Staff Report Item 14
Staff Report Item 14
To: Ava Community Energy Board of Directors
From: Howard Chang, CEO
Subject: Fiscal Year 2026-2027 Budget
Date: June 17, 2026
______________________________________________________
Recommendation
Adopt a resolution approving the 2026-2027 fiscal year budget as presented in Exhibit A Background and Discussion
Ava’s fiscal year is from July 1 through June 30. Each year the Board of Directors (the “Board”) approves the following fiscal year’s budget. The budget presented today incorporates feedback garnered from previous draft versions presented to the Executive Committee on May 6, 2026, and June 3, 2026, the Board on May 20, 2026, and the Financial, Administrative, and Procurement subcommittee on May 27, 2026.

The proposed budget (the “Budget”) outlines staff’s best estimates for costs and revenues anticipated for the next fiscal year, based on load, market prices, and Power Charge Indifference Adjustment (“PCIA”) charges. Due to these updates, the numbers in this Budget may differ from those presented in previous versions.

This Budget reflects Ava’s current best estimates of energy prices and includes two funding sources to stabilize costs: $18.9MM drawn from the Rate Stabilization Fund (RSF) and $5.3MM in additional GASB 62 funds. The GASB 62 funds will be recognized against incremental generation and capacity from the 2023 request for offer (RFO) projects starting in 2027, as outlined in Resolution R-2024-26.

Staff Report Item 14
Other factors and assumptions that are represented in this Budget are:
• No recommended changes to Ava’s value proposition to customers • Assumes Ava maintains a 1.25% uncollectable rate
• Energy costs are derived from a blend of contracted and open positions. Open prices are non-stressed, mean-forecasted market prices. • Implementation of a compliance period procurement methodology over a three-year period of 2024-2027 with an average target of 81% renewable and carbon free energy, which remains unchanged from previous Board-approved targets • No draws on credit facility or use of reserve funds
• Non-operating revenues assume an average of 3.5% interest rate earned through the fiscal year
• Personnel headcount of 5 incremental additional staff • No recommendation for Local Development allocation
Although the fiscal year 2026-27 budget forecasts a deficit of $18.9MM, the fiscal year 2025-26 budget is actualizing with a surplus in excess of $80MM and reflects Ava’s strong financial state. This is in addition to reserves of approximately $330MM and $162MM in RSF monies. While Ava has not previously utilized its RSF, it serves to balance over collection and under collection year-over-year.

In 2025, the Board approved the Rate Stabilization Fund Policy (P-22) By resolution R-2025-41 which authorizes the CEO and the Treasurer, or their designee, to utilize the RSF as needed to meet budgetary goals. The Budget includes the estimated amount of RSF deferred revenues ($18.9MM) intended for use in balancing the budget.

In future meetings, Staff plans to present a detailed proposal to the Board for allocation of the current fiscal year’s projected surplus for discussion and approval.

Fiscal Impact
The approved budget establishes the forecast of Ava’s fiscal position for the next 12 months.

Attachments:

A. Exhibit A: 1-Pager of the Fiscal Year 2026-2027 Budget B. Resolution Adopting Ava’s Fiscal Year 2026-2027 Budget C. Resolution R-2025-41 Rate Stabilization Policy Approval D. Policy Number 22-Rate Stabilization Fund Policy
E. Resolution R-2024-26 Renewable Surplus Allocation
F. Presentation on Fiscal Year 2026-2027 Budget
EXHIBIT A: 1-PAGER OF FISCAL YEAR 2026-2027 BUDGET
Attachment Staff Report Item 14A
Attachment Staff Report Item 14B
RESOLUTION NO. R-2026-XX

A RESOLUTION OF THE BOARD OF DIRECTORS

OF THE AVA COMMUNITY ENERGY AUTHORITY ADOPTING THE FISCAL YEAR 2026-2027 BUDGET
WHEREAS Ava Community Energy Authority (“Ava”) was formed as a community choice aggregation agency (“CCA”) on December 1, 2016, under the Joint Exercise of Powers Act, California Government Code sections 6500 et seq., among the County of Alameda, and the Cities of Albany, Berkeley, Dublin, Emeryville, Fremont, Hayward, Livermore, Piedmont, Oakland, San Leandro, and Union City to study, promote, develop, conduct, operate, and manage energy-related climate change programs in all of the member jurisdictions. The cities of Newark and Pleasanton, located in Alameda County, along with the City of Tracy, located in San Joaquin County, were added as members of Ava and parties to the Joint Powers Agreement (“JPA”) in March of 2020. The city of Stockton was added as a member to Ava in September of 2022. The city of Lathrop was added as a member to Ava in October of 2023. San Joaquin County was added as a member to Ava in July 2024. On October 24, 2023, Ava legally adopted the name Ava Community Energy Authority, where it had previously used the name East Bay Community Energy Authority since its inception; and WHEREAS Ava operates on a fiscal year budget cycle from July 1st through June 30th; and
WHEREAS draft versions of Ava’s budget for fiscal year 2026-2027 were presented to the Executive Committee on May 6, 2026, and June 3, 2026, the Finance, Administrative & Procurement subcommittee on May 27, 2026, and the Board of Directors (the “Board”) on May 20, 2026 (the “Prior Presentations”); and WHEREAS Staff has incorporated feedback from the Prior Presentations and prepared a revised proposed budget set forth in Exhibit A (the “Proposed Budget”); and WHEREAS in 2024, the Board adopted Resolution R-2024-26, approving the release of deferred revenues for long-term renewable energy and clean storage investments in calendar year 2027 at staff discretion; and WHEREAS the Proposed Budget includes recognition of half of the afore mentioned deferred revenues; and
WHEREAS in 2025, the Board adopted Resolution R-2025-41, approving the Rate Stabilization Fund Policy (P-22) which authorizes the CEO and the Treasurer, or their designee, to utilize the Rate Stabilization Fund (RSF) deferred revenues as needed to achieve budget objectives; and
WHEREAS the Proposed Budget includes the estimated amount of RSF deferred revenues to be utilized for the purpose of balancing the budget.

Attachment Staff Report Item 14B

NOW, THEREFORE, THE BOARD OF DIRECTORS OF AVA COMMUNITY ENERGY AUTHORITY DOES HEREBY RESOLVE AS FOLLOWS:

Section 1. The Board of Directors hereby approves and adopts the Proposed Budget, as set forth in Exhibit A, as Ava’s fiscal year 2026-2027 budget.

ADOPTED AND APPROVED this 17
th day of June, 2026.

Betsy Andersen, Chair
ATTEST:

Adrian Bankhead, Clerk of the Board
RESOLUTION NO. R-2025-41

A RESOLUTION OF THE BOARD OF DIRECTORS

OF AVA COMMUNITY ENERGY AUTHORITY ADOPTING A RATE STABILIZATION FUND

AND POLICY
WHEREAS The Ava Community Energy Authority (“Ava”) was formed as a community choice aggregation agency (“CCA”) on December 1, 2016, Under the Joint Exercise of Power Act, California Government Code sections 6500 et seq., among the County of Alameda, and the Cities of Albany, Berkeley, Dublin, Emeryville, Fremont, Hayward, Livermore, Piedmont, Oakland, San Leandro, and Union City to study, promote, develop, conduct, operate, and manage energy-related climate change programs in all of the member jurisdictions. The cities of Newark and Pleasanton, located in Alameda County, along with the City of Tracy, located in San Joaquin County, were added as members of Ava and parties to the JPA in March of 2020. The city of Stockton, located in San Joaquin County was added as a member of Ava and party to the JPA in September of 2022. The city of Lathrop, located in San Joaquin County, was added as a member to Ava and party to the JPA in October of 2023. On October 24, 2023, the Authority legally adopted the name Ava Community Energy Authority, where it had previously used the name East Bay Community Energy Authority since its inception.

WHEREAS Ava currently maintains a GASB 62 Budget Stabilization Fund (the “Fund”) established by resolution R-2020-26, which allows for the accrual and deferral of excess revenue, identified as budget surplus revenues, to be recognized in successive periods to offset uncontrolled cost variations and preserve positive net position for Ava by mechanisms of accounting governed under the Governmental Accounting Standards Board (GASB).

WHEREAS the Fund is an integral part of Ava’s waterfall of liquidity resources and is used for short-term budget cycle liquidity challenges and other financial matters necessary for maintaining rate stability year-to-year for Ava’s customers.

WHEREAS similar agencies refer to funds that provide a similar rate stability mechanism as a Rate Stabilization Fund (RSF).

WHEREAS similar agencies that maintain a RSF have specific policies established that give guidance for management of the RSF.

NOW, THEREFORE, THE BOARD OF DIRECTORS OF AVA COMMUNITY ENERGY AUTHORITY DOES HEREBY RESOLVE AS FOLLOWS:

Section 1. The GASB 62 Budget Stabilization Fund is hereby renamed the Rate Stabilization Fund (RSF).

Section 2. The Rate Stabilization Fund Policy attached to the staff report associated with this Resolution, is hereby approved.

Attachment Staff Report Item 14C
ADOPTED AND APPROVED this 17th day of September, 2025.

Betsy Andersen, Chair
ATTEST:

Adrian Bankhead, Clerk of the Board
Attachment Staff Report Item 14C
Attachment Staff Report Item 14D

RATE STABILIZATION FUND POLICY
Policy Number: 22
Approval Date: 9/17/2025
Agenda Item: Staff Report Item 10
Approved by Resolution: R-2025-41
PURPOSE:

The purpose of this Policy is to set guidelines for the processes for funding, utilizing, and managing the Rate Stabilization Fund (RSF) as a source of liquidity to manage financial and operational risk.

POLICY OBJECTIVES:

The establishment of the RSF will allow Ava to defer revenue in years when fiscal results are strong and to apply deferred revenue in years when financial results are negatively impacted by uncontrollable events. The RSF will provide Ava with a mechanism to protect customers from risks related to energy market volatility, extreme events, and regulatory changes, as well as maintain financial covenants, achieve annual budget objectives, and other such fiscal matters.

FUNDING MECHANISM:

Funding the RSF is accounted for under Governmental Accounting Standards Board (GASB) rules which codify and standardize the accounting management of revenue recognition for public agencies. Deferrals of revenue as a transfer to the RSF reduces net revenue recognized on budget statements, and net position in that period of deferral, by the same amount.

The Board of Directors (the “Board”) has authorized the Chief Executive Officer (CEO) and the Treasurer, or their designee, to defer revenue to the RSF from time to time such amount as may be determined as appropriate from any source designated as surplus in accordance with the budget previously approved by the Board, as established by resolution R-2020-26.

UTILIZATION MECHANISM:

Recognition of contributions to the RSF is also governed by GASB rules. Recognition of revenues as a transfer from the RSF increases net revenues recognized on budget statements, and net position in that period of recognition, by the same amount.

The Board has authorized the CEO and the Treasurer, or their designee, to utilize deferred revenues from the RSF from time to time in such amounts as necessary to stabilize rates, satisfy financial covenants, achieve budget objectives, and to implement direction provided by the Board.

REPORTING:

Attachment Staff Report Item 14D
The RSF balance is recorded on Ava’s Statement of Net Position. Transfers to and from the RSF are recorded in the Statements of Revenues, Expenses, and Changes in Net Position. Both statements are presented quarterly, and audited annually, in Ava’s financial statements.

TARGET FUND BALANCE:

The RSF balance target is 20% of operating expenses.

RSF HOLDINGS AND INVESTMENTS:

RSF balances are not required to be held in a separate account and may be commingled with other funds held by Ava for investment purposes but will be accounted for and reported separately. All Ava fund balances, including the RSF, are subject to Ava’s Board-approved and State Government Code compliant investment policy.

Attachment Staff Report Item 14E
RESOLUTION NO. R-2024-26

A RESOLUTION OF THE BOARD OF DIRECTORS
OF AVA COMMUNITY ENERGY AUTHORITY TO RELEASE $10,504,837 FROM THE FY2022-23 SURPLUS TOWARDS LONG-TERM RENEWABLE ENERGY AND CLEAN STORAGE INVESTMENTS IN 2027
WHEREAS The Ava Community Energy Authority (“Ava”) was formed as a community choice aggregation agency (“CCA”) on December 1, 2016, Under the Joint Exercise of Power Act, California Government Code sections 6500 et seq., among the County of Alameda, and the Cities of Albany, Berkeley, Dublin, Emeryville, Fremont, Hayward, Livermore, Piedmont, Oakland, San Leandro, and Union City to study, promote, develop, conduct, operate, and manage energy-related climate change programs in all of the member jurisdictions. The cities of Newark and Pleasanton, located in Alameda County, along with the City of Tracy, located in San Joaquin County, were added as members of Ava and parties to the JPA in March of 2020. The city of Stockton, located in San Joaquin County was added as a member of Ava and party to the JPA in September of 2022. The city of Lathrop, located in San Joaquin County, was added as a member to Ava and party to the JPA in October of 2023. On October 24, 2023, the Authority legally adopted the name Ava Community Energy Authority, where it had previously used the name East Bay Community Energy Authority since its inception.

WHEREAS with the approval of the 2022-23 fiscal year budget, the Board of Directors (the “Board”) approved a portion of surplus revenues to be allocated for long-term renewable energy and clean storage investments (the “Allocation”).

WHEREAS following the completion of the audit, the Allocation is $10,504,837 and is held as retained earnings in the GASB 62 Rate Stabilization Fund.

WHEREAS Ava is seeking to procure local, incremental generation and capacity from the 2023 RFO and intends to apply the Allocation to this portfolio of projects as they start delivery in 2027.

NOW, THEREFORE, THE BOARD OF DIRECTORS OF AVA COMMUNITY ENERGY AUTHORITY DOES HEREBY RESOLVE AS FOLLOWS:

Section 1. Release the Allocation to the General Fund in 2027 at staff discretion of the exact date.

Attachment Staff Report Item 14E
ADOPTED AND APPROVED this 20th day of March 2024.

Jack Balch, Chair
ATTEST:

Adrian Bankhead, Clerk of the Board
Fiscal Year 2026-2027
Draft Budget
Howard Chang, CEO | June 17, 2026
Attachment Staff Report Item 14F
Introduction
2 • Every year in June, Ava Board of Directors (the “Board”) approves the following fiscal year’s budget and staff is seeking formal approval of this proposed final budget at today's regular board meeting • This budget was reviewed by an ad hoc group of the Ex Comm on 5/6, full board on 5/20, FAP on 5/27, and ExComm on 6/3
• The Budget covers the overall categories of the General Operating Fund:
▪ Revenues from Operations
▪ Energy Operating Expenses (typically 90%+ of total expenses) ▪ Services to Facilitate Energy Operations
▪ Operational Overhead to Energy Operations
▪ Non-Operating Revenues
▪ Non-Operating Expenses, including a Capital Transfer to the Local Development Fund Attachment Staff Report Item 14F
Current Fiscal Year 2025-2026 Performance
• Details on “Actuals” are settlements through April and updated projections through June.
• Revenue is expected to settle above budget due to Board action on value proposition in December.
▪ Other Operating Revenue is primarily fees and damages to Ava on energy contracts
• Cost of energy is coming in below expectations as
market prices softened and higher than expected large
hydro generation
• Total overhead is currently estimated at $7.4MM below budget due to opex reductions
• Non-operating activity is higher than expected as interest rates remain higher-for-longer and with the reduction of Local Development contributions
▪ Borrowing interest expenses have been moved to General & Administrative overhead due to accounting treatment
changes
• Overall Net Revenues are expected to come in at $83MM above estimates without using $35MM budgeted GASB
62 funds.
3 Attachment Staff Report Item 14F
Fiscal Year 2026-2027 Draft Budget
4 Attachment Staff Report Item 14F
Draft Budget Fiscal Year 2026-2027
• Revenues: Energy prices continue to soften and
with resolution of the CPUC's Track 1 PCIA proceeding,
generation rates and PCIA going into calendar year 2027 remain relatively stable. The fiscal year revenues decline because prior fiscal year included higher rates in calendar 2025
• Cost of Energy: Lower energy prices reduce open position costs
• Overhead: Increase in G&A is predominantly due to increased rent, a change in accounting treatment of credit facility fees, increasing software costs, and addition of five
headcount
• Non-Operating Activity: Higher interest income and lower borrowing interest due to a change in accounting treatment of credit facility. No incremental contributions to Local
Development Funding in fiscal year 2026-2027 with
current fund balance at $84MM
5 • Note: Incorporates the use of the Rate Stabilization Fund (RSF) to offset the forecasted deficit.
• Expanded budget view shown in appendix
Attachment Staff Report Item 14F
Draft Budget: Forecast Uncertainty
• May 15, 2026 PG&E ERRA filing provided a forecast for 2027 rates and PCIA ▪ The filing provides an update on a subset of the underlying assumptions but did not provide updated MPBs ▪ While a formal updated filing from PG&E is outstanding, we do not anticipate material changes ▪ This is separate from potential changes that may come from the General Rate Case (GRC) ▪ PG&E’s October ERRA filing will provide the next meaningful update on 2027 rates • PCIA Tracks 2 and 3 may have material impacts on PCIA and rate setting methodologies. Track 3 scope and timing presents the greatest uncertainty. 3 pre-scoping workshops have been scheduled for June. • Load forecast uncertainty:
▪ Weather conditions present the greatest impact on actualized load volume and shape ▪ With the addition of SJC, estimates will become more accurate as Ava receives more data beyond initial enrollment ▪ Longer-term: data center and electrification presents significant uncertainty as well • Energy prices are highly volatile and have softened over the last 6 months in response to a mild winter, accelerated melting snowpack, and new energy capacity coming online. Over the last month, we have seen price forecasts increasing
• New power generation project online dates may be delayed or moved forward impacting power portfolio expenses • Interest rates and macroeconomic environment may change 6 Attachment Staff Report Item 14F
May ERRA Addendum Filings
• The May 15 ERRA filing consists of the filing documents and the series of datasets called the “Working Papers”
▪ The filing and working papers can be accessed through the PG&E Azure website here:
https://pgera.azurewebsites.net/Regulation/search
• Select the “ERRA 2027 PGE – Forecase [A.25-05-007]” case from the dropdown menu and click search to see all documents available for download
• Staff is still processing the working papers with consultants to get better color on the details
7 • What is known:
• 2025 RA PCIA reform is in place at a steady state for 2027 • Load appears to be materially lower for PG&E due to milder than expected weather to date and community load departure
• PG&E's revenue requirements remain stable despite the reduction in load, increasing generation rates • What is not known from the ERRA:
• Direction on MPB settlement for all attributes
• A significant portion of the filing is redacted due to market sensitive confidential information and our 3rd party consultant has access to this information, which may be shared on a very limited basis • There were some known errors/inconsistencies that are in the process of being validated and reconciled Attachment Staff Report Item 14F
PCIA Proceeding & Risk Elements
The CPUC has an ongoing proceeding regarding the PCIA, divided into "Tracks". o Track 1
o CalCCA has appealed CPUC Track 1 decision; appeal is pending o Revised the MPB for RA retroactive through 2025
o Major driver for the much higher PCIA most Ava customers see in 2026 versus 2025 o Track 2
o Proceeding is ongoing; decision expected in time for inclusion in 2027 rates o The CPUC is reviewing the methodology for valuing RECs that PG&E "banked" prior to 2019 but did not actually use for compliance purposes until 2025. An interim methodology values those RECs at $0. This increases the PCIA for most Ava customers versus what the PCIA would be if those RECs were valued at the current market price for RECs
o Outcome indeterminate; CalCCA proposal would use current market prices for REC value, and lower the PCIA for most Ava customers versus status quo; PG&E proposal would make the status quo interim methodology permanent o Track 3
o Scope and timing undetermined
▪ CCAs propose to address reviewing the Track One revisions to MPBs; aligning the RA MPB with the RA Slice of Day framework; revintaging of PCIA resources; PCIA GHG-free methodology; and potentially other structural changes to the PCIA ▪ IOUs propose to prioritize changes to RPS MPBs ahead of any other issues, with changes to the brown power MPB next o Outcome indeterminate; CCA approach would likely reduce PCIA for most Ava customers if adopted while the IOU approach would likely raise the PCIA for most Ava customers if adopted 8 Attachment Staff Report Item 14F
Historical NP15 Energy Price Actuals
9 • NP15 is the most liquid pricing for the northern
CA region as the closest proxy to Ava’s wholesale
prices
• Power prices are set by a number of factors
impacting supply and demand, such weather,
natural gas prices, system capacity,
transmission congestion, etc.
• Volatility is high due to these uncertain and
changing factors year to year
• Customer rates (generation and PCIA) are set
based on a forecast while also incorporating a
true up of the prior year's forecasted market
prices with actualized prices
• 2026 rates were set by 2026 forecasted prices
and truing up 2025 actualized prices. 2027 rates
will be set by 2027 forecasted prices and truing
up 2026 actualized prices.

Attachment Staff Report Item 14F
Forward NP15 Energy Price Forecasts
10 • This graph reflects forward pricing for FY 2026-
2027 pricing broken out by month
o The individual lines reflect the forward curve at
different points in time over the past 6 months
• The spread between the lines ranges from $5
to $15 depending on the month, which reflects
the volatility in forward pricing
Attachment Staff Report Item 14F
11 Market Price Benchmark Trends 2020-2027
• Forecast MPBs used to develop PCIA and generation rates are calculated in Sept each year:
o Energy: Avg forward price during Sept for delivery the following year o REC: Avg executed contract price in the past 15 months for delivery in following year
o RA: Avg executed contract price in the past 3 years for delivery the following year
• Forecasted vs. Final MPBs vary significantly, reflecting year to year market volatility
• RA MPB in 2025 reflects regulatory changes, no future PCIA reform is assumed in forecasts
• "Final" numbers in 2026 reflect actuals through March and updated forecast as of April
RA Market Price Benchmark
Brown Power Market Price Benchmark
RPS Adder
Attachment Staff Report Item 14F
12 Historical Generation Rates & PCIA
• Rates increased and PCIA decreased from 2022 to 2025, driven by forecasted increases in energy market prices • Since 2025 energy costs have softened in addition to substantive PCIA reform, setting PCIA higher and rates lower in 2026
• Lower prices are expected to continue through 2026 and we are forecasting a modest increase to generation rates and a lower PCIA in 2027, though rates remain stable ▪ Between calendar year 2025 and 2026, customer rates dropped 20%, and between 2026 and 2027 Ava is estimating rates will increase 0.3% (inclusive of PCIA)
▪ Between fiscal year 2025 and 2026, customer rates dropped 2%, and between 2026 and 2027, rates are expected to drop another 11%
12 0.078 0.082 0.072 0.083

0.132 0.145

0.129

0.114

0.088

0.026 0.030 0.038

0.037

0.012

0.006

0.006

0.019

0.030

0.017 0.018

0.008 0.011

0.029

0.039

0.016 0.014
-0.001 -0.02
0 0.02

0.04 0.06

0.08 0.1

0.12 0.14

0.16 2019 2020 2021 2022 2023 2024 2025 2026 2027-Base
$/kWh
Fiscal Year
Customer Rate Revenue Profile
Ava Average Rates PCIA Fees Operating Expenses Margin

0.081 0.080 0.066

0.113

0.137 0.141 0.139

0.085 0.090

0.029 0.032 0.043

0.024

0.004 0.010 0.004

0.033 0.029

0.016 0.016

0.003

0.022

0.038 0.035

0.025
-0.011

0.000
-0.04
-0.02
0 0.02

0.04 0.06

0.08 0.1

0.12 0.14

0.16 2019 2020 2021 2022 2023 2024 2025 2026 2027-Base
$/kWh
Calendar Year
Customer Rate Revenue Profile
Ava Average Rates PCIA Fees Operating Expenses Margin
Attachment Staff Report Item 14F
Draft Budget: Revenues
• Despite higher load, revenue from electricity sales is expected to decrease for the fiscal year with Ava's generation rates declining ~11%. Note: calendar rates are flat and fiscal year rates are down because calendar 2025 rates were significantly higher.
• Value proposition remains unchanged at 0.5% discount to PG&E for Bright Choice and a $0.0175 premium on Renewable 100 products
• Estimated bad debt slightly increased from 1.0% to 1.25% of billings based on rising trends and getting ahead of possible inflation increases due to oil market volatility • $24.1MM recognition from GASB 62 deferred revenue
▪ $18.9MM from the Rate Stabilization Fund
▪ $5.2MM related to resolution R-2024-26, which is half of the $10,504,837 deferred for incremental clean energy generation and storage from the 2023 RFO for projects starting in 2027 13 Attachment Staff Report Item 14F
Draft Budget: Base Case Revenue Assumptions
• Base Case Assumptions have MPB’s for calendar year 2026 down to align with market actuals and forwards year to date
• Forward looking prices in cost of energy reflect market price assumptions • In addition to MPB assumptions, revenue requirement inputs directly from PG&E are critical in determining generation rates
o In May ERRA filing, PG&E's revenue requirement stayed relatively flat despite declining load in 2027, which needs further diligence
14 Attachment Staff Report Item 14F
FY 2026-2027 Scenarios & Sensitivities
15 Ava looked at possible alternative MPB/revenue scenarios —High-End and Low-End • High-end: calendar year 2026 prices end up as current MPB forecasts from May ERRA filings, which are unchanged from the October ERRA filing
• Low-end: calendar year 2026 prices are one standard deviation down from current forward averages for brown power and Ava’s base case RPS and RA estimates • There is upward pressure on rates based on PG&E's request for increase in revenue requirement in their GRC filing that is anticipated, but unlikely to be implemented in the 2026-27 fiscal year MPBs 2026 2027 2026 2027 2026 2027
Power 35.04 46.02 23.70 33.28 40.90 47.61
RPS 40.00 36.92 40.00 36.92 62.45 62.45
RA 10.00 10.00 10.00 10.00 11.53 11.53
Base Case Low End High End Base Case Low End High End
Revenues 800,658,000 722,789,000 885,732,000
Cost of Energy 789,541,000 769,507,000 833,389,000
Overhead 54,306,000 54,306,000 54,306,000
Net Non-Op 24,279,000 15,988,000 23,849,000
Net Revenues (18,910,000) (85,036,000) 21,886,000
Load (MWh) 9,553,000 9,553,000 9,553,000
Case estimates do not
include RSF contributions in
order for scenarios to have
an equivalent comparison.

Attachment Staff Report Item 14F
Draft Budget: Overview of Operating Expenses
16 Expenses are divided into three overall cost center
categories:
• Energy Operations which includes all energy, energy
attributes, ancillary related costs and required
management services such as scheduling, data
management, and customer billing
• This category comprises 93.6% of Ava’s total
operating expenses
• Overhead Operations which includes all personnel
and staffing needs as well as work function cost
centers required to manage the organization at large,
and is about 6.4% of total operating expenses
• Non-Operating Expenses which are all capital and
capital transfer related costs, including Local
Development Fund contributions. This category is
presented and discussed in a later slide
Attachment Staff Report Item 14F
Draft Budget: Energy Operations
17 Energy Costs
• Costs are generally derived from a blend
of contracted and open position for all
energy attributes
▪ Currently, renewables, carbon free, and RA
are fully procured
▪ Open prices are non-stressed, mean
forecasted
▪ Material increase in PPAs due to reduced
revenue expectations from lower market
prices
PPAs Hedges Open Resource
Adequacy
RECs Carbon Free Transaction
Costs
Other
Fiscal Year Cost of Energy Budget by Attribute
2022 2023 2024 2025 2026 2027
Attachment Staff Report Item 14F
Draft Budget: Marketing & Communications
18 FY 2027 Summary of Adjustments:
• Continued notifications to unincorporated San Joaquin County solar customers • Customer mailings for Fremont commercial Renewable 100 transition • Investment to a brand awareness strategy and launch phase one of a multi-year awareness initiative • Investment in sponsorships, fellow, partners to activate more robust community engagement Attachment Staff Report Item 14F
Draft Budget: General & Administrative
19 FY 2027 Summary of Adjustments:
• Operational Expenses: Increase is primarily due
to accounting change for fees with line of credit
• Memberships Dues & Sponsorships: Costs
associated with JPAs, trade associations, and
industry associations (CalCCA, CCCFA, CCPower,
CFEE, Veloz, etc.)
• Software & Subscriptions: Increases to cover
additional software needs for IT, Power Resources,
and EAS data and increased cyber security needs
• Rent & Utilities: Increase due to initiation of
primary lease agreement from a sub-lease
agreement and no longer receiving TI related
allowance
• HR & Recruiting: Some increase in recruiting costs
for placing temporary consultants
• Board & Director Fees: These are reduced to more
closely align with Board practices of requesting
stipends
Attachment Staff Report Item 14F
Draft Budget: Local Development Fund Balance*
20 Program Area Balance Earmarked
Local Development $2,800,000 $2,600,000
BE+EE
Building Electrification $14,600,000 $8,500,000
Building Efficiency Accelerator $1,300,000 $1,000,000
TE
Vehicle Electrification $8,100,000 $4,500,000
Ava Charge $15,900,000 $15,900,000
Bike Electric $2,200,000 $2,200,000
SmartHome Charging $5,700,000 $1,700,000
Resilience
Critical Municipal Facilities (CMF) $5,800,000 $5,800,000 SmartHome Battery $10,900,000 $10,900,000
Resiliency Hubs $5,600,000 $5,600,000
BE+TE Virtual Power Plant DERMS Platform $1,900,000 $1,900,000 Grants Community Investment Grants $8,800,000 $8,800,000 Total $83,600,000 $69,400,000
Local Development Fund Reconciliation Board Item from March 2025 *Fund balance as of 1/31/26 Attachment Staff Report Item 14F
Local Development – FY27 anticipated spend
21 Program Area FY '27 Spend Committed FY'27 Activities Program Roadmap $500,000 $500,000 Local Development Programs Roadmap Ava Charge $2,640,000 $6,750,000 Development, Operations and Marketing for 5 Sites Critical Municipal Facilities $2,000,000 N/A - 25 yr PPA Complete Projects, Establish operating reserves, bill customers
Grants $600,000 $1,900,000 Issue new solicitation, select at least three grantees and Payments for contracted grants
SmartHome Battery
incentives $1,250,000 $10,900,000 Upfront and ongoing payments for SHB Resilience Hub
TA/Incentives $1,500,000 $5,600,000 Upfront incentives and Technical Assistance costs Building Efficiency
Accelerator $1,000,000 $1,000,000 Incentives for Commercial Heat Pump Water Heaters Ava Bike Electric incentives $2,200,000 $2,200,000 Bike Electric will add $4M from ACTC Ava SmartHome Charging
incentives $300,000 $600,000 Enrollment incentives and VPP dispatch payment for SmartHome Charging program Total $11,990,000 $29,450,000
Attachment Staff Report Item 14F
Draft Budget: Deferred Revenues & Reserve Funds
22 • Current reserve fund balance
covers 40.1% of projected
operating expenses for FY 2027
• Current FY surplus estimate of
$83MM not included in
balances
• Staff will bring
recommendations for
allocation of the surplus to the
Board after completion of the
annual audit in November
• Budget includes a release of
$5.2MM, equal to 50% of the
deferred revenues related to
Clean Energy Investments
Deferred Revenue Usage Balance Guidance
Rate Stabilization Fund 162,546,828
R-2025-23 authorizes recognition of ~$35MM to balance FY25-26 budget R-2025-41 authorizes conversions from previous budget deferrals R-2025-42 & R-2025-51 authorizes RSF funding allocations Clean Energy Investments 10,504,837
R-2023-37 authorizes deferral for specified use.

R-2024-26 authorizes recognition in 2027
Contribution Year Contribution Withdraws Balance Operating Expenses* OpEx Year PctCoverage 2018-2019 40,513,687 40,513,687 - 410,686,000 FY 2019-2020 9.9% 2019-2020 49,704,640 90,218,327 - 383,045,000 FY 2020-2021 23.6% 2020-2021 - 90,218,327 - 471,897,000 FY 2021-2022 19.1% 2021-2022 65,655,073 155,873,400 - 562,667,000 FY 2022-2023 27.7% 2022-2023 75,000,000 230,873,400 - 732,885,000 FY 2023-2024 31.5% 2023-2024 100,000,000 330,873,400 - 814,123,000 FY 2024-2025 40.6% 2024-2025 - - 330,873,400 899,393,000 FY 2025-2026 36.8% 2025-2026** - 330,873,400 - 844,230,000 FY 2026-2027 39.2% *Operating Expenses are fiscal year ahead for coverage purposes: 2025-26 contribution year aligns with 2026-2027 OpEx **Expected contribution with current policy as of 5/6/2026 Deferred Revenue
Balances After Utilization Balance
Rate Stabilization Fund 143,636,828
Clean Energy Investments 5,252,419
Attachment Staff Report Item 14F
5 -Year Forecast
23 • The reliability of any 5-year revenue forecast is
limited due to poor visibility into key PG&E
inputs, such as revenue requirements and load o This forecast does not assume material changes to PG&E revenue requirements,
regulatory reform, and market prices.
o Actuals will vary based on potential known
and unknown changes
• Forecast Assumptions: o No material changes to rate setting and PCIA regulatory methodologies
o No change to current value proposition o Markets perform at non-stressed, mean expected prices
o Cost of energy services increases at
historical growth rate
o Overhead increases at rate of inflation o Interest rates persist at 3.5% • Surplus revenues can be applied to lowering
rates, clean energy procurement, local
development funding, working capital needs,
RSF/reserves, operational enhancements, etc.

Attachment Staff Report Item 14F
Conclusion & Authorization
• Staff is seeking approval of the presented fiscal year 2026-2027 budget, including the expectation to utilize $18.9MM from the Rate Stabilization Fund to fully offset the forecasted deficit o Actuals will change relative to budget scenarios based on energy market conditions, developments in CPUC proceedings, and updates to PG&E ERRA and GRC filings • Staff will provide a review with the board mid-year, incorporating 2026 actuals and final 2027 rates o PG&E's October ERRA filing will provide a meaningful update 24 Attachment Staff Report Item 14F
FY 2026-2027 Draft Budget Expanded View
25 Attachment Staff Report Item 14F
Appendix
26 Attachment Staff Report Item 14F
PCIA & Operating Headroom
27 • Ava’s generation rates to customers are indexed to PG&E’s generation rate • A portion of the generation cost is a charge from PG&E for the Power Charge Indifference Adjustment (PCIA) • The PCIA is how PG&E recovers "stranded costs or credits" for legacy generation resources • PCIA rates are based on an annual mark-to-market
• For Energy, Resource Adequacy (RA), and Renewable Portfolio Standard (RPS) resources, the mark-to-market is against "Market Price Benchmarks" (MPBs)
• Forecasts for MPBs are presented by the Investor-Owned Utilities (IOUs) in May and then updated in October to establish the following year’s rates
• PCIA and rates are "trued up" from forecast to actual, and any over-collection or under-collection is recovered in rates the following year.
• Higher MPBs --> higher rates and lower PCIA = more operating headroom for Ava • Lower MPBs --> lower rates and higher PCIA = less operating headroom for Ava Portfolio
Costs
Portfolio
Value*
Stranded
Costs/credit
*Value calculated using “Market
Price Benchmarks” (MPBs)
Attachment Staff Report Item 14F
Electricity Product Load & Rates
• Renewable 100:
• Originally set at $0.01/kWh above PG&E and has migrated down as Ava financials improved • Currently priced at $0.0175/kWh above PG&E rates
• Bright Choice:
• Originally set at 1.5% discount to PG&E, reduced to a 1% discount in 2021,increased to a 3% discount in 2022, increased to 5% discount to PG&E rates in 2023. Latest adjustment was to 0.5% discount to PG&E in January of 2026
• The percent load of Bright Choice customers is estimated at ~66% for FY 2027 28 0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0 1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
9,000,000
10,000,000
2023 2024 2025 2026 2027
BC%
Retail MWh
Bright Choice as Percent of Retail Load by Fiscal Year
BC-Res BC-C&I R100-Res R100-C&I BC%
• Growth in Bright Choice in FY 2026 is
due to unincorporated SJC
• Growth in Renewable 100 in FY 2027
is due to Fremont opt up
• Annual load and load shape can
vary materially year to year and
between budget to actuals due to
weather, individual customer usage,
and expansion to new territories
Attachment Staff Report Item 14F
Draft Budget: Renewable & Large Hydro Content
29 • In April 2022, the Board approved the “Path to
Zero by 2030” plan for the Bright Choice
product, as shown in the table to the left
• Periodically, the Board has approved adjusting
targets to fit Ava’s financial position, typically
raising targets
• In December 2025, the Board approved a
compliance period approach across multiple
years instead of single year targets specifically
This table shows where Ava currently stands
with procurement relative to the compliance
period, and annual, targets
Year Renewables Lg. Hydro Total Renewables Lg. Hydro Total Long/Short 2024 52.0% 29.0% 81.0% 62.0% 33.7% 95.6% 14.6%
2025 56.0% 25.0% 81.0% 54.5% 35.5% 90.0% 9.0%
2026 55.6% 21.0% 76.6% 54.7% 18.0% 72.7% -3.9%
2027 64.0% 21.0% 85.0% 58.4% 12.3% 70.8% -14.3%
Period* 57.3% 23.7% 80.9% 57.4% 24.9% 82.3% 1.4%
Annual Targets Actuals/Forecast
Attachment Staff Report Item 14F
Draft Budget: Fiscal Year Personnel Details
• FY 2026 Budget was set for 7 additional FTE (105 total) to build more depth and to continue addressing increased workflow in key areas to help scale operations further. ▪ Ava is not filling 2 roles bringing the forecasted end of FY 2026 FTE to 103. • FY 2027 Budget seeks to add 5 FTE (108 total) to provide added expertise and support in key areas and help to meet essential business needs.
▪ 1) Contract Management Analyst 2) Finance Manager / Staff Accountant 3) Contract / Settlements Analyst ▪ 4) Optimization Software Engineer 5) Data Analyst
• Compensation Adjustments:
▪ COLA: 3%; Promotions/Wage Adjustments: 3%; AIP Compensation: 12% ▪ Accounting for increased healthcare premiums and associated benefit costs (realized and expected) • Change to benefits reflects some recategorization of expenses from Salaries & Wages to Health Care/Benefits 30 Attachment Staff Report Item 14F
Public Hearing - AB 2561: Ava FY 25-26 YTD
31 FY 2025 - 2026 Budgeted Headcount
Total Active FTE
Budgeted 105
New FTE Budgeted 7
New FTE Filled to date 5
Average Time to Hire 67 Days
Vacancy Rate 29%
Retention Rate 95%
Average Turnover Rate 5%
*For recruitment, only new budgeted positions are included. This does not account for other roles, like backfill positions.
*Reporting Period: FY 25-26; July ‘25 - April ‘26 (YTD at time of report) *Average Time to Hire: Days from role posted to start date. *FTE: Full-time employee; YTD: Year-to-date
Ava has a strong retention rate of 95%, with only 5
terminations so far this year.

Hiring Decision: Ava elected not to fill 2 positions this FY, bringing the total budgeted FTE down to 103.

Challenges faced in hiring:
• Finding a great fit can take time, but it’s worth it. ▪ We are prudent in our hiring process, strategically
planning the timing of hiring, carefully considering all aspects of the role and desired impact.
• Competition for talent is high, especially in the Bay Area What helps us overcome challenges?
• A strategic and robust hiring approach
• Ava is mission-driven & a certified Great Place to Work! This slide and data presented ensure compliance to AB 2561, which requires local public agencies to present the status of vacancies and recruitment and retention efforts at a public hearing before the governing board of the local agency at least once per fiscal year.

Attachment Staff Report Item 14F
Draft Budget: Legal, Policy, & Regulatory Affairs
32 FY 2027 Summary of Adjustments
Legal:
• Litigation counsel: funding to cover active litigation; litigation readiness; other potential disputes
• Commercial counsel: all procurement activities other than power resources • Software and implementation: Legal research resources; contract platform Phase 3 rollout Policy and Regulatory Affairs
• Federal and state lobbyists
• Consultants for compliance and CAISO matters
• Potential AI services
Attachment Staff Report Item 14F
Draft Budget: Professional Services
33 FY 2027 Summary of Adjustments:
• Technology Consultants: Expanding operations requires additional engineering and CRM structure and design support
• Other Services: Primarily reflects temporary consultants and contractors, which was recategorized and consolidated this year
Attachment Staff Report Item 14F
Draft Budget: Non-Operating Activity
34 Non-Operating Revenue
• Interest Income: Reflects “higher-for-longer”
FED interest rate policy and expected balance
drawdowns
▪ Rates are estimated to hold at 3.5%
• Other Non-Operating Revenue: is expected
income AT&T tower rent at the 8th Street building
Non-Operating Expenses
• Borrowing Interest: reduced due to changes in
line of credit accounting
• Capital Expenditures: costs estimated for
general improvements at 1999 Harrison St
offices
• Local Development: no planned incremental
contributions in light of the current fund balance
and future planning work that is underway