Item 9. Overview of Fire at Moss Landing
Meeting
February 5, 2025
Body
Ava Community Energy Executive Committee
Original file
800 KB
Text extracted from the CCA's file for reading and search. Open the original on avaenergy.org. That file is the official record.

Moss Landing Fire
Overview
Joanie Brooke | February 5, 2025
Moss Landing Battery Fire – what happened?
2 Image: Interior of Moss Landing BESS Phase I
https://www.energy-storage.news/fire-at-moss-landing-energy-storage-facility-what-we-know-so-far/ Moss Landing was a non-standard design:
• Phase I was built indoors, as one large 300MW
battery
• Minimal fire barriers between cells/modules
• Battery chemistry: Lithium Nickel Manganese
Cobalt Oxide (NMB), generally considered more
prone to thermal runaway
• Phase I was constructed before NFPA 855
established standards for battery storage design
and installation
• The non-standard design, and emergency
response standards, allowed the fire to propagate
through the entire building.

Current Standards
Current fire standard: NFPA 855
• Released 4/1/2020, Updated 8/25/2023
• Standard dictates testing, fire walls, minimum spacing between units, site-specific hazard mitigations, &
emergency response planning.
• Each container has dedicated HVAC unit, smoke, gas &
fire alarms, fire suppression systems, & automatic shut-off controls. • Factory testing ensures containers can suppress fires and prevent igniting adjacent units
Battery Chemistry
• Lithium Iron Phosphate (LFB) is the most common
chemistry today, generally considered to be stable.
3 Image Source: Daggett PV+Storage March 2024 Progress Report Overview of California Energy Storage
 California has over 13,000MW of Energy Storage
online as of the end of 2024 and ~11,500MW is
Utility scale
 >94% of all utility scale battery capacity came
online in 2021 or later after NFPA 855 standards
were released
* Information taken from CEC CA Energy Storage Survey 4 Overview of Ava’s Contracted Batteries
Ava’s contracted portfolio:
• 19 Storage Sites under contract (+1GW Nameplate)
▪ 7 in operation (352.5MW)
▪ 12 under development (737 MW)
• All are outdoor stationary containers (~2MW each)
• All permitted after NFPA 855 was released
• 16 Lithium-ion Phosphate (LFB)
• 3 Lithium Nickel Manganese Cobalt Oxide (NMB)
▪ Ava is discussing full safety reviews of NMB sites
with the developers.
5 Image Source: Scarlet I PV+Storage Feb 2024 Progress Report Project List
6 Project Technology Actual / Forecasted COD Storage Capacity (MW) Contract Duration (yr) County State

ONLINE PROJECTS
Henrietta D BESS 12/28/2021 10 15 Kings California
Ocotillo Solar + Storage 8/31/2023 50 10 San Diego California Daggett Solar + Storage 9/5/2023 12.5 15 San Bernadino California Oberon Solar + Storage 1/1/2024 125 15 Riverside California Scarlet I Solar + Storage 5/3/2024 30 20 Fresno California Tumbleweed_4hr BESS 7/16/2024 50 15 Kern California
Scarlet II_BESS BESS 12/11/2024 75 10 Fresno California

PROJECTS IN DEVELOPEMENT
Malaga – BESS BESS 2/15/2025 96 15 Fresno California
Hanford BESS 3/6/2025 16 15 Kings California
Kola BESS 7/7/2025 125 20 San Joaquin California
Alpaugh BESS 4/1/2026 5 12 Tulare California
Sun Pond Solar + Storage 4/1/2026 42.5 20 Maricopa Arizona Tumbleweed_8hr BESS 6/1/2026 50 12 Kern California
Scarlet III – BESS BESS 12/31/2026 70 10 Fresno California Aramis BESS 1/1/2027 25 10 Alameda California
Imperial Sun Solar + Storage 3/31/2027 100 15 Imperial California Gabriel BESS BESS 5/10/2027 100 20 Los Angeles California Zeta Solar Solar + Storage 7/26/2027 37.5 20 Merced California Rosemary Solar + Storage 6/1/2028 70 20 Fresno California