DEPARTMENT

Infrastructure

AGENDA NO.

5e

MEETING DATE

June 27, 2023

Last updated: 05.03.2023

AGENDA ITEM
Public Utilities Commission
City and County of San Francisco

Calendar: Consent Calendar
Contract/Project Manager: Ryan Freeborn

Accept Closeout of Contract No. WD-2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castro Street and 26th Street

Summary of
Proposed
Commission Action:

Accept work performed by Cratus, Inc. under Contract No. WD-2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castro Street and 26th Street , for a total contract amount of $15,404,492, and with a total contract duration of 802 consecutive calendar days (approximately two years and three months); and authorize final payment to the contractor.

Background: The water main replacement work under this contract was part of the Water Enterprise Local Conveyance/Distribution System Program. Much of the City’s water system infrastructure was built in the later part of the 19th century.

This program includes the rep lacement of old pipes that have either been damaged or are at the end of their useful service life to ensure reliable water delivery within the City. The City installed the existing 6-inch water mains along with the 16-inch to 24-inch transmission mains that have been replaced under this contract between 1888 and 1906; due to their age span between 113 and 131 years, they were at risk of failure and needed replacement.

The sewer replacement work under this contract was part of Wastewater Enterprise, Renewal and Replacement Program. After inspection, Wastewater Enterprise Collection System Division Staff determined that the main sewers were in need of replacement.

The City completed the pavement renovation work under this contract as part of the Public Wor ks Street Resurfacing Program. The
City completed the
parking lot renovation at 4061 24 th Street as part of San Francisco Municipal Transportation Agency Sustainable Streets Program. The Public Works Streets and Highways Section inspected street pavement on the subject streets along with the parking lot and determined that they needed to be replaced.

On January 14, 2020, by Resolution No. 20- 0009, the Commission awarded WD-2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castr o Street and 26th Street , to Cratus, Inc., (Contractor).

The original contract amount was [Original Award Amount $] and the original contract duration was 730 consecutive calendar days.

Agenda Title: WD-2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castro Street and 26th Street
Commission Meeting Date: June 27, 2023

Page 2 ends

Scope of Contract: The contract work location was on Castro Street from 19 th to 26th Street and on 26th Street from Castro Street to Guerrero Street in San Francisco, California. The contract work consisted of:
• Installation of approximately 8,800 feet of 4-inch, 6-inch, and 8-inch diameter ductile iron pipe, 1,900 feet of 16-inch diameter ductile iron pipe, 4,900 feet of 24-inch diameter ductile iron pipe, and 5,000 linear feet of ancillary 1-inch and 2-inch copper water service pipe; • Replacement of the existing main sewers with approximately 540 linear feet of 12-inch diameter, 284 linear feet of 15-inch diameter, 1,145 linear feet of 18-inch diameter vitreous clay pipe and lining of approximately 310 linear feet of existing main sewer pipe with cured- in place liner;
• Curb ramp construction; and
• Pavement restoration on Castro Street from 19th Street to Alvarado Street, Castro Street from Elizabeth to 26th Street, 26th Street from Castro Street to Guerrero Street, and at the parking lot at 4061 24th Street.

Modifications to the
Contract:

Modification Nos. 1 to 6 increased the contract amount by $485,201, and increased the contract duration by 72 consecutive calendar days (both within the original contract contingencies) , to change from owner -furnished procurement of 16-inch ductile iron water main pipe to contractor furnished procurement due to expiration of the San Francisco Public Utility Commission’s (SFPUC’s) pipe procurement term contract; additional 8 -inch ductile iron water main pipe, fittings, air release valve, service screw taps, and service line installation quantities due to differing site conditions, design omissions, and operational requests; and an additional 12-inch sewer line and manhole at Castro and 21
st Street, which Staff found to be blocked, for a total contract amount of $15,404,492, and a total contract duration of 802 consecutive calendar days.

Funding and Costs: Funding Source: Water Enterprise, Local Conveyance/Distribution System Program; Wastewater Enterprise, Renewal and Replacement Program; San Francisco Public Works Street Resurfacing Program; and San Francisco Municipal Transportation Agency (SFMTA) Sustainable Streets Program Original Contract Amount: [Original Award Duration]
Modification Nos. 1 to 6 Amount: $485,201
Total Revised Contract Amount: $15,404,492

SFPUC, Public Works, and the San Francisco Municipal
Transportation Agency (SFMTA) provided funding based on the following allocation of the final contract amount:

Agenda Title: WD-2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castro Street and 26th Street
Commission Meeting Date: June 27, 2023

Page 3 ends

DEPARTMENT FUNDING SOURCE AMOUNT
SFPUC
Water Enterprise
Project No. 10015173 Local
Conveyance/Distribution
System Program
$11,220,505
SFPUC
Sewer Enterprise
Renewal and Replacement
Program $2,986,759
Public Works Street Resurfacing Program $1,136,984
SFMTA Sustainable Streets Program $60,244

CONTRACT
TOTAL $15,404,492

Schedule: Notice-to-Proceed Date: August 17, 2020
Original Contract Duration: 730 consecutive calendar days Modification Nos. 1 through 6 Duration: 72 consecutive calendar days Total Revised Contract Duration: 802 consecutive calendar days

Local Business
Enterprise
Participation and
Non-Discrimination
In Contracting:

The Contract Monitoring Division established a 20% Local Business Enterprise (LBE) subcontracting requirement for this contract. The Contractor committed to 22.06% LBE participation in its bid submittal. The Contract Monitoring Division has determined that that the Contractor complied with its LBE subcontracting goal by achieving 22.93% LBE participation.

Attachment: 1. Contract Monitoring Division Memorandum
Agenda Title: WD-2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castro Street and 26th Street
Commission Meeting Date: June 27, 2023

Page 4 ends

PUBLIC UTILITIES COMMISSION
City and County of San Francisco

RESOLUTION NO.

WHEREAS, To ensure reliable water delivery within the City and County of San Francisco, the San Francisco Public Utilities Commission (SFPUC) required the replacement and installation of approximately 15,600 feet of ductile iron water conveyance pipe and ancillary water service pipe, replacement and installation of approximately 4,500 feet of sewer pipe, construction of curb ramps, and restoration of pavement on Castro Street from 19th to 26th Street, Castro Street from Elizabeth to 26th Street, 26th Street from Castro Street to Guerrero Street, and at the parking lot at 4061 24th Street; and
WHEREAS, On January 14, 2020, by Resolution No. 20-0009, the Commission awarded Contract No. WD-2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castro Street and 26th Street , in the amount of $14,919,291, to the responsible bidder that submitted the lowest responsive bid, Cratus, Inc., (Contractor); and WHEREAS, The original contract amount was for $14,919,291, and the original contract duration was 730 consecutive calendar days; and
WHEREAS, The construction contract notice -to-proceed date was August 17, 2020, and the contractor completed the work in 802 consecutive calendar days on October 27, 2022; and WHEREAS, Modification Nos. 1 to 6 increased the cont ract amount by $485,201, and increased the contract duration by 72 consecutive calendar days to change from owner -furnished procurement of 16-inch ductile iron water main pipe to contractor furnished procurement due to expiration of the SFPUC’s pipe procurement term contract; to include additional 8-inch ductile iron water main pipe, fittings, air release valve, service screw taps, and service line installation quantities due to differing site conditions, design e missions, and operational requests; and to refurbish a 12-inch sewer line and manhole at Castro and 21st Street , which Staff found to be blocked, for a total contract amount of $15,404,492, and a total contract duration of 802 consecutive calendar days; and
WHEREAS, The Contract Monitoring Division has determined that the C ontractor complied with the established Local Business Enterprise (LBE) subcontracting goal of 20% for this contract by achieving 22.93% LBE participation; and WHEREAS, Funds are available from Water Enterprise, Local Conveyance/Distribution System Program , Wastewater Enterprise Renewal and Replacement Program, San Francisco Public Works Street Resurfacing Program , and the San Francisco Municipal Transportation Agency, for Contract No. WD-2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castro Street and 26th Street; now, therefore, be it

RESOLVED, That this Commission hereby accepts work performed by Cratus, Inc. for Contract No. WD -2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castro Street and 26th Street, for a total contract amount of $15,404,492, and with a total contract duration of 802 consecutive calendar days; and authorizes final payment to the Contractor.

I hereby certify that the foregoing resolution was adopted by the Public Utilities Commission at its meeting of June 27, 2023.

Secretary, Public Utilities Commission