademark infr ingement) sustained by any person or persons (including, but not limited to, companies, or corporations, Contractor and its employees or agents, and members of the general public.

9. Except as otherwise required, Contractor shall concurrently with the execution of this Contract, furnish the City satisfactory evidence of insurance of the kinds and in the amounts provided in the Contract Documents. This insurance shall be kept in full force and effect by Contractor during this entire contract and all premiums thereon shall be promptly paid by it. Each policy shall further state that it cannot be canceled without 30 days unconditional written notice to the City and shall name the City as an additional insured. The Contractor shall furnish evidence of having in effect, and shall maintain Workers Compensation Insurance coverage of not less than the statutory amount or otherwise show a certificate of self -insurance, in accordance with the Workers Compensation laws of the State of California. Failure to maintain the required amounts and types of coverage throughout the duration of this Contract shall constitute a material breach of this Contract.

10. Contractor shall forfeit as a penalty to City $25.00 for each laborer, workman, or mechanic employed in the execution of this Contract by said Contractor, or any subcontractor under it, upon any of the work herein mentioned, for each calendar day during which such laborer, workman, or mechanic is required or permitted to work at other than a rate of pay provided by law for more than 8 hours in any one calendar day and 40 hours in any one calendar week, in violation of the provisions of Sections 1810- 1815 of the Labor Code of the State of California.

11. In accepting this Contract, Contractor certifies that in the conduct of its business it does not deny the right of any individual to seek, obtain and hold employment without discrimination because of race, religious creed, color, national origin, ancestry , physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status as provided in the California Fair Employment Prac tice Act (Government Code Sections 12900, et seq.) Contractor agrees that a finding by the State Fair Employment Practices Commission that Contractor has engaged during the term of this Contract in any unlawful employment practice shall be deemed a breach of this Contract and Contractor shall pay to City $500.00 liquidated damages for each such breach committed under this contract.

12. Contractor also agrees that for contracts in excess of $30,000 that apprentices will be employed without discrimination in an approved program in a ratio established in the apprenticeship standards of the craft involved (Sections 1777.5 and 1777.6, Labor Code of California). Contractors who willfully fail to comply will be denied the right to bid on public projects for a period of six months in addition to other penalties provided by law.

13. Contractor shall maintain and keep books and records on a current basis, recording all transactions pertaining to this agreement in a form in accordance with generally acceptable accounting principles. Said books and records shall be made available to the County, the State of California, the Federal government, and to any authorized representative thereof for the purposes of audit at all reasonable times and places. All such books and records shall be retained for such periods of time as required by law, provided, however, notwithstanding any shorter periods of retention, all books, records, and supporting detail shall be retained for a period of at least four (4) years after the expiration of the term of this Agreement.

14. This Contract shall not be assignable by Contractor without the written consent of City. 8 Agreement 1300-3

15. Contractor shall notify the City Engineer (in writing) forthwith when the Contract is deemed completed.

16. In accepting this Contract, Contractor certifies that no member or officer of the firm or corporation is an officer or employee of the City except to the extent permitted by law.

17. Contractor certifies that it is the holder of any necessary California State Contractor's License and authorized to undertake the Work. The Contractor must, at the Contractor’s sole expense, obtain all necessary permits and licenses required for the Work, give all necessary notices and pay all fees and taxes required by law, including without limitation, any business license tax imposed by City. The Contractor represents and declares to Agency that it has all licenses, permits ,qualifications, and approvals of whatever nature which are legally required to practice its professions.

18. The City, or its authorized auditors or representatives, shall have access to and the right to audit and reproduce any of the Contractor records to the extent the City deems necessary to insure it is receiving all money to which it is entitled under the contract and/or is paying only the amounts to which Contractor is properly entitled under the Contract or for other purposes relating to the Contract.

19. The Contractor shall maintain and preserve all such records for a period of at least three years after termination of the contract.

20. The Contractor shall maintain all such records in the City of Cathedral City. If not, the Contractor shall, upon request, promptly deliver the records to the City or reimburse the City for all reasonable and extra costs incurred in conducting the audit a t a location other than at City offices including, but not limited to, such additional (out of the City) expenses for personnel, salaries, private auditors, travel, lodging, meals and overhead.

21. In entering into this Contract or a contract with a subcontractor to supply goods, services, or materials pursuant to this Contract, Contractor and any or subcontractor are deemed to have offered and agreed to assign to City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C Sec. 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700 of Part 2 of Division 7 of the California Business and Professions Code), arising from purchases of goods, services, or materials for the Contract. This assignment will be deemed made and will be come effective at the time City tenders final payment to Contractor, without further acknowledgement by the Parties.

22. The Parties agree that, in accordance with the City’s Electronic Signature Use Policy, adopted on August 10, 2023, and as amended thereafter, the Parties may use electronic signatures to execute this Agreement. Any use of electronic signatures to exec ute this Agreement shall comply with the City’s Electronic Signature Use Policy, and such signatures shall have the same force and effect as if this Agreement were executed by hand. Contractor acknowledges that it has had an opportunity to request and rev iew the City’s Electronic Signature Use Policy, and Contractor agrees to comply with the Electronic Signature Use Policy. Contractor agrees to indemnify, defend, and hold the City harmless from any claim, damage, or liability associated with transmitting an electronic signature or an electronically signed record by electronic transmission.

9 Agreement 1300-4

IN WITNESS WHEREOF, the parties have executed this Agreement as of the dates stated below.

"CITY"

CITY OF CATHEDRAL CITY,

By:_____________________________ Dated: _____________________________ Andrew Firestine, City Manager

ATTEST:

Dated: _____________________________
Christina Burton, City Clerk

APPROVED AS TO FORM:

Dated: _____________________________
Eric S. Vail, City Attorney

“CONTRACTOR”

Dated: By: __________________________________ Name: __________________________________
Title: __________________________________

Dated: By: __________________________________ Name: __________________________________
Title: __________________________________

[CONTRACTOR SIGNATURES MUST BE NOTARIZED. IF CONTRACT IS A CORPORATION OR LIMITED LIABILITY COMPANY, TWO SIGNATURES MUST BE PROVIDED]

10 Faithful Performance Bond 1310-1
SECTION 1310

FAITHFUL PERFORMANCE BOND

KNOW ALL MEN BY THESE PRESENTS:

THAT the City of Cathedral City, a municipal corporation, hereinafter designated the City, has, on April 22, 2026, awarded to Riverside Slurry Seal, Inc., hereinafter designated as the Principal, a Contract for Bid No. B26-117E, DREAM HOMES NEIGHBORHOOD CRACK REPAIR PROJECT, CIP No. C02611, and

WHEREAS, said Principal is required under the terms of said Contract to furnish a bond for the faithful performance of said Contract:

NOW, THEREFORE, we, the Principal, and _____________________________________, as Surety, are held and firmly bound unto the City in the just and full amount of three-hundred ninety-six thousand, seven-hundred and seventy-two dollars, and eight cents ($396,772.08) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, his or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, and well and truly keep and faithfully perform the covenants, conditions, and agreements in the said contract and any alterations made as therein provided, on his or their part to be kept and performed, at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless, the City, its officers and agents as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue.

It is acknowledged that the Contract provides for one- year guarantee period, during which time this bond remains in full force and effort.

And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the same shall, in any way, affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the Contract or to the work or to the specifications. Said Surety hereby waives the provisions of Sections 2819 and 2845 of the Civil Code of the State of California.

THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK
11 Faithful Performance Bond 1310-2
IN WITNESS WHEREOF, the Principal and Surety have executed this instrument under their seals this _________ day of _________________________________, 2026, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

Principal
(Seal)

Signature for Principal

Title of Signatory

Surety

(Seal)

Signature for Surety

Title of Signatory

Address of Surety

Phone # of Surety

Contact Person For Surety
12 Payment Bond 1320-1
SECTION 1320

PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS:

THAT the City of Cathedral City, a municipal corporation, hereinafter designated the City, has, on April 22, 2026, awarded to Riverside Slurry Seal, Inc., hereinafter designated as the Principal, a Contract for Bid No. B26-117E, DREAM HOMES NEIGHBORHOOD CRACK REPAIR PROJECT, CIP No. C02611, and

WHEREAS, said Principal is required to furnish a bond in connection and with said Contract, providing that if said Principal, or any of it or its subcontractors shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, the Surety of this bond will pay the same to the extent hereinafter set forth:

NOW, THEREFORE, we, the Principal, and____________________________________, as Surety, are held and firmly bound unto the City in the just and full amount of three-hundred ninety-six thousand, seven -hundred and seventy -two dollars, and eight cents ($396,772.08) , executors, administrators, and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, it or its heirs, executors, administrators, successors, or assigns, shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the work contracted to be done, or for any work or labor thereon of any kind or for amount due under the Unemployment Insurance Act with respect to such work or labor, or for any amounts due, or to be withheld pursuant to Sections 18806 of the Revenue and Taxation Code of the State of California with respect to such work or labor, then said surety will pay the same in or to an amount not exceeding the amount hereinabove set forth, and also will pay in case suit is brought upon this bond, such reasonable attorney's fees to the City as shall be fixed by the court.

This bond shall insure to the benefit of any and all persons, companies, and corporations named in Section 3181 of the Civil Code of the State of California so as to give a right of action to them or their assigns in any suit brought upon this bond.

And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition of the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the same shall, in any way, affect its obligations of this bond, and it does hereby waive notice of any change, extension of time, alteration, or addition to the terms of the contract or to the work or to the specifications. Said Surety hereby waives the provisions of Sections 2819 and 2845 of the Civil Code of the State of California.

THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK
13 Payment Bond 1320-2
IN WITNESS WHEREOF, the Principal and Surety have executed this instrument under their seals this _________ day of _________________________________, 2026, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

Principal
(Seal)

Signature for Principal

Title of Signatory

Surety

(Seal)

Signature for Surety

Title of Signatory

Address of Surety

Phone # of Surety

Contact Person For Surety
14 Workers' Compensation Insurance 1330-1
SECTION 1330

WORKERS' COMPENSATION INSURANCE CERTIFICATE

In accordance with California Labor Code Section 1861, prior to commencement of work on the Contract, the Contractor shall sign and file with the City the following certification:

"I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self - insurance in accordance with the provisions of that code, and I will comply with suc h provisions before commencing the performance of the work of this contract."

Signature

Title

Date
15 Workers' Compensation Insurance 1330-1

SECTION 1340

LIABILITY AND INSURANCE

REQUIREMENTS

1.0 INDEMNIFICATION

Contractor shall defend, indemnify and hold harmless the City, City Council and each member thereof, and every officer, employee and agent of City, from any claim, demand, damage, liability, loss, cost or expense (including, without limitation, attorney’s fees and costs) arising from any intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of the Contractor, or any of the Contractor'’ employees, or any of its subcontractors arising out of work under this Contract.

The City does not, and shall not, waive any rights that it may have against Contractor, any of the Contractor’s employees, or any of its subcontractors under this Section because of the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to this Contract. The hold harmless, indemnification and duty to defend provisions of this Section shall apply regardless of whether or not said insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense described herein. The City will not be liable for any accident, loss, or damage to the work prior to its completion and acceptance.

2.0 INSURANCE REQUIREMENTS

2.1 General

After award of Contract, the Contractor shall promptly obtain, at its own expense, all the insurance required by Paragraph 1340- 2.0, INSURANCE REQUIREMENTS, and shall submit coverage verification for review and approval by the City upon execution of the Contract.

The Notice to Proceed with the Work under this Contract will not be issued, and the Contractor shall not commence work, until such insurance has been approved by the City. The Contractor shall not allow any subcontractors to commence work on its subcontract until all similar insurance required of the subcontractor has been obtained and verified by Contractor. Such insurance shall remain in full force and effect at all times during the prosecution of the Work and until the final completion and acceptance thereof.

The Notice to Proceed does not relieve the Contractor of the duty to obtain such insurance as required by Paragraph 1340- 2.0 INSURANCE REQUIREMENTS.
16 Workers' Compensation Insurance 1330-1

2.2 Commercial General Liability Policy

The Contractor shall take out and maintain during the life of the Contract, a Commercial General Liability Policy, on an occurrence basis, with a minimum limit of not less than One Million Dollars ($1,000,000) combined single limit for bodily injury and property damage for any one occurrence and a Two Million Dollar ($2,000,000) annual project aggregate, for all of the following:

a. Premises Operations, including Explosion, Collapse and Underground (X, C, and U) Coverage.

b. Completed Operations/Products, including X, C, and U Coverage.

c. Independent Contractors.

d. Blanket Contractual.

e. Deductible shall not exceed One Thousand Dollars ($1,000).

2.3 Commercial Business Auto Policy

The Contractor shall take out and maintain during the life of this Contract a Commercial Business Auto Policy, on an occurrence basis, with a minimum amount of not less than One Million Dollars ($1,000,000) combined single limit for bodily injury and property damage, providing at least all of the following coverage:

a. Coverage shall be applicable to any and all leased, owned, hired, or non-owned vehicles used in pursuit of any of the activities associated with this Contract.

b. Any and all mobile equipment, including cranes, which is not covered under said Commercial Business Auto Policy shall have said coverage provided for under the Commercial General Liability Policy.

c. Deductible shall not exceed One Thousand Dollars ($1,000).

2.4 Workers' Compensation Insurance

The Contractor shall take out and maintain during the life of the Contract, Worker's Compensation and Employers' Liability insurance providing coverage for any and all employees of Contractor:

17 Workers' Compensation Insurance 1330-1

a. The required policy shall provide coverage for Workers' Compensation (Coverage A).

b. This policy shall provide coverage for One Million Dollars ($1,000,000) Employers' Liability (Coverage B).

2.5 Endorsements

All of the following endorsements are required to be made a part of the policies described in this Section hereof:

a. "The City, City employees and officers, the City Engineer, its consultants, elected officials, agents, and sub-consultants are hereby added as additional insured insofar as Work done under this Contract is concerned."

b. "This policy shall be considered primary insurance as respects any other valid and collectible insurance, including self-insured retention, the City may possess, and any other insurance the City does possess shall be considered excess insurance only."

c. "This insurance shall act for each insured, and additional insured, as though a separate policy had been written for each. This, however, will not act to increase the limit of liability of the insuring company.

d. "Thirty (30) days prior written notice of cancellation shall be given to the City. Such notice shall be sent to:

Kevin Biersack, Administrative Services Director
City of Cathedral City
68-700 Avenida Lalo Guerrero
Cathedral City, CA 92234

2.6 Change in Terms

The Contractor shall provide immediate written notice to the City of any change in terms and conditions and/or reduction in the coverage of any nature to the insurance policies.

The notice shall be sent to the location identified in Paragraph 1340-2.6.d, Endorsements. The Contractor shall be obligated to pay any extra premium for maintaining the insurance requirements specified herein. 18 Staff Report
City Council
Item No. 5.C
Meeting Date: April 22, 2026
From: Anne V. Ambrose, Assistant City Manager
Title: To Approve the Public Arts Commission Recommendation to Allocate up to $5,000 for a Partnership Event with The Perez Art District to Celebrate Where Art Lives
RECOMMENDATION:

To Approve the Public Arts Commission Recommendation to Allocate up to $5,000 for a Partnership Event with The Perez Art District to Celebrate Where Art Lives BACKGROUND:

During the February and March Public Arts Commission meetings, the Commission discussed opportunities to utilize the remaining $5,000 available in their General Fund budget before the end of the fiscal year. The Public Arts Commission has an annual budget of $10,000 to be used for sponsorships or events. The Commission used $5,000 from their budget to promote and execute the Festival of the Arts event on March 28, 2028. The festival was an overwhelming success, with 38 artists participating and between 550-750 attendees.

From the discussions, Chair Liebelt and Commissioner Marks agreed to reach out to the artists of The Perez Art District to explore opportunities for collaboration. At the Commission meeting on April 14, 2026, the Commission voted to recommend the use of $5,000 of their general fund budget towards a joint event with the artists at The Perez Art District.

DISCUSSION:

The Cathedral City Public Arts Commission, in partnership with the artists of The Perez Art District and property owners who own some of the buildings within the district, are proposing a special Fourth Friday celebration on Friday May 22, and Saturday, May 23, 2026, designed to elevate the Perez Arts District as a vibrant creative hub and strengthen its role in the cultural identity of our city. To produce a meaningful, high impact kickoff event, the Commission requests approval to use its remaining $5,000 in discretionary funds. This investment supports an immersive, artist centered celebration that increases visibility, drives engagement, and lays the foundation for recurring District wide programming.

This two-day celebration, titled “Celebrating Where Art Lives” transforms Perez Road into a 1 lively, street level arts corridor. Home to more than 60 working artists, makers, and creative visionaries, the Perez Arts District stands as one of Cathedral City’s most significant cultural assets. This event serves as a high energy launch point — drawing residents, visitors, and art lovers into studios, amplifying the district’s creative identity, and building momentum toward future District wide activations.

What Guests Will Experience:

Open studios buzzing with conversation, creativity, and hands on discovery Artists welcoming visitors into their workspaces, sharing process, story, and craft Music drifting through the district — amplified sets along Buildings A&C and H&I, and intimate acoustic performances inside select galleries. Short bursts of dance and movement that surprise, delight, and animate the space Interactive art moments that invite guests to linger, explore, and create Food trucks and other mobile refreshments.

This celebration is more than a single evening — it is a strategic investment in the long-term visibility and vitality of The Perez Arts District. By showcasing the district’s creative energy and inviting the community to “come play,” the event strengthens Cathedral City’s cultural identity, supports local artists, and builds the foundation for sustainable, recurring arts programming that can grow year after year.

The event builds upon current momentum that has been focusing on the economic engine that is our downtown arts scene, that began with the ribbon cutting of the new Desert Modern gallery on March 5, the first annual Festival of the Arts in the Cathedral City Community Amphitheater on March 28, a second ribbon cutting planned in the district welcoming the Barbara Eberhart Gallery on May 6, and culminating the season with this planned event on May 22 and 23 which will bolster the existing Fourth Friday Art walks into something more substantial.

Chair Liebelt and Commissioner Marks have had several meetings with the artists of The Perez Art District to develop the concept for the two-day festival. Communications and Engagement Director Ryan Hunt and Assistant City Manager Anne Ambrose attended the most recent meeting on April 1, 2026, to help answer logistic questions and finalize the proposed agenda. This has truly been a partnership effort with the participating artists, Public Arts Commissioners, and staff helping to identify performers, food trucks, and activities for the event. In addition to opening their studios, many of the artists have planned interactive events that will allow visitors to share in the creative process.

The following are proposed activities that the artists are planning in their studios. There may be additional activities, but this is current as of the publishing of the agenda.

Friday May 22 4:00 –9:00 pm Saturday May 23 11:00 am –4:00 pm 4:00 - 4:20 11:00 – 11:20
“Paint a mini 4” canvas inspired by
art you saw on the art walk”
Ongoing throughout both festival days
for as long as supplies last.

Emeline
"Experiment with pre-made plaster
Anne Bedrick Fine Art
Building H, Suite 27
“Paint a mini 4” canvas inspired by art you
saw on the art walk”
Ongoing throughout both festival days for as
long as supplies last.
2 casts that you can add to create your
own sculptural painting."
Building H, Suite 27
4:30-4:50 11:30 – 11:50
Cheryl Gaines STUDIO
68-703 Perez Rd
Bldg A, Suite 17
Personal tour of gallery work on
Friday, May 22 @4:30pm
Cheryl Gaines STUDIO
68-703 Perez Rd
Bldg A, Suite 17
Personal tour of gallery work on
Saturday, May 23 @11:30am
5:00- 5:20 12:00 – 12:20
Bart Baxter
Studio H6/7 is planning a poetry
reading followed by an open mic.

We will provide the amplifier,
microphone, and a few folding chairs.

We would love to have thirty minutes.

I was the 1994 MTV Poetry Grand Slam
winner, the 1998 Seattle Poetry Grand
Slam winner, and the first ever 'Poet
Populist' of Seattle.

Emeline
"Experiment with pre-made plaster casts
that you can add to create your own
sculptural painting."
Building H suite 27
5:30- 5:50 12:30 – 12:50
Anne Bedrick Fine Art
Building H, Suite 27
“Paint a mini 4” canvas inspired by
art you saw on the art walk”
Kathleen Strukoff – Desert Modern Gallery
Suite I-27
Paint a Desert Botanical on a Rock for
your Garden
6:00 – 6:20 1:00 – 1:20
Barbara Eberhart.

Building C, Suite 7
Fashion Show in my gallery wearing
hand-painted shirts they either painted in
one of my classes, or just modeling
shirts I offer for sale.
20-minute
Lisa Van Herik
Building I 16, Suite 3 Seasons Gallery,
How to weave a wire Basket 12-people max
6:30- 6:50 1:30 - 1:50
Kathleen Strukoff- Desert Modern
Gallery
68895 Perez Road,
Suite I-27 (last one on the left)
"Painting our Desert" - an artist talk
with Kathleen Strukoff
May 22nd: 6:00 - 6:20
Kathleen Strukoff- Desert Modern Gallery
68895 Perez Road,
Suite I-27 (last one on the left)
"Painting our Desert" - an artist talk with
May 23rd 1:00 - 1:20
Rock Painting
7:00 – 7:20 2:00- 2:20
Anne Bedrick Fine Art
Building H, Suite 27
“Paint a mini 4” canvas inspired by
Bart Baxter
Studio H6/7 is planning a poetry reading
followed by an open mic.

We will provide the amplifier, microphone, and
3 art you saw on the art walk”
Ongoing throughout both festival days
for as long as supplies last.
a few folding chairs.

We would love to have thirty minutes.

I was the 1994 MTV Poetry Grand Slam
winner, the 1998 Seattle Poetry Grand Slam
winner, and the first ever 'Poet Populist' of
Seattle.
7:30 – 7:50 2:30 – 2:50
Kathleen Strukoff- Desert Modern
Gallery
Suite I-27
Rock Painting
Anne Bedrick Fine Art
Building H suite 27
“Paint a mini 4” canvas inspired by art you
saw on the art walk”
Ongoing throughout both festival days for as
long as supplies last.
8:00 – 8:20 3:00 – 3:20
Alberto Garcia-Uria Studio
Suite I-26
Special exhibit; "Subjugation" / The
Darkness Within Democracy / A visual
Reckoning
In conjunction with the Fall of Freedom
National campaign, we invite you to
experience a profound and thought-
provoking exhibition held at the Alberto
Garcia-Uria Studio/studio_gallery26. The
exhibition encourages all who see it to
raise their voices and resist forces that
threaten the foundational principles of
freedom and equality.

Alberto Garcia-Uria Studio
Suite I-26
Special exhibit; "Subjugation" / The Darkness
Within Democracy / A visual Reckoning
In conjunction with the Fall of Freedom
National campaign, we invite you to
experience a profound and thought-provoking
exhibition held at the Alberto Garcia-Uria
Studio/studio_gallery26. The exhibition
encourages all who see it to raise their voices
and resist forces that threaten the
foundational principles of freedom and
equality.
8:30 – 8:50
Andrée B Carter
Building I, Suite 17
Gallery tour with question and answer
format describing needlepoint and
embroidery designs and mixing of colors
from powdered pigments
The Public Arts Commission’s contribution would be funding for the musicians that will be performing at different times and throughout the various streets in the district, a dance performance provided by students with Dance with Miss Lindsay, rentals and printing for a passport that attendees can use to document their favorite studios and activities. In addition to the City’s contributions, one of the property owners in the district has pledged up to $5,000 to advertise for the event. To receive payment, performers will be required to provide a W-9.

Category Vendor Type Amount
4 Music The Perdido Trio Musician $ 200
Javier Valenzuela Singer $ 200
Kevin Christopher Musician $ 200
Cathedral City
Bluegrass Band
Bluegrass ensemble $ 600
The Blasto Boy Band Band $ 600
Dance Dance with Miss
Lindsay – Dance
School
Student Dance
Performance
$ 300
Rentals Dabresa Party Rentals Tables and Chairs $ 400 Printing Costs TBD Passport Brochure x
2,500
$1,200
Supplies $ 500
Contingency $ 800
Subtotal $5,000
Business Owner
Contributions
Amount
Advertising $ 5,000
Total $10,000
FISCAL IMPACT:

DESCRIPTION GENERAL
LEDGER

ACCOUNT
CODES

PROJECT
CODE
AMOUNT ONE TIME or

ONGOING
2025-2026
The Perez Art District
“Celebrating Where
Art Lives” Event
100-500-510-
513-8300-8601 M03513 $5,000 One Time
2025-2026 Total $5,000
FIVE-YEAR STRATEGIC PLAN:

Goal F: Embracing, Inclusive Community
ATTACHMENTS:

PACE Staff Report April 14, 2026
5 Staff Report
Public Arts Commission
Item No. 3.A
Meeting Date: April 14, 2026
From: Anne Ambrose, Assistant City Manager
Sponsors: Chair Liebelt and Commissioner Marks
Title: Discuss and Finalize Proposal to Expend Remaining Public Arts Commission Budget for FY 2025/26
RECOMMENDATION:

To approve use of remaining $5,000 in the Public Arts Commission’s General Fund budget to go towards a two-day event at The Perez Art District to Celebrate Where Art Lives.

BACKGROUND:

During the February and March Public Arts Commission meetings, the Commission discussed opportunities to utilize the remaining $5,000 available in their General Fund budget before the end of the fiscal year. From the discussions, Chair Liebelt and Commissioner Marks agreed to reach out to the artists of The Perez Art District to explore opportunities for collaboration.

DISCUSSION:

The Cathedral City Public Arts Commission, in partnership with the artists of The Perez Art District and property owners who own some of the buildings within the district, are proposing a special Fourth Friday celebration on Friday May 22, and Saturday, May 23, 2026, designed to elevate the Perez Arts District as a vibrant creative hub and strengthen its role in the cultural identity of our city. To produce a meaningful, high impact kickoff event, the Commission requests approval to use its remaining $5,000 in discretionary funds. This investment supports an immersive, artist centered celebration that increases visibility, drives engagement, and lays the foundation for recurring District wide programming.

This two-day celebration transforms Perez Road into a lively, street level arts corridor. Home to more than 60 working artists, makers, and creative visionaries, the Perez Arts District stands as one of Cathedral City’s most significant cultural assets. This event serves as a high energy launch point — drawing residents, visitors, and art lovers into studios, amplifying the district’s creative identity, and building momentum toward future District wide activations.

What Guests Will Experience:
Open studios buzzing with conversation, creativity, and hands on discovery Artists welcoming visitors into their workspaces, sharing process, story, and craft 6 Music drifting through the district — amplified sets along Buildings A&C and H&I, and intimate acoustic performances inside select galleries. Short bursts of dance and movement that surprise, delight, and animate the space Interactive art moments that invite guests to linger, explore, and create Food trucks and other mobile refreshments.

This celebration is more than a single evening — it is a strategic investment in the long-term visibility and vitality of The Perez Arts District. By showcasing the district’s creative energy and inviting the community to “come play,” the event strengthens Cathedral City’s cultural identity, supports local artists, and builds the foundation for sustainable, recurring arts programming that can grow year after year.

The event builds upon current momentum that has been focusing on the economic engine that is our downtown arts scene, that began with the ribbon cutting of the new Desert Modern gallery on March 5, the first annual Festival of the Arts in the Cathedral City Community Amphitheater on March 28, a second ribbon cutting planned in the district welcoming the Barbara Eberhart Gallery on May 6, and culminating the season with this planned events on May 22 and 23 which will bolster the existing Forth Friday Art walks into something more subs.

Chair Liebelt and Commissioner Marks have had several meetings with the artists of The Perez Art District to develop the concept for the two-day festival. Communications and Engagement Director Ryan Hunt and Assistant City Manager Anne Ambrose attended the most recent meeting on April 1, 2026, to help answer logistic questions and finalize the proposed agenda. This has truly been a partnership effort with the participating artists, Public Arts Commissioners, and staff helping to identify performers, food trucks, and activities for the event.

The following are proposed activities that the artists are planning in their studios. There may be additional activities, but this is current as of the publishing of the agenda.

Friday May 22 4:00-9:00pm Saturday May 23 11:00-4:00 Working List of Gallery Events and Activities
4:00 - 4:20 11:00 – 11:20
“Paint a mini 4” canvas inspired by art
you saw on the art walk”
Ongoing throughout both festival days for
as long as supplies last.

Emeline
"Experiment with pre-made plaster casts
that you can add to create your own
sculptural painting."
Building H suite 27
Anne Bedrick Fine Art
Building H suite 27
“Paint a mini 4” canvas inspired by art
you saw on the art walk”
Ongoing throughout both festival days for
as long as supplies last.
4:30-4:50 11:30 – 11:50
Cheryl Gaines STUDIO
68-703 Perez Rd
Bldg A,Suite 17
personal tour of gallery work on
Cheryl Gaines STUDIO
68-703 Perez Rd
Bldg A,Suite 17
personal tour of gallery work on
7 Friday,May 22 @4:30pm Saturday,May23 @11:30am

5:00- 5:20 12:00 – 12:20
Bart Baxter
Studio H6/7 is planning a poetry reading
followed by an open mic.

We will provide the amplifier, microphone,
and a few folding chairs.

We would love to have thirty minutes.

I was the 1994 MTV Poetry Grand Slam
winner, the 1998 Seattle Poetry Grand
Slam winner, and the first ever 'Poet
Populist' of Seattle.

Emeline
"Experiment with pre-made plaster casts
that you can add to create your own
sculptural painting."
Building H suite 27
5:30- 5:50 12:30 – 12:50
Anne Bedrick Fine Art
Building H suite 27
“Paint a mini 4” canvas inspired by art
you saw on the art walk”
Kathleen Strukoff- Desert Modern Gallery
Suite I-27
Paint a Desert Botanical on a Rock for
your Garden
6:00 – 6:20 1:00 – 1:20
Barbara Eberhart.

Building C suite 7
Fashion Show in my gallery wearing
hand-painted shirts they either painted in
one of my classes, or just modeling shirts
I offer for sale.
20-minute
Friday 6:00
Lisa Van Herik
Building I 16, suite 3 Seasons Gallery,
How to weave a wire Basket 12 people
max
Saturday 1PM
6:30- 6:50 1:30 - 1:50
Kathleen Strukoff- Desert Modern Gallery
68895 Perez Road,
Suite I-27 (last one on the left)
"Painting our Desert" - an artist talk with
Kathleen Strukoff
May 22nd: 6:00 - 6:20
Kathleen Strukoff- Desert Modern Gallery
68895 Perez Road,
Suite I-27 (last one on the left)
"Painting our Desert" - an artist talk with
May 23rd 1:00 - 1:20
Rock Painting
7:00 – 7:20 2:00- 2:20
Anne Bedrick Fine Art
Building H suite 27
“Paint a mini 4” canvas inspired by art
you saw on the art walk”
Ongoing throughout both festival days for
as long as supplies last.

Bart Baxter
Studio H6/7 is planning a poetry reading
followed by an open mic.

We will provide the amplifier, microphone,
and a few folding chairs.

We would love to have thirty minutes.

I was the 1994 MTV Poetry Grand Slam
winner, the 1998 Seattle Poetry Grand
Slam winner, and the first ever 'Poet
8 Populist' of Seattle.
7:30 – 7:50 2:30 – 2:50
Kathleen Strukoff- Desert Modern Gallery
Suite I-27
Rock Painting
Anne Bedrick Fine Art
Building H suite 27
“Paint a mini 4” canvas inspired by art
you saw on the art walk”
Ongoing throughout both festival days for
as long as supplies last.
8:00 – 8:20 3:00 – 3:20
Alberto Garcia-Uria Studio
Suite I-26
Special exhibit; "Subjugation" / The
Darkness Within Democracy / A visual
Reckoning
In conjunction with the Fall of Freedom
National campaign, we invite you to
experience a profound and thought-
provoking exhibition held at the Alberto
Garcia-Uria Studio/studio_gallery26. The
exhibition encourages all who see it to
raise their voices and resist forces that
threaten the foundational principles of
freedom and equality.

Alberto Garcia-Uria Studio
Suite I-26
Special exhibit; "Subjugation" / The
Darkness Within Democracy / A visual
Reckoning
In conjunction with the Fall of Freedom
National campaign, we invite you to
experience a profound and thought-
provoking exhibition held at the Alberto
Garcia-Uria Studio/studio_gallery26. The
exhibition encourages all who see it to
raise their voices and resist forces that
threaten the foundational principles of
freedom and equality.
8:30 – 8:50
Andrée B Carter
Building I Suite 17
Gallery tour with question-and-answer
format describing my needlepoint and
embroidery designs and mixing of colors
from powdered pigments
The Public Arts Commission’s contribution would be funding for the musicians that will be performing at different times and throughout the various streets in the district, a dance performance provided by students with Dance with Miss Lindsay, rentals and printing for a passport that attendees can use to document their favorite studios and activities. In addition to the City’s contributions, on of the property owners in the district has pledged up to $5,000 to advertise for the event.

Category Vendor Category Amount
City
Contributions
Music The Perdido Trio Musician $ 200.00
Javier Valenzuela Singer $ 200.00
Kevin Christopher Musician $ 200.00
Cathedral City Bluegrass Band Bluegrass Ensemble $ 600.00 9 The Blasto Boy Band Band $ 600.00

Dance
Dance with Miss Lindsay - Dance
School Student Dancers $ 300.00

Rentals Dabresa Party Rentals Tables and Chairs $ 400.00

Printing Costs TBD
Passport Brochure x
2,500 copies $ 1,200.00

Supplies $ 500.00
Contingency $ 800.00
Subtotal $ 5,000.00
Business
Owner
Contributions
Advertising $ 5,000.00
Total $ 10,000.00
FUNDING SOURCE:

This initiative would be funded by the Public Arts Commission General Fund Budget. $5,000 was committed to the Festival of the Arts, leaving a remaining balance of $5,000 available for this event.
10

← All documents from this meeting