Cities Index.
Water Supply Conditions Update

CleanPowerSF Sfpuc Commission
March 26, 2024

Document
Water Supply Conditions Update
Meeting
March 26, 2024
Body
CleanPowerSF Sfpuc Commission
Original file
2.0 MB
Text extracted from the CCA's file for reading and search. Open the original on sfpuc.sharefile.com. That file is the official record.

1 Water Supply Conditions Update
Steven R. Ritchie
Assistant General Manager, Water
March 18, 2024
March 18, 2024 Reservoir Storage
2 Reservoir
Current
Storage1,2,3
Maximum
Storage4
Available
Capacity
Percent of
Maximum
Storage
Normal
Percent of
Maximum
Storage5
(AF) (AF) (AF)
Tuolumne System
Hetch Hetchy 306,400 360,360 53,960 85.0% 61.9%
Cherry 237,500 273,345 35,845 86.9% -
Eleanor 23,670 27,100 3,430 87.3% -
Water Bank 570,000 570,000 0 100.0% 99.0%
Total Tuolumne Storage 1,137,570 1,230,805 93,235 92.4% - Local System
Calaveras 91,459 96,670 5,211 94.6% -
San Antonio 50,072 53,266 3,194 94.0% -
Crystal Springs 43,665 68,953 25,288 63.3% -
San Andreas 14,331 18,675 4,344 76.7% -
Pilarcitos 2,551 3,125 574 81.6% -
Total Local Storage 202,078 240,689 38,611 84.0% -
Total System Storage 1,339,648 1,471,494 131,846 91.0% 80.0% Total without water bank 769,648 901,494 131,846 85.4% -

Other
California
Reservoirs
3 California Drought Monitor
4 Hetch Hetchy Precipitation
5 Upcountry 6-station Precipitation Index as of
March 17, 2024
Avg Annual Total: 36.68 inches
YTD Total: 24.10 inches
6 Bay Area 7-station Precipitation Index
as of March 17, 2024
Avg Annual Total: 22.80 inches
YTD Total: 24.04 inches
7 Upcountry Snowpack
8 Water Available to the City
9 Tuolumne River Water Available
to the City

11 National Precipitation Forecast

Total Deliveries

← All documents from this meeting