EAST PALM CANYON DRIVE WIDENING, MASTER UNDERGROUND PROJECT (M.U.P.),
AND TRAFFIC SIGNAL AT CREE ROAD
CITY PROJECT NO. 8874, BID NO: B23-52E
BID TAB
CITY PROJECT No.:C08874
DATE: 10/22/2026
1 MOBILIZATION LS 1 45,000.00 $ 45,000.00 $ 75,000.00 $ 75,000.00 $ 132,346.00 $ 132,346.00 $ 225,000.00 $ 225,000.00 $ 2 TRAFFIC CONTROL LS 1 25,000.00 $ 25,000.00 $ 300,000.00 $ 300,000.00 $ 100,000.00 $ 100,000.00 $ 75,000.00 $ 75,000.00 $ 3 STORM WATER PROTECTION PLAN LS 1 3,000.00 $ 3,000.00 $ 20,000.00 $ 20,000.00 $ 5,000.00 $ 5,000.00 $ 2,400.00 $ 2,400.00 $ 4 CONSTRUCTION SURVEY LS 1 3,000.00 $ 3,000.00 $ 40,000.00 $ 40,000.00 $ 60,000.00 $ 60,000.00 $ 12,000.00 $ 12,000.00 $ 5 CLEARING AND GRUBBING LS 1 2,500.00 $ 2,500.00 $ 111,675.00 $ 111,675.00 $ 75,000.00 $ 75,000.00 $ 30,000.00 $ 30,000.00 $ 6 REMOVE & DISPOSE EXISTING CONC. SIDEWALK, CURB & GUTTER & OTHER MISCELLANEOUS CONCRETE CY 117 110.00 $ 12,870.00 $ 350.00 $ 40,950.00 $ 280.00 $ 32,760.00 $ 240.00 $ 28,080.00 $ 7 EXCAVATION, REMOVE & DISPOSE EXISTING ASPHALT & BASE CY 1771 110.00 $ 194,810.00 $ 95.00 $ 168,245.00 $ 100.00 $ 177,100.00 $ 100.00 $ 177,100.00 $ 8 REMOVE AND CONSTRUCT CURB RAMPS PER CALTRANS STD PLANS EA 7 13,000.00 $ 91,000.00 $ 6,500.00 $ 45,500.00 $ 8,000.00 $ 56,000.00 $ 8,500.00 $ 59,500.00 $ 9 REMOVE & RELOCATE EXISTING FIRE HYDRANT EA 2 10,000.00 $ 20,000.00 $ 5,000.00 $ 10,000.00 $ 6,100.00 $ 12,200.00 $ 16,500.00 $ 33,000.00 $ 10 REMOVE & RELOCATE EXISTING WATER METER EA 4 8,000.00 $ 32,000.00 $ 4,000.00 $ 16,000.00 $ 5,500.00 $ 22,000.00 $ 5,000.00 $ 20,000.00 $ 11 REMOVE & RELOCATE EXISTING BACK FLOW PREVENTER EA 4 5,600.00 $ 22,400.00 $ 5,000.00 $ 20,000.00 $ 7,000.00 $ 28,000.00 $ 6,200.00 $ 24,800.00 $ 12 INSTALL FIRE HYDRANT ASSEMBLY PER EMWD STD. B-517 EA 1 8,000.00 $ 8,000.00 $ 15,000.00 $ 15,000.00 $ 23,000.00 $ 23,000.00 $ 35,000.00 $ 35,000.00 $ 13 REMOVE & INSTALL NEW DETECTOR CHECK EA 2 15,000.00 $ 30,000.00 $ 5,000.00 $ 10,000.00 $ 50,000.00 $ 100,000.00 $ 22,000.00 $ 44,000.00 $ 14 REMOVE & RELOCATE EXISTING TRAFFIC SIGN EA 9 200.00 $ 1,800.00 $ 400.00 $ 3,600.00 $ 500.00 $ 4,500.00 $ 1,000.00 $ 9,000.00 $ 15 SAWCUT EXISTING PAVEMENT/CONCRETE LF 2460 4.00 $ 9,840.00 $ 2.00 $ 4,920.00 $ 6.00 $ 14,760.00 $ 6.00 $ 14,760.00 $ 16 REMOVE & DISPOSE OF EXISTING TREE EA 15 2,300.00 $ 34,500.00 $ 1,800.00 $ 27,000.00 $ 2,000.00 $ 30,000.00 $ 1,500.00 $ 22,500.00 $ 17 ADJUST TO GRADE EXISTING WATER VALVE COVER EA 9 1,500.00 $ 13,500.00 $ 1,700.00 $ 15,300.00 $ 2,500.00 $ 22,500.00 $ 1,200.00 $ 10,800.00 $ 18 ADJUST TO GRADE EXISTING UTILITY VAULT EA 1 2,000.00 $ 2,000.00 $ 7,000.00 $ 7,000.00 $ 6,000.00 $ 6,000.00 $ 4,000.00 $ 4,000.00 $ 19 ASPHALT PAVEMENT TON 1817 140.00 $ 254,380.00 $ 135.00 $ 245,295.00 $ 132.00 $ 239,844.00 $ 204.00 $ 370,668.00 $ 20 CLASS 2 BASE TON 1596 45.00 $ 71,820.00 $ 45.00 $ 71,820.00 $ 44.00 $ 70,224.00 $ 80.00 $ 127,680.00 $ 21 CONSTRUCT SIDEWALK PER CO. OF RIV. STD. 401 (MODIFIED) SF 9090 20.00 $ 181,800.00 $ 12.00 $ 109,080.00 $ 14.00 $ 127,260.00 $ 13.00 $ 118,170.00 $ 22 CONST. TYPE "A-8" CURB & GUTTER PER CO. OF RIV. STD. 201 (MODIFIED) LF 1110 40.00 $ 44,400.00 $ 70.00 $ 77,700.00 $ 70.00 $ 77,700.00 $ 70.00 $ 77,700.00 $ 23 CONSTRUCT TYPE "D" CURB PER CO. OF RIV. STD. 204 (MODIFIED) LF 1589 20.00 $ 31,780.00 $ 35.00 $ 55,615.00 $ 45.00 $ 71,505.00 $ 47.00 $ 74,683.00 $ 24 CONSTRUCT COMMERCIAL DRIVEWAY PER CO. OF RIV. STD. 207A (MODIFIED) EA 4 13,000.00 $ 52,000.00 $ 7,500.00 $ 30,000.00 $ 7,700.00 $ 30,800.00 $ 12,000.00 $ 48,000.00 $ 25 CONST. CROSS GUTTER & SPANDREL PER CO. OF RIV. STD. 209 (MODIFIED) EA 2 5,000.00 $ 10,000.00 $ 8,500.00 $ 17,000.00 $ 12,000.00 $ 24,000.00 $ 18,000.00 $ 36,000.00 $ 26 INSTALL 4" PVC PIPE UNDER SIDEWALK THRU CURB LF 92 15.00 $ 1,380.00 $ 135.00 $ 12,420.00 $ 40.00 $ 3,680.00 $ 70.00 $ 6,440.00 $ 27 INSTALL ARIZONA RIVER ROCK COBBLE RIP-RAP 2" TO 4" CY 0.5 200.00 $ 100.00 $ 9,000.00 $ 4,500.00 $ 4,000.00 $ 2,000.00 $ 8,400.00 $ 4,200.00 $ 28 COLD PLANE 0.2' TO 0.4' VARABLE WIDTH ASPHALT SF 2566 4.00 $ 10,264.00 $ 5.00 $ 12,830.00 $ 3.50 $ 8,981.00 $ 6.00 $ 15,396.00 $ 29 SIGNALIZATION OF INTERSECTION LS 1 400,000.00 $ 400,000.00 $ 500,000.00 $ 500,000.00 $ 618,000.00 $ 618,000.00 $ 750,000.00 $ 750,000.00 $ 30 SIGNAL INTERCONNECTION PLAN LS 1 60,000.00 $ 60,000.00 $ 50,000.00 $ 50,000.00 $ 77,000.00 $ 77,000.00 $ 85,000.00 $ 85,000.00 $ 31 SIGNING AND STRIPING LS 1 40,000.00 $ 40,000.00 $ 50,000.00 $ 50,000.00 $ 52,500.00 $ 52,500.00 $ 63,000.00 $ 63,000.00 $ 32 CONSTRUCT MONOLITHIC CURB WALL (MODIFIED) LF 230 80.00 $ 18,400.00 $ 285.00 $ 65,550.00 $ 150.00 $ 34,500.00 $ 105.00 $ 24,150.00 $ 33 ADJUST TO GRADE EXISTING TELECOM VAULT EA 1 2,000.00 $ 2,000.00 $ 7,000.00 $ 7,000.00 $ 4,000.00 $ 4,000.00 $ 7,500.00 $ 7,500.00 $ 34 ADJUST TO GRADE EXISTING TELECOM RISER EA 1 1,500.00 $ 1,500.00 $ 5,000.00 $ 5,000.00 $ 1,200.00 $ 1,200.00 $ 5,000.00 $ 5,000.00 $ 35 REMOVE AND RELOCATE EXISTING TELECOM RISER EA 2 1,500.00 $ 3,000.00 $ 8,000.00 $ 16,000.00 $ 2,100.00 $ 4,200.00 $ 7,500.00 $ 15,000.00 $ $ 2,260,000.00 1,734,044.00 $ 2,348,560.00 $ 2,655,527.00 $ HARDY & HARPER, Inc.
TOTAL
SUB-TOTAL BID ITEMS
ITEM DESCRIPTION UNIT QUANTITY UNIT COST
ENGINEER'S ESTIMATE
UNIT COST
BASE BID SCHEDULE
GRANITE CONSTRUCTION
COMPANY
CALPROMAX ENGINEERING,
INC.
TOTAL UNIT COST TOTAL UNIT COST TOTAL
EAST PALM CANYON DRIVE WIDENING, MASTER UNDERGROUND PROJECT (M.U.P.),
AND TRAFFIC SIGNAL AT CREE ROAD
CITY PROJECT NO. 8874, BID NO: B23-52E
BID TAB
CITY PROJECT No.:C08874
DATE: 10/22/2026
1B STRUCTURE EXCAVATION CY 4 200.00 $ 800.00 $ 1,600.00 $ 6,400.00 $ 250.00 $ 1,000.00 $ 600.00 $ 2,400.00 $ 2B BAR REINFORCING STEEL LS 1 2,500.00 $ 2,500.00 $ 10,000.00 $ 10,000.00 $ 7,200.00 $ 7,200.00 $ 5,000.00 $ 5,000.00 $ 3B STRUCTURAL CONCRETE CY 8 500.00 $ 4,000.00 $ 3,000.00 $ 24,000.00 $ 1,700.00 $ 13,600.00 $ 1,000.00 $ 8,000.00 $ 4B CONCRETE FINISHING LS 1 1,500.00 $ 1,500.00 $ 15,000.00 $ 15,000.00 $ 900.00 $ 900.00 $ 2,400.00 $ 2,400.00 $ 5B TRENCH 24” DEEP AND BACKFILL LF 250 40.00 $ 10,000.00 $ 425.00 $ 106,250.00 $ 16.00 $ 4,000.00 $ 80.00 $ 20,000.00 $ 6B FURNISH AND INSTALL (1) 4” SCH 40 PVC CONDUIT LF 250 25.00 $ 6,250.00 $ 125.00 $ 31,250.00 $ 22.00 $ 5,500.00 $ 30.00 $ 7,500.00 $ 7B
FURNISH AND INSERT (3) 1” SCH 80 CONDUITS WITHIN 4” SLEEVE LF 750 8.00 $ 6,000.00 $ 30.00 $ 22,500.00 $ 3.00 $ 2,250.00 $ 20.00 $ 15,000.00 $ 8B INSTALL PULL BOX, OLD CASTLE B16 OR APPROVED EQUAL EA 2 1,200.00 $ 2,400.00 $ 8,000.00 $ 16,000.00 $ 1,620.00 $ 3,240.00 $ 3,600.00 $ 7,200.00 $ 9B ELECTRICAL LIGHTING FIXTURES LS 1 1,000.00 $ 1,000.00 $ 18,600.00 $ 18,600.00 $ 6,150.00 $ 6,150.00 $ 3,600.00 $ 3,600.00 $ $ 250,000.00 34,450.00 $ 43,840.00 $ 71,100.00 $
1C FABRICATION LS 1 60,000.00 $ 60,000.00 $ 20,000.00 $ 20,000.00 $ 66,500.00 $ 66,500.00 $ 18,000.00 $ 18,000.00 $ 2C DELIVERY LS 1 2,000.00 $ 2,000.00 $ 20,000.00 $ 20,000.00 $ 5,000.00 $ 5,000.00 $ 6,000.00 $ 6,000.00 $ 3C INSTALLATION LS 1 5,000.00 $ 5,000.00 $ 20,000.00 $ 20,000.00 $ 15,000.00 $ 15,000.00 $ 12,000.00 $ 12,000.00 $ $ 60,000.00 67,000.00 $ 86,500.00 $ 36,000.00 $
$ 310,000.00 101,450.00 $ 130,340.00 $ 107,100.00 $
1D VAULTS EA 2 51,000.00 $ 102,000.00 $ 38,965.00 $ 77,930.00 $ 68,000.00 $ 136,000.00 $ 72,000.00 $ 144,000.00 $ 2D CONDUIT: 2-INCH EA 52 25.00 $ 1,300.00 $ 30.00 $ 1,560.00 $ 53.00 $ 2,756.00 $ 49.00 $ 2,548.00 $ 3D CONDUIT: 3-INCH EA 36 25.00 $ 900.00 $ 35.00 $ 1,260.00 $ 55.00 $ 1,980.00 $ 52.00 $ 1,872.00 $ 4D CONDUIT: 4-INCH EA 20 25.00 $ 500.00 $ 40.00 $ 800.00 $ 56.00 $ 1,120.00 $ 55.00 $ 1,100.00 $ 5D CONDUIT: 5-INCH EA 8427 44.00 $ 370,788.00 $ 50.00 $ 421,350.00 $ 60.00 $ 505,620.00 $ 45.00 $ 379,215.00 $ 6D CONDUIT: 6-INCH EA 2642 50.00 $ 132,100.00 $ 50.00 $ 132,100.00 $ 67.00 $ 177,014.00 $ 52.00 $ 137,384.00 $ 7D PULL BOXES EA 2 4,000.00 $ 8,000.00 $ 7,500.00 $ 15,000.00 $ 13,000.00 $ 26,000.00 $ 6,000.00 $ 12,000.00 $ $ 650,000.00 615,588.00 $ 850,490.00 $ 678,119.00 $
$ 3,220,000.00 2,451,082.00 $ 3,329,390.00 $ a 3,440,746.00 $
UNIT QUANTITY UNIT COST TOTAL
BID SCHEDULE B - MOUNTAIN CATHEDRALS ENTRYWAY MONUMENT CONCRETE FOUNDATION
SUB-TOTAL BID ITEMS
ITEM DESCRIPTION
ENGINEER'S ESTIMATE HARDY & HARPER, Inc.
GRANITE CONSTRUCTION
COMPANY
CALPROMAX ENGINEERING,
INC.
UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL
ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL UNIT COST TOTAL UNIT COST ENGINEER'S ESTIMATE HARDY & HARPER, Inc.
GRANITE CONSTRUCTION
COMPANY
CALPROMAX ENGINEERING,
INC.
TOTAL UNIT COST TOTAL
SUB-TOTAL BID ITEMS
BID SCHEDULE D - SOUTHERN CALIFORNIA EDISON (SCE) UNDERGROUND STRUCTURESBID SCHEDULE C - MOUNTAIN CATHEDRALS FABRICATION AND INSTALLATION ENGINEER'S ESTIMATE HARDY & HARPER, Inc.
GRANITE CONSTRUCTION
COMPANY
CALPROMAX ENGINEERING,
INC.
SUB-TOTAL BID ITEMS
GRAND TOTAL
ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL EAST PALM CANYON DRIVE WIDENING, MASTER UNDERGROUND PROJECT (M.U.P.),
AND TRAFFIC SIGNAL AT CREE ROAD
CITY PROJECT NO. 8874, BID NO: B23-52E
BID TAB
CITY PROJECT No.:C08874
DATE: 10/22/2026
1 MOBILIZATION LS 1 45,000.00 $ 45,000.00 $ 2 TRAFFIC CONTROL LS 1 25,000.00 $ 25,000.00 $ 3 STORM WATER PROTECTION PLAN LS 1 3,000.00 $ 3,000.00 $ 4 CONSTRUCTION SURVEY LS 1 3,000.00 $ 3,000.00 $ 5 CLEARING AND GRUBBING LS 1 2,500.00 $ 2,500.00 $ 6 REMOVE & DISPOSE EXISTING CONC. SIDEWALK, CURB & GUTTER & OTHER MISCELLANEOUS CONCRETE CY 117 110.00 $ 12,870.00 $ 7 EXCAVATION, REMOVE & DISPOSE EXISTING ASPHALT & BASE CY 1771 110.00 $ 194,810.00 $ 8 REMOVE AND CONSTRUCT CURB RAMPS PER CALTRANS STD PLANS EA 7 13,000.00 $ 91,000.00 $ 9 REMOVE & RELOCATE EXISTING FIRE HYDRANT EA 2 10,000.00 $ 20,000.00 $ 10 REMOVE & RELOCATE EXISTING WATER METER EA 4 8,000.00 $ 32,000.00 $ 11 REMOVE & RELOCATE EXISTING BACK FLOW PREVENTER EA 4 5,600.00 $ 22,400.00 $ 12 INSTALL FIRE HYDRANT ASSEMBLY PER EMWD STD. B-517 EA 1 8,000.00 $ 8,000.00 $ 13 REMOVE & INSTALL NEW DETECTOR CHECK EA 2 15,000.00 $ 30,000.00 $ 14 REMOVE & RELOCATE EXISTING TRAFFIC SIGN EA 9 200.00 $ 1,800.00 $ 15 SAWCUT EXISTING PAVEMENT/CONCRETE LF 2460 4.00 $ 9,840.00 $ 16 REMOVE & DISPOSE OF EXISTING TREE EA 15 2,300.00 $ 34,500.00 $ 17 ADJUST TO GRADE EXISTING WATER VALVE COVER EA 9 1,500.00 $ 13,500.00 $ 18 ADJUST TO GRADE EXISTING UTILITY VAULT EA 1 2,000.00 $ 2,000.00 $ 19 ASPHALT PAVEMENT TON 1817 140.00 $ 254,380.00 $
20 CLASS 2 BASE TON 1596 45.00 $ 71,820.00 $ 21
CONSTRUCT SIDEWALK PER CO. OF RIV. STD. 401 (MODIFIED) SF 9090 20.00 $ 181,800.00 $ 22 CONST. TYPE "A-8" CURB & GUTTER PER CO. OF RIV. STD. 201 (MODIFIED) LF 1110 40.00 $ 44,400.00 $ 23 CONSTRUCT TYPE "D" CURB PER CO. OF RIV. STD. 204 (MODIFIED) LF 1589 20.00 $ 31,780.00 $ 24 CONSTRUCT COMMERCIAL DRIVEWAY PER CO. OF RIV. STD. 207A (MODIFIED) EA 4 13,000.00 $ 52,000.00 $ 25 CONST. CROSS GUTTER & SPANDREL PER CO. OF RIV. STD. 209 (MODIFIED) EA 2 5,000.00 $ 10,000.00 $ 26 INSTALL 4" PVC PIPE UNDER SIDEWALK THRU CURB LF 92 15.00 $ 1,380.00 $ 27 INSTALL ARIZONA RIVER ROCK COBBLE RIP-RAP 2" TO 4" CY 0.5 200.00 $ 100.00 $ 28 COLD PLANE 0.2' TO 0.4' VARABLE WIDTH ASPHALT SF 2566 4.00 $ 10,264.00 $ 29 SIGNALIZATION OF INTERSECTION LS 1 400,000.00 $ 400,000.00 $ 30 SIGNAL INTERCONNECTION PLAN LS 1 60,000.00 $ 60,000.00 $ 31 SIGNING AND STRIPING LS 1 40,000.00 $ 40,000.00 $ 32 CONSTRUCT MONOLITHIC CURB WALL (MODIFIED) LF 230 80.00 $ 18,400.00 $ 33 ADJUST TO GRADE EXISTING TELECOM VAULT EA 1 2,000.00 $ 2,000.00 $ 34 ADJUST TO GRADE EXISTING TELECOM RISER EA 1 1,500.00 $ 1,500.00 $ 35 REMOVE AND RELOCATE EXISTING TELECOM RISER EA 2 1,500.00 $ 3,000.00 $ $ 1,734,044.00
TOTAL
SUB-TOTAL BID ITEMS
ITEM DESCRIPTION UNIT QUANTITY UNIT COST
BASE BID SCHEDULE ENGINEER'S ESTIMATE
$ 150,000.00 150,000.00 $ 191,000.00 $ 191,000.00 $ 111,000.00 $ 111,000.00 $ $ 225,000.00 225,000.00 $ 326,000.00 $ 326,000.00 $ 756,107.00 $ 756,107.00 $ $ 15,000.00 15,000.00 $ 24,000.00 $ 24,000.00 $ 7,500.00 $ 7,500.00 $ $ 50,000.00 50,000.00 $ 69,000.00 $ 69,000.00 $ 50,000.00 $ 50,000.00 $ $ 65,000.00 65,000.00 $ 111,000.00 $ 111,000.00 $ 262,000.00 $ 262,000.00 $ $ 10,530.00 90.00 $ 300.00 $ 35,100.00 $ 350.00 $ 40,950.00 $ $ 115,115.00 65.00 $ 68.00 $ 120,428.00 $ 115.00 $ 203,665.00 $ $ 59,500.00 8,500.00 $ 8,100.00 $ 56,700.00 $ 6,500.00 $ 45,500.00 $ $ 36,000.00 18,000.00 $ 530.00 $ 1,060.00 $ 5,500.00 $ 11,000.00 $ $ 36,800.00 9,200.00 $ 530.00 $ 2,120.00 $ 5,500.00 $ 22,000.00 $ $ 60,000.00 15,000.00 $ 530.00 $ 2,120.00 $ 5,500.00 $ 22,000.00 $ $ 27,000.00 27,000.00 $ 530.00 $ 530.00 $ 5,500.00 $ 5,500.00 $ $ 46,000.00 23,000.00 $ 530.00 $ 1,060.00 $ 5,500.00 $ 11,000.00 $ $ 6,750.00 750.00 $ 660.00 $ 5,940.00 $ 625.00 $ 5,625.00 $ $ 3,690.00 1.50 $ 2.77 $ 6,814.20 $ 2.00 $ 4,920.00 $
$ 28,500.00 1,900.00 $ 1,800.00 $ 27,000.00 $ 1,100.00 $ 16,500.00 $ $ 2,880.00 320.00 $ 2,050.00 $ 18,450.00 $ 1,750.00 $ 15,750.00 $ $ 3,500.00 3,500.00 $ 1,580.00 $ 1,580.00 $ 1,500.00 $ 1,500.00 $ $ 336,145.00 185.00 $ 135.00 $ 245,295.00 $ 155.00 $ 281,635.00 $ $ 103,740.00 65.00 $ 43.00 $ 68,628.00 $ 55.00 $ 87,780.00 $ $ 63,630.00 7.00 $ 6.60 $ 59,994.00 $ 8.00 $ 72,720.00 $ $ 44,400.00 40.00 $ 37.60 $ 41,736.00 $ 50.00 $ 55,500.00 $ $ 44,492.00 28.00 $ 25.60 $ 40,678.40 $ 37.00 $ 58,793.00 $ $ 34,000.00 8,500.00 $ 9,000.00 $ 36,000.00 $ 6,000.00 $ 24,000.00 $ $ 90,000.00 45,000.00 $ 17,000.00 $ 34,000.00 $ 6,000.00 $ 12,000.00 $ $ 4,600.00 50.00 $ 173.00 $ 15,916.00 $ 165.00 $ 15,180.00 $ $ 2,000.00 4,000.00 $ 9,500.00 $ 4,750.00 $ 11,000.00 $ 5,500.00 $ $ 5,132.00 2.00 $ 4.20 $ 10,777.20 $ 7.00 $ 17,962.00 $ $ 643,000.00 643,000.00 $ 649,000.00 $ 649,000.00 $ 618,000.00 $ 618,000.00 $ $ 67,000.00 67,000.00 $ 81,000.00 $ 81,000.00 $ 77,000.00 $ 77,000.00 $ $ 57,200.00 57,200.00 $ 64,000.00 $ 64,000.00 $ 52,500.00 $ 52,500.00 $ $ 34,500.00 150.00 $ 78.00 $ 17,940.00 $ 40.00 $ 9,200.00 $ $ 6,500.00 6,500.00 $ 1,580.00 $ 1,580.00 $ 1,500.00 $ 1,500.00 $ $ 2,500.00 2,500.00 $ 1,580.00 $ 1,580.00 $ 750.00 $ 750.00 $ $ 17,000.00 8,500.00 $ 5,300.00 $ 10,600.00 $ 1,000.00 $ 2,000.00 $ $ 2,383,376.80 2,497,104.00 $ 2,984,537.00 $
VAN ENGINEERING
UNIT COST TOTAL
ONYX PAVING COMPANY INC.
TOTAL UNIT COST TOTAL
HILLCREST CONTRACTING
UNIT COST
EAST PALM CANYON DRIVE WIDENING, MASTER UNDERGROUND PROJECT (M.U.P.),
AND TRAFFIC SIGNAL AT CREE ROAD
CITY PROJECT NO. 8874, BID NO: B23-52E
BID TAB
CITY PROJECT No.:C08874
DATE: 10/22/2026
1B STRUCTURE EXCAVATION CY 4 200.00 $ 800.00 $
2B BAR REINFORCING STEEL LS 1 2,500.00 $ 2,500.00 $
3B STRUCTURAL CONCRETE CY 8 500.00 $ 4,000.00 $ 4B CONCRETE FINISHING LS 1 1,500.00 $ 1,500.00 $ 5B TRENCH 24” DEEP AND BACKFILL LF 250 40.00 $ 10,000.00 $ 6B FURNISH AND INSTALL (1) 4” SCH 40 PVC CONDUIT LF 250 25.00 $ 6,250.00 $ 7B FURNISH AND INSERT (3) 1” SCH 80 CONDUITS WITHIN 4” SLEEVE LF 750 8.00 $ 6,000.00 $ 8B INSTALL PULL BOX, OLD CASTLE B16 OR APPROVED EQUAL EA 2 1,200.00 $ 2,400.00 $ 9B ELECTRICAL LIGHTING FIXTURES LS 1 1,000.00 $ 1,000.00 $ $ 34,450.00
1C FABRICATION LS 1 60,000.00 $ 60,000.00 $ 2C DELIVERY LS 1 2,000.00 $ 2,000.00 $ 3C INSTALLATION LS 1 5,000.00 $ 5,000.00 $ $ 67,000.00$ 101,450.00
1D VAULTS EA 2 51,000.00 $ 102,000.00 $ 2D CONDUIT: 2-INCH EA 52 25.00 $ 1,300.00 $ 3D CONDUIT: 3-INCH EA 36 25.00 $ 900.00 $ 4D CONDUIT: 4-INCH EA 20 25.00 $ 500.00 $ 5D CONDUIT: 5-INCH EA 8427 44.00 $ 370,788.00 $ 6D CONDUIT: 6-INCH EA 2642 50.00 $ 132,100.00 $ 7D PULL BOXES EA 2 4,000.00 $ 8,000.00 $ $ 615,588.00
$ 2,451,082.00
UNIT QUANTITY UNIT COST TOTAL
BID SCHEDULE B - MOUNTAIN CATHEDRALS ENTRYWAY MONUMENT CONCRETE FOUNDATION
SUB-TOTAL BID ITEMS
ITEM DESCRIPTION
ENGINEER'S ESTIMATE
ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL
ENGINEER'S ESTIMATE
SUB-TOTAL BID ITEMS
BID SCHEDULE D - SOUTHERN CALIFORNIA EDISON (SCE) UNDERGROUND STRUCTURESBID SCHEDULE C - MOUNTAIN CATHEDRALS FABRICATION AND INSTALLATION ENGINEER'S ESTIMATE
SUB-TOTAL BID ITEMS
GRAND TOTAL
ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL
$ 800.00 200.00 $ 1,680.00 $ 6,720.00 $ 1,600.00 $ 6,400.00 $ $ 2,000.00 2,000.00 $ 13,000.00 $ 13,000.00 $ 12,300.00 $ 12,300.00 $ $ 8,000.00 1,000.00 $ 3,100.00 $ 24,800.00 $ 2,940.00 $ 23,520.00 $ $ 2,000.00 2,000.00 $ 20,000.00 $ 20,000.00 $ 19,100.00 $ 19,100.00 $ $ 50,000.00 200.00 $ 27.30 $ 6,825.00 $ 26.00 $ 6,500.00 $ $ 33,500.00 134.00 $ 19.00 $ 4,750.00 $ 18.00 $ 4,500.00 $ $ 24,000.00 32.00 $ 12.60 $ 9,450.00 $ 12.00 $ 9,000.00 $ $ 17,000.00 8,500.00 $ 1,400.00 $ 2,800.00 $ 1,324.00 $ 2,648.00 $ $ 27,200.00 27,200.00 $ 6,500.00 $ 6,500.00 $ 6,150.00 $ 6,150.00 $ $ 94,845.00 164,500.00 $ 90,118.00 $
$ 28,500.00 28,500.00 $ 67,000.00 $ 67,000.00 $ 64,000.00 $ 64,000.00 $ $ 28,500.00 28,500.00 $ 2,600.00 $ 2,600.00 $ 1,700.00 $ 1,700.00 $ $ 38,000.00 38,000.00 $ 21,000.00 $ 21,000.00 $ 6,500.00 $ 6,500.00 $ $ 90,600.00 95,000.00 $ 72,200.00 $
$ 185,445.00 259,500.00 $ 162,318.00 $
$ 110,000.00 55,000.00 $ 53,000.00 $ 106,000.00 $ 50,000.00 $ 100,000.00 $ $ 1,820.00 35.00 $ 42.00 $ 2,184.00 $ 40.00 $ 2,080.00 $ $ 1,620.00 45.00 $ 53.00 $ 1,908.00 $ 50.00 $ 1,800.00 $ $ 1,000.00 50.00 $ 84.00 $ 1,680.00 $ 80.00 $ 1,600.00 $ $ 463,485.00 55.00 $ 110.00 $ 926,970.00 $ 105.00 $ 884,835.00 $ $ 171,730.00 65.00 $ 120.00 $ 317,040.00 $ 115.00 $ 303,830.00 $ $ 14,800.00 7,400.00 $ 1,580.00 $ 3,160.00 $ 1,500.00 $ 3,000.00 $ $ 1,358,942.00 764,455.00 $ 1,297,145.00 $
$ 3,927,763.80 3,521,059.00 $ 4,444,000.00 $
ONYX PAVING COMPANY INC.
UNIT COST TOTAL
VAN ENGINEERING
TOTAL UNIT COST TOTAL
HILLCREST CONTRACTING
UNIT COST
TOTAL UNIT COST
VAN ENGINEERING HILLCREST CONTRACTING ONYX PAVING COMPANY INC. VAN ENGINEERING HILLCREST CONTRACTING ONYX PAVING COMPANY INC.
UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL