Cities Index.
Contract No. WW-749

CleanPowerSF Sfpuc Commission
February 13, 2024

Document
Contract No. WW-749
Meeting
February 13, 2024
Body
CleanPowerSF Sfpuc Commission
Pages
4
Original file
805 KB
Text extracted from the CCA's file for reading and search. Open the original on sfpuc.sharefile.com. That file is the official record.

DEPARTMENT

Infrastructure Division

AGENDA NO.

6d

MEETING DATE

February 13, 2024

AGENDA ITEM
Public Utilities Commission
City and County of San Francisco

Calendar: Consent Calendar
Project Manager: Daniel Alvarado

Award Contract No. WW-749, Channel Pump Station Bar Screen Replacement

Summary of
Proposed
Commission
Action:

Award Contract No. WW-749, Channel Pump Station Bar Screen Replacement to the responsible bidder that submitted the lowest responsive bid, Western Water Constructors, Inc., in the amount of $8,675,000 with a duration of 990 consecutive calendar days (approximately two years and nine months), to re pair and replace existing wastewater process equipment at the Channel Pump Station.

Background: The objective of the project is to repair and replace existing San Francisco Public Utilities Commiss ion (SFPUC) wastewater process equipment at the end of its useful life by performing selective hazardous material abatement work; selective demolition; concrete repair; replacement of the existing bar screens; replacement of main pump medium voltage variab
le frequency drives; and support for
appurtenant mechanical, electrical, and instrumentation and controls components at the Channel Pump Station.

Scope of
Contract:

The Contract work location is in the City and County of San Francisco and within the Channel Pump Station property.

The Contract work consists of:
• Replacement of three bar screen systems including associated motors, electrical and controls systems;
• Concrete repair within channels;
• Replacement of two main pump medium voltage variable frequency drives;
• Repair of pump suction piping; and
• Demolition and capping of recirculation piping.

Funding and
Costs:

Funding Source: Wastewater Capital Renewal and Replacement Program Project Number 10015782, Channel Pump Station Improvements Engineer’s Estimate: $9,500,000
Award Amount: $8,675,000

Schedule: Estimated Notice-to-Proceed Date: April 1, 2024 Agenda Title: WW-749, Channel Pump Station Bar Screen Replacement Commission Meeting Date: February 13, 2024

Page 2 ends

Estimated End Date: December 18, 2026
Duration: 990 consecutive calendar days (930 consecutive calendar days to Substantial Completion and an additional 60 consecutive calendar days to Final Completion).

Bid History: Advertised: October 27, 2023

Bids Received: SFPUC received sealed bids from three firms on December 7, 2023.

Bid Rank Bid
Amount
Bid
Preference
Compensable
Delay (58-
Day
Duration)
Adjusted
Bid (with
Bid
Preference
Applied)
Final
Rank

1. Western
Water
Constructors,
Inc.
$8,675,000 Not eligible $58,000 $8,733,000 1

2. Anvil
Builders Inc. $9,227,000 Not eligible $87,000 $9,314,000 2

3. Cal State
Constructors,
Inc.
$10,847,000 10% $29,000 $9,788,400 3

Because the SFPUC anticipates that potential unforeseen conditions or other factors outside of the contractor’s control may impact the schedule, Staff included a requirement in the Invitation for Bids for bidders to provide a daily compensable time extension rate. At the bid opening, Staff announced that SFUPC would use the value of a 58-
day compensable delay to calculate the Compensable Delay amount bid adjustment. Staff used the daily rate in each bid to determine the total Compensable Delay value shown in the table by multiplying the bidder’s daily rate times 58. The Adjusted Bid value in the table is the sum of the Base Bid and Compensable Delay less any applicable LBE bid discount. Staff used the Adjusted Bid value to compare and rank the bids to determine the lowest bidder. However, the contract award amount is the Base Bid value (not the Adjusted Bid value) and, if the Commission awards the Contract, the bidder’s daily compensable delay rate will become a term of the Contract.

Application of bid preferences in accordance with Chapter 14B of the San Francisco Administrative Code did not change the final ranking of the low bidder.

Environmental
Review:

Award of this contract does not constitute a project under the California Environmental Quality Act (CEQA) Guidelines section 15378 because activities would not result in a direct or indirect physical change in the environment.

Local Business
Enterprise
Participation
and Non-
The Contract Monitoring Division established a 20% Local Business Enterprise (LBE) subcontracting requirement for this contract. The contractor committed to

20.67% LBE participation with its bid submittal.

Agenda Title: WW-749, Channel Pump Station Bar Screen Replacement Commission Meeting Date: February 13, 2024

Page 3 ends

Discrimination
In Contracting:

Attachment: 1. Contract Monitoring Division Memorandum
Agenda Title: WW-749, Channel Pump Station Bar Screen Replacement Commission Meeting Date: February 13, 2024

Page 4 ends

Site Map - Channel Pump Station
455 Berry St, San Francisco, CA 94107

PUBLIC UTILITIES COMMISSION
City and County of San Francisco

RESOLUTION NO.

WHEREAS, The San Francisco Public Utilities Commission (SFPUC) Wastewater Capital Renewal and Replacement Program provides for the repair and replacement of equipment at the end of its useful service life and upgrades to support reliable wastewater treatment; and WHEREAS, On October 27, 2023, SFPUC advertised Contract No. WW-749, Channel Pump Station Bar Screen Replacement; and
WHEREAS, The Engineer’s Estimate is $ 9,500,000 for this construction work to replace three bar screens and associated motors, electrical, and controls; repair concrete channels; replace two main pump medium voltage variable frequency drives; repair pump suction piping; and demolish and cap recirculation piping; and
WHEREAS, The Contract duration is 990 consecutive calendar days; and WHEREAS, On December 7, 2023, SFPUC received and publicly opened three bids; and WHEREAS, SFPUC staff and Contract Monitoring Division (CMD) reviewed the bids and the application of bid preferences and determined that Western Water Constructors, Inc. is the responsible bidder with the lowest responsive bid; and
WHEREAS, CMD established a 20 % Local Business Enterprise (LBE) subcontracting requirement for this C ontract, and Western Water Constructors, Inc. committed to 20.67% LBE participation in its bid submittal; and
WHEREAS, Award of this contract does not constitute a project under the California Environmental Quality Act (CEQA) Guidelines section 15378 because activities would not result in a direct or indirect physical change in the environment; and WHEREAS, Funds are avai lable from Project No. 10015782, Channel Pump Station Improvements; now, therefore, be it
RESOLVED, That this Commission hereby awards Contract No. WW-749, Channel Pump Station Bar Screen Replacement, in the amount of $8,675,000, and a duration of 990 consecutive calendar days, to the responsible bidder that submitted the lowest responsive bid, Western Water Constructors, Inc.

I hereby certify that the foregoing resolution was adopted by the Public Utilities Commission at its meeting of February 13, 2024.

Secretary, Public Utilities Commission

City & County of San Francisco
London N. Breed, Mayor
Office of the City Administrator
Carmen Chu, City Administrator

Contract Monitoring Division
Stephanie Tang, Director

MEMORANDUM

Date: December 26, 2023

To: Daniel Alvarado, SFPUC
Brittany Jones, PW

From: Katherine Mundhenk, CMD

Subject: CMD Review -- WW-749 Channel Pump Station Bar Screen Replacement

The Contract Monitoring Division (“CMD”) has reviewed the bids submitted for the above referenced project, applied the appropriate bid discounts, and determined responsiveness to the Chapter 14B pre- award requirements. The Micro/Small-LBE subcontracting participation requirement is 20% for this project. Below is a summary of CMD’s review.

Bid Discount

Firm LBE Status Base Bid Compensable
Delay Bid Discount
Adjusted Bid with
Compensable Delay
(with Bid Discount
applied)
Western Water
Constructors, Inc. Non-LBE $8,675,000 $58,000 Not eligible $8,733,000 Anvil Builders
Inc. Non-LBE $9,227,000 $87,000 Not eligible $9,314,000 Cal State
Constructors, Inc.

SF LBE-OBE
(Small) $10,847,000 $29,000 10% =
$1,087,600 $9,788,400

LBE Subcontracting Participation Requirement

Western Water Constructors, Inc. (“Western Water”) is the lowest responsive bidder. Western Water met the 20% Micro/Small-LBE subcontracting requirement by listing the following Micro/Small-LBE firms on Section 00 43 36 (Subcontractor List):

1155 Market Street, 4th Floor, San Francisco, CA 94103
Telephone (415) 581-2310 General Email [email protected]

LBE
Subcontractor
Scope of
Work
LBE Status,
Type and Size Listed Amount LBE-Credited
Amount
Credited
Participation
FavourPC, Inc.

VFD
Programming
and Supply

SF LBE-OBE
(Micro) $772,500.00 $169,012.50* 1.95%
Bay Engineering
LLC
Partial Demo
&
Mechanical

SF LBE-OBE
(Micro) $1,325,000.00 $1,325,000.00 15.27%
R&S Construction
Management Inc.

Concrete /
Shotcrete

SF LBE-MBE
(Micro) $416,000.00 $299,000.00 ** 3.45%
TOTAL $2,513,500.00 $1,793,012.50 20.67%
* FavourPC is supplying and programming VFD, which is a specially manufactured item. CMD Attachment 1 states that “5% of the purchase price of the item and 100% of the installation labor cost will be credited towards meeting the LBE sub participation requirement.” FavourPC’s scope consists of $635,250 VFD supply (LBE-credited at 5%) and $137,250 labor (credited at 100%).
** R&S Construction Management will be further subcontracting $117,000 to a non-LBE, per Form 6, and the LBE- credited amount was reduced accordingly.

Western Water also listed the following non-LBE subcontractors on Section 00 43 36.

Subcontractor Scope of Work Listed Amount Participation Structural Technologies LLC CFRP Pipe Lining $315,000.00 3.63% Blocka Construction Inc. Electrical / I&C $1,690,000.00 19.48% TOTAL $2,005,000.00 23.11%

Good Faith Efforts Requirements

Western Water utilized Approach C: Good Faith Negotiations on CMD Form 2B to meet the Good Faith Efforts (“GFE”) Requirements.

Western Water demonstrated that it met the GFE requirements under Approach C by achieving at least 50 points.

Based on the foregoing, CMD has determined that Western Water has complied with the pre-award Chapter 14B requirements. Should you have any questions, or if I can be of further assistance, please do not hesitate to contact me at 415-551-4335

← All documents from this meeting