Cities Index.
Item 5. Overview: 2023 Long-Term Resource RFO (Informational Item)

Ava Community Energy Financial, Administrative and Procurement Subcommittee
July 12, 2023

Document
Item 5. Overview: 2023 Long-Term Resource RFO (Informational Item)
Meeting
July 12, 2023
Body
Ava Community Energy Financial, Administrative and Procurement Subcommittee
Original file
280 KB
Text extracted from the CCA's file for reading and search. Open the original on avaenergy.org. That file is the official record.

2023 Long-Term
Resource RFO:

Overview and
Update
JULY, 2023
• Solicitation Overview
• Participation
• Evaluation Process
• Challenges in Marketplace
• Next Steps
• Reminder: Portfolio Summary
2 Agenda
Goals & Objectives
• Secure a portfolio of contracts to
provide EBCE customers with
affordable renewable and clean
energy sources;
• Meet IRP Near- and Mid-Term
Resource Adequacy Reliability
Procurement mandates;
• Meet current and future CPUC
compliance obligations;
• Create new renewable energy
projects to deliver PCC1 RECs
• Contract low-cost energy hedges to
compliment existing portfolio
• Partner with SJCE for efficiency,
to minimize expenses, and lead
the market in contract terms.

Actions
• Issued a broad, open, competitive
solicitation to ensure wide array of
opportunities considered;
• Evaluated combinations of projects
to achieve desired volume targets;
• Typically prioritize project risk,
location, workforce development,
economics, and other
characteristics; limited ability to do
so in this RFO due to limited offers
in earlier years;
• Encouraged RFO participants to be
creative and provide proposal
variations on individual projects and
include battery storage.
3 Project Characteristics
Facilities:
• Location: Projects may be within or outside
of California. All energy must be deliverable
to CAISO & must provide RA
• Construction Status: Energy and related
products may come from new resources or
add incremental capacity to existing
resources.

Capacity:
• Minimum Contract Capacity: 5 MW
• Maximum Contract Capacity: none
Delivery Date:
• Energy and RPS attribute delivery must be
within calendar years 2024 through 2030
with a preference for projects that begin
delivery earlier within this window.

Contract Duration:
• 10-20 year durations
Technology:
• Renewables, Large Hydro
• Storage – short or long duration; any
technology
Solicitation Overview
4 Solicitation Overview – Eligible Products
Product
#
Product Name Description Example
Product 1 As-Available RPS
Product
New or incremental capacity to an existing
stand-alone PCC1-eligible generating
resource
solar, wind, geothermal,
small hydro or ocean
(thermal, wave, or current)
Product 2 As-Available RPS plus
Energy Storage
New or incremental capacity to an existing
stand-alone PCC1-eligible generating
resource with co-located energy storage
Same as above plus storage
with 2-hr, 4-hr, or 4-hr+
duration capability
Product 3 Firm or Shaped RPS
Product
New PCC1-eligible generating resources;
likely paired with energy storage
Energy delivered during
specific hours
Product 4 Stand-Alone Energy
Storage Toll or RA-Only offer
Energy storage may offer a full product
“tolling” structure contract. RA-only offers
not accepted in this RFO
Any storage technology
with 2-hr, 4-hr, or 4-hr+
duration capability
5 Participation
More robust project offering than 2022 RFO, comparable to 2020 RFO. 72 unique project sites; 195 project variations (as compared to 44 sites; 185 variations in 2022 RFO)
All 4 products that were solicited were offered
Offers included solar, wind, and battery storage
Projects based in 6 different states (CA, AZ, ID, NM, NV, WY); predominantly CA *Only 2 projects in EBCE service territory.

Evaluation Process
• Evaluation Rubric scored 3 areas:
• Counterparty Execution, Offer Competitiveness, and Project Development Status • Multiple items under each area
• Two reviewers were assigned to each project.
• Staff reviewed all submitted information and provided scores for all categories and NPV. • Each item has 100 point max. at its own weighting.
• Term Sheet Markups were scored by one assigned reviewer. • NPV scores were directly incorporated into overall project score with a weighting of 55%. • The Net Present Value was calculated based on simulations on 6 different forward curves • For each forward curve we took a weighted average of the P5 (50%), P50 (30%), and P95 (20%); and then took a simple average across the 6 curves
• We normalized this number on a $/MW basis and the projects were then assigned a 0-55 score based on the NPV distribution • Other factors considered in qualitative evaluation were Counterparty Execution Risk (20 points), Development Status Risk (20 points) and Local Business Enterprise (4 points) and Small Business Enterprise (1 point) • Scoring and rubric were similar to the selection process for previous RFOs • Previous RFOs used 3 forward curves, this RFO featured 6 curves each representing a unique scenario • Minor changes were made to weighting of local projects, including addition of points for small businesses 6 Challenges in the Marketplace
• Ongoing supply chain disruption & delays
• Uncertainty related to future tariffs for core components • Result: suppliers of core components pricing using Index structure; many Project Developers unwilling to take on price risk thus requiring pricing using index also or extreme mark-ups in price to cover risk • General: prices for generation and storage resources have increased 30- 40% since ~2020.
7 Next Steps
• Complete negotiations of projects under consideration. Anticipate presentations to Board beginning in September and continuing through winter
• Assess projects as they hit key milestones and mature further. • Update filing to CPUC on status of 2021-2023 and 2023-2026 Electric Reliability Requirements due August 1, 2023.
• CPUC’s 2024 IRP cycle provides formal opportunity for portfolio review and analysis of open position, cost and risk. Further engagement with board and community as part of IRP process.
8 Portfolio Summary
9 Project Name1 Project Name2 Devloper Type
Nameplate
Capacity COD
Term
(Years) Technology County State
Altamont SHWEC Greenbacker RPS 57.5 7/2/2021 20 Wind Alameda CA Rosamond Central Golden Fields Clearway RPS 112 12/22/2020 15 Solar Kern CA Pattern Tecolote Pattern RPS, no RA 100 12/20/2021 10 Wind Guadalupe & Torrance
NM
Luciana Tulare Idemitsu RPS 55.83 4/30/2022 15 Solar Tulare CA Edwards Solar II Edwards Terra Gen RPS 100 Q2 2024 15 Solar Kern CA Fervo Corsac Station Fervo RPS 40 2/1/2030 15 Geothermal Churchill NV Daggett South Daggett Clearway RPS+Storage 482 7/1/2023 15 Solar + Storage San Bernadino CA RE Scarlet Sonrisa EDPR RPS+Storage 100 12/15/2023 20 Solar+Storage Fresno CA Oberon Oberon Intersect RPS+Storage 125 1/1/2024 15 Solar Riverside CA Henrietta D Henrietta Convergent Storage 10 12/2/2021 15 Storage Kings CA Tumbleweed Tumbleweed REV Renewables Storage 50 6/1/2024 15 Storage Kern CA Kola Kola NextEra Storage 125 4/1/2025 20 Storage San Joaquin CA Sanborn Sanborn Terra Gen Storage 47 Q2 2024 12 Storage Kern CA