DEPARTMENT

Infrastructure Division

AGENDA NO.

10b

MEETING DATE

August 23, 2022

APPROVAL:

COMMISSION

SECRETARY

Donna Hood

AGENDA ITEM
Public Utilities Commission
City and County of San Francisco

Construction Award: Consent Calendar
Project Manager: Jimmy Leong

Award Contract No. HH-1006, San Joaquin Pipeline Valve and Safe Entry Improvements Phase 1B

Summary of
Proposed
Commission
Action:

Approve the plans and specifications , and award Contract No. HH-1006, San Joaquin Pipeline Valve and Safe Entry Improvements Phase 1B , in the amount of $11,801,808, and with a duration of 675 consecutive calendar days (approximately one year and 10 months) to the responsible bidder submitting the lowest responsive bid , Mountain Cascade, Inc. , to replace 78-inch and 90-inch diameter butterfly valves on San Joaquin Pipeline Nos. 3 and 4 (SJPL 3 & 4) at Tesla Valvehouse with new, higher -pressure-rated butterfly valves, and install removable spool pieces and new vaults for San Joaquin Pipline Nos. 3 and 4 at Tesla Portal, P4J Tie-In, and Oakdale Portal.

Background: San Joaquin Pipeline (SJPL) Nos. 1, 2, and 3 consist of three parallel transmission pipelines (completed in 1932, 1953 , and 1968, respectively ) that cross the San Joaquin Valley from the east of Foothill Tunnel at Oakdale Portal to the west of Coast Range Tunnel at Tesla Portal, a distance of approximately 48 miles. A fourth partial pipeline (SJPL 4 completed in 2012) consists of a 6.4-mile segment of pipe downstream of Oakdale and another 11-mile segment upstream of Tesla Portal. SJPLs deliver Hetch Hetchy water to the San Francisco Bay Area. They have been in service ranging from 10 to 90 years. SFPUC staff members and contractors need to enter the pipelines regularly to perform condition assessment, maintenance, and repair work. A recent hydraulic study shows that several of the existing valves in the SJPLs may be under-rated for the potential surge pressures that could be triggered from an
unplanned closure of the valves at the
downstream Tesla Ultraviolet Treatment Facility. For safety reasons, the SFPUC initiated this capital project to increase the pressure rating of the valves, provide safe pipeline isolations for personnel entry into the pipelines, and allow shutdown of any section of the SJPLs without a complete system shutdown . Staff will implement t he project in phases , specifically phases 1A, 1B, 2, and 3. This construction contract, HH-1006, is for the improvement work of Phase 1B.

Contract: HH-1006, San Joaquin Pipeline Valve and Safe Entry Improvements Phase 1B Commission Meeting Date: August 23, 2022

Description of
Scope of Work:

The contract work locations are at Oakdale Portal in Tuolumne County, at P4J Tie-in in Stanislaus County, and at Tesla Portal and Tesla Valve House in San Joaquin County.

The contract work consists of:
• At Tesla Portal, P4J Tie-In, and Oakdale Portal locations:
o Performing site grading, excavation, and shoring;
o Furnishing and installing five 12.5-foot-long removable spool pieces and the associated vaults, thrust blocks, and drainage systems at each location; and
o Installing permanent Caltrans Class 2 staging pads for the removable spool pieces.
• At Tesla Valve House location:
o Replacing existing 78-inch and 90 -inch diameter butterfly valve s, gearboxes, and actuator s with new American Water Works Association class 250 78-inch and 90- inch diameter metal seated triple offset butterfly valves, gearboxes, and actuators; o Replacing existing SJPL Nos. 3 and 4 main concrete pipe support saddles;
o Performing associated electrical work; and
o Performing software programming for operation of the new butterfly valves.

Budget & Costs: Funding: Project No. 10035575, SJPL Valve and Safe Entry Improvements Engineer’s Estimate: $14,000,000
Award: $11,801,808

Schedule: Estimated Notice-to-Proceed Date: October 2022 Estimated Completion Date: September 2024
Contract Duration: 675) consecutive calendar days ( approximately one year and 10 months) (615 consecutive calendar days to Substantial Completion and an additional 60 consecutive calendar days to Final Completion)

Compliance with
Chapter 14B:

Local Business
Enterprise
Utilization and
Non-
Discrimination in
Contracting
Ordinance:

Set: The Contract Monitoring Division (CMD) established a Local Business Enterprise (LBE) subcontracting requirement of 6.0% for this contract.

Submitted: The contractor committed to 11.89% LBE subcontracting participation in its bid submittal.

Environmental
Review:

On July 9, 2009, the Planning Commission certified the Final Environmental Impact Report (FEIR) for the San Joaquin Pipeline System Project (Case Number 2007.0118E). On July 14, 2009, by Resolution No. 09- 0119, this Commission approved the San Joaquin Pipeline System Project and adopted findings (CEQA Contract: HH-1006, San Joaquin Pipeline Valve and Safe Entry Improvements Phase 1B Commission Meeting Date: August 23, 2022

Findings), including the Statement of Overriding Considerations and a Mitigation, Monitoring, and Reporting P rogram (MMRP) required by the California Environmental Quality Act (CEQA).

On January 27, 2022, the Planning Department issued a Minor Project Modification (MPM) to the FEIR to include work associated with the San Joaquin Valve and Safe Entry Improvements Project . The work under Contract No. HH-1006, San Joaquin Pipeline Valve and Safe Entry Improvements Phase 1B is within the scope of the project authorized under the FEIR and MPM.

The FEIR, MPM to the FEIR, Resolution No. 09-0119, CEQA Findings, and the MMRP can be found here:
https://sfpuc.sharefile.com/d-s6d1e909a956141eab188fde5eef920f5

Bid History: Advertised: April 21, 2022

Bids Received: SFPUC received sealed bids from five (5) firms on July 7, 2022, as follows:

Bid Rank Base Bid
Amount
Bid
Preference
Adjusted Bid Final
Rank

1. Mountain Cascade, Inc. $11,801,808 N/A $11,801,808 1

2. Anvil Builders Inc $13,210,530 N/A $13,210,530 2

3. Ranger Pipelines
Incorporated $13,696,935 N/A $13,696,935 3

4. Sierra Mountain
Construction, Inc. $14,344,295 N/A $14,344,295 4

5. Mitchell Engineering $21,027,241 10% *$21,027,241 5

There were no bid preferences on this contract because the engineer’s estimate was in excess of $10,000,000.

Recommendation: SFPUC staff recommends that the Commission adopt the attached resolution.

Attachments: 1. CMD Memorandum

Contract: HH-1006, San Joaquin Pipeline Valve and Safe Entry Improvements Phase 1B Commission Meeting Date: August 23, 2022

SITE LOCATION MAP – HH-1006 SAN JOAQUIN

PIPELINE VALVE AND SAFE ENTRY
IMPROVEMENTS - PHASE 1B

Work for Phase 1B will occur at Project Locations 1, 5 and 6 (circled in red)

PUBLIC UTILITIES COMMISSION
City and County of San Francisco

RESOLUTION NO.

WHEREAS, The San Francisco Public Utilities Commission (SFPUC) owns and operates four San Joaquin Pipeline s (SJPLs) that have been in service ranging from 10 to 90 years. The SFPUC must enter the pipelines regularly to perform condition assessment, maintenance, and repair work. A recent hydraulic study shows that several o f the existing valves in the SJPLs may be under-rated for potential surge pressures that could be triggered by an unplanned closure of the valves at the downstream Tesla Ultraviolet Treatment Facility. For safety reasons, the SFPUC initiated the capital project, San Joaquin Pipeline Valve and Safe Entry Improvements, to increase the pressure rating of the valves, provide safe pipeline isolations for personnel entry , and allow shutdown of any sections of the SJPLs without a complete system shutdown. Staff will implement the project in phases, specifically Phases 1A, 1B, 2, and 3. C onstruction contract HH-1006 is for the improvement work of Phase 1B; and
WHEREAS, On April 21 , 2022, the SFPUC advertised Contract No. HH-1006, San Joaquin Pipeline Valve and Safe Entry Improvements Phase 1B; and WHEREAS, The Engineer’s Estimate is $ 14,000,000 for this construction contract work to replace 78-inch and 90-inch diameter butterfly valves on San Joaquin Pipeline Nos. 3 and 4 at Tesla Valve House with new, higher-pressure-rated 78-inch and 90-inch diameter butterfly valves, and install removable spool pieces at Tesla Portal, P4J Tie-In, and Oakdale Portal; and WHEREAS, The contract duration is 675 consecutive calendar days; and WHEREAS, On July 7, 2022, SFPUC received and publicly opened five bids; and WHEREAS, SFPUC staff and Contract Monitoring Division (CMD) reviewed the bids for price, bid responsiveness, and bidder responsibility and determined that Mountain Cascade, Inc., was the responsible bidder that submitted the lowest responsive bid; and WHEREAS, CMD established a Local Business Enterprise ( LBE) subcontracting participation of 6.0% for this contract, and the contractor committed to 11.89% LBE subcontracting participation in its bid submittal; and
WHEREAS. On July 9, 2009, the Planning Commission certified the Final Environmental Impact Report (FEIR) for the San Joaquin Pipeline System Project (Case Number 2007.0118E); and
WHEREAS, On July 14, 2009, by Resolution No. 09-0119, this Commission approved the San Joaquin Pipeline System Project and adopted findings (CEQA Findings), including the Statement of Overriding Considerations and a Mitigation, Monitoring and Reporting Program (MMRP) required by the California Environmental Quality Act (CEQA); and WHEREAS, On January 27, 2022, the Planning Department issued a Minor Project Modification (MPM) to the FEIR to include work associated with the San Joaquin Valve and Safe Entry Improvements Project; and

WHEREAS, The work under Contract No. HH-1006, San Joaquin Pipeline Valve and Safe Entry Improvements Phase 1 B is within the scope of the project authorized under the FEIR and MPM; and
WHEREAS, The Planning Department is the custodian of records, located in File No. 2007.0118E, at 49 South Van Ness Avenue, Suite 1400, San Francisco, California; and WHEREAS, The Project files, including the FEIR, MPM to the FEIR, Resolution No. 09- 0119, CEQA Findings and the MMRP have been made available for review by this Commission and the public, and those files are part of the record before this Commission; and WHEREAS, This Commission has reviewed and considered the information contained in the FEIR, the findings contained in SFPUC Resolution Number 09- 0119, the MPM to the FEIR and all written and oral information provided by the Planning Department, the public, relevant public agencies, SFPUC staff and other experts, and the administrative files for the Project; now, therefore, be it,
RESOLVED, This Commission has reviewed and considered the FEIR and the MPM and the record as a whole, finds that the FEIR is adequate for its use as the decision –making body for the Project, and incorporates the CEQA findings contained in Resolution Number 09-0119 by this reference thereto as though set forth in this Resolution; and be it FURTHER RESOLVED, This Commission further finds that since the FEIR and MPM were finalized, there have been no substantial project changes and no substantial changes in project circumstances that would require major revisions to the FEIR due to the involvement of new significant environmental effects or an increase in the severity of previously identified significant impacts, and there is no new information of substantial importa nce that would change the conclusions set forth in the FEIR and MPM; and be it
FURTHER RESOLVED, That this Commission hereby approves the plans and specifications and awards Contract No. HH-1006, San Joaquin Pipeline Valve and Safe Entry Improvements Phase 1B, in the amount of $11,801,808, for a duration of 675 consecutive calendar days, to the responsible bidder that submitted the lowest responsive bid, Mountain Cascade, Inc.

I hereby certify that the foregoing resolution was adopted by the Public Utilities Commission at its meeting of August 23, 2022.

Secretary, Public Utilities Commission

London N. Breed, Mayor
Carmen Chu, City Administrator

Romulus Asenloo, Director

1155 Market Street, 4th Floor, San Francisco, CA 94103
Telephone (415) 581-2310 Fax (415) 581-2351

CONTRACT MONITORING DIVISION
CITY ADMINISTRATOR’S OFFICE

MEMORANDUM

Date: July 29, 2022

To: Tim Parkan, SFPUC
Derek Wong, SFPUC

From: Jason Chow, CMD

Subject: HH-1006 San Joaquin Pipeline Valve and Safe Entry Improvement: Phase 1B

The Contract Monitoring Division (“CMD”) has reviewed the bids submitted for the above referenced project, applied the appropriate bid discounts, and determined responsiveness to the Chapter 14B pre- award requirements. An LBE subcontracting participation requirement of 6% was established for this project. Below is a summary of CMD’s review.

Bidder Status Base Bid LBE Bid
Discount
Adjusted Bid with
Bid Discount
Mountain Cascade, Inc. Non- LBE $11,801,808 n/a $11,801,808 Anvil Builders Inc. Non-LBE $13,210,530 n/a $13,210,530 Ranger Pipelines Inc. Non-LBE $13,696,935 n/a $13,696,935 Sierra Mountain
Construction, Inc.

Non- LBE $14,344,295 n/a $14,344,295
Mitchell Engineering

SF LBE-
OBE
(Small)
$21,027,241 2% $20,606,696.18

Mountain Cascade, Inc. (“Mountain Cascade”) is the lowest responsive bidder. Mountain Cascade met the 6% LBE subcontracting participation requirement by listing the following LBE firms on Document 00 43 36 (Subcontractor List):

LBE
Subcontractor Scope of Work Status Listed
Amount
Amount
Credited
Participation
(based on
credited amount)
R & S
Construction
Management
Structural
Concrete
(partial)

SF LBE- MBE
(Micro) $1,111,539 $1,111,539 9.41%
Mission City
Rebar Rebar (partial) SF LBE- OBE
(Micro) $292,245 $292,245 2.48%
TOTAL $1,403,784 $1,403,784 11.89%

Mountain Cascade also listed the following non-LBE subcontractors on Document 00 43 36:

Subcontractor Scope of Work Listed Amount
Blocka Construction Electrical $144,910
Redwood Painting
Co. -- $196,558
TOTAL: $341,468

Based on the foregoing, CMD has determined that Mountain Cascade has complied with the Chapter 14B pre-award requirements. Should you have any questions, please contact Jason Chow at [email protected].