Cities Index.
Water Supply Conditions Update

CleanPowerSF Sfpuc Commission
April 23, 2024

Document
Water Supply Conditions Update
Meeting
April 23, 2024
Body
CleanPowerSF Sfpuc Commission
Original file
2.1 MB
Text extracted from the CCA's file for reading and search. Open the original on sfpuc.sharefile.com. That file is the official record.

1 Water Supply Conditions Update
Steven R. Ritchie
Assistant General Manager, Water
April 15, 2024
April 15, 2024 Reservoir Storage
2 Reservoir
Current
Storage1,2,3
Maximum
Storage4
Available
Capacity
Percent of
Maximum
Storage
Normal
Percent of
Maximum
Storage5
(AF) (AF) (AF)
Tuolumne System
Hetch Hetchy 290,400 360,360 69,960 80.6% 60.2%
Cherry 242,500 273,345 30,845 88.7% -
Eleanor 23,890 27,100 3,210 88.2% -
Water Bank 570,000 570,000 0 100.0% 99.0%
Total Tuolumne Storage 1,126,790 1,230,805 104,015 91.5% - Local System
Calaveras 94,512 96,670 2,158 97.8% -
San Antonio 50,961 53,266 2,305 95.7% -
Crystal Springs 47,292 68,953 21,661 68.6% -
San Andreas 13,927 18,675 4,748 74.6% -
Pilarcitos 2,562 3,125 563 82.0% -
Total Local Storage 209,254 240,689 31,435 86.9% -
Total System Storage 1,336,044 1,471,494 135,450 90.8% 79.7% Total without water bank 766,044 901,494 135,450 85.0% -

Other
California
Reservoirs
3 California Drought Monitor
4 Hetch Hetchy Precipitation
5 Upcountry 6-station Precipitation Index as of
April 14, 2024
Normal Annual Total: 36.68 inches
YTD Total: 30.03 inches
6 Bay Area 7-station Precipitation Index
as of April 14, 2024
Normal Annual Total: 22.80 inches
YTD Total: 28.39 inches
7 Upcountry Snowpack
8 Water Available to the City
9 Tuolumne River Water Available
to the City
10 11
National Precipitation Forecast

Total Deliveries

← All documents from this meeting