DEPARTMENT

Hetch Hetchy

AGENDA NO.

7h

MEETING DATE

May 14, 2024

AGENDA ITEM
Public Utilities Commission
City and County of San Francisco

Calendar: Consent Calendar
Project Manager: Brian Tanko

Award Contract No. HH-1013, Moccasin Compound Water System Filtration Addition

Summary of
Proposed
Commission Action:

Award Contract No. HH-1013, Moccasin Compound Water System Filtration Addition, to the responsible bidder that submitted the lowest responsive bid, Sierra Mountain Construction, Inc. , in the amount of $4,177,936, and with a duration of 346 consecutive calendar days to install a permanent freshwater treatment plant in Moccasin, CA. This action constitutes the Approval Action for the Project for the purposes of the California Environmental Quality Act (CEQA) pursuant to San Francisco Administrative Code section 31.04(h). The Planning Department has determined that the Project is exempt from the CEQA. The Commission will rely on that determination to make its decision on this action.

Background: The San Francisco Public Utilities Commission (SF PUC) Water Enterprise Moccasin Camp Water System (MCWS) is located above Moccasin camp east of the helipad and adjacent to the Moccasin Penstocks. MCWS is supplied from the Moccasin Penstocks and provides drinking water to the employees and residents of Moccasi n. The MCWS utilizes an ultraviolet system to treat the water prior to distribution and in extended outage periods relies upon the use of a temporary microfiltration system. The microfiltration unit is intended to treat raw water with a turbidity of less than 5 Nephelometric Turbidity Unit (NTU), and potentially as high as 100 NTU. Extended outage periods occur during scheduled winter shutdowns and outages for the ten- year Mountain
Tunnel Improvement project. During the 2017 and 2018 winter shutdowns, the SFPUC installed a portable microfiltration unit to treat raw water for the MCWS. The MCWS is regulated by the State of California, and it is critical to provide safe drinking water for the Moccasin Camp community. The installation of a permanent solution for microfiltration relieves the City of elevated costs associated with renting a temporary unit to support operations.

Scope of Contract: The contract work location is in Moccasin, Tuolumne County, California.

The contract work consists of:
• Construct permanent microfiltration facility to house filtration operations; and
• Install, test, and commission City furnished permanent microfiltration plant.

Contract: HH-1013, Moccasin Compound Water System Filtration Addition Commission Meeting Date: May 14, 2024

Page 2 ends

Funding and Costs: Funding Source: Hetch Hetchy Capital Improvement Program, Project No. 10014114, Mountain Tunnel Improvement Project
Engineer’s Estimate: $4,490,000
Award Amount: $4,177,936

Schedule: Estimated Notice-to-Proceed Date: July 2024
Estimated Completion Date: June 2025
Contract Duration: 346 consecutive calendar days (286 consecutive calendar days to Substantial Completion and an additional 60 consecutive calendar days to Final Completion)

Bid History: Advertised: December 11, 2023

Bids Received: On February 22, 2024, SFPUC received and publicly opened two bids, as follows:

Bid Rank Bid
Amount
LBE Bid
Discount
Adjusted
Bid
Final
Rank

1. Sierra Mountain
Construction, Inc. $4,177,936 N/A $4,177,936 1

2. Anvil Builders, Inc. $4,577,940 N/A $4,577,940 2

Application of bid preferences in accordance with Chapter 14B of the San Francisco Administrative Code did not change the final ranking of the low bidder.

Protest: On February 29, 2024, the official protest submission deadline date, SFPUC had not received a protest. After the protest submission deadline date, on March 1, 2024, Anvil Builders, Inc. sent email correspondence to SFPUC requesting review of the post -bid documents submitted by Sierra Mountain Construction, Inc. as Anvil Builders, Inc questioned whether Sierra Mountain Construction, Inc. met the minimum qualifications for the contract. On March 7, 2024, after completing the request for review, the Contract Administration Bureau, in consultation with the City Attorney and the Contract Monitoring Division, informed Anvil Builders ,
Inc that Sierra Mountain Construction,
Inc.’s post -bid documents met the minimum qualifications for the contract.

Considering this, Sierra Mountain Construction, Inc., remains the highest ranked bidder.

Environmental
Review:

On February 18, 2021, the San Francisco Planning Department determined the Project to be categorically exempt from environmental review under the CEQA Guidelines section 15303, Class 3 (Replacement or Reconstruction) under Case No. 2020-011950ENV. The exemption determination can be found here:

Contract: HH-1013, Moccasin Compound Water System Filtration Addition Commission Meeting Date: May 14, 2024

Page 3 ends

https://sfpuc.sharefile.com/public/share/web-
se8fa9e03d35547d5b0f3592973973410

This action constitutes the Approval Action for the Project for the purposes of the CEQA, pursuant to San Francisco Administrative Code section 31.04(h).

Local Business
Enterprise
Participation and
Non-Discrimination
in Contracting
The Contract Monitoring Division established a 10% Local Business Enterprise (LBE) subcontracting requirement for this Contract. The contractor committed to 11.9% LBE subcontractor participation with its bid submittal.

Attachment: 1. Contract Monitoring Division Memorandum
Contract: HH-1013, Moccasin Compound Water System Filtration Addition Commission Meeting Date: May 14, 2024

Page 4 ends

SITE LOCATION MAP
HH-1013 Moccasin Compound Water System Filtration Addition

Work will occur in Moccasin (circled)

PUBLIC UTILITIES COMMISSION
City and County of San Francisco

RESOLUTION NO.

WHEREAS, The San Francisco Public Utilities Commission (SFPUC) owns and operates the Moccasin Water Treatment Plant which serves the community of Moccasin in Tuolumne County, CA . The existing treatment plant requires additional supplemented temporary water treatment during annual water system maintenance periods . SFPUC is construction a permanent filtration facility to save capital and provide the highest quality potable water to Moccasin Camp; and
WHEREAS, On December 11, 2023, the SFPUC advertised Contract No. HH-1013, Moccasin Compound Water System Filtration Addition; and WHEREAS, The Engineer’s Estimate is $4,490,000 for this construction contract work to replace Moccasin’s aging wastewater treatment plant with a newer more efficient system; and WHEREAS, The Contract duration is 346 consecutive calendar days; and WHEREAS, On February 22, 2024, SFPUC received and publicly opened two bids; and WHEREAS, SFPUC staff and Contract Monitoring Division (CMD) reviewed the bids and the application of bid preferences and determined that Sierra Mountain Construction, Inc., is the responsible bidder with the lowest responsive bid; and
WHEREAS, CMD established a 10% Local Business Enterprise ( LBE) subcontracting participation requirement for this Contract, and Sierra Mountain Construction, Inc., committed to

11.9% LBE subcontracting participation in its bid submittal; and WHEREAS, On February 18, 2021, the San Francisco Planning Department determined the Project to be categorically exempt from environmental review under the California Environmental Quality Act Guidelines section 15303, Class 3 (Replacement or Reconstruction) under Case No. 2020-011950ENV; now, therefore, be it
RESOLVED, That this Commission hereby awards Contract No. HH-1013, Moccasin Compound Water System Filtration Addition, in the amount of $4,177,936, for a duration of 346 consecutive calendar days, to the responsible bidder that submitted the lowest responsive bid, Sierra Mountain Construction, Inc.

I hereby certify that the foregoing resolution was adopted by the Public Utilities Commission at its meeting of May 14, 2024.

Secretary, Public Utilities Commission
City & County of San Francisco
London N. Breed, Mayor
Office of the City Administrator
Carmen Chu, City Administrator

Contract Monitoring Division
Stephanie Tang, Director

1155 Market Street, 4th Floor, San Francisco, CA 94103 Telephone (415) 581-2310; Fax (415) 581-2351

MEMORANDUM
Date: March 12, 2024

To: Brian Tanko, SFPUC
Gary Hom, SFPUC

From: Jovi Cuntapay-Vitin, CMD

Subject: HH-1013 Moccasin Compound Water System Filtration Addition

The Contract Monitoring Division (“CMD”) has reviewed the bids submitted for the above referenced project, applied the appropriate bid discounts, and determined responsiveness to the Chapter 14B pre -award requirements. The Micro/Small -LBE subcontracting participation requirement is 10% for this project. The requirement is less than 20% due to the proximity of the project and in consideration of the bid results of other similar projects. Below is a summary of CMD’s review.

Bid Discount

Bidder
LBE Status,
Type and
Size
Base Bid LBE Bid
Discount
Adjusted Bid
with LBE
Bid Discount
Sierra Mountain
Construction, Inc.

Non-LBE $4,177,935.80 Not eligible $4,177,935.80
Anvil Builders, Inc. Non-LBE $4,577,940.00 Not eligible $4,577,940.00

LBE Subcontracting Participation Requirement

Sierra Mountain Construction, Inc. (“Sierra Mountain”) is the lowest responsive bidder. Sierra Mountain met the 10% Micro/Small LBE subcontracting requirement by listing the following Micro/Small LBE firms on Section 00 43 36 (Subcontractor List):

LBE
Subcontractor
Scope of
Work
LBE Status,
Type and
Size
Listed
Amount
Credited Participation
$ %
J. Hart Plumbing Partial Plumbing
& Supplies

PUC LBE-OBE
(Micro) $400,000 $400,000 9.57%
Pacific Engineering
& Construction, Inc.

Partial Building
Construction

SF LBE-OBE
(Micro) $60,000 $60,000 1.44%
Mission City Rebar Reinforced Steel PUC LBE-OBE
(Small) $36,978 $36,978 0.89%
TOTAL $496,978 $496,978 11.90%

7 Sierra Mountain also listed the following non-LBE subcontractors on Section 00 43 36.

Subcontractor Scope of Work Listed
Amount Participation
West Coast Water &
Trucking, Inc. Partial Trucking $1,500.00 0.04%
Augustine Planning
Associates, Inc. Environmental Consultant $1,500.00 0.04% Fusion Electric, Inc. Electrical $742,280.00 17.77%
TOTAL $745,280.00 17.84%

Good Faith Efforts Requirements

Sierra Mountain utilized Approach B (Inclusion of Micro-LBE) on CMD Form 2B to meet the Good Faith Efforts (“GFE”) Requirements. Sierra Mountain demonstrated that it met the GFE requirements under Approach B by listing the Micro-LBE firm: J. Hart Plumbing, Inc.

Based on the foregoing, CMD has determined that Sierra Mountain has complied with the pre - award Chapter 14B requirements. Should you have any questions, or if I can be of further assistance, please do not hesitate to contact me at [email protected].