2026-2027: Basin Surveys
Status / Anticipated
Timing
San Ardo Baristo Rd
2027-2028
2026-2027
Peggy Way
2028
Baristo & Avenida Del Padre
Completed
2028-2030
2026-2030
TBD
Medano Avenida Quintana
2026-2027
2027-2028
Tortuga
Completed
2027-2030
2027-2030
Century Park
2028-2030
La Paloma
2026-2027
McCallum & Avenida Del Padre
2028
McCallum / Landau
Cypress Santoro and Cypress
Completed
Completed
Completed
Completed
Completed
2028-2030
Bob Hope / Varner North of I-10
Ongoing
Remove dead plants and irrigation heads, excavate accumulated blowing sand, and replace irrigation lines Add decorative rock to perimeter and install shade trees along walking path Fabricate and install new gates into basin. (2 locations) Add large rock inside basin along slope
Refresh perimeter gravel
Perimeter landscaping: hardscape or excavate soil and install large decorative rock Remove irrigation heads without plants, remove dead plants, regrade basin, and add DG Consider thinning out plant material to reduce maintenance and water costs.
Add decorative gravel to perimeter
Century Park Drive and DaVall
Replace gates
behind Santoro LLD
Ongoing project: continue grading basin washed out from recent storms Repair and paint block wall
Add large rock inside basin along slope
Expand outlet into basin
behind homes off DaVall
corner lot
Ongoing project: continue grading basin washed out from recent storms Refresh decorative gravel along perimeter; large area to cover Nothing to report; maintained under Landau LLD maintenance Add large rock inside basin along slope
RETENTION BASINS
Homeless encampment and illegal dumping
issue; basin consistently appears rough even
after maintenance.
End of each fiscal year if funds remain purchase the material for the new gates.
Replace two gates
Refresh perimeter gravel
Refresh perimeter gravel
behind Cardenas Market
Peggy Way (Landau)
Remove overgrown brush and vegetation
Replace chain-link fence with block wall / install gates Status / Anticipated
Timing
LLD 1 VISTA DEL REY
Area:
LLD 2 La Paloma
Area:
Area:
Completed
Area:
Area:
Area:
Completed
2027-2030
Area:
2027-2030
LLD 5 Tapestry
Area:
Area:
LLD 12: Mercy Housing
Area:
Completed
Area:
2027-2028
Installed perimeter lighting to improve safety and visibility 2026-2027
Research alternatives for shade trees along walking path.
Renovate retention basin with desert landscaping and replace overgrown vegetation with low-maintenance plant material.
Full Corridor Redesign: Develop a comprehensive landscape redesign to address inconsistent plant spacing and coverage; includes plant replacement and upgraded ground cover.
Remove accumulated sand and install DG to stabilize landscape areas.
Replace loose gravel with DG and redistribute materials to slope areas to improve stability, reduce migration, and enhance appearance.
Santoro Corridor
30th (Sawgrass to Santoro) & Santoro (30th to Cypress)
Landau Blvd (30th to McCallum Way)
LLD 15 & 18 Landau (Homes & Manor)
Key Issues: Overgrown vegetation, visibility
concerns, inconsistent landscaping, wall
deterioration. Impacted by windblown sand
accumulation
Key Issues: Turf failure, irrigation damage,
slope instability, low power lines prevent
shade trees along walking path.
Completed
2027-2030
Parking lot between church and Senior Center (A St to C St) Incorporate into full corridor redesign noted above
Install shade trees along walking path to improve pedestrian comfort.
Convert turf to desert landscaping, replace irrigation, install new plant material and trees, install DG, and repair/paint wall to reduce water use and maintenance.
Replace DG with large angular rock in slope areas to prevent erosion and displacement from storm events.
Replace river rock with grey rock to match rest of landscaping.
Entrance off of DaVall
Completed
2027-2030
Remove accumulated sand (approx. 3”), remove dead plant material and damaged irrigation components, repair and repaint block wall, and install decomposed granite (DG) to stabilize surfaces and improve appearance.
Remove accumulated sand, bury exposed irrigation lines, and repair perimeter wall to prevent future exposure and damage.
DaVall Corridor: Remove accumulated sand (approx. 3”), remove dead plants and damaged irrigation, install decorative rock, and repair and repaint wall to restore landscape function and appearance.
La Paloma Sign – 30th & DaVall: Remove sand and irrigation, install decorative rock, artificial plant material, and lighting to create a low-maintenance, enhanced entry feature.
Key Issues: Impacted by windblown sand
accumulation.
Key Issues: Storm events and windblown
sand contributing to soil compaction and
landscape degradation. Existing Palo Verde
trees are causing maintenance challenges
and negatively impacting adjacent
properties.
DaVall from 30th to dead end
Completed
La Paloma Corner Sign 30th & DaVall
30th Ave & DaVall Drive
30th Ave. from San Eljay to Alexander Dr.
LIGHTING AND LANDSCAPING DISTRICTS
Evaluate installation of stamped colored concrete similar to Patriot Park perimeter to enhance durability and visual appeal.
Continue installation of stabilizing rock and DG/decorative gravel along slopes and perimeter wall to reduce erosion.
Entrance Improvements: Refresh decorative rock at entry signage and secure lighting to reduce vandalism and improve reliability.
Continue installation of large rock and DG/decorative gravel along slope and perimeter wall to stabilize slope.
Installed large angular rock, new plants and uplighting to illuminate community sign.
Explore partnership with JWMS/TRIBE and SCRAP Gallery to incorporate artistic elements along the corridor to enhance visual character and community identity.
Replace plant material as needed and install decorative ground cover to improve durability. 30th Ave: Correct slope and drainage issues around trees, install stabilizing rock and DG, repair wall. 30th from DaVall to End of Development, Including Entrance 30th & DaVall Perimeter (curb sidewalk)
Completed
Repair and repaint wall; evaluate design enhancements to improve aesthetics in a challenging area.
Install additional shade trees to enhance usability and reduce heat impacts.
Installed 4 Community Monuments at each entrance.
Add plant material and/or colored gravel to improve visual interest along corridor. 30th Corridor: Remove overgrown vegetation near monument signage, install new plant material, and add DG or decorative rock to improve visibility and aesthetics.
Repair and repaint perimeter wall from Sawgrass to Santoro to address visible deterioration.
LLD 19 Alicante
Area:
LLD 20 Cimarron
Area:
Completed
2028
LLD 21 Santoro Estates
Area:
Completed
2026-2027
LLD 16 Century Perimeter
Area:
Completed
Completed
Completed
Completed
2028-2030
Key Issues: Turf misuse (students), irrigation-related wall damage, aging infrastructure.
Completed
Repair and repaint additional wall segments as needed.
McCallum Way & San Eljay Dr
Repair and repaint wall along San Eljay to address irrigation-related damage.
Replace Alicante monument sign and enhance with decorative rock, artificial plants, and lighting. 30th Ave& Santoro (NE Quadrant)
Santoro Dr & Tortuga (SE Corner)
30th Ave (N), DaVall Dr (E), McCallum Way (S), Santoro (W) 2026-2027
Key Issue: Overgrown vegetation and
inconsistent landscaping.
Key Issues: Wall deterioration, inconsistent
plant coverage, irrigation challenges.
Impacted by windblown sand accumulation
Remove failing plant material and irrigation, and transition to decorative rock, boulders, and DG to create a low-maintenance landscape.
Refresh DG and add colored gravel at key intersections to enhance visual appeal.
Repair deteriorating wall sections and reestablish landscaping in phases.
Thin plant material, add DG or colored gravel, and evaluate wall-adjacent plant removal to identify underlying issues.
Address overgrown or missing plant material and improve sight visibility through selective thinning and replanting.
Remove failing plant material, repair irrigation, install new plants and shade trees, repair/paint wall, and install DG to restore corridor. 30th Corridor: Remove vegetation, clear sand buildup, repair irrigation and wall to address heavy deterioration.
Refresh ground cover (DG) across corridor as part of long-term maintenance cycle.
Remove overgrown vegetation and damaged irrigation components.
Replenish large angular rock and refresh DG/decorative gravel along perimeter to maintain stability and appearance.
Remove turf and convert to desert landscaping (rock and DG only) to reduce misuse and maintenance.
Key Issue: Harsh sun exposure limiting plant
viability.
Status /
Anticipated
Timing
Dinah Shore
Project Completed
Dinah Shore
Patriot Park
Area
Area
Area
Project 2026-2028
Public Works Yard 68385 Kieley Rd
Project Completed
Project 2026-2027
Dinah Shore Bridge Bridge
Project Completed
Project TBD
Corta / Vega Veterans Village
landscaping vacant parcel Project Completed
Vista Chino Carmela & by Starbucks
Project TBD
Project 2028-2030
Sungate Parkway off EPC and Sungate
Area along mountain Project
TBD
Projects
Completed
Projects Completed
Projects
Completed
Projects
Completed
Expanded larger rock up the slope, installed plants in open space, and added red DG.
Install six center boulders with flat tops for seating, three large boulders at entrance, and colored gravel (possibly two colors) throughout the area.
Consider relocating the soldier monument to this corner and creating a walking path.
Removed dead plants and irrigation heads; installed shade trees along walkway and added DG.
Repair irrigation, palm lighting, planting, rock and d/g.
Renovate perimeter using drought-tolerant plants to create a demonstration area. Fence install complete; landscape renovation pending fence painting Removed dead plants and trees (per Edison requirements).
Corner of Dinah Shore and Date Palm (Patriot Park monument location) Removed turf and installed decorative rock.
Potential public art project.
PARKWAYS & MISC
Perimeter desert landscaping
2027-2030
Removed dead plants and irrigation heads; refreshed DG and rock.
Dinah Shore from Date Palm to high school property
Install traffic bollards in open space or circular bollards.
Install shade trees along walking path.
Removed dead plants and irrigation heads along street section; installed DG.
Added shade trees along walkway.
Installed new landscaping along slope area near bridge (City Council approved).
Removed dead plants and irrigation heads.
Vaquero
Projects
No irrigation/electrical. Blowing
sand negatively impacts area. Repair wall (paint).
Notes: Area is very dark at night,
kids use pathway to get to/from
school, adults use pathway for
fitness
Installed additional rock and red DG
Renovate entire area; add more color, lighting, and larger decorative rock along slopes.
Add solar uplighting to palm trees.
Shifting Sands
Removed turf, installed border and desert landscaping, and replaced irrigation to eliminate overspray onto palm trunks.
Replenished rock and installed red DG.
Date Palm from Dinah Shore to Library property line (outlet/basin).
Removed turf, installed border and desert landscaping, and replaced irrigation to eliminate overspray onto palm trunks.
Installed larger rock along slope to reduce sand on sidewalk.
Paint bridge to cover previous graffiti and patchwork areas.
Program Summary (2016–2025): Over 1,000 irrigation heads removed across all medians; dead plant material removed and replaced; damaged curbs repaired; and sight visibility hazards addressed. 2026-2027: Check all median signs and bot dots and replace where needed. Art pedestal lighting and inventory.
Status /
Anticipated
Timing
Date Palm
Date Palm East Palm Canyon to Gerald Ford
Completed
2028
2027
Date Palm Gerald Ford to Dinah Shore
Completed
2027-2030
Date Palm Dinah Shore to Dave Kelley Ortega
Issue: No irrigation or electrical Completed
Date Palm Dave Kelley Ortega to Ramon Rd
Date Palm Ramon Rd to Baristo
2027
Date Palm Baristo to McCallum Way
2027
Date Palm McCallum Way to Vista Chino
Remove large boulders placed after storm events and relocate to more appropriate locations (e.g., retention basin).
Vista Chino Date Palm Drive
No Electrical or Irrigation 2027-2030
Quintana Island Vista Chino and Avenida Quintana
Verona Island Avenida Quintana & Verona (Rio Vista Elementary) Refresh median with decorative rock; maintain simple, low-maintenance design.
Ramon Rd Landau to DaVall
Completed
2028
DaVall DaVall at Ramon Rd (Rancho Mirage)
Dinah Shore Bridge to Plumley
Completed
2027-2028
East Palm Canyon Officer Jermaine Gibson (Ford) to Date Palm Issue: Solar lighting vandalism. Completed
Issue: Irrigation controller tied to
adjacent gas station.
Remove oversized rocks, restore soil around palm trees, repair lighting, and install decomposed granite (DG) to stabilize and improve appearance. Completed Completed
Post Office: Conduct arborist assessment of palm trees, install a new palm at median tip, repair curbs, replace signage, and install decorative rock to match corridor improvements.
Evaluate feasibility of relocating irrigation controller away from gas station for improved control and reliability.
Re-stain brick between Victoria and Dinah Shore to improve corridor aesthetics.
Upgrade landscaping with larger decorative rock to reduce maintenance and address concerns regarding lack of color; evaluate use of artificial desert plant accents.
Re-stain brick surfaces to improve appearance.
Refresh decorative rock to maintain consistency and durability.
Applebee’s: Replace stressed plant material with more resilient options, enhance rock coverage with added color, and incorporate low-maintenance (artificial) plant accents to improve appearance.
Carl’s Jr.: Replace existing rock with updated decorative material and install accent plant features to improve visual consistency.
Retain palm trees, remove failing plant material, and improve soil conditions around palms. Replace remaining areas with light-colored decorative rock better suited for wind conditions.
MEDIANS
Issue: No irrigation or electrical.
Issue: Located within school crosswalk.
Issue: Median tip regularly damaged by
large turning vehicles.
Refresh DG and decorative rock to maintain appearance.
Repair curbs and brickwork; refresh ground cover
Note: No landscaping maintained within this median per agreement.
Explore public art opportunity in partnership with SCRAP, Elementary School, and Arts Commission.
Remove irrigation and plant material near new fence; install larger decorative rock to reduce maintenance.
Refresh DG and rock as part of long-term maintenance cycle.
Enhance median around palm trees with lighting upgrades and added color elements to improve visibility and aesthetics. 2027-2030
2027-2030
Adelina Median
Refresh DG and decorative rock to maintain appearance.
Reinstall recycled glass material and evaluate durability improvements for high-impact area. 2027 Issues: Poor soil conditions, storm
impacts, exposed utilities, plant
failure.
Refresh DG to maintain uniform ground cover and appearance.
Refresh DG to maintain consistency along corridor.
Install red decorative rock (consistent with Patriot Park), repair curbs, replace signage, and re-stain brick.
East Palm Canyon Date Palm to Allen
Completed
2027
East Palm Canyon Allen to Auto Park
Issue: No irrigation or electrical. 2028
Bob Hope Bob Hope and Varner
Issue: No irrigation or electrical. 2028
Cove Cathedral Canyon and Terrace
Issue: Narrow median with limited
design flexibility. 2027-2030
Perform minor ground cover refresh while continuing to monitor palm trees impacted by adjacent project.
Re-stain brick to improve appearance.
Re-stain brick to improve appearance.
Implement low-maintenance beautification improvements appropriate for constrained space.
Full ground cover refresh (DG and rock) as part of long-term maintenance.