DEPARTMENT Infrastructure

AGENDA NO. 6d

MEETING DATE

August 13, 2024

AGENDA ITEM
Public Utilities Commission
City and County of San Francisco

Calendar: Consent Calendar
Project Manager: Jimmy Leong

Award Contract No. HH-1015, O’Shaughnessy Dam Drainage and Miscellaneous Improvements

Summary of
Proposed
Commission Action:

Award Contract No. HH-1015, O’Shaughnessy Dam Drainage and Miscellaneous Improvements , to the responsible bidder that submitted the lowest responsive bid, Sierra Mountain Construction, Inc., in the amount of $5,285,955, and with a duration of 360 consecutive calendar days (approximately one year ), to improve drainage and safe access within O’Shaughnessy Dam, located in Yosemite National Park, Tuolumne County.

Background: The San Francisco Public Utilities Commission (SFPUC ) is responsible for operating O’Shaughnessy D am which is located 140 miles east of San Francisco, in Yosemite National Park, Tuolumne County. Initially constructed in the 1920’s to impound water within the
Hetch Hetchy Reservoir,
O’Shaughnessy Dam is the primary structure of the Hetch Hetchy system which includes the Hetch Hetchy Reservoir, the Canyon Power Tunnel, and the Robert C. Kirkwood Powerhouse. The dam, a concrete curved gravity structure, is located on the Tuolumne River. In 1938, the dam was raised to its present-day height.

The objective of this project is to improve drainage and safe access within the dam.

Scope of Contract: The contract work location is at O’Shaughnessy Dam , located in Yosemite National Park, Tuolumne County.

The contract work consists of:
• Selective concrete demotion, including removal and disposal; • Diversion Tunnel access improvements;
• Ladder well platforms replacements;
• Drain cleaning; and
• Watertight door replacement.

Funding and Costs: Funding Source: Hetchy Capital Improvement Program Project No. 10032903, O’Shaughnessy Dam Outlet Work Rehabilitation Phase 1
Engineer’s Estimate: $4,900,000
Award: $5,285,955

Agenda Title: HH-1015 O’Shaughnessy Dam Drainage and Miscellaneous Improvements Commission Meeting Date: August 13, 2024

Page 2 ends

Schedule: Estimated Notice-to-Proceed Date: September 2024 Estimated Final Completion Date: September 2025
Contract Duration: 360 consecutive calendar days (approximately twelve months) ( 300 consecutive calendar days to Substantial Completion and an additional 60 consecutive calendar days to Final Completion.)

Bid History:

Advertised: May 3, 2024

Bids Received: On June 20, 2024, the SFPUC received sealed bids from three firms and evaluated the bids as follows:

Bid Rank/Firm Base Bid
Amount
Bid
Preference
Compensable
Delay
(10-day
Duration)
Adjusted Bid Final
Rank

1. Sierra
Mountain
Construction,
Inc
$5,285,954.71 N/A $10 $5,285,964.71 1

2. Mountain
Cascade, Inc
$6,142,178.00 N/A $50,000 $6,192,178.00 2

3. NMI Industrial
Holdings, Inc
$9,949,220.00 N/A $100,000 $10,049,220.00 3

The Contract Monitoring Division (CMD) determined that none of the bidders are eligible for Local Business Enterprise (LBE) bid discount in accordance with Chapter 14B of the San Francisco Administrative Code.

Application of bid preferences in accordance with Chapter 14B of the San Francisco
Administrative Code did not change the final ranking of the low bidder.

Because the SFPUC anticipates that potential unforeseen conditions or other factors outside of the contractor’s control may impact the schedule, S taff included a requirement in the Invitation for Bids for bidders to provide a daily compensable time extensi on rate. At the bid opening, S taff announced that SFPUC would use the value of 10 days to calculate the Compensable Delay bid adjustment amount. Staff used the daily rate from the bids to determine the total Compensable Delay values shown in the table above by multiplying the bidder’s daily rate times 10. The Adjusted Bid value in the table above is the sum of the Base Bid and Compensable Delay less any applicable Local Business Enterprise and Social Impact Partnership Program bid discounts.

Staff used the Adjusted Bid value to compare and rank the bids to determine the lowest bidder. However, the contract award amount is the Base Bid value (not the Adjusted Bid value) and, if the Commission awards the Contract, the bidder’s daily compensable delay rate will become a term of the Contract.

Environmental
Review:

On July 16, 2020 , the San Francisco Planning Department determined the Project to be categorically exempt from environmental review under the Agenda Title: HH-1015 O’Shaughnessy Dam Drainage and Miscellaneous Improvements Commission Meeting Date: August 13, 2024

Page 3 ends

California Environmental Quality Act Guidelines section 15301, Class 1 (Existing Facilities) under Case Number 2020-004917ENV.

On January 24, 2024, the San Francisco Planning Department concurred that minor project revisions entailing potential delivery methods of water supply to the work site, clarifications regarding the methods of drain cleaning and discharge of related water, and use of a new staging area, do not change the conclusions of the categorical exemption.

The exemption determination and Planning Department concurrence can be found here: link.

Local Business
Enterprise
Participation and
Non-Discrimination
in Contracting:

The CMD established a 10% LBE subcontracting requirement for this contract. Sierra Mountain Construction, Inc. committed to a 11.39% LBE subcontractor participation with its bid submittal.

Attachment: 1. Contract Monitoring Division Memorandum
Agenda Title: HH-1015 O’Shaughnessy Dam Drainage and Miscellaneous Improvements Commission Meeting Date: August 13, 2024

Page 4 ends

PUBLIC UTILITIES COMMISSION
City and County of San Francisco
RESOLUTION NO.

WH
EREAS, The San Francisco Public Utilities Commission (SFPUC) is responsible for operating O’Shaughnessy Dam in Yosemite National Park, Tuolumne County; and WHEREAS, On May 3, 2024, SFPUC advertised Contract No. HH-1015, O’Shaughnessy Dam Drainage and Miscellaneous Improvements; and
WHEREAS, The Engineer’s Estimate is $4,900,000 for this construction work to improve drainage and safe access within the dam; and
WHEREAS, The contract duration is 360 consecutive calendar days; and WHEREAS, On June 20, 2024, SFPUC staff received and publicly opened three bids; and WHEREAS, SFPUC staff and the Contract Monitoring Division (CMD) reviewed the bids and the application of bid preferences and have determined that Sierra Mountain Construction, Inc. (SMCI) is the responsible bidder that submitted the lowest responsive bid; and WHEREAS, CMD established a 10% Local Business Enterprise (LBE) subcontracting requirement for this contract, and SMCI committed to 11.39% LBE subcontractor participation in its bid submittal; and
WHEREAS, On July 16, 2020, the San Francisco Planning De partment determined the Project to be categorically exempt from environmental review under the California Environmental Quality Act Guidelines section 15301, Class 1 (Existing Facilities) under Case Number 2020- 004917ENV; and
WHEREAS, On January 24, 2024, the San Francisco Planning Department concurred that minor project revisions entailing potential delivery methods of water supply to the work site, clarifications regarding the methods of drain cleaning and discharge of related water, and use of a new staging area, do not change the conclusions of the categorical exemption; and WHEREAS, Funds are available from Hetchy Capital Improvement Program funded Project No. 10032903, O’Shaughnessy Dam Outlet Work Rehabilitation Phase 1; now, therefore, be it
RESOLVED, That this Commission hereby awards Contract No. HH-1015 O’Shaughnessy Dam Drainage and Miscellaneous Improvements , in the amount of $5,285,955, for a duration of 360 consecutive calendar days, to the responsible bidder that submitted the lowest responsive bid, Sierra Mountain Construction, Inc.

I hereby certify that the foregoing resolution was adopted by the Public Utilities Commission at its meeting of August 13, 2024.

Director of Commission Affairs,
San Francisco Public Utilities Commission
City & County of San Francisco
London N. Breed, Mayor
Office of the City Administrator
Carmen Chu, City Administrator

Contract Monitoring Division
Stephanie Tang, Director

1455 Market Street, Suite 16A, San Francisco, CA 94103
Telephone (415) 554 0630

MEMORANDUM

Date: July 8, 2024

To: Jimmy Leong, SFPUC
Rafael Alcaraz, SFPUC

From: Jovi Cuntapay-Vitin, CMD

Subject: CMD Award Memo for HH-1015 O’Shaughnessy Dam Drainage and Miscellaneous Improvements

The Contract Monitoring Division (“CMD”) has reviewed the bids submitted for the above referenced project, applied the appropriate bid discounts, and determined responsiveness to the Chapter 14B pre-award requirements. The LBE subcontracting participation requirement is 10% for this project. The LBE subcontracting participation requirement is less than 20% due to (1) the remote location of the project; (2) the limited number of contractors with experience working in confined spaces like dams; and (3) the specialized scopes of work with limited LBE availability like high-pressure water jet drain cleaning and the watertight door. Below is a summary of CMD’s review.

Bid Discount

Bidder
LBE Status,
Type &
Size
Base Bid
Compensable
Delay
(10 days)
LBE Bid
Discount
Adjusted Bid
with LBE
Bid Discount
&
Compensable
Delay
Sierra Mountain
Construction, Inc. Non-LBE $5,285,954.71 $10.00 Not
eligible $5,285,964.71
Mountain Cascade, Inc. Non-LBE $6,142,178.00 $50,000.00 Not eligible $6,192,178.00
NMI Industrial Holdings Non-LBE $9,949,220.00 $100,000.00 Not eligible $10,049,220.00

LBE Subcontracting Participation Requirement

Sierra Mountain Construction, Inc. (“Sierra Mountain ”) is the lowest responsive bidder. Sierra Mountain met the 10% LBE subcontracting requirement by listing the following Micro/Small LBE firms on Section 00 43 36 (Subcontractor List):

Subcontractor Scope of Work LBE Status,
Type & Size
Listed
Amount
Credited
Participation
Amount Percent
Sabie Trucking,
Inc.

Partial Trucking &
Hauling

PUC LBE-MBE
(Micro) $ 2,000.00 $ 2,000.00 0.04%
Pacific
Engineering &
Construction Inc.

Rigging &
Hoisting/Quality
Control Testing

SF LBE-OBE
(Micro) $ 300,000.00 $ 300,000.00 5.68%
J. Hart Plumbing
Inc.

Partial Drain
Cleaning
Equipment/Partial
Water Treatment
Equipment

PUC LBE-OBE
(Micro) $ 300,000.00 $ 300,000.00 5.68%
TOTAL $ 602,000.00 $ 602,000.00 11.39%

Sierra Mountain did not list any non-LBE subcontractor on Section 00 43 36.

Good Faith Efforts Requirements

Sierra Mountain utilized Approach B (Inclusion of Micro-LBE) on CMD Form 2B to meet the Good Faith Efforts (“GFE”) Requirements. Sierra Mountain demonstrated that it met the GFE requirements under Approach B by listing the Micro-LBE firm: Sabie Trucking, Inc.

Based on the foregoing, CMD has determined that Sierra Mountain has complied with the pre - award Chapter 14B requirements. Should you have any questions, or if I can be of further assistance, please do not hesitate to contact me at [email protected].