Award Agreement No. PRO.0232, New CDD Campus at 2000 Marin Design Services
Summary of
Proposed
Commission Action:
Approve the selection of Mark Cavagnero Ass ociates (MCA); award Agreement No. PRO.0232, New CDD Campus at 2000 Marin Design Services, to provide architectural, engineering, and consulting services to design new facilities for the San Francisco Pu blic Uti lities Commission (SFPUC) Water Enterprise City Distribution Division (CDD) at 2000 Mar in Street, San Francisco , to MCA; authorize the General Manager to execute a professional services agreement with MCA for an amount not -to-exceed $27,800,000 and with a duration of five years , subject to Board of Supervisors’ approval under San Francisco Charter Section 9.118; and request that the Board of Supervisors grant an exception from the Cam paign and Governmental Conduct Code for the Social Impact Partnership provisions of the Agreement.
Background: The CDD oversees w ater distribution within City limits. The CDD is responsible for the infrastructure of the City’s water system, oper ating and maintaining its reservoirs, pump stations and approximately 1,250 miles of water pipes ; managing the City’s meter program ; and mai ntaining CDD facilities, equipment, and fleet vehicles. The current CDD campus, located at 1990 Newcomb Avenue, has served as CDD’s main facility for almo st six decades.
Due to the exponential growth of service demands over the decades and challenges wi th maintaining operations at a facility that has exceeded its useful life, SFPUC has an acute need for the design and construction of a new headquarters facility to alleviate overcrowding, address building code and safety issues, eliminate inefficiencies, and accommodate CDD’s current and future operational needs.
Description of Scope
of Services:
The Consultant will be responsible for:
• Design of a new campus consisting of five buildings , including an office building, two industrial shop buildings, a warehouse, and a parking structure for a total of approximately 371,000 gross square Agreement: PRO.0232, New CDD Headquarters at 2000 Marin Commission Meeting Date: February 22, 2022
feet;
• Managing all engineering and specialty subconsultants; • Coordinating all design efforts toward a complete, efficient, functional and operational facility;
• Overseeing construction administration tasks during construction; and • Delivering Social Impact Program (SIP) benefits to the community, to which MCA voluntarily committed in its Proposal, conditioned on Board of Supervisors (BOS) adoption of an ordinance exempting Agreement No. PRO.0232 from the recently enacted legislation prohibiting behested payments ( Board of Supervisors Ordinance No. 232-21 (Board File No. 201132), which amended the Campaign and Government Conduct Code effective January 23, 2022 ). Subject to award and approval of this Commission, SFPUC will submit the proposed ordinance as a companion mea sure to its request for BOS approval of the agreement under Charter Section 9.118. I f the BOS does not pass the ordinance exempting Agreement No. PRO.0232 from the behested payments prohibition, staff will remove MCA’s SIP obligations from Agreement No. PRO.0232 prior to execution of the agreement.
Environmental
Review:
Authorization to execute this professional services agreement does not fall within the definitio n of a “project” under the California Environmental Quality Act ( CEQA) Guidelines Section 15378 because work under the agreement will consist of design and support services only, and no support during Start -up, Construction and Closeout services wi ll be in itiated under this contract until CEQA review is complete and until this Commission has reviewed and considered the CEQA determination and has approved the project. Approval of individual task orders under this c ontract for activities such as geo technical investigations would require compliance with CEQA prior to initiation of ground-disturbing activities.
Authorization to execute this professional services agreement is not an approval of any proposed project and SFPUC retains discretion to, among other th ings, modify the proposed project(s) to mitigate significant environmental impacts, require the implementation of specific measures to mitigate any significant environmental impacts of the project(s), or cancel the project, following completion of environmental review.
Result of Inaction: A delay in award ing this agreement will delay correction of the inadequacies of existing facilities, increase escalation costs , and negatively impact funding and schedules for other critical Water Enterprise infrastructure programs.
Agreement: PRO.0232, New CDD Headquarters at 2000 Marin Commission Meeting Date: February 22, 2022
Funding, Budget,
and Costs:
Funding: Funds will be available for individual task order awards from Project Number 21396-New CDD Headquarters at 2000 Marin. This Agreement is Water Enterprise Capital Improvement Program (CIP) funded.
Not-to-Exceed Amount: $27,800,000
Schedule: Advertised: September 17, 2021
Estimated Notice-to-Proceed Date: April 1, 2022
Estimated End Date: March 31, 2027
Duration: Five Years
Evaluation and
Selection Criteria:
Minimum Qualifications
The minimum qualifications set forth below were required for a Proposer to be eligible to submit a proposal in response to the RFP.
Prime Proposer or Joint Venture (JV) Partners Minimum Qualifications • 15 years demonstrated experience as the Lead Architect during design and construction on at least one (1) civic or industrial completed project with a minimum project construction value of $80,000,000 that included two or more buildings within the last 15 years.
• Experience managing five or more subconsultants as Lead Architect during design and construction on a minimum of three completed projects, each with a minimum of $50,000,000 construction value, within the last 10 years.
• Experience as Lead Architect during design and construction on a minimum of two completed projects utilizing an integrated project delivery method, which involved preparation of early trade packages between 65% and 95% completion of design, each with a minimum of $50,000,000 construction value within the last 10 years.
• Experience as a Lead Architect coordinating with design-build or construction manager/general contractor (CMGC) subcontractors during design and construction on a minimum of two completed projects with a minimum of $50,000,000 construction value within the last 10 years.
Non-Leading JV Partner Minimum Qualifications
Experience as Lead Architect on a minimum of two projects with a minimum construction value of $25,000,000 that included one or more of the following occupancy types: office, warehouse, or industrial shops, completed within the last 15 years.
Subconsultant Qualifications
A proposed Subconsultant providing technical services described in the RFP was Agreement: PRO.0232, New CDD Headquarters at 2000 Marin Commission Meeting Date: February 22, 2022
required to possess at a minimum the following qualifications. The SFPUC strongly encouraged Proposers to engage in positive efforts to utilize diverse, local firms as subconsultants for this project.
• A minimum of five years performing one of the technical fields required under the scope of services AND have a principal or partner with at least 10 years professional design experience in that field. The five -year "in business" and the 10- year principal/partner experience requirements, set forth above, are separate and distinct; one cannot be substituted for the other.
Evaluation and Selection
The evaluation and select ion process consisted of four phases : (1) Written Proposal, (2) Oral Interview , (3) Overhead and Profit Schedu le (OPS) , and (4) Social Impact Partnership Submittal evaluation . The consultant teams could be awarded up to a maximum of 1,000 points: 500 point s for the written proposal phase, 350 points for the oral interview phase , 100 points for the OPS, and 50 points for the Social Impact Partnership Submittal.
The technical evaluation panel consisted of individuals knowledgeable on the subject matter and i ncluded staff from Public Works, the Airport, and CDD. The panel reviewed and ranked the consultant te ams during the written proposal and oral interview phases. A separate panel of community benefits experts evaluated the Social Impact Partnership Submittal.
SFPUC received three proposals in response to the RFP: (1) Mark Cavagnero Associates, (2) KMD Architects, and (3) Dreyfuss and Blackford Architecture.
The SFPUC determined that the proposals from KMD Architects and Dreyfuss and Blackford Architectur e were not responsive to the RFP due to errors in their respective Overhead and Profit Schedules. Contrary to the clear instructions of the RFP, both proposers listed more than one multip lier for a single firm. This was a material defect because the Over head and Profit multiplier, as a component of the Evaluation Criteria, could not be calculated as provided in the RFP. As a result, Staff rejected these proposals as non-responsive.
SFPUC Staff therefore recommends award to the sole, qualifed proposer submitting a responsive proposal, Mark Cavagnero Associates.
Agreement: PRO.0232, New CDD Headquarters at 2000 Marin Commission Meeting Date: February 22, 2022
Final Score
Summary: Written Proposal, Social Impact Partnership, Oral Interview, and Overhead & Profit Schedule (OPS):
Firms
Written
Proposal
Score
(500)
Social Impact
Partnership
Score
(50)
Oral Score
(350)
OPS
Score
(100)
Total
Score
(1000)
Mark Cavagnero
Associates 435.2125 34.1667 303.3250 46.0000 818.7042
Compliance with
Chapter 14B: Local
Business Enterprise
Utilization and Non-
Discrimination in
Contracting
Ordinance:
The C ontract Monitoring Division (CMD) establish ed a Local Business Enterprise (LBE) subconsultant participation requirement of 13 % for this agreement.
The CMD has determined that MCA has complied with the pre -award Chapter 14B requirements. MCA committed to a LBE subconsultant participation of
32.45%.
Recommendation: SFPUC staff recommends that the Commission adopt the attached resolution.
Attachments: CMD Memorandum
PUBLIC UTILITIES COMMISSION
City and County of San Francisco
RESOLUTION NO.
WHEREAS, The San Francisco Public Utilities Commission (SFPUC ) requires a new campus for the Water Enterprise C ity Distribution Division (CDD). The current CDD campus located at 1990 Newcomb Avenue , has served as CDD’s main facility for almost six deca des.
Due to the exponential growth of service demands over the decades and challenges with maintaining operations at a facility that has exceeded its useful life, there is an acute need for the design and construction o f a new headquarters facility to alle viate overcrowding, address building code and safety issues, eliminate inefficiencies, and accommodate CDD’s cu rrent and future operational needs; and
WHEREAS, Procurement of the services of qualified design consultants to provide specialized architectural , engineering and specialty consultant design services is necessary to supplement SFPUC staff for this proposed Project; and
WHEREAS, On September 17, 2021, SFPUC advertised a Request for Proposals for the design of a new campus for CDD, consisting of five buildings, totaling approximately 371,000 gross square feet; and
WHEREAS, Staff anticipates services to begin in April 1, 2022, and end in March 2027, with an agreement duration of five years; and
WHEREAS, SFPUC and Contract Monitoring Division ( CMD) staff, upon review of the proposals, determined that Mark Cavagnero Associates (MCA) was the sole responsive proposer; and
WHEREAS, The CMD established a Local Business Enterprise ( LBE) subcontractor participation requirement of 13% for this a greement and MCA committed to 32.45% LBE subcontractor participation; and
WHEREAS, Authorization to execute this professional services agreement does not fall within the definition of a “proj ect” under the California Environmental Quality Act ( CEQA) Guidelines Section 15378 because work under the agreement will consist of design and support services onl y, and no support during Start -up, Construction and Closeout services will be initiated unde r this contract until CEQA revie w is complete and until this Commission has reviewed and considered the CEQA determination and has approved the project, and a pproval of individual task orders under this contract for activities such as geotechnical investig ations would require compliance with CEQA prior to initiation of ground-disturbing activities; and
WHEREAS, Authorization to execute this professional services agr eement i s not an approval of any proposed project and SFPUC retains discretion to, among other things, modify the proposed project to mitigate significant environmental impacts, require the implementation of specific measures to mitigate any significant en vironmental impacts of the project, or cancel the project, following completion of the environmental review; and
WHEREAS, MCA’s obligation to deliver Social Impact Program (SI P) benefits to the community, to which MCA voluntarily committed in its Prop osal, is conditioned on Board of Supervisors (BOS) adoption of a n ordinance exempting Agreement No. PRO.0232 from the recently enacted legislation prohibiting behested payments (Board of Supervisors Ordinance No. 232-21 (Board File No. 201132), which amended the Campaign and Government Conduct Code effective January 23, 2022); if the BOS does not pass the ordinance that exempts Agreement No.
PRO.0232 from the be hested payment p rohibition, staff will remove MCA ’s SIP obligations from Agreement No. PRO.0232 prior to execution of the agreement; and WHEREAS, The firm being awarded an agreement by the SFPUC must be in compliance with the Equal Benefits Provisions of Cha pter 12B of t he City’s Administrative Code either at the time of the award, or within two ( 2) weeks of t he date of the Commission award; failure of the bidder to obtain compliance certification from CMD may, in the G eneral M anager’s sole discretion, result in recission of the award by this Commission; now, therefore, be it RESOLVED, That this Commission her eby approves the selection of MCA and awards Agreement No. PRO.0232, New CDD Headquarters at 2000 Marin, to provide to provide architectural, engineering, and consulting s ervices to design new facilities for the Water Enterprise's City Distribution Division (“CDD”) at 2000 Marin Street, San Francisco; and be it
FURTHER RESOLVED, That this Commission authorizes the General Manager of t he San Francisco Public Utilities Comm ission to execute a professional services agreement with MCA for an amount not- to-exceed $27,800,000 and with a duration of five years , subject to the Board of Supervisors’ approval under San Francisco Charter Section 9.118; and be it
FURTHER RESOLVE D, That any contractual obligation under the SIP program provisions are hereby e xpressly conditioned on the Board of Supervisors’ adoption of an ordinance exempting the SIP program provisions of the A greement from the behested payment prohibitions under the San Francisco Campaign and Governmental Conduct Code.
I hereby certify that the foregoing resolution was adopted by the Public Utilities Commission at its meeting February 22, 2022.
Secretary, Public Utilities Commission
London N. Breed, Mayor
Carmen Chu, City Administrator
Romulus Asenloo, Director
1155 Market Street, 4th Floor, San Francisco, CA 9410
Telephone (415) 581-2310 Fax (415) 581-2351
CONTRACT MONITORING DIVISION
CITY ADMINISTRATOR’S OFFICE
MEMORANDUM
Date: February 14, 2022
To: Shelby Campbell, Project Manager, SFPUC
Melissa Ng, Contract Administrative Analyst, SFPUC
From: Linda Rainaldi, Contract Compliance Officer, CMD
Subject: PRO.0232 New CDD Campus at 2000 Marin Design Services (Rebid of PUC.PRO.0198)
Revised CMD Award Review
The Contract Monitoring Division (“CMD”) reviewed the consultant proposals and supporting documentation and applied the appropriate rating bonuses submitted for the above referenced project. Based on this review, CMD determined that out of the three (3) proposals submitted all were materially compliant with the pre-award Chapter 14B requirements:
Dreyfuss + Blackford Architecture
KMD Architects
Mark Cavagnero Associates
Rating Bonus
The rating bonus does not apply for contracts estimated by the awarding department which exceed $20 million dollars.
Score Sheets and Score Tabulations
CMD reviewed the SFPUC tabulations for the written proposal, Social Impact Partnership submittal, oral interview, and OPS scores.
Based on the SFPUC’s determination issued on February 13, 2022 and February 14, 2022 respectively, both KMD Architects and Dreyfuss + Blackford Architecture were deemed non- responsive and ineligible for further consideration by the SFPUC. As a result, Mark Cavagnero Associates (“MCA”) became the sole remaining responsive proposer.
The RFP indicates that the contract will be awarded to the highest ranked proposer.
LBE Subconsultant Participation Requirement
MCA, as the sole responsive proposer, met the 13% LBE subconsultant participation requirement by listing the following LBE firms:
Firm Service LBE
Status
LBE
Participation
LBE Credited
Participation
YA studio Architecture & Interiors SF LBE-MBE
(Small) 14.11% 14.11%
SJ Engineers Plumbing & Fire
Engineering
SF LBE-MBE
(Small) 8.24% 8.24%
HRA Consulting Eng. IT & Low Voltage SF LBE-MBE
(Micro) 4.61% 4.61%
Banks Landl Lighting Lighting Design SF LBE-OBE
(Small) 2.63% 2.63%
Clearstory Signage Consultant SF LBE-WBE
(Micro) 2.40% 2.40%
Emily Borland
Specifications, Inc.
Architectural Specifications
and Project Manual
Management
SF LBE-WBE
(Micro) 0.46% 0.46%
TBD Consultants Cost Consulting SBA LBE-
OBE 0.71% 0.00*
Total: 33.16% 32.45%
*SBA LBE certified firms are ineligible to receive LBE participation credit towards meeting the LBE participation requirement, therefore, TBD Consultants’ listed credit was deducted accordingly.
MCA also listed the following non-LBE firms:
Firm Service LBE Status Listed
Participation
Stantec Architecture Inc. Industrial Planning & Operations Consultant, MEP, FF&E Non-LBE 8.62%
BKF Civil Engineering Non-LBE 5.75%
Miyamoto International Structural Engineering Non-LBE 5.26% Charles M. Salter
Associates Acoustical & AV Non-LBE 1.38%
Syska Hennessey Vertical Transportation Non-LBE 0.37%
Stok LLC Sustainability, Commissioning Non-LBE 3.78%
Watry Design, Inc. Parking Consultant Non-LBE 2.63%
RDH Building Science Waterproofing Non-LBE 2.63%
Reax Engineering
Fire Life Safety Code Consulting,
Fire Protection Engineering and
Smoke Control Engineering
Non-LBE 0.48%
Total: 30.90%
Based on the foregoing, CMD has determined that MCA complied with the pre-award Chapter 14B requirements. Should you have any additional questions and/or concerns, please feel free to contact me at (415) 754-3227.
NEW CDD CAMPUS
AT 2000 MARIN STREET:
AWARD OF PRO.0232
Shelby Campbell, Project Manager
February 22, 2022
NEW CDD CAMPUS AT 2000 MARIN
2 DESIGN SERVICES,
PRO.0232
• Mark Cavagnero
Associates (MCA)
• $27,800,000
• 5 Years
WHO IS CDD…SFWD…WATER
3 • Potable, recycled, groundwater,
auxiliary
• 1250 miles of water mains
• 15 miles of pipe replaced per year
• 12 reservoirs
• 9 pump stations
• 176,000 water meters
1. 1906
HISTORIC YARD
639 BRYANTSTREET
EXISTING YARD
1990 NEWCOMB
PROPOSED YARD
2000 MARIN STREET
SFWD/CDD HISTORY
4 2: 1963 3: 2027
EXISTING CDD CAMPUS CONDITIONS
5 C
CAMPUS DESIGN PRINCIPLES:
S SECURE CAMPUS: RESTRICTED ACCESS + VISIBILITY OF OPERATIONS P PEDESTRIAN-SAFE CAMPUS: CLEAR AND SAFE PEDESTRIAN PATHWAYS + SEPARATION OF VEHICULAR CIRCULATION
C COMMUNITY-BUILDING CAMPUS:
S SHARED AMENITIES + GATHERING SPACES
C CENTRAL COMMUNITY GREEN ADJACENT TO HUB + GARAGE P PUBLIC FACE OF THE WATER DEPARTMENT:
STREETSCAPE PRESENCE + PUBLIC ART
PROPOSED YARD
2000 MARIN STREET
6 2000 MARIN SITE CONDITIONS
7 CAMPUS SITE PLAN
8 SCHEMATIC DESIGN
9 CAMPUS VIEW | LOOKING NORTHWEST TOWARDS POTRERO HILL
SCHEMATIC DESIGN
10 CAMPUS VIEW | MAIN ENTRY GATE + METER SHOP PICK -UP
SCHEMATIC DESIGN
11 CAMPUS VIEW | MAIN STAIR AT PARKING GARAGE TOWARDS CAMPUS QUAD
SCHEMATIC DESIGN
12 CAMPUS VIEW | ADMIN BUILDING ENTRY FROM CAMPUS QUAD
SCHEMATIC DESIGN
13 LANDSCAPED GATHERING PLAZA
CLIMATE RESILIENCY
Source of Power = BCTD
Green Building Leadership
• No Gas
• Renewables
• Water – R etention, Recycle, Reuse
Planning for EV
• Infrastructure
• Renewables/Batteries
14 PROJECT BUDGET & SCHEDULE
15 PROJECT BUDGET: $393.6M
PROJECT SCHEDULE:
PROJECT SCHEDULE
Schemati c Desi gn
Award Design Contract
Award CM/GC Contract
Award CM Contract
Envi ronmental Revi ew
Desi gn
Demo & Si te Work
Construction
Substantial Completion
Final Com ple tion
20282021 2022 2023 2024 2025 20272026
CONTRACTS
16 DESIGN:
PRO.0232
WHY • Complexity
• Scale
• Technical Expertise
WHO • Mark Cavagnero
Assoc.(MCA)
AMOUNT/TERM • $27.8M/5 Years
NEXT STEP • BOS Approval
• NTP in March
Request Award of PRO.0232 to MCA
CONTRACTS
17 CM/GC – WD2879R
WHEN Proposals Due February 9
WHY • Expedited Schedule
• Cost Control
• Collaboration
• Maximize Participation
INF vs. Buildings • Custom vs. Standard
QUESTIONS?
18