May 5, 2022 Brian Browne Wholesale Rate Presentation 5/10/2022 Wilson Constantine
SF Water and Sewer Communications
and Performance Issues
May 7, 2022 Brian Browne UPDATING 5_07_2022 Re: RBOC -
Response to records requests
May 9, 2022 Dave Warner Modifying the Design Drought During a Mega-Drought
Ivy Fine Response to Re: Award of PRO 0232, New
CDD Campus at 2000 Marin Design
Services and Modifications to Submittal
Document
Peter Drekmeier Item 7a - Drought Conditions Update
May 12, 2022 Jesse Jimenez Bid Advisory on Wilson Utility Construction - HH-1007 Transmission
Line 7/8 Upgrades - FFC Case No.
735ST
May 13, 2022 Richard Valle &
David Haubert
Thank you for Supporting Niles Canyon
Stroll & Roll
May 17, 2022 Peter Drekmeier Comments to Citizens’ Advisory Committee regarding the Long-Term
Vulnerability Assessment
Media Clips
• April 25 – May 6
From: Brian Browne
To: Hood, Donna
Cc: Elsbernd, Sean (MYR); bodisco; Peter Drekmeier
Subject: Wholesale Rate Presentation 5/10/2022 - please forward to Ms. Franks and Ms. Sandkulla Date: Thursday, May 5, 2022 12:32:18 PM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Dear Donna,
I see Ms. Erin Franks will deliver a wholesale cost report on 10 May 2022 at the SFPUC- Commission meeting. I have tried to replicate her results using the data I sent you under separate cover. Difficult in that I lack 2021 and 2022 data and have not had my data set validated.
In that time is of the essence would it be possible to send this request to Ms. Franks and Ms.
Sandkulla of BAWSCA. I do not have their email addresses. I assume the SFPUC used revenues/costs obtained from sales to the wholesale customers? The methodology used is the Revenue Requirement approach to ratemaking (2009 WSA). If the 1985 data are correct then I would see the balancing amounts equating over time. If I can have my data validated/corrected and extended through 2022 I would greatly appreciate such.
If I have these data shortly, I will be better able to comment more succinctly on 5/10/2022.
I
also think showing a formula in MGD and the results in hundred cubic feet (748 US gallons) could confuse the reader?* Is the 113.7 MGD used an actual wholesale forecast or a goal? The lower the denominator in the quotient the higher the rates - an anomaly with the revenue requirement approach to ratemaking.I am not sure I understand what is meant by "drivers." This is a bit like saying a cow in the paddock is responsible for raising the price of beef and mild. More like consumers at the super market.
It is also mentioned that debt service is increasing. I will eventually need to see calculations correlating debt service with beneficiaries to ensure loyalty to Proposition 218.
Please feel free to forward to anyone involved in addition to Ms. Franks and Ms. Sandkulla.
Best,
Brian Browne
Pls copy Ms. Sandkulla and Ms. Franks and the Commission * FY 2022-23 Rates = ($302.6+(−$44.8+$14.1M))
113.7 =$4.75/
Water Delivery Volumes
(MGD)1 Revenues ($)
FYE Total WholesaleRetail Total Wholesale Retail
1985 275 170 105 $55,434,000 $28,921,699 $26,512,301
1986 273 170 103 56,961,000 29,099,711 27,861,289
1987 290 185 106 59,582,000 27,602,484 31,979,516
1988 284 181 103 59,741,000 26,559,965 33,181,035
1989 229 138 91 71,153,000 22,034,190 49,118,810
1990 261 160 101 62,914,000 33,879,912 29,034,088
1991 217 132 85 76,214,512 36,243,421 39,971,091
1992 202 125 76 97,794,281 48,039,270 49,755,011
1993 212 133 79 106,888,550 60,280,877 46,607,673
1994 228 149 79 90,994,023 44,670,576 46,323,447
1995 224 146 79 105,251,495 51,892,697 53,358,798
1996 250 162 89 112,799,128 57,448,521 55,350,607
1997 260 171 89 120,394,213 60,043,848 60,350,365
1998 245 158 86 116,281,737 56,106,018 60,175,719
1999 256 169 87 112,883,893 52,117,271 60,766,622
2000 261 173 88 135,950,428 72,140,428 63,810,000
2001 264 175 89 139,719,486 76,156,486 63,563,000
2002 261 171 89 144,304,220 76,388,220 67,916,000
2003 255 169 86 148,975,443 75,589,443 73,386,000
2004 264 181 84 174,933,601 99,987,601 74,946,000
2005 251 167 84 164,089,742 92,098,742 71,991,000
2006 246 164 82 167,381,602 84,477,602 82,904,000
2007 256 176 80 201,268,555 106,915,555 94,353,000
2008 253 173 80 219,767,046 113,932,046 105,835,000
2009 242 164 78 236,476,615 118,129,615 118,347,000
2010 224 149 75 241,390,322 118,193,322 123,197,000
2011 219 144 75 273,038,624 132,212,624 140,826,000
2012 219 144 75 341,980,341 182,609,341 159,371,000
2013 223 148 75 389,598,954 211,147,954 178,451,000
2014 221 150 72 370,987,619 178,953,619 192,034,000
2015 195 128 67 369,742,524 174,654,524 195,088,000
2016 175 111 64 412,145,303 203,005,303 209,140,000
2017 180 116 64 466,279,497 233,356,497 232,923,000
2018 196 129 67 520,133,000 262,764,000 257,369,000
2019 191 125 66 520,485,444 250,454,444 270,031,000
2020 197 132 66 595,509,000 303,340,000 292,169,000
From: Wilson Constantine
To: Streeter, Jonathan P
Cc: Commission; Prager, Jackie (BOS)
Subject: Re: Resident request re: meter and sewer markings Date: Monday, May 9, 2022 10:21:29 AM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Jonathan
Thank you for your response on behalf of the Water Department. So I understand your email…SFPUC doesn’t need to comply with the state mandated 811 marking policies? I am confused. I marked “white USA” on not only the sidewalk, but the street in front of the house.
And SF PUC did not mark any…frankly they didn’t even go over to check. If they did they would of responded to the 811 requests….instead it took two weeks of my calling every SFPUC entity….to get a frantic phonemail from your team that I am getting them in trouble and they will mark the street and meter.
So I appreciate Scott Milton finally marking the
WATER, over two weeks after the statutory requirement. And now the SFPUC Sewer team is also not responding. I find it strange that the Electrical, Gas, Communication have all marked everywhere…but SFPUC has a policy that guarantees it the least amount of effort. Do you not find that odd? I am beyond frustrated with this. At some point, the money we pay… and we pay more with these two city owned services than other local, has to amount to some level of basic service.
I eagerly await the Sewer departments response. I will concurrently be asking my elected officials to make the failure to comply to 811 a fineable offense to the utility.
I believe you
would agree, this is not excellence at any level.
Wilson
On May 6, 2022, at 2:31 PM, Streeter, Jonathan P <[email protected]> wrote:
Hi Mr. Constantine:
I want to follow up on my voicemail from earlier today. Again, thanks for reaching out to us regarding markings for the water and sewer lines on your property.
I apologize for the difficulty you have experienced in getting a clear answer. In short, the San Francisco Public Utilities Commission does not mark water and sewer lines on private property, and the entire sidewalk in front of your house is considered private property.
While I'm sure you know this, your water meter is located in the sidewalk, so that's where our crew made the indication noted below.
<image008.jpg>
I've also reached out to my colleagues in the Sewer Department to ask if they can locate and share with you where the sewer line connects to the curb.
Beyond the curb, it is a homeowner responsibility to locate and identify water and sewer lines.
I understand your frustration in not getting a definitive answer sooner, but I hope this information will help.
Best regards,
JP
Jonathan “JP” Streeter
Communications Specialist
628-215-0940
Pronouns: he/him/his
sfpuc.org
<image003.png>
<image004.png><image005.png><image006.png><image007.png>
-----Original Message-----
From: Wilson Constantine
Sent: Thursday, May 5, 2022 5:10 PM
To: Commission <[email protected]
>; DPW, (DPW) <[email protected]>
Cc: Prager, Jackie (BOS) <[email protected]>
Subject: SF Water and Sewer Communications and Performance Issues
Commissioner Moran & Interim Director Carla Short
I am writing to you as an extremely frustrated San Francisco resident and homeowner.
I contacted PG&E to upgrade my panels to 200 AMP each. Due to the fact that the power lines and transformer are underground, I was asked to notify 811 and indicate by picture and proof from 811 that the markings were complete…as not to damage vital infrastructure.
I contacted 811 several weeks ago, and they notified all relevant parties. The statutory deadline I was told was 48 hours. PG&E marked the gas and
electric lines as per the 811 mandate, other utilities like PACBELL/ATT did the same.
The City and County of San Francisco FAILED to respond. I then filed a follow up notification which is required by the 811 regulations, and again, no response from City and County of San Francisco utilities. I did this FIVE times. In addition, I contacted 311 the city hotline, and was told they didn’t know what to do. I finally reached the water team, which stated that they only mark the meter and the street…not the sidewalk where the work would occur.
Again, the point of the 811 service is that the we protect vital infrastructure. When I asked the Water department about this, they said “oh wow, yeah…but I don’t know what to do”. The SF Water Department person stated that he doesn’t know anyone in the SF Sewer department…even though its SF Sewer- Water-Power is one organization, Sewer is operated by the SF DPW….and the agencies don’t speak.
I called and emailed the SF DPW, and have recited no response. So now, several weeks out, the SF City public utility departments are absent.
I am at a loss, who do I contact to get the side walk marked for Sewer and Water? Why is it so difficult for the SF PUC to adhere to the statutory requirements that they signed onto as part of the 811 process?
I am told by 811, that even though its a requirement,
and the City of SF Sewer and Water are failing to adhere to their statutory requirements, I can not move forward.
Please advise on how I can get to resolution.
My 811 ticket number is W211600340. My address is 3678 17TH STREET. My phone number is 415-606-8160
I look forward to your support in getting to resolution. I am copying Jackie Prager from Supervisor Mandelman's office also, as they have also been involved.
Best
Wilson Constantine
From: Brian Browne
To: Young, Victor (BOS)
Cc: Elsbernd, Sean (MYR); bodisco; Peter Drekmeier; Hood, Donna Subject: UPDATING 5_07_2022 Re: RBOC - Response to records requests Date: Saturday, May 7, 2022 1:22:14 PM
Attachments: image001.png
UCBUCLACONTRACT2010 (1).pdf
CONTROLLER_BROWN_PERL.pdf
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Dear Mr. Young with a copy to the SFPUC Commission (via Ms. Donna Hood) - As you are aware I am interested in the RBOC.
Where is the letter from the Coalition for San Francisco Neighborhoods (attached - a copy) in the minutes for the RBOC of September 20, 2010. Have I missed something? Did any person on the RBOC/SFPUC see or help edit the minutes of the RBOC before you presented them to the Committee during my tenure? It still remains a mystery to me how the long negotiated contract with UCLA and UCB was "disappeared" without comment. It represented the very soul of 2002 Proposition P calling for true independent oversight. Please see a letter from former acting City Attorney to Controller Rosenfield disputing the legality of Memorandum of Understanding (MOU) with the CCSF Controller's City Services Auditor (CSA) to do work
for the independent Revenue Bond Oversight Committee (RBOC/2002 Proposition P). I agreed then and now with Counselor Ward. It was in no way independent during my tenure, despite my many protestations of it being controlled. My then request for a legal review of this MOU was not approved. I am also attaching an email (September 8, 2010) from Charles Perl, SFPUC, to the Chair (6 times) of my then RBOC, Ms. Aimee Brown, to write a rebuttal to me.
In all my years of being involved in regulatory matter I have never seen such cooperation between the regulated (SFPUC) and the regulator (RBOC). Is such legal? Truly,
Brian Browne
On 7/6/2021 5:01 PM, Young, Victor (BOS) wrote:
Mr. Browne:
Below and attached are responsive documents and responses to your request for records submitted from June 27 to July 2 –
I have not found a contiguous site with all the RBOC minutes and agenda from 2003. Have I missed something? I also need the recorded minutes to correlate with these written documents. For starters I want the recorded minutes of the RBOC for the July and August 2007 meetings.
Below is the link to the Agenda and minutes:
BLOCKEDsfpuc[.]org/about-us/boards-commissions-
committees/revenue-bond-oversight-committee/rboc-agendas-and- minutesBLOCKED
In addition, please find attached copies of meeting minutes previously provided to you on November 16, 2020 as requested that are not yet online (from 2003 to 2008).
Thank you again. Some comments. On the meeting of July 2007 - I was excused by the chair. Not absent. I notice other members are noted as excused. Did anyone on the RBOC review the minutes before you published them? Make suggestions? Input? When will the attachment (SF Neighborhood Coalition) supporting the universities be added?
The July 16, 2007, meeting minutes were approved by the RBOC on August 13, 2007.
We will not be able to edit or provide additions minutes adopted by the RBOC.
How may I obtain biographies of RBOC members 2003-2013? The only biographies available are located in the annual reports. I have attached the annual report for 2008 through 2013. I do not have any biographies for prior years.
When did Mr. K Rhorer resign from the RBOC? May I obtain his resignation letter?
Based upon the annual report and meeting minutes I believed that Mr.
Rhorer left the RBOC in December of 2010. I do not have a copy of a resignation letter for K. Rhorer.
Where may I find (URL) the voice recordings of all RBOC meetings? The audio recordings of the meeting of the Revenue Bond Oversight Committee from 2009 to present are available at:
BLOCKEDsanfrancisco[.]granicus[.]com/ViewPublisher[.]php? view_id=97BLOCKED
We are reviewing our records to search for audio cassettes for pre 2009 RBOC meetings and will provide updates as they become available.
Victor Young
Board of Supervisors
1 Dr. Carlton B. Goodlett Place, City Hall., Room 244
San Francisco CA 94102
phone 415-554-7723
| fax 415-554-5163
[email protected] | BLOCKEDsfbos[.]orgBLOCKED
Click here to complete a Board of Supervisors Customer Service Satisfaction form.
The Legislative Research Center provides 24-hour access to Board of Supervisors legislation, and archived matters since August 1998.
Disclosures: Personal information that is provided in communications to the Board of Supervisors is subject to disclosure under the California Public Records Act and the San Francisco Sunshine Ordinance. Personal information provided will not be redacted.
Members of the public are not
required to provide personal identifying information when they communicate with the Board of Supervisors and its committees. All written or oral communications that members of the public submit to the Clerk's Office regarding pending legislation or hearings will be made available to all members of the public for inspection and copying. The Clerk's Office does not redact any information from these submissions. This means that personal information—including names, phone numbers, addresses and similar information that a member of the public elects to submit to the Board and its committees—may appear on the Board of Supervisors website or in other public documents that members of the public may inspect or copy.
Coalition for San Francisco
President
Judit
h Berkowitz 4/5.824.0677
1st Vice President
Penelope Oark 776.3876
2nd Vice President
Angelique Mahan 334. 773]
Recording Secretary
Demian Quesnel 867.5084
Corresponding Secretary
Dick Millet 86/.0345
Treasurer
Jim Lew 777.5250
Members-at-Large
Sue Cauthen
Rae Doyle
Lorraine Lucas
Barbary Coast Neighborhood Assn
Buena Vista Neighborhood Assn
Cathedral Hill Neighbors Assn
Cayuga Improvement Assn
Cole Valley Improvement Assn
Cow Hollow Assn
Dolores Heights Improvement Club
East Mission Improvement Assn
sero-Eureka Valley Neighborhood Assn
Ewing Terrace Neighborhood Assn
Excelsior District Improvement AsslI
Fair Oaks Community Coalition
Forest Knolls Neighborhood Assn
Frandsco Heights Civic Assn
"den Gate Heights Neighborhood Assn
'eater West Portal Neighborhood Assn
Haight Ashbury Improvement Assn
Inner Sunset Action Committee
Jordan Park Improvement Assn
Laurel Heights Improvement Assn
Lincoln Park Homeowners Assn
Marina CiVIC Improvement &
Property Owners Assn
Middle Polk Neighborhood Assn
Mdtown Terrace Homeowners Assn
Miraloma Park Improvement Club
MiSSIOnCreek Harbor Assn
ew Mission Terrace Improvement Assn
North Beach Neighbors
Oceanview, Merced Heigl'ts.
Ingleside - Neighbors III Action
Outer Mission Residents Ass"
Padnc Heights Residents Assn
Panhandle Residents Orgamzation/
Stanyan-Fulton
Parkmerced Residents Org
Potrero Boosters Neighborhood Assn
Richmond Community Assn
Rincon Point Neighborhood Assn
Russian Hill Improvement Assn
Russian Hill Neighbors
Sunset Heights Assn of
Responsible People
Sunset-Parkside Education &
Action Committee
Telegraph Hill Dwellers
Twin Peaks Coundl & Open
Space Conservancy
Twin Peaks Improvement Assn
University Terrace Neighborhood Assn
SF Public Utilities Commission
Revenue Bond Oversight Committee
Aimee 8rown, Chair
1155 Market Street 5th Floor
San Francisco, CA ~4103
The Coalition For San Francisco Neighborhoods, founded
in 1972, is a grassroots, non-profit, all-volunteer
organization whose members are 44 neighborhood associa- tions geographically based throughout San Francisco.
I write as Chair of the CSFN committee which studies
utilities issues and makes recommendations to the
membership on plans, programs and policies of the SFPUC.
We are strongly supportive of the proposal put forth by R80C member Brian 8rowne to engage the public policy
institutes of the universities, utilizing their extensive resources, knowledge and expertise, to conduct a truly
independent review of the status of the WSIP, in order
to determine if the projects can be completed on budget and by 2015 as mandated by State law. The attached
Resolution was unanimously adopted by our membership on August 17, 2010.
We are fully cognizant of the Review dated ~anuary 19,
2010 by the Commission's Panel of five experts, which
resulted in some good recommendations. And we recommend that the same six questions be the starting point of an analysis by the universities.
However, we do not believe this Review was as thorough
or as independent as necessary to instill greater public confidence that the WSIP will be completed by the
mandated deadline. We are anxious that our suburban
customers will take control of our HH system and that
the SF ratepayer will be exposed to ever rising rates as additional Bonds will need to be issued to cover costs
incurred by delay.
Coalition for San Francisco
Pres
ident
Judith Berkowitz 475.824.0617
1st Vice President
Penelope Oark 776.3876
2nd Vice President
Angelique Mahan 334.77 37
Recording Secretary
Demian Quesnel 867 .s084
Corresponding Secretary
Dick Millet 867.0345
Treasurer
Jim Lew 777.5250
Members-at-Large
Sue cauthen
Rae Doyle
Lorraine Lucas
Barbary Coast NeJfJ!'borhood Assn
Buena Vista Neighborhood Assn
Cathedral HJ11 Neighbors Assn
Cayuga Improvement Assn
Cole Valley Improvement Assn
Cow Hollow Assn
Dolores Heigh ts Improvement Club
East Mission Jmprovemen t Assn
sero-Eureka Valley NeIghborhood Assn
Ewing Terrace Neighborhood Assn
Excelsior District Improvement Assn
Fair Oaks Community Coalition
Forest Knolls Neighborhood Assn
Francisco Heights Civic Assn
~den Gate Heights Neighborhood Assn
'eater West Portal Neighborhood Assn
Haight Ashbury Improvement Assn
Inner Sunset Action Committee
Jordan Park Improvemen t Assn
Laurel Heights Improvement Assn
Lincoln Park Homeowners Assn
Marina Civic Improvement &
Property Owners Assn
Mddle Polk Neighborhood Assn
Mdtown Terrace Homeowners Assn
Mraloma Park Improvement Qub
Mssion Creek Harbor Assn
ew Mission Terrace Improvemen t Assn
North Beach Neighbors
Ocean view, Merced Heights,
Ingleside - Neighbors in Action
Outer Mission Residents Assn
Padhc Heights Residents Assn
Panhandle Residents Organization/
Stanyan·Fulton
Parkmerced Residents Org
Potrero Boosters Neighborhood Assn
Richmond Community Assn
Rincon Point Neighborhood Assn
Russian Hill Improvement Assn
Russian Hill Neighbors
Sunset Heights Assn of
ResponsIble People
Sunset-Parkside Education &
Action Committee
Telegraph Hill Owellers
Twin Peaks Council & Open
Space Conservancy
Twin Peaks Improvement Assn
University Terrace Neighborhood Assn
September 20, 2010
We are hopeful that
proposal will be of
you consider whether
our support of Mr. Browne's
some significance to you as
to move forward.
~£-~f-
Joan Girardot, Chair
CSFN Water Task Force
Att:
CC:
CSFN Resolution dtd 8/17,2010
San Francisco Public Utilities
Coali
tion for San Francisco
President
Judith Berkowitz 415.824.0677
7 st Vice President
Penelope Oark 776.3876
2nd Vice President
Angelique Mahan 334.71 3 1
Recording Secretary
Demian Quesnel 861.5084
Corresponding Secretary
Dick Millet 861.0345
Treasurer
Jim Lew 777.5250
Members-at-Large
Sue Cauthen
Rae Doyle
Lorraine Lucas
Barbary Coast Neighborhood Assn
Buena Vista Neighborhood Assn
Ca thedral Hill Neighbors Assn
Cayuga Improvement Assn
Cole Valley Improvement Assn
Cow Hollow Assn
Dolores Heights Improvement Club
East Mission Improvement Assn
,tro-Eureka Valley Neighborhood Assn
Ewing Terrace Neighborhood Assn
Excelsior District Improvement AssfI
FairOaks Community Coalition
Forest Knolls Neighborhood Assn
Franasco Heights Civic Assll
~den Ga te Heigh ts Neighborhood Assn
'eater West Portal Neighborhood Assll
Haight Ashbury Improvement Assll
Inner Sunset Action Committee
Jordan Park Improvement Assn
Laurel Heights Improvement Assn
Lincoln Park Homeowners Assn
Marina Civic Improvement &
Property Owners Assrl
Mddle Polk Neighborhood Assn
/vI"drown Terrace Homeowners Assn
Mraloma Park Improvement Club
Mssion Creek Harbor Assn
ew Mission Terrace Improvement Assn
North Beach Neighbors
Oceanview, Merced Heights,
Ingleside - Neighbors in Actioll
Outer Mission Residents Assn
Paahc Heights Residents Assn
Panhandle Residents Orgallization/
Stanyall-Fultoll
Parkmerced Residents Org
Potrero Boosters Neighborhood Assll
Richmond Community Assn
Rincon Point Neighborhood ASSIl
Russian Hill Improvement Assll
Russian Hill NeigfJbors
Sunset Heights Assll of
Responsible People
SUllset -Parkside E duca don &
Action Committee
Telegraph Hill Dwellers
Twin Peaks Counal & Open
Space Conservancy
Twin Peaks Improvement Assn
University T efface Neighborhood Assn
Resolved, that the Coalition for San Francisco
Neighborhoods strongly urges the Revenue Bond
Oversight Committee to enter into a contract
with designated experts at UCBerkeley and UCLA
to conduct a thorough organizational review
and status report of the WSIP (Water System
Improvement Program) to determine if the projects
can be completed on budget and by December 31,
2015, as mandated by State Law.
Passed
August
Unanimously
17, 2010
May 9, 2022
President Anson Moran, Commissioners and General Manager Dennis Herrera San Francisco Public Utilities Commission
525 Golden Gate Avenue
San Francisco, CA 94102
Via email
Re: Modifying the Design Drought During a Mega-Drought
Dear President Anson Moran, Commissioners and General Manager Dennis Herrera,
Thank you again for your planning to have a discussion to revisit our drought planning sequence, also referred to as the design drought. While some might consider it odd to reduce the design drought during our current drought or particularly during our two decade mega-drought, there are still good reasons to do so now in addition to those mentioned in my April 21st letter (copy included below).
O
ur Water Supply in this Mega Drought continues to be robust The chart below provides a visualization of how robust our water supply is. The blue solid line represents the SFPUC’s annual Tuolumne river water rights from 2001 to 2021, the twenty-one years and counting for our mega-drought. The orange dotted line represents the SFPUC’s water rights for the prior 21 years 1980 to 2000. The dashed gray line reflects current demand at 218 TAF. You can see fr
om the chart that on average our Tuolumne water rights significantly exceed current demand, infrequently dropping below the dashed gray line.
218
-
5 00
1,000
1,500
2,000
2,500
3,000
3,500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
TAF per Year
Year in sequence
RWS Tuolumne Water Rights Comparison
Mega Drought Compared to Prior Period and Current Demand 2001-2021
1980-2000
Current demand
While our average annual water rights declined from 999 TAF for the 1980 to 2000 period1 to 734 TAF fo
r the mega-drought, our average annual water rights during the mega-droug ht are still more than 3 times our current demand.
Re
visiting the design drought now is in the public interest not only for reasons mentioned in my April 21st letter, but also in conjunction with conclusions from the Long Term Vulnerability Assessment (LTVA):
1 ) “According to climate projections and expert elicitations, there is a central tendency of warming of +2°C and +4°C by 2040 and 2070 (Representative Concentration Pathway [RCP] 8.5), respectively, with no clear direction of change in mean annual precipitation over the planning horizon.” (Stated on page xxii of the main report, underlining added for emphasis) 2) With warming temperatures, the frequency of the severity of our significant droughts becomes rarer. For example, at demand of 269 TAF, the return period for the severity of the 1987-1992 drought increases from once in 420 years to once in 675 years. (Shown on table 5-1 shown on page 157 of the LTVA)
The LTVA did not calculate the return period of the design drought but it is likely in the range of once in 30,000 years.
With such a robust water supply, combined with such a rare drought planning model, combined with our high water rates, it makes sense to revisit the drought planning model particularly before ratepayer paid alternative water supplies are considered.
Kind regards,
Dave Warner
Enclosure
cc: Steve Ritchie
1 The SFPUC’s water rights appear to be higher than average for the 1980 to 2000 period. The average annual w
ater rights for the period 1971-2000 are 887 TAF. To my knowledge the data and calculations are accurate but the SFPUC should make its own calculations using its data.
/g87/g258/g336/g286/g3/g1005/g3/g381/g296/g3/g1007/g3
/g3
/g4/g393/g396/g349/g367/g3/g1006/g1009/g853/g3/g1006/g1004/g1006/g1006/g3 /g3
/g3
/g87/g396/g286/g400/g349/g282/g286/g374/g410/g3/g4/g374/g400/g381/g374/g3/g68/g381/g396/g258/g374/g853/g3/g18/g381/g373/g373/g349/g400/g400/g349/g381/g374/g286/g396/g400/g3/g258/g374/g282/g3/g39/g286/g374/g286/g396/g258/g367/g3/g68/g258/g374/g258/g336/g286/g396/g3/g24/g286/g374/g374/g349/g400/g3/g44/g286/g396/g396/g286/g396/g258/g3 /g94/g258/g374/g3/g38/g396/g258/g374/g272/g349/g400/g272/g381/g3/g87/g437/g271/g367/g349/g272/g3/g104/g410/g349/g367/g349/g410/g349/g286/g400/g3/g18/g381/g373/g373/g349/g400/g400/g349/g381/g374/g3 /g1009/g1006/g1009/g3/g39/g381/g367/g282/g286/g374/g3/g39/g258/g410/g286/g3/g4/g448/g286/g374/g437/g286/g3 /g94/g258/g374/g3/g38/g396/g258/g374/g272/g349/g400/g272/g381/g853/g3/g18/g4/g3/g1013/g1008/g1005/g1004/g1006/g3 /g115/g349/g258/g3/g286/g373/g258/g349/g367/g3
/g3
/g90/g286/g855/g3/g3/g68/g381/g282/g349/g296/g455/g349/g374/g336/g3/g410/g346/g286/g3/g24/g286/g400/g349/g336/g374/g3/g24/g396/g381/g437/g336/g346/g410/g3/g24/g437/g396/g349/g374/g336/g3/g258/g3/g24/g396/g381/g437/g336/g346/g410/g3 /g3
/g24/g286/g258/g396/g3/g87/g396/g286/g400/g349/g282/g286/g374/g410/g3/g4/g374/g400/g381/g374/g3/g68/g381/g396/g258/g374/g853/g3/g18/g381/g373/g373/g349/g400/g400/g349/g381/g374/g286/g396/g400/g3/g258/g374/g282/g3/g39/g286/g374/g286/g396/g258/g367/g3/g68/g258/g374/g258/g336/g286/g396/g3/g24/g286/g374/g374/g349/g400/g3/g44/g286/g396/g396/g286/g396/g258/g853/g3 /g3
/g100/g346/g258/g374/g364/g3/g455/g381/g437/g3/g296/g381/g396/g3/g455/g381/g437/g396/g3/g393/g367/g258/g374/g374/g349/g374/g336/g3/g410/g381/g3/g346/g258/g448/g286/g3/g258/g3/g282/g349/g400/g272/g437/g400/g400/g349/g381/g374/g3/g410/g381/g3/g396/g286/g448/g349/g400/g349/g410/g3/g381/g437/g396/g3/g282/g396/g381/g437/g336/g346/g410/g3/g393/g367/g258/g374/g374/g349/g374/g336/g3/g400/g286/g395/g437/g286/g374/g272/g286/g853/g3/g258/g367/g400/g381/g3/g396/g286/g296/g286/g396/g396/g286/g282/g3 /g410/g381/g3/g258/g400/g3/g410/g346/g286/g3/g282/g286/g400/g349/g336/g374/g3/g282/g396/g381/g437/g336/g346/g410/g856/g3/g3/g116/g346/g349/g367/g286/g3/g400/g381/g373/g286/g3/g373/g349/g336/g346/g410/g3/g272/g381/g374/g400/g349/g282/g286/g396/g3/g349/g410/g3/g381/g282/g282/g3/g410/g381/g3/g396/g286/g282/g437/g272/g286/g3/g410/g346/g286/g3/g282/g286/g400/g349/g336/g374/g3/g282/g396/g381/g437/g336/g346/g410/g3/g282/g437/g396/g349/g374/g336/g3/g258/g3 /g282/g396/g381/g437/g336/g346/g410/g853/g3/g410/g346/g286/g396/g286/g3/g258/g396/g286/g3/g336/g381/g381/g282/g3/g396/g286/g258/g400/g381/g374/g400/g3/g410/g381/g3/g282/g381/g3/g400/g381/g3/g374/g381/g449/g856/g3/g3/g18/g349/g396/g272/g437/g373/g400/g410/g258/g374/g272/g286/g400/g3/g258/g396/g286/g3/g400/g349/g336/g374/g349/g296/g349/g272/g258/g374/g410/g367/g455/g3/g282/g349/g296/g296/g286/g396/g286/g374/g410/g3/g410/g381/g282/g258/g455/g3/g410/g346/g258/g374/g3/g410/g346/g286/g455/g3 /g449/g286/g396/g286/g3/g258/g410/g3/g410/g346/g286/g3/g410/g349/g373/g286/g3/g381/g296/g3/g410/g346/g286/g3/g1005/g1013/g1012/g1011/g882/g1005/g1013/g1013/g1006/g3/g282/g396/g381/g437/g336/g346/g410/g853/g3/g349/g374/g272/g367/g437/g282/g349/g374/g336/g3/g373/g437/g272/g346/g3/g367/g381/g449/g286/g396/g3/g282/g286/g373/g258/g374/g282/g853/g3/g258/g3/g373/g437/g272/g346/g3/g346/g349/g336/g346/g286/g396/g3/g272/g381/g400/g410/g3/g381/g296/g3/g449/g258/g410/g286/g396/g853/g3 /g258/g374/g282/g3/g258/g3/g271/g286/g410/g410/g286/g396/g3/g437/g374/g282/g286/g396/g400/g410/g258/g374/g282/g349/g374/g336/g3/g381/g296/g3/g282/g396/g381/g437/g336/g346/g410/g3/g393/g396/g381/g271/g258/g271/g349/g367/g349/g410/g349/g286/g400/g856/g3/g3/g100/g381/g282/g258/g455/g3/g449/g286/g3/g258/g396/g286/g3/g258/g367/g400/g381/g3/g296/g258/g272/g349/g374/g336/g3/g282/g286/g272/g349/g400/g349/g381/g374/g400/g3/g396/g286/g336/g258/g396/g282/g349/g374/g336/g3 /g258/g367/g410/g286/g396/g374/g258/g410/g349/g448/g286/g3/g449/g258/g410/g286/g396/g3/g400/g437/g393/g393/g367/g349/g286/g400/g3/g449/g346/g349/g272/g346/g3/g349/g373/g393/g258/g272/g410/g400/g3/g272/g381/g400/g410/g856/g3/g3/g68/g258/g364/g349/g374/g336/g3/g282/g286/g272/g349/g400/g349/g381/g374/g400/g3/g396/g286/g336/g258/g396/g282/g349/g374/g336/g3/g410/g346/g286/g3/g282/g286/g400/g349/g336/g374/g3/g282/g396/g381/g437/g336/g346/g410/g3/g449/g349/g367/g367/g3 /g349/g373/g393/g396/g381/g448/g286/g3/g272/g367/g258/g396/g349/g410/g455/g3/g381/g296/g3/g282/g286/g272/g349/g400/g349/g381/g374/g3/g373/g258/g364/g349/g374/g336/g3/g258/g374/g282/g3/g349/g373/g393/g396/g381/g448/g286/g3/g381/g437/g396/g3/g258/g271/g349/g367/g349/g410/g455/g3/g410/g381/g3/g373/g258/g374/g258/g336/g286/g3/g449/g258/g410/g286/g396/g3/g396/g258/g410/g286/g400/g856/g3 /g3
/g24/g286/g373/g258/g374/g282/g3/g410/g381/g282/g258/g455/g3/g349/g400/g3/g296/g258/g396/g3/g271/g286/g367/g381/g449/g3/g410/g346/g286/g3/g1006/g1013/g1007/g3/g373/g336/g282/g3/g282/g286/g373/g258/g374/g282/g3/g336/g381/g349/g374/g336/g3/g349/g374/g410/g381/g3/g410/g346/g286/g3/g1005/g1013/g1012/g1011/g882/g1013/g1006/g3/g282/g396/g381/g437/g336/g346/g410/g3 /g1006/g1004/g1006/g1004/g3/g282/g286/g373/g258/g374/g282/g3/g449/g258/g400/g3/g1005/g1013/g1012/g3/g373/g336/g282/g853/g3/g258/g367/g373/g381/g400/g410/g3/g258/g3/g410/g346/g349/g396/g282/g3/g367/g286/g400/g400/g3/g410/g346/g258/g374/g3/g282/g286/g373/g258/g374/g282/g3/g393/g396/g349/g381/g396/g3/g410/g381/g3/g410/g346/g286/g3/g1005/g1013/g1012/g1011/g882/g1013/g1006/g3/g282/g396/g381/g437/g336/g346/g410/g856/g3/g3/g3 /g3
/g100/g346/g286/g3/g94/g38/g87/g104/g18/g859/g400/g3/g449/g258/g410/g286/g396/g3/g396/g258/g410/g286/g400/g3/g373/g258/g455/g3/g271/g286/g3/g410/g346/g286/g3/g346/g349/g336/g346/g286/g400/g410/g3/g349/g374/g3/g410/g346/g286/g3/g400/g410/g258/g410/g286/g3/g258/g374/g282/g3/g258/g396/g286/g3/g349/g374/g272/g396/g286/g258/g400/g349/g374/g336/g3 /g100/g346/g286/g3/g272/g346/g258/g396/g410/g3/g271/g286/g367/g381/g449/g3/g449/g258/g400/g3/g393/g396/g381/g282/g437/g272/g286/g282/g3/g349/g374/g3/g1006/g1004/g1005/g1012/g3/g271/g455/g3/g410/g346/g286/g3/g94/g258/g374/g3/g58/g437/g258/g374/g3/g116/g258/g410/g286/g396/g3/g24/g349/g400/g410/g396/g349/g272/g410/g856/g3/g3/g4/g374/g282/g3/g410/g346/g286/g3/g94/g38/g87/g104/g18/g3/g349/g400/g3/g393/g396/g381/g361/g286/g272/g410/g349/g374/g336/g3 /g400/g437/g271/g400/g410/g258/g374/g410/g349/g258/g367/g3/g272/g381/g374/g410/g349/g374/g437/g286/g282/g3/g349/g374/g272/g396/g286/g258/g400/g286/g400/g3/g884/g3/g449/g349/g410/g346/g381/g437/g410/g3/g258/g272/g272/g381/g437/g374/g410/g349/g374/g336/g3/g296/g381/g396/g3/g400/g349/g336/g374/g349/g296/g349/g272/g258/g374/g410/g3/g258/g367/g410/g286/g396/g374/g258/g410/g349/g448/g286/g3/g400/g437/g393/g393/g367/g349/g286/g400/g856/g3/g69/g381/g410/g286/g3/g410/g346/g258/g410/g3/g410/g346/g286/g3 /g94/g38/g87/g104/g18/g859/g400/g3/g272/g381/g367/g437/g373/g374/g3/g349/g400/g3/g410/g346/g286/g3/g296/g258/g396/g410/g346/g286/g400/g410/g3/g410/g381/g3/g410/g346/g286/g3/g396/g349/g336/g346/g410/g856/g3 /g3
/g87/g258/g336/g286/g3/g1006/g3/g381/g296/g3/g1007/g3
/g3
/g3
/g94/g258/g374/g3/g38/g396/g258/g374/g272/g349/g400/g272/g381/g3/g396/g286/g410/g258/g349/g367/g3/g396/g258/g410/g286/g400/g3/g296/g381/g396/g3/g410/g346/g286/g3/g367/g381/g449/g286/g400/g410/g3/g410/g349/g286/g396/g3/g349/g374/g3/g1006/g1004/g1004/g1011/g1005/g3/g449/g286/g396/g286/g3/g936/g1006/g856/g1004/g1012/g876/g272/g272/g296/g856/g3/g47/g374/g3/g1006/g1004/g1006/g1005/g3/g258/g396/g286/g3/g936/g1013/g856/g1010/g1004/g853/g3/g449/g349/g410/g346/g381/g437/g410/g3/g410/g346/g286/g3 /g272
/g437/g396/g396/g286/g374/g410/g3/g282/g396/g381/g437/g336/g346/g410/g3/g400/g437/g396/g272/g346/g258/g396/g336/g286/g853/g3/g258/g3/g1007/g1010/g1004/g1081/g3/g349/g374/g272/g396/g286/g258/g400/g286/g856/g3/g3/g38/g381/g396/g3/g272/g381/g373/g393/g258/g396/g349/g400/g381/g374/g853/g3/g349/g374/g296/g367/g258/g410/g349/g381/g374/g3/g282/g437/g396/g349/g374/g336/g3/g410/g346/g349/g400/g3/g410/g349/g373/g286/g3/g449/g258/g400/g3/g1007/g1005/g1081/g856/g3/g3/g3 /g3
/g116/g258/g410/g286/g396/g3/g396/g258/g410/g286/g400/g3/g272/g381/g437/g367/g282/g3/g336/g381/g3/g410/g381/g3/g936/g1007/g1009/g876/g272/g272/g296/g3/g381/g396/g3/g346/g349/g336/g346/g286/g396/g3/g3 /g100/g346/g286/g3/g272/g346/g258/g396/g410/g3/g271/g286/g367/g381/g449/g3/g349/g400/g3/g410/g258/g364/g286/g374/g3/g296/g396/g381/g373/g3/g296/g349/g336/g437/g396/g286/g3/g1009/g882/g1012/g1008/g3/g296/g396/g381/g373/g3/g410/g346/g286/g3/g94/g38/g87/g104/g18/g859/g400/g3/g62/g381/g374/g336/g3/g100/g286/g396/g373/g3/g115/g437/g367/g374/g286/g396/g258/g271/g349/g367/g349/g410/g455/g3/g4/g400/g400/g286/g400/g400/g373/g286/g374/g410/g3/g894/g62/g100/g115/g4/g895/g856/g3/g3 /g116/g346/g286/g374/g3/g393/g396/g286/g400/g286/g374/g410/g349/g374/g336/g3/g410/g346/g349/g400/g3/g272/g346/g258/g396/g410/g3/g410/g381/g3/g94/g38/g87/g104/g18/g3/g272/g381/g373/g373/g349/g400/g400/g349/g381/g374/g400/g853/g3/g24/g396/g856/g3/g18/g258/g400/g286/g455/g3/g17/g396/g381/g449/g374/g3/g393/g381/g349/g374/g410/g286/g282/g3/g381/g437/g410/g3/g410/g346/g258/g410/g3/g449/g258/g410/g286/g396/g3/g396/g258/g410/g286/g400/g3/g272/g381/g437/g367/g282/g3 /g336/g381/g3/g258/g400/g3/g346/g349/g336/g346/g3/g258/g400/g3/g936/g1007/g1009/g876/g272/g272/g296/g856/g3/g3/g100/g346/g349/g400/g3/g272/g258/g374/g3/g271/g286/g3/g400/g286/g286/g374/g3/g349/g374/g3/g410/g346/g286/g3/g367/g381/g449/g286/g396/g3/g396/g349/g336/g346/g410/g882/g346/g258/g374/g282/g3/g272/g381/g396/g374/g286/g396/g3/g381/g296/g3/g410/g346/g286/g3/g272/g346/g258/g396/g410/g853/g3/g272/g381/g367/g381/g396/g3/g272/g381/g282/g286/g282/g3/g396/g286/g282/g853/g3 /g449/g346/g286/g396/g286/g3/g410/g346/g286/g3/g448/g286/g396/g410/g349/g272/g258/g367/g3/g258/g454/g349/g400/g3/g400/g346/g381/g449/g400/g3/g282/g286/g373/g258/g374/g282/g3/g258/g410/g3/g1006/g1006/g1011/g3/g373/g336/g282/g3/g258/g374/g282/g3/g410/g346/g286/g3/g346/g381/g396/g349/g460/g381/g374/g410/g258/g367/g3/g258/g454/g349/g400/g3/g400/g346/g381/g449/g400/g3/g272/g258/g393/g349/g410/g258/g367/g3/g349/g374/g448/g286/g400/g410/g373/g286/g374/g410/g3/g258/g410/g3 /g936/g1005/g856/g1009/g1011/g1009/g3/g271/g349/g367/g367/g349/g381/g374/g856/g3/g3/g100/g346/g286/g3/g448/g286/g396/g410/g349/g272/g258/g367/g3/g258/g454/g349/g400/g3/g282/g381/g286/g400/g3/g374/g381/g410/g3/g336/g381/g3/g258/g400/g3/g367/g381/g449/g3/g258/g400/g3/g410/g381/g282/g258/g455/g859/g400/g3/g282/g286/g373/g258/g374/g282/g853/g3/g373/g286/g258/g374/g349/g374/g336/g3/g410/g346/g258/g410/g3/g349/g296/g3/g410/g381/g282/g258/g455/g859/g400/g3/g282/g286/g373/g258/g374/g282/g3 /g449/g286/g396/g286/g3/g381/g374/g3/g410/g346/g286/g3/g272/g346/g258/g396/g410/g853/g3/g272/g381/g373/g393/g258/g396/g258/g271/g367/g286/g3/g449/g258/g410/g286/g396/g3/g396/g258/g410/g286/g400/g3/g449/g381/g437/g367/g282/g3/g271/g286/g3/g258/g271/g381/g448/g286/g3/g936/g1007/g1009/g876/g272/g272/g296/g856/g3/g3/g100/g346/g286/g3/g349/g373/g393/g367/g349/g272/g258/g410/g349/g381/g374/g3/g349/g400/g3/g410/g346/g258/g410/g3/g349/g374/g448/g286/g400/g410/g373/g286/g374/g410/g3 /g349/g374/g3/g258/g367/g410/g286/g396/g374/g258/g410/g349/g448/g286/g3/g449/g258/g410/g286/g396/g3/g400/g437/g393/g393/g367/g349/g286/g400/g3/g272/g381/g437/g367/g282/g3/g400/g437/g271/g400/g410/g258/g374/g410/g349/g258/g367/g367/g455/g3/g396/g258/g349/g400/g286/g3/g449/g258/g410/g286/g396/g3/g396/g258/g410/g286/g400/g3/g349/g296/g3/g282/g286/g373/g258/g374/g282/g3/g282/g381/g286/g400/g374/g859/g410/g3/g258/g367/g400/g381/g3/g349/g374/g272/g396/g286/g258/g400/g286/g853/g3/g381/g396/g3 /g449/g381/g396/g400/g286/g3/g455/g286/g410/g3/g296/g381/g396/g3/g396/g258/g410/g286/g400/g853/g3/g282/g286/g373/g258/g374/g282/g3/g282/g286/g272/g396/g286/g258/g400/g286/g400/g856/g3 /g3
/g3
/g94/g346/g381/g396/g410/g286/g374/g349/g374/g336/g3/g410/g346/g286/g3/g282/g286/g400/g349/g336/g374/g3/g282/g396/g381/g437/g336/g346/g410/g3/g373/g349/g410/g349/g336/g258/g410/g286/g400/g3/g410/g346/g286/g3/g374/g286/g286/g282/g3/g296/g381/g396/g3/g258/g367/g410/g286/g396/g374/g258/g410/g349/g448/g286/g3/g400/g437/g393/g393/g367/g349/g286/g400/g853/g3/g346/g381/g367/g282/g349/g374/g336/g3/g282/g381/g449/g374/g3/g272/g381/g400/g410/g400/g3 /g90/g286/g282/g437/g272/g349/g374/g336/g3/g410/g346/g286/g3/g282/g437/g396/g258/g410/g349/g381/g374/g3/g381/g296/g3/g410/g346/g286/g3/g282/g286/g400/g349/g336/g374/g3/g282/g396/g381/g437/g336/g346/g410/g3/g346/g258/g400/g3/g410/g346/g286/g3/g400/g258/g373/g286/g3/g286/g296/g296/g286/g272/g410/g3/g410/g381/g3/g400/g437/g393/g393/g367/g455/g3/g258/g448/g258/g349/g367/g258/g271/g349/g367/g349/g410/g455/g3/g258/g400/g3/g258/g282/g282/g349/g374/g336/g3 /g258/g367/g410/g286/g396/g374/g258/g410/g349/g448/g286/g3/g449/g258/g410/g286/g396/g3/g400/g437/g393/g393/g367/g349/g286/g400/g856/g3/g3/g17/g437/g410/g3/g396/g286/g282/g437/g272/g349/g374/g336/g3/g410/g346/g286/g3/g282/g437/g396/g258/g410/g349/g381/g374/g3/g381/g296/g3/g410/g346/g286/g3/g282/g286/g400/g349/g336/g374/g3/g282/g396/g381/g437/g336/g346/g410/g3/g282/g381/g286/g400/g3/g374/g381/g410/g3/g396/g286/g395/g437/g349/g396/g286/g3/g272/g258/g393/g349/g410/g258/g367/g3 /g349/g374/g448/g286/g400/g410/g373/g286/g374/g410/g3/g258/g374/g282/g3/g346/g286/g374/g272/g286/g3/g282/g381/g286/g400/g3/g374/g381/g410/g3/g346/g258/g448/g286/g3/g410/g346/g286/g3/g393/g381/g410/g286/g374/g410/g349/g258/g367/g3/g410/g381/g3/g258/g282/g448/g286/g396/g400/g286/g367/g455/g3/g349/g373/g393/g258/g272/g410/g3/g449/g258/g410/g286/g396/g3/g396/g258/g410/g286/g400/g856/g3 /g3
/g4/g367/g410/g286/g396/g374/g258/g410/g349/g448/g286/g3/g449/g258/g410/g286/g396/g3/g400/g437/g393/g393/g367/g349/g286/g400/g3/g349/g373/g393/g396/g381/g448/g286/g3/g282/g396/g381/g437/g336/g346/g410/g3/g396/g286/g400/g349/g367/g349/g286/g374/g272/g286/g856/g3/g3/g44/g286/g374/g272/g286/g3/g349/g410/g3/g349/g400/g3/g449/g381/g396/g410/g346/g3/g282/g286/g448/g286/g367/g381/g393/g349/g374/g336/g3/g258/g367/g410/g286/g396/g374/g258/g410/g349/g448/g286/g3/g449/g258/g410/g286/g396/g3 /g400/g437/g393/g393/g367/g349/g286/g400/g3/g410/g346/g258/g410/g3/g282/g381/g374/g859/g410/g3/g349/g373/g393/g258/g272/g410/g3/g449/g258/g410/g286/g396/g3/g396/g258/g410/g286/g400/g856/g3/g3/g4/g374/g3/g286/g454/g258/g373/g393/g367/g286/g3/g449/g381/g437/g367/g282/g3/g271/g286/g3/g400/g410/g258/g410/g286/g3/g381/g396/g3/g296/g286/g282/g286/g396/g258/g367/g3/g336/g396/g258/g374/g410/g400/g853/g3/g393/g286/g396/g346/g258/g393/g400/g3/g258/g400/g3/g393/g258/g396/g410/g3/g381/g296/g3 /g258/g3/g17/g258/g455/g3/g24/g286/g367/g410/g258/g3/g87/g367/g258/g374/g3/g272/g381/g373/g393/g396/g381/g373/g349/g400/g286/g853/g3/g258/g400/g3/g346/g258/g400/g3/g271/g286/g286/g374/g3/g393/g396/g381/g393/g381/g400/g286/g282/g3/g449/g349/g410/g346/g3/g381/g410/g346/g286/g396/g3/g396/g349/g448/g286/g396/g400/g856/g3 /g3
/g3
/g1005/g3/g100/g346/g349/g400/g3/g349/g400/g3/g410/g346/g286/g3/g381/g367/g282/g286/g400/g410/g3/g282/g258/g410/g258/g3/g47/g3/g449/g258/g400/g3/g258/g271/g367/g286/g3/g410/g381/g3/g296/g349/g374/g282/g3/g296/g381/g396/g3/g94/g38/g87/g104/g18/g3/g396/g286/g410/g258/g349/g367/g3/g449/g258/g410/g286/g396/g3/g396/g258/g410/g286/g400/g856/g3
/g87/g258/g336/g286/g3/g1007/g3/g381/g296/g3/g1007/g3
/g3
/g100/g346/g286/g3/g367/g258/g410/g286/g400/g410/g3/g396/g286/g400/g286/g258/g396/g272/g346/g3/g400/g346/g381/g449/g400/g3/g410/g346/g286/g3/g282/g286/g400/g349/g336/g374/g3/g282/g396/g381/g437/g336/g346/g410/g3/g449/g381/g437/g367/g282/g3/g271/g286/g3/g286/g454/g410/g396/g286/g373/g286/g367/g455/g3/g396/g258/g396/g286/g3 /g47/g410/g3/g272/g258/g374/g3/g271/g286/g3/g349/g374/g296/g286/g396/g396/g286/g282/g3/g296/g396/g381/g373/g3/g410/g346/g286/g3/g62/g100/g115/g4/g3/g410/g346/g258/g410/g3/g410/g346/g286/g3/g282/g286/g400/g349/g336/g374/g3/g282/g396/g381/g437/g336/g346/g410/g3/g346/g258/g400/g3/g258/g3/g393/g396/g381/g271/g258/g271/g349/g367/g349/g410/g455/g3/g349/g374/g3/g410/g346/g286/g3/g396/g258/g374/g336/g286/g3/g381/g296/g3/g381/g374/g272/g286/g3/g349/g374/g3/g1007/g1004/g853/g1004/g1004/g1004/g3 /g455/g286/g258/g396/g400/g3/g349/g374/g272/g367/g437/g282/g349/g374/g336/g3/g410/g258/g364/g349/g374/g336/g3/g349/g374/g410/g381/g3/g258/g272/g272/g381/g437/g374/g410/g3/g62/g100/g115/g4/g3/g272/g367/g349/g373/g258/g410/g286/g3/g272/g346/g258/g374/g336/g286/g3/g272/g381/g374/g272/g367/g437/g400/g349/g381/g374/g400/g856/g3/g3/g44/g381/g449/g286/g448/g286/g396/g3/g410/g346/g286/g3/g62/g100/g115/g4/g3/g396/g286/g400/g286/g258/g396/g272/g346/g286/g396/g400/g3 /g400/g346/g381/g437/g367/g282/g3/g272/g381/g373/g393/g367/g286/g410/g286/g3/g410/g346/g286/g3/g393/g396/g286/g272/g349/g400/g286/g3/g393/g396/g381/g271/g258/g271/g349/g367/g349/g410/g455/g3/g272/g258/g367/g272/g437/g367/g258/g410/g349/g381/g374/g400/g3/g437/g400/g349/g374/g336/g3/g410/g346/g286/g349/g396/g3/g400/g410/g381/g272/g346/g258/g400/g410/g349/g272/g3/g373/g381/g282/g286/g367/g400/g856/g3 /g3
/g47/g410/g3/g349/g400/g3/g349/g374/g3/g449/g258/g410/g286/g396/g3/g437/g400/g286/g396/g400/g859/g3/g271/g286/g400/g410/g3/g349/g374/g410/g286/g396/g286/g400/g410/g400/g3/g410/g381/g3/g396/g286/g448/g349/g400/g349/g410/g3/g410/g346/g286/g3/g282/g286/g400/g349/g336/g374/g3/g282/g396/g381/g437/g336/g346/g410/g3/g374/g381/g449/g3 /g24/g286/g400/g393/g349/g410/g286/g3/g410/g346/g286/g3/g272/g437/g396/g396/g286/g374/g410/g3/g282/g396/g381/g437/g336/g346/g410/g853/g3/g449/g258/g410/g286/g396/g3/g437/g400/g286/g396/g400/g3/g449/g349/g367/g367/g3/g271/g286/g374/g286/g296/g349/g410/g3/g296/g396/g381/g373/g3/g410/g346/g286/g3/g94/g38/g87/g104/g18/g3/g396/g286/g882/g286/g448/g258/g367/g437/g258/g410/g349/g374/g336/g3/g410/g346/g286/g3/g282/g286/g400/g349/g336/g374/g3/g282/g396/g381/g437/g336/g346/g410/g3 /g393/g367/g258/g374/g374/g349/g374/g336/g3/g373/g381/g282/g286/g367/g3/g374/g381/g449/g856/g3/g3/g24/g286/g373/g258/g374/g282/g3/g349/g400/g3/g373/g437/g272/g346/g3/g367/g381/g449/g286/g396/g3/g410/g346/g258/g374/g3/g258/g410/g3/g410/g346/g286/g3/g400/g410/g258/g396/g410/g3/g381/g296/g3/g410/g346/g286/g3/g1005/g1013/g1012/g1011/g882/g1013/g1006/g3/g282/g396/g381/g437/g336/g346/g410/g856/g3/g3/g116/g258/g410/g286/g396/g3/g396/g258/g410/g286/g400/g3/g258/g396/g286/g3 /g448/g258/g400/g410/g367/g455/g3/g346/g349/g336/g346/g286/g396/g3/g449/g349/g410/g346/g3/g410/g346/g286/g3/g393/g381/g410/g286/g374/g410/g349/g258/g367/g3/g410/g381/g3/g361/g437/g373/g393/g3/g286/g448/g286/g374/g3/g373/g381/g396/g286/g856/g3/g3/g4/g367/g410/g286/g396/g374/g258/g410/g349/g448/g286/g3/g449/g258/g410/g286/g396/g3/g400/g437/g393/g393/g367/g349/g286/g400/g3/g258/g396/g286/g3/g437/g374/g282/g286/g396/g3/g272/g381/g374/g400/g349/g282/g286/g396/g258/g410/g349/g381/g374/g856/g3/g3 /g100/g346/g286/g3/g367/g258/g410/g286/g400/g410/g3/g396/g286/g400/g286/g258/g396/g272/g346/g3/g296/g396/g381/g373/g3/g410/g346/g286/g3/g62/g100/g115/g4/g3/g400/g346/g381/g449/g400/g3/g410/g346/g258/g410/g3/g410/g346/g286/g3/g282/g286/g400/g349/g336/g374/g3/g282/g396/g381/g437/g336/g346/g410/g3/g346/g258/g400/g3/g258/g374/g3/g286/g454/g272/g286/g393/g410/g349/g381/g374/g258/g367/g367/g455/g3/g367/g381/g449/g3/g393/g396/g381/g271/g258/g271/g349/g367/g349/g410/g455/g3/g381/g296/g3 /g381/g272/g272/g437/g396/g396/g349/g374/g336/g3/g258/g374/g282/g3/g258/g3/g400/g346/g381/g396/g410/g286/g374/g286/g282/g3/g282/g396/g381/g437/g336/g346/g410/g3/g393/g367/g258/g374/g374/g349/g374/g336/g3/g373/g381/g282/g286/g367/g3/g449/g381/g437/g367/g282/g3/g400/g410/g349/g367/g367/g3/g346/g258/g448/g286/g3/g448/g286/g396/g455/g3/g367/g381/g449/g3/g396/g349/g400/g364/g856/g3 /g3
/g47/g374/g3/g381/g410/g346/g286/g396/g3/g449/g381/g396/g282/g400/g853/g3/g410/g346/g286/g396/g286/g859/g400/g3/g258/g3/g336/g381/g381/g282/g3/g272/g258/g400/g286/g3/g410/g381/g3/g271/g286/g3/g373/g258/g282/g286/g3/g410/g381/g3/g396/g286/g882/g286/g448/g258/g367/g437/g258/g410/g286/g3/g410/g346/g286/g3/g282/g286/g400/g349/g336/g374/g3/g282/g396/g381/g437/g336/g346/g410/g3/g374/g381/g449/g853/g3/g349/g374/g282/g286/g393/g286/g374/g282/g286/g374/g410/g3/g381/g296/g3 /g381/g437/g396/g3/g271/g286/g349/g374/g336/g3/g349/g374/g3/g258/g3/g282/g396/g381/g437/g336/g346/g410/g3/g410/g381/g282/g258/g455/g856/g3 /g3
/g60/g349/g374/g282/g3/g396/g286/g336/g258/g396/g282/g400/g853/g3 /g3
/g3
/g24/g258/g448/g286/g3/g116/g258/g396/g374/g286/g396/g3 /g3
/g3
/g272/g272/g855/g3/g3/g94/g410/g286/g448/g286/g3/g90/g349/g410/g272/g346/g349/g286/g3
OUR MISSION: To provide our customers with high-quality, efficient and reliable water, power and sewer services in a manner that values environmental and community interests and sustains the resources entrusted to our care.
Project Administration Bureau
525 Golden Gate Avenue, 8th Floor
San Francisco, CA 94102
T 415.554.4306
F 415.554.3225
TTY 415.554.3488
May 9, 2022
VIA EMAIL
KMD Architects
Tom Turkington
[email protected]
Subject: R
esponse to Re: Award of PRO 0232, New CDD Campus at
2000 Marin Design Services and Modifications to Submittal Document
Dear Mr. Turkington:
We write in response to your April 29, 2022 letter to members of the San Francisco Public Utilities Commission (SFPUC). The SFPUC has reviewed the issue you raise and
finds no basis for further action with respect to the award of Contract No.
PRO.0232.
On December 20, 2021, the SFPUC issued an intent to recommend KMD Architects (KMD) for contract award. After further review, however, the SFPUC issued a preliminary notice of proposal s rejection due t o material defects in the Overhead and Profit Schedule (OPS) on February 4, 2022. KMD protested this rejection. On February 11, 2022, SFPUC confirmed the rejection and provided the following explanation:
Pursuant t
o Section 5.2.9 of the RFP, OPS, were required to use the OPS Template, provided as an Excel file in RFP Appendix B, to prepare their OPS. The OPS needed to include the base hourly rate and each firm's overhead and profit rate (OPR, or "multiplier") for each staff member for the Prime Proposer (or JV Partners) and all subconsultants expected to work on the Project. The RFP explicitly stated that only one overhead and profit rate (OPR or “multiplier”) must be listed for each firm and KMD listed more than one multiplier for two firms in its OPS:
Itself (KMD) and William Duff Architects. The Effective Overhead and Profit Rate (EOPR, or “Average Multiplier”) will be a weighted average of the rates proposed for each firm listed, to be used as a Project Multiplier. The EOPR is thus distinct from the OPR, but KMD’s improper inclusion of multiple OPRs for two firms did have a material effect on the EOPR.
To cure these material defects, KMD would have to provide new information not previously included in your proposal and thus would receive competit ive advantage by modifying the proposal after the proposal due date. Due to these material defects, KMD’s proposal was deemed non-responsive. See MCM Construction, Inc. v. City and County of San Francisco, 66 Cal.App.4th 359 (1998) (agency entitled to reject non-responsive proposals).
In contrast, SFPUC staff identified a minor mathematical error in the OPS of Mark Cavagnero and Associates (MCA). In its OPS, MCA listed the labor cost for each employee, which is determined from multiplying the employee’s hourly rate by the employee’s estimated number of hours of work. MCA incorrectly calculated t
hat cost in the OPS for six of its employees. However, the SFPUC was able to determine the correct calculation from the face of the OPS, because it includes the h
ourly rate and estimated hours for each of these six
employees. The
SFPUC was able to determine the correct estimated labor cost without the need for MCA to submit new information or otherwise alter its proposal, and therefore the SFPUC could waive the error as immaterial. See Ghilotti Const. Co. v. City of Richmond, 45 Cal.App.4th 897, 904-906 (1996).
Respectfully,
Ivy Fine
Contract Administration Bureau
525 Golden Gate Avenue
San Francisco,
CA 94102
Cc:
Kyndra Cox, SFPUC
SFPUC Commission
File PRO.0232
From: Turkington, Tom
To: Commission
Cc: Turkington, Tom
Subject: Modifications to Submittal Document and Award of PRO 0232, New CDD campus at 2000 Marin Design Services Date: Friday, April 29, 2022 1:32:22 PM
Attachments: Pro 0232 New CDD Campus Design Services Award_04.29.2022.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Dear Sir or Madam,
Please find attached a letter for the SFPUC Commission’s consideration. We look forward to whatever response you deem appropriate. Thank you for your time and consideration.
Best regards,
Tom
Tom Turkington
Principal
KMDARCHITECTS
[email protected]
m (415) 720-3078
417 Montgomery Street, Suite 200
San Francisco, CA 94104
kmdarchitects.com
tw | fb | in | ig
April 29, 2022
To: The PUC board
From: KMD Architects
Re: Award of PRO 0232, New CDD campus at 2000 Marin Design Services and Modifications to Submittal Documents
Dear Board Members:
KMD Architects and our team of consultants, prepared and submitted our proposal for the above referenced project twice. We were shortlisted both times and pursued this at great time and expense to our firm and to our consultant partners.
The San Francisco Public Utilities Commission initially awarded the PRO 0232, New CDD campus at 2000 Marin Design Services contract to our firm, KMD architects on December 20th, 2021.
We were subsequently informed on February 4, 2022 that our proposal and award was being rejected for not complying with the RFP requirements. To better understand the grounds of our rejection I requested and held a zoom call on February 4th with representatives of the SFPUC to discuss this. At that time, I was informed that we could not make any changes to our documents to cure the administrative errors. None of the cited discrepancies, including an OPS error, would have materially changed the submittal and our qualifications. One cited discrepancy was that per the OPS form a consultant markup stated a maximum of 5% and we intentionally entered 0% and as stated such. The supposition by the SFPUC appears to be that we could not have a $0 markup.
Based on the Zoom call we submitted a letter to the SFPUC protesting the rejection of our award on February 8,2022.
Our challenge of the rejection was denied and the rejection affirmed by the SFPUC on February 11, 2022.
The reason for the rejection to be upheld is shown on the attached letter from the SFPUC indicating there were administrative errors in our OPS document which were not allowed to be corrected by us. Had we been provided the opportunity to correct the errors our award would have been upheld.
More importantly, subsequent to this denial of our protest, through a public record request, we obtained and reviewed correspondence between the SFPUC and the current awardee Mark Cavagnero and Associates regarding administrative errors in their proposal which caused them to initially be rejected as well. As you will see in the attached letter dated February 20,2022 members of the SFPUC offered to correct an error on their OPS form and did so for Mark KMD Architects
Award of PRO 0232
April 29, 2022
Cavagnero in their OPS form. This opportunity to correct our form was not provided to KMD Architects.
Thank you for your consideration of this and we look forward to any response you deem appropriate
Sincerely,
KMD Architects
Tom Turkington
Principal
Cc: File
From: Felicia Dunham
To: Ng, Melissa
Cc: Cox, Kyndra; Kang Kiang; Mark Cavagnero
Subject: RE: PRO.0232 New CDD Campus at 2000 Marin Design Services Date: Monday, March 21, 2022 3:02:22 PM
Attachments: image001.png
image002.png
image003.png
image004.png
image005.png
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Hello Melissa:
Thank you for getting back to me. We have not received a request for insurance documentation.
FELICIA DUNHAM, AIA, LEED AP
SENIOR ASSOCIATE
MARK CAVAGNERO ASSOCIATES ARCHITECTS
1045 Sansome Street Suite 200, San Francisco, CA 94111
Main 415.398.6944 x208 l Direct 415.947.7600 x208
Mobile 415.377.3495 l [email protected]
Cavagnero.com l LinkedIn l Facebook l Instagram l Twitter
Please note: I will be out of the office March 28-April 1, 2022.
From: Ng, Melissa <[email protected]>
Sent: Monday, March 21, 2022 2:43 PM
To: Felicia Dunham <[email protected]>
Cc: Cox, Kyndra <[email protected]>; Kang Kiang <[email protected]>; Mark Cavagnero <[email protected]>
Subject: RE: PRO.0232 New CDD Campus at 2000 Marin Design Services
Hi Felicia,
The PRO.0232 New CDD Campus at 2000 Marin Design Services is subject to Board of Supervisors’ approval, calendared for May. Have you received a request for insurance documentation from my colleague, LaWan Jones?
Thank you,
Melissa Ng
Contract Administration Bureau
San Francisco Public Utilities Commission
525 Golden Gate Avenue, 8th Floor
San Francisco, CA 94102
[email protected]
sfpuc.org
From: Felicia Dunham <[email protected]>
Sent: Friday, March 18, 2022 2:55 PM
To: Ng, Melissa <[email protected]>
Cc: Cox, Kyndra <[email protected]>; Kang Kiang <[email protected]>; Mark Cavagnero <[email protected]>
Subject: RE: PRO.0232 New CDD Campus at 2000 Marin Design Services
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Hello Melissa:
I am checking in to see if you need anything from us related to contracting for the PUC CDD Campus project at 2000 Marin. We haven’t heard anything from you recently and want to make sure we did not miss any correspondence.
Thank you.
FELICIA DUNHAM, AIA, LEED AP
SENIOR ASSOCIATE
MARK CAVAGNERO ASSOCIATES ARCHITECTS
1045 Sansome Street Suite 200, San Francisco, CA 94111
Main 415.398.6944 x208 l Direct 415.947.7600 x208
Mobile 415.377.3495 l [email protected]
Cavagnero.com l LinkedIn l Facebook l Instagram l Twitter
Please note: I will be out of the office March 28-April 1, 2022.
From: Felicia Dunham
Sent: Wednesday, February 23, 2022 6:13 PM
To: 'Ng, Melissa' <[email protected]>
Cc: 'Cox, Kyndra' <[email protected]>; Kang Kiang <[email protected]>; Mark Cavagnero <[email protected]>
Subject: RE: PRO.0232 New CDD Campus at 2000 Marin Design Services
Hello Melissa:
I had a chance to review the corrections in detail and concur with the edits.
Thank you again for catching the error.
FELICIA DUNHAM, AIA, LEED AP
SENIOR ASSOCIATE
MARK CAVAGNERO ASSOCIATES ARCHITECTS
1045 Sansome Street Suite 200, San Francisco, CA 94111
Main 415.398.6944 x208 l Direct 415.947.7600 x208
Mobile 415.377.3495 l [email protected]
Cavagnero.com l LinkedIn l Facebook l Instagram l Twitter
From: Felicia Dunham
Sent: Wednesday, February 23, 2022 12:11 PM
To: 'Ng, Melissa' <[email protected]>
Cc: Cox, Kyndra <[email protected]>; Kang Kiang <[email protected]>; Mark Cavagnero <[email protected]>
Subject: RE: PRO.0232 New CDD Campus at 2000 Marin Design Services
Hello Melissa:
Thank you for catching the error. Your calculations look ok, but I want to review in more detail. I will confirm later today.
Thanks again.
FELICIA DUNHAM, AIA, LEED AP
SENIOR ASSOCIATE
MARK CAVAGNERO ASSOCIATES ARCHITECTS
1045 Sansome Street Suite 200, San Francisco, CA 94111
Main 415.398.6944 x208 l Direct 415.947.7600 x208
Mobile 415.377.3495 l [email protected]
Cavagnero.com l LinkedIn l Facebook l Instagram l Twitter
From: Ng, Melissa <[email protected]>
Sent: Tuesday, February 22, 2022 4:20 PM
To: Felicia Dunham <[email protected]>
Cc: Cox, Kyndra <[email protected]>; Kang Kiang <[email protected]>; Mark Cavagnero <[email protected]>
Subject: RE: PRO.0232 New CDD Campus at 2000 Marin Design Services
Hi Felicia,
I am currently drafting the contract agreement in preparation of seeking Board of Supervisors approval. The submitted OPS will be part of the contract as Appendix B-1 Fee Schedule.
We noticed that the base labor cost and actual labor cost in rows 392 through 397 had a miscalculation. Since the billing rates were calculated correctly, we have recalculated the actual labor costs and sum totals and will use these final calculations for the contract. Please see highlighted cells in the attached OPS for reference.
Please confirm the final calculations of the Fee Schedule based on the billing rates in the submission.
The pdf file will be included in the contract as Appendix B-1.
Thank you,
Melissa Ng
Contract Administration Bureau
San Francisco Public Utilities Commission
525 Golden Gate Avenue, 8th Floor
San Francisco, CA 94102
[email protected]
sfpuc.org
From: Felicia Dunham <[email protected]>
Sent: Sunday, February 20, 2022 6:39 PM
To: Ng, Melissa <[email protected]>
Cc: Cox, Kyndra <[email protected]>; Kang Kiang <[email protected]>; Mark Cavagnero <[email protected]>
Subject: RE: PRO.0232 New CDD Campus at 2000 Marin Design Services
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Hello Melissa:
Thank you very much for your message.
We are surprised and excited to be recommended for the project! We were really disappointed by the loss – especially by such a slim margin. We look forward to working with you and Shelby on this project and can’t wait to get started.
Thanks again.
FELICIA DUNHAM, AIA, LEED AP
SENIOR ASSOCIATE
MARK CAVAGNERO ASSOCIATES ARCHITECTS
1045 Sansome Street Suite 200, San Francisco, CA 94111
Main 415.398.6944 x208 l Direct 415.947.7600 x208
Mobile 415.377.3495 l [email protected]
Cavagnero.com l LinkedIn l Facebook l Instagram
From: Ng, Melissa
Sent: Sunday, February 20, 2022 5:42 PM
To: Felicia Dunham
Cc: Cox, Kyndra
Subject: PRO.0232 New CDD Campus at 2000 Marin Design Services
Dear Felicia,
Please find the attached correspondence regarding your firm’s proposal on San Francisco Public Utilities Commission Request for Proposal (RFP) for PRO.0232 New CDD Campus at 2000 Marin Design Services.
Please contact our office with any questions or concerns.
Thank you,
Melissa Ng
Contract Administration Bureau
San Francisco Public Utilities Commission
525 Golden Gate Avenue, 8th Floor
San Francisco, CA 94102
[email protected]
sfpuc.org
OUR MISSION: To provide our customers with high-quality, efficient and reliable water, power and sewer services in a manner that values environmental and community interests and sustains the resources entrusted to our care.
Project Administration Bureau
525 Golden Gate Avenue, 8th Floor
San Francisco, CA 94102
T 415.554.4306
F 415.554.3225
TTY 415.554.3488
February 18, 2022
VIA EMAIL
Mark Cavagnero Associates
Felicia Dunham
[email protected]
Subject: Recommendation of Contract Award
San Francisco Public Utilities Commission Contract No.
PRO.0232, New CDD Campus at 2000 Marin Design Services
(Rebid of PUC.PRO.0198)
Dear Felicia Dunham:
The San Francisco Public Utilities Commission (SFPUC) had initially posted the ranking of the above-referenced project on December 20, 2021, but has since identified defects in the proposals. The SFPUC is obligated to evaluate and reject proposals that are not materially responsive to the minimum qualifications in the RFP. This determination is central to the process of competitive bidding for public contracts, and should never be ignored. It applies regardless of where the procurement is in the review process, and can even overturn a contract award to a materially non-responsive bidder.
Accordingly, the SFPUC is now recommending contract award to Mark Cavagnero Associates.
Should you have any other questions or concerns, do not hesitate to contact our office.
Respectfully,
Melissa Ng
Contract Administration Bureau
Cc: Kyndra Cox, SFPUC
File PRO.0232
OFFICES
57 Post Street, Suite 711
San Francisco, CA 94104
(415) 882-7252
1031 15th Street, Suite 6
Modesto, CA 95354
(209) 236-0330
67 Linoberg Street
Sonora, CA 95370
(209) 588-8636
www.tuolumne.org
BOARD MEMBERS
John Kreiter, Chair
Harrison “Hap” Dunning,
Vice Chair
Cindy Charles, Treasurer
Kerstyn Crumb, Secretary
Eric Heitz,
Chair Emeritus
Eddie Corwin
Bob Hackamack
Camille King
Bill Maher
Marty McDonnell
John Nimmons
Eric Riemer
Bart Westcott
May 9, 2022
President Anson Moran and Commissioners
SFPUC
525 Golden Gate Ave.
San Francisco, CA 94102
Via Email
Re: Item 7a – Drought Conditions Update.
Dear President Moran and Commissioners:
When I receive the SFPUC agenda, one of the first things I look at is the “Water Supply/Drought Conditions Update.” There’s usually good news, and rarely bad news. Let me share some insights into the most current report.
Slide 4 (Reservoir Storage) shows that on May 2, 2022 “Total System Storage” was 1,080,809 thousand acre-feet (TAF). Regional Water System (RWS) demand in FY 2020/21 was 195 mgd, or 219 TAF. Therefore, the SFPUC has multiple years-worth of water in storage. We’re currently in the third year of drought, yet total system storage is at 74%, compared to 82% on average. We’re doing quite well.
Slide 13 (Total Deliveries) shows that even though it’s been a dry year and we’re just six weeks away from the beginning of summer, current RWS demand is 184 mgd, lower than last year’s average.
Slide 9 (Tuolumne Water Available to the City) shows that the SFPUC has captured 178 TAF from the Tuolumne River alone so far this water year. With RWS demand at 219 TAF (including supply from Bay Area watersheds), things aren’t looking so bad.
In fact, the situation is looking promising enough (see Slide 7 – Hetch Hetchy Storage) that the SFPUC is planning to release sufficient water from Hetch Hetchy to trigger the filling of the Poopenaut Valley pond (see Slide 15 – 2022 Planned Spill Management – and Slide 16). The pond provides critical habitat for aquatic invertebrates that serve as an important food source for wildlife, so this is good news for the ecosystem.
I get the impression that not everyone recognizes the good news for water supply that I see in the reports. Perhaps the difference in how people view the report can be answered by Slide 9. What jumps out at the reader is that the
SFPUC would need a total of 598 TAF for the year to reach full storage on July 1, which won’t happen. But there’s no need to get nervous. When you have enough storage capacity to last six years, achieving full storage is a luxury, not a necessity. If the vertical axis on the graph ranged from 0% to 100% of total system storage, the reality of the situation would be much clearer. One would see that total storage is currently at 74%. If a line were added showing the 82% average for storage at this time of year, the graph would look a lot rosier.
Similarly, current reservoir conditions could be made to look more dire. For example, if the SFPUC were to raise O’Shaughnessy Dam so that Hetch Hetchy could hold an additional 200 TAF, but the reservoir contained the same volume of water as it does today, the “WAC Target to Achieve Full Storage on July 1, 2022” would be 798 TAF. The situation would look worse, even though the amount of water in storage were the same.
Finally, unrelated to the Drought Conditions Update, but an issue that comes up frequently, is the potential impact of a climate-induced snowpack reduction on the SFPUC’s water supply. For many water agencies, snowpack is a big deal, especially for those that depend on run-of-river (seasonal flows) vs. storage. However, as long as there is capacity in the SFPUC’s reservoirs, available runoff will be captured, regardless of seasonal timing.
As we’ve pointed out many times, the SFPUC’s water entitlements will likely improve as a result of climate change due to the way water rights are structured in the Raker Act.
Thank you for the opportunity to share my thoughts.
Sincerely,
Peter Drekmeier
Policy Director
From: Jesse Jimenez
To: Lauppe Rhodes, Betsy
Cc: Commission; Commission; Commission; Commission; Cayetano Reynoso; Justin Bochmann; Eva Cruz-Huerta Subject: Bid Advisory on Wilson Utility Construction - HH-1007 Transmission Line 7/8 Upgrades - FFC Case No. 735ST Date: Thursday, May 12, 2022 7:09:26 AM
Attachments: Outlook-a2ej3wtd.png
Bid Advisory - Wilson Utility Construction Co - FFC Case No. 735ST.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
RE: BID ADVISORY
Low Bidder: Wilson Utility Construction Company Awarding Agency: San Francisco Public Utilities Commission Project: HH-1007 Transmission Line 7/8 Upgrades FFC Case No.: 735ST
Dear Ms. Rhodes:
Please enter this formal bid advisory against the above-noted contractor as a matter of public record and circulate to all Commissioners. We respectfully request that Wilson Utility Construction Company (WUC) bid be rejected.
The bid provided to the Commission by WUC signifies that the contractor would not be able to successfully perform its duties on the above project, while fulfilling its obligations with the Rules and Regulations Governing the Payment of Prevailing Wages, at the bid amount provided due to the following:
NON-RESPONSIVE BID PROVIDED/FAILURE TO INCLUDE COMPLETED
SCHEDULE OF BID PRICES
WUC’s bid fails to include pricing for all required bid line items, pursuant to City bid requirements and project specifications.
FAILURE TO COMPLY WITH BID SPECIFICATIONS/UNFAIR COMPETITIVE
ADVATAGE
WUC’s bid is significantly lower than all other bidders on this project which indicates a failure to account for the proper prevailing wage rate and include all items in the bid packet – including travel and subsistence. If awarded the project, this contractor would need to submit multiple costly change orders to complete the project in accordance with the specifications and/or compromise prevailing wage laws/standards. This gives WUC an unfair advantage in its bidding practices against its competitors and puts the San Francisco Public Utilities Commission into a precarious legal position.
COMPENSABLE DELAY COSTS EXCESSIVE BEYOND REASON
WUC’s Compensable Delay costs exceed all other bidders by a margin of over 1200%. This may result in the San Francisco Public Utilities Commission spending greatly in excess of the stated bid amount, should delays occur on the project.
FAILURE TO PROVIDE REQUIRED APPRENTICESHIP TRAINING FUND
CONTRIBUTIONS
WUC has failed to comply with the requirements set forth in Labor Code § 1777.5(m)(1) by omitting payments to either the California Apprenticeship Council or a state approved apprenticeship program.
FAILURE TO COMPLY WITH WORKFORCE DEVELOPMENT AND FORMAL
APPRENTICESHIP PROGRAMS
WUC has not made a good faith effort to participate and invest in Local Workforce Development, nor have they participated in local hiring of workers in the community through formal and recognized pre-apprenticeship programs and formal apprenticeship programs for specific apprenticeable crafts. They have failed to request, employ, train, and pay the proper prevailing wages to apprentices.
UNSAFE WORK ENVIRONMENT/MULTIPLE SAFTEY INCIDENCES WITH PAST
AND PENDING OSHA VIOLATIONS RESULTING IN FINES ISSUED AND UPHELD
WUC has multiple safety infractions that have resulted in worker injuries and death, leading to investigations and fines issued by OSHA. We have attached the detailed supporting documentation for your review.
Please contact our office with questions, comments, or clarifications.
Sincerely,
Jesse Jimenez
Executive Director
Case: 735ST
cc: San Francisco Public Utilities Commission – Commissioners Anson Moran – Email: [email protected]
Newsha K. Ajami – Email: [email protected]
Sophie Maxwell – Email: [email protected]
Tim Paulson – Email: [email protected]
Jesse Jimenez
Executive Director
Foundation for Fair Contracting
3807 Pasadena Avenue, Suite 150
Sacramento, California 95821
Office (916) 487-7871; Fax (916) 487-0306;
Direct (916) 549-6381
One Stop Solutions @ www.ffccalifornia.com
VIA EMAIL – [email protected]
May 12, 2022
Betsy L. Rhodes
San Francisco Public Utilities Commission
525 Golden Gate Avenue
San Francisco, CA 94102
RE: BID ADVISORY
Low Bidder: Wilson Utility Construction Company
Awarding Agency: San Francisco Public Utilities Commission Project: HH-1007 Transmission Line 7/8 Upgrades
FFC Case No.: 73 5ST
Dear Ms. Rhodes:
Please enter this formal bid advisory against the above-noted contractor as a matter of public record and circulate to all Commissioners. We respectfully request that Wilson Utility Construction Company (WUC) bid be rejected.
The bid provided to the Commission by WUC signifies that the contractor would not be able to successfully perform its duties on the above project, while fulfilling its obligations with the Rules and Regulations Governing the Payment of Prevailing Wages, at the bid amount provided due to the following:
• NON-RESPONSIVE BID PROVIDED/FAILURE TO INCLUDE COMPLETED
SCHEDULE OF BID PRICES
WUC’s bid fails to include pricing for all required bid line items, pursuant to City bid requirements and project specifications.
• FAILURE TO COMPLY WITH BID SPECIFICATIONS/UNFAIR COMPETITIVE
ADVATAGE
WUC’s bid is significantly lower than all other bidders on this project which indicates a failure to account for the proper prevailing wage rate and include all items in the bid packet – including travel and subsistence. If awarded the project, this contractor would need to submit multiple costly change orders to complete the project in accordance with the specifications and/or compromise prevailing wage laws/standards. This gives WUC an unfair advantage in its bidding practices against its competitors and puts the San Francisco Public Utilities Commission into a precarious legal position.
• COMPENSABLE DELAY COSTS EXCESSIVE BEYOND REASON
WUC’s Compensable Delay costs exceed all other bidders by a margin of over 1200%.
This may result in the San Francisco Public Utilities Commission spending greatly in excess of the stated bid amount, should delays occur on the project.
Betsy L. Rhodes
San Francisco Public Utilities Commission
May 12, 2022
• FAILURE TO PROVIDE REQUIRED APPRENTICESHIP TRAINING FUND
CONTRIBUTIONS
WUC has failed to comply with the requirements set forth in Labor Code § 1777.5(m)(1) by omitting payments to either the California Apprenticeship Council or a state approved apprenticeship program.
• FAILURE TO COMPLY WITH WORKFORCE DEVELOPMENT AND FORMAL
APPRENTICESHIP PROGRAMS
WUC has not made a good faith effort to participate and invest in Local Workforce Development, nor have they participated in local hiring of workers in the community through formal and recognized pre-apprenticeship programs and formal apprenticeship programs for specific apprenticeable crafts. They have failed to request, employ, train, and pay the proper prevailing wages to apprentices.
• UNSAFE WORK ENVIRONMENT/MULTIPLE SAFTEY INCIDENCES WITH PAST
AND PENDING OSHA VIOLATIONS RESULTING IN FINES ISSUED AND UPHELD WUC has multiple safety infractions that have resulted in worker injuries and death, leading to investigations and fines issued by OSHA. We have attached the detailed supporting documentation for your review.
Please contact our office with questions, comments, or clarifications.
Sincerely,
Jesse Jimenez
Executive Director
Case: 735ST
cc: San Francisco Public Utilities Commission – Commissioners Anson Moran – Email: [email protected]
Newsha K. Ajami – Email: [email protected]
Sophie Maxwell – Email: [email protected]
Tim Paulson – Email: [email protected]
San Francisco Public Utilities Commission
TABULATION OF BIDS
Bid Date: Thursday, March 24, 2022
Contract No.: HH-1007
Contract Title:
Estimate Amount: $28,000,000
LBE Sub Requirements: 10%
Contractors City License # Base Bid Daily Rate Total Bid Wilson Utility Construction Co. Canby, OR 753014 23,980,141$ 40,000$ 25,780, 141$ Anvil Builders, Inc. San Francisco, CA 952883 30,840,436$ 3,000$ 30,975, 436$ Sierra Mountain Construction Inc. Sonora, CA 885550 42,398,036$ 1$ 42,398,081$ List of Subcontractors Description of Work License # Amount Listed LBE Sub of Wilson Utility Construction Co.
CMC Traffic Control Specialist Traffic Controls 792059 319,900$ Yes Mountain Methods, Inc. Foundation Retrofit 931634 2,988,900$ Yes Power Construction Inc. Dirt Disposal & Foundation Retrofit 861418 671,000$ Yes Team EES Inc. Hydroseed and Environmental 386026 101,800$ Yes S2S Environmental SWPPP QSD 1002111 278,260$ No Ninyo & Moore Concrete & Soils Testing 697063 76,333$ No OneSource Supply Solutions Provide Wire & Line Hardware N/A 8,337,882$ No QB Fabrication & Welding Tower Steel N/A 246,527$ No Sub of Anvil Builders, Inc.
Michels Pacific Energy Inc.
Tower Raise & Reconstruction
Tower Retrofit (install only for all
scopes)
1057869 3,204,222$ No
Total Traffic Control Traffic Control 1018669 590,000$ Yes Team EES BMP Installation 386026 101,880$ Yes Quick SWPPP Corporation QSP & QSD N/A 31,700$ Yes On the level Concrete Foundation Retrofits (Partial) 813145 2,318,000$ Yes Mike O'Dell Surveys Survey N/A 67,950$ Yes Sub of Sierra Mountain Construction Inc.
Hotline Constuction, Inc. Bid Items: 4, Partial 9-11, Partial 13, 14, Partial 15-16 & Partial 19A 710855 18,975,300$ No Pacific Engineering & Construction, Inc. Bid Items: 5, 6A, 6B, 7, 8A, 8B, Partial 9-12, Partial 15, Partial 16 858547 6,247,856$ Yes * Not listed
CC: Jeff Wasserloos Vivian Liu
Jared Dunn File: HH-1007
Transmission Line 7/8 Upgrades
San Francisco Public Utilities Commission
SCHEDULE OF BID PRICE
Bid Date: Thursday, March 24, 2022
Contract No.: HH-1007
Contract Title:
Estimate Amount: $28,000,000
LBE Sub Requirements: 10%
Wilson Utility
Construction Co.
Anvil Builders,
Inc.
Sierra Mountain
Construction Inc.
Item
No. Bid Description Est. Qty Unit* Unit Price Amount Unit Price Amount Unit Price Amount 1 Mobilization --- LS --- $ 410,000.00 $ 410,000.00 $ 410,000.00 2 Demobilization --- LS --- $ 270,000.00 $ 270,000.00 $ 270,000.00 3 NOT USED --- --- --- --- --- ---
4 Temporary Guard Structures for
Roadway Crossings --- LS --- $ 737,690.15 $ 925,000.00 $ 250,000.00 5 Stormwater Pollution Prevention
Plan (SWPPP) Implementation --- LS --- $ 323,342.57 $ 34,000.00 $ 88,000.00 6A
Silt Fence for Stormwater
Protection and Resource
Avoidance
5,000 LF 4.80$ $ 24,000.00 $ 8.00 $ 40,000.00 $ 4.00 $ 20,000.00 6B Fiber Rolls for Erosion Control 2,000 LF 5.40$ $ 10,800.00 $ 8.00 $ 16,000.00 $ 7.00 $ 14,000.00 7 Orange Barrier (Safety) Fence 5,000 LF 4.87$ $ 24,350.00 $ 8.00 $ 40,000.00 $ 5.00 $ 25,000.00 8A Site Restoration – Hydroseed 20,000 SY 3.72$ $ 74,400.00 $ 2.00 $ 40,000.00 $ 2.00 $ 40,000.00 8B Site Restoration – Broadcast
Seeding 10,000 SY 4.11$ $ 41,100.00 $ 2.75 $ 27,500.00 $ 2.00 $ 20,000.00 9 Reconductor 115kV Transmission
Line 7/8 --- LS --- $ 13,773,052.05 $ 21,220,000.00 $ 30,030,000.00 10 Tower Raise - 9' 15 EA 52,005.86$ $ 780,087.90 $ 56,000.00 $ 840,000.00 $ 62,000.00 $ 930,000.00 11 Tower Raise - 16' 22 EA 71,183.79$ $ 1,566,043.38 $ 60,000.00 $ 1,320,000.00 $ 78,000.00 $ 1,716,000.00 12 Tower Foundation Retrofit 276 EA 12,272.04$ $ 3,387,083.04 $ 14,000.00 $ 3,864,000.00 $ 25,700.00 $ 7,093,200.00 13 Tower Reinforcement / Retrofit 6 EA 38,104.83$ $ 228,628.98 $ 30,000.00 $ 180,000.00 $ 90,000.00 $ 540,000.00 14 Tower Tap Replacement 2 EA 39,148.49$ $ 78,296.98 $ 48,600.00 $ 97,200.00 $ 22,000.00 $ 44,000.00 15 Temporary Tower Stabilization 3 EA 6,238.77$ $ 18,716.31 $ 11,800.00 $ 35,400.00 $ 18,000.00 $ 54,000.00 16 Start Up Testing and
Commissioning --- LS --- $ 25,000.00 $ 180,000.00 $ 40,000.00 17 Contract Safety Requirements --- LS --- $ 956,733.07 $ 644,000.00 $ 370,000.00 18 Spoil Removal 7,500 TN 98.81$ $ 741,075.00 $ 225,000.00 $ 1.00 $ 7,500.00 19A Grounding --- LS --- $ 133,502.10 $ 61,000.00 $ 65,000.00 19B
Contingency Allowance for
Additional Grounding Testing and
Requirements
--- AL --- $ 50,000.00 $ 50,000.00 $ 50,000.00 20 Contingency Allowance for
Unforeseen Conditions --- AL --- $ 50,000.00 $ 50,000.00 $ 50,000.00 21 Contingency Allowance for Select
Crop Tree Removal --- AL --- $ 50,000.00 $ 50,000.00 $ 50,000.00 22 Contingency Allowance for
Unanticipated and Additional
Environmental Mitigation
--- AL --- $ 50,000.00 $ 50,000.00 $ 50,000.00 23 Contingency Allowance for
Unanticipated City
Representative Directed Work
--- AL --- $ 50,000.00 $ 50,000.00 $ 50,000.00 24 Cash Allowance For Additional
Special Testing And Inspections --- AL --- $ 25,000.00 $ 25,000.00 $ 25,000.00 25 Cash Allowance for Dispute
Resolution Advisor --- AL --- $ 25,000.00 $ 25,000.00 $ 25,000.00 26 Cash Allowance for Partnering
Fees and Expenses --- AL --- $ 55,000.00 $ 55,000.00 $ 55,000.00 27 Contingency Allowance for
Hauling, Testing and Disposal of
Unforeseen Contaminated Soils or
Hazardous Materials
--- AL --- $ 15,000.00 $ 15,000.00 $ 15,000.00 COV-1
COVID-19 Infectious Disease
Preparedness And Response Plan
(IDPRP)***
668 Day 9.34$ $ 6,239.12 $ 1.00 $ 668.00 $ 1.00 $ 668.00 COV-2 COVID-19 Impacts To
Construction Activities*** 668 Day -$ $ - $ 1.00 $ 668.00 $ 1.00 $ 668.00 23,980,140.65$ 30,840,436.00$ 42,398,036.00$
*=In the case of discrepancy between a unit price Bid and extension therof (in column "Amount"), including a blank Amount, said unit price shall prevail.
Note: LS=Lump Sum; EA=Each; LF=Linear Feet; SY=Square Yard; TN=US Ton, CY=Cubic Yards; AL=Allowance; Day=Consecutive Calendar Day Box A Daily Rate for Compensable Delay $ 40,000 $ 3,000 $ 1 Box B Number of Days (multiplier) 45 45 45
Box C Extension $ 1,800,000 $ 135,000 $ 45 25,780,140.65$ 30,975,436.00$ 42,398,081.00$ TOTAL BASE BID PRICE & COMPENSABLE DELAY #REF!
Transmission Line 7/8 Upgrades
Bidder acknowledges that quantities are not guaranteed and final payment will be based on the actual quantities determined asprovided in the Contract Documents.
The City reserves the right after opening Bids to reject any or all Bids, and to waive any minor irregularity in a Bid. In case of discrepancy between the sum of Bid item amounts and the Total Bid Price ("Base Bid"), the sum of said amounts shall prevail. In the case of discrepancy between words and figures, the words shall prevail. In case of discrepancy between a unit price Bid and extension thereof (in column "Amount"), including a blank Amount, said unit price shall prevail. The City requires Bidders tofill in a unit price for all unit price items; if a Bidder intends to bid $0 for a unit price item, state the unit price of "0" and do not leave a blank. Likewise, do not leave a blank for lump sum bid items.
Time allowed for completion of all Work shall be the number of calendar days specified in Section 00 73 02, beginning with and including the official date of Notice to Proceed as established by the General Manager, San Francisco Public Utilities Commission.
The daily rate shown above will be the total amount of Contractor entitlement for each day of compensable delay caused by theCity at any time during the performance of Work through Substantial Completion, and shall constitute payment in full for all delay costs, direct or indirect (including, without limitation, compensation for all extended home office overhead and field overhead), of the Contractor and all subcontractors, suppliers, persons and entities under or claiming through Contractor on theProject. The number of days of compensable delay shown as a "multiplier" above is not an estimate of the number of days of compensable delay anticipated by the City. The City will pay the daily rate of compensation only for the actual number of days of compensable delay (if any), as determined under the General Conditions and/or Supplementary Conditions. The actual number of days of compensable delay, if any, may be greater or lesser than the "multiplier" shown above. Time allowed for completion of all Work shall be the number of calendar days specified in Section 00 73 02, beginning with and including the official date of Notice to Proceed as established by the General Manager, San Francisco Public Utilities Commission. /0 /1 /2 /2 /1 /3 /3 /4 /i255 /3 /6 /7 /0 /i255 /8/9/10 /11 /12 /13 /14 /15 /16 /17 /13 /11 /i255 /18 /19 /19 /16 /20 /17 /21 /13 /22 /20 /23 /24 /13 /19 /i255 /10 /15 /25 /17 /22 /13 /12 /i255 /26 /i255 /8 /25 /27 /12 /13 /22 /i255 /28 /15 /16 /29 /23 /i255 /21 /16 /11 /13 /17 /13 /17 /30 /i255 /14 /25 /17 /31 /i255 /22 /15 /17 /21 /16 /13 /27 /25 /21 /13 /15 /17 /23 /24 /21 /21 /19 /23 /6 /1 /1 /28 /28 /28 /32 /31 /13 /16 /32 /22 /11 /32 /30 /15 /33 /1 /10 /18 /10 /1 /34 /16 /11 /13 /17 /13 /17 /30 /35 /25 /17 /31 /1 /34 /35 /36 /20 /21 /21 /20 /16 /32 /11 /23 /19/2 /1 /2 /37 /38 /39 /38 /40 /i255 /42 /43 /i255 /44 /39 /45 /46 /43 /42 /47 /48 /46 /39 /49 /50 /51 /52 /53 /i255 /48 /54 /55 /56 /57/58/59/i255 /60 /61 /62 /63 /64 /65 /61 /64 /66 /67 /68 /69 /70/71/72/73 /69 /67 /i255 /67 /75 /75 /72 /76 /73 /77 /69 /66 /76 /78/79/69/75 /i255 /66/71/80/73 /66 /69 /68 /i255 /81 /82 /42 /82 /i255 /83 /57 /84 /i255 /85 /86 /87 /88 /87 /89 /37 /50 /53 /i255 /43 /90 /50 /53 /91 /52 /56 /91 /57 /59 /i255 /44/39 /i255 /92 /85 /93 /85 /86 /94 /87 /88 /87 /89 /95 /85 /93 /96 /97 /i255 /98 /87 /89 /94 /85 /92 /86 /87 /38 /57 /i255 /55 /99 /57/58/i255/52 /100 /i255/58/50/101 /i255 /91/57 /53 /91 /54 /90 /53 /102 /39 /91 /91 /57 /90 /103 /52 /53 /104 /i255 /100 /57 /i255 /100 /90 /50 /53/56 /50 /91 /100 /52 /57 /53 /56 /i255 /90 /54 /91 /57 /90 /103 /54 /103 /i255 /50 /56 /i255 /57 /105 /i255/106/50/101 /i255 /93 /87 /59 /i255 /86 /87 /86 /86 /59 /i255 /53 /57 /i255 /91 /57 /53 /100 /90 /52 /107 /108 /100 /52 /57 /53 /56 /i255 /99 /50 /51 /54 /i255 /107 /54 /54 /53 /i255 /90 /54 /91 /54 /52 /51 /54 /103/i255 /105 /57 /90 /i255 /44 /57 /53 /100 /90 /50 /91 /100 /57 /90 /56 /45 /52 /91 /54 /53 /56 /54 /i255 /53 /108/58/107/54 /90 /i255 /98/96 /89 /87 /93 /85 /i255 /52 /53 /i255 /100 /99 /54 /i255 /109 /50 /56 /100 /i255 /105 /57 /108 /90 /i255 /101 /54 /50 /90 /56 /82 /46 /105 /i255 /101 /57 /108 /i255 /99 /50 /51 /54 /i255 /50 /53 /101 /i255 /110 /108/54 /56 /100 /52 /57 /53 /56 /i255 /109 /111 /54 /50 /56 /54 /i255 /91 /57 /53 /100 /50 /91 /100 /i255 /100 /99 /54 /i255 /112 /52 /51 /52 /56 /52 /57 /53 /i255 /57 /105 /i255 /39 /109 /109 /90 /54 /53 /100 /52 /91 /54 /56 /99 /52 /109 /i255 /37 /100 /50 /53 /103 /50 /90 /103 /56 /82 /i255/100 /90 /50 /52 /53 /52 /53 /104 /105 /108 /53 /103/113/103/52 /90 /82 /91 /50 /82 /104 /57 /51 /49 /111 /54 /53 /i255 /43 /57 /90/58/50/53 /i255
/105 /57 /90 /i255 /100 /99 /54 /i255 /37 /54 /91 /90 /54 /100 /50 /90 /101 /59 /i255/44 /50 /111 /52 /105 /57 /90 /53 /52 /50 /i255 /39 /109 /109 /90 /54 /53 /100 /52 /91 /54 /56 /99 /52 /109 /i255 /44 /57 /108 /53 /91 /52 /111
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
1589253.015 | 1574310.015 | 1557198.015
Note: The following inspection has not been indicated as closed. Please be aware that the information shown may change, e.g. violations may be added or deleted. For open cases, in which a citation has been issued, the citation information may not be available for 5 days following receipt by the employer for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1589253.015 - Wa317968350 - Wilson Construction Co Inspection Information - Office: Washington Region 6
Nr: 1589253.015 Report ID: 1055360 Open Date:
04/01/2022
Wa317968350 - Wilson Construction Co
E 2121 Springfield
Spokane, WA 99202 Union Status: Union
SIC:
NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference:
Emphasis: P:Euc, S:Euc Close Case:
Note: The following inspection has not been indicated as closed. Please be aware that the information shown may change, e.g. violations may be added or deleted. For open cases, in which a citation has been issued, the citation information may not be available for 5 days following receipt by the employer for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1574310.015 - Wilson Utility Construction Co.
Inspection Information - Office: Ca Sacramento
Nr: 1574310.015 Report ID: 0950621 Open Date:
01/25/2022
Wilson Utility Construction Co.
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
26909 Rollins Lake Rd.
Colfax, CA 95713
Union Status: Union
SIC:
NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P.O. Box 1190, Canby, OR 97013
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference:
Close Case:
Related Activity: Type ID Safety Health
Accident 1852489
Inspection: 1557198.015 - Wa317966005 - Wilson Construction Co Inspection Information - Office: Washington Region 6
Nr: 1557198.015 Report ID: 1055360 Open Date:
10/05/2021
Wa317966005 - Wilson Construction Co
5610 Corkscrew Canyon Rd
Tumtum, WA 99034 Union Status: Union
SIC:
NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/05/2021
Emphasis: P:Euc, S:Euc Close Case: 10/05/2021
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
1451350.015 | 1286355.015
Note: The following inspection has not been indicated as closed. Please be aware that the information shown may change, e.g. violations may be added or deleted. For open cases, in which a citation has been issued, the citation information may not be available for 5 days following receipt by the employer for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1451350.015 - Wa317956699 - Wilson Construction Co Inspection Information - Office: Washington Region 6
Nr: 1451350.015 Report ID: 1055360 Open Date:
10/21/2019
Wa317956699 - Wilson Construction Co
100 North Hayford Road
Airway Heights, WA 99001 Union Status: Union
SIC:
NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Referral
Scope: Complete Advanced Notice: Y
Ownership: Private
Safety/Health: Safety Close Conference: 03/12/2020
Close Case:
Related Activity: Type ID Safety Health
Referral 1511145 Yes
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations 2 2
Initial Penalty $9,100 $0 $0 $0 $0 $9,100
Current Penalty $9,100 $0 $0 $0 $0 $9,100
FTA Amount $0 $0 $0 $0 $0 $0
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 296-45-335(4) 03/23/2020 04/10/2020 $4,200 $4,200 $0 04/15/2020 C - Contested
2. 01002A Serious 296-45-135(4) 03/23/2020 10/21/2019 $4,900 $4,900 $0 04/15/2020 C - Contested
3. 01002B Serious 296-45-215(14) 03/23/2020 10/21/2019 $0 $0 $0 04/15/2020 C - Contested Inspection: 1286355.015 - Wa317947792 - Wilson Construction Co Inspection Information - Office: Washington Region 5
Nr: 1286355.015 Report ID: 1055350 Open Date:
01/03/2018
Wa317947792 - Wilson Construction Co
13792 Vantage Hwy
Ellensburg, WA 98926 Union Status: Union
SIC:
NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/03/2018
Emphasis: P:Euc, S:Euc Close Case: 01/03/2018
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
1221612.015 | 1215591.015 | 1194781.015 | 1113481.015 | 1088897.015 Inspection: 1221612.015 - Wa317944562 - Wilson Construction Co Inspection Information - Office: Washington Region 5
Nr: 1221612.015 Report ID: 1055350 Open Date:
03/29/2017
Wa317944562 - Wilson Construction Co
10484 Hwy 28 West
Quincy, WA 98848 Union Status: Union
SIC:
NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/29/2017
Emphasis: P:Euc, S:Euc Close Case: 03/29/2017
Inspection: 1215591.015 - Wilson Construction Co.
Inspection Information - Office: Wilkes-Barre
Nr: 1215591.015 Report ID: 0317700 Open Date:
03/08/2017
Wilson Construction Co.
2177 Slocum Rd.
Mountain Top, PA 18707 Union Status: Union
SIC:
NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Complaint
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 05/24/2017
Close Case: 05/25/2017
Related Activity: Type ID Safety Health
Complaint 1188302 Yes
Inspection: 1194781.015 - Wa317943169 - Wilson Construction Co Inspection Information - Office: Washington Region 3
Nr: 1194781.015 Report ID: 1055330 Open Date:
11/29/2016
Wa317943169 - Wilson Construction Co
5502 119 St. Sw
Lakewood, WA 98499 Union Status: Union
SIC:
NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/29/2016
Emphasis: P:Euc, S:Euc Close Case: 11/29/2016
Inspection: 1113481.015 - Wa317938912 - Wilson Construction Co Inspection Information - Office: Washington Region 6
Nr: 1113481.015 Report ID: 1055360 Open Date:
11/20/2015
Wa317938912 - Wilson Construction Co
Glenrose & 29th
Spokane, WA 99201 Union Status: Union
SIC:
NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/07/2015
Emphasis: P:Euc, S:Euc Close Case: 12/07/2015
Inspection: 1088897.015 - Wa317937781 - Wilson Construction Co Inspection Information - Office: Washington Region 5
Nr: 1088897.015 Report ID: 1055350 Open Date:
07/30/2015
Wa317937781 - Wilson Construction Co
3510 Dodson Rd
Moses Lake, WA 98837 Union Status: Union
SIC:
NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/30/2015
Emphasis: P:Euc, S:Euc Close Case: 07/30/2015
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
1057131.015 | 1052226.015 | 317424042 | 315831974 | 316906288 | 316871532 | 316795319 | 316831346 Inspection: 1057131.015 - Wa317936140 - Wilson Construction Co Inspection Information - Office: Wa Tumwater Specialty Region Maritime, Electrical Nr: 1057131.015 Report ID: 1055380 Open Date:
04/21/2015
Wa317936140 - Wilson Construction Co
2 Woodland Rd.
Goldendale, WA 98620 Union Status: Union
SIC:
NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 05/11/2015
Emphasis: P:Constr, S:Constr Close Case: 05/11/2015
Inspection: 1052226.015 - Wa317935929 - Wilson Construction Co Inspection Information - Office: Wa Tumwater Specialty Region Maritime, Electrical Nr: 1052226.015 Report ID: 1055380 Open Date:
03/26/2015
Wa317935929 - Wilson Construction Co
Hwy 2 Just East Of Almira
Almira, WA 99103 Union Status: Union
SIC:
NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/30/2015
Emphasis: P:Explo, S:Explo Close Case: 03/30/2015
Inspection: 317424042 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 317424042 Report ID: 1055360 Open Date:
08/04/2014
Wilson Construction Co
Eloica Lake Rd Mile Post #5 Just East Of Hatch Rd
Deer Park, WA 99006 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/19/2014
Emphasis: L:Euc Close Case: 08/19/2014
Inspection: 315831974 - Wilson Utility Construction Co.
Inspection Information - Office: Ca American Canyon District Office Nr: 315831974 Report ID: 0950615 Open Date:
07/23/2014
Wilson Utility Construction Co.
840 Robinson Road
Sebastopol, CA 95472 Union Status: Union
SIC: 1731/Electrical Work
NAICS: 238210/Electrical Contractors
Mailing: P.O. Box 1190, Canby, OR 97013
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/03/2014
Close Case: 12/03/2014
Related Activity: Type ID Safety Health
Accident 102654787
Inspection: 316906288 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 316906288 Report ID: 1055340 Open Date:
11/06/2013
Wilson Construction Co
M St.West And 1st. St.
Centralia, WA 98531 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/06/2013
Emphasis: L:Euc Close Case: 11/06/2013
Inspection: 316871532 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 316871532 Report ID: 1055360 Open Date:
09/11/2013
Wilson Construction Co
Pole # 156.5, 906 W. Paradise
Cheney, WA 99004 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/12/2013
Emphasis: L:Euc Close Case: 09/12/2013
Inspection: 316795319 - Wilson Construction Co
Inspection Information - Office: Or Medford
Nr: 316795319 Report ID: 1054116 Open Date:
07/30/2013
Wilson Construction Co
32291 Edson Cr Rd
Gold Beach, OR 97444 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/21/2013
Planning Guide: Safety-Manufacturing Close Case: 12/02/2013 Related Activity: Type ID Safety Health
Accident 101621407
Accident Investigation Summary
Summary Nr: 201623725 Event: 07/30/2013 Worker Is Electrocuted After Contacting High Voltage At approximately 9:46 a.m. on July 30, 2013, Employee #1, a 35-year-old male Electrical and Electronic Equipment Assembler with Wilson Construction Company, was killed when he made contact with an unspecified high voltage.
Keywords: electrocuted, construction, electrical work, electric shock Inspection Degree Nature Occupation
1 316795319 Fatality Electric Shock Electrical and electronic equipment assemblers Inspection: 316831346 - Wilson Construction Co
Inspection Information - Office: Washington Region 2
Nr: 316831346 Report ID: 1055320 Open Date:
06/17/2013
Wilson Construction Co
Echo Lake Maple Valley Number One Line
Maple Valley, WA 99202 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Inspection Type: Referral
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/14/2013
Emphasis: L:Euc Close Case: 10/14/2013
Related Activity: Type ID Safety Health
Referral 203180716 Yes
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
316636208 | 316668391 | 316401082 | 315927764 | 316344019 | 316344027 Inspection: 316636208 - Wilson Construction Co
Inspection Information - Office: Or Safety 2-Salem
Nr: 316636208 Report ID: 1054113 Open Date: 12/11/2012
Wilson Construction Co
1190 Nw 3rd Ave
Canby, OR 97013 Union Status: NonUnion
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/07/2013
Planning Guide: Safety-Manufacturing Close Case: 06/06/2013 Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 3 3
Current Violations 2 2
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 702022104 A 02/01/2013 12/11/2012 $0 $0 $0 02/21/2013 I - Informal Settlement
2. 01002 Other 19100304 G05 02/01/2013 02/18/2013 $0 $0 $0 02/21/2013 I - Informal Settlement Deleted 3. 01003 Other 19100147 C04 I 02/01/2013 03/04/2013 $0 $0 $0 02/21/2013 I - Informal Settlement Inspection: 316668391 - Wilson Construction Company
Inspection Information - Office: Ca Van Nuys
Nr: 316668391 Report ID: 0950643 Open Date:
11/28/2012
Wilson Construction Company
Avenue S & Tuvey Road
Palmdale, CA 93551 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P.O. Box 1190, 1190 N.W. Third, Canby, OR 97013 Inspection Type: Accident
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/22/2013
Planning Guide: Safety-Construction Close Case: 06/30/2016 Related Activity: Type ID Safety Health
Accident 102784717
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 3 3
Current Violations
Initial Penalty $31,500 $0 $0 $0 $0 $31,500
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Serious 2743 B 04/23/2013 04/26/2013 $0 $6,750 $0 05/09/2013 D - Govt Dismissed Deleted 2. 02001 Serious 2941 I01 D 04/23/2013 04/26/2013 $0 $18,000 $0 05/09/2013 D - Govt Dismissed Deleted 3. 03001 Serious 1509 A 04/23/2013 04/26/2013 $0 $6,750 $0 05/09/2013 D - Govt Dismissed Accident Investigation Summary
Summary Nr: 202657136 Event: 11/17/2012 Employees Suffers Burns When Shocked By Electrical Lines At approximately 8:30 a.m. on November 17, 2012, Employee #1 and Employee #1, Journeyman electricians were assigned to replace a jumper cable on a high voltage electrical line transmission tower. The employees landed on the High Voltage transmission tower by helicopter and began to replacing the jumper cable while standing on a platform board. Two coworkers had previously installed the platform board the day before on the high voltage electrical tower lines. The two coworkers did not ground the platform board to the tower. Employee #1 was using a screwdriver to help pry the paddle off the bolts while employee #2 held the jumper cable paddle. Employee #2 was holding onto the conductor for leverage. When the paddle dislodged from the dead end both employees received induced electrical current shock. Employee #1 and 2 called for emergency assistance and descended the tower to the ground. The employees were the taken to the Helicopter landing zone by coworkers, where they were flown to Antelope Valley Hospital. Employees #1 and 2 were diagnosed by Antelope Valley Hospital with second-degree electrical burns to their bodies. The employees were hospitalized for approximately three days.
Keywords: burn, platform, shock, electrician, electrical work, elec utility work, transmission tower Inspection Degree Nature Occupation
1 316668391 Hospitalized injury Electric Shock Occupation not reported 2 316668391 Hospitalized injury Electric Shock Supervisors; electricians & power transm. install.
Inspection: 316401082 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 316401082 Report ID: 1055340 Open Date:
08/15/2012
Wilson Construction Co
Aze 53 Tower
Wishram, WA 98673 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/15/2012
Emphasis: L:Constr Close Case: 08/15/2012
Inspection: 315927764 - Wilson Construction Co
Inspection Information - Office: Or Bend
Nr: 315927764 Report ID: 1054115 Open Date:
08/01/2012
Wilson Construction Co
15 Mile Rd
The Dalles, OR 97013 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: 1190 Nw 3rd Ave, Canby, OR 97013
Inspection Type: Complaint
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/01/2012
Planning Guide: Safety-Construction Close Case: 08/01/2012 Related Activity: Type ID Safety Health
Complaint 207107517 Yes
Inspection: 316344019 - Wilson Utility Construction
Inspection Information - Office: Ca Monrovia District Office Nr: 316344019 Report ID: 0950644 Open Date:
06/06/2012
Wilson Utility Construction
Frame Ave/Bell River Rd
Hacienda Heights, CA 91745 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237110/Water and Sewer Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/10/2012
Close Case: 10/10/2012
Related Activity: Type ID Safety Health
Accident 102714953
Accident Investigation Summary
Summary Nr: 316344019 Event: 04/10/2012 Electrical Apprentice Falls From Sixteen Feet And Injured At approximately 10:50 a.m. on April 10, 2012, Employee #1, a first step electrical Apprentice was traveling across the top portion of a high-voltage tower cage that was staged in the horizontal position on the ground. Immediately before the first tower segment was being lifted into position, while Employee #1 was travelling point to point to complete the ground assembly work, a work crew was in the process of connecting the crane rigging on each end of the main rails, to
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
lift the tower cage to the vertical position. The crew had finished assembly on the ground; Employee #1 was on top of the cage and had just finished hooking up the cage to the crane operated by a coworker. Employee #1 had been instructed to tighten up the few remaining bolts. Employee #1 was moving from the west side main rail to the east side main rail, crawling across a horizontal member that was 5 inches wide and 15.75 feet long. E1's right hand slipped or wobbled, causing him to lose his balance while crawling across a horizontal member on a tower cage lying on its side, Employee #1 "barrel-rolled" around the beam and then fell off. Employee #1 fell about sixteen-feet to the ground to soft bare ground, landing on his chest, face and abdomen. Employee #1 was transported via ambulance to LA County-USC Medical Center for evaluation and treatment. He was in hospital for seven days, treated for an eye socket fracture and a lacerated kidney. Employee #1 was wearing work positioning equipment at the time of the accident but was travelling point to point and was not connected to a structural member. Employee #1 has been trained by Employer in fall protection and heat illness prevention in late October 2011, when he first began to work on this construction project. The Employer is a construction company that specializes in high-voltage tower construction. The worksite was an isolated hilltop in open country on top of a ridgeline.
Keywords: chest, eye, fracture, abdomen, electrical, electrician, electrical work, fall, face Inspection Degree Nature Occupation
1 316344019 Hospitalized injury Fracture Electricians' apprentices Inspection: 316344027 - Wilson Utility Construction Co
Inspection Information - Office: Ca Monrovia District Office Nr: 316344027 Report ID: 0950644 Open Date:
06/06/2012
Wilson Utility Construction Co
Mile 36 Structure
San Gabriel, CA 91775 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237110/Water and Sewer Line and Related Structures Construction Mailing: P.O.Box 1190, Canby, OR 97013
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/09/2012
Close Case: 11/09/2012
Related Activity: Type ID Safety Health
Accident 102715232
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
315967604 | 312669492 | 126200153 | 312668452 | 312668080 | 315180133 | 314842402 | 314535980 Inspection: 315967604 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 315967604 Report ID: 1055350 Open Date:
03/27/2012
Wilson Construction Co
Tower #G23-1
Grand Coulee, WA 99133 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/27/2012
Emphasis: L:Euc Close Case: 03/27/2012
Inspection: 312669492 - Wilson Utility Construction Co
Inspection Information - Office: &Nbsp;
Nr: 312669492 Report ID: 0950636 Open Date:
02/27/2012
Wilson Utility Construction Co
Live Oak & Graham Rd
Irwindale, CA 91706 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237110/Water and Sewer Line and Related Structures Construction Mailing: 2650 Orbiter #100, Brea, CA 92821
Inspection Type: Unprog Rel
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/06/2012
Planning Guide: Safety-Construction Close Case: 04/11/2012 Inspection: 126200153 - Wilson Utility Construction Co
Inspection Information - Office: Ca Pico Rivera
Nr: 126200153 Report ID: 0950642 Open Date:
02/17/2012
Wilson Utility Construction Co
1400 Las Lomas Rd
Duarte, CA 91016 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Complaint
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/07/2012
Planning Guide: Safety-Construction Close Case: 03/07/2012 Emphasis: S:Construction (Cship)
Related Activity: Type ID Safety Health
Complaint 207682725 Yes
Inspection: 312668452 - Wilson Utility Construction Co
Inspection Information - Office: &Nbsp;
Nr: 312668452 Report ID: 0950636 Open Date:
10/20/2011
Wilson Utility Construction Co
14661 Lost Trail Dr
Chino Hills, CA 91709 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: 2650 Orbiter St #150, Brea, CA 92821
Inspection Type: Complaint
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/20/2012
Close Case: 11/18/2013
Related Activity: Type ID Safety Health
Complaint 208520155 Yes
Inspection: 312668080 - Wilson Utility Construction Co
Inspection Information - Office: &Nbsp;
Nr: 312668080 Report ID: 0950636 Open Date:
09/26/2011
Wilson Utility Construction Co
18200 Pathfinder Rd
Rowland Heights, CA 91748 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: 1190 N.W. 3rd, Canby, OR 97013
Inspection Type: Complaint
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/01/2012
Planning Guide: Safety-Construction Close Case: 07/08/2016 Related Activity: Type ID Safety Health
Complaint 207212036 Yes
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $0 $0 $0 $750 $0 $750
Current Penalty $0 $0 $0 $750 $0 $750
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 341 C02 03/01/2012 03/05/2012 $750 $750 $0 03/13/2012 F - Formal Settlement Inspection: 315180133 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 315180133 Report ID: 1055360 Open Date:
09/06/2011
Wilson Construction Co
2722 Abbott Rd.
Spokane, WA 99224 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/06/2011
Emphasis: L:Euc Close Case: 09/06/2011
Inspection: 314842402 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 314842402 Report ID: 1055340 Open Date:
05/03/2011
Wilson Construction Co
1762 Bishop Rd
Chehalis, WA 98532 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 05/03/2011
Emphasis: L:Constr Close Case: 05/03/2011
Inspection: 314535980 - Wilson Utility Construction Co
Inspection Information - Office: Ca Sacramento
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Nr: 314535980 Report ID: 0950621 Open Date:
02/08/2011
Wilson Utility Construction Co
W Elverta Rd & Sorento Rd
Elverta, CA 95626 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237110/Water and Sewer Line and Related Structures Construction Mailing: 1190 Nw Third, Canby, OR 97013
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/24/2011
Close Case: 06/27/2011
Related Activity: Type ID Safety Health
Accident 361651607
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
314533902 | 314536574 | 314482787 | 314477886 | 314419631 | 314098849 | 313918682 | 313918815 | 313918948 | 313918914 | 313918864 Inspection: 314533902 - Wilson Utility Construction Co.
Inspection Information - Office: Ca Sacramento
Nr: 314533902 Report ID: 0950621 Open Date:
10/19/2010
Wilson Utility Construction Co.
Open Field Behind 7207 East Levee Rd
Rio Linda, CA 95673 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P.O. Box 1190, Canby, OR 97013
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/16/2011
Planning Guide: Safety-Construction Close Case: 12/17/2013 Emphasis: S:Construction (Cship)
Related Activity: Type ID Safety Health
Accident 361654593
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $0 $0 $0 $935 $0 $935
Current Penalty $0 $0 $0 $935 $0 $935
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 341 C01 A 03/17/2011 03/28/2011 $935 $935 $0 04/04/2011 J - ALJ Decision Accident Investigation Summary
Summary Nr: 202491429 Event: 10/19/2010 Employee Injured In Fall From Tower Collapse On October 19, 2010, a power line crew was removing conductors from a tower that had been designated for removal. After rigging the conductors for lowering, the crew disconnected six conductors (three conductors on each side of the tower) and lowered them to a height of 6.1 meters above the ground. The crew was using a winch line from a truck to relieve tension so that the workers could cut the conductors. One crewmember was operating the winch, and another worker was in communication with a second crew north of the tower. Two employees were positioned approximately 3 meters above the ground on a tower leg. One of them cut the first two conductors on one side, and the crew lowered the cut conductors to the ground with the other ends of the conductors still in the elevated rigging. The employee then cut the third conductor. As the crew lowered that conductor, the tower collapsed. The employee, who was secured to the tower, fell with the tower, which struck him as he landed. (The original form did not indicate whether the other employee on the tower leg was injured.) The injured worker underwent several surgeries for serious internal injuries and was hospitalized until December 1, 2010.
Keywords: overhead power line, collapse, power line worker, elec utility work, fall, transmission tower, unstable load Inspection Degree Nature Occupation
1 314533902 Hospitalized injury Other Electrical power installers and repairers Inspection: 314536574 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 314536574 Report ID: 1055340 Open Date:
09/01/2010
Wilson Construction Co
Bpa Right Of Way Off Raubuck Rd.
Winlock, WA 98596 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/09/2010
Emphasis: L:Euc Close Case: 09/09/2010
Inspection: 314482787 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 314482787 Report ID: 1055350 Open Date:
07/19/2010
Wilson Construction Co
3825 Sage Rd.
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/19/2010
Emphasis: L:Euc Close Case: 07/19/2010
Inspection: 314477886 - Wilson Construction Co
Inspection Information - Office: Washington Region 3
Nr: 314477886 Report ID: 1055330 Open Date:
06/22/2010
Wilson Construction Co
2414 Milton Way
Milton, WA 98354 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/22/2010
Emphasis: L:Euc Close Case: 06/22/2010
Inspection: 314419631 - Wilson Construction Co
Inspection Information - Office: Washington Region 3
Nr: 314419631 Report ID: 1055330 Open Date:
05/18/2010
Wilson Construction Co
1802 58th Ave E
Fife, WA 98424 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 05/25/2010
Emphasis: L:Constr Close Case: 05/25/2010
Inspection: 314098849 - Wilson Construction Co
Inspection Information - Office: Washington Region 3
Nr: 314098849 Report ID: 1055330 Open Date:
02/11/2010
Wilson Construction Co
Hwy 509
Tacoma, WA 98402 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/11/2010
Emphasis: L:Euc Close Case: 02/11/2010
Inspection: 313918682 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 313918682 Report ID: 1055340 Open Date:
01/19/2010
Wilson Construction Co
Old Pac. Hwy South
Kalama, WA 98625 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/19/2010
Emphasis: L:Euc Close Case: 01/19/2010
Inspection: 313918815 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 313918815 Report ID: 1055350 Open Date:
01/13/2010
Wilson Construction Co
7-5 Mcnary-John Day 500 Kv Bpa Line
Plymouth, WA 99346 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/13/2010
Emphasis: L:Euc Close Case: 01/13/2010
Inspection: 313918948 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 313918948 Report ID: 1055350 Open Date:
01/13/2010
Wilson Construction Co
30-4 Mcnary-John Day 500kv Bpa Line
Paterson, WA 99345 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/13/2010
Emphasis: L:Euc Close Case: 01/13/2010
Inspection: 313918914 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 313918914 Report ID: 1055350 Open Date:
01/13/2010
Wilson Construction Co
32-2 Mcnary-John Day 500kv Bpa Line
Paterson, WA 99345 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/13/2010
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Emphasis: L:Euc Close Case: 01/13/2010
Inspection: 313918864 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 313918864 Report ID: 1055350 Open Date:
01/12/2010
Wilson Construction Co
29-1 Mcnary-John Day 500kv Bpa Transmission Line
Paterson, WA 99345 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/12/2010
Emphasis: L:Euc Close Case: 01/12/2010
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
313885345 | 313885337 | 313769127 | 313578072 | 313569154 | 313395287 | 313395253 | 313394983 | 313394595 | 313158032 | 313099681 | 313095002
Inspection: 313885345 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 313885345 Report ID: 1055350 Open Date:
11/18/2009
Wilson Construction Co
7-5 Bpa Mcnary-John Day 500 Kv Transmission Line
Plymouth, WA 99346 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/18/2009
Emphasis: L:Euc Close Case: 11/18/2009
Inspection: 313885337 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 313885337 Report ID: 1055350 Open Date:
11/17/2009
Wilson Construction Co
36-4 Bpa Mcnary-John Day 500kv Transmission Line
Paterson, WA 99345 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/17/2009
Emphasis: L:Euc Close Case: 11/17/2009
Inspection: 313769127 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 313769127 Report ID: 1055350 Open Date:
10/19/2009
Wilson Construction Co
3612 Lakeshore Dr.
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/19/2009
Emphasis: L:Euc Close Case: 10/19/2009
Inspection: 313578072 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 313578072 Report ID: 1055340 Open Date:
08/19/2009
Wilson Construction Co
1222 Delaware Ave
Centralia, WA 98531 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/19/2009
Emphasis: L:Euc Close Case: 08/19/2009
Inspection: 313569154 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 313569154 Report ID: 1055350 Open Date:
07/29/2009
Wilson Construction Co
4404 Lake Shore Dr.
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/29/2009
Emphasis: L:Euc Close Case: 07/29/2009
Inspection: 313395287 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 313395287 Report ID: 1055350 Open Date:
07/15/2009
Wilson Construction Co
Mcnary-John Day #1 5-5
Plymouth, WA 99346 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/15/2009
Emphasis: L:Euc Close Case: 07/15/2009
Inspection: 313395253 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 313395253 Report ID: 1055350 Open Date:
07/15/2009
Wilson Construction Co
Mcnary-John Day #1 4-3
Plymouth, WA 99346 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/15/2009
Emphasis: L:Euc Close Case: 07/15/2009
Inspection: 313394983 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 313394983 Report ID: 1055360 Open Date:
07/09/2009
Wilson Construction Co
35315 Elk-Milan Rd.
Chattaroy, WA 99328 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/09/2009
Emphasis: L:Euc Close Case: 07/09/2009
Inspection: 313394595 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 313394595 Report ID: 1055360 Open Date:
07/09/2009
Wilson Construction Co
36104 Elk-Miilan Rd.
Chattaroy, WA 99214 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/09/2009
Emphasis: L:Euc Close Case: 07/09/2009
Inspection: 313158032 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 313158032 Report ID: 1055340 Open Date:
05/11/2009
Wilson Construction Co
Lewis River Rd
Ariel, WA 98603 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 05/11/2009
Emphasis: L:Euc Close Case: 05/11/2009
Inspection: 313099681 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 313099681 Report ID: 1055360 Open Date:
04/30/2009
Wilson Construction Co
Montgomery Ridge And Sherry Ridge
Anatone, WA 99401 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/30/2009
Emphasis: L:Euc Close Case: 04/30/2009
Inspection: 313095002 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 313095002 Report ID: 1055350 Open Date:
04/15/2009
Wilson Construction Co
Kingtull And Missimer Rd.
Prosser, WA 99350 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/15/2009
Emphasis: L:Euc Close Case: 04/15/2009
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
312959950 | 312959968 | 312951494 | 312944994 | 312949027 | 312699606 | 312647720 | 312647571 | 312641319 | 312562515 | 312549611 Inspection: 312959950 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 312959950 Report ID: 1055350 Open Date:
03/17/2009
Wilson Construction Co
5-2 Columbia Ancient Lake 115 Line
Rock Island, WA 98850 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/17/2009
Emphasis: L:Euc Close Case: 03/17/2009
Inspection: 312959968 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 312959968 Report ID: 1055350 Open Date:
03/17/2009
Wilson Construction Co
4-5 Columbia Ancient Lake 115 Kv Line
Rock Island, WA 98850 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/17/2009
Emphasis: L:Euc Close Case: 03/17/2009
Inspection: 312951494 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 312951494 Report ID: 1055350 Open Date:
03/10/2009
Wilson Construction Co
Hiway 26 8 Mi. West Of Royal City
Royal City, WA 99357 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/10/2009
Emphasis: L:Euc Close Case: 03/10/2009
Inspection: 312944994 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 312944994 Report ID: 1055350 Open Date:
03/04/2009
Wilson Construction Co
Hiway 28 And Palasaids Rd.
Rock Island, WA 98850 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/04/2009
Emphasis: L:Euc Close Case: 03/04/2009
Inspection: 312949027 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 312949027 Report ID: 1055350 Open Date:
03/04/2009
Wilson Construction Co
Pennivy Dr. And Pennensula
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/04/2009
Emphasis: L:Euc Close Case: 03/04/2009
Inspection: 312699606 - Wilson Construction Co
Inspection Information - Office: Washington Region 3
Nr: 312699606 Report ID: 1055330 Open Date:
12/09/2008
Wilson Construction Co
91st Ave Ct. Sw And Zircon Dr. Sw
Lakewood, WA 98498 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/09/2009
Emphasis: L:Euc Close Case: 01/09/2009
Inspection: 312647720 - Wilson Construction Co
Inspection Information - Office: Washington Region 3
Nr: 312647720 Report ID: 1055330 Open Date:
12/01/2008
Wilson Construction Co
14622 66th Avenue E
Puyallup, WA 98375 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/01/2008
Emphasis: L:Euc Close Case: 12/01/2008
Inspection: 312647571 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 312647571 Report ID: 1055350 Open Date:
11/20/2008
Wilson Construction Co
21986 N. Frontage Rd. N.E.
Warden, WA 98857 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/20/2008
Emphasis: L:Euc Close Case: 11/20/2008
Inspection: 312641319 - Wilson Construction Co
Inspection Information - Office: Washington Region 3
Nr: 312641319 Report ID: 1055330 Open Date:
11/13/2008
Wilson Construction Co
1215 Fairbanks Union Status: Union
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
Tacoma, WA 98404
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/13/2008
Emphasis: L:Euc Close Case: 11/13/2008
Inspection: 312562515 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 312562515 Report ID: 1055360 Open Date:
10/14/2008
Wilson Construction Co
3415 Marshal Rd.
Spokane, WA 99224 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/14/2008
Emphasis: L:Euc Close Case: 10/14/2008
Inspection: 312549611 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 312549611 Report ID: 1055340 Open Date:
10/13/2008
Wilson Construction Co
165 Lewis River Rd.
Ariel, WA 97013 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/16/2008
Emphasis: L:Euc Close Case: 10/16/2008
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
312323694 | 312323678 | 312159536 | 312159494 | 312159551 | 312130719 | 311846364 | 311850051 | 311842785 | 311733968 | 311657761 | 311439780
Inspection: 312323694 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 312323694 Report ID: 1055350 Open Date:
08/05/2008
Wilson Construction Co
Rocky Ford Substation Hiway 17
Ephrata, WA 98823 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/05/2008
Emphasis: L:Euc Close Case: 08/05/2008
Inspection: 312323678 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 312323678 Report ID: 1055350 Open Date:
08/05/2008
Wilson Construction Co
Five Miles South Of Ephrata
Ephrata, WA 98823 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/05/2008
Emphasis: L:Euc Close Case: 08/05/2008
Inspection: 312159536 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 312159536 Report ID: 1055350 Open Date:
06/18/2008
Wilson Construction Co
Rd U Se And Rd 6.9 Se
Warden, WA 98857 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/18/2008
Emphasis: L:Euc Close Case: 06/18/2008
Inspection: 312159494 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 312159494 Report ID: 1055350 Open Date:
06/18/2008
Wilson Construction Co
Rd U Se And Rd 6.9 Se
Warden, WA 98857 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/18/2008
Emphasis: L:Euc Close Case: 06/18/2008
Inspection: 312159551 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 312159551 Report ID: 1055350 Open Date:
06/18/2008
Wilson Construction Co
Penn Dr. And Kennedy Pl.
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/18/2008
Emphasis: L:Euc Close Case: 06/18/2008
Inspection: 312130719 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 312130719 Report ID: 1055340 Open Date:
06/10/2008
Wilson Construction Co
148 Sandy Blvd
Centralia, WA 97013 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Attn: Chris Hughes Po Box 1190, Canby, OR 97013 Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/10/2008
Emphasis: L:Euc Close Case: 06/10/2008
Inspection: 311846364 - Wilson Construction Co
Inspection Information - Office: Washington Region 3
Nr: 311846364 Report ID: 1055330 Open Date:
04/03/2008
Wilson Construction Co
9205 78st Sw
Tacoma, WA 98498 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/03/2008
Emphasis: L:Euc Close Case: 04/03/2008
Inspection: 311850051 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 311850051 Report ID: 1055350 Open Date:
03/25/2008
Wilson Construction Co
Road 7 And Stratford Road
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/25/2008
Emphasis: L:Euc Close Case: 03/25/2008
Inspection: 311842785 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 311842785 Report ID: 1055360 Open Date:
03/18/2008
Wilson Construction Co
15th St. And Dustin Loop
Clarkston, WA 99403 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/18/2008
Emphasis: L:Euc Close Case: 03/18/2008
Inspection: 311733968 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 311733968 Report ID: 1055340 Open Date:
02/25/2008
Wilson Construction Co
4231 Ocean Beach Hwy
Longview, WA 98632 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/25/2008
Emphasis: L:Euc Close Case: 02/25/2008
Inspection: 311657761 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 311657761 Report ID: 1055360 Open Date:
02/07/2008
Wilson Construction Co
Walnut And College
Spokane, WA 99201 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/07/2008
Emphasis: L:Euc Close Case: 02/07/2008
Inspection: 311439780 - Wilson Construction Co
Inspection Information - Office: Washington Region 3
Nr: 311439780 Report ID: 1055330 Open Date:
11/27/2007
Wilson Construction Co
5712 264th St. East
Graham, WA 98338 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/27/2007
Emphasis: L:Euc Close Case: 11/27/2007
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
311438063 | 311356026 | 311356364 | 311176143 | 310832233 Inspection: 311438063 - Wilson Construction Co
Inspection Information - Office: Washington Region 3
Nr: 311438063 Report ID: 1055330 Open Date:
11/20/2007
Wilson Construction Co
Wright Park 6th Ave And S. 5th
Tacoma, WA 98405 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/20/2007
Emphasis: L:Euc Close Case: 11/20/2007
Inspection: 311356026 - Wilson Construction Co
Inspection Information - Office: Washington Region 2
Nr: 311356026 Report ID: 1055320 Open Date:
09/18/2007
Wilson Construction Co
Crystal Mountain Blvd.
Enumclaw, WA 98022 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/18/2007
Emphasis: L:Euc Close Case: 09/18/2007
Inspection: 311356364 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 311356364 Report ID: 1055340 Open Date:
09/17/2007
Wilson Construction Co
Buland Dr. And Huntington Ave
Castle Rock, WA 98611 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/17/2007
Emphasis: L:Euc Close Case: 09/17/2007
Inspection: 311176143 - Wilson Construction Co
Inspection Information - Office: Washington Region 2
Nr: 311176143 Report ID: 1055320 Open Date:
07/11/2007
Wilson Construction Co
1880 108th Ave Se
Bellevue, WA 98008 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/11/2007
Emphasis: L:Euc Close Case: 07/11/2007
Inspection: 310832233 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 310832233 Report ID: 1055350 Open Date:
03/06/2007
Wilson Construction Co
2nd St Sw And B St Sw Alley
Quincy, WA 98848 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/06/2007
Emphasis: L:Euc Close Case: 07/20/2007
Violation Summary
Serious Willful Repeat Other Unclass Total
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Initial Violations 1 1
Current Violations
Initial Penalty $200 $0 $0 $0 $0 $200
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Serious 0452550502 04/05/2007 03/06/2007 $200 $200 $0 04/26/2007 Y - State Decision
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
310613781 | 310137542 | 310136015 | 309877215 | 309877223 Inspection: 310613781 - Wilson Construction Co
Inspection Information - Office: Washington Region 3
Nr: 310613781 Report ID: 1055330 Open Date:
01/10/2007
Wilson Construction Co
Lincoln Hill Rd. And Maranatha
Poulsbo, WA 98370 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/10/2007
Emphasis: L:Euc Close Case: 01/10/2007
Inspection: 310137542 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 310137542 Report ID: 1055350 Open Date:
08/03/2006
Wilson Construction Co
Easy St. York Switch Yard
Monitor, WA 98836 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/03/2006
Emphasis: L:Euc Close Case: 01/03/2008
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations
Initial Penalty $300 $0 $0 $0 $0 $300
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Serious 0450025507 08/30/2006 08/03/2006 $300 $300 $0 09/25/2006 F - Formal Settlement Inspection: 310136015 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 310136015 Report ID: 1055350 Open Date:
08/02/2006
Wilson Construction Co
1 Mi. N. Of N Ne And 3 Ne
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/02/2006
Emphasis: L:Euc Close Case: 08/02/2006
Inspection: 309877215 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 309877215 Report ID: 1055350 Open Date:
04/26/2006
Wilson Construction Co
Wanapum Bpa Substation
Mattawa, WA 97013 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/26/2006
Emphasis: L:Euc Close Case: 04/26/2006
Inspection: 309877223 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 309877223 Report ID: 1055350 Open Date:
04/26/2006
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Wilson Construction Co
Vantage,Wa.
Vantage, WA 98950 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/26/2006
Emphasis: L:Euc Close Case: 04/26/2006
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
309807766 | 309807758 | 309240208 | 309240190 | 309019354 | 309019362 Inspection: 309807766 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 309807766 Report ID: 1055350 Open Date:
03/15/2006
Wilson Construction Co
260 Stevens Rd.
Kittitas, WA 98934 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/15/2006
Emphasis: L:Euc Close Case: 03/15/2006
Inspection: 309807758 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 309807758 Report ID: 1055350 Open Date:
03/13/2006
Wilson Construction Co
I-90 And Dodson Rd.
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/13/2006
Emphasis: L:Euc Close Case: 03/13/2006
Inspection: 309240208 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 309240208 Report ID: 1055360 Open Date: 08/22/2005
Wilson Construction Co
Andrus Rd
Cheney, WA 99004 Union Status: NonUnion
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/22/2005
Emphasis: L:Constr Close Case: 08/22/2005
Inspection: 309240190 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 309240190 Report ID: 1055360 Open Date: 08/22/2005
Wilson Construction Co
Andrus Rd
Cheney, WA 99004 Union Status: NonUnion
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/22/2005
Emphasis: L:Constr Close Case: 08/22/2005
Inspection: 309019354 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 309019354 Report ID: 1055350 Open Date: 07/14/2005
Wilson Construction Co
E Pasco-Walla Walla-Franklin 1
Pasco, WA 99301 Union Status: NonUnion
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/14/2005
Emphasis: L:Euc Close Case: 07/14/2005
Inspection: 309019362 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 309019362 Report ID: 1055350 Open Date: 07/14/2005
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Wilson Construction Co
Walla Walla-Franklin Bpa 115
Pasco, WA 99301 Union Status: NonUnion
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/14/2005
Emphasis: L:Euc Close Case: 07/14/2005
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
309012276 | 309011088 | 308583996 | 308581016 | 308580489 | 308439918 | 308439967 | 308426667 | 308184308 Inspection: 309012276 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 309012276 Report ID: 1055360 Open Date: 06/14/2005
Wilson Construction Co
Addy - Gifford Rd
Addy, WA 99101 Union Status: NonUnion
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/14/2005
Emphasis: L:Euc Close Case: 06/14/2005
Inspection: 309011088 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 309011088 Report ID: 1055350 Open Date:
06/09/2005
Wilson Construction Co
Mcgee Rd
Dayton, WA 99328 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/09/2005
Emphasis: L:Euc Close Case: 06/09/2005
Inspection: 308583996 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 308583996 Report ID: 1055360 Open Date:
02/24/2005
Wilson Construction Co
Thomas Mallon And Hallet Rd
Four Lakes, WA 99014 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/24/2005
Emphasis: L:Euc Close Case: 02/24/2005
Inspection: 308581016 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 308581016 Report ID: 1055350 Open Date:
02/10/2005
Wilson Construction Co
4208 Lower River Rd.
Benton City, WA 99320 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/10/2005
Emphasis: L:Euc Close Case: 02/10/2005
Inspection: 308580489 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 308580489 Report ID: 1055350 Open Date:
02/10/2005
Wilson Construction Co
475 40th
West Richland, WA 97013 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/10/2005
Emphasis: L:Euc Close Case: 02/10/2005
Inspection: 308439918 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 308439918 Report ID: 1055360 Open Date:
12/23/2004
Wilson Construction Co
Craig Rd. 1/4 Mi. E Of Rambo
Airway Heights, WA 99001 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/23/2004
Emphasis: L:Euc Close Case: 12/23/2004
Inspection: 308439967 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 308439967 Report ID: 1055360 Open Date: 12/20/2004
Wilson Construction Co
Sherman Draw
Creston, WA 99117 Union Status: NonUnion
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/20/2004
Emphasis: L:Euc Close Case: 12/20/2004
Inspection: 308426667 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 308426667 Report ID: 1055350 Open Date:
12/08/2004
Wilson Construction Co
R Road Sw
Mattawa, WA 99344 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/08/2004
Emphasis: L:Euc Close Case: 02/26/2005
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $1,650 $0 $0 $0 $0 $1,650
Current Penalty $1,650 $0 $0 $0 $0 $1,650
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 0450034503 01/13/2005 12/08/2004 $1,650 $1,650 $0 - Inspection: 308184308 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 308184308 Report ID: 1055350 Open Date:
11/18/2004
Wilson Construction Co
R Sw And 25 Sw
Mattawa, WA 99349 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/18/2004
Emphasis: L:Euc Close Case: 11/18/2004
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
307618215 | 307618223 | 307616029 | 307616037 | 307197483 | 307099176 | 306647124 | 306513201 Inspection: 307618215 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 307618215 Report ID: 1055350 Open Date:
04/08/2004
Wilson Construction Co
Road 22.5 Wilson Creek
Wilson Creek, WA 98860 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/08/2004
Emphasis: L:Euc Close Case: 04/08/2004
Inspection: 307618223 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 307618223 Report ID: 1055360 Open Date:
04/08/2004
Wilson Construction Co
Vista Park
Spokane, WA 99212 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/08/2004
Emphasis: L:Euc Close Case: 04/08/2004
Inspection: 307616029 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 307616029 Report ID: 1055350 Open Date:
04/01/2004
Wilson Construction Co
3400 Sage Road
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/01/2004
Emphasis: L:Euc Close Case: 04/01/2004
Inspection: 307616037 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 307616037 Report ID: 1055350 Open Date:
04/01/2004
Wilson Construction Co
Boundary Road 3 Mi. S. Of Mabton
Mabton, WA 98935 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/01/2004
Emphasis: L:Euc Close Case: 04/01/2004
Inspection: 307197483 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 307197483 Report ID: 1055360 Open Date:
01/04/2004
Wilson Construction Co
1/4 Mi. East Of Starr Rd.
Otis Orchards, WA 99027 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/04/2004
Emphasis: L:Euc Close Case: 02/04/2004
Inspection: 307099176 - Wilson Construction Co
UNITED STATES
DEPARTMENT OF LABOR
Inspection Information - Office: Washington Region 5
Nr: 307099176 Report ID: 1055350 Open Date:
12/09/2003
Wilson Construction Co
47615 E. Hiway 224
Benton City, WA 99320 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/09/2003
Emphasis: L:Euc Close Case: 12/09/2003
Inspection: 306647124 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 306647124 Report ID: 1055360 Open Date:
11/13/2003
Wilson Construction Co
Rathdrum-Beacon Line 8/3 Jacobs Road
Spokane, WA 99217 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/13/2003
Emphasis: L:Euc Close Case: 11/13/2003
Inspection: 306513201 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 306513201 Report ID: 1055360 Open Date:
10/10/2003
Wilson Construction Co
Evergreen And Bigelow Gulch
Spokane, WA 99217 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/10/2003
Emphasis: L:Euc Close Case: 10/10/2003
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
306430018 | 306406547 | 306351883 | 306318049 | 306013707 | 125778597 | 302211081 | 305552531 Inspection: 306430018 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 306430018 Report ID: 1055360 Open Date:
09/23/2003
Wilson Construction Co
Boulder Park Gen. Station
Otis Orchards, WA 99027 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/23/2003
Emphasis: L:Euc Close Case: 09/23/2003
Inspection: 306406547 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 306406547 Report ID: 1055360 Open Date:
07/29/2003
Wilson Construction Co
Range St. And Willard St.
Hartline, WA 99135 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/29/2003
Emphasis: L:Euc Close Case: 07/29/2003
Inspection: 306351883 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 306351883 Report ID: 1055360 Open Date:
05/14/2003
Wilson Construction Co
Missimer And Johnson Road
Prosser, WA 99350 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: P O Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 05/14/2003
Emphasis: L:Euc Close Case: 05/14/2003
Inspection: 306318049 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 306318049 Report ID: 1055360 Open Date:
03/18/2003
Wilson Construction Co
6085 W Van Geisen-West
Richland, WA 99353 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/18/2003
Emphasis: L:Euc Close Case: 03/24/2003
Inspection: 306013707 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 306013707 Report ID: 1055360 Open Date:
12/19/2002
Wilson Construction Co
Newquest Rd And Satus Road
Mabton, WA 98935 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction NAICS: 237130/Power and Communication Line and Related Structures Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/19/2002
Emphasis: L:Euc Close Case: 12/19/2002
Inspection: 125778597 - Wilson Construction Company
UNITED STATES
DEPARTMENT OF LABOR
Inspection Information - Office: Ca Concord
Nr: 125778597 Report ID: 0950622 Open Date:
11/21/2002
Wilson Construction Company
The Alameda & Contra Costa Canal
Concord, CA 94520 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Complaint
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/16/2002
Emphasis: S:Construction (Cship) Close Case: 01/02/2003 Related Activity: Type ID Safety Health
Complaint 78372794 Yes
Inspection: 302211081 - Wilson Construction Inc
Inspection Information - Office: Washington Region 4
Nr: 302211081 Report ID: 1055340 Open Date:
08/28/2002
Wilson Construction Inc
23403 Nw 33rd Avenue
Battle Ground, WA 98604 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/28/2002
Emphasis: L:Euc Close Case: 08/28/2002
Inspection: 305552531 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 305552531 Report ID: 1055360 Open Date:
08/20/2002
Wilson Construction Co
3211 Court St
Pasco, WA 99301 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/20/2002
Emphasis: L:Euc Close Case: 08/26/2002
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
305420549 | 305208597
Inspection: 305420549 - Wilson Construction Inc
Inspection Information - Office: Washington Region 2
Nr: 305420549 Report ID: 1055320 Open Date:
06/25/2002
Wilson Construction Inc
7135 Delta Line Road
Ferndale, WA 98248 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/25/2002
Emphasis: L:Constr Close Case: 06/25/2002
Inspection: 305208597 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 305208597 Report ID: 1055360 Open Date:
05/16/2002
Wilson Construction Co
Deno & Craig Rd
Airway Heights, WA 99001 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 05/16/2002
Emphasis: L:Euc Close Case: 05/20/2002
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
305142200 | 305142192 | 305142135 | 304948888 | 304298300 Inspection: 305142200 - Wilson Construction Company Inc Inspection Information - Office: Washington Region 6
Nr: 305142200 Report ID: 1055360 Open Date:
02/11/2002
Wilson Construction Company Inc
Burke Substation
George, WA 98824 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Camby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/11/2002
Emphasis: L:Euc Close Case: 02/11/2002
Inspection: 305142192 - Wilson Construction Inc
Inspection Information - Office: Washington Region 6
Nr: 305142192 Report ID: 1055360 Open Date:
02/05/2002
Wilson Construction Inc
North 5300 Glade
Pasco, WA 99301 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/06/2002
Emphasis: L:Euc Close Case: 02/11/2002
Inspection: 305142135 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 305142135 Report ID: 1055360 Open Date:
01/10/2002
Wilson Construction Co
Commercial Ave
Pasco, WA 99301 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/10/2002
Emphasis: L:Euc Close Case: 01/10/2002
Inspection: 304948888 - Wilson Construction Company Inc Inspection Information - Office: Or Portland
Nr: 304948888 Report ID: 1054111 Open Date: 12/06/2001
Wilson Construction Company Inc
1190 Nw 3rd Ave
Canby, OR 97013 Union Status: NonUnion
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/06/2001
Planning Guide: Safety-Construction Close Case: 01/02/2003 Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 3 1 4
Current Violations 3 1 4
Initial Penalty $660 $0 $0 $500 $0 $1,160
Current Penalty $404 $0 $0 $255 $0 $659
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 19100212 A03 II 01/08/2002 12/06/2001 $92 $180 $0 01/22/2002 L - State Settlement
2. 01002 Serious 19100213 H01 01/08/2002 12/06/2001 $117 $180 $0 01/22/2002 L - State Settlement
3. 01003A Serious 19100219 D01 01/08/2002 12/06/2001 $195 $300 $0 01/22/2002 L - State Settlement
4. 01003B Serious 19100219 E01 I 01/08/2002 12/06/2001 $0 $0 $0 01/22/2002 L - State Settlement
5. 02004 Other 701076502 A 01/08/2002 01/18/2002 $255 $500 $0 01/22/2002 L - State Settlement Inspection: 304298300 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 304298300 Report ID: 1055360 Open Date:
10/17/2001
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Wilson Construction Co
Phillips Rd Off Mulnex Rd
Cheney, WA 99009 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/17/2001
Emphasis: L:Euc Close Case: 11/09/2002
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations 1 1
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 1552451003 G 11/29/2001 10/17/2001 $0 $0 $0 12/17/2001 J - ALJ Decision Deleted 2. 01002 Other 0450037506 11/29/2001 01/01/2002 $0 $0 $0 12/17/2001 J - ALJ Decision
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
119942290 | 304140569 | 302219555 | 303974752
Inspection: 119942290 - Wilson Construction Company
Inspection Information - Office: Ca Van Nuys
Nr: 119942290 Report ID: 0950643 Open Date:
03/16/2001
Wilson Construction Company
Sunrise Power Project, Pole #6
Fellows, CA 93224 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: P.O. Box 1190, Canby, OR 97013
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/14/2001
Emphasis: S:Construction (Cship) Close Case: 11/19/2001 Related Activity: Type ID Safety Health
Accident 362506446
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $0 $0 $0 $935 $0 $935
Current Penalty $0 $0 $0 $935 $0 $935
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 341 A02 07/03/2001 07/06/2001 $935 $935 $0 - Inspection: 304140569 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 304140569 Report ID: 1055360 Open Date:
01/04/2001
Wilson Construction Co
116 W 3rd In Alley
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/04/2001
Emphasis: L:Euc Close Case: 01/04/2001
Inspection: 302219555 - Wilson Construction Inc
Inspection Information - Office: Washington Region 6
Nr: 302219555 Report ID: 1055360 Open Date:
12/07/2000
Wilson Construction Inc
Yonazawa Dr
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/07/2000
Emphasis: L:Euc Close Case: 04/13/2001
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $1,250 $0 $0 $0 $0 $1,250
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 0450025507 01/29/2001 02/06/2001 $0 $1,250 $0 02/23/2001 Y - State Decision Inspection: 303974752 - Wilson Construction Company
Inspection Information - Office: Washington Region 6
Nr: 303974752 Report ID: 1055360 Open Date:
11/08/2000
Wilson Construction Company
2000 Block N Locust
Spokane, WA 99212 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/08/2000
Emphasis: L:Euc Close Case: 11/08/2000
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
304095193 | 303958466 | 303442966 | 303635247 | 303109391 | 303109383 | 303438519 | 303325062 | 303277123 | 303201636 | 303361042 | 303201529
Inspection: 304095193 - Wilson Construction Company
Inspection Information - Office: Washington Region 2
Nr: 304095193 Report ID: 1055320 Open Date:
10/26/2000
Wilson Construction Company
Bellevue Way & Ne 6th St
Bellevue, WA 98004 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/13/2000
Emphasis: L:Constr Close Case: 12/14/2004
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 4 4
Current Violations 1 1
Initial Penalty $12,600 $0 $0 $0 $0 $12,600
Current Penalty $3,150 $0 $0 $0 $0 $3,150
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Serious 1550065701 A 01/09/2001 11/13/2000 $3,150 $3,150 $0 02/15/2002 F - Formal Settlement Deleted 2. 01002 Serious 1550065511 A 01/09/2001 11/13/2000 $3,150 $3,150 $0 02/15/2002 F - Formal Settlement Deleted 3. 01003 Serious 1550065503 B 01/09/2001 11/13/2000 $3,150 $3,150 $0 02/15/2002 F - Formal Settlement
4. 01004A Serious 1550065701 A 04/18/2002 04/18/2002 $3,150 $3,150 $0 F - Formal Settlement
5. 01004B Serious 1550065503 B 04/18/2002 04/18/2002 $0 $0 $0 F - Formal Settlement Inspection: 303958466 - Wilson Construction Co
Inspection Information - Office: Washington Region 3
Nr: 303958466 Report ID: 1055330 Open Date:
10/10/2000
Wilson Construction Co
West Of Peppermill On Sedgwick
Port Orchard, WA 98366 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/16/2000
Emphasis: L:Constr Close Case: 05/28/2002
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $350 $0 $0 $0 $0 $350
Current Penalty $0 $0 $0 $350 $0 $350
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 0450021504 A 12/05/2000 10/16/2000 $350 $350 $0 12/29/2000 F - Formal Settlement Inspection: 303442966 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 303442966 Report ID: 1055340 Open Date:
09/20/2000
Wilson Construction Co
341st And Mountain Hwy
Eatonville, WA 98328 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/20/2000
Emphasis: L:Euc Close Case: 09/20/2000
Inspection: 303635247 - Wilson Construction Co
Inspection Information - Office: Washington Region 1
Nr: 303635247 Report ID: 1055310 Open Date: 06/23/2000
Wilson Construction Co
24100 Block Of 3rd Pl W
Lynnwood, WA 98036
Union Status: NonUnion
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/23/2000
Emphasis: L:Constr Close Case: 10/19/2000
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations 1 1
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 1550030007 A 07/18/2000 06/23/2000 $0 $0 $0 08/09/2000 Y - State Decision Deleted 2. 01002 Other 1550030007 B 07/18/2000 07/28/2000 $0 $0 $0 08/09/2000 Y - State Decision Inspection: 303109391 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 303109391 Report ID: 1055350 Open Date:
03/27/2000
Wilson Construction Co
Road Q & Road 3 Ne Grant Co
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/27/2000
Emphasis: L:Euc Close Case: 03/27/2000
Inspection: 303109383 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 303109383 Report ID: 1055360 Open Date:
03/27/2000
Wilson Construction Co
Road N - Grant Co
Royal City, WA 99357 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/27/2000
Emphasis: L:Euc Close Case: 08/25/2000
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Other 0450037517 05/03/2000 05/16/2000 $0 $0 $0 05/30/2000 Y - State Decision Inspection: 303438519 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 303438519 Report ID: 1055340 Open Date:
03/08/2000
Wilson Construction Co
6840 Lakeside Ave
Olympia, WA 98504 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/08/2000
Emphasis: L:Euc Close Case: 07/13/2006
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations
Initial Penalty $1,000 $0 $0 $0 $0 $1,000
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Serious 0450034504 B 06/26/2000 03/08/2000 $1,000 $1,000 $0 07/19/2000 R - Review Commission Inspection: 303325062 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 303325062 Report ID: 1055350 Open Date: 02/24/2000
Wilson Construction Co
6520 Home Run Rd
Pasco, WA 98371 Union Status: NonUnion
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 5950 W Brinkley Rd, Kennewick, WA 99338
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/24/2000
Emphasis: L:Constr Close Case: 02/24/2000
Inspection: 303277123 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 303277123 Report ID: 1055340 Open Date:
02/10/2000
Wilson Construction Co
Rosedale & Oak Bay Rd
Port Ludlow, WA 98365 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/10/2000
Emphasis: L:Euc Close Case: 02/10/2000
Inspection: 303201636 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 303201636 Report ID: 1055360 Open Date:
02/08/2000
Wilson Construction Co
Beverly Burke Rd
Royal City, WA 99357 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/08/2000
Emphasis: L:Euc Close Case: 02/22/2000
Inspection: 303361042 - Wilson Construction Co
Inspection Information - Office: Washington Region 2
Nr: 303361042 Report ID: 1055320 Open Date:
01/12/2000
Wilson Construction Co
Redmond Way At Cleveland St
Redmond, WA 98052 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 1833 Auburn Way N Ste #1, Auburn, WA 98002
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/12/2000
Emphasis: L:Euc Close Case: 01/12/2000
Inspection: 303201529 - Wilson Construction Co
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Inspection Information - Office: Washington Region 6
Nr: 303201529 Report ID: 1055360 Open Date:
01/06/2000
Wilson Construction Co
Hwy 26 Beverly-Burke Rd
Royal City, WA 99357 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/06/2000
Emphasis: L:Euc Close Case: 01/06/2000
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
303289441 | 303101828 | 303109177 | 303101745 | 303101588 | 303155287 | 302221957 | 302787155 | 302202338 | 302202601 Inspection: 303289441 - Wilson Construction Co
Inspection Information - Office: Washington Region 2
Nr: 303289441 Report ID: 1055320 Open Date:
12/09/1999
Wilson Construction Co
84th Ave S & James St
Kent, WA 98032 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97031
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/09/1999
Emphasis: L:Euc Close Case: 12/09/1999
Inspection: 303101828 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 303101828 Report ID: 1055340 Open Date:
12/08/1999
Wilson Construction Co
Oyehut Substation
Ocean Shores, WA 98569 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Complaint
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/08/1999
Emphasis: L:Euc Close Case: 12/08/1999
Related Activity: Type ID Safety Health
Complaint 202331534 Yes
Inspection: 303109177 - Wilson Construction Inc
Inspection Information - Office: Washington Region 6
Nr: 303109177 Report ID: 1055360 Open Date:
12/02/1999
Wilson Construction Inc
Sand Dunes Pot Holes 230 Rv Line
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/02/1999
Emphasis: L:Euc Close Case: 12/02/1999
Inspection: 303101745 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 303101745 Report ID: 1055340 Open Date:
12/02/1999
Wilson Construction Co
Mellinger Ave Nw & Williams Blvd
Orting, WA 98360 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 98360
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/02/1999
Emphasis: L:Euc Close Case: 08/17/2001
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations
Initial Penalty $2,250 $0 $0 $0 $0 $2,250
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Serious 0450032502 A 02/07/2000 12/02/1999 $2,250 $2,250 $0 02/23/2000 F - Formal Settlement Inspection: 303101588 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 303101588 Report ID: 1055340 Open Date:
11/16/1999
Wilson Construction Co
3811 Grandview
Gig Harbor, WA 98335
Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/16/1999
Emphasis: L:Euc Close Case: 12/19/2001
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations
Initial Penalty $2,500 $0 $0 $0 $0 $2,500
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Serious 0450032504 02/14/2000 11/16/1999 $1,250 $1,250 $0 03/07/2000 J - ALJ Decision Deleted 2. 01002 Serious 0450032502 E 02/14/2000 11/16/1999 $1,250 $1,250 $0 03/07/2000 J - ALJ Decision Inspection: 303155287 - Wilson Construction Co
Inspection Information - Office: Washington Region 3
Nr: 303155287 Report ID: 1055330 Open Date:
11/12/1999
Wilson Construction Co
Raft Island Dr
Gig Harbor, WA 98335 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 1190 Nw 3rd, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/12/1999
Emphasis: L:Constr Close Case: 04/22/2001
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $480 $0 $0 $0 $0 $480
Current Penalty $480 $0 $0 $0 $0 $480
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 1550020005 01/11/2000 11/12/1999 $480 $480 $0 01/25/2000 J - ALJ Decision Inspection: 302221957 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 302221957 Report ID: 1055360 Open Date:
10/14/1999
Wilson Construction Co
Chardonnay Blvd
Prosser, WA 99350 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/14/1999
Emphasis: L:Euc Close Case: 10/14/1999
Inspection: 302787155 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 302787155 Report ID: 1055340 Open Date:
08/24/1999
Wilson Construction Co
16810 154th St Kpn
Gig Harbor, WA 98335 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/24/1999
Emphasis: L:Euc Close Case: 08/24/1999
Inspection: 302202338 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 302202338 Report ID: 1055340 Open Date: 07/21/1999
Wilson Construction Co
16318 S Meridian
Puyallup, WA 98371 Union Status: NonUnion
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/21/1999
Emphasis: L:Euc Close Case: 07/21/1999
Inspection: 302202601 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 302202601 Report ID: 1055340 Open Date:
06/28/1999
Wilson Construction Co
Moon Rd & Hwy 12
Rochester, WA 98579 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/28/1999
Emphasis: L:Euc Close Case: 06/28/1999
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
301291886 | 302194295 | 302172416 | 302172721 | 302172044 | 302164272 Inspection: 301291886 - Wilson Construction Co
Inspection Information - Office: Or Bend
Nr: 301291886 Report ID: 1054115 Open Date:
02/23/1999
Wilson Construction Co
Owyhee Irrigation Power Project Sw Of
Nyssa, OR 97913 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/23/1999
Planning Guide: Safety-Construction Close Case: 02/23/1999 Inspection: 302194295 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 302194295 Report ID: 1055350 Open Date:
12/24/1998
Wilson Construction Co
9256 Randolf Rd
Moses Lake, WA 98837 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 1190 Nw 3rd, Canby, OR 97013
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/31/1999
Emphasis: L:Euc Close Case: 10/21/2003
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1 2
Current Violations
Initial Penalty $7,700 $63,000 $0 $0 $0 $70,700
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001A Willful 1550010001 B 05/28/1999 06/15/1999 $63,000 $63,000 $0 06/15/1999 R - Review Commission Deleted 2. 01001B Willful 0450005504 05/28/1999 06/15/1999 $0 $0 $0 06/15/1999 R - Review Commission Deleted 3. 01001C Willful 0450008503 05/28/1999 06/15/1999 $0 $0 $0 06/15/1999 R - Review Commission Deleted 4. 02001 Serious 0450032504 05/28/1999 03/31/1999 $7,700 $7,700 $0 06/15/1999 R - Review Commission Accident Investigation Summary
Summary Nr: 170006183 Event: 12/24/1998 Electric Shock - Direct Contact With Energized Conductor A power line worker contacted a conductor energized at 13.2 kilovolts. He received an electric shock and was hospitalized for his injuries.
Keywords: elec protect equip, electrical, power line worker, e ptd, elec utility work, electric conductor, electric shock Inspection Degree Nature Occupation
1 302194295 Hospitalized injury Electric Shock Electrical power installers and repairers Inspection: 302172416 - Wilson Construction Inc
Inspection Information - Office: Washington Region 4
Nr: 302172416 Report ID: 1055340 Open Date:
11/02/1998
Wilson Construction Inc
3628 Country Club Dr
Olympia, WA 98504 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/02/1998
Emphasis: L:Euc Close Case: 11/02/1998
Inspection: 302172721 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 302172721 Report ID: 1055340 Open Date:
10/07/1998
Wilson Construction Co
18702 Sr 503
Amboy, WA 98601 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
UNITED STATES
DEPARTMENT OF LABOR
Safety/Health: Safety Close Conference: 10/07/1998
Emphasis: L:Euc Close Case: 10/07/1998
Inspection: 302172044 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 302172044 Report ID: 1055340 Open Date:
09/10/1998
Wilson Construction Co
100 Block 7th
Mc Cleary, WA 98557 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/10/1998
Emphasis: L:Euc Close Case: 09/10/1998
Inspection: 302164272 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 302164272 Report ID: 1055340 Open Date:
07/20/1998
Wilson Construction Co
10310 Fruitland Ave
Puyallup, WA 98731 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/20/1998
Emphasis: L:Euc Close Case: 07/09/1999
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations
Initial Penalty $800 $0 $0 $0 $0 $800
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Serious 0450032512 D 08/05/1998 07/20/1998 $800 $800 $0 08/14/1998 F - Formal Settlement Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
302157458 | 302157359 | 302157367 | 115184988 | 115184889 | 115385841 | 115303745 Inspection: 302157458 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 302157458 Report ID: 1055340 Open Date:
06/09/1998
Wilson Construction Co
6700 Lynch Rd
Shelton, WA 98584 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/09/1998
Emphasis: L:Euc Close Case: 06/07/1999
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1 2
Current Violations 1 1 2
Initial Penalty $800 $0 $0 $0 $0 $800
Current Penalty $800 $0 $0 $0 $0 $800
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 0455253002 06/23/1998 06/09/1998 $800 $800 $0 06/29/1998 J - ALJ Decision
2. 02001 Other 0450037521 06/23/1998 06/27/1998 $0 $0 $0 06/29/1998 J - ALJ Decision Inspection: 302157359 - Wilson Construction
Inspection Information - Office: Washington Region 4
Nr: 302157359 Report ID: 1055340 Open Date:
05/21/1998
Wilson Construction
Lynch Rd & Sells Dr
Shelton, WA 98584 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Referral
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 05/21/1998
Emphasis: L:Euc Close Case: 05/21/1998
Related Activity: Type ID Safety Health
Referral 902773258 Yes
Inspection: 302157367 - Wilson Construction Company
Inspection Information - Office: Washington Region 4
Nr: 302157367 Report ID: 1055340 Open Date:
05/19/1998
Wilson Construction Company
6th & Ellis
Raymond, WA 98577 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 05/19/1998
Emphasis: L:Euc Close Case: 08/26/1999
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1 2
Current Violations 1 1 2
Initial Penalty $1,200 $0 $0 $0 $0 $1,200
Current Penalty $1,200 $0 $0 $0 $0 $1,200
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001A Serious 0450037502 A 06/18/1998 05/19/1998 $1,200 $1,200 $0 06/30/1998 F - Formal Settlement
2. 01001B Serious 0450037506 06/18/1998 05/19/1998 $0 $0 $0 06/30/1998 F - Formal Settlement
3. 01001C Serious 0450037522 06/18/1998 05/19/1998 $0 $0 $0 06/30/1998 F - Formal Settlement
4. 02001 Other 0450037521 06/18/1998 06/26/1998 $0 $0 $0 06/30/1998 F - Formal Settlement Inspection: 115184988 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 115184988 Report ID: 1055340 Open Date:
03/05/1998
Wilson Construction Co
Hwy 101 Milepost 176 Pole #2712
Forks, WA 98331 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/05/1998
Emphasis: L:Euc Close Case: 03/05/1998
Inspection: 115184889 - Wilson Construction Company
Inspection Information - Office: Washington Region 4
Nr: 115184889 Report ID: 1055340 Open Date:
02/09/1998
Wilson Construction Company
8615 Maple St
Tillicum, WA 98492 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 1190 Nw 3rd, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/09/1998
Emphasis: L:Euc Close Case: 02/09/1998
Inspection: 115385841 - Wilson Construction Co
Inspection Information - Office: Washington Region 1
Nr: 115385841 Report ID: 1055310 Open Date:
01/27/1998
Wilson Construction Co
1048 State St
Marysville, WA 98270 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 1190 Nw 3rd Street, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/29/1998
Emphasis: L:Constr Close Case: 12/21/1998
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1 2
Current Violations 1 1 2
Initial Penalty $700 $0 $0 $0 $0 $700
Current Penalty $560 $0 $0 $0 $0 $560
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT OCCUPATIONAL SAFETY AND HEALTH ABOUT THE SITE
1. 01001 Serious 1550021501 A 02/23/1998 01/29/1998 $560 $700 $0 03/03/1998 F - Formal Settlement
2. 02001 Other 1550011005 A 02/23/1998 01/29/1998 $0 $0 $0 03/03/1998 F - Formal Settlement Inspection: 115303745 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 115303745 Report ID: 1055360 Open Date:
10/15/1997
Wilson Construction Co
Union Flats Rd & Martin Druffel/Structures 75,76
Ewertzville, WA 99113 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 1190 Nw Third, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/19/1997
Emphasis: L:Euc Close Case: 09/27/1999
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 3 1 1 5
Current Violations 1 1
Initial Penalty $14,730 $63,000 $0 $0 $0 $77,730
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001A Willful 0456503304 D 03/31/1998 10/15/1997 $63,000 $63,000 $0 04/10/1998 J - ALJ Decision Deleted 2. 01001B Willful 0456503304 E 03/31/1998 10/15/1997 $0 $0 $0 04/10/1998 J - ALJ Decision Deleted 3. 01001C Willful 0456500904 03/31/1998 11/19/1997 $0 $0 $0 04/10/1998 J - ALJ Decision Deleted 4. 02001 Serious 0456503303 H 03/31/1998 11/19/1997 $6,600 $6,600 $0 04/10/1998 J - ALJ Decision Deleted 5. 02002 Serious 0456503303 F 03/31/1998 10/15/1997 $6,600 $6,600 $0 04/10/1998 J - ALJ Decision Deleted 6. 02003 Serious 1550010001 B 03/31/1998 11/19/1997 $1,530 $1,530 $0 04/10/1998 J - ALJ Decision
7. 03001 Other 04565019 03/31/1998 10/08/1999 $0 $0 $0 04/10/1998 J - ALJ Decision White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
115205544 | 115303802 | 300907524 | 115280588 | 115269243 Inspection: 115205544 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 115205544 Report ID: 1055340 Open Date:
08/01/1997
Wilson Construction Co
Locust S & Bonnie Lake Blvd
Bonney Lake, WA 98390 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 1190 Nw 3rd, Camby, OR 97013
Inspection Type: Referral
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/26/1997
Close Case: 01/21/2000
Related Activity: Type ID Safety Health
Referral 902773050 Yes
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations 1 1
Initial Penalty $2,800 $0 $0 $0 $0 $2,800
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001A Serious 0456502311 10/06/1997 09/26/1997 $2,100 $2,100 $0 10/20/1997 F - Formal Settlement Deleted 2. 01001B Serious 0456502318 10/06/1997 09/26/1997 $0 $0 $0 10/20/1997 F - Formal Settlement Deleted 3. 01001C Serious 0456502317 A 10/06/1997 09/26/1997 $0 $0 $0 10/20/1997 F - Formal Settlement
4. 01001D Other 0456500905 10/06/1997 09/26/1997 $0 $0 $0 10/20/1997 F - Formal Settlement Deleted 5. 01002 Serious 0456502116 B 10/06/1997 09/26/1997 $700 $700 $0 10/20/1997 F - Formal Settlement Inspection: 115303802 - Wilson Construction Co
Inspection Information - Office: Washington Region 5
Nr: 115303802 Report ID: 1055350 Open Date:
04/15/1997
Wilson Construction Co
Adams Rd Substation
Royal City, WA 99357 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/15/1997
Emphasis: L:Euc Close Case: 04/15/1997
Inspection: 300907524 - Wilson Construction Company Inc Inspection Information - Office: Or Eugene
Nr: 300907524 Report ID: 1054114 Open Date:
03/18/1997
Wilson Construction Company Inc
Moraga & Waverly St
Albany, OR 97321 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: Po Box 1190, Canby, OR 97013
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/18/1997
Planning Guide: Safety-Construction Close Case: 08/24/1999 Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $100 $0 $0 $0 $0 $100
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 19260652 A01 04/07/1997 03/18/1997 $0 $100 $0 04/11/1997 L - State Settlement Inspection: 115280588 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 115280588 Report ID: 1055360 Open Date:
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT OCCUPATIONAL SAFETY AND HEALTH ABOUT THE SITE 02/19/1997
Wilson Construction Co
S 4315 Cheatham Rd
Spokane, WA 99212 Union Status: Union
SIC: 1521/General Contractors-Single-Family Houses
Mailing: 1190 Nw Third, Canby, OR 97013
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/19/1997
Emphasis: L:Euc Close Case: 12/21/1998
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations
Initial Penalty $850 $0 $0 $0 $0 $850
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Serious 0456502922 03/20/1997 02/19/1997 $850 $850 $0 03/31/1997 J - ALJ Decision Inspection: 115269243 - Wilson Construction Company
Inspection Information - Office: Washington Region 2
Nr: 115269243 Report ID: 1055320 Open Date:
09/11/1996
Wilson Construction Company
Se 256th & 176th Ave Se
Kent, WA 98042 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 1833 Auburn Way N, Auburn, WA 98022
Inspection Type: Planned
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/11/1996
Emphasis: L:Constr Close Case: 09/11/1996
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
UNITED STATES
DEPARTMENT OF LABOR
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Inspection: 124781477 - Wilson Construction Company Inc Inspection Information - Office: Or Medford
Nr: 124781477 Report ID: 1054116 Open Date:
06/13/1994
Wilson Construction Company Inc
California And Sherman
North Bend, OR 97459 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/13/1994
Planning Guide: Safety-Construction Close Case: 10/12/1994 Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $240 $0 $0 $0 $0 $240
Current Penalty $50 $0 $0 $0 $0 $50
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 702022307 I 07/08/1994 06/13/1994 $50 $240 $0 07/27/1994 L - State Settlement Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
115470759 | 124781089 | 111292785 | 111286670 | 111292660 | 115528879 | 115531857 | 111239406 | 115531725 | 111418257 Inspection: 115470759 - Wilson Construction Co
Inspection Information - Office: Washington Region 4
Nr: 115470759 Report ID: 1055340 Open Date:
04/15/1994
Wilson Construction Co
10908 141st Ct E
Woodinville, WA 98072 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/15/1994
Emphasis: L:Wasafety Close Case: 06/14/1994
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 0456504301 04/26/1994 05/04/1994 $0 $0 $0 - Inspection: 124781089 - Wilson Construction Co Inc
Inspection Information - Office: Or Medford
Nr: 124781089 Report ID: 1054116 Open Date:
03/29/1994
Wilson Construction Co Inc
Mp 276 Hwy 101
Bandon, OR 97411 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St., Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/29/1994
Planning Guide: Safety-Construction Close Case: 07/07/1994 Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 3 1 4
Current Violations 3 1 4
Initial Penalty $900 $0 $0 $0 $0 $900
Current Penalty $630 $0 $0 $0 $0 $630
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 19260601 B09 04/13/1994 05/11/1994 $210 $300 $0 04/18/1994 L - State Settlement
2. 01002 Serious 19260602 A02 I 04/13/1994 05/11/1994 $210 $300 $0 04/18/1994 L - State Settlement
3. 01003 Serious 702022307 G 04/13/1994 05/11/1994 $210 $300 $0 04/18/1994 L - State Settlement
4. 02004 Other 19260301 D 04/13/1994 03/29/1994 $0 $0 $0 04/18/1994 L - State Settlement Inspection: 111292785 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 111292785 Report ID: 1055360 Open Date:
12/16/1993
Wilson Construction Co
West Side Substation
Spokane, WA 99204 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/16/1993
Emphasis: L:Wasafety Close Case: 12/16/1993
Inspection: 111286670 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 111286670 Report ID: 1055360 Open Date:
11/23/1993
Wilson Construction Co
140th St Ne & Ne 113th Ave Union Status: Union
Kirkland, WA 98033
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Marx St, Portland, OR 97220
Inspection Type: Accident
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/14/1993
Emphasis: L:Wasafety Close Case: 04/13/1994
Related Activity: Type ID Safety Health
Accident 361195720
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations
Initial Penalty $1,575 $0 $0 $0 $0 $1,575
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Serious 0456503804 B 01/04/1994 12/14/1993 $1,575 $1,575 $0 01/11/1994 Y - State Decision Accident Investigation Summary
Summary Nr: 170245310 Event: 11/22/1993 Burn - Electrical Fault In Switchboard A power line foreman (employee #2) had deenergized and removed fuses from a switchboard. He buzzed the lower parts of the fuseholders and found them to be deenergized. The top parts were still energized. He sent a power line worker back to the shop for a high-voltage detector and grounds to ensure that the deenergized part remained deenergized. The foreman then told an apprentice power line worker (employee #1) to take a break, while the foreman got some rubber insulating blankets to insulate the tops of the fuseholders. When the foreman turned to get the protective equipment, the apprentice grabbed a cable and pulled it up from the bottom of the switchboard. The top of the cable, for a length of about 4 inches, flipped over and contacted the top of one of the fuseholders. This caused a phase-to-ground fault, which developed into a phase-to-phase fault. The ensuing electric arc burned the foreman and the apprentice.
The employees were hospitalized for their injuries.
Keywords: burn, elec protect equip, electric arc, electrical, power line worker, switchboard, e ptd, elec utility work, electric conductor, electrical fault Inspection Degree Nature Occupation
1 111286670 Hospitalized injury Other Supervisors; electricians & power transm. install. 2 111286670 Hospitalized injury Other Electrical power installers and repairers Inspection: 111292660 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 111292660 Report ID: 1055360 Open Date:
10/05/1993
Wilson Construction Co
Hangman Sub George Rd
Spokane, WA 99204 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/05/1993
Emphasis: L:Wasafety Close Case: 12/10/1993
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 0456502603 D 11/22/1993 11/30/1993 $0 $0 $0 - Inspection: 115528879 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 115528879 Report ID: 1055360 Open Date:
09/21/1993
Wilson Construction Co
144th St & 70th Ave
Puyallup, WA 98371 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/21/1993
Emphasis: L:Wasafety Close Case: 11/15/1993
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations 2 2
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 0456502101 H 10/08/1993 10/16/1993 $0 $0 $0 -
2. 01002 Other 1550061501 I 02 10/08/1993 10/16/1993 $0 $0 $0 - Inspection: 115531857 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 115531857 Report ID: 1055360 Open Date:
03/24/1993
Wilson Construction Co
5th & Juniper
Connell, WA 99326 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 03/24/1993
Emphasis: L:Euc Close Case: 01/05/1995
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $2,700 $0 $0 $0 $0 $2,700
Current Penalty $750 $0 $0 $0 $0 $750
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 1550065701 A 04/26/1993 03/24/1993 $750 $2,700 $0 05/04/1993 F - Formal Settlement Inspection: 111239406 - Wilson Construction Inc
Inspection Information - Office: Washington Region 6
Nr: 111239406 Report ID: 1055360 Open Date:
02/24/1993
Wilson Construction Inc
Lee & Broadway
Othello, WA 99344 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/24/1993
Emphasis: L:Euc Close Case: 05/24/1993
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations 2 2
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 0456502101 H 04/15/1993 04/23/1993 $0 $0 $0 -
2. 01002 Other 0456502603 D 04/15/1993 04/28/1993 $0 $0 $0 - Inspection: 115531725 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 115531725 Report ID: 1055360 Open Date:
02/10/1993
Wilson Construction Co
N Colorado & W Grandridge
Kennewick, WA 99336 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 02/10/1993
Emphasis: L:Euc Close Case: 12/19/1994
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations
Initial Penalty $1,620 $0 $0 $0 $0 $1,620
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Serious 0456504115 04/05/1993 02/10/1993 $720 $720 $0 04/15/1993 F - Formal Settlement Deleted 2. 01002 Serious 0456502707 04/05/1993 02/10/1993 $900 $900 $0 04/15/1993 F - Formal Settlement Inspection: 111418257 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 111418257 Report ID: 1055360 Open Date:
01/07/1993
Wilson Construction Co
3080 San Juan Ave
Port Townsend, WA 98368 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 01/08/1993
Emphasis: L:Euc Close Case: 03/25/1993
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
1. 01001 Other 0456504137 02/18/1993 02/26/1993 $0 $0 $0 -
UNITED STATES
DEPARTMENT OF LABOR
OSHA Menu
SEARCH OSHA
OSHA STANDARDS ENFORCEMENT TOPICS HELP AND RESOURCES NEWS Contact Us FAQ A to Z Index
English
Español
Inspection Detail
Quick Link Reference
123733297 | 111233821 | 111254611 | 115531592 | 115531493 | 115531501 | 111315131 | 111254504 | 123776296 | 111254280 | 111284477 | 111254215
Inspection: 123733297 - Wilson Construction Co
Inspection Information - Office: Or Safety 3-Salem
Nr: 123733297 Report ID: 1054118 Open Date:
12/04/1992
Wilson Construction Co
12035 Ne Marx St
Portland, OR 97220 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Inspection Type: Accident
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 04/28/1993
Planning Guide: Safety-Construction Close Case: 10/29/1997 Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 8 2 1 11
Current Violations 3 1 4
Initial Penalty $40,000 $0 $20,000 $0 $0 $60,000
Current Penalty $10,000 $0 $0 $0 $0 $10,000
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 7030115 05/11/1993 05/14/1993 $5,000 $5,000 $0 05/21/1993 J - ALJ Decision Deleted 2. 01002 Serious 7030110 05/11/1993 05/14/1993 $0 $5,000 $0 05/21/1993 J - ALJ Decision
3. 01003 Serious 7030150 05/11/1993 05/14/1993 $5,000 $5,000 $0 05/21/1993 J - ALJ Decision Deleted 4. 01004 Serious 19260950 C01 05/11/1993 05/14/1993 $0 $5,000 $0 05/21/1993 J - ALJ Decision
5. 01005 Serious 7030305 05/11/1993 05/14/1993 $0 $5,000 $0 05/21/1993 J - ALJ Decision Deleted 6. 01006 Serious 7030380 05/11/1993 05/14/1993 $0 $5,000 $0 05/21/1993 J - ALJ Decision Deleted 7. 01007 Serious 19260021 B02 05/11/1993 05/14/1993 $0 $5,000 $0 05/21/1993 J - ALJ Decision Deleted 8. 01008 Serious 740003001 05/11/1993 05/14/1993 $0 $5,000 $0 05/21/1993 J - ALJ Decision Deleted 9. 02009 Repeat 7030200 05/11/1993 05/14/1993 $0 $10,000 $0 05/21/1993 J - ALJ Decision Deleted 10. 02010 Repeat 7030145 05/11/1993 05/14/1993 $0 $10,000 $0 05/21/1993 J - ALJ Decision
11. 03011 Other 740004705 A 05/11/1993 05/14/1993 $0 $0 $0 05/21/1993 J - ALJ Decision Accident Investigation Summary
Summary Nr: 170089197 Event: 12/04/1992 Electric Shock - Direct Contact With Overhead Line An apprentice line worker had climbed a utility pole to disconnect the low voltage side of a cutout for a transformer. He was using a shotgun-type live-line tool for this task. After opening the cutout, the employee started disconnecting the energized tap to the high voltage side of the transformer. The employee contacted the 1200-volt conductor. He received an electric shock and sustained second- and third-degree burns to his left hand and foot.
Keywords: burn, overhead power line, electrical, power line worker, live-line tool, e ptd, elec utility work, electric shock Inspection Degree Nature Occupation
1 123733297 Hospitalized injury Electric Shock Electrical power installers and repairers Inspection: 111233821 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 111233821 Report ID: 1055360 Open Date:
11/17/1992
Wilson Construction Co
Se 226th & 76th Se
Kent, WA 98031 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12305 Ne Marx St, Portland, OR 97220
Inspection Type: Accident
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/28/1992
Emphasis: L:Euc Close Case: 05/31/1994
Related Activity: Type ID Safety Health
Accident 361194038
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1 2
Current Violations 1 1
Initial Penalty $700 $0 $0 $0 $0 $700
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Serious 0456504136 03/01/1993 12/28/1992 $700 $700 $0 03/18/1993 F - Formal Settlement
2. 02001 Other 0456504139 03/01/1993 03/19/1993 $0 $0 $0 03/18/1993 F - Formal Settlement Accident Investigation Summary
Summary Nr: 170000681 Event: 11/17/1992 Employees Suffer Multiple Injuries When Crane Tips Over Employees #1 and #2 were approximately 80 ft high in the basket of an RO 175-73 crane. The boom was extended at a 75 to 80 degree angle and the radius was about 20 to 22 ft. They were positioning themselves to dead end newly pulled-in conductors on the lower arm of a dead end tower. The crane's right front outrigger was accidentally retracted, causing the crane to tip over on its right side. Employee #1 was hospitalized with multiple fractures to both lower legs; Employee #2 suffered minor chest and head injuries and did not require hospitalization. The crane's basket, boom, outriggers, and possibly the frame sustained extensive damage.
Keywords: chest, fracture, head, outrigger, construction, crane, inattention, leg, overturn Inspection Degree Nature Occupation
1 111233821 Non Hospitalized injury Concussion Occupation not reported 2 111233821 Hospitalized injury Fracture Occupation not reported Inspection: 111254611 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 111254611 Report ID: 1055360 Open Date:
11/05/1992
Wilson Construction Co
West Air Park
Ocean Shores, WA 98569 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 11/05/1992
Emphasis: L:Euc Close Case: 11/05/1992
Inspection: 115531592 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 115531592 Report ID: 1055360 Open Date:
10/16/1992
Wilson Construction Co
Sands & Hwy 27
Spokane, WA 99206 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/16/1992
Emphasis: L:Euc Close Case: 10/16/1992
Inspection: 115531493 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 115531493 Report ID: 1055360 Open Date:
09/02/1992
Wilson Construction Co
Pole #C416
St John, WA 99171 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/02/1992
Emphasis: L:Euc Close Case: 11/23/1992
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 0245920504 10/08/1992 10/16/1992 $0 $0 $0 - Inspection: 115531501 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 115531501 Report ID: 1055360 Open Date:
09/02/1992
Wilson Construction Co
Pole #C418
St John, WA 99171 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/02/1992
Emphasis: L:Euc Close Case: 11/23/1992
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations 2 2
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 04565019 10/08/1992 11/10/1992 $0 $0 $0 -
2. 01002 Other 0456502101 L 10/08/1992 10/16/1992 $0 $0 $0 - Inspection: 111315131 - Wilson Construction Co Inc
Inspection Information - Office: Washington Region 6
Nr: 111315131 Report ID: 1055360 Open Date:
09/02/1992
Wilson Construction Co Inc
10715 Se 224th Pl
Kent, WA 98032 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 09/18/1992
Emphasis: L:Euc Close Case: 09/16/1994
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations
Initial Penalty $375 $0 $0 $0 $0 $375
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent Deleted 1. 01001 Serious 0456504115 10/20/1992 09/18/1992 $375 $375 $0 10/30/1992 J - ALJ Decision Inspection: 111254504 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 111254504 Report ID: 1055360 Open Date:
08/13/1992
Wilson Construction Co
40th Powerhouse Rd
Yakima, WA 98901 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 08/13/1992
Emphasis: L:Euc Close Case: 10/12/1992
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 04565019 09/22/1992 08/13/1992 $0 $0 $0 - Inspection: 123776296 - Wilson Construction Co
Inspection Information - Office: Or Safety 3-Salem
Nr: 123776296 Report ID: 1054118 Open Date:
07/17/1992
Wilson Construction Co
Kingwood Dr
Mill City, OR 97220 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/22/1992
Planning Guide: Safety-Construction Close Case: 11/02/1992 Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $0 $0 $300 $0 $0 $300
Current Penalty $120 $0 $0 $0 $0 $120
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 19260201 A04 08/18/1992 07/17/1992 $120 $300 $0 08/27/1992 L - State Settlement Inspection: 111254280 - Wilson Construction
Inspection Information - Office: Washington Region 6
Nr: 111254280 Report ID: 1055360 Open Date:
07/09/1992
Wilson Construction
Lakebay Substation
Lakebay, WA 98349 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 07/09/1992
Emphasis: L:Euc Close Case: 11/23/1992
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 3 3
Current Violations 3 3
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 0456600901 08/27/1992 09/04/1992 $0 $0 $0 -
2. 01002 Other 1550012001 B 08/27/1992 09/04/1992 $0 $0 $0 -
3. 01003 Other 0456504137 08/27/1992 09/04/1992 $0 $0 $0 - Inspection: 111284477 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 111284477 Report ID: 1055360 Open Date:
06/09/1992
Wilson Construction Co
412 Sapp Rd
Sedro Woolley, WA 98284 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 06/15/1992
Emphasis: L:Euc Close Case: 11/23/1992
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 0240006003 A 08/20/1992 09/22/1992 $0 $0 $0 - Inspection: 111254215 - Wilson Construction Co
Inspection Information - Office: Washington Region 6
Nr: 111254215 Report ID: 1055360 Open Date:
05/18/1992
Wilson Construction Co
526 Trojan Ct
Olympia, WA 98502 Union Status: Union
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction Mailing: 12035 Ne Marx St, Portland, OR 97220
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 05/18/1992
Emphasis: L:Euc Close Case: 07/15/1992
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
UNITED STATES
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
200 Constitution Ave NW
Washington, DC 20210
800-321-6742 (OSHA)
TTY
www.OSHA.gov
FEDERAL GOVERNMENT
White House
Severe Storm and Flood Recovery Assistance
Disaster Recovery Assistance
DisasterAssistance.gov
USA.gov
No Fear Act Data
U.S. Office of Special Counsel
OCCUPATIONAL SAFETY AND HEALTH
Frequently Asked Questions
A - Z Index
Freedom of Information Act
Read the OSHA Newsletter
Subscribe to the OSHA Newsletter
OSHA Publications
Office of Inspector General
ABOUT THE SITE
Freedom of Information Act
Privacy & Security Statement
Disclaimers
Important Website Notices
Plug-Ins Used by DOL
Accessibility Statement
Current Violations 1 1
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Amount $0 $0 $0 $0 $0 $0
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 0456504301 06/29/1992 07/07/1992 $0 $0 $0 -
OFFICES
San Francisco
Modesto
Sonora
Mailing Address
P.O. Box 3727
Sonora, CA 95370
Phone
(415) 882-7252
Website
www.tuolumne.org
BOARD MEMBERS
John Kreiter, Chair
Harrison “Hap” Dunning,
Vice Chair
Cindy Charles, Treasurer
Kerstyn Crumb, Secretary
Eric Heitz,
Chair Emeritus
Jose Borroel
Eddie Corwin
Bob Hackamack
Camille King
Marty McDonnell
Homero Mejia
John Nimmons
Eric Riemer
Marek Robinson
Bart Westcott
May 17, 2022
Chair Moisés Garcia and Members
SFPUC Citizens’ Advisory Committee
525 Golden Gate Ave.
San Francisco, CA 94102
Via Email
Dear Chair Garcia and Members of the CAC:
It’s good to see you will be discussing the Long-Term Vulnerability Assessment (LTVA) at this evening’s CAC meeting, but it’s disappointing the presentation has evolved so little since the LTVA was released last year.
For years, a coalition of environmental and fishing groups has been encouraging the SFPUC to amend the arbitrary Design Drought (combining the 1987-92 and 1976/77 droughts, and assuming 265 mgd demand) to become a reasonable drought planning scenario. We were told more information was needed, especially concerning potential climate change impacts, which led to six very productive SFPUC workshops focusing on science, demand projections, alternative water supplies and climate change. The understanding was that following the workshops, the SFPUC would deliberate on the Design Drought.
Seven months have passed since the final workshop, yet nothing has happened.
The final workshop focusing on the LTVA and climate change was held on October 29, 2021. From the presentation, it was evident to us that the SFPUC Commissioners were not being provided with the information they needed to make informed decisions about the Design Drought. On November 5, we submitted a letter (attached) outlining the information we believed the Commission needed, but our letter was met with silence.
Another letter was submitted on January 19, 2022 (attached), again requesting the very simple analyses we thought were necessary. We asked three questions:
1) How likely is the SFPUC’s design drought to occur? Could it be modified or operational rule changes made to provide more flexibility for water supply planning (i.e. less unnecessary rationing) without compromising water supply security?
2) How might climate change, along with the instream flow requirements adopted by the State Water Board through the Bay Delta Water Quality Control Plan, affect the SFPUC’s water supply and entitlements under expected future conditions?
2 3) Under which future climate change projections, with the Bay Delta Plan implemented, would the SFPUC need to develop alternative water supplies, and if so, how much?
Again, no response.
Acknowledging that SFPUC staff had no intention of responding to our requests and recommendations, on February 4 we submitted our own analysis of the LTVA (attached) to the Commission.
At your meeting this evening, I encourage you to pay close attention to the following issues:
Slide 10: Hydrology and Water Supply — Some findings
Presentation: "+2°C warming leads to a spring runoff arrival 10 days prior to the baseline temperature conditions?"
Questions: How will earlier runoff affect the SFPUC’s water entitlements? What is the SFPUC’s response to the NGO analysis (included in our Feb. 4 letter)?
Presentation: "By 2040, in the Upcountry region, the median projections do not result in significant changes to mean annual WAC volume ( ~ -8 TAF). The same is true by 2070 RCP8.5 (~ -17 TAF)."
Note: This means that runoff (water supply) is not expected to change much, if at all.
Slide 11: Hydrology and Water Supply – Some findings
Presentation: "At a baseline demand of 227 mgd, the RWS can sustain warming of +4°C and - 5% change in precipitation before failing to meet performance targets on delivery reliability, frequency of 20% rationing, storage reliability and duration of rationing.”
Note: Current water demand in the SFPUC service area is under 200 mgd. The LTVA used six numbers to represent demand, the lowest (227 mgd) is 16% above current demand, and the highest is 71% above current demand.
Question: How would using current demand (which is projected by the SFPUC finance division to remain flat for at least the next decade) influence the outcomes of the model runs in the LTVA?
Note: On January 7, 2022, the Commission requested a graph comparing historic demand projections from both the SFPUC’s water supply and finance divisions with actual demand, to see which division had been more accurate. Within a week, we had produced our own graph showing that the finance division had been extremely accurate, while the water supply
3 division had been off by 20-25%. More than four months have passed, yet staff has yet to produce the graph. Why?
Slide 12: Demand and Water Supply — Some findings
Presentation: "An increase by 15% (265 mgd) will lead to failing to meet the rationing frequency targets in current climate."
Note: A 15% increase in demand from FY 2020/21 would be 224 mgd, not 265 mgd. The SFPUC uses a lot of different figures to represent current demand. The LTVA suggests 227 mgd is current demand. In FERC-related documents, the SFPUC uses 238 mgd for current demand. Last year, the SFPUC tried to use 265 mgd for current demand in their Urban Water Management Plan, but were caught and forced to use the actual demand figure (195 mgd).
Slide 13: IFR and Water Supply – Some findings
Presentation: "An equivalent increase in frequency of rationing [equivalent to the Bay Delta Plan instream flow requirements] is observed with a decrease of 15% in mean annual precipitation from severe climate change.”
Questions: Why didn’t the LTVA produce model runs using the instream flow requirements (this information should be very important to the Commissioners)? The NGOs used scenarios included in the LTVA that show the impacts of 20% less precipitation to represent the impact of the Bay Delta Plan flow requirements. Is their approach reasonable?
Final Note
Table 3-19 in the LTVA (Calculated Joint Return Period for Thresholds 269 TAF [240 mgd demand] and 365 TAF [326 mgd demand]) shows that repeats of droughts as severe as the 1987-92 and 1976/77 droughts are expected to be rare. Why didn’t the LTVA include the likelihood of the Design Drought occurring? How about the Design Drought minus one year? The Commissioners should be aware of these odds in order to make informed decisions.
Thank you for receiving my comments.
Sincerely,
Peter Drekmeier
Policy Director
OFFICES
57 Post Street, Suite 711
San Francisco, CA 94104
(415) 882-7252
1031 15th Street, Suite 6
Modesto, CA 95354
(209) 236-0330
67 Linoberg Street
Sonora, CA 95370
(209) 588-8636
www.tuolumne.org
BOARD MEMBERS
John Kreiter, Chair
Harrison “Hap” Dunning,
Vice Chair
Cindy Charles, Treasurer
Kerstyn Crumb, Secretary
Eric Heitz,
Chair Emeritus
Eddie Corwin
Bob Hackamack
Camille King
Bill Maher
Marty McDonnell
John Nimmons
Eric Riemer
Bart Westcott
November 5, 2021
President Anson Moran and Commissioners
SFPUC
525 Golden Gate Ave.
San Francisco, CA 94102
Via Email
Dear President Moran and Commissioners:
We’d like to thank you again for hosting last week’s workshop on the SFPUC’s Long- Term Reliability Assessment, and for including us. Some important information was shared.
We understand the purpose of the study was to assess the Regional Water System’s (RWS) vulnerability to climate change and other factors. However, the study also provides useful information that can help you assess the reasonableness of the Design Drought.
There are two issues we believe would benefit from additional analysis. First is an assessment of the expected occurrence interval for the Design Drought and for the Design Drought minus one year. Second is the potential impact of earlier runoff on the SFPUC’s water rights.
Occurrence Interval for the Design Drought
The following table was included on slide 43 of the staff/consultant presentation. We request that the Commission direct staff to add two new rows to this table, one for the Design Drought and a second for the Design Drought minus one year.
It could be that the occurrence interval for the Design Drought is as simple as multiplying the recurrence intervals of 1976/77 and 1987-92. If this is the case, the current odds of experiencing the Design Drought would be 1-in-42,000. With a 10%
2 decrease in precipitation (if it weren’t made up for in some other way) would be 1-in-5,400, and a 20% decrease in precipitation would be 1-in-1,125.
Below is a graph produced by Paul Collacchi, a former Mayor of Menlo Park and a member of the Mayor’s Water Supply Stakeholder Group. He plotted every eight-year sequence over the past 600 years using the historical record and tree ring data. Each bar represents eight consecutive years. The red line represents the Design Drought. You’ll see that the Tuolumne River did not experience anything even close in severity to the Design Drought during that time period.
Impact of Earlier Runoff on Water Rights
There was some disagreement at the workshop as to how earlier runoff might affect the SFPUC’s water rights. It turns out everyone was correct. On average, the SFPUC’s water rights remain about the same, because in normal and wet years the SFPUC tends to lose some of its entitlement to the Irrigation Districts. However, in dry years, when it really matters, the SFPUC gains entitlements.
Working with Greg Reis from The Bay Institute, we looked at how a three-week shift in runoff might affect the SFPUC’s water rights during the Design Drought. The data we used came from the Tuolumne Daily Model version 3.1 developed by the Irrigation Districts for use in the FERC licensing process. The unimpaired flow data were an input dataset developed by Dan Steiner in 2013.
3 The following scatter plot demonstrates that in drier years (on the left side of the horizontal axis) water entitlements shift from the Irrigation Districts to the SFPUC, showing up on the vertical axis as above zero (the break-even point). In wetter years, moving to the right on the horizontal axis, water rights shift from the SFPUC to the Irrigation Districts. The loss of entitlements in wet years is much less of a concern to the SFPUC than the benefit of picking up water rights in dry years when water is needed most.
According to our calculations, the shift in water rights for the eight years that constitute the Design Drought is as follows (figures are in thousand acre-feet).
1976 = +20
1977 = 0
1987 = +51
1988 = +8
1989 = +33
1990 = +54
1991 = +9
1992 = +62
The total amount of water the SFPUC would gain during the Design Drought if runoff were to occur three weeks earlier is 237 thousand acre-feet (TAF). Total SFPUC entitlements during the Design Drought years were 858 TAF, so 237 TAF represents a 28% increase.
RWS demand in FY 2019/20 was 198 mgd, or 222 thousand acre-feet. Therefore, the change in water rights during the Design Drought with runoff occurring three weeks earlier would amount to more
4 than one year’s-worth of water shifting to the SFPUC. We believe this should further justify removing one year from the Design Drought.
Conclusion
In summary, we request that the Commission direct staff to:
1) Determine the occurrence interval for the full Design Drought and the Design Drought minus one year.
2) Assess the potential impact of earlier runoff on the SFPUC’s water entitlements under the Design Drought scenario.
Thank you for the opportunity to share our thoughts and requests.
Sincerely,
Peter Drekmeier Dave Warner
Policy Director TRT Volunteer
Alameda Creek Alliance • California Sportfishing Protection Alliance Friends of the River • Golden State Salmon Association
Golden West Women Flyfishers • Institute for Fisheries Resources Northern California Council Federation of Flyfishers • Pacific Coast Federation of Fishermen’s Associations • San Francisco Baykeeper
San Francisco League of Conservation Voters • Tuolumne River Trust
January 19, 2022
Dr. Casey Brown and Mr. Alexis Dufour
[email protected]
[email protected]
Dear Dr. Brown and Mr. Dufour:
Thank you for the effort you’ve put into the SFPUC’s Long-Term Vulnerability Assessment (LTVA). It’s an impressive study that will play an important role in helping the SFPUC plan for future water supply security in the era of climate change.
The report describes future vulnerability under long-term conditions of extreme stress. Its modeling setup could also be re-used, quite easily, to help the SFPUC better understand current and near-future conditions and stressors to answer timely questions, such as:
1) How likely is the SFPUC’s design drought to occur? Could it be modified or operational rule changes made to provide more flexibility for water supply planning (i.e. less unnecessary rationing) without compromising water supply security? 2) How might climate change, along with the instream flow requirements adopted by the State Water Board through the Bay Delta Water Quality Control Plan, affect the SFPUC’s water supply and entitlements under expected future conditions? 3) Under which future climate change projections, with the Bay Delta Plan implemented, would the SFPUC need to develop alternative water supplies, and if so, how much?
The undersigned organizations and individuals request that you consider additional water supply scenarios to help answer the questions above. These scenarios are:
Re-analyze scenarios using actual current demand.
The LTVA analyzes a number of scenarios, but none considers the possibility that water demand in the SFPUC’s Regional Water System (RWS) service area might remain flat or decline. The figures used are anywhere from 16% to 71% above current demand. The report should include a demand scenario of 200 mgd, if not also one of even lower demand. SFPUC water deliveries have been below 200 mgd for the past seven years.
2 Add more scenarios that consider potential impacts from the Bay Delta Plan.
Only a few of the scenarios analyze the impact of the Bay Delta Plan’s flow requirements on the SFPUC’s water supply. Including the Bay Delta Plan flow requirements in more scenarios would help the SFPUC determine the potential impacts on water supply of leaving more water in the Tuolumne River for environmental purposes.
Following are three recommendations we have for inclusion in your webinar presentation scheduled for January 27, 2022.
1) Produce scenarios that include demand of 200 mgd and the Bay Delta Plan flow requirements for the following figures: 3-26, 3-29, 5-19 and 5-26. 2) Calculate the return period (or occurrence interval) for the design drought and the design drought minus its final year for Tables 3-19 and 5-1. Please do the same using a 224 TAF threshold (200 mgd demand).
3) Calculate the shift in Water Available to the City (WAC) for the design drought years (1987-92 plus 1976/77), but with runoff occurring 10 days and 20 days earlier, as projected in the summary on pages 147 and 148.
Again, this additional information would be extremely useful in near-term deliberations. Please include these additional analyses in your presentation on January 27.
Thank you for your attention.
Sincerely,
Peter Drekmeier
Policy Director
Tuolumne River Trust
Chris Shutes
FERC Projects Director
CA Sportfishing Protection Alliance
Ashley Overhouse
Resilient Rivers Director
Friends of the River
John McManus
President
Golden State Salmon Association
Ian Wren
Staff Scientist
San Francisco Baykeeper
Cindy Charles
Conservation Chairperson
Golden West Women Flyfishers
3 Mark Rockwell
President
Northern California Council Federation of
Flyfishers
Mike Conroy
Executive Director
Pacific Coast Federation of Fishermen’s
Associations
Institute for Fisheries Resources
Kristina Pappas
President
San Francisco League of Conservation
Voters
Jeff Miller
Dave Warner
Member
SF Mayor’s Water Supply Stakeholder
Group
Bill Martin
Bill Martin
Member
SF Mayor’s Water Supply Stakeholder
Group
Paul Collacchi
Member
SF Mayor’s Water Supply Stakeholder
Group
Iris Stewart-Frey
Professor
Santa Clara University
Executive Director
Alameda Creek Alliance
Cc: SFPUC Commissioners
Dennis Herrera, SFPUC
Steve Ritchie, SFPUC
California Sportfishing Protection Alliance • Coalition for San Francisco Neighborhoods • Friends of the River • Golden West Women Flyfishers Institute for Fisheries Resources • Northern California Council, Fly Fishers International • Pacific Coast Federation of Fishermen’s Associations San Francisco League of Conservation Voters • Save California Salmon • Sierra Club California • Sierra Club San Francisco Bay Chapter Tuolumne River Trust • Wholly H2O
February 4, 2022
President Anson Moran and Commissioners
San Francisco Public Utilities Commission
525 Golden Gate Avenue
San Francisco, CA 94102
Via email
Re: The Long-Term Vulnerability Assessment Offers Promising Results.
Dear President Moran and Commissioners:
While the SFPUC’s Long-Term Vulnerability Assessment (LTVA) is an impressive document that includes a lot of useful information, it falls short on providing clear answers to questions you may have regarding the practicality of the Design Drought. However, information can be extrapolated from the Study that clearly demonstrates the SFPUC could manage the Bay Delta Water Quality Control Plan instream flow requirements without risking running out of water.
Following are some of our findings.
Even with Inflated Water Demand Figures, the SFPUC’s Water Supply Is Not in Jeopardy
The LTVA states, “In summary, water delivery reliability is more sensitive to demand change than to change in temperature and precipitation.”
1 Yet the LTVA used a baseline demand of 227
mgd, which is 16% higher than the actual current demand of 195 mgd. Given the importance of demand in water supply planning, we find it surprising and disappointing the LTVA didn’t include any scenarios using current demand.
In fact, the six figures used to represent water demand in the LTVA are between 16% and 71% higher than current demand. Our requests to include current demand went unanswered.
1 SFPUC Long-Term Vulnerability Assessment, p. 172.
2 At your January 7, 2022 budget workshop, there once again was discussion about the large disparity in demand projections between the SFPUC’s financial and water supply divisions. We appreciated Commissioner Ajami’s request that staff produce a graph showing both sets of projections together, and compared to actual demand.
You have yet to receive this graph, but we’ve done our own analysis based on Urban Water Management Plan (UWMP) projections and the five most recent 10-Year Financial Plan projections (we’re still waiting to receive the earlier plans). We found that the financial projections were extremely close to the actuals, whereas projections for 2020 demand in the 2000 through 2015 UWMPs ranged from 19% to 47% greater than actual demand.
The most recent 10-Year Financial Plan forecasts water sales will remain flat over the coming decade. But even with the inflated demand figures used in the LTVA, the chance of the SFPUC running out of water as a result of the Bay Delta Plan instream flow requirements is very small, as explained below.
Annual Mean Precipitation is Unlikely to Change
The LTVA offers a much better understanding of how climate change will likely affect precipitation. It found that annual mean precipitation is unlikely to change, and is slightly more likely to increase than decrease. The Study states:
According to climate projections and expert elicitations, there is a central tendency of warming of +2°C and +4°C by 2040 and 2070 (Representative Concentration Pathway [RCP]
3 8.5), respectively, with no clear direction of change in mean annual precipitation over the planning horizon.2
And:
The Upcountry region and East Bay and Peninsula regions are in the positive precipitation domain for the winter season in 2070, and thus are somewhat more likely to see positive than negative precipitation in the near future.
3 The Bay Delta Plan Will Not Cause the SFPUC to Run Out of Water
Despite our repeated requests, the LTVA does not include scenarios incorporating the Bay Delta Plan instream flow requirements (IFR) to allow for an easy comparison with the current flow regime. However, it does provide information that can be used to deduce the Bay Delta Plan’s potential impact on water supply. For example, the Study states:
The RWS [Regional Water System] is particularly vulnerable to the state-adopted new IFR below Don Pedro Dam (State WQCP), which represents a significant reduction in water available. At a demand of 227 mgd, the effect of state-amended WQCP under current conditions is equivalent to a reduction in mean annual precipitation of about 15% in terms of the water delivery reliability (reliability around 85%, rationing in 1 out of 6.5 years on average).
4 The following graph demonstrates that even with a 20% reduction in precipitation, and at 227 mgd demand, the SFPUC remains in the safe zone (green) when it comes to water supply reliability. A 20% decrease in precipitation is greater than the 15% decrease that would be comparable to the Bay Delta Plan IFR. Using actual current demand (195 mgd), the impact of the IFR would move closer to the vertical line above 0% decrease in precipitation.
2 Ibid, p. xxii.
3 Ibid, p. 26.
4 Ibid, p. xxii.
4 Source: LTVA webinar, 1/27/22
The graph below5 illustrates the potential impact of precipitation change on water supply, using the 227 mgd baseline and a 20% decrease in precipitation. Substituting the Bay Delta Plan IFR (the equivalent of 15% precipitation loss), it demonstrates that the SFPUC is unlikely to run out of water. Using actual current demand would further improve the calculus.
The Design Drought is Extremely Unlikely to Occur
The following table
6 predicts how likely the severity of past droughts is to reoccur under two scenarios – demand of 240 mgd (Threshold: 269 TAF) and demand of 326 mgd (Threshold: 365 TAF). In other words, at 240 mgd demand, a two-year drought with an impact on water supply
5 Ibid, p. 176.
6 Ibid, p. 81.
5 as severe as the 1976/77 drought would be expected to occur once in 98 years. A drought as severe as 1987-92 would be expected to occur once in 772 years.
Despite our repeated requests, the SFPUC has failed to produce similar return periods for the Design Drought and the Design Drought minus one year. When flipping a coin, the odds of getting heads is 50%. The odds of getting heads twice in a row is 50% times 50%, or 25%. If this same methodology applies to droughts, the chances of the Design Drought occurring are miniscule.
Earlier Runoff Will Benefit the SFPUC’s Water Entitlements in Dry Years
The Study found that runoff is expected to come earlier in the season as a result of a diminished snowpack and more precipitation arriving as rain instead of snow. It states:
Therefore, an increase in temperature would result in less snowpack accumulation during winter season, as more precipitation will fall as rain rather than snow, leading to 1) a reduced spring runoff volume and magnitude and 2) an increase in winter flows. The spring runoff is also expected to occur earlier in the season (Figure 5-2). 7 And:
A +2°C warming leads to a spring runoff arrival 10 days prior to the baseline temperature conditions. Median of projections estimate warming around +2°C by 2040 with most projections and elicitations between +1°C and +4°C. At +4°C, the shift in timing would be closer to 20 days prior to baseline conditions. By 2070 RCP8.5, warming could reach around +4°C with most projections and elicitations between +3°C and +6°C. 8 Our analysis of historic data suggests that if the Design Drought were to repeat, but runoff came three weeks earlier, the SFPUC would pick up an additional 237 thousand acre-feet (211 mgd) of water – enough to add more than a year’s-worth of water to SFPUC storage. This is because the Modesto and Turlock Irrigation Districts are entitled to the first 2,400 cubic feet
7 Ibid, p. 147
8 Ibid, p. 147
6 per second (cfs) of runoff for most of the year. But between mid-April and mid-June (time of peak runoff), the Irrigation Districts are entitled to the first 4,000 cfs of runoff. Runoff between 2,400 and 4,000 cfs that shifts from mid-April-to-mid-June into the earlier season is water the SFPUC picks up. Runoff between 2,400 and 4,000 cfs that shifts from post-mid-June into the mid-April-to-mid-June period is water the Irrigation Districts pick up.
According to our calculations, the shift in water entitlements for the eight years that constitute the Design Drought would produce the following additions to SFPUC water supply (figures in thousand acre-feet).
Conclusion
If the SFPUC were to use reasonable demand projections, remove one year from the Design Drought, and consider the increase in “Water Available to the City” as a result of earlier runoff, it would significantly change the risk analysis. The following table is based on 200 mgd demand, includes the Bay Delta Plan instream flow requirements, and incorporates the additional water available to the SFPUC as a result of earlier runoff.
7 Source: Tuolumne River Trust
The results shown in the above table are extremely encouraging. Within the planning exercise that the Design Drought actually is, the SFPUC could manage a 7.5-year Design Drought and still retain positive storage, without developing any new alternative water supplies. The SFPUC could maintain positive storage over an eight-year Design Drought by developing 4,000 acre feet (3.8 mgd) of alternative annual water supplies.
Thank you for the opportunity to share our analysis of the LTVA. We look forward to working with you to implement decisions that will benefit the Tuolumne River ecosystem while also protecting the SFPUC’s water supply. We encourage you to schedule a discussion on the Design Drought as soon as possible.
Sincerely,
Peter Drekmeier
Policy Director
Tuolumne River Trust
Chris Shutes
FERC Projects Director
CA Sportfishing Protection Alliance
8 Ashley Overhouse
Resilient Rivers Director
Friends of the River
Cindy Charles
Conservation Chairperson
Golden West Women Flyfishers
Mark Rockwell
President
Northern California Council, Fly Fishers
International
Mike Conroy
Executive Director
Pacific Coast Federation of Fishermen’s
Associations
Institute for Fisheries Resources
Regina Chichizola
Co-Director
Save California Salmon
Eileen Boken
Eileen Boken
State and Federal Legislative Liaison
Coalition for San Francisco Neighborhoods
Molly Culton
Conservation Organizer
Sierra Club California
Chance Cutrano
Chapter Chair
Sierra Club San Francisco Bay Chapter
Kristina Pappas
President
San Francisco League of Conservation
Voters
Dave Warner
Member
SF Mayor’s Water Supply Stakeholder
Group
Bill Martin
Member
SF Mayor’s Water Supply Stakeholder
Group
Paul Collacchi
Member
SF Mayor’s Water Supply Stakeholder
Group
9 Elizabeth Dougherty
Elizabeth Dougherty
Executive Director
Wholly H20
Iris Stewart-Frey
Professor
Santa Clara University
OUR MISSION: To provide our customers with high-quality, efficient and reliable water, power and sewer services in a manner that values environmental and community interests and sustains the resources entrusted to our care.
525 Golden Gate Avenue, 13th Floor
San Francisco, CA 94102
T 415.554.3155
F 415.554.3161
TTY 415.554.3488
San Francisco Public Utilities Commission
Earned Media Clips
April 25, 2022 – May 6, 2022
This is a periodic roundup of local, regional and national media stories either related to the SFPUC or that involved proactive or reactive efforts by the Communications Division.
Date Outlet Story
4/25/2022 48 Hills Does SF have enough water to give some back to the salmon—and the ecosystem? -
48 hills
5/2/2022 SF Chronicle Repair costs for San Francisco’s Stern Grove balloon to $20 million, 5 times initial
estimates (sfchronicle.com)
5/3/2022 Bay City News (via
KTVU and other
news outlets)
Stern Grove's concert meadow reopening in
time for festival series starting next month
(ktvu.com)
5/3/2022 KRON4 Stern Grove Concert Meadow to reopen in
time for festival | KRON4
5/6/2022 SF Examiner How will The City fill firehoses during big quake? - The San Francisco Examiner
(sfexaminer.com)
OUR MISSION: To provide our customers with high-quality, efficient and reliable water, power and sewer services in a manner that values environmental and community interests and sustains the resources entrusted to our care.
525 Golden Gate Avenue, 13th Floor
San Francisco, CA 94102
T 415.554.3155
F 415.554.3161
TTY 415.554.3488
San Francisco Public Utilities Commission
Earned Media Clips
April 25, 2022 – May 6, 2022
This is a periodic roundup of local, regional and national media stories either related to the SFPUC or that involved proactive or reactive efforts by the Communications Division.
Date Outlet Story
4/25/2022 48 Hills Does SF have enough water to give some back to the salmon—and the ecosystem? -
48 hills
5/2/2022 SF Chronicle Repair costs for San Francisco’s Stern Grove balloon to $20 million, 5 times initial
estimates (sfchronicle.com)
5/3/2022 Bay City News (via
KTVU and other
news outlets)
Stern Grove's concert meadow reopening in
time for festival series starting next month
(ktvu.com)
5/3/2022 KRON4 Stern Grove Concert Meadow to reopen in
time for festival | KRON4
5/6/2022 SF Examiner How will The City fill firehoses during big quake? - The San Francisco Examiner
(sfexaminer.com)
OUR MISSION: To provide our customers with high-quality, efficient and reliable water, power and sewer services in a manner that values environmental and community interests and sustains the resources entrusted to our care.
525 Golden Gate Avenue, 13th Floor
San Francisco, CA 94102
T 415.554.3155
F 415.554.3161
TTY 415.554.3488
San Francisco Public Utilities Commission
FORM EMAIL:
Tell San Francisco to do its part to save salmon
and heal the environment
Date Received From Subject
May 9, 2022 Mecia Serafino Form Email: Tell San Francisco to do its part to save the salmon and heal the
environment.
May 16, 2022 Martin Gothberg
Deborah Levoy
May 17, 2022 Carles Rogers
Jeff Nesselroad
Don Marshall
Gordon Light
Frank Schulze
John Innes
Bruce Sloan
Kenneth Gibson
William Ritch
May 18, 2022 Mark Ortega
Paul Lourenco
Valerie Hogan
Ivan Fujinaka
From: Mecia Serafino
To: Commission
Subject: Tell San Francisco to do its part to save salmon and heal the environment Date: Monday, May 9, 2022 3:00:37 PM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Dear San Francisco Water,
Dear President Moran,
I am writing to urge the SFPUC to embrace science-based environmental protections for the Tuolumne River, the San Francisco Bay-Delta, and our declining salmon runs. This is urgent because SFPUC staff is fighting efforts to heal the river and the Bay and Delta it flows into.
Because of water diversions by the SFPUC and other diverters on the Tuolumne, salmon have fared more poorly on the Tuolumne than on any other salmon river in the Central Valley.
Those same diversions are causing great damage to the Bay-Delta ecosystem and San Francisco’s salmon fishing industry. The SFPUC’s position needs to change to reflect the strong commitment San Franciscans have to protecting the environment.
I oppose the two lawsuits brought by the City seeking to block protections by the State Water Resources Control Board for the Tuolumne and the Bay-Delta.
Sincerely,