DEPARTMENT

Infrastructure Division

AGENDA NO.

7a

MEETING DATE

January 14, 2025

AGENDA ITEM
Public Utilities Commission
City and County of San Francisco

Calendar: Consent Calendar
Contract Manager: Tedman Lee

Approve Amendment No. 2 to Contract No. PRO.0017, O’Shaughnessy Outlet Works

Summary of
Proposed
Commission Action:

Approve Amendment No. 2 to Contract No. PRO.0017,
O’Shaughnessy Outlet Works, with Black & Veatch Corporation, increasing the contract not- to-exceed amo unt by $1,5 00,000, and extending the contract duration by 1.5 years, for a total not -to-exceed contract amount of $5,250,000 and a total contract duration of 9.5 years, to continue providing engineering des ign and support services for drainage system improvements to address dam leakage, design for rehabilitation or replacement of the drum gates and slide gates, design of the new diversion pipe isolation valve, and supporting design of the new bulkhead system for the O’Shaughnessy Dam.

Background: The O’Shaughnessy Dam is located 140 miles east of San Francisco in Yosemite National Park, Tuolumne County. The concrete dam was initially constructed in the 1920s to impound the Tuolumne River to form the Hetch Hetchy Reservoir. The dam, a concrete curved gravity structure, was the key structure of the San Francisco Public Utilities Commission’s (SFPUC ) Hetch Hetchy pr oject, which als o included the construction of the Hetch Hetchy Reservoir, the Canyon Pow er Tunnel, and the Robert C. Kirkwood Powerhouse.

When O ’Shaughnessy Dam was raised in the 1930s, the reservoir outlet works and the needle and but terfly valves releasing to the Tuolumne River were encased in concrete. The isolati on syste m for these valves includes b oth shutte r and slide gates, but it is not functioning as int ended and does not allow the SFPUC ’s Hetch Hetchy Water & Po wer (HHWP) staff to perfor m maintenance on these critical needle and butterfly valves. In addition, many features of the dam ha ve reached the end of their service l ife and require refurbishment a nd improvemen ts. Furthe rmore, s everal areas of the dam require safety enhancements for protection of personnel.

On Octob er 25, 2016, by Resolution No. 16-0219, this C ommission awarded Cont ract No. PRO.0017, O’Shaughnessy Outlet Works , to Black & Veatch Corporation, with a contract not-to-exceed amount of $2,500,000, a nd a contract dur ation of four years, t o provide engineering services for access and drainage improvement s, drum and slide gates rehabilit ation, the new bulkhead system , rehabilitation of Agenda Title: PRO.0017, O’Shaughnessy Outlet Works
Commission Meeting Date: January 14, 2025

Page 2 ends

slide gates, and new diversion pipe isolation valve in stallation for the O’Shaughnessy Dam.

On January 26, 2021, by Re solution No. 21-0005, this Commission approved Amendment No. 1 to Contract No. PRO.0017, which included an incre ase of $1,250,000 to t he contract not-to-exceed amount, and an increase of four years to t he contract duration, for a total contract not-to-exceed amount of $3,750,000, and a total contract duration of eight years, to allow the contractor to co ntinue providing engineering services for access and drainage improvements, drum and slide gates rehabilit ation, the new bulkhead system , rehabilitation of slide gates, a nd new diversion pipe isolation valve installation for the O’Shaughnessy Dam.

During the construction of access and drai nage improvements to the existing drain system , crack locations in the supply well could not be verified so that aspect of the work scope was removed from the contract. Subsequent investigations have located the cracks in the supply well and connected them to the cracks in the lad der well. This crack remediation work will be r epackaged and issued to a job order contractor for implementation. SFPUC staff request s a contract extension of four y ears, to Ja nuary 31, 2029, to allow the contractor sufficient time to co mplete the remediation work and pr ovide construction support services.

SFPUC staff is also requesting an i ncrease in the contract not- to- exceed amount a t this time to allow the contractor to continue providing engineering design and support services for drainage system improvements to addr ess dam leakage, d esign for rehabilitation or replacement of the drum gates and slide gates, design of the new diversion pipe isolation valve, and supporting the design of the new bulkhead system.

Scope of Contract: The work unde r this contract consists o f providing professional engineering services for the following three sub-projects of the overall O’Shaughnessy Dam Outlet Works Rehabilitation Project:
• Access and Drainage Improvements
• Drum Gate Rehabilitation
• New Bulkhead System , Slide Gates Rehabili tation, a nd New Diversion Pipe Isolation Valve
The p rofessional services fo r th ese projects i nclude alternatives analysis and concep tual engineering, detailed design, a nd engineering information support for the environmental review, bid and award, and construction phases.

Modifications to the
Contract:

Amendment No. 1: On January 26, 2021, by Resolution No. 21-0005, this Commission approved an increase of $1,250,000 to the contact not- Agenda Title: PRO.0017, O’Shaughnessy Outlet Works
Commission Meeting Date: January 14, 2025

Page 3 ends

to-exceed amount, and an increase of four years to the contract duration, for a total contract not-to-exceed amount to $3,750,000, and a total contract duration of eight years, in order to allow the contractor to continue providing engineering ser vices for access and draina ge improvements, drum and slide gates rehabilitation, new bulkhead system rehabil itation, a nd new diver sion pipe isolation valv e installation for the O’Shaughnessy Dam.

Proposed A mendment No . 2: Staff recommends Commission approval of Amendment No. 2 to further increase the contract not- to- exceed amount by $ 1,500,000, and further extend the contract duration by 1.5 ye ars, for a total not -to-exceed contract amount of $5,250,000, and a total contract duration of 9.5 years, in order to allow the contractor to conti nue providing engineering design and suppor t services for drainage system improvements to address dam leakage, design for rehabi litation or replac ement of the drum ga tes and slide gates, design of the new diversion pipe isolation valve , and supporting design of the new bulkhead system for the O’Shaughnessy Dam.

Budget & Costs: Funding Source: Hetchy Water and P ower-funded Project No. 10032903– O’Shaughnessy Dam Outlet Works Phase 1.

Original Contract Not-To-Exceed Amount: $2,500,000
Amendment No. 1 Amount Increase: $1,250,000
Proposed Amendment No. 2 Amount Increase: $1,500,000
Total Contract Not-To-Exceed Amount: $5,250,000

Schedule: Original Contract Duration: Four years
Amendment No. 1 Duration Increase: Four years
Proposed Amendment No. 2 Duration Increase: 1.5 years
Total Contract Duration: 9.5 years

Environmental
Review:

Several of the projects named above have undergone environmental review under the California Environmental Quality A ct (CEQA) and received approval from this Commission:

• On July 16, 2020, under Case Number 2020-004917ENV, the San Francisco Planning Department determined the Access an d Drainage Improvements Project to be categorically exempt from environmental review under the CEQA Guidelines section 15301, Class 1 (Existing Facilities) . On August 13, 2024 , by Resolution No. 24-0166, this Commission approved the project . The Planning Department’s exemption determination can be found a t the followin g link : https://sfpuc.sharefile.com/public/share/web- sa9b70a04124e48ac8fe655cbff800f70

• On December 2, 2022, under Case Number 2022-011322ENV, the San Francisco P lanning Department deter mined the New Bulkhead System Project to be categorically exempt from Agenda Title: PRO.0017, O’Shaughnessy Outlet Works
Commission Meeting Date: January 14, 2025

Page 4 ends

environmental review under the CEQA Guidelines section 15301, Class 1 (Existing Facilities) and section 15302, Class 2 (Replacement or Reconstruction). O n June 13, 2023, by
Resolution N o. 23-0109, this Commission approved the project .

The Planning Department ’s exemption determination can be found at the following link: https://sfpuc.sharefile.com/d- s5388f3a1f0fc44b686463ef112009ff7

• On December 2, 2022, under Case Number 2022-004533ENV, the San Francisco Planning Department determined the New Diversion Pipe Isolation Valve Project to be categorically exempt from environmental review under the CEQA Guidelines section 15301, Class 1 (Existing Facilities) and section 15302, Class 2 (Replacement or Reconstruction). On June 13, 2023, by
Resolution No. 23-0111, this Commission approved the project.

The Planning Department’s exemption determination can be found here:
https://sfpuc.sharefile.com/d-
s423b4c77a11143fb826fafc2ce30a0cc

Amendment of this professional services contract does not otherwise fall within the defini tion of a “ project” under CEQA Guidelines section 15378 because work under the contract will consist of engineering design and support services only, and no engineering support du ring construc tion and closeout
services will be initiated
under this contract until CEQA review is complete and until this Commission has reviewed and considered the CEQA determination and has approved any of the other projects. Approval of individual task orders under this contract for activities such as geotechnical investigations would require compliance with CEQA prior to initiation of ground-disturbing activities.

Amendment of this professional services contract is not an approval of the proposed Drum Gate Rehabilitation project or the proposed Slide Gates Rehabili tation project, and the SFPUC retains discretion to, among other things, modify the proposed project (s) to mitigate significant environmental impacts, require the implementation of specific measures to mitigate any significant environmental impacts of the project(s), or reject the project(s) , fo llowing completion of environmental review.

Local Business
Enterprise
Utilization and Non-
Discrimination in
Contracting:

The Contract Monit oring Divisi on (CMD) established a Local Business Enterprise (LBE) subconsultant participation requirement of 20% participation for this contract. Black & Veatch committed to 20% LBE subcontractor participation w ith its p roposal, and this amount remains unchanged.

Attachment: 1. Contract Monitoring Division Memorandum
Agenda Title: PRO.0017, O’Shaughnessy Outlet Works
Commission Meeting Date: January 14, 2025

Page 5 ends

Subproject Name Current Budget Proposed Budget
Drum Gate Rehabilitation 497,289$ Planning 325,000$ 822,289$ Slide Gates 511,757$ Planning 200,000$ 711,757$ OSH Drainage & Misc Dam improvements 662,590$ ESDC 175,000$ 837,590$ Planning 150,000$
Design 475,000$
ESDC 175,000$
Other projects 2,078,364$ -$ 2,078,364$ TOTAL 3,750,000$ 1,500,000$ 5,250,000$ OSH Long Term Leakage Mitigation -$ 800,000$ Proposed Amendment 2 Modifications

Table 1: PRO.0017 Amendment No. 2 Summary

Figure 1: SFPUC O’Shaughnessy Dam

PUBLIC UTILITIES COMMISSION
City and County of San Francisco

RESOLUTION NO.

WHEREAS, The O’Shaughnessy Dam , located 140 m iles east of San Francisco i n Yosemite National Park, Tuo lumne County, was initially constructed in the 1920s to impound the Tuolumne River to form the Hetch Het chy Re servoir, a nd is the key structure of the San Francisco Public Utilities Commission’s (SFPUC) Hetch Hetchy project; and

WHEREAS, Many of the O'S haughnessy Dam features and systems have met their service life, requiring upgrades and refurbishment, and the services of a qualified professional engineering consultant are necessary to provide specialized services to supplement SFPUC staff; and

WHEREAS, On October 25, 2016, by Resolution 16-0219, the Commission a warded Contract No. PRO.0017, O’Shaughnessy Out let Works, to Black & Veatch Cor poration, with a contract not-to-exceed amount of $2,500,000, and a contract duration of four years, to provide engineering services for access and drainage improvements, drum and slide gates rehabilitation, new bulkhead system rehabilitation, and new diversion pipe isolation valve installation for the O’Shaughnessy Dam; and

WHEREAS, On Janua ry 26, 2021, by Resolut ion 21-0005, the Commission approved Amendment No. 1 t o Contract No. PRO.0017, increasing the contract not-to-exceed amount by $1,250,000, and the c ontract duration by four years, for a total contract not- to-exceed amount of $3,750,000, and a total contract duration of eig ht years, to allow the contra ctor to continue providing engineering ser vices for a ccess and drainage improvements, drum a nd slide g ates rehabilitation, ne w bulkhead s ystem rehabilitation, and n ew diversion pipe isolation valve installation for the O’Shaughnessy Dam; and

W
HEREAS, SFPUC s taff recommends the Commission approve Amendment No. 2 to further increase the contract not-to-exceed amount by $1,500,000, and further extend the contract duration by 1.5 years, for a new total contract not-to-exceed amount of $5,250,000 and a new total contract dur ation of 9.5 years, to allow the contractor to contin ue providing engineering design and support s ervices for drainage system improvements to address dam leakage, design for rehabilitation or repla cement of the drum gates and slide gates, design of the new diversion pipe isolation valve, and supporting design of the new bulkhead system for t he O’Shaughnessy Dam; and

WHEREAS, The Contract Monitoring Division (CMD) established a Lo cal Business Enterprise (LBE) subconsultant participation requirement of 20% for this contract, and B lack and Veatch Corp oration committed to a LBE subconsultant pa rticipation of 20% w ith their proposal, and this remains unchanged; and

WHEREAS, Several of the projects have undergone environmental review under the California Environmental Quality Act (CEQA) and received approval from this Commission:

• On July 16, 2020, under Case Number 2020-004917ENV, the San Francisco Planning Department determined the Access and Drainage I mprovements Project to be categorically exempt from environmental review under the CEQA Guidelines section 15301, Class 1 (Existing Facilities), and on August 13, 2024, by Resolution No. 24-0166, this Commission approved the project; and • On December 2, 2022, under Case Number 2022-011322ENV, the San Francisco Planning Department deter mined the New Bulkhead System Project to be categorically exempt from environmental review under the CEQA Guideli nes section 15301, Cl ass 1 (Existing Facilities) and section 15302, Class 2 (Replacement or Reconstruction), and on June 13, 2023 by Resolution N o. 23- 0109, this Commission approved the project; and
• On December 2, 2022, under Case Number 2022-004533ENV, the San Francisco Planning Department determined the New Diversion Pipe Isolation Valve Project to be categorically exempt from environmental review under the CEQA Guidelines section 15301, Class 1 (Existing Facilities) and section 15302, Class 2 (Replacement or Reconstruction), and on June 13, 2023 by Resolution N o. 23- 0111, this Commission approved the project; and

WHEREAS, Amendment of this pro fessional services contract does not otherwise fall within the de finition of a “project” under CEQA Guidelines section 15378 because work under the contract will consist of e ngineering design and support services only, and no engineering support during construction and closeout services will be initiated under this con tract until CEQA review is complete and until this Commission has reviewed and considered the CEQA determination and has approved any of the other projects, and approval of individual task orders under this contract for activities such as geotechnical inve stigations would require compliance with CEQA prior to initiation of ground-disturbing activities; and

WHEREAS, Amendment of this professional services contract is not an approval of the proposed Drum Gate Rehabi litation project or the proposed Slide Gat es Rehabilitation project, and the SFPUC retains discretion to, among other things, modify the proposed project (s) to mitigate significant environmental imp acts, require the implementation of specific measures to mitigate any significant environmental impacts o f the project(s) , or reject the project (s), following completion of environmental review; and

WHEREAS, Funds for this Amendment No. 2 are available from Project No. 10032903, O’Shaughnessy Dam Outlet Works Phase 1; and

WHEREAS, No Engineering Support During Bid and Award, Construction, Start-up, and Closeout services will be initiated under this contract un til CEQA review is complete and until this Com mission has reviewed and consider ed the CEQA determinatio n and approve d the Project; now, therefore, be it

RESOLVED, That this Commission hereby approves Amendment No. 2 to Contract No.

PRO.0017, O’Shaughnessy Ou tlet Works, with Black & Veat ch Corporation, increasing th e contract not-to-exceed amount by $1,500,000, and extendin g the contract duration by 1.5 years, for a total contract not-to-exceed amount of $5,250,000 and a total contract duration of 9.5 years, to allow the contractor to continue providing engine ering design and s upport services for drainage system improvements to address dam leakage, design for rehabilitation or replaceme nt of the drum gates and slide gates, design of the new diversion pipe isolation valve, and to support design of the new bulkhead system for the O’Shaughnessy Dam.

I hereby certify that the foregoing resolution was adopted by the Public Utilities Commission at its meeting of January 14, 2025.

Director of Commission Affairs
San Francisco Public Utilities Commission

City & County of San Francisco
London N. Breed, Mayor
Office of the City Administrator
Carmen Chu, City Administrator

Contract Monitoring Division
Stephanie Tang, Director

1455 Market Street, Suite 16A, San Francisco, CA 94103
Telephone (415) 554 0630

MEMORANDUM

Date: December 3, 2024

To: Tedman Lee, SFPUC

From: Jason Chow, CMD

Subject: CMD’s Amendment # 2 Review for PRO.0017 O’Shaughnessy Outlet Works REVISION #1

The San Francisco Public U tilities Commission (“SFPUC”) has requested an amendment for the above referenced contract by increasing the contract amount b y $1,500,000.00 for a total agreement amount of $5,250,000.00. Per the SFPUC , the scope of work for Amendment #2 consists of the continuati on of providing engineering work.

LBE Subconsulting Participation

The LBE subconsulting participation requirement estab lished for this contract is 20%. Black & Veatch Corporation (“B&V”) committed to a 20% LB E participation for this contract. Th e LBE subc onsulting participation commitment applies to the entire contract including any amendments, change orders and amendments. The LBE participation reflected on the B&V’s CMD Form 2A as amended by CMD’s Amendment #1 is as follows:

Subcontractor Scope of Work Status, Type and
Size
LBE Credited
Participation
Structus, Inc. Structural tasks associated
with the access ladder
inspection and design, the
bulk rehabilitation and
concrete rehabilitation

SF LBE-MBE
(Micro)

4.67%
AMC Consulting Engineers Structural engineering and
inspection services for the
access ladder improvements

SF LBE-MBE
(Micro)

12.67%
Bay Area Coating Consulting Provide coating inspection
and design services

PUC-LBE-OBE
(Small)

1.33%
KKL Consulting LLC (“KKL”) Dam and Drum Gate Advisory
Services

SF LBE-MBE
(Micro)
---1
Apex Testing Laboratories Provide Material Testing
Services

SF LBE-MBE
(Small)

0.67%
LEE Inc. Dam and Drum Gate Advisory
Services

SF LBE-WBE
(Micro)

0.67%

1 KKL withdrew from the contract. B&V reallocated KKL’s listed commitment to LEE Inc.

TOTAL 20.00%

As of August 30, 2024, the LBE participation achieved by B&V is as follows:

Per communications with B&V, APEX Testing’s (“APEX’s”), Bay Area Coating C onsulting’s (“BACC’s”) and Lee, Inc.’s (“Lee’s ”) LBE participation to -date is at 0.00% because their listed scopes of work hav e not surfaced. However, B&V confirmed that it is committed in utilizing APEX, BACC and Le e for its respective listed scopes of work in the next stage of this project when it is issued/released by SFPUC.

B&V is required to make good faith efforts to utilize L BEs for any scope of work, or portions thereof, which can reasonably be subcontracted out throughout the life of the contract. In light of t his requirement, B&V has performed good faith outreach to LBE firms. As part of its good faith efforts and as no ted in the table above, B&V added Lee, an LBE subconsultant, to its team to ensure that KK L’s participation, commitment and scope of work will be covered.

Based on the foregoi ng, B&V confirmed that it will remain committed to assigning work that may arise from future task orders to its original listed LBE subconsultants. B&V informed the CMD t hat it anticipates meeting its 20.00% LBE commitment, as follows:

Subcontractor Scope of Work
Status,
Type and
Size

Credited LBE
Participation
LBE Participation To-Date
(NOT including Modification No. 2)
Invoiced
Structus, Inc. Structural tasks
associated with the
access ladder inspection
and design, the
bulkhead rehabilitation
and concrete
rehabilitation

SF LBE-MBE
(Micro)

4.67% $77,254.22 3.50%
AMC Consulting
Engineers
Structural engineering
and inspection services
for the access ladder
improvements

SF LBE-MBE
(Micro)

12.67% $245,872.54 11.14%
Bay Area Coating
Consulting
Provide coating
inspection and design
services

PUC-LBE-
OBE
(Small)

1.33% $0.00 $0.00
KKL Consulting LLC Dam and Drum Gate
Advisory Services

SF LBE-MBE
(Micro)
--- --- ---
Apex Testing
Laboratories
Provide Material Testing
Services

SF LBE-MBE
(Small)

0.67% $0.00 $0.00%
LEE Inc. Dam and Drum Gate
Advisory Services

SF LBE-WBE
(Micro)

0.67% $0.00 0.00%
TOTAL 20.00% $323,126.76 14.65%
Subcontractor Scope of Work Status, Type and
Size
Projected LBE Participation
for entire contract –
Including this Modification
No. 2
(Based on $5,250,000 not to
exceed amount)

Going forward, SFPUC staff and B&V will obtain CMD approval for each subconsultant addition and LBE substitution according to established procedures. Additionally, in order to ensure compliance with the LBE ordinance and requirements, the SFPUC and B&V must notify CMD of any changes to the scope of work as well as any changes to informat ion provi ded to C MD. Co ntingent on the conditi ons set forth above, CMD approves the subject amendment/modification.

Should you have any questions, please contact me at [email protected]

Structus, Inc. Structural tasks
associated with the
access ladder inspection
and design, the bulk
rehabilitation and
concrete rehabilitation

SF LBE-MBE
(Micro)
$245,175.00 4.67%
AMC Consulting
Engineers
Structural engineering
and inspection services
for the access ladder
improvements

SF LBE-MBE
(Micro)
$665,175.00 12.67%
Bay Area Coating
Consulting
Provide coating
inspection and design
services

PUC-LBE-OBE
(Small)
$69,825.00 1.33%
KKL Consulting LLC Dam and Drum Gate
Advisory Services

SF LBE-MBE
(Micro)
--- ---
Apex Testing
Laboratories
Provide Material Testing
Services

SF LBE-MBE
(Small)
$35,175.00 0.67%
LEE Inc. Dam and Drum Gate
Advisory Services

SF LBE-WBE
(Micro)
$35,175.00 0.67%
TOTAL

$1,050,525.00 20.00%