Draft Budget Review for
Fiscal Year 2022-2023
MAY 3, 2023
PRESENTED BY:

NICK CHASET, CEO
2 Executive Summary
• In the face of rising energy costs, EBCE is able to continue to serve our local community and customers with cost competitive & cleaner energy while providing local jobs and equitable programs.
• Rates are up and PCIA is down, driven by a historic increase in market energy prices starting in 2021 and forecasted to persist in 2023-2024.
• With EBCE rates indexed to PG&E rates, we are forecasting significant headroom to operate and a strong financial surplus.
• Draft budget includes the following:
o Significant contributions to working capital and reserves o Improvements to the Value Proposition (increased discount and bill credits) o Increased carbon free energy procurement targets
o Meaningful contribution to local development budget
o Expand on staff expertise, build more depth, and scale operations further 3 Summary Draft Budget for Fiscal Year 2021-2022
Notes:

YTD* reflects actuals
through Feb 28, 2023
EST are most current
projections as of April
26, 2023
Net Position through FY
Feb 28, 2023: $57.7MM
FY 2023-24 FY 2022-23 FY 2022-23
DRAFT BUDGET BUDGET YTD* + EST

OPERATING ACTIVITY

REVENUE & OTHER SOURCES
GASB 62 Unrecognized Revenue Balance 15,814,000 15,814,000 15,814,000 Total Operating Revenue 934,627,000 769,940,000 865,646,000

EXPENSES & OTHER USES
Total Energy Operating Expenses 696,681,000 535,241,000 666,257,000 Total Overhead Operating Expenses 38,887,000 27,426,000 22,016,000

NON-OPERATING ACTIVITY
Total Non-Operating Revenue 1,728,000 276,000 2,821,000 Total Non-Operating Expenses 23,150,000 30,990,000 23,854,000 NET NON-OPERATING ACTIVITY (21,422,000) (30,714,000) (21,033,000) TOTAL REVENUES 936,355,000 770,216,000 868,467,000
TOTAL EXPENSES 758,718,000 593,657,000 712,127,000
NET INCREASE(DECREASE) IN POSITION 177,637,000 176,559,000 156,340,000

RESERVE BALANCE
Beginning Reserve Balance* 230,873,000 155,873,000 155,873,000 # Operating Target (50%) 367,784,000 281,334,000 281,334,000 *Expected value after FY 2022-23 contribution
4 Draft Budget: Base Case Assumptions
Revenues
• Increase to customer value proposition by
o Bright Choice from 3% to 5% discount to PG&E
o R100 from $0.0075 to $0.0025 above PG&E
o Estimated revenue reduction of $29.2MM
• $50 bill credit applied to all CARE & FERA customers in Q1/Q2, totaling an estimated $6.6MM in one time bill
savings
• Assumes current rates and PCIA are unchanged
through 2023
• Rates and PCIA for 2024 are non-stressed, or as
forecasted, energy rates
• 1.5% uncollectable rate for 2023, then 1.0% for 2024
• No recognition of GASB 62 revenue ($15,814,000)
• Non-operating revenue assumes 2.5% interest earned
on treasury backed cash balance accounts
Energy Costs
• Costs are derived from a blend of contracted and
open positions for all energy, attributes, and RA
o Open prices are non-stressed, or as forecasted
• Carbon free energy is above recent board approved
targets by 5% for calendar 2023 and 10% for 2024
Bright Choice targets
o 2023: CF 71% --> 76%
o 2024: CF 75% --> 85%
o Adds $5.6MM to costs (Each 1% is ~$373,000)
Other Costs
• Additional staffing requirements of 17 FTE
• $2.6MM increase in Marketing for re-branding
campaign
• $2MM increase in G&A to account for increased staff
requirements
• Significant Program funding maintained at $21MM
5 Draft Budget: Proposed Surplus Allocations
Net Position Estimated at $177.3MM
Proposed Budget Surplus Waterfall Allocation:
1) Working Capital Needs: $50MM*
2) Reserve Account Funding: $100MM*
3) 50/50% split of any excess to:**
o Incremental Long-Term Renewable Energy/Clean Energy Storage Investments: ~$13.6MM o One-time On-Bill Credits to Customers: ~$13.6MM
*Allocations to be made after the end of the fiscal period ending June 30, 2024 **Assuming a budget surplus that is materially consistent with this forecast, staff would plan for an even allocation. Formal action would be brought forth to the board to formally adopt prior to, or in conjunction with, the presentation of the audit in October of 2024. This timing would allow for staff to have exact knowledge of available surplus.
6 Draft Budget: Operating Revenues
• Increase to value proposition
o Bright Choice from 3% to 5% discount to PG&E
o Renewable 100 from $0.0075 to $0.0025 above PG&E
o $50 bill credit to all CARE & FERA customers in July-Sept 2022, shown as Other Operations Revenue reduction
• Assumes current rates and PCIA are unchanged through 2023 • Rates and PCIA for 2024 are non-stressed, or as expected, energy rates • 1.5% uncollectable rate for rest of 2023 and 1.0% for 2024 • No recognition of GASB 62 revenue ($15,814,000)
• Current Year Other Operations Revenue is damages received from counterparties FY 2023-24 FY 2022-23 FY 2022-23
DRAFT BUDGET BUDGET YTD* + EST

REVENUE & OTHER SOURCES
GASB 62 Unrecognized Revenue Balance 15,814,000 15,814,000 15,814,000 Operating Revenue
Electricity Sales 953,323,000 792,009,000 873,457,000
Uncollectables (12,054,000) (15,840,000) (17,469,000)
Other Operations Revenue (6,642,000) (6,229,000) 9,658,000 Total Operating Revenue 934,627,000 769,940,000 865,646,000 7 Draft Budget: Energy Expenses
Energy Costs
• Costs are derived from a blend of contracted and
open positions for all energy, attributes, and RA
o Open prices are non-stressed, or as forecasted
o FY 23/24 overall price projections are about on
parr with FY 22/23 actuals on average
o Most materially significant increase for FY
23/24 is with RECs and capacity charges
• Carbon free energy is above recent board approved
targets by 5% for calendar 2023 and 10% for 2024
Bright Choice targets
o 2023: CF 71% --> 76%
o 2024: CF 75% --> 85%
o Adds $5.6MM to costs (Each 1% is ~$373,000)
• Note: We are still in a period of historically high
energy pricing and significant uncertainty/volatility
o Forecasted market energy costs in 2023 and
2024 are approximately double the historical
10-year average and has persisted since 2021
FY 2023-24 FY 2022-23 FY 2022-23
DRAFT BUDGET BUDGET YTD* + EST
Energy Operating Expenses
Cost of Energy 685,451,000 523,996,000 654,987,000
Data Management/Customer Service 7,777,000 7,834,000 7,859,000 PG&E Service Fees (Billing/Metering) 2,722,000 2,715,000 2,711,000 CAISO Scheduling Coordinator 731,000 696,000 700,000
Total Energy Operating Expenses 696,681,000 535,241,000 666,257,000 8 Draft Budget: Overhead Expenses
Material Overhead Items for FY 23-24:
• Personnel costs will be discussed more in-depth on the next slide
• $2.5MM increase in Marketing costs is specifically driven by re-branding campaign
o Also includes approx. $1MM of Programs related
marketing costs
• $1.0MM increase in Legal, Policy, & Regulatory affairs is due to a couple of factors
o Membership expansion (Stockton)
o Additional volume of consulting/vendor agreements
and power contracts
• Larger staffing demand, from Personnel costs, increases in Professional Services with HR/recruiting and additional project support
• Increase to G&A is also directly related to increase in staffing with software subscriptions, membership dues, equipment, office space, insurance, and the like
• Depreciation increases due to new building
FY 2023-24 FY 2022-23 FY 2022-23
DRAFT BUDGET BUDGET YTD* + EST
Overhead Operating Expenses
Personnel 21,262,000 15,711,000 13,317,000
Marketing & Communications 5,303,000 2,824,000 2,073,000 Legal, Policy, & Regulatory Affairs 3,459,000 2,411,000 1,603,000 Other Professional Services 2,520,000 2,293,000 1,302,000 General & Administrative 5,983,000 4,007,000 3,563,000
Depreciation 360,000 180,000 158,000
Total Overhead Operating Expenses 38,887,000 27,426,000 22,016,000 9 Draft Budget: Overhead Expenses—Personnel
• FY 2021-22 Budget was initially approved at 43 FTE and expanded mid-year to 49 o 2.5% COLA and up to 5% merit-based/promotional compensation allotted o Currently at 45 FTE and interviewing for an additional 4 roles • FY 2022-23 Budget was increased to 68 FTE to accommodate additional work requirements in all areas.

Additional headcount will expand on internal expertise/skills, build more depth, and scale operations:
o 3.5% COLA and up to 10% merit-based/promotional compensation pool o 5 Marketing, 4 Local Programs, 3 Operations, 3 Technology, 2 Power Resources, 2 Legal • FY 2023-24 Budget seeks to add 17 FTE to accommodate additional work requirements in all areas.

Additional headcount will expand on internal expertise/skills, build more depth, and scale operations:
o 3.5% COLA and up to 10% merit-based/promotional compensation pool o 3 Marketing, 3 Local Programs, 3 Operations, 2 Technology, 3 Power Resources, 3 Legal FY 2023-24 FY 2022-23 FY 2022-23
DRAFT BUDGET BUDGET YTD* + EST

PERSONNEL
Salaries & Wages 16,021,000 11,598,000 9,747,000
Retirement 2,012,000 1,544,000 1,340,000
Health Care/Benefits 2,868,000 2,292,000 864,000
Payroll Expenses 361,000 277,000 169,000
Total 21,262,000 15,711,000 12,120,000
10 Draft Budget: Organization Chart
11 Draft Budget: Open Position Count
Team
# of New
Roles
Data & Tech 2
MAS 3
Operations, Admin &
Finance 2 +1
Power Resources 3
Programs 3 +1
Public Policy 2
Total New Roles: 15 + 2 (17)
● # of New Roles to budget for next FY: 15
○ Add 2 carry-over roles from FY 22-23, so 17 Total
12 Draft Budget: New Positions
Team Position Title (Draft) Position Level Desired Start Comp Band $ Low (Base) $ High (Base) $ Mid (Base) Data & Tech IT HelpDesk Associate Associate Q2 (Oct - Dec 2023) 4 $117,597 $133,400 $125,498 Data & Tech Junior Data Engineer Analyst Q3 (Jan - Mar 2024) 3 $89,597 $117,596 $103,596 MAS Graphic Designer & Content Developer Associate Q1 (Jul - Sep 2023) 4 $117,597 $133,400 $125,498 MAS Copywriter Associate Q1 (Jul - Sep 2023) 4 $117,597 $133,400 $125,498 MAS Manager, Customer Experience Manager/Principal Q3 (Jan - Mar 2024) 6 $151,319 $167,170 $159,245 Operations, Admin &
Finance Sr. Mgr / Mgr, Structured Finance (TBD) Sr Manager/Sr Principal Q2 (Oct - Dec 2023) 7 $167,171 $190,393 $178,782 Operations, Admin &
Finance Finance Associate Associate Q2 (Oct - Dec 2023) 4 $117,597 $133,400 $125,498 Operations, Admin &
Finance
Coordinator, Ops & Admin
(Carry-over from last yr) Coordinator Q1 (Jul - Sep 2023) 2 $69,174 $89,596 $79,385 Power Resources Contract Manager Manager/Principal Q1 (Jul - Sep 2023) 7 $167,171 $190,393 $178,782 Power Resources "CAISO Day Ahead Manager" Level Manager/Principal Q1 (Jul - Sep 2023) 7 $167,171 $190,393 $178,782 Power Resources Settlements Manager Manager/Principal Q3 (Jan - Mar 2024) 7 $167,171 $190,393 $178,782 Programs Programs Director Role Director Q1 (Jul - Sep 2023) 8 $190,394 $219,052 $204,723 Programs Program Lead / Associate Associate Q3 (Jan - Mar 2024) 4 $117,597 $133,400 $125,498 Programs Solar & Storage Programs / Associate Associate Q3 (Jan - Mar 2024) 4 $117,597 $133,400 $125,498 Programs Project Manager (Carry-over from last yr) Sr Associate Q2 (Oct - Dec 2023) 5 $133,401 $151,318 $142,360 Public Policy Contract Management Manager/Principal Q1 (Jul - Sep 2023) 6 $151,319 $167,170 $159,245 Public Policy Regulatory Analyst Analyst Q2 (Oct - Dec 2023) 3 $89,597 $117,596 $103,596 13 Draft Budget: Overhead Expenses—Marketing &
Account Services
Next Year Material Items:
• Majority of increase is driven by $2.6MM allocation for our first major foray into customer facing program campaigns where we are trying to acquire customers to participate and/or use our equipment (e.g. e-Bike, DCFC stations, induction cooking and EV adoption). Additionally, EBCE’s rebranding campaign will carry incremental costs beyond past year marketing spends that will pull from this allocation Included in cost items is approximately $1.0MM dedicated to Programs related marketing costs
• Required Mailings: Joint Rate Mailer w/ PG&E, Power Content Label, New Account Noticing
• Advertising: Active community presence activities, sponsorships, local events, increase due to Stockton and rebranding campaigns • Promotional Items: Give away items
• Communications: Public relations, media, newsletters, consultants, minor software needs--Website development from rebranding is biggest cost item at $1MM
Current Year Material Items:

Marketing has lower cost with advertising and
communications consultant due to shifting in
Programs related needs with Resilient Home and
BlocPower campaigns
FY 2023-24 FY 2022-23 FY 2022-23
DRAFT BUDGET BUDGET YTD* + EST
Required Mailings 282,000 520,000 529,000
Advertising 2,044,000 986,000 629,000
Promotional Items 123,000 50,000 41,000
Communications 2,854,000 1,268,000 874,000
Total 5,303,000 2,824,000 2,073,000
14 Draft Budget: Overhead Expenses—Legal, Policy, &
Regulatory Affairs
Current year spending was less than budgeted this year due to a delay in expected litigation expenses and unused contingency set aside
Next Year:
• Legal Consultants: Outside general counsel for procurement, analysis, and general operations.

Increase is driven by:
o Multiple pending and on-going litigations expenses
o 2023 Large Clean Energy RFO
o Implementation of numerous local development initiatives o Additional volume of consulting/vendor agreements and power contracts • Legislative Consultants: Retainer for legislative advocacy. For this coming fiscal year, EBCE has added additional resources focused on federal affairs to support both funding and policy initiatives. • Other Consultants: Policy related advising and economic consulting FY 2023-24 FY 2022-23 FY 2022-23
DRAFT BUDGET BUDGET YTD* + EST

LEGAL AND POLICY
Legal Consultants 3,117,000 2,135,000 1,384,000
Legislative Consultants 237,000 177,000 180,000
Other Consultants 105,000 99,000 39,000
Total 3,459,000 2,411,000 1,603,000
15 Draft Budget: Overhead Expenses—Other Professional
Services
Next Year Material Items:
• Operations: Accounting and auditing for financial
compliance, general finance, and addition of new
project with treasury management consulting
• Human Resources Consulting: Support for additional
HR demand for increased staffing recruitment,
professional development, and training
• Tech Consulting: Technical network assistance
• Power Resources: Technical consulting for Power
Resources, operational compliance support and other
various tasks
Current Year Material Items:
• HR consulting was approximated as first year need
for consulting. Hiring of HR lead has led to reduced
costs with active management
• Technology Consulting is lower than expected with
reevaluation of timeline for cost-of-service
implementation
• Power Resources consulting lower than expected
with IRP below budget
FY 2023-24 FY 2022-23 FY 2022-23
DRAFT BUDGET BUDGET YTD* + EST

OPERATIONS CONSULTANTS
Operations 931,000 363,000 435,000
Human Resources Consulting 634,000 1,000,000 338,000
Tech Consulting 325,000 325,000 209,000
Power Resources 630,000 605,000 320,000
Total 2,520,000 2,293,000 1,302,000
16 Draft Budget: Overhead Expenses—General & Administrative Next Year Material Items:
• Operational Expenses: Increased staff costs related to insurance, service fees, supplies, membership dues,
operational services, building maintenance, and other
relevant G&A
• Software, Subscriptions, SaaS: Increase covers
additional software needs for Finance, Power
Resource, and Technology operations, as well as
essential subscriptions for ongoing operations with
expanded staff
• Rent & Utilities: Increases with office space needs
due to expanded staff
• Conferences & Professional Development: Trainings,
conferences, and related expenses
• Board & Director Fees: Monthly stipends and
transportation reimbursements for board members
Current Year Material Items:
• Operational Expenses were higher than expected primarily due to inflationary increases in insurance costs and industry memberships dues
• Software costs were lower with delay in implementing
customer portal development and battery optimization as well as data storage was under budget
FY 2023-24 FY 2022-23 FY 2022-23
DRAFT BUDGET BUDGET YTD* + EST

GENERAL OPERATIONS
Operational Expenses 1,523,000 1,039,000 1,133,000
Software, Subscriptions, SaaS 2,948,000 2,233,000 1,576,000 Small Equipment 510,000 210,000 113,000
Rent & Utilties 764,000 345,000 565,000
Conferences & Prof. Development 160,000 130,000 124,000 Board & Director Fees 78,000 50,000 52,000
Total 5,983,000 4,007,000 3,563,000
17 Draft Budget: Non-Operating Activity
• Non-Operational Revenue: Interest earned on Treasury backed cash account balances (estimated at 2.5%) and BlocPower loan (5.5% on $500k)
• Grants: Generally only recognized against qualifying expenses as incurred, thus not projected
• Other Non-Operational Revenue: Rent from AT&T tower on new building
• Borrowing Interest Expenses: Expected costs associated with expanded credit facility
• Local Development Funding: Capital transfer to Local
Development Fund
• Capital Expenditures: Moving and new equipment/furniture related to new office space
FY 2023-24 FY 2022-23 FY 2022-23
DRAFT BUDGET BUDGET YTD* + EST

NON-OPERATING REVENUE
Interest Income 1,680,000 261,000 1,561,000
Grants 0 0 1,100,000
Other Non-Operating Revenue 48,000 15,000 160,000
Total Non-Operating Revenue 1,728,000 276,000 2,821,000

NON-OPERATING EXPENSES
Borrowing Interest 1,650,000 1,440,000 587,000
Local Development Funding 21,000,000 22,550,000 22,550,000 Grant 0 0 0
Capital Expenditures 500,000 7,000,000 717,000
Total Non-Operating Expenses 23,150,000 30,990,000 23,854,000 NET NON-OPERATING ACTIVITY (21,422,000) (30,714,000) (21,033,000) 18 Draft Budget: Local Development Fund
• 2023-2024 Local Development Fund
allocation is set at $21MM
• Allocating budget for capital
intensive infrastructure development
projects
• Allocating EBCE capital to reduce cost of
ownership for building and vehicle
electrification
• Initiating programs to accelerate heavy and
light duty vehicle adoption as well as
eMobility
• $1MM in Program marketing in the MAS
budget
• Unspent Local Development
budget carries forward year to year
Local Development Areas of Emphasis Budget Allocation
Transportation Electrification $11.75M
Building Electrification $7M
Energy Efficiency No Direct EBCE Cost
Community Resilience/Local RE $2M
Community Grants $0 ($4.2M allocated in FY'23)
Sponsorships/Memberships $250k

LOCAL DEVELOPMENT FUND
FY 2023-24 FY 2022-23 FY 2021-22 FY 2020-21 FY 2019-20
BEGINNING BALANCE 36,194,914 16,626,143 10,398,245 5,201,410 0

REVENUE & OTHER SOURCES
Transfer from Operating Fund 21,000,000 22,550,000 8,475,000 6,340,000 6,340,000 Grants/Interest - 1,025,980 335,460 395,000 219,673
Total Revenues & Other Sources 21,000,000 23,575,980 8,810,460 6,735,000 6,559,673

EXPENSES & OTHER USES
Actual Program Expenses 2,671,209 2,582,563 1,538,165 1,358,263 Expected Remaing Expenses 57,194,914 1,336,000 - - -
Total Expenses & Other Uses 57,194,914 4,007,209 2,582,563 1,538,165 1,358,263 ENDING BALANCE - 36,194,914 16,626,143 10,398,245 5,201,410 Thank You!