Attachment Staff Report Item 10E
vi. Record and store the AC energy charged to the system as measured at the Facility Meter. Measurements will be made by the Facility Meter with recording in the Facility historian.
vii. Within 5 minutes, command a real power discharge that results in an AC power output of the Facility’s maximum discharge power. viii. Maintain the discharging until the power is 2% different. ix. Record and store the AC energy discharged as measured at the Facility Meter. Measurements will be made by the Facility Meter with recording in the Facility historian.

Pass/Fail Criteria
The measured Efficiency Rate is greater than or equal to the Guaranteed Efficiency Rate. The Qualified Energy is greater than or equal to the Storage Contract Output.

Passed Failed Date:

Test Performed by:

Test Witnessed by:

Notes/Test Conditions:
________________________________________________________________________ ________________________________________________________________________ Attachment Staff Report Item 10E

EXHIBIT P

STORAGE FACILITY AVAILABILITY
Monthly Storage Availability
(a) Calculation of Monthly Storage Availability. Seller shall calculate the “Monthly Storage Availability” in a given month using the formula set forth below:

Monthly Storage Availability (%) =
where:

Attachment Staff Report Item 10E
Availability Adjustment
The applicable “Availability Adjustment” or “AA” is calculated as follows:
(i) If the Monthly Storage Availability is greater than or equal to the Guaranteed Storage Availability, then:
(ii) If the Monthly Storage Availability is less than the Guaranteed Storage Availability but greater than or equal to , then:
(iii) If the Monthly Storage Availability is less than 95% but greater than or equal to then:
(iv) If the Monthly Storage Availability is less than then:

Attachment Staff Report Item 10E

EXHIBIT Q

OPERATING RESTRICTIONS
The Parties will develop and finalize the Operating Restrictions prior to the Commercial Operation Date, provided that the Operating Restrictions (i) may not be materially more restrictive of the operation of the Facility than as set forth below, unless agreed to by Buyer in writing, (ii) will, at a minimum, include the rules, requirements and procedures set forth in this Exhibit Q, (iii) will include protocols and parameters for Seller’s operation of the Facility in the absence of Charging Notices, Discharging Notices or other similar instructions from Buyer relating to the use of the Facility, and (iv) may include Facility Scheduling, Operating Restrictions and Communications Protocols.

Interconnection Capacity Limit:

Maximum Stored Energy Level:

Minimum Stored Energy Level:

Maximum Charging Capacity:

Minimum Charging Capacity:

Maximum Discharging Capacity:

Minimum Discharging Capacity:

Maximum State of Charge (SOC) during
Charging:

Minimum State of Charge (SOC) during
Discharging:

Ramp Rate:

Annual Cycles per Contract Year:

Daily Dispatch Limits:

Maximum Time at Minimum Stored
Energy Level:

Grid Charging of Facility:

Attachment Staff Report Item 10E
Response Time:

Ancillary Services Capability:

Attachment Staff Report Item 10E

EXHIBIT R

METERING DIAGRAM
Attachment Staff Report Item 10E

EXHIBIT S

COMMUNITY INVESTMENT
Attachment Staff Report Item 10E