AGENDA ITEM
Public Utilities Commission
City and County of San Francisco
DEPARTMENT Water Enterprise AGENDA NO. 10
MEETING DATE September 9, 2025
Calendar: Regular Calendar
Contract Manager: Amelia Clark
Approve Amendments No. 2 to Contract Nos. PRO.0188.A, B, C, and D, As-Needed Specialized and Technical Services, Water Enterprise, To Increase the Contract Amount
Summary of Proposed
Commission Action:
Approve Amendments No. 2 to Contract Nos. PRO.0188.A, B, C, and D for As -Needed Specialized and Technical Services, Water Enterprise, with Kennedy Jenks Consultants, Inc. and Applied Technology & Science, Joint Venture (PRO.0188.A), AECOM Technical Services, Inc. and Water Resources Engineering, Inc., Joint Venture (PRO.0188.B), Woodard & Curran, Inc. and SRT
Consultants, Joint Venture (PRO.0188.C), and Brown and Caldwell and Lotus, Joint Venture (PRO.0188.D) increasing each c ontract amount by $2,500,000, for a new total not-to-exceed contract amount of $7,500,000 for each contract, with no change to the contract duration, to continue providing critical, short- term, highly specialized work related to the operations and management of the San Francisco Public Utilities Commission’s Water Enterprise.
Background: The San Francisco Public Utilities Commission (SFPUC) retain s the services of qualified consultants to perform short -term, highly specialized work related to operations and management of the SFPUC Water Enterprise through As -Needed C ontracts. The SFPUC Water Enterprise is responsible for managing the transmission, treatment, storage and distribution of water to San Francisco’s wholesale and retail customers. The SFPUC supplies drinking water to 2.7 million customers in Alameda, Santa Clara, San Mateo and San Francisco counties. The consultants are critical in assisting SFPUC staff on various SFPUC projects on an as -needed basis and are called upon to provide specialized and technical services for projects at any stage.
On June 14, 2022, by Resolution No. 22- 0015, this Commission awarded Contract Nos. PRO.0188.A, B, C and D, As - Needed Specialized and Technical Services, Water Enterprise, each with an amount not to exceed $5,000,000, and each with a duration of five years to Kennedy Jenks Consultants, Inc. and Applied Technology & Science, Joint Venture (KJ/A -T-S JV) (PRO.0188.A), AECOM Technical Services, Inc. and Water Resources Engineering, Inc., Joint Venture (AECOM/WRE JV) (PRO.0188.B), Woodard & Curran, Inc. and SRT Consultants, Joint Venture (Woodard & Curran/SRT JV)
(PRO.0188.C), and Brown and Caldwell and Lotus, Joint Venture (Brown and Caldwell/Lotus JV) (PRO.0188.D).
Agenda Title: Contract Nos. PRO.0188.A, B, C and D for As-Needed Specialized and Technical Services, Water Enterprise Commission Meeting Date: September 9, 2025
Scope of Contract: The contract work locations are at any of the locations in which the Water Enterprise operates, including but not limited to San Francisco, Millbrae, Burlingame, Sunol, Moccasin, and Hetch Hetchy.
The work under these agreements may consist of, but is not limited to, the following specialized and technical as-needed services:
• Water supply services;
• Water quality services;
• Water treatment services;
• Natural resources services;
• Management improvement services;
• Asset management services;
• Land management services;
• Security and emergency response services;
• Environmental and regulatory compliance services;
• Health and safety services; and,
• Customer-related analytical services.
The consultants could be called upon to provide the following types of technical skills for any of the scope areas listed above, as applicable:
• Technical and financial analyses and studies;
• Report writing and document development;
• Modeling;
• Forecasting and planning;
• Monitoring and surveying;
• Development and review of conceptual engineering plans to enable the Water Enterprise to decide which projects to design under a separate Chapter 6 contract;
• Inspection, condition assessment and alternative analyses; • Response to regulatory and compliance measures and/or audits; • Program development and implementation;
• Outreach and education;
• Organizational strategies and training;
Agenda Title: Contract Nos. PRO.0188.A, B, C and D for As-Needed Specialized and Technical Services, Water Enterprise Commission Meeting Date: September 9, 2025
• Leadership development and conflict resolution;
• Instrumentation and technology support; and,
• Grants and loans strategy, application and reporting.
Amendments to the
Contract:
Amendment No. 1:
Effective February 8, 2023, the SFPUC modified Contract Nos.
PRO.0188.A, B, C, and D to insert terms for reimbursable cost s that comport with the underlying Request for Proposals.
Proposed Amendment No. 2:
Staff recommends Commission approval of Amendment s No. 2 to Contract Nos. PRO.0188.A, B, C, and D, to increase each contract by $2,500,000, to continue providing critical, short - term, highly specialized work related to the operations and management of the SFPUC’s Water Enterprise, for a total not -to-exceed amount of $7,500,000 per contract, with no change to the contract duration.
Funding and Costs: Funding Source:
Funds will be available from Water Enterprise operating and capital budgets at the time of individual task order awards.
Original Not-to-Exceed Amount: $5,000,000 (per contract) Total Modifications to Date (No. 1): $0 (per contract)
Proposed Modification No. 2: $2,500,000 (per contract)
Total Not-To-Exceed Contract Amount: $7,500,000 (per contract)
Schedule: Original Duration: five years (per contract)
Modification No. 1 Duration: no change (per contract)
Proposed Modification No. 2 Duration: no change (per contract) Total Duration: five years (per contract)
Environmental Review: Amendment of these professional services contracts does not constitute a “project” under the California Environmental Quality Act (CEQA) Guidelines section 15378 because it does not involve commitment to any specific project that may result in a direct or indirect physical change in the environment. Staff will not approve any work involving ground disturbance or any other physical changes to the environment under these contracts until the proposed work is reviewed and any appropriate environmental review under the CEQA, if required, has been completed.
Local Business
Enterprise Participation
and Non-Discrimination
In Contracting:
The Contract Monitoring Division established a 15% Local Business Enterprise (LBE) subcontracting requirement for this contract.
KJ/A-T-S JV (PRO.0188.A), AECOM/WRE JV (PRO.0188.B),
Woodard & Curran/SRT JV (PRO.0188.C), and Brown and
Caldwell/Lotus JV (PRO.0188.D), committed to LBE subcontractor participation of 15%, 20.25%, 15% and 21% respectively with their proposals, and these amounts remain unchanged.
Attachment(s): CMD Modification Memos (PRO.0188.A, B, C and D)
PUBLIC UTILITIES COMMISSION
City and County of San Francisco
RESOLUTION NO.
WHEREAS, The San Francisco Public Utilities Commission (SFPUC) retain s the services of qualified consultants to perform short -term, highly specialized work related to the operations and management of the SFPUC Water Enterprise through as-needed contracts. The consultants are critical in assisting SFPUC staff on various Water Enterprise projects on an as- needed basis and are called upon to provide specialized and technical services for projects at any stage; and
WHEREAS, On June 14, 2022, by Resolution No. 22- 0015, the Commission awarded Contract Nos. PRO.0188.A, B, C and D for As-Needed Specialized and Technical Services, Water Enterprise, each for an amount not-to-exceed $5,000,000, and each with a duration of five years, to Kennedy Jenks Consultants, Inc. and Applied Technology & Science, Joint Venture (KJ/A -T- S JV) (PRO.0188.A), AECOM Technical Services, Inc. and Water Resources Engineering, Inc., Joint Venture (AECOM/WRE JV) (PRO.0188.B), Woodard & Curran, Inc. and SRT Consultants, Joint Venture (Woodard & Curran/SRT JV) (PRO.0188.C), and Brown and Caldwell and Lotus, Joint Venture (Brown and Caldwell/Lotus JV) (PRO.0188.D); and
WHEREAS, On February 8, 2023, the SFPUC executed Amendments No. 1 for Contract Nos. PRO.0188.A, B, C and D , to insert terms for reimbursable costs that comp ort with the underlying Request for Proposals; and
WHEREAS, Amendment of these professional services contracts does not constitute a “project” under the California Environmental Quality (CEQA) Guidelines section 15378 because it does not involve commitment to any specific project that may result in a direct or indirect physical change in the environment , and Staff will not approve any work involving ground disturbance or any other physical changes to the environment under these contracts until the proposed work is reviewed and any appropriate environmental review under the CEQA, if required, has been completed; and
WHEREAS, Staff recommends that this Commission approve Amendment s No. 2 to Contract Nos. PRO.0188.A, B, C, and D, As -Needed Specialized and Technical Services, Water Enterprise, to increase each contract by $2,500,000, for a total not -to-exceed contract amount of $7,500,000 per contract, with no change to the duration, to continue providing critical, short - term, highly specialized work related to the operations and management of the SFPUC’s Water Enterprise; and
WHEREAS, The Contract Monitoring Division established a 15% Local Business Enterprise (LBE) subcontracting requirement for these contracts; and KJ/A-T-S JV (PRO.0188.A), AECOM/WRE JV (PRO.0188.B), Woodard & Curran/SRT JV (PRO.0188.C), and Brown and Caldwell/Lotus JV (PRO.0188.D) committed to LBE subcontractor participation of 15%,
20.25%, 15% and 21% respectively with their proposals, and these amounts remain unchanged; and
WHEREAS, Funds for these contracts are available from Water Enterprise operating and capital budgets at the time of individual task order awards; now, therefore, be it
RESOLVED, That this Commission hereby approves Amendments No. 2 to Contract Nos. PRO.0188.A, B, C , and D for As -Needed Specialized and Technical Services, Water Enterprise, with KJ/A-T-S JV (PRO.0188.A), AECOM/WRE JV (PRO.0188.B), Woodard & Curran/SRT JV (PRO.0188.C), and Brown and Caldwell/Lotus JV (PRO.0188.D), to continue providing critical, short-term, highly specialized work related to the operations and management of the SFPUC’s Water Enterprise , increasing each contract amount by $2,500,000, for a total not-to-exceed contract amount of $7,500,000, with no change to the duration of each contract.
I hereby certify that the foregoing resolution was adopted by the San Francisco Public Utilities Commission at its meeting of September 9, 2025.
Director of Commission Affairs
San Francisco Public Utilities Commission
City & County of San Francisco
Daniel Lurie, Mayor
Office of the City Administrator
Carmen Chu, City Administrator
Contract Monitoring Division
Regina Chan, Director
MEMORANDUM
Date: August 13, 2025
To: Amelia Clark, SFPUC
From: Jason Chow, CMD
Subject: PRO.0188.A As-Needed Technical and Specialized Services, Water Enterprise CMD Amendment #1 (SFPUC’s Amendment #2) Review
SFPUC has requested to modify the above referenced contract by $2,500,000.00 for a total contract agreement amount of not-to-exceed $7,500,000.00 with no change to the contract duration. This request is to perform short-term, highly specialized work on an as-needed basis related to the operations and management of the SFPUC Water Enterprise covering the following service areas: Water supply services, Water quality services, Water treatment services, Natural resources services, Management improvement services, Asset management services, Land management services, Security and emergency response services, Environmental and regulatory compliance services, Health and safety services, and Customer-related analytical services.
LBE Joint Venture Partner Participation Commitment:
At the time of award, KJ/ATS JV received a 7.5% rating bonus because the proposed joint venture included 40% in prime level participation by ATS, the LBE joint venture partner. This commitment applies to the entire contract, including any amendments.
The breakdown of the to-date achieved/projected to be achieved prime level work by the joint venture KJ/ATS JV is as follows:
JV Partners JV Commitment JV Participation To-Date Projected JV Participation— Including Amendment #1
KJ (Non-LBE)
60% $1,324,146.00 92.79% $2,989,420.00 58.74%
ATS (LBE) 40% $102,939.00 7.21% $2,100,000.00 41.26%
TOTAL: $1,427,085.00 100.00% $5,089,420.00 100.00%
Based on the information provided by KJ/ATS JV, they plan to exceed their LBE JV participation commitment percentage for the overall contract (see table above). However, the LBE JV partner’s participation to-date is less than the 40% commitment. As such, CMD will continue to closely monitor the JV participation on this contract. That said, CMD reminded the JV, that the LBE JV partner
1455 Market Street, 16A Suite, San Francisco, CA 94103
Telephone (415) (415) 554-0630 General Email [email protected]
participation commitment of 40% will need to be achieved at the end. If not, then CMD, potentially can impose sanctions—KJ/ATS JV acknowledged the importance of this matter.1
LBE Subconsultant Participation Commitment:
The LBE subcontracting participation requirement established for this contract is 15%. The LBE subcontracting participation requirement applies to the entire contract including any modifications, change orders and amendments.
The LBE participation reflected on the Prime subconsultant, KJ/ATS JV, CMD’s Form 2A at the time of proposal is as follows:
Subcontractor Scope of Work LBE Status, Type
and Size Credited Participation
CADNET CAD SF LBE-WBE (Micro)
1.50%
Cornerstone Consulting &
Technology Inc.
Employment Development
Programs SF LBE-MBE (Micro)
3.00%
Coast Ridge Ecology LLC Habitat Environmental Services SF LBE-OBE (Micro) 1.00% McGovern McDonald
Engineers Environmental Advisory Services SF LBE-WBE (Micro)
2.50%
Meridian Surveying
Engineers Surveying (Land & Aerial) SF LBE-OBE (Micro)
0.50%
Merrill Morris Partners Landscape Architecture SF LBE-WBE (Micro) 0.50% Natalie Macris Urban & Regional Planning,
Environmental Impact Reports SF LBE-WBE (Micro)
0.50%
Panorama Environmental Regulatory Compliance Assistance SF LBE-WBE (Small) 1.00% Saylor Consulting Group Construction Management SF LBE-WBE (Small)
1.00%
SCA Environmental Hazardous Waste and Remediation
Services SF LBE-WBE (Micro)
1.00%
Terra Engineers Geotechnical Engineering SF LBE-WBE (Micro) 2.50% TOTAL 15.00%
As of July 23, 2025, the LBE participation achieved by KJ/ATS JV is as follows:
Subconsultant
Scope of Work LBE Status,
Type and Size Credited
Participation
LBE Participation To-Date—NOT
including Modification No. 1
($2,437,394.00 invoiced)
CADNET
CAD SF LBE-WBE
(Micro)
1.50%
$14,907.00
0.61%
1 This communication was provided by KJ/ATS JV to CMD via email correspondences on July 31, 2025.
Cornerstone
Consulting &
Technology Inc.
Employment
Development
Programs
SF LBE-MBE
(Micro)
3.00%
$65,432.00
2.68%
Coast Ridge
Ecology LLC
Habitat
Environmental
Services
SF LBE-OBE
(Micro)
1.00%
$0.00
0.00%
McGovern
McDonald
Engineers
Environmental
Advisory Services
SF LBE-WBE
(Micro)
2.50%
$64,159.00
2.63%
Meridian
Surveying
Engineers
Surveying (Land &
Aerial)
SF LBE-OBE
(Micro)
0.50%
$67,580.00
2.77%
Merrill Morris
Partners
Landscape
Architecture
SF LBE-WBE
(Micro)
0.50%
$4,065.00
0.17%
Natalie Macris
Urban & Regional
Planning,
Environmental
Impact Reports
SF LBE-WBE
(Micro)
0.50%
$0.00
0.00%
Panorama
Environmental
Regulatory
Compliance
Assistance
SF LBE-WBE
(Small)
1.00%
$0.00
0.00%
Saylor Consulting
Group
Construction
Management
SF LBE-WBE
(Small)
1.00%
$45,913.00
1.88%
SCA
Environmental
Hazardous Waste and
Remediation Services
SF LBE-WBE
(Micro)
1.00%
$68,550.00
2.81%
Terra Engineers Geotechnical
Engineering
SF LBE-WBE
(Micro)
2.50%
$0.00
0.00%
TOTAL 15.00% $330,606.00 13.55%
Pursuant to communication between KJ/ATS JV and the SFPUC, due to the As-Needed nature of this con- tract, some of the listed LBE subconsultants have not yet been utilized to date, this is because the LBE scopes of services have not yet been requested by the SFPUC. Due to said circumstances, CMD followed- up with KJ/ATS JV and, the JV acknowledged its commitment to meeting its original overall commitment percentage from time of proposal for the entire contract— will remain committed to assigning work to its listed LBE subcontractors and continue to look for opportunities to utilize LBEs on its task orders.2
Based on the foregoing and taking into consideration the proposed increase and the original contract amount, KJ/ATS JV foresees it will meet its original overall LBE subconsulting participation commitment of 15% with the following:
Subconsultant
Scope of Work LBE Status,
Type and Size
Credited
Participation
Projected LBE Participation —
Including Modification No. 1
(Based on $7.5M not to exceed
amount)
2 This communication was provided by KJ/ATS JV to CMD via email correspondences on July 31, 2025.
CADNET
CAD
SF LBE-WBE
(Micro)
1.50%
$112,500.00
1.50%
Cornerstone Consulting
& Technology Inc.
Employment
Development
Programs
SF LBE-MBE
(Micro)
3.00%
$225,000.00
3.00%
Coast Ridge Ecology LLC
Habitat
Environmental
Services
SF LBE-OBE
(Micro)
1.00%
$75,000.00
1.00%
McGovern McDonald
Engineers
Environmental
Advisory Services
SF LBE-WBE
(Micro)
2.50%
$187,500.00
2.50%
Meridian Surveying
Engineers
Surveying (Land &
Aerial)
SF LBE-OBE
(Micro)
0.50%
$37,500.00
0.50%
Merrill Morris Partners Landscape
Architecture
SF LBE-WBE
(Micro)
0.50%
$37,500.00
0.50%
Natalie Macris
Urban & Regional
Planning,
Environmental Impact
Reports
SF LBE-WBE
(Micro)
0.50%
$37,500.00
0.50%
Panorama
Environmental
Regulatory
Compliance
Assistance
SF LBE-WBE
(Small)
1.00%
$75,000.00
1.00%
Saylor Consulting Group Construction
Management
SF LBE-WBE
(Small)
1.00%
$75,000.00
1.00%
SCA Environmental Hazardous Waste and
Remediation Services
SF LBE-WBE
(Micro)
1.00%
$75,000.00
1.00%
Terra Engineers Geotechnical
Engineering
SF LBE-WBE
(Micro)
2.50%
$187,500.00
2.50%
TOTAL 15.00% $1,125,000.00 15.00%
The SFPUC staff and KJ/ATS JV shall continue to notify CMD of any changes that may impact LBE partici- pation. Additionally, SFPUC staff and/or KJ/ATS JV must continue to notify CMD of any proposed subcon- sultant additions and/or substitutions throughout the term of this contract. Contingent upon the condi- tions set forth above, CMD concurs with this amendment.
Should you have any questions, please contact Jason Chow at [email protected].
City & County of San Francisco
Daniel Lurie, Mayor
Office of the City Administrator
Carmen Chu, City Administrator
Contract Monitoring Division
Regina Chan, Director
MEMORANDUM
Date: August 13, 2025
To: Amelia Clark, SFPUC
From: Jason Chow, CMD
Subject: PRO.0188.B As-Needed Technical and Specialized Services, Water Enterprise CMD Amendment #1 (SFPUC’s Amendment #2) Review
SFPUC has requested to modify the above referenced contract by $2,500,000.00 for a total contract agreement amount of not-to-exceed $7,500,000.00 with no change to the contract duration. This request is to perform short-term, highly specialized work on an as-needed basis related to the operations and management of the SFPUC Water Enterprise covering the following service areas: Water supply services, Water quality services, Water treatment services, Natural resources services, Management improvement services, Asset management services, Land management services, Security and emergency response services, Environmental and regulatory compliance services, Health and safety services, and Customer-related analytical services.
LBE Joint Venture Partner Participation Commitment:
At the time of award, AECOM/WRE JV received a 7.5% rating bonus because the proposed joint venture included 40% in prime level participation by Water Resources Engineering, the LBE joint venture partner.
This commitment applies to the entire contract, including any amendments.
The breakdown of the to-date achieved/projected to be achieved prime level work by the joint venture AECOM/WRE JV is as follows:
JV Partners JV Commitment JV Participation To-Date Projected JV Participation— Including Amendment #1
AECOM Technical Services
(Non-LBE)
60%
$1,648,414.60
71.03% $3,350,686.10 60%
Water Resources
Engineering (LBE) 40% $672,285.80 28.97% $2,233,790.70 40% TOTAL: $2,320,700.40 100.00% $5,584,476.80 100.00%
Based on the information provided by AECOM/WRE JV, they will meet their LBE JV participation commitment percentage for the overall contract (see table above). However, the LBE JV partner’s participation to-date is less than the 40% commitment. As such, CMD will continue to closely monitor the JV participation on this contract. That said, CMD reminded the JV, that the LBE JV partner
1455 Market Street, 16A Suite, San Francisco, CA 94103
Telephone (415) (415) 554-0630 General Email [email protected]
participation commitment of 40% will need to be achieved at the end. If not, then CMD, potentially can impose sanctions—AECOM/WRE JV acknowledged the importance of this matter.1
LBE Subconsultant Participation Commitment:
The LBE subcontracting participation requirement established for this contract is 15%. The LBE subcontracting participation requirement applies to the entire contract including any modifications, change orders and amendments.
The LBE participation reflected on the Prime subconsultant, AECOM/WRE JV, CMD’s Form 2A at the time of proposal is as follows:
Subcontractor Scope of Work LBE Status, Type
and Size Credited Participation
AEW Engineering Hazardous Material (Env. &
Regulatory Compliance) SF LBE-MBE (Micro)
1.00%
BioMAas Biological Assessments (Habitat Env
Svcs/Env Advisory Svcs) SF LBE-MBE (Micro)
2.00%
Cadnet Computer Aided Design (CAD) –
Asset Mgmt Svcs SF LBE-WBE (Micro) 2.50%
Chaves & Associates
Database Development &
Analysis/Records Mgmt & Storage
(Doc Controls)
SF LBE-WBE (Small)
2.00%
Coast Ridge Ecology, LLC
Habitat Env Svcs/Env Advisory Svcs
(Biological Assessment and
Vegatation)
SF LBE-OBE (Micro)
2.50%
Davis & Associates
Communications
Community Relations/Public Affairs,
Public Relations, Crisis Mgmt
(Public Ed)
SF LBE-MBE (Micro)
1.50%
Divis Consulting, LLC Geotechnical Engineering (Including Materials Testing) SF LBE-OBE (Micro)
2.00%
KKL Consulting, LLC Water Resources Eng/Civil Eng
(Hydro- System Planning and Eng) SF LBE-MBE (Micro)
0.50%
M. Lee Corporation Value/Quality Eng. Construction
Mgmt (Cost Estimating) SF LBE-MBE (Small) 2.75%
McGovern McDonald
Engineers
Civil Eng/Water Resources Eng
(Water Supply) SF LBE-WBE (Micro)
1.00%
Natalie Macris Technical Writing and Editing SF LBE-WBE (Micro)
0.50%
Meridian Surveying
Engineering Aerial & Land Surveying SF LBE-OBE (Micro)
2.00%
TOTAL 20.25%
1 This communication was provided by AECOM/WRE JV to CMD via email correspondences on July 21, 2025.
As of August 7, 2025, the LBE participation achieved by AECOM/WRE JV is as follows:
Subconsultant Scope of Work LBE Status,
Type and Size Credited
Participation
LBE Participation To-Date—NOT
including Modification No. 1
($2,945,342.10 invoiced)
AEW Engineering
Hazardous Material
(Env. & Regulatory
Compliance)
SF LBE-MBE
(Micro)
1.00%
$0.00
0.00%
BioMAas
Biological
Assessments (Habitat
Env Svcs/Env
Advisory Svcs)
SF LBE-MBE
(Micro)
2.00%
$0.00
0.00%
Cadnet
Computer Aided
Design (CAD) – Asset
Mgmt Svcs
SF LBE-WBE
(Micro)
2.50%
$0.00
0.00%
Chaves &
Associates
Database
Development &
Analysis/Records
Mgmt & Storage (Doc
Controls)
SF LBE-WBE
(Small)
2.00%
$0.00
0.00%
Coast Ridge
Ecology, LLC
Habitat Env Svcs/Env
Advisory Svcs
(Biological
Assessment and
Vegatation)
SF LBE-OBE
(Micro)
2.50%
$0.00
0.00%
Davis &
Associates
Communications
Community
Relations/Public
Affairs, Public
Relations, Crisis
Mgmt (Public Ed)
SF LBE-MBE
(Micro)
1.50%
$0.00
0.00%
Divis Consulting,
LLC
Geotechnical
Engineering
(Including Materials
Testing)
SF LBE-OBE
(Micro)
2.00%
$0.00
0.00%
KKL Consulting,
LLC
Water Resources
Eng/Civil Eng (Hydro-
System Planning and
Eng)
SF LBE-MBE
(Micro)
0.50%
$0.00
0.00%
M. Lee
Corporation
Value/Quality Eng.
Construction Mgmt
(Cost Estimating)
SF LBE-MBE
(Small)
2.75%
$0.00
0.00%
McGovern
McDonald
Engineers
Civil Eng/Water
Resources Eng
(Water Supply)
SF LBE-WBE
(Micro)
1.00%
$19,969.10
0.68%
Natalie Macris Technical Writing and
Editing
SF LBE-WBE
(Micro)
0.50%
$0.00
0.00%
Meridian
Surveying
Engineering
Aerial & Land
Surveying
SF LBE-OBE
(Micro)
2.00%
$0.00
0.00%
Climate Adaptive
Systems, LLC2
Hydrologic and
Hydraulic Modeling
SF LBE-WBE
(Micro)
--
$31,659.50
1.07%
Joe Hill
Consulting
Engineers3
Improvement
Planning for Water
Systems and
Condition
Assessment Services
SF LBE-OBE
(Micro)
--
$0.00
0.00%
LEE Inc.4
Technical Services
and Strategies
related to Repair and
Replacement
Services
SF LBE-WBE
(Small)
--
$272,098.60
9.24%
TOTAL 20.25% $323,727.10 10.99%
Pursuant to communication between AECOM/WRE JV and the SFPUC, due to the As-Needed nature of this contract, some of the listed LBE subconsultants have not yet been utilized to date, this is because the LBE scopes of services have not yet been requested by the SFPUC. Due to said circumstances, CMD followed-up with AECOM/WRE JV and, the JV acknowledged its commitment to meeting its original overall commitment percentage from time of proposal for the entire contract— will remain committed to assigning work to its listed LBE subcontractors and continue to look for opportunities to utilize LBEs on its task orders.
5 That said (also for the entire contract), AECOM/WRE JV does anticipate some of its listed LBE firms will not receive its original listed percentage commitment from time of proposal based on how the task or- ders have been trending. As such, the JV reallocated the projected LBE participation for some of its listed LBE firms accordingly.
Further, in good faith, the JV added four (4) LBE firms onto its team to increase its overall LBE participation (as referenced in footnote)
Based on the foregoing and taking into consideration the proposed increase and the original contract amount, AECOM/WRE JV foresees it will meet its original overall LBE subconsulting participation commitment of 20.25% with the following:
Subconsultant
Scope of Work
LBE Status,
Type and Size
Credited
Participation
Projected LBE Participation —
Including Modification No. 1
(Based on $7.5M not to exceed
amount)
AEW Engineering
Hazardous Material
(Env. & Regulatory
Compliance)
SF LBE-MBE
(Micro)
1.00%
$25,000.00
0.33%
2 The JV added this firm onto its team after contract award. 3 The JV added this firm onto its team after contract award. 4 The JV added this firm onto its team after contract award. 5 This communication was provided by the JV to CMD via email correspondences on July 21, 2025.
BioMAas
Biological
Assessments (Habitat
Env Svcs/Env Advisory
Svcs)
SF LBE-MBE
(Micro)
2.00%
$65,000.00
0.87%
Cadnet
Computer Aided
Design (CAD) – Asset
Mgmt Svcs
SF LBE-WBE
(Micro)
2.50%
$75,000.00
1.00%
Chaves & Associates
Database
Development &
Analysis/Records
Mgmt & Storage (Doc
Controls)
SF LBE-WBE
(Small)
2.00%
$65,000.00
0.87%
Coast Ridge Ecology,
LLC
Habitat Env Svcs/Env
Advisory Svcs
(Biological
Assessment and
Vegatation)
SF LBE-OBE
(Micro)
2.50%
$80,000.00
1.07%
Davis & Associates
Communications
Community
Relations/Public
Affairs, Public
Relations, Crisis Mgmt
(Public Ed)
SF LBE-MBE
(Micro)
1.50%
$40,000.00
0.53%
Divis Consulting, LLC
Geotechnical
Engineering (Including
Materials Testing)
SF LBE-OBE
(Micro)
2.00%
$65,000.00
0.87%
KKL Consulting, LLC
Water Resources
Eng/Civil Eng (Hydro-
System Planning and
Eng)
SF LBE-MBE
(Micro)
0.50%
$25,000.00
0.33%
M. Lee Corporation
Value/Quality Eng.
Construction Mgmt
(Cost Estimating)
SF LBE-MBE
(Small)
2.75%
$137,500.00
1.83%
McGovern McDonald
Engineers
Civil Eng/Water
Resources Eng (Water
Supply)
SF LBE-WBE
(Micro)
1.00%
$135,000.00
1.80%
Natalie Macris Technical Writing and
Editing
SF LBE-WBE
(Micro)
0.50%
$30,000.00
0.40%
Meridian Surveying
Engineering
Aerial & Land
Surveying
SF LBE-OBE
(Micro)
2.00%
$54,000.00
0.72%
Climate Adaptive
Systems, LLC
Hydrologic and
Hydraulic Modeling
SF LBE-WBE
(Micro)
--
$140,090.00
1.87%
Joe Hill Consulting
Engineers
Improvement
Planning for Water
Systems and
Condition Assessment
Services
SF LBE-OBE
(Micro)
--
$310,000.00
4.13%
LEE Inc.
Technical Services and
Strategies related to
Repair and
Replacement Services
SF LBE-WBE
(Small)
--
$272,098.60
3.63%
TOTAL 20.25% $1,518,688.60 20.25%
The SFPUC staff and AECOM/WRE JV shall continue to notify CMD of any changes that may impact LBE participation. Additionally, SFPUC staff and/or AECOM/WRE JV must continue to notify CMD of any pro- posed subconsultant additions and/or substitutions throughout the term of this contract. Contingent upon the conditions set forth above, CMD concurs with this amendment.
Should you have any questions, please contact Jason Chow at [email protected] .
City & County of San Francisco
Daniel Lurie, Mayor
Office of the City Administrator
Carmen Chu, City Administrator
Contract Monitoring Division
Regina Chan, Director
MEMORANDUM
Date: August 13, 2025
To: Amelia Clark, SFPUC
From: Jason Chow, CMD
Subject: PRO.0188.C As-Needed Technical and Specialized Services, Water Enterprise CMD Amendment #1 (SFPUC’s Amendment #2) Review
SFPUC has requested to modify the above referenced contract by $2,500,000.00 for a total contract agreement amount of not-to-exceed $7,500,000.00 with no change to the contract duration. This request is to perform short-term, highly specialized work on an as-needed basis related to the operations and management of the SFPUC Water Enterprise covering the following service areas: Water supply services, Water quality services, Water treatment services, Natural resources services, Management improvement services, Asset management services, Land management services, Security and emergency response services, Environmental and regulatory compliance services, Health and safety services, and Customer-related analytical services.
LBE Joint Venture Partner Participation Commitment:
At the time of award, WC/SRT JV received a 7.5% rating bonus because the proposed joint venture included 40% in prime level participation by SRT, the LBE joint venture partner. This commitment applies to the entire contract, including any amendments.
The breakdown of the to-date achieved/projected to be achieved prime level work by the joint venture WC/SRT JV is as follows:
JV Partners JV Commitment JV Participation To-Date Projected JV Participation— Including Amendment #1
Woodard & Curran Inc.
(Non-LBE)
60%
$645,638.58
42.08% $2,102,733.97 60%
SRT Consultants (LBE) 40% $888,533.97 57.92% $1,404,322.65 40% TOTAL: $1,534,172.55 100.00% $3,507,056.62 100.00%
Based on the information provided by WC-ATS JV, they will meet their LBE JV participation commitment percentage for the overall contract (see table above). Further, the LBE JV partner’s participation to-date is currently exceeding it’s 40% commitment (also referenced in the table above).
1455 Market Street, 16A Suite, San Francisco, CA 94103
Telephone (415) (415) 554-0630 General Email [email protected]
LBE Subconsultant Participation Commitment:
The LBE subcontracting participation requirement established for this contract is 15%. The LBE subcontracting participation requirement applies to the entire contract including any modifications, change orders and amendments.
The LBE participation reflected on the Prime subconsultant, WC/SRT JV, CMD’s Form 2A at the time of proposal is as follows:
Subcontractor Scope of Work LBE Status, Type
and Size Credited Participation
AEW Engineering
Environmental Advisory Services,
Hazardous Waste and Remediation
Services
SF LBE-MBE (Micro)
2.00%
Cindy Potter Graphic
Design
Computer Graphics and Graphic
Arts SF LBE-WBE (Micro) 2.40%
Divis Consulting Geotechnical Engineering
SF LBE-OBE (Micro)
0.50%
CDIM Engineering
Environmental/civil engineering
and regulatory support
for water treatment plants
SF LBE-OBE (Micro)
2.10%
Coast Ridge Ecology, LLC Biological Services
SF LBE-OBE (Micro)
5.00%
Chaves & Associates Program and project controls,
document management
SF LBE-WBE (Small)
1.00%
Cornerstone Consulting
Diversity, equity, and inclusion
training and strategy
implementation
SF LBE-MBE (Micro)
2.00%
TOTAL:
15.00%
As of June 30, 2025, the LBE participation achieved by WC/SRT JV is as follows:
Subconsultant
Scope of Work LBE Status,
Type and Size Credited
Participation
LBE Participation To-Date—NOT
including Modification No. 1
($2,496,569.83 invoiced)
AEW Engineering
Environmental
Advisory Services,
Hazardous Waste and
Remediation Services
SF LBE-MBE
(Micro)
2.00%
$0.00
0.00%
Cindy Potter
Graphic Design
Computer Graphics
and Graphic Arts
SF LBE-WBE
(Micro)
2.40%
$22,106.51
0.89%
Divis Consulting Geotechnical
Engineering
SF LBE-OBE
(Micro)
0.50%
$10,609.45
0.42%
CDIM Engineering
Environmental/civil
engineering and
regulatory support
for water treatment
plants
SF LBE-OBE
(Micro)
2.10%
$103,504.48
4.14%
Coast Ridge
Ecology, LLC Biological Services SF LBE-OBE
(Micro) 5.00% $0.00 0.00%
Chaves &
Associates
Program and project
controls, document
management
SF LBE-WBE
(Small)
1.00%
$282,044.90
11.30%
Cornerstone
Consulting
Diversity, equity, and
inclusion training and
strategy
implementation
SF LBE-MBE
(Micro)
2.00%
$0.00
0.00%
TOTAL 15.00% $418,265.34 16.75%
Pursuant to communication between WC/SRT JV and the SFPUC, due to the As-Needed nature of this contract, some of the listed LBE subconsultants have not yet been utilized to date, this is because the LBE scopes of services have not yet been requested by the SFPUC. Due to said circumstances, CMD fol- lowed-up with WC/SRT JV and, the JV acknowledged its commitment to meeting its original overall com- mitment percentage from time of proposal for the entire contract— will remain committed to assigning work to its listed LBE subcontractors and continue to look for opportunities to utilize LBEs on its task or- ders.1
That said (also for the entire contract), WC/SRT JV does anticipate some of its listed LBE firms will not receive its original listed percentage commitment from time of proposal based on how the task orders have been trending. As such, the JV has reallocated the projected LBE participation for some of its listed LBE firms accordingly.
Based on the foregoing and taking into consideration the proposed increase and the original contract amount, WC/SRT JV foresees it will meet its original overall LBE subconsulting participation commitment of 15.00% with the following:
Subconsultant
Scope of Work
LBE Status,
Type and Size
Credited
Participation
Projected LBE Participation —
Including Modification No. 1
(Based on $7.5M not to exceed
amount)
AEW Engineering
Environmental
Advisory Services,
Hazardous Waste and
Remediation Services
SF LBE-MBE
(Micro)
2.00%
$120,428.57
1.61%
Cindy Potter Graphic
Design
Computer Graphics
and Graphic Arts
SF LBE-WBE
(Micro)
2.40%
$144,514.29
1.93%
Divis Consulting Geotechnical
Engineering
SF LBE-OBE
(Micro)
0.50%
$30,107.14
0.40%
1 This communication was provided by the JV to CMD via email correspondences on July 21, 2025.
CDIM Engineering
Environmental/civil
engineering and
regulatory support
for water treatment
plants
SF LBE-OBE
(Micro)
2.10%
$126,450.00
1.69%
Coast Ridge Ecology,
LLC
Biological Services
SF LBE-OBE
(Micro)
5.00%
$301,071.43
4.01%
Chaves & Associates
Program and project
controls, document
management
SF LBE-WBE
(Small)
1.00%
$282,044.90
3.75%
Cornerstone Consulting
Diversity, equity, and
inclusion training and
strategy
implementation
SF LBE-MBE
(Micro)
2.00%
$120,428.57
1.61%
TOTAL 15.00% $1,125,044.90 15.00%
The SFPUC staff and WC/SRT JV shall continue to notify CMD of any changes that may impact LBE partici- pation. Additionally, SFPUC staff and/or WC/SRT JV must continue to notify CMD of any proposed sub- consultant additions and/or substitutions throughout the term of this contract. Contingent upon the conditions set forth above, CMD concurs with this amendment.
Should you have any questions, please contact Jason Chow at [email protected] .
City & County of San Francisco
Daniel Lurie, Mayor
Office of the City Administrator
Carmen Chu, City Administrator
Contract Monitoring Division
Regina Chan, Director
MEMORANDUM
Date: August 13, 2025
To: Amelia Clark, SFPUC
From: Jason Chow, CMD
Subject: PRO.0188.D As-Needed Technical and Specialized Services, Water Enterprise CMD Amendment #1 (SFPUC’s Amendment #2) Review
SFPUC has requested to modify the above referenced contract by $2,500,000.00 for a total contract agreement amount of not-to-exceed $7,500,000.00 with no change to the contract duration. This request is to perform short-term, highly specialized work on an as-needed basis related to the operations and management of the SFPUC Water Enterprise covering the following service areas: Water supply services, Water quality services, Water treatment services, Natural resources services, Management improvement services, Asset management services, Land management services, Security and emergency response services, Environmental and regulatory compliance services, Health and safety services, and Customer-related analytical services.
LBE Joint Venture Partner Participation Commitment:
At the time of award, BC/Lotus JV received a 7.5% rating bonus because the proposed joint venture included 40% in prime level participation by Lotus, the LBE joint venture partner. This commitment applies to the entire contract, including any amendments.
The breakdown of the to-date achieved/projected to be achieved prime level work by the joint venture BC/Lotus JV is as follows:
JV Partners JV Commitment JV Participation To-Date Projected JV Participation— Including Amendment #1
BC (Non-LBE)
60% $828,095.00 67.79% $2,860,000.00 60%
Lotus (LBE) 40% $393,501.00 32.21% $1,882,500.00 40%
TOTAL: $1,221,596.00 100.00% $4,742,500.00 100.00%
Based on the information provided by BC/Lotus JV, they will meet their LBE JV participation commitment percentage for the overall contract (see table above). However, the LBE JV partner’s participation to-date is less than the 40% commitment. As such, CMD will continue to closely monitor the JV participation on this contract. That said, CMD reminded the JV, that the LBE JV partner
1455 Market Street, 16A Suite, San Francisco, CA 94103
Telephone (415) (415) 554-0630 General Email [email protected] 1 This communication was provided by the JV to CMD via email correspondences on August 12, 2025. participation commitment of 40% will need to be achieved at the end. If not, then CMD, potentially can impose sanctions—BC/Lotus JV acknowledged the importance of this matter.1
LBE Subconsultant Participation Commitment:
The LBE subcontracting participation requirement established for this contract is 15%. The LBE subcontracting participation requirement applies to the entire contract including any modifications, change orders and amendments.
The LBE participation reflected on the Prime subconsultant, BC/Lotus JV, CMD’s Form 2A at the time of proposal is as follows:
Subcontractor Scope of Work LBE Status, Type
and Size Credited Participation
AEW Engineering,
Inc.
Water Quality, Security and
Emergency Response
Environmental and Regulatory
Compliance, Health and Safety
SF LBE-MBE (Micro)
3.00%
BioMaAS, Inc. Natural Resources, Land
Management
SF LBE-MBE (Small)
2.00%
CDIM Engineering Inc.
Asset Management, Environmental
and
Regulatory Compliance
SF LBE- OBE (Micro)
3.00%
Chaves & Associates Water Quality, Management
Improvement
SF LBE-WBE (Small)
2.00%
Coast Ridge Ecology, LLC Natural Resources SF LBE- OBE (Micro) 3.00%
InCommon LLC. Management Improvement,
Customer Services
SF LBE-WBE (Micro)
2.00%
DBA InkeDesign Management Improvement,
Customer Services
SF LBE-WBE (Micro)
3.00%
Pathways Climate
Institute LLC
Water Supply, Management
Improvement, Asset Management
SF LBE-WBE (Micro)
3.00%
TOTAL 21.00%
As of August 1, 2025, the LBE participation achieved by BC/Lotus JV is as follows:
Subconsultant
Scope of Work LBE Status,
Type and Size Credited
Participation
LBE Participation To-Date—NOT
including Modification No. 1
($2,705,461.00 invoiced)
AEW Engineering,
Inc.
Water Quality,
Security and
Emergency Response
Environmental and
Regulatory
Compliance, Health
and Safety
SF LBE-MBE
(Micro)
3.00%
$107,593.00
3.98%
BioMaAS, Inc. Natural Resources,
Land Management
SF LBE-MBE
(Small)
2.00%
$0.00
0.00%
CDIM Engineering
Inc.
Asset Management,
Environmental and
Regulatory
Compliance
SF LBE- OBE
(Micro)
3.00%
$270,570.00
10.00%
Chaves &
Associates
Water Quality,
Management
Improvement
SF LBE-WBE
(Small)
2.00%
$192,083.00
7.10%
Coast Ridge
Ecology, LLC Natural Resources SF LBE- OBE
(Micro)
3.00%
$0.00
0.00%
InCommon LLC.
Management
Improvement,
Customer Services
SF LBE-WBE
(Micro)
2.00%
$0.00
0.00%
DBA InkeDesign
Management
Improvement,
Customer Services
SF LBE-WBE
(Micro)
3.00%
$0.00
0.00%
Pathways Climate
Institute LLC
Water Supply,
Management
Improvement, Asset
Management
SF LBE-WBE
(Micro)
3.00%
$0.00
0.00%
Lee Inc.2
Civil Engineering and
Construction
Management
SF LBE-WBE
(Small)
-- $339,923.00 12.56%
TOTAL 21.00% $910,169.00 33.64%
Pursuant to communication between BC/Lotus JV and the SFPUC, due to the As-Needed nature of this contract, some of the listed LBE subconsultants have not yet been utilized to date (despite currently ex- ceeding its original overall LBE subconsultant participation commitment percentage), this is because the LBE scopes of services have not yet been requested by the SFPUC. Due to said circumstances, CMD fol- lowed-up with BC/Lotus JV and, the JV acknowledged its commitment to meeting its original overall commitment percentage from time of proposal for the entire contract— will remain committed to as- signing work to its listed LBE subcontractors and continue to look for opportunities to utilize LBEs on its task orders.3
That said (also for the entire contract), BC/Lotus does anticipate some of its listed LBE firms will not re- ceive its original listed percentage commitment from time of proposal based on how the task orders have been trending. As such, BC/Lotus reallocated the projected LBE participation for some of its listed LBE firms accordingly.
2 The JV added this firm onto its team after contract award. 3 This communication was provided by the JV to CMD via email correspondences on August 12, 2025.
Further, in good faith, BC/Lotus JV added one (1) LBE firm onto its team to increase its overall LBE participation (as referenced in footnote)
Based on the foregoing and taking into consideration the proposed increase and the original contract amount, BC/Lotus JV foresees it will meet its original overall LBE subconsulting participation commitment of 21.00% with the following:
Subconsultant
Scope of Work
LBE Status,
Type and Size
Credited
Participation
Projected LBE Participation —
Including Modification No. 1
(Based on $7.5M not to exceed
amount)
AEW Engineering,
Inc.
Water Quality,
Security and
Emergency Response
Environmental and
Regulatory
Compliance, Health
and Safety
SF LBE-MBE
(Micro)
3.00%
$225,000.00
3.00%
BioMaAS, Inc. Natural Resources,
Land Management
SF LBE-MBE
(Small)
2.00%
$100,000.00
1.33%
CDIM Engineering Inc.
Asset Management,
Environmental and
Regulatory
Compliance
SF LBE- OBE
(Micro)
3.00%
$200,000.00
2.66%
Chaves & Associates
Water Quality,
Management
Improvement
SF LBE-WBE
(Small)
2.00%
$150,000.00
2.00%
Coast Ridge Ecology,
LLC
Natural Resources
SF LBE- OBE
(Micro)
3.00%
$150,000.00
2.00%
InCommon LLC.
Management
Improvement,
Customer Services
SF LBE-WBE
(Micro)
2.00%
$100,000.00
1.33%
DBA InkeDesign
Management
Improvement,
Customer Services
SF LBE-WBE
(Micro)
3.00%
$150,000.00
2.00%
Pathways Climate
Institute LLC
Water Supply,
Management
Improvement, Asset
Management
SF LBE-WBE
(Micro)
3.00%
$150,000.00
2.00%
LEE Inc.
Civil Engineering and
Construction
Management
SF LBE-WBE
(Small)
-- $350,000.00 4.68%
TOTAL 21.00% $1,575,000.00 21.00%
The SFPUC staff and BC/Lotus JV shall continue to notify CMD of any changes that may impact LBE par- ticipation. Additionally, SFPUC staff and/or BC/Lotus JV must continue to notify CMD of any proposed subconsultant additions and/or substitutions throughout the term of this contract. Contingent upon the conditions set forth above, CMD concurs with this amendment.