Hetch Hetchy Water Enterprise Budget and Capital Plan

CleanPowerSF Sfpuc Commission
January 30, 2023

Document
Hetch Hetchy Water Enterprise Budget and Capital Plan
Meeting
January 30, 2023
Body
CleanPowerSF Sfpuc Commission
Original file
3.7 MB
Text extracted from the CCA's file for reading and search. Open the original on sfpuc.sharefile.com. That file is the official record.

SFPUC 10-Year
Capital Improvement
Program FY2024-33
Hetch Hetchy Water
January 30, 2023
Steven R. Ritchie
Asst. General Manager, Water

Our Water System
Spanning the Width of California

System Schematic with Faultlines

2008 Water Enterprise
Level of Service Goals
• Water Quality – maintain high water quality
• Seismic Reliability – reduce vulnerability to earthquakes • Delivery Reliability – increase delivery reliability and improve ability to maintain the system
• Water Supply – meet customer water needs in non-drought and drought periods
• Sustainability – enhance sustainability in all system activities • Cost-effectiveness – achieve a cost-effective, fully operational system 4 Hetch Hetchy Water Capital Plan
Development
• Emphasized spending down available balances. This has been a priority the last two years.
• Worked closely with Infrastructure staff on deliverability. Combed through the potential projects several times to verify spending ability. • Over the last several years, Hetch Hetchy Water has been working on a project prioritization methodology emphasizing likelihood and consequences of failure of any given asset.
• This year it was ready for use and made the prioritization process straightforward.
5 Hetch Hetchy Water 10-Year Capital
Improvement Program
6 All assets/projects are classified as:
• Water (100% Water funded)
• Power (100% Power funded)
• Joint (45% Water and 55% Power funded)
Hetchy
Water/$million FY 23-24 FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-30 FY 30-31 FY 31-32 FY 32-33 Total Water
Infrastructure

48.9 59.4 31.1 16.4 5.3 4.7 4.8 4.9 5.0 5.1 185.6
Power
Infrastructure

0.0 32.2 27.1 39.6 14.4 38.9 29.8 11.5 10.3 19.4 223.3
Joint Projects 37.0 64.0 94.4 85.6 74.9 56.0 65.3 41.1 32.1 17.7 568.1 Total - Hetchy
Water 85.9 155.6 152.6 141.6 94.6 99.6 100.0 57.5 47.4 42.3 976.9

Hetch Hetchy Water FY23-24 Capital Budget
7 FY 2021-22
Approved
Budget
FY 2022-23
Approved
Budget
FY 2023-24
Program/Project (Millions)
Proposed
Budget
Water Infrastructure $33.7 $45.7 $48.9
Power Infrastructure $10.6 $44.1 0 Joint Water Infrastructure 45% $30.2 $11.3 $16.7
Joint Power Infrastructure 55% $36.9 $13.8 $20.4
Hetchy Water Subtotal $111.5 $114.9 $86.0
Prioritization Results
• Reductions were taken in a manner that prioritized reliability of providing water deliveries to the Bay Area and critical power facilities that support delivery of water.
• Reductions totaled about $377 million, leaving a robust 10-year Capital Program of $977 million.
8 Moccasin Powerhouse
(10-year CIP Funding in Millions)
9 • “New” Powerhouse constructed in 1967
• Generators, Transformers, & Switchyard Rehabilitation…..$ 21.9 • Moccasin and Kirkwood Powerhouse Bypass Upgrades….$ 38.2 Water Transmission Facilities
(10-year CIP Funding in Millions)
10 • San Joaquin Pipeline Life Extension and Safe Entry Projects….$111.9 • Mountain Tunnel Improvements Project…………………………..$ 68.0 San Joaquin Pipelines at Oakdale Mountain Tunnel New Adit Moccasin Dam and Spillway
(10-year CIP Funding in Millions)
• March 22, 2018 Atmospheric River Event
• Moccasin Dam and Reservoir Short Term Improvements complete • Moccasin Dam and Reservoir Long Term Improvements….$ 63.8 O’Shaughnessy Dam
(10-year CIP Funding in Millions)
12 • O’Shaughnessy Dam constructed in 1923 and raised in 1938 • O’Shaughnessy Dam Outlet Works Phase I…..$ 14.6
• O’Shaughnessy Dam Outlet Works Phase II….$ 98.0
Hetch Hetchy Project Locations

Conclusion
• This 10-year Capital Program is robust.
• The FY 23-24 Capital Program reflects a commitment to spending down available balances while moving forward on significant projects 14 15