Cities Index.
Camera Install

Cathedral City City Council
October 14, 2026

Document
Camera Install
Meeting
October 14, 2026
Body
Cathedral City City Council
Original file
81 KB
Text extracted from the city's file for reading and search. Open the original on cathedralcity.primegov.com. That file is the official record.

RHYTHM ELECTRIC LLC Proposal
73530 Catalina Way Apt 1
Palm Desert, CA 92260
Ph: (760) 851-2229
Email: [email protected]
CLIENT:

CATHEDRAL CITY HALL
68700 AVENIDA LALO GURRERO
CATHEDRAL CITY, CA 92234

TERMS PROJECT

BID BUILDING CAMERA
FEEDS

QUANTITY DESCRIPTION RATE AMOUNT
36ea.

Misc.

Labor:

1. Run cat 6 feeds to (18) separate locations in
and around the main city hall building.

2. Install the cameras in locations approved by
the IT and PD dept representatives.

3. All feeds to be run into the
electrical/telephone room and terminated by
the server racks and in addition, all feeds to
be dedicated runs.

4. Rhythm Electric will be responsible for
installing the RJ45 terminations at each end
of the run.

5. Cat 6 to be tested for wire integrity and
performance before being energized.

Materials:

RJ45 termination ends.

Standards, straps and attachment materials.

Sub-total Labor
Sub-total Materials
Tax on Materials @ 9.25%
$5000.00
$49.20
$300.00
$5000.00
$349.20
$32.30
TOTAL $5381.50
DATE PROPOSAL#
9/21/2026 55212041
Terms:

1. Quote is subject to approval from the local serving utility of work to be accomplished if required.

2. Utility fees are not included.

3. All devices must have appropriate UL listings.

4. Any service equipment in need of corrections or updating will be done on a time and material basis with labor @ $100.00 per hour and materials marked up @ 20%.

5. Shipping and handling not included.

6. Permit fees not included.

7. Work is guaranteed for 1 calendar year after inspection.

EXCLUSIONS: Off hours work, Code upgrades to existing systems, Utility hookup fees, Hazardous materials removal and abatement including but not limited to lead and asbestos, WSST as built, California state energy code requirements, All patch and paint, excavation, backfill, soil removal, saw and concrete removal unless otherwise specified in the contract.

PAYMENT TO BE MADE AS FOLLOWS: 40% upon signing, 35% upon completion of rough-in, 25% upon final inspection.

All work is guaranteed for one year upon final inspection. All work to be completed in a craftsman like manner according to industry standards. All agreements are contingent upon strikes, accidents or delays beyond our control.

Owners to carry fire insurance and other necessary insurances.

ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are satisfactory and are hereby accepted. You authorized to do the work as specified. Payment will be made as outlined. Our price will remain in effect for 30 days, after which it will be subject to a review.

Date of Acceptance Cont. or Owners Signature
Date of Acceptance Rhythm Electric LLC

← All documents from this meeting