Project Administration Bureau
525 Golden Gate Avenue, 8th Floor
San Francisco, CA 94102
T 415.554.4306
F 415.554.3225
TTY 415.554.3488

TO: Commissioner Anson Moran, President
Commissioner Newsha Ajami, Vice President
Commissioner Sophie Maxwell
Commissioner Tim Paulson

THRU: Dennis J. Herrera, General Manager

FROM: Ivy Fine, Deputy Assistant General Manager,
Project Administration Bureau, Infrastructure Division

Stephen Robinson, Assistant General Manager, Infrastructure Division

DATE: September 16, 2022

SUBJECT: Contract Advertisement Report: September 27, 2022

CONSTRUCTION:

Contract Number and Title: Estimated Cost:

WD-2801, 8- and 12-Inch Ductile Iron Water
Main Replacement, 16-Inch Earthquake
Resistant Ductile Iron Water Main
Installation, Sewer Replacement, and
Pavement Renovation, from Mariposa Street
to Cesar Chavez on York and Hampshire
Streets
$22,000,000
Program:

Local Water Conveyance/Distribution System Program
Estimated Date of Advertisement:

September 2022
Description of Contract Work:

The main contract work includes installation of earthquake resistant ductile iron pipe, replacement of existing wat er mains and sewer, pavement restoration, and curb ramp reconstruction.

Project Manager:

Jon Cantu

Type text here

Contract Number and Title:

WW-737 Baker St. Combined Sewer Discharge
Baffle Improvements & Backflow Valve Repair
Estimated Cost:

Between $800,000 and
$1,200,000
Program:

Sewer System Improvement Program (SSIP)
Estimated Date of Advertisement:

October 2022

Description of Contract Work:

The objective of this project is t o construct a new baffle wall and repair of the existing baffle inside the Baker Street Co mbined Sewer Discharge (CSD) and repair the leaks in the existing backflow valve.

Project Manager:

Saed Toloui

PROFESSIONAL SERVICES:

Contract Number and Title: Contract Estimate:

PRO.0257 Underwater Tank Reservoir
Inspection and Cleaning Services
$1,800,000
Program:

Water Enterprise - Water Supply & Treatment and City Distribution Divisions
Estimated Date of Advertisement:

September 2022
Description of Contract Work:

The work under this contrac t includes p erformance of inspection and cleaning services of raw water reservoirs, drinking water t ransmission pipelines, drinking water tr eatment facilities, and finished drinking water storage facilities through the use of dive teams and/or remotely operated vehicles (ROVs). Proposer must be familiar with related Occupational Safety and Health Adminis tration (OSHA) requirements, American Wa ter Works Association (AWWA) standards, and equipment decontamination practices.

Project Manager:

David Agam

Contract Number and Title: Contract Estimate:

PRO.0263 CleanPowerSF 2022 Renewable
Energy Supplies
$700,000,000
Program:

Power Enterprise
Estimated Date of Advertisement:

September 2022
Description of Contract Work:

The City seeks to purchase energy, environmental attributes, capacity attributes, ancillary services and related products fro m existing and new renewable energy resources.

Project Manager:

Kiara Hermann