OUR MISSION: To provide our customers with high-quality, efficient and reliable water, power and sewer services in a manner that values environmental and community interests and sustains the resources entrusted to our care.
Project Administration Bureau
525 Golden Gate Avenue, 8th Floor
San Francisco, CA 94102
T 415.551.4603
F 415.554.3225
TTY 415.554.3488
TO: Commissioner Newsha K. Ajami, President
Commissioner Sophie Maxwell, Vice President
Commissioner Tim Paulson
Commissioner Anthony Rivera
Commissioner Kate H. Stacy
THRU: Dennis J. Herrera, General Manager
FROM: Ivy Fine, Deputy Assistant General Manager,
Project Administration Bureau, Infrastructure Division
Stephen Robinson, Assistant General Manager, Infrastructure Division
DATE: April 27, 2023
SUBJECT: Contract Advertisement Report: May 9, 2023
CONSTRUCTION:
Contract Number and Title:
Estimated Cost:
WD-2765, 8-Inch and 16-Inch Ductile Iron
Water Main Replacement on Jersey Street
from Douglass Street to Church Street and
Various Street Locations
$ 6,800,000
Program:
Local Water Conveyance/Distribution System Program
Estimated date of advertisement:
May 2023
Description of contract work:
Replace existing water mains with 8-inch and 16-inch ductile iron pipe on Jersey Street from Douglass to Church Streets, on Diamond Street from 26th to 23rd Streets, and on Elizabeth Street from Hoffman Avenue to Castro Street.
Project Manager:
Jon Cantu
Contract Number and Title:
Estimated Cost:
WD-2907(I) Sunol Valley Water Treatment
Plant Generator Filter Upgrade
$ 900,000
Program:
Water Enterprise Capital Improvement Program
Estimated date of advertisement:
May 2023
Description of contract work:
The objective of the project is to remove and replace the Sunol Valley Water Treatment Plant’s Backup Generator Filter and Load Bank, including the provision of a 1MW, 480VAC, 3PH, 60Hz, temporary backup generator during the construction. This contract will be for micro-Local Business Enterprises.
Project Manager:
Alisha Reinhardt
Contract Number and Title:
Estimated Cost:
HH-1014(E) 2023 Storm Damage Emergency
Road Repairs
$ 10,000,000 - 15,000,000
Program:
Hetchy Water
Estimated date of advertisement:
May 2023
Description of contract work:
The SFPUC issued a Declaration of Emergency on March 22, 2023, for the repair of Hetch Hetchy Water and Power (HHWP) roads due to above- normal precipitation from November 2022 through March 2023, which has significantly impaired the HHWP’s road infrastructure to essential facilities.
The objective of the project is to perform emergency repairs to roads, embankments, and drainage facilities for HHWP that were damaged due to recent adverse wet weather events. The work is considered critical and essential to maintaining facilities that HHWP owns and operates. The work generally consists of rock and debris removal, asphalt repair and replacement, embankment stabilization including retaining wall construction, and drainage repairs. The work is physically located in Tuolumne County, along access roads known as Cherry Lake Road and Hetch Hetchy Road. The timing for design of the repairs allows for qualifying contractors through a Request for Qualifications and advertisement for low bids.
Project Manager:
Tom Walker