OUR MISSION: To provide our customers with high-quality, efficient and reliable water, power and sewer services in a manner that values environmental and community interests and sustains the resources entrusted to our care.
Contract Administration Bureau
525 Golden Gate Avenue, 8th Floor
San Francisco, CA 94102
T 415.551.4603
F 415.554.3225
TTY 415.554.3488
TO: Commissioner Tim Paulson, President
Commissioner Anthony Rivera, Vice President
Commissioner Newsha K. Ajami
Commissioner Sophie Maxwell
Commissioner Kate H. Stacy
THRU: Dennis J. Herrera, General Manager
FROM: Ivy Fine, Deputy Assistant General Manager,
Project Administration Bureau, Infrastructure Division
Stephen Robinson, Assistant General Manager, Infrastructure Division
DATE: February 2, 2024
SUBJECT: Contract Advertisement Report: February 13, 2024
CONSTRUCTION:
Contract Number and Title:
WD-2844, 12-Inch Ductile Iron Water Main Installation on Parnassus Avenue fr om Stanyan S treet to 6th Avenue, on Lawton Street from 7th Avenue to Funston Avenue, and Various Street Locations
Contract Estimate:
$8,600,00
Program:
Local Water Cap ital Improvement P rogram – Local Water Conveyance/Distribution System Program
Estimated Date of Advertisement:
February 2024
Description of Contract Work:
Installation of new 12 -inch ductile iron water main to provide redundancy to the northern portion of the Stan ford H eights pressure zone in preparation for future repl acement o f seismic back bone pipelines in th e system. Rep lace 8 -inch duc tile iron water main that have exceede d it s useful life, pavement restoration, and curb ramp reconstruction.
Project Manager:
Jon Cantu
Contract Number and Title:
WW-719C, Folsom Ar ea Stormwater Improvements – Harrison/Treat Box Sewer and Connecting Auxiliary Sewers – Request for Qualifications
Contract Estimate:
$140,000,000
Program:
Sewer System Improvement Program
Estimated Date of Advertisement:
Request for Qualifications in February 2024; Request for Bids in July 2024
Description of Contract Work:
The contract will address the Sewer System Improvement Program’s level of service in the City’s Inner Mission District as part of the overall Folsom Area Stormwater Improvements Project. The proposed improvements include:
• Installing a new approximately 20 -foot-wide box sewer on Harrison Street to collect all-weather flows.
• Replacing the existing box sewers on Treat Avenue.
• Installing a new approximately 20-foot-wide box sewer on Florida Street to collect wet-weather flows.
• Installing new approximately 8-foot-wide auxiliary box sewers on 17th and 18th streets to convey all-weather flows.
• Lining existing sewers on 18th Street.
• Relocating existing combined sewer pipes.
• Constructing and/or modifying e xisting se wer box junction structures.
Project Manager:
Derek Adams
Contract Number and Title:
WW-753, Hayes Valley Sewer Improvements
Contract Estimate:
$12,500,000
Program:
Sewer System Improvement Program
Estimated Date of Advertisement:
February 2024
Description of Contract Work:
The purpose of this project is to rehabilitate existing 3’x5’ brick sewers on Franklin, Grove, Hayes, Laguna, McAllister, Oak, P
age, Polk, Scott, and
Sutter Street.
Project Manager:
Ming Yee
Contract Number and Title:
WD-2901, San Andreas Pipeline No. 3 Slope Stabilization
Contract Estimate:
$1,200,000
Program:
Water Enterprise
Estimated Date of Advertisement:
March 2024
Description of Contract Work:
Contract work consists of the stabilization of a gully and the e xtension of a High-Density Polyethylene drain line along with associated vegetation removal, grading, shoring, erosion control, and hydroseeding . The work is being performed to protect the S an Francisco Public U tilities Commission’s San Andreas Pipeline an d easement in Junip ero Serra Park located i n San Mateo County.
Project Manager:
Mary Tienken
Contract Number and Title:
WD-2906, Town of Sunol Pipeline Replacement at Arroyo de la Laguna Creek
Contract Estimate:
$6,000,000
Program:
Water Enterprise Capital Improvement Program
Estimated Date of Advertisement:
March 2024
Description of Contract Work:
Replacement of 12-inch diameter pipeline crossing the Arroyo de la Laguna Creek, including new tie -in poin ts and removal of existing pipelines from the creek.
Project Manager:
Alisha Reinhardt
Contract Number and Title:
WD-2910, Procurement of Medium and Large Diameter Valves for Regional Pipelines
Contract Estimate:
$16,000,000
Program:
Water Capital Improvement Program
Estimated Date of Advertisement:
March 2024
Description of Contract Work:
Contract work consists of fabricating, storing, and transporting valves ranging in size from 20” to 90” in diameter. These valves will be installed in future Regional W ater pipeline improvement projects to achieve s afe pipeline entry for construction crews and for future operational needs.
Project Manager:
Janet Ng
Contract Number and Title:
HH-1015, O’Shaughnessy Dam Drainage Miscellaneous Improvements
Contract Estimate:
$4,900,000
Program:
Hetch Hetchy Capital Improvement Program
Estimated Date of Advertisement:
March 2024
Description of Contract Work:
All the Contract Work will be performed inside O’Shaughnessy D am. It consists of the follow ing: (1) replace existing steel platforms in the ladder wells; (2) clear approximately a thousand feet of internal drains; (3) replace an existing door with a new watertight door between ladder wells number 3 and number 4; and (4) install railing to an exist ing walkway and increase clearance by removing overhe ad concrete to improve personnel safety at the diversion tunnel trifurcation area.
Project Manager:
Jimmy Leong
Contract Number and Title:
WW-720, As-Needed Main Sewer Replacement No. 10
Contract Estimate:
$12,100,000
Program:
Wastewater Enterprise, Renewal and Replacement Program
Estimated Date of Advertisement:
March 2024
Description of Contract Work:
Contract is to provide contingency based as -needed main sewer (manhole to manhole segment) replacement at locations to be determ ined within the City of San Francisco.
Project Manager:
Aileen Caylao
Contract Number and Title:
WW-726, Various Locations Sewer Replacement No. 15
Contract Estimate:
$9,800,000
Program:
Wastewater Enterprise, Renewal and Replacement Program
Estimated Date of Advertisement:
April 2024
Description of Contract Work:
Contract work consists of replacing and lining the existing sewers on Cabrillo Street from 46th Avenue to 47th Avenue; 38th Avenue from Balboa Street to Cabrillo Street; 35th Avenue from Anza Street to Balboa S treet; 35th Avenue from Cabrillo Street to Fulton Street; 26th Avenue from Balboa Street to Cabrillo Street; Jackson Street from Gou gh Street to Franklin Street; Cole Street from Grove Street to Ha yes Street; Ashbury Street from Hayes Street to Fell Street ; Fr ederick Street from Belvedere Street to Clayton Street; Shrader Street from Parnassus Avenue to Grattan Street; Dr Carlton B Goodlette Place from McAllister St reet to Grove Street; Lafayette Street from M ission Street to Howard Street; Minna Street from Lafa yette Street from 11 th Street; Natoma Street from Lafayette Street from 11th Street; Capp Street from 16 th Street to 17 th Street; Bry ant Street from 15th Street to 16 th Street; Mariposa Street from Ha mpshire S treet to Potrero Avenue; 30th Street from Whitney Street to Church Street; Cordova Street from Winding Way to Chicago Way; and San Bruno Avenue Easement from Somerset Street to Beeman Lane.
Project Manager:
Aileen Caylao
Contract Number and Title:
PW-010(I), One South Van Ness Lighting
Contract Estimate:
$500,000
Program:
N/A
Estimated Date of Advertisement:
April 2024
Description of Contract Work:
The lighting project scope of work at On e South Van Ness (OSVN) includes the whole sale retrofit of luminaires in throughout OSVN with energy efficient LED lighting. Retrofits will include the replacement of old fixtures with new, energy efficient fixtures and the ret rofit of the fixtures wit h LED components. There will also be occupancy sen sing controls installed in certain areas to comply with Title 24 code and provide additional energy savings. The areas covered in the scope include administrative areas, common areas, offices, and the parking garages.
Project Manager:
Matt Suidan
PROFESSIONAL SERVICE:
Contract Number and Title:
PRO.0270, Programmatic Support Services for Contractors Assistance Center, W orkforce an d Economic Program S ervices and Project La bor Agreement Administration
Contract Estimate:
$1,200,000 Cumulative
(Three (3) contracts, each for a not-to-exceed value of $400,000) Program:
Workforce and Economic Program Services
Estimated Date of Advertisement:
February 2024
Description of Contract Work:
The City s eeks to retain the services of up to three qualified Proposers to provide: as -needed support to the Workforce and Economic Program Services (WEPS) st aff with the following: (1) the creation and implementation of programmatic support services for small, local businesses to increase access and participation on SFPUC projects; (2) lean problem - solving development; and (3) improving the administration of the SFPUC’s Project Labor Agreement.
Project Manager:
Elizabeth Connely