Relative to water resources and groundwater supplies, the City of Cathedral City obtains water services from the Coachella Valley Water District (CVWD) and Desert Water Authority (DWA), whose main water supply comes from the underlying Whitewater Groundwater Basin. Future development and redevelopment would increase the long-term demand for water for domestic purposes and landscape irrigation. This increased water demand may lead to an increase in groundwater pumping from local wells. However, the CVWD and DWA regulate groundwater pumping from the Whitewater Groundwater Basin, and comply with pumping rights, as required under the Sustainable Groundwater Management Act (SGMA). Thus, groundwater pumping that may lead to the depletion of local groundwater resources is not expected to occur. Goal 1 in the Water Resources Sub-Element of the General Plan calls for adequate, reliable, and sustainable water supplies to the community. Supporting policies direct the City to consult with the CVWD and DWA on water conservation throughout the community, including the use of drought-tolerant landscaping and low water-demanding appliances. They also direct the City to encourage the expanded use of recycled and reclaimed water, and the elimination of on-lot septic tanks to the greatest extent practicable. Promotion of water conservation by the City, in coordination with CVWD and DWA, is also mandated. In addition, General Plan EIR Mitigation Measures HYD-9 through HYD-13 include both site-specific requirements for future development under the General Plan and recommended City actions, which would reduce these groundwater and water resources impacts to less than significant.
Thresholds of Significance
The following significant thresholds or criteria are derived from Appendix G of CEQA, which is used to determine if and to what extent a project may have a potentially significant impact relative to hydrology and water quality. The City would consider the proposed Project to have a significant effect regarding hydrology and water quality if it is determined that the Project will:
a) Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality.
b) Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin. c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
i) result in substantial erosion or siltation on- or off-site; ii) substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site;
557799
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 56 August 2026
iii) create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff; or
iv) impede or redirect flood flows.
d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation. e) Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan.
Proposed Project Analysis
Policies and actions in the General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Development Code Update. The proposed Project would update the Development Code for consistency with the 2040 General Plan. The update would result in the creation of new zoning districts as well as the elimination of existing districts; the renaming of existing districts; the consolidation of existing districts; as well as the modification or modernization of requirements for development and land uses within various other districts. However, these districts and their standards would be consistent with the 2040 General Plan. The proposed Project would update but not eliminate the fundamental regulations and requirements of the Development Code, such as meeting design and development standards. The proposed Project would align the Development Code with the General Plan and ensure it regulates the types of land uses and development envisioned in the General Plan.
The proposed Project would implement the 2040 General Plan, thereby resulting in the same hydrology and water quality impacts from new development as evaluated in the certified General Plan EIR. In addition, the proposed Project would not result in increased density or more development than was envisioned in the General Plan.
The Development Code Update, in and of itself, does not propose specific projects but aligns the Code to match the General Plan. Because it is a regulatory update, the Development Code Update would not, in and of itself, result in impacts relative to hydrology and water quality such as resulting in a violation of water quality standards, decreased groundwater supplies or groundwater recharge, altered drainage patterns resulting in increased flooding, tsunami, or seiche hazard risks, or conflict with a water quality control plan.
Future development facilitated by the Development Code Update would undergo project-specific developmental review, including design review where applicable, and would be subject to adopted development regulations. Therefore, the proposed Project would not result in any new significant impacts or a substantial increase in the severity of the impacts identified in the General Plan EIR.
Applicable General Plan EIR Mitigation Measures:
HYD-1 The City shall continue to partner with and support federal, State, and local agencies in regional planning and management initiatives to promote and enhance water quality in the Whitewater watershed. The City shall also participate in efforts to reduce storm water and urban runoff impacts to water quality, restoration efforts, and regional mitigation, monitoring, and public education programs.
HYD-2 The City shall require all new development to minimize the creation of new impervious to the maximum extent practicable. The City shall also prohibit post-project peak storm 558800
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 57 August 2026
water runoff discharge rates from exceeding the estimated pre-project rate by requiring on-site retention.
HYD-3 The City shall require all new developments to include facilities that intercept pollutants prior to storm events during construction to control dust in order to prevent discharge of debris or sediment from the development sites.
HYD-4 The City shall continue to update data and information on hydrologic conditions in the General Plan study area, and plan and pro-actively coordinate with local and regional flood control agencies in upgrading the City's local and regional drainage system.
HYD-5 The City shall monitor and periodically update the Master Plan of Drainage to reflect changes in local and regional drainage and flood conditions.
HYD-6 The City shall require all new developments to retain runoff from rainfall events up to and including the one-hundred-year, three-hour duration event.
HYD-7 The City shall require all new development to incorporate adequate flood mitigation measures, such as grading that prevents adverse drainage impacts to adjacent properties, on-site retention of runoff, and the adequate siting of structures located within flood plains.
HYD-8 The City will ensure that adequate, safe, all-weather crossings over drainage facilities and flood control channels are provided where necessary, and are maintained for access during major storm events.
HYD-9 Require the installation and application of water-conserving technologies, in conformance with Section 17921.3 of the Health and Safety Code, Title 20, California Administrative Code Section 1601(b), and other applicable sections of Title 24 of the Public Code.
HYD-10 Provide information to developers, contractors, property owners and other appropriate parties on the usage and benefits of water conserving bathroom fixtures.
HYD-11 The City shall maintain, update and fully implement a water conserving landscape ordinance, which requires the use of natural and drought-resistant planting materials and efficient irrigation systems in new development.
HYD-12 Coordinate with the Coachella Valley Water District and Desert Water Agency to expand and strengthen educational materials and programs that inform residents of the methods and benefits of water-saving techniques available.
HYD-13 Coordinate with CVWD and DWA regarding the continued use and future expansion of recycled and reclaimed wastewater to serve new and existing development projects.
HYD-14 Coordinate with CVWD and DWA regarding the feasibility and financing of extending sewer facilities to the unsewered areas of the City.
HYD-15 Coordinate with California Regional Water Quality Control Board and other appropriate agencies to share information on potential groundwater contaminating sources, and develop and maintain a system of record and information sharing with these agencies.
HYD-16 Evaluate all proposed land use and development plans for their potential to create groundwater contamination hazards from point and non-point sources, and confer with other appropriate agencies to assure adequate review.
558811
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 58 August 2026
HYD-17 The City shall require all new development, public and private, to meet or exceed State storm water requirements and incorporate best management practices to treat, infiltrate, or filter storm water runoff and reduce pollutants discharged into the storm drain system during construction and post-construction, to the maximum extent practicable. 558822
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 59 August 2026
4.10 Land Use and Planning
Summary of Analysis in the General Plan EIR
Land use and planning impacts are discussed in Section 2.11, Land Use and Planning, of the General Plan EIR. As it relates to the physical divide of an established community, the General Plan EIR determined that none of the proposed land use, goals, policies, and programs under the proposed General Plan Update would physically divide an established community. Instead, the General Plan Update would provide additional opportunities to create mixed-use and transit-oriented neighborhoods on vacant land. Additionally, no new roadways or neighborhood-dividing development would be facilitated by the General Plan Update. The General Plan Update includes goals and policies (Land Use Element Goal 1 and 2 and Policy 1 through 3) which promotes balanced and integrated pattern of land use. With implementation of goals and policies, the General Plan EIR determined that implementation of the General Plan Update would have a less than significant impact.
The General Plan EIR determined that the City is within jurisdiction of various land use plans, policies, and regulations such as the Santa Rosa and San Jacinto Mountains National Monument (National Monument), Coachella Valley Multiple Species Habitat Conservation, Palm Springs International Airport master plan, and the influence of Agua Caliente Band of Cahuilla Indian Tribal land. The proposed General Plan Update was determined to not conflict with these plans and would conform with applicable land use guidelines outlined in these plans and policies. Additionally, the General Plan Update was developed in conformance with the State General Plan Guidelines. As such, the General Plan EIR determined that implementation of the General Plan Update would have a less than significant impact.
While the General Plan Update would not physically divide an establish community and would not conflict with applicable plans and policies, the General Plan EIR identify Mitigation Measure LU-1, as described below in “Applicable General Plan EIR Mitigation,” which assures that potential changes in land use are adequately assessed. With implementation of Mitigation Measure LU-1, the General Plan EIR determined that implementation of the General Plan Update would have a less than significant impact on land use and planning.
Thresholds of Significance
The following significant thresholds or criteria are derived from Appendix G of CEQA, which is used to determine if and to what extent a project may have a potentially significant impact on land use and planning. The City would consider the proposed Project to have a significant effect on land use and planning if it is determined that the project will:
a) Physically divide an established community.
b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect.
Proposed Project Analysis
Policies and actions in the General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Development Code Update. The proposed Project would update the Development Code for consistency with the 2040 General Plan. The update would result in the creation of new zoning districts as well as the elimination of existing districts; the renaming of existing districts; the consolidation of existing districts; as well as the modification or modernization of requirements for development and land uses within various other districts. However, these districts and their standards would be consistent 558833
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 60 August 2026
with the 2040 General Plan. The proposed Project would update but not eliminate the fundamental regulations and requirements of the Development Code, such as meeting design and development standards. The proposed Project would align the Development Code with the General Plan and ensure it regulates the types of land uses and development envisioned in the General Plan.
The proposed Project would implement the 2040 General Plan, thereby resulting in the same land use and planning impacts from new development as evaluated in the certified General Plan EIR. In addition, the proposed Project would not result in increased density or more development than was envisioned in the General Plan.
The Development Code Update, in and of itself, does not propose specific projects but aligns the Code to match the General Plan. Because it is a regulatory update, the Development Code Update would not, in and of itself, result in the physical divide of an established community or conflict with any land use plan or policy.
Future development facilitated by the Development Code Update would undergo project-specific developmental review, including design review where applicable, and would be subject to adopted development regulations. Therefore, the proposed Project would not result in any new significant impacts or a substantial increase in the severity of the impacts identified in the General Plan EIR.
Applicable General Plan EIR Mitigation Measures:
LU-1 Individual proposed projects, especially those involving a mix of residential and other uses, as well as those located nearby or adjacent to sensitive lands or uses, shall be fully evaluated during the project review process to assure that all land use compatibility issues are addressed and mitigated.
558844
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 61 August 2026
4.11 Noise
Summary of Analysis in the General Plan EIR
Noise and vibration impacts are discussed in Section 2.12, Noise, of the General Plan EIR. As it relates to exterior noise levels, the General Plan EIR determined that future transportation noise would expose future noise-sensitive land to exterior noise levels greater than the normally acceptable exterior noise criteria. However, the General Plan EIR determined that noise management policies and programs in the General Plan and Mitigation Measures N-1 through N-11, as described below in “Applicable General Plan EIR Mitigation,” would reduce exterior transportation noise level.
As it relates to interior noise, the General Plan EIR determined that exterior noise levels along City transportation corridors have the potential to exceed 70 A-weighted decibel (dBA) Community Noise Equivalent Level (CNEL) and thus, standard building construction providing the minimum 25 dBA exterior-to-interior noise reduction may still result in interior noise levels exceeding the 45 dBA CNEL standard for residential units. As such, interior noise mitigation, as described below in “Applicable General Plan EIR Mitigation,” would be required for certain developments. With implementation of applicable policies and programs contained in the Noise Sub-Element and applicable mitigation measures, transportation noise impacts on interior noise levels were determined to be less than significant.
As it relates to long-term traffic noise from automobiles, trucks, buses, and motorcycles, the General Plan EIR determined that the buildout of the General Plan would generate traffic noise changes ranging from a decrease of 0.7 to an increase of 0.6 dBA CNEL along roadways. The noise level increases would not exceed applicable thresholds and the General Plan EIR determined that impacts were less than significant.
As it relates to vibration, the General Plan EIR determined that the noise-sensitive and non-noise-sensitive uses within 50 to 150 feet of the Union Pacific Railroad (UPRR) may experience vibration levels that exceed the noise-sensitive threshold of 72 vibration decibel (Vdb) and non-noise-sensitive threshold of 75 Vdb. Thus, the policies and programs from the Noise Sub-Element, including Program
1.D, identifies and discusses the applicability of feasible measures to satisfy the 72 Vdb threshold for noise-sensitive uses. Additionally, the General Plan EIR identify Mitigation Measure N-4, as described below in “Applicable General Plan EIR Mitigation,” which would reduce and mitigate potential vibration impacts. Upon adherence to applicable policies and programs in the Noise Sub-Element and implementation of Mitigation Measure N-4, the General Plan EIR determined that implementation and buildout of the General Plan would have a less than significant impact.
The General Plan EIR determined that the 60 dBA CNEL contours of the Palm Springs International Airport (PSP) in the year of 2002 partially overlaps with the City boundaries east of San Joaquin Drive and north of Ramon Road. Furthermore, mapping of future noise conditions in the year of 2025 indicates that the 60 dBA CNEL contours of the PSP would shift to partially overlap with City boundaries east of San Joaquin Drive and north of Mission Drive. As such, the General Plan EIR determined that future (2025) noise associated with aircraft flyover events would be equal or less than existing conditions (2002). Nevertheless, the General Plan EIR determined that new or expanded school sites within two miles of PSP’s runway would be subject to review by the California Department of Transportation (Caltrans) Division of Aeronautics. Additionally, the PSP land use policies require noise reduction design features in residential dwelling units near the airport. Specifically, the PSP land use policies require that design features ensure an interior noise limit of 45 dBA CNEL and an exterior noise level of 60 dBA CNEL. Due to the location of the PSP’s noise contour overlapping with the City’s boundaries, the 558855
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 62 August 2026
General Plan EIR determined that little or no specific mitigation would be required to ensure new residential development are below applicable noise thresholds. As such, upon adherence to applicable PSP land use policies, the General Plan EIR determined that implementation and buildout of the General Plan would have a less than significant impact.
Thresholds of Significance
The following significant thresholds or criteria are derived from Appendix G of CEQA, which is used to determine if and to what extent a project may have a potentially significant impact on noise.
The City would consider the proposed Project to have a significant effect on noise if it is determined that the project would result in:
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies.
b) Generation of excessive groundborne vibration or groundborne noise levels. c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels.
Proposed Project Analysis
Policies and actions in the General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Development Code Update. The proposed Project would update the Development Code for consistency with the 2040 General Plan. The update would result in the creation of new zoning districts as well as the elimination of existing districts; the renaming of existing districts; the consolidation of existing districts; as well as the modification or modernization of requirements for development and land uses within various other districts. However, these districts and their standards would be consistent with the 2040 General Plan. The proposed Project would update but not eliminate the fundamental regulations and requirements of the Development Code, such as meeting design and development standards. The proposed Project would align the Development Code with the General Plan and ensure it regulates the types of land uses and development envisioned in the General Plan.
The proposed Project would implement the 2040 General Plan, thereby resulting in the same noise impacts from new development as evaluated in the certified General Plan EIR. In addition, the proposed Project would not result in increased density or more development than was envisioned in the General Plan. As such, the proposed Project would not result in an increase in vehicular traffic nor would it introduce a substantial increase in stationary noise.
The Development Code Update, in and of itself, does not propose specific projects but aligns the Code to match the General Plan. Because it is a regulatory update, the Development Code Update would not, in and of itself, result in impacts to exterior and interior noise, transportation noise, vibration, or substantial aircraft noise.
Future development facilitated by the Development Code Update would undergo project-specific developmental review, including design review where applicable, and would be subject to adopted development regulations. Therefore, the proposed Project would not result in any new significant impacts or a substantial increase in the severity of the impacts identified in the General Plan EIR. 558866
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 63 August 2026
Applicable General Plan EIR Mitigation Measures:
N-1 The City shall develop and maintain an inventory of existing and future noise sources and areas of incompatibility and establish procedures, methods and standards to reduce the noise levels in these areas to acceptable levels.
N-2 Prior to development plan approvals for new noise-sensitive development projects, the City shall require the submittal of noise impact and mitigation analyses to the Planning Department identifying practicable noise mitigation measures ensuring compliance with City standards.
N-3 Prior to development plan approvals for new residential and similar noise sensitive projects, the City shall require submittal of noise impact and mitigation analyses to the Planning Department that demonstrates that the interior noise levels in all habitable rooms will satisfy the 45 dBA CNEL interior noise level standard of the General Plan and Title 24, Part 2, of the California Building Code.
N-4 Prior to development plan approvals for new noise-sensitive development projects within 150 feet of UPRR railroad tracks, the City shall require submittal of a final vibration study, which identifies all practicable mitigation measures to satisfy the 72 VdB noise-sensitive and 75 VdB non-noise-sensitive vibration level standards, as defined by the FTA for frequent rail events.
N-5 The City shall maintain, update and enforce the City’s Noise Ordinance that establishes community-wide noise standards and identifies measures designed to resolve noise complaints.
N-6 The City shall require major stationary noise-generating sources throughout the City to install additional noise buffering or reduction mechanisms on development sites and/or within facilities to reduce noise generation levels to the lowest extent practicable prior to the renewal of conditional use permits or business licenses or prior to the approval and/or issuance of new conditional use permits for said facilities.
N-7 Parking lots, loading zones, and large trash bins shall be located the greatest distance practicable from adjacent residential properties, and designed is a manner that reduces associated noise impacts to levels allowable by the City’s Noise Ordinance.
N-8 The City Zoning Ordinance and development review standards shall be used to limit land use patterns and project designs to those that are compatible with the existing and long-term noise environment.
N-9 The City shall develop guidelines and minimal criteria requirements for noise analyses for future development projects and in compliance with the General Plan Noise Study.
Studies shall evaluate project impacts and the effectiveness of proposed mitigation measures.
N-10 The City shall periodically review and amend the General Plan Land Use Map as appropriate to assure reasonable land use/noise level compatibility.
N-11 The City shall designate primary truck routes and ensure that they are clearly marked throughout the community and properly identified on mobile apps and other web-based platforms. Except for traffic providing location specific services and deliveries, construction and delivery trucks shall be limited to those truck routes identified in the General Plan Circulation and Mobility Element.
558877
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 64 August 2026
N-12 Development projects which result in through-traffic in residential neighborhoods shall be discouraged through the development review process, and most viable alternative routes shall be identified and adhered to.
N-13 Where applicable, prior to the issuance of building permits for new development or other construction projects, when sensitive receiver locations are within 100 feet of proposed construction activities the City shall require the submittal of construction noise impact analysis and management plans that demonstrate:
• Exterior construction noise levels at the closest sensitive receiver locations will satisfy the FTA 80 dBA Leq residential and 85 dBA Leq commercial 8-hour construction noise level standards and the 0.01 in/sec RMS vibration standard for sensitive uses. The site-specific study shall identify the necessary noise and/or vibration mitigation measures, if any, required to reduce exterior noise and vibration levels to below FTA noise and City vibration thresholds; and • Measures to reduce construction noise and vibration levels, such as those provided below, shall be incorporated in the final noise management plan, if necessary:
o Install temporary construction noise barriers at the development site boundary which break the line of sight for occupied sensitive uses for the duration of construction activities. The noise control barrier(s) must provide a solid face from top to bottom and shall:
Provide a minimum transmission loss of 20 dBA and be
constructed with an acoustical blanket (e.g. vinyl acoustic curtains or quilted blankets) attached to the construction site perimeter fence or equivalent temporary fence posts;
Properly maintained with any damage promptly repaired. Gaps, holes, or weaknesses in the barrier or openings between the barrier and the ground shall be promptly repaired.
o Install sound dampening mats or blankets to the engine compartments of heavy mobile equipment (e.g. graders, dozers, heavy trucks). The dampening materials must be capable of a 5 dBA minimum noise reduction, must be installed prior to the use of heavy mobile construction equipment, and must remain installed for the duration of the equipment use.
o Construction activities requiring loaded trucks, large bulldozers, and jackhammers within 50 feet of nearby sensitive land uses (e.g. residential, school, etc.) shall be minimized, or alternative equipment or methods shall be used, unless the vibration levels are shown to be less than the City threshold of 0.01 in/sec RMS.
558888
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 65 August 2026
4.12 Parks and Recreational Resources
Summary of Analysis in the General Plan EIR
Parks and recreational resources impacts are discussed in Section 2.13, Parks and Recreational Resources, of the General Plan EIR. The General Plan EIR determined that future development and redevelopment facilitated by the proposed General Plan Update would result in a population of approximately 105,532 new residents in the City. As such, the General Plan Update would result in an increased demand for existing and future parks and recreational facilities. The General Plan EIR states that Section 9.106.040 of the CCMC requires the City to dedicate land and/or require payment of in-lieu fees for the provision of parkland at a standard of 3 acres per 1,000 residents. With payment of fees and dedication of parkland, the General Plan EIR determined that the City would meet the parkland standards even with the increased population growth. Furthermore, the General Plan Update includes goals, policies, and programs (Parks and Recreation Element Goal 1, Policy 1.4, and Program 1.4.2) which establishes alternative modes of transportation and therefore, provides new recreational opportunities. With implementation of goals, policies, and programs and payment of in-lieu fees, the General Plan EIR determined that implementation and buildout of the General Plan would have a less than significant impact.
As it relates to the expansion of construction of recreational facilities, the General Plan EIR determined that the proposed General Plan Update includes 3,760 acres of land dedicated as open space and 125 acres established for schools and libraries. Based on the projected population growth, a total of 317 acres of new parkland would be required and a total of 478 acres of parkland would be required to meet the city’s buildout population of 159,998 residents (existing and new residents combined). Each future recreational facility would be evaluated on a project-by-project basis to ensure that environmental impacts are minimized or mitigated, as needed. As such, the General Plan EIR determined that implementation and buildout of the General Plan would have a less than significant impact.
Thresholds of Significance
The following significant thresholds or criteria are derived from Appendix G of CEQA, which is used to determine if and to what extent a project may have a potentially significant impact on parks and recreational facilities. The City would consider the proposed Project to have a significant effect on parks and recreational facilities if it is determined that the project will:
a) Increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated. b) Include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment.
Proposed Project Analysis
Policies and actions in the General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Development Code Update. The proposed Project would update the Development Code for consistency with the 2040 General Plan. The update would result in the creation of new zoning districts as well as the elimination of existing districts; the renaming of existing districts; the consolidation of existing districts; as well as the modification or modernization of requirements for development and land uses within various other districts. However, these districts and their standards would be consistent with the 2040 General Plan. The proposed Project would update but not eliminate the fundamental 558899
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 66 August 2026
regulations and requirements of the Development Code, such as meeting design and development standards. The proposed Project would align the Development Code with the General Plan and ensure it regulates the types of land uses and development envisioned in the General Plan.
The proposed Project would implement the 2040 General Plan, thereby resulting in the same parks and recreational facility impacts from new development as evaluated in the certified General Plan EIR. In addition, the proposed Project would not result in increased density or more development than was envisioned in the General Plan.
The Development Code Update, in and of itself, does not propose specific projects but aligns the Code to match the General Plan. Because it is a regulatory update, the Development Code Update would not, in and of itself, result in impacts to parks and recreational facilities.
Future development facilitated by the Development Code Update would undergo project-specific developmental review, including design review where applicable, and would be subject to adopted development regulations. Therefore, the proposed Project would not result in any new significant impacts or a substantial increase in the severity of the impacts identified in the General Plan EIR.
Applicable General Plan EIR Mitigation Measures:
PR-1 The City shall maintain and, where appropriate, upgrade existing facilities and diversify activities programming.
PR-2 The City shall periodically conduct a needs assessment for recreation programs and services with local residents.
PR-3 The City shall maintain and where possible expand use of joint-use agreements with the Palm Springs Unified School District to use school properties for public use during non-school hours.
PR-4 The 2005 Cathedral City Parks and Recreation Master Plan shall be revised to include an updated facilities and program analysis, and five to ten-year master plan for future park and open space lands and recreation programs.
PR-5 Concurrent with the update to the Parks and Recreation Master Plan, evaluate the distribution of existing and planned park and recreation lands, and the distribution of under-served or otherwise disadvantaged neighborhoods, and ensure that the need of all sectors of the community are well served.
PR-6 Upon completion of the Parks and Recreation Master Plan update the City shall adopt population-based parkland acreage standards for all sizes and types of parks and recreation areas.
PR-7 A broad range of sources of purchase financing and operating revenue, shall be investigated and shall include Development Impact Fees, Mello-Roos special districts, public/private ventures, state and federal grant opportunities, developer fees and inter-agency joint use agreements to supplement revenues collected for parks and recreation projects.
PR-8 The City shall improve and expand pedestrian and bicycle access and connections to regional parks and open space by implementing the City ATP, including the striping and/or construction of new and improved sidewalks and multi-class bikeways. 559900
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 67 August 2026
PR-9 The City shall work diligently to implement the General Plan Circulation and Mobility Element, the ATP and other components of the City’s transportation plan that address safe pedestrian, bicycle and ADA access to transit connections and facilities, especially those located between residential neighborhoods and parks and open space.
PR-10 The City shall develop and explore programs that encourage bicycle commuting or testing of innovative facility designs to accommodate bicycles, scooters and LSEVs.
PR-11 Every reasonable effort shall be made to enhance accessibility throughout the planning of park areas and facilities, in accordance with the Americans with Disabilities Act (ADA), and include increased wheelchair accessibility and other requirements needed for the elderly and disabled.
PR-12 The City shall adopt design and planning guidelines that enhance safety in parks, playgrounds, streets, and public places.
PR-13 New development, redevelopment, and public works projects shall be required to incorporate applicable General Plan guidelines when developing streets, parks, playgrounds, and other public places.
PR-14 The City shall encourage or require the provision of recreation space in private development.
PR-15 Recreation space and amenities shall be required and provided in large developments, especially in areas of high population and building density.
PR-16 The City shall regularly review and, as necessary, update the Active Transportation Plan to ensure a comprehensive and convenient bicycle and pedestrian transportation network.
PR-17 The City shall identify and program physical improvements, such as crosswalks, sidewalk improvements, signs, and traffic signalization, that would make bicycle and pedestrian travel safer to parks and recreational facilities.
PR-18 Every reasonable effort shall be made to provide children with safe and appealing opportunities for walking and bicycling to school in order to decrease rush hour traffic and fossil fuel consumption, encourage exercise and healthy living habits, and reduce the risk of injury.
PR-19 The City shall collaborate with CVAG, Coachella Valley jurisdictions, and other relevant agencies to support the completion of all planned CV Link segments and expansion of community connector links, particularly those in Cathedral City and neighboring communities.
559911
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 68 August 2026
4.13 Population, Housing and Socio-Economic Resources
Summary of Analysis in the General Plan EIR
Population, housing, and socio-economic impacts are discussed in Section 2.14, Population, Housing, and Socio-Economic Resources, of the General Plan EIR. As it relates to substantial unplanned population growth, the General Plan EIR determined that implementation of the General Plan Update would not in itself result in any population growth. However, implementation of the General Plan Update would include a land use plan and policies that would facilitate new housing and businesses. The General Plan EIR determined that the General Plan Update would accommodate up to approximately 33,396 additional residential units, resulting in a total population of 159,998 residents at buildout. The General Plan EIR determined that the population growth is considered substantial. However, the proposed General Plan Update would facilitate new development in vacant land. The projected population growth is planned and would occur over many years. As such, impacts were determined to be less than significant.
As it relates to the displacement of existing residents or housing, the General Plan EIR determined that implementation of the General Plan Update would not increase residential densities on currently developed land. Instead, buildout of the General Plan Update would occur primarily on currently vacant land. As such, the General Plan EIR determined that the General Plan Update would not displace existing residents or housing, and no replacement housing would be required. Thus, the General Plan EIR determined that implementation and buildout of the General Plan would have a less than significant impact.
According to the General Plan EIR, the planning area does not contain any disadvantaged communities, as designated by CalEPA. Thus, the General Plan EIR determined that implementation and buildout of the General Plan would have no impact on disadvantaged communities.
Thresholds of Significance
The following significant thresholds or criteria are derived from Appendix G of CEQA, which is used to determine if and to what extent a project may have a potentially significant impact on population, housing, and socio-economic resources. The City would consider the proposed Project to have a significant effect on population, housing, and socio-economic resources if it is determined that the project will:
a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure).
b) Displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere.
Proposed Project Analysis
Policies and actions in the General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Development Code Update. The proposed Project would update the Development Code for consistency with the 2040 General Plan. The update would result in the creation of new zoning districts as well as the elimination of existing districts; the renaming of existing districts; the consolidation 559922
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 69 August 2026
of existing districts; as well as the modification or modernization of requirements for development and land uses within various other districts. However, these districts and their standards would be consistent with the 2040 General Plan. The proposed Project would update but not eliminate the fundamental regulations and requirements of the Development Code, such as meeting design and development standards. The proposed Project would align the Development Code with the General Plan and ensure it regulates the types of land uses and development envisioned in the General Plan.
The proposed Project would implement the 2040 General Plan, thereby resulting in the same population, housing, and socio-economic impacts from new development as evaluated in the certified General Plan EIR. In addition, the proposed Project would not result in increased density or more development than was envisioned in the General Plan.
The Development Code Update, in and of itself, does not propose specific projects but aligns the Code to match the General Plan. Because it is a regulatory update, the Development Code Update would not, in and of itself, result in impacts to substantial unplanned population growth and displace housing.
As the planning area does not contain any disadvantaged communities, the proposed Project would not result in increased density or more development than was envisioned in the General Plan that would have an impact on disadvantaged communities.
Future development facilitated by the Development Code Update would undergo project-specific developmental review, including design review where applicable, and would be subject to adopted development regulations. Therefore, the proposed Project would not result in any new significant impacts or a substantial increase in the severity of the impacts identified in the General Plan EIR.
Applicable General Plan EIR Mitigation Measures:
No mitigation measures were identified in the General Plan EIR for population, housing, and socio-economic resources. 559933
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 70 August 2026
4.14 Public Utilities and Service Systems
Summary of Analysis in the General Plan EIR
Public Services
Public services are discussed in Section 2.15, Public Utilities and Service Systems, of the General Plan EIR. The General Plan EIR determined that implementation of the General Plan would result in development of up to 33,396 new dwelling units, an additional 8,937,897 square feet of new commercial structures, and an additional 15,564,546 square feet of industrial space within the city. As it relates to fire protection services, the introduction of new development and residents would increase the overall demand for fire services within the city. Funding for additional fire protection services would be provided via the City’s general fund which is maintained by the collection of taxes. Additionally, future projects within the city would be required to pay Development Impact Fees to offset the project-related demand for existing fire services. Furthermore, future developments would be required to be constructed consistent with current fire regulations and provide fire safety features. With implementation of policies, compliance with applicable design requirements, and payment of development fees, impacts on fire protection services were determined to be less than significant.
As it relates to police protection, the increase in development proposed under the General Plan would increase demands for police protection. The City’s Police Department’s Strategic Plan has a service ratio goal of no less than one officer for every 1,000 residents. As such, the General Plan EIR determined that future development has the potential to impact response times. The increase in police protection services would require the hiring of additional staff which would be funded by the City’s general fund and grant funding. New police stations or expansion of existing police facilities could be required, however, each future facility would be evaluated on a project-by-project basis to ensure that environmental impacts are minimized or mitigated, as needed. Furthermore, the General Plan includes a policy (Public Services and Facilities Element Policy 1.3) that requires the City to provide adequate and timely expansion of police protection capabilities, services and facilities to meet future development demands. With implementation of applicable policies, impacts on police services were determined to be less than significant.
As it relates to schools, the increase in dwelling units and subsequent population increase would increase the enrollment of students in schools within the city. The General Plan EIR determined that a worst-case scenario would result in approximately 4,983 new elementary/middle/high school students being generated during the buildout of the General Plan. While the buildout of the General Plan would generate new students, the Palm Spring Unified School District (PSUSD) would collect school impact fees as new development (residential, commercial, industrial, etc.) occurs in accordance with Senate Bill 50 and Policy 3.5 of the Public Services and Facilities Element. Upon collection of school impact fees, impacts associated with schools were determined to be less than significant.
The General Plan EIR determination on park impacts is summarized in Section 4.12, Parks and Recreational Resources, of this Addendum.
As it relates to library services, the increase in dwelling units and subsequent population increase in the City would gradually increase the demand for library services. The General Plan EIR determined that new library facilities or expansion of existing facilities could be required as library demands increase.
However, each facility would be evaluated on a project-by-project basis to ensure that environmental impacts are minimized or mitigated, as needed. Furthermore, the General Plan includes a policy (Public Services and Facilities Element Policy 3.4) which requires the City to coordinate with the Riverside 559944
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 71 August 2026
County Library System. With implementation of applicable policies, impacts on library services were determined to be less than significant.
While the General Plan EIR determined that the General Plan would have a less than significant impact on public services (i.e., impacts on fire protection, police services, parks, schools, libraries), Mitigation Measures PS-1 through PS-13, as described below in “Applicable General Plan EIR Mitigation Measures,” would ensure that impacts related to public services continue to be less than significant.
Mitigation Measures PS-1 through PS-13 were derived from the Public Services and Facilities Element and serves to reinforce actions taken by the City and project applicants.
Utilities Service Systems
Utilities service systems are discussed in Section 2.15, Public Utilities and Service Systems, of the General Plan EIR. As it relates to the construction, relocation, or expansion of utilities, the General Plan EIR would result in a population of approximately 159,998 residents and up to 33,396 new dwelling units, an additional 8,937,897 square feet of new commercial structures, and an additional 15,564,546 square feet of industrial space. Future development facilitated by the General Plan would connect to existing or expanded utility infrastructure. To ensure adequate capacity, utility providers have plans that would expand capacity, as needed, based on future demands. New utility facilities or expansion of existing facilities would be evaluated on a project-by-project basis to ensure that environmental impacts are minimized or mitigated, as needed. Additionally, the General Plan contains policies (Public Facilities Sub-Element Policy 4.1 and 4.2 and Water, Sewer and Utilities Sub-Element Policy 5.1 and 5.2) that encourages the City to work alongside providers to allocate budget, land, and sites for future infrastructure development. With implementation of applicable policies, the General Plan EIR determined that impacts are less than significant.
As it relates to sufficient water supplies, the General Plan EIR determined that buildout of the General Plan would result in an increase in population and land development when compared to the existing land use plan. Buildout of the General Plan would have a total water demand of approximately 20,769.86 acre-feet per year. The City is served by the Cucamonga Valley Water District (CVWD) and Desert Water Agency (DWA) which has adequate water supply to meet anticipated demands for normal, single dry, and multiple dry water years. The General Plan EIR determined that the projected water demands from the buildout of the General Plan would represent approximately 8.5 percent of the CVWD and DWA combined water demand for the year 2040. With implementation of policies (Water, Sewer and Utilities Sub Element Policy 6.2) that require coordination with water agencies and applicable policies that reduce water demands, the General Plan EIR determined that impacts are less than significant.
As it relates to wastewater, the General Plan EIR states that the City is currently served by CVWD and DWA. Wastewater generated by the city is treated at CVWD’s Cook Street wastewater reclamation plant which treats approximately 15 million gallons of wastewater a day. The General Plan EIR determined that buildout of the General Plan would potentially require new wastewater connections to existing wastewater treatment lines. Additionally, CVWD and DWA have plans for the expansion of existing facilities based on future demands. Additionally, the General Plan includes policies (Water, Sewer and Utilities Sub-Element Policy 6.1, 6.2, 6.3) which encourage an integrated, city-wide sewer system and monitoring of resource management activities. New wastewater facilities or expansion of existing facilities would be evaluated on a project-by-project basis to ensure that environmental impacts are minimized or mitigated, as needed. With implementation of applicable policies, the General Plan EIR determined that impacts are less than significant.
As it relates to solid waste and compliance with solid waste reduction regulations, the General Plan EIR determined that buildout of the General Plan would result in a generation of approximately 90,017 tons 559955
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 72 August 2026
of solid waste per year after considering Assembly Bill 939. Assembly Bill 939 requires a 50 percent diversion of solid waste from landfills. Waste generated by the city is disposed of in three landfills which has a combined remaining capacity of 178.8 million cubic yards and thus, waste generated by General Plan buildout would not exceed the landfills’ remaining capacity. With adherence to Assembly Bill 939 and applicable policies within the General Plan, the General Plan EIR determined that impacts are less than significant.
While the General Plan EIR determined that the General Plan would have a less than significant impact on utilities service systems, Mitigation Measures PS-14 through PS-25, as described below in “Applicable General Plan EIR Mitigation Measures,” would ensure that impacts related to utilities service systems continue to be less than significant. Mitigation Measures PS-14 through PS-25 were derived from the Public Services and Facilities Element and serves to reinforce actions taken by the City and project applicants.
Thresholds of Significance
The following significant thresholds or criteria are derived from Appendix G of CEQA, which is used to determine if and to what extent a project may have a potentially significant impact on public services and utilities and service systems.
The City would consider the proposed Project to have a significant effect on public services if it is determined that the project will:
a) Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
i) Fire protection.
ii) Police protection.
iii) Schools.
iv) Parks.
v) Other public facilities.
Additionally, the City would consider the proposed Project to have a significant effect on utilities service systems if it is determined that the project will:
a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects.
b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years. c) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments.
d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals. 559966
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 73 August 2026
e) Comply with federal, state, and local management and reduction statutes and regulations related to solid waste.
Proposed Project Analysis
Public Services
Policies and actions in the General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Development Code Update. The proposed Project would update the Development Code for consistency with the 2040 General Plan. The update would result in the creation of new zoning districts as well as the elimination of existing districts; the renaming of existing districts; the consolidation of existing districts; as well as the modification or modernization of requirements for development and land uses within various other districts. However, these districts and their standards would be consistent with the 2040 General Plan. The proposed Project would update but not eliminate the fundamental regulations and requirements of the Development Code, such as meeting design and development standards. The proposed Project would align the Development Code with the General Plan and ensure it regulates the types of land uses and development envisioned in the General Plan.
The proposed Project would implement the 2040 General Plan, thereby resulting in the same public services impacts from new development as evaluated in the certified General Plan EIR. In addition, the proposed Project would not result in increased density or more development than was envisioned in the General Plan.
The Development Code Update, in and of itself, does not propose specific projects but aligns the Code to match the General Plan. Because it is a regulatory update, the Development Code Update would not, in and of itself, result in impacts to public services such as police protection, fire protection, schools, parks, and libraries.
Future development facilitated by the Development Code Update would undergo project-specific developmental review, including design review where applicable, and would be subject to adopted development regulations. Therefore, the proposed Project would not result in any new significant impacts or a substantial increase in the severity of the impacts identified in the General Plan EIR.
Utilities Service Systems
Policies and actions in the General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Development Code Update. The proposed Project would update the Zoning Code for consistency with the 2040 General Plan. The update would result in the creation of new zoning districts as well as the elimination of existing districts; the renaming of existing districts; the consolidation of existing districts; as well as the modification or modernization of requirements for development and land uses within various other districts. However, these districts and their standards would be consistent with the 2040 General Plan. The proposed Project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design and development standards.
The proposed Project would align the Zoning Code with the General Plan and ensure it regulates the types of land uses and development envisioned in the General Plan.
The proposed Project would implement the 2040 General Plan, thereby resulting in the same utilities service system impacts from new development as evaluated in the certified General Plan EIR. In addition, the proposed Project would not result in increased density or more development than was envisioned in the General Plan.
559977
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 74 August 2026
The Development Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the General Plan. Because it is a regulatory update, the Development Code Update would not, in and of itself, result in impacts to utilities service systems (i.e., wastewater, water, electricity, natural gas, etc.).
Future development facilitated by the Development Code Update would undergo project-specific developmental review, including design review where applicable, and would be subject to adopted development regulations. Therefore, the proposed Project would not result in any new significant impacts or a substantial increase in the severity of the impacts identified in the General Plan EIR.
Applicable General Plan EIR Mitigation Measures:
Fire and Police Services
PS-1 The Fire and Police Departments shall coordinate with other City departments and schedule periodic review, access and update the Strategic Plans and Local Hazards Mitigation Plan.
PS-2 The Fire and Police Departments shall evaluate proposals for new development to assure adequate emergency access, the integration of defensible space principles, clear street name signage and numbering, internal circulation, fire flow and other safety design considerations.
PS-3 The City shall apply objective criteria, including appropriate minimum response time, the matching of services and facilities to local needs, and the availability of alternative routes to serve target neighborhoods, and assure the optimal siting of future fire and police stations.
PS-4 The City shall evaluate current and potential methods of financing the expansion of fire and police services, including developer impact fees, assessment districts, and fire and police permitting fees for development occurring in high security or fire risk areas.
PS-5 City departments shall continue to collaborate between County Health and Human Services staff and law enforcement personnel to provide training and education on methods for addressing mental health patients in the criminal justice system.
PS-6 The City shall strictly enforce the California Building and Fire Codes, City Municipal Code and other applicable building standards in the course of reviewing development plans and conducting building inspections.
PS-7 The siting of facilities that produce, store, use or transport hazardous, flammable or explosive materials shall be conducted in a manner which assures the highest level of safety, in strict conformance with the California Building and Fire Codes, Municipal Code and other applicable regulations.
PS-8 An ongoing effort shall be made to enhance public awareness and participation in crime prevention, and encourage and promote the Neighborhood Watch Program, Citizens on Patrol and other community-oriented policing programs. The City shall develop new and expand existing educational programs dealing with personal safety awareness, such as neighborhood and commercial association watch/protection programs, and emergency preparedness and education for residents to register their cell phone with “Alert RivCo” at https://rivcoready.org/AlertRivCo used to alert Riverside County community members of urgent actions to take during disasters, such as earthquakes, wildfires, and floods. 559988
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 75 August 2026
Schools and Libraries
PS-9 Review PSUSD and COD development proposals and environmental documentation, and otherwise coordinate with these institutions in planning new public school facilities as part of the City’s continuing effort to provide enhanced educational opportunities for the community’s residents.
PS-10 Routinely evaluate and update the Land Use Element and confer with potentially affected institutions to ensure that school and library sites are compatible with surrounding land uses, arterial roadways and significant noise generators.
PS-11 The City shall encourage and/or require the use of design and development techniques, such as sound attenuation walls, earthen berms and acoustical insulation in buildings, that mitigate potential traffic and other noise impacts on schools and libraries.
PS-12 The City shall proactively pursue agreements with the Palm Springs Unified School District regarding the shared purchase, lease, and/or joint use of land for school and recreational purposes. Provisions shall be made to optimize access to recreation facilities and open space for the community during non-school hours.
PS-13 The City shall coordinate with PSUSD, COD and the Riverside County Library System to ensure that safe routes and means to school and library facilities through the thoughtful implementation of the Circulation and Mobility Element and the Active Transportation Plan.
Public Facilities
PS-14 The City shall periodically review its official Land Use Map and development patterns to assure the availability of adequate sites for future public and quasi-public buildings, infrastructure, and other facilities. The City shall confer and coordinate with utilities and other public and quasi public agencies regarding their long-term needs.
PS-15 Establish and implement a Capital Improvement Program review and update schedule, which includes annual reviews, analysis and comprehensive revisions every five years.
PS-16 All new maintenance and utility facilities (and their signage) shall be integrated into the surrounding environment using landscape treatments, architectural elements, and/or other appropriate design mechanisms. Design plans shall be reviewed by the Planning Department.
PS-17 Consult and coordinate with Southern California Edison regarding the costs, methods, potential barriers to, and feasibility of undergrounding electrical power lines.
PS-18 Critical structures and facilities (including civic administrative center, hospitals, fire stations, police stations, schools and major communications facilities) shall be restricted from geologically and hydrologically hazardous areas, to the greatest extent practical.
PS-19 Investigate the feasibility of expanding the City’s existing corporate yard to accommodate larger office space, parking lots, and maintenance facilities.
PS-20 Continue to investigate the feasibility of constructing a new community center, including potential sites, constraints, and funding opportunities.
PS-21 Establish a facilities upkeep and restoration master plan for City-owned facilities. 559999
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 76 August 2026
Water, Sewer, and Utilities
PS-22 Confer and coordinate with CVWD and DWA on methods to finance the upgrading and expansion of the sewer and domestic water systems, including the establishment of assessment and/or community facilities districts that also provide financial assistance for economically disadvantaged neighborhoods.
PS-23 The City shall support the efforts of DWA and CVWD to construct and expand facilities that treat and distribute reclaimed water.
PS-24 The City shall explore avenues for the expansion of roof-top solar and utility-scale wind energy development, and the implementation of domestic and utility-scale storage systems.
PS-25 The City shall confer and coordinate with SCE to identify existing above ground power lines that are candidates for cost-effective undergrounding, with a special emphasis on those occurring along City image corridors.
660000
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 77 August 2026
4.15 Transportation
Summary of Analysis in the General Plan EIR
Transportation impacts are discussed in Section 2.16, Transportation, of the General Plan EIR.
According to the General Plan EIR, the General Plan is not a land use nor a transportation project but instead, a broad-based policy document. The General Plan EIR utilized three methods to determine if the General Plan would result in conflict with State CEQA Guidelines Section 15064.3(b):
• Does the Project’s VMT exceed an applicable threshold of significance? o The City does not have an applicable VMT threshold however, the General Plan EIR determined that the General Plan would result in a net reduction in trips and VMT when compared to the existing General Plan.
• Is the Project within one-half mile of an existing major transit stop or stop along an existing high quality transit corridor?
o The city is served by existing transit services provided by the SunLine Transit Agency.
The General Plan would require continue coordination with SunLine Transit Agency to ensure that the transit system can adequately serve future development and population within the city.
• Does the Project decrease VMT in the project area compared to existing conditions? o While the General Plan would facilitate new development and growth within the city, the General Plan EIR determined that the General Plan would result in a net reduction in trips and VMT when compared to the existing General Plan.
The General Plan EIR determined that the proposed Circulation and Mobility Element include policies and programs (Policy 1, Policy 2, Program 5.A, and Policy 11) that would reduce the City’s VMT.
Mitigation Measures TM-1 through TM-7 are discussed below to further reduce the City’s impacts related to transportation and VMT. Furthermore, the General Plan EIR determined that the implementation of Complete Streets concepts provided in the City’s Active Transportation Plan would contribute to overall reduction in VMT, vehicle trip length, and vehicular delay. With implementation of these policies, programs, and implementation of Complete Streets concepts, the General Plan EIR determined that the General Plan would not conflict with or be inconsistent with CEQA Guidelines Section 15064.3(b) and a less than significant impact would occur.
The General Plan EIR determined that as future development is proposed, roadway design and improvements would be reviewed by City staff and other agencies, such as Caltrans, to ensure that sharp curves, dangerous intersections, or other hazardous design features are avoided. Circulation and Mobility Element Policy 4 requires development proposals generating traffic volumes or impacts beyond the scope of the General Plan analysis to conduct project-specific traffic studies to ensure impacts are adequately mitigated. The General Plan EIR further determined that implementation of the Circulation and Mobility Element and the Active Transportation Plan would expand the City's multi-modal network, integrating vehicular and multi-modal travel to maximize roadway safety for all users. Circulation and Mobility Element Policies 1, 2, 5, 6, and 7 serve to ensure a safe and compatible mix of transportation modes. The General Plan EIR noted that vehicular incompatibilities associated with farm equipment are not anticipated because the City does not contain farmland. With implementation of these policies and standard project-level review, the General Plan EIR determined that the General Plan would not 660011
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 78 August 2026
substantially increase hazards due to geometric design features or incompatible uses and a less than significant impact would occur.
The General Plan EIR determined that the General Plan would not propose any land use designation or physical improvements that would result in inadequate emergency access. However, new development under the General Plan has the potential to affect emergency access during and after construction. Nevertheless, the General Plan EIR noted that the City Fire and Police Departments and other agencies, as appropriate, would continue to review plans and inspect development sites to ensure adequate emergency access is provided, including vehicular access, turn-around spaces, fire lanes, signage, secondary access points, and access to gated or locked entrances. In addition, the General Plan Emergency Preparedness Sub-Element addresses the identification, establishment, and maintenance of citywide emergency access and evacuation routes (Program 2.B, Policy 3, Program
3.A). With implementation of these General Plan policies and programs, along with standard City requirements, the General Plan EIR determined that the General Plan would have a less than significant impact on emergency access.
Thresholds of Significance
The following significant thresholds or criteria are derived from Appendix G of CEQA, which is used to determine if and to what extent a project may have a potentially significant impact on transportation.
The City would consider the proposed Project to have a significant effect on transportation if it is determined that the project will:
a) Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities.
b) Conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b). c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment). d) Result in inadequate emergency access.
Proposed Project Analysis
Policies and actions in the General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Development Code Update. The proposed Project would update the Development Code for consistency with the 2040 General Plan. The update would result in the creation of new zoning districts as well as the elimination of existing districts; the renaming of existing districts; the consolidation of existing districts; as well as the modification or modernization of requirements for development and land uses within various other districts. However, these districts and their standards would be consistent with the 2040 General Plan. The proposed Project would update but not eliminate the fundamental regulations and requirements of the Development Code, such as meeting design and development standards. The proposed Project would align the Development Code with the General Plan and ensure it regulates the types of land uses and development envisioned in the General Plan.
The proposed Project would implement the 2040 General Plan, thereby resulting in the same transportation impacts from new development as evaluated in the certified General Plan EIR. In addition, the proposed Project would not result in increased density or more development than was envisioned in the General Plan.
660022
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 79 August 2026
The Development Code Update, in and of itself, does not propose specific projects but aligns the Code to match the General Plan. Because it is a regulatory update, the Development Code Update would not, in and of itself, result in impacts to transportation such as conflicting with a program or plan addressing the circulation system, conflict with CEQA Guidelines § 15064.3, subdivision (b), substantially increase hazards from geometric design or incompatible uses, or result in inadequate emergency access.
Future development facilitated by the Development Code Update would undergo project-specific developmental review, including design review where applicable, and would be subject to adopted development regulations. Therefore, the proposed Project would not result in any new significant impacts or a substantial increase in the severity of the impacts identified in the General Plan EIR.
Applicable General Plan EIR Mitigation Measures:
TM-1 Cathedral Canyon Drive from Perez Road to Ramon Road shall be identified as a special study corridor for transportation/mobility. The City shall study this corridor and monitor its operations on an ongoing basis to develop recommendations for improvements. Specific tasks shall involve identifying the corridor’s strengths, weaknesses, and opportunities for improvements. Recommendations should balance the needs to improve mobility, safety, parking, and the area’s appearance.
TM-2 The Public Works Department shall establish and implement a prioritized roadway and intersection study and analysis program to assure the provision of adequate future rights-of-way and facilities at critical roadways and intersections. This program may be incorporated into the five-year Capital Improvements Program, which should be reviewed and amended, as necessary, annually.
TM-3 A planning and engineering project review checklist will be developed, which addresses all major roadway components and ensures compliance with the provisions of the Circulation and Mobility Element and the Active Transportation Plan. The checklist will be used in reviewing development proposals.
TM-4 Identified roadway segments and intersections with the potential to operate at LOS E or worse at General Plan buildout shall be designated as “Special Study Zones” where detailed analysis shall be conducted to minimize further degradation of operating conditions at these locations and to ensure that they operate at acceptable LOS at General Plan buildout.
TM-5 The City shall encourage and if necessary, require developers to explore alternative designs of streets and other transportation facilities by providing, as appropriate, information on Complete Streets design concepts and standards that may meet basic performance and safety needs, while still being responsive to the New Urbanism principles.
TM-6 The City shall apply to all development plans the adopted roadway classifications, and implement the Active Transportation Plan to maximize walking, bicycling, and use of LSEVs, and assure safe and efficient connections to City-wide and regional multi-modal facilities.
TM-7 When initiating review of development proposals, the City shall consult and coordinate with SunLine and solicit comments and suggestions on bus stops and other public transit facilities and design concepts, including enhanced handicapped access, that should be integrated into project designs.
660033
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 80 August 2026
5 References
California Department of Conservation, California Important Farmland Finder, https://maps.conservation.ca.gov/dlrp/ciff/, accessed May 8, 2026.
California Department of Conservation, Williamson Act Enrollment Finder, https://maps.conservation.ca.gov/dlrp/WilliamsonAct/, accessed May 8, 2026.
California Department of Transportation, State Scenic Highway interactive map, https://experience.arcgis.com/experience/47e2009986264718a5a13a2c81382774, accessed May 8, 2026.
City of Cathedral City, City of Cathedral City 2040 General Plan Draft Environmental Impact Report (SCH #2018081012), July 15, 2019.
660044
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 81 August 2026
This page intentionally left blank.
660055
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 82 August 2026
6 Report Preparers
City of Cathedral City
68700 Avenida Lalo Guerrero
Cathedral City, CA 92234
BKF Engineers (CEQA Consultant)
3850 Vine Street, Suite 110
Riverside, CA 92507
Peter Minegar, AICP (Vice President - Planning)
Debra Leight (Principal Planner)
Renee Gleason, CEP-IT (Senior Environmental Planner)
Dennis Dinh (Environmental Planner)
Trevor Withrow (Environmental Planner)
Maggie Martinez (GIS Analyst)
660066
City of Cathedral City
DEVELOPMENT CODE UPDATE
EIR Addendum PAGE 83 August 2026
This page is intentionally left blank.
660077
Staff Report
City Council
Item No. 3.J
Meeting Date: October 28, 2026
From: Jose Nunez, Police Sergeant
Title: Authorization to Purchase Axon Enterprise Taser Devices for the Police Department
RECOMMENDATION:
Approve the purchase of an additional twenty-five (25) Axon TASER 10 Conducted Energy Weapons (CEWs), including cartridges, accessories, licensing, and extended warranties, for a total contract value of $103,943.44, to equip the Police Department’s sworn personnel with a standardized TASER 10 platform.
BACKGROUND:
The Cathedral City Police Department currently deploys conducted energy weapons as a less-lethal force option to assist officers in safely resolving encounters involving violent or combative individuals while reducing the likelihood of serious injury to officers, suspects, and members of the public.
On August 26, 2026, the City Council authorized the purchase of twenty-five (25) Axon TASER 10 Conducted Energy Weapons to replace aging CEWs approaching the end of their service life. The TASER 10 offers updated technology, including multiple-probe deployment capability, improved accuracy and targeting, enhanced data collection, and integration with the Department’s existing Axon digital evidence system.
While the initial purchase provided 25 TASER 10 devices, additional sworn personnel would continue utilizing older-generation TASER models. Maintaining multiple generations of CEWs creates differences in weapon operation, deployment procedures, cartridges, batteries, accessories, and training requirements.
To address these differences, the Police Department is requesting authorization to purchase an additional twenty-five (25) TASER 10 CEWs and associated equipment. This purchase will expand deployment of the current-generation platform throughout the Department and reduce reliance on older equipment.
11 DISCUSSION:
The Police Department is requesting authorization to purchase an additional twenty-five (25) Axon TASER 10 Conducted Energy Weapons to establish a consistent CEW platform across its sworn personnel. This is a single source vendor purchase.
Standardizing the Department’s CEW inventory provides important officer-safety and operational benefits. Officers frequently work together during rapidly evolving and high-risk incidents. Equipping personnel with the same TASER model ensures familiarity with its controls, functions, deployment procedures, and safety features. This consistency reduces the potential for confusion when deploying a CEW, assisting another officer, exchanging equipment, or responding to a critical incident.
Department-wide standardization also improves training and proficiency by allowing personnel to focus on a single platform rather than maintaining proficiency with multiple generations of TASER devices. Uniform equipment and deployment procedures reinforce consistent tactics, improve training efficiency, and establish common operational expectations throughout the organization.
Additionally, maintaining a single CEW platform simplifies equipment management by reducing the need for different cartridges, batteries, accessories, replacement parts, warranties, and training materials associated with multiple TASER models.
TASER 10 provides multiple-probe deployment capability without requiring officers to manually reload after each probe deployment. The system also incorporates enhanced data collection and accountability features that support post-incident review, training, equipment management, and digital evidence retention.
The October 7, 2026, Axon quote includes 25 TASER 10 Basic Plans, 25 TASER 10 handles, 25 duty magazines, 25 Safariland holsters, 28 tactical battery packs, live and HALT cartridges, training magazines, Axon Evidence licenses, Data Science Program access, and extended warranties.
This additional purchase will provide sworn personnel with reliable, current-generation less-lethal equipment while strengthening officer safety, operational consistency, accountability, and equipment readiness.
FISCAL IMPACT:
The total cost of the additional twenty-five (25) Axon TASER 10 CEWs and associated equipment is $103,943.44. Funding for this purchase is proposed to come from the Police Department’s existing General Fund budget. No additional budget authorization is required.
FIVE-YEAR STRATEGIC PLAN:
E-2 Safety – Continue to explore and utilize technology to promote public safety.
The purchase of additional TASER 10 Conducted Energy Weapons supports the City’s Five-Year Strategic Plan by incorporating current less-lethal technology to enhance public and officer safety. Department-wide implementation will promote consistent training and operational readiness while providing officers with an effective less-lethal option intended to 22 reduce the need for higher levels of force.
The TASER 10 platform also advances the Department’s commitment to accountability, evidence management, and the continued use of technology to support safe and effective law enforcement operations.
ATTACHMENTS:
1. Attachment 1 - Axon quote 10-07-2026
33 Axon Enterprise, Inc.
17800 N 85th St, Scottsdale, Arizona 85255, United States VAT: 86-0741227
Domestic: (800) 978-2737 | International: +1 800.978.2737 Q-964462-004 Acct: 225411
Issued Oct 7, 2026
Expires N/A
Payment Terms N30
Mode of Delivery AUTO-GND
Cathedral City Police Dept. - CA Currency: USD
CUSTOMER DETAILS
SHIP TO
Cathedral City Police Dept. - CA
68700 Avenida Lalo Guerrero
Cathedral City, CA
92234-1208
USA
BILL TO
Cathedral City Police Dept. - CA
68700 Avenida Lalo Guerrero
Cathedral City, CA
92234-1208
USA
SALES REPRESENTATIVE
David Gollobit
Email: [email protected]
PRIMARY CONTACT
Mark Robles
Phone: (760) 202-2416
Email: [email protected]
QUOTE SUMMARY
Program Length 60 Months
Contract Start Dec 1, 2026
Contract End Nov 30, 2031
TOTAL CONTRACT
Net Total $96,897.86
Est. Tax $7,045.58
Total Contract Value $103,943.44
DISCOUNT SUMMARY
MSRP $115,526.99
Net Price $96,897.86
Total Savings $18,629.13
PAYMENT SUMMARY
DATE SUBTOTAL EST. TAX TOTAL
Nov 1, 2026 $96,897.86 $7,045.58 $103,943.44
Total $96,897.86 $7,045.58 $103,943.44
Axon Enterprise, Inc. Doc ID: 3f12aa15807e Tax estimates are approximate and subject to change at time of invoicing.
Q-964462-004 • Page 1 of 4
44 Cathedral City Police Dept. - CA Q-964462-004 Generated Oct 7, 2026
SUMMARY PRICING FOR TERM
ITEM DESCRIPTION QTY TERM
(START)
UNBUNDLED LIST PRICE NET PRICE SUBTOTAL EST. TAX TOTAL
BODY WORN CAMERA
H00002 Axon Body 4 Multi-Bay Dock Bundle 1 60
(12/2026)
— $1,638.90 $0.00 $0.00 $0.00 $0.00
71019 Axon Body - Dock Powercord - North America 1 — — $0.00 $0.00 $0.00 $0.00 $0.00 70033 Axon Body - Dock Wall Mount - Bracket Assembly 1 — — $43.90 $0.00 $0.00 $0.00 $0.00 100206 Axon Body 4 - Dock - Eight-Bay 1 — — $1,595.00 $0.00 $0.00 $0.00 $0.00 H00003 Axon Body 4 Single-Bay Dock Bundle 1 60
(12/2026)
— $229.00 $0.00 $0.00 $0.00 $0.00
71104 Axon Body - Dock/Dataport Powercord - North America 1 — — $0.00 $0.00 $0.00 $0.00 $0.00 100201 Axon Body 4 - Dock - Single-Bay 1 — — $229.00 $0.00 $0.00 $0.00 $0.00 Body Worn Camera Total $0.00 $0.00 $0.00
CEW
C00033 TASER 10 Basic Plan 25 60
(12/2026)
$64.47 $61.00 $59.92 $89,885.36 $6,396.93 $96,282.29
100591 Axon TASER - Cleaning Kit 1 — — $45.00 $42.58 $42.58 $3.93 $46.51 101455 Axon TASER 10 - Replacement Tool Kit - Interposer Bucket 1 — — $280.00 $264.93 $264.93 $24.50 $289.43 102186 Axon TASER 10 - Command Box 1 — — $0.00 $0.00 $0.00 $0.00 $0.00 101456 Axon TASER 10 - Replacement Interposer Bucket 2 — — $20.00 $18.92 $37.84 $3.50 $41.34 20018 Axon TASER - Battery Pack - Tactical 28 — — $117.16 $110.85 $3,103.80 $287.11 $3,390.91 100611 Axon TASER 10 - Holster - Safariland RH 25 — — $91.02 $21.53 $538.25 $49.79 $588.04 100390 Axon TASER 10 - Handle - Yellow Class 3R 25 — — $2,350.00 $2,223.52 $55,588.00 $5,141.89 $60,729.89 101755 Axon TASER 10 - Magazine - Live Duty Black 25 — — $165.00 $156.12 $3,903.00 $361.04 $4,264.04 20248 Axon TASER - Evidence.Com License 25 — — $349.80 $330.97 $8,274.25 $0.00 $8,274.25 101180 Axon TASER - Data Science Program 25 — — $64.80 $61.31 $1,532.75 $0.00 $1,532.75 100399 Axon TASER 10 - Cartridge - Live 250 — — $24.00 $22.71 $5,677.50 $525.17 $6,202.67 80374 Axon TASER - Ext Warranty - Battery Pack T7/T10 28 — — $25.97 $24.57 $687.96 $0.00 $687.96 100704 Axon TASER 10 - Ext Warranty - Handle 25 — — $432.67 $409.38 $10,234.50 $0.00 $10,234.50 101757 Axon TASER 10 - Magazine - Live Training Purple 5 — — $165.00 $82.50 $412.50 $38.15 $450.65 100400 Axon TASER 10 - Cartridge - Halt 275 — — $24.00 $12.00 $3,300.00 $305.25 $3,605.25 100399 Axon TASER 10 - Cartridge - Live 275 — — $24.00 $12.00 $3,300.00 $305.25 $3,605.25 CEW Total $96,897.86 $7,045.58 $103,943.44
DIGITAL EVIDENCE MANAGEMENT
ProLicense Pro License Bundle 1 60
(12/2026)
— $48.82 $0.00 $0.00 $0.00 $0.00
73746 Axon Evidence - License - Pro 1 — — $2,929.20 $0.00 $0.00 $0.00 $0.00 73683 Axon Evidence - Storage - 10GB A La Carte 3 — — $0.00 $0.00 $0.00 $0.00 $0.00 Digital Evidence Management Total $0.00 $0.00 $0.00
SUBTOTAL EST. TAX TOTAL
Total $96,897.86 $7,045.58 $103,943.44
Axon Enterprise, Inc. Doc ID: 3f12aa15807e Tax estimates are approximate and subject to change at time of invoicing.
Q-964462-004 • Page 2 of 4
55 Cathedral City Police Dept. - CA Q-964462-004 Generated Oct 7, 2026
DELIVERY SCHEDULE
ESTIMATED SHIPPING DATE: Nov 1, 2026
Shipping Location: 68700 Avenida Lalo Guerrero, Cathedral City, CA, 92234-1208, USA
HARDWARE QTY
71019 Axon Body - Dock Powercord - North America 1
70033 Axon Body - Dock Wall Mount - Bracket Assembly 1
71104 Axon Body - Dock/Dataport Powercord - North America 1 100206 Axon Body 4 - Dock - Eight-Bay 1
100201 Axon Body 4 - Dock - Single-Bay 1
20018 Axon TASER - Battery Pack - Tactical 28
100591 Axon TASER - Cleaning Kit 1
100400 Axon TASER 10 - Cartridge - Halt 275
100399 Axon TASER 10 - Cartridge - Live 525
102186 Axon TASER 10 - Command Box 1
100390 Axon TASER 10 - Handle - Yellow Class 3R 25
100611 Axon TASER 10 - Holster - Safariland RH 25
101755 Axon TASER 10 - Magazine - Live Duty Black 25
101757 Axon TASER 10 - Magazine - Live Training Purple 5 101456 Axon TASER 10 - Replacement Interposer Bucket 2
101455 Axon TASER 10 - Replacement Tool Kit - Interposer Bucket 1
WARRANTIES QTY
80374 Axon TASER - Ext Warranty - Battery Pack T7/T10 28 100704 Axon TASER 10 - Ext Warranty - Handle 25
ESTIMATED SHIPPING DATE: Dec 1, 2026
Shipping Location: 68700 Avenida Lalo Guerrero, Cathedral City, CA, 92234-1208, USA
SOFTWARE QTY
73746 Axon Evidence - License - Pro 1
73683 Axon Evidence - Storage - 10GB A La Carte 3
101180 Axon TASER - Data Science Program 25
20248 Axon TASER - Evidence.Com License 25
Axon Enterprise, Inc. Doc ID: 3f12aa15807e Tax estimates are approximate and subject to change at time of invoicing.
Q-964462-004 • Page 3 of 4
66 Cathedral City Police Dept. - CA Q-964462-004 Generated Oct 7, 2026
TERMS & CONDITIONS
Tax is estimated based on rates applicable at date of quote and subject to change at time of invoicing. If a tax exemption certificate should be applied, please submit prior to invoicing.
STANDARD TERMS AND CONDITIONS
Axon Master Services and Purchasing Agreement:
This Quote is limited to and conditional upon your acceptance of the provisions set forth herein and Axon’s Master Services and Purchasing Agreement (posted at https:// www.axon.com/sales-terms-and-conditions), as well as the attached Statement of Work (SOW) for Axon Fleet and/or Axon Interview Room purchase, if applicable. In the event you and Axon have entered into a prior agreement to govern all future purchases, that agreement shall govern to the extent it includes the products and services being purchased and does not conflict with the Axon Customer Experience Improvement Program Appendix as described below.
ACEIP:
The Axon Customer Experience Improvement Program Appendix, which includes the sharing of de-identified segments of Agency Content with Axon to develop new products and improve your product experience (posted at www.axon.com/legal/sales-terms-and-conditions), is incorporated herein by reference. By signing below, you agree to the terms of the Axon Customer Experience Improvement Program.
Acceptance of Terms:
Any purchase order issued in response to this Quote is subject solely to the above referenced terms and conditions. By signing below, you represent that you are lawfully able to enter into contracts. If you are signing on behalf of an entity (including but not limited to the company, municipality, or government agency for whom you work), you represent to Axon that you have legal authority to bind that entity. If you do not have this authority, please do not sign this Quote.
EXCEPTIONS TO STANDARD TERMS AND CONDITIONS
Rewrite Estimates
Estimated Amounts and Contract Terminations. Any amounts stated as due under existing or terminated contracts — including contract transfer balances carried forward to new or pending contracts — are estimates based on payments received as of the calculation date. These estimates may be adjusted if new contracts are not executed on the anticipated dates or if expected payments are not made.
Refresh Shipment Timing
Technology Assurance Plan (TAP) Refresh Prior to Renewal. For Customers with expiring agreements that include TAP refresh rights, Axon may, in its discretion, ship refresh hardware under the existing contract while renewal or replacement agreements are in progress. Any such shipments will be deemed made under the terms of the existing contract until the new contract is fully executed, after which any applicable updates, fees, or adjustments will apply.
Shipment Timing
Shipment Variance . Estimated shipment dates are provided for planning purposes only and are not guarantees. Axon may ship hardware before or after the estimated shipment date, and failure to meet an estimated shipment date will not, by itself, constitute a breach, provided Axon uses commercially reasonable efforts to meet estimated shipment dates.
Signature Date Signed
10/7/2026
Axon Enterprise, Inc. Doc ID: 3f12aa15807e Tax estimates are approximate and subject to change at time of invoicing.
Q-964462-004 • Page 4 of 4
77 Staff Report
City Council
Item No.
Meeting Date: October 28, 2026
From: Nishant Seoni, Contract Associate Planner
Title: Foothill Cove PUD (Planned Unit Development) - Request of GHA Companies to subdivide a 7.86-acre lot at Van Fleet and D Streets, into residential lots including private streets, open space, and stormwater retention to construct 75 townhomes; along with a Tentative Tract Map and a Zoning Ordinance Amendment to provide additional flexibility in PUD development standards.
RECOMMENDATION:
Find Zoning Ordinance Amendment 26-0001, Planned Unit Development 25-0001, and Tentative Tract Map 25-0001 exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15162. Introduce an ordinance approving Zoning Ordinance Amendment 25-0002 amending Chapter 9.94 of Title 9 of the Cathedral City Municipal Code to modify setback, parking, and open space requirements in the PUD development standards. Approve a Planned Unit Development and Tentative Tract Map to subdivide an existing 7.86-acre lot into four residential condominium lots and eight lots for private streets, open space, stormwater retention to construct 75 townhomes.
BACKGROUND:
The Applicant (Mario Gonzales/GHA Companies) submitted applications for a Zoning Ordinance Amendment (ZOA), Tentative Tract Map (TTM), and Planned Unit Development (PUD) on December 11, 2025. The TTM (TTM No. 39447) proposes to subdivide the 7.86 acre site into four residential condominium lots and eight lettered lots reserved for streets, open space, and stormwater retention. The PUD proposes the development of 75 residential units clustered in three-unit townhouses.
The ZOA provides additional flexibility in the PUD development standards and supports the intent and purpose of the PUD, which is to facilitate comprehensive and site-responsive development by allowing greater flexibility in design than is possible through the strict application of zoning regulations. The amendment proposes the following modifications to CCMC Sec. 9.94.110:
• Delete the minimum structure and garage setback requirements set forth in Sec.
9.94.110(C);
• Modify Sec. 9.94.110(E) to delete the requirement for residential PUDs to provide an additional one guest parking per unit, and to allow a reduction of up to ten percent of 11 the total required parking for residential PUDs;
• Amend Sec. 9.94.110(G) to allow private yards and patios of at least 50 square feet to satisfy up to 30% of the open space requirement.
The Project site is located immediately south of the Cathedral Cove Center, east of Van Fleet Avenue, and north of D Street. The Project will have a primary gated entry and exit on Van Fleet Avenue, with a secondary entry and exit on D Street.
Previous Approval
In 2022, the adjacent Cathedral Cove Center was approved by the City Council under Planned Unit Development 21-001 and Tentative Parcel Map No. 37876, along with a Mitigated Negative Declaration (MND). These approvals contemplated the subject project site for a future phase of multi-family residential development, which must be approved through a separate entitlement project. That project specified:
• A Tentative Parcel Map, which has been recorded, assembling underlying lots. • 13.93 acres, including 5.8 acres of commercial development and 8.05 acres of multi-family development. • 24,375 square feet of retail commercial development, including fast food restaurants and a gas station with convenience store.
• Up to 200 residential units at 25 units per acre density and with an undetermined layout and design which were to be designed and approved under subsequent entitlement.
The Project addresses the residential component of the prior approved PUD, specifies layout and design, and reduces unit count from 200 to 75 units.
Planning Commission
The Project was presented to the Planning Commission in a public hearing on September 9, 2026. Staff reviewed the site history, proposed amendments, and the previous Architectural Review Committee (ARC) discussion. ARC unanimously approved the project’s architecture and landscaping at its August 5, 2026 meeting.
The Planning Commission asked clarifying questions, and two members of the public spoke in support of the project and one expressed privacy concerns for neighboring residences.
The applicant clarified the Project’s proposed residences will be far enough from neighboring residences to avoid privacy impacts. The Planning Commission recommended to the City Council that Zoning Ordinance Amendment 26-0001, Planned Unit Development 25-0001, and Tentative Tract Map 25-0001 be approved.
DISCUSSION:
Zoning Ordinance Amendment
The ZOA is consistent with the General Plan's residential land use, housing, and neighborhood development policies. It provides flexibility for future PUD developments while maintaining compatibility with surrounding development and supporting thoughtful site design. It does not change permitted uses or allowed density, create land use incompatibilities, or create additional environmental impacts not already analyzed in the Cathedral Cove Mitigated Negative Declaration. 22
Planned Unit Development, General Plan and Zoning
The Project is designated as DTC (Downtown Commercial) on the City’s General Plan and located within the DRN (Downtown Residential Neighborhood) zoning district. The Project must comply with DRN (CCMC Sec. 9.25) and PUD (CCMC Sec. 9.94) standards and requirements. Further analysis of individual standards and requirements is found in Attachment 8 (September 9, 2026 Planning Commission Staff Report).
Tentative Tract Map
The proposed subdivision is consistent with the site’s General Plan land use designation, prior planned residential development of the site, and applicable development standards.
The site can accommodate the proposed subdivision, and the associated Project accommodates applicable public access, utility, and easement requirements and does not create additional environmental impacts not already analyzed in the Cathedral Cove Mitigated Negative Declaration. The proposed subdivision would not conflict with the Subdivision Map Act.
Public Outreach
The applicant held a Community Engagement Meeting on January 8, 2026, inviting residents to discuss the Project with the City and the Applicant. Residents generally expressed support for the Project and development of the site. Discussion focused on connectivity, security, amenities, sustainability, and housing cost. The applicant described proposed gated access points and lighting, financial feasibility of additional sustainability features, and noted that pricing would be market responsive. The City also informed residents of ongoing plans to improve bicycle, trail, and CV Link connections in the area.
Environmental Review
In accordance with CEQA Guidelines Sec. 15162, no additional CEQA review is required for the Project as there is no substantial evidence in the record that the Project would require “major revisions” to the Cathedral Cove Mitigated Negative Declaration “due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.”
The Cathedral Cove Center Mitigated Negative Declaration (approved on September 28, 2022) contained the 3 Mitigation Measures listed below, which have also been included as Conditions of Approval.
BIO-1: A qualified biologist shall conduct two (2) take avoidance pre-construction burrowing owl surveys onsite. The first shall occur between 14 and 30 days prior to ground disturbance, and the second shall occur within 24 hours of ground disturbance. If burrowing owls are detected, the project proponent shall consult with California Department of Fish and Wildlife (CDFW) to determine what course of action is needed, such as the use of exclusion devices (if applicable) to discourage owls from using burrows that are believed to be in jeopardy of being impacted by implementation of the project.
BIO-2: For any grubbing, grading or other site disturbance or tree or vegetation removal occurring during the nesting season between January 15 – August 31, a qualified biologist shall conduct at least one nesting bird survey, and more if deemed necessary by the consulting biologist, immediately prior to initiation of project-related ground disturbing activities. If nesting birds are present, no work shall be permitted near the nest(s) until the young birds have fledged. While there is no established protocol for nest avoidance, when consulted, the CDFW generally recommends avoidance buffers of about 500 feet for birds-33 of-prey, and 100 – 300 feet for songbirds. If ground disturbance occurs outside the nesting season, this requirement shall be waived.
BIO-A: Prior to the issuance of any permit to allow ground disturbance on the site, the Project Proponent shall furnish the City with pre-construction surveys for burrowing owl and Migratory Bird Treaty Act (MBTA) covered birds.
FINDINGS:
FIND THAT NO FURTHER ENVIRONMENTAL REVIEW IS REQUIRED UNDER THE
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) BASED ON THE FOLLOWING FINDINGS:
1. Pursuant to CEQA Guideline 15162, no additional CEQA review is required for the Project as there is no substantial evidence in the record that the Project would require “major revisions” to the Cathedral Cove Mitigated Negative Declaration “due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.”
2. The proposed Zoning Ordinance Amendment is consistent with the purpose and intent of Title 9 of the Cathedral City Municipal Code and promotes the public health, safety, convenience and general welfare.
APPROVE ZONING ORDINANCE AMENDMENT 26-0001 TO AMEND CHAPTER 9.94 OF THE CATHEDRAL CITY MUNICIPAL CODE BASED ON THE FOLLOWING FINDINGS:
1. The proposed Zoning Ordinance Amendment is consistent with the goals, policies, and land use designations of the Cathedral City General Plan; and
2. The proposed Zoning Ordinance Amendment is consistent with the purpose and intent of Title 9 of the Cathedral City Municipal Code and promotes the public health, safety, convenience and general welfare.
The proposed Zoning Ordinance Amendment is consistent with the purpose and intent of Title 9 of the Cathedral City Municipal Code and promotes the public health, safety, convenience and general welfare.
APPROVE PLANNED UNIT DEVELOPMENT 25-0001 BASED ON THE FOLLOWING FINDINGS:
1. The Project meets the intent of the Planned Unit Development regulations, to facilitate a comprehensively planned development in accordance with applicable Zoning regulations;
2. The design of the Project uses imaginative and innovative planning by offering lot and unit features and details, community recreational amenities, and open space;
3. The use of the Planned Unit Development provides for more open space, both active and passive, and other pertinent amenities while allowing flexibility with setbacks and parking;
4. The Project is compatible with existing and planned land uses and with circulation patterns on adjoining properties, and will not be a disruptive element to the neighborhood or community;
44 5. The proposed subdivision is consistent with the DTC (Downtown Commercial) designation of the General Plan and the development standards of the DRN (Downtown Residential Neighborhood) zoning district;
6. The site of the proposed subdivision is physically suitable for the proposed development;
7. The design of the proposed subdivision and the proposed improvements have been mitigated to the extent they will have a less than significant impact on the environment;
8. The design of the proposed subdivision and the required improvements will not conflict with easements acquired by the public at large for access through, or use of, property within the proposed subdivision;
9. There is no substantial evidence in the record the Project would require major revisions to the Cathedral Cove Mitigated Negative Declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; and
10.The applicant agrees to comply with any and all the conditions imposed by the City Council or be subject to a revocation hearing.
APPROVE TENTATIVE TRACT MAP 25-0001 BASED ON THE FOLLOWING FINDINGS:
1. The proposed map is consistent with applicable General and Specific Plans;
2. The design or improvement of the subdivision is consistent with applicable General and Specific Plans;
3. The site is physically suitable for the type of development proposed;
4. The site is physically suitable for the proposed density of development;
5. The design of the subdivision or proposed improvements is not likely to cause substantial environmental damage or substantially and avoidably injure fish, wildlife, or their habitat;
6. The design of the subdivision or type of improvements is not likely to cause serious public health problems; and
7. The design of the subdivision or type of improvements will not conflict with easements acquired by the public for access through or use of property within the proposed subdivision.
FISCAL IMPACT:
Other than costs associated with staff time, implementation of the proposed ordinances will have no fiscal impact.
FIVE-YEAR STRATEGIC PLAN:
Goal F – EMBRACING, INCLUSIVE COMMUNITY
Objective: Cathedral City is valued and respected as a community that welcomes and embraces diversity, has an abundance of high quality and affordable housing options and vibrant businesses. Our neighborhoods are attractive, well-maintained, and issues surrounding homelessness have been compassionately addressed with thoughtful, coordinated, and collaborative programs. 55
ATTACHMENTS:
Attachment 1 – Draft Ordinance Adopting Zoning Ordinance Amendment 26-0001 Attachment 2 – Tentative Tract Map
Attachment 3 – Conditions of Approval
Attachment 4 – Site Plan
Attachment 5 – Renderings and Elevations
Attachment 6 – Landscape Plans
Attachment 7 – Cathedral Cove Mitigated Negative Declaration Attachment 8 – September 9, 2026 Planning Commission Staff Report 66 ORDINANCE NO. ____
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CATHEDRAL CITY
CALIFORNIA, MODIFYING THE PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT STANDARDS CONTAINED WITHIN SECTION 9.94.110 OF THE
CATHEDRAL CITY MUNICIPAL CODE
WHEREAS, the intent and purpose of the Planned Unit Development (PUD) regulations are to facilitate comprehensively planned development while encouraging imaginative and innovative planning of residential neighborhoods with a variety of dwelling units while permitting greater flexibility in design than is possible through a strict application of conventional zoning and subdivision regulations;
WHEREAS, the PUD regulations identify that imaginative planning and design is used to relate the development to the site and the surrounding area through the modification of the requirements of the underlying zone to accommodate the project as approved;
WHEREAS, the PUD regulations contain design criteria requiring a PUD plan to provide for adequate open space, circulation, off-street parking, recreational facilities and other pertinent amenities as related to the intended use and intensity of development; WHEREAS, the PUD regulations do not have any minimum lot dimensions and allow for the creation of special building setback or yard requirements based on the design and relation of buildings to each other and to topography; WHEREAS, the PUD regulations, while permitting flexibility through lot dimensions and special building setback or yard requirements, also require all structures to be set back from the right-of-way of public or private streets at least 10 feet and garages be set back a minimum of 20 feet from the sidewalk or curbline if a sidewalk does not exist; WHEREAS, the PUD regulations require the provision of parking in accordance with the requirements of the underlying zone and parking requirements for all and uses are provided in Section 9.58.020 of the Cathedral City Municipal Code, including parking requirements for residential uses for zones where parking is not listed; WHEREAS, the PUD regulations require that in addition to the parking requirements of the underlying zone, a residential PUD shall require an additional parking space per unit for visitor parking;
WHEREAS, the PUD regulations require the provision of open space designed for active recreation based on the density of the proposed residential project, and private yards or patios do not count towards satisfying the open space requirement; WHEREAS, the minimum structure and garage setback requirements, the additional parking requirements, and the open space requirements in the PUD regulations set prescriptive standards that restrict the intent and purpose of the PUD regulations and otherwise impede the design flexibility of a PUD plan;
77 WHEREAS, notwithstanding the minimum structure and garage setback requirements, the additional parking requirements, and the common open space requirements, the PUD regulations still contain design criteria requiring a PUD plan demonstrate the ability of a plan to provide open space, circulation, off-street parking, recreational facilities and other pertinent amenities;
THEREFORE, THE CITY COUNCIL OF THE CITY OF CATHEDRAL CITY ORDAINS AS FOLLOWS:
SECTION 1. MODIFICATION OF SECTION 9.94.110(C) OF THE CATHEDRAL CITY
MUNICIPAL CODE
Section 9.94.110(C) of the City of Cathedral City Municipal Code is modified to delete the minimum structure and garage setback requirements:
C. Yards. Special building setback or yard requirements may be established which are based on design and relation of buildings to each other and to topography.
All structures, however, shall be set back from the right-of-way of public or private streets at least ten feet, excepting parking structures with an entrance at approximate right angles from a public or private street shall maintain a minimum setback of twenty feet from the sidewalk or curbline if a sidewalk does not exist toward which it is directed.
SECTION 2. MODIFICATION OF SECTION 9.94.110(E) OF THE CATHEDRAL CITY
MUNICIPAL CODE
Section 9.94.110(E) of the City of Cathedral City Municipal Code is modified to require parking to be provided in accordance with the parking requirements of Chapter 9.58, Off-Street Parking:
E. Parking. A nonresidential PUD shall provide parking in accordance with the requirements of the underlying zone. A residential PUD shall provide parking as required per the underlying zone, plus visitor parking shall be provided at a ratio of one space for every unit. Such parking shall be conveniently accessible to the units they are intended to serve. A PUD shall provide parking in accordance with the requirements of the underlying zone and Chapter
9.58, Off-Street Parking. A reduction of up to ten percent of the required parking shall be permitted for a residential PUD. Credit may be given for on-street parking provided the street is totally within the project and a parking lane is provided.
SECTION 3. MODIFICATION OF SECTION 9.94.110(G) OF THE CATHEDRAL CITY
MUNICIPAL CODE
Section 9.94.110(G) of the City of Cathedral City Municipal Code is modified to allow private yards and patios of at least 50 square feet to satisfy up to 30% of the required usable open space:
G. Open Space—Residential.
88 1. Common oOpen space areas designed for active recreational use such as swimming pool, tennis court, golf course, children's playground, picnic area, shall be provided for all residential developments based on the density of the project as follows:
Range of Dwelling Units per Gross
Acre
Amount of Usable Open Space Area
Square Feet per Dwelling Unit
Less than 4 600
4 to 9.99 500
10 to 20 450
Greater than 20 400
Common open space areas shall be designed for active recreational use such as swimming pools, tennis courts, golf courses, children's playgrounds, and picnic areas, Areas designed for active recreational uses and may be located on roofs of buildings, but not involving private patios, may satisfy the open space requirements.
Private yards and patios of at least 50 square feet may satisfy up to 30% of the required open space.
SECTION 3. CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
The Project is exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15061(b)(3), referred to as the commonsense exemption, which states that CEQA only applies to projects which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA.
SECTION 4. SEVERABILITY
If any chapter, sections, subsections, subdivisions, sentences, clauses, phrases, or portion of this ordinance, is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision will not affect the validity of the remaining portions of this ordinance. The City Council hereby declares that it would have adopted this ordinance, and each chapter, sections, subsections, subdivisions, sentences, clauses, phrases, or portion thereof, irrespective of the fact that any one or more sections, subsections, subdivisions, sentences, clauses, phrases, or portions thereof be declared invalid or unconstitutional.
SECTION 5. POSTING
The City Clerk shall, within fifteen (15) days after passage of this Ordinance, cause it to be posted in at least three (3) designated public places; shall certify to the adoption and 99 posting of this Ordinance; and shall cause this Ordinance and its certification, together with proof of posting, to be entered in the Book of Ordinances of this City.
SECTION 6. CERTIFICATION
The foregoing Ordinance was approved and adopted at a meeting of the City Council held on the ____ day of _____________, 2026, by the following vote:
Ayes:
Noes:
Abstain:
Absent:
___________________________
Raymond Gregory, Mayor
ATTEST:
____________________________
Christina Burton, City Clerk
APPROVED AS TO FORM:
____________________________
Eric S. Vail, City Attorney
1100
OFFICIAL USE ONLY SHEET 1 OF 1
LINE TABLE PRELIMINARY
TENTATIVE TRACT
MAP NO. 39447
OF PARCEL 9 OF PARCEL MAP NO. 37876. FILED IN BOOK 256. PAGES 62 THROUGH 65. INCLUSIVE OF PARCEl RANGE SŁASI, SAN BERNARDINO BASE
FOMOTOR ENGINEERING DECEMBER 2025
EASEMENT NOTES EASEMENT NOTES CONT.
FOR CONDOMINIUM PUPOSES PER FIRST AMERICAN TITLE COMPANY, ORDER NO. OSA-7243285 DATED 3/25/2025.
LEGEND:
AOSED VACATION ACRES 2. STATE OR ERA
AREA TO BE VACATED
RECORDED FERRUARY 02. 2024 A0
AIM EASEMENT, RECORDED FEBRUARY 16, 2024 AS
10050
L00SF
1181
10T S 201
PROCED TO FAE COMPAN FOR EVEN, METER THE CRARION SELING RING OUT A LOT a WATER RICHTS CLAIMS OR TIME TO WATER WHETHER OR NOT SHOWN BY THE PIRA pECORDO - 188 G
E STREET
VAN FLEET STREET B STREET
AVA
6275C
1 Аренко
C STREET 1506 B F STREET
LOT 1
C AREA TO BE VACATES
D STREET. FEMA ZONE
LEGAL DESCRIPTION ASS-50S-OR. P661-500- NIL, 687-500-035 AND 687-500-038 UTILITY PURVEYORS: EXISTING ZONING
BASIS OF BEARINGS
EXISTING UTILITIES NOTE WASTE & RECYCLING
40 FOOTHILL COVE CIVIL TENTATIVE TRACT MAP
CATHEDRAL CITY, CALIFORNIA NEHSA
06.01.26 NGINEERIN
CLF 330.41
FNIRON
337.57 -ELVENT 337.67
HRD 339.52
336.42 336.75
330.97 BASE
TARGET
TARGET
TARGET
TARGET
WALL 313.38
WALL 315.69
WALL 315.77
TOE 317.90
TOE 316.89
TOE 316.48
TOE 316.24
TOE 315.81
TOE 315.65
TOE 315.54
TOE 315.33
TOE 315.13
TOE 314.81
TOE 314.72
TOE 314.31
TOE 314.02
TOE 313.70
TOE 313.63
326.40 -ELVENT 326.34
326.41 326.41 326.32
325.61 325.70
326.17 -ELVENT USS
SS SS SS SS SS SS SS
SS SS SS SS SS
OE OE OE OE OE OE
OTV OTV OTV OTV OTV OTV
CONDO UNIT LOT
HWY ESMT TO CAT
CITY DOC NO.
CONDO UNIT LOT
CONDO UNIT LOT
CONDO UNIT LOT
TO BE QUITCLAIMED
TO BE QUITCLAIMED
108.00' 71.11'
6.01' 110.62' 97.91'
TO BE QUITCLAIMED
TO BE QUITCLAIMED
NO. APPROVED DATE
PALM SPRINGS, CA. 92262
225 S. CIVIC DRIVE, SUITE 1-5
(760) 323-1842 FAX (760) 323-1742
UNDERGROUND SERVICE ALERT
A PUBLIC SERVICE BY
TOLL FREE 1-800-227-2600
YOU DIG
BEFORE
TWO WORKING
YOU DIG
TRACT MAP NO. 37876
DATE: 4/17/2026
OWNER: GHA INVESTMENTS LLC
PH. (760) 250-8611
MAILING: 30875 DATE PALM DR., SUITE C-2
CATHEDRAL CITY, CA 92234
EMAIL: [email protected]
ELECTRICITY: SOUTHERN CALIFORNIA EDISON (800) 655-4555
GAS: THE GAS COMPANY (800) 427-2200
TELEPHONE: FRONTIER (760) 778-3601
TV CABLE: SPECTRUM CABLE (760) 340-2225
USA: UNDERGROUND SERVICE ALERT (800) 227-2600
PARCEL 9 AS SHOWN ON PARCEL MAP NO. 37876, ON FILE IN BOOK 256, PAGES 62 THROUGH 65, INCLUSIVE, OF PARCEL MAPS, RECORDS OF RIVERSIDE COUNTY, CALIFORNIA.
A FIELD SURVEY OF VISIBLE SURFACE UTILITIES WAS PERFORMED IN MARCH OF 2025. RESEARCH OF UTILITY RECORDS IS PENDING. NATURAL GAS PLATS HAVE YET TO BE RECEIVED. ADDITIONAL SUBSURFACE UTILITIES MAY EXIST, BUT ARE NOT DENOTED HEREON.
ELEVATION: 300.95 NAVD 88
CATHEDRAL CANYON DR. ON THE SOUTH SIDE OF FLOOD CONTROL CHANNEL.
0.1 MILES NORTH OF COMMERCIAL RD
12. AN EASEMENT FOR PUBLIC UTILITY, EMERGENCY ACCESS, FLOOD CONTROL AND INCIDENTAL PURPOSES SHOWN OR DEDICATED ON THE MAP FILED OR RECORDED MAY 1, 2006 IN BOOK 217, PAGES 7-10 OF PARCEL MAPS.
13. THE TERMS, PROVISIONS AND EASEMENTS CONTAINED IN THE DOCUMENT ENTITLED RESOLUTION NO. 2005-067 RECORDED MAY 01, 2006 AS INSTRUMENT NO. 2006-0314164 OF OFFICIAL RECORDS.
14. AN EASEMENT IN FAVOR OF DESERT WATER AGENCY, A PUBLIC AGENCY, ITS SUCCESSORS AND ASSIGNS FOR
CONSTRUCT, RECONSTRUCT, ALTER, REPLACE, USE, OPERATE, INSPECT, MAINTAIN, REPAIR, AND REMOVE WATER AND
SEWAGE PIPELINES AND APPURTENANCES AND ELECTRICAL AND COMMUNICATION CONDUITS AND APPURTENANCES AND INCIDENTAL PURPOSES, RECORDED JULY 20, 2007 AS INSTRUMENT NO. 2007-0472200 OF OFFICIAL THE EFFECT OF A DOCUMENT ENTITLED "EASEMENT QUITCLAIM DEED TERMINATING GRANTS OF EASEMENT AND RIGHT-OF-WAY", RECORDED SEPTEMBER 01, 2023 AS INSTRUMENT NO. 2023-0260814 OF OFFICIAL RECORDS.
15. THE TERMS AND PROVISIONS CONTAINED IN THE DOCUMENT ENTITLED GRANT DEED CONTAINING COVENANTS
AFFECTING CERTAIN PROPERTY CONVEYED, EXECUTED BY AND BETWEEN CATHEDRAL CITY REDEVELOPMENT AGENCY, CORPORATE AND POLITIC, RECORDED JANUARY 31, 2008, AS INSTRUMENT NO. 2008-0048582 OF OFFICIAL
16. AN EASEMENT IN FAVOR OF RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FOR FLOOD CONTROL AND ACCESS PURPOSES AND INCIDENTAL PURPOSES, RECORDED APRIL 12, 2012 AS INSTRUMENT NO. 2012-0167267 OF OFFICIAL RECORDS.
17. INTENTIONALLY DELETED
18. AN EASEMENT IN FAVOR OF DESERT WATER AGENCY, A PUBLIC AGENCY
FOR WATER AND SEWAGE PIPELINES, ELECTRICAL AND COMMUNICATION CONDUITS AND INCIDENTAL PURPOSES, RECORDED APRIL 25, 2023 AS INSTRUMENT NO. 2023-0117508 OF OFFICIAL RECORDS.
CONSTRUCTION EASEMENT AGREEMENT" RECORDED DECEMBER 21, 2023 AS INSTRUMENT NO. 2023-0377911 OF OFFICIAL RECORDS. (BLANKET OVER SUBJECT PARCEL)
SYSTEM EASEMENT AGREEMENT" RECORDED DECEMBER 21, 2023 AS INSTRUMENT NO. 2023-0377912 OF OFFICIAL RECORDS. (TO BE MODIFIED)
21. THE OWNER OF THE PROPERTY IS A CALIFORNIA NONPROFIT CORPORATION (WHICH INCLUDES PUBLIC BENEFIT
BY LAWS AND ARTICLES OF INCORPORATION, ALONG WITH ANY AMENDMENTS TO THOSE DOCUMENTS, MUST BE PROVIDED TO THE COMPANY FOR REVIEW, WHETHER THE CORPORATION IS SELLING OR TAKING OUT A LOAN.
22. WATER RIGHTS, CLAIMS OR TITLE TO WATER, WHETHER OR NOT SHOWN BY THE PUBLIC RECORDS.
23. RIGHTS OF PARTIES IN POSSESSION.
4. COVENANTS, CONDITIONS, RESTRICTIONS AND EASEMENTS IN THE DOCUMENT RECORDED NOVEMBER 04, 1925 IN BOOK 655 OF DEEDS, PAGE 234, BUT DELETING ANY COVENANT, CONDITION, OR RESTRICTION THAT VIOLATE APPLICABLE STATE OR FEDERAL LAWS.
5. AN EASEMENT IN FAVOR OF JOHN J. GROVE, ET AL FOR PIPELINES AND INCIDENTAL PURPOSES, RECORDED NOVEMBER 04, 1925 IN BOOK 655, BOTH OF DEEDS, PAGE 234 AND JUNE 28, 1926 IN BOOK 684, PAGE 165. (TO BE QUITCLAIMED)
6. AN EASEMENT IN FAVOR OF CATHEDRAL CITY WATER COMPANY FOR PIPE LINES AND INCIDENTAL PURPOSES, RECORDED OCTOBER 08, 1926 IN BOOK 689 OF DEEDS, PAGE 524. (TO BE QUITCLAIMED)
7. AN EASEMENT IN FAVOR OF SOUTHERN SIERRAS POWER COMPANY FOR POLE LINES, CONDUITS AND INCIDENTAL PURPOSES, RECORDED APRIL 19, 1927 IN BOOK 715 OF DEEDS, PAGE 3.
THE EFFECT OF A DOCUMENT ENTITLED "PARTIAL QUITCLAIM EASEMENT", RECORDED FEBRUARY 02, 2024 AS INSTRUMENT NO. 2024-0032376 OF OFFICIAL RECORDS.
THE EFFECT OF A DOCUMENT ENTITLED "PARTIAL QUITCLAIM EASEMENT", RECORDED FEBRUARY 16, 2024 AS INSTRUMENT NO. 2024-0043880 OF OFFICIAL RECORDS.
8. AN EASEMENT IN FAVOR OF RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, A BODY
CORPORATE AND POLITIC FOR FLOOD CONTROL AND WATER CONSERVATION PURPOSES AND INCIDENTAL PURPOSES, RECORDED MARCH 18, 1947 AS BOOK 826, PAGE 140 OF OFFICIAL RECORDS.
9. THE EFFECT OF AN ORDINANCE OF THE CITY OF CATHEDRAL CITY, CALIFORNIA, APPROVING AND ACCEPTING THE REDEVELOPMENT PLAN FOR "CATHEDRAL CITY REDEVELOPMENT PROJECT NO. 1", A CERTIFIED COPY OF WHICH WAS RECORDED DECEMBER 02, 1982 AS INSTRUMENT NO. 208831 OF OFFICIAL RECORDS OF RIVERSIDE COUNTY, CALIFORNIA, TO WHICH RECORD REFERENCE IS MADE FOR FURTHER PARTICULARS.
10. THE FACT THAT THE LAND LIES WITHIN THE BOUNDARIES OF THE CATHEDRAL CITY REDEVELOPMENT PROJECT AREA NO. 1, AS DISCLOSED BY THE DOCUMENT RECORDED JULY 21, 2003 AS INSTRUMENT NO. 2003-542990 OF OFFICIAL RECORDS.
11. AN EASEMENT IN FAVOR OF SOUTHERN CALIFORNIA EDISON COMPANY, A CORPORATION FOR TO CONSTRUCT,
USE, MAINTAIN, OPERATE, ALTER, ADD TO, REPAIR, REPLACE, RECONSTRUCT, INSPECT AND REMOVE AT ANY TIME
AND FROM TIME TO TIME UNDERGROUND ELECTRICAL SUPPLY SYSTEMS AND COMMUNICATION SYSTEMS AND INCIDENTAL PURPOSES, RECORDED JANUARY 18, 2005 AS INSTRUMENT NO. 2005-0044318 OF OFFICIAL RECORDS.
EXISTING STREET RIGHT OF
WAY TO BE QUITCLAIMED BY
CITY OF CATHEDRAL CITY
PROPOSED PL
PL FEMA ZONE
ZONE X AREAS OF 0.2% ANNUAL CHANCE FLOOD; PER FEMA MAP
ASSESSOR PARCEL NUMBER
687-500-031, 687-500-032, 687-500-035 AND 687-500-038
DRN - DOWNTOWN RESIDENTIAL NEIGHBORHOOD
PER CITY OF CATHEDRAL CITY ZONING MAP
NO. BEARING LENGTH
ARC TABLE
AREA TABLE
LOTS SQ FT
TOTAL 342,249
(CONDOMINIUM UNITS)
(CONDOMINIUM UNITS)
(CONDOMINIUM UNITS)
(CONDOMINIUM UNITS)
(PRIVATE STREET)
(PRIVATE STREET)
(PRIVATE STREET)
(PRIVATE STREET)
(RESERVE
LAN
SCAPE LOT)
LIC STREET)
TOTAL AREA =
7.68 EXISTING ACRES
7.86 POST PROPOSE
VACATION ACRES
CLF 330.41
FNIRON
337.57 -ELVENT 337.67
336.42 336.75
330.97 BASE
TARGET
TARGET
TARGET
TARGET
WALL 313.38
WALL 314.02
WALL 315.69
WALL 315.77
TOE 317.90
TOE 316.89
TOE 316.48
TOE 316.24
TOE 315.81
TOE 315.65
TOE 315.54
TOE 315.33
TOE 315.13
TOE 314.81
TOE 314.72
TOE 314.31
TOE 314.02
TOE 313.70
TOE 313.63
326.40 -ELVENT 326.34
326.41 326.41 326.32
325.61 325.70
326.17 -ELVENT USS
SS SS SS SS SS SS SS
SS SS SS SS SS
OE OE OE OE OE OE
OTV OTV OTV OTV OTV OTV
CONDO UNIT LOT
HWY ESMT TO CAT
CITY DOC NO.
CONDO UNIT LOT
CONDO UNIT LOT
CONDO UNIT LOT
TO BE QUITCLAIMED
TO BE QUITCLAIMED
108.00' 71.11'
6.01' 110.62' 97.91'
TO BE QUITCLAIMED
TO BE QUITCLAIMED
NO. APPROVED DATE
PALM SPRINGS, CA. 92262
225 S. CIVIC DRIVE, SUITE 1-5
(760) 323-1842 FAX (760) 323-1742
UNDERGROUND SERVICE ALERT
A PUBLIC SERVICE BY
TOLL FREE 1-800-227-2600
YOU DIG
BEFORE
TWO WORKING
YOU DIG
TRACT MAP NO. 37876
DATE: 4/17/2026
OWNER: GHA INVESTMENTS LLC
PH. (760) 250-8611
MAILING: 30875 DATE PALM DR., SUITE C-2
CATHEDRAL CITY, CA 92234
EMAIL: [email protected]
ELECTRICITY: SOUTHERN CALIFORNIA EDISON (800) 655-4555
GAS: THE GAS COMPANY (800) 427-2200
TELEPHONE: FRONTIER (760) 778-3601
TV CABLE: SPECTRUM CABLE (760) 340-2225
USA: UNDERGROUND SERVICE ALERT (800) 227-2600
PARCEL 9 AS SHOWN ON PARCEL MAP NO. 37876, ON FILE IN BOOK 256, PAGES 62 THROUGH 65, INCLUSIVE, OF PARCEL MAPS, RECORDS OF RIVERSIDE COUNTY, CALIFORNIA.
A FIELD SURVEY OF VISIBLE SURFACE UTILITIES WAS PERFORMED IN MARCH OF 2025. RESEARCH OF UTILITY RECORDS IS PENDING. NATURAL GAS PLATS HAVE YET TO BE RECEIVED. ADDITIONAL SUBSURFACE UTILITIES MAY EXIST, BUT ARE NOT DENOTED HEREON.
ELEVATION: 300.95 NAVD 88
CATHEDRAL CANYON DR. ON THE SOUTH SIDE OF FLOOD CONTROL CHANNEL.
0.1 MILES NORTH OF COMMERCIAL RD
12. AN EASEMENT FOR PUBLIC UTILITY, EMERGENCY ACCESS, FLOOD CONTROL AND INCIDENTAL PURPOSES SHOWN OR DEDICATED ON THE MAP FILED OR RECORDED MAY 1, 2006 IN BOOK 217, PAGES 7-10 OF PARCEL MAPS.
13. THE TERMS, PROVISIONS AND EASEMENTS CONTAINED IN THE DOCUMENT ENTITLED RESOLUTION NO. 2005-067 RECORDED MAY 01, 2006 AS INSTRUMENT NO. 2006-0314164 OF OFFICIAL RECORDS.
14. AN EASEMENT IN FAVOR OF DESERT WATER AGENCY, A PUBLIC AGENCY, ITS SUCCESSORS AND ASSIGNS FOR
CONSTRUCT, RECONSTRUCT, ALTER, REPLACE, USE, OPERATE, INSPECT, MAINTAIN, REPAIR, AND REMOVE WATER AND
SEWAGE PIPELINES AND APPURTENANCES AND ELECTRICAL AND COMMUNICATION CONDUITS AND APPURTENANCES AND INCIDENTAL PURPOSES, RECORDED JULY 20, 2007 AS INSTRUMENT NO. 2007-0472200 OF OFFICIAL THE EFFECT OF A DOCUMENT ENTITLED "EASEMENT QUITCLAIM DEED TERMINATING GRANTS OF EASEMENT AND RIGHT-OF-WAY", RECORDED SEPTEMBER 01, 2023 AS INSTRUMENT NO. 2023-0260814 OF OFFICIAL RECORDS.
15. THE TERMS AND PROVISIONS CONTAINED IN THE DOCUMENT ENTITLED GRANT DEED CONTAINING COVENANTS
AFFECTING CERTAIN PROPERTY CONVEYED, EXECUTED BY AND BETWEEN CATHEDRAL CITY REDEVELOPMENT AGENCY, CORPORATE AND POLITIC, RECORDED JANUARY 31, 2008, AS INSTRUMENT NO. 2008-0048582 OF OFFICIAL
16. AN EASEMENT IN FAVOR OF RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FOR FLOOD CONTROL AND ACCESS PURPOSES AND INCIDENTAL PURPOSES, RECORDED APRIL 12, 2012 AS INSTRUMENT NO. 2012-0167267 OF OFFICIAL RECORDS.
17. INTENTIONALLY DELETED
18. AN EASEMENT IN FAVOR OF DESERT WATER AGENCY, A PUBLIC AGENCY
FOR WATER AND SEWAGE PIPELINES, ELECTRICAL AND COMMUNICATION CONDUITS AND INCIDENTAL PURPOSES, RECORDED APRIL 25, 2023 AS INSTRUMENT NO. 2023-0117508 OF OFFICIAL RECORDS.
CONSTRUCTION EASEMENT AGREEMENT" RECORDED DECEMBER 21, 2023 AS INSTRUMENT NO. 2023-0377911 OF OFFICIAL RECORDS. (BLANKET OVER SUBJECT PARCEL)
SYSTEM EASEMENT AGREEMENT" RECORDED DECEMBER 21, 2023 AS INSTRUMENT NO. 2023-0377912 OF OFFICIAL RECORDS. (TO BE MODIFIED)
21. THE OWNER OF THE PROPERTY IS A CALIFORNIA NONPROFIT CORPORATION (WHICH INCLUDES PUBLIC BENEFIT
BY LAWS AND ARTICLES OF INCORPORATION, ALONG WITH ANY AMENDMENTS TO THOSE DOCUMENTS, MUST BE PROVIDED TO THE COMPANY FOR REVIEW, WHETHER THE CORPORATION IS SELLING OR TAKING OUT A LOAN.
22. WATER RIGHTS, CLAIMS OR TITLE TO WATER, WHETHER OR NOT SHOWN BY THE PUBLIC RECORDS.
23. RIGHTS OF PARTIES IN POSSESSION.
4. COVENANTS, CONDITIONS, RESTRICTIONS AND EASEMENTS IN THE DOCUMENT RECORDED NOVEMBER 04, 1925 IN BOOK 655 OF DEEDS, PAGE 234, BUT DELETING ANY COVENANT, CONDITION, OR RESTRICTION THAT VIOLATE APPLICABLE STATE OR FEDERAL LAWS.
5. AN EASEMENT IN FAVOR OF JOHN J. GROVE, ET AL FOR PIPELINES AND INCIDENTAL PURPOSES, RECORDED NOVEMBER 04, 1925 IN BOOK 655, BOTH OF DEEDS, PAGE 234 AND JUNE 28, 1926 IN BOOK 684, PAGE 165. (TO BE QUITCLAIMED)
6. AN EASEMENT IN FAVOR OF CATHEDRAL CITY WATER COMPANY FOR PIPE LINES AND INCIDENTAL PURPOSES, RECORDED OCTOBER 08, 1926 IN BOOK 689 OF DEEDS, PAGE 524. (TO BE QUITCLAIMED)
7. AN EASEMENT IN FAVOR OF SOUTHERN SIERRAS POWER COMPANY FOR POLE LINES, CONDUITS AND INCIDENTAL PURPOSES, RECORDED APRIL 19, 1927 IN BOOK 715 OF DEEDS, PAGE 3.
THE EFFECT OF A DOCUMENT ENTITLED "PARTIAL QUITCLAIM EASEMENT", RECORDED FEBRUARY 02, 2024 AS INSTRUMENT NO. 2024-0032376 OF OFFICIAL RECORDS.
THE EFFECT OF A DOCUMENT ENTITLED "PARTIAL QUITCLAIM EASEMENT", RECORDED FEBRUARY 16, 2024 AS INSTRUMENT NO. 2024-0043880 OF OFFICIAL RECORDS.
8. AN EASEMENT IN FAVOR OF RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, A BODY
CORPORATE AND POLITIC FOR FLOOD CONTROL AND WATER CONSERVATION PURPOSES AND INCIDENTAL PURPOSES, RECORDED MARCH 18, 1947 AS BOOK 826, PAGE 140 OF OFFICIAL RECORDS.
9. THE EFFECT OF AN ORDINANCE OF THE CITY OF CATHEDRAL CITY, CALIFORNIA, APPROVING AND ACCEPTING THE REDEVELOPMENT PLAN FOR "CATHEDRAL CITY REDEVELOPMENT PROJECT NO. 1", A CERTIFIED COPY OF WHICH WAS RECORDED DECEMBER 02, 1982 AS INSTRUMENT NO. 208831 OF OFFICIAL RECORDS OF RIVERSIDE COUNTY, CALIFORNIA, TO WHICH RECORD REFERENCE IS MADE FOR FURTHER PARTICULARS.
10. THE FACT THAT THE LAND LIES WITHIN THE BOUNDARIES OF THE CATHEDRAL CITY REDEVELOPMENT PROJECT AREA NO. 1, AS DISCLOSED BY THE DOCUMENT RECORDED JULY 21, 2003 AS INSTRUMENT NO. 2003-542990 OF OFFICIAL RECORDS.
11. AN EASEMENT IN FAVOR OF SOUTHERN CALIFORNIA EDISON COMPANY, A CORPORATION FOR TO CONSTRUCT,
USE, MAINTAIN, OPERATE, ALTER, ADD TO, REPAIR, REPLACE, RECONSTRUCT, INSPECT AND REMOVE AT ANY TIME
AND FROM TIME TO TIME UNDERGROUND ELECTRICAL SUPPLY SYSTEMS AND COMMUNICATION SYSTEMS AND INCIDENTAL PURPOSES, RECORDED JANUARY 18, 2005 AS INSTRUMENT NO. 2005-0044318 OF OFFICIAL RECORDS.
EXISTING STREET RIGHT OF
WAY TO BE QUITCLAIMED BY
CITY OF CATHEDRAL CITY
PROPOSED PL
PL FEMA ZONE
ZONE X AREAS OF 0.2% ANNUAL CHANCE FLOOD; PER FEMA MAP
ASSESSOR PARCEL NUMBER
687-500-031, 687-500-032, 687-500-035 AND 687-500-038
DRN - DOWNTOWN RESIDENTIAL NEIGHBORHOOD
PER CITY OF CATHEDRAL CITY ZONING MAP
NO. BEARING LENGTH
ARC TABLE
AREA TABLE
LOTS SQ FT
TOTAL 342,249
(CONDOMINIUM UNITS)
(CONDOMINIUM UNITS)
(CONDOMINIUM UNITS)
(CONDOMINIUM UNITS)
(PRIVATE STREET)
(PRIVATE STREET)
(PRIVATE STREET)
(PRIVATE STREET)
(RESERVE
LAN
SCAPE LOT)
LIC STREET)
TOTAL AREA =
7.68 EXISTING ACRES
7.86 POST PROPOSE
VACATION ACRES
P1
P3
P2
P2 P1 P3
P1
P3
P2
P1
P3
P2
P1
P3
P2
P1
P3
P2
P1
P3
P2
P1
P3
P2
P1
P3
P2
P1 P3 P2 P1 P3 P2
P1 P3 P2
P1 P3 P2
P1
P3
P2
W:\WORK\25026\DWG\GRADING\PRELIM\25026 civil exhibit.dwg, 4/17/2026 12:49:14 AM, N.CAMPBELL
CATHEDRAL CITY, CALIFORNIA
FOOTHILL COVE
06.01.26 41
CIVIL GEOMETRIC EXHIBIT
1122
FOMOTOR
ENGINEERING
W:\WORK\25026\DWG\X-BASE 25026.dwg, 4/21/2026 4:01:12 PM, N.CAMPBELL
CATHEDRAL CITY, CALIFORNIA
FOOTHILL COVE
06.01.26 42
CIVIL ENTRANCE ENLARGEMENTS
1133
CATHEDRAL CITY, CALIFORNIA
FOOTHILL COVE
06.01.26 43
CIVIL EXISTING CONDITIONS
1144
W:\WORK\25026\DWG\GRADING\PRELIM\25026 PRELIM GRADING.dwg, 4/17/2026 9:19:03 AM, N.CAMPBELL
CATHEDRAL CITY, CALIFORNIA
FOOTHILL COVE
06.01.26 44
CIVIL PRELIMINARY GRADING
1155
DOG
PARK
RETENTION
ENGINEERING
FOMOTOR
FIRE ACCESS PLAN
FOR
FOOTHILL COVE
TENTATIVE TRACT MAP 39447
CATHEDRAL CITY, CALIFORNIA
FOOTHILL COVE
06.01.26 45 CIVIL FIRE LANE EXHIBIT
1166
CITY OF CATHEDRAL CITY
PLANNING COMMISSION
CONDITIONS OF APPROVAL
PLANNED UNIT DEVELOPMENT NO. 25-0001
TENTATIVE TRACT MAP NO. 39447
FOOTHILL COVE
PROJECT LOCATION: SOUTH OF EAST PALM CANYON
(HIGHWAY 111), NEAR THE INTERSECTION OF VAN FLEET
AND D STREETS
(APN: 687-500-031, 687-500-032, 687-500-035, AND 687-500- 038)
DATE APPROVED: SEPTEMBER 9, 2026
SECTION 1 ADMINISTRATIVE CONDITIONS
1.1 A copy of all pages of these conditions shall be printed onto the first page of the construction drawings.
1.2 Approval of the reference plan is preliminary only. All final working drawings shall be submitted to and approved by the Planning, Engineering and Building Departments prior to issuance of building permits. The development of the property shall conform substantially to that as approved in Exhibit A, dated September 16, 2020, except as specifically modified by any of the conditions of approval. Any deviation from the approved set of improvement plans shall be approved in writing by the Director of Planning/Building prior to the installation, construction or deletion of the requested plan modification.
1.3 This approval shall be valid for two years from date of approval, unless extended pursuant to the Zoning and Subdivision Ordinance.
1.4 No Certificate of Occupancy shall be granted until all conditions of approval have been satisfied.
1.5 The Final Tract Map shall be approved by the City Council and recorded prior to the issuance of any building permits.
1.6 The development of the site shall conform to all ordinances, codes, regulations, policies and development design controls pursuant to the Cathedral City Municipal Code and the CC&Rs prior to the approval of the Final Tract Map. All conditions herein shall be met prior to the approval of the Final Tract Map and/or issuance of a grading or building permit.
1177
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
SECTION 2 FEES
2.1 The Applicant shall pay all applicable City of Cathedral City fees, charges and other costs such as development impact fees as prescribed by City Ordinance.
The applicant is hereby advised that the fees may change at the time they become due and payable, as permitted by applicable law.
NOTICE TO APPLICANT: Pursuant to Government Code Section 66020(d)(1), the 90-day period to protest the imposition of any impact fee, dedication, reservation, or other exaction described in this resolution begins on the effective date of this approval and any such protest must be in a manner that complies with Section 66020(a), and failure to timely follow this procedure will bar any subsequent legal action to attack, review, set aside, void or annul imposition.
The right to protest the fees, dedications, reservations, or other exactions does not apply to planning, zoning, grading, or other similar application processing fees or service fees in connection with this project.
It further does not apply to any fees, dedication, reservations, or exactions for which the applicant has been given a notice similar to this, nor does it revive challenges to any fees for which the Statute of Limitations has previously expired.
SECTION 3 PLANNING
3.1 The project shall comply with the requirements of the Chapter 9.94 (Planned Unit Development), as amended.
3.2 A Final Planned Unit Development (PUD) Plan in accordance with Section
9.94.160 of the Cathedral City Municipal Code (CCMC) shall be approved by the City Council prior to the issuance of any building permits.
3.3 No building permits for production units shall be issued until Tract Map 39447, or the phases thereof, is recorded.
3.4 Prior to the issuance of a building permit, the Applicant shall alleviate the negative yearly impact on the City’s General Fund from residential development for police, fire, paramedic, park maintenance, and general maintenance by annexing into Community Facilities District (CFD) No. 2006-1 having an annual special tax equal to the yearly cost of providing General Fund services as calculated and determined by the City of Cathedral Finance Department.
3.5 Parking in driveways is prohibited.
3.6 Recreational vehicle parking (campers, trailers, fifth-wheel, motorhomes) is prohibited within the development.
3.7 Decorative masonry shall be included on all exposed retaining walls, even if only exposed to resident(s).
1188
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
3.8 Before Final Tract Map approval by the City Council, a Final Site Plan shall be submitted to the Planning Department for review and approval consistent with the following:
a. Plans shall be draw in a minimum scale of 1” = 30’.
b. Show locations of all property lines.
c. Walkways shall be a minimum of 4’ wide and constructed of concrete or an acceptable alternative material such as brick or tile. (Section 9.94.110.N) d. Stacking distance at the entry gates shall be for a minimum of two cars. e. Show location of all mechanical and electrical equipment on exterior of building or ground-mounted equipment. All exterior and ground-mounted equipment is required to be screened.
f. Locations of mailboxes on the site.
g. Location of call box(es).
h. Decorative paving at key crossing points on private roads. Include detail of decorative paving.
i. Location of all mechanical equipment and trash storage. j. Show locations of all fire hydrants, catch basins, and gutters.
3.9 Prior to approval of the Final Tract Map by the City Council, a Final Landscape Plan shall be submitted to the Planning Division for review and approval. The Final Landscape Plan shall be substantially consistent with the landscape plan approved as part of the Project and shall include the following:
a. Front yards for all residential lots shall be landscaped. Typical front-yard landscape plans shall be provided.
b. Parks and common open space areas shall be fully landscaped and improved consistent with the approved Project plans. The plans shall identify the location and design of proposed amenities.
c. Perimeter and internal property lines shall be shown as necessary to demonstrate the relationship of proposed landscaping to individual lots, common areas, streets, and other improvements.
d. Recreation areas shall include appropriate site furnishings and amenities, including benches, bicycle racks, shade structures, play equipment, and other amenities shown on the approved Project plans. The location and design of proposed amenities shall be shown on the Final Landscape Plan. 1199
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
e. The location of ground-mounted mechanical, electrical, irrigation, backflow, and similar equipment shall be shown, together with the proposed method of screening such equipment from public view.
3.10 Prior to issuance of building permits for improvements requiring landscaping, Final Landscape Construction and Irrigation Plans prepared by a licensed landscape architect shall be submitted to and approved by the Planning Division and shall obtain any approval required by the applicable water purveyor. The plans shall be substantially consistent with the approved Final Landscape Plan and shall comply with the Cathedral City Municipal Code, as amended, the City Design Guidelines, and all other applicable landscape and water-efficiency requirements in effect at the time of plan review. The plans shall include the following:
a. A complete plant legend identifying each proposed plant species, quantity, and size, including caliper, gallon or box size, brown trunk height, or other applicable measurement, and identifying trees as deciduous or evergreen.. b. The location of all ground-mounted mechanical, electrical, irrigation, backflow, and similar equipment and the landscaping or other screening proposed to minimize visibility from public view.
c. Details demonstrating how landscape areas adjacent to sidewalks, walkways, driveways, and other paved surfaces will be designed to prevent soil, decomposed granite, and other landscape materials from migrating onto paved surfaces.
d. All recreation areas shall provide site furnishings such as benches, bike racks, shading and play equipment the locations of which shall be shown on the landscape plans. Provide details of all proposed site furnishings. e. Side-yard landscaping for corner lots where visible from public streets or other public areas.
f. Compliance with the Cathedral City Municipal Code, as amended, including applicable water-efficient landscape requirements.
g. Plant materials consistent with applicable City landscape requirements and approved plant lists in effect at the time of landscape plan review. h. Irrigation plans, including applicable equipment and installation details, demonstrating compliance with applicable City and water-purveyor requirements.
3.11 A Final Landscape Construction Plan, prepared by a licensed landscape architect and approved by the Director of Planning/Building, shall be signed by 2200 FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
the local water purveyor prior to the issuance of building permits. The Final Landscape Construction Plan shall contain the following required information:
a. A title block with sheet number, site address and APNs, date of preparation, and name, address, and phone number of applicant on all sheets. b. Show use of concrete mow strip between turf and other surfaces. c. A plant landscape legend, including a specific symbol for each plant species used, size (i.e., caliper, gallon, box, or brown trunk height, and/or quantity) and whether it is deciduous or evergreen.
d. Show all location of mechanical, electrical, and irrigation equipment and landscaping that will screen from public view.
e. A detail showing planter design adjacent to walkways and driveways that is designed to prevent soil and/or decomposed granite from flowing onto walkways and driveways. There shall be a minimum two-inch vertical separation between the pavement and the soil.
f. Plant and tree installation and staking details.
g. Side yard landscaping for each corner lot.
h. Landscape plans shall meet the requirements of the City of Cathedral City’s Water Efficient Landscape Ordinance.
i. All plant materials used on the project site shall be those listed in the most recent version of Coachella Valley Water District’s “Lush & Efficient Landscape Gardening in the Coachella Valley”, or the City’s approved plant list in the municipal code, as amended or adopted.
j. An Irrigation Plan with equipment details.
3.12 Site landscaping shall comply with the City Design Guidelines and Water Conservation policies and rules regardless of whether the items are illustrated on the Construction Landscape Plans:
a. Plants and trees shall be primarily of drought tolerant species compatible with the desert environment.
b. Projects shall minimize the use of turf. Residential front yards shall contain no more than 35% turf.
c. At least 50% of the trees shall be evergreen species. 2211
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
d. All trees in parking lots shall be centered between parking spaces to provide optimal shading.
e. All single trunk trees shall be double staked and multi-trunk trees shall be staked appropriate to the species of tree.
f. Arbor guards shall be installed around trees in turf areas. g. Projects located along major arterials and/or streets shall comply with the street tree requirements of the City’s Design Guidelines. h. Planter areas shall be surrounded by a concrete mow strip or other hard surface.
i. All ground-mounted equipment, such as mechanical, electrical, and irrigation equipment (backflow preventers), shall be located within a landscape planter.
This equipment shall not be located within a turf area and shall not be visible from public view.
j. Any drain that terminates in a planter shall have a splash guard. k. All palm trees shall have a brown trunk height of between a minimum of 10 – 20 feet, varied to the satisfaction of City staff.
l. All 36-inch box trees or greater shall be verified as to size by the project planner prior to being planted. It is the responsibility of the contractor and/or Applicant to make an appointment with the project planner to conduct this verification.
3.13 Per section 9.94.110 of the Zoning Ordinance, all structures shall be setback a minimum of ten feet from the right-of-way of public or private streets, unless a variance has been granted.
3.14 All lighting on site shall comply with Chapter 9.89 of the Municipal Code relative to outdoor lighting including fixtures that direct lighting downward.
3.15 If determined to be necessary for the project by the Director of Planning/Building, an exterior Lighting Plan shall be submitted in compliance with CCMC Section
9.89, including a photometric analysis, for review and approval prior to issuance of a building permit. The Lighting Plan shall also identify the following:
a. The type of fixtures, including height, material, and color. b. That the total height of all freestanding lighting fixtures will not exceed 18 feet. c. That all concrete fixture bases will have a decorative finish. At a minimum, a trowel finish shall be provided. 2222
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
d. That the bolts connecting the light fixture to the base will be covered.
3.16 All mechanical equipment, either roof or ground mounted, and shall be screened from public view. All such equipment shall be fully screened by the roof structure, a parapet wall, appropriate ground mounted walls, berming, or landscaping. All walls shall architecturally match the building. If after construction, but prior to the issuance of a Certificate of Occupancy, it is determined by the Director of Planning/Building that equipment can be viewed from the public right-of-way a plan for screening the equipment shall be submitted to the Planning Department for approval. Once approved, said screening shall be constructed prior to issuance of a Certificate of Occupancy.
3.17 Property addresses or building identification signs shall be placed on all new and existing buildings so as to be plainly visible from the public street. Said signs shall be a minimum of 12 inches in height on commercial buildings and four inches in height for residential buildings. Numbers shall be either internally or externally illuminated to be consistent with Municipal Code Section 9.02 and designed to illuminate automatically during periods of darkness.
3.18 Signage for the proposed project is not part of this approval and shall require a sign permit, prior to the issuance of a Certificate of Occupancy.
3.19 Trash enclosures shall have a decorative wall surface and a decorative cap that are consistent with the overall architecture of the project.
3.20 In single-family residential subdivisions, all exterior walls facing a public street or public area shall have a decorative surface and a decorative cap that is consistent with the overall architecture. Interior walls between units are exempt from this requirement.
3.21 Building and landscaping shall be maintained in a condition that substantially complies with this approval.
3.22 All breaker boxes, fire sprinkler risers, and utility conduits shall be interior to the building.
3.23 All roof drains and downspouts shall be on the interior of the building with decorative drain terminations. Exposed drainpipes are specifically prohibited.
3.24 Contractor must divert at least 75 percent of all demolition waste to a recycling facility. The reuse of materials is considered an acceptable recycling program but must be documented and approved by the Environmental Conservation Manager
3.25 Prior to the issuance of a Certificate of Occupancy, the applicant shall submit all weight tickets associated with trash and recycling disposal to be approved by the Environmental Conservation Manager.
2233
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
3.26 If the PUD is proposed to be constructed in phases, the application shall state this and include a proposed construction schedule. A phasing plan shall outline the construction timeline for homes, infrastructure, landscaping, open space, recreational and common amenities, and other site improvements.
3.27 The project shall comply with the following Mitigation Measures as identified in the Final Initial Study/Mitigated Negative Declaration for the project:
1. BIO-1: A qualified biologist shall conduct two (2) take avoidance pre-construction burrowing owl surveys onsite. The first shall occur between 14 and 30 days prior to ground disturbance, and the second shall occur within 24 hours of ground disturbance. If burrowing owls are detected, the project proponent shall consult with CDFW to determine what course of action is needed, such as the use of exclusion devices (if applicable) to discourage owls from using burrows that are believed to be in jeopardy of being impacted by implementation of the project.
2. BIO-2: For any grubbing, grading or other site disturbance or tree or vegetation removal occurring during the nesting season between January 15th and August 31st, a qualified biologist shall conduct at least one nesting bird survey, and more if deemed necessary by the consulting biologist, immediately prior to initiation of project-related ground disturbing activities. If nesting birds are present, no work shall be permitted near the nest(s) until the young birds have fledged. While there is no established protocol for nest avoidance, when consulted, the CDFW generally recommends avoidance buffers of about 500 feet for birds-of-prey, and 100 – 300 feet for songbirds. If ground disturbance occurs outside the nesting season, this requirement shall be waived.
3. BIO-A: Prior to the issuance of any permit to allow ground disturbance on the site, the Project Proponent shall furnish the City with pre-construction surveys for burrowing owl and MBTA covered birds.
Some of the Mitigation Measures may be duplicated by or be more specific then some of the Standard Conditions of Approvals, since the special studies for the Initial Study document were prepared by outside consultants. Staff has left the City Standard Conditions intact, unless there was an exact duplication, in order to ensure that all issues were covered.
SECTION 4 ENGINEERING / PUBLIC WORKS
GENERAL REQUIREMENTS 2244
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
4.1 The Applicant agrees to defend, indemnify and hold harmless the City of Cathedral City (“city”), its agents, officers and employees from any claim, action or proceeding to attack, set aside, void, or annul the approval of this Tentative Tract Map No. 39447 (TTM). The city will have sole discretion in selecting its defense counsel. The city will promptly notify the Applicant of any claim, action or proceeding and will cooperate fully in the defense.
4.2 This TTM will expire two years after the city Planning Commission approval date, unless recorded or granted a time extension pursuant to the Cathedral City Subdivision Ordinance.
4.3 This TTM, and any Final Tract Map (FTM) recorded thereunder, will comply with the requirements and standards of the State “Subdivision Map Act” and the Cathedral City Subdivision Code, and the FTM will:
i. Be
based upon a field survey.
ii. A
preliminary soils report will be completed for the proposed parcels and will be noted on the FTM.
4.4 The TTM will comply with all applicable terms, conditions and/or mitigation measures for the following approvals:
i. TTM No. 39447.
ii. PUD No. 25-0001.
iii. Cathedral City Design Guidelines
iv. Cathedral City Water Conservation Policies and Rules v. Cathedral City Municipal Codes and Ordinances
vi. Attachment 1: Cathedral Cove Center Conditions of Approval as follows:
• TPM No. 37876
• PUD No. 21-001
• CUP Nos. 21-006, 21-007, 21-008 and 21-009
• DR Nos 21-001,21-002 and 21-003
• Zone Ordinance Amendment No. 21-001
• Master Sign Program No. 22-019
• Planning Commission Approval with Revisions: August 3, 2022 • Date Approved: September 28, 2022 (Second Reading)
In the event of any conflict(s) between the above provisions for these conditions or approvals, the Applicant will notify the Director of Public Works and/or Director of Community and Economic Development to determine precedence. 2255
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
4.5 Prior to the FTM approval, the Applicant will provide security to guarantee the survey and setting of final monumentation, parcel boundaries and lot corners.
The security will be in the form of a 100% cash bond. Release of security will occur after the Applicant’s engineer of record provides the city with the required certification that all such monuments have been placed and the engineer of record has been compensated in full for the work.
4.6 All conditions herein will be met prior to the Grading Permit issuance for the TTM or as specifically modified by item as linked to a Certificate of Occupancy (COO) issuance and/or time limit from the date of issuance of the Grading Permit.
4.7 References:
i. To “approved by the city” include the following city staff to be contacted as applicable to the specific approval:
1. The Director of Public Works, or
2. The Director of Community and Economic Development, or
3. The City Engineer.
ii. The “Cathedral Cove Center” refers to APNs 687-500-031, 031, 029, 028, 027, 026, 025, 024, 023, collectively.
1. “Cathedral Cove Center Conditions of Approval” as referenced in Condition 4.4iii above.
iii. Supplemental Conditions of Approval required for the TTM are highlighted for convenience in Attachment 1: Cathedral Cove Center Conditions of Approval for the Applicant to complete. Please note that any Conditions of Approval that are not highlighted in Attachment 1 and applicable to the TTM will still apply.
4.8 Prior to issuance of any grading, construction or building permit by the city, the Applicant will obtain any necessary clearances and/or permits from the following agencies, where required:
i. City of Cathedral City Fire Marshal.
ii. Cathedral City Public Works Department.
iii. Cathedral City Development Services Department.
iv. Riverside County Environmental Health Department.
v. Palm Springs Unified School District (PSUSD).
vi. Desert Water Agency (DWA).
vii. Southern California Edison (SCE).
viii. Frontier Communications.
ix. Spectrum Cable.
x. Riverside County Airport Land Use Commission (RCALUC). xi. California Regional Water Quality Control Board (CRWQCB). xii. State Water Resources Control Board.
xiii. Federal Emergency Management Agency (FEMA).
xiv. Sunline Transit Agency (SunLine). 2266
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
xv. South Coast Air Quality Management District – Coachella Valley (SCAQMD).
xvi. Riverside County Flood Control District (RCFCD)
The Applicant is responsible for all the requirements of the permits and/or clearances from the above listed agencies. When the requirements include approval of improvement plans, the Applicant will furnish proof of such approvals when submitting those improvement plans for city approval.
4.9 Approval of this TTM will not be construed as approval for any horizontal and/or vertical dimensions implied by any site plans or exhibits unless specifically identified in the following Conditions of Approval.
4.10 The Applicant will reimburse the city, within thirty (30) days of presentment of the invoice, all costs and actual attorney’s fees incurred by the City Attorney to prepare, review, negotiate and/or modify any documents or instruments required by these conditions and/or subsequent modification requests to these Conditions of Approval. This obligation will be paid in the time noted above without deduction or offset and the Applicant’s failure to make such payment will be a material breach of the Conditions of Approval.
4.11 The Applicant will reimburse the city, within thirty (30) days of presentment of the invoice, all cost and actual consultant’s fees incurred by the city for engineering, surveying and/or any other technical consultants to review and/or modify any documents or instruments required by these conditions and/or subsequent modification requests. This obligation will be paid in the time noted above without deduction or offset and the Applicant’s failure to make such payment will be a material breach of the Conditions of Approval.
4.12 The Applicant will reimburse the city, within thirty (30) days of presentment of the invoice, all actual costs incurred by the city for Public Works and/or Community and Economic Development Departments reviews and/or modify any documents or instruments required by these conditions and/or subsequent modification requests. This obligation will be paid in the time noted above without deduction or offset and the Applicant’s failure to make such payment will be a material breach of the Conditions of Approval.
REAL PROPERTY
4.13 Prior to issuance of any permit(s), the Applicant will acquire or confer easements and other property rights necessary for the construction or proper functioning of the proposed TTM. Conferred rights will include irrevocable offers to dedicate or grant access easements to the city for emergency services, maintenance, construction, and reconstruction of essential improvements. 2277
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
4.14 Pursuant to the condition, conferred rights will include approvals from all necessary persons or entities over easements and other property rights necessary for construction and proper functioning of the proposed TTM, not limited to access rights over proposed and/or existing private streets that access public streets and open space/drainage facilities of all phases of the TTM.
Specifically:
i. If utility easements exist where the proposed parcels are to be created, in accordance with the provisions of the Subdivision Map Act and prior to FTM approval, these easements will either be quitclaimed or terminated by their owners, or the city will be provided with “non-interference” letters from the easement owners stating that the Applicant’s proposed TTM will not interfere with their easements.
ii. The Owner of Record of the TTM will be responsible for daily cleanup of blowsand, debris, trash, rubbish and deleterious material removal in all areas of the TTM’s Van Fleet Street and “D” Street frontage areas, including gutter pans, sidewalks, parkways, drive aisles, entry areas and all interior areas within walled areas and all other areas outside walled areas of the TTM. The Owner of Record will ensure that these site maintenance responsibilities are identified and incorporated into the CC&Rs for the TTM.
iii. The Owner of Record of the TTM will be responsible for the daily maintenance of the interior and exterior right of way frontage landscaping continually in a condition to COO or better (matured) and will be required to enter into a Landscaping Maintenance Agreement, which includes improvement securities as cited further in Condition 4.62 of these Conditions of Approval. The Owner of Record ensure that these daily landscaping maintenance responsibilities are identified and incorporated into the CC&Rs for the TTM.
iv. The Owner of Record of the TTM will record a mutual drainage easement for breakout waters with the north adjacent Cathedral Cove Center, subject to city approval. The Owner of Record will ensure that the mutual drainage easement is identified and incorporated into the CC&Rs for the TTM.
v. If required, the Owner of Record of the TTM will record a pedestrian access easement with the north adjacent Cathedral Cove Center for emergency responders, if required, and TTM residents, at a location approved by the city. The Owner of Record will ensure that the mutual pedestrian access easement is identified and incorporated into the CC&Rs for the TTM.
2288
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
vi. The Owner of Record shall record the Water Quality Management Plan and Urban Runoff Best Management Practices Transfer, Access and Maintenance Covenant (as part of the WQMP) described in Condition
4.29.iv. against all the parcels of the TTM. The Owner of Record will ensure that the access and the ongoing facilities maintenance will be incorporated into the CC&Rs for the TTM.
vii. The Owner of Record of the TTM will record the Street Light Covenant described in Condition 4.47 against all the parcels of the TTM. The Owner of Record will ensure that the ongoing street light maintenance responsibilities will be incorporated into CC&Rs for the TTM. viii. On the FTM, the Owner of Record shall dedicate additional right of way at all the TTM’s Van Fleet Street and “D” Street frontage driveways to provide for Corner Cutbacks per Riverside County (RC) Standard No. 805.
ix. The city will vacate portions of the “D” Street offset cul-de-sac located at the east end of “D” Street as required with the recordation of the FTM to complete a reduced size cul-de-sac in accordance with a 56-feet right of way size, shape and geometric alignment as generally show on the TTM per Riverside County (RC) Standard No. 800(A) and as final approved by the City Fire Chief and Director of Public Works. Vacation and completion of construction of the “D" Street cul-de-sac shall occur prior to the issuance of the first COO of the TTM.
x. As identified in Conditions of Approval 4.17 B. Phase II – Residential ix. of the Cathedral Cove Center’s entitlement:
The Developers of the Phase II - Residential and Phase II - Retail shall abandon, relocate, underground, or otherwise clear existing utilities in these streets in conjunction these Phases, respectively, to the satisfaction of their owners, and meet the other conditions of the street and alley vacations as outlined in that Resolution, and a final Resolution of Vacation must be adopted and recorded prior to the issuance of Grading and/or Building Permits on any of the portions of streets or alley to be vacated. Abandonment, relocation or undergrounding of any utilities in these vacated streets shall occur prior to the first COO issued for either Phase II – Residential or Phase II - Retail, where such vacation is applicable.”
xi. Supplemental Conditions of Approval required for the TTM are highlighted for convenience in Attachment 1: Cathedral Cove Center Conditions of Approval for the Applicant to complete. Please note that any Conditions of Approval that are not highlighted in Attachment 1 and applicable to the TTM will still apply. 2299
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
4.15 Right of way dedications may include additional widths as necessary for dedicated right and left turn lanes, bus turnouts, parking and other features contained in proposed TTM.
4.16 The Applicant will retain for private use on the FTM all private street rights-of-way, parking lots, alleys, access ways, entry points and rights of way in conformance with the City’s General Plan, Municipal Code and/or as required by the city.
4.17 When the city determines that access rights to a proposed street right-of-way shown on the TTM are necessary prior to the issuance of the FTM, the Owner of Record will grant the necessary rights-of-way within 60 days of a written request by the city.
4.18 Where applicable, the Owner of Record will offer for dedication on the FTM, a public utility easement (PUE) contiguous with, and along both sides of all pubic and/or private streets.
4.19 The Owner of Record will offer for dedication on the FTM to the city those easements necessary for the placement of, and access to, utility lines, structures, drainage facilities and park lands on the FTM.
4.20 The Applicant will cause all missing property corners and survey monuments along and within the boundaries of the TTM to be set prior to the final acceptance of the TTM improvements in accordance with the Subdivision Map Act.
4.21 The Applicant will furnish proof of easements, or written permission, as appropriate, from those owners of all abutting properties on which, and not limited to, grading, wall construction, retaining wall construction, permanent slopes, street improvements, sidewalks, driveways, utility relocations, other encroachments and other construction activities will occur.
i. Further, all abutting properties disturbed by the Applicants, and not limited to, grading, wall construction, retaining wall construction, permanent slopes, street improvements, sidewalks, driveways, utility relocations, other encroachments and other construction activities performed by the Applicant, will be restored to original and/or improved conditions subject to city inspection.
4.22 The Applicant will cause no easement to be granted, or recorded, over any portion of the TTM between the date of approval of the TTM and the date of recording of any FTM, unless such easement is approved by the city.
4.23 The Applicant will be responsible for the vacation, quitclaim or granting of easements that address changes in the existing easements over the proposed 3300 FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
TTM that may be affected by proposed improvements. Pursuant to this Condition, the Applicant will apply to the city for any street vacation request of public right-of-way and/or utility easements. The Applicant must provide all applicable exhibits and legal descriptions and perform all necessary abandonments or relocation of easements and/or facilities as required by all affected utility purveyors over the public rights-of-way and/or utility easements.
Typically, the right-of-way vacation process may take up to three (3) months to complete.
PHASE I, SWPPP, STORMWATER AND NPDES REQUIREMENTS
4.24 The Applicant, where applicable, will be responsible for completing all TTM approved Phase I Study, city, Riverside County and Riverside County Department of Environmental Health requirements, respectively. Proof of compliance will be submitted to the city before issuance of any permit for the TTM.
4.25 Coverage under the State of California Construction General Permit must be obtained by the Applicant, who then will submit a copy of the Regional Water Quality Control Board’s (“RWQCB”) acknowledgement of the applicant’s Notice of Intent (“NOI”) and Waste Discharge Identification (“WDID”) number to the city prior to the issuance of a grading or building permit.
Prior to construction, during construction and up to Final Tract Map (FTM) acceptance, the Applicant will comply with applicable provisions of the city’s NPDES Stormwater Discharge Permit and Riverside County Ordinance No. 457; the California Regional Water Quality Control Board – Colorado River Basin Regional Board Order No. R7-2013-0011 and the State Water Resources Control Board’s Order No. 2009-009-DWQ, Order No. 2010-0014-DWQ and Order No. 2012-0006-DWQ.
i. For construction activities including clearing, grading or excavation of land that disturbs one (1) acre or more of land, or that disturbs less than one (1) acre of land, but which is a part of a construction project that encompasses more than one (1) acre of land, the Applicant (“Permitee”) will be required to submit a Storm Water Pollution Protection Plan (“SWPPP”) to the State Water Resources Control Board (“SWRCB”). ii. The Applicant or design professional can obtain the California Stormwater Quality Association SWPPP template at www.cabmphandbooks.com for use in their SWPPP preparation.
iii. Prior to the Applicant submitting the SWPPP to the SWRCB, the Applicant will submit a copy of the SWPPP to the city for review. iv. The Applicant will deliver a complete copy of the State Water Resources Control Board approved SWPPP to the city prior to issuance of the Grading Permit for city records.
3311
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
v. The Applicant will ensure that the required SWPPP is always available for inspection on the project site through and including acceptance of all improvements by the city.
vi. The Applicant’s SWPPP will include provisions for all of the following Best Management Practices (“BMPs”), but not limited to:
1. Temporary soil stabilization (erosion control).
2. Temporary sediment control.
3. Wind erosion control.
4. Track out control.
5. Non-storm water management.
6. Waste management and materials pollution control.
7. Retention and infiltration basins management.
vii. All erosion and sediment control BMPs proposed by the Applicant will be approved by the city prior to implementation.
viii. All erosion control BMPs will remain in effect for the entire duration of project construction until all improvements are completed and accepted by the city.
ix. The SWPPP will remain in effect for the entire duration of project construction until all improvements are completed and accepted by the City Council.
4.26 The Applicant’s TTM PM-10 and erosion control plans (separate plans and/or packet) will include provisions for all the above cited Best Management Practices (“BMPs”).
4.27 The Applicant will design and construct facilities to capture all onsite nuisance and storm waters, with breakout facilities, within the paved and landscaped areas of the CUP, per with the Cathedral City Floodplain Management Ordinance §8.24 and other conditions generally described in the TTM’s “Preliminary Hydrology Study for Foothill Cove prepared by Fomotor Engineering December 3, 2025” (subject to final hydrology review).
4.28 Final stormwater handling will conform to a final approved Hydrology Study for the TTM. The design of the Project will not cause any increase in flood boundaries, levels, or frequencies in any area outside the TTM.
4.29 Stormwater and nuisance water (drainage) for the TTM will be retained on site, conveyed and disposed of in an approved manner. Drainage water will be conveyed underground as much as is feasible. Drainage water shall be disposed of via on-site storm drains, catch basins, underground percolation piping, dry wells, retention basin(s) and/or a combination of the aforementioned (as generally shown on the TTM’s Plans) as approved by the city.
All retention systems will be designed for full containment of the 100 year-3-hour storm event. All infiltration rates used in calculations for said retention basins or underground systems will conform to the TTM’s Geotechnical Infiltration Report or 3322 FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
no more than 2-inches per hour (2.0”/hr.), whichever is less. All proposed infiltration locations will be at the proposed bottom of the retention basin and/or underground retention system elevation. No drainage water storage facility shall detain or retain standing water for longer than 36 hours.
The minimum precipitation frequency rate utilized for the 100 year-3-hour storm event shall be at the current rate published by the National Oceanic and Atmospheric Administration (NOAA) and RCFCD and approved by the city. All flows for the proposed drainage system (catch basins, piping, etc.) will be calculated utilizing the largest flow rate of the 100-year storm event (1 - hour, 3 - hour, 6 - hour or 24 - hour).
4.30 Storm water drainage historically received from adjoining properties will be received and retained and/or passed though into the historic downstream drainage relief route.
4.31 The Applicant will comply with applicable provisions for post construction runoff per the Cathedral City’s NPDES Stormwater Discharge Permit; Riverside County Ordinance No. 457; the Californian Regional Water Quality Control Board – Colorado River Basin (CRWQCB-CRB) Regional Board Order No. R7-2013-0011 and the State Water Resources Control Board’s Order No. 2010-0014-DWQ and Order No. 2012-0006-DWQ.
i. For post-construction, urban runoff from New Development and Redevelopment Projects, the Applicant will implement requirements of the NPDES permit for the design, construction and the covenants for the perpetual operation and maintenance of BMPs per the approved revised/updated Water Quality Management Plan (WQMP) for the project as require by the California Regional Water Quality Control Board – Colorado River Basin (CWQRCB- CRB) Region Board Order No. R7- 2013-0011.
ii. The Applicant will implement the revised/updated WQMP Design Standards per (CRWQCB-CRB) Region Board Order No. R7-2013-0011 utilizing BMPS approved by the city.
iii. The Owner of Record will execute and record a Water Quality Management Plan and Urban Runoff Best Management Practices Transfer, Access and Maintenance Covenant with the city (as part of the WQMP) on the TTM prior to the issuance of a COO.
4.32 For drainage facilities and basins, the Owner of Record will offer dedication to the city the easements necessary for access to drainage facilities and basins on the FTM. The Owner of Record is also required to execute and record a separate Drainage System and Basin Covenant with the city prior to issuance of the Grading Permit. 3333
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
4.33 Open retention basins will be designed as follows:
i. The minimum slopes accepted without security fencing will be 3:1. ii. Slopes will be lined with 3-inch to 6-inch angular rock over weed block. iii. The bottom will not be rock lined or landscaped.
iv. Landscaping will be allowed on the top bench.
v. A maintenance access route to the bottom of the retention basin will be provided.
vi. A basin elevation monument will be installed at the bottom of each retention basin and visible when driving by.
ONSITE PRIVATE TTM ROADWAYS
4.34 The Applicant will dedicate (by easement), design and construct the following private streets within the TTM to be retained for private use:
i. Private entry/exit driveway off the east side of Van Fleet Street - as generally shown on the TTM’s plans, to be constructed as follows:
1. Curb to Curb width will be 45 feet.
a. The driveway is to be divided into two (2) sides separated by a minimum 5-foot median.
b. The driveway will provide ingress and egress for residents and visitors. The gate system related to vehicle and
pedestrian entry, exits and refusals, will require the approval of the city.
c. The gated entry/exit shall provide for vehicle stacking capacity for inbound traffic to be a minimum length to
accommodate three (3) vehicles from the call box to the street; and shall provide for a full turn around outlet (egress) for non-accepted vehicles.
i. For the proposed gated entry, the Applicant shall
submit a detailed exhibit at a scale of 1” = 10’,
demonstrating that those passenger vehicles that do
not gain entry into the TTM can safely make a full
turn-around (minimum radius of 24 feet) out onto Van
Fleet Street from the gated entry. The turn-around
clear opening shall be a minimum of twenty-five (25)
feet wide.
ii. Two (2) lanes of traffic shall be provided on the
ingress side of the gated entry, one (1) lane shall be
dedicated for residents and one (1) lane for visitors.
The two travel lanes shall be a minimum of 20 feet
wide.
3344
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
iii. One (1) lane of traffic shall be provided on the egress side of the gated exit. The one (1) travel lane shall be a minimum of 20 feet wide.
iv. There will be no parking designated on either side of the entry/exit with the curbing to be painted red with
white stenciling of “NO PARKING FIRE LANE.”
v. Driveway entrance radii and drainage design will be
approved by the city and constructed to the same.
ii. Private entry/exit driveway near the east end of “D” Street prior to the cul-de-sac - as generally shown on the TTM’s plans, to be constructed as follows:
1. Curb to Curb width of 24 to 28 feet.
a. The driveway is to be divided into two (2) lanes.
b. The driveway will provide ingress and egress for residents.
The gate system related to vehicle entry and exits will require the approval of the city.
c. The gated entry/exit shall provide for vehicle stacking capacity for inbound traffic to be a minimum length to
accommodate one (1) vehicle from the gate to the street; and shall not provide for a full turn around outlet (egress) for non-accepted vehicles.
i. For the proposed gated entry, the Applicant shall
submit a detailed exhibit at a scale of 1” = 10’,
demonstrating the gate opening operations and
emergency access operations.
ii. One (1) lane of traffic shall be provided on the ingress side of the gated entry dedicated to residents. The
one travel lanes shall be a minimum of 12 to 14 feet
wide.
iii. One (1) lane of traffic shall be provided for on the egress side of the gated exit. The one (1) travel lane
shall be a minimum of 12 to 14 feet wide.
iv. There will be no parking designated on either side of the entry/exit with the curbing to be painted red with
white stenciling of “NO PARKING FIRE LANE.”
v. Driveway entrance and drainage design will be
approved by the city and constructed to the same.
iii. “B” Street” – a private residential roadway constructed as follows:
1. Curb to Curb width will be 28 feet.
a. Vehicle parking is allowed on one side of the street. b. On the side of the street where no parking will be
designated, the curbing shall be painted red with white stenciling of “NO PARKING FIRE LANE.”
2. Right of way width will be 29 feet.
a. A 5-foot PUE will be dedicated on both sides of the street. 3355 FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
iv. “B” Street north of the Van Fleet Street entry drive – a private residential dead-end roadway constructed as follows:
1. Curb to Curb width will be 24 feet.
a. Vehicle parking is not allowed on either side of the street. b. On both sides of the street where no parking will be allowed, the curbing shall be painted red with white stenciling of “NO PARKING FIRE LANE.”
2. Right of way width will be 25 feet.
a. A 5-foot PUE will be dedicated on both sides of the street. v. “C” Street – a private residential roadway constructed as follows:
1. Curb to Curb width will be 28 feet.
a. Vehicle parking is allowed on one side of the street. b. On the side of the street where no parking will be designated the street curbing shall be painted red with white stenciling of “NO PARKING FIRE LANE.”
2. Right of way width will be 29 feet.
a. A 5-foot PUE will be dedicated on both sides of the street. vi. “C” Street west of “B” Street – a private residential roadway constructed as follows:
1. Curb to Curb width will be 24 feet.
a. Vehicle parking is not allowed on either side of the street. b. On both sides of the street where no parking will be allowed, the curbing shall be painted red with white stenciling of “NO PARKING FIRE LANE.”
2. Right of way width will be 25 feet.
a. A 5-foot PUE will be dedicated on both sides of the street. vii. “D” Street – a private residential roadway constructed as follows:
1. Curb to Curb width will be 28 feet.
a. Vehicle parking is allowed on one side of the street. b. On the side of the street where no parking will be designated the street curbing shall be painted red with white stenciling of “NO PARKING FIRE LANE.”
2. Right of way width will be 29 feet.
a. A 5-foot PUE will be dedicated on both sides of the street. viii. “E” Street - a private residential roadway constructed as follows:
1. Curb to Curb width will be 28 feet.
a. Vehicle parking is allowed on one side of the street. b. On the side of the street where no parking will be designated the street curbing shall be painted red with white stenciling of “NO PARKING FIRE LANE.”
2. Right of way width will be 29 feet.
a. A 5-foot PUE will be dedicated on both sides of the street. 3366 FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
ix. “F” Street - a private residential roadway constructed as follows:
1. Curb to Curb width will be 28 feet.
a. Vehicle parking is allowed on one side of the street. b. On the side of the street where no parking will be designated the street curbing shall be painted red with white stenciling of “NO PARKING FIRE LANE.”
2. Right of way width will be 29 feet.
a. A 5-foot PUE will be dedicated on both sides of the street. x. “F” Street west of “D” street and east of “F” Street – a private residential dead-end roadway constructed as follows:
1. Curb to Curb width will be 24 feet.
a. Vehicle parking is not allowed on either side of the street. b. On both sides of the street where no parking will be allowed, the curbing shall be painted red with white stenciling of “NO PARKING FIRE LANE.”
2. Right of way width will be 25 feet.
a. A 5-foot PUE will be dedicated on both sides of the street.
OFFSITE PUBLIC ROADWAYS
4.35 All traffic impacts and mitigations are in conformance to the city accepted “Traffic Analysis for the Cathedral Cove Center”, prepared by Urban Crossroads, dated April 8, 2022.
4.36 The Applicant shall dedicate, design, and construct the following frontage improvements:
i. Residential improvements for the purposes of these Conditions of Approval, will include the TTM’s frontages abutting and south of The Cathedral Cove Center, east along the East Cathedral Canyon Flood Control Channel’s west bank, abutting and north of “D” Street and abutting and west of Van Fleet Street.
ii. All TTM improvements will be completed prior to the issuance of the first COO of the TTM and linked to the completion of the East Palm Canyon Drive frontage and East Palm Canyon Drive/Van Fleet Street intersection improvements within Phase II – Retail of the Cathedral Cove Center. Further, upon the completion of the purchase and/or sale of the TTM Parcel, the Developer of the Cathedral Cove Center or the Applicant will initiate the design and construction of the aforementioned Phase II – Retail of the Cathedral Cove Center improvements (East Palm Canyon Drive frontage and East Palm Canyon Drive/Van Fleet Street intersection improvements) and complete the improvements within eighteen (18) months of the sale date.
iii. Supplemental Conditions of Approval required for the TTM are highlighted for convenience in Attachment 1: Cathedral Cove Center Conditions of Approval for the Applicant to complete. Please note that any Conditions 3377
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
of Approval that are not highlighted in Attachment 1 and applicable to the TTM will still apply.
SPECIFIC DESIGN AND CONSTRUCTION
4.37 The Applicant will design and construct the TTM’s public roadways corresponding to the following standards:
i. Pavement:
1. The Applicant will design public street pavement sections using Caltrans’s design procedure for 20-year life pavement, and the site-specific data for soil strength and anticipated traffic loading (including construction traffic). Minimum structural sections, with asphalt placed in two lifts will be:
a. Onsite private streets within the TTM will be as follows:
i. 3.0” a.c./4.5” class II base with 12” at 95%
compaction.
b. Offsite public streets (Van Fleet repairs):
i. 4.0” a.c./5.0” class II base with 12” at 95%
compaction.
c. Offsite public streets (D Street repairs):
i. 3.0” a.c./4.5” class II base with 12” at 95%
compaction.
2. On roadways joined by two (2) tracts, the Applicant will construct and complete the full asphalt width (on and off TTM) required for the ultimate roadway width (to the opposite side’s curb’s future location complete w/crown).
ii. Sidewalks:
1. The Applicant will construct non-adjacent to curb concrete sidewalks or adjacent to curb concrete sidewalks using RC Std. 401.
iii. Curbs and Gutters:
1. The Applicant will construct curbs in accordance with (as applicable):
a. RC Std. 202A for Type “W” curbs (wedge curb); or,
b. RC Std. 200 Type A-6 Curb and Gutter (6” curb face); or, c. RC Std. 204 Type “D” Curb (6” curb face).
d. On streets with no parking is allowed on one side of the street or both sides of the street the street curbing will be painted red with white stenciling of “NO PARKING FIRE
LANE.”
3388
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
e. Curbs will be constructed to convey water without ponding and provide lateral containment of dust and residue during street sweeping operations.
iv. Cross Gutters and Spandrels:
1. RC Std. 209 Cross Gutter and Spandrel.
2. RC Std. 210 Cross Gutter and Spandrel with Splash Area. v. Dead Ends:
1. Whether interim of permanent, the “Dead End” on local residential or local collector streets will incorporate signing, striping and/or improvements to minimize turning conflicts to be approved by the city.
vi. Corner Curve Radii:
1. The Applicant will construct corners with the following curve radii criteria:
a. Onsite streets within the TTM: 25-foot to 35-foot radii as shown on the TTM.
b. Entryway streets from public streets connecting the TTM:
minimum 25 to 35-foot radii to be shown on the TTM to be approved by the city.
vii. ADA Ramps:
1. The Applicant will construct ADA ramps to Caltrans A88A Standards using the appropriate Case or Detail as required to be confirmed by the city.
viii. Connectivity:
1. The Applicant will ensure that the TTM is not built without connectivity to the north, south, west, or east with roadways, drainage facilities, utilities and all other infrastructure necessary for completing the TTM to a FTM. If the TTM is constructed in phases, the Applicant will construct the necessary infrastructure to complete the TTM’s connectivity.
GENERAL DESIGN AND CONSTRUCTION
4.38 The Applicant will construct all streets, parking areas, drive aisles, curbs and gutters, sidewalks, and driveways to uniformly connect to existing adjacent public and/or private improvements within and adjacent the TTM.
4.39 The Applicant will construct all appurtenant roadway components such as, but not limited to, curb, gutter, sidewalk, ADA ramps, traffic control striping, legends, traffic control signs and street name signs in accordance with city and MUTCD standards. 3399
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
4.40 The Applicant will construct and dedicate streets and related street improvements to conform to the General Plan and/or requirements of the TTM’s Traffic Study.
4.41 The Applicant will construct full crowned street improvements and coordinate all public and private roadway improvements, driveway transitions, relocation of fire hydrants, water meters, storm drains, and all other appurtenances as required.
4.42 Right-of-Way geometry for property line corner cutbacks at curb returns will conform to RC Std. 805.
4.43 Improvements will be designed and constructed in accordance with city adopted standards, supplemental drawings, and specifications.
4.44 All public and private improvements will be subject to city requirements and inspection during construction.
4.45 The city will conduct final inspections of building structures when the building structures have improved street and sidewalk access to publicly maintained streets. The improvements will include the required traffic control devices, pavement markings, ADA improvements and street name signs.
4.46 The Applicant will complete the final pavement lift prior to the final COO of the last structure in the TTM.
STREET LIGHTS
4.47 The Applicant will coordinate and pay all costs necessary for the installation of the below detailed city and Southern California Edison (SCE) approved LED street lights with SCE and take over all related expenses, including the monthly electrical expense for the street lights installed prior to the issuance of the COO. The Applicant will coordinate the transferring of the street lights financial obligation to the HOA prior to the FTM approval. Prior to the FTM approval or the HOA acceptance of these obligations, the Applicant will be required to execute the city’s Street Light Covenant prior to energizing the street lights. i. Install three (3) 5,800 lumen shielded LED street lights along the Van Fleet Street frontage of the TPM, per city and SCE Standards, with the final locations subject to approval by the city prior to the issuance of the first COO.
ii. Install three (3) 5,800 lumen shielded LED street lights along the “D” Street frontage of the TPM, per city and SCE Standards, with the final locations subject to approval by the city prior to the issuance of the first COO.
4400
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
iii. Supplemental Conditions of Approval required for the TTM are highlighted for convenience in Attachment 1: Cathedral Cove Center Conditions of Approval for the Applicant to complete. Please note that any Conditions of Approval that are not highlighted in Attachment 1 and applicable to the TTM will still apply.
OVERHEAD AND OTHER UTILITIES
4.48 Where applicable, the Applicant will coordinate and pay all cost necessary for the undergrounding and removal of all, and not limited to, aerial wires, power lines, telephone wires, cable lines, communication equipment, pole under burden and respective poles that are within this TTM prior to the issuance of the first COO. i. Where existing overhead utilities exist, the Applicant will seek a concurrence from the city on which lines are subject to undergrounding per Cathedral City Municipal Code §8.30.050, after which, the Applicant will coordinate all undergrounding of existing facilities with each respective utility, service provider and adjacent properties owners to ensure that all aerial lines are removed/undergrounded from the TTM’s property.
4.49 The Applicant will coordinate and pay all cost necessary for the undergrounding and removal of all, and not limited to, aerial wires, power lines, telephone wires, cable lines, communication equipment, pole under burden and respective poles that are within this TTM prior to the issuance of the first COO.
4.50 The Applicant will obtain approval from the city for the location of all utility lines within any right-of-way, and all above-ground utility structures including, but not limited to, traffic signal cabinets, electrical vaults, water valves, and telephone stands, to ensure optimum placement for practical and aesthetic purposes.
4.51 All service runs and new utilities will be installed underground, per the utility purveyor standards.
4.52 The Applicant will coordinate all undergrounding of existing facilities with each respective utility, service provider and adjacent properties owners to ensure that all aerial lines are removed from the TTM’s Site Plan.
4.53 Underground utilities will be installed prior to overlaying hardscape. For installation of utilities in existing improved streets, the Applicant will comply with trench restoration requirements required by the city.
4.54 The Applicant will provide certified reports of all utility trench compaction for city approval.
4411
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
4.55 All lots within the TTM will be served with a gravity sanitary sewer system, a domestic water system and a fire protection system in accordance with DWA and Cathedral City Fire Department requirements and standards. Applicant will pay to the city and DWA all applicable sewer and water service charges, capacity charges and construction reimbursements to ensure all services are complete, in place and operational prior to the respective COO being issued.
4.56 The Applicant will abandon or relocate existing easements over the TTM prior to recordation of the FTM as required by the agency and/or individual favored and as approved by the city. Additionally, the Applicant will relocate existing utility facilities that are required by all utility purveyors prior to issuance of the first building permit.
IMPROVEMENT PLANS
As used throughout these Conditions of Approval, professional titles such as “engineer,”’ “surveyor,” and “architect,” refer to persons currently certified or licensed to practice their respective professions in the State of California.
4.57 Improvement plans will be prepared, for each phase, by or under the direct supervision of qualified engineers and/or architects, as appropriate, and will comply with all the requirements of the city.
4.58 The following improvement plans will be prepared and submitted for review to the city. A separate set of plans for each line item specified below will be prepared.
The plans will utilize the minimum scale specified, unless authorized by the city.
Plans may be prepared at a larger scale if additional detail or plan clarity is desired.
NOTE: Engineering Site Plans will be prepared by a Civil Engineer licensed to practice their profession in the State of California.
NOTE: The Applicant may be required to prepare other improvement plans not listed here pursuant to improvements required by other agencies and utility purveyors.
A. On-Site Rough Grading Plan 1” = 20’ Horizontal
B. PM 10 Plan and Packet 1” = 20’ Horizontal (Plan)
C. Erosion Control Plan 1” = 20’ Horizontal
D. WQMP (Plan submitted in report form)
NOTE: A through D to be submitted concurrently.
NOTE: Rough Grading Plan will normally include perimeter wall with Top of Wall and Top of Footing elevations shown. All footings will have a minimum of 1-foot of cover, or sufficient cover to clear any adjacent obstructions. 4422 FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
E. Precise Grading Plan 1” = 10’ Horizontal
F. On Site Storm Drain Plan 1” = 20’ Horizontal
G. Street Improvements Plan 1” = 20’ Horizontal, 1’ = 2’ Vertical H. Street Signing/Striping Plan 1” = 20’ Horizontal
I. Signal Plan (N/A) 1” = 20’ Horizontal
J. Monumentation Plan 1” = 20’ Horizontal
NOTE: E through J to be submitted concurrently.
NOTE: Precise Grading Plan will normally include perimeter wall with Top of Wall and Top of Footing elevations shown. All footings will have a minimum of 1-foot of cover, or sufficient cover to clear any adjacent obstructions.
NOTE: The street improvement plans will show the sidewalk in the combined parkway and landscape setback area.
NOTE: Separate Storm Drain Plan if applicable and/or required by city.
Other engineered improvement plans prepared for city approval that are not listed above will be prepared in formats approved by the city prior to commencing plan preparation.
All Plan and Profile Street Plans and Signing and Striping plans will show all existing improvements for a distance of at least 200-feet beyond the Project limits, or a distance sufficient to show any required design transitions.
All Signing and Striping Plans will show, at a minimum; Stop Signs, Limit Lines and Legends, No Parking Signs, Raised Pavement Markers (RPMs) (including Blue RPMs at fire hydrants) and Street Name Signs per Cathedral City Standard Plans and/or as approved by the city.
“Rough Grading” plans will normally include perimeter wall with Top of Wall and Top of Footing elevations shown. All footings will have a minimum of 1-foot of cover, or sufficient cover to clear any adjacent obstructions.
4.59 The Applicant will furnish accurate mylars of all improvement plans and the FTM, to the city for approval. The FTM will be of a scale approved by the city.
4.60 The Applicant will furnish a PDF copy of all approved improvement plans and recorded FTM acceptable to the city.
4.61 Upon completion of construction, and prior to final acceptance of the improvements by the city, the Applicant will furnish the city with reproducible record drawings, of all improvement plans which were approved by the city.
Each sheet will be clearly marked “As Built” and will be stamped and signed by 4433 FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
the engineer or surveyor certifying the accuracy and completeness of the drawings. The applicant will have all approved Mylars previously submitted to the city, revised to reflect the as-built conditions. The Applicant will employ or retain the Engineer of Record (EOR) during the construction phase of the project so that the EOR can make site visits in support of preparing “As Built”. However, if subsequent approved revisions have been approved by the city and reflect said “As Built” conditions, the EOR may submit a letter attesting to said fact to the city in lieu of Mylar submittal.
IMPROVEMENT SECURITY AGREEMENTS
4.62 Prior to approval of the FTM, the Applicant will construct and dedicate all on and off-site improvements and satisfy its obligations for same or will furnish a fully secured and executed Subdivision Agreement guaranteeing the construction of such improvements and the satisfaction of its obligations for same, or will agree to any combination thereof, as may be required by the city.
4.63 Prior to FTM approval the Applicant will submit for review and city approval CC&Rs for the future maintenance and upkeep of (and not limited to) street lighting (Street Light Covenant), landscaping improvements, hardscape improvements, retention basin improvements, sidewalks, roadway debris removal, blow sand removal and TTM permanent site Best Management Practice (BMP) appurtenances (Water Quality Management Plan Covenant). Once approved by the city, the Owner of Record will execute and record such documents and provide the copies to the city.
4.64 Any subdivision agreement entered into by and between the Applicant and the city, for the purpose of guaranteeing the completion of any improvements related to this TTM, will comply with all applicable city codes and ordinances.
All required improvement securities will be in a form and amount as approved by the city. Evidence of liability and workers’ compensation insurance coverage will be submitted as required by the terms of the subdivision agreement.
4.65 The Applicant will submit applicable deposits for the cost of reviewing subdivision agreement, CC&Rs, map extensions, covenants, WQMP and/or any other requests or form submittals made by the Applicant related to this TTM.
4.66 Improvements to be made, or agreed to be made, will include the removal of any existing structures or other obstructions which are not a part of the proposed improvements and will provide for the setting of the final survey monumentation.
When improvements are phased through a “Phasing Plan,” all improvements (e.g., backbone utilities, retention basins, perimeter wall, landscaping, and gates) will be constructed, or secured through a subdivision agreement, prior to FTM approval. 4444
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
Improvements and obligations required of each subsequent phase will be either complete, or secured through a subdivision agreement, prior to the completion of homes or the occupancy of permanent buildings within such latter phase.
In the event the Applicant fails to construct the improvements for the development or fails to satisfy its obligations for the development in a timely manner, pursuant the approved phasing plan, the city will have the right to halt issuance of permits, and/or final inspections, withhold other approvals related to the development of the project, or call upon the surety to complete the improvements.
4.67 Depending on the timing of the development of this TTM, and the status of the improvements at the time, or if the Applicant desires to record the TTM in increments the Applicant may be required to:
i. Construct certain improvements outside of the construction phase or map increment.
ii. Construct additional improvements, subject to the reimbursement of its cost by others.
iii. Reimburse others for those improvements previously constructed that are an obligation of this TTM.
iv. Secure the costs for future improvements that are to be made by others. v. To agree to any combination of these means, as the city may require.
In the event that any of the improvements required for this development are constructed by the city, the Applicant will, prior to the approval of the FTM, or the issuance of any permit related thereto, reimburse the city for the costs of such improvements.
If the Applicant elects to utilize the secured agreement alternative, the Applicant will submit detailed construction cost estimates for all proposed improvements for each phase, or map increment, including an estimate for the final survey monumentation, for review and approval by the city. Such estimates will conform to the unit costs schedule as approved by the city.
At the time the Applicant submits its detailed construction cost estimates for approval of the FTM by the City Council, the Applicant will also submit one copy each of an 8-1/2” x 11” reduction of each page of the FTM, along with a copy of an 8-1/2” x 11” Vicinity Map.
Estimates for improvements under the jurisdiction of other agencies will be approved by those agencies and submitted to the city along with the Applicant’s detailed cost estimates.
4455
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
Security will not be required for telephone, natural gas, or Cable T.V. improvements.
4.68 The Applicant will provide security to guarantee the final monumentation of the TTM. All securities for final survey monumentation will be in the form of 100% cash deposits.
GRADING
4.69 The Applicant will comply with all the provisions of Cathedral City municipal codes and ordinances.
4.70 The Applicant will obtain a Grading Permit approved by the city prior to initiating any construction or on the project site.
4.71 To obtain an approved Grading Permit, the applicant will submit and obtain approval of all of the following:
i. A Grading Plan prepared by a civil engineer registered in the State of California,
ii. A preliminary geotechnical (“Soils”) Report prepared by a professional registered in the State of California,
iii. A Fugitive Dust Control Plan and Packet prepared in accordance with city requirements,
iv. An Erosion Control Plan prepared in accordance with city requirements, v. A Best Management Practices report prepared in accordance with city requirements (NPDES Stormwater Discharge Permit and Storm Management and Discharge Controls),
vi. A WQMP prepared by an authorized professional registered in the State of California, and
vii. A Conditional Letter of Map Revision – Fill (CLOMR-F) issued by FEMA. If the Applicant is not securing a CLOMR the Applicant must verify that the entire Project limits are outside a FEMA designated Flood Hazard Area and/or Area of Flood Hazard Risk as designated by the latest approved FEMA FIRM Map and in accordance with the Cathedral City Municipal Code Chapter 8.24.
4.72 All grading will conform with the recommendations contained in the Preliminary Soils Report and Phase 1 Environmental Assessment report and will be certified as being adequate by the soils engineer, or engineering geologist registered in the State of California.
4.73 A statement will appear on the FTM that a soils report has been prepared in accordance with the California Health and Safety Code § 17953 and California Government Code § 66490.
4466
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
4.74 The Applicant will furnish security, in a form acceptable to the city, and in an amount sufficient to guarantee compliance with the approved Fugitive Dust Control Plan provisions as submitted with its application for a grading permit.
Additionally, the Applicant will replenish said security if expended by the city to comply with the Fugitive Dust Control Plan as required by the city.
4.75 The Applicant may choose to submit a stockpile plan to the city to review and approve. If a stockpile plan is submitted to the city for review and approval, the city will also calculate the required cash deposit to ensure that the site is maintained for erosion and dust control in conformance with city ordinances and standards. The deposit will be released back to the Applicant when the site is transitioned back with an approved grading plan and a Grading Permit issued for said same location.
4.76 The Applicant will maintain all open graded, undeveloped land to prevent wind and/or water erosion of such land. All open graded, undeveloped land will either be planted with interim landscaping, stabilized with other erosion control measures, or maintained as were approved in the Fugitive Dust Control Plan.
4.77 Grading within the parkway areas will conform to city requirements except as otherwise modified by this condition. The maximum slope will not be steeper than 3:1 anywhere in the landscape setback area, except for the back slope (i.e. the slope at the back of the landscaped lot) which will not be steeper than 2:1 if fully planted with ground cover. The steepest slope in the first six (6) feet adjacent to the curb will not exceed 4:1 when the nearest edge of sidewalk is within six feet (6’) of the curb, otherwise the steepest slope within the right of way will not be steeper than 3:1. All unpaved parkway areas adjacent to the curb will be depressed one and one-half inches (1.5”) in the first eighteen inches (18’) behind the curb.
4.78 Building pad elevations on the Grading or Precise Grading Plan(s) submitted for city approval will conform to the pad elevations shown on the TTM or CLOMR (with the CLOMR taking precedence), as applicable, unless the pad elevations have other requirements imposed elsewhere in the Conditions of Approval.
4.79 Building pad elevations of perimeter lots will not differ by more than one foot higher from the building pads in adjacent development. The Applicant will minimize the differences in elevation between the adjoining properties and the lots within this development.
House pad elevations on contiguous interior lots will not differ by more than three feet except for lots that do not share a common street frontage, where the differential will not exceed five feet or as approved by city.
4.80 Prior to any site grading or re-grading that will raise or lower any portion of the site by more than plus or minus half of a foot (0.5’) from the elevation shown on 4477 FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
the approved TTM, the Applicant will submit the proposed grading changes to the city for a substantial conformance review.
4.81 Prior to the issuance of a Building Permit for any TTM lot, the Applicant will provide a lot pad certification stamped and signed by a qualified engineer or surveyor with applicable compaction tests and over excavation documentation.
Each pad certification will list the pad elevation as shown on the approved grading plan, the actual pad elevation and the difference between the two, if any.
Such pad certification will also list the relative compaction of the pad soil. The data will be organized by lot number and listed cumulatively if submitted at different times.
4.82 This TTM will comply with the Cathedral City Floodplain Management Ordinance §8.24. If any portion of any proposed building lot in the development is or may be located within a flood hazard area as identified on the Cathedral City’s Flood Insurance Rate Maps (FIRM Maps), the development will be graded to ensure that all floors and exterior fill (at the foundation) are above the level of the project (100-year) flood and building pads are compacted to 95% Proctor Density. Prior to issuance of building permits for lots which are so located, the Applicant will furnish Elevation Certifications, as required by FEMA, that the above conditions have been met.
SECTION 5 FIRE PROTECTION
This project has been reviewed as R-1 type occupancies, any other use will require further review.
Unless specifically stated herein, these conditions shall not be construed to permit or allow deviation from any Federal or State laws nor any of the local codes and ordinances adopted by this jurisdiction. Please contact the City of Cathedral City Fire Department for any questions regarding compliance with the applicable codes or following conditions:
Note: All references to the 2019 California Fire Code are shown as CFC, the 2019 California Building Code is shown as CBC and the California Code of Regulations are shown as CCR.
AGENCY COMMENTS
5.1 The Final Conditions of Approval for this project shall be included in any site plan or construction plans submitted for permit issuance. Plans will not be approved without reference to these “conditions”.
LIFE SAFETY AND FIRE PROTECTION SYSTEMS
4488
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
5.2 Fire Sheet PUD.03 dated 2020.0.-04: A Fire Lane of twenty feet of unobstructed width is required to be painted with Red paint to designate a fire lane into the property, on the east side of Santoro Dr., for the entire length of Santoro Dr. from McCallum Way to Via Campanile Rd and shall be stenciled “NO PARKING” “FIRE LANE” - CVC 22500.1 with White paint and posted with signage WHITE Signs with RED letter and numbers “NO PARKING” “FIRE LANE” - CVC 22500.1
5.3 Sheet PUD.03 dated 2020.02.04: Fire Lanes are required on each street labeled as “Fire Truck Access” throughout the community of twenty feet of unobstructed width and is required to be painted with Red paint (both sides of the streets) to designate a fire lanes and shall be stenciled “NO PARKING” “FIRE LANE” - CVC 22500.1 with White paint and posted with signage WHITE Signs with RED letter and numbers “NO PARKING” “FIRE LANE” - CVC 22500.1 NOTE: No street parking is permitted in front of the homes, in the community.
5.4 Sheet PUD.03 dated 2020.02.04: All Fire Lanes shall be rated to support a 72,000 G.V.W load
5.5 Sheet PUD.02 dated 2020.02.04 - Fire Hydrants shall be relocated and /or added as follows:
• RELOCATE Fire Hydrants on street marked LOT ”C” from southside to northside of street at two locations
• RELOCATE Fire Hydrants on street marked LOT ”F” from first lot on the northside to the N/W corner of Santoro Dr. and LOT F street (East of Handicapped Parking spaces)
• RELOCATE Fire Hydrants on street marked LOT ”F” from southside to northside of street at one location (furthest west F/H) • RELOCATE Fire Hydrants on street marked LOT ”G” from southside to northside of street at one location (furthest west F/H) • ADD Fire Hydrants - On the eastside of Santoro Dr. from McCallum Way to the community gated entrance every 400 feet.
SECTION 6 BUILDING DEPARTMENT
6.1 Project shall comply with the 2019 California Building Standards Code (Title 24, California Code of Regulations) and other adopted City Ordinances which include the following:
a. CA Building Code
b. CA Plumbing Code
c. CA Mechanical Code
d. CA Electrical Code 4499
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
e. CA Fire Code
f. CA Green Building Standards Code
g. CA Energy Code
h. Chapter 8.34 of the Municipal Code: Building Security
6.2 As applicable, automatic fire sprinkler systems shall be installed in all new construction as per Chapter 9 of the California Building code and per City Ordinance. Design and type of system shall be based upon the requirements of the California Building Code, the California Fire Code and the requirements of the Fire Department.
6.3 The requirements of the Department of Environmental Health Services and the Air Quality Management District shall be satisfied prior to the issuance of any permit if hazardous materials are stored and/or used.
6.4 Any temporary building, trailer, commercial coach, etc. installed and/or used in connection with a construction project shall comply with the City of Cathedral City requirements.
6.5 All perimeter/boundary walls shall be designed and constructed so that the outer/exterior face of the wall is as close as possible to the property line. In any case, the outer/exterior face of the wall shall be within two inches of the property line. Distances greater than two inches may be approved prior to construction by the Building Official on a case-by-case basis for extenuating circumstances.
6.6 All property lines, easement lines, etc. shall be located and/or relocated in such a manner as to not cause any existing structure to become non-conforming with the requirements of the latest adopted edition of the Building Code, or any other applicable law, ordinance, or code.
6.7 The Tract map shall record prior to the issuance of any permits.
6.8 The Grading Permit shall be issued prior to the issuance of building permits.
6.9 All signs shall be Underwriters Laboratories approved or the equivalent.
6.10 Permits issued by the Building Department are required prior to the removal and/or demolition of structures.
6.11 All exterior lighting shall be orientated, directed, and/or shielded as much as possible so that direct illumination does not infringe onto adjoining properties.
6.12 Prior to any building inspection, the following information shall be submitted to the Building Department:
a. A Pad Certification from the civil engineer of record that certifies the pad elevation is consistent with the approved grading plan; 5500
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
b. A Form Certification from the civil engineer of record that certifies the building concrete forms have been placed to conform with the required setbacks as per the approved site/grading plan; and
c. A compaction Report from a geotechnical testing firm that certifies the site has been compacted to comply with the approved soils/geotechnical report.
6.13 If hazardous substances are used and/or stored, a technical opinion and report, identifying and developing methods of protection from the hazards presented by the hazardous materials may be required. This report shall be prepared by a qualified person, firm, or corporation and submitted to the Building Department.
This report shall also explain the proposed facility's intended methods of operation and list all of the proposed materials, their quantities, classifications, and the effects of any chemical (material) inter-mixing in the event of an accident or spill.
Approved for Planning Entitlements by the Cathedral City Planning Commission on _____________, 2026.
Attest:
___________________________ ___________________________ Director Applicant
5511
FOOTHILL COVE – PUD, TTM 39447
Planning Commission Conditions of Approval
September 9, 2026
Exhibit A - Signed Conditions of Approval for Cathedral Cove Project (follow) 5522
CITY OF CATHEDRAL CITY
CITY COUNCIL
CONDITIONS OF APPROVAL
PLANNED UNIT DEVELOPMENT NO. 21-001
TENTATIVE PARCEL MAP NO. 37876
CONDITIONAL USE PERMIT NOS.
21-006, 21-007, 21-008 AND 21-009
DESIGN REVIEW NOS. 21-001, 21-002 AND 21-003
ZONE ORDINANCE AMENDMENT NO. 21-001
MASTER SIGN PROGRAM NO. 22-019
CATHEDRAL COVE CENTER
PROJECT LOCATION:
SOUTHWEST CORNER OF EAST PALM CANYON DRIVE AND
DATE PALM DRIVE
(APN: 674-500-038, 687-500-001, -003, -006 THROUGH -012, - 014 AND -018 THROUGH -020, AND 687-207-003 AND -006)
DATE APPROVED: SEPTEMBER 28, 2022 (SECOND READING)
(CONDITIONS REVISED BY PLANNING COMMISSION
ON AUGUST 3, 2022)
SECTION 1 ADMINISTRATIVE CONDITIONS
1.1 Prior to issuance of a building permit the Applicant or Developer shall sign the approved Conditions of Approval which shall certify that the Applicant or Developer agrees to implement all Conditions of Approval.
1.2 A copy of the signed Conditions of Approval shall be printed onto the first page of the construction drawings.
1.3 The plans approved by the Architectural Review Committee and Planning Commission will be referenced as “Exhibit A”. The construction drawings shall conform substantially to “Exhibit A” as approved by the Planning Commission, with the exception of any detail specifically modified by any of the conditions of approval contained herein. Any deviation from “Exhibit A” shall be submitted in writing and approved by the Director of Planning/Building and/or the Director of Engineering/Public Works prior to approval of the construction drawings.
EXHIBIT A (also referred to as Attachment 1)
5533
Cathedral Cove Center
September 28, 2022
1.4 This approval shall be valid for two years from date of approval, unless extended pursuant to the Cathedral City Municipal Code and Subdivision Ordinance.
1.5 No Certificate of Occupancy shall be granted until all Conditions of Approval have been completed and approved by the Director of Planning/Building, Director of Engineering/Public Works, and Fire Chief unless otherwise identified herein.
1.6 The Final Parcel Map shall be approved by the City Council and recorded prior to the issuance of any building permits.
1.7 The development of the site shall conform to all ordinances, codes, regulations, policies and development design controls pursuant to the Cathedral City Municipal Code in effect prior to issuance of any building permits.
1.8 All improvements approved for construction are required to be maintained as to comply substantially with the plans approved for construction, unless modifications are approved by the Director of Planning/Building and the Director of Engineering/Public Works. The improvements to be maintained include, but are not limited to, site improvements: parking and walking surfaces, private drainage control facilities, fences/walls, signs, and lights; building and accessory structure improvements; paint colors and other finish materials, roofing materials, mechanical equipment, windows, trellises, canopies, all architectural features, landscaping and landscape irrigation.
1.9 The Developer shall defend, indemnify and hold harmless the City of Cathedral City, its officials, employees and agents, from and against any liability whatsoever related to the approval of this Conditional Use Permit and any other permits or approvals issued related to this Conditional Use Permit.
SECTION 2 FEES
2.1 The Developer shall pay all applicable City of Cathedral City fees, charges and other costs such as development impact fees as prescribed by City Ordinance.
The applicant is hereby advised that the fees may change at the time they become due and payable, as permitted by applicable law.
NOTICE TO APPLICANT: Pursuant to Government Code Section 66020(d)(1), the 90-day period to protest the imposition of any impact fee, dedication, reservation, or other exaction described in this document begins on the effective date of this approval and any such protest must be in a manner that complies with Section 66020(a), and failure to timely follow this procedure will bar any subsequent legal action to attack, review, set aside, void or annul imposition.
The right to protest the fees, dedications, reservations, or other exactions does not apply to planning, zoning, grading, or other similar application processing fees or service fees in connection with this project.
It further does not apply to any fees, dedication, reservations, or exactions for which the applicant has been given a notice similar to this, nor does it revive challenges to any fees for which the Statute of Limitations has previously expired.
5544
Cathedral Cove Center
September 28, 2022
SECTION 3 PLANNING
3.1 If the project is proposed to be constructed in phases, a phasing plan shall be submitted for review and approval. The phasing plan shall outline the approximate construction timeline for buildings, infrastructure, landscaping, open space, common amenities, and other site improvements.
3.2 The project shall comply with the requirements of Chapter 9.94 (Planned Unit Development), where applicable.
3.3 A Final Planned Unit Development (PUD) Plan in accordance with Section
9.94.160 of the Cathedral City Municipal Code (CCMC) shall be approved by the City Council prior to the issuance of any building permits.
3.4 Per section 9.94.110 of the Zoning Ordinance, all structures shall be setback a minimum of ten feet from the right-of-way of public or private streets, unless a variance has been granted.
3.5 All drive-through lanes shall be screened from public view along East Palm Canyon Drive. Screening methods may include block walls and landscape mounding and hedges.
3.6 Prior to Final Parcel Map approval by the City Council, a Final Site Plan shall be submitted to the Planning Department for review and approval consistent with the following:
a. Plans shall be draw in a minimum scale of 1” = 30’.
b. Show locations of all property lines.
c. Show location of all mechanical and electrical equipment on exterior of building or ground-mounted equipment. All exterior and ground-mounted equipment is required to be screened.
d. Locations of mailboxes on the site.
e. Decorative paving at key crossing points on private roads. Include detail of decorative paving material.
f. Show locations of all fire hydrants, catch basins, and gutters.
3.7 Prior to the issuance of building permits, a Final Landscape Construction Plan, prepared by a licensed landscape architect, and signed by the local water purveyor, shall be submitted to the Planning Department for review and approval.
The Final Landscape Construction Plan shall contain the following required information:
a. A title block with sheet number, site address and APNs, date of preparation, and name, address, and phone number of Applicant or Developer on all sheets.
5555
Cathedral Cove Center
September 28, 2022
b. A plant landscape legend, including a specific symbol for each plant species used, size (i.e., caliper, gallon, box, or brown trunk height, and/or quantity) and whether it is deciduous or evergreen.
c. Show use of concrete mow strip between turf and other surfaces. d. Clear indication where landscaping will be used to screen mechanical, electrical, and irrigation equipment.
e. A plant landscape legend, including a specific symbol for each plant species used, size (i.e., caliper, gallon, box, or brown trunk height, and/or quantity) and whether it is deciduous or evergreen.
f. Show all location of mechanical, electrical, and irrigation equipment and landscaping that will screen from public view.
g. A detail showing planter design adjacent to walkways and driveways that is designed to prevent soil and/or decomposed granite from flowing onto walkways and driveways. There shall be a minimum two-inch vertical separation between the pavement and the soil.
h. Plant and tree installation and staking details. Plant and tree installation and staking details that require single trunk trees to be double staked and multi-trunk trees to be staked appropriate to the species of tree. i. Details, specifications, and location of all pavers and decorative surface materials used on the site. Samples of crushed rock material or decomposed granite materials shall be submitted to the Planning Department for approval. j. All decorative surface materials shall be approved by the Director of Planning/Building before issuance of any permits.
k. Landscaping and irrigation shall be provided along the street frontage. l. Landscape plans shall meet the requirements of the City of Cathedral City’s Water Efficient Landscape Ordinance.
m. All plant materials used on the project site shall be those listed in the most recent version of Coachella Valley Water District’s “Lush & Efficient Landscape Gardening in the Coachella Valley”.
n. An Irrigation Plan with equipment details.
3.8 Site landscaping shall comply with the City Design Guidelines and Water Conservation policies and rules regardless of whether the items are illustrated on the Construction Landscape Plans:
a. Plants and trees shall be primarily of drought tolerant species compatible with the desert environment. 5566
Cathedral Cove Center
September 28, 2022
b. At least 50% of the trees shall be evergreen species. c. All trees in parking lots shall be centered between parking spaces to provide optimal shading.
d. All single trunk trees shall be double staked and multi-trunk trees shall be staked appropriate to the species of tree.
e. Arbor guards shall be installed around trees in turf areas. f. Projects located along major arterials and/or streets shall comply with the street tree requirements of the City’s Design Guidelines. g. Planter areas shall be surrounded by a concrete mow strip or other hard surface.
h. All ground-mounted equipment, such as mechanical, electrical, and irrigation equipment (backflow preventers), shall be located within a landscape planter.
This equipment shall not be located within a turf area and shall not be visible from public view.
i. Any drain that terminates in a planter shall have a splash guard. j. All palm trees shall have a brown trunk height of between a minimum of 10 – 20 feet, varied to the satisfaction of City staff.
k. All 36-inch box trees or greater shall be verified as to size by the project planner prior to being planted. It is the responsibility of the contractor and/or Applicant to make an appointment with the project planner to conduct this verification.
3.9 All landscaping shall be continuously maintained. Trees, shrubs, ground covers, etcetera, shall be watered and permanently maintained. All dead vegetation shall be removed and replaced in a timely manner.
3.10 Where landscaping is required for off-street parking areas, or in other vehicular parking areas, concrete curbing and/or bumper blocks shall be required to regulate vehicular traffic and to protect plant materials from vehicles. Such curbing height shall be at least six inches. Curbing of six inches or more shall be required where a public planter slopes toward a sidewalk and said curbing is needed to retain water. Overflow devices which drain under sidewalks may be required to assure that water does not overflow planters. In no event shall the finished grade of the irrigated planter be less than three inches below a public sidewalk and/or curb.
3.11 The Applicant shall contact the Planning Department 90 days after issuance of a Certificate of Occupancy to arrange for a follow-up on-site inspection to ensure 5577 Cathedral Cove Center
September 28, 2022
that all plant material is being maintained consistent with the approved Exhibit “A”.
3.12 Redwood headers are specifically prohibited from use on the project site for landscaping or as a permanent condition for other uses.
3.13 The property owner shall record a maintenance covenant over the property that guarantees the removal of weeds, dust, blowsand, and debris, and ensures that the property is maintained in a weed, dust, blowsand, and debris-free condition per the approved plans and conditions of approval.
3.14 Building and landscaping shall be maintained in a condition that substantially complies with this approval.
3.15 A final fence and wall plan shall be submitted to the Planning Department for review and approval that includes at minimum, the height, color, materials and location of all fences and walls proposed for the project.
3.16 All lighting on site shall comply with Chapter 9.89 of the Municipal Code relative to outdoor lighting including fixtures that direct lighting downward.
3.17 An exterior Lighting Plan, that includes landscape and pedestrian lighting, shall be submitted in compliance with CCMC Section 9.89, including a photometric analysis, for review and approval prior to issuance of a building permit. The Lighting Plan shall also identify the following:
a. The type of fixtures, including height, material, and color. b. That the total height of all freestanding lighting fixtures will not exceed 18 feet. c. That all concrete fixture bases will have a decorative finish. At a minimum, a trowel finish shall be provided.
d. That the bolts connecting the light fixture to the base will be covered.
3.18 Property addresses or building identification signs shall be placed on all new and existing buildings so as to be plainly visible from the public street. Said signs shall be a minimum of 12 inches in height. Numbers shall be either internally or externally illuminated consistent with Municipal Code Section 9.02 and designed to illuminate automatically during periods of darkness.
3.19 All mechanical equipment, either roof or ground mounted, shall be screened from public view. All such equipment shall be fully screened by the roof structure, a parapet wall, appropriate ground mounted walls, berming, or landscaping. All walls shall architecturally match the building. If after construction, but prior to the issuance of a Certificate of Occupancy, it is determined by the Director of Planning/Building that equipment can be viewed from the public right-of-way a plan for screening the equipment shall be submitted to the Planning Department for approval. Once approved, said screening shall be constructed prior to issuance of a Certificate of Occupancy. 5588
Cathedral Cove Center
September 28, 2022
3.20 Outdoor display and storage of merchandise is strictly prohibited, unless approved in compliance with the Cathedral City Municipal Code.
3.21 Signage for the proposed project is not part of this approval and shall require a sign permit, prior to the issuance of a Certificate of Occupancy.
3.22 All signage shall comply with the approved Master Sign Program for the project.
Any deviations from the Program will require an amendment approved by the Planning Commission.
3.23 No loading or unloading shall occur within the public right-of-way, except those activities approved by the Director of Planning/Building or Director of Engineering/Public Works.
3.24 For each parcel that contains a building, a trash enclosure shall be provided.
3.25 Trash enclosures shall be constructed to City standard and have a decorative wall surface and a decorative cap that are consistent with the overall architecture of the project.
3.26 The trash enclosures shall accommodate an organic waste bin in compliance with SB 1383.
3.27 All breaker boxes, fire sprinkler risers, and utility conduits shall be interior to the building or within an enclosure that is in integrated into the building design as approved by the Planning Department.
3.28 All roof drains and downspouts shall be on the interior of the building or within an enclosure that is in integrated into the building design as approved by the Planning Department with decorative drain terminations. Exposed drainpipes are specifically prohibited.
3.29 All drain terminations shall be the Watts Drainage Product RD-940 or a product of equal value.
3.30 Contractor must divert at least 75 percent of all demolition waste to a recycling facility. The reuse of materials is considered an acceptable recycling program but must be documented and approved by the Environmental Conservation Manager
3.31 Prior to the issuance of a Certificate of Occupancy, the applicant shall submit all weight tickets associated with trash and recycling disposal to be approved by the Environmental Conservation Manager.
3.32 If during excavation, grading or construction, artifacts or other archaeological resources are discovered, all work in the immediate area of the find shall be halted and the applicant shall immediately notify the Director of Planning/Building. A qualified archaeologist, meeting the Secretary of the Interior’s professional qualifications standards for archaeology, shall be called to the site by, and at the expense of, the applicant to identify the find and propose mitigation if the resource is culturally significant.
5599
Cathedral Cove Center
September 28, 2022
3.33 The project shall comply with the following Mitigation Measures as identified in the Final Initial Study/Mitigated Negative Declaration for the project:
1. BIO-1: A qualified biologist shall conduct two (2) take avoidance pre-construction burrowing owl surveys onsite. The first shall occur between 14 and 30 days prior to ground disturbance, and the second shall occur within 24 hours of ground disturbance. If burrowing owls are detected, the project proponent shall consult with CDFW to determine what course of action is needed, such as the use of exclusion devices (if applicable) to discourage owls from using burrows that are believed to be in jeopardy of being impacted by implementation of the project.
2. BIO-2: For any grubbing, grading or other site disturbance or tree or vegetation removal occurring during the nesting season between January 15th and August 31st, a qualified biologist shall conduct at least one nesting bird survey, and more if deemed necessary by the consulting biologist, immediately prior to initiation of project-related ground disturbing activities. If nesting birds are present, no work shall be permitted near the nest(s) until the young birds have fledged. While there is no established protocol for nest avoidance, when consulted, the CDFW generally recommends avoidance buffers of about 500 feet for birds-of-prey, and 100 – 300 feet for songbirds. If ground disturbance occurs outside the nesting season, this requirement shall be waived.
3. CUL-1: Earth-moving activities including grading, grubbing, trenching, or excavations at the site shall be monitored by a qualified archaeologist and approved Tribal Monitor(s).
Should cultural materials be discovered, they shall be recorded and evaluated in the field. The monitors shall be prepared to recover artifacts quickly to avoid construction delays but must have the power to temporarily halt or divert construction equipment to allow for controlled archaeological recovery if a substantial cultural deposit is encountered. The Native American Monitor may request that destructive construction halt and the Monitor shall notify a Qualified Archaeologist (Secretary of the Interior’s Standards and Guidelines) to investigate and, if necessary, prepare a mitigation plan for submission to the State Historic Preservation Officer and the Agua Caliente Tribal Historic Preservation Office. If artifacts are discovered, these shall be processed, catalogued, analyzed, and prepared for permanent curation in a repository with permanent retrievable storage that would allow for additional research in 6600 Cathedral Cove Center
September 28, 2022
the future. Archaeological site records shall be prepared to document the cultural remains discovered during monitoring and submitted to the California Historical Resources Information System.
4. GEO-1: Development of the Project shall adhere to the recommendations set forth in the Project specific Geotechnical Engineering Investigation (see Appendix D of this document), including but not limited to removal and recompaction of collapsible or weak soils during the grading phase and completion of additional geotechnical/soil investigations on the southern portion of the site proposed for the future residential development.
5. HAZ-1: Per the Geophysical Anomaly Investigation Report, the existing UST located onsite shall be cleaned, removed, and disposed prior to redevelopment of the subject property.
6. TRA-1: The Project is required to pay the requisite CVAG TUMF fee.
7. TRA-2: Each drive-through occupant shall prepare a vehicle stacking management plan demonstrating appropriate emergency vehicle access and access to handicap parking stalls are retained in the event of overflow vehicle stacking.
8. TRA-3: In order to assure that the intersections of Cathedral Canyon/Dinah Shore and Date Palm/Ramon operate at acceptable levels of service at General Plan build out, the following condition of approval shall be implemented:
The City shall be responsible for monitoring conditions at the intersections of Cathedral Canyon/Dinah Shore and Date Palm/Ramon and providing improvements to those intersections through its Capital Improvement Program, and local, State or federal funding at such time as the improvements are warranted.
3.34 Vehicular access and parking for the existing building at 68783 East Palm Canyon Drive (APN: 687-207-004), adjacent to the project site, shall be maintained at all times including during construction. (Condition added by the Planning Commission on August 3, 2022)
SECTION 4 ENGINEERING / PUBLIC WORKS
6611
Cathedral Cove Center
September 28, 2022
4.1 The Applicant (aka Developer) agrees to defend, indemnify and hold harmless the City of Cathedral City (“City”), its agents, officers and employees from any claim, action or proceeding to attack, set aside, void, or annul the approval of this Planned Unit Development No. 21-001 (PUD), corresponding Tentative Parcel Map No. 37876 (TPM) and corresponding entitlement Site Plans (Plans). The City shall have sole discretion in selecting its defense counsel. The City shall promptly notify the Developer of any claim, action or proceeding and shall cooperate fully in the defense.
4.2 This TPM shall expire two years after the City Council approval date, unless recorded or granted a time extension pursuant to Cathedral City Ordinance 659; Section 3; Paragraph 8.4(A).
4.3 This TPM and any Final Parcel Map recorded there under, shall comply with the requirements and standards of Government Code §§ 66410 through 66499.58 (“the Subdivision Map Act”), and Cathedral City Ordinance No. 629, 659, 691 and 830.
4.4 This TPM shall (and incorporate by reference) comply with all applicable terms, conditions and/or mitigation measures for the following approvals:
A. PUD No. 21-001
B. CUP Nos. 21-006, 21-007, 21-008 & 21-009.
C. Design Review Nos. 21-001, 21-002 & 21-003.
D. Zoning Ordinance Amendment No. 21-001.
E. Cathedral City Downtown Design Guidelines and Zoning Designations.
F. Cathedral City Water Conservation Policies and Rules.
G. Cathedral City Municipal Codes and Ordinances.
H. Project Phasing (TPM Phasing Map attached as reference) as follows:
1) Phase I: Parcels No. 1 through 5 and APN 674-500-038. 2) Phase II - Residential: Parcel 9
3) Phase II - Commercial: Parcels No. 6 through 8.
When cited within these Conditions of Approval, “each phase”, incorporated by reference, represents the Phases cited above in 4.4.A., 4.4.B. and 4.4.C.
In the event of any conflict(s) between approval conditions and/or provisions of these approvals, the Director of Engineering/Public Works and/or Director of Planning/Building shall determine precedence.
4.5 All conditions herein for the TPM shall be met prior to:
A. The Final Parcel Map approval; and/or,
B. Grading Permit issuance; and/or,
C. Encroachment Permit issuance; or,
6622
Cathedral Cove Center
September 28, 2022
D. As specifically modified by item as linked to a Certificate of Occupancy (COO) issuance; and/or,
E. Time limit from the date of issuance of the Grading and/or Encroachment Permit.
4.6 Prior to issuance of any Grading, Encroachment or Building Permit by the City, the Developer shall obtain any necessary clearances and/or permits from the following agencies, if required:
A. City of Cathedral City Fire Marshal.
B. Cathedral City Engineering Department.
C. Cathedral City Planning Department.
D. Cathedral City Building Department.
E. Riverside County Environmental Health Department.
F. Riverside County Flood Control District (RCFCD).
G. Palm Springs Unified School District.
H. Desert Water Agency (DWA).
I. Southern California Edison (SCE).
J. Frontier Communications.
K. Spectrum Cable (TW).
L. California Regional Water Quality Control Board (CRWQCB).
M. State Water Resources Control Board.
N. Sunline Transit Agency (SunLine).
O. South Coast Air Quality Management District – Coachella Valley (SCAQMD).
The Developer is responsible for all the requirements of the permits and/or clearances from the above listed agencies. When the requirements include approval of improvement plans, the Applicant shall furnish proof of such approvals when submitting those improvement plans for City approval.
4.7 If applicable, the Developer shall be responsible for completing all TPM approved Phase I Study recommendations, all City and Riverside County requirements and Riverside County Department of Environmental Health requirements. Proof of compliance shall be submitted to the City before issuance of Building Permits for the CUP.
4.8 Coverage under the State of California Construction General Permit must be obtained by the Applicant, who then shall submit a copy of the California Regional Water Quality Control Board’s (“CRWQCB”) acknowledgement of the Applicant’s Notice of Intent (“NOI”) and Waste Discharge Identification (”WDID”) number to the City prior to the issuance of a Grading, Encroachment or Building permit.
4.9 Prior to construction, during construction and up to TPM acceptance the Applicant shall comply with applicable provisions of the City’s NPDES Stormwater Discharge Permit and Riverside County Ordinance No. 457; the CRWQCB – Colorado River 6633
Cathedral Cove Center
September 28, 2022
Basin Regional Board Order No. R7-2013-0011 and the CRWQCB’s Order No. 2009-009-DWQ, Order No. 2010-0014-DWQ and Order No. 2012-0006-DWQ.
A. For construction activities including clearing, grading or excavation of land that disturbs one (1) acre or more of land, or that disturbs less than one (1) acre of land, but which is a part of a construction project that encompasses more than one (1) acre of land, the Applicant (“Permitee”) shall be required to submit a Storm Water Pollution Protection Plan (“SWPPP”) to the CRWQCB.
B. The Applicant or design professional can obtain the California Stormwater Quality Association SWPPP template at www.cabmphandbooks.com for use in their SWPPP preparation.
C. Prior to the Applicant submitting the SWPPP to the CRWQCB, the Applicant shall submit a copy of the SWPPP to the Director of Engineering/Public Works for review.
D. The Applicant shall deliver a complete copy of the CRWQCB approved SWPPP to the Director of Engineering/Public Works prior to issuance of the Grading Permit for City records.
E. The Applicant shall ensure that the required SWPPP is available for inspection at the project site at all times through and including acceptance of all improvements by the City.
F. The Applicant’s SWPPP shall include provisions for all of the following Best Management Practices (“BMPs”), but not limited to:
1) Temporary Soil Stabilization (erosion control).
2) Temporary Sediment Control.
3) Wind Erosion Control.
4) Track-Out Control.
5) Non-Storm Water Management.
6) Waste Management and Materials Pollution Control.
7) Retention and Infiltration Basins Management.
G. All erosion and sediment control BMPs proposed by the Applicant shall be approved by the Director of Engineering/Public Works.
6644
Cathedral Cove Center
September 28, 2022
H. The SWPPP and BMPs shall remain in effect for the entire duration of Project construction until all improvements are completed and accepted by the City.
4.10 Erosion Control BMPs shall remain in effect for the entire duration of Project construction until all improvements are completed and accepted by the City.
4.11 The Developer shall be responsible for blow sand, debris, trash, rubbish and deleterious material removal in all areas of the TPM’s driveways, parking lots, access aisles, and East Palm Canyon Drive, Van Fleet Street, D Street and frontages. This includes frontage areas at the intersections of East Palm Canyon Drive and Date Palm Drive, East Palm Canyon Drive and Allen Avenue, East Palm Canyon and Van Fleet Street, Van Fleet Street and B Street, Van Fleet Street and C Street, Van Fleet Street and D Street and the D Street cul-de-sac.
Responsibilities include all frontage gutter pans, sidewalks, parkways, right-of-way and all interior areas within walled areas and all areas outside the walled areas of the TPM. This will also include all driveways and drive aisles providing ingress and egress to and from all the TPM’s frontage roadways. The Developer shall include these responsibilities into a City approved routine maintenance schedule of the site for perpetuity and incorporate these into the TPM’s CC&Rs for all Parcels within each phase of the TPM, respectively.
4.12 Approval of this TPM and Plans shall not be construed as approval for any horizontal dimensions implied by any Plans or exhibits unless specifically identified in the following Conditions of Approval.
4.13 The Developer shall reimburse the City, within thirty (30) days of presentment of the invoice, all costs and actual attorney’s fees incurred by the City Attorney to prepare, review, negotiate and/or modify any documents or instruments required by these conditions and/or subsequent modification requests to these Conditions of Approval. This obligation shall be paid in the time noted above without deduction or offset and Developer’s failure to make such payment shall be material breach of the Conditions of Approval.
4.14 The Developer shall reimburse the City, within thirty (30) days of presentment of the invoice, all cost and actual consultant’s fees incurred by the City for engineering, surveying and/or any other technical consultants to review and/or modify any documents or instruments required by these conditions and/or subsequent modification requests. This obligation shall be paid in the time noted above without deduction or offset and Developer’s failure to make such payment shall be material breach of the Conditions of Approval.
4.15 The Developer shall reimburse the City, within thirty (30) days of presentment of the invoice, all actual costs incurred by the City for Engineering, Planning and/or Building Department reviews and/or modify any documents or instruments required by these conditions and/or subsequent modification requests. This obligation shall be paid in the time noted above without deduction or offset and 6655 Cathedral Cove Center
September 28, 2022
Developer’s failure to make such payment shall be material breach of the Conditions of Approval.
PROPERTY RIGHTS AND PRIVATE IMPROVEMENTS
4.16 Prior to issuance of any COO within each phase, the Developer shall acquire or confer easements and other property rights necessary for the construction or proper functioning of the proposed TPM. Conferred rights shall include irrevocable offers to dedicate or grant access easements to the City for emergency services and for maintenance, construction and reconstruction of essential improvements.
4.17 Pursuant to the aforementioned condition, conferred rights shall include approvals from all necessary persons or entities over easements and other property rights necessary for construction and proper functioning of the proposed TPM not limited to access rights over proposed and/or existing private streets that access public streets and open space/drainage facilities of all phases of the development.
Specifically:
A. Phase I
i. On the Final Parcel Map, the Owner of Record shall dedicate an additional 8 to 15 feet of right of way to the City along the East Palm Canyon Drive frontage to assure a half street right of way width of 63 feet. ii. If not already completed, on the Final Parcel Map, the Owner of Record shall dedicate an additional 18 feet of right of way to the City along the Van Fleet Street frontage to assure a half street right of way width of 38 feet.
iii. On the Final Parcel Map, the Owner of Record shall dedicate additional right of way at the TPM’s East Palm Canyon Drive and Van Fleet Street corner to provide for a Corner Cut-Back per Riverside County (RC) Standard No. 805.
iv. On the Final Parcel Map, the Owner of Record shall dedicate additional right of way at the TPM’s East Palm Canyon Drive and Allen Avenue corners to provide for Corner Cut-Backs per Riverside County (RC) Standard No. 805.
v. On the Final Parcel Map, the Owner of Record shall dedicate additional right of way at the TPM’s East Palm Canyon Drive and Date Palm Drive corners to provide for a Corner Cut-Backs per Riverside County (RC) Standard No. 805.
vi. On the Final Parcel Map, the Owner of Record shall dedicate additional right of way for the new 30-foot-wide driveway located approximately 80 6666 Cathedral Cove Center
September 28, 2022
feet east of Parcel 6’s west property line along the TPM’s East Palm Canyon Drive frontage provide for a Corner Cut-Back per Riverside County (RC) Standard No. 805.
vii. The TMP’s CC&Rs for all parcels within Phase I shall incorporate mutual access for emergency access (if required) and pedestrian access to Phase II – Residential; and, mutual access for emergency vehicles, vehicles and pedestrians to Phase II – Retail, subject to the approval of the Director of Engineering/Public Works.
viii. The TMP’s CC&Rs shall incorporate the Maintenance Conditions described in Condition 4.11 for all the parcels in Phase I, subject to the approval of the Director of Engineering/Public Works.
ix. The Developer shall record and the TPM’s CC&Rs shall incorporate the Street Light Covenant described in Condition 4.26 and 4.27 against all the parcels in Phase I.
x. The TPM’s CC&Rs shall incorporate a Mutual Drainage Easement between all parcels in Phase I and Phase II – Retail; and between Phase I and Phase II – Residential for receiving break out stormwater, subject to the approval of the Director of Engineering/Public Works. xi. The Developer shall record and the TPM’s CC&Rs shall incorporate the Water Quality Management Plan and Urban Runoff Best Management Practices Transfer, Access and Maintenance Covenant (as part of the WQMP) described in Condition 4.29.iv. against all the parcels in Phases I. xii. On the Final Parcel Map, the Owner of Record shall dedicate the proposed south extension of the Date Palm Drive/East Palm Canyon intersection for public street and public utility purposes, for a distance of approximately 100 ft south of East Palm Canyon Drive, in an alignment, width and configuration as approved by the Director of Engineering/Public Works. The south extension entrance into the TPM’s Phase I area shall be constructed as generally as shown on Plans, with concrete curb and gutter, sidewalks, curb returns, access ramps, and pavement. The TPM’s CC&Rs shall incorporate the ongoing maintenance and upkeep of the street improvements within the dedicated public portion of the proposed south extension of the Date Palm Drive entrance in a form as approved by Director of Engineering/Public Works.
xiii. On the Final Parcel Map with a certification that a vacation is the intent, the Property Owner of Record shall complete the vacation of a portion of A Street, all of “B” Street and a public alley between. Portions of “A” Street, “B” Street, and a public alley between these streets, were conditionally 6677
Cathedral Cove Center
September 28, 2022
vacated by the City by Vacation Case No. 2015-02, as detailed in City Council Resolution No. 2015-60, adopted on November 16, 2015.
The Developers of the Phase II - Residential and Phase II - Retail shall abandon, relocate, underground, or otherwise clear existing utilities in these streets in conjunction these Phases, respectively, to the satisfaction of their owners, and meet the other conditions of the street and alley vacations as outlined in that Resolution, and a final Resolution of Vacation must be adopted and recorded prior to the issuance of Grading and/or Building Permits on any of the portions of streets or alley to be vacated.
Abandonment, relocation or undergrounding of any utilities in these vacated streets shall occur prior to the first COO issued for either Phase II – Residential or Phase II - Retail, where such vacation is applicable.
TPM’s CC&Rs shall incorporate the ongoing maintenance and upkeep of the street improvements within the non-vacation public portion of “A” Street, east of Van Fleet Street in a form as approved by Director of Engineering/Public Works.
B. Phase II - Residential:
i. If not already completed, on the Final Parcel Map, the Owner of Record shall dedicate an additional 18 feet of right of way to the City along the Van Fleet Street frontage to assure a half street right of way width of 38 feet.
ii. On the Final Parcel Map, the Owner of Record shall dedicate additional right of way at all the TPM’s Van Fleet Street and “D” Street frontage driveways to provide for Corner Cut-Backs per Riverside County (RC) Standard No. 805.
iii. The City will vacate portions of the “D” Street offset cul-de-sac located at the east end of “D” Street as required with the recordation of the Final Parcel Map (FPM) to complete a reduced size cul-de-sac in accordance with a 56-feet right of way size, shape and geometric alignment as generally show on the TTM per Riverside County (RC) Standard No. 800(A) and as final approved by the City Fire Chief and Director of Engineering/Public Works. Vacation and completion of construction of the “D" Street cul-de-sac shall occur prior to the issuance of the first permit and CCO of the Phase II – Residential, respectively.
iv. The TMP’s CC&Rs (or by recorded Covenant) for all parcels within Phase II - Residential shall incorporate mutual access for emergency access (if required) and pedestrian access to Phase I and Phase II – Retail subject to the approval of the Director of Engineering/Public Works. 6688
Cathedral Cove Center
September 28, 2022
v. The TMP’s CC&Rs (or by recorded Covenant) shall incorporate the Maintenance Conditions described in Condition 4.11 for all the parcels in Phase II - Residential, subject to the approval of the Director of Engineering/Public Works.
vi. The Property Owner of Record shall record the Street Light Covenant described in Condition 4.26 and 4.27 against all the parcels in Phase II – Residential and ongoing maintenance shall be incorporated in the Phase II recorded CC&Rs.
vii. The TPM’s CC&Rs shall incorporate a Mutual Drainage Easement (or by recorded covenant) between all parcels in Phase II – Residential and Phase I for receiving break out stormwater, subject to the approval of the Director of Engineering/Public Works.
viii. The Property Owner of Record shall record the Water Quality Management Plan and Urban Runoff Best Management Practices Transfer, Access and Maintenance Covenant (as part of the WQMP) described in Condition 4.29.iv. against all the parcels in Phase II - Residential of the TPM and maintenance shall be incorporated in the Phase II - Residential CC&Rs.
ix. If not already completed, on the Final Parcel Map with a certification that a vacation is the intent, the Property Owner of Record shall complete the vacation of a portion of “A” Street, all of “B” Street and a public alley between. Portions of “A” Street, “B” Street, and a public alley between these streets, were conditionally vacated by the City by Vacation Case No. 2015-02, as detailed in City Council Resolution No. 2015-60, adopted on November 16, 2015.
The Developers of the Phase II - Residential and Phase II - Retail shall abandon, relocate, underground, or otherwise clear existing utilities in these streets in conjunction these Phases, respectively, to the satisfaction of their owners, and meet the other conditions of the street and alley vacations as outlined in that Resolution, and a final Resolution of Vacation must be adopted and recorded prior to the issuance of Grading and/or Building Permits on any of the portions of streets or alley to be vacated.
Abandonment, relocation or undergrounding of any utilities in these vacated streets shall occur prior to the first COO issued for either Phase II – Residential or Phase II - Retail, where such vacation is applicable C. Phase II - Retail
i. On the Final Parcel Map, the Owner of Record shall dedicate an additional 8 to 15 feet of right of way to the City along the East Palm Canyon Drive frontage to assure a half street right of way width of 63 feet. 6699 Cathedral Cove Center
September 28, 2022
ii. On the Final Parcel Map, the Owner of Record shall dedicate an additional 18 feet of right of way to the City along the Van Fleet Street frontage to assure a half street right of way width of 38 feet.
iii. On the Final Parcel Map, the Property Owner of Record shall dedicate a 10-foot access easement on the west side of Parcel 6 for full ingress and egress access to abutting Parcel APN No. 687-207-004. The dedicated 10-foot access and egress easement will be constructed as generally as shown on Plans, with concrete curb, gutter, and pavement and will be included in the Maintenance Covenant described in Condition 4.11. iv. The TPM’s Phase II – Retail recorded CC&Rs shall incorporate a Mutual Trash Enclosure Access Easement to allow the property owner of Parcel APN No. 687-207-004 access to a trash enclosure constructed by the Applicant for the property owner of APN No. 687-207-004 as part of this TPM at the location generally shown on the Plans. The trash enclosure will be located, designed, and constructed per Cathedral City Design Standards at the Developer’s cost and subject to the approval of the Director of Planning/Building.
v. If not already completed, on the Final Parcel Map with a certification that a vacation is the intent, the Property Owner of Record shall complete the vacation of a portion of A Street, all of B Street and a public alley between.
Portions of A Street, B Street, and a public alley between these streets, were conditionally vacated by the City by Vacation Case No. 2015-02, as detailed in City Council Resolution No. 2015-60, adopted on November 16, 2015.
The Developers of the Phase II - Residential and Phase II - Retail shall abandon, relocate, underground, or otherwise clear existing utilities in these streets in conjunction these Phases, respectively, to the satisfaction of their owners, and meet the other conditions of the street and alley vacations as outlined in that Resolution, and a final Resolution of Vacation must be adopted and recorded prior to the issuance of Grading and/or Building Permits on any of the portions of streets or alley to be vacated.
Abandonment, relocation or undergrounding of any utilities in these vacated streets shall occur prior to the first COO issued for either Phase II – Residential or Phase II - Retail, where such vacation is applicable.
The TPM’s CC&Rs shall incorporate the ongoing maintenance and upkeep of the street improvements within the non-vacation public portion of “A” Street, east of Van Fleet Street in a form as approved by Director of Engineering/Public Works.
7700
Cathedral Cove Center
September 28, 2022
vi. The TMP’s CC&Rs for all parcels within Phase II - Retail shall incorporate mutual access for emergency access (if required) and pedestrian access to Phase II – Residential; and mutual access for emergency vehicles, vehicles and pedestrians to Phase I, subject to the approval of the Director of Engineering/Public Works.
vii. The TMP’s CC&Rs shall incorporate the Maintenance Conditions described in Condition 4.11 for all the parcels in Phase II - Retail, subject to the approval of the Director of Engineering/Public Works. viii. The Developer shall record and the TPM’s CC&Rs shall incorporate the Street Light Covenant described in Condition 4.26 and 4.27 against all the parcels in Phase II - Retail.
ix. The TPM’s CC&Rs shall incorporate a Mutual Drainage Easement between all parcels in Phase II – Retail and Phase I, subject to the approval of the Director of Engineering/Public Works.
x. The Developer shall record and the TPM’s CC&Rs shall incorporate the Water Quality Management Plan and Urban Runoff Best Management Practices Transfer, Access and Maintenance Covenant (as part of the WQMP) described in Condition 4.29.iv. against all the parcels in Phase II - Retail.
4.18 The Developer shall retain for private use on this TPM all private street rights-of-way, parking lots, access ways, entry points, and rights-of-way in conformance with the City’s General Plan, Municipal Code, TPM and/or as required by the Director of Engineering/Public Works.
4.19 The Developer shall design the onsite private parking lot and drive aisles pavement sections using Cal Trans’s design procedure for 20-year life pavement, and the site-specific data for soils strength and anticipated traffic loading (including construction traffic). Minimum structural sections shall be as follows:
a. Parking Lot and Drive Aisles:
i. Asphalt (a.c.): Placed in one (1) lift: 3.0” a.c./4.0” class II base. Applicant will provide pavement and base section thicknesses and will be subject to the approval of the Director of Engineering/Public Works. ii. Portland Cement Concrete (PCC): 5.0” PCC w/wire mesh/4.0” class II base. Applicant will provide pavement and base section thicknesses and will be subject to the approval of the Director of Engineering/Public Works. 7711
Cathedral Cove Center
September 28, 2022
b. Apply striping, legends and signage over the entire parking lot and drive aisles.
Final striping, legend and signage layout shall be approved by the Director of Engineering/Public Works.
c. Parking lot lighting shall comply with the lighting, photometric, Building and/or Engineering Site Plans to the satisfaction of the Director of Planning/Building and Director of Engineering/Public Works.
4.20 The Developer shall include on the following frontages:
a. Phase I:
i. East Palm Canyon Drive and Allen Avenue: Construct one (1) approximately 42-foot-wide signalized intersection driveway entrance to comply with ADA standards and to be shown on the Engineering Plans, to the satisfaction of the Director of Engineering.
1) The ingress and egress driveway at Allen Avenue cited above and as shown on the TPM and Plan and as part of these Conditions of Approval, shall provide ingress and egress for the retail development.
2) Any modification to these driveways will require the approval of the Director of Engineering/Public Works.
3) The entry drives, interior circulation routes, setbacks and other features generally shown on the TPM’s Plans, may require additional street widths as determined by the Director of Engineering/Public Works. The City shall determine any such additional requirements during the plan check process prior to the issuance of a Grading Permit for Phase I.
ii. East Palm Canyon Drive and Date Palm Drive: Construct one (1) approximately 60-foot-wide signalized intersection street entrance to comply with ADA standards and to be shown on the Engineering Plans, to the satisfaction of the Director of Engineering.
1) The ingress and egress driveway at Date Palm Drive cited above and as shown on the TPM and Plan and as part of these Conditions of Approval, shall provide ingress and egress for the retail development.
2) Any modification to these driveways will require the approval of the Director of Engineering/Public Works.
7722
Cathedral Cove Center
September 28, 2022
3) The entry drives, interior circulation routes, setbacks and other features generally shown on the TPM’s Plans, may require additional street widths as determined by the Director of Engineering/Public Works. The City shall determine any such additional requirements during the plan check process prior to the issuance of a Grading Permit for Phase I.
B. Phase II - Residential:
i. Driveway and access points located in Phase II – Residential are to be submitted with the Applicant’s application documents for the entitlement for Phase II - Residential.
C. Phase II - Retail:
i. East Palm Canyon Drive approximately 80 feet east of Parcel 6’s west property line as generally shown on the TPM’s Plans: Construct one (1) approximately 30-foot-wide City Standard 200-B driveway entrance to comply with ADA standards and to be shown on the Engineering Plans, to the satisfaction of the Director of Engineering/Public Works. 1) The ingress and egress driveway on East Palm Canyon cited above and as shown on the TPM and Plan and as part of these Conditions of Approval, shall provide ingress and egress for the Phase II - Retail development.
2) Any modification to these driveways will require the approval of the Director of Engineering/Public Works.
3) The entry drives, interior circulation routes, setbacks and other features generally shown on the TPM’s Plans, may require additional street widths as determined by the Director of Engineering/Public Works. The City shall determine any such additional requirements during the plan check process prior to the issuance of a Grading Permit for Phase I.
ii. Van Fleet Street/A Street intersection: Construct one (1) 30-foot-wide Riverside County Standard Driveway Standard No. 207A driveway to comply with ADA standards and to be shown on the Engineering Plans to the satisfaction of the Director of Engineering/Public Works. 1) The ingress and egress driveway on Van Fleet Street cited above and as shown on the TPM and Plan and as part of these Conditions of Approval, shall provide ingress and egress for the retail development.
7733
Cathedral Cove Center
September 28, 2022
2) Any modification to these driveways will require the approval of the Director of Engineering/Public Works.
3) The entry drives, interior circulation routes, setbacks and other features generally shown on the TPM’s Plans, may require additional street widths as determined by the Director of Engineering/Public Works. The City shall determine any such additional requirements during the plan check process prior to the issuance of a Grading Permit for Phase I.
4.21 Curve Radii for curbs at all street intersections and driveways shall not be less than 35 feet. All radii less than 35 feet will require the individual approval of the Director of Engineering/Public Works.
4.22 All commercial driveways shall be RC Commercial Driveway Standard No. 207A or as specifically cited in these Conditions of Approval with final approval by the Director of Engineering/Public Works.
4.23 Install Type A-6, A-8 and/or Type “D” curbs per RC Standards, which will convey water without ponding, and provide lateral containment of dust and residue during street sweeping operations, subject to the approval of the Director of Engineering/Public Works.
4.24 Construct all roadways, parking lots, drive aisles, curbs and gutters, sidewalks and driveways to uniformly connect to existing adjacent public and/or private improvements within and adjacent TPM as shown on the Plans to the satisfaction of the Director of Engineering/Public Works.
4.25 Construct all appurtenant roadway components such as, but not limited to: curb, gutter, sidewalk, ADA ramps, traffic control striping, legends, traffic control signs and street name signs to the satisfaction of the Director of Engineering/Public Works.
4.26 Existing Decorative Street Lights:
a. Phase I:
i. The Developer shall coordinate and pay all cost necessary for the refurbishment, LED retrofit and re-installation of the below detailed City owned street lights; and coordinate with SCE and the City for the Developer (and subsequent assignees to be incorporated in the CC&Rs) to take over the monthly electrical expense for the street lights; and coordinate with the City for the Developer (and subsequent assignees to be incorporated in the CC&Rs) to take over all future related maintenance, refurbishment and replacement costs, prior to the issuance of the first COO. The Developer shall execute a Street Light Covenant covering all 7744 Cathedral Cove Center
September 28, 2022
the above, to be incorporated into the CC&Rs, and be reviewed and approved by the Director of Engineering/Public Works prior to recordation. 1) Remove, refresh with new purple coating, convert to LED, and reinstall the eight (8) existing decorative street lights along the Phase I East Palm Canyon Drive frontage from the eastern boundary of Phase I (east property line of APN 674-500-038) to the west boundary of Phase I, per City Standards, with the final locations subject to approval by the Director of Engineering/Public Works prior to the issuance of the first COO.
B. Phase II – Retail
i. The Developer shall coordinate and pay all cost necessary for the refurbishment, LED retrofit and re-installation of the below detailed City owned street light; and coordinate with SCE and the City for the Developer (and subsequent assignees to be incorporated in the CC&Rs) to take over the monthly electrical expense for the street light; and coordinate with the City for the Developer (and subsequent assignees to be incorporated in the CC&Rs) to take over all future related maintenance, refurbishment and replacement costs, prior to the issuance of the first COO. The Developer shall execute a Street Light Covenant covering all the above, to be incorporated into the CC&Rs, and be reviewed and approved by the Director of Engineering/Public Works prior to recordation. 1) Remove, refresh with new purple coating, convert to LED, and reinstall the one (1) existing decorative street light along the Phase III East Palm Canyon Drive frontage from the eastern boundary of Phase II - Retail to the west boundary of Phase II - Retail, per City Standards, with the final locations subject to approval by the Director of Engineering/Public Works prior to the issuance of the first COO.
4.27 New Standard Street Lights:
a. Phase II - Residential:
i. The Developer shall coordinate and pay all cost necessary for the installation of the below detailed City and Southern California Edison (SCE) approved standard LED street lights with SCE and the Developer (and subsequent assignees to be incorporated in the CC&Rs) to take over all related expenses, including the monthly electrical expense for the street lights installed prior to the issuance of the first COO. The Developer shall execute a Street Light Covenant, to be incorporated into the CC& Rs, and be reviewed and approved by the Director of Engineering/Public Works prior to recordation. 7755
Cathedral Cove Center
September 28, 2022
1. Install three (3) 5,800 lumen shielded LED street lights along the Van Fleet Street frontage of the TPM, per City and SCE Standards, with the final locations subject to approval by the Director of Engineering/Public Works prior to the issuance of the first COO.
2. Install three (3) 5,800 lumen shielded LED street lights along the “D” Street frontage of the TPM, per City and SCE Standards, with the final locations subject to approval by the Director of Engineering/Public Works prior to the issuance of the first COO. b. Phase II- Retail:
i. The Developer shall coordinate and pay all cost necessary for the installation of the below detailed City and Southern California Edison (SCE) approved standard LED street lights with SCE and the Developer (and subsequent assignees to be incorporated in the CC&Rs) to take over all related expenses, including the monthly electrical expense for the street lights installed prior to the issuance of the first COO. The Developer shall execute a Street Light Covenant, to be incorporated into the CC& Rs, and be reviewed and approved by the Director of Engineering/Public Works prior to recordation.
1. Install one (1) 5,800 lumen shielded LED street light along the Van Fleet Street frontage of the TPM, per City and SCE Standards, with the final locations subject to approval by the Director of Engineering/Public Works prior to the issuance of the first COO.
4.28 If applicable, the Developer of each phase shall coordinate and pay all cost necessary for the undergrounding and removal of all, and not limited to, aerial wires, power lines, telephone wires, cable lines, communication equipment, pole under burden and respective poles that are within this TPM, per CC Municipal Code 8.30.050, prior to the issuance of the first COO within each phase to the satisfaction of the Director of Engineering/Public Works.
4.29 The Developer of each phase will design and install on site stormwater drainage facilities for each phase:
i. Within the paved and landscaped areas of each phase of the TPM, the Developer will design facilities to capture all onsite nuisance and stormwater, with breakout facilities, per Cathedral City Municipal Code requirements and other conditions specified herein to the satisfaction of the Director of Engineering/Public Works.
ii. The Developer of Phase I will install facilities during the TPM’s Phase I construction to temporarily either capture and/or pass-through all stormwater 7766 Cathedral Cove Center
September 28, 2022
from the Phase II - Residential Parcels immediately to the south to a stormwater inlet and/or outlet drain on the eastern boundary of Phase I to the satisfaction of the Director of Engineering/Public Works. Phase I will be required to pass receive and/or pass through breakout stormwater from Phase II – Residential.
iii. The Developer of Phase II – Residential will design permanent facilities to capture all required nuisance and 100-year stormwater on the Phase II – Residential parcel(s) and only pass through to Phase I breakout stormwater. iv. The Developer of each phase shall offer for dedication to the City those easements necessary for access to drainage facilities and basins, by separate instrument. The Developer of each phase required to execute a Water Quality Management Plan and Urban Runoff Best Management Practices Transfer, Access and Maintenance Covenant with the City (as part of the WQMP) and incorporate in each phase’s CC&Rs prior to issuance of the Grading Permit.
4.30 Dedications shall include additional widths as necessary for dedicated right and left turn lanes, deceleration and acceleration lanes, bus turnouts and other features that may be contained in the TPM’s Plans.
4.31 When the Director of Engineering/Public Works determines that access rights to the proposed street rights-of-way shown on the TPM’s Plans are necessary prior to the approval of the Final Parcel Map dedicating such rights-of-way, the Developer shall grant the necessary rights-of-way within 60 days of a written request by the City.
4.32 Where public facilities (e.g., sidewalks) are placed on privately owned setbacks, the Applicant shall offer for dedication blanket easements for those purposes by separate instrument prior to the issuance of the first COO.
4.33 The Developer of each phase shall cause all missing property corners and survey monuments within the boundaries of the TPM to be set prior to the issuance of the first COO, in accordance with the Subdivision Map Act and City requirements.
4.34 The Developer of each phase shall furnish proof of easements, or written permission, as appropriate, from those owners of all abutting properties on which, and not limited to, grading, wall construction, retaining wall construction, permanent slopes, street improvements, sidewalks, driveways, utility relocations, other encroachments and other construction activities will occur. i. Further, all abutting properties disturbed by the Developer of each phase, and not limited to, grading, wall construction, retaining wall construction, permanent slopes, street improvements, sidewalks, driveways, utility relocations, other encroachments and other construction activities7777 Cathedral Cove Center
September 28, 2022
performed by the Developer, will be restored to original and/or improved conditions subject to the prior review and approval of the Director of Engineering/Public Works and/or Director of Planning/Building.
4.35 The Developer of each phase shall cause no easement to be granted, or recorded, over any portion of the subject property between the date of approval of the TPM and the date of issuance of the first COO, unless such easement is approved by the Director of Engineering/Public Works.
4.36 The Developer of each phase will coordinate all private roadway improvements and driveway transitions with the adjacent property owners (public and/or private) and coordinate relocation of fire hydrants, water meters and all other appurtenances as required to the satisfaction of the Director of Engineering/Public Works.
4.37 Improvements shall be designed and constructed in accordance with City adopted standards, supplemental drawings and specifications, or as approved by the Director of Engineering/Public Works.
4.38 All improvements will be subject to City requirements for inspection during construction.
4.39 The City will conduct final inspections of structures only when the buildings have improved street and sidewalk access to streets, including ADA access. The improvements shall include required traffic control devices, pavement markings and street name signs.
4.40 The Developer shall be responsible for the vacation and granting of easements that address changes in the existing easements over the proposed TPM that may be affected by proposed improvements. Pursuant this condition, the Developer shall apply to the City for any street vacation request of public right-of-way and/or utility easements. The Developer must provide all applicable exhibits and legal descriptions and perform all necessary abandonments or relocation of easements and/or facilities as required by all affected utility purveyors over the public rights-of-way and/or utility easements, or as approved by the Director of Engineering/Public Works. Typically, the right-of-way vacation process is up to three (3) months.
PUBLIC IMPROVEMENTS
4.41 The Developer of each phase shall pay all costs to engineer, construct, dedicate and complete the following street and traffic signal modification improvements to conform to these Conditions of Approval, the General Plan and the requirements of the TPM’s Traffic Analysis for the Cathedral Cove Center, prepared by Urban Crossroads, dated April 8, 2022:
7788
Cathedral Cove Center
September 28, 2022
Exception: The City shall be responsible for monitoring conditions at the offsite intersections of Cathedral Canyon Drive/Dinah Shore Drive and Date Palm Drive/Ramon Road and providing improvements to those intersections through its Capital Improvement Program and/or local, State or federal funding at such time as the improvements are warranted, thereby mitigating the TMP’s impacts to these intersections.
A. PUBLIC IMPROVEMENTS
i. Phase I:
1. Phase I public improvements for the purposes of these Conditions of Approval, will include the TPM’s north property line frontage along East Palm Canyon Drive abutting Parcel 6’s east property line in Phase II - Retail, east to the eastern boundary of TPM’s APN 674-500-038 and south abutting Parcel 9. Phase I include Parcels I through 5 and APN 674-500-038.
2. All Phase I improvements will be completed by the Developer of Phase I prior to the issuance of the first COO of Phase I.
3. East Palm Canyon Drive – Public roadway as shown on the Plans and per these Conditions of Approval shall include the following:
a. East Palm Canyon Drive is a public roadway and is
designated as an Arterial Highway with a 126 ft. right of way (half street right of way is 63 feet).
b. Street measured at curb to curb shall have a minimum 94 ft. street width. The location of the south curb line shall be a minimum of 47 feet south of the East Palm Canyon Drive
centerline of improvements as generally shown on the
TPM’s Plans.
c. From Parcel 5’ west property line to the Allen Avenue driveway entrance construct and/or replace:
i. A minimum 8 to 16 feet wide sidewalk to provide
smooth transition and connectively west and east in
accordance with ADA and RC Standards 401 or 404
as generally shown on the TPM’s Plans to the
satisfaction of the Director of Engineering/Public
Works.
ii. Non-compliant and/or broken roadway and parkway
components such as, and not limited to: curb, gutter, 7799 Cathedral Cove Center
September 28, 2022
sidewalk, a.c., ADA ramps, traffic control striping,
legends, LED traffic control signs and street name
signs to the satisfaction of the Director of
Engineering/Public Works. The City shall identify all
such areas prior to issuance of the Grading Permit.
d. Fronting Parcel 5 remove:
i. The existing eastbound to southbound deceleration
lane island at East Palm Canyon Drive and Allen
Avenue and remove all landscaping, electrical, storm
drain, traffic signal facilities and all other ancillary accessories. Replace asphalt within this area per
these Conditions of Approval to the satisfaction of the Director of Engineering/Public Works. Removed
facilities that are salvageable and subject to
refurbishment may be relocated if approved prior by
the Director of Engineering/Public Works.
e. From the Allen Avenue driveway entrance east
approximately 430 feet along the frontages of Parcels 4, 3 and 2 construct:
i. New curb, gutter and a.c. as part of street widening to connect to existing curb, gutter and a.c. within and
east of Parcel 2 with a smooth taper transition
designed and constructed as generally shown on the
TPM’s Plans to the satisfaction of the Director of
Engineering/Public Works.
f. From the Allen Avenue driveway entrance to the Date Palm Drive entrance construct and/or replace:
i. A minimum 8 to 16 feet wide sidewalk to provide
smooth transition and connectivity west and east in
accordance with ADA and RC Standards 401 or 404
as generally shown on the TPM’s Plans to the
satisfaction of the Director of Engineering/Public
Works.
ii. Non-compliant and/or broken roadway and parkway
components such as, and not limited to: curb, gutter,
sidewalk, a.c., ADA ramps, traffic control striping,
legends, LED traffic control signs and street name
signs to the satisfaction of the Director of
8800
Cathedral Cove Center
September 28, 2022
Engineering/Public Works. The City shall identify all
such areas prior to issuance of the Grading Permit.
g. From the Date Palm entrance to the east TPM limits
including the east property line of APN 674-500-038
construct/modify and/or repair:
i. Non-compliant and/or broken roadway and parkway
components such as, and not limited to: curb, gutter,
sidewalk, a.c., ADA ramps, traffic control striping,
legends, LED traffic control signs and street name
signs to the satisfaction of the Director of
Engineering/Public Works. The City shall identify all
such areas prior to issuance of the Grading Permit.
h. In all areas where new curb and gutter is constructed as part of street widening and as generally shown on the TPM’s
Plans along the East Palm Canyon Drive frontage:
i. Replace a.c. to a thickness per these Conditions of
Approval to the satisfaction of the Director of
Engineering/Public Works.
ii. Grind and overlay A minimum of 1-inch a.c. to the
centerline of improvements or less as approved by
the Director of Engineering/Public Works to create
and/or maintain a 2% crossfall to the adjacent curb
and gutter and the extent of the grind and overlay
meeting these requirements shall be identified on the
Civil Engineering Street Plans.
i. Along the entire East Palm Canyon Drive frontage of Phase I:
i. Apply Type II REAS (Rubberized Emulsion Aggregate
Slurry) from the gutter pan to the centerline of
improvements to the satisfaction of the Director of
Engineering/Public Works.
ii. Restripe all lanes, crosswalks and turning pockets, including legends as generally shown on the TPM’s
Plans to the satisfaction of the Director of
Engineering/Public Works.
iii. Construct all street, curb and gutter to uniformly connect to existing adjacent improvements east and8811
Cathedral Cove Center
September 28, 2022
west of the TPM to the satisfaction of the Director of
Engineering/Public Works.
iv. East Palm Canyon Drive frontage will be designated
as “No Stopping” with signs posted as approved by
the Director of Engineering/Public Works.
4. East Palm Canyon Drive Intersections:
a. East Palm Canyon Drive/Allen Avenue intersection:
i. Replace, protect in place/refurbish, relocate/refurbish (if meets current standards and approved by the
Director of Engineering/Public Works) and/or install
new, all traffic signal equipment, lighting equipment
and all related appurtenances making the traffic signal fully operational at the East Palm Canyon Drive/Allen
Avenue intersection to make the intersection fully
functional adhering to current CA traffic safety and
ADA standards to the satisfaction of the Director of
Engineering/Public Works.
1. Appurtenances include and are not limited to:
a. ADA audible pedestrian call buttons
b. Controllers
c. Cabinets
d. Poles
e. Mast arms
f. Signal heads
g. Signage
h. Traffic safety lights
i. Signal timing
j. Etc.
ii. Complete all traffic signal engineering, signal retiming and synchronization coordination modifications
necessary for local and regional signal operation.
iii. Replace existing pedestrian call buttons with ADA
audible pedestrian call buttons as approve by the
Director of Engineering/Public Works.
iv. Replace the existing traffic safety lights with LED traffic safety lights as approve by the Director of
Engineering/Public Works. 8822
Cathedral Cove Center
September 28, 2022
v. Restripe east, west, south and north pedestrian
crosswalks and turn pockets to the satisfaction of the
Director of Engineering/Public Works.
vi. Construct and/or reconstruct ADA pedestrian
sidewalk ramps on the south side of the East Palm
Canyon Drive/Allen Avenue intersection to conform to
Cal Trans A-88-A as approved by the Director of
Engineering/Public Works.
b. East Palm Canyon Drive and Date Palm Drive intersection:
i. Replace, protect in place/refurbish, relocate/refurbish (if meets current standards and approved by the
Director of Engineering/Public Works) and/or install
new, all traffic signal equipment, lighting equipment
and all related appurtenances making the traffic signal fully operational at the East Palm Canyon Drive/Date
Palm Drive intersection to make the intersection fully
functional adhering to current CA traffic safety and
ADA standards to the satisfaction of the Director of
Engineering/Public Works.
1. Appurtenances include and are not limited to:
a. ADA audible pedestrian call buttons
b. Controllers
c. Cabinets
d. Poles
e. Mast arms
f. Signal heads
g. Signage
h. Traffic safety lights
i. Signal timing
j. Etc.
ii. Complete all traffic signal engineering, signal retiming and synchronization coordination modifications
necessary for local and regional signal operation.
iii. Replace existing pedestrian call buttons with ADA
audible pedestrian call buttons as approve by the
Director of Engineering/Public Works.
8833
Cathedral Cove Center
September 28, 2022
iv. Replace the existing traffic safety lights with LED traffic safety lights as approve by the Director of
Engineering/Public Works.
v. Install the east pedestrian crosswalk with all related equipment and appurtenances.
vi. Construct a minimum 160-foot left lane turn pocket at the east side of East Palm Canyon Drive intersection
for west bound traffic to turn left/southbound to enter the TPM’s Date Palm Drive entrance.
1. Left turn pocket design and construction will
require the removal, relocation and restoration
of the existing median artwork, signage and
lighting system as approved by the Director of
Engineering/Public Works.
vii. Restripe east, west, south and north pedestrian
crosswalks and turn pockets to the satisfaction of the
Director of Engineering/Public Works.
viii. Construct and/or reconstruct ADA pedestrian
sidewalk ramps on the south side of the East Palm
Canyon Drive/Date Palm Drive intersection to
conform to Cal Trans A-88-A as approved by the
Director of Engineering/Public Works.
ix. Construct Date Palm Drive south of East Palm
Canyon drive to integrate with the proposed private
improvements of the TPM.
5. Date Palm Drive is a public roadway as shown on the Plans and per these Conditions of Approval shall include the following:
a. Date Palm Drive is a public roadway and is designated as an Arterial Highway with a 126 ft. right of way (half street right of way is 63 feet).
b. Street measured at curb to curb shall have a minimum 94 ft. street width.
c. Along the TPM’s Date Palm Drive frontage south of East Palm Canyon Drive reconstruct:
8844